IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2009-09-02

DGFT Committee Minutes

Document text

RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   Minutes of the Norms Committee­II Meeting No. 20/10 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Meeting No. 20/10 of Norms Committee­II was held on 02.09.2009 for the licensing year 2009­2010 under the Chairmanship of  Sh.  O.P.  Hisaria,  Joint  Director  General  of  Foreign  Trade  (OPH)  to  consider  the  applications  under  Duty  Exemption  Scheme (Chapter­4) of Foreign Trade Policy 2004­2009. The following members were present in the meeting:­ S.No Name of the representatives & their Designation   Deptt.   1. Shri B.D. Ghosh, AIA M/o Steel   2. 3. 4. 5. Sh. S.K. Jain, D.O. Sh. Gajraj Singh, Sr. D.O. Shri A. K. Mishra, Asst IA Shri K. K. Funda, Asst. Director DIPP DHI M/o Steel DC(SSI) 6.   Shri Narendra Vashista, FTDO DGFT The Committee took up the individual cases of the agenda of this meeting for discussion and the decision taken in respect of each case as follows:   1

Case No.:90/9/83­ALC1/2008

Party Name:STERLITE INDUSTRIES (INDIA) LTD. Meet No/Date:20/81­ALC2/2009 18.08.2009 Status:Deffered and Re­ indexed HQ File :01/83/050/00262/AM09/ RLA File :35/21/040/00022/AM09/ Lic.No/Date:3510023523 15.05.2008 Defer Date:18.08.2009 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  20/81  scheduled  to  be  held  on  18.08.2009  but  actually  held  on  02.09.2009.  As  per  the  information furnished by RA, the committee observed that the AA is issued on repeat basis. Hence, decided to close the case on the part of NC.     2

Case No.:69/15/81­ALC2/2008

Party Name:NOKIA SIEMENS NETWORKS INDIA PVT. LTD., 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00237/AM09/ RLA File :02/24/040/00004/AM09/ Lic.No/Date:0210113297 04.06.2008 Defer Date:18.08.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the details of items given in the comments by DOT do not match with the details given in the application of the firm. DOT may clarify. The case stands deferred and to be relisted on 13.10.2009.   3

Case No.:6/13/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00159/AM09/ RLA File :11/24/040/00004/AM08/ Lic.No/Date:1110017576 18.06.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the AA is issued on repeat basis. Hence, decided to close the case on the part of NC.   4

Case No.:12/19/81­ALC2/2008

Party Name:SHEZAR TECHNOLOGIES PVT. LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00297/AM09/ RLA File :03/95/040/00349/AM09/ Lic.No/Date:0310479365 18.07.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 13.10.2009.     5

Case No.:18/19/81­ALC2/2008

Party Name:ABB LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00303/AM09/ RLA File :07/24/040/00134/AM09/ Lic.No/Date:0710058730 25.07.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   6

Case No.:24/19/81­ALC2/2008

Party Name:DURLUM INDIA PRIVATE LIMITED Meet No/Date:20/81­ALC2/2009 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00309/AM09/ RLA File :05/24/040/00289/AM09/ Lic.No/Date:0510224603 29.07.2008 Defer Date:18.08.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the case is under examination of DIPP. The case stands deferred and to be relisted on 13.10.2009.   7

Case No.:2/21/81­ALC2/2008

Party Name:ALCAN COMPOSITES INDIA PVT. LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00313/AM09/ RLA File :03/94/040/00132/AM09/ Lic.No/Date:0310481240 05.08.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee decided to refer a copy of the reply received from the firm to DIPP. The case stands deferred and to be relisted on 13.10.2009.   8

Case No.:9/21/81­ALC2/2008

Party Name:ITW INDIA LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00320/AM09/ RLA File :09/24/040/00096/AM09/ Lic.No/Date:0910034958 07.08.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. As per the information furnished by RA, the committee observed that the AA is issued on repeat basis. Hence, decided to close the case on the part of NC.   9

Case No.:13/21/81­ALC2/2008

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00324/AM09/ RLA File :07/24/040/00187/AM09/ Lic.No/Date:0710058952 08.08.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   10

Case No.:14/21/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00325/AM09/ RLA File :03/95/040/00422/AM09/ Lic.No/Date:0310481936 08.08.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the case is under examination of MIT. The case stands deferred and to be relisted on 13.10.2009.

11

Case No.:15/21/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00326/AM09/ RLA File :03/95/040/00406/AM09/ Lic.No/Date:0310481947 08.08.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the case is under examination of MIT. The case stands deferred and to be relisted on 13.10.2009.     12

Case No.:8/25/81­ALC2/2008

Party Name:PERMASTEELISA (INDIA) PVT. LTD., 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00376/AM09/ RLA File :07/24/040/00313/AM09/ Lic.No/Date:0710059597 08.09.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The D/L was received back undelivered and was sent to RA for serving to the firm. The committee observed that no communication from RA in the matter is received and decided to call for the report from RA. The case stands deferred and to be relisted on 13.10.2009.   13

Case No.:10/25/81­ALC2/2008

Party Name:TEK ELECTROMECHANICALS PVT LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00378/AM09/ RLA File :31/24/040/00114/AM09/ Lic.No/Date:3110035315 09.09.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   14

Case No.:11/25/81­ALC2/2008

Party Name:TEK ELECTROMECHANICALS PVT LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00379/AM09/ RLA File :31/24/040/00158/AM09/ Lic.No/Date:3110035325 09.09.2008 Defer Date:18.08.2009

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.No.  20/81  scheduled  to  be  held  on  18.08.2009  but  actually  held  on  02.09.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.      Net weight of export product may be specified as 2052 Kgs. 2.      Quantity of import item at S.No. 1 may be allowed as 985.3 Kgs. inclusive of 5% wastage. 3.      Import items at S.No.2 & 3 may be allowed as 180,000 Nos. & 360,000 Nos. respectively on net to net basis with accountability clause.   R/A may take suitable consequential action accordingly.   15

Case No.:7/27/81­ALC2/2008

Party Name:R.K.POLYMERS 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00389/AM09/ RLA File :13/24/040/00009/AM09/ Lic.No/Date:1310026943 16.09.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   16

Case No.:8/27/81­ALC2/2008

Party Name:VIJAI ELECTRICALS LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00390/AM09/ RLA File :09/24/040/00238/AM09/ Lic.No/Date:0910035321 18.09.2008 Defer Date:18.07.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   17

Case No.:22/27/81­ALC2/2008

Party Name:PEARL METAL PRODUCTS (BANGALORE) PVT. LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00404/AM09/ RLA File :07/24/040/00333/AM09/ Lic.No/Date:0710060092 24.09.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 13.10.2009.

18

Case No.:2/29/81­ALC2/2008

Party Name:POWER GEAR LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00419/AM09/ RLA File :07/24/040/00359/AM09/ Lic.No/Date:0710060192 29.09.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 13.10.2009.   19

Case No.:13/29/81­ALC2/2008

Party Name:IDMC LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00430/AM09/ RLA File :34/24/040/00106/AM09/ Lic.No/Date:3410022444 30.09.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the case pertains to NC­I. Hence decided to transfer the case to NC­I.     20

Case No.:2/34/81­ALC2/2008

Party Name:THERELEK ENGINEERS PVT LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00499/AM09/ RLA File :07/24/040/00419/AM09/ Lic.No/Date:0710060837 03.11.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 13.10.2009.     21

Case No.:16/34/81­ALC2/2008

Party Name:STI­SANOH INDIA LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00513/AM09/ RLA File :11/24/040/00032/AM09/ Lic.No/Date:1110018907 07.11.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred

22

Case No.:17/34/81­ALC2/2008

Party Name:L M GLASFIBER (INDIA) PVT LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00514/AM09/ RLA File :07/24/040/00437/AM09/ Lic.No/Date:0710060971 07.11.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 13.10.2009.   23

Case No.:5/42/81­ALC2/2008

Party Name:TECHNO TRACK ENGINEERS(PROP. ASHOK R. SONAWANE) 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00639/AM09/ RLA File :31/24/040/00235/AM09/ Lic.No/Date:3110036602 23.12.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 13.10.2009: ­   1.      Export product wise information in respect of items at Sl. Nos. 4, 5 & 11 of SDF.       24

Case No.:15/42/81­ALC2/2008

Party Name:ABB LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00649/AM09/ RLA File :07/21/040/01037/AM09/ Lic.No/Date:0710062081 29.12.2008 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to issue a D.O. reminder to RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 13.10.2009.   25

Case No.:17/42/81­ALC2/2008

Party Name:TESLA TRANSFORMERS LTD., 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00651/AM09/ RLA File :03/95/040/00824/AM09/ Lic.No/Date:0310500580 31.12.2008 Defer Date:18.08.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   26

Case No.:20/42/81­ALC2/2008

Party Name:GAVIRANGA ENTERPRISES 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00654/AM09/ RLA File :07/24/040/00546/AM09/ Lic.No/Date:0710062157 01.01.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  Simultaneously, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 13.10.2009: ­   1.       Information in respect of items at Sl. Nos. 1, 3 &  8 of SDF. 2.       Specifications of items of import.     27

Case No.:21/42/81­ALC2/2008

Party Name:SHAKUN POLYMERS LIMITED, 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00655/AM09/ RLA File :34/24/040/00183/AM09/ Lic.No/Date:3410023112 01.01.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. As per the information furnished by RA, the committee observed that the AA is issued on repeat basis. Hence, decided to close the case on the part of NC.   28

Case No.:24/42/81­ALC2/2008

Party Name:VICTORY TRANSFORMERS & SWITCHGEARS LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00658/AM09/ RLA File :09/24/040/00252/AM09/ Lic.No/Date:0910036578 05.01.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred

29

Case No.:25/42/81­ALC2/2008

Party Name:VICTORY TRANSFORMERS & SWITCHGEARS LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00659/AM09/ RLA File :09/24/040/00253/AM09/ Lic.No/Date:0910036579 05.01.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred     30

Case No.:12/44/81­ALC2/2008

Party Name:PERSANG ALLOY INDUSTRIES PVT LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00672/AM09/ RLA File :34/24/040/00182/AM09/ Lic.No/Date:3410023188 13.01.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   31

Case No.:4/48/81­ALC2/2008

Party Name:L M GLASFIBER (INDIA) PVT LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00709/AM09/ RLA File :07/24/040/00594/AM09/ Lic.No/Date:0710062693 03.02.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 13.10.2009.   32

Case No.:7/48/81­ALC2/2008

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00712/AM09/ RLA File :05/24/040/00518/AM09/ Lic.No/Date:0510235656 03.02.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the case is under examination of DIPP. The case stands deferred and to be relisted on 13.10.2009.

33

Case No.:9/48/81­ALC2/2008

Party Name:EFD INDUCTION LIMITED, 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00714/AM09/ RLA File :07/24/040/00690/AM08/ Lic.No/Date:0710062735 04.02.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 13.10.2009.   34

Case No.:15/48/81­ALC2/2008

Party Name:SUNLAND METAL RECYCLING INDUSTRIES 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00720/AM09/ RLA File :03/95/040/00059/AM09/ Lic.No/Date:0310505652 05.02.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the comments from MOEF are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 13.10.2009.   35

Case No.:19/48/81­ALC2/2008

Party Name:DELTON CABLES LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00724/AM09/ RLA File :05/24/040/00664/AM09/ Lic.No/Date:0510235840 05.02.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to issue a D.O. reminder to RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 13.10.2009.     36

Case No.:24/48/81­ALC2/2008

Party Name:INDUSTRIAL METAL POWDERS (INDIA) PVT.LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00729/AM09/ RLA File :31/24/040/00301/AM09/ Lic.No/Date:3110037275 06.02.2009 Defer Date:18.08.2009

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.No.  20/81  scheduled  to  be  held  on  18.08.2009  but  actually  held  on  02.09.2009.  Based  on  the recommendations of the representative of DC(SSI) present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.      Quantity of import item may be allowed as 16.92 MT inclusive of 4% wastage.     37

Case No.:30/48/81­ALC2/2008

Party Name:GENSER AEROSPACE & INFORMATION TECHNOLOGIES P.LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00735/AM09/ RLA File :07/24/040/00592/AM09/ Lic.No/Date:0710062936 10.02.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred     38

Case No.:31/48/81­ALC2/2008

Party Name:PATEL ENGINEERING LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00736/AM09/ RLA File :03/95/040/00922/AM09/ Lic.No/Date:0310506468 10.02.2009 Defer Date:18.08.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.No.  20/81  scheduled  to  be  held  on  18.08.2009  but  actually  held  on  02.09.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.  Word “relevant”  may  be  prefixed  with  the  description  of  import  item  and  its  quantity  may  be  allowed  as  229.138    MT. inclusive  of 5% wastage     39

Case No.:34/48/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00739/AM09/ RLA File :11/21/040/00128/AM09/ Lic.No/Date:1110019619 11.02.2009 Defer Date:18.08.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 13.10.2009.     40

Case No.:38/48/81­ALC2/2008

Party Name:JINDAL SAW LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00743/AM09/ RLA File :05/24/040/00716/AM09/ Lic.No/Date:0510236321 12.02.2009 Defer Date:18.08.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.No.  20/81  scheduled  to  be  held  on  18.08.2009  but  actually  held  on  02.09.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1. Quantity of import item may be allowed as 2772  Nos of Rolls inclusive of 5 % wastage.     41

Case No.:40/48/81­ALC2/2008

Party Name:ASTRA LIGHTING LTD., 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00745/AM09/ RLA File :22/24/040/00062/AM09/ Lic.No/Date:2210008650 13.02.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of DC(SSI)  vide their U.O. No. 30(36)/2008­ME dated 12.08.2009. (copy enclosed).     42

Case No.:41/48/81­ALC2/2008

Party Name:ALSTOM PROJECTS INDIA LIMITED, 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00746/AM09/ RLA File :03/94/040/01011/AM09/ Lic.No/Date:0310507423 16.02.2009 Defer Date:18.08.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   43

Case No.:9/5/81­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00017/AM10/ RLA File :05/24/040/00525/AM09/ Lic.No/Date:0510237295 27.02.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Norms Committee, after deliberating upon the case, decided to call for some information in respect of the subject advance authorisation, as per DHI’s U.O. No. 3(17)/2009­TSW(B)/285 dated 03.07.2009. (copy enclosed). The case stands deferred and to be relisted on 13.10.2009.     44

Case No.:3/2/85­ALC3/2009

Party Name:SAI KALA POWER PVT.LTD, 18.08.2009 Status:Deffered and Re­indexed HQ File :01/85/050/00003/AM10/ RLA File :07/24/040/00656/AM09/ Lic.No/Date:0710064045 06.04.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 13.10.2009.   45

Case No.:1/5/81­ALC2/2009

Party Name:AMARTARA PVT. LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00009/AM10/ RLA File :03/94/040/00016/AM10/ Lic.No/Date:0310515819 16.04.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 13.10.2009.     46

Case No.:5/5/81­ALC2/2009

Party Name:DIAMOND ENGINEERING (CHENNAI) PVT LTD 18.08.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00013/AM10/ RLA File :04/24/040/00007/AM10/ Lic.No/Date:0410103964 20.04.2009 Defer Date:18.08.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.No.  20/81  scheduled  to  be  held  on  18.08.2009  but  actually  held  on  02.09.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.      Description of Export product may be specified as per Annexure I of firm’s letter dated 03.08.2009 (copy enclosed). 2.      Word “relevant” may be prefixed with the description of import items  from Sl Nos 1 to 5  and the same   may be allowed as 1.02  Kgs./Kg. content in the export products.     47

Case No.:6/5/81­ALC2/2009

Party Name:ORION METAL POWDER PVT LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00014/AM10/ RLA File :02/24/040/00001/AM10/ Lic.No/Date:0210125702 21.04.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of DC(SSI)  vide their U.O. No. 30(36)/2008­ME dated 12.08.2009. (copy enclosed).       48

Case No.:7/5/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00015/AM10/ RLA File :09/24/040/00479/AM09/ Lic.No/Date:0910037711 22.04.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   49

Case No.:11/5/81­ALC2/2009

Party Name:SVAM PACKAGING INDUSTRIES PRIVATE LIMITED 18.08.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00019/AM10/ RLA File :05/24/040/00006/AM10/ Lic.No/Date:0510240301 24.04.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee decided to refer a copy of the reply received from the firm to DC(SSI). The case stands deferred and to be relisted on 13.10.2009.   50

Case No.:1/6/85­ALC3/2009

Party Name:SAI KALA POWER PVT.LTD, 18.08.2009 Status:Deffered and Re­indexed HQ File :01/85/050/00037/AM10/ RLA File :07/24/040/00070/AM10/ Lic.No/Date:0710064907 21.05.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee noted that RA  neither  reported  the  status  of  the  case  nor  forwarded  the  four  sets  of  application  in  response  to  this  office  letter  and subsequent  reminders.  The  committee  presumed  that  ratification  of  norms  of  the  subject  authorisation  is  not  required  by  RA. Hence, the case may be closed on the part of NC. “In case RA feels that case needs to be ratified by NC, they may intimate the NC in writing in 4 weeks time”.       51

Case No.:5/13/81­ALC2/2009

Party Name:HYDRIL JINDAL INTERNATIONAL PVT. LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00073/AM10/ RLA File :05/24/040/00123/AM10/ Lic.No/Date:0510243201 05.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. As per the information furnished by RA, the committee observed that the AA is issued on repeat basis. Hence, decided to close the case on the part of NC.   52

Case No.:6/13/81­ALC2/2009

Party Name:UTV SOFTWARE COMMUNICATIONS LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00074/AM10/ RLA File :05/24/040/00004/AM10/ Lic.No/Date:0510243219 08.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the case is under examination of MIT. The case stands deferred and to be relisted on 13.10.2009.

53

Case No.:1/13/81­ALC2/2009

Party Name:ABB LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00069/AM10/ RLA File :07/24/040/00093/AM10/ Lic.No/Date:0710065291 09.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee noted that RA  neither  reported  the  status  of  the  case  nor  forwarded  the  four  sets  of  application  in  response  to  this  office  letter  and subsequent reminders. The committee  presumed  that  ratification  of  norms  of  the  subject  authorisation  is  not  required  by  RA. Hence, the case may be closed on the part of NC. “In case RA feels that case needs to be ratified by NC, they may intimate the NC in writing in 4 weeks time”.         54

Case No.:2/13/81­ALC2/2009

Party Name:ABB LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00070/AM10/ RLA File :07/24/040/00092/AM10/ Lic.No/Date:0710065292 09.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee noted that RA  neither  reported  the  status  of  the  case  nor  forwarded  the  four  sets  of  application  in  response  to  this  office  letter  and subsequent reminders. The committee  presumed  that  ratification  of  norms  of  the  subject  authorisation  is  not  required  by  RA. Hence, the case may be closed on the part of NC. “In case RA feels that case needs to be ratified by NC, they may intimate the NC in writing in 4 weeks time”.       55

Case No.:3/13/81­ALC2/2009

Party Name:EVEREADY INDUSTRIES INDIA LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00071/AM10/ RLA File :02/24/040/00003/AM10/ Lic.No/Date:0210127482 09.06.2009 Defer Date:18.08.2009

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. Based on the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance  Authorisation  on  repeat  basis  as  per  Advance  Authorisation  No.  0210109186  dated  15.02.2008  ratified  in  NC  meeting  dated 10.06.2008:­   a.      After taking clue from SIONs C­1707 & C­1753, quantities of items of import may be allowed as under: b.      Quantities of import items at S.No.1 to 6 may be allowed as applied for i.e. 46580 Kgs., 6480 Kgs., 43900 Kgs., 1200 Kgs., 1300 Kgs., & 120 Kgs respectively c.      Quantities of import items at S.No. 7 to12 may be allowed as applied for i.e 10,000,000 Nos. each on net to net basis. d.      Quantities  of import items at S.No. 13 to 15 may be allowed as per Packing Policy. e. The quantity of import item at S.No. 16 may be allowed as applied for i.e. 540600 meters inclusive of 2% wastage.     56

Case No.:4/13/81­ALC2/2009

Party Name:CLESTRA MODULAR SYSTEMS PVT.LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00072/AM10/ RLA File :31/24/040/00037/AM10/ Lic.No/Date:3110038755 10.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 13.10.2009: ­   1.      Quantity of export product e.g. area and thickness of Cleanroom partition system & its accessories. 2.      Information in respect of items at Sl. Nos. 3, 4, 5 & 11 of Standard Deficiency Format.     57

Case No.:7/13/81­ALC2/2009

Party Name:MAHENDRA INDUSTRIES 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00075/AM10/ RLA File :07/24/040/00055/AM10/ Lic.No/Date:0710065317 10.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 13.10.2009.

58

Case No.:8/13/81­ALC2/2009

Party Name:NIRLEP APPLIANCES LIMITED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00076/AM10/ RLA File :03/95/040/00152/AM10/ Lic.No/Date:0310523710 11.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 13.10.2009.   59

Case No.:10/13/81­ALC2/2009

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00078/AM10/ RLA File :05/24/040/00099/AM10/ Lic.No/Date:0510243650 12.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 13.10.2009: ­   1.      Export product wise information in respect of items at Sl. Nos. 3, 4, 5 & 11 of SDF.       60

Case No.:9/13/81­ALC2/2009

Party Name:ALCAN COMPOSITES INDIA PVT. LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00077/AM10/ RLA File :03/94/040/00110/AM10/ Lic.No/Date:0310523944 12.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 13.10.2009: ­   1.      Total thickness of Aluminium Composite Panel and thickness of PE core in the Composite Panel along with their quantities in Sq. Mtrs. and in Kgs. 2.      Thickness of Aluminium Coil/sheet i.e. import item at Sl. No.1 alongwith their quantities 3        Information in respect of items at Sl.Nos. 4,5 & 11 of SDF for each type of Composite Panel.

61

Case No.:11/13/81­ALC2/2009

Party Name:JUPITER INTERNATIONAL LTD., 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00079/AM10/ RLA File :02/24/040/00046/AM10/ Lic.No/Date:0210127724 15.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the case is under examination of MIT. The case stands deferred and to be relisted on 13.10.2009.   62

Case No.:12/13/81­ALC2/2009

Party Name:DYNATECH FURNACES (BOMBAY) PVT.LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00080/AM10/ RLA File :03/94/040/00196/AM10/ Lic.No/Date:0310524136 15.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 13.10.2009: ­   1. Specification and brief description of import item No. 10. 2. Specific items of import at S.No. 16 with specific quantities. 3. Information in respect of items at Sl.Nos. 11 of SDF for all items of raw material nature.     63

Case No.:13/13/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00081/AM10/ RLA File :09/24/040/00073/AM10/ Lic.No/Date:0910038235 16.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the case is under examination of MIT. The case stands deferred and to be relisted on 13.10.2009.     64

Case No.:14/13/81­ALC2/2009

Party Name:ADITYA VIDYUT APPLIANCES LTD., 18.08.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00082/AM10/ RLA File :03/94/040/00204/AM10/ Lic.No/Date:0310524339 16.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Norms Committee, after deliberating upon the case, decided to call for some information in respect of the subject advance authorisation, as per DHI’s U.O.  No.  3(123)/2009­TSW(B)/337  dated  27.08.2009.  (copy  enclosed).  The  case  stands  deferred  and  to  be  relisted  on 13.10.2009.     65

Case No.:15/13/81­ALC2/2009

Party Name:METSYS ENGINEERING AND CONSULTANCY PVT.LTD, 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00083/AM10/ RLA File :07/21/040/00248/AM10/ Lic.No/Date:0710065391 16.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee noted that RA  neither  reported  the  status  of  the  case  nor  forwarded  the  four  sets  of  application  in  response  to  this  office  letter  and subsequent reminders. The committee  presumed  that  ratification  of  norms  of  the  subject  authorisation  is  not  required  by  RA. Hence, the case may be closed on the part of NC. “In case RA feels that case needs to be ratified by NC, they may intimate the NC in writing in 4 weeks time”.         66

Case No.:16/13/81­ALC2/2009

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00084/AM10/ RLA File :05/24/040/00152/AM10/ Lic.No/Date:0510243872 17.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 13.10.2009.   67

Case No.:17/13/81­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00085/AM10/ RLA File :31/24/040/00040/AM10/ Lic.No/Date:3110038911 18.06.2009 Defer Date:18.08.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 13.10.2009: ­   1.      Export product wise information in respect of items at Sl. Nos. 3, 4, 5, 11 & 11(a) of SDF.       68

Case No.:18/13/81­ALC2/2009

Party Name:COTMAC ELECTRONICS (SURAT)PVT LTD 18.08.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00086/AM10/ RLA File :52/21/040/00039/AM10/ Lic.No/Date:5210027072 22.06.2009 Defer Date:18.08.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee noted that RA  neither  reported  the  status  of  the  case  nor  forwarded  the  four  sets  of  application  in  response  to  this  office  letter  and subsequent reminders. The committee  presumed  that  ratification  of  norms  of  the  subject  authorisation  is  not  required  by  RA. Hence, the case may be closed on the part of NC. “In case RA feels that case needs to be ratified by NC, they may intimate the NC in writing in 4 weeks time”.         PART –A ­DEFFER S.No.10

Case No.AR ­7

M/s  Crompton Greaves Ltd.Mumbai           Meeting No. 20/81 Pt.F.No.01/80/162 /1101/AM08/DES­I/DES­II Dated: 18­08­2009 Advance Licence No 0310443826 dt. 26­09­2007          RLA F.No. 03/94/040/634/AM08       Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed tat DHI showed their inability to offer the comments, however in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 13.10.2009: ­

1.            Copy of ARE­I for item of Export at S. No. 4. 2.            How much is the recoverable wastage.     PART –AR –DEFFER S.No.33

Case No.AR ­7

M/s  Penwalt Ltd.Mumbai           Meeting No. 20/81 Pt.F.No.01/81/162 /432/AM07/DES­II Dated: 18­08­2009 Advance Licence No 0310389620 dt. 14­07­2006          RLA F.No. 03/95/040/220/AM07       Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 13.10.2009.     S.No.34

Case No. AR­19

 M/s  Copper Bussmann India Pvt. Ltd., Pondichery         Meeting No.20/81 F.No.01/80/162/538/AM 07/DES­I/DES­II Dated 18­08­2009 Advance Licence No.0410013279   dt.15­03­2001    RLA  F.No.04/80/040/217/AM’01 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. Based on the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1. Net weight of export product may be specified as 26370 Kgs. 2. Quantity of import item may be allowed as 1.03 Kgs/Kg content in the export product as claimed by the firm     S.No.35

Case No. AR ­41

 M/S Proteck Circuit & Systems Pvt.Ltd.Chennai             Meeting No.20/81 F.No.01/81/50/306/AM07/DES­II Dated 18­08­2009 Advance Licence No.0410083158 dt.27­07­2006            RLA F.No.04/24/40/00125/AM07 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The Norms Committee, after deliberating upon

the case, decided to ratify the norms in respect of the subject advance authorisation, as per written comments of DHI  vide their U.O. No. 3(48)/2009/TSW(B)/311 dated 10.08.2009. (copy enclosed).     PART­C­DEFFER   S.N0.29

Case No.C ­1

M/s  Salzer Electronics,Coimbatore through EEPC,Kolkata           Meeting No. 20/81 F.No.01/81/162 /0034/AM10/DES­II Dated: 18­08­2009  .         Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the data from EEPC is still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 13.10.2009.   S.NO.30

Case No.C ­2

M/s  Jindal Aluminium through EEPC,Bangalore          Meeting No. 20/81 F.No.01/81/162 /0766/AM09/DES­II Dated: 18­08­2009  .         Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee observed that the comments given by M/o Mines are not proper and decided to once again request them to give proper comments. The case stands deferred and to be relisted on 13.10.2009.       S.NO.31

Case No.C ­3

M/s  Bhukhanvala Tools Pvt.Ltd.Navsari M/s Kalpataru Power Transmission Ltd.Gandhinagar M/s B.C.Instruments,Udyog Nagar through O/O The D.C(KFTZ),Gandhidham­Kutch          Meeting No. 20/81 F.No.01/81/162 /0033/AM10/DES­II Dated: 18­08­2009  .         Decision : The case regarding fixation of wastage norms in respect of above mentioned 100% EOUs was considered by the Norms Committee ­ II in its M.No. 20/81 scheduled to be held on 18.08.2009 but actually held on 02.09.2009. The committee decided to refer a copy of the applications of the firms to respective Technical Authorities. The case stands deferred and to be relisted on 13.10.2009.

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied