IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2009-07-07

DGFT Committee Minutes

Document text

RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   Minutes of the Norms Committee­II Meeting No. 14/10 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Meeting No. 14/10 of Norms Committee­II was held on 21.07.2009 for the licensing year 2009­2010 under the Chairmanship of  Sh.  O.P.  Hisaria,  Joint  Director  General  of  Foreign  Trade  (OPH)  to  consider  the  applications  under  Duty  Exemption  Scheme (Chapter­4) of Foreign Trade Policy 2004­2009. The following members were present in the meeting:­ S.No Name of the representatives & their Designation   Deptt.   1. Shri B.D. Ghosh, AIA M/o Steel   2. 3. 4. 5. Sh. S.K. Jain, D.O. Sh. N. L. Goswami, Sr. D.O. Shri A. K. Mishra, Asst IA Shri K. K. Funda, Asst. Director DIPP DHI M/o Steel DC(SSI) 6.   Shri Narendra Vashista, FTDO DGFT               The Committee took up the individual cases of the agenda of this meeting for discussion and the decision taken in respect of each case as follows:   1

Case No.:29/47/80­ALC2/2006

Party Name:KOTAK URJA PVT. LTD. Meet No/Date:14/81­ALC2/2009 07.07.2009 Status:Deffered and Re­indexed HQ File :01/80/050/01201/AM07/ RLA File :07/24/040/00709/AM07/ Lic.No/Date:0710049661 18.01.2007 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 01.09.2009.

2

Case No.:12/38/81­ALC2/2008

Party Name:PERMASTEELISA (INDIA) PVT. LTD., 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00574/AM09/ RLA File :07/24/040/00425/AM08/ Lic.No/Date:0710053353 14.09.2007 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that  the  application  of  the  firm  is  not  received  despite  several  reminders.  Therefore,  the  Committee  decided  to  issue  a  D.O. reminder from the level of Chairman to Zonal Jt. DGFT for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 01.09.2009.   3

Case No.:31/2/81­ALC2/2008

Party Name:AUTONIX AUTO INDUSTRIES PVT.LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00725/AM08/ RLA File :05/24/040/00750/AM08/ Lic.No/Date:0510214123 28.12.2007 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   4

Case No.:44/2/81­ALC2/2008

Party Name:DELTON CABLES LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00738/AM08/ RLA File :05/24/040/00814/AM08/ Lic.No/Date:0510215720 31.01.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to issue a final reminder the firm to expedite the reply. If no reply is  received  within  15  days  from  the  issue  of  the  letter  the  case  will  be  rejected  and  no  representations  in  the  matter  will  be entertained. The case stands deferred and to be relisted on 01.09.2009.     5

Case No.:45/2/81­ALC2/2008

Party Name:CONTROL & SWITCHGEAR CO LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00739/AM08/ RLA File :05/24/040/00838/AM08/ Lic.No/Date:0510215910 06.02.2008 Defer Date:07.07.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to issue a final reminder the firm to expedite the reply. If no reply is  received  within  15  days  from  the  issue  of  the  letter  the  case  will  be  rejected  and  no  representations  in  the  matter  will  be entertained. The case stands deferred and to be relisted on 01.09.2009.   6

Case No.:15/9/81­ALC2/2008

Party Name:LAMBDA TELEVENTURE 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00115/AM09/ RLA File :05/24/040/00868/AM08/ Lic.No/Date:0510216256 12.02.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee noted that RA  neither  reported  the  status  of  the  case  nor  forwarded  the  four  sets  of  application  in  response  to  this  office  letter  and subsequent reminders. The committee  presumed  that  ratification  of  norms  of  the  subject  authorisation  is  not  required  by  RA. Hence, the case may be closed on the part of NC. “In case RA feels that case needs to be ratified by NC, they may intimate the NC in writing in 4 weeks time”.   R/A may take suitable consequential action accordingly.     7

Case No.:1/52/81­ALC2/2007

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00684/AM08/ RLA File :11/24/040/00055/AM08/ Lic.No/Date:1110016892 28.02.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   8

Case No.:33/8/81­ALC2/2008

Party Name:L M GLASFIBER (INDIA) PVT LTD 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00098/AM09/ RLA File :07/24/040/00757/AM08/ Lic.No/Date:0710056217 04.03.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the inputs mentioned by C&PC in their comments is different from the inputs given in the application and decided to request C&PC to re­check the comments. The case stands deferred and to be re­listed on 01.09.2009.

9

Case No.:31/8/81­ALC2/2008

Party Name:LAXMI ELECTRONICS MOULDS & PRECISION ENGG P.LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00096/AM09/ RLA File :07/24/040/00767/AM08/ Lic.No/Date:0710056291 07.03.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed the firm has failed to furnish the requisite information despite several reminders and decided to reject the request of the firm.     10

Case No.:45/15/81­ALC2/2008

Party Name:CIM TOOLS PVT.LTD., 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00213/AM09/ RLA File :07/24/040/00815/AM08/ Lic.No/Date:0710056594 26.03.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the case is under examination of DIPP. The case stands deferred and to be re­listed on 01.09.2009.     11

Case No.:38/15/81­ALC2/2008

Party Name:NAMO ALLOYS P.LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00206/AM09/ RLA File :05/24/040/00962/AM08/ Lic.No/Date:0510219169 09.04.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   12

Case No.:6/12/81­ALC2/2008

Party Name:NIRLEP APPLIANCES LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00152/AM09/ RLA File :03/95/040/00237/AM09/ Lic.No/Date:0310474453 12.06.2008 Defer Date:07.07.2009

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1. Words “containing 21534 Kgs of Aluminium” may be added with the description of export product. 2. Quantity of import item at S.No. 1 may also be specified as 23096 Nos. 3. The quantity of import item at Sl No.1 may be allowed as 1.07 Kg /Kg content in the Export Product as per SION at Sl.No. C­ 2046. 4. Quantity of import item at S.No.2 may be allowed as 0.403 ltrs  per Sq Mtrs of internal coating area as per SION at Sl.No. C­ 2046. 5.  Import item at S.No.3 may be allowed on net to net basis.       13

Case No.:7/12/81­ALC2/2008

Party Name:NIRLEP APPLIANCES LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00153/AM09/ RLA File :03/95/040/00238/AM09/ Lic.No/Date:0310474459 12.06.2008 Defer Date:07.07.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1. Words “containing 58171 Kgs of Aluminium” may be added with the description of export product. 2. The quantity of import item at Sl No.1 may be allowed as applied for i.e.63988 Kgs. inclusive of 10% wastage. 3.  Quantity of import item at S.No.2 may be allowed as 0.128 ltrs  per Sq Mtrs of internal coating area after taking clue from SION at S.No. C­ 23. 4. Quantity of import item at S.No.3 may be allowed as 0.128 ltrs  per Sq Mtrs of external coating area after taking clue from SION at S.No. C­ 23. 5.  Import items at S.Nos. 4, 5 & 6 may be allowed on net to net basis. 6. Import items at S.Nos. 7 & 8 may be allowed as per Packing Policy.     14

Case No.:61/15/81­ALC2/2008

Party Name:CIM TOOLS PVT.LTD., 07.07.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00229/AM09/ RLA File :07/24/040/00099/AM09/ Lic.No/Date:0710058177 27.06.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the case is under examination of DIPP. The case stands deferred and to be re­listed on 01.09.2009.     15

Case No.:16/17/81­ALC2/2008

Party Name:TECHNICAL CONSULTANCY & SERVICES 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00263/AM09/ RLA File :03/95/040/00305/AM09/ Lic.No/Date:0310478477 14.07.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of MIT  vide their U.O. No. 17(62)/2008­IPHW dated 04.02.2009. (copy enclosed).     16

Case No.:23/20/80­ALC2/2008

Party Name:ANCHOR ELECTRICALS PVT.LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/80/050/00779/AM09/ RLA File :03/94/040/00353/AM09/ Lic.No/Date:0310479318 18.07.2008 Defer Date:07.07.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.        Net weight of export product may be specified as 19037 Kgs 2.        Quantity of import itemss at S.No. 1  may be allowed as 9844 Kgs. inclusive of 1% wastage. 3.        Quantities of import items at. S.No.  2, 3 & 4 may be allowed as applied for i.e. 5685.55 Kgs, 2842.78 Kgs. & 947.59 Kgs respectively inclusive of 2% wastage.  

17

Case No.:25/20/80­ALC2/2008

Party Name:ANCHOR ELECTRICALS PVT.LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/80/050/00781/AM09/ RLA File :03/94/040/00355/AM09/ Lic.No/Date:0310479339 18.07.2008 Defer Date:07.07.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.      Net weight of export product may be specified as 19235 Kgs. 2.      Quantity of import items at S.No. 1 may be allowed as 9808 Kgs. inclusive of 1% wastage. 3.      Quantities of import items at. S.No.  2, 3 & 4 may be allowed as applied for i.e. 5829.09 Kgs., 2913.37 Kgs. & 971.12 Kgs respectively inclusive of 2% wastage.     18

Case No.:2/44/81­ALC2/2008

Party Name:SHAKTHI DATA CABLES 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00662/AM09/ RLA File :25/24/040/00004/AM09/ Lic.No/Date:2510002204 13.08.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that  the  comments  from  DOT  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands deferred and to be relisted on 01.09.2009.     19

Case No.:15/38/81­ALC2/2008

Party Name:VEEGEE INDUSTRIAL ENTERPRISES PVT. LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00577/AM09/ RLA File :05/24/040/00168/AM09/ Lic.No/Date:0510227078 08.09.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 01.09.2009.   20

Case No.:17/38/81­ALC2/2008

Party Name:DIAMOND ENGINEERING (CHENNAI) PVT LTD 07.07.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00579/AM09/ RLA File :04/24/040/00147/AM09/ Lic.No/Date:0410098572 12.09.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that  the  application  of  the  firm  is  not  received  despite  several  reminders.  Therefore,  the  Committee  decided  to  issue  a  D.O. reminder from the level of Chairman to Zonal Jt. DGFT for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 01.09.2009.   21

Case No.:1/38/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00546/AM09/ RLA File :05/24/040/00972/AM08/ Lic.No/Date:0510227684 17.09.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 01.09.2009.     22

Case No.:17/29/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00434/AM09/ RLA File :61/24/040/00039/AM09/ Lic.No/Date:6110000219 22.09.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 01.09.2009.   23

Case No.:3/29/81­ALC2/2008

Party Name:PSL LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00420/AM09/ RLA File :03/95/040/00545/AM09/ Lic.No/Date:0310487951 26.09.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. A copy of the reply received from the firm was handed over to the representative of DHI, present in the meeting for examination and comments. The case stands deferred and to be re­listed on 01.09.2009.   24

Case No.:4/29/81­ALC2/2008

Party Name:SUNLAND METAL RECYCLING INDUSTRIES 07.07.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00421/AM09/ RLA File :03/95/040/00087/AM09/ Lic.No/Date:0310487963 26.09.2008 Defer Date:07.07.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations  of  the  representative  of  DC(SSI)  present  in  the  meeting  and  taking  clue  from  SION  C­1575,  the  Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.      The items of import at S.No. 1 &2 may be allowed as applied for inclusive of 6% wastage. 2.      The item of import at S.No. 3 may be allowed as applied for inclusive of 1% wastage.     25

Case No.:10/29/81­ALC2/2008

Party Name:TRIVENI BIALETTI INDUSTRIES PVT. LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00427/AM09/ RLA File :03/95/040/00581/AM09/ Lic.No/Date:0310488215 29.09.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred     26

Case No.:7/29/81­ALC2/2008

Party Name:RATNESH METAL INDUSTRIES PVT. LTD 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00424/AM09/ RLA File :08/24/040/00141/AM09/ Lic.No/Date:0810075047 29.09.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of M/o Steel  vide their U.O. No. 2(13)/2006­TW dated 01.07.2009. (copy enclosed).     27

Case No.:12/29/81­ALC2/2008

Party Name:SIEPMANNS CARD SYSTEMS PVT.LTD., 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00429/AM09/ RLA File :03/95/040/00580/AM09/ Lic.No/Date:0310488476 30.09.2008 Defer Date:07.07.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of DC(SSI)  vide their U.O. No. 30(344)08­ME dated 15.07.2009. (copy enclosed).     28

Case No.:2/38/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00547/AM09/ RLA File :05/24/040/00974/AM08/ Lic.No/Date:0510228825 03.10.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 01.09.2009.   29

Case No.:14/38/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00576/AM09/ RLA File :05/24/040/00971/AM08/ Lic.No/Date:0510228820 03.10.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 01.09.2009.   30

Case No.:18/29/81­ALC2/2008

Party Name:AREVA T & D INDIA LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00435/AM09/ RLA File :04/24/040/00331/AM08/ Lic.No/Date:0410099017 06.10.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. A copy of the reply received from the firm was handed over to the representative of DHI, present in the meeting for examination and comments. The case stands deferred and to be re­listed on 01.09.2009.   31

Case No.:19/29/81­ALC2/2008

Party Name:AREVA T & D INDIA LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00436/AM09/ RLA File :04/24/040/00298/AM08/ Lic.No/Date:0410099018 06.10.2008 Defer Date:07.07.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. A copy of the reply received from the firm was handed over to the representative of DHI, present in the meeting for examination and comments. The case stands deferred and to be re­listed on 01.09.2009.   32

Case No.:20/29/81­ALC2/2008

Party Name:AREVA T & D INDIA LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00437/AM09/ RLA File :04/24/040/00420/AM08/ Lic.No/Date:0410099019 06.10.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. A copy of the reply received from the firm was handed over to the representative of DHI, present in the meeting for examination and comments. The case stands deferred and to be re­listed on 01.09.2009.   33

Case No.:21/29/81­ALC2/2008

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00438/AM09/ RLA File :35/24/040/00017/AM09/ Lic.No/Date:3510024822 06.10.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that the comments from M/o Mines is not received despite several reminders. Therefore, the Committee decided to issue a D.O. reminder from the level of Chairman to the JS, M/o Mines for forwarding the comments. The case stands deferred and to be relisted on 01.09.2009.   34

Case No.:25/29/81­ALC2/2008

Party Name:MAHENDRA INDUSTRIES 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00442/AM09/ RLA File :07/24/040/00372/AM09/ Lic.No/Date:0710060318 07.10.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred     35

Case No.:30/29/81­ALC2/2008

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 07.07.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00447/AM09/ RLA File :35/24/040/00018/AM09/ Lic.No/Date:3510024830 10.10.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that the comments from M/o Mines is not received despite several reminders. Therefore, the Committee decided to issue a D.O. reminder from the level of Chairman to the JS, M/o Mines for forwarding the comments. The case stands deferred and to be relisted on 01.09.2009.   36

Case No.:42/29/81­ALC2/2008

Party Name:TECHNO TRACK ENGINEERS(PROP. ASHOK R. SONAWANE) 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00459/AM09/ RLA File :31/24/040/00185/AM09/ Lic.No/Date:3110035743 13.10.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that  the  application  of  the  firm  is  not  received  despite  several  reminders.  Therefore,  the  Committee  decided  to  issue  a  D.O. reminder from the level of Chairman to Zonal Jt. DGFT for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 01.09.2009.   37

Case No.:4/34/81­ALC2/2008

Party Name:KING METAL WORKS 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00501/AM09/ RLA File :03/94/040/00646/AM09/ Lic.No/Date:0310492687 03.11.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The firm has informed that they have surrendered the licence and decided to close the case on the part of NC.     38

Case No.:3/36/81­ALC2/2008

Party Name:L M GLASFIBER (INDIA) PVT LTD 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00518/AM09/ RLA File :07/24/040/00436/AM09/ Lic.No/Date:0710061007 12.11.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the case is under examination of C&PC. The case stands deferred and to be re­listed on 01.09.2009.   39

Case No.:11/36/81­ALC2/2008

Party Name:TECHNO TRACK ENGINEERS(PROP. ASHOK R. SONAWANE) 07.07.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00526/AM09/ RLA File :31/24/040/00223/AM09/ Lic.No/Date:3110036120 17.11.2008 Defer Date:07.07.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.      Quantity of export product at S.No.1 may be specified as 3390 nos. (667.83 Mtrs.) 2.      Quantity of export product at S.No.2 may be specified as 1152 nos. (292.608 Mtrs.) 3.      Net weight of export products at S.No.1 & 2 may be specified as 52342 Kgs. & 23777 Kgs. respectively.   4. Quantity of import item may be allowed as 1024 Mtrs. (102.02 MT after taking 20% recovery from scrap) inclusive of 6.6% wastage.       40

Case No.:7/36/81­ALC2/2008

Party Name:K.S.INSTRUMENTS PVT.LTD., 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00522/AM09/ RLA File :07/24/040/00457/AM09/ Lic.No/Date:0710061076 17.11.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that  the  comments  from  MIT  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands deferred and to be relisted on 01.09.2009.   41

Case No.:19/36/81­ALC2/2008

Party Name:BLOOMENERGY INDIA PRIVATE LIMITED, 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00534/AM09/ RLA File :07/24/040/00453/AM09/ Lic.No/Date:0710061125 18.11.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   42

Case No.:27/36/81­ALC2/2008

Party Name:GYSCOAL ALLOYS LTD., 07.07.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00542/AM09/ RLA File :08/24/040/00164/AM09/ Lic.No/Date:0810076112 20.11.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. A copy of the reply received from the firm was handed over to the representative of DHI, present in the meeting for examination and comments. The case stands deferred and to be re­listed on 01.09.2009.     43

Case No.:29/36/81­ALC2/2008

Party Name:AHLCONS INDIA PVT LTD 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00544/AM09/ RLA File :05/24/040/00531/AM09/ Lic.No/Date:0510231245 20.11.2008 Defer Date:07.07.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.      Words “Total area of Glazing 4217.15 sq. mtrs. containing 24268 Kgs. of Aluminium” may be suffixed with the description of export product. 2.      Quantity of import item at S.No.1 may be allowed as 24.757 MT inclusive of 2% wastage. 3.      Import items from S.Nos. 2 to 7 may be allowed on net to net basis with accountability clause.       44

Case No.:30/36/81­ALC2/2008

Party Name:ALCAN COMPOSITES INDIA PVT. LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00545/AM09/ RLA File :03/94/040/00621/AM09/ Lic.No/Date:0310495201 21.11.2008 Defer Date:07.07.2009

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.        Description of export product may be modified as “Aluminum Composite Panel 4 MM thick with 0.5 MM thick Aluminium Sheet on upper and lower side”. 2.        Net weight of export product may be specified as 275000 Kgs. 3.               Words “0.5 MM thick, width: 1250 MM” may be suffixed with the description of import item at S.No. 1 and quantity of this item may be allowed as 139050 Kgs. inclusive of 3% wastage. 4.        Quantity of import item at S.No. 2 may be allowed as 127500 Kgs. on net to net basis as claimed by the firm. 5.        Quantity of import item at S.No. 3 may be allowed as 5665 Kgs. inclusive of 3% wastage as claimed by the firm. 6.        Quantity of import item at S.No. 4 may be allowed as 3605 Kgs. inclusive of 3% wastage. as claimed by the firm.       45

Case No.:7/38/81­ALC2/2008

Party Name:DIAMOND ENGINEERING (CHENNAI) PVT LTD 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00552/AM09/ RLA File :04/24/040/00207/AM09/ Lic.No/Date:0410100295 25.11.2008 Defer Date:07.07.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.      Description of Export product may be specified as per Annexure I of firm’s letter dated 12.05.2009 (copy enclosed). 2.      Word “relevant” may be prefixed with the description of import item and its quantity    may be allowed as 1.05 Kgs./Kg. content in the export products.     46

Case No.:8/38/81­ALC2/2008

Party Name:AREVA T & D INDIA LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00553/AM09/ RLA File :04/24/040/00118/AM08/ Lic.No/Date:0410100312 25.11.2008 Defer Date:07.07.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   47

Case No.:23/38/81­ALC2/2008

Party Name:RUBY MICA COMPANY PRIVATE LIMITED, 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00585/AM09/ RLA File :02/24/040/00201/AM09/ Lic.No/Date:0210120549 02.12.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   48

Case No.:24/38/81­ALC2/2008

Party Name:SU­KAM POWER SYSTEMS LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00586/AM09/ RLA File :05/24/040/00560/AM09/ Lic.No/Date:0510231987 02.12.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   49

Case No.:25/38/81­ALC2/2008

Party Name:WAGO & CONTROLS (I) LTD 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00587/AM09/ RLA File :05/24/040/00564/AM09/ Lic.No/Date:0510232058 03.12.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of DC(SSI)  vide their U.O. No. 30(336)/2008­ME dated 18.05.2009. (copy enclosed).     50

Case No.:27/38/81­ALC2/2008

Party Name:COOKSON INDIA PVT. LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00589/AM09/ RLA File :04/24/040/00191/AM09/ Lic.No/Date:0410100521 03.12.2008 Defer Date:07.07.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the AA is issued on repeat basis. Hence, decided to close the case on the part of NC.     51

Case No.:28/38/81­ALC2/2008

Party Name:COOKSON INDIA PVT. LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00590/AM09/ RLA File :04/24/040/00185/AM09/ Lic.No/Date:0410100522 03.12.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the AA is issued on repeat basis. Hence, decided to close the case on the part of NC.   52

Case No.:30/38/81­ALC2/2008

Party Name:SHAKUN POLYMERS LIMITED, 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00592/AM09/ RLA File :34/24/040/00159/AM09/ Lic.No/Date:3410022845 04.12.2008 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 01.09.2009.   53

Case No.:33/38/81­ALC2/2008

Party Name:SUZLON GENERATORS LTD 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00595/AM09/ RLA File :31/24/040/00237/AM09/ Lic.No/Date:3110036337 05.12.2008 Defer Date:26.05.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that this case has already been approved on 26.05.2009. Hence, decided to withdraw the case.     54

Case No.:34/38/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00596/AM09/ RLA File :03/95/040/00530/AM09/ Lic.No/Date:0310496943 08.12.2008 Defer Date:07.07.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of MIT  vide their U.O. No. 17(19)/2009­IPHW dated 05.06.2009. (copy enclosed).     55

Case No.:3/44/81­ALC2/2008

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00663/AM09/ RLA File :35/24/040/00023/AM09/ Lic.No/Date:3510025556 05.01.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that the comments from M/o Mines is not received despite several reminders. Therefore, the Committee decided to issue a D.O. reminder from the level of Chairman to the JS, M/o Mines for forwarding the comments. The case stands deferred and to be relisted on 01.09.2009.   56

Case No.:4/44/81­ALC2/2008

Party Name:TEK ELECTROMECHANICALS PVT LTD 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00664/AM09/ RLA File :31/24/040/00265/AM09/ Lic.No/Date:3110036929 07.01.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited by MIT and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 01.09.2009. 57

Case No.:5/44/81­ALC2/2008

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00665/AM09/ RLA File :35/24/040/00024/AM09/ Lic.No/Date:3510025570 07.01.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that the comments from M/o Mines is not received despite several reminders. Therefore, the Committee decided to issue a D.O. reminder from the level of Chairman to the JS, M/o Mines for forwarding the comments. The case stands deferred and to be relisted on 01.09.2009.

58

Case No.:9/44/81­ALC2/2008

Party Name:SHETRON LTD 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00669/AM09/ RLA File :07/24/040/00556/AM09/ Lic.No/Date:0710062327 09.01.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the case is under examination of DIPP. The case stands deferred and to be re­listed on 01.09.2009.   59

Case No.:11/44/81­ALC2/2008

Party Name:COPPER STRIPS PVT LTD 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00671/AM09/ RLA File :11/24/040/00065/AM09/ Lic.No/Date:1110019365 12.01.2009 Defer Date:07.07.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.                       Word “relevant” may be prefixed with the description of import item and its  quantity may allowed as  17381 Kgs inclusive of 3 % wastage after 2/3rd recovery of scrap     60

Case No.:10/44/81­ALC2/2008

Party Name:IMAGE LABELS PVT.LTD., 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00670/AM09/ RLA File :07/24/040/00542/AM09/ Lic.No/Date:0710062372 13.01.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee decided to refer a copy of the application of the  firm to C&PC for examination and comments. The case stands deferred and to be re­listed on 01.09.2009.   61

Case No.:16/44/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00676/AM09/ RLA File :03/95/040/00691/AM09/ Lic.No/Date:0310502559 16.01.2009 Defer Date:07.07.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of MIT  vide their U.O. No. 17(28)/2009­IPHW dated 23.06.2009. (copy enclosed).     62

Case No.:17/44/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00677/AM09/ RLA File :03/95/040/00693/AM09/ Lic.No/Date:0310502563 16.01.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of MIT  vide their U.O. No. 17(29)/2009­IPHW dated 23.06.2009. (copy enclosed).       63

Case No.:18/44/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00678/AM09/ RLA File :03/95/040/00533/AM09/ Lic.No/Date:0310502571 16.01.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of MIT  vide their U.O. No. 17(30)/2009­IPHW dated 23.06.2009. (copy enclosed).     64

Case No.:19/44/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00679/AM09/ RLA File :03/95/040/00532/AM09/ Lic.No/Date:0310502575 16.01.2009 Defer Date:07.07.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of MIT  vide their U.O. No. 17(31)/2009­IPHW dated 23.06.2009. (copy enclosed).     65

Case No.:20/44/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00680/AM09/ RLA File :11/24/040/00054/AM09/ Lic.No/Date:1110019426 19.01.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 01.09.2009.     66

Case No.:21/44/81­ALC2/2008

Party Name:PROINS TECHNOLOGIES PVT LTD, Meet No/Date:14/81­ALC2/2009 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00681/AM09/ RLA File :07/21/040/01039/AM09/ Lic.No/Date:0710062446 20.01.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee noted that RA  neither  reported  the  status  of  the  case  nor  forwarded  the  four  sets  of  application  in  response  to  this  office  letter  and subsequent reminders. The committee  presumed  that  ratification  of  norms  of  the  subject  authorisation  is  not  required  by  RA. Hence, the case may be closed on the part of NC. “In case RA feels that case needs to be ratified by NC, they may intimate the NC in writing in 4 weeks time”.       67

Case No.:2/51/81­ALC2/2008

Party Name:IDMC LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00748/AM09/ RLA File :34/24/040/00175/AM09/ Lic.No/Date:3410023519 17.02.2009 Defer Date:07.07.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee decided to refer a copy of the reply received from the firm to DHI for examination and comments. The case stands deferred and to be re­ listed on 04.08.2009.   68

Case No.:4/51/81­ALC2/2008

Party Name:TRANS ENGINEERS INDIA PVT.LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00750/AM09/ RLA File :31/24/040/00186/AM09/ Lic.No/Date:3110037391 18.02.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   69

Case No.:5/51/81­ALC2/2008

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00751/AM09/ RLA File :05/24/040/00734/AM09/ Lic.No/Date:0510236836 20.02.2009 Defer Date:07.07.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1. Words “Total Pipe Length 266.10 mtrs.” may be specified with the  quantity of export product. 2. Total net weight of export product may be modified as 106.5 MT. 3. Word “relevant” may be prefixed with the description of import items at S.No.1&3. 4. Quantity of import item at S.No.1 may be allowed as 71.71 MT (271.5 Mtrs.) inclusive of 2% wastage. 5. Quantity of import item at S.No.2 may be allowed as 193 Nos. (31.94 MT) on net to net basis. 6. Quantity of import item at S.No.3 may be allowed as 0.94 MT (950 Nos.) on net to net basis. 7. Quantity of import item at S.No.4 may be allowed as 9 Nos. (50 Kgs.)on net to net basis. 8. Quantity of import item at S.No. 5 may be allowed as 1.05 MT. 9. Quantity of import item at S.No. 6 may be allowed equal to the quantity of Welding Wire at S.No. 5. 10. Import of components may be allowed with accountability clause.     70

Case No.:7/51/81­ALC2/2008

Party Name:POWER GEAR LTD. 07.07.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00753/AM09/ RLA File :07/24/040/00613/AM09/ Lic.No/Date:0710063182 20.02.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   71

Case No.:8/51/81­ALC2/2008

Party Name:INDUSTRIAL METAL POWDERS (INDIA) PVT.LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00754/AM09/ RLA File :31/24/040/00313/AM09/ Lic.No/Date:3110037424 20.02.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the case is under examination of DC(SSI). The case stands deferred and to be re­listed on 01.09.2009.   72

Case No.:16/51/81­ALC2/2008

Party Name:GARGI ENTERPRISES, 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00762/AM09/ RLA File :07/24/040/00638/AM09/ Lic.No/Date:0710063290 26.02.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 01.09.2009.   73

Case No.:17/51/81­ALC2/2008

Party Name:MOLEX (INDIA) PRIVATE LIMITED, Meet No/Date:14/81­ALC2/2009 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00763/AM09/ RLA File :07/24/040/00618/AM09/ Lic.No/Date:0710063292 26.02.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee decided to refer a copy of the application of the  firm to DOT for examination and comments. The case stands deferred and to be re­listed on 01.09.2009.     74

Case No.:18/51/81­ALC2/2008

Party Name:PERMASTEELISA (INDIA) PVT. LTD., 07.07.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00764/AM09/ RLA File :07/24/040/00614/AM09/ Lic.No/Date:0710063303 26.02.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the D/L has been received back undelivered and it has been decided to ask RA to deliver the D/L to the firm. The case stands deferred and to be re­listed on 01.09.2009.   75

Case No.:20/51/81­ALC2/2008

Party Name:SHAKUN POLYMERS LIMITED, 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00766/AM09/ RLA File :34/24/040/00218/AM09/ Lic.No/Date:3410023608 26.02.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the AA is issued on repeat basis. Hence, decided to close the case on the part of NC.   76

Case No.:21/51/81­ALC2/2008

Party Name:POSCO­INDIA PUNE PROCESSING CENTER PVT. LTD., 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00767/AM09/ RLA File :31/24/040/00309/AM09/ Lic.No/Date:3110037483 27.02.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of M/o Steel  vide their U.O. No. 2(5)/2006­TW Vol. I dated 01.07.2009. (copy enclosed).       77

Case No.:1/7/81­ALC2/2009

Party Name:PHOENIX INDUSTRIES PVT. LTD 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00021/AM10/ RLA File :03/95/040/00029/AM10/ Lic.No/Date:0310517585 28.04.2009 Defer Date:07.07.2009

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DC(SSI) present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1. Quantity of import item at S.No.1 may be allowed as 181.80 MT  inclusive of 1% wastage. 2. Quantity of import item at S.No.2 may be allowed as 20.2 MT on net to net basis.     78

Case No.:2/7/81­ALC2/2009

Party Name:RPG CABLES LIMITED, 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00022/AM10/ RLA File :03/95/040/00966/AM09/ Lic.No/Date:0310517731 29.04.2009 Defer Date:07.07.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1. Quantity of import item at Sl.No.1 may be allowed as 54.408 MT inclusive of 1% wastage.       79

Case No.:4/7/81­ALC2/2009

Party Name:TECHCELLENCY(PROP. NIMESH RAMESHCHANDRA DESAI) 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00024/AM10/ RLA File :31/24/040/00017/AM10/ Lic.No/Date:3110038295 30.04.2009 Defer Date:07.07.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DC(SSI) present in the meeting and after taking clue from SION C­388, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1. Quantity of import item may be allowed as 348.2 Kg.  inclusive of 65% wastage.  

80

Case No.:3/7/81­ALC2/2009

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00023/AM10/ RLA File :05/24/040/00054/AM10/ Lic.No/Date:0510240790 04.05.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee noted that RA  neither  reported  the  status  of  the  case  nor  forwarded  the  four  sets  of  application  in  response  to  this  office  letter  and subsequent reminders. The committee  presumed  that  ratification  of  norms  of  the  subject  authorisation  is  not  required  by  RA. Hence, the case may be closed on the part of NC. “In case RA feels that case needs to be ratified by NC, they may intimate the NC in writing in 4 weeks time”.         81

Case No.:5/7/81­ALC2/2009

Party Name:KDDL LTD., 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00025/AM10/ RLA File :07/24/040/00024/AM10/ Lic.No/Date:0710064481 04.05.2009 Defer Date:07.07.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1. Quantity of import item may be allowed as 19109  Kgs. inclusive of 97 % wastage after 1/3rd recovery from scrap.     82

Case No.:6/7/81­ALC2/2009

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00026/AM10/ RLA File :07/24/040/00039/AM10/ Lic.No/Date:0710064492 04.05.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 01.09.2009.

83

Case No.:10/7/81­ALC2/2009

Party Name:ABB LIMITED 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00030/AM10/ RLA File :07/24/040/00049/AM10/ Lic.No/Date:0710064538 05.05.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee noted that RA  neither  reported  the  status  of  the  case  nor  forwarded  the  four  sets  of  application  in  response  to  this  office  letter  and subsequent reminders. The committee  presumed  that  ratification  of  norms  of  the  subject  authorisation  is  not  required  by  RA. Hence, the case may be closed on the part of NC. “In case RA feels that case needs to be ratified by NC, they may intimate the NC in writing in 4 weeks time”.       84

Case No.:7/7/81­ALC2/2009

Party Name:HYDRIL JINDAL INTERNATIONAL PVT. LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00027/AM10/ RLA File :05/24/040/00059/AM10/ Lic.No/Date:0510240868 05.05.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the AA is issued on repeat basis. Hence, decided to close the case on the part of NC.     85

Case No.:8/7/81­ALC2/2009

Party Name:TATA BP SOLAR INDIA LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00028/AM10/ RLA File :07/24/040/00001/AM10/ Lic.No/Date:0710064532 05.05.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.N0.  14/81  scheduled  to  be  held  on  07.07.2009  but  actually  held  on  21.07.2009.  Firm’s  representative appeared before the committee to explain their products and processes.  After the PH, the committee observed that MN&RE has recommended the approval of the case with 3% wastage. However, the Norms Committee, after deliberating upon the case after the PH, decided to ratify the norms in respect of the subject advance authorisation with 2% wastage.  

86

Case No.:9/7/81­ALC2/2009

Party Name:MAHENDRA INDUSTRIES 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00029/AM10/ RLA File :07/24/040/00038/AM10/ Lic.No/Date:0710064535 05.05.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 01.09.2009.   87

Case No.:11/7/81­ALC2/2009

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00031/AM10/ RLA File :05/24/040/00062/AM10/ Lic.No/Date:0510240907 06.05.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of DHI  vide their U.O. No. 3(16)/09/TSW(B)/283 Vol. I dated 01.07.2009. (copy enclosed).     88

Case No.:12/7/81­ALC2/2009

Party Name:ALSTRONG ENTERPRISES 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00032/AM10/ RLA File :05/24/040/00464/AM09/ Lic.No/Date:0510240950 06.05.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 01.09.2009.   89

Case No.:13/7/81­ALC2/2009

Party Name:ALUPAN COMPOSITEPANELS PVT.LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00033/AM10/ RLA File :05/24/040/00042/AM10/ Lic.No/Date:0510241032 08.05.2009 Defer Date:07.07.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 04.08.2009: ­   1.      Total thickness of Aluminium Composite Panel with thickness of PE core and aluminum sheet in the Composite Panel 2.      Thickness of Aluminium Coil/sheet i.e. import item at Sl. No.1 alongwith its quantity in Sq Mtrs. 3.   Information in respect of items at Sl.Nos. 4,5 & 11 of SDF.       90

Case No.:14/7/81­ALC2/2009

Party Name:ALUPAN COMPOSITEPANELS PVT.LTD. 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00034/AM10/ RLA File :05/24/040/00044/AM10/ Lic.No/Date:0510241033 08.05.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 04.08.2009: ­   1. Total thickness of Aluminium Composite Panel with thickness of PE core and aluminum sheet in the Composite Panel 2. Thickness of Aluminium Coil/sheet i.e. import item at Sl. No.1 alongwith its quantity in Sq Mtrs. 3. Information in respect of items at Sl.Nos. 4,5 & 11 of SDF.     91

Case No.:15/7/81­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 07.07.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00035/AM10/ RLA File :03/94/040/00065/AM10/ Lic.No/Date:0310519156 08.05.2009 Defer Date:07.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 01.09.2009.

PART –A ­DEFFER   S.No.7

Case No. A­18

 M/S Zenstar Impex, Mumbai            Meeting No.14/81 F.No.01/81/162/411/AM09/DES­II Dated 07­07­2009 RLA F.No.03/95/40/0242/AM09   CIF value applied for A/A Rs.18,48,65,520/­ Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the case is under examination of M/o Steel. The case stands deferred and to be re­listed on 01.09.2009.                                     PART –AR­DEFFER S.No.22

Case No. AR ­41

 M/S Proteck Circuit & Systems Pvt.Ltd.Chennai            Meeting No.14/81 F.No.01/81/50/306/AM07/DES­II Dated 07­07­2009 Advance Licence No.0410083158 dt.27­07­2006            RLA F.No.04/24/40/00125/AM07 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 04.08.2009.     S.No.23

Case No.A R­ 46

M/s  Sietz Technologies India Pvt.Ltd. Meeting No.14/81 F.No.01/81/50/177/AM07/DES­II Dated: 07­07­2009 Advance Licence No 0510183784   dt  31­05­2006               RLA F.No. 05/24/040/180/AM07              Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The Norms Committee, after deliberating upon the case, decided to call for some information in respect of the subject advance authorisation, as per DC(SSI)  vide their U.O. No. 30(355)/2008­ME dated 22.06.2009. (copy enclosed). The case stands deferred and to be relisted on 01.09.2009.

S.No.24

Case No. AR­9

 M/s Delton Cables Ltd.            Meeting No.14/81/ F.No.01/81/50/659/ AM08/DES­II Dated 07­07­2009 Advance Licence No.0510212061 dt.14­11­2007   RLA  F.No.05/24/040/603/AM08 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­ list the case on 01.09.2009: ­   Reply received form the firm is not proper and they may again be asked to submit    the following information for export products from Sl. No 1 to 5.   1. Detailed calculations for the requirement of each  raw material, export product wise supported by the Cross sectional diagram of the cable/Buyers data sheet 2. Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 3. Total requirement of each raw material, export product wise, in a tabular form.   Note: It has also been decided to refer a copy of the application of the firm to DOT.     PART –C­ DEFFER S.No.20

Case No. C­11

 M/S Vijai Electricals Ltd..           Meeting No.14/81 F.No.01/81/162/1052/AM08/DES­II Dated: 07­07­2009            Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The date of visit is being finalized by the team members. The case stands deferred and to be relisted on 01.09.2009.     S.No.21

Case No. C ­ 6

M/s  Reychem RPG Ltd.            Meeting No.14/81 F.No.01/81/162/801/AM08/DES­II Dated: 07­07­2009  Advance Lic.NO.0310340407 dt.21­07­2005          RLA.F.No.03/95/039/0003/AM06

Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. Based on the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1. Description and quantity of Export product  and its weight may be specified as under:   Sl.No. Description Quantity Export Weight 1 R Loc SS band 53114 Nos. 313372.6 Kgs   2. Quantity of import item namely; Strap SS (width 20 MM x 0.75 MM thick) may be allowed as 1.02 Kgs./Kg. content in the export product     S. No. 22

Case No. C ­ 7

M/s  Reychem RPG Ltd.            Meeting No.14/81 F.No.01/81/162/886/AM08/DES­II Dated: 07­07­2009  Advance Lic.NO.0310340407 dt.21­07­2005          RLA.F.No.03/95/039/0003/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 01.09.2009.     SUPPLIMENTARY AGENDA   PART –A ­FRESH    

Case No. A­1

 M/S GKN Sinter Metals Ltd.Pune            Meeting No.14/81 F.No.01/80/50/1472/AM06/DES­I/DES­II Dated 07­07­2009 Advance Licence No.3110023953 dt.21­02­2006   RLA F.No.31/24/040/234/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 14/81 scheduled to be held on 07.07.2009 but actually held on 21.07.2009. The committee observed that similar case of the firm was approved by NC­I in their meeting dated 11.07.2006 and based on that decision the committee decided to ratify the case as under:   I. Prior requisite permission of Ministry of Environment & Forests in regard to import item No.2 is required

II. The RLA shall endorse the license that no imports shall be allowed under the subject license unless and until the firm fulfill the requirement  as  per  Schedule  4  of  the  Hazardous  Wastes)  Management  &  Handling)  Rules,  2003  and  get  registered  with  Central Pollution  Control  Board  and  shall  produce  the  registration  certificate  before  them  alongwith  recommendation  from  Ministry  of Environment & Forests.   1.      The description of Import item No.1 may be amended to read as “Copper Scrap minimum purity 98%” and its quantity may be allowed as 99910 kg inclusive of 3% wastage. 2.      The description of import item No.2 may be amended to read as “Copper Mill Scale (Copper content Minimum 80% in Natural State”  and  its  quantity  may  be  allowed  as  applied  for  subject  to  the  prior  requisite  permission  of  Ministry  of  Environment  & Forests as stated above. The RLA may take necessary action accordingly.

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied