IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2009-10-28

DGFT Committee Minutes

Document text

RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   MINUTES OF THE NORMS COMMITTEE­II MEETING NO. 30/10 SCHEDULED TO BE HELD ON 27.10.2009 BUT ACTUALLY HELD ON 17.11.2009. The Meeting No. 30/10 of Norms Committee­II was held on 17.11.2009 for the licensing year 2009­2010 under the Chairmanship of Sh. A. KOMU, Addl. Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorizations under Duty Exemption Scheme (Chapter­4) of Foreign Trade Policy 2004­2009. The following members were present in the meeting:­ S.No Name of the representatives & their Designation   Deptt.   1. 2. 3. 4. 5.   Sh. B.D. Ghosh, Jt. IA Sh. S.K. Jain, D.O. Sh. Gajraj Singh, Sr. D.O. Sh. K.K. Funda, Asst. Dir. Shri Shyam Sunder, Dy. DGFT M/o Steel DIPP DHI DC(MSME) DGFT 6.   Shri Narendra Vashista, FTDO DGFT             The Committee took up the individual cases of the agenda of this meeting for discussion and the decision taken in respect of each case is as follows: 1

Case No.:1134/26/81­ALC2/2007

Party Name:BHARAT ELECTRONICS LTD. Meet No/Date:30/81­ALC2/2009 27.10.2009 Status: Deferred and Re­ indexed HQ File :01/81/050/00573/AM06/ RLA File :07/24/040/00521/AM06/ Lic.No/Date:0710040666 05.10.2005 Defer Date:22.12.2009 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. It has been verified from DES­I that the norms for the subject AA are not yet ratified. Hence it has been decided to refer a copy of the application of the firm to DIPP for comments. The case stands deferred and to be relisted on 22.12.2009.     2

Case No.:12/38/81­ALC2/2008

Party Name:PERMASTEELISA (INDIA) PVT. LTD., 27.10.2009 Status: Withdrawn

HQ File :01/81/050/00574/AM09/ RLA File :07/24/040/00425/AM08/ Lic.No/Date:0710053353 14.09.2007   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. This case has already been ratified in NC meeting no. 03/81 dated 15.04.2008. Hence it has been decided to withdraw the case.   3

Case No.:12/40/81­ALC2/2007

Party Name:POWER GEAR LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00450/AM08/ RLA File :07/24/040/00600/AM08/ Lic.No/Date:0710054616 22.11.2007 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that  the  comments  from  DHI  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands deferred and to be relisted on 22.12.2009.   4

Case No.:44/2/81­ALC2/2008

Party Name:DELTON CABLES LTD. 27.10.2009 Status: Rejected HQ File :01/81/050/00738/AM08/ RLA File :05/24/040/00814/AM08/ Lic.No/Date:0510215720 31.01.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders and therefore, decided to reject the request of the firm.   R/A may take suitable consequential action accordingly.     5

Case No.:45/2/81­ALC2/2008

Party Name:CONTROL & SWITCHGEAR CO LTD. 27.10.2009 Status: Rejected HQ File :01/81/050/00739/AM08/ RLA File :05/24/040/00838/AM08/ Lic.No/Date:0510215910 06.02.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders and therefore, decided to reject the request of the firm.  

6

Case No.:15/9/81­ALC2/2008

Party Name:LAMBDA TELEVENTURE 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00115/AM09/ RLA File :05/24/040/00868/AM08/ Lic.No/Date:0510216256 12.02.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that  the  comments  from  DOT  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands   7

Case No.:45/15/81­ALC2/2008

Party Name:CIM TOOLS PVT.LTD., 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00213/AM09/ RLA File :07/24/040/00815/AM08/ Lic.No/Date:0710056594 26.03.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 22.12.2009.     8

Case No.:38/15/81­ALC2/2008

Party Name:NAMO ALLOYS P.LTD. 27.10.2009 Status: Rejected HQ File :01/81/050/00206/AM09/ RLA File :05/24/040/00962/AM08/ Lic.No/Date:0510219169 09.04.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders and therefore, decided to reject the request of the firm.     9

Case No.:61/15/81­ALC2/2008

Party Name:CIM TOOLS PVT.LTD., 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00229/AM09/ RLA File :07/24/040/00099/AM09/ Lic.No/Date:0710058177 27.06.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred

10

Case No.:32/18/80­ALC2/2008

Party Name:TRANSLLOY INDIA PVT. LTD., 27.10.2009 Status: Approved HQ File :01/80/050/00701/AM09/ RLA File :03/95/040/00293/AM09/ Lic.No/Date:0310478002 09.07.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The NC decided to ratify the  norms  on  repeat  basis  on  the  basis  of  ad­hoc  norms  fixed  in  meeting  no.  50/81  dated  11.03.2008  in  case  of  licence  no. 0310439763 dated 16.08.2007. Verified the said decision and it was decided to ratify the norms in this case on repeat basis.       11

Case No.:18/21/81­ALC2/2008

Party Name:L M GLASFIBER (INDIA) PVT LTD 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00329/AM09/ RLA File :07/24/040/00216/AM09/ Lic.No/Date:0710059071 13.08.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands   12

Case No.:12/23/81­ALC2/2008

Party Name:ALSTOM PROJECTS INDIA LIMITED, 27.10.2009 Status: Approved HQ File :01/81/050/00346/AM09/ RLA File :03/94/040/00407/AM09/ Lic.No/Date:0310483438 22.08.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of DHI  vide their U.O. No. 3(79)/2009/TSW(B)/394 dated 21.10.2009 as below:­   i)                    Quantity of import item No.1 may be allowed as applied by the firm including 1% wastage. ii)                  Total CIF value of import items at S.No. 2 to 8 and 11 to 15(insulating material) may be restricted upto 15% of FOB value. iii)                Import item No. 9 & 10 may be allowed as applied by the firm.  

13

Case No.:15/38/81­ALC2/2008

Party Name:VEEGEE INDUSTRIAL ENTERPRISES PVT. LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00577/AM09/ RLA File :05/24/040/00168/AM09/ Lic.No/Date:0510227078 08.09.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   14

Case No.:12/25/81­ALC2/2008

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 27.10.2009 Status: Approved HQ File :01/81/050/00380/AM09/ RLA File :05/24/040/00387/AM09/ Lic.No/Date:0510227339 11.09.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of DHI  vide their U.O. No. 3(16)/2009/TSW(B)/381 dated 05.10.2009 as below:­   1.      Weight of export product no. 1 may be indicated as 42.6 Kg/unit. 2.      Weight of export product no. 2 may be indicated as 15.3 Kg/unit. 3.      Weight of export product no. 3 may be indicated as 27 Kg/unit. 4.      The export product No. 2 & 3 may be amended by inserting word “Alloy” after aluminium. 5.      Import item No.1 may be allowed as 1995 Kg. including 1% wastage. 6.      Import item No.2 may be allowed as 7715.62 Kg. including 5% wastage. 7.      Import item No.3 may be allowed as 1150 Kg. including 5% wastage.       15

Case No.:17/38/81­ALC2/2008

Party Name:DIAMOND ENGINEERING (CHENNAI) PVT LTD 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00579/AM09/ RLA File :04/24/040/00147/AM09/ Lic.No/Date:0410098572 12.09.2008 Defer Date:22.12.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The representative of DIPP informed that the reply received from the firm is not proper and the committee further decided to call for the following information from the firm and to re­list the case on 22.12.2009: ­   1.      Firm may be asked to clarify the value of welding consumables which is  very high at approximately 91% of FOB value  of exports. 2.      FOB value of exports is unreasonably low at Rs.1382/MT and the same may be clarified by the firm. 3.      Firm may also be advised to submit information in respect of S.No.1, 3, 5, 11 & 13 of Standard Deficiency Format, export product wise.     16

Case No.:1/38/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 27.10.2009 Status: Rejected HQ File :01/81/050/00546/AM09/ RLA File :05/24/040/00972/AM08/ Lic.No/Date:0510227684 17.09.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders and therefore, decided to reject the request of the firm.       17

Case No.:25/28/80­ALC2/2008

Party Name:NATIONAL STEEL AND AGRO INDUSTRIES LTD., 27.10.2009 Status: Withdrawn HQ File :01/80/050/01106/AM09/ RLA File :11/24/040/00037/AM09/ Lic.No/Date:1110018442 19.09.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. This case has already been ratified in NC meeting no. 03/81 dated 14.07.2008. Hence it has been decided to withdraw the case.   18

Case No.:17/29/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00434/AM09/ RLA File :61/24/040/00039/AM09/ Lic.No/Date:6110000219 22.09.2008 Defer Date:22.12.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   19

Case No.:3/29/81­ALC2/2008

Party Name:PSL LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00420/AM09/ RLA File :03/95/040/00545/AM09/ Lic.No/Date:0310487951 26.09.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee decided that a copy of the reply received from the firm may be referred to DHI for examination and comments. The case stands deferred     20

Case No.:10/29/81­ALC2/2008

Party Name:TRIVENI BIALETTI INDUSTRIES PVT. LTD. 27.10.2009 Status: Rejected HQ File :01/81/050/00427/AM09/ RLA File :03/95/040/00581/AM09/ Lic.No/Date:0310488215 29.09.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders and therefore, decided to reject the request of the firm.     21

Case No.:5/29/81­ALC2/2008

Party Name:BHUSHAN STEEL LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00422/AM09/ RLA File :05/24/040/00350/AM09/ Lic.No/Date:0510228478 29.09.2008 Defer Date:08.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the case is under examination of M/o Steel. The case stands short deferred and to be relisted on 08.12.2009.   22

Case No.:2/38/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00547/AM09/ RLA File :05/24/040/00974/AM08/ Lic.No/Date:0510228825 03.10.2008 Defer Date:22.12.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred     23

Case No.:14/38/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00576/AM09/ RLA File :05/24/040/00971/AM08/ Lic.No/Date:0510228820 03.10.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   24

Case No.:18/29/81­ALC2/2008

Party Name:AREVA T & D INDIA LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00435/AM09/ RLA File :04/24/040/00331/AM08/ Lic.No/Date:0410099017 06.10.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee decided to forward the case file to DHI for detailed study. The case stands deferred and to be relisted on 22.12.2009.   25

Case No.:19/29/81­ALC2/2008

Party Name:AREVA T & D INDIA LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00436/AM09/ RLA File :04/24/040/00298/AM08/ Lic.No/Date:0410099018 06.10.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee decided to forward the case file to DHI for detailed study. The case stands deferred and to be relisted on 22.12.2009.   26

Case No.:20/29/81­ALC2/2008

Party Name:AREVA T & D INDIA LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00437/AM09/ RLA File :04/24/040/00420/AM08/ Lic.No/Date:0410099019 06.10.2008 Defer Date:22.12.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee decided to forward the case file to DHI for detailed study. The case stands deferred and to be relisted on 22.12.2009.   27

Case No.:21/29/81­ALC2/2008

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00438/AM09/ RLA File :35/24/040/00017/AM09/ Lic.No/Date:3510024822 06.10.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee decided that a copy of the reply received from the firm may be referred to M/o Mines for examination and comments. The case stands   28

Case No.:25/29/81­ALC2/2008

Party Name:MAHENDRA INDUSTRIES 27.10.2009 Status: Rejected HQ File :01/81/050/00442/AM09/ RLA File :07/24/040/00372/AM09/ Lic.No/Date:0710060318 07.10.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders and therefore, decided to reject the request of the firm.     29

Case No.:30/29/81­ALC2/2008

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00447/AM09/ RLA File :35/24/040/00018/AM09/ Lic.No/Date:3510024830 10.10.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee decided that a copy of the reply received from the firm may be referred to M/o Mines for examination and comments. The case stands     30

Case No.:41/29/81­ALC2/2008

Party Name:JSW STEEL LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00458/AM09/ RLA File :03/94/040/00476/AM09/ Lic.No/Date:0310490039 13.10.2008 Defer Date:08.12.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the case is under examination of M/o Steel. The case stands short deferred and to be relisted on 08.12.2009.   31

Case No.:42/29/81­ALC2/2008

Party Name:TECHNO TRACK ENGINEERS(PROP. ASHOK R. SONAWANE) 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00459/AM09/ RLA File :31/24/040/00185/AM09/ Lic.No/Date:3110035743 13.10.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The representative of DIPP informed that the reply received from the firm is not proper and the committee further decided to call for the following information from the firm and to re­list the case on 22.12.2009: ­   1. Information in respect of S.No. 4 & 11 of Standard Deficiency Letter – export product­wise.       32

Case No.:3/36/81­ALC2/2008

Party Name:L M GLASFIBER (INDIA) PVT LTD 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00518/AM09/ RLA File :07/24/040/00436/AM09/ Lic.No/Date:0710061007 12.11.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands     33

Case No.:7/36/81­ALC2/2008

Party Name:K.S.INSTRUMENTS PVT.LTD., 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00522/AM09/ RLA File :07/24/040/00457/AM09/ Lic.No/Date:0710061076 17.11.2008 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the reply has been given by the party to MIT and we may remind MIT for comments. The case stands deferred and to be relisted on 22.12.2009.

34

Case No.:8/36/81­ALC2/2008

Party Name:AJMERA REALTY & INFRA INDIA LTD 27.10.2009 Status: Rejected HQ File :01/81/050/00523/AM09/ RLA File :31/24/040/00193/AM09/ Lic.No/Date:3110036110 17.11.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders and therefore, decided to reject the request of the firm.     35

Case No.:9/36/81­ALC2/2008

Party Name:AJMERA REALTY & INFRA INDIA LTD 27.10.2009 Status: Rejected HQ File :01/81/050/00524/AM09/ RLA File :31/24/040/00206/AM09/ Lic.No/Date:3110036111 17.11.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders and therefore, decided to reject the request of the firm.       36

Case No.:19/36/81­ALC2/2008

Party Name:BLOOMENERGY INDIA PRIVATE LIMITED, 27.10.2009 Status: Rejected HQ File :01/81/050/00534/AM09/ RLA File :07/24/040/00453/AM09/ Lic.No/Date:0710061125 18.11.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders and therefore, decided to reject the request of the firm.     37

Case No.:8/38/81­ALC2/2008

Party Name:AREVA T & D INDIA LIMITED 27.10.2009 Status: Rejected HQ File :01/81/050/00553/AM09/ RLA File :04/24/040/00118/AM08/ Lic.No/Date:0410100312 25.11.2008

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders and therefore, decided to reject the request of the firm.     38

Case No.:30/38/81­ALC2/2008

Party Name:SHAKUN POLYMERS LIMITED, 27.10.2009 Status: Withdrawn HQ File :01/81/050/00592/AM09/ RLA File :34/24/040/00159/AM09/ Lic.No/Date:3410022845 04.12.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. RA has informed that the AA has been issued on repeat basis as per NC decision taken in r/o licence no. 3410021265 dated 29.04.2008 in meeting no. 15/81 dated 15.07.2008. Hence decided to withdraw the case on the part of NC.       39

Case No.:3/44/81­ALC2/2008

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00663/AM09/ RLA File :35/24/040/00023/AM09/ Lic.No/Date:3510025556 05.01.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee decided that a copy of the reply received from the firm may be referred to M/o Mines for examination and comments. The case stands   40

Case No.:4/44/81­ALC2/2008

Party Name:TEK ELECTROMECHANICALS PVT LTD 27.10.2009 Status: Rejected HQ File :01/81/050/00664/AM09/ RLA File :31/24/040/00265/AM09/ Lic.No/Date:3110036929 07.01.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. Since, no reply is given to MIT as per DGFT records, the Committee decided to reject the request of the firm.     41

Case No.:5/44/81­ALC2/2008

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 27.10.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00665/AM09/ RLA File :35/24/040/00024/AM09/ Lic.No/Date:3510025570 07.01.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee decided that a copy of the reply received from the firm may be referred to M/o Mines for examination and comments. The case stands     42

Case No.:9/44/81­ALC2/2008

Party Name:SHETRON LTD 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00669/AM09/ RLA File :07/24/040/00556/AM09/ Lic.No/Date:0710062327 09.01.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   43

Case No.:6/48/81­ALC2/2008

Party Name:SUZLON ENERGY LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00711/AM09/ RLA File :31/24/040/00296/AM09/ Lic.No/Date:3110037214 03.02.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands   44

Case No.:4/51/81­ALC2/2008

Party Name:TRANS ENGINEERS INDIA PVT.LTD. 27.10.2009 Status: Rejected HQ File :01/81/050/00750/AM09/ RLA File :31/24/040/00186/AM09/ Lic.No/Date:3110037391 18.02.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders and therefore, decided to reject the request of the firm.  

45

Case No.:7/51/81­ALC2/2008

Party Name:POWER GEAR LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00753/AM09/ RLA File :07/24/040/00613/AM09/ Lic.No/Date:0710063182 20.02.2009 Defer Date:08.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the case is under examination of DHI. The case stands short deferred and to be relisted on 08.12.2009.   46

Case No.:16/51/81­ALC2/2008

Party Name:GARGI ENTERPRISES, 27.10.2009 Status: Approved HQ File :01/81/050/00762/AM09/ RLA File :07/24/040/00638/AM09/ Lic.No/Date:0710063290 26.02.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The NC decided to ratify the norms on repeat basis on the basis of ad­hoc norms fixed by NC­VII in meeting no. 08/81 dated 28.05.2008. Verified the said decision and it was decided to ratify the norms in this case on repeat basis.     47

Case No.:17/51/81­ALC2/2008

Party Name:MOLEX (INDIA) PRIVATE LIMITED, Meet No/Date:30/81­ALC2/2009 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00763/AM09/ RLA File :07/24/040/00618/AM09/ Lic.No/Date:0710063292 26.02.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that  the  comments  from  MIT  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands     48

Case No.:18/51/81­ALC2/2008

Party Name:PERMASTEELISA (INDIA) PVT. LTD., 27.10.2009 Status: Rejected HQ File :01/81/050/00764/AM09/ RLA File :07/24/040/00614/AM09/ Lic.No/Date:0710063303 26.02.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders and therefore, decided to reject the request of the firm.     49

Case No.:7/5/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 27.10.2009 Status: Withdrawn HQ File :01/81/050/00015/AM10/ RLA File :09/24/040/00479/AM09/ Lic.No/Date:0910037711 22.04.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC observed that this case has already been considered in NC meeting dated 13.10.2009 and decided to withdraw from this agenda.   50

Case No.:6/7/81­ALC2/2009

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00026/AM10/ RLA File :07/24/040/00039/AM10/ Lic.No/Date:0710064492 04.05.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the comments form DIPP & MSME are still awaited and therefore decided to remind the them to expedite the same. The case stands deferred and to be relisted on 22.12.2009.     51

Case No.:9/7/81­ALC2/2009

Party Name:MAHENDRA INDUSTRIES 27.10.2009 Status:Approved HQ File :01/81/050/00029/AM10/ RLA File :07/24/040/00038/AM10/ Lic.No/Date:0710064535 05.05.2009 Defer Date:27.10.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. As per online data, the authorisation  is  issued  on  the  basis  of  ad­hoc  norms  fixed  in  meeting  no.  35/81  dated  25.11.2008  in  case  of  licence  no. 0710059808 dated 15.09.2008. Verified the said decision and it was decided to close the case as Norms in this case are on repeat basis .  

52

Case No.:12/7/81­ALC2/2009

Party Name:ALSTRONG ENTERPRISES 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00032/AM10/ RLA File :05/24/040/00464/AM09/ Lic.No/Date:0510240950 06.05.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   53

Case No.:13/7/81­ALC2/2009

Party Name:ALUPAN COMPOSITEPANELS PVT.LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00033/AM10/ RLA File :05/24/040/00042/AM10/ Lic.No/Date:0510241032 08.05.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred     54

Case No.:14/7/81­ALC2/2009

Party Name:ALUPAN COMPOSITEPANELS PVT.LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00034/AM10/ RLA File :05/24/040/00044/AM10/ Lic.No/Date:0510241033 08.05.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. It may be noted that this is the final reminder and the case will be rejected if reply is not received before the next meeting. The case stands deferred and to be relisted on 22.12.2009.   55

Case No.:15/7/81­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 27.10.2009 Status: Closed HQ File :01/81/050/00035/AM10/ RLA File :03/94/040/00065/AM10/ Lic.No/Date:0310519156 08.05.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  30/81  scheduled  to  be  held  on  27.10.2009  but  actually  held  on  17.11.2009.  Since  RA  has  not forwarded  hard  copy  of  application  despite  reminders,  the  committee  presumed  that  ratification  of  norms  of  the  subject authorisation is not required by RA. Hence, the case was decided to be closed on the part of NC.   RA may take note of the NC decision for information.   56

Case No.:12/9/81­ALC2/2009

Party Name:ITP INFOTECH PRIVATE LTD 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00047/AM10/ RLA File :05/24/040/00102/AM10/ Lic.No/Date:0510241847 20.05.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC observed that MIT has issued D/L to the party and decided to remind party to reply immediately with a copy to DGFT. The case stands deferred and to be relisted on 22.12.2009.     57

Case No.:1/15/81­ALC2/2009

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00087/AM10/ RLA File :05/24/040/00156/AM10/ Lic.No/Date:0510244222 23.06.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee decided that a copy of the reply received from the firm may be referred to DIPP for examination and comments. The case stands deferred   58

Case No.:7/15/81­ALC2/2009

Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00093/AM10/ RLA File :31/24/040/00052/AM10/ Lic.No/Date:3110039008 26.06.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred

59

Case No.:10/15/81­ALC2/2009

Party Name:ITP INFOTECH PRIVATE LTD 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00096/AM10/ RLA File :05/24/040/00187/AM10/ Lic.No/Date:0510244848 30.06.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC observed that MIT has issued D/L to the party and decided to remind party to reply immediately with a copy to DGFT. The case stands deferred and to be relisted on 22.12.2009.     60

Case No.:11/15/81­ALC2/2009

Party Name:DELTON CABLES LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00097/AM10/ RLA File :05/24/040/00614/AM09/ Lic.No/Date:0510244874 30.06.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply latest by 18.12.2009. The case stands deferred and to be relisted on 22.12.2009.   61

Case No.:8/15/81­ALC2/2009

Party Name:R.K.POLYMERS 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00094/AM10/ RLA File :13/24/040/00007/AM10/ Lic.No/Date:1310029212 30.06.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee decided that a copy of the reply received from the firm may be referred to DIPP for examination and comments. The case stands deferred   62

Case No.:13/15/81­ALC2/2009

Party Name:MMTC LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00099/AM10/ RLA File :05/24/040/00164/AM10/ Lic.No/Date:0510244977 01.07.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the case is under examination of M/o Steel. The case stands deferred and to be relisted on 22.12.2009.

63

Case No.:14/15/81­ALC2/2009

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00100/AM10/ RLA File :05/24/040/00177/AM10/ Lic.No/Date:0510244978 01.07.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee decided that a copy of the reply received from the firm may be referred to DIPP for examination and comments. The case stands deferred   64

Case No.:15/15/81­ALC2/2009

Party Name:PEARL INSULATIONS PVT. LIMITED 27.10.2009 Status: Closed HQ File :01/81/050/00101/AM10/ RLA File :07/24/040/00081/AM10/ Lic.No/Date:0710065721 02.07.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  30/81  scheduled  to  be  held  on  27.10.2009  but  actually  held  on  17.11.2009.  Since  RA  has  not forwarded  hard  copy  of  application  despite  reminders,  the  committee  presumed  that  ratification  of  norms  of  the  subject authorisation is not required by RA. Hence, the case was decided to be closed on the part of NC. RA may take note of the NC decision for information.   65

Case No.:2/17/81­ALC2/2009

Party Name:ITP INFOTECH PRIVATE LTD 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00108/AM10/ RLA File :05/24/040/00213/AM10/ Lic.No/Date:0510245289 07.07.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC observed that MIT has issued D/L to the party and decided to remind party to reply immediately with a copy to DGFT. The case stands deferred and to be relisted on 22.12.2009.     66

Case No.:18/17/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00124/AM10/ RLA File :03/95/040/00243/AM10/ Lic.No/Date:0310529299 17.07.2009 Defer Date:22.12.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that  the  comments  from  MIT  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands   67

Case No.:2/18/81­ALC2/2009

Party Name:INTERPLEX ELECTRONICS INDIA PVT.LTD., 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00128/AM10/ RLA File :07/24/040/00098/AM10/ Lic.No/Date:0710066106 23.07.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC observed that MIT has issued D/L to the party and decided to remind party to reply immediately with a copy to DGFT. The case stands deferred and to be relisted on 22.12.2009.   68

Case No.:1/23/81­ALC2/2009

Party Name:INDUSTRIAL METAL POWDERS (INDIA) PVT.LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00154/AM10/ RLA File :31/24/040/00065/AM10/ Lic.No/Date:3110039597 19.08.2009 Defer Date:08.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The NC observed that Hard copy is received and to be forwarded to DC(MSME) for examination and comments. The case stands deferred and to be relisted on 08.12.2009.     69

Case No.:2/23/81­ALC2/2009

Party Name:MOLEX (INDIA) PRIVATE LIMITED, Meet No/Date:30/81­ALC2/2009 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00155/AM10/ RLA File :07/24/040/00200/AM10/ Lic.No/Date:0710066592 19.08.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that the comments from MIT & DOT are still awaited and therefore decided to remind them to expedite the same. The case stands   70

Case No.:3/23/81­ALC2/2009

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 27.10.2009 Status: Approved HQ File :01/81/050/00156/AM10/ RLA File :07/24/040/00198/AM10/ Lic.No/Date:0710066636 21.08.2009

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.No.  30/81  scheduled  to  be  held  on  27.10.2009  but  actually  held  on  17.11.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1. Details as per Annexure­ I.       71

Case No.:4/23/81­ALC2/2009

Party Name:ABIR INFRASTRUCTURE PRIVATE LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00157/AM10/ RLA File :05/23/040/00023/AM10/ Lic.No/Date:0510248276 25.08.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The representative of DIPP informed that the reply received from the firm is not proper and the committee further decided to call for the following information from the firm and to re­list the case on 22.12.2009: ­   1.      Information in respect of S.No. 4, 5, 11 & 11(a) of Standard Deficiency Format, export product wise.     72

Case No.:5/23/81­ALC2/2009

Party Name:JLC ELECTROMET PVT. LTD., 27.10.2009 Status: Approved HQ File :01/81/050/00158/AM10/ RLA File :13/24/040/00014/AM10/ Lic.No/Date:1310029838 25.08.2009

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.No.  30/81  scheduled  to  be  held  on  27.10.2009  but  actually  held  on  17.11.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.           Word “relevant” may be prefixed with the description of export item at S.No.1 and quantity of this item may be allowed as applied for i.e. 18389 Kgs. inclusive of 1% wastage after taking clue from SION C­1801. 2.      Quantity of import item at S.No.2 may be allowed as 22941 Kgs. inclusive of 2% wastage after taking clue from SION C­1801. 3.      Quantity of import item at S.No.3 may be allowed as 30588 Kgs. inclusive of 2% wastage after taking clue from SION C­1801. 4.      Quantity of import item at S.No.4 may be allowed upto 1% of the weight of copper tube to be nickel plated.     73

Case No.:6/23/81­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00159/AM10/ RLA File :31/24/040/00100/AM10/ Lic.No/Date:3110039712 26.08.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The representative of DIPP informed that the reply received from the firm is not proper and the committee further decided to call for the following information from the firm and to re­list the case on 22.12.2009: ­   1. Information in respect of S.No. 5, 11 & 11(a) of Standard Deficiency Format, export product wise.     74

Case No.:7/23/81­ALC2/2009

Party Name:MAHARASHTRA SEAMLESS LTD 27.10.2009 Status: Approved HQ File :01/81/050/00160/AM10/ RLA File :05/24/040/00278/AM10/ Lic.No/Date:0510248398 26.08.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  30/81  scheduled  to  be  held  on  27.10.2009  but  actually  held  on  17.11.2009.   It  was  noted  by  the Committee  that  the  authorisation  has  been  issued  by  RA  on  the  basis  of  ad­hoc  norms  fixed  in  meeting  no.  24/81  dated 15.09.2009 in case of licence no. 0510245972 dated 16.07.2009. Therefore, it was decided to withdraw the case  

75

Case No.:8/23/81­ALC2/2009

Party Name:WELSPUN GUJARAT STAHL ROHREN LTD. 27.10.2009 Status: Approved HQ File :01/81/050/00161/AM10/ RLA File :34/24/040/00080/AM10/ Lic.No/Date:3410024974 26.08.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  30/81  scheduled  to  be  held  on  27.10.2009  but  actually  held  on  17.11.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratified on repeat basis as per Advance Authorization No.3410022343 dated 18.09.2008 ratified in Norms Committee Meeting No. 43/80 dated 20.01.2009.     76

Case No.:10/23/81­ALC2/2009

Party Name:BHANSALI CABLES & CONDUCTORS (P) LTD., 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00163/AM10/ RLA File :05/24/040/00101/AM10/ Lic.No/Date:0510248490 27.08.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Committee observed that  the  comments  from  DOT  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands     77

Case No.:9/23/81­ALC2/2009

Party Name:S K M TECHNOLOGIES PRIVATE LIMITED 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00162/AM10/ RLA File :09/24/040/00167/AM10/ Lic.No/Date:0910039105 28.08.2009 Defer Date:22.12.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The representative of DIPP informed that the reply received from the firm is not proper and the committee further decided to call for the following information from the firm and to re­list the case on 22.12.2009: ­   1. Information in respect of S.No. 4, 5 & 11 of Standard Deficiency Format – export product wise. 2. Input raw material blanks size without cutting allowance – export product wise. 3. Input raw material blanks weight without cutting allowance – export product wise. 4. Cutting allowance and any other allowance / wastage export product wise.     78

Case No.:2/25/81­ALC2/2009

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00165/AM10/ RLA File :05/23/040/00030/AM10/ Lic.No/Date:0510248715 01.09.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 22.12.2009.   79

Case No.:3/25/81­ALC2/2009

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 27.10.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00166/AM10/ RLA File :05/23/040/00001/AM10/ Lic.No/Date:0510248736 02.09.2009 Defer Date:22.12.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 22.12.2009. AR­Derfer   S.No.52

Case No. AR­9

 M/s Delton Cables Ltd.           Meeting No.30/81  F.No.01/81/50/659/ AM08/DES­II Dated 27­10­2009 Advance Licence No.0510212061 dt.14­11­2007   RLA  F.No.05/24/040/603/AM08

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorisation, as per written comments of DOT  vide their I.D. No. 15­01/2008­IP dated 23.09.2009 as below:­   1. Quantity of import item No.1 may be allowed as 3657.11 Kg including 1% wastage. 2. Quantity of import item No.2 may be allowed as 1484.34 Kg including 2% wastage. 3. Quantity of import item No.3 may be allowed as 2467 Kg including 5% wastage. 4. Quantity of import item No.4 may be allowed as 3622 Kg including 2% wastage. 5. Quantity of import item No.5 may be allowed as 257.43 Kg including 2% wastage. 6. Quantity of import item No.6 may be allowed as 211.24 Kg including 2% wastage. 7. Quantity of import item No.7 may be allowed as 334 Kg including 2% wastage.     S.No.53

Case No. AR­20

 M/s  Crompton Greaves Ltd.        Meeting No.30/81 F.No.01/86/50/217/AM02/DES­VIIDES­II Dated 27­10­2009 Advance Licence No.0310114303   dt.13.12­2001    RLA  F.No.03/24/42/00104/AM02  Decision : The case regarding amendment of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC observed that item of export covered by C­155 is different from the item of export and therefore SION under C­155 cannot be allowed. Hence, decided to reject the request of the firm.     S.No.54

Case No. AR­21

 M/s  Crompton Greaves Ltd.        Meeting No.30/81 F.No.01/86/50/175/AM02/DES­VIIDES­II Dated 27­10­2009 Advance Licence No.0310114300   dt.13.12­2001    RLA  F.No.03/24/42/001125/AM02  Decision : The case regarding amendment of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC observed that no proper justification was given for review of the norms already ratified. Hence, decided to reject the request of the firm.       S.No.55

Case No. AR­24

 M/S  RPG Cables Ltd.Mysore.           Meeting No.30/81 F.No.01/81/50/157/AM09/DES­II Dated 27­10­2009 Advance License No.0310475240 dt.18­06­2008   RLA F.No.03/95/40/0242/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 22.12.2009.           S.No.56

Case No. AR­36

 M/S Walchandnagar Industries Ltd., Pune           Meeting No.30/81 F.No.01/81/162/851/AM06/DES­II Dated 27­10­2009 Advance Licence No.3110023394  dt. 23.12.2005           RLA F.No.31/95/42/0042/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC observed that two similar cases of the same firm are approved earlier and decided to process the case on file alongwith old cases. The case stands deferred and to be relisted on 22.12.2009.     S.No.57

Case No. AR­26

 M/S Suzlon Generators Ltd.Pune Meeting No.30/81 F.No.01/81/162/642/AM08/DES­II Dated 27­10­2009 Advance License No.3110030422 dt.20­08­2008   RLA F.No.31/24/040/166/AM08 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that reference made to DHI may be withdrawn. Based on Sub­committee report, the quantity may be calculated by DGFT on the individual files.   S.No.58

Case No. AR­27

Meeting No.30/81 F.No.01/81/50/299/AM09/DES­II Dated 27­10­2009 Advance License No.3110034522 dt.23­07­2008   RLA F.No.31/24/040/112/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that reference made to DHI may

    S.No.59

Case No. AR­28

Meeting No.30/81 F.No.01/81/50/183/AM09/DES­II Dated 27­10­2009 Advance License No.3110033765 dt.15­05­2008   RLA F.No.31/24/040/041/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that reference made to DHI may     S.No.60

Case No. AR­29

Meeting No.30/81 F.No.01/81/50/150/AM08/DES­II Dated 27­10­2009 Advance License No.3110029592 dt.20­06­2007   RLA F.No.31/24/040/086/AM08 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that reference made to DHI may     S.No.61

Case No. AR­30

Meeting No.30/81 F.No.01/81/50/167/AM09/DES­II Dated 27­10­2009 Advance License No.3110034113 dt.20­06­2008   RLA F.No.31/24/040/078/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that reference made to DHI may     S.No.62

Case No. AR­31

Meeting No30/81 F.No.01/81/50/121/AM09/DES­II Dated 27­10­2009 Advance License No.3110032606 dt.17­02­2008   RLA F.No.31/24/040/354/AM09

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that reference made to DHI may     S.No.63

Case No. AR­32

Meeting No.30/81 F.No.01/81/50/171/AM09/DES­II Dated 27­10­2009 Advance License No.3110034123 dt.23­06­2008   RLA F.No.31/24/040/076/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that reference made to DHI may     S.No.64

Case No. AR­33

Meeting No.30/81 F.No.01/81/50/172/AM09/DES­II Dated 27­10­2009 Advance License No.3110034124 dt.23­06­2008   RLA F.No.31/24/040/077/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that reference made to DHI may     S.No.65

Case No. AR­34

Meeting No.30/81 F.No.01/81/50/210/AM08/DES­II Dated 27­10­2009 Advance License No.3110029962 dt.24­07­2007   RLA F.No.31/24/040/177/AM08 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that reference made to DHI may     S.No.66

Case No. AR­35

Meeting No.30/81 F.No.01/81/50/140/AM08/DES­II

Dated 27­10­2009 Advance License No.3110029541 dt.14­06­2007   RLA F.No.31/24/040/080/AM08 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that reference made to DHI may     S.No.67

Case No. AR­36

Meeting No.30/81 F.No.01/81/50/263/AM08/DES­II Dated 27­10­2009 Advance License No.3110030411 dt.20­08­2007   RLA F.No.31/24/040/167/AM08 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that reference made to DHI may     PART –C­ DEFFER S.No.45

Case No. C­11

 M/S Vijai Electricals Ltd..           Meeting No.30/81 F.No.01/81/162/1052/AM08/DES­II Dated: 27­10­2009            Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC observed that the matter is pending with DHI for quite long and may be followed with them. The case stands deferred and to be relisted on 22.12.2009.     S.No. 46

Case No. C ­ 7

M/s  Reychem RPG Ltd.            Meeting No.30/81 F.No.01/81/162/886/AM08/DES­II Dated: 27­10­2009  Advance Lic.NO.0310340407 dt.21­07­2005          RLA.F.No.03/95/039/0003/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that reply now received may be processed and brought up before                                      NC. The case stands deferred and to be relisted on 22.12.2009.   S.No.47                    

Case No. C­7

 M/s Wartsila India Ltd. Raigad, Through  Office of the Development Commissioner, (SEEPZ Special Economic Zone), Mumbai

Meeting No.30/81 F.No.01/81/162/166/AM10/DES­II Dated 27­10­2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. DHI informed that the matter pertains to DES­I and may be transferred to them.   S.No.48

Case No.C­36

M/s  Sahney Commutators Pvt.Ltd.Bangalaore Meeting No.30/81 F.No.01/81/162/968/AM08/DES­II Dated: 27­10­2009               Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that DHI comments may be examined on file and brought up before the NC. The case stands deferred and to be relisted on 22.12.2009.       S.No.49

Case No.C­37

M/s  Sahney Commutators Pvt.Ltd.Bangalaore Meeting No.30/81 F.No.01/81/162/967/AM08/DES­II Dated: 27­10­2009               Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that DHI comments may be examined on file and brought up before the NC. The case stands deferred and to be relisted on 22.12.2009.     S.No.50

Case No. C­14

 M/S  Ionex India Ltd. Vadodara forwarded by EEPC, Kolkata Meeting No.30/81 F.No.01/81/162/348/AM10/DES­II Dated 27­10­2009       Decision : The case regarding modification of SION S. No. C­1808 was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. Based on the written recommendations of DIPP, the Norms Committee decided to recommend amendment of SION C­1808 as below:­   SION Export item Quantity Import item Quantity C­1808 Dish Ends (Ellipsoidal or  Circular  shape) made  of  Non­ 1 Kg. 1.Non­ Alloy/Alloy/Stainless 1.1  Kg./kg. content  of  the

Alloy/Alloy/Stainless Steel. Steel  Plates/Coils  of relevant grade. Steel  in  export product.      A public notice may issued accordingly after approval from DGFT.  PART –D –DEFER   S.No.11

Case No. D­3

 M/s  Star Wire (India) Ltd. Ballabgarh received through EEPC India, Kolkata         Meeting No.30/81 F.No.01/81/162/175/AM10/DES­II Dated 27­10­2009   Decision : The case regarding upward revision of value cap for DEPB S. No. 67A, 381 & 390 was considered by the Norms Committee ­ II in its M.No. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that O/o DGFT may workout the necessary details required by DEPB committee.   Annexure­I  

Case No.:3/23/81­ALC2/2009

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 27.10.2009 Status:Deffered and Re­ indexed HQ File :01/81/050/00156/AM10/ RLA File :07/24/040/00198/AM10/ Lic.No/Date:0710066636 21.08.2009 Defer Date:27.10.2009     Sl. No. of Import item Import item Weight (Kgs) (Allowed) Wastage after 2/3rd recovery (in % ) 1 36.716 100.0 2 19.403 100.0 3 27.164 100.0 4 9.842 100.0 5 3.694 99.7 6 8.235 99.9 7 1.213 98.9

8 27.514 100.0 9 2.497 99.7 10 2.497 99.7 11 20.674 99.9 12 13.605 100.1 13 0.383 101.8 14 0.383 101.8 15 4.875 99.8 16 4.875 99.8 17 11.956 99.9 18 11.956 99.9 19 8.737 99.9 20 8.737 99.9 21 4.573 99.7 22 6.880 100.0 23 6.880 100.0 24 0.532 97.0 25 27.952 99.9 26 5.040 100.0 27 5.040 100.0 28 69.153 100.0 29 69.153 100.0 30 13.519 100.0 31 18.924 100.0 32 107.536 100.0 33 53.764 100.0 34 1.925 100.5 35 6.674 99.8 36 7.258 100.0 37 7.258 100.0 38 12.422 100.0 39 12.422 100.0 40 5.643 100.1 41 4.437 99.8 42 2.218 99.8 43 6.933 99.8 44 6.933 99.8 45 16.333 99.9

46 32.659 100.0 47 19.715 99.9 48 39.423 100.0 49 0.342 101.2 50 0.684 101.2 51 9.643 100.1 52 7.939 100.0 53 4.820 100.0 54 18.900 100.0 55 18.900 100.0 56 9.075 99.9 57 9.075 99.9 58 10.884 100.1 59 5.442 100.1 60 9.643 100.1 61 8.843 100.1 62 8.843 100.1 63 9.557 99.9 64 2.714 99.5 65 6.555 99.8 66 17.475 99.9 67 6.233 99.8 68 8.577 99.9 69 8.961 100.0 70 8.961 100.0 71 9.879 100.0 72 7.439 100.0 73 7.439 100.0 74 6.957 99.9 75 14.153 99.9 76 14.153 99.9 77 23.277 100.0 78 32.583 100.0 79 1.384 100.6 80 1.384 100.6 81 6.584 100.1 82 3.295 99.7 83 9.879 100.0 84 56.345 100.0

85 56.345 100.0 86 7.939 100.0 87 2.921 100.1 88 2.921 100.1 89 17.216 100.0 90 34.433 100.0 91 9.603 100.1 92 17.313 99.9 93 8.656 99.9 94 151.683 100.0 95 1.363 100.5 96 0.682 100.5 97 3.324 100.3 98 17.741 100.0 99 151.683 100.0 100 0.942 100.5 101 0.532 97.0 102 9.356 99.9 103 12.475 99.9 104 25.993 99.9 105 8.053 99.8 106 0.942 100.5 107 4.854 99.8 108 4.854 99.8 109 6.655 99.9 110 6.655 99.9 111 3.495 99.7 112 3.495 99.7 113 4.854 99.8 114 4.854 99.8 115 1.075 99.0 116 3.478 99.9 117 3.478 99.9 118 12.902 100.0 119 12.902 100.0 120 127.005 100.0 121 1.075 99.0 122 6.674 99.8

123 95.157 100.0 124 139.213 100.0 125 5.543 100.1 126 5.141 100.0 127 9.701 100.0 128 4.200 100.0 129 44.100 100.0 130 14.866 100.0 131 8.745 100.0 132 1.355 99.9 133 7.535 100.0 134 8.156 100.0 135 107.565 100.0 136 0.485 99.7 137 0.485 99.7   Supplementary Agenda    

Case No. D­2

 M/s  AIA Engineering Ltd. Ahmedabad received through EEPC India ,Kolkakta         Meeting No.15/81 F.No.01/81/162/174/AM10/DES­II Dated 14­07­2009   Decision : The case regarding removal of value cap on export product “High Chromium Grinding Media Balls’ under DEPB S.No. 163 was considered by the Norms Committee ­ II in its M.N0. 30/81 scheduled to be held on 27.10.2009 but actually held on 17.11.2009. NC decided that O/o DGFT may workout the necessary details required by DEPB committee.    


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied