IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2020-04-01

DGFT Committee Minutes

Document text

7

| |

a4

po METING No, 01/81-ALC2/2020 DATED 01.04.2020(Heldon 08.04.2020) | pre:iget ee ye Vortinformation of exporttrs; Norms ‘Comimittée-II handicé-allcasespertalning6 fixation/ratification .— - desco! Cia ste aliGioosl pails MMR RUS UE AIR ho sent 0 emwlladdross: nedydef@nivinn ss acc...cass ag bringRennasui een SSNS TRe BRUTE Caloinittce - feist A Reeoimmontaniongy powPe “iH,decisions, Similarly, a“has‘also scanned copybeen ofattached the blankin Standardthe. end. DeficiencyThis may Format,also bewhichreferredmay findato by referoncethe concernedin 9 NC: | PopoWe "The Norms Committeehas taken decision only with respect to techtlical aspect/wastage- norms, While me hae _tedecming the ‘applications, RAs should check that the applicant has fulfilled’all requirements as - 2G ge prescribed in policy/procedure including those in Policy Circulars issued from time to time or any | PoSo other provisions under FIP/HBPforEODC. . a | ee Paleae ‘v.“wastages/consuffiptionWherever the Committeeas" hastatified fixed:by Norms,the Committe. the concernedor as RAper maywastages ensureclaimedthat AAin ‘isthe.issuedapplicationy, on’ the Poe[> ee oa Meeting’No, 01/81 of Norms -Commiittee-I] for“the year 2020-21(Originally ‘scheduledfor ‘ < - : ooes rsooSka so:g29 Additional,1.042020)Director,held. on 08.04.2020Gerieralof through.Foreign TradeVideo Conferencingunder to consider the following the Chairmanship ofapplications for Shriratification R. P. Goyal, of oe feo Policynorms in2015-20, respect ofThe advancefollowingauthorizations members:wereunder present Dutyin Exemptionthe meeting:Scheme (Chapter-4)reof Forcign Trade7 , | 7 | Name.Designation = | Department | ae ET _| ShriShobhit ShriShobhit Gupia, Dy. DGFToe DGFToeoe ee 2 2 DGRT

ae ET _| ShriShobhit ShriShobhit Gupia, Dy. DGFToe DGFToeoe ee 2 2 DGRT — MEETING NUMBER: 1/8}-ALC2/2020 | MEETING DATE: 01.04.2020 | : Boab wk ree “Case Noi311/14/81«, ° . Party Name: MERSEN ‘Meet No/Date: 1/8 1-ALC2/2020 ‘Status: ~ 8 oe, es A “ALC2/2018: INDIA PVTLID ~~ 101.04.2020 Deferred

a oo : Decision: ‘The Committee. considered the case as per the agenda and noted that the hard copy of. oe Ate oe ee “application: has’ hot yet, beeir received from the applicant and in this regard, an email was sent on; cee See Lf PagedZ on 0 Minutes of Meeting No:01/81 of NC-2 held on 08.04.2020 08117 GUE Lan no

:

» (20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet. 8 -: Hence, the Committee decided to wait for the complete set ofapplication, ~ oeeiealp af nebe ke P

  • ~

:

, (ALC2/2018 , - . JENERGY PVT.LTD. ALC2/2029 Deferred 4 ; * £01/81/050/00743/AM19/ ':13/24/040/00002/AM | 6/ AVO7T2015 0 “Applicant "| | 2 ‘Decision: The Committee considered the case as por the agenda and: noted thatthe hardcopy ee 7 a | application has not yet been reccived from the applicant and in. this regard, an email was. sention., cp geo deed i 23.12.2019 followed by a reminder on 31.03.2020, However, no information has been received yet. 1 : fee | , ‘Hence, the Committee decided to wait for the complete set of application. coe

“+ | |The cas¢ stands deferred. - Cpe BRAT PT ee ee Case No.:312/14/81- “Party Name: SAKAR Meet No/Date:|/8IStatuses ; ALC2/2018 INDUSTRIES LIMITED ~ALC2/2020Deferred’ , 2 .101/81/050/01030/AM19/ :08/24/040/00.1 10/AM1 6/ 21072015. Applicant) | 3 ‘Decision: The Committee considered the case as per the agenda and noted that the hard copy of. - : 7 application has not yet becn received from the applicantand in this regard, an email was senton= 9. ys | : (23.12.2019 followed bya reminder on 31.03.2020, However, no information’has been received yet.) | i Hence, the Committee decided to wait for the complete set of application. wg | oe. ‘The case stands deferred. sg a CT: vee Berg - Gage Nosaiatagis Panty Name: SAKAR ‘Mea Noa li8I Statin -_ one 4 | /:01/81/050/0103 1/AM19/ ——_—:08/24/040/00108/AM16/ «21.07.2015. “Applicant | " Decision: The Committee considered the case as per the agenda and noted that the hard-copy of me | '.>}.|. (93.12.2019lapptication followedhas-not yetby beena reminderregeiyedonfrom31.03.2020:the applicantHowever,and noin informationthis regard, hasah emailbeen receivedwas Sentyet.one 2 pes es eo ‘Hence, the Committee decided, to wait for the complete set of'application.* rioters ioe 9 = Seer a pe eenee@ cos

| 1:01/81/050/01035/AMI19/ —. 1:04/24/040/00112/AM16/ 10.08.2015 Applicant +). Decision: The Committee considered the cas¢’as por the agenda and ‘noted that the hard copy eS. | 2|Pagea7 Minutes of Meeting No. 01781 of NC-2 held on 08.04.2026y: Directo cacao aaitel Tle

: 3 :; |

|

| [applicationhas not yet been received from the[applicant] and in this regard, an emailwas sent | [23.12.2019 followed by a reminder on 30.03.2020. However, no information has been received yet. | on | | |Hence, the Committee decided to wait for the complete set of application. The case stands deferred. | || |ALC2/2018[Case No.:318/14/81[PartyIINFRATECH Name: GOLDSTONE LIMITED = MeetiALC2/2020 No/Date:1/81-—|Status:Deferred | | | HQ File IRLA File | “Lic.No/Date:0910062464 Action by : | | 0 1/81/050/01036/AM19/ :09/24/040/00279/AM 16/ 11.08.2015 [Applicant ; 6 ‘Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking: l || een|However,informationno reply hasas beenraisedreceivedby Consultantyet. Therefore,(TEC-1)the wasCommitteesent todecidedthe applicantto remindon the27.01.2020.applicant | for furnishing the requisite information. ; | Ire case stands deferred. | t | \Case No.:322/14/81party Name: STERA . ‘Meet No/Date:1/81Status: | ALC2/2018 ENGINEERING INDIA ALC2/2020 Deferred | f | PRIVATE LIMITED 01.04.2020 | | | {HQ File RLA File - [Lic.No/Date:04 10160911 ‘Action by : : 1 1:0 1/81/050/01040/AM19/ 1:04/2.4/040/00113/AM16/ (13.08.2015 ‘Applicant : 7 Decision: The Committee considered the case as per the agenda and noted that the hard copy of ; “4 application has not yet been received from the applicant and in this regard, an email was sent on | 23.12.2019 followed by a reminder on 30.03.2020. However, no information has been received yet. : i \Hence, the Committee decided to wait for the complete set of application. ! tod ; "| |The case stands deferred, | | | CaseNo:46/14/81|Party Name: SHERA (Meet No/Date:1/81(Status: | » (ALLC2/2018 METAL PVT.LTD, |ALC2/2020 ‘Approved — |; | ':0.1/8[HQ File 1/050/00764/AM19/ |:13/24/040/00019/AM16/RL File —:14,08,.2015ULic.No/Date:1310047951, | Decision: The Committee considered the case as per agenda and noted hard copy of application has not | | lyet been received from the applicant and in this regard, an email was sent on 23.12.2019 followed by a, 8 ireminder[Idue][ deliberation,] on 31.03.2020.[ the][ Committee] However,[ decided] Consultant[ to][ fix][ the] (SKB)[ ad-hoc] furnished[ norms] the[ as][ under:] comments based on agenda. After, || | ITCHSCode | Pxporttemath SHYTate No.Sl. |CodeITCHS |PONTO- |[Quantity] Recommended |i i | | Brass Rod (with 1.05 Keke | composition of Brass | 50000.000 Copper content in both | | 74072120 oy | o, | l 74040012 | 2? export and fo as 58% Copper, 39% | Kgs Scrap . i Zine and 3% Lead) : import | :3 | Page6 47 Minutes of Meeting No. , 01/81 of NC-2 held on_ 08.0@g202e:I0rDiractorateSHOBHITGeneralGenerel ofofGUPTA Foreign Fo.uign TradeTce Ministry of Commearcs¢: trdusH y

| | | | | | | | |

| 1

i i |

||| ; ,

:

: | | | | } | | | | | | : |

||| content in both |) ; | 2 | 79011200 | Zinc Ingots | export and , i import | | products | | | content in both |: | | 3 | 78011000 | Lead export and | i | import | products | RA concerned may tale suitable consequential action accordingly. j | \Case No.:323/14/81Party Name: TRAFOMEC Meet No/Date: 1/8 1- ‘Status: | | |ALC2/2018 INDIA PVT. LTD. ALC2/2020 Deferred | i | (01.04.2020 | | 1HQ File IRLA File ‘Lic.No/Date:0710108750 [Action by : | ‘9 j:01/81/050/0104 1/AM19/ :07/24/040/00190/AM16/ 21.09.2015 (DAL | | [Pecision: The Committee considered the case as per agenda and noted that the applicant’s reply was | 1; |sent to DHI on 13.02.2020‘ for examination of the case. However,; no comments have been received;| . _ jyet. Therefore, the Committee decided to remind DHI for expediting the comments. | | | The case stands deferred, | | | (Case No.:34/14/81Party Name: ARFIN INDIA (Meet No/Date: 1/81‘Status: | | » (|ALC2/2018 (LIMITED ALC2/2020 Deterred || | (01.04.2020 | | |HQ File RLA File — Lie.No/Date:0810136182 Action by :_ | |:01/81/050/00752/AM19/ _:08/24/040/00218/AM16/ (06.10.2015 ‘Applicant 10 Decision: The Committee considered the case as per agenda and noted hard copy of application has, not yet been received from the applicant and in this regard, an email was sent on 23.12.2019 followed | ;| |{by a reminder on 31.03.2020. However, Consultant (SKB) furnished the comments based on agenda. | | on 3! Benda. | After due deliberation, the Committee decided to wait for hard copy of application to find out) ‘Aluminium content in import item. IThe case stands deferred. : | (Case No:76/14/81[Party Name: FCLOEN Meet No/Date:1/81(Status: /ALC2/2018 CONNECTORS LIMITED — |ALC2/2020 ‘Approved | | HQ File IRLA File ; ~ Lic.No/Date: 1010059350 | HY ::01/81/050/00794/AM19/ 10/24/040/00090/AM 16/ 30.12.2015 Decision: The Committee considered the case as pet agenda and decided to fix the ad-hoc norms | [per written comments given by MeitY vide F. No. W-41/3/2020-IPHW-MeitY dated 18.03.2020.as | ‘(Copy enclosed) | RA concerned may take suitable consequential action accordingly. BN x 4 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020 ny Ose Pee Ente |

|| | ; f F | | ; | { ;

|||[CaseNo.:9/14/81-ALC2/2018<br>[Party Name:SONS<br>MeetNo/Date:1/81-“Status:<br>|<br>|<br>FOUNDRYPVT. LTD.<br>ALC2/2020<br>Deferred||||
|---|---|---|---|
|:<br>|<br>i<br>|<br>||| {HQFile<br>IRLAFile<br>LLic.No/Date:3110065856[Actionby:_<br>|<br>(:01/81/050/00727/AM19/<br>|:31/83/040/00141/AM16/<br>(08.01.2016<br>‘Applicant<br>jl2Decision: The Committee considered the case as per the agenda and noted thatthe hard copy of |<br>|<br>application has notyet been received from the applicant and in this regard, an email was sent on!<br>(23.12.2019 followed bya reminder on31.03.2020.However, noinformation hasbeenreceivedyet.<br>| fencetheCommitteedecidedto waitforthecompletesetofapplication.<br>|<br>|<br>The case stands deferred.<br>|<br>SINUS NUONORIN<br>NOONEFEO<br>a<br>aA<br>See oN eet<br>att amet<br>NEAR OSMARA<br>on Adc cnmlAdnanaAAtTe=<br>RATEReRREReNANAMAAnE=“manateetbe Anat+ 8 8<br>se ROW RACMAGD<br>ih OYNG sem ene gEaBLNAOONNIEUR ERI HetRecess<br>GAN|||
||||<br>[CaseNo.:353/14/81-<br>(PartyName:POWER<br>‘Meet No/Date:1/81-<br>Status:<br>ALC2/2018<br>(CONTROLEQUIPMENTS —|ALC2/2020<br>Deferred<br>||||
||<br>|<br>i<br>:|| HQFile<br>RLFile<br>‘Lic.No/Date:0710109325 Actionby :<br>|<br>:01/81/050/01071/AM19/<br>1:07/24/040/00359/AM16/<br>29.01.2016<br>Applicant<br>[13Decision: The Committee considered the case as per the agenda and noted thatthe hard copy of.<br>|<br>application has notyet been received from the applicantand in this regard, an emailwas senton.<br>20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet.<br>'<br>iHence, the Committee decided to wait for the complete set ofapplication.|||
|||<br>|<br>Inthecasestands deferred.<br>||||
|!<br>;<br>:<br>|<br>:<br>i|7 \Case No.:354/14/81- [Party<br>Name:POWER<br>MeetNo/Date:1/81-Status:<br>|<br>ALC2/2018<br>‘CONTROLEQUIPMENTS —ALC2/2020<br>Deferred<br>|<br>;<br>|<br>01.04.2020<br>|<br>|<br>ork<br>seeste teeatannntancteatenaae «mae<br>issessnnae nanrsseamanPresence<br>encimaawe yo<br>2tan<br>tat<br>HQ File<br>IRLA File<br>‘Lic.No/Date:0710109326 ‘Actionby :<br>|<br>|<br>1:01/81/050/01072/AM19/<br>|-07/24/040/00364/AM 16/<br>29.01.2016<br>Applicant<br>{14Decision:TheCommittee considered the case as per theagenda andnoted thatthe hard copyof<br>{<br>lapplication has not yet been received from the applicant and in this regard, an email was sent on.<br>|<br>20.12.2019 followed by areminder on 31.03.2020. However, no information has beenreceived yet.<br>jHence, theCommitteedecided to waitforthecomplete setofapplication.||;|
||||<br>‘The casestands deferred.<br>||||
|||‘CaseNo.:355/14/81-<br>‘PartyName:KRISAM _<br>“MeetNo/Date:1/81-<br>Status: |<br>|<br>1ALC2/2018<br>iAUTOMATIONPVT. LTD.<br>,AI.C2/2020<br>(Deferred<br>||||
||<br>.|| HQFile<br>RLAFile<br>[Lic.No/Date:0710109343 \Actionby :<br>|<br>|<br>1:01/81/050/01073/AM 19/<br>1:07/24/040/00369/AM16/<br>(03.02.2016<br>Applicant<br>|||||
||<br>||>Decision: The Committee considered the case as per the agenda and noted that the hard copy of.<br>‘application has not yet been received from the applicant and in this regard, an email was sent on!||||
|7<br>:||<br>(20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet.<br>|<br>[HencetheCommitteedecidedtowaitforthecompletesetofapplication.<br>|<br>| Thecase standsdeferred.<br>BY|||
||5<br>| Page47<br>MinutesofMeeting No.01/81ofNC-2 heldono8.oavgaireo"cenoretorrofrag|||
||Ministry ofCommerce & Industry<br>UdyogBhawan,NewDati||i<br>||
||||||

| | |! | 2 | | .

==> picture [554 x 748] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|t|
||4||i|'Case No.:344/14/81-jALC2/2018|‘PartyPARTS Name: PVT.LTD. DC AUTO|ALC2/2020Meet No/Date:1/81-|Status:Deferred|||
||||||JQ|File|IRLA|File|'Lic.No/Date:071010943201.04.2020|Action by >||
|i||,01/81/050/01062/AM19/||:07/24/040/003|13/AM|16/|23.02.2016|\Applicant|||
|||16 Decision:|The|Committee|considered|the|case|as|per the|agenda|and|noted|that|the|hard|copy|of ||
|i|application|has|not|yet|been|received|from|the|applicant|and|in|this|regard,|an|email|was|sent on|
|:|[20.12.2019|followed|by|a|reminder|on|31.03.2020.|However,|no|information|has|been|received|yet.|[;]|
|i|||Hence,|the Committee|decided|to|wait for the complete|set of application.|
|||iThe|case|stands|deferred.|.|
|||i [Case|No.359/14/81-|0!”|Party|Name: AMC|—™Meet|No/Date:1/81-|[Status||
|||‘ALC2/2018|iCOOKWARE (INDIA)|ALC2/2020|(Deferred|||
||||'|':01/81/050/01077/AM19/1HQ File|REA|.07/24/040/00409/AM16/ File|22.03.2016Lic.|No/Date:0710109555|‘ApplicantAction by:|||
|il Decision: The Committee consideredthe|case as|per agenda and|noted|that|a|deficiency|letter|secking|||
||||||certain|information|as|raised|by DPIIT was|sent to|the applicant on|27.01.2020.|However,|no|reply has|
|_|[been|received|yet.|Therefore,|the|Committee|decided|to|remind|the|applicant|for|furnishing|the,|
|'||requisite|information.|||
||||||The case stands deferred.|
|||enactcect|tat|ARAN|ONUE oe MEN|tne|ENOREE|MNO|Ee|WNEAE SE|wo|Pemeamares|ese|vie|we|EHF|AEWA|FU|ERE|SANNA A|AA|A|ft|mst|ensittn|ttt|den attn|anh|#4|atmah|cancnttemmannniri|tectlnsen|othed|
|||_|(Case No.:11/14/81-|Party Name: GALLANTT|—/Meet No/Date:1/81-|Status:|
|||||jALC2/2018|IMETAL LTD.|ALC2/2020|1)|eferred|
|1:01/81/050/00729/AM19/|':37/24/040/00009/AM1 6/|04.05.2016|Applicant|||
|||‘Decision:|The|Committee|considered|the|case|as|per|the|agenda|and|noted|that|the|hard|copy|of!|
|||lapplication|has|not|yet|been|received|from|the|applicant|and|in|this|regard,|an|email|was|sent|on}|
|18|23.12.2019|followed|by|a|reminder|on|31.03.2020.|However,|on|the|advice|of Consultant|(SKB),|the||
|‘Committee|decided|to|seek|from|the|applicant|to|furnish|the|following|information|along|with.|
|'|‘complete|set|of application:|
|i|||1.|What|is the ratio|of sponge|iron and|steel scrap|in the charge mix?|
|||||2.|How|much|quantity|of Ferro|Manganese|and|Ferro|Silicon|are|being|used|for|maintaining.|
|po|percentage|of Mn&|Si|in|the|export|product?|
|The|case|stands|deferred.|
|r|Case Nos/i4si|"Party|Name: GALLANTT|reNoaeigi|‘Status|,|:|
|||ALC2/2018|METAL LTD.|ALC2/2020|Deferred|—|
|i19|||||||01.04.2020|||||
|||:01/81/050/00730/AM19/|1:37/24/040/00011/AM16/|04.05.2016|ae|
|6|||Page 47|Minutes|of Meeting|No. 01/81|of NC-2|held on 08.04 Binder" pane mt|ea “enn|

----- End of picture text -----<br>

: iH i } | | |

|

| | | ' |

,

| | |

F | |Decision: The Committce considered the case as per the agenda and noted that the hard copy of. || || [23.12.2019application followedhas not yetby beena reminderreceivedon 31.03.2020.from the applicantHowever,andoninthethisadviceregard,of Consultantan email was(SKB),sent theon.| | Committee decided to seek from the applicant to furnish the following information along with: | complete set of application: | | , || 2.1. HowWhat ismuch the ratioquantity of spongeof Ferro ironManganese and steel scrapand inFerro the chargeSilicon mix?are being used for maintaining} percentage of Mn& Si in the export product? | [ | Lhe case stands deferred. | cet2 spca NNN mt shld nnceanns? Hmnmnannnnatttciermti n ttntintnmnttntnentm e etmeeerTiminnmntntint n tnntntC~temtteeettntentRstenttnttnt t A eSet tA MOREE ee MMOod sto et ree = | | [Case No.:13/14/81Party Name: GALLANTT — Meet No/Date:1/81Status: , | iALC2/2018 ‘METAL LTD. 'ALC2/2020 Deferred | i | HO File | RLA File Lic.No/Date:3710002637 [Action by : | | ,01/81/050/0073 1/AM19/ :37/24/040/00012/AM 1 6/ 04.05.2016 ‘Applicant | | (Decision: The Committee considered the case as per the agenda and noted that the hard copy of | : 20 application(23.12.2019 followedhas not yetby beena reminderreceivedon 31.03.2020.from the applicantHowever,andoninthethisadviceregard,of Consultantan email was(SKB),sent theon,| | ICommittee decided to seek from the applicant to furnish the following information along with: | {complete set of application: | | | 1. What is the ratio of sponge iron and steel scrap in the charge mix? | 2. How much quantity of Ferro Manganese and Ferro Silicon are being used for maintaining percentage of Mn& Si in the export product? ! | | ‘The case stands deferred. | | [Case NowlA/14ro1 _ (Party Name:[GALLANTT][—] Meet No/Date:1/81- Status: (ALC2/2018 METAL LID. ALC2/2020 ‘Deferred | HQ File _ (RLAFile Lic. No/Date:3710002638 |Action by : 01/8 1/050/00732/AM19/ |:37/24/040/00013/AM16/ 04.05.2016 ‘Applicant | Decision: The Committce considered the case as per the agenda and noted that the hard copy of. | application has not yet been received from the applicant and in this regard, an email was sent on. 21 23.12.2019 followed by a reminder on 31.03.2020. However, on the advice of Consultant (SKB), the[|] | jCommittee decided to seek from the applicant to furnish the following information along with. | ‘complete set of application: | | 1. What is the ratio of sponge iron and steel scrap in the charge mix? | | 2. How much quantity of Ferro Manganese and Ferro Silicon are being used for maintaining[|] 1 | percentage of Mn& Si in the export product? | the case stands deferred. |

SHOF< om an | Dy. pirecior General of Foreign nee Directorate | Genoxal ©ain hahisiy | Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020istry eine ent rei | |

7 | Page 47

j

;

|

|

| ;

I | [Case No.:15/14/81-—*[Party Name: GALLANTT —-Meet No/Date:1/81Status: | | |ALC2/2018 METAL LTD. jALC2/2020 ‘Deferred | | | iH File IRLA File [Lic.No/Date:3710002639 |Action by : hacenys tene LinemiOGiAANAAAR Antamina Me eraneemncneemmmnmine sstiatasne+ stan ete ernie | ||i i|| :01/81/050/00733/AM19/‘Decision:rantTheenrantCommittee consideredei1:37/24/040/000nn swans iacrasannrtnactnihaihundthe case 14/AMtui oemasteem nanamamnarinenmentnper1 6/the agenda04.05.2016and noted that the hardApplicantcopy of]| : ‘application has not yet been received from the applicant and in this regard, an email was sent on! | ‘Committee decided to seek from the applicant to furnish the following information along with) | 22 23.12.2019 followed by a reminder on 31.03.2020. However, on the advice of Consultant (SKB), the | complete set of application: | | 1. What is the ratio of sponge iron and steel scrap in the charge mix? j ; | 2. Howpercentage much ofquantity Mn& Si ofin Ferro the exportManganese product?and Ferro Silicon are being used for maintaining |

'The case stands deferred.

|| | {Case No:17/14/81—(PartyNName: GALLANTT— Meet No/Date:1/81Status: : iALe27018 METAL LTD. [ALC2/2020(01.04.2020 [Deferred| || | :01/81/050/00735/AM19/HQ File ':37/24/040/00008/AMIRLA File 16/ (23.05.2016Lic.No/Date:37 10002642 [\ A ctionpplicant by =| | | Decision: The Committee considered the case as per the agenda and noted that the hard copy of (23[23.12.2019] application[followed] has not yet[by] been[a][reminder] received[on][31.03.2020.] from the applicant[However,] and[on] in[the] this[advice] regard,[of][ Consultant] an email was[(SKB),] sent[the] on,[|] ! Committee decided to seek from the applicant to furnish the following information along with[|] | pomplets set of application: 1. What is the ratio of sponge iron and steel scrap in the charge mix? | | | 2. How much quantity of Ferro Manganese and Ferro Silicon are being used for maintaining[|] ; || percentage of Mn& Si in the export product? | | ‘The case stands deferred. i[Case No. 19/14/81 ~~(PartyName:AMC. —~—S(Meet No/Date:1/81- Status: | |ALC2/2018 (COOKWARE (INDIA) ALC2/2020 Deferred | _ PVT.LTD. (01.04.2020 | HQ File RLA File ‘Lic.No/Date:07 10109940 Action by : | |:01/81/050/00737/AM19/ :07/24/040/00047/AM17/ 14.06.2016 Applicant i24 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking: | jcertain information as raised by DPIT was sent to the applicant on 27.01.2020. However, no reply has, lbeen received yet. Therefore, the Committee decided to remind the applicant for furnishing the. requisite information, |. [The case stands deferred.

Dy. Director General of Forrian Tree

| | | | |

. Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020

8 | Page 47

| { f

|| i |

ICase No.:42/14/81Party Name: AMC ‘Meet No/Date:1/81‘Status: | : | |ALC2/2018 COOKWARE (INDIA) ALC2/2020 Deferred | | || PVT.LTD. 01.04.2020 | | |HQ File IRLA File ‘Lic.No/Date:07 10110268 ‘Action by : | 01/8 1/050/00760/AM19/ |:07/24/040/00134/AM17/ 17.08.2016 ‘Applicant | Ps Decision:soca ere em Ne RHRThe CommitteeUES PEE HMR QOH consideredMage Aon Ra the aN caseYPas8 A perWE agendaRE andAN notedANN that RW HH a RNR deficiencycmcletter mn seeking meter[|] | | |certain information as raised by DPIT was sent to the applicant on 27.01.2020. However, no reply has | | been received yet. Therefore, the Committee decided to remind the applicant for furnishing the: requisite information. | | |The case stands deferred. | i Case No.:150/14/81Party Name: AMC ‘Meet No/Date: 1/8 1- Status: | 'ALC2/2018 COOKWARE (INDIA) ALC2/2020 ‘Deferred | | PVT.LTD. 01.04.2020 | | HQ File aL File 'Lic.No/Date:0710110362 Action by : | 26| Decision::01/81/050/00868/AM19/The Committee considered:07/24/040/00176/AM17/the case as per agenda and02.09.2016noted that a deficiency letterApplicant seeking|| ; icertain information as raised by DPIT was sent to the applicant on 27.01.2020. However, no reply has | ‘been received yet. Therefore, the Committee decided to remind the applicant for furnishing the: | | Ijrequisite case standsinformation. deferred. . ‘Case(ALC2/2018 No.:151/14/81Party‘TECHNOLOGIES Name: LDSQUAREINDIA ALC2/2020Meet No/Date:1/81Status:Deferred | | | |HQ File IRLA File _Lie.No/Date:0710110363 Action by : | | .01/81/050/00869/AM1 9/ |:07/24/040/00177/AM1L7/ 02.09.2016 ‘Applicant | 27 Decision: The Committee considered the case as per the agenda and noted that thehard copy of | application has not yet been received from the applicant and in this regard, an email was sent on, | 20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet.[|] | Hence, the Committee decided to wait for the complete set of application.

| {The case stands deferred.

ALC2/2018 BATTERIES PRIVATE ALC2/2020 ‘Deferred | i (LIMITED (01.04.2020 | | HQ File IRLA File ‘Lic.No/Date:0710110561 Action by : + (:0.1/81/050/00890/AM 19/ 1:0'7/2.4/040/00221/AM17/ 24.10.2016 Applicant | 28 Decision: The Committee considered the case as per the agenda and noted that the hard copy of | \application has not yet been received from the applicant and in this regard, an email was sent on. | Hence,20.12.2019 the Committeefollowed by decid a r e minderd to waiton for 31.03.2020. the completeHowever,set of application.no information has been received yet.| | | |The case stands deferred. eo 9 Dy. Director General 0 orsign tex° | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.3098"ry a Conte orto rs inchctry Udyog Bhawan, Now Balti

| | F

| (Case No.:33/14/81Party Name: DIANA Meet No/Date:1/81Status: | | | |(ALC2/2018 METALS 01.04.2020‘ALC2/2020 |Deferred i | HQ File IRLA File ILic.No/Date:0410162477 'Action by : | | — 1101/81/050/0075 1/AM19/ 1.04/24/040/001 36/AM17/ 08.11.2016 ‘Applicant | | ' (29 Decision: The Committee considered the case as per the agenda and noted that the hard copy of: | f i: application(23.12.2019 followedhas not yetby beena reminderreceivedon from30.03.2020.the applicantHowever,and noin informationthis regard, hasan emailbeen receivedwas sentyet.on!| |i Hence, the Committee decided to wait for the complete set of application. | | ‘The case stands deferred. | | (Case No.:184/14/81Party Name: AMC ‘Meet No/Date:1/81Status: i iALC2/2018 ‘COOKWARE (INDIA) JALC2/2020 Deferred | i | PVT.LTD. (01.04.2020 ! | ':0{HQ 1/81/050/00902/AM File 19/ |:07/24/040/0023IRLA File 8/AM17/ ‘Lic.(09.11.2016No/Date:0710110630 ‘Applicant[Action by : : 3i 0 Decision:PA CN OOH NOES NEEREOTheOCU Committee CANNON 8 CUR PUMA ANNE RIA YUN considered APP NASR ANH SEPMAHSNthe HRATMHEScaseCHES20 SCENESas per agendaPENH NPE andEAM notedMatthat “tnt a deficiency2" SACUPte Wm ane ante mtamnnennlettereZ Se muNY seekingAaUNnINe a AMR ote 4 | icertain information as raised by DPIIT was sent to the applicant on 27.01.2020. However, no reply has| | been received yet. Therefore, the Committee decided to remind the applicant for furnishing the,| irequisite information. | |The case stands deferred. | | [Case N-AOstaeL oe Party Na~ SUNSHINE WieNcjDatevgie Status a | | | (ALC2/2018 |EXTRU SIONS INDIA P. ALC2/2020 Deferred | | i LTD, (01.04.2020 | | | HQ File IRLA File ‘Lic.No/Date:0710110703 Action by: | | | | (:01/81/050/0091 1/AM19/ |:07/24/040/00258/AM17/ 29.11.2016 |Applicant | | p! Decision: The Committee considered the case as per the agenda and noted that the hard copy of, || ; japplication has not yet been received from the applicant and in this regard, an email was sent on| , | 20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet. | ‘Hence, the Committee decided to wait for the complete set of application. 7;4 |Iphe case stands deferred. | | Case NowI31/14/81[Party Name: FCIOEN —s[Meet No/Date:1/81(Status: \ALC2/2018 CONNECTORS LIMITED = |ALC2/2020 ‘Approved | | 1HQ File ~IRLA File Lie, No/Date:1010059668 | 34 01/8 1/050/00849/AM19/ ——}:10/24/040/00084/AM17/ 19.12.2016 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as | iper written comments given by MeitY vide F. No. W-41/7/2020-IPHW-MeitY dated 19.03.2020. » (Copy enclosed) IRA concemed may take suitable consequential action accordingly. wow | 10 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.20HP EGE CSOveThebtn ee cat By io!Bos joie ||

| |

| | | | | F

| i |

| Case No.:345/14/81(Party Name: AMC Meet No/Date: 1/81Status: ; ALC2/2018 COOKWARE (INDIA) ALC2/2.020 Deferred PVT.LTD. 01.04.2020 | ne File IRLA File |Lic.No/Date:0710110836 Action by : | ':01/81/050/01063/AM19/ —_:07/24/040/00313/AM17/ (23.12.2016 ‘Applicant | P| 3 Decis|certa i non:informationThe Committeeas raised consideredby DPIUT the was casesent as to perthe agendaapplicant ando n oted27.01.2020. that a deficiencyHowever, letteno r seekingeply has | ;\ | {been received Y yet. Therefore, the Committee decided to remind the applicantpp for furnishing the|| | | [requisite information. | Ihe case stands deferred. i | [Case No.:347/14/81{Party Name:TRAFOMEC Meet No/Date:1/81Status: (ALC22018 INDIA PVT. LTD. ALC2/2020 Deferred | : | HQ File RL File ‘Lic.No/Date:0710110958 |Action by : | | |34ep1:01/8ccsessaWtitiae adna 1/050/01065/AM19/ hahibutss a saharwinmiumaianaaninne=in menmnonnaniniasnnanmniite mannii1:07/24/040/00329/AM17/tessa innennwnaeniinabithinnnt: sinensis Rue stanmnbuilibAnanummrt Mnabinannahuanathetntles}12.01.2017 DHI | Decision: The Committee considered the case as per agenda and sonotae Se e w d thatfats perennethe applicant’s reply was|: |, | iyet.sent toTherefore, the DHI on 13.02.2020 Committeefor decided examination to remindof the DHI case. for expeditingHowever, theno comments comments.have been received || : | 'The case stands deferred. j OE EW GENES TLS ee coments dnt om . Ava an retin Re aint AE Seated ‘ 2 Pe eeno eS 2Sh : . | /ALC2/2018\Case No.:107/14/81[PartyICORPORATName: CHINAION INDIA STEEL ALC2/2020Meet No/Date:1/81iApprovedStatus: || _ PRIVATE LIMITED (01.04.2020 | | |HQ File PRLA File | Lic.No/Date:3410042905 | . | ':01/81/050/00825/AM19/ (:34/24/040/00273/AM17/ 01.02.2017 | | | . Decision: The Committee considered the case as per agenda and noted the comments given by bs \Consultant (SKB). The Committee also noted that earlier similar cases were approved with 15%, | iwastage on the recommendation of MoS. Therefore, the Committee decided to fix the ad-hoc norms | | | lon repeat basis as approved for AA No. 3410043636 dated 14.11.2017 in NC-2 M. No. 05/81 dated | 12.06.2019 @ 1.5% wastage on the recommendation of the representative of MoS with the condition -| . ithat the thickness and grade of import and export items to match. | | RA concerned may take suitable consequential action accordingly. | | [CaseNo.:349/14/81SS PartyName: AMC SS MeetNo/Date:1/81Status: | i = jALC2/2018 COOKWARE (INDIA) ALC2/2020 Deferred : PVT.LTD. 01.04.2020 i | | HQ File IRLA File Lic.No/Date:07101 11078 Action by : 6 |01/81/050/01067/AM19/ |07/24/040/00315/AML7/ 06.02.2017 ‘Applicant | | Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking information as raised by DPIT was sent to the applicant on 27.01.2020. However, no reply has’ [certain | | |been received yet. Therefore, the Committee decided to remind the applicant for furnishing the | Irequisite information. | |The case stands deferred. 11 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2026 General of Foreign Tee? Dy. Dikector Genel al of Fos iil |ha

==> picture [3 x 156] intentionally omitted <==

----- Start of picture text -----<br> :<br>|<br>{<br>|<br>;<br>----- End of picture text -----<br>

|

| || | ALC2/2018 \COOK WARE (INDIA) ALC2/2020 Deferred | | | (Case No.:357/14/81Party Name: AMC [Meet No/Date:1/81‘Status: | TAQ File | IRLA File Lic.No/Date:07101 11264 ‘Action by + | | 37| (0.1/8Decision:1/050/01075/AM19/The Committee considered:07/24/040/00383/AM17/the case as per agenda and(09.03.2017 noted that a deficiency letterApplicant secking[|] | | | icertainbeen receivedinformationyet. asTherefore,raised by DPIITthe Committee was sent todecidedthe applicantto remindon 27.01.2020.the applicantHowever,for furnishingno reply hasthe| | | requisite information. || | |The case stands deferred. | iCase No.:44/14/81‘Party Name: VELOX ‘Meet No/Date:1/81Status: /ALC2/2018 [AUTOMATION PRIVATE ALC2/2020 Deferred | |iHQ File IRLA[LIMITED File Lic.(01.04.2020No/Date:5210042215 !Action by : | 1g 9 |:01/81/050/00762/AM | Decision: The Committee19/ considered':52/24/040/00085/AM17/the case as per the agenda15.03.2017and noted that the hard‘Applicantcopy of || | | lapplication has not yet been received from the applicant and in this regard, an email was sent on | | (23.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet.[|] | \Hence, the Committee decided to wait for the complete set of application. | The case stands deferred. _ | | (Case No.:115/14/81eon Name: CHINA STEEL Meet No/Date:1/81Status: ALC2/2018 ICORPORATION INDIA /ALC2/2020 ‘Approved | | | PRIVATE LIMITED 01 04.2020 | /HQ File RLA File ‘Lic.No/Date:3410043081 | |:01/81/050/00833/AM19/ :34/24/040/00378/AM17/ 30.03.2017 ‘Decision: The Committee considered the case as per agenda and noted the comments given by | 39 Consultant (SKB). The Committee also noted that earlier similar cases were approved @ 1.5%! | wastage on the recommendation of MoS. Therefore, the Committee decided to fix the ad-hoc norms. | es repeat basis as approved for AA No. 3410043636 dated 14.11.2017 in NC-2 M. No. 05/81 dated. | [12.06.2019 @ 1.5% wastage on the recommendation of the representative of MoS with the condition | || that the thickness and grade of import and export items to match. | IRA concerned may take suitable consequential action accordingly. | | [Case No48/14/81- ———PartyName: AMC Meet No/Date:1/81Status: | jALC2/2018 \COOK WARE (INDIA) (ALC2/2020 Deferred | HQ File RLA File 'Lic.No/Date:0710111502 ‘Action by: ‘40 1:01/81/050/00766/AM19/ ':07/24/040/00016/AM18/ 28.04.2017 ‘Applicant | (Decision: The Committee considered information as raised by DPIT was sent to the applicant on 27.01.2020. However, no reply has , oeriain the case as per agenda and noted that a deficiency letter seeking | | [een received yet. Therefore, the Committee decided to remind the applicant for furnishing thegé gay | requisite information. eMOselt Cd vA |_iThe case stands deferred, ynanata a asin 12 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.202915+Y OFGOMIRGRSS Ste

i | :

| | | ; | ; |

! . : | i i |

} | | ALC2/20 18 LIMITED ALC2/2020 ‘Deferred _ ‘01.04.2020 | 141 :01/81/050/00773/AM19/ {:07/24/040/0008 1/AM18/ ‘14.06.2017 ‘DUI | | HQ File RLA File Lic.No/Date:0710111752 [Action by :: | | Decision: The Committee considered the case as per agenda and noted that a copy of application was| | | sent to DH on 28.01.2020 for examination of the case. However, no comments have been received | | | lyet. Therefore, the Committee decided to remind DHI for expediting the comments. | | | Ihe case stands deferred. | | | \Case No.:68/14/81-ALC2/2018 PartyENGINEERING Name: SPIRAL PRIVATE EHL =ALC2/2020Meet No/Date: 1/81Deferred[Status | | LIMITED 01.04.200 | HQ File RLA File 'Lic.No/Date:0710111807 Action by = | | (:01/81/050/00786/AM19/ :07/24/040/00002/AM 18/ (22.06.2017 ‘Applicant | Decision: The Committee considered the case as per agenda and noted that the applicant could not be. | (Therefore,calledcalled for thepersonal Committeehearing deciddu thepersonal Committeehearing deciddupersonal Committeehearing deciddu Committeehearing decidduhearing deciddu deciddudu e d to seekcurrent fromcountrywide thecurrent fromcountrywide the fromcountrywide thecountrywide the the applicantlockdown the followingsituationinformationtolockdown the followingsituationinformationto the followingsituationinformationto followingsituationinformationtosituationinformationtoinformationtoto expl a ndinin cai]thethe againcase.|case.|| ("* |for Personal Hearing Personal Hearing Hearing in the forthcoming meeting of the forthcoming meeting of forthcoming meeting of meeting of Norms Committee: Committee: | | 1. Justification for higher wastage, which is in the range of Justification for higher wastage, which is in the range of for higher wastage, which is in the range of higher wastage, which is in the range of which is in the range of is in the range of in the range of the range of range of of 77-93% on item of import. on item of import. item of import. of import. import. | | | 2. Reasons for indicating Aluminium Rods Aluminium Rods Rods and profiles profiles in the items the items items of export export while items of import. of import. import. / ; are only only plate and tube. | | 3. Process Process chart for manufacture of export product and for manufacture of export product and manufacture of export product and of export product and export product and product and and wastage at different different stages of operation. operation. | | 4, What is the composition of Aluminium of Aluminium Aluminium Alloy, indicating in the the item of import? import? | IThe case stands deferred. stands deferred. deferred. |

i | (Therefore,calledcalled for thepersonal Committeehearing deciddu thepersonal Committeehearing deciddupersonal Committeehearing deciddu Committeehearing decidduhearing deciddu deciddudu e d to seekcurrent fromcountrywide thecurrent fromcountrywide the fromcountrywide thecountrywide the the applicantlockdown the followingsituationinformationtolockdown the followingsituationinformationto the followingsituationinformationto followingsituationinformationtosituationinformationtoinformationtoto expl a ndinin cai]thethe againcase.|case.|| i ("* |for Personal Hearing Personal Hearing Hearing in the forthcoming meeting of the forthcoming meeting of forthcoming meeting of meeting of Norms Committee: Committee: | | | 1. Justification for higher wastage, which is in the range of Justification for higher wastage, which is in the range of for higher wastage, which is in the range of higher wastage, which is in the range of which is in the range of is in the range of in the range of the range of range of of 77-93% on item of import. on item of import. item of import. of import. import. | : | | 2. Reasons for indicating Aluminium Rods Aluminium Rods Rods and profiles profiles in the items the items items of export export while items of import. of import. import. / ; are only only plate and tube. | | 3. Process Process chart for manufacture of export product and for manufacture of export product and manufacture of export product and of export product and export product and product and and wastage at different different stages of operation. operation. : | | 4, What is the composition of Aluminium of Aluminium Aluminium Alloy, indicating in the the item of import? import? | IThe case stands deferred. stands deferred. deferred. | : [Case| jALC2/2018No.:62/14/81~— (PartyINTERNATIONALName: D.V. (MeetALC2/2020No/Date:1/81‘Status:Deferred | 01.04.2020 | |HQ Pile IRLA File Lic.No/Date:05 10403617 Action by : | Hi | |.01/81/050/00780/AM19/estonia + sina|:05/23/040/00183/AM18/ean “oma meanness(08.08.2017tmmmnanmnnrmeaninins LtAN‘ApplicantNN RN tnt MON NE || ‘ 43 Decision: The Committee considered the case as per the agenda and noted that the hard copy of, | | japplication has not yet been received from the applicant and in this regard, an email was sent on. (PP PE | 23.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet.[|] | _ |Hence, the Committee decided to wait for the complete set of application. i SASSO Bt " 2 ofEA ANLUN lt ’ sot eee Seat come eee vont aetna recente: se MMAALIME TO oy 2 mma cman ened “ se pn nunsamen.8 nt st sees second : | (Case No.63/14/81Party Name:RK.STEEL Meet No/Date:1/81- —‘|Status: ! | j/ALC2/2018 MANUFACTURING ‘ALC2/2020 (Deferred | 44 | ‘COMPANY PRIVATE LIMITED (01.04.2020 | | : | (:01/81/050/0078 1/AM19/ |:04/2.4/040/00101/AM18/ (18.08.2017 . ‘Applicant | , - suosuressPIA : 13 | Page 47 Minutes of Meeting No. 01/81 of NC-2 heid on 0839422020 General of Foraign Traxts Directorate General of Fo. ngn Tree's Ministry of Commerce ney Hb ¥

==> picture [2 x 15] intentionally omitted <==

----- Start of picture text -----<br> |<br>----- End of picture text -----<br>

| f|| i !

! | i }

|

| |

f|| | Decision: The Committee considered the case as per the agenda and noted that the hard copy of i | application has not yet been received from the applicant and in this regard, an email was sent on | (23.12.2019 followed by a reminder on 30.03.2020. However, no information has been received yet. i ! ; Heves, the Committee decided to wait for the complete set of application. ‘The | case stands deferred, | | eae No.:244/14/81‘Party Name: BHARAT (Meet No/Date: 1/8 1- Status: | |ALC2/2018 HEAVY ELECTRICALS iALC2/2020 Deferred i | (LIMITED (01.04.2020 | | ; HQ File RLA File Lic.No/Date:0710112108 !Action by : | 45 |:01/8 1/050/00962/AM19/ 07/2 1/040/003 16/AM18/ |07.09.2017 ‘Applicant | | ‘Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking | certain information as raised by DHI was sent to the applicant on 27.01.2020. However, no reply has, been received yet. Therefore, the Committee decided to remind the applicant for furnishing the . requisite information. | ! | |The case stands deferred, | | [ease No.:66/14/81——|Party Name: KIRANUDYOG[Meet No/Date:1/81(Status: | : | |ALC2/2018 | |ALC2/2020 Deferred | | (01.04.2020 | : | HQ File RLA File Lic.No/Date:09 10065531 ‘Action by : | ':01/81/050/00784/AM19/ :09/24/040/0032 1/AM18/ )05.10.2017 Applicant | 146 Decision: The Committee considered the case as per the agenda and noted that the hard copy of | | lapplication has not yet been received from the applicant and in this regard, an email was sent on, | (23.12.2019 followed by a reminder on 31.03.2020. However, the applicant vide email dated | (01.04.2020 informed that they will send all the required documents when complete lockdown liftoff | by the Govt. of India. Hence, the Committee decided to wait for the complete set of application, | The case stands deferred. _ (Case No.:67/14/81-——~—“@Party Name: KIRAN | UDYOG.Meet No/Date:1/81- Status: 1ALC2/2018 /ALC2/2020 Deferred | [HQ File IRLA File ‘Lic.No/Date:0910065532 ‘Action by : | \47 |:01/81/050/00785/AM19/ :09/24/040/00320/AM18/ \05.10.2017 [Applicant ; ‘Decision: The Committee considered the case as per the agenda and noted that the hard copy of | application has not yet been received from the applicant and in this regard, an email was sent on! (23.12.2019 followed by a reminder on 31.03.2020. However, the applicant vide email dated | | iby11.04.2020 the Govt. informed of India. Hence,that they the will Committee send all the requireddecided to waitdocuments for the complete when complete set of application.lockdown liftoff | ‘The case stands deferred. ‘

‘ SHOGHITSUPTA Dy. Director Gerieral of Foreign Trade Directorate Eanaial of Fo. wgn Trade

Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020

| i | i ) | | |

14 | Page 47

| | i | |

| |

| | {Case No.:152/14/81—‘[PartyName: SAPA Meet No/Date:1/81- Status: | | ‘ALC2/2018 EXTRUSION INDIA (ALC2/2020 (Deferred | ff PRIVATE LIMITED 01.04.2020 | | | [HQ File IRLA File ‘Lic.No/Date:0710112266 Action by : 48 Decision: The Committee considered the case as per the agenda and noted that the hard copy of | | |:01/81/050/00870/AM19/ |:07/24/040/00182/AM18/ (12.10.2017 Applicant | application has not yet been received from the applicant and in this regard, an email was sent on) : | }20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet. | pene’ the Committee decided to wait for the complete set of application. | 'The case stands deferred. ; | iCase No.:148/14/81Party Name: DC AUTO ‘Meet No/Date:1/81Status: ALC22018 PARTS PVT.LTD. ALC2/2020 Deferred ! | [HQ File RLA File \Lic.No/Date:0710112309 ‘Action by : | (:01/81/050/00866/AM19/ !:07/24/040/00 1 68/AM18/ 26.10.2017 Applicant | 49i Decision:lapplicationThehas Committeenot yet beenconsideredreceived thefromcasethe asapplicantper the andagendain thisandregard,noted anthatemailthe hardwas copysent onof: | 20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet.[|] i | Hence, the Committee decided to wait for the complete set of application. | | |The case stands deferred. | iCase No.:183/14/81Paty Name: ABB INDIA ‘Meet No/Date:1/81‘Status: | i iALC2/2018 |LIMITED (ALC2/2020 - ‘Deferredi | ‘HQ File IRLA File ‘Lic.No/Date:0710112554 Action by : | Iso j:01/81/050/00901/AM19/ |:07/24/040/0023 1/AM] 8/ (19.12.2017 DHI ‘Decision:The Committee considered thecase as perper aa g enda ‘andnoted that the a p plicant’sp re p ]ly was | ' |sent to DHL on 14.02.2020 for examination of the case. However, no comments have been received| iyet. Therefore, the Committee decided to remind DHI for expediting the comments. | | | bre case stands deferred. : | (Case No.:104/14/81Party Name: COSMOS [Meet No/Date:1/81Status: | | |ALC2/2018 /ENGITECH PVT. LTD. ALC2/2020 Deferred HQ File IRLA File Lic.No/Date:3410043767 |Action by: :01/81/050/00822/AM19/ —::34/24/040/00229/AM18/ (01.01.2018 ‘Applicant IS] (Decision: The Committee considered the case as per agenda and noted the comments given by, | ‘Consultant (TEC-3). After due deliberation, the Committee decided to seek from the applicant the[|] | {following information: | | | (i) Details of Export Product | | | i (il) Quantity, in numbers and weight, of each Export Product ee| {The case stands ds deferreddeferred. || 15 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020 on VEuPTA | Dy. Director General of Foreign Trece Directorate Gerieial of Fe..gn Wess Ministry of Comments Aincuecy | |

| |

|

| | | { | { |

i : i | [Case No.:195/14/81‘Party Name: FCI OEN Meet No/Date:1/81‘Status: | | |ALC2/2018 (CONNECTORS LIMITED — |ALC2/2020 Deferred | | || |(HQ File IRLA File 01.04.2020(Lic.No/Date:0710112641 |Action| by : || | |:01/81/050/00913/AM19/ ——|:07/2.4/040/00257/AM18/ (04.01.2018 Applicant | p2 Decision: The Committee considered the case as per the agenda and noted that the hard copy of | ; | ‘application has not yet been received from the applicant and in this regard, an email was sent on, 20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet. | IThe caseHence, the stands Committeedeferre d .ecided to wait for the complete set of application. | | || [Casej|ALC2/2018No.:216/14/81- ——|PartyName:INDUSTRIESAPAR—S*SLIMITED |ALC2/2020Meet No/Date:1/81Status:Deferred | | HQ File [RL File ~ [Lic.No/Date:34 10043787 |Action by : | | 1:01/81/050/00934/AM19/ 1:34/24/040/00270/AM18/ 108.01.2018 ‘Applicant . P 3 ‘Decision: The Committee considered the case as per the agenda and noted that the hard copy of | ‘application has not yet been received from the applicant and in this regard, an email was sent on) 23.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet.| | ‘Hence, the Committee decided to wait for the complete set of application. the case stands deferred. | | {Case No.:74/14/81Party Name: SAKAR ‘Meet No/Date: 1/81erase | | ALc2n018 INDUSTRIES PVT. ‘ALC2/2020 Deferred | ‘LIMITED (01.04.2020 | | |:01/81/050/00792/AM 19/ |:08/24/040/0023 1/AM18/ ,12.01.2018 ‘Applicant | (HQ File LA File Lic.No/Date:08 10141768 Action by : | 4 (Decision: The Committee considered the case as per the agenda and noted that the hard copy of | | japplication has not yet been received from the applicant and in this regard, an email was sent on} | [23.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet. | Hence, the Committee decided to wait for the complete set of application. | ‘The case stands deferred. || [Case[No.:373/14/81-][Party] Name: ACCIONA Meet No/Date:_ Status: | j{ALC2/2018 ‘WINDPOWER INDIA \1/81-ALC2/2020 ‘Deferred | | | PRIVATE LIMITED 01.04.2020 | | 155 HQ[1:01/81/050/01091/AM19/] File RLA':07/24/040/00300/AM File 1— 8/ (09.02.2018No/Date:0710112807 |Action‘Applicant by || Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking | | certain|However,informationno reply hasas beenraisedreceivedby Consultantyet. Therefore,(TEC-1)the wasCommitteesent todecidedthe applicantto remindon the12.03.2020...appligawty [for furnishing the requisite information. = f | |The case stands deferred. SHOBHIT GUPTA4 rede ni penne antenna tt i ennanone ye BHR OHOF General ai Eoregn ieee Directorate Ganeial of Pugh Waco 16 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04°3620 eS

! | ~~ 4

! |

| | | | |

| | (Case No.:364/14/81[Party Name: GAVIRANGA [Meet No/Date:i/81-—|Status: | | jALC2/20 18 ENTERPRISES ALC2/2020 Deferred | | | (01.04.2020 | | HQ File RLA File 'Lic.No/Date:07101 12827 |Action by : | 01/8 1/050/01082/AM19/ :07/24/040/003 18/AM18/ 14.02.2018 ‘Applicant | | Po ‘Decision: The Committee considered the case as per the agenda and noted that the hard copy of | i | application has not yet been received from the applicant and in this regard, an email was sent on r (20:12.2019 followed by ateminder on 31.03.2020. However, no information has been received yet- ~~ | || te‘Hence, case the stands Committee deferred. decided to wait for the complete set of application. | | |ALC2/2018 ENTERPRISES ALC2/2020 Deferred | ‘0 1/81/050/01083/AM19/ 1:07/24/040/003 19/AM18/ (14.02.2018 ‘Applicant | | |HQ File IRLA File _ ‘Lic.No/Date:0710112828 Action by | I 7 Decision: The Committee considered the case as per the agenda and noted that the hard copy of| application has not yet been received from the applicant and in this regard, an email was sent on | 20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet.| \ Hence, the Committee decided to wait for the complete set of application. | i | Ihe case stands deferred. | [Case No.:366/14/81—~—«Party Name:GAYATHRIMeet No/Date:1/81Status: | |ALC2/2018 BartERIES PVT. LTD. ALC2/2020 Deferred | | | | 01.04.2020 | | HQ File IRLA File iLic.No/Date:0710112878 Action by : | |:0.1/81/050/01084/AM19/ |:07/2.4/040/003 11/AM18/ 26.02.2018 Applicant 58 Decision: The Committee considered the case as per the agenda and noted that the hard copy of | [application has not yet been received from the applicant and in this regard, an email was sent on: | {20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet.| | | ee the Committee decided to wait for the complete set of application. . | |The case stands deferred. ! | [Case No.:73/5/81-ALC2/2018 |Party Name: ILM WIND Meet No/Date:i/81‘Status: i | POWER BLADES [INDIA] ALC2/2020 Deferred I | IPVT. LTD. (01.04.2020 | | | HQ File RLA File 'Lic.No/Date:3410043923 |Action by : | 59 1:0.1/81/050/0028 1/AM19/ :34/24/040/00350/AM 1 8/ (27.02.2018 ‘Applicant | | Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking[|] | certain information as raised by Consultant (TEC-1) was sent to the applicant on 12.03.2020. : | lLlowever, the applicant vide email dated 06.04.2020 requested more time to reply due to the Corona| i ines outbreak. ‘Therefore, the Committee decided to wait for the applicant’s reply. | 'The case stands deferred. Woe temh LO ewe wae GREE age camse ger + sammanem@ympenmnenwan 20 ssn suet P nueNNiNe NNN Alt AmM Fe eIDDEERE ULAR ttt fat GARR pena w eerm— 7 eatin 2 17 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2024 Gonerat of Foreign Trade Ministry of Commerce & inchs ¥ Udyog Bhawsan, Now Dcun

i

| . ! | |

( | i

i

|

| |

|

i . | || | |Case No.:367/14/81‘Party Name: ACCIONA Meet No/Date: 1/8 1- Status: : | |ALC2/2018 |WINDPOWER INDIA |ALC2/2020 Deferred | |HQ File PI R LAIVATE File LIMITED |Lic.No/Date:0710112930(01.04.2020 ‘Action by : || po | {:01/81/050/01085/AM19/ — |:07/24/040/00337/AM18/ ~ (06.03-2018° Applicant 160 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking | | | ‘certain information as raised by Consultant (TEC-1) was sent to the applicant on 12.03.2020. | | {However, no reply has been received yet. Therefore, the Committee decided to remind the applicant | : | ‘for furnishing the requisite information. | | ithe case stands deferred. | | \CaseNo:369/14/81- —(PartyName: SAPA———(Mect No/Date:i/81- Status: | : bY| ALC2/2018 PRIVATEEXTRUSION LIMITED INDJA 01.04.2020\ALC2/2020 ‘Deferred | HO File IRLA File ‘Lic.No/Date:07101 12996 ‘Action by : | | |:01/81/050/01087/AM19/ (:07/24/040/003 16/AM18/ 21.03.2018 Applicant | \61 Decision: The Committee considered the case as per the agenda and noted that the hard copy of | | | lapplication has not yet been received from the applicant and in this regard, an email was sent on) | [20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet. i |Hence, the Committee decided to wait for the complete set of application. | The case stands deferred. | | | [Case No.:370/14/81-—(PartyName:SAPA—S (Meet No/Date:1/81(Status: | |ALC2/2018 EXTRUSION INDIA |ALC2/2020 Deferred | | PRIVATE LIMITED (01.04.2020 | [HQ File IRLA File ‘Lic.No/Date:07 10112999 [Action by : | ; {:01/81/050/01088/AM19/ |-07/24/040/003 15/AM18/ 21.03.2018 Applicant (62. (Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on, 20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet.| | Hones the Committee decided to wait for the complete set of application. | |The case stands deferred. | | (Case Nos371/14/81Party Name: ADHESIVE “(Meet No/Date:1/81Status: | ALC2/2018 ISPECIALITIES ALC2/2020 Deferred 1 | (01.04.2020 | | | HQFile = ~———SRLAFile =—————S~S~SCSCSCSLte No/Date:0710113008 |Acction by = 63 ':01/81/050/01089/AM 19/ |:07/24/040/00351/AM18/ (22.03.2018 ‘Applicant | Decision: The Committee considered the case as per the agenda and noted that the hard copy of | application has not yet been received from the applicant and in this regard, an email was sent on 20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received se | 'The[Hence, thecase stands Committeedeferre d .ecided to wait for the complete set of application. aoeeets Be1 mec5 1 ghRoreiga Tees1. | 18 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020 eyed BEE | j

| | | ' i

i i | ‘ i L |

| | 4 | |

| i | Case No.:121/14/81Party Name: APAR ‘Meet No/Date:1/81‘Status: | ALC2/2018 INDUSTRIES LIMITED ALC2/2020 ‘Deferred | , i | | (01.04.2020 i HQ File RL File Lic.No/Date:3410044075 |Action by: (:01/81/050/00839/AM19/ :34/24/040/00017/AM19/ 24.04.2018 |Applicant i (64 Decision: The Committee considered the case as per the agenda and noted that the hard copy of jo 1 123-12:2019application followedhas not yet“by beena reminderreceivedon from31.03.2020.the applicantHowever,andnoin inforniationthis regard, hasan emailbeen receivedwas sent yeton. | | Ihe\Hence, case stands the Committee deferre d .ecided to wait for the complete set of application. | | iCase No.:103/14/81‘Party Name: LM WIND Meet No/Date:1/81Status: | | |ALC2/2018 POWER BLADES INDIA (ALC2/2020 ‘Deferred | | ':01/8{HQ File 1/050/0082 1/AM19/ |:34/24/040/00065/AM19/RLA File (23.05.2018‘Lic.No/Date:3410044165 |ActionApplicant by : | i65 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking | {certain information as raised by Consultant (TEC-1) was sent to the applicant on 27.01.2020, | |However, the applicant vide email dated 06.04.2020 requested more time to reply due to the Corona | virus outbreak. Therefore, the Committee decided to wait for the applicant’s reply. The case stands deferred. |

: | 'Case(ALC2/2018No.:92/14/81[Party(LIMITED Name: ABB INDIA MeetALC2/2020 No/Date:1/81-. Status:Deferred : | IHQ File RLA File Lic.No/Date:0710113375 |Action by : | 66 :01/81/050/008 10/AM19/ :07/24/040/00050/AM19/ 01.06.2018 IDHI | |Decision: The Committee considered the case as per agenda and noted that a copy of application was | | | seat to DHI on 28.01.2020 for examination of the case. However, no comments have been received | yet. Therefore, the Committee decided to remind DHI for expediting the comments. | | The case stands deferred. [ Case No.:108/14/81Party Name: LM WIND ‘Meet No/Date: l/81‘Status: ! ALC2/2018 POWER BLADES INDIA ‘ALC2/2020 Deferred | HQ File HLA File Lic.No/Date:34 10044263 ‘Action by : | | 1:01/81/050/00826/AM1 9/ 1:34/24/040/00075/AM19/ 19.06.2018 ‘Applicant 67 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking. | jcertain information as raised by Consultant (TEC-1) was sent to the applicant on 27.01.2020. | |However, the applicant vide email dated 06.04.2020 requested more time to reply due to the Corona| | ins outbreak. Therefore, the Committee decided to wait for the applicant’s reply. | |The case stands deferred. 19 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020 SHOBHITreGUPTA Dy, Director General of Foreign Trade Directorate General of Fo ugh Trade Ministry of Commerce & mousy Udyog Bhawan, Nav Loon

| !1 i |

| i | (Case No.:161/14/81Party Name: TUBACEX [Meet No/Date:1/81Status: ~ | | LIMITED i01.04.2020 | | |ALC2/2018 PRAKASH INDIA PRIVATE |ALC2/2020 [Deferred | |i | Ho01/8 File17050/00879/AM197 ~~ 103/95/040/00260/AM19/IRLA File _____[bic.No/Date:031082178320.06.2018 ‘Applicant|Action by:||| | (68 Decision: The Committee considered the case as per the agenda and noted that the hard copy of | application has not yet been received from the applicant and in this regard, an email was sent on) : || ‘Hence,[23.12.2019 the Committeefollowed by decid a r e dminder on to wait for the 30.03.2020. complete How s t e ver, of applicati n. no inf o rmation has been received yet. | | |The case stands deferred, | | (Case No.:71/8/81-ALC2/2018 {Party Name: LM WIND ‘Meet No/Date:1/8iStatus: | | POWER BLADES INDIA ‘ALC2/2020 [Deferred ‘ i | PVT. LTD. 01.04.2020 1 HQwitee x seen 2 + mace UE ee Amama tena A Boeanne ‘veterans eects ORMEanesBen nest “ooneremnmmeratati shed Pam haan te «fi pen semen tis ~| { | File IRLA File ‘Lic. No/Date:34 10044297 Action by : | [69 |:01/81/050/00453/AM19/ 134/24/040/001 17/AM19/ '02.07.2018 iApplicant | Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking. | |However,icertain informthe a pplicanttion as videraisedemailby datedConsultant06.04.2020(TEC-1)requestedwas sent moretotimethe toapplicantreply dueonto27.01.2020.the Corona | : ‘virus outbreak. Therefore, the Committee decided to wait for the applicant’s reply. | | cnet aeTheheme caseNe standsmt ttStedeferred. sammnsiarins4A esate uta Peamammats | — Samaanet SM MARUTNEit tmtat th tt tA AAe NNN tenannies Sct t Amini ttt: At aronenn, “ht, anna 7 | [Case No.:120/14/81«PartyName: ACCIONA ‘Meet No/Date: I81(Status: | | |ALC2/2018 WINDPOWER INDIA ALC2/2020 Deferred | HQ File IRLA File [Lic.No/Date:0710113621 ‘Action by: : . 70 |:01/81/050/00838/AM1 9/ |:07/24/040/00099/AM19/ \23.07.2018 ‘Applicant | Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking |bjcertain information as raised by Consultant (TEC-1) was sent to the applicant on 27.01.2020 followed| | y a remii n derder oo n 12.03.2020.12.03. - HHowever, No replyly hashas bbeen recei v ed ed yet. TT h erefore,erefore, theth Committee|| | |decided to remind again the applicant for furnishing the requisite information. : | iT ds deferred , |The case stands deferred. | | Case No.:128/14/81‘Party Name: KIRAN UDYOG Meet No/Date:1/8 1- Status: : : ALC2/2018 ALC2/2020 Deferred | HQ File RLA File Lic.No/Date:09 10066574 |Action by : | 7 |:01/81/050/00846/AM19/ ':09/24/040/00234/AM19/ 17.08.2018 ‘Applicant | Decision: The Committee considered the case as per the agenda and noted that the hard copy of ' \application has not yet been received from the applicant and in this regard, an email was sent on. : |(23.12.2019 followed by a reminder on 31.03.2020. However, the applicant vide emai! dated’ ! ; P | (01.04.2020 informed that they will send all the required documents when countrywide lockdown. ' liftoff by the Govt. of India. Hence, the Committee decided to wait for the complete set of application, |The case stands deferred. - | 20 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.202@Kevlon". See sey iy nacbasty :

==> picture [596 x 696] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|:|~|Gige NeS/IAIC Paty|NamesBUT|MeatNotas San|||
|i|ALC2/2018|POLYMERS PVT. LTD.|ALC2/2020||Deferred|||
|||||[HQ File|RLA File|Lic.No/Date:3710002714 ‘Action by|||
|t|'|:01/81/050/00963/AM19/|:37/24/040/00001/AM|19/|12.10.2018|DPT|||
|17 Decision: The Committee|considered the case as per agenda and noted that a copy of application was|
|:|sent|to|DPJIT|for|examination|of|the|case|on|26.12.2019|followed|by|a|reminder|on|03.04.2020.||||
|[However,]|DPT|vide|email|dated|06.04.2020|requested|to|defer|the case. Therefore,|the|Committee’|et|
|||[mem]|||
|t|||(fecided to wait for the comments.|||||
|||||The case stands deferred.|J|||
|||/[Case|ALC2/2018 No.:177/14/81-|"PartyINFRATECHName:|LIMITEDGOLDSTONE|MeetALC2/2020 No/Date:1/81-|DeferredStatus:|[|
||||||1:01/8(AQ File 1/050/00895/AM19/|(:09/24/040/003RLAFile|15/AM19/|25.10.2018Lic.No/Date:0910066766|‘ApplicantAction by +||i|
|||||Decision:|The Committee|considered|the|case|as per agenda.|Consultant (TEC-1) informed|that the|
|||japplicant’s|reply|letter|dated|17.02.2020is|deficient|as|annexure-1|is|not|enclosed|wherein|it|was)|
|'|‘supposed|to|give|weight|of|rubber|part|for|each|of|export|separately.|Therefore,|the|Committee:|
|||"3 decided to seek again from the applicant to furnish following information as per advice of|Consultant|||.|||
|||||1.|To provide net weight of rubber part (silicon rubber compound)|in each export product|
|1|||separately.|||
|:|||2.|To|clarify, why in the material|balance|statement weight of import item|at|SI. No. 4|is not|
|||||included|between|import and|export.|
|i|i|3.|To provide clarification for, why|it is stated that import item at SI. No.|5 to 7 is on net to net|||
|I"|||basis, however as per application|in agenda papers quantity claimed|is on 5|%|basis.|||
|||'The|case|stands|deferred.|i|
|||ese|MONOD INL NNNCOUNANA|TENNON NNN|ONES|NN EE UNE OE|ihe|MURS|COE|eee|A|Innes|SA MoMA|A|wee na|caatin|snes maalnanmnnaenetn|Renate|+ mumminn:n#2 *memlalln AM|etl Ail|e|en|+|senna|ee|05|eh|ncn|tetadteonenaiNAhttths|9m|dnethentor|
|||Case No.:179/14/81-|Party Name: GAVIRANGA —||Meet No/Date:1/81-|Status:|||
|'|\ALC2/2018|ENTERPRISES|ALC2/2020|Deferred|||
|||1HQ File|LA File|Lic.No/Date:07101 14087 Action by :|||
|1101/8 1/050/00897/AM19/||:07/24/040/00190/AM19/|‘01.11.2018||Applicant|||||
|\"4 Decision:|The|Committee|considered|the|case|as|per|the|agenda|and|noted|that|the|hard|copy|of|
|||‘application|has|not|yet|been|received|from|the|applicant|and|in|this|regard,|an|email|was|sent|on.|||
|||‘Hence,20.12.2019the|Committeefollowed bydecided a reminder onto|wait|for 31.03.2020. the|complete However, noset of application. information has|been received yet.|||
|1|q|i|
||||||The|case|stands|deferred.|||
|||||[Case|No.:96/8/81-ALC2/2018 |Party Name:LMWIND|‘Meet|No/Date:1/81- ‘Status:|
|Lye|||POWER BLADES|INDIA|—-ALC2/2020|Deferred|
|>)|PVT.|LTD.|01.04.2020|!|||
|||(HQ File|IRLA File|; “eee|a|||
|21|||Page A7|Minutes of Meeting|No. 01/81|of NC-2|held on 08.04.202Q0BRF|GUPTA|‘o|

----- End of picture text -----<br>

|

| | | | ,

| |

|

| | [:01/81/050/00478/AM19/ _|:34/24/040/00249/AM19/ (09.11.2018 =—————=SApplicant | | iseekingDecision:& certain The Committeeinformationconsideredas raised bytheConsultcase a sntper(TEC-1)agendawasandsentnotedto thethatapplicantPF the deficiencyon 28.12.2018,letters | followed by reminders on 01.06.2019, 14.08.2019 & 10.12.2019. However, the applicant vide email| eee ldated06.04.2020 requested for more to reply due to the Corona virus outbreak. Therefore, the | | i eon decided to wait forthe applicant’sreply, i |The case stands deferred. | | (Case No.:200/14/81[Party Name:[MAHADEVA][Meet][No/Date:1/81-][Status:][ |] i | (ALC2/2018 MULTI TECH ALC2/2020 ‘Deferred | | {HQ File RLA File - Lic.No/Date:0710114258 \Action by : | i “01/8i 1/050/00918/AM19/ :07/24/040/002 | 1 8/AM19/ (12.12.2018 ‘Applicant | 76 Decision: The Committee considered the case as per the agenda and noted that the hard copy of, : pplication 120,12.2019 followedhas not yetby beena remindrec e ivedr on from31.03.2020.the applicantHowever,and noin informationthis regard, hasan emailbeen receivedwas sentyet.on! i Hence, the Committee decided to wait for the complete set of application. | Pp | | |The case stands deferred. :| |» |Case'ALC2/2018 No.:297/14/81SPECIALarty Name; VALVE BOMAFA ‘AIC2/2020[Meet No/Date:1/8 1- DeferredStatus: || | ‘SOLUTIONS PVT. LTD. (01.04.2020 | | | | |HQ File RLA File Lic.No/Date:0810144141 ‘Action by: | 7 :01/81/050/01015/AM19/ :08/24/040/00258/AM19/ 20.12.2018 ‘DPT / | | Decision: The Committee considered the case as per agenda and noted that a copy of application was[|] : | sent to DPT on 23.01.2020 for examination of the case. However, DPIIT vide email dated! | {06.04.2020 advised to defer the case. Therefore, the Committee decided to wait for the comments. { i i IThe case stands deferred. |([Case| No#215/14/81Party. Name: WAAREE [Meet| No/Date:1/81‘Status:i | | (ALC2/2018 ENERGIES LTD. ‘ALC2/2020 ‘Deferred i | 01.04.2020 | | | [HQ File ‘RLA File ‘Lic.No/Date:52 10042877 [action by: / — {:01/81/050/00933/AM19/ |:52/24/040/00070/AM19/ 20.12.2018 ‘Consultant (TEC-3) | 78 (Decision: The Committee considered the case as per agenda and noted that the applicant’s reply was | | forwarded to Consultant (TEC-3) for examination of the case. However, Consultant (TEC-3) vide[|] jemail dated 05.04.2020 informed that the case is under examination. Therefore, the Committee[|] | Idecided to wait for the comments. | bshe case stands deferred. | . SHOOMPGONTS Dircatorcte Conaal of Fo vgn Wace Ministy of Gommcics oy incuesy 22 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020

. | | | | '

|||||||||<br>|CaseNo.:224/14/81-<br>PartyName: JINDAL<br>‘MeetNo/Date:1/81-<br>Status;||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|||<br>|||||||ALC2/2018<br>ALUMINIUMLTD<br>ALC2/2020<br>Deferred<br>|<br>(01.04.2020<br>|<br>|||||||
|||<br>;<br>|||||||| HQFile<br>JRLAFile<br>Lic.No/Date:0710114342 Actionby :<br>79':01/81/050/00942/AM19/<br>j:07/2.4/040/00211/AM19/<br>31.12.2018<br>PC-IV<br>‘Decision:<br>TheCommittee considered the case as peragenda and noted thatthe casewas examined on:|||||.|
||;<br>i<br>|<br>i<br>i|-_=-|«=|=|-|.|file and has been referred to PC-IV for their comments before taking the case to PIC. However, no<br>icomments have been received from PC-IV. Therefore, theCommittee directed to remind PC-IV.<br>ae<br>--<br>--<br>-<br>=<br>—_—<br>we ee<br>-<br>aeee<br>.<br>-<br>—-.-<br>.<br>se<br>---<br>-<br>- eee ee ee<br>- ==. - 7“<br>| Fhecasestandsdeferred.<br>|<br>nn<br>Le<br>ne|-|= = =|||!<br>:<br>||
|||||||||<br>iCaseNo.:225/14/81-<br>PartyName:TRASCCON<br>‘Meet No/Date:1/81-<br>Status:<br>\ALC2/2018<br>INTERCONNECTION<br>ALC2/2020<br>Deferred|||||||
|||<br>|<br>\|||||||<br>[HQFile<br>IRLAFile<br>‘Lic.No/Date:0710114349 |Actionby<br>:<br>|<br>|<br>:01/81/050/00943/AM19/ ':07/24/040/00209/AM<br>19/<br>|01.01.2019<br>Applicant<br>j80‘Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>|<br>(application has not yet been received from the applicant and in this regard, an email was sent on'<br>|<br>20.12.2019 followed byareminder on 31.03.2020. However, no information has beenreceived yet.<br>| Here,theCommitteedecidedtowaitforthecompletesetofapplication.||||||<br>|<br>[<br>[<br>||
|||||||||\Thecase stands deferred,||||||
|i<br>|<br>:<br>||||||||' (Case No.:247/14/81-~ 'Party Name: ARFININDIAMeet No/Date:1/81-<br>Status:<br>|<br>|ALC2/2018<br>‘LIMITED<br>‘ALC2/2020<br>Approved<br>|<br>|<br>|<br>[01.04.2020<br>|<br>|<br>|<br>{HQFile<br>IRLAFile<br>/<br>‘Lic.No/Date:0810144302<br>|<br>j:01/81/050/00965/AM19/<br>—_|:08/24/040/00341/AM19/<br>17.01.2019<br>|<br>|Decision: The Committee considered the case asper<br>theagenda andnoted thatthe hard copyof<br>|<br>applicationhasnotyetbeenreceivedfromtheapplicantdespiteemailsenton23.12.2019followedby<br>;<br>|a reminder on 31.03.2020. However, the matter was deliberated in the meeting and the Committee’<br>'<br>decidedtofixthead-hocnorms asrecommended byConsultant(SKB) asunder:|||||<br>|||
|||||||||rr<br>s<br>B<br>a,<br>ys<br>Sl.<br>"HS<br>port<br>|Recommended|||||||
|.<br>:<br>|||||||||CalciumCilicideCordWire,<br>Ferro<br>1.03Kes/Kg<br>|<br>TheNetWeightofFerro<br>1<br>72029990|Calcium|contentinthe<br>|<br>i<br>| 72029990<br>Calcium SiliconAndCRCA<br>160.000<br>Silicon | exportproduct<br>|<br>|<br>CoilsShouldNotBeLess<br>MT<br>rses<br>Asapplied |<br>|<br>Than 100Mt&60Mt<br>2<br>72091890 CRCA|||||||
||<br>|||<br>|||<br>|||<br>|||<br>|||<br>|||<br>|||i<br>|<br>|IRAconcernedmaytakesuitableconsequential action accordingly.|||||||
|||||||||[CaseNo.:258/14/81-——[PartyName:<br>BHUJ.=<br>[MeetNo/Date:1/81-Status:<br>ALer2018<br>iPOLYMERS PVT.LTD.<br>ALC2/2020<br>‘Deferred||||||
||||||||HQFile<br>IRLAFile<br>‘Lic.No/Date:3710002724|Actionby+.<br>23 | Page47<br>MinutesofMeetingNo.01/81ofNC-2heldon08.04.2020 44S||||<br>:|||
||||||||Oy. DireciorGeneral ofForsignTree|Tree||||||
|||||||||||i|||

:

| | | | | f | | : : | ; |

| | |:01/81/050/00976/AM 19/ :37/24/040/00004/AM19/ (28.01.2019 DPIT | | Decision: The Committee considered the case as per agenda and noted that a copy of application was| || i {sent to DPUT for examination of the case on 26.12.2019 followed by a reminderPp onpp 03.04.2020,|| _ |However, DPIIT vide email dated 06.04.2020 advised to defer the case. Therefore, the Committee | | decided to wait for the comments. | |The case stands deferred. : [ (Case No.:275/14/81[Party Name: SCHWEITZER [Meet No/Date:1/81Status: i | ALC2/2018 ENGINEERING ‘ALC2/2020 Deferred | |HQ File RLA File [Lic.No/Date:0510409583 Action by : | ; | ':01/81/050/00993/AM19/ }:05/24/040/00625/AM19/ (05.02.2019 ‘Applicant | icettain information from the applicant vide letter. No.: 17(34)/2019-IPHW dated 05.12.2019. | 83 Decision: The Committee considered the case as per agenda and noted that MeitY has sought the’ 4 | However, MeitY vide email dated 03.04.2020 informed that the applicant’s reply is still awaited. | lasked(Therefore,by MeitY.the Committee decided to remind the applicant for furnishing the requisite information as.| ! | Lhe case stands deferred. | | , ICase(47/2/81-ALC2/2019No: ~ PartyISHRIRAM Name: MANUFACTURINGLEITWIND a ALC2/2020‘Meet No/Date: [/81Rejected‘Status: | | | | PRIVATE LIMITED 01.04.2020 | | | | jHQ File RLA File Lic.No/Date:0410165234 | | | | |:01/81/050/01133/AM19/ ':04/24/040/00254/AM19/ 20.02.2019 | ||, (e [Decsion:certain informationThe Committeeas raised consideredby DHIthewas casesent asto perthe agendaapplicant and notedon 19.09.2019 that a deficiencyfollowedlettersby reminders seeking|[|] / jon 04.11.2019 & 10.12.2019. However, no reply has been received yet. Therefore, the Committee: ! | . | ested‘RA concern to r e ject thed may take casesuitable under intimationconsequential to RA,action Chennai.accordingly. | _ [CaseNo: = ———~—S~S~SC«Warty Name:VESTASWIND [Mec No/Datte:1/81- Status: | | }49/2/81-ALC2/2019 TECHNOLOGY INDIA /ALC2/2020 ‘Deferred | | PRIVATE LIMITED ‘01.04.2020 | | [HQ File IRLA File ‘Lic. No/Date:04 10165242. Action by = | i }:01/81/050/01135/AM19/ ':04/24/040/00259/AM19/ 22.02.2019 ‘Applicant | i85 ‘Decision: The Committee considered the case as per agenda and noted that a deficiency letters. | ‘seeking certain information as raised by Consultant (TEC-1) was sent to the applicant on 12.03.2020. | However, no reply has been received yet. Therefore, the Committee decided to remind the applicant, | Pp PP | for furnishing the requisite information. | | | |The case stands deferred. Cod 24 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020

| | | | | i | | i |

| | | | : i

| | {Case No.: ‘Party Name: LEITWIND ‘MeetNo/Date:1/81Status: PRIVATE LIMITED 01.04.2020 | | 2.1/2/81-ALC2/2019 SHRIRAM MANUFACTURING ALC2/2020 Rejected | HQ File RLA File Lic.No/Date:04 10165252 | [86 Decision: The Committee considered the case as per agenda and noted that a deficiency letters - | | 01/8 1/050/01 107/AM19/ ':04/24/040/00253/AM19/ 26.02.2019 | [ | iseeking certain information as raised by DHI was sent to the applicant on 19.09.2019 followed by | | reminders on 04.11.2019 & 10.12.2019. However, no reply has been received yet. Therefore, the| io ' ICommitteé decided fo rejectthe case under ifitimationto RA, Chenfaiy | | |RA concerned may take suitable consequential action accordingly. I eee tsSONIARON Eh AMOI DORR ht Ash HONIOIhtt NG YR EON CBUON NB 8 RUA Alan tO Rin ttt mantener S58 ANCEMAEEY LONMPY * + Ace eQaprw nn mney nr namnneetn cutie tmunnnannnceldulimunnmalin? 0" eee see MacRaeRam oMalII © toe ot me ceiNA Asam Amet ost | | |CaseNo.:24/5/81-ALC2/2019 [Party Name: VESTAS WIND MeetNo/Date:1/81- (Status: i | | TECHNOLOGY INDIA ALC2/2020 (Deferred | li PRIVATE LIMITED 01.04.2020 | | : | (:01/81/050/00073/AM20/HQ File 1:04/24/040/00283/AM19/RLA File 21.03.2019'Lic.No/Date:0410165342 ‘Applicant|Action by : | [87 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking, : || iHowever,jcertain informationno reply hasas beenraisedreceivedby Consultantyet. Therefore,(TEC-1)the wasCommitteesent todecidedthe applicantto remindon the12.03.2020.applicant,| | for furnishing the requisite information. i ; |The case stands deferred. : fj| [Case No.:90/2/81-ALC2/2019 ALUMINIUMParty Name: JINDAL, LTD ‘MeetALC2/2020 No/Date:1/81- Status:Deferred | i 01.04.2020 | : |88 ':01/81/050/01176/AM19/[HQ File IRLA|.07/24/040/00269/AM19/ File [22.03.2019Lic.No/Date:0710114696 PC-IV|Action by : | Decision: The Committee considered the case as per agenda and noted that the case was examined on} | {file and has been referred to PC-IV for their comments before taking the case to PIC. However, no[|] , | jcomments have been received from PC-IV. Therefore, the Committee directed to remind PC-IV. | | Ithe case stands deferred. ! ! | |CaseNo: ~~~ PartyName: MEHTA TUBES [Meet No/Date:1/81(Status: | | §/3/81-ALC2/2019 LIMITED 'ALC2/2020 [Approved | , | (01.04.2020 | | | [HQ File RLA File \Lic. No/Date:03 10828425 | | i :01/81/050/00025/AM20 :03/95/040/01269/AM19/ 18.04.2019 7:| 8ha DecisionapplicationRARE RE NEHER,Shek RedpathThehas Committnottt yet bA ee nconsideredreceivedRN NNNfromthe TE theSEEcaseE +applicantasNTper thedespiteagendemFao a orsilandsentA saynnsaannnannnnsannnnpunnnnnlinninsthlim notedon 23.12.2019that the NI harderinfollowedeen copy ofby; : | la reminder on 30.03.2020. However, the matter was deliberated in the meeting and the Committee: | decided to fix the ad-hoc norms as recommended by Consultant (SKB) as under: y Recommended | [ 1rcHs ; | at Sl.[|][ ITCHS][ |] Andmsmmauiaisonaneannmin| Eeiiikidihe vane tah ftw Export Tremie te we) wan WRENNLS arn ARMARALENRRANNNENRRNLALAR| Quantityik fun aA te nh sn QUE Codeerentmt| importme inne Sen Them= HN a Atfamammmannanancmre| 5 ileQuantityoonwe He Aner AR 25 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on os.oa2agnost GUPTA Dy. Director Ger fe ay Tye

:

| |

| | | |

| | | | | | j

: | | Copper Billets 1.05 Kes/Kg | || (Net Content of 1 | 74040012 CopperOpper Scrapscrap All content in“the the | | 74031300 | CoPPer 198600 | 200000.000 Grades export product )| | Kes Net Wt Kg irseas Nettonet | i Tellurium 1470 2 | 280450 Alloying Element ‘(RA concerned may take suitable consequential action accordingly. | ISTAMPINGS INDIA PVT. /ALC2/2020 ‘Deferred 4 } { ! i (HQ LTD, (01.04.2020 | | | 1:01/81/050/00032/AM20/ File -IRLA1:3 1/83/040/00007/AM20/ File ‘Lic.24.04.2019 No/Date:3 110067393 ‘Action‘Applicant by : || i| 0 [Decision:«Mm RN NFThe I RNRCommitteeeA eNO tS tnd AMARconsideredot Ft I RAGA ans amantheTracecaseCte aseS NRper EYALthe agendaa etandot AannotedNE NAthatMANAtheSen, NONhard has,copy sanofn| | iapplication has not yet been received from the applicant and in this regard, an email was sent on, | 23.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet. i | Hence, the Committee decided to wait for the complete set of application. Lhe[case][stands][deferred.] | tet nethet ne AA0H. AAA AAUUE IA Na Pm te NNN AANA UNIO NS HEhttUY tnt IN Hanes anmemati eects 6 sake aN A A NUNNNAN teed A AAAI = ates.” tinttnnceeeeie,sep ACOARAHN nee % skh lle ante n a SMM TS ae care eceeten Aen wt em | 143/81-AL.C22019 TECHNOLOGIES PRIVATE ‘ALC2/2020 Deferred | 1 | (LIMITED (01.04.2020 | | |HQ File IRLA File \Lic.No/Date:04 10165518 | ! . | |-01/81/0S0/00034/AM20/ ':04/24/040/00012/AM20/ 26.04.2019 | | ie Decision: The Committee considered the case as per the agenda and noted that the hard copy of : ‘application has not yet been received from the applicant and in this regard, an email was sent on | | 23.12.2019 followed by a reminder on 30.03.2020. However, no information has been received yet. | (Hence, the Committee decided to wait for the complete set of application. | | (The case stands deferred. | | | [Case | No.:21/3/81-ALC2/2019 [Party Name: VESTAS WIND(Meet No/Date:1/81- Status: ‘PRIVATE LIMITED (01.04.2020 | i)TECHNOLOGY INDIA ALC2/2020 Deferred | HQ File IRLA File ‘Lie.No/Date:0410165523 Action by : | P /:01/8 1/050/00041/AM20/ |:04/24/040/00017/AM20/ (30.04.2019 ‘Applicant 2 Decision: The Committee considered the case as per agenda and noted that a deficiency letter secking | | icertain information as raised by Consultant (TEC-1) was sent to the applicant on 12.03.2020. , i |[However, no reply has been received yet. Therefore, the Committee decided to remind the applicantPp | (for furnishing the requisite information. | , SHOBHIFGEPTIA Dy. Diroctor General ef Forsign race 26 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020

==> picture [595 x 708] intentionally omitted <==

----- Start of picture text -----<br> | |Case No.: Party Name: JINDAL Meet No/Date: Status: Deferred |<br>| | |9/5/81-A1.C2/2019 SAW LIMITED 1/81-ALC2/2020 | |<br>:i || [HQnara Filesuena, wre rmements |IRLAwT Stet =NAR FileNA ren nr ena,‘Lic.No/Date:0510410481(01.04.2020enema NA+ 6 mS “ers Se pmenmenptenmenaarnrteimescnmtiacmmmandime Sb |[ActionGA by SAP He etnanennnaas by:san Adam enamine we |||<br>| 93| (Decision:01/8 1/050/00058/AM20The Committee|:05/23/040/00055/AM20considered the case as per06.05.2019agenda and noted that the[Consultantapplicant’s (TEC-3)reply was ||<br>: sent to Consultant (TEC-3) on 13.11.2019 for examination of the case. However, Consultant (TEC-3) |<br>oT [===")][ —aecided] vide emailto waitdatedfor05.04.2020the comments,informed“nethat the case is under examination. Therefore, the annyCommittee| ons 4;<br>| {The case stands deferred.<br>ii prea mee penmmnnhillshem smssmaamlinr 48 Ae cuImRe WY+ 5 SHONaanum OY4 see Wernernianein naRew nome PSA >" st wryreneeMN HY rereptnt a ne ~<br>; | [Case No.:10/5/81-ALC2/2019 PartySTEEL Name: WORKS CHANDA PRIVATE (Meet'ALC2/2020 No/Date: 1/81- Status:‘Approved<br>LIMITED (01.04.2020 | |<br>| HQ File RLA File ‘Lic.No/Date:0510410513 | |<br>| 1:01/81/050/00059/AM20/ —_:05/23/040/00061/AM20/ 08.05.2019 | |<br>| Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms on [|]<br>| | ithe basis of study group report dated 21.02.2020, as adopted by the Committee in the Meeting No.<br>: | 24/81 dated 18.03.2020, as under:<br>| | jircHsis [oo+ ate csHE [tee Reecommendednded ||. |<br>; | | Stainless Steel Cold Rolled Stainless Steel 110Kgs/Kg |<br>: i Utensils With | 319.000 Circle Finish : 2B Grade : content in the ||<br>73239390 or Without MT 72209090 $8201 Thickness: Below 0.8 | export product | |<br>| | , 24 . ThicknessGrade of steelof sheet/circle to match inshould importbe&betweenexport. 0.1 mm to 1 mm.<br>! 3. Export product should be of cireular/oval shape only. |<br>| IRA concerned may take suitable consequential action accordingly. |<br>| (Case No.:21/5/81-ALC2/2019 ‘Party Name: LM WIND Meet No/Date: 1/81- ‘Status:<br>| | POWER BLADES INDIA ALC2/2020 Deferred |<br>| | IHQ File IRLA File Lie.No/Date:3410045142 ‘Action by : |<br>':01/81/050/00070/AM20/ 1:34/24/040/00046/AM20/ 15.05.2019 - jApplicant — |<br>: 95 Decision: The Committee considered the case as per agenda and noted that a deficiency letter seeking,<br>! ‘certain information as raised by Consultant (TEC-1) was sent to the applicant on 03.08.2019 followed<br>: iby reminders on 20.09.2019 & 17.12.2019. However,the applicant vide email dated 06.04.2020<br>irequested more time to reply due to the Coronavirus outbreak.Therefore, the Committee decided to<br>wait for the applicant’s reply.<br>iThe case stands deferred.<br>27 | Page 47 7 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020SHORHIToyGUPTAa |||<br>----- End of picture text -----<br>

||| | '

| | ;

| |

|

t ,||iCase No.:22/5/81-ALC2/2019 POWER(Party Name: BLADES LM WINDINDIA ALC2/2020Meet No/Date:1/81[DeferredStatus: | | | PVT. LTD. 01.04.2020 | HaQ File IRLA File ILic. No/Date:3410045 143 [Action by =) : 196| (Decision:{certain information The Committeeas raised consideredby Consultantthe case(TEC-1) as per was agenda andsent to notedthe applicant that a deficiencyon 03.08.2019letterfollowed seeking | ; | [by reminders on 20.09.2019 & 17.12.2019. However,the applicant vide email dated 06.04.2020: | | lrequested more time to reply due to the Coronavirus outbreak.Therefore, the Committee decided to, : [wait for the applicant’s reply. | Irhe case stands deferred. | | - GaseNor TT Party Name: DaBauer 7 : | 126/8/81-AT.C2/2019 VOESTALPINE VAE VEN {1/81-ALC2/2020 PPeforred | | | INDIA PRIVATE LIMITED |01.04.2020 | | | 1HOQ File IRLA File ILic.No/Date:0510410637 ‘Action by : | | |:01/81/050/00075/AM20/ }:05/24/040/00101/AM20/ (20.05.2019 (Consultant | 97 Decision: The Committee considered the case as per agenda and decided to seek from the applicant to | furnish following information as per advice of Consultant (SKB): | | | 1. Weight of each set (Sl. No. 1 to 7) indicated in the item of export? | | i 2. Weight of the quantity of items in number. | | 3. Manufacturing process of each set. : | 4. Drawing/photograph of each set. | 5. Justification of 5% wastage asked for manufacturing of each set. | | Irhe case stands deferred. | [ Case No.: ‘Party Name: BLUEBIRD /Mecet No/Date:1/81Status: Deferred | | | '33/5/81-ALC2/2019 SOLAR PRIVATE IALC2/2020 | | i WLIMITED 01.04.2020 | | HQ File RLA File 'Lic.No/Date:0510410642 Action by : i |:01/81/050/00082/AM20/ |:05/23/040/00078/AM20/ 21 05.2019 ‘Consultant (TEC-3) | ps Decision: The Committee considered the case as per agenda and noted that the applicant’s reply was. _ fsent to Consultant (TEC-3) on 06.02.2020 for examination of the case. However, Consultant (TEC-3) | | | Wide email dated 05.04.2020 informed that the case is under examination. Therefore, the Committee | | : [decided to wait for the comments. | | |The case stands deferred. | [Case No.:34/5/81‘Party Name: JINDAL “Meet No/Date:1/81Status: Deferred | | |ALC2/2019 SAW LIMITED ALC2/2020 ' 99 | | 01.04.2020 | | HQ File IRLA File ~~ Lic.No/Date:0510410679 Action by : | [:01/81/050/00083/AM20/ |:05/23/040/00079/AM20/ 23.05.2019 ‘Consultant (LEC ;3 PUPTA 28 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020¥IN3 7 Cen ad |

| | | i

| Decision: The Committee considered the case as per agenda and noted that the applicant’s reply was | f | sent to Consultant (TEC-3) on 23.12.2019 for examination of the case. However, Consultant (TEC-3) | i | lyide email dated 05.04.2020 informed that the case is under examination. Therefore, the Committee! i | | |decided to wait for the comments. ; 4 | |The case stands deferred. | i : | Case No.:35/5/81Party Name: GAVIRANGA Mee No/Date: 1/81Status: i~ ee ~|AGE2/2019-—— ENTERPRISES -= ATC2/2020-— Approved : a . | HQ File IRLA File Lic,No/Date:0710114946 | | 100 :01/81/050/00084/AM20/ :07/24/040/00042/AM20/ 24.05.2019 | | : Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as. | | iper written comments given by MeitY vide F. No. W-21/4/2020-IPHW-MeitY dated 11.03.2020. : (Copy enclosed) | | : | ‘RA concerned may take suitable consequential action accordingly. | | | Case No.:36/3/81Party Name: GAVIRANGA [Meet No/Date:1/81Status: ' | ALC2/2019 ENTERPRISES ALC2/2020 Approved i fog | 101.04.2020 | | ||, (:01/81/050/00085/AM20/ |HQ File IRLA:07/24/040/00043/AM20/ File (24.05.2019[Lic.No/Date:0710114947 || || | Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as_ | per written comments given by MeitY vide F. No. 17(3)/2020-IPHW dated 11.03.2020. (Copy: | — IRA concerned may take suitable consequential action accordingly. i i Case No.:39/5/81‘Party Name: SHIVALIK Meet No/Date: 1/8 1- Status: Deferred LTD. [01.04.2020 | ! | 'ALC2/2019 BIMETAL CONTROLS [ALC2/2020 | HQ File IRLA File Lic. No‘Date:05 10410693 Action by : | / ~—1:01/81/050/00088/AM20/ |:05/24/040/00096/AM20/ |24.05.2019 ‘Consultant (TEC-3) | | 102| Ds e ntcision:to Consultant The Committee (TEC-3) c on sidered06.02.2020 the casefor examinatio as per age n da andof the notedcase. However, that the applicanConsul t ’s replyant (TEC-3); was | |7 || decidedvide emailto datedwait for 05.04.2020 the comments.informed that the case is under examination. Therefore, the Committee. | ‘The case stands deferred. | || (Case No.:40/5/81-[Party Name: SHIVALIK MestNo/Date:1/81-__|Status: Deferred | ALC2/2019 IBIMETAL CONTROLS /ALC2/2020 | | oy (LTD. (01.04.2020 | | 1103 HQ File IRLA File ‘Lic.No/Date:0510410694 |Action by : | | ':01/81/050/00089/AM20/ |:05/24/040/00095/AM20/ 24.05.2019 ‘Consultant (TEC-3) | | Decision: The Committee considered the case as per agenda and noted that the applicant’s reply was | 29 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020SHOBHITCUPTABe |

i | i | [sent to Consultant (TEC-3) on 17.12.2019 for examination ofthe case. However, Consultant | | \vide email dated 05.04.2020 informed that the case is under examination. Therefore, the Committee[|] ; |decided to wait for the comments, | | | |The case stands deferred. | Case No.:41/5/81Party Name: SHIVALIK (Meet No/Date: 1/8 | ALC2/2019 BIMETAL CONTROLS !ALC2/2020 | : | 1- Status: Deferred | | LTD. 01.04.2020 | | | [HQ File RLA File ILic,No/Date:05 10410695 ‘Action by : (104 |:01/81/050/00090/AM20/ |:05/24/040/00094/AM20/Decision: The Committee considered the case as per|24.05.2019agenda and noted that the \Consultantapplicant’s (TEC-3)reply was.| | 1 sent to Consultant (TEC-3) on 17.12.2019 for examination of the case. However, Consultant (TEC-3) i vide email dated 05.04.2020 informed that the case is under examination. Therefore, the Committee. | | decided to wait for the comments. | : | iThe case stands deferred. | | | (Case No.:1/16/81Party Name: KANADE [Meet No/Date:1/81Status: | i |ALC2/2019 LTD.[ANAND UDYOG PVT. 1ALC2/ 04. 20 2020 Deferred | ! | |HO File IRLA File Lic. No/Date:03 10832294 |Action by | | i 01/8j 1/050/00286/AM20/ 1:03/94/040/00569/AM20/i —. {17.10.2019i eDPOTi 3 | | {105 Decision: The Committee considered the case as per agenda and noted that a copy of application was ; | sent to DPIIT for examination of the case on 26.12.2019 followed by a reminder on 03.04.2020. | | | comm jHow e ver,nts.no comments have been received yet. Therefore, the Committee decided to wait for the| | poten wore Pa orton <ARR tee He se eaten aman# AE WISN A HSE SE et temas ane EME RamIN goa Hey fe oes Shad StepOnNeeMHS oSammmtnrimnes a nt nay rinZam Peace CAA AANA ANALSAE MA WAIN Se EE . come Se ee eoee | : | (Case No.:2/16/81Party Name: KANADE [Meet No/Date:1/81Status: | ! ALC2/2019 [ANAND UDYOG PVT ALC2/2020 iD ferred | || AQHQ FilFile RLAA FilFile |Lic.No/Date:Lic.No/Date:03 1083229595 Action| bby | } 01/81/050/00287/AM20/ ':03/94/040/00570/AM20/ 17.10.2019 it DPOT | 7 :106 Decision: The Committee considered the case as per agenda and noted that a copy of application was| | sent to DPIIT for examination of the case on 26.12.2019 followed by a reminder on 03.04.2020. 7 ‘However, no comments have been received yet. Therefore, the Committee decided to wait for the, | comments. | ' ‘The case stands deferred. | | oe 5woNG SIGIR ipariy Namo: MGRHg Stataar , | | ALC2/2019 METALS |ALC2/2020 Approved | ,OF \01.04.2020 | | HQKile = RL Fle [Lic.No/Date:0810146373 | |Ste tneUO SEED(:01/81/050/00290/AM20/watt Ne ON HEE eaten SUNN ON 8 at ENF PETE SEE OTL EERE EEN ER PRRE HTD|:08/24/040/002.15/AM20/HG VITALIA Se SOE SEY FAS © GHEONRMMSA ONES WMote Cand 22.10.2019etcrOe praesent ~ | wetccanieys see aneeeuwaneneoet on HOFNE jeeoTGUE ify . ! 30 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020Diresiee" 3 Eanaiol OF PON IED

; : | }

i : | ' t | | ! | | 7 | | : i

; | Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as_ | | |per commentsa given by Consultant (TEC-3) vide email dated 05.04.2020 as under: | ; i | ITCHS : - — ITCHS Import Recommended |: | Code Exp ort Item Quantity Code Item Quantity | | | Aluminium Rolling Slab 500000.000 Aluminium | 525000 Kgs | | 76012090 (Net Content 5,00,000 Kes) | Kgs 76020010 Scrap | | RA concerned may take suitable consequential action accordingly, | ho anche al | ‘ALC2/2019 TRANSMISSION & }ALC2/2020 Deferred | | | Case No.:6/16/81———(PartyName: TOSHIBA [Meet No/Date:1/81_ [Status - | | IDISTRIBUTION SYSTEMS 01.04.2020 | | HQ File [RLA File ‘Lie No/Date:0910068126 [Action by | |:01/8 1/050/00291/AM20/ 1:09/24/040/00368/AM20/ (22.10.2019 i: DAL /108 Decision: The Committee considered the case as per agenda and noted that a copy of application was | | sent to DHI for examination of the case on 17.12.2019 followed by a reminder on 03.04.2020.| ‘However, no comments have been received yet. Therefore, the Committee decided to wait for the | comments. | ‘The case stands deferred. |(Case No.:7/16/81(PartyName: SHIVALIK Meet No/Date:1/81-. Status: ; ALC2/2019 IBIMETAL CONTROLS LTD = ALC2/2020 [Deferred | | HQ File IRLA File ‘Lic.No/Date:0501.04.2020 10412272 ||Action by : . | 01/8 1/050/00292/AM20/ {:05/24/040/00425/AM20/ 25.10.2019 Applicant _ | |Pecision: The Committee considered the case as per agenda and decided to seek from the applicant |, |109 | ithe following information as per recommendation given by Consultant (TEC-3) vide email dated || | 1 (i) Specific items of import and export t | | (ii) S.No. 3, 5 and 11 of SDL | | ‘|The case stands deferred. | | ~ Case No.:8/16/81———PartyName: ARMOR = Meet No/Date:1/81(Status: | i = ALC2/2019 PLAST LIMITED jALC2/2020 Approved | i '01.04,2020 | | | [HQ File RLA File Lie No/Date:07101 15611 | | I |:01/81/050/00293/AM20/ :07/24/040/00163/AM20/ 28.10.2019 | ; (0 Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as | dereper| ITCHScomments[Export given+ bythe Consultant (TEC-3) videLove emailate datedOeITCHS 05.04.2020 |eImport as under: QuantityRecommended“et|: i| ren * 31 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020SHOBRT aGUPTAht |||| Dy. Director General of Foreignies Directorate General ot Fort ety | Ministry of Commeres “ ines vy ” Ydyeg Bhawan, New (at | |

==> picture [594 x 795] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|{|4|
|||
|ii|
|i|
|F|||Articles Made of 17-7PH|17-7PH|1.02Kgs/Ke|
|||fo|73042200|ContentStainless of SteelImport Tubes item (Netin|Kegs210.240|73069090|SteelStainless|exportcontent product inthe||,|,|
|i|||Export|Product 210.24kgs) ||||Tubing||||
|||||‘Note: Grade & diameter of SS to match in import &|export items.|||
|:|||‘RA|concerned may take|suitable|consequential|action|accordingly.|||
|||\Case No.:9/16/81-|Party Name: AXORA|Meet No/Date:1/81-|Status:|||
|||||ALC2/2019|RESOURCES LIMITED|ALC2/2020|Deferred|||
|||||HQ File|RLA File|‘Lic.No/Date:0210209513|Action by:|||
|:|||/:01/8 1/050/00294/AM20/|.02/24/040/00109/AM20/ 28.10.2019|‘Applicant|||||
|||1 1] (Dis|e|cision:eking|certainThe|informaCommit|t|ionee|asconsidrais|e|redd|by MSMEthe|case w|as|sp|e|ntr|toagendathe|applicantand|notedon|27.01.2020that|a|deficiencyfollowedletter!by:|
|4|||ia reminder on 01.04.2020.|However,|no reply has|been received|yet.|Hence, the Committee decided||
|||to|wait|for the|comments.|
|||||The case stands deferred.|
|||[|(Case No.:44/18/81-|————[PartyName: APAR_|[Meet No/Date:1/81-—_|Status:|||
|(ALC2/2019|INDUSTRIES LIMITED||ALC2/2020|‘Deferred|.|
|f|||01.04.2020|||||||
|||HQ File|IRLA File|\Lic.No/Date:3410045678||Action by|||
||||:01/81/050/0033|8/AM20/|':34/2.4/040/00268/AM20/|03.12.20 19||; DPOT|||
|||! 12 Decision:|The Committee considered|the case as per agenda and noted that a copy of|application was|||
|!|sent|to|DPIT|for|examination|of|the|case|on|23.12.2019|followed|by|a|reminder|on|03.04.2020,|
|‘However,|DPIIT|vide|email|dated|06.04.2020|advised|to|defer|the|case.|Therefore,|the|Committee|[,]|
|||[tecided to wait for the comments.|||||
|||The|case|stands|deferred.|.|||
|“ICaseNo2/19/81-|=|PartyName:|APAR|(Meet|No/Date:1/81-|Status:|
||||ALLC2/2019|INDUSTRIES LIMITED|= |ALC2/2020|‘Approved|||
|||||||\01.04.2020|||
|||HQ File|RLA File|{Lic|No/Date:03 10833236|||||
|»|—|:01/81/050/00341/AM20/|__|:03/94/040/00671/AM20/|(05.12.2019|
|||Decision:|The Committee|considered|the case as per agenda and decided to|fix the ad-hoc norms as|
|||iper comments given by Consultant (TEC-3) vide email dated 05.04.2020 as under:|||
|||[st|||ITcHs|Recommended|Quantity|
|||ENo.|Code|Import Item|||
|||4||74081190eeCopper WireWire Rod: Rod|®8||| Net Net plus plus 1%1% wastagewastace oror asas applied. applied,|whicheverwhichever|isis|lowerlower||||||
|;|||Primary Unalloyed|||Net plus|1% wastage|or as|applied,|whichever|is|lower|||
|,|2|76011010 | Alluminium Ingots/|||
|IL -|3|39011090||SowrrsbarsXLPE Compound|Neteeplus|2.5%|wastage|oreeas|applied,|whichever|is lowersa|
|Dy,|Director|Gonoral|of Foroign Hace|
|32|||Page 47|Minutes of Meeting|No.|01/81|of NC-2|held on 08.04.202Racisrato Gororal GF|Pb.|sf) HERO|

----- End of picture text -----<br>

[ | [4]29173200 | | i |S} 39041020]| PlasticiPVC Re s iner DOP)|‘] Net plus 2.5% wast ageage or as applied, whiwhi chev erer is[lower_] lower | | 16 | 40027000 |EPDM ___| Net plus 2.5% wastage or asapplied, whichever is lower| | | || 18| 7 |3802901939013000 ||EVACalcined Co-Polymer Clay _| NetNet plus plus 2.5% 2.5%wastagewastage oror as applied, whichever is low er|,er |, | i | SCNT ep aJr)RO nota cy ne a n lio d whinheuarielawer F |: p pf| 9 |28183000 HydroxideAluminium Netf plus 2.5% wastage or as applied, whichever is lower 2 [| | | ? “1 ad: 0 gate eG ¢ - ' H { 4 p |} | |10 | 39019090 Polymers of Net plus 2.5% wastage or as applied, whichever is lower | | | | | 11 | 72172010 | EthyleneG.L.Wire ____|an reNet plus 2% wastage or as oe | ‘Note: For import item No. 10, the type of polymer to be imported will be same as used in, | applied, whichever is lower | | RA concerned may take suitable consequential action accordingly. | | iCaseNo.:3/19/81- -—~—=«Party | Name: DIAMOND —‘|Meet No/Date:1/81(Status: | | ALC2/2019 ENGINEERING (CHENNAD) |ALC2/2020 Deferred : | [HQ File IRLA File [Lic.No/Date:04 10166336 [Action by | | | 1 14 :01/81/050/00342/AM20/ |:04/24/040/00135/AM20/ (06.12.2019 :DPOT | | | ‘sentDecisit o n:DPIIT The Committeefor examination consideredof thethe case ason per23.01.2020. agenda and notedHowever, that aDPIIT copy ofvide applicationemail dated. was | 06.04.2020 advised to defer the case. Therefore, the Committee decided to wait for the comments. | | |The case stands deferred. | | Case No:4/19/81- ————PartyName: PEARL (Meet No/Date:1/81(Status: | | ALC2/2019 INSULATIONS PRIVATE |ALC2/2020 [Deferred | HQ File RLA File Lie-No/Dat:07101 15821 [Action by : | | | :01/81/050/00343/AM20/ (:07/24/040/00202/AM20/ = |06.12.2019 Applicant is ‘Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on. . | 20.12.2019 followed by a reminder on 31.03.2020. However, no information has been received yet.| 1 i i | ! | Hence, the Committee decided to wait for the complete set of application. ) | The case stands deferred. | [ Case No.:6/19/81Party Name: ALUFOU. Meet No/Date: 1/81Status: | | jALC2/2019 PRODUCTS PVT LTD = ALC2/2020 Deferred || Oo nnn meas ser cst an orate 2mans Seats ecanmruntnmn ttenaraenamenmutta 80 . ':02/2.4/040/00131/AM20/ 09.12.2019 Applicant r[16][ :01/81/050/00345/AM20/] HQ File RLA File iLic.No/Date:02 10209602 jAction by: | Decision: The Committee considered the case as per the agenda and noted that the hard copy of | | application has not yet been received from the applicant and in this regard, an email was sent on | (23.12.2019 followed by a reminder on 30.03.2020. However, no information has been received yet. | | Hence, the Committee decided to wait for the complete set of application. | | The case stands deferred. — | 33 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020 2h éBe | py, Dirooiar General NT aa | |

| | |

| | | I | | i |k i |

\ { (Case No:S/19/81(Party Name: RAJPUTANA {Meet No/Date:1/81Status: | i = |ALLC2/2019 INDUSTRIES PVT.LTD. 'ALC2/2020 Deferred | | | | {01.04.2020 | | [HQ File IRLA File |Lic.No/Date: 1310049465 | | | i |:01/81/050/00344/AM20/ |: 13/24/040/00177/AM20/ (09.12.2019 i | i 17 Decision: The Committee considered the case as per agenda and decided to seek from the applicant | to furnish the following information as per adviceof the representative of MSME: | | | 1. Firm to provide percentage of brass in import item and the wastage incurred in each step of | ; fo | the manufacturing process. | ‘The| 2.caseCompositionstands deferred. ofBrass of import and expott. i , ALC2/2019‘Case No.:7/19/81INDUCTIONParty Name: EFD PRIVATE ‘Meet No/Date:1/81-ALC2/2020 DeferredStatus: || | HQ File IRLA File Lic.No/Date:07101 15833 (Action by : | 118 (:01/81/050/00346/AM20/ —:07/2.4/040/00213/AM20/ 10.12.2019 Section | Decision: The Committee considered the case as per agenda and noted that the copy of application ; | thas not yet been sent to MeitY as decided in M. No. 22/81 dated 19.02.2020. Therefore, the | Committee directed to send a copy of application to MeitY, | |The case stands deferred. : |Case No.:10/19/81““iparty Name: NAMO [Meet No/Date:1/81-. (Status: | =ALC2/2019 ‘ALLOYS PVT. LTD. ALC2/2020 Deferred | | | fae File IRLA File ILic.No/Date:0510412859 Action by: | | |:01/81/050/00349/AM20/ —_—-:05/24/040/00544/AM20/ [11.12.2019 NC : , 19 Decision: The Committee considered the case as per agenda and noted that Consultant (TEC-3) and | ' Consultant (SKB) have recommended the case with different wastages. It was observed that there: - lare two norms which appear to be applicable to the present case i.e. at C-3 and at C-1679. However, . in both the entries, the wastages are different. Therefore, the Committee decided to ask Consultant | : ((TEC-3) and Consultant (SKB) to provide more clarity on the serial number to be applicable in the: : current case. Hence, the Committee decided to discuss the issue in the forthcoming meeting. | | The case stands deferred. | | [Case No.:9/19/81[PartyName: NEO [Meet No/Date:1/81- (Status: |ALC2/2019 (POWER ELECTRONICS |ALC2/2020 Deferred | i & PROJECTS PVT.LTD. {01.04.2020 | | | HQ File | IRLA File [Lic.No/Date:03 10833357 [Action by : | 120 01/8 1/050/00348/AM20/ |:03/95/040/00888/AM20/ [11.12.2019 (Consultant (Tec-3) | ‘Decision: The Committee consideredthe case as per agenda and noted that a copy of application was sent to Consultant (TEC-3) on 14.02.2020 for examination of the case. However, Consultant (TEC-3). | vide‘decidedemail[to][ wait] dated[ for] 05.04.2020[ the][ comments.] informed that the case is under examination. Therefore, the Committee| enaeeer UEC RNC INNES = NEmoNeNEUNeNELEE —<mANe aa" “UMNIUEY Yee Sm wENe emule rn ONntee A| (The case stands deferred.Setmm oe noe ee eae ae HOHE 8 tees ORENSTEIN Ste! . 1 A eeAen EINER Ne Ont NS oe mate SOsBYji BUPTA _ 34 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2024 eotornte General GF Foi TOS Udyveg Bhawan, Mew Loin

| | | | f | | i|f | | : | | | | | :

| | (Case No.:11/19/81———«(PartyName: SHERA —([Meet No/Date:1/81-—|Status: | i | 01.04.2020 | ALC2/2019 ENERGY PVT.LTD. ALC2/2020 Deferred | | | HQ File RLA File \Lic. No/Date: 1310049469 /Action by | 121 ':01/81/050/00350/AM20/Decision: The Committee considered:13/24/040/00184/AM20/the case as per agenda and(11.12.2019noted that a copy of application:DPUT was:| | | ‘sent to DPIIT for examination of the case on 20.12.2019 followed by a reminder on 03.04.2020.[|] i| |: |However, DPIT vide email dated 06.04.2020 advised to defer the case. Therefore, the Committee ; | iThe case standsdecided to wait deferred.for the comments. || || »| Case |ALC2/20No: 1 92/19/81Party‘TRANSMISSIONName:TOSHIBA & = MeetALC2/2020 No/Date:1/81-—|Status:Deferred | spren reamat naanpennantDISTRIBUTION SYSTEMSirninnntin tt(01.04.2020oN nt a i yagapanennn iment | mereranimnei | i 1) :01/81/050/0035 1/AM20/ (09/24/040/00134/AM20/ 12.12.2019 DHI HQ File RLA File Lic.No/Date:09 10068279 iAction by: | i 22 ‘Decision: The Committee considered the case as per agenda and noted that a copy of application was | : |1 sent to DHI for examination of the case on 23.12.2019 followed by a reminder on 03.04.2020.| However, no comments have been received yet. Hence, the Committee decided to wait for the. | ithe case stands deferred. | [Case No.:13/19/81Party Name: SUBHAM “(Meet No/Date:1/81- (Status: | | ||ALLC2/2019 [ENGINEERING WORKS -ALC2/2020(01.04.2020 ‘Deferred| | | | {EIQ File RLA File ‘Lic.No/Date:03 10833407 Action by: 112 ::01/81/050/00352/AM20/ |:03/95/040/00843/AM20/ 13.12.2019 ‘Applicant i Decision: The Committee consideredthe case as per the agenda and noted that the hard copy of. | application has not yet been received from the applicant and in this regard, an email was sent on! i (23.12.2019Hence, the Committeefollowed bydecided a reminderto waiton for 30.03.2020. the completep However,set of application.noPp information has been received yet. | |The case stands deferred. | (CaseNo:2/22/81Party Name: ASTA INDIA’ [Meet No/Date:1/81Status: | ! | ‘ALC2/2019 PRIVATE LIMITED (ALC2/2020 [Deferred | Ft | 101.04.2020 | | 104[':01/81/050/00392/AM20/] HQFile 134/24/040/00262/AM20/IRLA File — 08.01.2020Lie No/Date:3410045771 |Applicant[Action by : | Decision: The Committee considered the case as per the agenda and noted that the hard copy of | | application17.02.2020. hasHowever,not yetnobeei n formationreceived fromhas been the applicantreceived yet.and Therefore,in this regard,the Committeean email wasdecidedsent onto . | | temind the applicant for submitting the complete set of application. | The case stands deferred. 35 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020wo a |i | t

i k i

2[ | E |

| |

, ; | : | ; | |

| | | | | i |

|

; 01.04.2020 | ALC2/2019 METALS PVT. LIMITED (ALC2/2020 Deferred | {HQ File IRLA File [Lic.No/Date:2410042968 |Action by: | —-:01/81/050/00391/AM20/ _|:24/24/040/00044/AM20/ {08.01.2020 Applicant 125 \Decision: The Committee considered the case as per agenda and noted the comments given by| | ‘Consultant (SKB). After due deliberation, the Committee decided to seek from the applicant the | | |following information: | (i) Composition of Brass of both export and import item | ‘The case stands deferred. | (Case No.:3/22/81Party Name: JAIN FGL Meet No/Date:1/81Status: i (ALC2/2019 METAL INDUSTRIES ALC2/2020 (Deferred | | (01.04.2020 | | | HQ File IRLA File Lic.No/Date:0410166419 Action by: | | :01/81/050/00393/AM20/ — |:04/24/040/00151/AM20/ (09.01.2020 ‘Applicant 1126 Decision: The Committee considered the case as per agenda and noted the comments given by, | ‘Consultant (SKB). After due deliberation, the Committee decided to seek from the applicant the| | following information on the advice of representative of MSME: | (1) Certificate on chemical analysis of item of imports from recognized BIS laboratory | The case stands deferred. “Tease Nowa Paty Namo: SAPA [Meat NofDatssT81. “WStatuse - | ALC2/2019 EXTRUSION INDIA \ALC2/2020 Deferred | | HQ File IRLA File |Lic.No/Date:0710116012. [Action by : | | yey [01/8 1/050/00394/AM20/ ':07/24/040/00240/AM20/ 09.01.2020 Applicant | || applicationDecision: Thehas Committeenot yet beenconsideredreceived fromthe casethe asapplicantper the andagendain thisandregard,noted thatan emailthe hardwas copysent on!of /18.02.2020. However, no information has been received yet. Therefore, the Committee decided to, ' remind the applicant for submitting the complete set of application. | | |The case stands deferred. | [CaseNo:7/22/81- —‘|PartyName: GALA SMe No/Date:1/81Status: ALC2/2019 PRECISION ENGINEERING |ALC2/2020 Deferred | IPVT. LTD. (01.04.2020 | {HQ File IRLA File [Lic.No/Date:03 10834081 |Action by : 1128 :01/81/050/00397/AM20/ 03/94/040/00847/AM20/ '10.01.2020 ‘Applicant | Decision: The Committee considered the case as per the agenda and noted that the hard copy of. | application|18.02.2020. hasHowever,not yetnobeei n formationreceived fromhas been the applicantreceived yet.and Therefore,in this regard,the Committeean email wasdecidedsent onto|| : _ |remind the applicant for submitting the complete set of application. - ' The case stands deferred. . cote ew eee winesite oy qu nnenemys + eeaeneveeeaiyveninainmnt-tntintitreeenimmamresmeinss ni, yunaiie + coltciniepertiineuenae nimi ikik ci See ete aT ei 4iP gare we'd

i | | |

36 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.20205 say of cae cist vt

|

|| | | } | i | | | |

|

i

| | |

i

: | i | : | :

| (CaseNo.:5/22/81| ALC2/2019 ———(PartyName:APPLIANCESMITTAL LIMITED — [Meet jALC2/2020 No/Date:1/81- (Status:Approved | I 01.04.2020 | | | HQ File RLA File {Lic.No/Date:56 10005782 | j = :01/81/050/00395/AM20/ —|:56/24/040/00025/AM20/ 10.01.2020 | || applicationDecision: Thehas notCommittyet b ee n consrece i dv e dredfromthe thecaseapplicantas per despiteagendaemailand sentnoted onthat18.02.2020.the hardHowever,copy of || [12 ithe matter was deliberated in the meeting and the Committee decided to fix the ad-hoc norms as |g jrecommended by Consultant (SKB) asunder; . _ _ | | | ITCHS aay .,.|ITCHS | Import |Recommended Quantity | Refined Copper 203 MT (inclusive of 1.015 | | 74031300 | Billets vice 74040012 copes MT/MT content in the export | | RA concerned may take suitable consequential action accordingly. | Case No.:6/22/81|Party Name: RAJHANS [Meet No/Date:1/81Status: ALC2/2019 IMPEX PRIVATE iALC2/2020 Deferred | LIMITED (01.04.2020 | | HQ File RLA File Lic.No/Date:2410042974 Action by: | |:01/81/050/00396/AM20/ — |:24/24/040/00047/AM20/ {10.01.2020 Applicant {130 Decision: The Committee considered the case as per agenda and noted the comments given by, | (Consultant (SKB). After due deliberation, the Committee decided to seek from the applicant the | following information: | / (i) Composition of Brass in both export and import item. | |The case stands deferred.

Case Nod Pasty Name Ei Meet Noibatw/8i2 [Seats — ALC2/2019 METALS ‘ALC2/2020 Deferred | HQFile RLAFile [Lic.No/Date:0510413314 [Action by: | | 01/8 1/050/00398/AM20/ :05/23/040/00377/AM20/ 13.01.2020 ‘Applicant | 3 Decision: The Committee considered the case as per the agenda and noted that the hard copy of| |18.02.2020.application hasHowever,not yetnobeei n formationreceived fromhas beenthe applrece i cantved andyet. Therefore,in this regard,the Committeean email wasdecidedsent on,to. remind the applicant for submitting the complete set of application.

‘The case stands deferred. : | AOI EMAAR oo Me ey Se emp seo “ cena Se ee reenact guaanurnUnnRR pin anesengenennnypsnyttttt UMMA" SRE AMES EASA UIA EYER Ss ERO REY SNA eePe aR CN sess sans aemnners attest meaner a? | |ALC2/2019 METALS AND TUBESLTD. — ALC2/2020 [Deferred HQ File IRLA File Lic.No/Date:0810146986 ‘Action by: | 01/8 1/050/00400/AM20/_ ;:08/24/040/00335/AM20/ (13.01.2020 Applicant | 37 | Page 47 . Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020 SHOSAITGUPIABS. Directorate Geneal Fon ey | Ministry of Commerne & WCU Udyog Bhawan, Hew Dotti |

|

| | | | | | | ; ' |

| ‘Decision: The Committee considered the case as per agenda and decided to seek from the applicant ito furnish the following information as per advice of Consultant (TEC-3): i|£ | i iH| | 1. Thickness of each layer of coating. | | ‘The case stands deferred. oe ; an | | [Case No.:11/22/81[Party Name: ALUTOP [Meet No/Date:1/81-ALC2/2020 Status: | | ALC2/2019 | (01.04.2020 Deferred i | [HQ1:01/81/050/00401/AM20/ File |:07/2.4/040/00239/AM20/IRLA File ‘Lic.14.01.2020No/Date:07101 16026 ‘Applicant‘Action by: 1133 |Decision: The Committee considered the case as per the agenda and noted that the hard copy of | ‘application has not yet been received from the applicant and in this regard, an email was sent on | | 18.02.2020. However, no information has been received yet. Therefore, the Committee decided to, | lremind the applicant for submitting the complete set of application. | The case stands deferred. | | | (Case No.:9/22/81‘Party Name: APAR _ Moet No/Date:1/81«Status: | — ALLC2/2019 INDUSTRIES LIMITED [ALC2/2020 Approved | | 1 | | '01.04.2020 | | | | HQ File IRLA File [Lic.No/Date:0310834137 | | :01/81/050/00399/AM20 _ |:03/94/040/00804/AM20 14.01.2020 | | _ Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as. |7 |134 |Pe[—__] comments given| by Consultant (TEC-3) vide email dated 05.04.2020 as under: | | | Sl. | ITCHS ; Tes Recommended Quantity |, | 12[1]|7601101074081190 ||[Copper] Primary WireUnalloyed Rod: 8MmDiaAlluminium|Ingots/Sow/T-Bars | NetNet plusplus 1%1% wastagewastage|)| | | 3 | 39011090 | XLPE Compound __| Netplus 2.5% wastage | 4 39041020 |PVC Resin _ _____| Net plus 2.5% wastage _ |) i RA concerned may take suitable consequential action accordingly. _ (Case\ALC2/2019No.:14/22/81-“Party Name: DISHA AUTO[MeetNo/Date:1/81-Status: | |‘COMPONENTS PVT.LTD. [01.04.2020jALC2/2020 [Deferred | IAQ File IRLA File |Lic.No/Date:03 1083419] |Action by _ :01/81/050/00404/AM20/ |:03/94/040/00823/AM20/ j15.01.2020 : Section | ii3 ‘Decision: The Committee considered the case as per agenda and noted that a copy of application was | | jsent to Consultant (TEC-3) on 06.02.2020 for examination of the case. However, Consultant (TEC-3) | | |vide email dated 05.04.2020 requested to send again a complete set of application. Therefore, the’ | ‘Committee decided to send again a complete set of application to Consultant (TEC-3). | | |The case stands deferred. BS. 38 | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020 Udyog rss tate

j

==> picture [2 x 14] intentionally omitted <==

----- Start of picture text -----<br> [<br>----- End of picture text -----<br>

| ; i ; |

|\<br>|<br>|<br>|<br>|<br>|<br>;<br>i<br>||=<br>—_<br>|<br>[CaseNo.:12/22/81- ==PartyName:<br>SELP INDIA Meet No/Date:1/8i-<br>Status:<br>|<br>(ALC2/2019<br>PVT.LTD.<br>ALC2/2020<br>‘Deferred<br>|<br>|<br>|<br>(01.04.2020<br>|<br>|<br>|<br>HQFile<br>IRLAFile<br>Lic.No/Date:0310834156<br>|Actionby :<br>:01/81/050/00402/AM20/<br>:03/95/040/00997/AM20/ 15.01.2020<br>‘Applicant<br>136 ‘Decision: The Committee considered the case as per the agenda and noted that the hard copy of|<br>|<br>application has not yet been received from the applicant and in this regard, an email was sent on,<br>18.02.2020. However, no information has been received yet. Therefore, the Committee decided to.<br>|<br>remindtheapplicantforsubmittingthecomplete setofapplication.<br>|<br>|<br>Thecasestandsdeferred.<br>||;||i<br>||
|---|---|---|---|---|
||<br>:|‘CaseNo.:13/22/81-<br>PartyName:WELSPUN<br>iMeetNo/Date:1/81-<br>(Status:<br>|<br>|<br>|ALC2/2019<br>CORPLTD.<br>ALC2/2020<br>‘Approved<br>|||||
|i||<br>HQFile<br>[RiaFile<br>[Lic.No/Date:0310834181<br>|<br>|<br>— :01/81/050/00403/AM20/<br>_|:03/95/040/00819/AM20/<br>{15.01.2020<br>|||||
||<br>|<br>;<br>!<br>:<br>:<br>:|Decision: The Committee considered the case as peragendaand decided to fixthe ad-hocnormsas |<br>percomments givenbyConsultant(TEC-3)videemaildated05.04.2020 asunder:<br>:<br>13<br>eo<br>7<br>| ITCHS<br>;<br>.<br>oat<br>ITCHS<br>“ee<br>Recommended<br>|,<br>©<br>[odo |PxpontMem|Quantity|Code| MPO MEM |Quantity<br>|<br>fo<br>AlloySteelERW | |ag9999<br>AlloySteel<br>10700MT<br>|<br>| 73061929| Pipe ofAPI<br>:<br>72253090 | Plates/Coil ofPlates<br>|<br>i<br>i<br>Grad<br>MT<br>.<br>poofGradeid<br>ofrelevantgrade |<br>|<br>Note: (i)Descriptionofimportitem isamended asabove.<br>|<br>iGii) Grade ofimport& exportitemsshould match.<br>:||||<br>|<br>||
|||<br>RAconcernedmaytake suitableconsequential actionaccordingly.|||||
|;||<br>(ALC2/2019<br>METALLOYS<br>(ALC2/2020<br>Deferred||||
||<br>|||<br>AQ File<br>RLA File<br>Lic.No/Date:1310049503<br>[Actionby:<br>|<br>:01/81/050/00407/AM20/ ':13/24/040/00191/AM20/ |17.01.2020<br>Applicant<br>|<br>13 ‘Decision: TheCommittee considered the case as<br>peragendaand decided toseekfromtheapplicant<br>ig<br>P<br>°<br>to furnish the following information as per advice ofthe representative ofMSME:|||<br>|||
|!|—<br>1.<br>Percentage oflead in importand exportproduct.<br>2.<br>Manufacturingprocesses with step-wise wastage.||||
||<br>7<br>/||<br>‘Thecas**e**standsdeferred.<br>|<br>rase A<br>mmanth<br>treme<br>tina omen<br>nant<br>AE" tn<br>mtMAAS<br>enmsty enervonnanpnena<br>|<br>CaseNo.:16/22/81-<br>(PartyName:METALIC<br>iMeetNo/Date:1/81-<br>‘Status:<br>i<br>i<br>|<br>:<br>i<br>;<br>—ALC2/2019<br>(IMPRESSIONS(INDIA)PVT.<br>AILC2/2020<br>Deferred|||<br>:<br>|<br>|||
|||<br>HQFile<br>RLAFile<br>Lic.No/Date:0510413371 ‘Actionby:<br>;<br>—:01/81/050/00406/AM20/ |:05/24/040/00672/AM20/<br>17.01.2020<br>‘Applicant<br>|||||
||39<br>| Page47<br>MinutesofMeeting No.01/81 ofNC-2 held on 08.04.2020||||
||SHORMITCGPI.||||

|

| |

| |

i

: | i |\ | i '| 18.02.2020. japplicationDecision: Thehas Committeenot yet beenconsideredreceived fromthe casethe asapplicant per the andagendain this andregard,noted thatan emailthe hardwas copysent onof!| | However, no information has been received yet. Therefore, the Committee decided to. | {remind the applicant for submitting the complete set of application. | i | The| case stands deferred. . || | | (Case No.:15/22/81Party Name:P.K.STEEL [MeetNo/Date:1/81- Status: - |ALC2/2019 “AND METAL WORKS — ALC2/2020 (Deferred | | [AQ File RLA File ‘Lie.No/Date:0510413370 ‘Action by + | | !40 Decision::01/81/050/00405/AM20/The Committee considered:05/24/040/00668/AM20/the case as per the |17.01.2020agenda and noted that the hardApplicantcopy of ' application has not yet been received from the applicant and in this regard, an email was sent on! | remind the applicant for submitting the complete set of application. : |18.02.2020. However, no information has been received yet. Therefore, the Committee decided to| | 'The case stands deferred. | . | ‘Case No.:18/22/81[Party Name: POLYCAB Meet No/Date: 1/8 1- \Status: | i |ALC2/2019 INDIA LIMITED ALC2/2020 (Deferred || (01.04.2020 | | THQ File IRLA File [Lic.No/Date:03 10834331 Action by : | |:01/81/050/00408/AM20/ ':03/95/040/01018/AM20/ 20.01.2020 ‘Applicant | a Decision: The Committee considered the case as per the agenda and noted that the hard copy of lapplication has not yet been received from the applicant and in this regard, an email was sent on| _ | 18.02.2020. However, no information has been received yet. Therefore, the Committee decided to | iremind the applicant for submitting the complete set of application. | | [The case stands deferred.

| (Case No.:21/22/81«PartyName: GAVIRANGA[Meet No/Date:1/81- (Status: | (ALC2/2019 ENTERPRISES ALC2/2020 Deferred | | (01.04.2020 | HQ File RLA File Lie.No/Date:0710116046 ‘Action by : | 1149 1:01/81/050/0041 1/AM20/ :07/24/040/00255/AM20/ 21.01.2020 ‘Section Decision: The Committee considered the case as per the agenda and decided to send again acopy of | ‘application to MeitY for examination of the case as MeitY vide email dated 03.04.2020 informed that[the][copy][of][ application][is][not][traced][out.] '

| iThe case stands deferred.

| Case No.:22/22/81‘Party Name: GAVIRANGA [Meet No/Date:1/8 1- (Status: | /ALC2/2019 ENTERPRISES ALC2/2020 ‘Deferred — 143 | (01.04.2020 | HQ File RLA File [Lic.No/Date:07101 16047 ‘Action by _ saat LAE revenannegens :01/81/050/00412/AM20/RNIN NR NRE AA NAN Nm AAI ARNE NRE RENNIN:07/24/040/00256/AM20/A EFA aS, a ness snenteemmeneensenmnnne eamanteaimnvutcnwu-iauary(21.01.2020namie wewwaeene! woe - --+ “StiGnAa secon CNYSut Py A a. 40 . Dy. Director General of Fave eco | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020 pjrectorate Gevectel Ue

| i | t

==> picture [594 x 734] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|||
|i|||Decision:lapplication Theto|MeitYCommitteefor|examinationconsidered|theof thecasecaseas|peras|theMeitYagendavideandemaildecideddatedto03.04.2020 send|again|informedacopy of|[']|
|||||jthat the copy of application|is not traced|out.|
|||i||The case stands deferred.|
|||||CaseNo.:19/22/81-|——[PartyName: MGR|Mest|No/Date:1/81- (Status:|
|||ALC2/2019|METALS|iALC2/2020|Approved|
|;|(01.04.2020|.|||
|||HQ|File|
|;|||:01/81/050/00409/AM20/7|RLA—_‘|:08/24/040/00339/AM20/ File|[Lic|No/Date:0810147046(21.01.2020||||||
|||Decision:|The|Committee|considered|the|case|as|per|the|agenda|and|noted|that|the|hard|copy|of|||
|||‘application|has|not|yet|been|received|from|the|applicant|and|in|this|regard,|an|email|was|sent|on||
|i|jl4|18.02.2020.|However,|the|Committee|noted|the|comments|given|by|Consultant|(SKB).|After|due|[|]|
|4|4|deliberation,|the|Committee|decided|to|review SION|at C-3|and|fix the|ad-hoc normsas|under:|
|;|||ITCHS|sane|The|ate|ITCHS|Import|Recommended|
||||||| Code| ExportAluminiute|m|Rolling__| Quantity|__| Code|_||Item|oi|Quantity1.05Kgs/Kg|content|ftin||.|
|||||||16012090 | Slab (Net Content|| 3°40°°-0 | agoa0o10|||UM MEM|||the export product|||
|,|||1384000|Kgs) _|i|al ||||
|‘RA|concerned|may take|suitable|consequential|action|accordingly.|
|||||[Case No.:20/22/81-|Party Name: USHA|‘Meet No/Date: 1/81-|Status;|
|||||ALC2/2019|INDUSTRIAL|ALC2/2020|Deferred|
|:|jCORPORATION|(01.04.2020|/|
|||||HQ File|RLA File|—|[Lic.No/Date:0810147053|[Action by|:|||
|:|||4g. :01/81/050/00410/AM20/||:08/24/040/00333/AM20/|(21.01.2020|Applicant|||||
|||Decision:|The|Committee|considered|the|case|as|per|the|agenda|and|noted|that|the|hard|copy|of|||
|application|has|not|yet|been|received|from|the|applicant|and|in|this|regard,|an|email|was|sent|on!|4|
|18.02.2020.|However,|no|information|has|been|received|yet.|Therefore,|the|Committee|decided|to|
|remind the applicant for|submitting the complete|set of application.|
|LAN||EEN LENE|(TheEES|RLMENOMINEEcase|standsnett|Sine|SET|deferred.we|oNU|ENE|MMNNMNIMRREE Wem|ST|seomeenoupruouenaevrsenamnneeeeeeetttntin|[+]|6|ol|ffer|eenmerrermmmnnen|newe|WPPNa WOH|PPO|tt||e|aeee|+|aveuewenamemembenannneattalanaes AUISm RAEN|ermeerNK mINNRItaIntes|LAehARh|%|ved|||
|||LIMITED|01.04.2020|||
|||ALC2/2020|INDUSTRIES PRIVATE|ALC2/2020|Deferred|
|||HQ File|IRLA File|
|':01/81/050/00459/AM20/||:63/24/040/00001/AM20/~|18.02.2020'Lie.No/Date:6310001432||Applicant[Action by:|||
|‘Decision:|The|Committee|considered|the|case|as|per|the|agenda|and|noted|that|the|hard|copy|of,|||
|||(146||application|has|not|yet|been|received|from|the|applicant|and|in|this|regard,|an|email|was|sent|on:|
|||31.03.2020.|However,|on|the|advice|of Consultant|(SKB),|the|Committee|decided|to|seek|from|the.|
|applicant|to|furnish|the following information|along with|complete|set of application:|'|
|1.|Basis|of|calculation|of|754|MT|Vanadium|compound|of|9%|to|40%|V.Os|for|export|of}|
|STMT of Ferro Vanadium|(50% to 80% Vanadium).|||
|:|po|2.|Manufacturing|process|chart and|stage wise|wastage|of each|step.|
|!|,|The|case|stands|deferred.|||
|!i|41|| Page 47|Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020SHOBHIFGUPioeTA|
|Dy.|Director Genoral of Foreiga Trede|||

----- End of picture text -----<br>

i |

| | | | |

1 : i| (Case No.:2/1/81——Party Name: RATNAVEERMeet No/Date:1/81_[Status:Deferred | | (01.04.2020 | | | | |ALC2/2020 IMETALS LIMITED 'ALC2/2020 | ; || = HQ|:01/81/050/00460/AM20/ File Rts|:34/24/040/00378/AM20/ File — ‘Lic.[03.03.2020No/Date:34 10045925 |Actionby:iApplicant | 47 Mpecision: The Committee considered the case as per the agenda and noted that the hard copy of! it | application has not yet been received from the applicant and in this regard, an email was sent on| ' for the complete set of application. | | | 31.03.2020. However, no information has been received yet. Hence, the Committee decided to wait | : | |The case stands deferred. | | | ‘Case No.:4/1/81‘Party Name: GLITTER Mest No/Date:1/81‘Statas:Deferred : |AL-C2/2020 jMETALS PRIVATE ALC2/2020 | | | | \LIMITED 01.04.2020 | | HQ File RLA File ILic. No/Date:03 10835 199 ‘Action by : | 148 ':01/81/050/00462/AM20/ _:03/94/040/01011/AM20/ 104.03.2020 DPHT | ; | ‘Decision: The Committee considered the case as per agenda and noted that a copy of application was | isent to DPIIT on 07.04.2020 for examination of the case. However, the comments are still awaited.[;] ‘Hence, the Committee decided to wait for comments. : ‘The case stands deferred. [ | | CaseNo: ~—~—~—sPartyName: ~=——SCwMett Noo/Dates 1/81 - Status:Deferred| | L (3/1/81-ALC2/2020 PVT.PARAMJYOTILTD. MOVERS /01.04.2020jALC2/2020 | | | | HQ File IRLA File Lic.No/Date:0610039446 Action by : | '01/81/050/0046 1/AM20/ |:06/24/040/0009 1/AM20/ (04.03.2020 ‘Applicant 149 Decision: The Committee considered the case as per the agenda and noted that the hard copy of | | lapplication has not yet been received from the applicant and in this regard, an email was sent on | 31.03.2020. However, no information has been received yet. Hence, the Committee decided to wait! | for the complete set of application. Inhe case stands deferred. | [ [Case No.:6/1/81- —~—~—«*(Party Name: BRIGHT Meet No/Date:1/81—|Status: | § |ALC2/2020 METALS INDIA PVT. /ALC2/2020 |Approved | / | LTD. '01.04.2020 | | HQFile == RLA File Lic.No/Date:1310049536 115 :0.1/81/050/00464/AM20/ —:13/24/040/00201/AM20/ {06.03.2020 | |0 \Decision:applicationThehas Committeenot yet beenconsideredreceived fromthe casethe asapplicantper theandagenda8g in thisandregard,noted thatan emailthe hardwas copysent on|of | | 31.03.2020. However, the matter was deliberated in the meeting and the Committee decided to fix| | ithe ad-hoc norms as recommended by Consultant (SKB) as under:

42 oe Directorate Gonaral of Fu ciMeee | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020 apnisiry of Commaiie oF |

==> picture [596 x 704] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|||||;ITCHS|.|Sl.|ITCHSrye|Recommended:|||||
|en|nee|aOC|t|
|,|||Code|Export Item|Quantity ||No.|Code|Import Item|Quantity|||
|||126.742MT|||
|f|||]|74040012|| Copper|Scrap|||inclusive|of|{|
|i|BRASS INGOTS|wastage of|6%|||
|||||(Content|of Copper|1.02|Kgs/Kg|;|
|;|||||74032100|Scrap|119.568 m.t.,|{| 200.000|content inthe|||||
|||Zine|Scrap 42.965|MT|2|79011200 ||Zinc|Ingots|export|product|||
|i|m.t.|and|Zinc|Ingots|taking|clue|from|||
|||||3|| 79020010 ||Zinc|Scrap|Asapplied|||
|||||||||37.583 m.t,)|neaeae Te COS|SDCeeESSeeasSION C-L167_||||
||ae|OO|See|eee ae|
|||(RA|concerned|may take|suitable|consequential|action|accordingly.|
|;||||ALC2/2020Case No.77/1/81-|INDUSTRIES‘Party Name: KEL LIMITED||ALC2/2020[Meet|No/Date:|1/81-|‘Status:Deferred||
|ho|01.04.2020|||
|||||[HQ File|RLA File||Lio.No/Date:0510413815|[Action by:|||
|;|||:0.1/81/050/00465/AM20/|—_:05/23/040/00460/AM20/|06.03.2020|‘Applicant|
|5]|Decision:|The|Committee|considered|the|case|as|per|the|agenda|and|noted|that|the|hard|copy|of|i|
|||31.03.2020.‘application|hasHowever,not yetno beeninformationreceived|hasfrombeenthe|receivedapplicantyet.andHence,in|thistheregard,Committee an emaildecided was|sentto|wait,on.|
|||for|the|complete|set|of application.|
|i|||The case stands|deferred.|
|||||ALC2/2020|iCONTROLS AND|(ALC2/2020|||
|i|||||ISYSTEMS PVT.LTD.||01.04.2020|||
|.|||HQ File|IRLA File|Lic.No/Date:3210079446||Action|by|:|||
|[The]|[Committee]|[considered]|[the]|[case]|[as]|[per]|[the]|[agenda]|[and]|[noted]|[that]|[the]|[hard]|[copy]|[of]|
|hs|[2][ Decision:]||:01/81/050/00463/AM20/||:32/24/040/00 136/AM20/||06.03.2020|Applicant|||
|||||application|has|not|yet|been|received|from|the|applicant|and|in|this|regard,|an|email|was|sent|on.|
|:|||31.03.2020.|However,|no|information|has|been|received|yet.|Hence,|the|Committee|decided|to|wait:|
|i|for the complete|set of application.|
|||i||:‘The case stands deferred.|,|||
|||||ALC2/2020|INTERNATIONAL|ALC2/2020|[Approved|||
|}|||PRIVATE LIMITED|(01.04.2020|
||||11537 HQ:01/81/050/00467/AM20/ File|—_|:05/23/040/00463/AM20/IRLA File|Lic.No/Date:0510413859_—_/12.03.2020||||||
|||||‘Decision:|The Committee|considered|the|case|as|per|the|agenda|and|noted that|the|hard|copy|of|||
|3|||lapplication|has|not|yet|been|received|from|the|applicant|and|in|this|regard,|an|email|was|sent|on.|
|||31.03.2020.|However,|the matter was|deliberated|in|the mecting|and|the Committee|decided|tg cs,|
|43|||Page 47|Minutes of Meeting|No. 01/81 of NC-2|held on 08;9492020 Geneve ofaah meta|

----- End of picture text -----<br>

| | |

:

: | | | |

| | ithe ad-hoc norms as recommended by Consultant (SKB) as under: | [i | |IITCHS : - asrsa, | LECHS7 TTRecommended |J. | | [Code | PxPom Mem | Quantity | code | Mmport iim | Quantity ; | | 74081190 Bare Copper Wire or | 230.000 74071010 Copper CC Rods EC inclusive of | Conductors 1x4 mm |MT Grade 1¥ ' | RA concerned may take suitable consequential action accordingly. | i i| ALC2/2020|Case No.:10/1/81AVIATION‘Party Name: TECHNOLOGY LOTUS (Meet|ALC2/2020 No/Date:1/81Status:‘Deferred | HQ File | :01/81/050/00468/AM20/: |:05/23/040/00475/AM20/RLA File )12.03.2020[Lic.No/Date:0510413864 ‘Applicant‘Action by : i |154| Decision:lapplicationT h ase Committeenot yet beenconsiderreceiv ed fromthe casethe asapplicantper the andagendain thisandregard,noted thatan email the hardwas copysent onof ! | 31.03.2020. However, no information has been received yet. Hence, the Committee decided to wait, | | for the complete set of application. | : | ‘The case stands deferred. Case No.:8/1/81\Party Name: NAMO ‘Meet No/Date: 1/8 1- ‘Status: /ALC2/2020 ‘ALLOYS PVT.LTD. ALC2/2020 Deferred | | | HO File ; RLA File Lie No/Date:05 10413836 lActionby: | ':01/81/050/00466/AM20/ _|:05/24/040/00751/AM20/ |12.03.2020 INC i, .,.Decision: The Committee considered the case as per agenda and noted that Consultant (TEC-3) and. i155 ‘Consultant (SKB) have recommended the case with different wastages. It was observed that there. | ; are two norms which appear to be applicable to the present case i.e. at C-3 and at C-1679. However, | | | in both the entries, the wastages are different. Therefore, the Committee decided to ask Consultant | | | (TEC-3) and Consultant (SKB) to provide more clarity on the serial number to be applicable in the: 7 | current case. Hence, the Committee decided to discuss the issue in the forthcoming meeting. ‘The case stands deferred. . 7 ICase Now 11/1/81-—~—~—~=Ss@PartyName: PARAM ~—sMeet No/Date:1/81Status: | ‘ALC2/2020 INDUSTRIES |ALC2/2020 Deferred | | HQ File - RLA File ‘Lic.No/Date:03 10835385 Action by : | © .:01/81/050/00469/AM20/ :03/95/040/01157/AM20/ 12.03.2020 ‘Applicant | > 6 Decision: The Committee consideredthe case as per the agenda and noted that the hard copy of | | application has not yet been received from the applicant and in this regard, an email was sent on | | 30.03.2020.for the completeHowever,set of application.no information has been received yet. Hence, the Committee decided to wait | — SHERRY SUP TA 1 ‘The case stands deferred, es Dy.Direciorale Dirgotor GeneralGeral of FPuFov s ignign Tredoaes Ministry of Commerce a GUSTY AA | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020

| || |

==> picture [1 x 7] intentionally omitted <==

----- Start of picture text -----<br> |<br>----- End of picture text -----<br>

==> picture [596 x 769] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|i|
|||||
|||/|Ges|Naive|Banty NameAUSA|‘Meet|NoDutect/8t:|a|Statusibetervea’|||
|‘ALC2/2020|MEDICAL DEVICES|IALC2/2020|||
|||foHQ|File|RLAPRIVATEFile|LIMITED|(01.04.2020ILic.No/Date:07101 16253|Action|by:|||
|:01/81/050/0047 1/AM20/|.07/24/040/00304/AM20/|13.03.2020|‘Applicant|||
|i|renner|iene|eo «Amn|mint|I|
|jL>|7|Decision:|The|Committee|considered|the|case|as|per|the|agenda|and|noted|that|the|hard|copy|of.|
|||application|has|not|yet|been|received|from|the|applicant|and|in|this|regard,|an|email|was|sent|on_|‘|
|||31.03.2020.|However,|no|information|has|been|received|yet.|Hence,|the|Committee|decided|to|wait.|:|
|i;|i||(for the complete|set of application.|i||||;|
|||fo|
|||‘The case stands deferred.|||||
|||‘Case No.:17/1/81-|\Party Name: DIACH|[Meet No/Date:1/81-|Status:Deferred|||||
|||fo|‘PIGMENTS PRIVATE|(01.04.2020|||
|Lo|[LIMITED|||||
||i|t|poorest|nwratementry|ae|ae|oe a|cm|ewanot noni emmy onenna|araan etm pers cee rmeancemumsenryewnargeniarmmrtnroneas|||
|ss|':01/81/050/00475/AM20/||:02/24/040/00202/AM20/|13.03.2020|‘Applicant|||
|||ae File|RLA File|Lic.No/Date:02 10209825 ‘Action by:|
|||||Decision:|The|Committee considered|the|case|as|per the|agenda|and|noted|that|the|hard|copy of|
|;|application|has|not|yet been|received|from|the|applicant|and|in|this|regard,|an|email|was|sent|on.|
|||30.03.2020.|However, no information|has|been received|yet. Hence,|the Committee|decided|to wait:|i|
|||for the complete|set of application.|||||
|The case|stands|deferred.|||
|;||©|CaseALC2/2020 No.:16/1/81-|‘(PartyINDIAName: ENGINEERS|[MeetALC2/2020No/Date:/81-Status:‘Approved|||||
|i|||01.04.2020|:|||||
|;|||HQ|File|RLA File|[Lic.No/Date:05 10413868|||
|101/81/050/00474/AM20/|—||:05/23/040/00471/AM20/|13.03.2020|
|Decision:|The Committee|considered|the|case|as|per|the|agenda|and|noted|that|the|hard|copy|of|
|application|has|not|yet|been|received|from|the|applicant|and|in|this|regard,|an|email|was|sent|on|
|31.03.2020.|However,|the|matter|was|deliberated|in|the|meeting|and|the|Committee|decided|to|fix||
|ig|the|ad-hoc norms|as|recommended|by|Consultant|(SKB)|as|under:|||
|||TN|aaera|||
|[Code|Export Item|Quantity||Code|Import Item|.|Quantity|
|||1|ITCHS|1|The|eet,|||LECHS|the|Recommended||,|
|||;|395.000|227.250 MT||)|
|||||74081190|| Bare Copper Wire|MT.|74071010 | Copper CC Rods|inclusive of|||||
|||||a|i|es|AM wastage|||
|RA|concerned|may take|suitable|consequential|action|accordingly.|
|j|nccP|A|pp|PP|PO|A|Ps|SE|PPA|PPP|i|
||ALC2/2020|ISAW LIMITED|iALC2/2020|||
|||||HQ File|IRLA File|Lic.|No/Date:05 10413872 !Action by:|
|||:01/81/050/00470/AM20/|—_|:05/23/040/0046 1/AM20/|13.03.2020|Applicant|’|'|
|45|| Page 47|Minutes of Meeting No. 01/81 of NC-2 held on snonnenon|SOO|{|
|Dy.|Director Gensral|of Foreign Trade|
|Directorate|Gencial|of Fo. vc Tred|||

----- End of picture text -----<br>

| | Decision: TheCommittee considered the case as per the agenda and noted that the hard copy of | |i japplication has not yet been received from the applicant and in this regard, an email was sent on| | (31.03.2020. However, no information has been received yet. Hence, the Committee decided to wait. for the complete set of application. | 'The case stands deferred.

| | | { i |

| /\CaseALC2/2020No14/U/81- ——~—*(PartyName:[SAW LIMITEDJINDAL [MeetALC2/2.020 No/Date:1/81-‘Status:Deferred|| i | HQ File ‘RLA File ILic. No/Date:0510413873 Action by: | 161 :01/81/050/00472/AM20/ —;:05/23/040/00457/AM20/ (13.03.2020 Applicant | ‘Decision: The Committee considered the case as per the agenda and noted that the hard copy of| i | application has not yet been received from the applicant and in this regard, an email was sent on/ (31.03.2020. However, no information has been received yet. Hence, the Committee decided to wait | | for the complete set of application. | The case stands deferred. ! | (Case No.:15/1/81- [Party Name: SHIVALIK [Meet No/Date:1/81__Status:Deferred. | |ALC2/2020 (BIMETAL CONTROLS |ALC2/2020 ? fo |LTD, (01.04.2020 | | | HQ File IRLA File Lic. No/Date:0510413875 Action by: | |:01/81/050/00473/AM20/ —}:05/24/040/00759/AM20/ {13.03.2020 ‘Applicant i162 ‘Decision: The Committee considered the case as per the agenda and noted that the hard copy of) : ' ‘application has not yet been received from the applicant and in this regard, an email was sent on | |31.03.2020. However, no information has been received yet. Hence, the Committee decided to wait[|] 7 | {for the complete set of application. | | | ‘The case stands deferred. | » ALC2/2020 INDUSTRIES LIMITED |ALC2/2020 | | [HQ File IRLA File Lic.No/Date:05 10413882 ‘Action by: | 1:01/81/050/00476/AM20/ (:05/23/040/00477/AM20/ |16.03.2020 ‘Applicant /163 ‘Decision: The Committee considered the case as per the agenda and noted that the hard copy of | lapplication has not yet been received from the applicant and in this regard, an email was sent on, for the complete set of application. | | 31.03.2020. However, no information has been received yet. Hence, the Committee decided to wait | | |The case stands deferred. | | (CaseNo.:20/1/81Name:SIECHEM Meet No/Date:1/81|[Status:Deferred _ , ALC2/2020 ‘TECHNOLOGIES (ALC2/2020 | | _ 64, PRIVATE LIMITED 01.04.2020 x6 | _ jHQ File IRLA File (Lic.No/Date:04. 10166620 Action bys , Soe . . a Dy. Director General of Foreign Teo A6 ryrectorate Geneial of Pi ait ie ee | Page 47 Minutes of Meeting No. 01/81 of NC-2 held on 08.04.2020 Ey ce Gommeiss & eet FY

| | j | | | \

| :01/81/050/00478/AM20/ |:04/24/040/00197/AM20/ [16.03.2020 ~~ Applicant = | Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the applicant and in this regard, an email was sent on, 30.03.2020. However, no information has been received yet. Hence, the Committee decided to wait ; | for the complete set of application. | | The case stands deferred, | (ALC2/2020 ‘PRAKASH INDIA ALC2/2020 [Deferred , | | Case No.:19/1/81Party Name: TUBACEX Meet No/Date:1/81Status: | | HQ File RLA File ‘Lic.No/Date:03 10835401 Action by : r | 01/8 1/050/00477/AM20/ :03/95/040/01068/AM20/ 16.03.2020 ‘Applicant | | | |1165 Decision:applicationT h ase Committeenot yet beenconsiderreceiv ed fromthe casethe asapplicant per the agendaand in this andregard, noted thatan email the hardwas copysent ofon, |!i | for(30.03.2020. the completeHowever,set of no application. information has been received yet. Hence, the Committee decided to wait| || | ‘The case stands deferred. | | Case No:2/1/81- —'PartyName:JANS = Mect No/Date:1/81-—-Status:Deferred. | ALC2/2020 (COPPER PVT. LTD. jALC2/2020 | | | | | 10.04.2020 | | | i Fi 66 :01/81/050/00479/AM20/HQ File IRLA|:03/94/040/01044/AM20/ File [Lic.No/Date:03{17.03.2020 10835436 ActionDPT by : | | Decision: The Committee considered the case as per agenda and noted that a copy of application was | | | sent to DPIIT on 07.04.2020 for examination of the case. However, no comments have been received | | — lyet. Hence, the Committee decided to wait for the comments. | | 'The case stands deferred. | | (Case No:22/1/81—*(PartyName:UPR —([Meet No/Date:1/81- ‘Status:Deferred | | | ALC2/2020 ENGINEERING |ALC2/2020 | | fy PRIVATE LIMITED (01.04.2020 | . | AQ File IRLA File _ —_{Lic.No/Date:03 10835465 ‘Action by: | | 01/8 1/050/00480/AM20/ __|:03/95/040/01185/AM20/ 17.03.2020 Applicant 167 Decision: The Committee considered the case as per the agenda and noted that the hard copy of . | | application has not yet been received from the applicant and in this regard, an email was sent on | for30.03.2020. the completeHowever, noset of application. information has been received yet. Hence, the Committee decided to wait!| | | ‘The case stands deferred. | A7 | Page 47 “Minutes of Meeting No. 01/81 of NC-2 held on secaDy. 200016Dirsctar General of Peroigncan Trade || Direciorate Gorieal of Po. uen Vrede |

| | | | | !| ; | | | |

| i : i j i

| ; |

|

7

i

| ‘ i

||<br>j<br>|||<br>StandardDeficiencyFormat(SDI)<br>‘Exportitems:<br>1<br>Model number, technical specification and specific quantity-both in terms ofnumber (if<br>|__| any) and/or weight, of each export product (Appendix-33 of current HBP refers).|
|---|---|
||3<br>Detail technical drawingswith dimension ofeach export product, Catalogue, ifany, may|
|i<br>[|5<br>Weightofeach oftheimported and indigenous input, separatelyfor each product,forthe<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each<br>imported and indigenous input in the export product may be indicated. Net weight along<br>with details ofother imported inputtobe used inthe resultantproductand soughtto be|
|||**|** 6 | Information abouttheinputsrequiredperunitofthe **r**esu**l**tantproductasperSI.No. |of<br>|__<br>Appendix-11A<br>appearing in current HBP (Vol) sepa ate y foreach product.|
|:<br>|<br>||8<br>Assembly drawings/diagrams ofthe resultant productshowing placement and exact use<br>___|___| ofcomponents<br>intheexportproduct(s),<br>9<br>Bifurcated quantities ofcomponents to be accounted for inthe resultant product and the<br>___|__| requirement of components as spares. Raw Material/Consumables<br>10 | Sizc and specification including gradc, composition, range, thickness etc. ofthe items<br>| |proposed<br>forimport<br>eee ennpneee<br>11 | Startingfromthe specificationoftheexportproduct, basic calculation astohowofraw<br>material proposed for importhas been arrived at, including the netweight ofcomponents|
|i|to be manufactured out ofthese imported materials, wastages claimed at each stage of<br>manufacturing<br>with<br>complete<br>justification<br>and<br>supported<br>by<br>documentary|
|i|11 | Sheetlayoutdiagram ofthe material indicating thewastage during blanking|
|j|12 | Cross Sectional Diagram ofexport product with calculation ofraw material requirement<br>and the weight of the Cable in Kg. per Km. Copy of relevant National/International|
||13<br>|WeightofSteel, which requires importedweldingmaterial, givingbreak-up of:<br>i)<br>SteelPlates/Sheetsupto30mmthickness|
||ii)<br>Steel Plates/Sheets more than 30mmthickness and upto 70mmthickness|
||iii)<br>Stecl Plates/Sheets more than 70mm thickness.<br>___|____|__<br>iv) Others e.g. Flanges, Pipes, Tubes, Bars/Rods, Castings/Forgings ete.<br>14 | Particulars of the licenses obtained in the past and ratified by ALC (with or without<br>modification) for the same export product covered under this application, in view of|
||Vy | 19 |Anyotherinformation:|
||20 | The information called formust be submitted in duplicate within 15 days from the date<br>of issue of this letter. The information may be directly sent to Chairman, NC-II, O/o<br>DGIT,UdyogBhawan,NewDelhi-110011,E-mail:nc2.dgft@nic.in,OfficeTel.:|

| | | RD

|

; |

| |

| || | |

:

i

i |

bo : .

|

4

| OTT ATA | Government ofIndia \ Cu RD seaathrar sit qaar wlenfient dare ANS Ministry of Electronics & Information Technology | seaetiren Part, 6, dt sft att wtareian,ag feectt-110003 | Website: www.meity.gov.in | Electronics Niketan, 6,C G O Complex, New Delhi- 110003 : | NoW-41/3 (2020-12 HW-Meity Dat@rnsecceemih i03:2020.., f , | ; Subject: Ratification of norms in terms of Para 4.7 of HBP. (Vol.1) in respect of Advance Authorization No. 1010059350 dated 30.12.2015 issued in favour of M/s. FCI OEN Connectors Ltd., Cochin

This refer to DGFT L D. No. 01/81/50/794/AM-19/DES-2/12 dated 03.06.2019 seeking Cc o chinmmentsfor of export this Ministryof “ Connectoron theP/N”.above mentioned application of M/s. FC] OEN Connectors Limited,

  1. The application has been examined in the Ministry of Electronics and Information Technology from technical angle. The import items are required for manufacturing the export product. This Ministry recommends Ratification of norms of advance authorization as per the detailsEncl :- As abovein Annexure.

|

.

Shri Shobhit Gupta, FTDO, O/o DGFT, Udyog Bhavan, New Delhi MeitY No. W-41/3/2020 -IPHW — MeitY dated 18.03.2020

-S Prtvotmedl Lanwdtos

==> picture [116 x 32] intentionally omitted <==

----- Start of picture text -----<br> CV)<br>----- End of picture text -----<br>

(Sushil Kumar Jangid} Scientist-B Tel: 011-24301784 ftp-iphwé@meity.gov.in

==> picture [9 x 32] intentionally omitted <==

----- Start of picture text -----<br> ee<br>----- End of picture text -----<br>

==> picture [3 x 18] intentionally omitted <==

----- Start of picture text -----<br> |<br>----- End of picture text -----<br>

==> picture [596 x 829] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|i|
|i|
|F|~y|
|}|
|;|
|3|1|——|
|E|zg|||
|E}|falas|
|H|||ge&|nNRAIS.|aY|fa}Nyite)|Sghwi|SJBeye Q{ cl|w||i|*o|
|ql|4|re|||Ge|s|ery|i|oi|
|J|5]||g|Oyslais|as]|ct|Ng1&8|
||!||8|al|cl|7)|Wie|fw|AIS! oh|ta|1|1B} 8|Sy|sla|!|
|FE|dt|“gsstYe&|iedmm}|sr]aa|oawo|wlaln!|on|im|mal|lt|:|
|BO]|j2me)|[Sinlal|&|(GS|Sls|8g)|-4|~|
|i|Fy|aAlea|mls|BI|Sistisig|1Bl ailm1|ree)oe|a”|xd|Ola|i1|
|i}|o|a}|AS|||
|;i|1|8uy|a|”|0|<4|y|bed|se|:|Hi|
|Hli|teiy|foal|ij|of|2o|2|:|
|[|Fiségb|BSB)glalg|nS|S©5|lojslal[AB|&[mole[Qsisis|wlbitsihelajo!|&9ie|wim|3@|||
|:i|niB9|SAYS)|bY8BPPSpay|&|Sls/a)s|O/Blalasala)a|38oo8|wbma8|/SiaigIole|re);|ARs]sl=alelR|Be|l|oia]|=§s||,Vis{als(Qe|||
|||:|j|
|Hi:|aaha|wilA.|&;|[¥|ce|ee]|oc]|ec}|yi|.|;|E|_|a:|;|
|||Seal|ele)=2|SSE)|6|(SCE SIEE)|leigle)Zigig|22|[Sele](VEE|SEE&|leieie|~|dd[gigig8:|=idle|||
|||£23|glial|®|lajalal|o|€|
|ii|=|gE|SSlNIN;|S=||WISINIAIwia!|oWS|SslZigigis3B]|[8] B]]|ol|¢|st]|te%|¢|25|
|fHijii|o|soleywlio]|fo2fdz|(SINSWlholwfafsfet|wo42rt|Blais|[|A8otiaf eayetRallsWhinj wos)sis|rs)alet]mtnofedot|edSo&|Rmweap|byomstet|pal1%tspei|00to]etethst]onl on stet|baia}c|;|4i|
|&|mayest|tapes}|By|os|[eisleal ales|=2|
|7|
|8|3|te|[89)|fa] fo|fain|i|||
|I!|*|O5|i||
|:1|iyv|elaQ|w|DiN||w|‘|||
|||8,|re]BIE}8|B88)THIN|[St]|[om]|2|iN(Risieiseig)ive)|[sleialt/2|=|teleQe,|BS|[elafanis}wo|!|
|:|i|mio|Solo!|Sicidio12/0/60|RIAPs|eaeidiSiSls)|&|(SiSls/sigic/BIIe|{Aey|Oh|3j|
|||6i|O/Olol|o|+}|7|olmAT PS|slalo]&|aSs|DOO[HO(8/S2lelAau|el|ie Rie)a|was|celtOays|F4|
|ii|o19|1|
|!|°|setisefeven|
|\|
|mle|
|iHi|Recyaals46823%afi2|AnemSiN(asrye|NEN]SSS]Aaase]|72/0;s2}|3oO|Ssig/2|A(RSjsisis88] a8]ATQpQpola 88] se}A|||ae|IE]msSB)1PIES11 086|BS]Sisis]|S|/S15/Ig/o ak}|agt|&ag|x2}(8l(slSiSisis6|32]|xxe]:|se]on ae]ro3] se 8|at]Sse&|xe|2|Pa|BS|y|
|i)a|=.|[NP|oN||[AAT-|4|SN|[AiN/A/a/sial|NIN[BISia]|NI(818||{j|
|;|;|ola|&|%|iol ann|on|=|a|
|:|ejSizedi?saeBou|$sc|38][SSalmisisis;rialA]|ak)|S se|BS]Sylar]e|se|°|&ag|(B/Sfae|SiS) 818©|setae8)|:|8/30)|ae|2e! else! so]|we|
|2i22Og|pSesyeey™|a|laliaisisicl|falsislelssieis)8|(S/S/B/8/s8)|(s/h|alRlsis|
|||[7|5|ISiQa|ISS}|&|(eielssiale|mH]BAR $218)SAlsiaisl]BIS] S/S)|ASM|[espAl|a|eisetae/lsiaialalseine,|(Rod| Fh) Bac} 8/32alelels|
|BI|SpA]|ra]|oy|ed|E|
|!|BL|al|
|fe|3|j|
|&|YimslOojaluja|,|||
|wm|peO|ty|Baselsishats)Gla|salnmlelVisig@|aOo|ISRlala|SIS|we|
|||eec|3|MINSR ciS/s/a/¥/a)ISIS!|Sl GIG|81||SSASIAcs)OlG)/ ojo|Rs[S/SSg)S1g18)8)Slol¢|3);|&2|lelgiaigisT/Olin| Slay|BIS/OIn|
||||z3&88|2,|2|[Slaldlala|aleaI|ei|S/o]a] a/S/8]/8 dia/d]|Sso|jdjojalalalsBISis/sigiss|ayHistlold|e]eda} be 4|||
|||
|=|5|S/$)s|35/2vlalw|a4|lod||i|
|oO|2)|Ot] of|ow|ww|
|5|GOGO!SScesi|olaG4gisisiefel|=S;|EEsls:|i|=BS/S/5|ce85/8)42/4)S|SisislPlaje] | ad|S)2)5/2/2|ele|s=ej5/6)|=x5=)||s)3/3/§SISolel|ad od|w|uv3)=/S/2/S/S/e 5/213)Yelelw 2/5|E|i|
|©|6/9, O|Sle|||
|{|
|aE||||
|]|a|ala3/0.Biao|mt|==oO¥|==|irlst3|asa2|Fon=|=|=|emt AI|j|
|Hleial|Sis|=]|3|3|2|u|S12|ji|a|3|s/s|:|i|
|Bits|coljal4|oFwl|2=|8=|Ol|thSi|sx2)|a)=||2|8=|Pea9|S}9S|;|
|E|§|[2] 99|2) wy|m)|BR|[fowl es|oes|aed|a)|a)|ow,|2|&|Sy|My|3] S|
|i}|
|‘&|OS|/|Elals;ajs]|los(sias=|as||&=2|(|SSeSSES“|SZa5)|S|lala)SS!Aye|lo(e|l|sMm}.e|8ol|we&8|lxjSislkle18|12/2)a! &|3/8)|™)Sa.[BS|
|BISI8!|[ole|
|e&&Q|lAjsay/Ple2)TBISE)ad|pe|LEMS4fsfalajeyol(os)_/5)w|—|SiSleard|wSsS|[EISe/S|S/SiB/Sl5|[aja]aaleiZiZiaie]=|SB|slelXl=|SIT) ae||[ape ape[oa|”(“alesis(/a1eofica|[NSizZz1]|4|ml5)|¥&5Ls[S/S(E/DIEsisle(SjsiaIN|SSISASBShee]|]|e/slS)ih&|[arslow]|gee|S|Biswnto) ||se]a8op|||
|£|zi“igiale/sialais;<gis} | calen|bs|QE[sreyeisla)Aymms!ie|&&&||S/22/3/SHOABo]|of OlGryais 819)ma;|=F1Slal_8|S15)aa||e[So|slel2igla)LZgzalSiA is/o]ly|S=|=alsez(ojsls/8/s/zlzligpercSais! /eie)||e[3|sielelSgis|
|Zj2/2,|Si Y|1s|ol s/Bla|All|PE,Sleih|
|o.c|ay1|elYi ee aisle]2)BieSwiss@) RIS)Ol|aie|WwSa|[alLjE(Slol slzlalSlZlel gal 8a]aS|slAjBiSlisiTlsMIAN|al @ELIE!Cw SES)eis!|YSS&||BWi[Sto elSl9 elslalflO)sie]als|&=/ |eBIZSig)|Co]|ale) eaeEla S1QS|I‘|
|=ae|Ski2|i|EIa/OlS| A 8) E] Se]Ze) &|i|[SpeAl SBIR] gyalai?|at]|BYe] ype].2} ALBEE) Weo/o/2|wl|:a|le|SB S(Sl BiolSls|218|wlviaaBD)4]|a) oo) eo}|&Sy|a)giwieQSis|q4|
|Pi)|Gitded (VlalOoal 3od eddzl|Zz>||.Ia|Sl(GIA!s|/2|Sis}|Siz518) 8/3]siSl8l %|el|Zz}Z| >|G|S/SBlSVie] SiBl Sl|[S]|al al|Sl Sl Bials|t|
|EMIS|
|“Nv|5|SlySalPO]slZiog)By] OF|9ae|il[elgis|iG|Q)|a!2} Slal| 0|Tic!|S)|SISlol/Zzlft|Zz|ia|ElslaA|l|sit}alm]|¢/f)3]e} 8els] 4ielSs|l|2z|F|
|©|S/O|A/a]|2|TN|a3] GF|2|SO|OS|Atk,|Nolel=|3);|GS} BE|Fi|]|
|“|OIA|8|El BiSlS1S/8)|8|SR/al3/8|3|é/|3/3) $12|8/¥igi5)|S|[8/3/8181|2)|8 la/a[ Tel|2} ale|
|Sates|STS|S|EIEIO|2]|||S181)|2/8) 813/8/8!|8|SRS SE|91g)|gu]|S|e1S|
|pe|rd|id|ed Bed|wlaiteotes|
|eH|HT ON|SEPtas|OPStstetestm|ol|a|POraped2(P1S/2/4l Parayearenarerp|ab|ett|eg$)-||ofolENEta)|TESeee2)7 S/SIn]||2keeOTs|:‘|

----- End of picture text -----<br>

||||||.|
|---|---|---|---|---|
||||Ch<br>st<br>et<br>Rls<br>wloy<br>DM<br>[tr] 9]0<br>fal<br>walcay<br>gy<br>lo<br>] SHRANK<br>AB<br>leatgin<br>Nott]<br>aS!<br>Slals<br>BSR) 2 [MBAR<br>mB<br>t|St]ek i] of<br>BlS14<br>a<br>Bos<br>stsfS<br>ayS|<br>wlalwl<br>2S<br>1OGinlalala||
|||:<br>tm] |St<br>fa<br>i<br>et<br><t<br>wo)st<br>S| 8<br>Jalsisisiaie|<br>|S/S/8)<br>/8/sial<br>8 jalsiaisials)<br>Z/8/8)<br>Ialalel<br>8 [aigialalala<br>F<br>ed<br>:<br>+<br>ie<br>Hihora noes<br>;<br>Seed Od etdis<br>|<br>mI<br>&<br>elSlt]i<br>BIR]a<br>Ry<br>RR [Ll] Apa]ars<br>S118<br>wife}ol<br>J IM S|Nlololei<br>q<br>j.<br>Ak<br>|<br>v<br>y<br>f<br>i<br>=<br>2||:<br>2|
|||;<br>=<br>on<br>wan<br>=<br>a<br>i<br>2<br>rs<br>:<br>:<br>|<br>tm}<br>st<br>Fal<br>ly<br>Shiela<br>1<br>Ps} og]<br>ey]<br>feleaist]‘S<br>mw<br>ley<br>|<br>S}OPOARRAS!<br>lealgicl<br>& INSl] @ YS SiQry)<br>ISlel § |RiBlsl & |aslaaqan<br>q<br>a<br>:<br>hPa]<br>f<br>Hie<br>Lit BM]<br>5S ied Oa ald<br>ltd<br>;<br>|<br>&<br>tS) into<br>ols<br>3<br>mn)<br>oD]<br>A]ul<br>So<br>Blslm)gy [joj<br>9<br>[MolNiolald<br>*<br>3<br>3<br>i<br>&<br>a||.<br>:<br>a|
|||E|s<br>:<br>a<br>ns<br>fe<br>=<br>&<br>_|||
|||i}<br>I<br>i<br>i|og<br>food acd0dPett<br>wiv<br>6<br>|v<br>ce<br>fecpoc)<br>oct us| |<br>YiMins<br>B<br>[ws<br>oe| oe foc)vi) oe |oc<br>Lae<br>BPE EVS/ESSIE)<br>Geis<br>8 SEE)<br>& E/E/ES egg) 8 (SEE) &|EESIE/E/E<br>=<br>2<br>mio<br>infested)<br>i|i<br>||
|||i<br>;<br>|<br>|<br>f<br>|<br>:<br>{<br>i<br>I<br>li|al 2 jeraaisiaay<br>[sysie!s<br>[sisig) &<br>/sisisisisig!<br>|S/eis]& 3/3/8 |zi2/s/3/s/3<br>oH<br>alas<br>i<br>aN NIRA AAA<br>AAS &<br>ALAA)<br>A [AIA RIAAlA<br>mywmlin)gw<br>palin<br>WP)<br>inpinna ww<br>a<br>—<br>—<br>2<br>-<br>5<br>8<br>*<br>*<br>in<br>B |93/51] fe] S| oo<br>a]ob|%<br>Kislay<br>&<br>(SlBlSiklas<br>O|aia<br>SSG)<br>B Via<br>B Sls<br>N<br>14)<br>BalSisls<br>Lop) es<br>edt]LO]rel<br>oo<br>ralad abel bod<br>eee cd va<br>wl P|ON, a<br>Olstystlet es]00<br>Sat]<br>aE<br>Bad ocd ocd Bcd ect boc<br>Se ard a<br>sheifet<br>et INTO;<br>O;Oa Se<br>Fe ed<br>eedet<br>mt<br>PNTOLO;<br>Oo;a)<br>eo]<br>3<br>jalds|dlaidia<br>ol ayst<br>aiolal<br>co<br>ldl6jdiolaje<br>Q)3]<br>Bl/o]o|<br>6<br>[olaldidia|s6<br>od|j<br>hk<br>|<br>E<br>iq<br>:<br>;|
|||||||
||;<br>|<br>4<br>i||xe]<br>se | ag}ae/selaelae<br>1S xe<br>xref}<br>oe.<br>behehelsehelse]<br>|E/Bhx<br>xe]se]ae) ge faz fag) se)ae]ae<br>i)<br>¢<br>g<br>518 818/88)8|8<br>eta|tA<br>8/3/9<br>ra} B1Si9/S/S|/s<br>ARE<br>3|3/9 S SSS/8si8<br>Ld<br>hw<br>ardSedBerd el nd<br>mf ed] 8<br>Qeia)<br>&<br>2 RPQ O;a;e<br>viet<br>MISO,<br>S<br>FSPSepepers<br>m™<br>N<br>MENTS] NEN<br>NN<br>Mpa} mM<br>NENTS<br>™<br>INEENT NINEENG<br>hs 7 ko; MO<br>INTINT<br>N<br>NENTNEN]<br>OY ON<br>NEN<br>NTN||
||j||||
||il||—<br>:<br>_|||
|||<br>;<br>4<br>|<br>I||eg}<br>se<br>faelselactsgiaciae]<br>|BIR]<br>ae]a8)<br>ge]<br>3¢<br>ia<br>x<br>#1 Alget eB] aglegi<br>38<br>g|39/38<br>S| 8 SS S888)<br>(SSBSissies]<br>8 SSSSS/8) ASRS RS SS) & ASS Sss<br>8]<br>8<br>jeasjajaje)<br>[LSBs<br>SiSis/s) 8<br>Slessyeys)<br>(AAV<br>sss]<br>S /Blojsis/aje<br>NP<br>NIN Ned<br>A ye<br>HMMA<br>NTS NE AO [A]<br>| AT]<br>dy<br>rial]<br>AD<br>fev[all<br>a [NNT<br>AN] il)<br>st|st<br>in}in|;|
|i<br>;<br>}<br>|:|||2]<br>2<br>q<br>x<br>ci<br>pet<br>al<br>ci/wlwol<br>@<br>fet<br>A<br>sa| st<br>A) 8 BSS SSIS) [BIBS SS/SS/S) & SS SiS/8) /SiS/SS/RIS**I**G**I**N|<br>& |B SIS SIEIE<br>:<br>so<br>ef|e<br>om<br>bel<br>nat<br>8/5/8/8/5]/<br>OAS S/Slalala) wi [a o/a/olsla<br>NPRM<br>pOletetpey ct<br>A/8/8/a/a] a<br>of<br>3<br>|dfaldlalaic<br>Niaislo Sldidial o<br>[alsis/alajo<br>tld]FiSlojalajal<br>od<br>[djalscialcja|;|
|**|**||||||
||.<br>:<br>)||||
||<br>||:||Y<br>wvlalu<br>o|W<br>a)<br>nlniw<br>al<br>va)<br>el ge (ecleclelSiele)<br>|S/S/eislzlSlele|<br>w lelelee|Sleiey<br>(2igiSislsiglele)<br>© leiele/2 ele<br>2<br>= felis<br>e/s| |S/sigisielslziz\<br>= |z|z/=1s\s15|<br>|é/gie e/a/slziz| = |212|218)3|5<br>=<br>ZS/F1GA]F]<br>[GIG/G/OO/G/<br>4i=) =<br>|=|=)<br>215<br>G]G] 5]9]OG<br>6|ij|
|:|:|:|:|:f<br>||
|||||||
|||5<br>SI<br>als<br>3<br>3<br>a\8<br>5<br>=<br>.<br>x<br>rand<br>=<br>O19<br>=<br>Fi<br>2)<br>318<br>4<br>San<br>—<br>;<br>—~|<br>=|<br>Lo]<br>NTO<br>~~! &<br>=<br>val<br>NS<br>a &<br>ne<br>w<br>j<br>=| 8<br>ri<br>Oo} 4<br>Ble<br>=| g<br>6<br>Q<br>Be<br>aS<br>ra<br>Q<br>=)<br>Q<br>2! a<br>oe<br>a) =<br>Oo<br>Sy<br>tix<br>sos<br>g<br>ro)<br>q<br>4<br>8<br>ale<br>“<br>my<br>Hl<br>2<br>8<br>2)i<br><<br>ia<br>o)<br>=<br>ey<br>;<br>&<br>lol<br>(Slo<br>|S)KISS<br>al<br>a<br>[a_Sta)<br>12)6/9lg<br>ml<br>9)<br>&<br>la<br>JO}<br>Ss<br>|<br>2)<br>6 (SSS)<br>La |] x<br>2) gy<br>2)<br>m6 |alSR)e)<br>|)slala)<br>[Se<br>fa § (SSS)a<br>o<br>,<br>|<br>z<br>BO Se Oe|Spe PE oh| WO] LO<br>eel Fy<br>Zz<br>|] SI Se) se]OO) et |OL<br>Fay<br>m<br>Pf fee aed A esa<br>i<br>a) S (SiRlsste|<br>2(gS) (Sela je] 8 [SIS/({[S/Sleig<br>isis) [elals |s) S (S/siSelge<br>om<br>hs<br>Sig/go)alo<br>5 |<br>i)<br>bs<br>|B Sta<br>olo<br>o|.2<br>ia)<br>ee |S] FiGG<br>:<br>|<br>“|w [SSE Sis<br>Si<br>QlsSl fe) w<br>EISIE]zialz<br>areal<br>PSPS<br>|]weSel<br>S|aia<br>:<br>\<br>2)<br>&<br>|e/@ibyainias|&<br>AlSial2| ¥<br>[EIS]<br>Slala<br>&|*<br>Alsleriz, 4 [EQS anys<br>4<br>6] 3 SleGlajzia|<br>sie [8]s|si28! $ RSlSlal2/Z2/8|aie}<br>leleje[o) = |Sle|Sla|2]z<br>|<br>ser<br>miMd<br>br]<br>‘=<br>xy} Be] he<br>—<br>gon|LA<br>if is<br>ELEISI,<br>neat<br>><br>| Ud<br>:<br>q<br>dl a<br>=|2121318)2] 2 [e/a<br>le]<br>1 Sic<br>ire} =) 9) 2)S]5) a)Sala<br>a —¢(=|Sic g S/S)3/8]2<br>YY<br>BslSilVigisisla,<br>|S<br>ERla|4)<br>2 |S slOlsilia) Fisisy<br>[a<br>ElSlealel<br>& |S elSlsielg<br>|<br>GO]<br>GO [wy esi] eyo<br>Blals(PPESEOG! G LR ers]S] sla<br>ialty<br>EIMIEVSG! G jBlets]<br>Q]ale<br>j<br>=<br>3|<br>3 A 8/82) Sa) 2/228) €) Su Se 2 (8/9)2/2) §)o| 2/BjBiBle)<br>Swlals) & [8] 82/2!<br>gio<br>i<br>X<br>q<br>~~<br>2<br>hl<br>c<br>bad<br>2<br>_<br>o<br>‘<br>cE E<br>a] 8)B/§| 414] ¢ 4)21S Ble|Sizle|<br>Sym 8/5/217) ¢ a)ggialejoiale| & Stay |S)817<br>Kur<br>dd<br>ini<br>Q<br>e**e**r)<br>a<br>2|“ke<br>y<br>oopul) Ud<br>~<br>]<br>aw<br>;<br>cB] ws) Dj ao<br>2 | od] 3} O} £] Elal<br>Blu) D)copw) S| og)alo) 8) Elaie<br>0B]<br>| D] cof uy<br>i<br>:<br>21<br>2<br>Inlicls|Ziols<br>ee S5) 5<br>21<br>2<br>inla/SiZisis|o<br>=/ 3/3<br>2<br>2<br>imialsizlols<br>:<br>aes<br>i]<br>G<br>|H/el/4ig/e<br>a8)<br>elslclAla}<br>w<br>je<br>et)2<br>Blas cielsig/Sie) &<br>5/8<br>a)8<br>SS)<br>8 [Se Seles aliasagai & SESS ze] eieizisialglsis| $ /aisisial2s<br>4<br>NX<br>Q| 2 [SB S/Slals] S|Bla S/S ss sO)<br>[**ei**s s)S)a/S|G] olols)Os slsiSl B jsislsigiaia<br>;<br>Pr)<br>Ol<br>GO f2| ia Olula) O lAlaAla Olal ei 2 0) O l<br>ya) Ola.)a<br>APAlae Olapale!OL<br>WO LeyalalO)wo<br>i<br>7<br>v4<br>i<br>uy<br>|<br>Qe<br>[ee TSSISTRPS Spe APSF TPPese] [eisiaia arn] Teles]<br>© [S[S[S/e]S]4<br>|h|||
|||||i|
|||||{|
|||||i<br>I<br>i<br>t|
|||||f|

. id

H dii k k i | : I f ; ! A 4 ! I i|li i |

|

; : ' ! q i |

| i| wo uw e Cy a a ae | Eatus gs le ¢ 8 | aEeM pMUywwWoeeowi q | eo i | = i) 2a 28, 3 — | y3 £uyQc2 jagelgj a &a SoBaEsa.,| . | 3 LOGsl?e/g 5& £)8al Bi Bal; a8Fo8 || | | |a 2 g; a w3ie tnd rte) i BS fos1S a1s| &8 2 iY)n Paloy twNM SOo faa)“| mySs nN 4 iwSh fea)y fo]d &/of 22 I 5 strt f‘ Na n[wn} ost :; £ jh wim TBS | 2 2s . tr ye y ¢he | 2¢ , oa S ee3gkfA ya2° = 8 a x | CxoQ #or Fy fe®4 gsed2. “S ;f DE» 2B Hna £3 | eR, £ Rieaia n £ oO ol i 5M £ as 4 q we pag BG) a i a. gs aogg® 2eseAs &‘. i oS=. 3s> egauBS}od2 ceedsaisOo tisBe =g ]| GN co) a2, Nl > > : P Lom) o —o> oO TO} eke Le i N el BI a IO ras \

|

|

| | i |

; |

. 7 i

f

; "

: |

| |

|

eet

Government of India Ministry of Electronics & Information Technology seaitran Faet, 6, dt sit ait alerted, ad feeet-110003 Electronics Niketan, 6, C G O Complex, New Delhi-110003 Website: www.meity.gov.in

==> picture [60 x 51] intentionally omitted <==

----- Start of picture text -----<br> ale Vf<br>wv<br>----- End of picture text -----<br>

==> picture [29 x 17] intentionally omitted <==

----- Start of picture text -----<br> fonts<br>----- End of picture text -----<br>

Subject: Ratification of norms in terms of Para 4.7 of HBP. (Vol.1) in respect of Advance Authorization No. 1010059668 dated 19.12.2016 issued in favour of M/s. FCI OEN Connectors Ltd., Cochin

This refer to DGFT 1. D. No. 01/81/50/849/AM-19/DES-2/11 dated 03.06.2019 seeking comments of this Ministry on the above mentioned application of M/s. FCI OEN Connectors Limited, Cochin for export of“Connector P/N”.

  1. The application has been examined in the Ministry of Electronics and Information Technology from technical angle. The import items are required for manufacturing the export product. This Ministry recommends Ratification of norms of advance authorization as per the details in Annexure.

Encl :- As above

3 Pan (Sushil Kumar Jangid) Scientist-B Tel: 011-24301784 ftp-iphw@meity.gov.in

Shri Shobhit Gupta, FTDO, O/o DGFT, Udyog Bhavan, New Delhi MeitY No, W-41/7/2020 -IPHW - MeitY dated 19.03.2020

Ee PV towed Bane lace

==> picture [56 x 27] intentionally omitted <==

----- Start of picture text -----<br> eee qrret<br>----- End of picture text -----<br>

==> picture [9 x 27] intentionally omitted <==

----- Start of picture text -----<br> is<br>----- End of picture text -----<br>

==> picture [16 x 27] intentionally omitted <==

----- Start of picture text -----<br> |<br>: |<br>----- End of picture text -----<br>

==> picture [2 x 13] intentionally omitted <==

----- Start of picture text -----<br> |<br>----- End of picture text -----<br>

==> picture [594 x 799] intentionally omitted <==

----- Start of picture text -----<br> q<br>|<br>i- CO) |<br>b<br>i savanna en a neni 7" : anger ose a emetic - |i<br>ii ce]3 FT<br>i zec ite)mh Nwn 3S ive)|R Kg a & N9 be}b Fi<br>E s | m m io Shoo os mo | i<br>Os ™ w@ N 1m g a] wo iG g . :<br>i $ . “ s bed ia et wt<br>1<br>i<br>| St mM |) a6 ik wn | ™m io]fA ™Nx | 4 i:<br>: & & a | ~ 1g ‘| « N mops i<br>| eo v|N| 2 aSa |S x | 34 qa Q|4134 fi<br>|\g> q<br>i<br>{ 3& reg al $ st | 0 ie) 8 09 3 5 8= ‘<br>3 > s/s] 8 3 |8 e| | 8 i 8) S| 2<br>i «a % ae tw gj |S nm | 8 © wv om | a 4 !<br>6 a/@i ¢ Sa a g Be, e) ¢<br>ii £ OD° N ° neQo ™ ol et oOOo<br>| 5 a a a<br>i a i] fsa |<br>! sr= E }S € ¢ !<br>:i OBS= O“| io)8 S“, 2 ls lg 8 24 g\g g q§<br>i|2 26©& o a Fo ;<br>$ $ ba 47<br>|it: Ay md% ® % i<br>| 5 g/ 8) 4 % |% Rig] 8 g Bl| 21 &<br>|1 g3 wvain | Ww&a) 3=& mosmSa [Phfe a}iQ a&Q =)3is] fiaamn NERgN 5g 33fa . ;'|<br>‘a 3 3<br>:<br>4<br>#<br>i »y io]a Q xomS 7;Ojo cow]a“ wha i v e ] ise)° is)Ww i<br>: 3 A w o 1O ol i i) aA ia) |<br>” | oot mM 12 wo) bs 5 Ny :<br>0 e ow w ao |o o es) tS 9 “ :<br>eia i 6 — —— : i<br>. In| E 9 x | x x x | R x = | x i<br>| O;2 Fe gi fa q | & o eR |<br>: Of #3 P| oO I + | I ss |<br>|7 slze8als 2 8 | 8) Ba8 4a gaja| § aa g|a | 3oa i:<br> - - [ee ft ch on creer reer some -- esowe-passssmmmsssac| — j<br>Si, ck eo Cy ° o a a i<br>3/8GifS83£80vs [a]° wnafm; | 9sighs2 |e]{sy 94 3sls}yPyal(8[Aim63 Ww}sa)! | als4so, OQ]sl[S| 83 maRBPye}|s|1783/|S]; 83 insx|pte|| =m¥ isl[S|io[S| 88s3 |;{<br>ve<br>ca<br>68<br>‘<br>faxposcc +a|t | 688)iol ~3x ti~ o||ml|o) © Q8/3a | ® ja!lol m&a 86 lalJol 2aa 8)Sixaiawojal a : :<br>& & a 2) %a |S)lol 9a aN |9!|ol 9o fo)N |] aN /S}@ol gga =A |e]|3] 9a aNi | 9oa [SG]Jol 9G i<br>a [&]<br>2<br>& eeererneees tee if<br>1<br>!<br>g wma | aOo [eyOo) x© OU id/OI © is)2|2Oo {alIO, 2© @6 le)1}O) &© ise]aw | oOo [el]|O) ::|<br>i}<br>wnm wy~ a wBS Wwim wis f<br>= lex Q - N le Q a N wm le N F<br>omo |8| S a Pa ema |8(| ba KaQ S ega |S1a bs ;i<br>a |e 8 a 3 A ie 8 a 3 A |n 3 i<br>Rg 4 x} 3S¢g 8C lel t» 4g 18£ ct} 2 ga si] =@ &a2 &14 sl +9 ij<br>~ s a a 1G | ete a qi ro ioc be baad bj ww les = a a od “ Ss a | ame i<br>i) fd of al & 19 ia al € 1% fi] i al & [0 a a & |O ia ic} ny & |? j<br>Ea ge- 18Ja b§[8 (3)je] 3 8] Io@ fs)jol BIE3 [so» |G| |SiJe! BJSSIS [GoIo isjes) BieSle |o|e |B|B inlisl SISB ; |<br>f= ceWwW “Aa Ao Oo]° vA ir|& wva |O)2 A Ps|& a)a “Aao |O)2 a” wi wya [S|° A id vw. r%)a JO)© a Wwl%<br>e Fe] a tn Al wy ie tn Aj wo ja fom] nH | @ | foo] wy} oy | © wy Al wa jm<br>8 18 jg la (") 2/8 ls |) €ig je je |} 2]2 ig lol €/2 18 Is lol 218 '<br>SFE iS|25/q4wI8 |@(8 io)|S) ElBule& |# eG 1)18) EizulsEle AG [2|S |S)16 &E]2 |ZaHule G18) biBul&& 14 sig lis(2 |SB| && jee|= g ii<br>nas © |B Pie Bs & sieges Is |S Sle gis jE] € jesis js jz & les <br>2 iS S [ul BIS Bio |e BIS GIS jo Ie BIE GS [zl w Gao [Oo jx § |e bw i<br>=a 280we Wo) le[os lBwl Feele BGgig leljakSlele oseSle j eo fg[a SERSMd Elegie% fopoeS/SlesieBG if|S jeeris]wl Se4 ee i<br>oo BRSSaiz 16iz |B181 SloeEIGRIS |BfH) SissE BR a |ejs |e)8 Sieeis€ Gee |Bfey Feels§ 5 Bla jG| is18 EE IRsIGS |<br>—) mw BSOa Q =|a = jw aloNS wt!" 2 |W mS©) 7 ed 8 Ea 4 6 4<br>Spare Bw Aw Ww Of} fe apn oO! AS ie a)O ion)uy a)S| Bie2 iuawajo a)el BS2 leiw apno]o wvQ aS ) 32 leoo [a]<br>i) 2gi9 a9 23 a 22/5 32 2 285 29 23 & 2/5 23 fi 2215 25 28 8 z 3 i<br>3o Q8 218¢E bleFSaaS]Blo]yea] w&st [819 £183ormGlo]biolse Bwa& [8|O B/S+tvlaSBidaBig]6/0)mstTH& jo[O ZOey« ajoBLO[at ) mmm@ |Ojo ee¢=dS l esmwweBLO)Por w®eesst|.1O i|<br>ud » tA * my x * of ui & » . wo |<br>----- End of picture text -----<br>

|||—_<br>E<br>I<br>ii|||||||||||||||:<br>||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
||j<br>|<br>|<br>!<br>{?||i<br>8<br>8<br>3<br>uy<br>rl||rm | ©<br>e<br>|x<br>pe<br>Oo<br>Ww<br>ot<br>hy<br>fas)||||%<br>Ni<br>wo<br>ive]|Syn<br>@ | 5<br>Sf<br>S<br>©<br>Pa<br>Mw|||we<br>lal<br>se<br>re)<br>S|<br>Flam]<br>se]<br>al<br>lk} 2<br>tua)<br>n<br>fA<br>[)<br>@ |<br>hS<br>wt<br>el<br>in<br>rye]<br>Dy<br>roy 3<br>in<br>rt<br>md<br>rd<br>rt<br>nd<br>rt<br>a|||:<br>:<br>.|||
||<br>|<br>i<br>!<br>!|||ES<br>8<br>4<br>4S||Rg<br>8/8<br>B | i<br>1<br>AN<br>y<br>ra)||||g<br>g<br>3<br>mn<br>4|i<br>&1§<br>413<br>er]<br>a<br>4<br>mm|||cl | om<br>$/<br>8)<br>8)/8/<br>8]<br>8 x)»<br>ei<br>cgiwl<br>st!<br>a]<br>¢<br>lay 2<br>ai];<br>6]<br>sx]<br>om]<br>+<br>fey<br>&<br>ix]<br>N<br>nN<br>a)<br>Gia)<br>~N<br>|e|||:<br>=<br>:|||
||<br>iH<br>|<br>}<br>i<br>!<br>Is<br>1<br>||||&<br>4<br>2<br>wn<br>pall|_|4<br>1.<br>ers<br>=)<br>Ww<br>wrt<br>-<br>m|cH]<br>3<br>is<br>2<br>2<br>c<br>fs]<br>ee<br>®<br>w|||st<br>m<br>an<br>“<br>oO|3<br>7<br>2<br>X<br>~<br>ts)<br>an<br>a<br>he<br>Sion<br>c<br>Pad<br>oO<br>fa]<br>4<br>NN<br>Gg<br>a|2<br>i<br>2<br>Oo<br>ha<br>8<br>a<br>4||~<br>-<br>itr)<br>a<br>wo<br>Co)<br>ES<br>Qo<br>it<br>ain],<br>|]<br>2;<br>SiN!<br>mR<br>mil<br>alam}<br>oa]<br>6 | 6<br>lal &<br>rt<br>wd<br>wy<br>fe)<br>ea)<br>rey<br>oO w<br>cl<br>ot<br>ed<br>rt<br>ot<br>tots|||:|||<br>||
|\<br>|<br>!<br>{<br>|<br>\<br>H<br>Hl|||g<br><<br>8<br>w||Z|<br>21<br>wo<br>Sie)<br>oe | &<br>n<br>n|s<br>g<br>y<br>ve<br>~<br>&<br>g<br>Lf<br>3<br>Ps<br>&<br>8<br>*|||2)<br>5}<br>N<br>i|8<br>¥12)<br>8<br>w<br>cad<br>”<br>i=<br>&<br>os | og<br>3<br>gi<br>e|<br>fs<br>H<br>A}<br>A | W<br>8<br>N<br>4<br>¥|g<br>3<br>w<br>L<br>cd<br>c<br>2<br>aw<br>3<br>Zg<br>X<br>8<br>*||Zi<br>i Zl<br>el<br>esleigeg<br>co<br>ao)<br>wo<br>8/2/8/2)<br>8)<br>8<br>|<br>8<br>4'8/8/<br>8,8;<br>8/8)<br>8<br>w<br>A<br>rts)<br>ra)<br>A<br>H<br>}mH||||||<br>|<br>|<br>i<br>j<br>.<br>L<br>I<br>.<br>i<br>|||
|i|||||||||||||||||||
|i<br>1<br>|<br>||||iS<br>5<br>°3<br>=}||a]<br>~ | N<br>NS<br>“8||||t<br>i<br>fe<br>N||<br>8<br>m | 8<br>io<br>oJ|||~<br>és<br>18/8/2818)<br>8 lgl a<br>N<br>ym}<br>oo]<br>vu}<br>A]<br>go)<br>FR<br>]<br>A<br>ina]<br>oi<br>iia<br>rh]<br>S|<br>ot||||i||
|ay<br>4"<br>4<br>i<br>t<br>i||es|xe<br>o<br>m<br>wi<br>g||x1<br>8<br>gp<br>Sy<br>a<br>ted<br>a1<br>5||||x<br>N<br>a<br>Ri<br>g|xe | x<br>i<br>aa<br>ao | o<br>ays|—||a<br>x]<br>xe]<br>x]<br>x<br>¢<br>2<br>xilihn|<br>&/<br>A | &]<br>8<br>la €<br>VER?<br>oO}<br>ae)<br>Fi<br>R<br>1a) &<br>ei<br>of]<br>ol<br>w<br>31<br>6<br>Ite<br>a) sla} | 8) sj 4<br>7|.||j<br>i<br>||||
|;<br>|<br>!<br>,|||KR<br>jsel<br>&<br>[8] <br>2<br>1S)<br>6<br>I2/<br>oO]<br>Se<br>fal|3¢<br> 8<br>OS<br>e<br>8|xs<br>Ee<br>jxey<br>xe<br>2)<br>8 18 8<br>!<br>4<br>S<br>afm<br>{22<br>5,<br>|O;<br>@<br>So)<br>Bin] a||||S<br>fre]<br>&<br>[8] <br>2<br>2}<br>eo]<br>8 18|we<br>x<br>XX<br>[se<br> §<br>B | 2<br>[8<br>i<br>»<br>|O|<br>O<br>aii<br>mn<br>[2]<br>9<br>Oo;<br> *<br>S/S<br>ial|Oo<br>2<br>ma||xs<br>x<br>Pd<br>x<br>x<br>SX<br>Heol x<br>|e<br>ala}<br>2|/<br>8)<br>3) &<br>lal 8<br>is<br>d<br>}<br>}<br>i<br>wy<br>1}<br>© 1O<br>oil<br>él<br>a<br>lo<br>dpe}<br>8%<br>19<br>sd<br>Oo<br>Ie<br>a]<br>Ry;<br>ae]<br>&<br>5 AM A<br>Te|||j<br>{|||
|'||||||-||||ws|||||||||
|:<br>i<br>|<br>||||moist]<br>m<br>[mi<br>WwW<br>]O,<br>e<br>/e} <br>m<br>|e)|9<br>oO<br>om<br> &<br>2|879<br>/4i<br>Y<br>ia<br>QO<br>06<br>1O<br>BR}<br>at<br>[oO]<br>NS<br>fet<br>JO!|2<br>8<br>oO|||N<br>|x]<br>eg<br>8;<br>Sis<br>N<br>Ot<br>a<br>3S<br>4<br>iN}<br>mM<br>}Oy<br>oct<br>}°<br>ee<br>jo]<br>(S/o<br>R118!<br>TYE)<br>Ni)<br>od<br>[ol||&<br>wm<br>+<br>8<br>oa||R<br>8<br>6/8;<br>8/]eis} 218<br>ra<br>&<br>fe)<br>io)<br>om<br>jm)<br>st<br>ja<br>laa<br>w<br>A<br>m<br>2<br>2<br>{Ol<br>h&<br>Ai<br>anl<br>ef<br>~ Rr}<br>S[<br>ax<br>ls B18<br>a<br>Oo]<br>+4<br>ri | Nw [ ed<br>IX]<br>o<br>fo||||||
|||||||||||—||||tu<br>men||||||
||<br>!|||||||||||||||||||
|7|||2<br>|=)<br>a<br>lel<br>O<br>io|&<br>&<br>wo|S's<br>& | 2<br>le<br>@<br>Oo<br>|O]|5s<br>2<br>@|||=<br>(|S/<br>e<br>lal<br>oO<br>16|=<br>2]<br>/3]<br>e<br>&<br>|=<br>le]<br>w@<br>Oo<br>|Ol|3<br>é||J<br>2};<br>2<br>,2/2]<br>2]<br>5<br>j|3/<br>318<br>e,;e|e]e2|é|<br>€<br>lg gis<br>9<br>©<br>Oo<br>Oo<br>©<br>©<br>fOr<br>vo<br>jo||||<br>|<br>|<br>||||
|||||||||||||||||‘|||
|||||||||||||||||‘|||
||wy<br>~<br>wn<br>in<br>wn<br>a<br>De)<br>~<br>py<br>S<br>a2}<br>&<br>a<br>ioal<br>os<br>2.<br>q<br>N<br>=<br>N<br>a<br>le<br>N<br>Si<br>bl]<br>S|!<br>slals<br>o}<br>oO<br>x<br>m<br>Q<br>%<br>Oo<br>mM<br>nm<br>w<br>u<br>ov<br>'<br>Yi<br>fa<br>Yi<br>IY<br>3<br>Y<br>3<br>w<br>14<br>3<br>y/<br>=e]<br>&#]<br>&€]<br>€1<br>8<br>4<br>=<br>Q<br>nn<br>bee<br>oS<br>na<br>9<br>wn<br>2<br>&<br>&<br>fas<br>&<br>3<br>c<br><<br>ta<br>+<br>&<br>Ie<br>t<br>a<br>+<br>a<br>8<br>&<br>6<br>8<br>6<br>6|<br>§]6<br>*<br>5<br>Isl<br>2<br>s<br>|e<br>|g]<br>2<br>5<br>||<br>2<br>5<br>|&<br>js!<br>¢<br>©)<br>9)<br>a)<br>ae!)<br>ele |jz<br>lg<br>*<br>it<br>fle<br>is<br>|S<br>isl<br>Ble<br>(2<br>is}<br>Ble<br>[2<br>[8<br>ISi<br>Fle<br>[4!<br>3)<br>a]<br>43<br>21)<br>4125<br>la<br>6<br>|al<br>£<br>|<br>jo<br>6<br>lol<br>£<br>1G<br>G@<br>ia}<br>£<br>{U<br>3<br>®<br>|oa|<br>S<br>|?<br>3<br>4<br>en<br>|n<br>&<br>Oo |ik<br>o4<br>&<br>a<br>|<br>ES<br>a<br>Fa<br>Bh<br>s<br>Sl<br>a<br>1k<br>is)<br>ied<br>fe}<br>8<br>fe)<br>ba}<br>a<br>Sed<br>a<br>oe<br>is]<br>oO<br>ep<br>om<br>jm<br>g<br>me)<br>oS<br>lo<br>OQ<br>oO<br>=<br>|<br>iv<br>fs}<br>i<br>o<br>oO<br>£<br>[De<br>o<br>2]<br>3<br>a<br>gv<br>@|<br>3<br>2)<br>Sle<br>®<br>Q<br>21<br>2<br>Ie<br>is}<br>2<br>o<br>6<br>Red<br>2<br>16]3<br>4<br>a.<br>a]<br>A<br>1%<br>iow<br>Q<br>wis<br>oa<br>eo;<br>4<br>1s<br>a<br>1a<br>S|<br>4<br>1%<br>Ral<br>S<br>&<br>Ro<br>a)<br>§<br>|s<br>8<br>|<br># |g<br>oO<br>TA<br>gq<br>@ g<br>mR<br>I<br>g |2<br>So<br>liq<br>iA<br>g 8<br>f<br>a<br>a<br>g<br>3<br>2 218<br>|<br>wi<br>‘2<br>eo<br>|<br>ft) 8<br>N<br>i<br>2<br>if<br>foal<br>2<br>ie<br>2x<br>f/€}]<br>£€)/£/<br>a}<br>2<br>ISIN<br>jo<br>2 18) €leul&<br>[2<br>|G) Ela4ie<br>jo Ejaulo<br>j@<br>jOle€ |Su}é)/2)/€1E)]<br>=]<br>€ igi<br>g<br>$ 5) Begs (2 18) BES |G] § E39<br>8<br>| BiEa) FE) ELE] E]e} £ isle |S<br>ad<br>s<br>i<br>.<br>Poel<br>r<br>=]<br>¢<br>,<br>=|<br>i<br>ro<br>>16<br>|<br>Oo<br>|x|<br>Sie Bio<br>lo<br>Ie]<br>Ble Slo<br>|Z<br>EIS Ko<br>io<br>[ay<br>8<br>& & ALATA]<br>RE<br>GS]<br>GA<br>loim<br>[ze<br>a)<br>se)<br>PC Ix ale<br>a)<br>@|<br>2<br>a Sig<br>Sf<br>& ig m|y<br>+4]<br>Rl<br>oe [a sl mw<br>a<br>nN<br>foe)<br>“N<br>wo<br>Oly<br>g<br>hina<br>a<br>Bee**t**iam<br>a<br>Ma<br>f<br>|a<br>_<br>meet | ot<br>ap<br>aw]<br>#<br>mid<br>-<br>a<br>= [ex in s<br>= lo file<br>Sie ga<br>ig<br>Simwm) y<br>M<br>é<br>K<br>wo<br>Fe<br>lelcy | aol<br>~—<br>_<br>ao =<br>~<br>fel on<br>**a**la<br>wo<br>Ol<br>sd<br>7**)** on<br>a)<br>**&**<br>Oo<br>&<br>a<br>uw<br>iam<br>&<br>| € IB BS<br>&<br>Sle 5<br>S|<br>¢ BBS,<br>&<br>|S<br>& G &<br>aR)<br>RL<br>A)<br>am l= Bs<br>4)<br>oad<br>7 mp4<br>a)<br>a<br>m|<br>Pd<br>in<br>Ba]<br>in<br>}<br>:<br>?<br>2<br>J<br>’<br>= se<br>a)<br>3<br>&}<br>3<br>it<br>2<br>Sig wio<br>lo<br>[8]<br>slime<br>of]<br>Si<br>oO]<br>6]<br>oO]<br>o iSle S[z<br>os<br>R<br>(als<br>ilFeR<br>|R<br>jo}<br>Ss lF SIS<br>jel<br>s|$HX8<br>1B<br>lel<br>le<br>sl<br>sis!]s!]E!s<br>igissle<br>2<br>Sz<br>£ i286 go sel<br>Sl2 95 ao]<br>Siz gS ah ool<br>BBS)<br>a/<br>ale]<br>ai<br>sig wi Qly<br>N<br>S$5S) 8 19 S18 ES 5/5) we 1G BIS Slo! cs 15 S13 SiS gla) B<br>6 SA 1 A]<br>RL<br>SB<br>|<br>% fale &19<br>Qo<br>O wAgl<br>a OE<br>ALO vO) a [O TO Al<br>a<br>We RIO ALO AO) a [Oo my) oO<br>|}<br>W<br>CP lp OO<br>NPE ISPe<br>TTS TR rs Ta re ie la<br>PPS Pe Pele) Ss le le<br>eye iy<br>® fo|||||||||||||||<br>oo<br>i<br>sf<br>f<br>i<br>(<br>-<br>|<br>i<br>’<br>i<br>i<br>]<br>|<br>|<br>i<br>i<br>|<br>i<br>i<br>|;||||
|||||||||||||||||||||
||||||
|---|---|---|---|
||cy|F||
|L|L|L.|.|
||<br>.<br>_<br>a<br>__||||
|td<br>|<br>® fol 8<br>nN<br>Q<br>Ot<br>4<br>1a<br>ied<br>st<br>aed<br>#15<br>t]m]<br>ost<br>wt<br>ie)<br>t<br>4<br>a<br>°<br>©<br>/<br>wish<br>al<br>| oo<br>N]oa]<br>Q<br>st<br>cai<br>i<br>ne ee<br>BYR}<br>wm<br>Nv}<br>og<br>|<br>eiledy<br>et<br>N<br>3<br>o|<br>9<br>|<br>©<br>is<br>Hi<br>a<br>|<br>N<br>ey<br>F<br>wot<br>| ed<br>'<br>ri||||
||.||||
|t||||
|i||<br>2<br>-<br>-|||
||<br>I<br>t<br>i|o<br>a<br>e<br>&<br>|g<br>&<br>+<br>bs<br>BS<br>h]ral<br>ot<br>ot<br>wo<br>rs)<br>re)<br>S|<br>‘<br>8<br>fol<br>3<br>o}<br>ri] 03<br>N]og]<br>Q<br>x<br>cain<br>sl<br>«<br>Ia<br>dj}<br>N<br>o<br>Q||{<br>4|
||<br>Vv<br>" re<br>v<br>—<br>Wy——<br>eo<br>wv<br>:<br>_<br>~~<br>rn<br>i<br>a<br>2<br>2<br>2<br>!<br>Gy<br>i<br>CI<br>%<br>rs<br>Gigi<br>8<br>|e<br>a}<br>&<br>lal<br>gis}<br>@<br>inlets!)<br>a | w | al]<br>2<br>ae<br>ly<br>t<br>)<br>ola<br>a<br>fe)<br>st<br>os<br>«If<br>wel<br>2<br>[N/R] a<br>f=)<br>=<br>al<br>se)<br>a<br>IA<br>Hl<br>BIg;<br>«<br>=<br>a}<br>go<br>{t<br>00/85<br>ae<br>el Rod a<br>od<br>fon)<br>6]<br>3<br>de<br>i<br>6<br>a<br>5<br>my<br>os<br>ls<br>a<br>6<br>|<br>3<br>F**i**<br>3<br>3<br>g<br>i<br>G<br>10<br>w<br>.<br>a<br>i<br>fa)<br>oO<br>a<br>a||i<br>i<br>|<br>i||
|i<br>|<br>A<br>:<br>'<br>-<br>|<br>!<br>H<br>I<br>i<br>:<br>|<br>:<br>||E<br>&<br>ro}<br>rt)<br>E<br>w]<br>&<br>&<br>Fad<br>om<br>ot<br>a<br>on<br>oO<br>8<br>gigi<br>2 | s<br>g)<br>g<br>ig<br>wig)<br>§<br>|S/E)E] &<br>EYES<br>gg<br>ig<br>Pe<br>ie)<br>ie)<br>©<br>3<br>Ras<br>Ra)<br>a<br>Ps)<br>a<br>w<br>v<br>Y<br>£<br>&<br>£<br>£<br>ad<br>6<br>43<br>w<br>»<br>”<br>Pa<br>w<br>0<br>i<br>i)<br>a<br>5<br>§<br>§<br>5<br>%<br>a8<br>3<br>cm<br>8<br>8<br>Bs<br>fodfor)<br>B<br>elol<br>o<br>2<br>o<br>2<br>Q<br>9<br>Q<br>Q<br>as)<br>in ant<br>int<br>&<br>6<br>Go<br>x<br>1D]wo<br>&<br>©)2, &<br>pte)<br>6<br>©<br>o<br>ve]<br>ive)<br>a<br>sop<br>vw<br>hs<br>NS<br>a<br>aiied<br>5<br>BRP<br>BS<br>ing<br>tS<br>BS<br>BS<br>mm<br>eal<br>a<br>3<br>SIN;<br>OS<br>fe<br>Blo<br>ow<br>tS<br>cael<br>&<br>imi}<br>oa<br>ead<br>m |<br>wml<br>ow<br>|i<br>a<br>esl<br>$s<br>Ki<br>S|<br>Sis<br>nyin<br>=<br>jinhit<br>wn<br>wn<br>ita)<br>wo]<br>ow<br>mo}<br>ooo<br>oi”<br>oO<br>oi<br>*<br>*<br>+<br>*|j<br>!<br>i<br>}<br>‘<br>|<br>q<br>:<br>:||
|**|**|**|**|**|**i|i|
|||L.||
|]<br>|<br>:|al<br>wo<br>uy<br>wy<br>a<br>a)<br>wo<br>Q<br>ip<br>n<br>xt<br>Bia<br>8<br>g<br>8<br>Bla<br>as]<br>&<br>| 2<br>[ais]<br>(8<br>&<br>[8<br>™<br>jal<br>S<br>a;<br>8<br>f/m<br>a]8) S13<br>8<br>{38|s<br>al<br>m<br>|S<br>o<br>19<br>st<br>2<br>ra)<br>rapa<br>OO]<br>@<br>Q<br>o<br>o<br>o<br>N<br>o<br>Nn|||
||<br>|<br>.|2<br>x<br>Ps<br>3<br>x<br>xe]<br>&<br>eS<br>a<br>Rix] Sx<br>x | x | x<br>S|<br>om<br>[8<br>@ |x|<br>8<br>a)<br>8<br>abe<br>ele]<br>8<br>| 8<br>| el<br>eB)<br>i<br>&<br>le<br>‘s<br>3<br>,<br>N<br>mm<br>wo<br>a ee<br>*<br>1<br>.<br><<br>A<br>><br>3<br>19<br>py<br>Ke<br>4<br>3/15<br>NIN]<br>ow<br>N<br>N<br>i]<br>N<br>3<br>ba<br>1|{||
|:<br>||e<br>e<br>2<br>©<br>x<br>x [8]<br>x<br>x<br>S<br>[x8<br>R/X|8|¥<br>[gigi x | 8<br>2 | x | x<br>ER}<br>SS<br>[es<br>8<br>Bla<br>S | 3<br>A<br>os<br>(8<br>isigiel<br>8fsisis |) 8 | 8 | 8]<br>8<br>m]<br>oS<br>als<br>g<br>ea Fd<br>g<br>¥/<br>a<br>ls<br>S19]<br>9 leila]<br>wi<br>N<br>ai<br>at<br>oN<br>a}<br>8<br>ime<br>ey<br>uw<br>Mm<br>N<br>Lad<br>dt<br>™N<br>InP INYEN<br>ive]<br>Ww<br>“I<br>LN||<br>i||
||o|||
|||o1oa<br>Cm!<br>wy<br>Coad<br>mm<br>oO<br>uy<br>a<br>=z<br>isi<br>8<br>Q<br>3<br>re<br>IR<br>S/S/a) 3 [Sls<br>ta<br>2<br>st<br>Qtg¢<br>S|<br>8<br>[AIK<br>8<br>ais}<br>F ] B<br>x<br>=<br>(8|<br>([Sslsi<br>S |S/8i<br>8)<br>& | 8<br>|848<br>¢<br>3<br>(8/8<br>3<br>ae<br>be<br>a<br>8<br>a]<br>4%<br>18<br>8/G/S/<br>6 |S/S)<br>oO | &<br>@<br>|8|/s<br>a<br>[AS<br>3<br>979)<br>™<br>°<br>3<br>nr<br>1S<br>eiiN]o]<br>o [old]<br>o<br>3<br>°<br>fos)<br>2<br>of<br>Ss<br>Jets|,||
|||i||
||||||
||4<br>><br>s<br>a<br>oe<br>fo<br>[aa<br>os|||
||&<br>&<br>&<br>;<br>SIG]<br>&<br>[Ss]<br>=]<br>=<br>=<br>|S]<br>5)<br>&<br>&<br>o<br>oO<br>1<br>wu<br>@<br>C)<br>Oo<br>ra)<br>OOO!@<br>1a<br>re<br>9<br>joo|||
|:|wn<br>™<br>Q<br>aq<br>Ibe<br>vad<br>wy<br>Ly<br>wont<br>Lr<br>nN<br>FI<br>ot<br>4<br>a<br>&<br>a<br>Fd<br>nN<br>oo<br>lw<br>am Ww<br>o<br>m Ww<br>o**t**<br>nN<br>+<br>ey<br>mw<br>1S<br>~ 2<br>cl<br>Re<br>e<br>ed<br>uw<br>avo<br>N<br>ao<br>14<br>o<br>Wi<br>a<br>Dw<br>ot<br>oO<br>oc<br>sey foe<br>-_><br>qq<br>eo<br>a<br>4<br>Ta<br>4<br>3S<br>TY]<br>a oy<br>te|<br>)<br>wu<br>16<br>m &<br>tN<br>ca<br>faa)<br>8<br>~~<br>ok<br>ws<br>qu)to<br>#1314<br>;<br>3<br>;<br>%<br>‘<br>+<br>v<br>898<br>JZE<br>8 als<br>vt<br>a<br>32<br>¥<br>or}<br>a<br>g<br>2<br>i182<br>|@2<br>(8 23<br>a<br>=<br>‘<br>a | 418<br>2<br>go<br>re<br>ze<br>Sl<br>oe<br>tied)<br>Pas}<br>SG<br>lz |& 2/2<br>c<br>5<br>aad rd<br>6<br>am |S<br>a3<br>2<br>Pan)<br>yoo<br>S| = | € Zs<br>iy<br>Lu<br>Oo<br>om<br>ww W<br>co YY) ) oe] ae<br>Elam<br>2/38<br>e|<br>Ble<br>|g2 | 2 |klge2<br>2 flea<br>sls<br>j**o**<br>ise<br>jaé<br>lobes fyag<br>isa<br>a=,<br>Bm la<br>!<br>et]<br>oo<br>2<br>w<br>2<br>‘<br>og] By<br>3<br>><br>{ala=<br>Q<br>~ Ala><br>{2<br>Nels)<br>3 |S)<br>(2<br>|Q=<br>|BS Rae<br>al = iaje<br>“15<br>wn<br>mw iD<br>ale<br>oy<br>ford<br>aiet<br>@<br>fe ixfrle) 4 1S<br>Oo<br>Q8<br>a<br>2 w<br>Zz] wg lxio<br>pala)<br>vo|/als<br>[elo&<br>fn<br>8 |sic&<br>|<br>8<br>ole|s<br>gy|4|<br>12 |8 2<br>j28<br>m Zs 2] 8 jog<br>Els<br>&<br>= |S<br>Bie G<br>=<br>lel?wo<br>in| 2<br>& |Yloiw<br>GIs<br>2 Oo<br>Ih fla o<br>4)<br>2||<br>|<br>]<br>i<br>|||
|=<br>xr<br>QO.<br>id<br>©<br>g<br>Ni|Bieis<br>(#62 |<br>6<br>|Eee BERING<br>& Zulg ging<br>(88<br>jeslasie<br>kis<br>js<br>bs<br>we jo<br>WO<br>—<br>te<br>[9<br>5<br>o<br>ad es)<br>2j/Q “Ie =<br>oA<br>2<br>iva)<br>Yn<br>Pa]<br>uU<br>Pm<br>eo)<br>de<br>oe<br>4<br>rd<br>=<br>c<br>he|ay<br>|#/zle<br>ESE.<br>& | 2 S82<br>8<br>2 sell<br>& gelsgies Bs gis<br>2\s8e<br>Fle<br>zlelS jaf 2k<br>ce aff 2k<br>we<br>fuld<br>= Oe]<br>dO — IZ E<br>SOMd<br>el «x<br>fale&<br>|S<br>=/196 zoe Se<br>2<br>Oo<br>[ale<br>cio)<br>aie**le** = SIN<br>Oo & alm oC S**l**o F**i**m =] O<br>jalese<br>[OS<br>E|&<br>lz &xle<br>6 =| &<br>5<br><i><br>8 2/8] 6 e/E ) & [Sime 68 2 B/S & S e B gs) Gb isl= s<br>wig<br>5<br>&<br>wn<br>a<br>Mg<br>{£2}<br>5<br>iv<br>Q<br>.<br>adWe<br>&<br>3<br>w Byte sez<br>a<br>3 aif 2 xia<br>¥ a|Sla| 8 B88 ale tr GS = Vim 28<br>E BR xX<br>fe}<br>S|<br>2<br>@ syle<br>Ge) x<br>2 UZ<br>vel 2 /s/5/3) & |olals of8 & 3/5 3 Sis 38 S| 2 [Bs g<br>Hz<br>“t<br>9 |o<br>ot uw<br>e)<br>m tT i)Oo} ©<br>Ji<br>OO} DB lminlr aa ow<br>Oot eo tio<br>Qo.<br>}<br>yO<br>B18<br>l@ableer<br>6<br>|SIGS ERS<br>S(ASid]<br>&[S85 Gk S B18<br>e<br>SIN alsa) O jas o(S/O<br>ay<br>el)<br>es)<br>+<br>wt<br>NT<br>wy<br>etfepey<br>2<br>[inhops<br>6<br>7<br>fo)<br>af<br>oe<br>Peal<br>OA<br>arse<br>fi<br>es<br>My<br>£||<br>:<br>|<br>i<br>|<br>i<br>4<br>i<br>|||

==> picture [596 x 793] intentionally omitted <==

----- Start of picture text -----<br> 1<br>ft ron oo eshte eT — — ;<br>(}<br>:4 winmi] wme | lead 2/8) 8 ii nybe i bel & | 8] &<br>Glial a 3 3 oO] 6 g be Slal oa fo) o oOo} 3<br>|ii r one] an cre ; :<br>[: YOim<br>Bo} a fo) i] alo $ aol a a a oOo} 9 :<br>| gialel & | a | eig % dein} so | g lala<br>3 3 Py]<br>><br>@ ire) 9 ie m m | oN x 9<br>jaal my 4 bz gS) 4 a Q {elas 4 3 a} &<br>! ¢ o ° 3 fo oOo] 6 3 9c «|F]e] 3 fo i=) o1 3 :<br>)<br>q a ¥ j<br>: %8u |<br>Fy eSafey&* Y fe5)oy Fa5 | fe6 | ELEfc—, oe ro)2 wo| 83E: OPRls;oc] ox oc&§ | ET— ELEof<br>: @ aoO 4<br>| é =<br>| im<br>it s&0 %e8 :|<br>i &a 818)ao oO OQ . — 4<br>| 3 a ed aS] ra& Fa8 |} 8/8m 9 iS)& ooja} &3 6}|S 99) 6R] «©B %& | Als& %<br>|H +e2 jase] 4) a [als S w|S) *3 ISS] 8 | 8 | a]<br>F<br>, nial a Rd wo eo | » of<br>el ba SA BS & A] & h Io Sis; 8 8 N 8|&<br>: e/a,<br>So] S| 8 > | 81a m/e Sie} S| & 8 }/8/ 8<br>| a 3 3 3 |o N Ja S/o] © fo) ° a|o<br>‘|HI — I }<br>::! agisg] ag 38 x 38 s is ¢ ¢ g < g<br>: gel 8) & s 1818 & |% See 5 | 2<br>! Sai & } S 3 3 ” a alo} & is} fo)<br>||| NIN] ow Ni N N | ow Yok Nis] —"ow N N N | ow '<br>; Bd x 2150 o ;<br>roa5 jesS| S BS x | x & (SiS)3S fagiezyx BS 8 S| x<br>| 278sBoidinfsy s2 $Q o|e] es ey¢ (WS8 leislQea] oes 8138/82 Q<br>N wl N | oN ia SIS] BS lish ws N N Nn | AN<br>i<br>Mm |S fett ts D ry a | m eg inin 4<br>! sig)<br>. 3B8 jajs)|oaloal aos|5] 388] for88 1 8lsa1|s/830 dog= (bls)Jefo)|A/S) 5/888)8So jes)loaja] aS|] os8) fon)68 oo]|elée18/33<br>i<br>slsaes oe5S/Soc5 ie5 cca | ot <=S |sis||s|s! S&SS$ [Sia][sid]a5 [ra5 na5 wmm1 | 8 ;<br>o to | § |s)8s SGg 16/8) OoSigs;1G =| =F | &= |S 2 : |:<br>sd<br>wmR wu 14 n<br>ni rd | O N ;<br>4 So a<br>85} GS leeLt Smo e e| S 6 2~ 6 lerhad |a<br>= ~ + 18 < to] & e 12 2 ~ : is s ua] &<br>Rw]wv w2 IGSjez ir|62 18[9 218zt 2mig|& Zlel Eia vZ2 |8SB{O62 |e|ze iSS res2/4 |<br>Bia!gigi jO Jom WwWa ja gld o WG «| = |SSenet zi}~ % Ju) [8 aPout3 a2 9 coMN HIG ax<br>=2 id jafOn iva|86 lo WhSl/ezlog Powe2/5 jg@l =ele j¢ OoIse« le 4 oy[SasA ah =<br>. (SlezaEg|%¢ : 12SizeBlealziuJZ iElinMMgg2|2S se8aSeryita)Ise2|@o322qi (2226wl|Q5|8[82|Sj=§YoOS |eIGmnBasel eS|mel2ojBetlaedawm|I¢ 2saS@4/o#16 &|28a}8) 5@a2 if“tt141°(8~ lasfcAGS/S)af2</8|ajo G) £sissesse&é324 |:|4|Oo}algeiu.GIGla Ria|22S|S|= Qalemig|8[Boeag&~=& tid1s:28j2825198j&ood24G jsle(|REl2awas|gaz819[swea.ole2/24«6WOeit2we&¥ i|{<br>Sa asSSfase1G |< Goce— aSiseleasss]rlS el elg_6 ia SondB ls)Bw =SSRf SlgisaleeOo GS —eisigs& aloje glesIe &= '<br>=a |e sNool8S. ela w Si)gig G38fi ZiR see]rome BOsred jeswm SS © |Z|\o2 gia we28 beBSle gisot =& E<br>NX© | @2TIM® (BiSi8|hNSlVo l a1es OSaleeleBlo216 -8aG&& aSISO15QSB a a«3eass ORSSo@ alsaa2Sa oa]&=2) 2)Bik2 a4&: &e§2 jsa|vee[BislSO]Bl! er)ca]a&®&B lajgiw[RIS]PlsioISG 9= 8/82/8EIS618 be©BSAISY ES3sBesa3S2& Sls°alea8:UR elsalssea2a &z3 ii{i<br>i<br>i<br>fb<br>----- End of picture text -----<br>

t | q| ~y | i A ; F ia | | I¥ i! | i}HI| i | " | | Ij‘ fb t fy | %s eB . b oF @ |i aS.@ ssri fap;1c]| 6 j f": 28683a2 st jt]d) oo i ii S0707" ;q rf 32EddagqE 5 j fl|:|i, 2 % Oop “ | wy2 oe i Be Sie E 4 | & Sieiagi 2 4 : i: Z g/3a§af5/5/18BVMIZE8 giS& 8y& ji 21. ElaGe 8 ” o i | 7a. a Eo oo > 3 a oo I 3a Gg a &S Mm il ‘5[9] omRow oo i to m @ ra es . % $a Bo awa OB ac ne ey oycQ lr ogvotAet |t1 & Ht q & Ao ' 3 hye \ a i“ , g $ tee 2 28 & - 3 f4 £ fc 4 w Go OR Go Ep QESE i aogne | 228s - aad ra) i Om Ex oO my ‘ 4 e8eBeBeBar LL.i. wog SATABSESugBiok fo]wm Oows \ii4 — w eeegaa 3S 2 paige ss al 5 ost Suh i ae] i uaz 2GO06 i el ql|

ns ©

| | : | |

| | | |

_ .i

Governmentanetweof India ; seraattrat aie gern wenfirat warera Ministry of Electronics & ‘atuctaa, 38 fret 1 Electronics Niketan, 6, C G O Complex, New Delhi-116003 saath Prat, 6, at ait ait ataetan, ag fareit-110003 Website: www.meity.gov.in

==> picture [73 x 61] intentionally omitted <==

----- Start of picture text -----<br> Kwv<br><br>----- End of picture text -----<br>

WEN w-21/4/2020-IPHW-Meity Nihecsssssescsecsscscsseasarecsnnerseners

R 11.03.2020 Date. cesensssessassecrsetesarsatenacesy

| Subject: Ratification of norms in terms of Para 4.7 of HBP. (Vol.1) in | 24.05.2018respect of issuedAdvancein favorAuthorizationof M/s GavirangaNo. 0710114946Enterprises dated [ This refers to DGFT I.D No. 01/81/50/0084/AM-20/DES-2/34 Dated | 04.07.2019 seeking comments of this Ministry on the above-mentioned ; application of M/s Gaviranga Enterprises for export of “Other Transformers: : 2.HavingThe a powerapplication handlinghas capacitybeen examined not exceedingin the Ministry1 KVA B-19of ElectronicsElectronic”,and Information Technology from technical angle. The import products are required for manufacturing the export product. The Ministry recommends Ratification of norms of advance authorization as per Calculation Sheet enclosed.

Sob (Sushil Kumar Jangid) Scientist ‘B’ Tel: 011-24301784 ftp-iphw@meity.gov.in

Shri Pranav Upadhyay, Asst. Director, O/o DGFT, Udyog Bhawan, New Delhi.

|

|

|

i |

f ; 4

i | | | |; | | |

==> picture [593 x 412] intentionally omitted <==

----- Start of picture text -----<br> ,<br>|<br>\ v<br>|<br>| Calculation Sheet; AA : OF 1O | MING<br>i Export {tem Per unt Wastage Wastage |<br>s (A) Oty. Soughi VOM consumption Claimea [A Wed Oty, recommended<br>| El 42.0x35<br>| £ Cc i<br>: Laminations (Parts Nil<br>i Otter Transformers:fof Transformers] 5200 |G 0.13 0.00% 5200 |<br>| handlingHavingcapacity a Powernot [Core<br>oe<br>i; Coil Former (Parts a<br>| exceeding 1 KVA El 42x14.8mm 8g : ;<br>| of — Transformer)! 40000 | Number Nil 0.00% {OR Nel to net basis<br>|| 40000 Former/BobbinColl with Nil Wastage |<br>Number {El 43x4.8mm<br>2pes)Shroud (Parts(Set ofoff |<br>ShroudTransformer) 40000 Number Nit, 0.00% Onwithnet Nil to Wastage net basis |<br>Pormer/Bobbim<br>|<br>:<br>----- End of picture text -----<br>

if |

==> picture [2 x 8] intentionally omitted <==

----- Start of picture text -----<br> H<br>----- End of picture text -----<br>

UTA AUATT Goverament of India

cy

i

| :|

|

| |

|

|

|

|

:

|

|

|

==> picture [70 x 36] intentionally omitted <==

----- Start of picture text -----<br> oy yw<br>ar<br>----- End of picture text -----<br>

Ministry of Electronics & Information Technology geaetiran Praera, 6, at sit sit aatadrere, wd feeett-110003 Electronics Niketan, 6, C G QO Complex, New Delhi-110003 Website: www.meity.gov.in

NOcomscsescsssesecvennasesentorsentennen17(3)/2020-IPHW

DatomeGressstesrissrersconsracneeatnrsenanes11.03.2020

Subject: Ratification of norms in terms of Para 4.7 of HBP. (Vol.1) in respect of Advance Authorization No. 0710114947 dated 24.05.2018 issued in favor of M/s Gaviranga Enterprises

This refers to DGFT I.D No. 01/81/50/0085/AM-20/DES-2/37 Dated 04.07.2019 seeking comments of this Ministry on the above-mentioned application of M/s Gaviranga Enterprises for export of “Other Transformers: Having a power handling capacity not exceeding 1 KVA B-19 Electronic”. 2. The application has been examined in the Ministry of Electronics and Information Technology from technical angle. The import products are required for manufacturing the export product. The Ministry recommends Ratification of norms of advance authorization as per Calculation Sheet enclosed.

i

|

!

Shri Pranav Upadhyay, Asst. Director, O/o DGFT, Udyog Bhawan, New Delhi.

(Sushil Kumar Jangid) Scientist ‘B’ Tel: 011-24301784 ftp-iphw@ meity.gov.in

|

|

  • ;| 4 | | | i ' |

I

gy

I| t i t{ i iH i4 i i i |i

| | i " |

| . i ; : | | {[i] i y q f

:

==> picture [463 x 190] intentionally omitted <==

----- Start of picture text -----<br> Calculation Sheeg: A A , O7 }Orm4syy<br>.<br>Export. Item (A) Qty. Sought = JUOM Per unit consumption)ron |Wastage:wmed8 Wastage Qty. recommendedsen<br>eas, Ei —_— 54,.0X45 5) allowed (Cal _<br>HAVINGTRANSPORT A POWER [MI formers] Coil On net to net basis with —<br>HANDLING isformers] Coi<br>NOT . LAMINATIONS(P ans o 15000 KG O.475 Nit 0.00% WastAvcountability Clayse on Nit<br>EXCEEDING [ RVA ax 25.5mm $$ Coif<br>FOPAeTTV | _. astage<br>ee<br>40000 Nurnber Former/BobbinFormer (Parts 3 Number Nii 0.00% ‘On net to net basis with Nit<br>Teansformer} Cail Wastage<br>E} $4x25,5mm Shroud (Set<br>of 2pes) (Pang g<br>‘ On ret to net basis with Nj)<br>jFonner/BobbimTransformer) Shroud A000 {Number Nit 0.00% Wastage<br>----- End of picture text -----<br>

| | \ : | i | | ;

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied