RATIFIED   Minutes of M.No.12/11 due for 22.6.2010 but held on 29. 06.2010 of Norms Committee (NC­I) (DES.I Section)   The meeting No. 12/11 of the Norms Committee (NC­I) for the licensing year 2010­2011due for 22.6.10 was actually held on 29.06.2010 under the Chairmanship of Shri V.K. Srivastava, Addl. Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  & their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 475 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. A.K. Mishra, AIA     M/o Steel, U.B. 5. Sh. B.D. Ghosh, Jt.IA 399 23063355 M/o Steel, U.B. 6. Sh. Rajiva Kumar, Dy.DGFT, 207 23061562 Extn.232 DGFT, U.B. 5. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.   The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon were as under: ­ 1 Case No.:28/42/80­ALC2/2008 Party Name:THERMAX LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/01652/AM09/ RLA File :31/21/040/00319/AM09/ Lic.No/Date:3110036852 02.01.2009 Defer Date:27.07.2010 Decision :The case regarding ratification of norms in respect of above authorization was considered by the Norms  Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.  The  representative  of  the  DHI informed the Committee the reply of firm has not received. The Committee, therefore, decided to forward a copy of reply to DHI for examination and to relist the case on 27.07.2010.     Case No.:22/50/80­ALC2/2008 Party Name:WPIL LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Approved HQ File :01/80/050/01820/AM09/ RLA File :02/24/040/00274/AM09/ Lic.No/Date:0210123758 27.02.2009

2 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. As per the  written comments of DIPP communicated vide their note dated 29.6.2010,   the Committee   decided  to  ratify  the norms in respect of the subject advance authorization with following modifications:­   1.      Net Empty Export weight of 224.93 MT may be specified with the quantity of export product. 2.       Word “Relevant” may be prefixed with the description of import items at Sl. Nos. 1, 2 & 3. 3.      Quantity of import item at S.No.1   may be allowed as applied for i.e. 14770 Kgs inclusive of a wastage of 2.6 %. 4.           Quantity of import item at S.No.2   may be allowed as applied for i.e. 2345 Kgs inclusive of a wastage of 2.5 %. 5.           Quantity of import item at S.No.3   may be allowed as applied for i.e. 1845 Kgs inclusive of a wastage of 2.7 %. The Regional Authority may take necessary action accordingly.   3 Case No.:2/1/80­ALC2/2009 Party Name:TERUMO PENPOL LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred  HQ File :01/80/050/01825/AM09/ RLA File :53/24/040/00012/AM09/ Lic.No/Date:5310007800 16.03.2009 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee observed that the comments called for from C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments.   The case may be re­listed on 27.07.2010.     Case No.:11/1/80­ALC2/2009 Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Approved HQ File :01/80/050/01834/AM09/ RLA File :07/24/040/00665/AM09/ Lic.No/Date:0710063756 20.03.2009   Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. As per written comments of DHI communicated vide their U.O. No.  3(155)/09­TSW(B)/  dated 28.06.201,  Committee   decided to ratify the norms in respect of the subject advance authorization with following modifications:­   Sl No. Item no Quantity  applied  in meters Quantity allowed in meters 1 12 42 40 2 13 36 34.2 3 14 24 22.8 4 31 7.65 7.3 5 32 7.65 7.3   Other items are components & are recommended under GN­4.     Case No.:11/9/80­ALC2/2009 Party Name:ENMAS GB POWER SYSTEMS PROJECTS LTD Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Rejected HQ File :01/80/050/00102/AM10/ RLA File :04/24/040/00036/AM10/ Lic.No/Date:0410104770 21.05.2009

5 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee decided to reject the  case  on  the  ground  that  the  firm  did  not  furnish  any  reply  with  reference  to  this  office  letter  and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.           6 Case No.:14/14/80­ALC2/2009 Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00184/AM10/ RLA File :61/24/040/00012/AM10/ Lic.No/Date:6110000320 19.06.2009 Defer Date:27.07.2010        informed  the  Committee  that  they  have  received  the  firm’s  reply  and  case  was  under  their  study.  The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.   Case No.:44/33/80­ALC2/2009 Party Name:CIM TOOLS PVT.LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Approved HQ File :01/80/050/00510/AM10/ RLA File :07/24/040/00109/AM10/ Lic.No/Date:0710065478 19.06.2009

7 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. As per the written comments of DIPP communicated vide their U.O. note dated 29.6.2010, the  Committee  decided to ratify the norms in respect of the subject advance authorization with following modifications:­   Import Item No. Quantity of Import items (In Nos.) Import Weight after 5 % recovery (In Kgs) Wastage after 5 % recovery ( %) 1 15 Nos. 35.00 118.3 2 15 Nos. 34.98 123.4 3 15 Nos. 35.02 114.2 4 15 Nos. 34.99 120.7 5 15 Nos. 30.16 113.2 6 15 Nos. 30.12 125.8 7 15 Nos. 10.69 125.5 8 15 Nos. 72.92 118.9 9 15 Nos. 72.88 123.0 10 15 Nos. 56.43 112.9 11 15 Nos. 56.34 127.6 12 15 Nos. 40.85 116.1 13 15 Nos. 35.97 119.6 14 15 Nos. 1.16 142.5 15 15 Nos. 3.64 142.5 16 15 Nos. 3.64 142.5 17 15 Nos. 10.77 142.5 18 15 Nos. 5.67 142.5 19 15 Nos. 2.18 142.5 20 15 Nos. 2.71 143.8 21 15 Nos. 3.35 142.5 22 15 Nos. 3.35 142.5 23 15 Nos. 1.31 142.5 24 15 Nos. 19.45 115.4 25 15 Nos. 19.42 132.0 26 15 Nos. 19.47 108.0 27 15 Nos. 19.45 114.0 28 15 Nos. 37.91 119.8 29 15 Nos. 37.97 107.1 30 15 Nos. 16.53 118.2 31 15 Nos. 16.60 85.6 32 15 Nos. 16.54 111.3 33 15 Nos. 16.54 114.5   Case No.:29/21/80­ALC2/2009 Party Name:MINDA STONERIDGE INSTRUMENTS LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Approved HQ File :01/80/050/00311/AM10/ RLA File :31/24/040/00016/AM10/ Lic.No/Date:3110039048 01.07.2009

8 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. As per the written comments of DHI furnished  vide their U.O. No.  3(32)/08­TSW(B)/259  dated 26.05.2010, the Committee   decided to ratify the norms in respect of the subject advance authorization with import of three items No.10,11 and 12 on net­to­net basis. Item no 1 to 9 are components & the same may be allowed under GN­4.       9 Case No.:1/17/80­ALC2/2009 Party Name:GEA BGR Energy SYSTEM INDIA LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/0022410/ RLA File :04/24/040/00079/AM Lic.No/Date:0410106106 14.07.2009 Defer Date:27.07.2010 informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.    10 Case No.:16/17/80­ALC2/2009 Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00239/AM10/ RLA File :03/94/040/00300/AM10/ Lic.No/Date:0310529264 16.07.2009 Defer Date:27.07.2010 consideration and to relist the case on 27.07.2010.    Case No.:9/25/80­ALC2/2009 Party Name:TITANIUM TANTALUM PRODUCTS LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Approved HQ File :01/80/050/00367/AM10/ RLA File :04/24/040/00250/AM09/ Lic.No/Date:0410107602 08.09.2009

11 Norms  Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.As  per  the  written  comments communicated by DIPP vide their U.O. note  dated 29.6.10, the  Committee  decided to ratify the norms in respect of the subject advance authorization with following modifications:   1. Export product falls under the list of SCOMET items and it is noted that the firm has taken export licence No. 0450000640 dated 17.11.2009 for the item of export. 2. Quantity of import  item  at  S.No.1  may  be  allowed  as  6457  Mtrs.  (2026.5  Kgs.)  inclusive  of  2% wastage. 3. Word “relevant” may be prefixed with the description of import items at Sl. Nos. 2 & 8. 4. Quantity  of  import  item  at  S.No.2  may  be  allowed  as  applied  for  i.e.372  Kgs.  inclusive  of  2% wastage. 5. Quantity of import item at S.No.3 may be allowed as 1 No. on net to net basis (96.9 Kgs. inclusive of 2 % wastage). 6. Quantity of import item at Sl. No. 4 may be allowed as applied for i.e. 11 Kgs. 7. Quantity of import item at S.No.5 may be allowed as 3 Nos. on net to net basis (1025.8 Kgs. inclusive of 2 % wastage). 8. Quantity of import item at S.No.6 may be allowed as 1 No. on net to net basis (788.2 Kgs. inclusive of 2 % wastage). 9. Quantity of import item at S.No.7 may be allowed as 6 Nos. on net to net basis (1359.3 Kgs. inclusive of 2 % wastage). 10. Quantity of import item at S.No. 8 may be allowed as applied for i.e. 2172 Kgs. inclusive of 2% wastage.     12 Case No.:13/25/80­ALC2/2009 Party Name:AKSH OPTI­FIBRE LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status:   HQ File :01/80/050/00371/AM10/ RLA File :05/23/040/00039/AM10/ Lic.No/Date:0510249115 11.09.2009 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee observed that the comments called for from DIT are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 27.07.2010.   13 Case No.:11/28/80­ALC2/2009 Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00429/AM10/ RLA File :31/24/040/00124/AM10/ Lic.No/Date:3110040186 07.10.2009 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010.  The Committee observed that no reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information despite reminder. The Committee, therefore, decided to issue final reminder to the firm for expediting  the  said  information  within  a  period  of  15  days  from  the  date  of  issue  of  communication otherwise their case will be rejected and no further representation will be entertained.   The case may be re­ listed on 27.04.2010   Case No.:2/33/80­ALC2/2009 Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred

14 HQ File :01/80/050/00468/AM10/ RLA File :07/24/040/00258/AM10/ Lic.No/Date:0710067933 30.10.2009 Defer Date:27.07.2010 informed  the  Committee  that  they  have  received  the  firm’s  reply  and  case  was  under  their  study.  The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.   15 Case No.:7/33/80­ALC2/2009 Party Name:ECOCAT INDIA PVT.LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00473/AM10/ RLA File :05/23/040/00087/AM10/ Lic.No/Date:0510251883 04.11.2009 Defer Date:27.07.2010 informed  the  Committee  that  they  have  received  the  firm’s  reply  and  case  was  under  their  study.  The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.   16 Case No.:12/33/80­ALC2/2009 Party Name:KERN­ LIEBERS(INDIA) PRIVATE LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00478/AM10/ RLA File :07/24/040/00283/AM10/ Lic.No/Date:0710067999 04.11.2009 Defer Date:27.07.2010 informed  the  Committee  that  they  have  received  the  firm’s  reply  and  case  was  under  their  study.  The Committee, therefore, decided to defer the consideration and to relist the case on 20.07.2010.   17 Case No.:47/33/80­ALC2/2009 Party Name:PERFECT ENGG COMPONENTS P LTD Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Rejected HQ File :01/80/050/00513/AM10/ RLA File :05/24/040/00334/AM10/ Lic.No/Date:0510252281 11.11.2009   Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee decided to reject the  case  on  the  ground  that  the  firm  did  not  furnish  any  reply  with  reference  to  this  office  letter  and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.      18 Case No.:5/41/80­ALC2/2009 Party Name:RANE (MADRAS) LIMITED, Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00626/AM10/ RLA File :04/24/040/00206/AM10/ Lic.No/Date:0410109740 26.11.2009 Defer Date:13.07.2010 informed the Committee that the case was under their study with regard to item No. 27 of this case. The Committee, therefore, decided to defer the consideration and to relist the case on 13.07.2010.

19 Case No.:18/41/80­ALC2/2009 Party Name:KE­BURGMANN FLEXIBLES INDIA PVT.LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00639/AM10/ RLA File :04/24/040/00247/AM10/ Lic.No/Date:0410110339 22.12.2009 Defer Date:27.07.2010 consideration and to relist the case on 27.07.2010.   20 Case No.:13/41/80­ALC2/2009 Party Name:BACHMANN INDUSTRIES INDIA LTD Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00634/AM10/ RLA File :05/23/040/00134/AM10/ Lic.No/Date:0510255171 23.12.2009 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee observed that no reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information  despite  reminder.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for expediting the said information within 15 days from the date of issue of communication otherwise their case  will  be  rejected  and  no  further  representation  will  be  entertained.      The  case  may  be  re­listed  on 27.07.2010.   21 Case No.:19/41/80­ALC2/2009 Party Name:PLAST TECH ENGINEERING Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00640/AM10/ RLA File :04/24/040/00216/AM10/ Lic.No/Date:0410110358 23.12.2009 Defer Date:27.07.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain expediting the said information within 15 days from the date of issue of communication otherwise their case  will  be  rejected  and  no  further  representation  will  be  entertained.      The  case  may  be  re­listed  on 27.07.2010.   22 Case No.:6/41/80­ALC2/2009 Party Name:SATA VIKAS INDIA PRIVATE LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00627/AM10/ RLA File :05/24/040/00426/AM10/ Lic.No/Date:0510255235 24.12.2009 Defer Date:27.07.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain expediting the said information within a period of 15 days from the issue of communication otherwise their case  will  be  rejected  and  no  further  representation  will  be  entertained.      The  case  may  be  re­listed  on 27.07.2010.   Case No.:7/41/80­ALC2/2009 Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Approved

23 HQ File :01/80/050/00628/AM10/ RLA File :05/23/040/00105/AM10/ Lic.No/Date:0510255239 24.12.2009   Norms  Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.  As  per  the  written  comments communicated by DIPP vide their U.O.note dated 29.6.2010,the Committee    decided to ratify the norms in respect of the subject advance authorization with following modifications:­   1. Net weight of export product may be modified as 42 MT. 2. Word “relevant” may be prefixed with the description of import items at S.No.1 & 5. 3. Quantity of import item at S.No.1 may be allowed as 18.943 MT inclusive of 2% wastage. 4. Quantity of import item at S.No.2 may be allowed as  8.93 MT  on net to net basis. 5. Quantity of import item at S.No.3 may be allowed as 0.969 MT  inclusive of 2% wastage. 6. Quantity of import item at S.No.4 may be allowed as 10.83 MT on net to net basis. 7. Quantity of import item at S.No.5 may be allowed as 0.392 MT. 8. Quantity of import item at S.No.6 may be allowed equal to quantity of Welding Wire at Sl. No. 5 of import item. 9. Import of components may be allowed with accountability clause.   24 Case No.:9/41/80­ALC2/2009 Party Name:UNITED DRILLING TOOLS LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00630/AM10/ RLA File :05/24/040/00422/AM10/ Lic.No/Date:0510255294 29.12.2009 Defer Date:27.07.2010 informed  the  Committee  that  firm’s  reply  received  the  case  was  under  their  study.  The  Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.    25 Case No.:11/41/80­ALC2/2009 Party Name:UNITED ENGINEERING (EASTERN)CORPN., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00632/AM10/ RLA File :02/24/040/00196/AM10/ Lic.No/Date:0210135971 01.01.2010 Defer Date:27.07.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.  The  Committee  observed  that incomplete reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to ask to the firm to furnish the complete point wise reply within a period of 15 days from the date of issue of communication  otherwise  their  case  will  be rejected and no further representation will be entertained.   The case may be re­listed on 27.07.2010.   Case No.:14/41/80­ALC2/2009 Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Approved HQ File :01/80/050/00635/AM10/ RLA File :05/23/040/00132/AM10/ Lic.No/Date:0510255510 01.01.2010

26 Norms  Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.  As  per  the  written  comments communicated by DIPP vide their U.O.note dated 29.6.2010,the Committee    decided to ratify the norms in respect of the subject advance authorization with following modifications:­   1. Net weight of export product may be modified as 11.5 MT. 2. Word “relevant” may be prefixed with the description of import items at S.No.1,2 & 4. 3. Quantity of import item at S.No.1 may be allowed as 9.31 MT inclusive of 2% wastage. 4. Quantity  of  import  item  at  S.No.2  may  be  allowed  as  applied  for  i.e.  160  Kgs    inclusive  of  5% wastage. 5. Quantity of import item at S.No.3 may be allowed as  1 MT  on net to net basis. 6. Quantity of import item at S.No.4 may be allowed as 2 Meters(0.1 MT)   inclusive of 2% wastage. 7. Quantity of import item at S.No.5 may be allowed as 0.106 MT. 8. Quantity of import item at S.No.6 may be allowed equal to quantity of Welding Wire at Sl. No. 5 of import item. 9. Import of components may be allowed with accountability clause.   27 Case No.:22/41/80­ALC2/2009 Party Name:ARMOR PLAST LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00643/AM10/ RLA File :07/24/040/00368/AM10/ Lic.No/Date:0710069234 04.01.2010 Defer Date:27.07.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain expediting  the  said  information  within  a  period  of  15  days  from  the  date  of  issue    of  communication listed on 27.07.2010.   Case No.:24/41/80­ALC2/2009 Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Approved HQ File :01/80/050/00645/AM10/ RLA File :05/23/040/00067/AM10/ Lic.No/Date:0510255676 06.01.2010

28 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms  Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.As  per  the  written  comments communicated by DIPP vide their U.O.note dated 29.6.2010, the Committee    decided to ratify the norms in respect of the subject advance authorization with following modifications:­ 1. Net weight of export product may be modified as 44.9 MT. 2. Word “relevant” may be prefixed with the description of import items at S.No.1 & 9. 3. Quantity of import item at S.No.1 may be allowed as 19.865 MT inclusive of 2% wastage. 4. Quantity of import item at S.No.2 may be allowed as  20.425 MT  on net to net basis. 5. Quantity of import item at S.No.3 may be allowed as 1.425 MT on net to net basis. 6. Quantity of import item at S.No.4 may be allowed as 0.423 MT. 7. Quantity of import item at S.No.5 may be allowed equal to quantity of Welding Wire at Sl. No. 4 of import item. 8. Quantity of import item at S.No.6 may be allowed as 90 Nos.(0.285 MT) on net to net basis. 9. Quantity of import item at S.No.7 may be allowed as 45 Nos.(95 Kgs) on net to net basis. 10. Quantity of import item at S.No.8 may be allowed as 11 Nos.(50 Kgs) on net to net basis. 11. Quantity of import item at S.No.9 may be allowed as 100 Meters(97 Kgs) inclusive of 2% wastage. 12. Quantity of import item at S.No.10 may be allowed as 170 Nos.(570 Kgs) on net to net basis. 13. Quantity of import item at S.No.11 may be allowed as 4 Nos.(200 Kgs) on net to net basis. 14. Import of components may be allowed with accountability clause.   29 Case No.:10/49/80­ALC2/2009 Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00779/AM10/ RLA File :02/24/040/00176/AM10/ Lic.No/Date:0210136339 11.01.2010 Defer Date:27.07.2010 informed  the  Committee  that  they  have  received  the  firm’s  reply  and  case  was  under  their  study.  The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.   30 Case No.:19/5/80­ALC2/2010 Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00052/AM11/ RLA File :09/24/040/00423/AM10/ Lic.No/Date:0910040811 03.02.2010 Defer Date:27.07.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information  despite  reminder.  The  Committee,  therefore,  decided  to  final  reminder  to  the  firm  for expediting  the  said  information  within  a  period  of  15  days  from  the  date  of  issue  of  communication   31 Case No.:1/49/80­ALC2/2009 Party Name:KIDDE INDIA LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00770/AM10/ RLA File :03/94/040/00925/AM10/ Lic.No/Date:0310560868 18.02.2010 Defer Date:27.07.2010

Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee observed that same items of import are appearing at more that one place in the list of items of one place in the list of items of import eg. Sl. No. 1 and 8; 2 and 9 etc.  It was decided to call for clarification from firm and  re­list the case on 27.07.2010.   32 Case No.:4/49/80­ALC2/2009 Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00773/AM10/ RLA File :09/24/040/00458/AM10/ Lic.No/Date:0910040992 18.02.2010 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. On the recommendations of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information / clarification from the firm and to re­list the case on 27.07.2010:­   1. Sl no 11 of SDL. 2. Use of item no 4 of import & justification of quantity of import   33 Case No.:7/49/80­ALC2/2009 Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00776/AM10/ RLA File :31/24/040/00229/AM10/ Lic.No/Date:3110042047 19.02.2010 Defer Date:27.07.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain expediting  the  said  information  within  a  period  of  15  days  from  the  date  of  issue  of  communication   34 Case No.:38/5/80­ALC2/2010 Party Name:RUBAMIN LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00071/AM11/ RLA File :34/24/040/00194/AM10/ Lic.No/Date:3410026435 19.02.2010 Defer Date:13.07.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.  The  representative  of  the DS(MSME)  informed  the  Committee  that  the  case  was  under  their  study.  The  Committee,  therefore, decided to defer the consideration and to relist the case on 13.07.2010.    35 Case No.:9/49/80­ALC2/2009 Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00778/AM10/ RLA File :34/24/040/00200/AM10/ Lic.No/Date:3410026452 22.02.2010 Defer Date:27.07.2010

Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. On the recommendations of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information / clarification from the firm an to re­list the case on 27.07.2010:­         1. Sl no 11 of SDL.   36 Case No.:13/49/80­ALC2/2009 Party Name:MIKROTEK MACHINES LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00782/AM10/ RLA File :07/24/040/00443/AM10/ Lic.No/Date:0710070171 23.02.2010 Defer Date:27.07.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.  The  Committee  noted  that  the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 27.07.2010.   37 Case No.:14/49/80­ALC2/2009 Party Name:MIKROTEK MACHINES LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00783/AM10/ RLA File :07/24/040/00400/AM10/ Lic.No/Date:0710070172 23.02.2010 Defer Date:27.07.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.  The  Committee  noted  that  the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 27.07.2010.   38 Case No.:16/49/80­ALC2/2009 Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00785/AM10/ RLA File :03/94/040/00986/AM10/ Lic.No/Date:0310561988 25.02.2010 Defer Date:13.07.2010 consideration and to relist the case on 13.07.2010.     39 Case No.:18/49/80­ALC2/2009 Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Closed HQ File :01/80/050/00787/AM10/ RLA File :05/24/040/00492/AM10/ Lic.No/Date:0510259473 25.02.2010   Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee noted that the firm has surrendered the advance authorization to concerned RA and therefore, decided to close the case.  

40 Case No.:20/49/80­ALC2/2009 Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00789/AM10/ RLA File :07/24/040/00460/AM10/ Lic.No/Date:0710070294 01.03.2010 Defer Date:27.07.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain expediting  the  said  information  within  a  period  of  15  days  from  the  date  of  issue  of  communication   41 Case No.:21/49/80­ALC2/2009 Party Name:LUBI SUBMERSIBLES LTD Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Approved HQ File :01/80/050/00790/AM10/ RLA File :08/24/040/00330/AM10/ Lic.No/Date:0810086954 03.03.2010   Norms  Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.  As  per  the  written  comments communicated by DIPP vide their U.O.note dated 29.6.2010, the Committee    decided to ratify the norms in respect of the subject advance authorization with following modifications:­   1.      Net weight of export products at Sl. Nos. 1, 2 and 3  may be specified as 9470 Kgs., 113751 Kgs and 15537 Kgs respectively (Total net export weight 138758 Kgs.) 2.      Word “relevant” may be prefixed with the descriptions of import items at S.Nos. 1 & 2. 3.      Quantity of import item at Sl. No. 1  may be allowed as applied for i.e. 26305.8 Kgs. inclusive of 38.5 % wastage. 4.      Quantity of import item at Sl. No. 2 may be allowed as 167600 Kgs. inclusive of 64 % wastage after taking 1/3rd recovery.   42 Case No.:22/49/80­ALC2/2009 Party Name:ULTRA ENGINEERS Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00791/AM10/ RLA File :31/24/040/00234/AM10/ Lic.No/Date:3110042181 03.03.2010 Defer Date:13.07.2010 consideration and to relist the case on 13.07.2010.    43 Case No.:20/5/80­ALC2/2010 Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00053/AM11/ RLA File :09/24/040/00506/AM10/ Lic.No/Date:0910041252 09.03.2010 Defer Date:27.07.2010

reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain expediting  the  said  information  within  a  period  of  15  days  from  the  date  of  issue  of  communication   44 Case No.:22/5/80­ALC2/2010 Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00055/AM11/ RLA File :09/24/040/00510/AM10/ Lic.No/Date:0910041253 09.03.2010 Defer Date:27.07.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain expediting  the  said  information  within  a  period  of  15  days  from  the  date  of  issue  of  communication    45 Case No.:23/5/80­ALC2/2010 Party Name:INJECTOPLAST PVT.LTD Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00056/AM11/ RLA File :06/24/040/00047/AM10/ Lic.No/Date:0610017458 18.03.2010 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. On the recommendations of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information / clarification from the firm an to re­list the case on 27.07.2010:­   1.         Serial no3,4,5 & 11 of SDL for each export product. 2.          Sample of product in CKD/SKD condition   46 Case No.:21/5/80­ALC2/2010 Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00054/AM11/ RLA File :09/24/040/00536/AM10/ Lic.No/Date:0910041410 23.03.2010 Defer Date:27.07.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain expediting the said information within a period of 15 days from the date of issue of the communication   Case No.:35/5/80­ALC2/2010 Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Approved HQ File :01/80/050/00068/AM11/ RLA File :05/23/040/00216/AM10/ Lic.No/Date:0510261020 23.03.2010

47 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. As per the written comments of  DHI furnished vide their U.O. No.3(117)/09­TSW(B)/  dated 25.06.2010  the Committee     decided to ratify the norms in respect of the subject advance authorization by allowing wastage of 5% on weight basis. RA may call for exact net weight of components to be manufactured out of imported seamless tubes and total quantity of imported tubes may be allowed based on net+ 5%wastage as was done in similar earlier cases. Components may be allowed under GN­4.     48 Case No.:32/5/80­ALC2/2010 Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00065/AM11/ RLA File :05/23/040/00225/AM10/ Lic.No/Date:0510261296 26.03.2010 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. . On the recommendations of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information / clarification from the firm an to re­list the case on 27.07.2010:­   1.      Description of import item at Sl. No. 1 is very generic and firm may indicate list of components of Hydrogen Generation Plant with quantities thereof. 2.               Quantity of the  import items at Sl. No. 2, 5, 8, 9, 11 & 12 has been indicated in Sets and the constituents of Sets  may be indicated for these import items.   49 Case No.:36/5/80­ALC2/2010 Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00069/AM11/ RLA File :05/23/040/00214/AM10/ Lic.No/Date:0510261354 29.03.2010 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. On the recommendations of the representative of  DHI present in the meeting  it was decided by the Committee to call for the following information / clarification from the firm an to re­list the case on 27.07.2010:­   1. Specific item of export. 2. Use of the export product. 3. Break up of all import items to Seamless & welded pipes. 4. The firm has mentioned in the manufacturing process that pipe fittings are manufactured from pipes.    Again pipe fittings are imported. The firm may clarify 5. SL Non 3,5 & 11 of SDL.   50 Case No.:34/5/80­ALC2/2010 Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00067/AM11/ RLA File :05/23/040/00232/AM10/ Lic.No/Date:0510261727 05.04.2010 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The comments called for from the M/o  Mines  are  still  awaited.  The  committed,  therefore,  decided  to  remind  them  to  expediting  their comments. The case to be relisted on 27.07.2010.

51 Case No.:3/5/80­ALC2/2010 Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00036/AM11/ RLA File :05/24/040/00500/AM10/ Lic.No/Date:0510262366 13.04.2010 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. On the recommendations of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information / clarification from the firm an to re­list the case on 27.07.2010:­      1.  The firm to reply 1,2,3,5 & 11 of SDL export product wise.   52 Case No.:4/5/80­ALC2/2010 Party Name:G.R.ENGINEERING PRIVATE LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Approved HQ File :01/80/050/00037/AM11/ RLA File :03/94/040/01142/AM10/ Lic.No/Date:0310569483 15.04.2010   Norms  Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.  As  per  the  written  comments communicated by DIPP vide their U.O.note dated 29.6.2010,the Committee    decided to ratify the norms in respect of the subject advance authorization with following modifications:­   1. Net Empty Export weight of 18.2 MT may be specified with the quantities of each export product at S.No.1 & 2. 2. Net Empty Export weight of 14.005 MT may be specified with the quantities of each export product at S.No.3 & 4 3. Net Empty Export weight of 19.5 MT may be specified with the quantities of each export product from Sl. No. 5 to 8. 4. Net Empty Export weight of 22 MT may be specified with the quantities of each export product from Sl. No. 9 to 14. 5. Word “Relevant” may be prefixed with the description of import items at Sl. Nos. 1, 2 & 4. 6. Quantities of import items at S.No.1 & 2  may be allowed as 1.05 Kg/ Kg. content in the export products. 7. Weight of “48.96 MT ”may be added with the quantity of import item at Sl.No.3 and quantity of this item may be allowed on net to net basis. 8. Weight of “59.772 MT ”may be added with the quantity of import item at Sl.No.4 and quantity of this item  may be allowed as 1.02 Mtr/ Mtr.. content in the export products   53 Case No.:6/5/80­ALC2/2010 Party Name:ULTRA ENGINEERS Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00039/AM11/ RLA File :31/24/040/00002/AM11/ Lic.No/Date:3110042881 15.04.2010 Defer Date:27.07.2010 consideration and to relist the case on 27.07.2010.

54 Case No.:5/5/80­ALC2/2010 Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00038/AM11/ RLA File :34/24/040/00096/AM10/ Lic.No/Date:3410026835 16.04.2010 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The committed decided to forward a copy of  firm’s application   to C&PC  for examination and submission of their comments. The case to be relisted on 27.07.2010.   55 Case No.:9/5/80­ALC2/2010 Party Name:MAG ENGINEERING PVT LTD Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00042/AM11/ RLA File :07/21/040/00006/AM11/ Lic.No/Date:0710070974 16.04.2010 Defer Date:27.07.2010 informed the Committee that the case was under their study. The Committee, therefore, decided to confirm from  RA  about  the  reply  given  by  the  firm  and    defer  the  consideration  and  to  relist  the  case  on 27.07.2010.    56 Case No.:10/5/80­ALC2/2010 Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00043/AM11/ RLA File :09/24/040/00552/AM10/ Lic.No/Date:0910041731 20.04.2010 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The committee noted that Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 27.07.2010.   57 Case No.:11/5/80­ALC2/2010 Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00044/AM11/ RLA File :05/24/040/00014/AM11/ Lic.No/Date:0510262671 20.04.2010 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The committee noted that Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 27.07.2010.   Case No.:12/5/80­ALC2/2010 Party Name:INJECTOPLAST PVT.LTD Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00045/AM11/ RLA File :06/24/040/00005/AM11/ Lic.No/Date:0610017742 20.04.2010 Defer Date:13.07.2010

58 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms  Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.  The  representative  of  the DC(MSME)  informed  the  Committee  that  the  case  was  under  their  study.  The  Committee,  therefore, decided to defer the consideration and to relist the case on 13.07.2010.      59 Case No.:13/5/80­ALC2/2010 Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Approved HQ File :01/80/050/00046/AM11/ RLA File :03/94/040/00069/AM11/ Lic.No/Date:0310570348 20.04.2010   Norms Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.  As  per  the    written  comments furnished by DIT  vide their U.O. No.  17(34)/2010­IPHW  dated 11.06.2010, the Committee decided to ratify the subject    advance authorization on net­to­net basis with accountability clause.      60 Case No.:14/5/80­ALC2/2010 Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Approved HQ File :01/80/050/00047/AM11/ RLA File :03/94/040/00070/AM11/ Lic.No/Date:0310570351 20.04.2010   Norms Committee  (NC­I)  in  its  Meeting  No.12/11  held  on  29.06.2010.  As  per  the    written  comments furnished by DIT  vide their U.O. No.  17(35)/2010­IPHW  dated 11.06.2010, the Committee decided to ratify the subject    advance authorization on net­to­net basis with accountability clause.     61 Case No.:15/5/80­ALC2/2010 Party Name:SOUTHERN LUBRICATION (P) LTD., Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00048/AM11/ RLA File :07/24/040/00012/AM11/ Lic.No/Date:0710071058 20.04.2010 Defer Date:27.07.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain expediting  the  said  information  within  a  period  of  15  days  from  the  date  of  issue  of  communication   62 Case No.:16/5/80­ALC2/2010 Party Name:TERUMO PENPOL LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00049/AM11/ RLA File :53/24/040/00001/AM11/ Lic.No/Date:5310010393 21.04.2010 Defer Date:27.07.2010

Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee noted that firm’s application was received from RA and referred to C&PC for examination and submission of comments. However their comments are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 27.07.2010.   63 Case No.:17/5/80­ALC2/2010 Party Name:PRABHA EXPORTS(P) LTD Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00050/AM11/ RLA File :03/95/040/00045/AM11/ Lic.No/Date:0310570582 21.04.2010 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee noted that subject case pertains to DIPP. The Committee, accordingly, decided to refer the copy of firm’s application to them for examination and submission of comments. The case may be relisted on 27.07.2010.   64 Case No.:26/5/80­ALC2/2010 Party Name:ULTRA ENGINEERS Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00059/AM11/ RLA File :31/24/040/00010/AM11/ Lic.No/Date:3110042986 23.04.2010 Defer Date:27.07.2010 consideration and to relist the case on 27.07.2010.    65 Case No.:29/5/80­ ALC2/2010 Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00062/AM11/ RLA File :05/24/040/00019/AM11/ Lic.No/Date:0510262876 23.04.2010 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. On the recommendations of the representative of  DIPP present in the meeting. it was decided by the Committee to call for the following information / clarification from the firm an to re­list the case on 27.07.2010:­   1. Sl. No. 3,4,5,11 & 13 of SD Export product wise.   66 Case No.:30/5/80­ALC2/2010 Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00063/AM11/ RLA File :05/24/040/00028/AM11/ Lic.No/Date:0510262877 23.04.2010 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010.  On the recommendations of the representative of  DHI present in the meeting  it was decided by the Committee to call for the following information / clarification from the firm an to re­list the case on 27.07.2010:­   1. Sl. No. 3,4,5,11 & 13 of SDL .

67 Case No.:25/5/80­ALC2/2010 Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00058/AM11/ RLA File :31/24/040/00009/AM11/ Lic.No/Date:3110042996 26.04.2010 Defer Date:27.07.2010 consideration and to relist the case on 27.07.2010   68 Case No.:37/5/80­ALC2/2010 Party Name:TERUMO PENPOL LIMITED Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00070/AM11/ RLA File :53/24/040/00003/AM11/ Lic.No/Date:5310010400 27.04.2010 Defer Date:27.07.2010 Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee noted that firm’s application was received from RA and referred to C&PC for examination and submission of comments. However their comments are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 27.07.2010.   69 Case No.:41/5/80­ALC2/2010 Party Name:KINECO PVT. LTD. Meet No/Date:12/80­ ALC2/2010 22.06.2010 Status: Deferred HQ File :01/80/050/00074/AM11/ RLA File :17/24/040/00055/AM10/ Lic.No/Date:1710003301 28.04.2010 Defer Date:27.07.2010 consideration and to relist the case on 27.07.2010   S.No.06 Case No.A ­ 01 M/s.  Larson  & Toubro Ltd., HQ F.No.01/80/162/01184/AM10/DES–I   Lic. Nos. & Date Meeting No. 12/11 RLA F.No.03/95/039/00001/AM09 0310475712 dt.20.06.2008 Date: 22.06.2010 Ratification of norms The  case  regarding  ratification  of  norms  in  respect  of  above  authorization  was  considered  by  the  Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 13.07.2010     S.No.72 Case No.A/R­46 M/s.  Bharat Heavy Electricals  Ltd., Hyderabad HQ F.No.01/80/162/01436/AM08/DES­I Lic. No. & Date Meeting No. 12/11 RLA No.09/24/040/00556/AM07   0910030003 dt.16.04.2007 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. On the recommendations of the representative of    DHI  present  in  the  meeting.  it  was  decided  by  the  Committee  to  call  for  the  following  information  / clarification from the firm and to re­list the case on 27.07.2010:­

1. The firm may be asked to submit Sl. No 11 of SDL for each raw material separately for each export product. 2. Weight of each export product like steam turbine, LP heaters, pumps etc should be given separately along with the specification. 3. Sl no 5 of SDL may be given for each export product.     S.No.73 Case No.A/R­19 M/s.  Graphite India Ltd., Nashik HQ F.No.01/80/50/1343/AM06/DES–I   Lic. Nos. & Date Meeting No. 12/11 RLA F.No.03/94/040/01160/AM06 0310364066 dt.20.01.2006 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The representative of the DIPP informed the committee that they have received the firm’s representation and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 06.07.2010.     S.No.74 Case No.A/R­20 M/s.  Bharat Heavy  Electricals Ltd., Bhopal HQ F.No.01/80/50/1779/AM09/DES–I   Lic.  Nos.  & Date Meeting No. 12/11 RLA F.No.11/24/040/00076/AM09 1110019584 dt.10.02.2009 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee observed that no reply of the firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain  information  despite reminder.  The  Committee,  therefore,  decided  to  issue  final  reminder  to  the  firm  for  expediting  the  said information within a period of 15 days from the date of issue of communication otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 27.07.2010         S.No.75 Case No.A/R­21 M/s.  Minda Stoneridge Instruments LTd., HQ F.No.01/80/50/00065/AM10/DES–I   Lic.  Nos.  & Date Meeting No. 12/11 RLA F.No.31/24/040/00320/AM09 3110038290 dt.30.04.2009 Date: 22.06.2010 The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. As per the written comments furnished by DHI vide their U.O. No.3(32)/08­TSW(B)/260 dated 26.05.2010  the Committee   decided to ratify the norms for import of Item Nos. 7 to 9 on net to net basis and Item Nos. 1 to 6 being components have been allowed under General Note 4.     S.No.76 Case No.A/R­22 M/s.  Minda  Silca Engg. Ltd., HQ F.No.01/80/5 0/00995/AM09/DES–I   Lic. Nos. & Date Meeting No. 12/11 RLA F.No.05/24/040/00941/AM09 0510217932 dt.14.03.2008 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee observed that no reply of the firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain  information  despite

reminder.  The  Committee,  therefore,  decided  to  issue  final  reminder  to  the  firm  for  expediting  the  said information within a period of 15 days from the date of issue of communication otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 27.07.2010.   S.No.77 Case No.A/R­23 M/s.  Kilburn Engg. Ltd., HQ F.No.01/80/50/00341/AM09/DES–I   Lic. Nos. & Date Meeting No. 12/11 RLA F.No.03/94/040/01309/AM08 0310465801 dt.19.03.2008 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.     S.No.78 Case No.A/R­24 M/s.  Kilburn Engg. Ltd., HQ F.No.01/80/50/00484/AM09/DES–I   Lic. Nos. & Date Meeting No. 12/11 RLA F.No.03/94/040/00281/AM09 0310474390 dt.12.06.2008 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.     S.No.79 Case No.A/R­25 M/s.  Minda  Sai Ltd., Mumbai HQ F.No.01/80/50/00755/AM08/DES–I   Lic. Nos. & Date Meeting No. 12/11 RLA F.No.05/24/040/00147/AM08 0510204041 dt.24.05.2007 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The representative of the DC(MSME) informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.   S.No.80 Case No.A/R­26 M/s.  Kilburn Engg. Ltd., HQ F.No.01/80/50/01257/AM09/DES–I   Lic. Nos. & Date Meeting No. 12/11 RLA F.No.03/94/040/00757/AM09 0310492847 dt.04.11.2008 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.   S.No.81 Case No.A/R­28 M/s.  Larson  & Toubro LTd., HQ F.No.01/80/162/00301/AM08/DES–I   Lic. Nos. & Date Meeting No. 12/11 RLA F.No.04/24/040/00223/AM08 0410091098 dt.18.09.2007 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.

S.No.82 Case No.A/R­29 M/s. Metso Paper India Pvt. LTd., HQ F.No.01/80/50/01625/AM09/DES–I   Lic. Nos. & Date Meeting No. 12/11 RLA F.No.05/24/040/00635/AM09 0510233403 dt.29.12.2008 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee observed that incomplete reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided  to call point wise reply from the firm within a period of 15 days from the date of communication  otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 27.07.2010.     S.No.83 Case No.A/R­30 M/s. Metso Paper India Pvt. LTd., HQ F.No.01/80/50/01308/AM09/DES–I   Lic. Nos. & Date Meeting No. 12/11 RLA F.No.05/24/040/00535/AM09 0510231137 dt.19.11.2008 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. On the recommendations of the representative of    DHI  present  in  the  meeting.  it  was  decided  by  the  Committee  to  call  for  the  following  information  / clarification from the firm an to re­list the case on 27.07.2010:­   1.         Sl.No.8 & 11 of SDL & 2.         Brief description of imported inputs along with size & specification.   S.No.84 Case No.A/R­31 M/s.  Lubi Submersibles Ltd., HQ F.No.01/80/50/00874/AM09/DES–I   Lic.  Nos.  & Date Meeting No. 12/11 RLA F.No.07/24/040/00079/AM09 0810074011 dt.18.08.2008 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. As per the written comments communicated by DIPP vide their U.O.note dated 29.6.2010,the Committee    decided to ratify the norms in respect of the subject advance authorization with following modifications:­   1.      Net weight of export products at Sl. Nos. 1, 2 and 3  may be specified as 2367 Kgs., 30334 Kgs and 3884 Kgs respectively (Total net export weight 36585Kgs.) 2.      Word “relevant” may be prefixed with the descriptions of import items from S.No. 1 to 6. 3.      Quantity of import item at Sl. No. 1  may be allowed as applied for i.e. 663.6 Kgs. inclusive of 52.9 % wastage. 4.      Quantity of import item at Sl. No. 2  may be allowed as applied for i.e. 2382 Kgs. inclusive of 41.5 % wastage. 5.      Quantity of import item at Sl. No. 3  may be allowed as applied for i.e. 5858.4 Kgs. inclusive of 39 % wastage. 6.      Quantity of import item at Sl. No. 4  may be allowed as applied for i.e. 38016 Kgs. inclusive of 66.3 % wastage. 7.      Quantity of import item at Sl. No. 5  may be allowed as applied for i.e. 423.8 Kgs. inclusive of 17 % wastage. 8.      Quantity of import item at Sl. No. 6 may be allowed as 3806 Kgs. inclusive of 56.5 % wastage after taking 1/3rd recovery.

S.No.85 Case No.A/R­32 M/s. Bharat Heavy Electricals  LTd., Tiruchirapalli HQ F.No.01/80/50/00517/AM08/DES–I   Lic.  Nos.  & Date Meeting No. 12/11 RLA F.No.04/24/040/00170/AM08 0410091601 dt.16.10.2007 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010.As per the  written comments furnished by DHI vide their U.O. No. 3(158)/09­TSW(B)/225  dated 07.05.2010  the Committee,   decided to ratify the norms in respect of the subject advance authorization with the following modification:­   EXPORT 1. The  description  of  the  export  product  may  be  modified  to  “piping  components  for  1X80  MW  Steam generator Hindustan Zinc ltd”.  Total export weight is 248.9 MT & the same may be incorporated in the licence. IMPORT 1. Item no 1­ (Carbon Steel)The quantity of seamless tube/ pipe to be allowed is 44 MT& that of welded tube is 6 MT with 2% wastage as applied by the firm. 2.  Item no 2­ (Alloy Steel)The quantity of seamless tube/ pipe to be allowed is 60 MT with 2% wastage as applied by the firm. “welded” may be deleted from the description of import item 3.  Item no 3­ (Alloy Steel)The quantity of seamless tube/ pipe to be allowed is 5 MT with 2% wastage as applied by the firm. “welded” may be deleted from the description of import item 4. Item no­4­ The total weight is 18 MT & the same may be incorporated in the licence. The item may be allowed under GN­4 as applied for. The word “Finished Forging” may be suffixed to the description of import item.       S.No.86 Case No.A/R­33 M/s.  Bharat Heavy  Electricals LTd., Chennai HQ F.No.01/80/50/01081/AM09/DES–I   Lic.  Nos.  & Date Meeting No. 12/11 RLA F.No.04/24/040/00113/AM09 0410098647 dt.17.09.2008 Date: 22.06.2010   Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 27.07.2010.    S.No.87 Case No.A/R­34 M/s. Bharat Heavy Electricals  LTd., Tiruchirapalli HQ F.No.01/80/50/00391/AM09/DES–I   Lic.  Nos.  & Date Meeting No. 12/11 RLA F.No.04/24/040/00408/AM09 0410094947 dt.01.04.2008   Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. As per the   written comments furnished by DHI  vide their U.O. No.  3(158)/09­TSW(B)/226  dated 07.05.2010  the Committee,   decided to ratify the norms in respect of the subject advance authorization with the following modification:­   EXPORT The  description  of  the  export  product  may  be  modified  to  “piping  system  for  4X125  MW  Kosti  Power Project of Sudan”. The firm has stated that the export weight was erroneously mentioned as 7340 MT . but it has stated that total revised export weight is 4840 MT & the same may be incorporated in the licence. IMPORT

1. Item  no  1­  (Carbon  Steel)The  quantity  of  seamless  tube/  pipe  to  be  allowed  is  875  MT  with  2% wastage . “welded” may be deleted from the description of import item as it has not given break up of welded pipes. 2.   Item  no  2­  (Alloy  Steel)The  quantity  of  seamless  tube/  pipe  to  be  allowed  is  630  MT&  with  2% wastage. “welded” may be deleted from the description of import item as it has not given break up of welded pipes. 3.   Item  no  3­  (Alloy  Steel)The  quantity  of  seamless  tube/  pipe  to  be  allowed  is  14  MT&  with  2% wastage as applied by the firm. 4. Item no­4­ The total weight is 96 MT & the same may be incorporated in the licence. The item may be  allowed  under  GN­4  as  applied  for.  The  word  “Finished  Forging”  may  be  suffixed  to  the description of import item. 5. Item no­5­ Welding electrodes­ The firm has applied for 3 MT. Quantity applied is with in the norms normally allowed. We may recommend import as applied for. 6. Item no 6 & 7­ may be allowed as applied for. However weight 16 MT & 24 MT may be incorporated in the licence for item no 6 & 7 respectively       S.No.88 Case No.A/R­38 M/s.  IDMC Limited, Udyognagar, Gujarat HQ F.No.01/80/50/00357/AM07/DES–I   Lic.  Nos.  & Date Meeting No. 12/11 RLA F.No.34/24/040/00076/AM07 3410016398 dt.04.07.2006 Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. M/S IDMC Ltd. As per the written comments furnished by DHI    vide their U.O. No.    3(76)/09­TSW(B)/326    dated  29.06.2010  the  Committee  decided  to amend the weight of import item No. 4 to 1.8 Kg. and that  of import item No. 10 as 1.00 Kg. with nil wastage. The export product should have the net content of tank plate of relevant grade and thickness weighing 2.8 Kg. instead of 2.8 MT mentioned earlier.       S.No.13 Case No.C­35   M/s.  Panch  Ratna Fastners (P). Ltd; HQ F.No.01/80/162/1316/AM09/DES.I Meeting No. 12/11 Date: 22.06.2010 Alleged swindling of several crores of Govt. revenue – DEPB.   Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee observed that EEPC has not provided data.  The Committee,  therefore, decided to write to the Chairperson of EEPC for providing industrial data of at least 3 companies  failing which matter will be brought to the notice of DGFT   for non Co­operation of EEPC and defer the consideration and to relist the case on 27.07.2010.      S.No.14 Case No. C­20 M/s.  BOSCH  Limited, Bangalore  HQ F.No.01/80/162/00683/AM10/DES­I Meeting No. 12/11 Fixation of SION Date: 22.06.2010 Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee, therefore, decided to ask to EEPC, New Delhi  to give industrial  data of at least 3 companies  with a copy of BOSCH Ltd., Bangalore and defer the consideration and to relist the case on 27.07.2010.

S.No.15 Case No. C­27 M/s.  Wartsila  India  Ltd., Raigad,  Through  Office of  the  Development Commissioner,  (SEEPZ Special  Economic  Zone), Mumbai.   HQ  F.No.01/81/162/00166/AM10/DES­II/DES­ DES­I Meeting No. 12/11 Fixation of SION for the export product “Different Types of Gear Boxes and HR Nozzle” Date: 22.06.2010   Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. As per the   written comments furnished by DHI  vide their UO No 1(05)/09­TSW(B)  dated 08.06.2010  the Committee,  decided to ratify the norms in respect of the subject advance authorization with the following modification:­   Item of Manufacture­  HR Nozzle 1.       There are different models of nozzles with export weight varying from 660 kg to 6500 kg. The raw material consists of SS plate, MS plate, MS round Bar, & Hexagon socket Screw plug. The firm has not given the calculation of wastage. Based on the information available, this Office recommends for wastage of 15% on SS plate & MS plate, 4% on round bar. Hexagon socket Screw plug is a component & may be allowed under GN­4.   Item of Manufacture ­ Gear Box Housing & Gear Box 1. Casting­ Relevant casting may be allowed on net to net basis on number terms. Wastage of 15% on average may be allowed on weight basis. 2. Forging­ Relevant forging may be allowed on net to net basis on number terms. Wastage of 15% may be allowed on weight basis.   All the above wastage percentage recommended is on the weight of the finished component/product     S.No.16 Case No.C­03   M/s.  Bhukhanvala Diamond  Systems  Pvt. LTd., Navsari HQ F.No.01/80/162/00012/AM10/DES.I Meeting No. 12/11 Date: 22.06.2010 Fixation of Standard Input Output Norms (SION)  in respect  of  100%  for  the  export  of  “Diamond impregnated Segments of various sizes”   Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010.As per the   written comments of DHI furnished vide their UO No 1A(1 )/09­TSW(B)  dated 14.5.2010  the Committee   decided to ratify the norms in respect of the subject advance authorization with the following modification:­   Item of manufacture quantity Inputs Quantity allowed Diamond impregnated saw 1 No 1. Cold rolled Steel Sheet 1.35  Kg/Kg  content  in  export product     Or  Circular sheet Net to net #     Or Circular Blank Net to net     2. Metal powder 1.03  Kg/Kg  content  in  export product     3. Diamond Powder 1.01  Kg/Kg  content  in  export product  Cup saw Wheel 1 No 1. Cold rolled Steel Sheet 1.95  Kg/Kg  content  in  export product

2. Metal powder 1.03  Kg/Kg  content  in  export product     3. Diamond Powder 1.01  Kg/Kg  content  in  export product  Tuck saw 1 No 1. Circular Steel Sheet 1.50  Kg/Kg  content  in  export product     2. Metal powder 1.03  Kg/Kg  content  in  export product     3. Diamond Powder 1.01  Kg/Kg  content  in  export product Grinding/polishing plate 1 No 1. Hot & cold rolled Steel Sheet 1.35  Kg/Kg  content  in  export product     2. Metal powder 1.03  Kg/Kg  content  in  export product     3. Diamond Powder 1.01  Kg/Kg  content  in  export product  Tool Holder   1 No 1.Circular Steel Sheet 1.6 Kg/Kg content in export product     2. Metal powder 1.03  Kg/Kg  content  in  export product     3. Diamond Powder 1.01  Kg/Kg  content  in  export product  Core bit drills   1 No 1. MS Pipe 1.02  Kg/Kg  content  in  export product     2. Metal powder 1.03  Kg/Kg  content  in  export product     3. Diamond Powder 1.01  Kg/Kg  content  in  export product  Forged plate/end plate   1 kg 1. Raw forging 1.40 kg Gang saw blades   1 No 1. Cold rolled Steel Sheet 1.02  Kg/Kg  content  in  export product     2. Metal powder 1.03  Kg/Kg  content  in  export product     3. Diamond Powder 1.01  Kg/Kg  content  in  export product # wastage of 3% on weight basis                     S.No.17 Case No.C­04   M/s.  Kusalava International LTd., HQ F.No.01/80/162/00021/AM10/DES.I Meeting No. 12/11 Date: 22.06.2010 Fixation of Standard Input Output Norms (SION) for the export of “Cylinder Liners”       Committee (NC­I) in its Meeting No.12/11 held on 29.06.2010. The Committee, therefore, decided to ask to

EEPC, New Delhi  to give industrial data of at least 3 companies  and defer the consideration and to relist the case on 27.07.2010.   