DGFT Committee Minutes
RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DESII SECTION) MINUTES OF THE NORMS COMMITTEEII MEETING NO. 38/10 SCHEDULED TO BE HELD ON 22.12.2009 BUT ACTUALLY HELD ON 29.12.2009. The Meeting No. 38/10 of Norms CommitteeII was held on 29.12.2009 for the licensing year 20092010 under the Chairmanship of Sh. A. KOMU, Addl. Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorisations under Duty Exemption Scheme (Chapter4) of Foreign Trade Policy 20042009. The following members were present in the meeting: S.No Name of the representatives & their Designation Deptt. 1. 2. 3. 4. 5. Sh. Gajraj Singh, Sr. D.O. Sh. S.K. Jain, D.O. Sh. K.K. Funda, Asst. Dir. Sh. A.K. Mishra, Asstt. Director Shri Narendra Vashista, FTDO DHI DIPP DC(MSME) M/o Steel DGFT 1
Case No.:1134/26/81
ALC2/2007 Party Name:BHARAT ELECTRONICS LTD. Meet No/Date:38/81 ALC2/2009 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00573/AM06/ RLA File :07/24/040/00521/AM06/ Lic.No/Date:0710040666 05.10.2005 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case on 16.02.2010: 1. Information in respect of S.No. 3, 4, 5, 6, 8, 9 & 11 of Standard Deficiency Letter Export product wise. Note: Firm may be advised to endorse a copy of the reply to DC(MSME) also. Since the matter pertains to NC-I. The case may be transferred after issue of D/L.
2
Case No.:12/40/81ALC2/2007
Party Name:POWER GEAR LTD. Meet No/Date:38/81ALC2/2009 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00450/AM08/ RLA File :07/24/040/00600/AM08/ Lic.No/Date:0710054616 22.11.2007 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 16.02.2010. 3
Case No.:15/9/81ALC2/2008
Party Name:LAMBDA TELEVENTURE 22.12.2009 Status: approved HQ File :01/81/050/00115/AM09/ RLA File :05/24/040/00868/AM08/ Lic.No/Date:0510216256 12.02.2008 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorisation, as per written comments of DOT vide their I.D. No. 1506/2009IP dated 23.102009 on 0% wastage basis (copy enclosed). R/A may take suitable consequential action accordingly. 4
Case No.:45/15/81ALC2/2008
Party Name:CIM TOOLS PVT.LTD., 22.12.2009 Status: Rejected HQ File :01/81/050/00213/AM09/ RLA File :07/24/040/00815/AM08/ Lic.No/Date:0710056594 26.03.2008 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders. Therefore, decided to reject the request of the firm. 5
Case No.:61/15/81ALC2/2008
Party Name:CIM TOOLS PVT.LTD., 22.12.2009 Status: Rejected HQ File :01/81/050/00229/AM09/ RLA File :07/24/040/00099/AM09/ Lic.No/Date:0710058177 27.06.2008
Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders. Therefore, decided to reject the request of the firm. 6
Case No.:18/21/81ALC2/2008
Party Name:L M GLASFIBER (INDIA) PVT LTD 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00329/AM09/ RLA File :07/24/040/00216/AM09/ Lic.No/Date:0710059071 13.08.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 16.02.2010. 7
Case No.:15/38/81ALC2/2008
Party Name:VEEGEE INDUSTRIAL ENTERPRISES PVT. LTD. 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00577/AM09/ RLA File :05/24/040/00168/AM09/ Lic.No/Date:0510227078 08.09.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. NC observed that copy of application as well as copy of D/L is not available in file. The same may be obtained from DIPP and reminder to the firm for furnishing of reply may be issued. The case stands deferred and to be relisted on 16.02.2010. 8
Case No.:17/38/81ALC2/2008
Party Name:DIAMOND ENGINEERING (CHENNAI) PVT LTD 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00579/AM09/ RLA File :04/24/040/00147/AM09/ Lic.No/Date:0410098572 12.09.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. NC observed that authorizations cannot be clubbed for the purpose of ratification of norms. Hence, decided to reject the request of the firm. 9
Case No.:17/29/81ALC2/2008
Party Name:BHARAT HEAVY ELECTRICALS LIMITED 22.12.2009 Status:Deffered and Reindexed
HQ File :01/81/050/00434/AM09/ RLA File :61/24/040/00039/AM09/ Lic.No/Date:6110000219 22.09.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the reply is received by DHI and the case is under examination of DHI. The case stands deferred and to be relisted on 16.02.2010. 10
Case No.:3/29/81ALC2/2008
Party Name:PSL LTD. 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00420/AM09/ RLA File :03/95/040/00545/AM09/ Lic.No/Date:0310487951 26.09.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee decided that a copy of the reply received from the firm may be referred to DHI for examination and comments. The case stands deferred and to be relisted on 16.02.2010. 11
Case No.:14/38/81ALC2/2008
Party Name:BHARAT HEAVY ELECTRICALS LIMITED 22.12.2009 Status:Deffered and Re indexed HQ File :01/81/050/00576/AM09/ RLA File :05/24/040/00971/AM08/ Lic.No/Date:0510228820 03.10.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 16.02.2010. 12
Case No.:2/38/81ALC2/2008
Party Name:BHARAT HEAVY ELECTRICALS LIMITED 22.12.2009 Status:Deffered and Re indexed HQ File :01/81/050/00547/AM09/ RLA File :05/24/040/00974/AM08/ Lic.No/Date:0510228825 03.10.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 16.02.2010. 13
Case No.:18/29/81ALC2/2008
Party Name:AREVA T & D INDIA LIMITED 22.12.2009 Status:Deffered and Reindexed
HQ File :01/81/050/00435/AM09/ RLA File :04/24/040/00331/AM08/ Lic.No/Date:0410099017 06.10.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 16.02.2010. 14
Case No.:19/29/81ALC2/2008
Party Name:AREVA T & D INDIA LIMITED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00436/AM09/ RLA File :04/24/040/00298/AM08/ Lic.No/Date:0410099018 06.10.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 16.02.2010. 15
Case No.:20/29/81ALC2/2008
Party Name:AREVA T & D INDIA LIMITED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00437/AM09/ RLA File :04/24/040/00420/AM08/ Lic.No/Date:0410099019 06.10.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 16.02.2010. 16
Case No.:21/29/81ALC2/2008
Party Name:STERLITE INDUSTRIES (INDIA) LTD. 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00438/AM09/ RLA File :35/24/040/00017/AM09/ Lic.No/Date:3510024822 06.10.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands 17
Case No.:30/29/81ALC2/2008
Party Name:STERLITE INDUSTRIES (INDIA) LTD. 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00447/AM09/ RLA File :35/24/040/00018/AM09/ Lic.No/Date:3510024830 10.10.2008 Defer Date:16.02.2010
Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands 18
Case No.:42/29/81ALC2/2008
Party Name:TECHNO TRACK ENGINEERS(PROP. ASHOK R. SONAWANE) 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00459/AM09/ RLA File :31/24/040/00185/AM09/ Lic.No/Date:3110035743 13.10.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 12.02.2010. The case stands deferred and to be relisted on 16.02.2010. 19
Case No.:3/36/81ALC2/2008
Party Name:L M GLASFIBER (INDIA) PVT LTD 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00518/AM09/ RLA File :07/24/040/00436/AM09/ Lic.No/Date:0710061007 12.11.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands 20
Case No.:7/36/81ALC2/2008
Party Name:K.S.INSTRUMENTS PVT.LTD., 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00522/AM09/ RLA File :07/24/040/00457/AM09/ Lic.No/Date:0710061076 17.11.2008 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands
21
Case No.:3/44/81ALC2/2008
Party Name:STERLITE INDUSTRIES (INDIA) LTD. 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00663/AM09/ RLA File :35/24/040/00023/AM09/ Lic.No/Date:3510025556 05.01.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands 22
Case No.:5/44/81ALC2/2008
Party Name:STERLITE INDUSTRIES (INDIA) LTD. 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00665/AM09/ RLA File :35/24/040/00024/AM09/ Lic.No/Date:3510025570 07.01.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands 23
Case No.:9/44/81ALC2/2008
Party Name:SHETRON LTD 22.12.2009 Status:Rejected HQ File :01/81/050/00669/AM09/ RLA File :07/24/040/00556/AM09/ Lic.No/Date:0710062327 09.01.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders. Therefore, decided to reject the request of the firm. 24
Case No.:6/48/81ALC2/2008
Party Name:SUZLON ENERGY LIMITED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00711/AM09/ RLA File :31/24/040/00296/AM09/ Lic.No/Date:3110037214 03.02.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands
25
Case No.:17/51/81ALC2/2008
Party Name:MOLEX (INDIA) PRIVATE LIMITED, Meet No/Date:38/81ALC2/2009 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00763/AM09/ RLA File :07/24/040/00618/AM09/ Lic.No/Date:0710063292 26.02.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands 26
Case No.:6/7/81ALC2/2009
Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 22.12.2009 Status:Rejected HQ File :01/81/050/00026/AM10/ RLA File :07/24/040/00039/AM10/ Lic.No/Date:0710064492 04.05.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders. Therefore, decided to reject the request of the firm. 27
Case No.:12/7/81ALC2/2009
Party Name:ALSTRONG ENTERPRISES 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00032/AM10/ RLA File :05/24/040/00464/AM09/ Lic.No/Date:0510240950 06.05.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. NC observed that D/L has been received undelivered and has been sent to RA for delivery to the firm. We may remind RA for furnishing the status. The case stands deferred and to be relisted on 16.02.2010. 28
Case No.:13/7/81ALC2/2009
Party Name:ALUPAN COMPOSITEPANELS PVT.LTD. 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00033/AM10/ RLA File :05/24/040/00042/AM10/ Lic.No/Date:0510241032 08.05.2009 Defer Date:16.02.2010
Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee decided that a copy of the reply received from the firm may be handed over to DIPP for examination and comments. The case stands 29
Case No.:14/7/81ALC2/2009
Party Name:ALUPAN COMPOSITEPANELS PVT.LTD. 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00034/AM10/ RLA File :05/24/040/00044/AM10/ Lic.No/Date:0510241033 08.05.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee decided that a copy of the reply received from the firm may be handed over to DIPP for examination and comments. The case stands 30
Case No.:12/9/81ALC2/2009
Party Name:ITP INFOTECH PRIVATE LTD 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00047/AM10/ RLA File :05/24/040/00102/AM10/ Lic.No/Date:0510241847 20.05.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands 31
Case No.:1/15/81ALC2/2009
Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 22.12.2009 Status: approved HQ File :01/81/050/00087/AM10/ RLA File :05/24/040/00156/AM10/ Lic.No/Date:0510244222 23.06.2009
Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. Based on the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification: 1. Net weight of export product at Sl. No 1 may be modified as 3.5 MT containing 3.382 MT of imported inputs. 2. Net weight of export product at Sl. No 2 may be modified as 39 MT containing 37.66 MT of imported inputs. 3. Word “relevant” may be prefixed with the description of import items at S.No.1, 3 & 5. 4. Quantities of import items at S.Nos.1, 3 & 5 may be allowed as 2.481 MT, 8.43 MT & 10.66 MT respectively inclusive of 2% wastage. 5. Quantity of import item at S.No.2 may be allowed as 0.95 MT on net to net basis. 6. Weights of 6.992 MT, 6.232 MT & 0.023 MT may be specified with the quantities of import items at Sl. Nos. 4, 6 & 7 respectively and the same may be allowed on net to net basis. 7. Quantity of import item at S.No.8 may be allowed as 0.358 MT. 8. Quantity of import item at S.No.9 may be allowed equal to quantity of Welding Wire at S.No. 8 of import item. 9. Import of components may be allowed with accountability clause. 32
Case No.:7/15/81ALC2/2009
Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 22.12.2009 Status:Rejected HQ File :01/81/050/00093/AM10/ RLA File :31/24/040/00052/AM10/ Lic.No/Date:3110039008 26.06.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders. Therefore, decided to reject the request of the firm. 33
Case No.:10/15/81ALC2/2009
Party Name:ITP INFOTECH PRIVATE LTD 22.12.2009 Status:Deffered and Re indexed HQ File :01/81/050/00096/AM10/ RLA File :05/24/040/00187/AM10/ Lic.No/Date:0510244848 30.06.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands
34
Case No.:11/15/81ALC2/2009
Party Name:DELTON CABLES LTD. 22.12.2009 Status:Rejected HQ File :01/81/050/00097/AM10/ RLA File :05/24/040/00614/AM09/ Lic.No/Date:0510244874 30.06.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the firm has failed to furnish the reply despite repeated reminders. Therefore, decided to reject the request of the firm. 35
Case No.:8/15/81ALC2/2009
Party Name:R.K.POLYMERS 22.12.2009 Status:Deffered and Re indexed HQ File :01/81/050/00094/AM10/ RLA File :13/24/040/00007/AM10/ Lic.No/Date:1310029212 30.06.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. NC observed that the reply of the firm is not proper and on the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to further call for the following information/clarification from the firm and to relist the case on 16.02.2010: 1. Detailed calculations as to how the quantity of raw materials proposed for import has been arrived at supported by size of conductors & insulation/ sheathing thickness. A copy of relevant National/International standard or buyers data sheet may also be furnished 36
Case No.:13/15/81ALC2/2009
Party Name:MMTC LIMITED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00099/AM10/ RLA File :05/24/040/00164/AM10/ Lic.No/Date:0510244977 01.07.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the case is under examination of MOS. The case stands deferred and to be relisted on 16.02.2010.
37
Case No.:14/15/81ALC2/2009
Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 22.12.2009 Status: approved HQ File :01/81/050/00100/AM10/ RLA File :05/24/040/00177/AM10/ Lic.No/Date:0510244978 01.07.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. Based on the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification: 1. Net weight of export product may be modified as 51 MT containing 49.1 MT of imported inputs. 2. Word “relevant” may be prefixed with the description of import item at S.No.1. 3. Quantity of import item at S.No.1 may be allowed as 28.57 MT inclusive of 2% wastage. 4. Weights of 14.203 MT & 1.254 MT may be specified with the quantities of import items at Sl. Nos. 2 & 3 respectively and the same may be allowed on net to net basis. 5. Quantity of import item at S.No.4 may be allowed as 0.44 MT. 6. Quantity of import item at S.No.5 may be allowed equal to quantity of Welding Wire at S.No. 4 of import item. 7. Import of components may be allowed with accountability clause. 38
Case No.:2/17/81ALC2/2009
Party Name:ITP INFOTECH PRIVATE LTD 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00108/AM10/ RLA File :05/24/040/00213/AM10/ Lic.No/Date:0510245289 07.07.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands 39
Case No.:18/17/81ALC2/2009
Party Name:VIDEOCON INDUSTRIES LIMITED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00124/AM10/ RLA File :03/95/040/00243/AM10/ Lic.No/Date:0310529299 17.07.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands
40
Case No.:2/18/81ALC2/2009
Party Name:INTERPLEX ELECTRONICS INDIA PVT.LTD., 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00128/AM10/ RLA File :07/24/040/00098/AM10/ Lic.No/Date:0710066106 23.07.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands 41
Case No.:2/23/81ALC2/2009
Party Name:MOLEX (INDIA) PRIVATE LIMITED, Meet No/Date:38/81ALC2/2009 22.12.2009 Status: approved HQ File :01/81/050/00155/AM10/ RLA File :07/24/040/00200/AM10/ Lic.No/Date:0710066592 19.08.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorisation, as per written comments of DOT vide their I.D. No. 1537/2009IP dated 19.11.2009 (copy enclosed) as detailed below: 1. Quantity of import item at S.No.1 to 6 may be allowed as 5000000 nos. each with 0% wastage. 2. Quantity of import item at S.No. 7 may be allowed as 315 ltrs. inclusive of 2% wastage. 3. Quantity of import item at S.No. 8 may be allowed as 15300 Kg. inclusive of 2% wastage. 42
Case No.:4/23/81ALC2/2009
Party Name:ABIR INFRASTRUCTURE PRIVATE LIMITED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00157/AM10/ RLA File :05/23/040/00023/AM10/ Lic.No/Date:0510248276 25.08.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 12.02.2010. The case stands deferred and to be 43
Case No.:6/23/81ALC2/2009
Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00159/AM10/ RLA File :31/24/040/00100/AM10/ Lic.No/Date:3110039712 26.08.2009 Defer Date:16.02.2010
Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 12.02.2010. The case stands deferred and to be 44
Case No.:10/23/81ALC2/2009
Party Name:BHANSALI CABLES & CONDUCTORS (P) LTD., 22.12.2009 Status: approved HQ File :01/81/050/00163/AM10/ RLA File :05/24/040/00101/AM10/ Lic.No/Date:0510248490 27.08.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorisation, as per written comments of DOT vide their I.D. No. 1534/2009IP dated 23.11.2009 (copy enclosed) as detailed below: 1. Quantity of import item at S.No.1 may be allowed as 2341.99 kg inclusive of 1% wastage. 2. Quantity of import item at S.No. 2 may be allowed as 124.20 kg. inclusive of 2% wastage. 3. Quantity of import item at S.No. 3 may be allowed as 760.25 Kg. inclusive of 2% wastage. 4. Quantity of import item at S.No. 4 may be allowed as 891.29 kg inclusive of 2% wastage. 5. Quantity of import item at S.No. 5 may be allowed as 76.87 Kg. inclusive of 2% wastage. 6. Quantity of import item at S.No. 6 may be allowed as 2203.06 Kg. inclusive of 2% wastage. 45
Case No.:9/23/81ALC2/2009
Party Name:S K M TECHNOLOGIES PRIVATE LIMITED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00162/AM10/ RLA File :09/24/040/00167/AM10/ Lic.No/Date:0910039105 28.08.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 12.02.2010. The case stands deferred and to be
46
Case No.:2/25/81ALC2/2009
Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00165/AM10/ RLA File :05/23/040/00030/AM10/ Lic.No/Date:0510248715 01.09.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee decided that a copy of the reply received from the firm and forwarded to DHI for examination and comments. The case stands deferred and to be relisted on 16.02.2010. 47
Case No.:3/25/81ALC2/2009
Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00166/AM10/ RLA File :05/23/040/00001/AM10/ Lic.No/Date:0510248736 02.09.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee decided that a copy of the reply received from the firm and forwarded to DHI for examination and comments.The case stands deferred and to be relisted on 16.02.2010. 48
Case No.:1/29/81ALC2/2009
Party Name:VIDEOCON INDUSTRIES LIMITED 22.12.2009 Status: approved HQ File :01/81/050/00247/AM10/ RLA File :03/95/040/00340/AM10/ Lic.No/Date:0310539733 29.09.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009.Comments of MIT were debated. While the recommendation was accepted it was noticed that the exporter has not given the size and broad specification of export and import items. RA is therefore directed to obtain relevant details and incorporate the same in the advance authorisation. NC felt that DGFT may make a proposal to MIT for their future guidelines in this regard, so that there is no scope for any ambiguity. 49
Case No.:2/29/81ALC2/2009
Party Name:SOURIAU INDIA PRIVATE LIMITED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00248/AM10/ RLA File :10/24/040/00066/AM10/ Lic.No/Date:1010035455 30.09.2009 Defer Date:16.02.2010
Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee decided that a copy of the application received from the firm and forwarded to MIT for examination and comments.The case stands 50
Case No.:4/29/81ALC2/2009
Party Name:EXIDE INDUSTRIES LTD 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00250/AM10/ RLA File :02/24/040/00128/AM10/ Lic.No/Date:0210132062 30.09.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 12.02.2010. The case stands deferred and to be 51
Case No.:5/29/81ALC2/2009
Party Name:EXIDE INDUSTRIES LTD 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00251/AM10/ RLA File :02/24/040/00129/AM10/ Lic.No/Date:0210132066 30.09.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 12.02.2010. The case stands deferred and to be 52
Case No.:6/29/81ALC2/2009
Party Name:SIEMENS LTD 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00252/AM10/ RLA File :03/95/040/00390/AM10/ Lic.No/Date:0310539877 30.09.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 12.02.2010. The case stands deferred and to be
53
Case No.:8/29/81ALC2/2009
Party Name:TREND TECHNOLOGIES INDIA PUNE PRIVATE LIMITED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00254/AM10/ RLA File :31/24/040/00050/AM10/ Lic.No/Date:3110040096 30.09.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 12.02.2010. The case stands deferred and to be 54
Case No.:7/29/81ALC2/2009
Party Name:MAINI PRECISION PRODUCTS P LTD 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00253/AM10/ RLA File :07/24/040/00239/AM10/ Lic.No/Date:0710067290 01.10.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the case is under examination of DIPP. The case stands deferred and to be relisted on 16.02.2010. 55
Case No.:9/29/81ALC2/2009
Party Name:PITTI LAMINATIONS LTD., 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00255/AM10/ RLA File :09/24/040/00225/AM10/ Lic.No/Date:0910039468 05.10.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Norms Committee, after deliberating upon the case, decided to call for the following information from the firm, as per DHI’s U.O. No. 3(156)/2009/TSW(B)/488 dated 30.12.2009 as under and the case is relisted on 16.02.2010: 1. Information in respect of S.No. 3, 4, 5 & 11 of Standard Deficiency format. 2. Details of indigenous inputs have not been given in the application while use of copper plates and Aluminium ingots is envisaged as per manufacturing process. Firm may clarify. 56
Case No.:11/29/81ALC2/2009
Party Name:EXIDE INDUSTRIES LTD 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00257/AM10/ RLA File :02/24/040/00133/AM10/ Lic.No/Date:0210132194 06.10.2009 Defer Date:16.02.2010
Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 12.02.2010. The case stands deferred and to be 57
Case No.:14/29/81ALC2/2009
Party Name:BHANSALI CABLES & CONDUCTORS (P) LTD., 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00260/AM10/ RLA File :05/23/040/00045/AM10/ Lic.No/Date:0510250377 07.10.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the comments from DOT are still awaited and therefore decided to remind them to expedite the same. The case stands 58
Case No.:13/29/81ALC2/2009
Party Name:SOURIAU INDIA PRIVATE LIMITED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00259/AM10/ RLA File :10/24/040/00069/AM10/ Lic.No/Date:1010035517 08.10.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee decided that a copy of the application received from the firm and forwarded to MIT for examination and comments. The case stands 59
Case No.:16/29/81ALC2/2009
Party Name:CENTURY METAL RECYCLING PRIVATE LTD.(FORMERLY CENT 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00262/AM10/ RLA File :05/24/040/00223/AM10/ Lic.No/Date:0510250489 08.10.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee decided that a copy of the application received from the firm and forwarded to DC(MSME & Min. of Mines for examination and comments. The case stands deferred and to be relisted on 16.02.2010.
60
Case No.:17/29/81ALC2/2009
Party Name:GUJARAT FOILS LIMITED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00263/AM10/ RLA File :08/24/040/00170/AM10/ Lic.No/Date:0810083464 09.10.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 12.02.2010. The case stands deferred and to be 61
Case No.:18/29/81ALC2/2009
Party Name:GUJARAT FOILS LIMITED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00264/AM10/ RLA File :08/24/040/00171/AM10/ Lic.No/Date:0810083465 09.10.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 12.02.2010. The case stands deferred and to be 62
Case No.:19/29/81ALC2/2009
Party Name:AMARTARA PVT. LTD. 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00265/AM10/ RLA File :03/94/040/00562/AM10/ Lic.No/Date:0310541184 09.10.2009 Defer Date:16.02.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 16.02.2010. 63
Case No.:20/29/81ALC2/2009
Party Name:ABIR INFRASTRUCTURE PRIVATE LIMITED 22.12.2009 Status:Deffered and Reindexed HQ File :01/81/050/00266/AM10/ RLA File :05/23/040/00070/AM10/ Lic.No/Date:0510250680 12.10.2009 Defer Date:16.02.2010
Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case on 16.02.2010: 1. Information in respect of S.No. 4, 5, 11 & 11A of Standard Deficiency Letter Export product wise. PART –AR –DEFFER S.No.76
Case No. AR24
M/S RPG Cables Ltd.Mysore. Meeting No.38/81 F.No.01/81/50/157/AM09/DESII Dated 22122009 Advance License No.0310475240 dt.18062008 RLA F.No.03/95/40/0242/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 12.02.2010. The case stands deferred and to be relisted on 16.02.2010. S.No.77
Case No. AR36
M/S Walchandnagar Industries Ltd., Pune Meeting No.38/81 F.No.01/81/162/851/AM06/DESII Dated 22122009 Advance Licence No.3110023394 dt. 23.12.2005 RLA F.No.31/95/42/0042/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009.NC debated the matter and felt that Nuclear Power Corporation should be asked to intimate about the National Standard/International Standards with reference to the mandatory testing mentioned in their letter under intimation to the Party. The case stands deferred and to be relisted on 16.02.2010.
PART –C DEFFER S.No.55
Case No. C11
M/S Vijai Electricals Ltd.. Meeting No.38/81 F.No.01/81/162/1052/AM08/DESII Dated: 22122009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 16.02.2010. S.No. 56
Case No. C 7
M/s Reychem RPG Ltd. Meeting No.38/81 F.No.01/81/162/886/AM08/DESII Dated: 22122009 Advance Lic.NO.0310340407 dt.21072005 RLA.F.No.03/95/039/0003/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the case is under examination of DIPP. The case stands deferred and to be relisted on 16.02.2010. S.No.57
Case No.C36
M/s Sahney Commutators Pvt.Ltd.Bangalaore Meeting No.38/81 F.No.01/81/162/968/AM08/DESII Dated: 22122009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the case is being processed on file by DGFT. The case stands short deferred and to be relisted on 05.01.2010. S.No.58
Case No.C36
M/s Sahney Commutators Pvt.Ltd.Bangalaore Meeting No.38/81 F.No.01/81/162/967/AM08/DESII Dated: 22122009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee II in its M.No. 38/81 scheduled to be held on 22.12.2009 but actually held on 29.12.2009. The committee observed that the case is being processed on file by DGFT. The case stands short deferred and to be relisted on 05.01.2010.