IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2020-01-15

DGFT Committee Minutes

Document text

.MINUTES OF MEETING NO. 19/80 OF NORMS COMMITTEE- I (DES-I SECTION) DATED 15.01.2020

Meeting No. 19/80 of the Norms Committee (NC-I) for the licensing year 2019-2020 held on 15.01.2020 under the Chairmanship of Sh. R. P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -

==> picture [426 x 158] intentionally omitted <==

----- Start of picture text -----<br> Sl. No. Name of the representatives & their Designation Department<br>1. Shri B. C. Nayak, DO DHI<br>2. Shri Shaish Kumar, (Tech-1) Consultant<br>3. Shri V.C. Agarwal, (Tech-3) Consultant<br>4. Shri S. K. Bhatnagar, (SKB) Consultant<br>5. Shri K.V. Tirumala, Deputy DGFT DGFT<br>----- End of picture text -----<br>

Note:

  1. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.

  2. Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.

  3. All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail address- nc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.

  4. For all the Manual cases, the concerned RA should check the composition fees paid by the firm.

  5. Minutes of Meeting 17/20 dated 18.12.2019 were circulated on 13.01.2020 to all the members of the Committee. However, no comments had been received, so the said minutes were unanimously approved.

1 | P a g e

MEETING NUMBER: 19/80-ALC2/2019 MEETING DATE: 15.01.2020

1

Case No.: Party Name: SARA SAE Meet No/Date:19/80- Status:
345/15/80-ALC2/2018 PRIVATE LIMITED ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00687/AM19/ RLA File<br>:61/24/040/00008/AM16/ Lic.No/Date:6110001290<br>01.06.2015 Deferred

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 13.01.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

2

Case No.:70/15/80- Party Name: BHARAT Meet No/Date:19/80- Status:
ALC2/2018 HEAVY ELECTRICALS ALC2/2019
LIMITED 15.01.2020
HQ File<br>:01/80/050/00412/AM19/ RLA File<br>:07/24/040/00095/AM16/ Lic.No/Date:0710108519<br>15.07.2015 Deferred

Decision: The Committee considered the case as per the agenda and noted that a copy of application was again sent to MeitY on 08.01.2020, on their request, for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for comments.

Case is deferred.

3

Case No.:363/15/80- Party Name: PROMAC Meet No/Date:19/80- Status:
ALC2/2018 ENGINEERING ALC2/2019
INDUSTRIES LIMITED, 15.01.2020
HQ File<br>:01/80/050/00705/AM19/ RLA File<br>:07/24/040/00184/AM16/ Lic.No/Date:0710108812<br>05.10.2015 Deferred

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 18.11.2019 followed by a reminder on 07.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:364/15/80- Party Name: PROMAC Meet No/Date:19/80- Status:<br>ALC2/2018 ENGINEERING ALC2/2019<br>INDUSTRIES LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0710108813 Deferred<br>:01/80/050/00706/AM19/ :07/24/040/00185/AM16/ 05.10.2015<br>4<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DHI was sent to the firm on 18.11.2019 followed by a<br>reminder on 07.01.2020. However, no reply has been received yet. Hence, the Committee decided to<br>wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

2 | P a g e

Case No.:12/1/80-ALC2/2019 Party Name: INTERPUMP Meet No/Date:19/80- Status:
HYDRAULICS INDIA PVT. ALC2/2019
LTD. 15.01.2020
HQ File<br>:01/80/050/00760/AM19/ RLA File<br>:04/24/040/00093/AM17/ Lic.No/Date:0410162268<br>09.09.2016 Deferred

5 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 16.10.2019 followed by a reminder on 07.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:402/15/80- Party Name: SHIV Meet No/Date:19/80- Status:
ALC2/2018 HYDROMET ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00744/AM19/ RLA File<br>:24/24/040/00034/AM17/ Lic.No/Date:2410042158<br>14.03.2017 Deferred

6 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-1) on 13.01.2020 for examination of the case. However, the matter was discussed in the meeting and the Committee decided to call the firm for personal hearing to explain the case before Norms Committee in the forthcoming NC meeting.

Case is deferred.

7

Case No.:11/19/80- Party Name: VEM Meet No/Date:19/80- Status:
ALC2/2017 TECHNOLOGIES PVT LTD. ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00292/AM18/ RLA File<br>:09/24/040/00054/AM18/ Lic.No/Date:0910065039<br>15.05.2017 Withdrawn

Decision: The Committee considered the case as per the agenda and noted that the case is already approved in Meeting No. 17/80 dated 18.12.2019. Therefore, the Committee decided to withdraw the case from the agenda.

Case is withdrawn.

3 | P a g e

==> picture [476 x 454] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/8/80-ALC2/2017 Party Name: THE INDURE Meet No/Date:19/80- Status:<br>PVT. LTD ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0510402573 Approved<br>:01/80/050/00148/AM18/ :05/24/040/00005/AM18/ 16.05.2017<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms<br>on the recommendation of representative of DHI as under:<br>ITCHS Sl. ITCHS Recommended<br>Export Item Import Item<br>Code No. Code Norms<br>Fused Cast Basalt Cylinders ID<br>As per GN-4<br>230 mm,Type 232 Mm ID/274 mm<br>with no<br>OD - 500 mm long Abrasion &<br>1 68159900 wastage in<br>Corrosion resistant material- made<br>number &<br>of volcanic erupted deposits - used<br>weight terms<br>as lining in Ash Slurry pipeline<br>Ash Handling<br>Fused Cast Basalt Cylinders ID<br>System & Ash<br>8 Water Package for 400 Mm ,Type 400 mm ID/ Mm As per GN-4<br>442 mm OD - 500 mm long with no<br>NTPC Lara Super<br>2 68159900 Abrasion & Corrosion resistant wastage in<br>Thermal Power<br>material- made of volcanic erupted number &<br>Project, (2 X 800<br>deposits - used as lining in Ash weight terms<br>MW)<br>84289020 Slurry pipeline<br>Copy of BBU<br>Telescopic Chutes/Loading 7 numbers as<br>attached- Materials<br>Bellows, Type Za Ba Standard- components, 4<br>of International<br>3 84283300 2970 mm length numbers as<br>Standard- duly<br>For unloading of Fly Ash from spares as per<br>approved under<br>Silos to Ash Tankers spares policy<br>NTPC Strict Quality<br>Instruments For Hcsd System :<br>Control norms<br>Consisting of Transmitters,<br>Density Meters, Temperature Deleted as no<br>4 90260000 Elements, Local Gauges information<br>,Switches, Limit Switches As per submitted<br>Quality standards of NTPC Quality<br>Controls<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 132] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/11/80-ALC2/2018 Party Name: DIAMOND Meet No/Date:19/80- Status:<br>METAL SCREENS (P) LTD ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:6510000003 Deferred<br>:01/80/050/00192/AM19/ :65/24/040/00003/AM18/ 17.05.2017<br>9 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the firm on 07.01.2020. However, no<br>reply has been received yet. Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

4 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:80/11/80- Party Name: MACAWBER Meet No/Date:19/80- Status:<br>ALC2/2018 BEEKAY PVT. LTD. ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0510403845 Deferred<br>:01/80/050/00271/AM19/ :05/24/040/00230/AM18/ 29.08.2017<br>10<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the firm on 17.12.2019. However, no<br>reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the<br>requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

11

Case No.:18/19/80- Party Name: KINECO Meet No/Date:19/80- Status:
ALC2/2017 KAMAN COMPOSITES - ALC2/2019
INDIA PVT LTD 15.01.2020
HQ File<br>:01/80/050/00299/AM18/ RLA File<br>:17/24/040/00050/AM18/ Lic.No/Date:1710006668<br>10.10.2017 Deferred

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 07.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.

Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:36/19/80- Party Name: ASHOKA Meet No/Date:19/80- Status:<br>ALC2/2017 MANUFACTURING LTD, ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0210207941 Deferred<br>:01/80/050/00317/AM18/ :02/24/040/00120/AM18/ 03.11.2017<br>12 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the firm on 16.10.2019 followed by a<br>reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided<br>to remind again the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:26/20/80- Party Name: ICEM Meet No/Date:19/80- Status:
ALC2/2017 ENGINEERING COMPANY ALC2/2019
PRIVATE LIMITED, 15.01.2020
HQ File<br>:01/80/050/00390/AM18/ RLA File<br>:03/94/040/00742/AM18/ Lic.No/Date:0310817800<br>15.12.2017 Deferred

13 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 16.10.2019 followed by a reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind again the firm for furnishing the requisite information within 15 days.

Case is deferred.

5 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:20/20/80- Party Name: BIRLA Meet No/Date:19/80- Status:<br>ALC2/2017 PRECISION TECHNOLOGIES ALC2/2019<br>LTD., 15.01.2020<br>HQ File RLA File Lic.No/Date:0310818218 Deferred<br>:01/80/050/00384/AM18/ :03/94/040/00782/AM18/ 04.01.2018<br>14<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the firm on 18.11.2019 followed by a<br>reminder on 07.01.2020. However, no reply has been received yet. Hence, the Committee decided to<br>wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:23/20/80- Party Name: BIRLA Meet No/Date:19/80- Status:
ALC2/2017 PRECISION ALC2/2019
TECHNOLOGIES LTD., 15.01.2020
HQ File<br>:01/80/050/00387/AM18/ RLA File<br>:03/94/040/00784/AM18/ Lic.No/Date:0310818219<br>04.01.2018 Deferred

15 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 18.11.2019 followed by a reminder on 07.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:21/20/80- Party Name: BIRLA Meet No/Date:19/80- Status:
ALC2/2017 PRECISION ALC2/2019
TECHNOLOGIES LTD., 15.01.2020
HQ File<br>:01/80/050/00385/AM18/ RLA File<br>:03/94/040/00785/AM18/ Lic.No/Date:0310818275<br>05.01.2018 Deferred

16 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 18.11.2019 followed by a reminder on 07.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:22/20/80- Party Name: BIRLA Meet No/Date:19/80- Status:<br>ALC2/2017 PRECISION ALC2/2019<br>TECHNOLOGIES LTD., 15.01.2020<br>HQ File RLA File Lic.No/Date:0310818273 Deferred<br>:01/80/050/00386/AM18/ :03/94/040/00783/AM18/ 05.01.2018<br>17<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the firm on 18.11.2019 followed by a<br>reminder on 07.01.2020. However, no reply has been received yet. Hence, the Committee decided to<br>wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

6 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:126/15/80- Party Name: SHAKTI Meet No/Date:19/80- Status:<br>ALC2/2018 PUMPS (INDIA) LTD. ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:5610005299 Deferred<br>:01/80/050/00468/AM19/ :56/24/040/00036/AM18/ 08.01.2018<br>18<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to DPIIT on 11.12.2019 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to remind DPIIT for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/17/80-ALC2/2019 Party Name: SHAKTI Meet No/Date:19/80- Status:<br>PUMPS (INDIA) LTD., ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:5610005319 Deferred<br>:01/80/050/00240/AM20/ :56/24/040/00038/AM18/ 15.01.2018<br>19<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to DPIIT on 13.12.2019 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to remind DPIIT for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:20/1/80-ALC2/2019 Party Name: ZTT INDIA Meet No/Date:19/80- Status:
PRIVATE LIMITED ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00768/AM19/ RLA File<br>:04/24/040/00212/AM18/ Lic.No/Date:0410163956<br>07.02.2018 Deferred

20 Decision: The Committee considered the case as per the agenda and noted that MeitY sought certain information from the firm vide letter dated 16.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 145] intentionally omitted <==

----- Start of picture text -----<br> Case No.:393/15/80- Party Name: SARTORIUS Meet No/Date:19/80- Status:<br>ALC2/2018 STEDIM INDIA PVT. LTD. ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0710113010 Deferred<br>:01/80/050/00735/AM19/ :07/24/040/00348/AM18/ 23.03.2018<br>21<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the firm on 07.01.2020. However, no<br>reply has been received yet. Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

7 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: MAGNA Meet No/Date:19/80- Status:<br>10/1/80-ALC2/2019 AUTOMOTIVE INDIA ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0410164172 Deferred<br>:01/80/050/00758/AM19/ :04/24/040/00001/AM19/ 06.04.2018<br>22<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME for examination of the case on 06.08.2019 followed by an I.D. reminder on<br>17.10.2019. However, no comments have been received yet. Therefore, the Committee decided to<br>remind again MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:6/8/80-ALC2/2018 Party Name: L & T-MHPS Meet No/Date:19/80- Status:
TURBINE GENERATORS ALC2/2019
PRIVATE LIMITED 15.01.2020
HQ File<br>:01/80/050/00129/AM19/ RLA File<br>:03/95/040/01112/AM18/ Lic.No/Date:0310820724<br>27.04.2018 Deferred

23 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind again the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:397/15/80- Party Name: PROMAC Meet No/Date:19/80- Status:
ALC2/2018 ENGINEERING ALC2/2019
INDUSTRIES LIMITED 15.01.2020
HQ File<br>:01/80/050/00739/AM19/ RLA File<br>:07/24/040/00357/AM18/ Lic.No/Date:0710113276<br>14.05.2018 Deferred

24 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 18.11.2019 followed by a reminder on 07.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:166/15/80- Party Name: BHARAT Meet No/Date:19/80- Status:<br>ALC2/2018 HEAVY ELECTRICALS ALC2/2019<br>LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0910066472 Deferred<br>:01/80/050/00508/AM19/ :09/24/040/00171/AM19/ 18.07.2018<br>25<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was<br>sent to DHI on 13.01.2020 for examination of the case. However, no comments have been received<br>yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

8 | P a g e

Case No.:76/11/80- Party Name: HIMACHAL Meet No/Date:19/80- Status:
ALC2/2018 FUTURISTIC ALC2/2019
COMMUNICATIONS LTD 15.01.2020
HQ File<br>:01/80/050/00267/AM19/ RLA File<br>:05/23/040/00215/AM19/ Lic.No/Date:0510407445<br>06.08.2018 Deferred

26 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MeitY for examination of the case on 15.07.2019 followed by an ID reminder on 14.11.2019. However, MeitY vide their email dated 15.01.2020 informed that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:19/11/80- Party Name: ICEM Meet No/Date:19/80- Status:
ALC2/2018 ENGINEERING COMPANY ALC2/2019
PRIVATE LIMITED 15.01.2020
HQ File<br>:01/80/050/00210/AM19/ RLA File<br>:03/94/040/00306/AM19/ Lic.No/Date:0310822939<br>09.08.2018 Deferred

27 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 16.10.2019 followed by a reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind again the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 72] intentionally omitted <==

----- Start of picture text -----<br> Case No.:179/15/80- Party Name: PROMAC Meet No/Date:19/80- Status:<br>ALC2/2018 ENGINEERING ALC2/2019<br>INDUSTRIES LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0710113710 Deferred<br>:01/80/050/00521/AM19/ :07/24/040/00102/AM19/ 13.08.2018<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per the advice of representative of DHI :

  • 28 1. Weight of each Export Product.

    1. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

    2. Manufacturing process of the export product giving clearly the use of imported & indigenous items with wastage in the manufacturing process, catalogue/write-up of the export item.

Case is deferred.

9 | P a g e

==> picture [476 x 305] intentionally omitted <==

----- Start of picture text -----<br> Case No.:34/1/80-ALC2/2019 Party Name: KINECO Meet No/Date:19/80- Status:<br>KAMAN COMPOSITES - ALC2/2019<br>INDIA PVT LTD 15.01.2020<br>HQ File RLA File Lic.No/Date:1710006716 Deferred<br>:01/80/050/00782/AM19/ :17/24/040/00017/AM19/ 20.08.2018<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per written comments of DPIIT vide U. No.: P-47011/193/2019-<br>TSWdated 23.12.2019:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also<br>be furnished.<br>29<br>2. Assembly drawings/diagrams of the resultant product showing placement and exact use of<br>components in the export product (s).<br>3. Bifurcated quantities of components to be accounted for in the resultant product and the<br>requirement of components as spares. Raw Material / Consumables.<br>4. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components to<br>be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary evidence/drawings<br>etc.<br>5. Basis/justification for the quantities of import items.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 179] intentionally omitted <==

----- Start of picture text -----<br> Case No.:25/11/80- Party Name: LARSEN & Meet No/Date:19/80- Status:<br>ALC2/2018 TOUBRO LIMITED ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0310823360 Approved<br>:01/80/050/00216/AM19/ :03/95/040/00056/AM19/ 28.08.2018<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc<br>norms as per written comments of Consultant (Tech-3) by considering the reply dated 03.10.2019 as<br>30<br>under:<br>1. Quantity of import items at Sl. No. 1, 3 to 6, 8 to 68, 70 & 79 to 95 may be allowed as per<br>GN-4 .<br>2. Quantity of import items at Sl. No. 2, 7 & 69 may be allowed with net plus 2% wastage.<br>3. Quantity of import items at Sl. No. 71 to 78 & 96 may be deleted (as per firm’s request) .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:23/11/80- Party Name: JAYESH Meet No/Date:19/80- Status:<br>ALC2/2018 METALS AND FERRO ALC2/2019<br>ALLOYS LLP 15.01.2020<br>HQ File RLA File Lic.No/Date:0310823416 Deferred<br>31 :01/80/050/00214/AM19/ :03/94/040/00488/AM19/ 29.08.2018<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME is being sent to the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

10 | P a g e

==> picture [476 x 180] intentionally omitted <==

----- Start of picture text -----<br> Case No.:28/11/80- Party Name: L & T-MHPS Meet No/Date:19/80- Status:<br>ALC2/2018 TURBINE GENERATORS ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0310823400 Deferred<br>:01/80/050/00219/AM19/ :03/95/040/00466/AM19/ 29.08.2018<br>Decision: The Committee considered the case as per the agenda and the representative of DHI<br>32<br>informed that the firm’s reply dated 30.09.2019 is incomplete. Therefore, the Committee decided to<br>ask again from the firm to furnish the following information as per advice of representative of DHI :<br>1. Revised weight balance after not importing item no. 8 to 11.<br>2. Technical justification of taking 70mm extra in Z-axis for calculation of wastage.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 244] intentionally omitted <==

----- Start of picture text -----<br> Case No.:65/11/80- Party Name: PLANSEE INDIA Meet No/Date:19/80- Status:<br>ALC2/2018 HIGH PERFORMANCE ALC2/2019<br>MATERIALS PVT LTD 15.01.2020<br>HQ File RLA File Lic.No/Date:0710113822 Approved<br>:01/80/050/00256/AM19/ :07/24/040/00094/AM19/ 06.09.2018<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms as per<br>written comments of Consultant (Tech-3) by considering the reply dated 18.09.2019 as under:<br>33 Recommended<br>ITCHS ITCHS<br>Export Item Import Item Norms<br>Code Code<br> Hot Runner Nozzles made of<br>TZM rods (4950 numbers) TZM Rods DIA<br>84779000 81029590 1780 Kgs<br>(500Kgs) 6MM And Above<br>Note: Grade & diameter of import will match with export.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 179] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/1/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:19/80- Status:<br>TURBINE GENERATORS ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0310823645 Deferred<br>:01/80/050/00757/AM19/ :03/95/040/00469/AM19/ 07.09.2018<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>34<br>furnish following information as per the advice of representative of DHI :<br>1. Calculation of all raw materials is to be given linking the same with Dimensional Engineering<br>Drawing.<br>2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each imported<br>----- End of picture text -----<br>

11 | P a g e

and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

  1. List of components, spares, consumables separately.

  2. Details of sets & accessories in the list of import.

Case is deferred.

==> picture [476 x 158] intentionally omitted <==

----- Start of picture text -----<br> Case No.:201/15/80- Party Name: DYNAMATIC Meet No/Date:19/80- Status:<br>ALC2/2018 TECHNOLOGIES LIMITED ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0710113852 Deferred<br>:01/80/050/00543/AM19/ :07/24/040/00155/AM19/ 17.09.2018<br>35 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the firm on 18.11.2019 followed by a<br>reminder on 07.01.2020. However, no reply has been received yet. Hence, the Committee decided to<br>wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

36

Case No.:57/11/80- Party Name: GL&V INDIA Meet No/Date:19/80- Status:
ALC2/2018 PRIVATE LIMITED ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00248/AM19/ RLA File<br>:31/83/040/00096/AM19/ Lic.No/Date:3110067179<br>26.09.2018 Deferred

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply has been sent to MSME on 15.01.2020 for examination of the case. Therefore, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:82/11/80- Party Name: ANSTECH Meet No/Date:19/80- Status:<br>ALC2/2018 ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:3410044543 Deferred<br>:01/80/050/00273/AM19/ :34/24/040/00218/AM19/ 04.10.2018<br>37 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Vadodara & the firm and in this regard a letter was<br>sent to RA, Vadodara and the firm on 08.07.2019 followed by reminders on 25.09.2019, 18.10.2019 &<br>08.01.2020. However, no information has been received so far. Hence, the Committee decided to wait<br>for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

12 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:247/15/80- Party Name: AZAD Meet No/Date:19/80- Status:<br>ALC2/2018 ENGINEERING PRIVATE ALC2/2019<br>LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0910066802 Deferred<br>:01/80/050/00589/AM19/ :09/24/040/00324/AM19/ 02.11.2018<br>38<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a<br>reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided<br>to remind again the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:249/15/80- Party Name: AZAD Meet No/Date:19/80- Status:
ALC2/2018 ENGINEERING PRIVATE ALC2/2019
LIMITED 15.01.2020
HQ File<br>:01/80/050/00591/AM19/ RLA File<br>:09/24/040/00329/AM19/ Lic.No/Date:0910066804<br>02.11.2018 Deferred

39 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind again the firm for furnishing the requisite information within 15 days.

Case is deferred.

40

Case No.:253/15/80- Party Name: BHARAT Meet No/Date:19/80- Status:
ALC2/2018 HEAVY ELECTRICALS ALC2/2019
LIMITED 15.01.2020
HQ File<br>:01/80/050/00595/AM19/ RLA File<br>:09/24/040/00340/AM19/ Lic.No/Date:0910066870<br>16.11.2018 Deferred

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 13.01.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 147] intentionally omitted <==

----- Start of picture text -----<br> Case No.:259/15/80- Party Name: DYNAMATIC Meet No/Date:19/80- Status:<br>ALC2/2018 TECHNOLOGIES LIMITED ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0710114156 Deferred<br>:01/80/050/00601/AM19/ :07/24/040/00182/AM19/ 22.11.2018<br>41 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the firm on 18.11.2019 followed by a<br>reminder on 07.01.2020. However, no reply has been received yet. Hence, the Committee decided to<br>wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

13 | P a g e

==> picture [476 x 145] intentionally omitted <==

----- Start of picture text -----<br> Case No.:17/1/80-ALC2/2019 Party Name: MUDHRA FINE Meet No/Date:19/80- Status:<br>BLANC PRIVATE LTD ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0410164995 Deferred<br>:01/80/050/00765/AM19/ :04/24/040/00207/AM19/ 17.12.2018<br>42<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME for examination of the case on 18.10.2019 followed by a reminder on 07.01.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:274/15/80- Party Name: STERLITE Meet No/Date:19/80- Status:
ALC2/2018 TECHNOLOGIES LTD. ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00616/AM19/ RLA File<br>:03/95/040/00812/AM19/ Lic.No/Date:0310825720<br>18.12.2018 Deferred

43 Decision: The Committee considered the case as per the agenda and noted that MeitY sought again certain information from the firm vide letter dated 05.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.

Case is deferred.

44

Case No.:275/15/80- Party Name: STERLITE Meet No/Date:19/80- Status:
ALC2/2018 TECHNOLOGIES LTD. ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00617/AM19/ RLA File<br>:03/95/040/00815/AM19/ Lic.No/Date:0310825721<br>18.12.2018 Approved

Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of MeitY letter No.: 17(11)/2019-IPHW dated 08.01.2020. (Copy enclosed)

RA concerned may take further necessary action as per the decision of NC.

==> picture [476 x 145] intentionally omitted <==

----- Start of picture text -----<br> Case No.:279/15/80- Party Name: SUPER CIRCLE Meet No/Date:19/80- Status:<br>ALC2/2018 AUTO LIMITED ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0510409020 Deferred<br>:01/80/050/00621/AM19/ :05/24/040/00506/AM19/ 20.12.2018<br>45<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the firm on 07.01.2020. However, no<br>reply has been received yet. Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

14 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:293/15/80- Party Name: STERLITE POWER Meet No/Date:19/80- Status:<br>ALC2/2018 TRANSMISSION LIMITED ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0310826313 Deferred<br>:01/80/050/00635/AM19/ :03/95/040/00869/AM19/ 10.01.2019<br>46 Decision: The Committee considered the case as per the agenda and noted that MeitY sought again<br>certain information from the firm vide letter dated 05.12.2019. However, no reply has been received<br>yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information<br>within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/1/80-ALC2/2019 Party Name: MUDHRA FINE Meet No/Date:19/80- Status:<br>BLANC PRIVATE LTD ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0410165082 Deferred<br>:01/80/050/00769/AM19/ :04/24/040/00222/AM19/ 11.01.2019<br>47 Decision: The Committee considered the case as per the agenda and noted that the copy of application<br>was sent to MSME for examination of the case on 29.05.2019 followed by I.D. reminders on<br>08.07.2019, 17.10.2019, 11.12.2019 & 07.01.2020. However, no comments have been received yet.<br>Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:298/15/80- Party Name: ULTRA Meet No/Date:19/80- Status:<br>ALC2/2018 ENGINEERS ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:3110067288 Deferred<br>:01/80/050/00640/AM19/ :31/83/040/00164/AM19/ 16.01.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>48 furnish following information as per the advice of representative of DHI :<br>1. Write-up/catalogue along with specific use of export item.<br>2. Calculation of the requirement of raw material correlating the same with the Dimensional<br>Engineering Drawing with relevant dimensions highlighted.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:23/1/80-ALC2/2019 Party Name: PARKER Meet No/Date:19/80- Status:<br>HANNIFIN INDIA PVT. ALC2/2019<br>LTD. 15.01.2020<br>HQ File RLA File Lic.No/Date:0410165142 Deferred<br>:01/80/050/00771/AM19/ :04/24/040/00223/AM19/ 28.01.2019<br>49<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply has<br>been sent to MSME on 15.01.2020 for examination of the case. Therefore, the Committee decided to<br>wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

15 | P a g e

Case No.:25/1/80-ALC2/2019 Party Name: MUDHRA FINE Meet No/Date:19/80- Status:
BLANC PRIVATE LTD ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00773/AM19/ RLA File<br>:04/24/040/00241/AM19/ Lic.No/Date:0410165210<br>13.02.2019 Deferred

50 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 11.07.2019 followed by I.D. reminders on 17.09.2019 & 07.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:26/1/80-ALC2/2019 Party Name: MUDHRA FINE Meet No/Date:19/80- Status:
BLANC PRIVATE LTD ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00774/AM19/ RLA File<br>:04/24/040/00242/AM19/ Lic.No/Date:0410165228<br>19.02.2019 Deferred

51 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 10.07.2019 followed by I.D. reminders on 17.09.2019 & 07.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 72] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: LARSEN & Meet No/Date:19/80- Status:<br>42/1/80-ALC2/2019 TOUBRO LIMITED ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0310827622 Deferred<br>52 :01/80/050/00790/AM19/ :03/95/040/01295/AM19/ 12.03.2019<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that a letter is being issued to the firm as decided in Meeting No. 17/80 dated 18.12.2019.

Case is deferred.

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:49/1/80-ALC2/2019 Party Name: DIAMOND Meet No/Date:19/80- Status:<br>METAL SCREENS (P) LTD ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:6510000026 Deferred<br>:01/80/050/00797/AM19/ :65/24/040/00007/AM19/ 14.03.2019<br>53<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME for examination of the case on 16.05.2019 followed by reminders on 08.07.2019,<br>17.09.2019 & 07.01.2020. However, no comments have been received yet. Hence, the Committee<br>decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

16 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: ISGEC TITAN Meet No/Date:19/80- Status:<br>46/1/80-ALC2/2019 METAL FABRICATORS ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0510409960 Deferred<br>:01/80/050/00794/AM19/ :05/23/040/00557/AM19/ 15.03.2019<br>54<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to DPIIT on 14.01.2020 for examination of the case. However, no comments have been<br>received yet. Hence, the Committee decided wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/5/80-ALC2/2019 [Party Name: MAINI ] Meet No/Date:19/80- Status:<br>PRECISION PRODUCTS ALC2/2019<br>LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0710114732 Deferred<br>:01/80/050/00056/AM20/ :07/24/040/00306/AM19/ 29.03.2019<br>55 Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per the advice of representative of DHI :<br>1. Calculation with the Dimensional Engineering Drawing with relevant dimensions highlighted.<br>2. Wastage for each machining activity.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 57] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/2/80-ALC2/2019 [Party Name: VIPRA CLOSURES ] Meet No/Date:19/80- Status:<br>PRIVATE LIMITED ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0310828134 Deferred<br>:01/80/050/00005/AM20/ :03/95/040/01384/AM19/ 03.04.2019<br>----- End of picture text -----<br>

56 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 07.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.

Case is deferred.

==> picture [476 x 144] intentionally omitted <==

----- Start of picture text -----<br> Case No.:14/5/80-ALC2/2019 Party Name: UNI VTL Meet No/Date:19/80- Status:<br>PRECISION PVT. LTD. ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:6510000027 Deferred<br>:01/80/050/00052/AM20/ :65/24/040/00006/AM19/ 05.04.2019<br>57<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 07.01.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

17 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/3/80-ALC2/2019 Party Name: MUDHRA FINE Meet No/Date:19/80- Status:<br>BLANC PRIVATE LTD ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0410165451 Deferred<br>:01/80/050/00009/AM20/ :04/24/040/00294/AM19/ 11.04.2019<br>58<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was<br>sent to DHI on 12.12.2019 for examination of the case. However, no comments have been received<br>yet. Therefore, the Committee decided to remind DHI for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 145] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/3/80-ALC2/2019 Party Name: VEELINE Meet No/Date:19/80- Status:<br>MEDIA LIMITED ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0210209114 Deferred<br>:01/80/050/00010/AM20/ :02/24/040/00003/AM20/ 16.04.2019<br>59<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the firm on 07.01.2020. However, no<br>reply has been received yet. Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/3/80-ALC2/2019 Party Name: SMC Meet No/Date:19/80- Status:<br>CORPORATION (INDIA) ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0510410292 Deferred<br>:01/80/050/00011/AM20/ :05/24/040/00020/AM20/ 18.04.2019<br>60<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was<br>sent to Consultant (Tech-3) for examination of the case. However, the matter was discussed in the<br>meeting and the Committee decided to call the firm for personal hearing to explain the case before<br>Norms Committee along with sample of export product and blank in the forthcoming NC meeting.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 151] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/3/80-ALC2/2019 Party Name: TINITA Meet No/Date:19/80- Status:<br>ENGINEERING PVT.LTD. ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0310828410 Rejected<br>:01/80/050/00012/AM20/ :03/95/040/00030/AM20/ 18.04.2019<br>61 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DPIIT was sent to the firm on 08.07.2019 followed by<br>reminders on 17.10.2019 & 10.12.2019. However, no reply has been received yet. Therefore, the<br>Committee decided to reject the case under intimation to RA, Mumbai .<br>Case is deferred.<br>----- End of picture text -----<br>

18 | P a g e

==> picture [476 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/3/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:19/80- Status:<br>TURBINE GENERATORS ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0310828481 Deferred<br>:01/80/050/00014/AM20/ :03/95/040/01354/AM19/ 23.04.2019<br>62 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DHI was sent to the firm on 06.08.2019. However, the firm<br>vide letter dated 14.09.2019 informed that the Project Engineering & Detail Design is in progress and<br>is expected to be complete by January 2020 and sought more time to respond. Therefore, the<br>Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:9/3/80-ALC2/2019 Party Name: RAYCHEM Meet No/Date:19/80- Status:
RPG PVT LTD. ALC2/2019 & 15.01.2020
HQ File<br>:01/80/050/00015/AM20/ RLA File<br>:03/95/040/01371/AM19/ Lic.No/Date:0310828517<br>23.04.2019 Deferred

63 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DPIIT on 16.12.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DPIIT for expediting the comments.

Case is deferred.

Case No.:8/5/80-ALC2/2019 Party Name: GODREJ & Meet No/Date:19/80- Status:
BOYCE MFG. CO. LTD., ALC2/2019 & 15.01.2020
HQ File<br>:01/80/050/00046/AM20/ RLA File<br>:03/94/040/00093/AM20/ Lic.No/Date:0310828981<br>13.05.2019 Deferred

64 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DPIIT on 12.12.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DPIIT for expediting the comments.

Case is deferred.

Case No.:10/5/80-ALC2/2019 Party Name: I-TECH PLAST Meet No/Date:19/80- Status:
INDIA PVT.LTD.(EOU) ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00048/AM20/ RLA File<br>:03/94/040/00088/AM20/ Lic.No/Date:0310828994<br>14.05.2019 Rejected

65 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 17.09.2019 followed by reminders on 11.11.2019 & 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Mumbai .

Case is deferred.

19 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/5/80-ALC2/2019 Party Name: AZAD Meet No/Date:19/80- Status:<br>ENGINEERING PRIVATE ALC2/2019<br>LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0910067528 Deferred<br>:01/80/050/00043/AM20/ :09/24/040/00061/AM20/ 15.05.2019<br>66<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a<br>reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided<br>to remind again the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:6/5/80-ALC2/2019 Party Name: AZAD Meet No/Date:19/80- Status:
ENGINEERING PRIVATE ALC2/2019
LIMITED 15.01.2020
HQ File<br>:01/80/050/00044/AM20/ RLA File<br>:09/24/040/00059/AM20/ Lic.No/Date:0910067529<br>15.05.2019 Deferred

67 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind again the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:7/5/80-ALC2/2019 Party Name: AZAD Meet No/Date:19/80- Status:
ENGINEERING PRIVATE ALC2/2019
LIMITED 15.01.2020
HQ File<br>:01/80/050/00045/AM20/ RLA File<br>:09/24/040/00060/AM20/ Lic.No/Date:0910067530<br>15.05.2019 Deferred

68 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind again the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 139] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/5/80-ALC2/2019 [Party Name: PAHARPUR ] Meet No/Date:19/80- Status:<br>COOLING TOWERS LIMITED ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0210209171 Deferred<br>:01/80/050/00039/AM20/ :02/24/040/00012/AM20/ 16.05.2019<br>69 Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to DPIIT for examination of the case on 18.10.2019 followed by a reminder on 11.12.2019<br>along with the complete set of application. However, no comments have been received yet. Therefore,<br>the Committee decided to remind DPIIT for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

20 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/7/80-ALC2/2019 Party Name: OSWAL PUMPS Meet No/Date:19/80- Status:<br>LIMITED ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:3310030557 Deferred<br>:01/80/050/00099/AM20/ :33/24/040/00012/AM20/ 25.06.2019<br>70<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to DPIIT for examination of the case on 14.01.2020. However, no comments have been<br>received yet. Hence, the Committee decided wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 133] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/7/80-ALC2/2019 Party Name: OAM SAAI Meet No/Date:19/80- Status:<br>INTERNATIONAL INC. ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0510411061 Deferred<br>:01/80/050/00100/AM20/ :05/24/040/00181/AM20/ 26.06.2019<br>71 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by MSME was sent to the firm on 07.01.2020. However, no<br>reply has been received yet. Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:4/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:19/80- Status:
ENGINEERING PRIVATE ALC2/2019
LIMITED 15.01.2020
HQ File<br>:01/80/050/00101/AM20/ RLA File<br>:09/24/040/00138/AM20/ Lic.No/Date:0910067697<br>26.06.2019 Deferred

72 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm to furnish the requisite information within 15 days.

Case is deferred.

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:19/80- Status:<br>ENGINEERING PRIVATE ALC2/2019<br>LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0910067698 Deferred<br>:01/80/050/00102/AM20/ :09/24/040/00142/AM20/ 26.06.2019<br>73<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a<br>reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided<br>to send final reminder to the firm to furnish the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

21 | P a g e

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/7/80- Party Name: AZAD ENGINEERING Meet No/Date:19/80- Status:<br>ALC2/2019 PRIVATE LIMITED ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0910067699 Deferred<br>:01/80/050/00103/AM20/ :09/24/040/00140/AM20/ 26.06.2019<br>74 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a<br>reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided<br>to send final reminder to the firm to furnish the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:7/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:19/80- Status:
ENGINEERING PRIVATE ALC2/2019
LIMITED 15.01.2020
HQ File<br>:01/80/050/00104/AM20/ RLA File<br>:09/24/040/00139/AM20/ Lic.No/Date:0910067700<br>26.06.2019 Deferred

75 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm to furnish the requisite information within 15 days.

Case is deferred.

Case No.:8/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:19/80- Status:
ENGINEERING PRIVATE ALC2/2019
LIMITED 15.01.2020
HQ File<br>:01/80/050/00105/AM20/ RLA File<br>:09/24/040/00137/AM20/ Lic.No/Date:0910067701<br>26.06.2019 Deferred

76 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm to furnish the requisite information within 15 days.

Case is deferred.

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:19/80- Status:<br>ENGINEERING PRIVATE ALC2/2019<br>LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0910067702 Deferred<br>:01/80/050/00106/AM20/ :09/24/040/00141/AM20/ 26.06.2019<br>77<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a<br>reminder on 10.12.2019. However, no reply has been received yet. Therefore, the Committee decided<br>to send final reminder to the firm to furnish the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

22 | P a g e

==> picture [476 x 155] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/7/80-ALC2/2019 Party Name: P. M. ELECTRO Meet No/Date:19/80- Status:<br>AUTO PVT. LTD. ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:3110067458 Deferred<br>:01/80/050/00107/AM20/ :31/83/040/00048/AM20/ 28.06.2019<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>78<br>application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to<br>the firm & RA, Pune on 08.08.2019 followed by reminders on 11.11.2019 & 08.01.2020. However, no<br>information has been received so far. Hence, the Committee decided to wait for complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/7/80-ALC2/2019 Party Name: POLYCAB Meet No/Date:19/80- Status:<br>INDIA LIMITED ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0310830021 Deferred<br>:01/80/050/00108/AM20/ :03/95/040/00295/AM20/ 01.07.2019<br>79 Decision: The Committee considered the case as per the agenda and noted that MeitY sought certain<br>information from the firm vide letter dated 16.12.2019. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:12/7/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:19/80- Status:
CORPORATION PANSE ALC2/2019
PRIVATE LIMITED 15.01.2020
HQ File<br>:01/80/050/00109/AM20/ RLA File<br>:31/83/040/00050/AM20/ Lic.No/Date:3110067460<br>01.07.2019 Deferred

80 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI for examination of the case on 22.10.2019 followed by a reminder on 14.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/7/80-ALC2/2019 Party Name: BANGALORE Meet No/Date:19/80- Status:<br>BIOTECH LABS PVT LTD. ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0710115122 Deferred<br>:01/80/050/00110/AM20/ :07/24/040/00082/AM20/ 03.07.2019<br>81 Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME for examination of the case on 12.07.2019 followed by a reminder on 17.09.2019.<br>However, no comments have been received yet. Therefore, the Committee decided to remind MSME<br>for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

23 | P a g e

==> picture [476 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/7/80- Party Name: DOOWON Meet No/Date:19/80- Status:<br>ALC2/2019 CLIMATE CONTROL INDIA ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:6610000035 Deferred<br>:01/80/050/00112/AM20/ :66/24/040/00003/AM20/ 03.07.2019<br>82 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Vijayawada and in this regard a letter was<br>sent to the firm & RA, Vijayawada on 18.10.2019 followed by a reminder on 08.01.2020. However,<br>no information has been received so far. Hence, the Committee decided to wait for the complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:43/11/80- Party Name: ERBATECH Meet No/Date:19/80- Status:<br>ALC2/2019 MACHINERY PRIVATE LIMITED ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:3210079031 Deferred<br>:01/80/050/00169/AM20/ :32/21/040/00061/AM20/ 19.07.2019<br>83 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 13.12.2019.<br>However, no reply has been received yet. Therefore, the Committee decided to remind the firm for<br>furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/9/80- Party Name: TOLIA Meet No/Date:19/80- Status:<br>ALC2/2019 INDUSTRIES ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0310830453 Deferred<br>:01/80/050/00126/AM20/ :03/95/040/00218/AM20/ 22.07.2019<br>84 Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME for examination of the case on 01.10.2019 followed by an I.D. reminder on<br>10.12.2019. However, no comments have been received yet. Therefore, the Committee decided to<br>remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/9/80- Party Name: DYNA FORCE Meet No/Date:19/80- Status:<br>ALC2/2019 HYDRAULICS PRIVATE LIMITED ALC2/2019 & 15.01.2020<br>HQ File RLA File :31/83/040/00067/AM20/ Lic.No/Date:3110067484 Deferred<br>:01/80/050/00128/AM20/ 25.07.2019<br>85 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to<br>RA, Pune on 18.10.2019 followed by a reminder on 08.01.2020. However, no information has been<br>received so far. Hence, the Committee decided to wait for the complete set of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

24 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/9/80-ALC2/2019 Party Name: RATNAMANI Meet No/Date:19/80- Status:<br>METALS AND TUBES LTD ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0810145826 Deferred<br>:01/80/050/00129/AM20/ :08/24/040/00135/AM20/ 25.07.2019<br>86 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 20.11.2019<br>followed by a reminder on 07.01.2020. However, no reply has been received yet. Hence, the<br>Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:5/9/80-ALC2/2019 Party Name: ROTHE ERDE Meet No/Date:19/80- Status:
INDIA PRIVATE LIMITED ALC2/2019 & 15.01.2020
HQ File<br>:01/80/050/00130/AM20/ RLA File<br>:31/83/040/00066/AM20/ Lic.No/Date:3110067486<br>26.07.2019 Deferred

87

Decision: The Committee considered the case as per the agenda and noted that a copy of application has been referred to DPIIT on 15.01.2020 for examination of the case. Therefore, the Committee decided to wait for the comments.

Case is deferred.

Case No.:42/11/80- Party Name: PREMIER Meet No/Date:19/80- Status:
ALC2/2019 INDUSTRIAL ALC2/2019
CORPORATION LIMITED 15.01.2020
HQ File<br>:01/80/050/00168/AM20/ RLA File<br>:03/95/040/00377/AM20/ Lic.No/Date:0310830608<br>26.07.2019 Deferred

88

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 14.01.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/9/80-ALC2/2019 Party Name: VICTORA Meet No/Date:19/80- Status:<br>AUTO PVT. LTD. ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0510411435 Deferred<br>:01/80/050/00137/AM20/ :05/24/040/00251/AM20/ 02.08.2019<br>89 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, New Delhi and in this regard a letter was<br>sent to RA, New Delhi on 18.10.2019 followed by a reminder on 13.01.2019. However, no<br>information has been received so far. Hence, the Committee decided to wait for the complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

25 | P a g e

Case No.:41/11/80- Party Name: PHOENIX Meet No/Date:19/80- Status:
ALC2/2019 FOILS PVT. LTD. ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00167/AM20/ RLA File<br>:03/95/040/00459/AM20/ Lic.No/Date:0310830770<br>02.08.2019 Deferred

90 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email has been sent on 15.01.2020. Therefore, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:13/9/80-ALC2/2019 Party Name: SSP PVT.LTD. Meet No/Date:19/80- Status:
ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00138/AM20/ RLA File<br>:05/24/040/00259/AM20/ Lic.No/Date:0510411438<br>05.08.2019 Deferred

91 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 20.11.2019 followed by a reminder on 08.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:45/11/80- Party Name: L&T- MHPS Meet No/Date:19/80- Status:<br>ALC2/2004 TURBINE GENERATORS ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0310831568 Deferred<br>:01/80/050/00171/AM20/ :03/95/040/00574/AM20/ 16.09.2019<br>92<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to DHI on 19.12.2019 for examination of the case. However, no comments been received<br>yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:46/11/80- Party Name: L&T-MHPS Meet No/Date:19/80- Status:<br>ALC2/2004 BOILERS PVT LTD ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0310831569 Deferred<br>:01/80/050/00172/AM20/ :03/95/040/00588/AM20/ 16.09.2019<br>93<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to DHI on 19.12.2019 for examination of the case. However, no comments been received<br>yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

26 | P a g e

==> picture [476 x 135] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/13/80-ALC2/2019 Party Name: RONCH Meet No/Date:19/80- Status:<br>POLYMERS PVT LTD ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0310832012 Deferred<br>:01/80/050/00186/AM20/ :03/95/040/00654/AM20/ 04.10.2019<br>94 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 17.12.2019. However, no information has been received so far. Therefore, the Committee decided<br>to remind RA, Mumbai & the applicant for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

95

Case No.:2/13/80-ALC2/2019 Party Name: FERRUM Meet No/Date:19/80- Status:
EXTREME ENGINEERING ALC2/2019
PRIVATE LIMITED 15.01.2020
HQ File<br>:01/80/050/00187/AM20/ RLA File<br>:05/23/040/00265/AM20/ Lic.No/Date:0510412040<br>07.10.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 17.12.2019. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the applicant for submitting the complete set of application.

Case is deferred.

==> picture [476 x 134] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/13/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:19/80- Status:<br>AUTOMOTIVES PVT. LTD. ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0510412058 Deferred<br>:01/80/050/00188/AM20/ :05/23/040/00266/AM20/ 09.10.2019<br>96 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA,<br>New Delhi on 17.12.2019. However, no information has been received so far. Therefore, the Committee decided<br>to remind RA, New Delhi & the applicant for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 136] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/13/80-ALC2/2019 Party Name: L&T- MHPS Meet No/Date:19/80- Status:<br>TURBINE GENERATORS ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0310832116 Deferred<br>:01/80/050/00189/AM20/ :03/95/040/00681/AM20/ 10.10.2019<br>97<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>DHI for examination of the case on 19.11.2019 followed by a reminder on 07.01.2020. However, no comments<br>been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

27 | P a g e

==> picture [476 x 406] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/13/80-ALC2/2019 Party Name: L&T- MHPS Meet No/Date:19/80- Status:<br>TURBINE GENERATORS ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0310832159 Deferred<br>:01/80/050/00190/AM20/ :03/95/040/00655/AM20/ 11.10.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per the advice of representative of DHI :<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also<br>be furnished.<br>2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the<br>purpose of material balancing. Net weight (Gross weight minus wastage) for each imported<br>and indigenous input in the export product may be indicated. Net weight along with details of<br>other imported input to be used in the resultant product and sought to be imported/procured<br>98<br>from sources other than the license, if any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw<br>material proposed for import has been arrived at, including the net weight of components to<br>be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary evidence/drawings<br>etc.<br>5. Sheet layout diagram of the material indicating the wastage during blanking.<br>6. List of components, spares, consumables separately.<br>7. Raw material weight & finished weight of casting & forging proposed for import.<br>8. It is observed that both blading material, blade forging & finished blades are being imported.<br>To provide details of import item number of all the above items with their specific use & their<br>placement in the turbine.<br>9. List of spares if any.<br>10. AA number of the similar export product & copy of NC decision.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/13/80-ALC2/2019 Party Name: GODREJ & Meet No/Date:19/80- Status:<br>BOYCE MFG. CO. LTD., ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0310832178 Deferred<br>:01/80/050/00191/AM20/ :03/94/040/00505/AM20/ 11.10.2019<br>99<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to DPIIT on 18.12.2019 for examination of the case. However, no comments been received<br>yet. Hence, the Committee decided to remind DPIIT for expediting the case.<br>Case is deferred.<br>----- End of picture text -----<br>

28 | P a g e

==> picture [476 x 166] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/13/80- Party Name: ISGEC Meet No/Date:19/80- Status:<br>ALC2/2019 HITACHI ZOSEN LIMITED ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0510412096 Deferred<br>:01/80/050/00192/AM20/ :05/23/040/00269/AM20/ 11.10.2019<br>100 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, New Delhi and in this regard a letter was<br>sent to the firm & RA, New Delhi on 17.12.2019. However, no information has been received so far.<br>Therefore, the Committee decided to remind RA, New Delhi & the applicant for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 167] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/13/80- Party Name: AZAD Meet No/Date:19/80- Status:<br>ALC2/2019 ENGINEERING PRIVATE ALC2/2019<br>LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0910068080 Deferred<br>:01/80/050/00193/AM20/ :09/24/040/00347/AM20/ 14.10.2019<br>101 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was<br>sent to the firm & RA, Hyderabad on 17.12.2019. However, no information has been received so<br>far. Therefore, the Committee decided to remind RA, Hyderabad & the applicant for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/13/80- Party Name: GENESIS Meet No/Date:19/80- Status:<br>ALC2/2019 PACKAGING PVT. LTD. ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0710115559 Deferred<br>:01/80/050/00194/AM20/ :07/24/040/00152/AM20/ 14.10.2019<br>102<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>was sent to MSME on 01.11.2019 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 129] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/13/80- Party Name: GOLD MOHUR Meet No/Date:19/80- Status:<br>ALC2/2019 PROFILES LIMITED ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0510412119 Deferred<br>103 :01/80/050/00195/AM20/ :05/23/040/00279/AM20/ 15.10.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to<br>furnish following information as per the advice of Consultant (Tech-1):<br>1. Net weight of export item.<br>----- End of picture text -----<br>

29 | P a g e

  1. Net content of rubber compound in export.

  2. Percentage composition of Rubber Compound indicating different inputs used for 100 Kg of Rubber Compound.

  3. Details of indigenous input with their quantity.

  4. Manufacturing process in details.

  5. Percentage wastage involved in the process.

Case is deferred.

Case No.:11/13/80- Party Name: GLOVIS INDIA Meet No/Date:19/80- Status:
ALC2/2019 (P) LTD. ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00196/AM20/ RLA File<br>:04/24/040/00111/AM20/ Lic.No/Date:0410166162<br>15.10.2019 Deferred

104 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 14.11.2019 followed by an ID reminder on 07.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

105

Case No.:1/15/80- Party Name: SHAKTI Meet No/Date:19/80- Status:
ALC2/2019 PUMPS INDIA LIMITED ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00209/AM20/ RLA File<br>:56/24/040/00019/AM20/ Lic.No/Date:5610005713<br>31.10.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 11.12.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DPIIT for expediting the comments.

Case is deferred.

Case No.:2/15/80- Party Name: ULTRA Meet No/Date:19/80- Status:
ALC2/2019 ENGINEERS ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00210/AM20/ RLA File<br>:31/83/040/00099/AM20/ Lic.No/Date:3110067586<br>05.11.2019 Deferred

106

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm and in this regard an email has been sent on 15.01.2020. Therefore, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

30 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/17/80- Party Name: VICTORA Meet No/Date:19/80- Status:<br>ALC2/2019 AUTO PVT. LTD ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0510412724 Deferred<br>:01/80/050/00233/AM20/ :05/24/040/00513/AM20/ 29.11.2019<br>107<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, New Delhi & the firm and in this regard an email<br>has been sent on 15.01.2020. Therefore, the Committee decided to wait for the complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:2/17/80- Party Name: SULZER Meet No/Date:19/80- Status:
ALC2/2019 PUMPS INDIA LIMITED ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00234/AM20/ RLA File<br>:03/95/040/00827/AM20/ Lic.No/Date:0310833126<br>02.12.2019 Deferred

108 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email has been sent on 15.01.2020. Therefore, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/17/80- Party Name: SULZER Meet No/Date:19/80- Status:<br>ALC2/2019 PUMPS INDIA LIMITED ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:0310833143 Deferred<br>:01/80/050/00235/AM20/ :03/95/040/00828/AM20/ 02.12.2019<br>109 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Mumbai & the firm and in this regard an email has<br>been sent on 15.01.2020. Therefore, the Committee decided to wait for the complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/17/80- Party Name: AZAD Meet No/Date:19/80- Status:<br>ALC2/2019 ENGINEERING PRIVATE ALC2/2019<br>LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0910068243 Deferred<br>:01/80/050/00236/AM20/ :09/24/040/00438/AM20/ 02.12.2019<br>110<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter<br>seeking certain information as raised by DHI was sent to the firm on 10.12.2019. However, no reply<br>has been received yet. Therefore, the Committee decided to remind the firm for furnishing the<br>requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

31 | P a g e

Case No.:5/17/80- Party Name: AZAD Meet No/Date:19/80- Status:
ALC2/2019 ENGINEERING PRIVATE ALC2/2019
LIMITED 15.01.2020
HQ File<br>:01/80/050/00237/AM20/ RLA File<br>:09/24/040/00439/AM20/ Lic.No/Date:0910068244<br>02.12.2019 Deferred

111 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

Case No.:6/17/80- Party Name: TRILLIUM Meet No/Date:19/80- Status:
ALC2/2019 FLOW TECHNOLOGIES ALC2/2019
INDIA PRIVATE LIMITED 15.01.2020
HQ File<br>:01/80/050/00238/AM20/ RLA File<br>:03/95/040/00852/AM20/ Lic.No/Date:0310833148<br>02.12.2019 Deferred

112 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email has been sent on 15.01.2020. Therefore, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/17/80- Party Name: HANNING Meet No/Date:19/80- Status:<br>ALC2/2019 MOTORS INDIA P LTD ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:3410045677 Deferred<br>:01/80/050/00241/AM20/ :34/24/040/00270/AM20/ 03.12.2019<br>113 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Vadodara & the firm and in this regard an email<br>has been sent on 15.01.2020. Therefore, the Committee decided to wait for the complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/17/80- Party Name: HANNING Meet No/Date:19/80- Status:<br>ALC2/2019 MOTORS INDIA P LTD ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:3410045679 Deferred<br>:01/80/050/00242/AM20/ :34/24/040/00271/AM20/ 03.12.2019<br>114 Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Vadodara & the firm and in this regard an email<br>has been sent on 15.01.2020. Therefore, the Committee decided to wait for the complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

32 | P a g e

115

Case No.:11/17/80- Party Name: AZAD Meet No/Date:19/80- Status:
ALC2/2019 ENGINEERING PRIVATE ALC2/2019
LIMITED 15.01.2020
HQ File<br>:01/80/050/00243/AM20/ RLA File<br>:09/24/040/00437/AM20/ Lic.No/Date:0910068247<br>04.12.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

Case No.:12/17/80- Party Name: DOOWON Meet No/Date:19/80- Status:
ALC2/2019 CLIMATE CONTROL ALC2/2019
INDIA PRIVATE LIMITED 15.01.2020
HQ File<br>:01/80/050/00244/AM20/ RLA File<br>:26/24/040/00012/AM20/ Lic.No/Date:2610012887<br>04.12.2019 Deferred

116 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Visakhapatnam & the firm and in this regard an email has been sent on 15.01.2020. Therefore, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 136] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/17/80- Party Name: KABY Meet No/Date:19/80- Status:<br>ALC2/2019 PRECISION MACHINING ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0910068268 Deferred<br>:01/80/050/00245/AM20/ :09/24/040/00447/AM20/ 06.12.2019<br>117<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application has been<br>referred to DHI on 15.01.2020 for examination of the case. Therefore, the Committee decided to wait for the<br>comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 136] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/19/80- Party Name: BAUMER Meet No/Date:19/80- Status:<br>ALC2/2019 TECHNOLOGIES INDIA ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:5210043275 Deferred<br>:01/80/050/00266/AM20/ :52/24/040/00051/AM20/ 23.12.2019<br>118<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Surat & the firm. Therefore, the Committee decided to request from RA,<br>Surat and the firm to furnish the hard copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

33 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/19/80- Party Name: DILIGENT Meet No/Date:19/80- Status:<br>ALC2/2019 SCM SOLUTIONS PR ALC2/2019<br>IVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0910068302 Deferred<br>:01/80/050/00267/AM20/ :09/24/040/00474/AM20/ 24.12.2019<br>119<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee<br>decided to request from RA, Hyderabad and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:3/19/80- Party Name: DIGI DRIVES Meet No/Date:19/80- Status:
ALC2/2019 PRIVATE LIMITED ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00268/AM20/ RLA File<br>:05/23/040/00375/AM20/ Lic.No/Date:0510413072<br>24.12.2019 Deferred

120 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

Case No.:4/19/80- Party Name: CRYOGAS Meet No/Date:19/80- Status:
ALC2/2019 EQUIPMENT PVT LTD ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00269/AM20/ RLA File<br>:34/24/040/00287/AM20/ Lic.No/Date:3410045738<br>24.12.2019 Deferred

121 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

122

Case No.:5/19/80- Party Name: SHAKTI Meet No/Date:19/80- Status:
ALC2/2019 PUMPS INDIA LIMITED ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00270/AM20/ RLA File<br>:56/24/040/00026/AM20/ Lic.No/Date:5610005767<br>24.12.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that a copy of application has been referred to DPIIT on 15.01.2020 for examination of the case. Therefore, the Committee decided to wait for the comments.

Case is deferred.

34 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/19/80- Party Name: SHAKTI Meet No/Date:19/80- Status:<br>ALC2/2019 PUMPS INDIA LIMITED ALC2/2019 & 15.01.2020<br>HQ File RLA File Lic.No/Date:5610005768 Deferred<br>:01/80/050/00271/AM20/ :56/24/040/00027/AM20/ 24.12.2019<br>123<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application<br>has been referred to DPIIT on 15.01.2020 for examination of the case. Therefore, the Committee<br>decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:7/19/80- Party Name: DAMPER Meet No/Date:19/80- Status:
ALC2/2019 TECHNOLOGY INDIA PVT ALC2/2019
LTD, 15.01.2020
HQ File<br>:01/80/050/00272/AM20/ RLA File<br>:32/24/040/00099/AM20/ Lic.No/Date:3210079311<br>27.12.2019 Deferred

124 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Coimbatore & the firm. Therefore, the Committee decided to request from RA, Coimbatore and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

Case No.:9/19/80- Party Name: BONATRANS Meet No/Date:19/80- Status:
ALC2/2019 INDIA PRIVATE LIMITED ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00274/AM20/ RLA File<br>:03/94/040/00785/AM20/ Lic.No/Date:0310833747<br>27.12.2019 Deferred

125 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/19/80- Party Name: TEGA Meet No/Date:19/80- Status:<br>ALC2/2019 INDUSTRIES LIMITED ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0210209647 Deferred<br>:01/80/050/00273/AM20/ :02/24/040/00148/AM20/ 30.12.2019<br>126<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of<br>application has not yet been received from RA, Calcutta & the firm. Therefore, the Committee<br>decided to request from RA, Calcutta and the firm to furnish the hard copy of application for<br>examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

35 | P a g e

127

Case No.:10/19/80- Party Name: BANGALORE Meet No/Date:19/80- Status:
ALC2/2019 BIOTECH LABS PVT LTD., ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00275/AM20/ RLA File<br>:07/24/040/00223/AM20/ Lic.No/Date:0710115950<br>30.12.2019 Deferred

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm. Therefore, the Committee decided to request from RA, Bangalore and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

==> picture [476 x 136] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/19/80- Party Name: AZAD Meet No/Date:19/80- Status:<br>ALC2/2019 ENGINEERING PRIVATE ALC2/2019<br>LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0910068312 Deferred<br>:01/80/050/00276/AM20/ :09/24/040/00489/AM20/ 31.12.2019<br>128<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from<br>RA, Hyderabad and the firm to furnish the hard copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 136] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/19/80- Party Name: AZAD Meet No/Date:19/80- Status:<br>ALC2/2019 ENGINEERING PRIVATE ALC2/2019<br>LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0910068313 Deferred<br>:01/80/050/00277/AM20/ :09/24/040/00490/AM20/ 31.12.2019<br>129<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from<br>RA, Hyderabad and the firm to furnish the hard copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 136] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/19/80- Party Name: AUTOCOMP Meet No/Date:19/80- Status:<br>ALC2/2019 CORPORATION PANSE ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:3110067645 Deferred<br>:01/80/050/00278/AM20/ :31/83/040/00128/AM20/ 31.12.2019<br>130<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Pune & the firm. Therefore, the Committee decided to request from RA, Pune<br>and the firm to furnish the hard copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

36 | P a g e

131

Case No.:14/19/80- Party Name: ISGEC HEAVY Meet No/Date:19/80- Status:
ALC2/2019 ENGINEERING LIMITED ALC2/2019
15.01.2020
HQ File<br>:01/80/050/00279/AM20/ RLA File<br>:05/23/040/00381/AM20/ Lic.No/Date:0510413163<br>01.01.2020 Deferred

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

==> picture [476 x 136] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/19/80- Party Name: SOGEFI Meet No/Date:19/80- Status:<br>ALC2/2019 ENGINE SYSTEMS INDIA ALC2/2019<br>PRIVATE LIMITED 15.01.2020<br>HQ File RLA File Lic.No/Date:0710115971 Deferred<br>:01/80/050/00280/AM20/ :07/24/040/00097/AM20/ 02.01.2020<br>132<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Bangalore & the firm. Therefore, the Committee decided to request from RA,<br>Bangalore and the firm to furnish the hard copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 136] intentionally omitted <==

----- Start of picture text -----<br> Case No.:16/19/80- Party Name: MICRON Meet No/Date:19/80- Status:<br>ALC2/2019 INSTRUMENTS PVT LTD ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0510413177 Deferred<br>:01/80/050/00281/AM20/ :05/24/040/00590/AM20/ 02.01.2020<br>133<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA,<br>New Delhi and the firm to furnish the hard copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 136] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: ISGEC HEAVY Meet No/Date:19/80- Status:<br>17/19/80-ALC2/2019 ENGINEERING LIMITED ALC2/2019<br>15.01.2020<br>HQ File RLA File Lic.No/Date:0510413181 Deferred<br>:01/80/050/00282/AM20/ :05/23/040/00378/AM20/ 02.01.2020<br>134<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA,<br>New Delhi and the firm to furnish the hard copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

37 | P a g e

Manual Cases

Sl. No. 563

Sl. No. 563
Case No.36/21/80-ALC2/2016 Status:
NAVKAR FITTINGS &<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
FORGINGS PVT. LTD.<br>Lic.No.: 0310808954 Date: 03.11.2016
HQ. No.: 01/80/050/00496/AM17<br>**Subject:**Request for fixation of ad-hoc Deferred
norms<br>RLA No.: 03/95/040/00606/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in
Meeting No. 04/80-ALC2/2017dated 23.05.2017 due to non-submission of reply of deficiency letter
raised by DIPP vide UO No.12/13/2017-TSW/81 dated 02/03/2017.
However, the firm had furnished the reply with a request to re-open the case and fix the ad-
hoc norms. The Committee noted that the firm’s representation was forwarded toMSMEon 28.11.2018
followed by ID reminders on 17.09.2019 & 10.01.2020 for expediting the comments. However, no
comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 564

CaseNo. 14/15/80-ALC2/2013<br>Status:
Automat Irrigation Pvt.<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
Ltd.<br>Lic.No.: 0510362949 dated20.08.2013
HQ. No.: 01/80/050/00270/AM14<br>**Subject:**Request for fixation of ad-<br>Deferred
hoc norms<br>RLA No.: 05/23/040/00199/AM14
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in
Meeting No. 22/80 dated 02.02.2016 due to non-submission of reply of deficiency letter dated
30.07.2014 as raised by C & PC.
However, the firm had furnished the reply with a request to re-open the case and fix the ad-hoc norms.
The Committee noted that the firm’s representation was referred toMSMEon 28.11.2018 followed by
ID reminders on 24.09.2019 & 16.12.2019 for expediting the comments. The case has been also referred
to**Consultant (Tech-1)**for examination on 10.01.2020. However, no comments have been received yet.
Hence, the Committee decided to wait for the comments.
Caseis deferred.

Sl. No. 565

Sl. No. 565
CaseNo. 50/2/80-ALC2/2016 Status:
S AND W JEWELLERY PRIVATE<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
LIMITED<br>Lic. No.: 0710108479 dated 08.07.2015
HQ. No.: 01/80/050/00053/AM17<br>**Subject:**Request for re-fixation of ad-<br>hoc norms<br>RLA No.: 05/23/040/00125/AM16 Deferred
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in
Meeting No. 05/80 dated 07.06.2016 as per written comments of MSME vide U. O. No.: TSW B
3/26/20TL-13024/82/2016-MMM & A-DCMSME dated 20.05.2016.

38 | P a g e

However, the firm vide letter dated 26.04.2017 requested for re-fixation of ad-hoc norms. The Committee noted that a deficiency letter seeking information as raised by MSME, i.e. The complete statement of exports along with copies of shipping bills” , was sent to the firm on 30.11.2018 followed by reminders on 18.09.2019 & 10.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.

Case is deferred.

Sl. No. 566

==> picture [476 x 69] intentionally omitted <==

----- Start of picture text -----<br> Case No. 2/4/80-ALC2/2015 Status:<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020 Terumo Penpol Ltd.<br>Lic. No.: 5310008377 dated 28.05.2009<br>HQ. No.: 01/80/050/00073/AM16 Subject: Request for fixation of ad-hoc Deferred<br>RLA No.: 53/21/040/00002/AM10 norms<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted its decision of Meeting 11/19 date 30.11.2018 in which representative of MSME stated that the norms may be fixed on the basis of DIPP recommendation vide No. 07/9/20l6-TSW dt. 08.12.2017 for License No. 5310019514 dt. 05.10.2017 as ratified in Meeting No. 16/80 dated 14.11.2017. However, the Committee observed that the description of export item in the subject application does not exactly match with that appearing in the recommendation of DIPP and due to this it was requested to MSME to provide comments.

Decision: The Committee considered the case as per the agenda and noted its decision of Meeting 11/19 date 30.11.2018 in which representative of MSME stated that the norms may be fixed on the basis of DIPP recommendation vide No. 07/9/20l6-TSW dt. 08.12.2017 for License No. 5310019514 dt. 05.10.2017 as ratified in Meeting No. 16/80 dated 14.11.2017. However, the Committee observed that the description of export item in the subject application does not exactly match with that appearing in the recommendation of DIPP and due to this it was requested to MSME to provide comments. Based on the deliberations & as per advice of MSME, the Committee decided that Consultant (Tech -1) to look into the issue. Hence, the case was referred to Consultant (Tech -1) on 16.10.2019 for examination & comments . Consultant (Tech-1) informed that a similar case of the firm has already been referred to PLEXCOUNCIL and Department of C & PC. However, PLEXCOUNCIL vide email dated 17.12.2019 has requested for 15 days time to reply the query and no information has been received from Deptt. Of C & PC. Therefore, the Committee decided to remind PLEXCOUNCIL and Department of C & PC for the expediting the matter. Case is deferred.

Sl. No. 567

==> picture [483 x 225] intentionally omitted <==

----- Start of picture text -----<br> Case No. 2/10/80-ALC2/2014 Status:<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020 Larsen & Toubro Ltd.<br>Lic. No.: 0310781699 dated 15.05.2014<br>HQ. No.: 01/80/050/00198/AM15 Subject: Request for fixation of ad- Approved<br>RLA No.: 03/95/040/00038/AM15 hoc norms<br>Decision: The Committee considered the case as per the agenda and noted that the case was rejected in M.<br>No. 11/80 dated 30.08.2016 due to non-submission of reply of deficiency letter dated 22.02.2016. The<br>party replied to the deficiency letter and requested for reopening the case.<br> The Committee reconsidered the case and decided to ratify the ad-norms on repeat basis as<br>approved for AA No. 0310781705 dated 15.05.2014 on the recommendation of the representative of DHI<br>as under:<br>ITCHS Sl. ITCHS Recommended<br>Export Item Import Item<br>Code No. Code Norms<br>Main Clad Plates - Base Material Spec: SA- 1.03Kgs/Kg<br>Condenser (In 1 72100000 516M -Clad Material Spec:SB-265 - content in the<br>84042000 Section) With Thickness Range:40 mm to 50 mm export product<br>Flash Box, Welded Titanium Tubes - Spec: SB-338 1.01Kgs/Kg<br>2 81080000<br>Spares And - Size: 20 mm to 30 mm Outside content in the<br>----- End of picture text -----<br>

39 | P a g e

Tools &<br>Tackles Diameter exportproduct
3 83110000 Welding Electrodes As per SION<br>C1647
4 83110000 Welding Wire As per SION<br>C1647
5 38100000 Welding Flux As per SION<br>C1647
RA concerned maytake further necessaryaction asper the decision of NC.

Sl. No. 568

==> picture [476 x 91] intentionally omitted <==

----- Start of picture text -----<br> Case No. 26/11/80-ALC2/2016 Status:<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020 Dee Development Engineers<br>Lic. No.: 0510398701 dated 01.06.2017 Ltd.<br>HQ. No.: 01/80/050/00299/AM17 Subject: Request for fixation of ad-hoc Deferred<br>RLA No.: 05/23/040/00101/AM17 norms in respect of AA issued to M/s.<br>Dee Development Engineers Ltd., under<br>Para 4.7 of HBP (Vol.-I) – reg.<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 09/80 dated 01.08.2017 due to non-submission of reply of deficiency letter dated 19.04.2017.

The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.12.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.

Case is deferred.

Sl. No. 569

Case No. 5/14/80-ALC2/2016 Status: M. No.: 19/80-ALC2/2019 dated 15.01.2020 Injectoplast Pvt. Ltd. Lic. No.: 0610038435 dated 09.08.2016 HQ. No.: 01/80/050/00355/AM17 Subject: Request for re-fixation of ad-hoc Deferred RLA No.: 06/24/040/0015/AM17 norms

Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 17/80 dated 19.12.2017 as per comments of MSME.

However, the firm requested for re-fixation of ad-hoc norms. The Committee noted that the firm’s representation was forwarded to MSME on 15.01.2019 followed by reminder on 17.09.2019 & 16.12.2019 for expediting the comments. The case has been also referred to Consultant (Tech-1) for examination on 10.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

40 | P a g e

Sl. No. 570

Sl. No. 570
CaseNo. 21/6/80-ALC2/2016 Status:
M. No.: 19/80-ALC2/2019 dated 15.01.2020 Dee Development Engineers Ltd.
Lic.No.: 0510398216 dated13.04.2016
HQ. No.: 01/80/050/00180/AM17 **Subject:**Request for fixation of ad-hoc Deferred
RLA No.: 05/23/040/00015/AM17 norms
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in
Meeting No. 09/80 dated 01.08.2017 due to non-submission of reply of deficiency letter dated
19.04.2017.
However, the firm had furnished the reply with a request to re-open case and fix the ad-hoc
norms. The Committee reconsidered the case and noted that a deficiency letter seeking certain
information as raised byDPIITwas sent to the firm on 16.12.2019. However, no reply has been
received yet. Therefore, the Committee decided toremind the firmfor furnishing the requisite
information within 15 days.
Caseis deferred.

Sl. No. 571

Sl. No. 571
CaseNo. 15/2/80-ALC2/2016 Status:
Deepeeka Exports Pvt. Ltd.<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
Lic.No.: 0510396524dated 04.12.2015
HQ. No.: 01/80/050/00018/AM17<br>**Subject:**Request for fixation of ad-hoc Deferred
norms<br>RLA No.: 05/23/040/00371/AM16
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in
Meeting No. 14/80 dated 11.10.2016 due to non-submission of reply of deficiency letter dated
04.08.2016.
The Committee noted that the firm’s reply against deficiency letter dated 15.01.2019 was sent
toMSMEon 21.10.2019 for examination of the case. However, no comments have been received yet.
Hence, the Committee decided toremindMSME for expediting the case.
Case is deferred.

Sl. No. 572

==> picture [476 x 67] intentionally omitted <==

----- Start of picture text -----<br> Case No. 45/24/80-ALC2/2013 Status:<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020 Kelvion India Pvt. Ltd.<br>Lic. No.: 0310766285 dated 15.01.2014<br>HQ. No.: 01/80/050/00522/AM14 Subject: Request for fixation of ad-hoc Deferred<br>RLA No.: 03/94/040/00880/AM14 norms<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda noted that the case was rejected in Meeting No. 22/80 dated 20.01.2015 due to non-submission of reply of deficiency letter dated 30.07.2014.

The firm furnished the reply vide letter dated 20.11.2017 with a request to fix the ad-hoc norms. The Committee noted that the firm’s reply of deficiency letter dated 21.10.2019 was forwarded to DPIIT on 15.11.2019 for examination & comments. However, no comments have been received yet. Hence, the Committee decided to remind DPIIT for expediting the case.

Case is deferred.

41 | P a g e

Sl. No. 573

Sl. No. 573
CaseNo. 52/15/80-ALC2/2013 Status:
M. No.: 19/80-ALC2/2019 dated 15.01.2020 Sharma Pharmaceutical Pvt. Ltd.
Lic.No. : 3410037864dated11.09.2013
HQ. No.: 01/80/050/00308/AM14 **Subject:**Request for fixation of ad-hoc<br>Deferred
RLA No.: 34/24/040/00131/AM14 norms
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in M.
No. 04/80 dated 13.05.2014 due to non-submission of reply of deficiency letter dated 17.12.2013.
The Committee noted that a deficiency letter seeking certain information as raised byDPIIT
was sent to the firm on 16.07.2019 & subsequent reminder on 24.09.2019. However, no reply has been
received yet. Therefore, the Committee decided tosend final reminder to the firmto furnish the
requisite information within 15 days.
Caseis deferred.

Sl. No. 574

Sl. No. 574
Case No. A/R 16/19 Status:
TATA Sikorsky Aerospace Ltd.<br>M. No.: 19/80-<br>ALC2/2019 dated<br>15.01.2020
HQ. No.:<br>01/80/162/301/AM1<br>8/DES-18<br>**Subject:**EOU- M/s. TATA Sikorsky Aerospace Ltd., LOP No.<br>PER: 076/EOU/VSEZ/HYD/2011 dated 25.07.2011 for fixation of<br>wastage norms for export product “Helicopter cabin kits & parts<br>and accessories for Aircraft” against import items 1. Stainless Steel<br>bars/rods2. Stainless Steel Tube/Pipes 3. Stainless Steel round bars Deferred
**Decision:**The Committee considered the case as per the agenda and noted that the application of the
firm was sent to DIPP on 10.07.2018 and also to DHI on 03.08.2018 for their examinations/comments.
Since, they had stated that the export product is not under the purview of DIPP/DHl, so it was forwarded
toMSMEon 18.03.2019, 24.09.2019 and 10.01.2020. However, no comments have been received yet.
Therefore, the Committee decided toremind MSMEfor expediting for the comments.
Caseis deferred.

Sl. No. 575

Case No.67/2/80-ALC2/2016<br>Status:
ECOCAT INDIA PVT.LTD<br>M.No.:19/80-ALC2/2019 dated15.01.2020
Lic.No.: 0510397548 dated 09.02.2016
HQ. No.: 01/80/050/00070/AM17<br>**Subject:**Request for fixation of ad-hoc<br>Deferred
norms<br>RLA No.: 05/23/040/00472/AM16
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in
Meeting No. 15/80 dated 06.03.2019 due to non-submission of reply of deficiency letter dated
11.10.2018.
However, the firm had requested for fixation of ad-hoc norms. The Committee noted that the
firm’s representation was forwarded toMSMEon 11.07.2019 followed by reminders on 24.09.2019 &
10.01.2020, for examination of the case. However, no comments have been received yet. Hence, the
Committee decided to wait for the comments.
Case is deferred.

42 | P a g e

Sl. No. 576

==> picture [476 x 69] intentionally omitted <==

----- Start of picture text -----<br> Case No. 27/9/80-ALC2/2017 Status:<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020 TERUMO PENPOL PRIVATE<br>Lic. No.: 5310019417 dated 15.06.2017 LIMITED<br>HQ. No.: 01/80/050/00205/AM18 Subject: Request for fixation of ad-hoc Deferred<br>RLA No.: 53/24/040/00003/AM18 norms<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda noted that the case was approved in Meeting No. 03/80 dated 09.05.2018 as per written comments of DIPP (TSW section) vide letter No.: 07/9/2016-TSW dated 08.12.2017. However the firm requested to re-fix the norms and also allow them for Personal Hearing .

Decision: The Committee considered the case as per the agenda noted that the case was approved in Meeting No. 03/80 dated 09.05.2018 as per written comments of DIPP (TSW section) vide letter No.: 07/9/2016-TSW dated 08.12.2017. However the firm requested to re-fix the norms and also allow them for Personal Hearing . In continuation to Meeting 09/80 dated 14.09.2019, the Committee noted that the firm appeared for PH in its Meeting 09/80 dated 14.09.2019 and explained the reason for higher wastage claimed. Based on the deliberations, the Committee decided that Consultant (Tech 1) to look into the issue. Consultant (Tech-1) pointed out that firm is requesting to increase the wastage norms for PVC compound from 10% to 16% on the basis of Deptt. of C&PC suggestion vide letter dated 10.09.2012 for amending the SION H-67 and AA of the firm has been ratified on the basis of SION H-67 which allows for only 10%. Consultant (Tech 1) suggested that PLEXCOUNCIL may be requested to provide Production/Consumption data of other manufacturers. The Committee noted that the case was referred to PLEXCOUNCIL &Deptt. of C & PC on 18.10.2019 & 05.11.2019 respectively. However, PLEXCOUNCIL vide email dated 17.12.2019 has requested for 15 days time to reply the query and no information has been received from Deptt. of C & PC. Therefore, the Committee decided to wait for the requisite information. Case is deferred.

Sl. No. 577

Sl. No. 577
Case No. : 61/25/80-ALC2/2016 Status:
M/s. BARODA EQUIPMENT AND<br>M.No.:19/80-ALC2/2019 dated15.01.2020
VESSELS PVT. LTD.<br>Lic. No. /date: 3410042545 dated 21.09.2016
HQ.No.: 01/80/50/621/AM17/DES-I<br>**Subject:**Request for reviewing of ad-hoc Deferred
norms<br>RLA No.: 34/24/040/00182/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in M.
No. 14/80-ALC2/2017dated 10.10.2017due to non submission of reply of deficiency raised by DPIIT.
However, the firm furnished the reply vide letter dated 31.07.2019 with a request to fix the ad-
hoc norms. The Committee reconsidered the case and noted that a deficiency letter seeking certain
information as raised byDPIITwas sent to the firm on 19.11.2019 and 13.01.2019. However, no reply
has been received yet. Therefore, the Committee decided towait for the firm’s reply.
Case is deferred.

43 | P a g e

Sl. No. 578

CaseNo. : 24/17/80-ALC2/2014<br>M/s GEA BGR ENERGY SYSTEM<br>INDIA LIMITED<br>Status:<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020<br>Lic.No. /date: 0410159425 dated16.09.2014
HQ. No.: 01/80/050/00396/AM15<br>**Subject:**Request for fixation of ad-<br>Deferred
hoc norms<br>RLA No.: 04/24/040/00154/AM15
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in
Meeting No. 05/80-ALC2/2016 dated 08.06.2015due to non submission of reply to the deficiency (raised
by DHI).
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered
the case and noted that the case was sent toDHIfor examination on 21.08.2019, 18.10.2019 &
17.12.2019.However, the representative ofDHIrequested for the physical file for examination of the
case. Therefore, the Committee decided to forward the physical file to the DHI.
Case is deferred.

Sl. No. 579

CaseNo. : 24/19/80-ALC2/2014<br>Status:
M/s SHAKTI PUMPS (INDIA) LTD.<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
Lic.No. /date: 5610004450Date:21.10.2014
HQ. No.: 01/80/050/00458/AM15<br>**Subject:**Request for re-fixation of ad-<br>hoc norms<br>Deferred<br>RLA No.: 56/24/040/00042/AM15
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in
Meeting No. 5/80-ALC2/2016dated 07.06.2016as per recommendation of DIPP vide ID Note No.
12/46/2016-TSW/11 dated 03.06.2016.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered
the case and noted that the case was referred toDPIITfor examination on 24.09.2019, 22.10.2019 &
16.12.2019. However, no comments have been received yet. Therefore, the Committee decided to
remind again DPIITfor expediting the comments.
Case is deferred.

Sl. No. 580

CaseNo. : No.:9/12/80-ALC2/2017<br>SMC PNEUMATICS (INDIA)<br>PRIVATE LIMITED<br>Status:<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020<br>Lic.No. /date: 0510403402dated14.07.2017
HQ. No.: 01/80/050/00223/AM18<br>**Subject:**Request for re-fixation of ad-<br>Deferred
hoc norms<br>RLA No.: 05/24/040/00172/AM18
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in M.
No. 3**/**80-ALC2/2016 dated 09.05.2018as per recommendation of DHI, DIPP and MSME present in the
meeting.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered
the case and decided to call the firm forpersonal hearing along with the samples of Export Product
to explain the case before Norms Committee along with reply of deficiency letter dated 13.01.2020 in the
forthcoming NC meeting.
Caseis deferred.

44 | P a g e

Sl. No. 581

Case No. :16/8/80-ALC2/2018<br>**M/s.**SMC PNEUMATICS (INDIA)<br>PRIVATE LIMITED<br>Status:<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020<br>Lic. No.: 0510407130 Date: 09.07.2018
HQ. No.: 01/80/050/139/AM19<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred
norms<br>RLA No.: 05/24/040/00207/AM19
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
4/80-ALC2/2019 dated 22.05.2018as per written comments ofDPIITvide U. O. No.: P-47011/289/2018-TSW
dated 25.04.2019.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case
and decided to call the firm forpersonal hearing along with the samples of Export Product to explain the
case before Norms Committee in the forthcoming NC meeting.
Case is deferred.

Sl. No. 582

==> picture [476 x 71] intentionally omitted <==

----- Start of picture text -----<br> Case No. 28/19/80-ALC2/2014 Status:<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020 VOITH HYDRO PRIVATE<br>Lic. No.: 0510391512 dated 09.10.2014 LIMITED<br>HQ. No.: 01/80/050/00462/AM15 Subject: Request for fixation of ad-hoc norms Approved<br>RLA No.: 05/24/040/00277/AM15<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda noted that the case was rejected in Meeting No. 12/80 dated 12.09.2017 due to non-submission of reply of deficiency letter dated 04.05.2017. However, the firm vide letter dated 30.05.2019 requested to fix the ad-hoc norms.

The Committee reconsidered the case and noted that in Meeting 13/80 dated 23.10.2019, representative of DHI had raised some deficiencies. Firm reply dated 25.10.2019 was sent to DHI. Therefore, the Committee decided to ratify the ad-norms on the recommendation of the representative of DHI by considering reply dated 25.10.2019 as under:

==> picture [457 x 24] intentionally omitted <==

----- Start of picture text -----<br> ITCHS ITCHS Recommended Norms<br>Export Item Import Item<br>Code Code<br>----- End of picture text -----<br>

ITCHS<br>Code Export Item ITCHS<br>Code Import Item Recommended Norms
84109000 Francis Runner<br>Gr. 1**(Total**<br>export weight<br>is 12305 kgs) 84109000 Runner Crown (1No), Runner band (1 No),<br>Blade (15 Nos) Material ASTM A 743<br>CA6NM<br>Condition: All Inputs Imported Shall Be<br>Utilized In Manufacturing of Product Except<br>Wastage. Import quantity allowed<br>with25% net wastage<br>after taking 5%<br>recovery

RA concerned may take further necessary action as per the decision of NC.

Sl. No. 583

Sl. No. 583
Case No.41/3/80-ALC2/2015 Status:
M. No.: 19/80-ALC2/2019 dated 15.01.2020 Y-TEC INDIA PVT. LTD.
Lic. No.: 0510393093 dated 05.02.2015
HQ. No.: 01/80/050/00041/AM16 **Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 05/24/040/00523/AM15
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
18/80 dated 08.12.2015 due to non-submission of reply of deficiency letter dated 22.06.2015.
However, the firm vide letter dated 20.12.2018 submitted the representation with a request to fix the ad-
hoc norms. The Committee reconsidered the case and noted that a deficiency letter seeking certain information as
raised by**Consultant (Tech-1)**was sent to the firm on 22.11.2019 and a reminder on 13.01.2020. However, no
reply has been received yet. Therefore, the Committee decided towait for the firm’s reply.
Case is deferred.

45 | P a g e

Sl. No. 584

Sl. No. 584
CaseNo. 14/3/80-ALC2/2017 Status:
BGR ENERGY SYSTEMS LIMITED<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
Lic. No. /date: 0410162877 dated 09.03.2017
HQ.No.: 01/80/050/00014/AM18<br>**Subject:**Request for fixation of ad-hoc Deferred
norms<br>RLA No.: 04/24/040/00215/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in
Meeting No.12/80-ALC2/2017dated 12.09.2017 due to non-submission of reply of deficiency raised
by DIPP vide U. O. No.:12/36/2017-TSW/160 dated 16/05/2017.
However, the firm furnished the reply with a request to fix the ad-hoc norms. The Committee
reconsidered the case and noted that the case was referred to DPIIT for examination on 29.07.2019
followed by reminders on 23.09.2019 & 22.10.2019. The complete set of application was again sent to
DPIITon 17.12.2019 followed by a reminder on 13.01.2020. However, no comments have been
received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 585

Sl. No. 585
CaseNo. : 25/21/80-ALC2/2016<br>M/s L & T-MHPS TURBINE Status:
GENERATORS PRIVATE<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
LIMITED<br>Lic.No. /date: 0310808650Date:21.10.2016
HQ. No.: 01/80/050/00485/AM17<br>**Subject:**Request for re-fixation of ad-<br>hoc norms<br>RLA No.: 03/95/040/00528/AM17 Deferred
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in
Meeting No. 11/80-ALC2/2018 dated 06.12.2018 as per DHI written recommendation vide F. No.
3/12/2017/TSW(B) dated 18.05.2018.
The firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and noted
the comments given by DHI recommending ratifying the license on repeat basis are not clear. Hence, the
Committee decided to request again to DHI for comments.
Caseis deferred.

Sl. No. 586

CaseNo.: 39/5/80-ALC2/2017<br>L & T-MHPS TURBINE<br>Status:
GENERATORS PRIVATE<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
LIMITED<br>Lic.No. /date: 0310813078Date: 05.05.2017
HQ. No.: 01/80/050/00100/AM18<br>**Subject:**Request for re-fixation of ad-<br>hoc norms<br>Deferred<br>RLA No.: 03/95/040/01041/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in
Meeting No.15/80-ALC2/2018dated 06.03.2019 as per the written comments of DHI vide their U.O.
No. DES-I/L&T/Tu-1-2018-HEI dated 24.12.2018.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case
and noted that the firm’s representation was referred toDHIon 17.12.2019. However, no comments
have been received yet. Therefore, the Committee decided toremind DHIfor expediting the comments.
Caseis deferred.

46 | P a g e

Sl. No. 587

Sl. No. 587
Case No.:7/11/80-ALC2/2015<br>L & T-MHPS TURBINE GENERATORS<br>PRIVATE LIMITED<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020<br>Lic. No. /date: 0310796416 Date: 04.06.2015 Status:
HQ. No.: 01/80/050/00214/AM16/<br>**Subject:**Request for re-fixation of ad-hoc<br>norms<br>RLA No.: 03/95/040/00086/AM16 Deferred
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No.9/80-ALC2/2016dated 02.08.2016 as per the written comments of DHI vide U. O. No.: 3 (174)/15-TSW (B)
dated 19.07.2016.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and the
representative of DHI informed that the firm’s reply dated 18.06.2019 is incomplete. Therefore, the Committee
decided to ask from the firm to furnish the following information as per advice of the representative of DHI:
1. To submit calculation correlating the same with dimensional engineering drawing with relevant
dimensions highlighted.
2. Write-up/catalogue of items which are proposed to be imported as components. The specific use of items
should be given.
Case is deferred.

Sl. No. 588

Case No.:13/16/80-ALC2/2017<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020<br>Lic. No. /date: 0310815484 Date: 01.09.2017 Case No.:13/16/80-ALC2/2017<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020<br>Lic. No. /date: 0310815484 Date: 01.09.2017 L & T-MHPS TURBINE GENERATORS<br>PRIVATE LIMITED L & T-MHPS TURBINE GENERATORS<br>PRIVATE LIMITED Status:
HQ. No.: 01/80/050/00276/AM18 **Subject:**Request for fixation of ad-hoc norms <br>Deferred
RLA No.: 03/95/040/00052/AM18
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No.<br>06/80-ALC2/2018dated<br>11.07.2018 on<br>the<br>ground<br>that<br>the<br>parts<br>of the import<br>items
given ( Unit of Measurement) in sets and number of parts in each set and their composition is not known. The
Committee found that it was very difficult to enforce accountability and rejected the case.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that
deficiency letter seeking certain information as per advice of representative ofDHIis being sent to firm in
accordance with NC Meeting 18/80 dated 02.01.2020.
Case is deferred.

Sl. No. 589

==> picture [472 x 155] intentionally omitted <==

----- Start of picture text -----<br> M. No.: 19/80-ALC2/2019 dated<br>Astha Corporation Pvt. Ltd. Status:<br>15.01.2020<br>HQ File No: Subject: Request for 100% EOU for fixation of Norms for<br>Deferred<br>01/80/162/003/AM20/DES1 Precision Metal Machined Parts<br>Decision: The Committee considered the case as per agenda and noted that the representation received from O/o<br>Development Commissioner Vishakhapatnam Special Economic Zone, Hyderabad has forwarded the application of<br>M/s Astha corporation Pvt. Ltd., for 100% EOU for fixation of Norms for Precision Metal Machined Parts.<br> The firm had requested for fixation of norms. The Committee noted that the case was referred to MSME<br>for examination on 27.08.2019 followed by reminders on 08.11.2019 & 06.01.2020. However, no comments have<br>been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per agenda and noted that the representation received from O/o Development Commissioner Vishakhapatnam Special Economic Zone, Hyderabad has forwarded the application of M/s Astha corporation Pvt. Ltd., for 100% EOU for fixation of Norms for Precision Metal Machined Parts.

47 | P a g e

Sl. No. 590

==> picture [472 x 228] intentionally omitted <==

----- Start of picture text -----<br> Case No.: 21/5/80-ALC2/2018<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020 MICRON INSTRUMENTS PVT LTD Status:<br>Licence No.: 0510406253 dated 27.04.2018<br>HQ File No: 01/80/050/00070/AM19/<br>Subject: Request for revision of ad-hoc norms Deferred<br>RLA File No: 05/24/040/00040/AM19/<br>Decision: The Committee considered the case as per the agenda and noted that the case was approved in M. No.<br>01/80 dated 03.04.2019 on the recommendation of DPIIT vide their U. No. P -47011/381/2018-TSW dated<br>18.02.2019.<br> The firm vide letter dated 12.07.2019 has requested to revise the norms on repeat basis as approved for AA<br>No. 0510405087 dated 26.12.2017 in M. No. 19/80 dated 28.02.2018. The Committee reconsidered the case and<br>observed that DPIIT vide U. O. No. P-47011/85/2019-TSW dated 25.11.2019 has agreed to the request of the firm<br>‘in line with earlier cases’. The Committee decided to have more information from DPIIT regarding specific details<br>of the earlier cases on the basis of which the revision is being recommended and reason to allow different wastage<br>earlier. However, no information has been received yet from DPIIT . Hence, the Committee decided to wait for the<br>comments.<br>Case is deferred.<br>----- End of picture text -----<br>

The firm vide letter dated 12.07.2019 has requested to revise the norms on repeat basis as approved for AA No. 0510405087 dated 26.12.2017 in M. No. 19/80 dated 28.02.2018. The Committee reconsidered the case and observed that DPIIT vide U. O. No. P-47011/85/2019-TSW dated 25.11.2019 has agreed to the request of the firm ‘in line with earlier cases’. The Committee decided to have more information from DPIIT regarding specific details of the earlier cases on the basis of which the revision is being recommended and reason to allow different wastage earlier. However, no information has been received yet from DPIIT . Hence, the Committee decided to wait for the comments.

Sl. No. 591

==> picture [472 x 229] intentionally omitted <==

----- Start of picture text -----<br> Case No. : 16/12/80-ALC2/2018<br>MICRON INSTRUMENTS PVT. LTD. Status :<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020<br>Licence No.: 0510408225 Date: 25.10.2018<br>HQ File No: 01/80/050/00289/AM19/ Subject: Request for revision of ad-hoc norms Deferred<br>RLA File No: 05/24/040/00398/AM19/<br>Decision: The Committee considered the case as per the agenda and noted that the case was approved in meeting<br>No. 14/80 dated 20.02.2019 as per written comments of DPIIT vide their F. No.: P-47011/17/2019/TSW dated<br>08.02.2019.<br> The firm vide their letter dated 12.07.2019 has requested to revise the norms on repeat basis as approved for<br>AA No. 0510405087 dated 26.12.2017 in meeting 19/80 dated 18.02.2018. The Committee reconsidered the case<br>and observed that DPIIT vide U. O. No. P-47011/85/2019-TSW dated 25.11.2019 has agreed to the request of the<br>firm ‘in line with earlier cases’. The Committee decided to have more information from DPIIT regarding specific<br>details of the earlier cases on the basis of which the revision is being recommended and reason to allow different<br>wastage earlier. However, no information has been received yet from DPIIT . Hence, the Committee decided to wait<br>for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

The firm vide their letter dated 12.07.2019 has requested to revise the norms on repeat basis as approved for AA No. 0510405087 dated 26.12.2017 in meeting 19/80 dated 18.02.2018. The Committee reconsidered the case and observed that DPIIT vide U. O. No. P-47011/85/2019-TSW dated 25.11.2019 has agreed to the request of the firm ‘in line with earlier cases’. The Committee decided to have more information from DPIIT regarding specific details of the earlier cases on the basis of which the revision is being recommended and reason to allow different wastage earlier. However, no information has been received yet from DPIIT . Hence, the Committee decided to wait for the comments.

Sl. No. 592

==> picture [472 x 127] intentionally omitted <==

----- Start of picture text -----<br> Case Number : 20/5/80-ALC2/2018<br>MICRON INSTRUMENTS PVT LTD Status:<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020<br>Licence No.: 0510406252 Date: 27.04.2018<br>HQ File No: 01/80/050/00069/AM19/ Subject: Request for revision of ad-hoc norms Deferred<br>RLA File No: 05/24/040/00042/AM19/<br>Decision: The Committee considered the case as per the agenda and noted that the case was approved in M. No.<br>1/80 dated 03.04.2019 on the recommendation of DPIIT vide their U.O. No. P -47011/379/2018-TSW dated<br>20.02.2019.<br> The firm vide their letter dated 15.07.2019 has requested to revise the norms on repeat basis as approved for quested to revise the norms on repeat basis as approved for uested to revise the norms on repeat basis as approved for peat basis as approved for eat basis as approved for pproved for roved for<br>----- End of picture text -----<br>

The firm vide their letter dated 15.07.2019 has requested to revise the norms on repeat basis as approved for quested to revise the norms on repeat basis as approved for uested to revise the norms on repeat basis as approved for peat basis as approved for eat basis as approved for pproved for roved for

48 | P a g e

AA No. 0510398272 dated 22.04.2016 in meeting No. 19/80 dated 18.02.2018. The Committee reconsidered the case and observed that DPIIT vide U. O. No. P-47011/85/2019-TSW dated 25.11.2019 has agreed to the request of the firm ‘in line with earlier cases’. The Committee decided to have more information from DPIIT regarding specific details of the earlier cases on the basis of which the revision is being recommended and reason to allow different wastage earlier. However, no information has been received yet from DPIIT . Hence, the Committee decided to wait for the comments.

Case is deferred.

Sl. No. 593

==> picture [484 x 263] intentionally omitted <==

----- Start of picture text -----<br> Case Number : 46/24/80-ALC2/2012<br>BHARAT HEAVY ELECTRICALS LIMITED Status :<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020<br>Licence No.: 0410141886 Date: 19.12.2012<br>HQ File No: 01/80/050/00526/AM13/ Subject: Request for revision of ad-hoc norms Deferred<br>RLA File No: 04/24/040/00188/AM13/<br>Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting<br>No.07/80 dated 25.06.2013 as per comments of DHI UO No. 3(23)/13-TSW(B)/89 dated 6.5.2013.<br> However, the firm vide letter dated 17.10.2019 requested for revision of ad-hoc norms. The firm stated that<br>they have not requested DGFT to amend the UOM as No for the items which have UOM as “SET”. Based on their<br>requirement, they have only provided the break up details. The firm has further stated that the quantity of material they<br>have imported in terms of “NO” is same as that they have declared to DGFT earlier. Now, they have requested to revise<br>the Unit of Measurement (UoM).<br>The Committee reconsidered the case and noted that the firm’s representation was referred to DHI on 21.11.2019 and<br>again on 06.01.2020. However, no comments have been received yet. Therefore, the Committee decided to wait for the<br>comments .<br>Case is deferred.<br>----- End of picture text -----<br>

However, the firm vide letter dated 17.10.2019 requested for revision of ad-hoc norms. The firm stated that they have not requested DGFT to amend the UOM as No for the items which have UOM as “SET”. Based on their requirement, they have only provided the break up details. The firm has further stated that the quantity of material they have imported in terms of “NO” is same as that they have declared to DGFT earlier. Now, they have requested to revise the Unit of Measurement (UoM).

The Committee reconsidered the case and noted that the firm’s representation was referred to DHI on 21.11.2019 and again on 06.01.2020. However, no comments have been received yet. Therefore, the Committee decided to wait for the comments .

Sl. No. 594

==> picture [484 x 222] intentionally omitted <==

----- Start of picture text -----<br> Case Number : 46/24/80-ALC2/2012<br>BHARAT HEAVY ELECTRICALS LIMITED Status :<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020<br>Lic. No.: 0410112044 dated.02.03.2011<br>HQ File No: 01/80/050/00819/AM10/ Subject: Request for revision of ad-hoc norms Deferred<br>RA.F.No.04/24/040/00290/AM10<br>Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting<br>No.07/80 dated 25.06.2013 as per written of DHI UO No. 3(23)/13-TSW(B)/89 dated 6.5.2013.<br> The firm vide letter dated 17.10.2019 requested for revision of ad-hoc norms. The firm stated that they have not<br>requested DGFT to amend the UOM as No for the items which have UOM as “SET”. Based on their requirement, they<br>have only provided the break up details. The firm has further stated that the quantity of material they have imported in<br>terms of “NO” is same as that they have declared to DGFT earlier. Now, they have requested to revise Unit of<br>Measurement (UoM).<br> The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by<br>DPIIT was sent to the firm on 14.01.2020. However, no reply has been received yet. Hence, the Committee decided to<br>wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

The firm vide letter dated 17.10.2019 requested for revision of ad-hoc norms. The firm stated that they have not requested DGFT to amend the UOM as No for the items which have UOM as “SET”. Based on their requirement, they have only provided the break up details. The firm has further stated that the quantity of material they have imported in terms of “NO” is same as that they have declared to DGFT earlier. Now, they have requested to revise Unit of Measurement (UoM).

The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 14.01.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

49 | P a g e

Sl. No. 595

Sl. No. 595
Case No.:43/23/80-ALC2/2016<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020<br>Lic. No. /date: 0210207219 Date: 21.12.2016 MINCO TECH (INDIA) PRIVATE<br>LIMITED<br>Status:
HQ. No.: 01/80/050/00546/AM17 **Subject:**Request for fixation of ad-hoc norms<br>Deferred
RLA No.: 02/24/040/00187/AM17
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in M. No.
9/80-ALC2/2017dated 01.08.2017 due to non-submission of reply of deficiency letter dated 22.03.2017 raised by
DIPP.
The firm vide letter dated 30.09.2019 has furnished the reply of deficiency letter and requested for fixation of ad-
hoc norms. The Committee reconsidered the case and noted that the firm’s representation was referred toDPIITon
06.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the
comments.
Case is deferred.

Sl. No. 596

Case No.:53/2/80-ALC2/2016<br>Status:
ALSTOM INDIA LIMITED<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
Lic. No. /date: 0310795652 Date: 30.04.2015
HQ. No.: 01/80/050/00056/AM17/<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred
RLA No.: 03/94/040/00060/AM16/
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in M. No.
20/80-ALC2/2016dated 03.01.2017 due to non-submission of reply of deficiency letter dated 24.10.2016 raised by
DHI.
The firm vide letter dated 28.09.2019 has furnished the reply of deficiency letter and requested for fixation of ad-
hoc norms. The Committee reconsidered the case and noted that the firm’s representation was referred toDHIon
06.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the
comments.
Case is deferred.

Sl. No. 597

Case No.:58/12/80-ALC2/2014 Status:
M. No.: 19/80-ALC2/2019 dated 15.01.2020 GEA ECOFLEX INDIA PVT.LTD.
Lic. No. /date: 3110064489 Date: 27.06.2014
HQ. No.: 01/80/050/00307/AM15/ **Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 31/83/040/00082/AM15
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in M. No.
3/80-ALC2/2015dated 12.05.2015 due to non-submission of reply of deficiency letter dated 07.10.2014.
The firm vide letter dated 02.11.2019 has furnished the reply and requested for fixation of ad-hoc norms. The
Committee reconsidered the case and noted that the firm’s representation was referred toDPIITon 06.01.2020.
However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

50 | P a g e

Sl. No. 598

Case No.:10/8/80-ALC2/2015<br>Status:
GEA ECOFLEX INDIA PVT. LTD.<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
Lic. No. /date: 0310795103 Date: 06.04.2015
HQ. No.: 01/80/050/00116/AM16<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred
RLA No.: 03/94/040/01169/AM15
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No.20/80-ALC2/2015dated 05.01.2016 due to non-submission of reply of deficiency letter dated 22.09.2015
raised by DIPP.
The firm vide letter dated 02.11.2019 has furnished the reply and requested for fixation of ad-hoc norms.
The Committee reconsidered the case and noted that the firm’s representation was referred toDPIITon
06.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the
comments.
Case is deferred.

Sl. No. 599

Case No.:39/22/80-ALC2/2014<br>Status:
GEA ECOFLEX INDIA PVT.LTD.<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
Lic. No. /date: 0310789333 Date: 17.09.2014
HQ. No.: 01/80/050/00520/AM15/<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred
RLA No.: 03/94/040/00580/AM15/
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in M. No.
10/80-ALC2/2015dated 17.08.2015 due to non-submission of reply of deficiency letter dated 20.03.2015 raised by
DIPP.
The firm vide letter dated 02.11.2019 has furnished the reply and requested for fixation of ad-hoc norms.
The Committee reconsidered the case and noted that the firm’s representation was referred toDPIITon
06.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the
comments.
Case is deferred.

Sl. No. 600

Case No.:20/19/80-ALC2/2014<br>Status:
GEA ECOFLEX INDIA PVT.LTD.<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
Lic. No. /date: 0310788788 Date: 05.09.2014
HQ. No.: 01/80/050/00454/AM15<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred
RLA No.: 03/94/040/00415/AM15
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No.4/80-ALC2/2015dated 26.05.2015 due to non-submission of reply of deficiency letter dated 09.02.2015 raised
by DIPP.
The firm vide letter dated 02.11.2019 has furnished the reply and requested for fixation of ad-hoc norms.
The Committee reconsidered the case and noted that the firm’s representation was referred toDPIITon
06.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the
comments.
Case is deferred.

51 | P a g e

Sl. No. 601

CaseNo.: 4/8/80-ALC2/2018<br>Status:
CHIRAG UDYOG<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
Lic.No. /date: 0510406909Date:19.06.2018
HQ. No.: 01/80/050/00127/AM19<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred
norms<br>RLA No.: 05/23/040/00141/AM19/
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in
M. No.10/80-ALC2/2019dated 11.09.2019 on the basis of inputs given by the Technical Authorities
present in the meeting.
The firm vide letter dated 21.10.2019 has requested for re-fixation of ad-hoc norms. The Committee
reconsidered the case and noted that the firm’s representation was referred toMSMEon 06.01.2020.
However, no comments have been received yet. Hence, the Committee decided to wait for the
comments.
Case is deferred.

Sl. No. 602

==> picture [476 x 72] intentionally omitted <==

----- Start of picture text -----<br> Case No.: 67/11/80-ALC2/2018 Status:<br>MASU BRAKE PADS PRIVATE<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020<br>LIMITED<br>Lic. No. /date: 0510408083 Date: 11.10.2018<br>HQ. No.: 01/80/050/00258/AM19 Subject: Request for fixation of ad-hoc Approved<br>RLA No.: 05/24/040/00394/AM19 norms<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 7/80-ALC2/2019 dated 17.07.2019 due to non-submission of reply of deficiency letter dated 26.03.2019 raised by Consultant (Tech-1).

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 7/80-ALC2/2019 dated 17.07.2019 due to non-submission of reply of deficiency letter dated 26.03.2019 raised by Consultant (Tech-1). However, the firm vide letter dated 10.09.2019 has furnished the reply and requested for fixation of adhoc norms. The Committee reconsidered the case and decided to ratify the ad-hoc norms as per written comments given by Consultant (Tech-1) as under: 1. The description of import item at Sl. No. 1 may be amended as “ HR Non Alloy Steel Block Plate” 2. The description of import item at Sl. No. 4 may be amended to be read as “ P. F. Resin ”. 3. Quantity of import item at Sl. No. 1 may be allowed with 1% wastage with accountability clause. 4. Quantity of rest of the import items may be allowed as 1.10 Kgs/Kg content in the export product. RA concerned may take further necessary action as per the decision of NC.

52 | P a g e

Sl. No. 603

==> picture [476 x 117] intentionally omitted <==

----- Start of picture text -----<br> Case No.: 11/11/80-ALC2/2018 Status:<br> 35/1/80-ALC2/2019<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020 ISGEC HITACHI ZOSEN LIMITED<br>Lic. No. /date: 0510407480 Date: 08.08.2018<br>0510409835 Date: 05.03.2019<br>HQ. No.: 01/80/050/00202/AM19/ Subject: Request for re-fixation of ad-hoc Deferred<br>01/80/050/00783/AM19 norms<br>RLA No.: 05/23/040/00216/AM19/<br>05/23/040/00526/AM19<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 3/80-ALC2/2019 dated 08.05.2019 as per written comments of DPIIT vide U. O. No.: P- 47011/84/2019-TSW dated 24.04.2019.

The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 7/80-ALC2/2019 dated 17.07.2019 as per written comments of DPIIT vide U.O. No.: P- 47011/98/2019-TSW dated 27.06.2019.

The firm vide letters dated 14.08.2019 & 20.09.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and noted that the firm’s representation was referred to DPIIT on 06.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Sl. No. 604

Case No.:13/11/80-ALC2/2018<br> 9/3/80-ALC2/2018<br>Status:
MICRON INSTRUMENTS PVT LTD<br>M.No.:19/80-ALC2/2019 dated15.01.2020
Lic. No. /date: 0510407381 Date: 31.07.2018<br> 0510405742 Date:28.02.2018
HQ. No.: 01/80/050/00204/AM19<br> 01/80/050/00009/AM19<br>**Subject:**Request for re-fixation of ad-hoc<br>norms<br>Deferred
RLA No.: 05/24/040/00265/AM19<br> 05/24/040/00599/AM18
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in
Meeting No.3/80-ALC2/2019dated 08.05.2019 as per written comments of DPIIT vide F. No.: P-
47011/85/2019-TSW dated 18.04.2019.
The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No.3/80-ALC2/2019dated 08.05.2019 as per written comments of DPIIT vide F. No.: P-
47011/85/2019-TSW dated 16.04.2019.
The firm vide letters dated 15.07.2019 has requested for re-fixation of ad-hoc norms. The
Committee reconsidered the case and noted that the firm’s representation was referred toDPIITon
06.01.2020. However, no comments have been received yet. Hence, the Committee decided to wait for
the comments.
Caseis deferred.

53 | P a g e

Sl. No. 605

Sl. No. 605
Case No.:331/15/80-ALC2/2018 Status:
MICRON INSTRUMENTS PVT LTD<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
Lic. No. /date: 0510409696 Date: 20.02.2019
HQ. No.: 01/80/050/00673/AM19<br>**Subject:**Request for re-fixation of ad-hoc Deferred
norms<br>RLA No.: 05/24/040/00668/AM19
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No.3/80-ALC2/2019dated 08.05.2019 as per written comments of DPIIT vide their F. No.: P-47011/17/2019-
TSW dated 16.04.2019.
The firm vide letter dated 06.06.2019 has requested for re-fixation of ad-hoc norms. The Committee
reconsidered the case and noted that the firm’s representation was referred toDPIITon 06.01.2020. However, no
comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 606

Sl. No. 606
Case No.:25/8/80-ALC2/2017 Status:
M. No.: 19/80-ALC2/2019 dated 15.01.2020 MICRON INSTRUMENTS PVT LTD
Lic. No. /date: 0510402472 Date: 05.05.2017
HQ. No.: 01/80/050/00169/AM18 **Subject:**Request for re-fixation of ad-hoc Deferred
RLA No.: 05/24/040/00056/AM18 norms
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No.14/80-ALC2/2017dated 10.10.2017 on the recommendation of DIPP letter no. 12/71/2017-TSW/81
dated10.10.2017.
The firm vide letter dated 24.06.2019 has requested for re-fixation of ad-hoc norms. The Committee
reconsidered the case and noted that the firm’s representation was referred toDPIITon 06.01.2020. However, no
comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 607

Sl. No. 607
Case No.:14/11/80-ALC2/2018 Status:
MICRON INSTRUMENTS PVT LTD<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020
Lic. No. /date: 0510407383 Date: 31.07.2018
HQ. No.: 01/80/050/00205/AM19<br>**Subject:**Request for re-fixation of ad-hoc Deferred
norms<br>RLA No.: 05/24/040/00263/AM19
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No.1/80-ALC2/2019dated 03.04.2019 on the recommendation of DPIIT vide their letter No. P-47011/17/2019-
TSW dated 20.02.2019.
The firm vide letter dated 15.07.2019 has requested for re-fixation of ad-hoc norms. The Committee
reconsidered the case and noted that the firm’s representation was referred toDPIITon 06.01.2020. However, no
comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

54 | P a g e

Sl. No. 608

CaseNo.: 20/9/80-ALC2/2017<br>CORNING TECHNOLOGIES INDIA<br>PVT. LTD.<br>Status:<br>M. No.: 19/80-ALC2/2019 dated 15.01.2020<br>Lic.No. /date: 0510403029Date: 05.06.2017
HQ. No.: 01/80/050/00198/AM18/<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred
norms<br>RLA No.: 05/23/040/00081/AM18/
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in
Meeting No.11/80-ALC2/2018dated 06.12.2018 as per the written comments of MeitY vide U. O. No.
17/ (18)/2017-IPHW dated 13.11.2018.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered
the case and decided to forward the firm’s representation toMeitYfor examination & comments.
Case is deferred.

Sl. No. 609

Sl. No. 609
CaseNo.: 25/14/80-ALC2/2018<br>M.No.:19/80-ALC2/2019 dated15.01.2020<br>Lic. No. /date: 0510386129 Date: 09.05.2014 SPIROTECH HEAT EXCHANGERS<br>PVT. LTD.<br>Status:
HQ.No.: 01/80/050/00341/AM19 **Subject:**Request for re-fixation of ad-hoc<br>Deferred
RLA No.: 05/24/040/00051/AM15/ norms
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in
Meeting No.14/80-ALC2/2018dated 20.02.2019 as per written comments of DPIIT vide F. No.: P-
47011/24/2019-TSW dated 20.02.2019.
The firm vide letter dated 22.04.2019 has requested for re-fixation of ad-hoc norms. The
Committee reconsidered the case and decided to forward the firm’s representation toDPIITfor
examination & comments.
Case is deferred.

55 | P a g e

==> picture [469 x 640] intentionally omitted <==

56 | P a g e

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied