RATIFIED MINUTES   DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   MINUTES OF THE NORMS COMMITTEE­II MEETING NO. 15/81 SCHEDULED TO BE HELD ON 13.07.2010 BUT ACTUALLY HELD ON 20.07.2010.   The Meeting No. 15/81 of Norms Committee­II was held on 20.07.2010   for the licensing year 2010­2011 under the Chairmanship of Sh. V.K. Srivastava, Addl. Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorizations  under  Duty  Exemption  Scheme  (Chapter­4)  of  Foreign  Trade  Policy  2009­2014.  The  following  members  were  present  in  the meeting:­ S.No Name of the representatives & their Designation   Deptt.     1. 2. 3. 4. 5.   Sh. B.D. Ghosh, Jt. IA Sh. Gajraj Singh, Sr. D.O. Sh. S.K. Jain, DO Sh. K.K.Funda, Asst. Dir. Sh. Shyam Sunder, DDG   MOS DHI DIPP M/o Steel DGFT     1

Case No.:12/40/81­

ALC2/2007 Party Name:POWER GEAR LTD. Meet No/Date:15/81­ ALC2/2010 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00450/AM08/ RLA File :07/24/040/00600/AM08/ Lic.No/Date:0710054616 22.11.2007 Defer Date:03.08.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance authorization  was  considered  by  the  Norms  Committee  ­  II  in  its  M.No.  15/81 scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 03.08.2010.     2

Case No.:10/13/81­ALC2/2008

Party Name:INTEGRATED CLEAN ROOM TECHNOLOGIES LTD., Meet No/Date:15/81­ALC2/2010 13.07.2010 Status:Approved HQ File :01/81/050/00163/AM09/ RLA File :09/24/040/00072/AM09/ Lic.No/Date:0910034355 19.06.2008   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II

in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP vide their U.O dated 13.07.2010 with following modification:­   1.            FOB  value  of    export  product  may  be  corrected  to  279.10  lakhs  as  informed  by  the  firm  vide  their  letter  dated 18/6/2010. 2.      Net weight of export product may be specified as 371.72 MT. 3.      Quantity of import item may be allowed within 2 % of FOB value of exports.   R/A may take suitable consequential action accordingly.   3

Case No.:3/29/81­ALC2/2008

Party Name:PSL LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00420/AM09/ RLA File :03/95/040/00545/AM09/ Lic.No/Date:0310487951 26.09.2008 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. NC decided that a copy of the reply received from the firm may be referred to DHI. The case stands deferred and to be relisted on 17.08.2010.   4

Case No.:2/38/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00547/AM09/ RLA File :05/24/040/00974/AM08/ Lic.No/Date:0510228825 03.10.2008 Defer Date:03.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under examination of DHI. The case stands deferred and to be re­listed on 03.08.2010.   5

Case No.:14/38/81­ALC2/2008

LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00576/AM09/ RLA File :05/24/040/00971/AM08/ Lic.No/Date:0510228820 03.10.2008 Defer Date:13.07.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under examination of DHI. The case stands deferred and to be re­listed on 03.08.2010.   6

Case No.:21/29/81­ALC2/2008

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 13.07.2010 Status:Deffered and Re­indexed

HQ File :01/81/050/00438/AM09/ RLA File :35/24/040/00017/AM09/ Lic.No/Date:3510024822 06.10.2008 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from M/o Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.   7

Case No.:7/34/81­ALC2/2008

Party Name:UTV SOFTWARE COMMUNICATIONS LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00504/AM09/ RLA File :05/24/040/00488/AM09/ Lic.No/Date:0510230376 05.11.2008 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.     8

Case No.:3/41/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00388/AM10/ RLA File :03/95/040/00692/AM09/ Lic.No/Date:0310503872 27.01.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.   9

Case No.:2/1/81­ALC2/2010

Party Name:RPG CABLES LIMITED, 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00536/AM10/ RLA File :03/95/040/00521/AM09/ Lic.No/Date:0310505808 05.02.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 17.08.2010.   10

Case No.:17/51/81­ALC2/2008

Party Name:MOLEX (INDIA) PRIVATE LIMITED, 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00763/AM09/ RLA File :07/24/040/00618/AM09/ Lic.No/Date:0710063292 Defer

26.02.2009 Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 17.08.2010.     11

Case No.:25/33/81­ALC2/2009

Party Name:BLOOMENERGY INDIA PRIVATE LIMITED, 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00304/AM10/ RLA File :07/24/040/00676/AM09/ Lic.No/Date:0710063959 31.03.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 17.08.2010.   12

Case No.:24/27/81­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00206/AM10/ RLA File :32/24/040/00067/AM09/ Lic.No/Date:3210040135 01.04.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under examination of DHI. The case stands deferred and to be re­listed on 17.08.2010.   13

Case No.:12/7/81­ALC2/2009

Party Name:ALSTRONG ENTERPRISES 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00032/AM10/ RLA File :05/24/040/00464/AM09/ Lic.No/Date:0510240950 06.05.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 13.08.2010. The case stands deferred and to be re­listed on 17.08.2010.     14

Case No.:15/7/81­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 13.07.2010 Status:Deffered and Re­indexed

HQ File :01/81/050/00035/AM10/ RLA File :03/94/040/00065/AM10/ Lic.No/Date:0310519156 08.05.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under   15

Case No.:11/9/81­ALC2/2009

Party Name:PRAKASH STEELAGE LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00046/AM10/ RLA File :03/95/040/00846/AM09/ Lic.No/Date:0310520480 20.05.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list the case on 17.08.2010: ­   1.      OD and WT of import item and export product. 2.      Manufacturing process with reduction in diameter and wall thickness at each stage of pilgering/drawing and wastage claimed at each stage with complete justification.     16

Case No.:12/9/81­ALC2/2009

Party Name:ITP INFOTECH PRIVATE LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00047/AM10/ RLA File :05/24/040/00102/AM10/ Lic.No/Date:0510241847 20.05.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. NC decided that a copy of the application of the firm may be referred to DIPP. The case stands deferred and to be relisted on 17.08.2010.     17

Case No.:17/27/81­ALC2/2009

Party Name:CIM TOOLS PVT.LTD., 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00199/AM10/ RLA File :07/24/040/00114/AM10/ Lic.No/Date:0710065505 22.06.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DIPP  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.

18

Case No.:10/27/81­ALC2/2009

Party Name:DYNATECH FURNACES (BOMBAY) PVT.LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00192/AM10/ RLA File :03/94/040/00171/AM10/ Lic.No/Date:0310526069 26.06.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under   19

Case No.:4/41/81­ALC2/2009

Party Name:NICOMET INDUSTRIES LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00389/AM10/ RLA File :03/95/040/00162/AM10/ Lic.No/Date:0310526170 29.06.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list the case on 17.08.2010: ­   1.      Various Chemical reactions involved alongwith their molecular formula and yield. 2.      Wastage at each stage of manufacturing. 3.       Various co­products and by­products obtained during manufacture alongwith their quantity and value. 4.      Last one year production of Nickel Metal and corresponding consumption of various chemicals and Nickel Concentrate duly certified by the Central Excise.     20

Case No.:10/15/81­ALC2/2009

Party Name:ITP INFOTECH PRIVATE LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00096/AM10/ RLA File :05/24/040/00187/AM10/ Lic.No/Date:0510244848 30.06.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. NC decided that a copy of the application of the firm may be referred to DIPP. The case stands deferred and to be relisted on 17.08.2010.   21

Case No.:13/15/81­ALC2/2009

Party Name:MMTC LIMITED 13.07.2010 Status:Approved HQ File :01/81/050/00099/AM10/ RLA File :05/24/040/00164/AM10/ Lic.No/Date:0510244977 01.07.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II

g g p y in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of M/o Steel vide their U.O No. 2(5)/2008­TW(pt.) dated 05.07.2010 (copy enclosed).     22

Case No.:2/17/81­ALC2/2009

Party Name:ITP INFOTECH PRIVATE LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00108/AM10/ RLA File :05/24/040/00213/AM10/ Lic.No/Date:0510245289 07.07.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. NC decided that a copy of the application of the firm may be referred to DIPP. The case stands deferred and to be relisted on 17.08.2010.     23

Case No.:15/17/81­ALC2/2009

Party Name:JHAGADIA COPPER LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00121/AM10/ RLA File :34/24/040/00161/AM09/ Lic.No/Date:3410024683 16.07.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DC(MSME) are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.   24

Case No.:18/17/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 13.07.2010 Status:Approved HQ File :01/81/050/00124/AM10/ RLA File :03/95/040/00243/AM10/ Lic.No/Date:0310529299 17.07.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of MIT vide their U.O No. 17(42)/2009­iphw dated 11.06.2010 (copy enclosed).    

Case No.:2/18/81­ALC2/2009

Status:Deffered and

25 Party Name:INTERPLEX ELECTRONICS INDIA PVT.LTD., 13.07.2010 Re­indexed HQ File :01/81/050/00128/AM10/ RLA File :07/24/040/00098/AM10/ Lic.No/Date:0710066106 23.07.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.     26

Case No.:19/39/81­ALC2/2009

Party Name:BIMETAL BEARINGS LIMITED, 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00375/AM10/ RLA File :32/24/040/00017/AM10/ Lic.No/Date:3210040968 03.08.2009 Defer Date:17.08 .2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DC(MSME) are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.   27

Case No.:13/1/81­ALC2/2010

Party Name:RPG CABLES LIMITED, 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00547/AM10/ RLA File :03/95/040/01032/AM09/ Lic.No/Date:0310532963 10.08.2009 Defer Date:13.07.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. NC decided that a copy of the reply received from the firm may be referred to DIPP. The case stands deferred and to be relisted on 17.08.2010.   28

Case No.:16/41/81­ALC2/2009

Party Name:SALZER ELECTRONICS LTD 13.07.2010 Status:Approved HQ File :01/81/050/00401/AM10/ RLA File :32/24/040/00021/AM10/ Lic.No/Date:3210041042 14.08.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DHI vide their U.O No. 3(76)/2008/TSW(B)/302 dated 11.06.2010 (copy enclosed).  

29

Case No.:9/23/81­ALC2/2009

Party Name:S K M TECHNOLOGIES PRIVATE LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00162/AM10/ RLA File :09/24/040/00167/AM10/ Lic.No/Date:0910039105 28.08.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. NC decided that the party may be advised to seek PH from the TA. The case stands deferred and to be relisted on 17.08.2010.   30

Case No.:2/25/81­ALC2/2009

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00165/AM10/ RLA File :05/23/040/00030/AM10/ Lic.No/Date:0510248715 01.09.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 13.08.2010. The case stands deferred and to be re­listed on 17.08.2010.   31

Case No.:3/25/81­ALC2/2009

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00166/AM10/ RLA File :05/23/040/00001/AM10/ Lic.No/Date:0510248736 02.09.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 13.08.2010. The case stands deferred and to be re­listed on 17.08.2010.     32

Case No.:34/1/81­ALC2/2010

Party Name:INJECTOPLAST PVT.LTD 13.07.2010 Status:Approved HQ File :01/81/050/00568/AM10/ RLA File :06/24/040/00022/AM10/ Lic.No/Date:0610016249 02.09.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in

respect of the subject advance authorization, as per written comments of C&PC vide their O.M. No. 46011/93/2004­PC.II dated 21.06.2010 (copy enclosed).     33

Case No.:4/25/81­ALC2/2009

Party Name:INDIA METAL & ENGINEERING SERVICES, 13.07.2010 Status:Approved HQ File :01/81/050/00167/AM10/ RLA File :07/24/040/00195/AM10/ Lic.No/Date:0710066830 04.09.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect  of  the  subject  advance  authorization,  as  per  written  comments  of  M/o  Steel  vide  their  U.O  No.  2(5)/2006­TW(Vol.II)  dated 02.07.2010 (copy enclosed).     34

Case No.:15/41/81­ALC2/2009

Party Name:SALZER ELECTRONICS LTD 13.07.2010 Status:Approved HQ File :01/81/050/00400/AM10/ RLA File :32/24/040/00024/AM10/ Lic.No/Date:3210041176 08.09.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DHI vide their U.O No. 3(76)/2008/TSW(B)/303 dated 11.06.2010 (copy enclosed).       35

Case No.:7/41/81­ALC2/2009

Party Name:CROMPTON GREAVES LIMITED, 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00392/AM10/ RLA File :03/94/040/00328/AM10/ Lic.No/Date:0310537877 15.09.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DHI are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.

36

Case No.:40/1/81­ALC2/2010

Party Name:INNO FAB (INDIA)PVT LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00574/AM10/ RLA File :09/24/040/00243/AM10/ Lic.No/Date:0910039371 23.09.2009 Defer Date:13.07.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. NC decided that a copy of the application of the firm may be referred to DHI. The case stands deferred and to be relisted on 17.08.2010.   37

Case No.:11/39/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 13.07.2010 Status:Approved HQ File :01/81/050/00367/AM10/ RLA File :03/95/040/00395/AM10/ Lic.No/Date:0310539130 24.09.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of MIT vide their U.O No. 17(69)/2009­iphw dated 06.07.2010 (copy enclosed).       38

Case No.:8/29/81­ALC2/2009

Party Name:TREND TECHNOLOGIES INDIA PUNE PRIVATE LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00254/AM10/ RLA File :31/24/040/00050/AM10/ Lic.No/Date:3110040096 30.09.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 13.08.2010. The case stands deferred and to be re­listed on 17.08.2010.   39

Case No.:7/29/81­ALC2/2009

Party Name:MAINI PRECISION PRODUCTS P LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00253/AM10/ RLA File :07/24/040/00239/AM10/ Lic.No/Date:0710067290 01.10.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee decided that a copy of the reply received from the firm may be referred to DIPP for comments. The case stands deferred and to be relisted on 17.08.2010.

40

Case No.:11/41/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00396/AM10/ RLA File :03/95/040/00399/AM10/ Lic.No/Date:0310540446 06.10.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited by MIT and therefore decided to remind the firm to expedite the reply to MIT under intimation to this office. The case stands deferred and to be re­listed on 17.08.2010.     41

Case No.:14/29/81­ALC2/2009

Party Name:BHANSALI CABLES & CONDUCTORS (P) LTD., 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00260/AM10/ RLA File :05/23/040/00045/AM10/ Lic.No/Date:0510250377 07.10.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DIPP  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.   42

Case No.:16/29/81­ALC2/2009

Party Name:CENTURY METAL RECYCLING PRIVATE LTD.(FORMERLY CENT 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00262/AM10/ RLA File :05/24/040/00223/AM10/ Lic.No/Date:0510250489 08.10.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited by DC(MSME) and therefore decided to remind the firm to expedite the reply to them under intimation to this office. The case stands deferred and to be re­listed on 17.08.2010.   43

Case No.:4/31/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00270/AM10/ RLA File :09/24/040/00107/AM10/ Lic.No/Date:0910039610 15.10.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under

    44

Case No.:12/31/81­ALC2/2009

Party Name:B.M.P. METALS PVT. LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00278/AM10/ RLA File :05/23/040/00066/AM10/ Lic.No/Date:0510251399 26.10.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from M/o Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.   45

Case No.:13/31/81­ALC2/2009

Party Name:SOURIAU INDIA PRIVATE LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00279/AM10/ RLA File :10/24/040/00075/AM10/ Lic.No/Date:1010035805 27.10.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.   46

Case No.:1/33/81­ALC2/2009

Party Name:MET TRADE (INDIA) LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00280/AM10/ RLA File :05/24/040/00338/AM10/ Lic.No/Date:0510251506 27.10.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from M/o Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.     47

Case No.:31/1/81­ALC2/2010

Party Name:MIRC ELECTRONICS LIMITED. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00565/AM10/ RLA File :03/95/040/00417/AM10/ Lic.No/Date:0310542887 28.10.2009 Defer Date:17.08.2010

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited by MIT and therefore decided to remind the firm to expedite the reply to MIT under intimation to this office. The case stands deferred and to be re­listed on 17.08.2010.   48

Case No.:14/33/81­ALC2/2009

Party Name:MET TRADE (INDIA) LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00293/AM10/ RLA File :05/24/040/00354/AM10/ Lic.No/Date:0510252096 09.11.2009 Defer Date:13.07.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from M/o Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.   49

Case No.:15/33/81­ALC2/2009

Party Name:MET TRADE (INDIA) LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00294/AM10/ RLA File :05/24/040/00356/AM10/ Lic.No/Date:0510252098 09.11.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from M/o Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.     50

Case No.:13/35/81­ALC2/2009

Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00321/AM10/ RLA File :31/24/040/00134/AM10/ Lic.No/Date:3110040661 13.11.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 17.08.2010.   51

Case No.:20/35/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 13.07.2010 Status:Approved

HQ File :01/81/050/00328/AM10/ RLA File :09/24/040/00320/AM10/ Lic.No/Date:0910039959 18.11.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect  of  the  subject  advance  authorization,  as  per  written  comments  of  DHI  vide  their  U.O  No.  3(112)/2009/TSW(B)/245  dated 13.05.2010 (copy enclosed).     52

Case No.:9/41/81­ALC2/2009

Party Name:RPG CABLES LIMITED, 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00394/AM10/ RLA File :07/24/040/00308/AM10/ Lic.No/Date:0710068403 19.11.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.     53

Case No.:28/35/81­ALC2/2009

Party Name:PHOENIX INDUSTRIES PVT. LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00336/AM10/ RLA File :03/95/040/00507/AM10/ Lic.No/Date:0310546984 23.11.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from M/o Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.   54

Case No.:6/1/81­ALC2/2010

Party Name:RATNESH METAL INDUSTRIES PVT. LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00540/AM10/ RLA File :08/24/040/00220/AM10/ Lic.No/Date:0810084403 25.11.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  NC  observed  that  the  D/L  has  been  received undelivered. Hence, NC decided that RA may be requested to deliver the letter to the firm and to check whether the firm is existing or not. The case stands deferred and to be relisted on 17.08.2010.

55

Case No.:1/37/81­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00344/AM10/ RLA File :31/24/040/00167/AM10/ Lic.No/Date:3110040846 27.11.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 13.08.2010. The case stands deferred and to be re­listed on 17.08.2010.     56

Case No.:2/37/81­ALC2/2009

Party Name:HAVELLS INDIA LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00345/AM10/ RLA File :05/23/040/00111/AM10/ Lic.No/Date:0510253581 30.11.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under examination of DIPP. The case stands deferred and to be re­listed on 17.08.2010.   57

Case No.:11/1/81­ALC2/2010

Party Name:ROTOMAG MOTORS AND CONTROLS P LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00545/AM10/ RLA File :34/24/040/00125/AM10/ Lic.No/Date:3410025758 01.12.2009 Defer Date:13.07.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP vide their U.O dated 13.07.2010 with following modification:­   1.      Net weight of export products at Sl. Nos. 1 & 2  may be specified as 5472 Kgs and 2220 Kgs. respectively. 2.      Quantity of import item at Sl. No 1 may be allowed as 720 Kgs on net to net basis. 3.      Quantity of import item at Sl. No 2 may be allowed as 1200 Nos. on net to net basis. 4.      Quantities of import items at Sl. Nos 3 & 4  may be allowed as 4800 Nos and 1200 Nos. respectively on   net to net basis. 5.      Quantities of import items at Sl. Nos 5 & 6  may be allowed as 48 Kgs and 140 Kgs.. respectively  on net to net basis   6.      Quantities of import items at Sl. Nos 7, 8 & 9  may be allowed as 200 Nos., 1600 Nos. and 200 Nos. respectively on   net to net basis.

7.      Quantity of import item at Sl. No 10 may be allowed as 8 Kgs on net to net basis. 8.      Import of components may be allowed with accountability clause   58

Case No.:17/1/81­ALC2/2010

Party Name:SUNCHIRIN AUTOPARTS INDIA PVT. LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00551/AM10/ RLA File :07/24/040/00329/AM10/ Lic.No/Date:0710068636 02.12.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be re­listed on 17.08.2010.   59

Case No.:3/1/81­ALC2/2010

Party Name:TRANSLLOY INDIA PVT. LTD., 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00537/AM10/ RLA File :03/95/040/00558/AM10/ Lic.No/Date:0310549022 03.12.2009 Defer Date:13.07.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DC(MSME) are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.   60

Case No.:8/1/81­ALC2/2010

Party Name:VINDHYA TELELINKS LTD., 13.07.2010 Status:Approved HQ File :01/81/050/00542/AM10/ RLA File :11/24/040/00035/AM10/ Lic.No/Date:1110021383 03.12.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DOT vide their I.D. No. 15­02/2010­IP dated 08.06.2010 (copy enclosed).       61

Case No.:12/37/81­ALC2/2009

Party Name:KE­TECHNICAL TEXTILES PVT.LTD. 13.07.2010 Status:Deffered and Re­indexed

HQ File :01/81/050/00355/AM10/ RLA File :02/24/040/00171/AM10/ Lic.No/Date:0210134925 07.12.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   62

Case No.:13/37/81­ALC2/2009

Party Name:KE­TECHNICAL TEXTILES PVT.LTD. 13.07.2010 Status:Approved HQ File :01/81/050/00356/AM10/ RLA File :02/24/040/00172/AM10/ Lic.No/Date:0210134949 08.12.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of textile commissioner vide their letter No. 11(5)/07­Wvg/Vol/13 dated 12.07.2010 (copy enclosed).     63

Case No.:3/39/81­ALC2/2009

Party Name:MAHENDRA INDUSTRIES 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00359/AM10/ RLA File :07/24/040/00342/AM10/ Lic.No/Date:0710068801 10.12.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. NC decided that a copy of the application of the firm may be referred to DIPP. The case stands deferred and to be relisted on 17.08.2010.     64

Case No.:40/48/83­ALC1/2009

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/83/050/00924/AM10/ RLA File :03/95/040/00408/AM09/ Lic.No/Date:0310551323 17.12.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from M/o Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.

65

Case No.:25/41/81­ALC2/2009

Party Name:CODINA METALIC PRIVATE LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00410/AM10/ RLA File :04/24/040/00239/AM10/ Lic.No/Date:0410110392 23.12.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under   66

Case No.:21/41/81­ALC2/2009

Party Name:MINEX METALLURGICAL COMPANY LIMITED 13.07.2010 Status:Approved HQ File :01/81/050/00406/AM10/ RLA File :03/95/040/00637/AM10/ Lic.No/Date:0310553140 31.12.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DC(MSME) vide their U.O. No. 30(89)/2008­ME dated 10.06.2010 (copy enclosed).       67

Case No.:22/41/81­ALC2/2009

Party Name:EFD INDUCTION LIMITED, 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00407/AM10/ RLA File :07/24/040/00331/AM10/ Lic.No/Date:0710069195 31.12.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under   68

Case No.:18/1/81­ALC2/2010

Party Name:VIDEOCON INDUSTRIES LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00552/AM10/ RLA File :03/95/040/00640/AM10/ Lic.No/Date:0310553146 31.12.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm

is still awaited by MIT and therefore decided to remind the firm to expedite the reply to MIT under intimation to this office. The case stands deferred and to be re­listed on 17.08.2010.   69

Case No.:29/41/81­ALC2/2009

Party Name:JCR DRILLSOL PVT LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00414/AM10/ RLA File :07/21/040/00919/AM10/ Lic.No/Date:0710069229 04.01.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be re­listed on 17.08.2010.     70

Case No.:10/1/81­ALC2/2010

Party Name:ROTOMAG MOTORS AND CONTROLS P LTD 13.07.2010 Status:Approved HQ File :01/81/050/00544/AM10/ RLA File :34/24/040/00180/AM10/ Lic.No/Date:3410026142 13.01.2010   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP vide their U.O dated 13.07.2010 with following modification:­   1.      Net weight of export products at Sl. Nos. 1, 2, 3 & 4  may be specified as 8208 Kgs ,790 Kgs., 731 Kgs and 740 Kgs. respectively. 2.      Quantities of import items from Sl. No 1 to 24  may be allowed on net to net basis. 3.      Import of components may be allowed with accountability clause     71

Case No.:32/1/81­ALC2/2010

Party Name:ABIR INFRASTRUCTURE PRIVATE LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00566/AM10/ RLA File :05/23/040/00159/AM10/ Lic.No/Date:0510256336 14.01.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be re­listed on 17.08.2010.

72

Case No.:6/45/81­ALC2/2009

Party Name:COOKSON INDIA PVT. LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00436/AM10/ RLA File :04/24/040/00263/AM10/ Lic.No/Date:0410110982 21.01.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   73

Case No.:42/1/81­ALC2/2010

Party Name:GLOBAL WIND POWER LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00576/AM10/ RLA File :03/94/040/00676/AM10/ Lic.No/Date:0310556824 25.01.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   74

Case No.:8/45/81­ALC2/2009

Party Name:DUCATI ENERGIA (INDIA) PVT.LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00438/AM10/ RLA File :31/24/040/00216/AM10/ Lic.No/Date:3110041683 27.01.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. As per written recommendations of DHI vide U.O. No. 3(50)/2010­TSW(B)/309 dated 23.06.2010(copy enclosed), NC decided to call for the certain information/clarification from the firm and to re­list the case on           17.08.2010.                                 75

Case No.:10/45/81­ALC2/2009

LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00440/AM10/ RLA File :05/23/040/00163/AM10/ Lic.No/Date:0510257035 28.01.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DHI are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.

76

Case No.:11/45/81­ALC2/2009

LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00441/AM10/ RLA File :05/23/040/00164/AM10/ Lic.No/Date:0510257036 28.01.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DHI are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.   77

Case No.:1/46/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00446/AM10/ RLA File :09/24/040/00431/AM10/ Lic.No/Date:0910040768 02.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DHI are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.     78

Case No.:2/46/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00447/AM10/ RLA File :09/24/040/00378/AM10/ Lic.No/Date:0910040771 02.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DHI are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.   79

Case No.:4/46/81­ALC2/2009

Party Name:BILCARE LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00449/AM10/ RLA File :31/24/040/00194/AM10/ Lic.No/Date:3110041791 02.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DIPP  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.

80

Case No.:1/47/81­ALC2/2009

Party Name:BILCARE LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00450/AM10/ RLA File :31/24/040/00197/AM10/ Lic.No/Date:3110041809 03.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DIPP  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.     81

Case No.:2/47/81­ALC2/2009

Party Name:NICO EXTRUSIONS PVT.LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00451/AM10/ RLA File :03/95/040/00689/AM10/ Lic.No/Date:0310558495 04.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DC(MSME) are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.   82

Case No.:4/47/81­ALC2/2009

Party Name:MINOX METAL PVT.LTD, 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00453/AM10/ RLA File :07/24/040/00413/AM10/ Lic.No/Date:0710069856 05.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. NC decided that a copy of the application of the firm may be referred to MOS. The case stands deferred and to be relisted on 17.08.2010.   83

Case No.:5/47/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00454/AM10/ RLA File :03/95/040/00702/AM10/ Lic.No/Date:0310559157 09.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited by MIT and therefore decided to remind the firm to expedite the reply to MIT under intimation to this office. The case stands deferred and to be re­listed on 17.08.2010.

84

Case No.:6/47/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00455/AM10/ RLA File :03/95/040/00688/AM10/ Lic.No/Date:0310559158 09.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited by MIT and therefore decided to remind the firm to expedite the reply to MIT under intimation to this office. The case stands deferred and to be re­listed on 17.08.2010.   85

Case No.:43/1/81­ALC2/2010

Party Name:K.S.INSTRUMENTS PVT.LTD., 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00577/AM10/ RLA File :07/24/040/00407/AM10/ Lic.No/Date:0710069903 09.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be re­listed on 17.08.2010.   86

Case No.:9/47/81­ALC2/2009

Party Name:R.M.CONTROLS P LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00458/AM10/ RLA File :05/24/040/00478/AM10/ Lic.No/Date:0510258401 12.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under     87

Case No.:10/47/81­ALC2/2009

Party Name:R.M.CONTROLS P LTD 13.07.2010 Status: Deffered and Re­indexed HQ File :01/81/050/00459/AM10/ RLA File :05/24/040/00484/AM10/ Lic.No/Date:0510258402 12.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to call for the certain

information from the firm, as per written comments of DHI vide their U.O No. 3(58)/2010/TSW(B)/348 dated 19.07.2010 (copy enclosed). The case stands deferred and to be re­listed on 17.08.2010.       88

Case No.:38/1/81­ALC2/2010

Party Name:ANJANI TECHNOPLAST LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00572/AM10/ RLA File :05/23/040/00184/AM10/ Lic.No/Date:0510258638 16.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited by C&PC and therefore decided to remind the firm to expedite the reply to C&PC under intimation to this office. The case stands deferred and to be re­listed on 17.08.2010.   89

Case No.:45/1/81­ALC2/2010

LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00579/AM10/ RLA File :11/24/040/00044/AM10/ Lic.No/Date:1110021822 18.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under     90

Case No.:44/1/81­ALC2/2010

LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00578/AM10/ RLA File :05/23/040/00176/AM10/ Lic.No/Date:0510259435 25.02.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under   91

Case No.:33/1/81­ALC2/2010

Party Name:ASHLEY ALTEAMS INDIA PRIVATE LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00567/AM10/ RLA File :04/24/040/00306/AM10/ Lic.No/Date:0410112257 10.03.2010 Defer Date:17.08.2010

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under   92

Case No.:19/51/81­ALC2/2009

Party Name:SOURIAU INDIA PRIVATE LIMITED 13.07.2010 Status:Approved HQ File :01/81/050/00534/AM10/ RLA File :10/80/040/00109/AM10/ Lic.No/Date:1010037681 12.03.2010   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of MIT vide their U.O No. 17(27)/2010­iphw dated 08.07.2010 (copy enclosed).       93

Case No.:1/1/81­ALC2/2010

Party Name:MAHENDRA INDUSTRIES 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00535/AM10/ RLA File :07/24/040/00465/AM10/ Lic.No/Date:0710070541 15.03.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   94

Case No.:15/1/81­ALC2/2010

Party Name:ADARSHA CONTROL SYSTEMS PVT LTD., 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00549/AM10/ RLA File :07/21/040/01138/AM10/ Lic.No/Date:0710070560 17.03.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   95

Case No.:16/1/81­ALC2/2010

Party Name:ADARSHA CONTROL SYSTEMS PVT LTD., 13.07.2010 Status:Deffered and Re­indexed

HQ File :01/81/050/00550/AM10/ RLA File :07/21/040/01139/AM10/ Lic.No/Date:0710070561 17.03.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands     96

Case No.:24/1/81­ALC2/2010

Party Name:TATA BP SOLAR INDIA LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00558/AM10/ RLA File :07/24/040/00419/AM10/ Lic.No/Date:0710070585 18.03.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from MNRES are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.   97

Case No.:25/1/81­ALC2/2010

Party Name:ESWARI METAL INDUSTRIES 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00559/AM10/ RLA File :07/24/040/00461/AM10/ Lic.No/Date:0710070587 18.03.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from M/o Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.   98

Case No.:26/1/81­ALC2/2010

Party Name:ESWARI METAL INDUSTRIES 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00560/AM10/ RLA File :07/24/040/00462/AM10/ Lic.No/Date:0710070588 18.03.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from M/o Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.

99

Case No.:27/1/81­ALC2/2010

Party Name:VEER­O­ METALS PVT .LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00561/AM10/ RLA File :07/24/040/00467/AM10/ Lic.No/Date:0710070640 22.03.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list the case on 17.08.2010: ­   1. Export product wise information in respect of S.No. 3, 4, 5, 11  & 11(a) of the Standard Deficiency Format.     100

Case No.:28/1/81­ALC2/2010

Party Name:KALYANI THERMAL SYSTEMS LTD., 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00562/AM10/ RLA File :31/24/040/00250/AM10/ Lic.No/Date:3110042494 23.03.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. NC decided that a copy of the application of the firm may be referred to DHI. The case stands deferred and to be relisted on 17.08.2010.   101

Case No.:30/1/81­ALC2/2010

Party Name:TRANSLLOY INDIA PVT. LTD., 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00564/AM10/ RLA File :03/95/040/00862/AM10/ Lic.No/Date:0310566656 25.03.2010 Defer Date:17   .08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. As per written recommendations of DC(MSME) vide U.O. No. 30(114)/2010­ME dated 03.06.2010(copy enclosed), NC decided to call for the certain information/clarification from the firm and to re­list the case on           17.08.2010.                                 102

Case No.:1/3/81­ALC2/2010

Party Name:ELINS SWITCH BOARDS PVT. LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00002/AM11/ RLA File :07/24/040/00497/AM10/ Lic.No/Date:0710070749 01.04.2010 Defer Date:17.08.2010

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   103

Case No.:2/3/81­ALC2/2010

Party Name:WEBB INDIA PVT. LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00003/AM11/ RLA File :07/24/040/00490/AM10/ Lic.No/Date:0710070750 01.04.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   104

Case No.:3/3/81­ALC2/2010

Party Name:OIL COUNTRY TUBULAR LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00004/AM11/ RLA File :09/24/040/00571/AM10/ Lic.No/Date:0910041570 07.04.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under     105

Case No.:4/3/81­ALC2/2010

Party Name:MAHENDRA INDUSTRIES 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00005/AM11/ RLA File :07/24/040/00493/AM10/ Lic.No/Date:0710070805 07.04.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   106

Case No.:6/3/81­ALC2/2010

Party Name:VIJAI ELECTRICALS LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00007/AM11/ RLA File :09/24/040/00141/AM10/ Lic.No/Date:0910041604 09.04.2010 Defer

Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   107

Case No.:8/3/81­ALC2/2010

Party Name:ABB LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00009/AM11/ RLA File :07/24/040/00006/AM11/ Lic.No/Date:0710070878 12.04.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands     108

Case No.:1/9/81­ALC2/2010

Party Name:NAGREEKA FOILS LTD., 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00034/AM11/ RLA File :03/95/040/00106/AM11/ Lic.No/Date:0310574202 13.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under   109

Case No.:2/9/81­ALC2/2010

LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00035/AM11/ RLA File :06/24/040/00009/AM11/ Lic.No/Date:0610017929 14.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under   110

Case No.:3/9/81­ALC2/2010

Party Name:MAHENDRA INDUSTRIES 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00036/AM11/ RLA File :07/24/040/00038/AM11/ Lic.No/Date:0710071635 18.05.2010 Defer Date:17.08.2010

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under examination of DC(MSME). The case stands deferred and to be re­listed on 17.08.2010.   111

Case No.:4/9/81­ALC2/2010

Party Name:METAL LINK ALLOYS LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00037/AM11/ RLA File :03/95/040/00072/AM11/ Lic.No/Date:0310575266 20.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under examination of DC(MSME). The case stands deferred and to be re­listed on 17.08.2010.     112

Case No.:5/9/81­ALC2/2010

Party Name:METAL LINK ALLOYS LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00038/AM11/ RLA File :03/95/040/00021/AM11/ Lic.No/Date:0310575270 20.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   113

Case No.:6/9/81­ALC2/2010

Party Name:MAN INDUSTRIES (INDIA) LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00039/AM11/ RLA File :03/95/040/00102/AM11/ Lic.No/Date:0310575282 20.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under examination of M/o Steel. The case stands deferred and to be re­listed on 17.08.2010.   114

Case No.:7/9/81­ALC2/2010

Party Name:MAN INDUSTRIES (INDIA) LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00040/AM11/ RLA File :03/95/040/00103/AM11/ Lic.No/Date:0310575295 20.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under

examination of M/o Steel. The case stands deferred and to be re­listed on 17.08.2010.     115

Case No.:8/9/81­ALC2/2010

Party Name:VIJAI ELECTRICALS LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00041/AM11/ RLA File :09/24/040/00053/AM11/ Lic.No/Date:0910042102 20.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   116

Case No.:9/9/81­ALC2/2010

Party Name:THEETA ELECTRICALS PVT LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00042/AM11/ RLA File :05/24/040/00058/AM11/ Lic.No/Date:0510264638 20.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under   117

Case No.:10/9/81­ALC2/2010

Party Name:MAHENDRA INDUSTRIES 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00043/AM11/ RLA File :07/24/040/00032/AM11/ Lic.No/Date:0710071753 24.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under     118

Case No.:11/9/81­ALC2/2010

Party Name:TATA BP SOLAR INDIA LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00044/AM11/ RLA File :07/24/040/00441/AM10/ Lic.No/Date:0710071806 26.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II

in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from MNRES are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.   119

Case No.:12/9/81­ALC2/2010

Party Name:ADARSHA CONTROL SYSTEMS PVT LTD., 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00045/AM11/ RLA File :07/21/040/00113/AM11/ Lic.No/Date:0710071810 26.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   120

Case No.:1/11/81­ALC2/2010

Party Name:COPRAL INSULATED CONDUCTORS PVT LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00046/AM11/ RLA File :04/24/040/00040/AM11/ Lic.No/Date:0410114089 28.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands     121

Case No.:11/11/81­ALC2/2010

Party Name:APAR INDUSTRIES LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00056/AM11/ RLA File :34/24/040/00001/AM11/ Lic.No/Date:3410027088 28.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under   122

Case No.:12/11/81­ALC2/2010

Party Name:ROTOMAG MOTORS AND CONTROLS P LTD 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00057/AM11/ RLA File :34/24/040/00003/AM11/ Lic.No/Date:3410027090 28.05.2010 Defer Date:13.07.2010

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP vide their U.O dated 13.07.2010 with following modification:­   1.      Net weight of export product may be specified as 13680 . 2.      Weights of import items at Sl. Nos. 7 & 10 may be specified as 1125 Kgs. and 840 Kgs. respectively. 3.       Quantities of import items from Sl. No 1 to 10  may be allowed on net to net basis. 4.      Import of components may be allowed with accountability clause       123

Case No.:2/11/81­ALC2/2010

Party Name:CONTROL INFOTECH PRIVATE LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00047/AM11/ RLA File :07/24/040/00051/AM11/ Lic.No/Date:0710071914 31.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   124

Case No.:3/11/81­ALC2/2010

LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00048/AM11/ RLA File :06/24/040/00012/AM11/ Lic.No/Date:0610018095 31.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under   125

Case No.:4/11/81­ALC2/2010

Party Name:DYNAMIC CABLES PVT. LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00049/AM11/ RLA File :13/24/040/00029/AM10/ Lic.No/Date:1310032271 31.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under

126

Case No.:6/11/81­ALC2/2010

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00051/AM11/ RLA File :35/24/040/00045/AM10/ Lic.No/Date:3510030416 02.06.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from M/o Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.   127

Case No.:8/11/81­ALC2/2010

Party Name:AUTO COMP INDIA PVT. LTD 13.07.2010 Status: Transferred HQ File :01/81/050/00053/AM11/ RLA File :31/24/040/00035/AM11/ Lic.No/Date:3110043464 02.06.2010   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. NC observed that the matter pertains to NC­I and decided to transfer the matter to NC­I.   128

Case No.:9/11/81­ALC2/2010

Party Name:DELTA POWER SOLUTIONS INDIA PVT.LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00054/AM11/ RLA File :25/24/040/00004/AM11/ Lic.No/Date:2510002878 02.06.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands     129

Case No.:7/11/81­ALC2/2010

Party Name:DIANA METALS 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00052/AM11/ RLA File :04/24/040/00054/AM11/ Lic.No/Date:0410114241 03.06.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under

  130

Case No.:10/11/81­ALC2/2010

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00055/AM11/ RLA File :35/24/040/00046/AM10/ Lic.No/Date:3510030450 03.06.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from M/o Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.   131

Case No.:5/11/81­ALC2/2010

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00050/AM11/ RLA File :35/24/040/00048/AM10/ Lic.No/Date:3510030471 04.06.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from M/o Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.     132

Case No.:13/11/81­ALC2/2010

Party Name:RUBY MICA COMPANY PRIVATE LIMITED, 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00058/AM11/ RLA File :02/24/040/00029/AM11/ Lic.No/Date:0210142969 04.06.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   133

Case No.:14/11/81­ALC2/2010

Party Name:S K M TECHNOLOGIES PRIVATE LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00059/AM11/ RLA File :09/24/040/00024/AM11/ Lic.No/Date:0910042253 07.06.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II

in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands   134

Case No.:15/11/81­ALC2/2010

Party Name:APAR INDUSTRIES LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00060/AM11/ RLA File :34/24/040/00004/AM11/ Lic.No/Date:3410027158 07.06.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands     135

Case No.:16/11/81­ALC2/2010

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00061/AM11/ RLA File :35/24/040/00049/AM10/ Lic.No/Date:3510030492 07.06.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from M/o Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands  deferred  and  to  be  relisted  on 17.08.2010.   136

Case No.:17/11/81­ALC2/2010

Party Name:TOPWORTH PIPES & TUBES PRIVATE LIMITED 13.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00062/AM11/ RLA File :03/95/040/00191/AM11/ Lic.No/Date:0310577992 08.06.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in  its  M.No.  15/81  scheduled  be  held  on  13.07.2010  but  actually  held  on  20.07.2010.  The  committee  observed  that  the  case  is  under

PART –AR – DEFFER S.No.77

Case No. AR­24

 M/S  RPG Cables Ltd.Mysore.           Meeting No.15/81 F.No.01/81/50/157/AM09/DES­II Dated : 13.07.2010 Advance License No.0310475240 dt.18­06­2008   RLA F.No.03/95/40/0242/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be re­listed on 17.08.2010.     S.No. 78

Case No. AR­36

 M/S Walchandnagar Industries Ltd., Pune           Meeting No. 15/81 F.No.01/81/162/851/AM06/DES­II Dated 13.07.2010 Advance Licence No.3110023394  dt. 23.12.2005           RLA F.No.31/95/42/0042/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The Committee observed that the comments from DIPP are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 17.08.2010.   S.No. 79

Case No. AR­56

 M/S  Banaras Beads Ltd.,  Varanasi             Meeting No.15/81 F.No.01/84/050/641/AM06/DES­I/DES­II Dated 13.07.2010 Advance License No.1510003017 dt. 28.12.2005   RlA F.No.15/80/40/016/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. NC decided that a copy of the reply received from the firm may be referred to DC(MSME). The case stands deferred and to be relisted on 17.08.2010.     S.No.  80

Case No. AR­49

 M/s Delton Cables Ltd.,    Meeting No.15/81 F.No.01/81/050/00793/AM09/DES­II Dated 13.07.2010 Advance License No.0510206449 dt.18.07.2007   RLA F.No.05/24/040/0306/AM08

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The committee observed that the case is under examination of DIPP. The case stands deferred and to be re­listed on 17.08.2010.   Sl. No. 81

Case No. AR ­81

M/s.  Copper Strips (P) Ltd. Bhopal             Meeting No.15/81 F.No.01/80/81/50/688/AM09/DES­II  Dated 13.07.2010 Advance License No 1110016890 dt.23­03­2008                RLA F.No.11/24/40/064/AM08          Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The committee observed that the case is under examination of DIPP. The case stands deferred and to be re­listed on 17.08.2010.     Sl. No. 90

CASE NO. AR­39

M/s. Gamesa Wind Tubines Pvt. Ltd., Chennai           Meeting No. 15/81 F.No.01/81/050/178/AM10/DES­II      Dated:  13.07.2010  Advance Licence No. 0410107978 dated 23.03.2009   RLA’s F.No.04/24/40/1136/AM10 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 17.08.2010.     Sl. No. 91

CASE NO. AR­39

M/s. Andritz Hydro Pvt. Ltd.(formerly known VA Tech Hydro India Pvt. Ltd.)             Meeting No. 15/81 F.No.01/81/162/256/AM11/DES­II       Dated:  13.07.2010  Advance Licence No. 1110019319 dated 02.01.2009   RLA’s F.No.11/22/40/043/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 17.08.2010.   PART – C – DEFFER S.No. 27

Case No. C­ 02

Reference received from Policy Devision           Meeting No. 15/81 F.No.01/80/162/748/AM10/DES­II  Dated 13.07.2010     Verification of SION for the product “Graphite Electrodes” Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. NC observed that data from EEPC is still awaited and decided to remind them to expedite the same. The case stands deferred and to be re­listed on 17.08.2010.     S.No. 28

Case No. C­19

 M/S.  Andritz Hydro Pvt. Ltd.(formerly known VA Tech Hydro India Pvt. Ltd.)             Meeting No15/81 F.No.01/81/162/00464/AM10//DES­II Dated 13.07.2010   Decision :  The  case  regarding  modification  of  SION  was  considered  by  the  Norms  Committee  ­  II  in  its  M.No.  15/81  scheduled  be  held  on 13.07.2010 but actually held on 20.07.2010. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 17.08.2010.     PART – D – DEFFER

CASE NO. D­  1

  M/s.  The Madras Aluimnium Co. Ltd., Salem (T.N)   Meeting No.    15/81 F.No.01/81/162/307/AM’11/DES­II      Dated:     13.07.2010      Decision : The case regarding clarification of DEPB S.No. 310 was considered by the Norms Committee ­ II in its M.No. 15/81 scheduled be held on 13.07.2010 but actually held on 20.07.2010. The committee observed that the case is under examination of DIPP. The case stands deferred and to be re­listed on 17.08.2010.  