The Meeting No. 1/AM10 for the licensing year 2009-10 to consider the cases under Duty Exemption Schemes (Chapter-4) held on 02.04.2009 in Room No.4 of DGFT under the Chairmanship of Shri A.K.Singh, Jt. DGFT. The following officers were present: - Sl. No Name of the representatives & their designation Department 1. Sh. R.A.Lal, Dy.Director, R.O, TC, Noida 2. Sh. G.D.Giri, Vice President, M/s Shahi Exports Nominee, AEPC 3. Sh. Ashok Kumar Arora, Dy.DGFT DGFT 4. Sh. Kuldeep Singh, Asstt. Director MSME 5. Sh. Pradip Kumar, F.T.D.O DGFT
(TEXTILES AND LEATHER ITEMS)
At the outset the Minutes of NC Meeting No. 51/AM09 dated 19.03.2009 were ratified. However, the
following amendment was made in the Minutes of NC meeting No. 47/09 dated 19.02.2009 of outside agenda case No.2 in respect of M/s J.B.Exports, Surat as under: -
In the minutes, the dissent notes of Sh. R.A.Lal, Deputy Director, R.O, TC, Noida & nominated member of NC-V, present in the said meeting were not recorded. In the said minutes, Norms Committee had allowed 30% wastage (on weight basis) against earlier allowed wastage of 44.82% as per report of NC team, who visited the unit of the firm. Sh. Lal was of the view that the wastage (on weight basis) in this case should not be more than that of 14.5% as recommended by O/o TC, Mumbai. It was therefore, decided to incorporate this dissent views of Sh. R.A.Lal in the said minutes.
PRO version
Thereafter, Agenda for individual cases for Meeting No. 01/AM10 was taken up for discussion and the decision taken in respect of each case is enumerated below: -
MEETING NUMBER : 1/84-ALC3/2009 MEETING DATE : 02.04.2009
1
Case No.:4/45/84-ALC3/2008
Party Name:CACTUS CLOTHING PVT.LTD. Meet No/Date:1/84-ALC3/2009 02.04.2009 Status: Approved HQ File :01/84/050/00440/AM09/ RLA File :05/24/040/00642/AM09/ Lic.No/Date:0510235021 27.01.2009
Decision: The Committee considered the case as per agenda alongwith other relevant papers and heard Sh. Maninder Singh, an authorized representative of the firm, who appeared for personal hearing in this case. He explained the case alongwith sample. It was observed that export product i.e Mens Shorts is reversible in this case. Therefore, Committee after detailed deliberations in consultation with representatives of technical authorities present in the meeting decided to allow the Qty. of inputs as applied by the firm.
The GSM should match in import & Export. They may also monitor the Style No. mentioned in the each of export item on export side. The R.A. shall be advised to take necessary action subject to compliance of other usual conditions.
Case No.:1/47/84-ALC3/2008
Party Name:GAURAV INTERNATIONAL 02.04.2009 Status: Approved HQ File :01/84/050/00453/AM09/ RLA File :05/24/040/00705/AM09/ Lic.No/Date:0510235997 06.02.2009
PRO version 2 Decision: The Committee considered the case as per agenda alongwith other relevant papers and after detailed deliberations in consultation with representatives of technical authorities present in the meeting decided to allow the Qty. of inputs as applied by the firm.
usual conditions.
3
Case No.:2/47/84-ALC3/2008
Party Name:NETWORK CLOTHING COMPANY PVT.LTD., 02.04.2009 Status: Deferred HQ File :01/84/050/00454/AM09/ RLA File :32/24/040/00057/AM09/ Lic.No/Date:3210039704 10.02.2009 Defer Date: 30.04.2009 Decision: The Committee considered the case as per agenda alongwith other relevant papers and observed that reply asked for from applicant firm is still awaited. In view of this, it was decided to await the same and defer the case for re-listing on 30.04.2009.
4
Case No.:7/47/84-ALC3/2008
Party Name:RICHA & CO 02.04.2009 Status: Approved HQ File :01/84/050/00459/AM09/ RLA File :05/24/040/00713/AM09/ Lic.No/Date:0510236191 11.02.2009 Defer Date:02.04.2009
PRO version usual conditions.
5
Case No.:2/1/84-ALC3/2009
Party Name:LASTOLITE IMAGING SOLUTIONS PRIVATE LIMITED, 02.04.2009 Status: Deferred HQ File :01/84/050/00466/AM09/ RLA File :04/24/040/00273/AM09/ Lic.No/Date:0410102678 04.03.2009 Defer Date: 30.04.2009 Decision: The Committee considered the case as per agenda alongwith other relevant papers and decided to link earlier file wherein similar case of the firm has been approved. It was decided to await the same and defer the case for re-listing on 30.04.2009.
6
Case No.:4/1/84-ALC3/2009
Party Name:AMMAYAPPER TEXTILES PVT. LTD., 02.04.2009 Status: Approved HQ File :01/84/050/00468/AM09/ RLA File :04/24/040/00252/AM09/ Lic.No/Date:0410102679 04.03.2009
Dec Decision: The Committee considered the case as per agenda alongwith other relevant papers and after
usual conditions.
PRO version
7
Case No.:5/1/84-ALC3/2009
Party Name:BANNARI AMMAN APPAREL PRIVATE LIMITED, 02.04.2009 Status: Approved HQ File :01/84/050/00469/AM09/ RLA File :04/24/040/00282/AM09/ Lic.No/Date:0410102804 09.03.2009
usual conditions.
8
Case No.:1/1/84-ALC3/2009
Party Name:KANTI FLOOR FURNISHERS 02.04.2009 Status: Approved HQ File :01/84/050/00465/AM09/ RLA File :10/24/040/00126/AM09/ Lic.No/Date:1010032942 16.03.2009
Decision: The Committee considered the case as per agenda and in consultation with the representatives of technical authorities present in the meeting decided to ratify the Advance Authorization issued in this case on the basis of report of team, who visited the unit of the applicant firm by allowing 1% wastage. Weight of Plastisole should match in the export and import item.
The R.A. shall be advised to take necessary action subject to compliance of other usual conditions.
PRO version
9
Case No.:7/1/84-ALC3/2009
Party Name:ORIENT FASHION EXPORTS(INDIA) PVT.LTD. 02.04.2009 Status: Approved HQ File :01/84/050/00471/AM09/ RLA File :05/24/040/00757/AM09/ Lic.No/Date:0510237976 16.03.2009
usual conditions.
10
Case No.:8/1/84-ALC3/2009
Party Name:ORIENT FASHION EXPORTS(INDIA) PVT.LTD. 02.04.2009 Status: Approved HQ File :01/84/050/00472/AM09/ RLA File :05/24/040/00758/AM09/ Lic.No/Date:0510237980 16.03.2009
usual conditions.
Case No.:3/1/84-ALC3/2009
Party Name:DYUTI ENTERPRISE PRIVATE LIMITED 02.04.2009 Status: Deferred HQ File :01/84/050/00467/AM09/ RLA File :02/24/040/00284/AM09/ Lic.No/Date:0210124438 Defer
PRO version 11 Q e :0 /8 /050/00 67/ 09/ e :0 / /0 0/00 8 / 09/ c.No/ ate:0 0 38 18.03.2009 e e Date:30.04.2009 Decision: The Committee considered the case as per agenda alongwith other relevant papers and observed that copy of application is still awaited in this case. It was decided to await the same and defer the case for re- listing on 30.04.2009.
12
Case No.:9/1/84-ALC3/2009
Party Name:CHELSEA MILLS 02.04.2009 Status: approved HQ File :01/84/050/00473/AM09/ RLA File :05/24/040/00770/AM09/ Lic.No/Date:0510238326 19.03.2009
usual conditions.
13
Case No.:10/1/84-ALC3/2009
Party Name:GAURAV INTERNATIONAL 02.04.2009 Status: Approved HQ File :01/84/050/00474/AM09/ RLA File :05/24/040/00776/AM09/ Lic.No/Date:0510238392 19.03.2009
PRO version usual conditions.
14
Case No.:11/1/84-ALC3/2009
Party Name:RICHA & CO 02.04.2009 Status: Approved HQ File :01/84/050/00475/AM09/ RLA File :05/24/040/00775/AM09/ Lic.No/Date:0510238394 19.03.2009
usual conditions.
15
Case No.:12/1/84-ALC3/2009
Party Name:CHELSEA MILLS 02.04.2009 Status: Approved HQ File :01/84/050/00476/AM09/ RLA File :05/24/040/00785/AM09/ Lic.No/Date:0510238533 20.03.2009
usual conditions.
PRO version
16
Case No.:13/1/84-ALC3/2009
Party Name:CHELSEA MILLS 02.04.2009 Status: Approved HQ File :01/84/050/00477/AM09/ RLA File :05/24/040/00786/AM09/ Lic.No/Date:0510238537 20.03.2009
usual conditions.
PRO version 17
Case No.:6/1/84-ALC3/2009
Party Name:KANTI FLOOR FURNISHERS 02.04.2009 Status: Approved HQ File :01/84/050/00470/AM09/ RLA File :10/24/040/00132/AM09/ Lic.No/Date:1010033059 23.03.2009
Decision: The Committee considered the case as per agenda and in consultation with the representatives of technical authorities present in the meeting decided to ratify the Advance Authorization issued in this case on the basis of report of team, who visited the unit of the applicant firm by allowing 1% wastage. Weight of Plastisole should match in the export and import item.
The R.A. shall be advised to take necessary action subject to compliance of other usual conditions.
18
Case No.:14/1/84-ALC3/2009
Party Name:MERIDIAN APPARELS LIMITED, 02.04.2009 Status: Approved HQ File :01/84/050/00478/AM09/ RLA File :04/24/040/00307/AM09/ Lic.No/Date:0410103378 25.03.2009
usual conditions.
PRO version Manual agenda cases
Case No.1
M/s Richa & Co., New Delhi
NC 01/10 dt. 02.04.2009
F.No. 01/84/50/366/AM-06/DES-V
Ratification of input output norms against Advance Authorization No. 0510165218 dated
29.08.2005 – under Para 4.7 of HBP (Vol.I) 2004-2009.
Decision: The Committee considered the case as per agenda and decided to ratify the advance authorizations
issued in this case as per written comments of DC (MSME) vide their U.O No. 37 (5)/01/2009-10/Hosy. dated
01.04.2009 as detailed below: -
Export Product
Import Item
Qty. allowed
Ladies Skirts made of 100%
cotton yarn dyed fabric, GSM-
245+/-10%
(Style No. ABWS513181)
100% cotton yarn dyed fabric,
GSM-245+/-10%
3.32 Sq mtrs/Pc
Ladies Skirts made of 100%
cotton yarn dyed fabric, GSM-
245+/-10%
(Style No. WS615320)
100% cotton yarn dyed fabric,
GSM-245+/-10%
3.35 Sq mtrs/Pc
The GSM shall match on both side of export and import. The R.A shall be advised to take necessary action subject to compliance of other usual conditions.
Case No.2 F.No. 01/84/50/611/AM-06/DES-V Ratification of input output norms against Advance Authorization No. 0510171394 dated 08.12.2005 – under Para 4.7 of HBP (Vol.I) 2004-2009. Decision: The Committee considered the case as per agenda alongwith other relevant papers and observed that case is under examination of DC (MSME) and comments are awaited. It was therefore decided to defer the case for
PRO version re-listing on 30.04.2009.
Case No.3 F.No. 01/84/50/379/AM-06/DES-V Ratification of input output norms against Advance Authorization No. 0510165753 dated 02.09.2005 – under Para 4.7 of HBP (Vol.I) 2004-2009.
Case No.4 M/s United Electrotex Pvt. Bangalore F.No. 01/84/162/274/AM-08/DES-V Ratification of input output norms against Advance Authorization No. 0710051672 dated 17.05.2007 – under Para 4.7 of HBP (Vol.I) 2004-2009. Decision: The Committee considered the case as per agenda and decided to ratify the advance authorizations issued in this case as per written comments of DC (MSME) vide their U.O No. 37 (5)/42/2007-08/Hosy. dated 01.04.2009 as detailed below: - Export Product Import Item Qty. allowed Men’s Pants made of 100% cotton poplin fabric, GSM- 123+/-10% 100% cotton poplin fabric, GSM-123+/-10%
2.25 Sq mtrs/Pc (as per SION, J-275)
Ladies Pants made of 100% cotton poplin fabric, GSM- 123+/-10% 100% cotton poplin fabric, GSM-123+/-10%
2.25 Sq mtrs/Pc (as per SION, J-275)
Men’s shirts made of 100% cotton poplin fabric, GSM- 134+/-10% 100% cotton poplin fabric, GSM-134+/-10% 2.15 Sq mtrs/Pc (as per SION, J-175)
PRO version Hand Bags Qty. of inputs is not allowed, as the information submitted for these items is not readable. And there are no SIONs exist. The GSM shall match on both side of export and import. The R.A shall be advised to take necessary action subject to compliance of other usual conditions.
Case No.5
F.No. 01/84/50/588/AM-06/DES-V
Ratification of input output norms against Advance Authorization No. 0510170981 dated
02.12.2005 – under Para 4.7 of HBP (Vol.I) 2004-2009.
Decision: The Committee considered the case as per agenda and decided to ratify the advance authorizations
issued in this case as per written comments of DC (MSME) vide their U.O No. 37 (5)/02/2009-10/Hosy. dated
01.04.2009 as detailed below: -
Export Product
Import Item
Qty. allowed
Ladies Capri made of 55%
Linen 45% cotton fabric, GSM-
190+/-10%
(Style No. F2736)
55% Linen 45% cotton fabric,
GSM-190+/-10%
1.98 Sq mtrs/Pc
The GSM shall match on both side of export and import. The R.A shall be advised to take necessary action subject to compliance of other usual conditions
Case No.6 F.No. 01/84/50/211/AM-07/DES-V Ratification of input output norms against Advance Authorization No. 0510187513 dated 26.07.2006 – under Para 4.7 of HBP (Vol.I) 2004-2009. Decision: The Committee considered the case as per agenda and decided to ratify the advance authorizations issued in this case as per written comments of DC (MSME) vide their U.O No. 37 (5)/03/2009-10/Hosy. dated
PRO version 01.04.2009 as detailed below: - Export Product Import Item Qty. allowed Ladies Jacket made of 98% cotton 2% spandex stretch corduroy fabric, GSM-280+/- 10% (Style No. 270200) 98% cotton 2% spandex stretch corduroy fabric, GSM- 280+/-10%
2.21 Sq mtrs/Pc
Ladies Skirt made of 100% rayon printed woven fabric, GSM-195+/-10% (Style No. 663571) 100% rayon printed woven fabric, GSM-195+/-10% 4.51 Sq mtrs/Pc
The GSM shall match on both side of export and import. The R.A shall be advised to take necessary action subject to compliance of other usual conditions
Case No.7 F.No. 01/84/50/623/AM-06/DES-V Ratification of input output norms against Advance Authorization No. 0510171691 dated 12.12.2005 – under Para 4.7 of HBP (Vol.I) 2004-2009. Decision: The Committee considered the case as per agenda and decided to ratify the advance authorizations issued in this case as per written comments of DC (MSME) vide their U.O No. 37 (5)/4/2009-10/Hosy. dated 01.04.2009 as detailed below: - Export Product Import Item Qty. allowed Ladies Top made of 55% Linen 45% rayon dyed fabric, GSM-195+/-10% 55% Linen 45% rayon dyed fabric, GSM-195+/-10% 2.31 Sq mtrs/Pc
Ladies Skirt made of 55% linen
45% rayon dyed fabric, GSM-
195+/-10%
55% linen 45% rayon dyed
fabric, GSM-195+/-10%
Not allowed as no
information
was
submitted.
The relevant original case file has since been received from DC (MSME).
PRO version The GSM shall match on both side of export and import. The R.A shall be advised to take necessary action subject to compliance of other usual conditions.
Case No.8 M/s Texport Syndicate (India) Ltd. Mumbai F.No. 01/84/162/1027/AM-08/DES-V Ratification of input output norms against Advance Authorization No. 0310441360 dated 30.08.2007 – under Para 4.7 of HBP (Vol.I) 2004-2009. Decision: The Committee considered the case as per agenda and decided to ratify the advance authorizations issued in this case as per written comments of DC (MSME) vide their U.O No. 37 (5)/59/2008-09/Hosy. dated 22.12.2008 as detailed below: - Export Product Import Item Qty. allowed Men’s short sleeve shirt made of 100% cotton yarn dyed fabric (Style No. SW8-415) 100% cotton yarn dyed woven fabric of relevant GSM. 3.15 Sq mtrs/Pc
Men’s short sleeve shirt made of 100% cotton yarn dyed fabric (Style No. SW8-417) 100% cotton yarn dyed woven fabric of relevant GSM. 3.35 Sq mtrs/Pc
Men’s long sleeve shirt made of 100% cotton yarn dyed fabric (Style No. SW8-416) 100% cotton yarn dyed woven fabric of relevant GSM. 4.45 Sq mtrs/Pc
Men’s Trouser made of 100% linen fabric (Style No. MWB- 202) 100% linen fabric of relevant GSM. 3.10 Sq mtrs/Pc
Men’s short made of 100% cotton yarn dyed fabric (Style No. MWB8-209) 100% Linen fabric of relevant GSM. 2.60 Sq mtrs/Pc
The relevant original case file has since been received from DC (MSME).
PRO version The R.A shall be advised to take necessary action subject to compliance of other usual conditions
Case No.9 F.No. 01/84/50/097/AM-07/DES-V Ratification of input output norms against Advance Authorization No. 0510183229 dated 24.05.2006 – under Para 4.7 of HBP (Vol.I) 2004-2009.
Case No.10 M/s Super house Ltd. Kanpur F.No. 01/84/50/329/AM-03/DES-V(Pt.) Re-fixation of input output norms against Advance Authorization No. 0610004075 dated 03.09.2002 – under Para 4.7 of HBP (Vol.I) 2004-2009. case is under examination of DIPP and comments are awaited. It was therefore decided to defer the case for re- listing on 30.04.2009.
Case No.11 M/s Super house Ltd. Kanpur F.No. 01/84/50/290/AM-03/DES-V (Pt.) Re-fixation of input output norms against Advance Authorization No. 0610003833 dated 09.07.2002 – under Para 4.7 of HBP (Vol.I) 2004-2009. case is under examination of DIPP and comments are awaited. It was therefore decided to defer the case for re- listing on 30.04.2009.
Case No.12 M/s RR Leather Products Pvt. Ltd., Chennai
PRO version F.No. 01/84/50/87/AM-08/DES-V Ratification of input output norms against Advance Authorization No. 0410090091 dated 25.06.2007 – under Para 4.7 of HBP (Vol.I) 2004-2009. Decision: The Committee considered the case as per agenda alongwith other relevant papers and decided to add one additional Style No. 709800 in the export item in this case as requested by the firm.
The R.A shall be advised to take necessary action subject to compliance of other usual conditions.
Case No.13 M/s RR Leather Products Pvt. Ltd., Chennai F.No. 01/84/50/183/AM-08/DES-V Ratification of input output norms against Advance Authorization No. 0410091297 dated 03.10.2007 – under Para 4.7 of HBP (Vol.I) 2004-2009. Decision: The Committee considered the case as per agenda alongwith other relevant papers and decided to amend the description of export item from ‘Men’s woolen jacket’ to ‘Men’s Textile Jacket’ as requested by the firm.
The R.A shall be advised to take necessary action subject to compliance of other usual conditions.
Case No.14 F.No. 01/84/162/344/AM-08/DES-V Ratification of input output norms against Advance Authorization No. 0510204883 dated 13.06.2007 – under Para 4.7 of HBP (Vol.I) 2004-2009.
PRO version
Case No.15 F.No. 01/84/50/392/AM-08/DES-V Ratification of input output norms against Advance Authorization No. 0510215164 dated 18.01.2008 – under Para 4.7 of HBP (Vol.I) 2004-2009.
Case No.16 M/s William Goodacre & Sons India Pvt. Ltd., Kerala F.No. 01/84/50/135/AM-08/DES-V Ratification of input output norms against Advance Authorization No. 1010028345 dated 03.01.2008 – under Para 4.7 of HBP (Vol.I) 2004-2009. case is under examination of DIPP and comments are awaited. It was therefore decided to defer the case for re- listing on 30.04.2009.
Case No.17 M/s Shahi Exports Pvt. Ltd., New Delhi F.No. 01/84/162/590/AM-09/DES-V Permission for using balance interlining imported under Advance Authorization Nos. 0510204251 dated 30.05.2007, 0510204919 dated 14.06.2007 and 0510205035 dated 18.06.2007 against Advance Authorization Nos. 0510226024 dated 22.08.2008 and 0510228184 dated 24.09.2008. Decision: The Committee considered the case as per agenda alongwith other relevant papers and heard S/Sh. S. Hariharan, Manager and S. Murli Krishnan, AGM in the firm who appeared for personal hearing in this case. They
PRO version explained the case alongwith relevant details. The Committee after detailed deliberations in consultation with representatives of technical authorities present in the meeting decided to permit the use of balance interlining imported against three advance authorization Nos. 0510204251 dated 30.05.2007, 0510204919 dated 14.06.2007 and 0510205035 dated 18.06.2007 in two advance authorization Nos. 0510226024 dated 22.08.2008 and 0510228184 dated 24.09.2008 by clubbing with accountability clause.
The R.A. shall be advised to take necessary action subject to compliance of other usual conditions.
Case No.18 M/s Dulari Exports Pvt. Ltd. New Delhi F.No. 01/84/50/533/AM-09/DES-V Ratification of input output norms against Advance Authorization No. 0510200278 dated 01.03.2007 – under Para 4.7 of HBP (Vol.I) 2004-2009.
Case No.19 M/s Dulari Exports Pvt. Ltd. New Delhi F.No. 01/84/50/57/AM-09/DES-V Ratification of input output norms against Advance Authorization No. 0510203969 dated 22.05.2007 – under Para 4.7 of HBP (Vol.I) 2004-2009.
PRO version
Case No.20 M/s Ponn Sanger Exports, Coimbatore F.No. 01/84/50/238/AM-09/DES-V Ratification of input output norms against Advance Authorization No. 3210037105 dated 25.01.2008 – under Para 4.7 of HBP (Vol.I) 2004-2009. firm have failed to give reply to DC (MSME) letter dated 23.03.2009. Further, in this case there are various export products and firm have not given specific details as to which import item is used for which export product and justification of their quantitative requirement, in absence of which it is not possible to fix adhoc norms in this case. Hence, Committee was constrained to maintain the status quo.
Firm may be informed accordingly.
Case No.21 M/s Color Lines Clothing India (Pvt.) Ltd, Bangalore F.No. 01/84/50/346/AM-09/DES-V Ratification of input output norms against Advance Authorization No. 0710060473 dated 16.10.2008 – under Para 4.7 of HBP (Vol.I) 2004-2009.
PRO version
Case No.22 M/s Mahavir spinfab Pvt. Ltd., Kanpur F.No. 01/84/50/202/AM-09/DES-V Ratification of input output norms against Advance Authorization No. 0610013679 dated 16.07.2008 – under Para 4.7 of HBP (Vol.I) 2004-2009. firm have failed to give reply to R.O, TC, Noida letter dated 09.03.2009, in absence of which it is not possible to fix adhoc norms in this case. Hence, Committee was constrained to maintain the status quo. Firm may be informed accordingly.
Case No.23 M/s Entermonde Polycoaters Ltd., Mumbai F.No. 01/84/50/67/AM-09/DES-V Ratification of input output norms against Advance Authorization No. 0310464295 dated 10.03.2008 – under Para 4.7 of HBP (Vol.I) 2004-2009. case is under examination of DIPP and comments are awaited. It was therefore decided to defer the case for re- listing on 16.04.2009.
Case No.24 M/s Apparel Merchandising Co. New Delhi F.No. 01/84/50/359/AM-09/DES-V Ratification of input output norms against Advance Authorization No. 0510230066 dated 29.10.2008 – under Para 4.7 of HBP (Vol.I) 2004-2009. Decision: The Committee considered the case as per agenda alongwith other relevant papers and went through the CAD/CAM and Measurement submitted by the firm. The Committee after detailed deliberations in consultation with representatives of technical authorities present in the meeting decided to allow the Qty. of inputs as applied by the firm.
PRO version The R.A. shall be advised to take necessary action subject to compliance of other usual conditions.
Outside agenda cases
Case No.1 M/s Chelsea Mills, New Delhi NC 52/09 dt. 26.03.2009 F.No. 01/84/50/722/AM-07/DES-V Ratification of input output norms against Advance Authorization No. 051075922 dated 07.02.2006 – under Para 4.7 of HBP (Vol.I) 2004-2009. R.A has rejected this case on the ground that validity period of this advance authorization has already expired. In view of this Committee decided to advise R.A to take/implement the decision of NC taken in its meeting No. 33/AM09 held on 20.11.2008 in this case, even where advance authorizations are expired.
The R.A. shall be advised to take necessary action subject to compliance of other usual conditions.
Case No.2 M/s Chelsea Mills, New Delhi NC 52/09 dt. 26.03.2009 F.No. 01/84/50/592/AM-06/DES-V Ratification of input output norms against Advance Authorization No. 0510171001 dated 05.12.2005 – under Para 4.7 of HBP (Vol.I) 2004-2009. R.A has rejected this case on the ground that validity period of this advance authorization has already expired. In view of this Committee decided to advise R.A to take/implement the decision of NC taken in its meeting No. 44/AM06 held on 16.02.2006 in this case, even where advance authorizations are expired.
The R.A. shall be advised to take necessary action subject to compliance of other usual conditions.
PRO version
@@@@@@
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.