IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2010-07-06

DGFT Committee Minutes

Document text

RATIFIED MINUTES   DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   MINUTES OF THE NORMS COMMITTEE­II MEETING NO. 14/81 HELD ON 06.07.2010 & 09.07.2010.   The  Meeting  No.  14/81  of  Norms  Committee­II  was  held  on  06.07.2010  &  09.07.2010    for  the  licensing  year  2010­2011  under  the Chairmanship of Sh. V.K. Srivastava, Addl. Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorisations under Duty Exemption Scheme (Chapter­4) of Foreign Trade Policy 2009­2014. The following members were present in the meeting:­ S.No Name of the representatives & their Designation   Deptt.     1. 2. 3. 4. 5. 6.   Sh. B.D. Ghosh, Jt. IA Sh. Gajraj Singh, Sr. D.O. Sh. S.K. Jain, DO Sh. K.K.Funda, Asst. Dir. Sh. Shyam Sunder, DDG Sh. Narendra Vashista   MOS DHI DIPP M/o Steel DGFT DGFT   1

Case No.:31/27/81­

ALC2/2009 Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:14/81­ ALC2/2010 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00213/AM10/ RLA File :03/94/040/01278/AM08/ Lic.No/Date:0310464531 11.03.2008 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the  firm  to  expedite  the  proper  reply.  The  case  stands deferred and to be relisted on 03.08.2010.   2

Case No.:27/11/81­ALC2/2008

Party Name:KEI INDUSTRIES LIMITED Meet No/Date:14/81­ALC2/2010 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00145/AM09/ RLA File :05/24/040/00916/AM08/ Lic.No/Date:0510220390 09.05.2008 Defer Date:03.08.2010 Decision : NC observed that the reply  sent  by  the  firm  is  not  complete  and  as  per  DIPP,  it  was  decided  to  again  call for the following information/clarification from the firm and to re­list the case on 03.08.2010: ­   1.      Revised list of export items with specifications of each export product including their voltage ratings.

3

Case No.:20/27/81­ALC2/2009

Party Name:ABB LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00202/AM10/ RLA File :07/21/040/00757/AM09/ Lic.No/Date:0710061858 22.12.2008 Defer Date:20.07.2010 Decision : The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 20.07.2010.   4

Case No.:10/46/81­ALC2/2008

Party Name:KDDL LTD., 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00693/AM09/ RLA File :07/24/040/00579/AM09/ Lic.No/Date:0710062546 23.01.2009 Defer Date:03.08.2010 Decision : NC decided that a copy of the application of the firm may be referred to DIPP. The case stands deferred and to be re­listed on 03.08.2010.   5

Case No.:27/27/81­ALC2/2009

Party Name:L M GLASFIBER (INDIA) PVT LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00209/AM10/ RLA File :07/24/040/00641/AM09/ Lic.No/Date:0710063326 27.02.2009 Defer Date:03.08.2010 Decision : The committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 03.08.2010.   6

Case No.:18/1/81­ALC2/2009

Party Name:MID INDIA POWER AND STEEL LIMITED, 06.07.2010 Status: Approved HQ File :01/81/050/00786/AM09/ RLA File :11/24/040/00080/AM09/ Lic.No/Date:1110019817 13.03.2009   Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of M/o Steel vide their U.O No. 2(5)/2008­TW dated 25.06.2010 (copy enclosed).   R/A may take suitable consequential action accordingly.   7

Case No.:12/51/81­ALC2/2009

Party Name:POSCO­INDIA PUNE PROCESSING CENTER PVT. LTD., 06.07.2010 Status:Approved HQ File :01/81/050/00527/AM10/ RLA File :31/24/040/00330/AM09/ Lic.No/Date:3110037760 19.03.2009

Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of M/o Steel vide their U.O No. 2(5)/2006­TW dated 07.05.2010 (copy enclosed).   8

Case No.:28/50/81­ALC2/2009

Party Name:PRAKASH STEELAGE LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00497/AM10/ RLA File :03/95/040/00848/AM09/ Lic.No/Date:0310513423 26.03.2009 Defer Date:03.08.2010 Decision : As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list the case on 03.08.2010: ­   1.      OD and WT of import item and export product. 2.      Manufacturing process with reduction in diameter and wall thickness at each stage of pilgering/drawing and wastage claimed at each stage with complete justification.     9

Case No.:29/50/81­ALC2/2009

Party Name:PRAKASH STEELAGE LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00498/AM10/ RLA File :03/95/040/00849/AM09/ Lic.No/Date:0310513425 26.03.2009 Defer Date:03.08.2010 Decision : As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list                                               i.                  OD and WT of import item and export product.                                           ii.                  Manufacturing process with reduction in diameter and wall thickness at each stage of pilgering/drawing and wastage claimed at each stage with complete justification.     10

Case No.:35/50/81­ALC2/2009

Party Name:PRAKASH STEELAGE LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00504/AM10/ RLA File :03/95/040/00845/AM09/ Lic.No/Date:0310513424 26.03.2009 Defer Date:03.08.2010 Decision : As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list                                                  i.                OD and WT of import item and export product.

ii.                Manufacturing process with reduction in diameter and wall thickness at each stage of pilgering/drawing and wastage claimed at each stage with complete justification.     11

Case No.:42/50/81­ALC2/2009

Party Name:RATNESH METAL INDUSTRIES PVT. LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00511/AM10/ RLA File :08/24/040/00255/AM09/ Lic.No/Date:0810079063 30.03.2009 Defer Date:03.08.2010 Decision : NC noted that the AA has been issued on repeat basis by RA. Hence decided to close the case on the part of NC.   12

Case No.:34/50/81­ALC2/2009

Party Name:PRAKASH STEELAGE LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00503/AM10/ RLA File :03/95/040/00837/AM09/ Lic.No/Date:0310514053 01.04.2009 Defer Date:03.08.2010 Decision : As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list                                                        i.          OD and WT of import item and export product.                                                    ii.          Manufacturing process with reduction in diameter and wall thickness at each stage of pilgering/drawing and wastage claimed at each stage with complete justification.     13

Case No.:9/27/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 06.07.2010 Status:Approved HQ File :01/81/050/00191/AM10/ RLA File :03/95/040/00009/AM10/ Lic.No/Date:0310515887 16.04.2009   Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of MIT vide their U.O No. 17(49)/2009­iphw dated 22.04.2010 (copy enclosed).     14

Case No.:38/27/81­ALC2/2009

Party Name:TATA BP SOLAR INDIA LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00220/AM10/ RLA File :07/24/040/00025/AM10/ Lic.No/Date:0710064531 05.05.2009 Defer Date:03.08.2010 Decision : The committee observed that the comments from MNRES are still awaited and therefore decided to remind them to expedite the

same. The case stands deferred and to be relisted on 03.08.2010.     15

Case No.:29/27/81­ALC2/2009

Party Name:HIGH ENERGY BATTERIES ( INDIA ) LIMITED, 06.07.2010 Status:Approved HQ File :01/81/050/00211/AM10/ RLA File :04/24/040/00026/AM10/ Lic.No/Date:0410104670 18.05.2009   Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP vide their U.O dated 06.07.2010 (copy enclosed).     16

Case No.:54/27/81­ALC2/2009

Party Name:HINDALCO INDUSTRIES LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00236/AM10/ RLA File :34/24/040/00030/AM10/ Lic.No/Date:3410024344 02.06.2009 Defer Date:03.08.2010 Decision : The committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 03.08.2010.   17

Case No.:11/27/81­ALC2/2009

Party Name:DYNATECH FURNACES (BOMBAY) PVT.LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00193/AM10/ RLA File :03/94/040/00172/AM10/ Lic.No/Date:0310524162 15.06.2009 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the proper reply. The case stands deferred and to be relisted on 03.08.2010.   18

Case No.:13/13/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00081/AM10/ RLA File :09/24/040/00073/AM10/ Lic.No/Date:0910038235 16.06.2009 Defer Date:06.07.2010 Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DHI vide their U.O No. 3(112)/2009/TSW(B) dated 13.05.2010 (copy enclosed).  

19

Case No.:4/17/81­ALC2/2009

Party Name:RADIX DIES & MOULDS PVT.LTD. 06.07.2010 Status: Transferred HQ File :01/81/050/00110/AM10/ RLA File :31/24/040/00062/AM10/ Lic.No/Date:3110039159 09.07.2009   Decision : NC decided to transfer the case to NC­I, as the matter pertains to them.   20

Case No.:36/50/81­ALC2/2009

Party Name:RATNESH METAL INDUSTRIES PVT. LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00505/AM10/ RLA File :08/24/040/00099/AM10/ Lic.No/Date:0810081589 21.07.2009 Defer Date:03.08.2010 Decision : M/o Steel informed that the D/L has been received undelivered. Hence, NC decided that RA may be requested to deliver the letter to the firm and to check whether the firm is existing or not. The case stands deferred and to be relisted on 03.08.2010.   21

Case No.:1/18/81­ALC2/2009

Party Name:SUPER PACK INDUSTRIES, 06.07.2010 Status:Approved HQ File :01/81/050/00127/AM10/ RLA File :07/24/040/00162/AM10/ Lic.No/Date:0710066091 22.07.2009   Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP vide their U.O dated 06.07.2010 (copy enclosed).     22

Case No.:10/21/81­ALC2/2009

Party Name:ITP INFOTECH PRIVATE LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00150/AM10/ RLA File :05/23/040/00006/AM10/ Lic.No/Date:0510247502 11.08.2009 Defer Date:03.08.2010 Decision : As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list   1. Export product wise information in respect of S.No. 3, 4, 5 & 11 of the Standard Deficiency Format.

23

Case No.:17/50/81­ALC2/2009

Party Name:ASTRA MICROWAVE PRODUCTS LTD., 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00486/AM10/ RLA File :09/24/040/00065/AM10/ Lic.No/Date:0910039054 24.08.2009 Defer Date:03.08.2010 Decision : NC decided that a copy of the application of the firm may be referred to M/o Defence. The case stands deferred and to be relisted on 03.08.2010.   24

Case No.:33/50/81­ALC2/2009

Party Name:RPG CABLES LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00502/AM10/ RLA File :03/95/040/00952/AM09/ Lic.No/Date:0310535083 25.08.2009 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the   25

Case No.:7/51/81­ALC2/2009

Party Name:CONTINENTAL DEVICE INDIA LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00522/AM10/ RLA File :22/21/040/00060/AM10/ Lic.No/Date:2210009213 27.08.2009 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 03.08.2010.   26

Case No.:1/26/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00177/AM10/ RLA File :09/24/040/00223/AM10/ Lic.No/Date:0910039304 16.09.2009 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 20.07.2010.   27

Case No.:10/33/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/80/050/00476/AM10/ RLA File :05/23/040/00034/AM10/ Lic.No/Date:0510249536 17.09.2009 Defer Date:06.07.2010 Decision :  NC decided to reject the request of the firm as per the written recommendations of DHI vide U.O. No. 3(17)/2009/TSW(B) dated 26.05.2010(copy enclosed).  

28

Case No.:14/27/81­ALC2/2009

Party Name:TRANSLLOY INDIA PVT. LTD., 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00196/AM10/ RLA File :03/95/040/00318/AM10/ Lic.No/Date:0310538895 23.09.2009 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the   29

Case No.:62/27/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00244/AM10/ RLA File :03/95/040/00343/AM10/ Lic.No/Date:0310539390 25.09.2009 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 03.08.2010.   30

Case No.:63/27/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00245/AM10/ RLA File :03/95/040/00342/AM10/ Lic.No/Date:0310539395 25.09.2009 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 03.08.2010.   31

Case No.:8/50/81­ALC2/2009

Party Name:EURO SOLO ENERGY SYSTEMS LIMITED 06.07.2010 Status:Approved HQ File :01/81/050/00477/AM10/ RLA File :03/94/040/00557/AM10/ Lic.No/Date:0310540717 07.10.2009   Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP vide their U.O dated 06.07.2010 (copy enclosed).     32

Case No.:20/50/81­ALC2/2009

Party Name:EURO SOLO ENERGY SYSTEMS LIMITED 06.07.2010 Status:Approved HQ File :01/81/050/00489/AM10/ RLA File :03/94/040/00558/AM10/ Lic.No/Date:0310540718 07.10.2009   Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP vide their U.O dated 06.07.2010 (copy enclosed).

  33

Case No.:10/50/81­ALC2/2009

Party Name:HBL POWER SYSTEMS LTD., 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00479/AM10/ RLA File :09/24/040/00253/AM10/ Lic.No/Date:0910039639 19.10.2009 Defer Date:03.08.2010 Decision : As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list   1. Export product wise information in respect of S.No. 3, 4, 5 & 11 of the Standard Deficiency Format.     34

Case No.:15/50/81­ALC2/2009

Party Name:KALPANA INTERNATIONAL 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00484/AM10/ RLA File :06/24/040/00027/AM10/ Lic.No/Date:0610016468 28.10.2009 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the   35

Case No.:6/33/81­ALC2/2009

Party Name:POWER GEAR LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00285/AM10/ RLA File :07/24/040/00270/AM10/ Lic.No/Date:0710068044 05.11.2009 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 03.08.2010.   36

Case No.:8/33/81­ALC2/2009

Party Name:HOSLEY INDIA PRIVATE LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00287/AM10/ RLA File :05/23/040/00082/AM10/ Lic.No/Date:0510252073 06.11.2009 Defer Date:03.08.2010 Decision : The committee observed that the comments from DC(MSME) are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 03.08.2010.     37

Case No.:3/35/81­ALC2/2009

Party Name:ITP INFOTECH PRIVATE LTD 06.07.2010 Status:Deffered and Re­indexed

HQ File :01/81/050/00311/AM10/ RLA File :05/23/040/00060/AM10/ Lic.No/Date:0510252256 10.11.2009 Defer Date:03.08.2010 Decision : As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list   1. Export product wise information in respect of S.No. 3, 4, 5 & 11 of the Standard Deficiency Format.     38

Case No.:4/35/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00312/AM10/ RLA File :09/24/040/00316/AM10/ Lic.No/Date:0910039893 12.11.2009 Defer Date:03.08.2010 Decision  :  The  committee  observed  that  the  case  is  under  examination  of  DHI.  The  case  stands  deferred  and  to  be  re­listed  on 03.08.2010.                               39

Case No.:8/35/81­ALC2/2009

Party Name:OIL COUNTRY TUBULAR LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00316/AM10/ RLA File :09/24/040/00322/AM10/ Lic.No/Date:0910039906 13.11.2009 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 03.08.2010.   40

Case No.:9/35/81­ALC2/2009

Party Name:MYAGERI ELECTRONICS PVT. LIMITED, 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00317/AM10/ RLA File :07/21/040/00755/AM10/ Lic.No/Date:0710068273 13.11.2009 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 03.08.2010.   41

Case No.:11/35/81­ALC2/2009

Party Name:MOLEX (INDIA) PRIVATE LIMITED, 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00319/AM10/ RLA File :07/24/040/00281/AM10/ Lic.No/Date:0710068276 13.11.2009 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 03.08.2010.   42

Case No.:16/35/81­ALC2/2009

Party Name:IND METAL EXTRUSIONS PRIVATE LIMITED, 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00324/AM10/ RLA File :05/23/040/00071/AM10/ Lic.No/Date:0510252832

Q 18.11.2009 Defer Date:03.08.2010 Decision : The committee observed that the comments from DC(MSME) are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 03.08.2010.   43

Case No.:23/35/81­ALC2/2009

Party Name:INTERPLEX ELECTRONICS INDIA PVT.LTD., 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00331/AM10/ RLA File :07/24/040/00293/AM10/ Lic.No/Date:0710068415 19.11.2009 Defer Date:03.08.2010 Decision : The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 03.08.2010.   44

Case No.:27/35/81­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00335/AM10/ RLA File :03/94/040/00716/AM10/ Lic.No/Date:0310546880 20.11.2009 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the   45

Case No.:31/35/81­ALC2/2009

Party Name:YAMUNA POWER & INFRASTRUCTURE LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00339/AM10/ RLA File :05/24/040/00320/AM10/ Lic.No/Date:0510253235 24.11.2009 Defer Date:03.08.2010 Decision : As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list   1. Information in respect of S.No. 11 of the Standard Deficiency Format.       46

Case No.:33/35/81­ALC2/2009

Party Name:MET TRADE (INDIA) LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00341/AM10/ RLA File :05/24/040/00372/AM10/ Lic.No/Date:0510253291 25.11.2009 Defer Date:03.08.2010 Decision : NC decided that a copy of the application of the firm may be referred to DC(MSME). The case stands deferred and to be re­listed on 03.08.2010.

47

Case No.:34/35/81­ALC2/2009

Party Name:VEER­O­ METALS PVT .LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00342/AM10/ RLA File :07/24/040/00322/AM10/ Lic.No/Date:0710068467 26.11.2009 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the   48

Case No.:35/35/81­ALC2/2009

Party Name:SOURIAU INDIA PRIVATE LIMITED 06.07.2010 Status:Approved HQ File :01/81/050/00343/AM10/ RLA File :10/24/040/00092/AM10/ Lic.No/Date:1010036122 26.11.2009   Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of MIT vide their U.O No. 17(15)/2010­iphw dated 12.05.2010 (copy enclosed).     49

Case No.:3/50/81­ALC2/2009

Party Name:ADITYA VIDYUT APPLIANCES LTD., 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00472/AM10/ RLA File :03/94/040/00693/AM10/ Lic.No/Date:0310549448 07.12.2009 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the   50

Case No.:32/50/81­ALC2/2009

Party Name:SALZER ELECTRONICS LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00501/AM10/ RLA File :32/24/040/00040/AM10/ Lic.No/Date:3210042050 07.12.2009 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the   51

Case No.:12/50/81­ALC2/2009

Party Name:CROMPTON GREAVES LIMITED, 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00481/AM10/ RLA File :03/94/040/00728/AM10/ Lic.No/Date:0310549600 08.12.2009 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the

  52

Case No.:31/50/81­ALC2/2009

Party Name:SUZLON STRUCTURES LIMITED. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00500/AM10/ RLA File :08/24/040/00238/AM10/ Lic.No/Date:0810084723 08.12.2009 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 03.08.2010.   53

Case No.:19/50/81­ALC2/2009

Party Name:LEITNER SHRIRAM MANUFACTURING LIMITED, 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00488/AM10/ RLA File :04/24/040/00236/AM10/ Lic.No/Date:0410110189 15.12.2009 Defer Date:03.08.2010 Decision : The committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 03.08.2010.   54

Case No.:2/51/81­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00517/AM10/ RLA File :11/24/040/00036/AM10/ Lic.No/Date:1110021447 16.12.2009 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 03.08.2010.   55

Case No.:3/51/81­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00518/AM10/ RLA File :11/24/040/00019/AM10/ Lic.No/Date:1110021483 24.12.2009 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 03.08.2010.     56

Case No.:4/51/81­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00519/AM10/ RLA File :11/24/040/00023/AM10/ Lic.No/Date:1110021484 24.12.2009 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 03.08.2010.

57

Case No.:11/50/81­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 06.07.2010 Status:Approval HQ File :01/81/050/00480/AM10/ RLA File :06/24/040/00036/AM10/ Lic.No/Date:0610016927 31.12.2009   Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DHI vide their U.O No. 3(70)/2007/TSW(B) dated 11.06.2010 (copy enclosed).     58

Case No.:14/50/81­ALC2/2009

Party Name:MINEX METALLURGICAL COMPANY LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00483/AM10/ RLA File :03/95/040/00584/AM10/ Lic.No/Date:0310553102 31.12.2009 Defer Date:06.07.2010 Decision :  The  committee  observed  that  the  case  is  under  examination  of  M/o  Steel.  The  case  stands  deferred  and  to  be  re­listed  on 03.08.2010.   59

Case No.:22/50/81­ALC2/2009

Party Name:MIRC ELECTRONICS LIMITED. 06.07.2010 Status:Closed HQ File :01/81/050/00491/AM10/ RLA File :03/95/040/00604/AM10/ Lic.No/Date:0310553119 31.12.2009   Decision : NC noted that the AA has been issued on repeat basis by RA. Hence decided to close the case on the part of NC.   60

Case No.:13/50/81­ALC2/2009

Party Name:KSH INTERNATIONAL PVT.LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00482/AM10/ RLA File :03/94/040/00844/AM10/ Lic.No/Date:0310553784 05.01.2010 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the     61

Case No.:27/50/81­ALC2/2009

Party Name:ASHLEY ALTEAMS INDIA PRIVATE LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00496/AM10/ RLA File :04/24/040/00253/AM10/ Lic.No/Date:0410110841 13.01.2010 Defer Date:03.08.2010 Decision : The committee observed that the comments from DOT are still awaited and therefore decided to remind them to expedite the

same. The case stands deferred and to be relisted on 03.08.2010.   62

Case No.:6/50/81­ALC2/2009

Party Name:CORDS CABLE INDUSTRIES LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00475/AM10/ RLA File :05/23/040/00137/AM10/ Lic.No/Date:0510256341 15.01.2010 Defer Date:03.08.2010 Decision  :  The  committee  observed  that  the  case  is  under  examination  of  DIPP.  The  case  stands  deferred  and  to  be  re­listed  on 03.08.2010.   63

Case No.:9/50/81­ALC2/2009

Party Name:KANADE ANAND UDYOG PVT. LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00478/AM10/ RLA File :03/94/040/00527/AM10/ Lic.No/Date:0310555773 18.01.2010 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the   64

Case No.:1/45/81­ALC2/2009

Party Name:DIAMOND ENGINEERING (CHENNAI) PVT LTD 06.07.2010 Status:Approved HQ File :01/81/050/00431/AM10/ RLA File :04/24/040/00271/AM10/ Lic.No/Date:0410110907 19.01.2010   Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP vide their U.O dated 06.07.2010 (copy enclosed).       65

Case No.:2/45/81­ALC2/2009

Party Name:MINOX METAL PVT.LTD, 06.07.2010 Status:Approved HQ File :01/81/050/00432/AM10/ RLA File :07/24/040/00391/AM10/ Lic.No/Date:0710069470 19.01.2010   Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of MIT vide their U.O No. 2(5)/2006­iphw dated 06.07.2010 (copy enclosed).  

66

Case No.:3/45/81­ALC2/2009

Party Name:KANADE ANAND UDYOG PVT. LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00433/AM10/ RLA File :03/94/040/00771/AM10/ Lic.No/Date:0310556297 20.01.2010 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the   67

Case No.:4/45/81­ALC2/2009

Party Name:NAVGRAH FASTNERS PVT. LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00434/AM10/ RLA File :52/24/040/00029/AM10/ Lic.No/Date:5210029454 21.01.2010 Defer Date:06.07.2010 Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP vide their U.O dated 06.07.2010 (copy enclosed).     68

Case No.:7/45/81­ALC2/2009

Party Name:TECHNICAL CONSULTANCY & SERVICES 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00437/AM10/ RLA File :03/95/040/00629/AM10/ Lic.No/Date:0310556555 22.01.2010 Defer Date:06.07.2010 Decision : The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 03.08.2010.     69

Case No.:23/50/81­ALC2/2009

Party Name:LEITNER SHRIRAM MANUFACTURING LIMITED, 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00492/AM10/ RLA File :04/24/040/00269/AM10/ Lic.No/Date:0410111023 25.01.2010 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the   70

Case No.:24/50/81­ALC2/2009

Party Name:LEITNER SHRIRAM MANUFACTURING LIMITED, 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00493/AM10/ RLA File :04/24/040/00270/AM10/ Lic.No/Date:0410111024 25.01.2010 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the

  71

Case No.:13/45/81­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00443/AM10/ RLA File :05/23/040/00171/AM10/ Lic.No/Date:0510257259 01.02.2010 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 03.08.2010.   72

Case No.:15/45/81­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00445/AM10/ RLA File :31/24/040/00221/AM10/ Lic.No/Date:3110041756 01.02.2010 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the   73

Case No.:26/50/81­ALC2/2009

Party Name:ASHLEY ALTEAMS INDIA PRIVATE LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00495/AM10/ RLA File :04/24/040/00283/AM10/ Lic.No/Date:0410111239 02.02.2010 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 03.08.2010.   74

Case No.:1/50/81­ALC2/2009

Party Name:AREVA T & D INDIA LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00470/AM10/ RLA File :02/24/040/00036/AM10/ Lic.No/Date:0210138613 01.03.2010 Defer Date:03.08.2010 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the   75

Case No.:16/50/81­ALC2/2009

Party Name:MET TRADE (INDIA) LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00485/AM10/ RLA File :05/24/040/00401/AM10/ Lic.No/Date:0510259866 04.03.2010 Defer Date:03.08.2010 Decision : NC decided that a copy of the application of the firm may be referred to DC(MSME). The case stands deferred and to be re­listed on 03.08.2010.

76

Case No.:13/51/81­ALC2/2009

Party Name:WELSPUN GUJARAT STAHL ROHREN LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00528/AM10/ RLA File :34/24/040/00217/AM10/ Lic.No/Date:3410026551 09.03.2010 Defer Date:03.08.2010 Decision : As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list   1.      Outer Diameter (OD), Wall Thickness (WT) and length of export product. 2.      Reasons for the import of Alloy Steel Coils/Plates for the manufacture of Carbon Steel i.e. Non­Alloy Steel Pipes. 3.      Information in respect of S.No. 5 & 11 of Standard Deficiency Format.     77

Case No.:18/51/81­ALC2/2009

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00533/AM10/ RLA File :35/24/040/00040/AM10/ Lic.No/Date:3510029388 09.03.2010 Defer Date:03.08.2010 Decision : NC noted that there are around 19 old cases pending for the same item. There are around 80 cases of the same firm and same item were approved in the past. The matter may be processed on file. The case stands deferred and to be re­listed on 03.08.2010.     78

Case No.:16/51/81­ALC2/2009

Party Name:MIRC ELECTRONICS LIMITED. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00531/AM10/ RLA File :03/95/040/00613/AM10/ Lic.No/Date:0310563999 10.03.2010 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 03.08.2010.   79

Case No.:2/5/81­ALC2/2010

Party Name:MINOX METAL PVT.LTD, 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00011/AM11/ RLA File :07/24/040/00008/AM11/ Lic.No/Date:0710070925 13.04.2010 Defer Date:03.08.2010 Decision : As per written recommendations of M/o Steel vide U.O. No. 2(5)/2006­TW VolI(Pt.) dated 06.07.2010(copy enclosed, NC decided to call for the certain information/clarification from the firm and to re­list the case on 03.08.2010.   80

Case No.:3/7/81­ALC2/2010

Party Name:VARRSANA ISPAT LTD. 06.07.2010 Status:Deffered and Re­indexed

HQ File :01/81/050/00023/AM11/ RLA File :05/24/040/00007/AM11/ Lic.No/Date:0510263617 04.05.2010 Defer Date:03.08.2010 Decision :  The  committee  observed  that  the  case  is  under  examination  of  M/o  Steel.  The  case  stands  deferred  and  to  be  re­listed  on 03.08.2010.   81

Case No.:4/7/81­ALC2/2010

Party Name:S.M.CREATIVE ELECTRONICS LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00024/AM11/ RLA File :05/24/040/00046/AM11/ Lic.No/Date:0510263638 04.05.2010 Defer Date:03.08.2010 Decision  :  The  committee  observed  that  the  case  is  under  examination  of  DIPP.  The  case  stands  deferred  and  to  be  re­listed  on 03.08.2010.   82

Case No.:1/7/81­ALC2/2010

Party Name:HINDALCO INDUSTRIES LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00021/AM11/ RLA File :34/24/040/00023/AM11/ Lic.No/Date:3410026960 05.05.2010 Defer Date:03.08.2010 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 03.08.2010.     83

Case No.:2/7/81­ALC2/2010

Party Name:SUPER CIRCLE AUTO LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00022/AM11/ RLA File :05/24/040/00015/AM11/ Lic.No/Date:0510263721 05.05.2010 Defer Date:03.08.2010 Decision  :  NC observed that RA has forwarded  the  desired  information  and  the  same  may  be  referred  to  M/o  Steel.  The  case  stands deferred and to be relisted on 03.08.2010.   84

Case No.:5/7/81­ALC2/2010

Party Name:VIJAI ELECTRICALS LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00025/AM11/ RLA File :09/24/040/00010/AM11/ Lic.No/Date:0910041915 05.05.2010 Defer Date:03.08.2010 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for   85

Case No.:6/7/81­ALC2/2010

Party Name:VIJAI ELECTRICALS LTD Status:Deffered and

06.07.2010 Re­indexed HQ File :01/81/050/00026/AM11/ RLA File :09/24/040/00037/AM11/ Lic.No/Date:0910041916 05.05.2010 Defer Date:03.08.2010 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for   86

Case No.:7/7/81­ALC2/2010

Party Name:JLC ELECTROMET PVT. LTD., 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00027/AM11/ RLA File :13/24/040/00006/AM11/ Lic.No/Date:1310032052 05.05.2010 Defer Date:03.08.2010 Decision  :  The  committee  observed  that  the  case  is  under  examination  of  DIPP.  The  case  stands  deferred  and  to  be  re­listed  on 03.08.2010.     87

Case No.:8/7/81­ALC2/2010

Party Name:VIJAI ELECTRICALS LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00028/AM11/ RLA File :09/24/040/00027/AM11/ Lic.No/Date:0910041965 07.05.2010 Defer Date:03.08.2010 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for   88

Case No.:9/7/81­ALC2/2010

Party Name:NICO EXTRUSIONS PVT.LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00029/AM11/ RLA File :03/95/040/00038/AM11/ Lic.No/Date:0310573289 07.05.2010 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of DIPP & DC(MSME). The case stands deferred and to be re­listed on 03.08.2010.   89

Case No.:10/7/81­ALC2/2010

Party Name:PANASONIC HOME APPLIANCES INDIA COMPANY LIMITED 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00030/AM11/ RLA File :04/24/040/00028/AM11/ Lic.No/Date:0410113577 07.05.2010 Defer Date:03.08.2010 Decision : The committee observed that the case is under examination of DIPP & DC(MSME). The case stands deferred and to be re­listed on 03.08.2010.

90

Case No.:11/7/81­ALC2/2010

Party Name:SHIVALIK BIMETAL CONTROLS LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00031/AM11/ RLA File :05/24/040/00038/AM11/ Lic.No/Date:0510263884 07.05.2010 Defer Date:06.07.2010 Decision : The committee observed that the case is under examination of     M/o Steel. The case stands deferred and to be re­listed on 03.08.2010.   91

Case No.:12/7/81­ALC2/2010

Party Name:WEBB INDIA PVT. LTD 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00032/AM11/ RLA File :07/24/040/00030/AM11/ Lic.No/Date:0710071488 10.05.2010 Defer Date:03.08.2010 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for   92

Case No.:13/7/81­ALC2/2010

Party Name:UNISEF CABLE INDUSTRIES 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00033/AM11/ RLA File :05/24/040/00050/AM11/ Lic.No/Date:0510264021 10.05.2010 Defer Date:03.08                     .2010 Decision : As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list   1.      Core Sizes of cables to be exported alongwith their quantities in meters. 2.      Information in respect of S.No. 5 & 11 of Standard Deficiency Format.     93

Case No.:1/14/81­ALC2/2010

Party Name:FITCAST FOUNDERS  & ENGINEERS PVT. LTD. 06.07.2010 Status:Deffered and Re­indexed HQ File :01/81/050/00081/AM11/ RLA File :08/24/040/00082/AM11/ Lic.No/Date:0810089995 24.06.2010 Defer Date:03.08.2010 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for   94

Case No.:2/14/81­ALC2/2010

Party Name:MICRO TECH.CNC PRIVATE LIMITED Meet No/Date:14/81­ALC2/2010 06.07.2010 Status: Deffered and Re­indexed

HQ File :01/81/050/00082/AM11/ RLA File :07/24/040/00091/AM11/ Lic.No/Date:0710072433 24.06.2010 Defer Date:03.08.2010 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for   95

Case No.:5/14/81­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, 06.07.2010 Status: Deffered and Re­indexed HQ File :01/81/050/00085/AM11/ RLA File :03/94/040/00260/AM11/ Lic.No/Date:0310580565 24.06.2010 Defer Date:03.08.2010 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for   96

Case No.:3/14/81­ALC2/2010

Party Name:EASTERN COPPER MFG. CO PVT. LTD., 06.07.2010 Status: Deffered and Re­indexed HQ File :01/81/050/00083/AM11/ RLA File :02/24/040/00031/AM11/ Lic.No/Date:0210144065 25.06.2010 Defer Date:03.08.2010 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for   97

Case No.:4/14/81­ALC2/2010

Party Name:SHIVALIK BIMETAL CONTROLS LTD. 06.07.2010 Status: Deffered and Re­indexed HQ File :01/81/050/00084/AM11/ RLA File :05/24/040/00123/AM11/ Lic.No/Date:0510266963 25.06.2010 Defer Date:03.08.2010 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for

PART – AR – DEFERRED Sl. No. 56

Case No. AR ­83

M/s.  Harpi Machinery Pvt. Ltd., Ludhiana      Meeting No.14/81 F.No.01/80/81/50/774AM07DES­I//DES­II Dated:  06.07.2010 Advance Authorization No.3010045457 Dt. 02.01.2006   RLA F. No. ADV­51/AM06/LIC/LDH Decision : NC decided that a copy of the reply received from the firm may be referred to DIPP. The case stands deferred and to be relisted on 03.08.2010.   Sl. No. 57

Case No. AR ­88

M/s.  FCI­OEN Connectors Ltd., Cochin        Meeting No. 14/81 F.No.01/80/81/162/367/AM10/DES­I/DES­II Dated:  06.07.2010 Advance  Authorization  No.1010027228,No1010027229    Dt. 24.08.2007, & No.1010025443 and 1010024560   RLA F. No. 10/81/040/0010/AM08 Decision : NC noted that the comments received from MIT are not clear and decided to ask MIT to give revised comments. The case stands deferred and to be relisted on 03.08.2010.   Sl. No. 58

Case No. AR ­89

M/s.  FCI­OEN Connectors Ltd., Cochin      Meeting No.14/81 F.No.01/80/81/162/615/AM07/DES­I/DES­II  Dated 06.07.2010 Advance  Autho.  No.  1010027228,  No1010027229    No.1010025443 & No.1010024560  Dt. 24.08.2007,   RLA F. No. 10/81/040/0010/AM08 Decision : NC noted that the comments received from MIT are not clear and decided to ask MIT to give revised comments. The case stands deferred and to be relisted on 03.08.2010.   S.No. 59

Case No.AR ­7

M/s  Crompton Greaves Ltd., Mumbai           Meeting No.14/81 Pt.F.No.01/80/162 /1101/AM08/DES­I/DES­II Dated: 06.07.2010 Advance Licence No 0310444382  dt. 26­09­2007          RLA F.No. 03/94/040/634/AM08       Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the proper reply. The case stands deferred and to be relisted on 03.08.2010.   S.No.60

Case No. AR­45

 M/S MID India Power & Steel Ltd.             Meeting No.14/81 F.No.01/81/162/00400/AM109/DES­II Dated: 06.07.2010 Advance License No.1110013812 dt.3­8­2006 & 1110013148 dt.6­4­2008   RLA F. No. 11/22/40/0063/AM07 & 11/80/160/00211/AM07 Decision : The committee observed that the case is under examination of         M/o Steel. The case stands deferred and to be re­listed on 03.08.2010.   S. No. 61

Case No. AR ­7

M/s  Penwalt  Ltd., Mumbai           Meeting No.14/81 Pt.F.No.01/81/162 /432/AM07/DES­II Dated: 06.07.2010 Advance Licence No 0310389620 dt. 14­07­2006          RLA F. No. 03/95/040/220/AM07       Decision : The Committee observed that the reply from the firm and RA is still awaited and therefore decided to remind them to expedite the reply. The case stands deferred and to be relisted on 03.08.2010. S. No. 62

Case No. AR ­70

M/s.P M E Transformers (India) Ltd., Noida             Meeting No.14/81 F.No.01/81/50/090/AM09/DES­II  Dated 06.07.2010 Advance License No 0510216261 dt.12­002­2008                RLA F.No.05/24//040/0850/AM08          Decision :  NC  decided  to  reject  the  request  of  the  firm  as  per  the  written  recommendations  of  DHI  vide  U.O.  No.  3(29)/2010/TSW(B)  dated 21.06.2010(copy enclosed).     S. No. 63

Case No.AR ­76

M/s. Indiana Gratings Pvt. Ltd. Mumbai            Meeting No. 14/81 F.No.01/80/162/AM10/DES­I /DES­II  Dated: 06.07.2010 Advance License No 0310177747 dt.10.01.2003                RLA F.No. 03/24/41/00102/AM03         Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the proper reply. The case stands deferred and to be relisted on 03.08.2010.   S. No. 64

Case No.AR ­77

M/s. KDDL Ltd.            Meeting No. 14/81 F.No.01/81/50/0025/AM10/DES­II  Dated 06.07.2010 Advance License No 0710064481 dt.04­05­2009                RLA F.No.07/24/40/0024/AM10

Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the proper reply. The case stands deferred and to be relisted on 03.08.2010.     S. No.65

Case No. AR ­62

M/s. Sterlite Industries (I) Ltd. Tuticorin           Meeting No.14/81 F.No.01/81/50/331/AM07/DES­II  Dated 06.07.2010 Advance License No 0310392436 dt.01­08­2006               RLA F.No. 03/95/040/0423/AM07        Decision : NC noted that there are around 19 old cases pending for the same item. There are around 80 cases of the same firm and same item were approved in the past. The matter may be processed on file. The case stands deferred and to be re­listed on 03.08.2010.   S. No.66

Case No. AR ­63

M/s. Sterlite Industries (I) Ltd. Tuticorin           Meeting No.14/81 F.No.01/81/50/531/AM07/DES­II  Dated: 06.072010 Advance License No 0310403064 dt.09­10­2006               RLA F.No. 03/95/040/0778/AM07        Decision : NC noted that there are around 19 old cases pending for the same item. There are around 80 cases of the same firm and same item were approved in the past. The matter may be processed on file. The case stands deferred and to be re­listed on 03.08.2010.   S. No.67

Case No. AR ­64

M/s. Sterlite Industries (I) Ltd. Tuticorin           Meeting No.14/81 F.No.01/81/50/730/AM07/DES­II  Dated : 06.07.2010 Advance License No 0310412682 dt.19­12­2006               RLA F.No. 03/95/040/1105/AM07        Decision : NC noted that there are around 19 old cases pending for the same item. There are around 80 cases of the same firm and same item were approved in the past. The matter may be processed on file. The case stands deferred and to be re­listed on 03.08.2010.   S. No.68

Case No. AR ­65

M/s. Sterlite Industries (I) Ltd.  Tuticorin           Meeting No.14/81 F.No.01/81/50/728/AM07/DES­II  Dated 06.07.2010 Advance License No 0310392437 dt.18­12­2006               RLA F.No. 03/95/040/1104/AM07        Decision : NC noted that there are around 19 old cases pending for the same item. There are around 80 cases of the same firm and same item were approved in the past. The matter may be processed on file. The case stands deferred and to be re­listed on 03.08.2010.   S. No.69

Case No. AR ­66

M/s. Sterlite Industries (I) Ltd. Tuticorin           Meeting No.14/81 F.No.01/81/50/238/AM07/DES­II

Dated 06.07.2010 Advance License No 0310387683 dt.30­06­2006               RLA F.No. 03/95/040/0323/AM07        Decision : NC noted that there are around 19 old cases pending for the same item. There are around 80 cases of the same firm and same item were approved in the past. The matter may be processed on file. The case stands deferred and to be re­listed on 03.08.2010.   S. No.70

Case No. AR ­67

M/s. Sterlite Industries (I) Ltd., Tuticorin           Meeting No.14/81 F.No.01/81/50/333/AM07/DES­II  Dated : 06.07.2010 Advance License No 0310392529 dt.28­06­2006               RLA F.No. 03/95/040/0466/AM07        Decision : NC noted that there are around 19 old cases pending for the same item. There are around 80 cases of the same firm and same item were approved in the past. The matter may be processed on file. The case stands deferred and to be re­listed on 03.08.2010.   S. No.71

Case No.AR ­67

M/s. Sterlite Industries (I) Ltd., Tuticorin           Meeting No.14/81 F.No.01/81/50/229/AM07/DES­II  Dated : 06.07.2010 Advance License No 0310387431 dt.02­08­2006               RLA F.No. 03/95/040/0466/AM07        Decision : NC noted that there are around 19 old cases pending for the same item. There are around 80 cases of the same firm and same item were approved in the past. The matter may be processed on file. The case stands deferred and to be re­listed on 03.08.2010.   S. No.72

CASE NO. AR­06

M/s. Shiv­Om Brass Industries, Jamnagar Meeting No. 14 /81 F.No.01/81/050/218/AM10/DES­II      Dated: 06.07.2010  Advance Licence No. 2410024949 dated 03.06.2009   RLA’s F.No.24/24/40/004/AM10 Decision : The Committee observed that the reply from RA is still awaited and therefore decided to remind them to expedite the proper reply. The case stands deferred and to be relisted on 03.08.2010. S. No.73

CASE NO. AR­ 15

M/s. Adlec Systems Pvt. Ltd., Delhi.   Meeting No.  14/81 F.No.01/81/050/289/AM09/DES­II      Dated: 06.07.2010  Advance Licence No. 05100221997 dated 12.06.2008   RLA’s F.No.05/24/40/0126/AM09 Decision : The Committee observed that the reply from the firm is not complete/proper. Hence it has decided to again request the firm to expedite the proper reply. The case stands deferred and to be relisted on 03.08.2010.     S. No.74

CASE NO. AR­ 20

M/s. Pranita Engineering Solutions Pvt. Ltd., Bangalore   Meeting No.   14/81 F.No.01/81/050/026/AM10/DES­II      Dated: 06.07.2010  Advance Licence No. 0710064492 dated 04.05.2009   RLA’s F.No.07/24/40/039/AM10 Decision : The committee observed that the case is under examination of         DIPP. The case stands deferred and to be re­listed on 03.08.2010.   S. No.75

Case No. AR ­62

M/s. Transalloy India Pvt. Ltd. Mumbai.           Meeting No.14/81 F.No.01/80/50/00345/AM08/DES­II Dated :06.07.2010 Advance Licence No  0310445415 dt.10.08.2007             RLA F.No. 03/95/40/612/AM08       Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DHI vide their U.O No. 30(122)/2010­ME dated 25.06.2010 (copy enclosed).       S. No.76

CASE NO. AR­ 38

M/s. Pranita Engineering Solutions Pvt. Ltd., Bangalore   Meeting No.   14/81 F.No.01/81/050/0388/AM09/DES­II      Dated: 06.07.2010  Advance Licence No. 0710059816 dated 15.09.2008   RLA’s F.No.07/24/40/0311/AM09 Decision : As per written recommendations of DIPP, NC decided to call for the following information/clarification from the firm and to re­list the case on 03.08.2010: ­                                               i.                        Information in respect of S.No. 5 & 11 of Standard Deficiency Format.                                           ii.                        Input raw material blank size and weight without cutting allowance­export product wise.                                         iii.                        Cutting allowance and any other allowance/wastage export product wise.   PART – B –DEFERRED S. No.03

Case No. B ­5

M/s. Rajendra Mechanical Industrial Ltd. Mumbai          Meeting No.14/81 F.No.01/81/162/612/AM10/DES­II Dated: 06.07.2010 Advance Licence No 0310272011 dt.01.06.2004 and Advance Licence No.0310383103 dt. 05.06.2006             RLA F.No. 03/22/040/0171/AM05 and             03/91/040/0133/AM05

Decision : The Committee observed that the reply from the policy division are still awaited and therefore decided to remind them to expedite the   PART – C –DEFERRED   Sl. No. 21

CASE NO. C ­ 07

M/s TTP Technologies Pvt. Ltd., Bangalore.   Meeting No. 14/81 F.No.01/81/162/0094/AM’11/DES­II      Dated: 06.07.2010   Decision : NC noted that the comments offered by DHI are not correct and decided that case may again be discussed in the next meeting. The case stands deferred and to be relisted on 20.07.2010.   Sl. No. 22

Case No. C ­26

M/s  AIA Engineering Ltd., Ahmedabad       Meeting No  14/81 F. No. 01/81/162/694/AM10/DES­II Dated: : 06.07.2010                Decision :  NC  decided  to  reject  the  request  of  the  firm  as  per  the  written  recommendations  of  M/o  Steel  vide  U.O.  No.  2(5)/2010/TW  dated ­01.07.2010(copy enclosed).     Sl. No. 23

Case No. C­27

 M/S  Carborundum Universal Ltd., Hosur Meeting No. 14/81 F.No.01/81/162/975/AM10/DES­II Dated:  06.07.2010   Decision : The committee observed that the case is under examination of         DIPP. The case stands deferred and to be re­listed on 03.08.2010.       Sl. No. 24

Case No. C­28

 M/S  Welspun Gujarat Stahl Rohren Ltd., received through EEPC India, Kolkata Meeting No. 14/81 F.No.01/81/162/660/AM10/DES­II Dated: 06.07.2010   Decision : As per written recommendations of DIPP, NC decided to call for the data of some more manufacturers of similar items from EEPC and to re­list the case on 03.08.2010.

S.NO. 25

Case No. C ­3

M/s  Bhukhanvala Tools Pvt. Ltd., Navsari M/s  B. C .Instruments, Udyog Nagar through O/O The D.C(KFTZ),Gandhidham­Kutch          Meeting No. 14/81 F.No.01/81/162 /0033/AM10/DES­II Dated: 06.07.2010  .         Decision : The firm wise decision is as under:­    1. M/s  Bhukhanvala Tools Pvt.Ltd.Navsari   The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 03.08.2010.     2. M/s B.C. Instruments, Udyog Nagar   The Committee observed that the comments from DC(MSME) are still awaited and therefore decided to remind DC(MSME) to expedite the same. The case stands deferred and to be relisted on 03.08.2010.     S. No.26

Case No.C­24

M/s.  Metal Closures Pvt. Ltd.           Meeting No. 14/81 F.No.01/80/162/01152/AM10/DES­II  Dated  06.07.2010       Decision : NC observed that the firm has yet not applied through EEPC and decided that the case may be placed before NC after the receipt of the application through EEPC.


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied