IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2011-11-17

DGFT Committee Minutes

Document text

RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   MINUTES OF THE NORMS COMMITTEE­II MEETING NO. 34/81 SCHEDULED TO BE HELD ON 08.11.2011 BUT ACTUALLY  HELD ON   17.11.2011.  The  Meeting  No.  34/81  of  Norms  Committee­II  was  held  on  17.11.2011  for  the  licensing  year  2010­2011  under  the  Chairmanship  of  Sh. Hardeep  Singh,  Joint  Director  General  of  Foreign  Trade  to  consider  the  following  applications  for  ratification  of  norms  in  respect  of  advance authorisations under Duty Exemption Scheme (Chapter­4) of Foreign Trade Policy 2009­2014. The following members were present in the meeting:­         S.No Name of the representatives &             their Designation   Deptt.   1.            Shri. S.K.Jain, Sr.D.O.                                                                   DIPP 2.            Shri K.K Funda, A.D.                                                                      MSME 3.            Shri  Praveen Sharma, Dy. DG                                                     DGFT 4.            Sh Raman Kumar, FTDO                                                              DGFT 5.            Sh. B.D. Ghose, Addl. IA                                                              MOS 6.            Sh. Gajraj Singh, Sr. D.O.                                              DHI   1

Case No.:54/27/81­ALC2/2009

Party  Name:HINDALCO  INDUSTRIES LIMITED Meet No/Date:34/81­ALC2/2011 08.11.2011 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00236/AM10/ RLA File :34/24/040/00030/AM10/ Lic.No/Date:3410024344 02.06.2009 Defer Date:20.12.2011 Decision :NC decided to send  a  letter  to  firm  to  submit  requisite  information  as  required  by  MSME  vide  U.O.  No.  30(82)2011­ME  dated 24.10.2011. (copy enclosed). The case stands deferred and to be re­listed on 20.12.2011.

2

Case No.:19/39/81­ALC2/2009

Party Name:BIMETAL BEARINGS LIMITED, 08.11.2011 Status:Approved HQ File :01/81/050/00375/AM10/ RLA File :32/24/040/00017/AM10/ Lic.No/Date:3210040968 03.08.2009 Defer Date:08.11.2011 Decision :NC decided to ratify the norms of above AA as per written comments of MSME vide U.O. No. 6(33)/met/2009­10 dated 31.10.2011 as under:­   Export Item Quantity Import Items Qty allowed Copper  Based  pre­ alloyed Powder R­800 100 Kg. 1.  Copper  Scrap    /Cathodes/Ingots/ Scrap 76.57 Kg.   2. Lead/Lead Scrap 21.36 Kg. 3. Tin ingots/Scrap 2.08Kg. 4. Nickel/Nickel Scrap 4.16 Kg.   R/A may take suitable consequential action accordingly.     3

Case No.:6/40/81­ALC2/2010

Party  Name:RATNESH  METAL  INDUSTRIES PVT. LTD 08.11.2011 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00374/AM11/ RLA File :08/24/040/00256/AM10/ Lic.No/Date:0810085115 21.12.2009 Defer Date:20.12.2011 Decision : The case is under examination at MOS. The case stands deferred and to be re­listed on 20.12.2011.     4

Case No.:2/46/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 08.11.2011 Status:Approved HQ File :01/81/050/00447/AM10/ RLA File :09/24/040/00378/AM10/ Lic.No/Date:0910040771 02.02.2010 Defer Date:08.11.2011 Decision  :  NC  decided  to  ratify  the  norms  of  above  AA  as  per  written  comments  of  DHI  vide  U.O.  No.  3(9)/2011/TSW(B)/627  dated 19.10.2011 as under:­   (i)              Net weight per unit of Export Product No. 1,2,3,4, 5 & 6 may be indicated as 3925 kg., 4120 kg, 3430 kg, 4450 kg, 4200 kg and 2680 kg respectively in addition to quantity in numbers.

(ii)            Word ‘Coil’ may be added in the description of Import Item No. 1, 7, 13, 19, 25 and 31 and their quantity may be allowed as applied by the firm including 7% wastage. (iii)          Quantity of Import Item No. 2,8,14,20 26 and 32 may be reduced to 810 kg, 4333 kg, 1500 kg, 1273 kg, 690 kg and 758 kg respectively including 1% wastage. (iv)          Import Item No. 3,9,15,21,27 and 33 may be allowed as applied by the firm including 10% wastage. (v)            Import Item No. 6,12,18,24,30 and 36 are components and may be allowed on net to net basis. (vi)          Rest of the Items are insulating material (Press Board and Kraft Paper) and may be allowed as applied by the firm including 5% wastage.     5

Case No.:8/40/81­ALC2/2010

Party Name:SUMI MOTHERSON INNOVATIVE ENGINEERING LIMITED 08.11.2011 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00376/AM11/ RLA File :05/24/040/00460/AM10/ Lic.No/Date:0510258719 17.02.2010 Defer Date:20.12.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 20.12.2011.   6

Case No.:11/45/81­ALC2/2010

Party Name:DAKI ENGINEERING WORKS, 08.11.2011 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00488/AM11/ RLA File :24/24/040/00020/AM10/ Lic.No/Date:2410027741 18.03.2010 Defer Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited after final reminder  and   decided to  wait for reply of the firm till next meeting.  The case stands deferred and to be re­listed on 20.12.2011.   7 Case  No.:11/9/81­ ALC2/2010 Party Name:TATA BP SOLAR INDIA LTD. Meet  No/Date:34/81­ ALC2/2011 08.11.2011 Status:Deferred and Re­indexed   HQ File :01/81/050/00044/AM11/ RLA  File :07/24/040/00441/AM10/ Lic.No/Date:0710071806 26.05.2010 Defer  Date: 20.12.2011 Decision : NC observed that comments of MNRE is awaited and hence decided to send a reminder to MNRE to expedite the comments. The case stands deferred and to be relisted on 20.12.2011.     8

Case No.:5/11/81­ALC2/2010

Party  Name:STERLITE  INDUSTRIES  (INDIA) LTD. 08.11.2011 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00050/AM11/ RLA File :35/24/040/00048/AM10/ Lic.No/Date:3510030471 04.06.2010 Defer Date: 20.12.2011

Decision :NC observed that the firm has asked for some more time for reply hence decided to defer the case for next meeting. The case stands deferred and to be relisted on 20.12.2011.   9

Case No.:16/11/81­ALC2/2010

Party  Name:STERLITE  INDUSTRIES  (INDIA) LTD. 08.11.2011 Status:Approved HQ File :01/81/050/00061/AM11/ RLA File :35/24/040/00049/AM10/ Lic.No/Date:3510030492 07.06.2010 Defer Date:08.11.2011 Decision : NC observed that firm has requested to change the export and import items of above mentioned AA as per SION C­1950. NC decided to allow the export and import in r/o above AA as per SION C­1950 subject to condition mentioned therein .     10

Case No.:2/27/81­ALC2/2010

Party  Name:ASIATIC  ELECTRICAL  AND SWITCHGEAR PVT.LTD. 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00210/AM11/ RLA File :05/23/040/00059/AM11/ Lic.No/Date:0510267975 12.07.2010 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 20.12.2011.   11

Case No.:9/25/81­ALC2/2010

Party  Name:TTP  TECHNOLOGIES  PRIVATE LIMITED 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00183/AM11/ RLA File :07/24/040/00121/AM11/ Lic.No/Date:0710072965 15.07.2010 Defer  Date: 20.12.2011 Decision : The case is under examination at DHI. The case stands deferred and to be re­listed on 20.12.2011.   12

Case No.:10/27/81­ALC2/2010

Party  Name:BHANSALI  CABLES  & CONDUCTORS (P) LTD., 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00218/AM11/ RLA File :05/23/040/00022/AM11/ Lic.No/Date:0510269614 04.08.2010 Defer  Date: 20.12.2011 Decision :NC observed that RA has not enclosed the correct application of the firm in r/o above authorization and decided to send a letter to RA to forward correct application . The case stands deferred and to be re­listed on 20.12.2011.   13

Case No.:33/45/81­ALC2/2010

Party Name:TATA BP SOLAR INDIA LTD. 08.11.2011 Status:Deferred and Re­indexed Lic.No/Date:0710073904

HQ File :01/81/050/00510/AM11/ RLA File :07/24/040/00181/AM11/ 30.08.2010 Defer  Date: 20.12.2011 Decision : NC observed that comments of MNRE is awaited and hence decided to send a reminder to MNRE to expedite the comments. The case stands deferred and to be relisted on 20.12.2011.   14

Case No.:35/27/81­ALC2/2010

Party Name:UM CABLES LTD., 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00243/AM11/ RLA File :03/95/040/00435/AM11/ Lic.No/Date:0310593774 24.09.2010 Defer  Date: 20.12.2011 Decision :NC observed that case is under examination at DIT. The case stands deferred and to be relisted on 20.12.2011.   15

Case No.:31/40/81­ALC2/2010

Party Name:ADDI ALLOYS PVT.LTD. 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00399/AM11/ RLA File :30/24/040/00031/AM11/ Lic.No/Date:3010069857 30.09.2010 Defer  Date: 20.12.2011 Decision : NC observed that reply of the firm has not been received despite two reminders, hence decided to send a final reminder to firm. The case stands deferred and to be re­listed on 20.12.2011.   16

Case No.:19/40/81­ALC2/2010

Party  Name:BHARAT  HEAVY  ELECTRICALS LIMITED 08.11.2011 Status:Approved HQ File :01/81/050/00387/AM11/ RLA File :06/24/040/00032/AM11/ Lic.No/Date:0610019278 05.10.2010 Defer Date:08.11.2011 Decision :NC decided to ratify the norms of above AA on repeat basis as per earlier authorization No. 0610019255 dated 04.10.2010 which was  ratified  in  NC  M.No.  15/81  dated  05.07.2011  on  the  basis  of  written  comments  of  DHI  vide  U.O.  No.  3(101)/2010/TSW(B)  dated 31.10.2011 as under:­  1.Net weight per piece of export product may be incorporated as 2040 Kg.  2. Quanĕty of import item No. 1 may be allowed as 321.75 Kg per piece of export product.  3. Quanĕty of import item No. 2 may be allowed as 236 Kg per piece of export product.  4. Quanĕty of import item No. 3 may be allowed as 760.91 Liter per piece of export product.    R/A may take suitable consequenĕal acĕon accordingly   17

Case No.:29/40/81­ALC2/2010

Party  Name:BHARAT  HEAVY  ELECTRICALS LIMITED 08.11.2011 Status:Approved HQ File :01/81/050/00397/AM11/ RLA File :11/24/040/00043/AM11/ Lic.No/Date:1110023344 12.10.2010 Defer Date:08.11.2011 Decision : NC decided to ratify the norms of above AA as per written comments of DHI vide U.O. No. 3(33)/2010 dated 31.10.2011 as under:­

A. Export Product No. 1   :  240 MVA Single Phase Generator Transformer – 04 Nos.       Import Items (i) Total quantity of Import Item No. 1 & 5 may be restricted to 86,400 kg talking cue from SION C­283, (ii) Quantity of Import Item NO. 2 may be allowed as 4,72,500 kg as applied by the firm; (iii) Quantity of Import Item No. 3 may be restricted to 2,01,600 kg with nil wastage; (iv) Quantity of Import Item No. 4 may be allowed as 30,400 kg as applied by the firm; (v) Import Item No.8 & 12 may be deleted as these items are not components of the transformer; (vi) Import Item no. 11 may be deleted as requested by the firm in their reply ; (vii) Import Item No. 6,7,9 and 10 are components and may be allowed on net­to­net basis as applied by the firm.   B. Export Product No. 2   :  3­Phase, 63 MVAR Shunt Reactor – 01 No.(Net Weight 1,26,085 kg).       Import Items  (i) Quantity of Import Item No. 1  may be allowed as 13,900 kg including 1% wastage; (ii) Quantity of Import Item No. 2 may be allowed as 39,886 kg as applied by the firm; (iii) Quantity of Import Item No. 3 may be allowed as 35,650 kg with ‘nil’  wastage; (iv) Quantity of Import Item No. 4 may be allowed as 1,757 kg as applied by the firm.   C. Export Product No. 3   :  Single Phase 145 KVA Neutral Grounding Reactor – 01 No. (Net Weight 6,180 Kg.)       Import Items  : (i)  Quantity of Import Item No. 1 may be allowed as 931 kg including 1% wastage; (ii) Quantity of Import Item No. 2 may be allowed as 735 kg including 7% wastage; (iii) Import Item No. 3 may be allowed as 1,855 kg with ‘nil’ wastage; (iv) Import Item No. 4 may be allowed as 95 kg as applied by the firm.         18

Case No.:9/31/81­ALC2/2010

Party Name:IP SOFTCOM (INDIA) PVT.LTD., 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00315/AM11/ RLA File :04/24/040/00180/AM11/ Lic.No/Date:0410118155 19.10.2010 Defer  Date: 20.12.2011 Decision : The case is under examination at DIT. The case stands deferred and to be re­listed on 20.12.2011.   19

Case No.:40/1/81­ALC2/2011

Party  Name:GUJARAT  VICTORY  FORGING PVT.LTD, 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00619/AM11/ RLA File :34/24/040/00232/AM11/ Lic.No/Date:3410028754 08.12.2010 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    20

Case No.:41/1/81­ALC2/2011

Party  Name:GUJARAT  VICTORY  FORGING Meet No/Date:34/81­ALC2/2011 Status:Deferred

PVT.LTD, 08.11.2011 and Re­indexed HQ File :01/81/050/00620/AM11/ RLA File :34/24/040/00233/AM11/ Lic.No/Date:3410028755 08.12.2010 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    21

Case No.:7/45/81­ALC2/2010

Party Name:INDIAN TECHNOMAC CO.LTD. 08.11.2011 Status:Approved HQ File :01/81/050/00484/AM11/ RLA File :05/23/040/00252/AM11/ Lic.No/Date:0510279098 09.12.2010 Defer Date:08.11.2011 Decision :NC decided to ratify the norms of above AA as per written comments of MOS vide U.O. No. 2(3)2011­TW dated 17.11.2011 as under:­   Export Item Item of Export Quantity Medium  Carbon  Ferro  Manganese  (MN  70­ 80%) 500 M.T.   Import Item S. No. Import Item Applied Qty. Recommended Qty. 1 Manganese Ore (Mn 46­55%) 1500 M.T. 1042 M.T. 2. LAM  Coke    /Raw  petroleum coke/Australian  char/Anthiac  coal (with fixed carbon 88% min. & Ash content  6%  maximum/  Noncoking coal) 400 M.T. 375 M.T. 3. Carbon Electrode/Paste 15 M.T. 10 M.T.  Alumunium scrap is not allowed because the process is based on reduction by Coke/ coal which has been allowed. Dolomite is not allowed because usual input and past consumption is for Lime/Limestone. MS sheet is not allowed because only scrap material is used in production. While calculating the recommended quantity, SION C­477, 522 and technical literature have been consulted.   22

Case No.:2/40/81­ALC2/2010

Party Name:UM CABLES LTD., 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00370/AM11/ RLA File :03/95/040/00690/AM11/ Lic.No/Date:0310606224 14.12.2010 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.

  23

Case No.:4/45/81­ALC2/2010

Party  Name:ALSTOM  PROJECTS  INDIA LIMITED, 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00481/AM11/ RLA File :03/94/040/00812/AM11/ Lic.No/Date:0310606403 15.12.2010 Defer  Date: 20.12.2011 Decision :The case is under examination at DHI. The case stands deferred and to be re­listed on 20.12.2011.   24

Case No.:2/46/81­ALC2/2010

Party  Name:LEITNER  SHRIRAM MANUFACTURING LIMITED, 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00517/AM11/ RLA File :04/24/040/00245/AM11/ Lic.No/Date:0410120023 22.12.2010 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    25

Case No.:11/52/81­ALC2/2010

Party Name:CHANDAN STEEL LIMITED 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00576/AM11/ RLA File :03/94/040/00883/AM11/ Lic.No/Date:0310611243 17.01.2011 Defer  Date: 20.12.2011 Decision : The case is under examination at MOS. The case stands deferred and to be re­listed on 20.12.2011.   26

Case No.:20/45/81­ALC2/2010

Party Name:ATUL ELECTRO FORMERS LTD 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00497/AM11/ RLA File :31/24/040/00189/AM11/ Lic.No/Date:3110046519 20.01.2011 Defer  Date: 20.12.2011 Decision :NC observed that reply of the firm is  still awaited despite two reminders hence decided to send a final reminder to firm. The case stands deferred and to be re­listed on 20.12.2011.   27

Case No.:37/45/81­ALC2/2010

Party  Name:SUMI  MOTHERSON  INNOVATIVE ENGINEERING LIMITED 08.11.2011 Status:Approved HQ File :01/81/050/00514/AM11/ RLA File :05/24/040/00350/AM11/ Lic.No/Date:0510282431 27.01.2011 Defer Date:08.11.2011 Decision :NC decided to ratify the norms of above AA as per written comments of C&PC vide  communication No. 46011/49/2006­PC­II  dated May, 2011 as under:­ The above AA is ratified with 5% wastage on net content of the export product Relevant Stanyl, Latilub­66 and Latamid­66.

  28

Case No.:15/52/81­ALC2/2010

Party Name:SANKALP FORGINGS PVT.LTD. 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00580/AM11/ RLA File :31/24/040/00227/AM11/ Lic.No/Date:3110046694 31.01.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    29

Case No.:3/47/81­ALC2/2010

Party  Name:ALSTOM  PROJECTS  INDIA LIMITED, 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00529/AM11/ RLA File :03/94/040/00959/AM11/ Lic.No/Date:0310614989 08.02.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    30

Case No.:13/52/81­ALC2/2010

Party  Name:LEITNER  SHRIRAM MANUFACTURING LIMITED, 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00578/AM11/ RLA File :04/24/040/00305/AM11/ Lic.No/Date:0410121683 17.02.2011 Defer  Date: 20.12.2011 Decision :NC decided to send a letter to firm to submit requisite information as per written comments of DHI(copy enclosed). The case stands deferred and to be re­listed on 20.12.2011.   31

Case No.:14/52/81­ALC2/2010

Party  Name:ANDRITZ  HYDRO  PRIVATE LIMITED, 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00579/AM11/ RLA File :11/21/040/00129/AM11/ Lic.No/Date:1110024055 18.02.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    32

Case No.:14/50/81­ALC2/2010

Party Name:SWASTIK PIPES LTD 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00560/AM11/ RLA File :05/24/040/00322/AM11/ Lic.No/Date:0510284564 23.02.2011 Defer  Date: 20.12.2011 Decision :NC observed that reply received from the firm is not complete and hence decided to send a letter to firm to submit complete reply.

33

Case No.:23/52/81­ALC2/2010

Party Name:VIJAI ELECTRICALS LTD 08.11.2011 Status:Approved HQ File :01/81/050/00588/AM11/ RLA File :09/24/040/00468/AM11/ Lic.No/Date:0910045872 09.03.2011 Defer Date:08.11.2011 Decision :NC decided to ratify the norms of above AA as per written comments of DHI vide U.O. No. 3(9)/2011/TSW(B) dated 19.10.2011 as under:­   (i)              Net weight per unit of Export Product No.1 and 2 may be indicated as 615 kg and 940 kg respectively in addition to quantity in numbers. (ii)            Word ‘Coil’ may be added in the description of Import Item No. 1 & 9 and their quantity may be allowed as applied by the firm including 7%wastage. (iii)          Quantity of Import Itme no. 2 and 10 may be allowed as 628 kg and 482.6 kg respectively including 10% wastage. (iv)          Import Item No. 3,4 and 11,12 are insulating material and may be allowed as applied by the firm including 5% wastage. (v)            Import Item No. 5 and 13 are coating material and may be allowed as applied by the firm (vi)          Rest of the Items are components and may be allowed on net­to­net basis as applied by the firm.     34

Case No.:1/5/81­ALC2/2011

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00014/AM12/ RLA File :05/24/040/00008/AM12/ Lic.No/Date:0510288472 21.04.2011 Defer  Date: 20.12.2011 Decision :NC observed that case is under examination of DIT. The case stands deferred and to be re­listed on 20.12.2011.   35

Case No.:3/5/81­ALC2/2011

Party Name:INDIAN TECHNOMAC CO.LTD. 08.11.2011 Status:Approved HQ File :01/81/050/00016/AM12/ RLA File :05/23/040/00032/AM12/ Lic.No/Date:0510288841 27.04.2011 Defer Date:08.11.2011 Decision : NC decided to ratify the norms of above AA as per written comments of MOS vide U.O. No. 2(3)/2011/TW dated 17.11.2011 as under:­   Export Item Item of Export Quantity Medium  Carbon  Ferro  Manganese  (MN  70­ 80%) 1666.670 M.T.   Import Item

S. No. Import Item Applied Qty. Recommended Qty. 1 Manganese Ore (Mn 46­55%) 5000  M.T. 3473 M.T. 2. LAM  Coke    /Raw  petroleum coke/Australian  char/Anthiac  coal (with fixed carbon 88% min. & Ash content  6%  maximum/  Noncoking coal) 1333.340 M.T. 1250 M.T. 3. Carbon Electrode/Paste 50 M.T. 34 M.T.  Alumunium scrap is not allowed because the process is based on reduction by Coke/ coal which has been allowed. Dolomite is not allowed because usual input and past consumption is for Lime/Limestone MS sheet is not allowed because only scrap material is used in production. While calculating the recommended quantity, SION C­477, 522 and technical literature have been consulted. Manganese content 46­55 % may be added to description of import item No. 1       36

Case No.:1/11/81­ALC2/2011

Party  Name:A­1  FENCE  PRODUCTS CO.PVT.LTD. 08.11.2011 Status:Approved HQ File :01/81/050/00070/AM12/ RLA File :03/94/040/00182/AM12/ Lic.No/Date:0310632798 25.05.2011 Defer Date:08.11.2011 Decision : NC decided to ratify the norms of above AA as per written comments of DIPP vide U.O.   17.11.2011 as under:­     1.Word “Relevant” may be prefixed with the descripĕons of import items from Sl. No.1 to 4. 2. Quanĕĕes of import items at Sl. No. 1 & 2 may be allowed as 202  MT  & 101 MT respecĕvely inclusive 1 % wastage. 3. Quanĕty of import item at Sl. No. 3 may be allowed as 126.38 MT  inclusive 33% wastage a├er 1/3rd recovery from scrap. 4. Quanĕty of import item at Sl. No. 4  may be allowed as 75.72 inclusive 1 % wastage. R/A may take suitable consequenĕal acĕon accordingly.     37

Case No.:2/11/81­ALC2/2011

Party Name:DELTA POWER SOLUTIONS INDIA PVT.LTD. 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00071/AM12/ RLA File :25/24/040/00005/AM12/ Lic.No/Date:2510003250 25.05.2011 Defer  Date: 20.12.2011 Decision : NC observed that case is under examination of DIT. The case stands deferred and to be re­listed on 20.12.2011.

38

Case No.:6/11/81­ALC2/2011

Party Name:INDIAN TECHNOMAC CO.LTD. 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00075/AM12/ RLA File :05/23/040/00093/AM12/ Lic.No/Date:0510292675 06.06.2011 Defer  Date: 20.12.2011 Decision : NC decided to send a letter to firm to submit requisite information as required by MOS (copy enclosed). The case stands deferred and to be re­listed on 20.12.2011.   39

Case No.:7/11/81­ALC2/2011

Party  Name:CONSOLIDATED  ENGINEERING COMPANY 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00076/AM12/ RLA File :05/23/040/00088/AM12/ Lic.No/Date:0510292677 07.06.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    40

Case No.:21/20/81­ALC2/2011

Party  Name:RATNAMANI  METALS  &  TUBES LIMITED 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00172/AM12/ RLA File :08/24/040/00063/AM12/ Lic.No/Date:0810100235 07.06.2011 Defer  Date: 20.12.2011 Decision :NC observed that reply of the firm has been received and being forwarded to DIPP. The case stands deferred and to be re­listed on 20.12.2011.   41

Case No.:19/20/81­ALC2/2011

Party Name:VIJAI ELECTRICALS LTD 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00170/AM12/ RLA File :09/24/040/00574/AM11/ Lic.No/Date:0910047178 20.06.2011 Defer  Date: 20.12.2011 Decision :NC decided to again forward the application to DHI for examination. The case stands deferred and to be re­listed on 20.12.2011.   42

Case No.:9/20/81­ALC2/2011

Party Name:CROMPTON GREAVES LIMITED, 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00160/AM12/ RLA File :03/94/040/00188/AM12/ Lic.No/Date:0310637472 21.06.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    43

Case No.:8/20/81­ALC2/2011

Party Name:CROMPTON GREAVES LIMITED, Status:Deferred

08.11.2011 and Re­indexed HQ File :01/81/050/00159/AM12/ RLA File :03/94/040/00248/AM12/ Lic.No/Date:0310638590 24.06.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    44

Case No.:20/20/81­ALC2/2011

Party  Name:RADIANT  ­  RSCC  SPECIALTY CABLE PRIVATE LIMITED 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00171/AM12/ RLA File :09/24/040/00158/AM12/ Lic.No/Date:0910047350 28.06.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    45

Case No.:5/18/81­ALC2/2011

Party Name:ARUN INTERNATIONAL 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00143/AM12/ RLA File :05/23/040/00130/AM12/ Lic.No/Date:0510295905 06.07.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    46

Case No.:6/18/81­ALC2/2011

Party Name:BHANU UDYOG 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00144/AM12/ RLA File :04/24/040/00097/AM12/ Lic.No/Date:0410125789 07.07.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    47

Case No.:7/18/81­ALC2/2011

Party Name:LITEX ELECTRICALS PVT LTD, 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00145/AM12/ RLA File :31/83/040/00067/AM12/ Lic.No/Date:3110049124 08.07.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    48

Case No.:9/18/81­ALC2/2011

Party  Name:THE  SARASWATI  INDUSTRIAL SYNDICATE LTD. 08.11.2011 Status:Deferred and Re­indexed

HQ File :01/81/050/00147/AM12/ RLA File :05/24/040/00097/AM12/ Lic.No/Date:0510296434 13.07.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    49

Case No.:10/18/81­ALC2/2011

Party Name:JINDAL SAW LTD 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00148/AM12/ RLA File :05/23/040/00139/AM12/ Lic.No/Date:0510296435 13.07.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    50

Case No.:12/18/81­ALC2/2011

Party Name:JINDAL SAW LTD 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00150/AM12/ RLA File :05/23/040/00141/AM12/ Lic.No/Date:0510296449 13.07.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    51

Case No.:13/18/81­ALC2/2011

Party Name:HAVELLS INDIA LTD. 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00151/AM12/ RLA File :05/23/040/00144/AM12/ Lic.No/Date:0510296566 14.07.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    52

Case No.:3/20/81­ALC2/2011

Party  Name:WESTERN  CABLEX  ENGG.  PVT. LTD., 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00154/AM12/ RLA File :03/95/040/00249/AM12/ Lic.No/Date:0310643425 20.07.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    53

Case No.:15/20/81­ALC2/2011

Party Name:PARAMOUNT COMMUNICATIONS LTD. 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00166/AM12/ RLA File :05/24/040/00139/AM12/ Lic.No/Date:0510297732 Defer  Date:

27.07.2011 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    54

Case No.:16/20/81­ALC2/2011

Party Name:PARAMOUNT COMMUNICATIONS LTD. 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00167/AM12/ RLA File :05/24/040/00140/AM12/ Lic.No/Date:0510297735 27.07.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    55

Case No.:17/20/81­ALC2/2011

Party Name:WAGO & CONTROLS (I) LTD 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00168/AM12/ RLA File :05/24/040/00146/AM12/ Lic.No/Date:0510297963 28.07.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    56

Case No.:18/20/81­ALC2/2011

Party Name:AMARTARA PVT. LTD. 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00169/AM12/ RLA File :03/94/040/00388/AM12/ Lic.No/Date:0310645394 29.07.2011 Defer  Date: 20.12.2011 Decision :NC observed that the case is under examination at C&PC. The case stands deferred and to be re­listed on 20.12.2011.   57

Case No.:1/26/81­ALC2/2011

Party Name:VIKARSH STAMPINGS INDIA PVT. LTD. 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00217/AM12/ RLA File :31/83/040/00070/AM12/ Lic.No/Date:3110050170 07.09.2011 Defer  Date: 20.12.2011 Decision : NC observed that the case is under examination at MOS. The case stands deferred and to be re­listed on 20.12.2011.   58

Case No.:2/26/81­ALC2/2011

Party Name:HOGANAS INDIA LIMITED 08.11.2011 Status:Approved HQ File :01/81/050/00218/AM12/ RLA File :31/83/040/00110/AM12/ Lic.No/Date:3110050198 08.09.2011 Defer Date:08.11.2011 Decision : : NC decided to ratify the norms of above AA as per written comments of DIPP vide U.O.   17.11.2011 as under:­

1. Words “ Ni: 1.32 %  to 1.42 %, Mo: 1.19 % to 1.29 %, Mn: 0.37 % to 0.51 %. ,  P: 0.02 % (Max), Fe: balance” may be suffixed with descripĕon of export product. 2.  Words “ Mo: 60 %” may be suffixed with descripĕon of import item at Sl. No. 1. 3. Words “ Mn: 70 %” may be suffixed with descripĕon of import item at Sl. No. 3. 4. Taking clue from SION C‐1416, quanĕĕes of import items at Sl No. 1 to 3  may be allowed as applied for i.e. 2558 Kgs., 1714 Kgs. & 716 Kgs respecĕvely.   R/A may take suitable consequenĕal acĕon accordingly.     59

Case No.:3/26/81­ALC2/2011

Party  Name:ALSTOM  PROJECTS  INDIA LIMITED, 08.11.2011 Status:closed HQ File :01/81/050/00219/AM12/ RLA File :03/94/040/00512/AM12/ Lic.No/Date:0310652997 12.09.2011 Defer Date:08.11.2011 Decision : NC   presumed that RA has issued the licence on net to net basis as per general note 4 of Engineering products and ratification of NC is not required. The case may be treated as closed.   60

Case No.:4/26/81­ALC2/2011

Party  Name:ALSTOM  PROJECTS  INDIA LIMITED, 08.11.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00220/AM12/ RLA File :03/94/040/00472/AM12/ Lic.No/Date:0310653258 13.09.2011 Defer  Date: 20.12.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 20.12.2011.   PART – AR – FRESH  Sl No. 160

CASE NO. AR­ 28

M/s. LM Wind Power Blades Pvt. Ltd. Meeting No. 34/81 F.No.01/81/050/98/AM10/DES­II      Dated:08.11.2011  Advance Licence No. 0710056217 dated 04.03.2008   RLA’s F.No.07/24/040/0438/AM08

Decision : NC observed that comments of C&PC is awaited and hence decided to send a reminder to C&PC to expedite the comments. The case stands deferred and to be relisted on 20.12.2011. Sl No. 161

CASE NO. AR­ 30

M/s. Nazareth Metals, Mumbai Meeting No. 34/81 F.No.01/80/050/476/AM01/DES­II   (pt.)   Dated:08.11.2011  Advance Licence No. 0310063820 dated 04.12.2000      Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 20.12.2011. Sl No. 162

CASE NO. AR­ 31

M/s. RPG Cables ltd., Mysore Meeting No. 34/81 F.No.01/81/050/393/AM10/DES­II       Dated:08.11.2011  Advance Licence No. 0310546258 dated 18.11.2009       Decision :NC decided to send a letter to firm to submit following information as per written comments of DIPP vide U.O. dated 17.11.2011 as under:­ Reply submiĥed by the firm is not complete and they  may be asked to submit the following informaĕon: 1.      Detailed calculaĕons for the requirement of each  raw material, export product wise  supported by the Cross secĕonal diagram of the cable/Buyers data sheet. 2.      Net weight per KM of  each Cable. 3.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 4.      Total requirement of each raw material, export product wise, in a tabular form.   S.No. 163

CASE NO. AR­ 33

M/s. RPG Cables ltd., Mysore Meeting No. 27/81 F.No.01/81/050/228/AM10/DES­II       Dated:27.09.2011  Advance Licence No. 0310529890 dated 21.07.2009

Decision : NC decided to send a letter to firm to submit following information as per written comments of DIPP vide U.O. dated 8.11.2011 as under:­ Reply submiĥed by the firm is not complete and they  may be asked to submit the following informaĕon: 1.      Detailed calculaĕons for the requirement of each  raw material, export product wise  supported by the Cross secĕonal diagram of the cable/Buyers data sheet. 2.      Net weight per KM of  each Cable. 3.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 4.      Total requirement of each raw material, export product wise, in a tabular form. Sl No. 164

CASE NO. AR­ 37

M/s. Bharat Heavy Electricals Ltd. Meeting No. 34/81 F.No.01/81/50/329/AM10/DES­II       Dated:08.11.2011  Advance Licence No. 0510248210 dated 24.8.2009    RLA F.No. 05/24/40/0207/AM10  Decision : The case is under examination at DHI. The case stands deferred and to be re­listed on 20.12.2011.   Sl No. 165

CASE NO. AR­ 38

M/s. High Energies Batteries (India) Ltd. Meeting No. 27/81 F.No.01/81/50/211/AM10/DES­II       Dated:27.09.2011  Advance Licence No. 0410104670 dated 18.5.2009    RLA F.No. 04/24/40/026/AM10 Decision :NC decided to forward the representation of the firm to DIPP. The case stands deferred and to be re­listed on 20.12.2011. Sl No. 166

CASE NO. AR­ 41

M/s. Kotak Urja Pvt. Ltd. Meeting No. 34/81 F.No.01/81/50/373/AM09/DES­II       Dated:08.11.2011  Advance Licence No. 0710059579 dated 04.09.2008

RLA F.No. 07/24/50/0296/AM09  Decision : NC observed that comments of MNRE is awaited and hence decided to send a reminder to MNRE to expedite the comments. The case stands deferred and to be relisted on 20.12.2011. Sl No. 167

CASE NO. AR­ 41

M/s.  Lloyd Insulations (India) Ltd. Meeting No. 34/81 F.No.01/81/50/036/AM10/DES­II       Dated:08.11.2011  Advance Licence No. 0510241176 dated 12.5.2009    RLA F.No. 05/24/50/065/AM10  Decision : NC decided to forward the case file to DHI for examination. The case stands deferred and to be re­listed on 20.12.2011. Sl No. 168

CASE NO. AR­ 42

M/s.  Abir Infrastructure Pvt. Ltd. Meeting No. 34/81 F.No.01/81/50/0566/AM10/DES­II       Dated:08.11.2011  Advance Licence No. 0510256336 dated 14.01.2010    RLA F.No. 05/23/50/0159/AM10  Decision : NC decided to send a letter to firm giving thirty days time for submission of revised documents. The case stands deferred and to be re­ listed on 20.12.2011.   Sl No. 169

CASE NO. AR­ 43

M/s.  Abir Infrastructure Pvt. Ltd. Meeting No. 34/81 F.No.01/81/50/0266/AM10/DES­II       Dated:08.11.2011  Advance Licence No. 0510250680 dated 12.10.2009    RLA F.No. 05/23/50/070/AM10  Decision : NC decided to send a letter to firm giving thirty days time for submission of revised documents. The case stands deferred and to be re­ listed on 20.12.2011. Sl No. 170

CASE NO. AR­ 45

M/s.  Narayan Powertech Pvt. Ltd.

Meeting No. 34/81 F.No.01/80/50/0241/AM06/DES­II       Dated:08.11.2011  Advance Licence No. 3410015084 dated 29.12.2005      Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 20.12.2011. Sl No. 171

CASE NO. AR­ 46

M/s.  Narayan Powertech Pvt. Ltd. Meeting No. 34/81 F.No.01/80/50/01424/AM04/DES­II       Dated:08.11.2011  Advance Licence No. 3410009450 dated 08.01.2004     Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 20.12.2011. Sl No. 172

CASE NO. AR­ 47

M/s.  Abir Infrastructure Pvt.Ltd Meeting No. 34/81 F.No.01/81/50/0157/AM10/DES­II       Dated:08.11.2011  Advance Licence No. 0510248276 dated 25.08.2009      Decision : NC decided to send a letter to firm giving thirty days time for submission of revised documents. The case stands deferred and to be re­ listed on 20.12.2011. Sl No. 173

CASE NO. AR­ 48

M/s ABB. Ltd. Meeting No. 34/81 F.No.01/80/162/0334/AM12/DES­II       Dated:08.11.2011  Advance Licence No. 0710079392 dated 26.05.2011     Decision : NC observed that reply of the firm is being forwarded to DHI for examination and comments. The case stands deferred and to be re­listed on 20.12.2011

Sl. No. 174

Case No. AR­54

 M/S  Sage metals Ltd., Delhi. Meeting No. 34/81 F.No.01/81/50/535/AM11/DES­II Dated:08.11.2011 Advance Licence No. 0510278436 dated 02.12.2010 Decision : NC decided to visit the unit for assessing their requirement/wastage of raw­material which is peculiar to their manufacturing process. The case stands deferred and to be re­listed on 20.12.2011. ‐‐‐‐‐‐‐‐‐‐‐‐‐

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied