RATIFIED MINUTES   DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   MINUTES OF THE NORMS COMMITTEE­II MEETING NO. 20/81 SCHEDULED TO BE HELD ON 17.08.2010 BUT ACTUALLY HELD ON 25.08.2010.   The Meeting No. 20/81 of Norms Committee­II was held on 25.08.2010 for the licensing year 2010­2011 under the Chairmanship of Sh. Hardeep Singh, Joint Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorisations  under  Duty  Exemption  Scheme  (Chapter­4)  of  Foreign  Trade  Policy  2009­2014.  The  following  members  were  present  in  the meeting:­ S.No Name of the representatives &                   their Designation   Deptt.   1. 2. 3. 4. 5.   Sh. B.D. Ghosh, Addl. IA Sh. Gajraj Singh, Sr. D.O. Sh. S.K. Jain, DO Sh. K.K.Funda, Asstt. Dir. Sh. Raman Kumar, FTDO   MOS DHI DIPP M/o Steel DGFT   1

Case No.:611/26/81­

ALC2/2007 Party Name:SPARROW ELECTRONICS LTD., Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed   HQ File :01/81/050/00699/AM05/ RLA File :07/24/040/00388/AM05/ Lic.No/Date:0710033433 15.10.2004 Defer Date:28.09.2010   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. As per the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 28.09.2010: ­   1.           Information in respect  of  S.No.  4,5  &  11  of  the  Standard Deficiency Format.

2

Case No.:3/29/81­

ALC2/2008 Party Name:PSL LTD. Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed         HQ File :01/81/050/00420/AM09/ RLA File :03/95/040/00545/AM09/ Lic.No/Date:0310487951 26.09.2008 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No.20/81 scheduled  to  be  held  on  17.08.2010  but  actually  held  on  25.08.2010.  The committee  observed  that  the  comments  from  DHI  are  still  awaited  and therefore decided to send a copy of reply to DHI. The case stands deferred and to be relisted on 28.09.2010. 3

Case No.:21/29/81­

ALC2/2008 Party Name:STERLITE INDUSTRIES (INDIA) LTD. Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00438/AM09/ RLA File :35/24/040/00017/AM09/ Lic.No/Date:3510024822 06.10.2008 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled  to  be  held  on  17.08.2010  but  actually  held  on  25.08.2010.  The committee  observed  that  the  comments  from  Min.  of  Mines  are  still  awaited and therefore decided to send D.O.letter to JS(Mines)  to expedite the same. The case stands deferred and to be relisted on 28.09.2010 4 Case No.:7/34/81­ ALC2/2008 Party Name:UTV SOFTWARE COMMUNICATIONS LIMITED Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00504/AM09/ RLA File :05/24/040/00488/AM09/ Lic.No/Date:0510230376 05.11.2008 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled  to  be  held  on  17.08.2010  but  actually  held  on  25.08.2010.  The committee observed that the comments from Min. of IT are still awaited and

therefore decided to send D.O. letter to JS(IT)  to expedite the same. The case stands deferred and to be relisted on 28.09.2010 5

Case No.:3/41/81­

ALC2/2009 Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00388/AM10/ RLA File :03/95/040/00692/AM09/ Lic.No/Date:0310503872 27.01.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled  to  be  held  on  17.08.2010  but  actually  held  on  25.08.2010.  The committee observed that the comments from Min. of IT are still awaited and therefore decided to send D.O. letter to JS(IT)  for attending the meeting. The case stands deferred and to be relisted on 28.09.2010   6

Case No.:2/1/81­ALC2/2010

Party Name:RPG CABLES LIMITED, Meet No/Date:20/81­ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00536/AM10/ RLA File :03/95/040/00521/AM09/ Lic.No/Date:0310505808 05.02.2009 Defer Date: 28.09.2010 Decision : : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be re­listed on 28.09.2010.   7

Case No.:17/51/81­ALC2/2008

Party Name:MOLEX (INDIA) PRIVATE LIMITED, 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00763/AM09/ RLA File :07/24/040/00618/AM09/ Lic.No/Date:0710063292 26.02.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The committee also decided to send a reminder to M/o IT.The case stands deferred and to be re­listed on 28.09.2010.   8

Case No.:25/33/81­ALC2/2009

Party Name:BLOOMENERGY INDIA PRIVATE LIMITED, 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00304/AM10/ RLA File :07/24/040/00676/AM09/ Lic.No/Date:0710063959 31.03.2009 Defer Date: 28.09.2010

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited after sending two reminders and therefore decided to send a final reminder to firm . The case stands deferred and to be re­listed on 28.09.2010.                 9

Case No.:24/27/81­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 17.08.2010 Status:Approved HQ File :01/81/050/00206/AM10/ RLA File :32/24/040/00067/AM09/ Lic.No/Date:3210040135 01.04.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DHI vide their U.O No. 3(15)/2010/TSW(B) dt.02.08.2010 as under:­ 1. Import item listed as Sl No. 2,9,12 to 16 allowed on net to net basis as applied by the firm. 2. Rest of the items are components and may be allowed as per condition of GN­4. R/A may take suitable consequential action accordingly.   10

Case No.:12/7/81­ALC2/2009

Party Name:ALSTRONG ENTERPRISES 17.08.2010 Status:Rejected HQ File :01/81/050/00032/AM10/ RLA File :05/24/040/00464/AM09/ Lic.No/Date:0510240950 06.05.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that despite six reminders reply has not been received from firm therefore decided to reject the request of firm.   11

Case No.:15/7/81­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 17.08.2010 Status:Approved HQ File :01/81/050/00035/AM10/ RLA File :03/94/040/00065/AM10/ Lic.No/Date:0310519156 08.05.2009   Decision :      The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­

II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DHI vide their U.O No. 3(15)/2010/TSW(B) dt.02.08.2010 (copy enclosed).         12

Case No.:11/9/81­ALC2/2009

Party Name:PRAKASH STEELAGE LTD. Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00046/AM10/ RLA File :03/95/040/00846/AM09/ Lic.No/Date:0310520480 20.05.2009 Defer Date:28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited   therefore decided to send another reminder to firm . The case stands deferred and to be re­listed on 28.09.2010. 13

Case No.:12/9/81­ALC2/2009

Party Name:ITP INFOTECH PRIVATE LTD Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00047/AM10/ RLA File :05/24/040/00102/AM10/ Lic.No/Date:0510241847 20.05.2009 Defer Date: 28.09.2010 Decision : : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.NC decided that a copy of the application of the firm may be sent to DIPP for comments. The case stands deferred and to be re­listed on 28.09.2010. 14

Case No.:17/27/81­ALC2/2009

Party Name:CIM TOOLS PVT.LTD., 17.08.2010 Status:Approved HQ File :01/81/050/00199/AM10/ RLA File :07/24/040/00114/AM10/ Lic.No/Date:0710065505 22.06.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP as under:­ Import Item No. Quantity  of Import items (In Nos.) Import Weight after 15  %  recovery  (In Kgs) Wastage  after  15 % recovery    ( %) 1 17 Nos. 54.22 89.5 2 17 Nos 54.22 89.5 3 17 Nos 49.55 94.6 4 17 Nos 49.55 94.6 5 17 Nos 46.84 94.0

6 17 Nos 46.84 94.0 7 17 Nos 19.08 114.8 8 17 Nos 19.08 114.8 9 17 Nos 18.85 112.9 10 17 Nos 18.85 112.9 11 17 Nos 18.85 112.9 12 17 Nos 18.85 112.9 13 17 Nos 21.85 100.8 14 17 Nos 21.85 100.8 15 17 Nos 18.85 112.9 16 17 Nos 18.85 112.9 17 17 Nos 19.05 119.9 18 17 Nos 19.05 119.9 19 17 Nos 19.05 119.9 20 17 Nos 19.05 119.9 21 17 Nos 19.10 80.8 22 17 Nos 19.10 80.8 23 17 Nos 10.91 116.1 24 17 Nos 10.91 116.1 25 17 Nos 36.17 115.0 26 17 Nos 36.17 115.0 27 17 Nos 16.58 114.3 28 17 Nos 16.58 114.3 29 17 Nos 27.08 113.9 30 17 Nos 27.08 113.9 31 17 Nos 157.18 116.9 32 17 Nos 157.18 116.9 33 17 Nos 16.00 99.8 34 17 Nos 16.00 99.8 35 17 Nos 15.69 114.0 36 17 Nos 15.69 114.0 37 17 Nos 16.95 114.2 38 17 Nos 16.95 114.2 39 17 Nos 4.59 112.4 40 17 Nos 4.59 112.4 41 17 Nos 20.77 100.5 42 17 Nos 20.77 100.5 43 17 Nos 33.54 119.4 44 17 Nos 33.54 119.4 45 17 Nos 31.84 121.7 46 17 Nos 31.84 121.7

47 17 Nos 17.57 114.2 48 17 Nos 17.57 114.2 49 17 Nos 12.80 113.4 50 17 Nos 12.80 113.4 51 501Nos 2400.07 120.6 52 51 Nos 244.32 120.6 53 377 Nos 1806.04 120.6 54 287 Nos 1374.89 120.6 55 84 Nos 402.40 120.6 56 2000Nos 53.60 89.5                     15

Case No.:10/27/81­ALC2/2009

Party Name:DYNATECH FURNACES (BOMBAY) PVT.LTD 17.08.2010 Status:Approved HQ File :01/81/050/00192/AM10/ RLA File :03/94/040/00171/AM10/ Lic.No/Date:0310526069 26.06.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DHI vide their U.O No. 3(135)/2009/TSW(B) dated 26.07.2010 (copy enclosed).     16

Case No.:4/41/81­ALC2/2009

Party Name:NICOMET INDUSTRIES LTD. 17.08.2010 Status:Deffered and Re­ indexed HQ File :01/81/050/00389/AM10/ RLA File :03/95/040/00162/AM10/ Lic.No/Date:0310526170 29.06.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the

firm is still awaited   therefore decided to send another reminder to firm . The case stands deferred and to be re­listed on 28.09.2010. 17

Case No.:10/15/81­ALC2/2009

Party Name:ITP INFOTECH PRIVATE LTD 17.08.2010 Status:Deffered and Re­ indexed HQ File :01/81/050/00096/AM10/ RLA File :05/24/040/00187/AM10/ Lic.No/Date:0510244848 30.06.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. As per the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 28.09.2010: ­   1.      Information in respect of S.No. 3,4,5 & 11 of the Standard Deficiency Format.             18

Case No.:2/17/81­ALC2/2009

Party Name:ITP INFOTECH PRIVATE LTD 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00108/AM10/ RLA File :05/24/040/00213/AM10/ Lic.No/Date:0510245289 07.07.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. As per the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 28.09.2010: ­   1.      Information in respect of S.No. 3,4,5 & 11 of the Standard Deficiency Format.     19

Case No.:15/17/81­ALC2/2009

Party Name:JHAGADIA COPPER LIMITED 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00121/AM10/ RLA File :34/24/040/00161/AM09/ Lic.No/Date:3410024683 16.07.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from MSME are still awaited . The case stands deferred and to be relisted on 28.09.2010. 20

Case No.:2/18/81­ALC2/2009

Party Name:INTERPLEX ELECTRONICS INDIA PVT.LTD., Meet No/Date:20/81­ Status:Deffered

ALC2/2010 17.08.2010 and Re­ indexed HQ File :01/81/050/00128/AM10/ RLA File :07/24/040/00098/AM10/ Lic.No/Date:0710066106 23.07.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o IT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 28.09.2010.                   21

Case No.:19/39/81­ALC2/2009

Party Name:BIMETAL BEARINGS LIMITED, 17.08.2010 Status:Deffered and Re­ indexed HQ File :01/81/050/00375/AM10/ RLA File :32/24/040/00017/AM10/ Lic.No/Date:3210040968 03.08.2009 Defer Date: 28.09.2010 Decision : : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. NC has decided to examine the case on file as per comments of MSME in SION case. The case stands deferred and to be relisted on 28.09.2010.   22

Case No.:13/1/81­ALC2/2010

Party Name:RPG CABLES LIMITED, 17.08.2010 Status: Approved     HQ File :01/81/050/00547/AM10/ RLA File :03/95/040/01032/AM09/ Lic.No/Date:0310532963 10.08.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP as under:­ 1.      Net weight of export product may be specified as 45.512 MT. 2.      Quantity of import item at Sl.No.1 i.e. Aluminium wire rod EC grade  may be allowed as applied for i.e. 9.626 MT inclusive of 1% wastage. 3.      Quantity of import item at Sl.No.2 i.e. XLPE Semiconducting Compound may be allowed as applied for i.e. 1.350 MT inclusive of 4 % wastage. 4.      Quantity of import item at Sl.No.3 ie. XLPE Insulation Compound may be allowed as applied for i..e. 9.69 MT inclusive of 4 % wastage.

5.      Quantity of import item at Sl.No.4 i.e. Copper Foil(Tape)  may be allowed as applied for i.e.0.642  MT inclusive of 0.5% wastage. 6.      Quantity of import item at Sl.No.5 ie. PVC Resin  may be allowed as applied for i..e. 5.126 MT inclusive of 1 % wastage           23

Case No.:9/23/81­ALC2/2009

Party Name:S K M TECHNOLOGIES PRIVATE LIMITED 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00162/AM10/ RLA File :09/24/040/00167/AM10/ Lic.No/Date:0910039105 28.08.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ask firm to depute Technical Person for personnel hearing in next NC on 28.09.2010.                   24

Case No.:2/25/81­ALC2/2009

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00165/AM10/ RLA File :05/23/040/00030/AM10/ Lic.No/Date:0510248715 01.09.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. NC decided to forward the reply received from the firm to DHI for examination /comments. The case stands deferred and to be re­listed on 28.09.2010. 25

Case No.:3/25/81­ALC2/2009

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00166/AM10/ RLA File :05/23/040/00001/AM10/ Lic.No/Date:0510248736 02.09.2009 Defer Date: 28.09.2010

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. NC decided to forward the reply received from the firm to DHI for examination /comments. The case stands deferred and to be re­listed on 28.09.2010. 26

Case No.:7/41/81­ALC2/2009

Party Name:CROMPTON GREAVES LIMITED, 17.08.2010 Status:Approved HQ File :01/81/050/00392/AM10/ RLA File :03/94/040/00328/AM10/ Lic.No/Date:0310537877 15.09.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DHI vide their U.O No. 3(82)/2010/TSW(B) dated 30.07.2010 (copy enclosed).   27

Case No.:40/1/81­ALC2/2010

Party Name:INNO FAB (INDIA)PVT LTD. Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­ indexed HQ File :01/81/050/00574/AM10/ RLA File :09/24/040/00243/AM10/ Lic.No/Date:0910039371 23.09.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from DHI are still awaited . The case stands deferred and to be relisted on 28.09.2010.   28

Case No.:8/29/81­ALC2/2009

Party Name:TREND TECHNOLOGIES INDIA PUNE PRIVATE LIMITED 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00254/AM10/ RLA File :31/24/040/00050/AM10/ Lic.No/Date:3110040096 30.09.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.NC decided to forward copy of application to DIPP for comments as M/o IT and DOT have clarified that items do not come under their purview. The case stands deferred and to be relisted on 28.09.2010.   29

Case No.:7/29/81­ALC2/2009

Party Name:MAINI PRECISION PRODUCTS P LTD Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00253/AM10/ RLA File :07/24/040/00239/AM10/ Lic.No/Date:0710067290 01.10.2009 Defer Date:28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in

its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.NC decided to forward copy of application to DIPP for examination. The case stands deferred and to be relisted on 28.09.2010. 30

Case No.:11/41/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00396/AM10/ RLA File :03/95/040/00399/AM10/ Lic.No/Date:0310540446 06.10.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o IT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 28.09.2010. 31

Case No.:14/29/81­ALC2/2009

Party Name:BHANSALI CABLES & CONDUCTORS (P) LTD., 17.08.2010 Status:Approved HQ File :01/81/050/00260/AM10/ RLA File :05/23/040/00045/AM10/ Lic.No/Date:0510250377 07.10.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP as under:­ 1.      Net weight of export product may be specified as 45.512 MT. 2.           Quantity of import item at Sl.No.1 i.e. Aluminium wire rod EC grade  may be allowed as applied for i.e. 9.626 MT inclusive of 1% wastage. 3.      Quantity of import item at Sl.No.2 i.e. XLPE Semiconducting Compound may be allowed as applied for i.e. 1.350 MT inclusive of 4 % wastage. 4.      Quantity of import item at Sl.No.3 ie. XLPE Insulation Compound may be allowed as applied for i..e. 9.69 MT inclusive of 4 % wastage. 5.      Quantity of import item at Sl.No.4 i.e. Copper Foil(Tape)  may be allowed as applied for i.e.0.642  MT inclusive of 0.5% wastage. 6.      Quantity of import item at Sl.No.5 ie. PVC Resin  may be allowed as applied for i..e. 5.126 MT inclusive of 1 % wastage     32

Case No.:16/29/81­ALC2/2009

Party Name:CENTURY METAL RECYCLING PRIVATE LTD.(FORMERLY CENT 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00262/AM10/ RLA File :05/24/040/00223/AM10/ Lic.No/Date:0510250489 08.10.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from MSME are still awaited . The case stands deferred and to be relisted on 28.09.2010.   33

Case No.:4/31/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD Status: Approved

17.08.2010 HQ File :01/81/050/00270/AM10/ RLA File :09/24/040/00107/AM10/ Lic.No/Date:0910039610 15.10.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DHI vide their U.O  No. 3(112)/2009/TSW(B) dated 28.07.2010 (copy enclosed).Decision for Sl No. 1 to 9  applicable to all 27 import items as they are repeated items .       34

Case No.:12/31/81­ALC2/2009

Party Name:B.M.P. METALS PVT. LTD. 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00278/AM10/ RLA File :05/23/040/00066/AM10/ Lic.No/Date:0510251399 26.10.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 28.09.2010.             35

Case No.:13/31/81­ALC2/2009

Party Name:SOURIAU INDIA PRIVATE LIMITED Meet No/Date:20/81­ALC2/2010 17.08.2010 Status:Deffered and Re­ indexed HQ File :01/81/050/00279/AM10/ RLA File :10/24/040/00075/AM10/ Lic.No/Date:1010035805 27.10.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o  IT  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 28.09.2010. 36

Case No.:1/33/81­ALC2/2009

Party Name:MET TRADE (INDIA) LTD. 17.08.2010 Status:Deffered and Re­ indexed HQ File :01/81/050/00280/AM10/ RLA File :05/24/040/00338/AM10/ Lic.No/Date:0510251506 27.10.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II

in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 28.09.2010.   37

Case No.:31/1/81­ALC2/2010

Party Name:MIRC ELECTRONICS LIMITED. 17.08.2010 Status:Deffered and Re­ indexed HQ File :01/81/050/00565/AM10/ RLA File :03/95/040/00417/AM10/ Lic.No/Date:0310542887 28.10.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited   therefore decided to send another reminder to firm . The case stands deferred and to be re­listed on 28.09.2010. 38

Case No.:14/33/81­ALC2/2009

Party Name:MET TRADE (INDIA) LTD. 17.08.2010 Status:Deffered and Re­ indexed HQ File :01/81/050/00293/AM10/ RLA File :05/24/040/00354/AM10/ Lic.No/Date:0510252096 09.11.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 28.09.2010.   39

Case No.:15/33/81­ALC2/2009

Party Name:MET TRADE (INDIA) LTD. 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00294/AM10/ RLA File :05/24/040/00356/AM10/ Lic.No/Date:0510252098 09.11.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 28.09.2010.   40

Case No.:13/35/81­ALC2/2009

Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00321/AM10/ RLA File :31/24/040/00134/AM10/ Lic.No/Date:3110040661 13.11.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the

firm is not received. Therefore, the Committee decided to remind RA Pune for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 28.09.2010.   41

Case No.:28/35/81­ALC2/2009

Party Name:PHOENIX INDUSTRIES PVT. LTD 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00336/AM10/ RLA File :03/95/040/00507/AM10/ Lic.No/Date:0310546984 23.11.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 28.09.2010.                 42

Case No.:6/1/81­ALC2/2010

Party Name:RATNESH METAL INDUSTRIES PVT. LTD 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00540/AM10/ RLA File :08/24/040/00220/AM10/ Lic.No/Date:0810084403 25.11.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply of the firm is not received. Therefore, the Committee decided to send letter to  RA Ahmedabad  for checking whereabouts of the firm and delivering D/L to the firm. The case stands deferred and to be relisted on 28.09.2010.   43

Case No.:1/37/81­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00344/AM10/ RLA File :31/24/040/00167/AM10/ Lic.No/Date:3110040846 27.11.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited   therefore decided to send another reminder to firm . The case stands deferred and to be re­listed on 28.09.2010.  

Case No.:2/37/81­ALC2/2009

Party Name:HAVELLS INDIA LTD. Status:Approved

44 y 17.08.2010 pp HQ File :01/81/050/00345/AM10/ RLA File :05/23/040/00111/AM10/ Lic.No/Date:0510253581 30.11.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP as under:­ 1.      Quantities of import items from S.No. 1 to 9 and  13 to 23 may be allowed on net to net basis with accountability clause. 2.      Quantities of import items at S.No. 10, 11 & 12  may be allowed as 50 Grams, 238 Grams and 216 Grams respectively on net to net basis. 3.      Quantity of import items at S.No. 24 may be allowed as applied for i.e. 1176 Kgs inclusive of 5 % wastage. 4.      Quantities of import items at S.No. 25 & 26  may be allowed as 612 Grams and 4816 Litres  respectively on net to net basis.                 45

Case No.:17/1/81­ALC2/2010

Party Name:SUNCHIRIN AUTOPARTS INDIA PVT. LTD. Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00551/AM10/ RLA File :07/24/040/00329/AM10/ Lic.No/Date:0710068636 02.12.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited after sending two reminders and therefore decided to send a final reminder to firm . The case stands deferred and to be re­listed on 28.09.2010. 46

Case No.:3/1/81­ALC2/2010

Party Name:TRANSLLOY INDIA PVT. LTD., Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00537/AM10/ RLA File :03/95/040/00558/AM10/ Lic.No/Date:0310549022 03.12.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited   therefore decided to send another reminder to firm . The case stands deferred and to be re­listed on 28.09.2010. 47

Case No.:12/37/81­ALC2/2009

Party Name:KE­TECHNICAL Meet No/Date:20/81­ Status:

TEXTILES PVT.LTD. ALC2/2010 17.08.2010 Tranferred HQ File :01/81/050/00355/AM10/ RLA File :02/24/040/00171/AM10/ Lic.No/Date:0210134925 07.12.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the above case does not pertain to NC­II and decided to transfer the case to NC­5. 48

Case No.:3/39/81­ALC2/2009

Party Name:MAHENDRA INDUSTRIES Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Approved HQ File :01/81/050/00359/AM10/ RLA File :07/24/040/00342/AM10/ Lic.No/Date:0710068801 10.12.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP as under vide UO   dtd. 25.08.2010.:­ 1.      Quantity of import item at S.No. 1 may be allowed as applied for i.e. 19611.37 Kgs. inclusive of 1% wastage. 2.      Quantity of import item at S.No. 2 may be allowed as applied for i.e. 588.62 Kgs. inclusive of 1% wastage.       49

Case No.:40/48/83­ALC1/2009

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 17.08.2010 Status:Deffered and Re­indexed HQ File :01/83/050/00924/AM10/ RLA File :03/95/040/00408/AM09/ Lic.No/Date:0310551323 17.12.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 28.09.2010.   50

Case No.:25/41/81­ALC2/2009

Party Name:CODINA METALIC PRIVATE LIMITED 17.08.2010 Status:Approved HQ File :01/81/050/00410/AM10/ RLA File :04/24/040/00239/AM10/ Lic.No/Date:0410110392 23.12.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP as under vide UO dtd. 25.08.2010:­

1.      Words “ 595 X 595 x 0.9 mm” may be suffixed with the description of export product. 2.      Words “Thickness 0.9 mm” may be suffixed with the description of import item and its quantity may be allowed as 46200 Sq. Mtrs. inclusive of a wastage of 5 %.       51

Case No.:22/41/81­ALC2/2009

Party Name:EFD INDUCTION LIMITED, 17.08.2010 Status:Approved HQ File :01/81/050/00407/AM10/ RLA File :07/24/040/00331/AM10/ Lic.No/Date:0710069195 31.12.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DHI vide their U.O   No. 3(36)/2010/TSW(B) dated 13.08.2010 (copy enclosed).               52

Case No.:18/1/81­ALC2/2010

Party Name:VIDEOCON INDUSTRIES LIMITED 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00552/AM10/ RLA File :03/95/040/00640/AM10/ Lic.No/Date:0310553146 31.12.2009 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o IT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 28.09.2010. 53

Case No.:29/41/81­ALC2/2009

Party Name:JCR DRILLSOL PVT LTD 17.08.2010 Status:Rejected HQ File :01/81/050/00414/AM10/ RLA File :07/21/040/00919/AM10/ Lic.No/Date:0710069229 04.01.2010   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its  M.No.  20/81  scheduled  to  be  held  on  17.08.2010  but  actually  held  on  25.08.2010.  The  Committee  observed  that  despite  several reminders reply has not been received from firm therefore decided to reject the request of firm.

54

Case No.:32/1/81­ALC2/2010

Party Name:ABIR INFRASTRUCTURE PRIVATE LIMITED Meet No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00566/AM10/ RLA File :05/23/040/00159/AM10/ Lic.No/Date:0510256336 14.01.2010 Defer Date:28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited after sending two reminders and therefore decided to send a final reminder to firm . The case stands deferred and to be re­listed on 28.09.2010.   55

Case No.:6/45/81­ALC2/2009

Party Name:COOKSON INDIA PVT. LTD. 17.08.2010 Status:Closed HQ File :01/81/050/00436/AM10/ RLA File :04/24/040/00263/AM10/ Lic.No/Date:0410110982 21.01.2010 Defer Date:   Decision : : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The committee has observed that as RA informed that the copy of application may not be forwarded to HQ because the firm has not submitted the sufficient number of copy of applications to RA, decided to withdraw the case.   56

Case No.:42/1/81­ALC2/2010

Party Name:GLOBAL WIND POWER LTD. 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00576/AM10/ RLA File :03/94/040/00676/AM10/ Lic.No/Date:0310556824 25.01.2010 Defer Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from the DHI is still awaited . The case stands deferred and to be re­listed on 28.09.2010   57

Case No.:8/45/81­ALC2/2009

Party Name:DUCATI ENERGIA (INDIA) PVT.LTD. 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00438/AM10/ RLA File :31/24/040/00216/AM10/ Lic.No/Date:3110041683 27.01.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited   therefore decided to send another reminder to firm . The case stands deferred and to be re­listed on 28.09.2010. 58

Case No.:10/45/81­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Status:Deffered

17.08.2010 and Re­indexed HQ File :01/81/050/00440/AM10/ RLA File :05/23/040/00163/AM10/ Lic.No/Date:0510257035 28.01.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited   therefore decided to send another reminder to firm . The case stands deferred and to be re­listed on 28.09.2010. 59

Case No.:11/45/81­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and  Re­ indexed HQ File :01/81/050/00441/AM10/ RLA File :05/23/040/00164/AM10/ Lic.No/Date:0510257036 28.01.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited   therefore decided to send another reminder to firm . The case stands deferred and to be re­listed on 28.09.2010.   60

Case No.:1/46/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 17.08.2010 Status:Deffered  and Re­indexed HQ File :01/81/050/00446/AM10/ RLA File :09/24/040/00431/AM10/ Lic.No/Date:0910040768 02.02.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from the DHI is still awaited . The case stands deferred and to be re­listed on 28.09.2010   61

Case No.:2/46/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 17.08.2010 Re­indexed HQ File :01/81/050/00447/AM10/ RLA File :09/24/040/00378/AM10/ Lic.No/Date:0910040771 02.02.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from the DHI is still awaited . The case stands deferred and to be re­listed on 28.09.2010   62

Case No.:4/46/81­ALC2/2009

Party Name:BILCARE LIMITED 17.08.2010 Re­indexed HQ File :01/81/050/00449/AM10/ RLA File :31/24/040/00194/AM10/ Lic.No/Date:3110041791 02.02.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II

in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. As per the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 28.09.2010: ­   1.Information in respect of S.No.  5 & 11 of the Standard Deficiency Format.                 63

Case No.:1/47/81­ALC2/2009

Party Name:BILCARE LIMITED 17.08.2010 Re­indexed HQ File :01/81/050/00450/AM10/ RLA File :31/24/040/00197/AM10/ Lic.No/Date:3110041809 03.02.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. As per the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 28.09.2010: ­   1.Information in respect of S.No.  5 & 11 of the Standard Deficiency Format.     64

Case No.:2/47/81­ALC2/2009

Party Name:NICO EXTRUSIONS PVT.LTD. 17.08.2010 Re­indexed HQ File :01/81/050/00451/AM10/ RLA File :03/95/040/00689/AM10/ Lic.No/Date:0310558495 04.02.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. As per the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 28.09.2010: ­   1.Information in respect of S.No.  5 & 11 of the Standard Deficiency Format.

65

Case No.:4/47/81­ALC2/2009

Party Name:MINOX METAL PVT.LTD, 17.08.2010 Status:Approved HQ File :01/81/050/00453/AM10/ RLA File :07/24/040/00413/AM10/ Lic.No/Date:0710069856 05.02.2010   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. As per the recommendation of the representative of M/o Steel present in the meeting, it was decided by the Committee to ratify the norms with 0.5% wastage and quantity allowed is 74089 Kg.               66

Case No.:5/47/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 17.08.2010 Re­indexed HQ File :01/81/050/00454/AM10/ RLA File :03/95/040/00702/AM10/ Lic.No/Date:0310559157 09.02.2010 Defer Date:28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited   therefore decided to send another reminder to firm . The case stands deferred and to be re­listed on 28.09.2010.   67

Case No.:6/47/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00455/AM10/ RLA File :03/95/040/00688/AM10/ Lic.No/Date:0310559158 09.02.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited   therefore decided to send another reminder to firm . The case stands deferred and to be re­listed on 28.09.2010. 68

Case No.:43/1/81­ALC2/2010

Party Name:K.S.INSTRUMENTS PVT.LTD., 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00577/AM10/ RLA File :07/24/040/00407/AM10/ Lic.No/Date:0710069903 09.02.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is

still awaited after sending two reminders and therefore decided to send a final reminder to firm . The case stands deferred and to be re­listed on 28.09.2010. 69

Case No.:9/47/81­ALC2/2009

Party Name:R.M.CONTROLS P LTD Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and  Re­ indexed HQ File :01/81/050/00458/AM10/ RLA File :05/24/040/00478/AM10/ Lic.No/Date:0510258401 12.02.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its  M.No.  20/81  scheduled  to  be  held  on  17.08.2010  but  actually  held  on  25.08.2010.As  per  written  comments  of  DHI  vide  U.O.  No 3(58)/2010/TSW(B) dtd. 17.08.2010, D/L is being issued to firm. The case stands deferred and to be re­listed on 28.09.2010.   70

Case No.:38/1/81­ALC2/2010

Party Name:ANJANI TECHNOPLAST LTD. 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00572/AM10/ RLA File :05/23/040/00184/AM10/ Lic.No/Date:0510258638 16.02.2010 Defer Date:28.09.2010 Decision : : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the C&PC is still awaited   therefore decided to send another reminder to C&PC . The case stands deferred and to be re­listed on 28.09.2010. 71

Case No.:45/1/81­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00579/AM10/ RLA File :11/24/040/00044/AM10/ Lic.No/Date:1110021822 18.02.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee decided to send the application of firm to DHI for re­examination. The case stands deferred and to be re­listed on 28.09.2010. 72

Case No.:44/1/81­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and  Re­ indexed HQ File :01/81/050/00578/AM10/ RLA File :05/23/040/00176/AM10/ Lic.No/Date:0510259435 25.02.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited   therefore decided to send another reminder to firm . The case stands deferred and to be re­listed on 28.09.2010.   73

Case No.:33/1/81­ALC2/2010

Party  Name:ASHLEY  ALTEAMS  INDIA  PRIVATE LIMITED 17.08.2010 Re­indexed

HQ File :01/81/050/00567/AM10/ RLA File :04/24/040/00306/AM10/ Lic.No/Date:0410112257 10.03.2010 Defer  Date: 28.09.2010 Decision : : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee decided that copy of the application may be forwarded to DIPP for comments. The case stands deferred and to be re­listed on 28.09.2010.   74

Case No.:1/1/81­ALC2/2010

Party Name:MAHENDRA INDUSTRIES 17.08.2010 Re­indexed HQ File :01/81/050/00535/AM10/ RLA File :07/24/040/00465/AM10/ Lic.No/Date:0710070541 15.03.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 28.09.2010.   75

Case No.:15/1/81­ALC2/2010

Party Name:ADARSHA  CONTROL  SYSTEMS  PVT LTD., 17.08.2010 Re­indexed HQ File :01/81/050/00549/AM10/ RLA File :07/21/040/01138/AM10/ Lic.No/Date:0710070560 17.03.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   76

Case No.:16/1/81­ALC2/2010

Party Name:ADARSHA  CONTROL  SYSTEMS  PVT LTD., 17.08.2010 Re­indexed HQ File :01/81/050/00550/AM10/ RLA File :07/21/040/01139/AM10/ Lic.No/Date:0710070561 17.03.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands

77

Case No.:24/1/81­ALC2/2010

Party Name:TATA BP SOLAR INDIA LTD. 17.08.2010 Re­indexed HQ File :01/81/050/00558/AM10/ RLA File :07/24/040/00419/AM10/ Lic.No/Date:0710070585 18.03.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from the MNRE is still awaited therefore decided to send a reminder to MNRE. The case stands deferred and to be re­listed on 28.09.2010   78

Case No.:25/1/81­ALC2/2010

Party Name:ESWARI METAL INDUSTRIES 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00559/AM10/ RLA File :07/24/040/00461/AM10/ Lic.No/Date:0710070587 18.03.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from the M/o Mines is still awaited therefore decided to send a reminder to M/o Mines. The case stands deferred and to be re­listed on 28.09.2010 79

Case No.:26/1/81­ALC2/2010

Party Name:ESWARI METAL INDUSTRIES 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00560/AM10/ RLA File :07/24/040/00462/AM10/ Lic.No/Date:0710070588 18.03.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from the M/o Mines is still awaited therefore decided to send a reminder to M/o Mines. The case stands deferred and to be re­listed on 28.09.2010 80

Case No.:27/1/81­ALC2/2010

Party Name:VEER­O­ METALS PVT .LTD Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and  Re­ indexed HQ File :01/81/050/00561/AM10/ RLA File :07/24/040/00467/AM10/ Lic.No/Date:0710070640 22.03.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be re­listed on 28.09.2010.   81

Case No.:28/1/81­ALC2/2010

Party Name:KALYANI THERMAL SYSTEMS LTD., 17.08.2010 Status:Transferred  To NC­I HQ File :01/81/050/00562/AM10/ RLA File :31/24/040/00250/AM10/ Lic.No/Date:3110042494 23.03.2010 Defer Date:

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee decided to transfer the case to NC­I . 82

Case No.:30/1/81­ALC2/2010

Party Name:TRANSLLOY INDIA PVT. LTD., Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00564/AM10/ RLA File :03/95/040/00862/AM10/ Lic.No/Date:0310566656 25.03.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be re­listed on 28.09.2010. 83

Case No.:1/3/81­ALC2/2010

Party Name:ELINS SWITCH BOARDS PVT. LTD. Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00002/AM11/ RLA File :07/24/040/00497/AM10/ Lic.No/Date:0710070749 01.04.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 84

Case No.:2/3/81­ALC2/2010

Party Name:WEBB INDIA PVT. LTD Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and  Re­ indexed HQ File :01/81/050/00003/AM11/ RLA File :07/24/040/00490/AM10/ Lic.No/Date:0710070750 01.04.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   85

Case No.:3/3/81­ALC2/2010

Party Name:OIL COUNTRY TUBULAR LIMITED 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00004/AM11/ RLA File :09/24/040/00571/AM10/ Lic.No/Date:0910041570 07.04.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be re­listed on 28.09.2010. Status:Deffered

86

Case No.:4/3/81­ALC2/2010

Party Name:MAHENDRA INDUSTRIES 17.08.2010 and Re­indexed HQ File :01/81/050/00005/AM11/ RLA File :07/24/040/00493/AM10/ Lic.No/Date:0710070805 07.04.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 87

Case No.:6/3/81­ALC2/2010

Party Name:VIJAI ELECTRICALS LTD Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00007/AM11/ RLA File :09/24/040/00141/AM10/ Lic.No/Date:0910041604 09.04.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from the DHI is still awaited . The case stands deferred and to be re­listed on 28.09.2010 88

Case No.:8/3/81­ALC2/2010

Party Name:ABB LIMITED Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and  Re­ indexed HQ File :01/81/050/00009/AM11/ RLA File :07/24/040/00006/AM11/ Lic.No/Date:0710070878 12.04.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   89

Case No.:1/9/81­ALC2/2010

Party Name:NAGREEKA FOILS LTD., 17.08.2010 Status:Approved HQ File :01/81/050/00034/AM11/ RLA File :03/95/040/00106/AM11/ Lic.No/Date:0310574202 13.05.2010   Decision : Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP as under vide UO   dtd. 25.08.2010:­ 1.  Word ‘ Relevant” may be prefixed with the description of import item at Sl. No. 1 and after taking clue from SION C­1711, quantity of this item  may be allowed as 492900  Kgs   inclusive of 6% wastage. 2  Taking clue from SION C­1711, quantity of  import item at Sl. No 2 may be allowed 36780  Kgs   inclusive of 5% wastage

      90

Case No.:2/9/81­ALC2/2010

Party  Name:BHARAT  HEAVY  ELECTRICALS LIMITED 17.08.2010 Status:Approved HQ File :01/81/050/00035/AM11/ RLA File :06/24/040/00009/AM11/ Lic.No/Date:0610017929 14.05.2010   Decision : Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DHI vide their U.O   No. 3(70)/2007/TSW(B) dtd 06.08.2010 (copy enclosed).                                 91

Case No.:3/9/81­ALC2/2010

Party Name:MAHENDRA INDUSTRIES 17.08.2010 Status:Approved HQ File :01/81/050/00036/AM11/ RLA File :07/24/040/00038/AM11/ Lic.No/Date:0710071635 18.05.2010   Decision : Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms

y y in respect of the subject advance authorization, as per written comments of DIPP as under vide UO   dtd. 25.08.2010 :­ 1.      Quantity of import item at S.No. 1 may be allowed as applied for i.e. 4871.34 Kgs on net to net basis.                                2.    Quantity of import item at S.No. 2 may be allowed as                                                 applied for i.e. 126.86  Kgs. inclusive of 1% wastage         92

Case No.:4/9/81­ALC2/2010

Party Name:METAL LINK ALLOYS LTD. 17.08.2010 Re­indexed HQ File :01/81/050/00037/AM11/ RLA File :03/95/040/00072/AM11/ Lic.No/Date:0310575266 20.05.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from the MSME is still awaited . The case stands deferred and to be re­listed on 28.09.2010   93

Case No.:5/9/81­ALC2/2010

Party Name:METAL LINK ALLOYS LTD. 17.08.2010 Re­indexed HQ File :01/81/050/00038/AM11/ RLA File :03/95/040/00021/AM11/ Lic.No/Date:0310575270 20.05.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands       94

Case No.:6/9/81­ALC2/2010

Party Name:MAN INDUSTRIES (INDIA) LTD. Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and  Re­ indexed HQ File :01/81/050/00039/AM11/ RLA File :03/95/040/00102/AM11/ Lic.No/Date:0310575282 20.05.2010 Defer  Date: 28.09.2010 Decision : : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee decided to send a letter to firm as per comments of DIPP. The case stands deferred and to be relisted on 28.09.2010.

95

Case No.:7/9/81­ALC2/2010

Party Name:MAN INDUSTRIES (INDIA) LTD. Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00040/AM11/ RLA File :03/95/040/00103/AM11/ Lic.No/Date:0310575295 20.05.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee decided to send a letter to firm as per comments of DIPP. The case stands deferred and to be relisted on 28.09.2010 96

Case No.:8/9/81­ALC2/2010

Party Name:VIJAI ELECTRICALS LTD Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00041/AM11/ RLA File :09/24/040/00053/AM11/ Lic.No/Date:0910042102 20.05.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 97

Case No.:9/9/81­ALC2/2010

Party Name:THEETA ELECTRICALS PVT LTD. 17.08.2010 Status:Approved HQ File :01/81/050/00042/AM11/ RLA File :05/24/040/00058/AM11/ Lic.No/Date:0510264638 20.05.2010   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP as under vide UO   dtd. 25.08.2010:­ Word “Relevant” may be prefixed with the description of import items from Sl. No.      1 to 15 and the same may be allowed on net to net basis.     98

Case No.:10/9/81­ALC2/2010

Party Name:MAHENDRA INDUSTRIES 17.08.2010 Status:Approved HQ File :01/81/050/00043/AM11/ RLA File :07/24/040/00032/AM11/ Lic.No/Date:0710071753 24.05.2010   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP as under: 1.      Quantity of import item at S.No. 1 may be allowed as applied for i.e. 14708.83 Kgs. inclusive of 1% wastage. 2.      Quantity of import item at S.No. 2 may be allowed as applied for i.e. 441.16  Kgs. inclusive of 1% wastage.

  99

Case No.:11/9/81­ALC2/2010

Party Name:TATA BP SOLAR INDIA LTD. 17.08.2010 Re­indexed HQ File :01/81/050/00044/AM11/ RLA File :07/24/040/00441/AM10/ Lic.No/Date:0710071806 26.05.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from the MNRE is still awaited therefore decided to send a reminder to MNRE. The case stands deferred and to be re­listed on 28.09.2010   100

Case No.:12/9/81­ALC2/2010

Party Name:ADARSHA  CONTROL  SYSTEMS  PVT LTD., 17.08.2010 Re­indexed HQ File :01/81/050/00045/AM11/ RLA File :07/21/040/00113/AM11/ Lic.No/Date:0710071810 26.05.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands               101

Case No.:1/11/81­ALC2/2010

Party Name:COPRAL  INSULATED  CONDUCTORS PVT LTD 17.08.2010 Re­indexed HQ File :01/81/050/00046/AM11/ RLA File :04/24/040/00040/AM11/ Lic.No/Date:0410114089 28.05.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   102

Case No.:11/11/81­ALC2/2010

Party Name:APAR INDUSTRIES LIMITED 17.08.2010 Status:Approved

HQ File :01/81/050/00056/AM11/ RLA File :34/24/040/00001/AM11/ Lic.No/Date:3410027088 28.05.2010   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP as under vide UO   dtd. 25.08.2010:­ Taking clue from SION C­1, quantity of import item may be allowed as applied for i.e. 15.6 MT inclusive of a wastage of 4 %.   R/A may take suitable consequential action accordingly 103

Case No.:2/11/81­ALC2/2010

Party Name:CONTROL INFOTECH PRIVATE LIMITED Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and  Re­ indexed HQ File :01/81/050/00047/AM11/ RLA File :07/24/040/00051/AM11/ Lic.No/Date:0710071914 31.05.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands               104

Case No.:3/11/81­ALC2/2010

Party  Name:BHARAT  HEAVY  ELECTRICALS LIMITED 17.08.2010 Status: Approved HQ File :01/81/050/00048/AM11/ RLA File :06/24/040/00012/AM11/ Lic.No/Date:0610018095 31.05.2010   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DHI vide their U.O No 3(70)/2007/TSW(B)  dated 06.08.2010 (copy enclosed).   R/A may take suitable consequential action accordingly   105

Case No.:4/11/81­ALC2/2010

Party Name:DYNAMIC CABLES PVT. LTD. 17.08.2010 Status:Approved

HQ File :01/81/050/00049/AM11/ RLA File :13/24/040/00029/AM10/ Lic.No/Date:1310032271 31.05.2010   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP as under vide UO   dtd. 25.08.2010:­ 1.      Words “ 3C x 95 Sq. mm­ Qty. 2 Kms and 3C x 120 Sq. mm­ Qty. 2 Kms” may be suffixed with the description of export product. 2.      Total net weight of export product may be specified as 25046 Kgs. 3.      Quantity of import item at Sl.No.1 i.e. may be allowed as applied for i.e. 3.46 MT inclusive of 1% wastage. 4.      Quantity of import item at Sl.No.2 may be allowed as 1.05 Kgs./Kg content in the export product. 5.      Quantity of import item at Sl.No.3 may be allowed as 11.375 MT inclusive of 2 % wastage. 6.      Quantity of import item at Sl.No.4  may be allowed as 0.556  MT inclusive of 1 % wastage.   R/A may take suitable consequential action accordingly   106

Case No.:6/11/81­ALC2/2010

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 17.08.2010 Re­indexed HQ File :01/81/050/00051/AM11/ RLA File :35/24/040/00045/AM10/ Lic.No/Date:3510030416 02.06.2010 Defer Date:28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 28.09.2010.             107

Case No.:9/11/81­ALC2/2010

Party  Name:DELTA  POWER  SOLUTIONS  INDIA PVT.LTD. 17.08.2010 Re­indexed HQ File :01/81/050/00054/AM11/ RLA File :25/24/040/00004/AM11/ Lic.No/Date:2510002878 02.06.2010 Defer Date:28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands

108

Case No.:7/11/81­ALC2/2010

Party Name:DIANA METALS 17.08.2010 Re­indexed HQ File :01/81/050/00052/AM11/ RLA File :04/24/040/00054/AM11/ Lic.No/Date:0410114241 03.06.2010 Defer Date:28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. As per the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 28.09.2010: ­   1.      Information in respect of S.No. 3,4,5 & 11 of the Standard Deficiency Format.­ Export product wise     109

Case No.:10/11/81­ALC2/2010

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 17.08.2010 Re­indexed HQ File :01/81/050/00055/AM11/ RLA File :35/24/040/00046/AM10/ Lic.No/Date:3510030450 03.06.2010 Defer Date:28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 28.09.2010.         110

Case No.:5/11/81­ALC2/2010

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 17.08.2010 Re­indexed HQ File :01/81/050/00050/AM11/ RLA File :35/24/040/00048/AM10/ Lic.No/Date:3510030471 04.06.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 28.09.2010.   111

Case No.:13/11/81­ALC2/2010

Party  Name:RUBY  MICA  COMPANY  PRIVATE LIMITED, 17.08.2010 Re­indexed HQ File :01/81/050/00058/AM11/ RLA File :02/24/040/00029/AM11/ Lic.No/Date:0210142969 04.06.2010 Defer  Date: 28.09.2010

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  20/81  scheduled  to  be  held  on  17.08.2010  but  actually  held  on  25.08.2010.  The  Committee  decided  to  send  a  copy  of application of firm to DIPP for comments. The case stands deferred and to be relisted on 28.09.2010.   112

Case No.:14/11/81­ALC2/2010

Party  Name:S  K  M  TECHNOLOGIES  PRIVATE LIMITED 17.08.2010 Re­indexed HQ File :01/81/050/00059/AM11/ RLA File :09/24/040/00024/AM11/ Lic.No/Date:0910042253 07.06.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands                   113

Case No.:15/11/81­ALC2/2010

Party Name:APAR INDUSTRIES LIMITED 17.08.2010 Re­indexed HQ File :01/81/050/00060/AM11/ RLA File :34/24/040/00004/AM11/ Lic.No/Date:3410027158 07.06.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands 114

Case No.:16/11/81­ALC2/2010

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 17.08.2010 Re­indexed HQ File :01/81/050/00061/AM11/ RLA File :35/24/040/00049/AM10/ Lic.No/Date:3510030492 07.06.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 28.09.2010.

115

Case No.:17/11/81­ALC2/2010

Party Name:TOPWORTH PIPES & TUBES PRIVATE LIMITED Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00062/AM11/ RLA File :03/95/040/00191/AM11/ Lic.No/Date:0310577992 08.06.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee decided to send deficiency letter to firm as per written comments of DIPP.(copy enclosed) The case stands deferred and to be relisted on 28.09.2010. 116

Case No.:1/20/81­ALC2/2010

Party Name:ABB LIMITED Meet  No/Date:20/81­ ALC2/2010 17.08.2010 Status: Deffered and  Re­ indexed HQ File :01/81/050/00114/AM11/ RLA File :07/24/040/00145/AM11/ Lic.No/Date:0710073408 05.08.2010 Defer  Date: 28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands       117

Case No.:2/20/81­ALC2/2010

Party Name:NAGREEKA FOILS LTD., 17.08.2010 Status: Deffered and Re­indexed HQ File :01/81/050/00115/AM11/ RLA File :03/95/040/00303/AM11/ Lic.No/Date:0310586271 06.08.2010 Defer Date:28.09.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands

PART –AR – DEFFER S.No. 120

Case No. AR­24

 M/S  RPG Cables Ltd.Mysore.           Meeting No.20/81 F.No.01/81/50/157/AM09/DES­II Dated : 17.08.2010 Advance License No.0310475240 dt.18­06­2008   RLA F.No.03/95/40/0242/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the reply from the firm is still awaited   therefore decided to send another reminder to firm . The case stands deferred and to be re­listed on 28.09.2010. S.No. 121

Case No. AR­36

 M/S Walchandnagar Industries Ltd., Pune           Meeting No. 20/81 F.No.01/81/162/851/AM06/DES­II Dated 17.08.2010 Advance Licence No.3110023394  dt. 23.12.2005           RLA F.No.31/95/42/0042/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Committee decided to examine the case on file as per earlier decision. The case stands deferred and to be re­listed on 28.09.2010.   S.No. 122

Case No. AR­56

 M/S  Banaras Beads Ltd.,  Varanasi             Meeting No. 20/81 F.No.01/84/050/641/AM06/DES­I/DES­II Dated 17.08.2010 Advance License No.1510003017 dt. 28.12.2005   RlA F.No.15/80/40/016/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Committee observed that the case is under examination to MSME. The case stands deferred and to be re­listed on 28.09.2010.   S.No.  123

Case No. AR­49

 M/s Delton Cables Ltd.,    Meeting No. 20/81 F.No.01/81/050/00793/AM09/DES­II Dated 17.08.2010 Advance License No.0510206449 dt.18.07.2007   RLA F.No.05/24/040/0306/AM08 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP as under vide UO   dtd. 25.08.2010:­ 1.      Quantity of import item at Sl.No.1 may be allowed as  1928.7 Kgs inclusive of 1% wastage. 2.      Quantities of import items at Sl.No.2  & 4 may be allowed as 1.05 Kgs/Kg content in the export products. 3.      Quantity of import item at Sl.No.3 may be allowed as 4832 kgs.  inclusive of 2 % wastage.

R/A may take suitable consequential action accordingly   Sl. No. 124

Case No. AR ­81

M/s.  Copper Strips (P) Ltd. Bhopal            Meeting No.20/81 F.No.01/80/81/50/688/AM09/DES­II  Dated 17.08.2010 Advance License No 1110016890 dt.23­03­2008                RLA F.No.11/24/40/064/AM08          Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP as under vide UO   dtd. 25.08.2010:­ i)           Description of export product may be amended to “Copper Components Usable in Electrical Equipments viz. Profile Curve 160A, L=1000, Profile Curve 160A, L=1400, Profile Curve 250A, L=1000, Profile Curve 250A, L=1400, Profile Curve 400A, L=1000 & Profile Curve 400A, L=1400” ii) The quantity of import item may allowed as  6989.97 Kgs. inclusive of 3 % wastage after 2/3rd recovery of scrap     R/A may take suitable consequential action accordingly Sl. No. 125

CASE NO. AR­39

M/s. Gamesa Wind Tubines Pvt. Ltd., Chennai           Meeting No. 20/81 F.No.01/81/050/178/AM10/DES­II      Dated:  17.08.2010  Advance Licence No. 0410107978 dated 23.03.2009   RLA’s F.No.04/24/40/1136/AM10 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Committee observed that the case is under examination to DHI. The case stands deferred and to be re­listed on 28.09.2010.     Sl. No. 126

CASE NO. AR­39

M/s. Andritz Hydro Pvt. Ltd.(formerly known VA Tech Hydro India Pvt. Ltd.)             Meeting No. 20/81 F.No.01/81/162/256/AM11/DES­II      Dated:  17.08.2010  Advance Licence No. 1110019319 dated 02.01.2009   RLA’s F.No.11/22/40/043/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Committee observed that the case is under examination to MSME. The case stands deferred and to be re­listed on 28.09.2010.

PART – C – DEFFER S.No. 37

Case No. C­ 02

Reference received from Policy Devision           Meeting No. 20/81 F.No.01/80/162/748/AM10/DES­II  Dated 17.08.2010     Verification of SION for the product “Graphite Electrodes” Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010. The Committee observed that the data from the EEPC is still awaited   therefore decided to send another reminder to them . The case stands deferred and to be re­listed on 28.09.2010.   S.No. 38

Case No. C­19

 M/S.  Andritz Hydro Pvt. Ltd.(formerly known VA  Tech Hydro India Pvt. Ltd.)             Meeting No 20/81 F.No.01/81/162/00464/AM10//DES­II Dated 17.08.2010   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Committee observed that the case is under examination on file by DGFT.The case stands deferred and to be re­listed on 28.09.2010 PART – D – DEFFER S. No. 01

CASE NO. D­  1

  M/s.  The Madras Aluimnium Co. Ltd., Salem (T.N)   Meeting No.  20/81 F.No.01/81/162/307/AM’11/DES­II      Dated:     17.08.2010          Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 17.08.2010 but actually held on 25.08.2010.The Committee observed that the case is under examination to DIPP. The case stands deferred and to be re­listed on 28.09.2010