← Archive
IN FORCE Advance Authorisation

DGFT Minutes

Reliability

In force — no superseding record on file.

Document text

1

MINUTES OF MEETING NO. 18/80 OF NORMS COMMITTEE- I (DES-I SECTION) DATED 02.01.2020 Meeting No. 18/20 of the Norms Committee (NC-I) for the licensing year 2019-2020 held on 02.01.2020 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: - Sl. No. Name of the representatives & their Designation Department 1. Shri S. K. Jain, D. O. DPIIT 2. Shri B. C. Nayak, D. O. DHI 3. Shri Shaish Kumar, (Tech-1) Consultant 4. Shri V.C. Agarwal, (Tech-3) Consultant 5. Shri K.V. Tirumala, Deputy DGFT DGFT 6. Shri Pranav Upadhyay, Assistant Director ISS DGFT

Note:

  1. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.

  2. Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.

  3. All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail address- nc1.dgft@nic.in.

ts as per wastage norms approved or as applied whichever is less.

  1. All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail address- nc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.

  2. For all the Manual cases, the concerned RA should check the composition fees paid by the firm.

  3. Minutes of Meeting 16/20 dated 04.12.2019 were circulated on 27.12.2019 respectively, to all the members of the Committee and the comments, there upon received, were incorporated in the Minutes. The said minutes were unanimously approved.

2

MEETING NUMBER: 18/80-ALC2/2019 MEETING DATE: 02.01.2020

1

Case No.:78/6/83-

ALC1/2015
Party Name: ECOCAT INDIA PVT.LTD. Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/83/050/00408/AM16/
RLA File :05/23/040/00078/AM16/
Lic.No/Date:0510394421 03.06.2015 Deferred Decision: The Committee considered the case as per the agenda and noted that the comments for import items at No. Sl. 1 to 4 was already given by MSME and the case was again referred to MSME on 26.12.2019 for comments on import items at Sl. No. 5 & 6. However, no comments have been received yet. Hence, the Committee decided to wait for comments.

Case is deferred.

2

Case No.:5/15/80-

ALC2/2018
Party Name: AZAD ENGINEERING PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00347/AM19/
RLA File :09/24/040/00679/AM16/
Lic.No/Date:0910063260 12.02.2016 Deferred Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm &RA, Hyderabad and in this regard a letter was sent to the firm &RA, Hyderabad on 29.07.2019 followed by reminders on 06.11.2019& 26.12.2019. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

3

Case No.:186/15/80-

ALC2/2018
Party Name: TEMPCO TEMPERATURE MEASUREMENT PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00528/AM19/
RLA File :07/24/040/00157/AM17/
Lic.No/Date:0710110332 29.08.2016 Deferred Decision: The Committee considered the case as per the agenda and noted that the copy of application was sent to MeitY for examination of the case on 22.08.2019 & 16.09.2019 followed by reminder on 04.11.2019 & 26.12.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

3

4

Case No.:404/15/80-

ALC2/2018
Party Name: OSWAL PUMPS LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00746/AM19/
RLA File :33/24/040/00007/AM17/
Lic.No/Date:3310030377 03.03.2017 Deferred Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 26.12.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

5

Case No.:94/15/80-

ALC2/2018
Party Name: MODEL INFRA CORPORATION PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00436/AM19/
RLA File :07/24/040/00085/AM18/
Lic.No/Date:0710111766 16.06.2017 Deferred Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

6

Case No.:108/15/80-

ALC2/2018
Party Name: DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00450/AM19/
RLA File :05/23/040/00116/AM18/
Lic.No/Date:0510403207 22.06.2017 Deferred seeking certain information as raised by DHI was sent to the firm on 04.10.2019 followed by a reminder on 22.11.2019. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

7

Case No.:3/18/80-ALC2/2019 Party Name: INTERPUMP

HYDRAULICS INDIA PVT LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00248/AM20/
RLA File :04/24/040/00094/AM18/
Lic.No/Date:0410163413 10.08.2017 Deferred application has not yet been received from RA, Chennai & the firm. Therefore, the Committee decided to request from RA, Chennai and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

4

8

Case No.:405/15/80-

ALC2/2018
Party Name: OSWAL PUMPS LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00747/AM19/
RLA File :33/24/040/00007/AM18/
Lic.No/Date:3310030410 01.11.2017 Deferred was sent to DPIIT on 26.12.2019for examination of the case. However, no comments have been

Case is deferred.

9

Case No.:394/15/80-

ALC2/2018
Party Name: TRIVENI HI- TECH PVT.LTD. Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00736/AM19/
RLA File :07/24/040/00368/AM18/
Lic.No/Date:0710113046 04.04.2018 Deferred Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 11.12.2019for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

10

Case No.:121/15/80-

ALC2/2018
Party Name: ZTT INDIA PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00463/AM19/
RLA File :04/24/040/00009/AM19/
Lic.No/Date:0410164238 23.04.2018 Deferred Decision: The Committee considered the case as per the agenda and noted that a reply from the firm has been received on 01.01.2020. Therefore the committee decided to refer the firm’s reply toMeitYfor examination of the case.

Case is deferred.

11

Case No.:122/15/80-

ALC2/2018
Party Name: SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00464/AM19/
RLA File :05/24/040/00047/AM19/
Lic.No/Date:0510406269 27.04.2018 Deferred seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 19.11.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.

Case is deferred.

5

12

Case No.:11/6/80-ALC2/2019 Party Name: SMC

PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00082/AM20/
RLA File :05/24/040/00233/AM19/
Lic.No/Date:0510407270 23.07.2018 Deferred Decision: The Committee considered the case as per the agenda and decided to refer the firm’s reply to Consultant (Tech-3) for examination of the case.

Case is deferred.

13 Case No.: 3/12/80-ALC2/2018
Party Name: BIRLA PRECISION TECHNOLOGIES LTD. Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00276/AM19/ RLA File :03/94/040/00599/AM19/
Lic.No/Date:0310824314 09.10.2018 Deferred Decision: The Committee considered the case as per the agenda and the firm’s representative explained the case before Norms Committee. The Committee directed to the representatives to furnish the following information:

  1. Specific item of export wherever description of export item generic or non-specific.
  2. Drawing of the export product vis-à-vis drawing of the blank for round products, if number of sizes of export product is high, information can be provided any of 4-5 sizes.
  3. Drawing of the export product vis-à-vis drawing of the sheet for flat products, if number of

Case is deferred.

14

Case No.:4/12/80-ALC2/2018 Party Name: BIRLA

PRECISION TECHNOLOGIES LTD., Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00277/AM19/
RLA File :03/94/040/00600/AM19/
Lic.No/Date:0310824317 09.10.2018 Deferred Decision: The Committee considered the case as per the agenda and the firm’s representative explained the case before Norms Committee. The Committee directed to the representatives to furnish the following information:

  1. Specific item of export wherever description of export item generic or non-specific.
  2. Drawing of the export product vis-à-vis drawing of the blank for round products, if number of
  3. Drawing of the export product vis-à-vis drawing of the sheet for flat products, if number of

Case is deferred.

6

15

Case No.:5/12/80-ALC2/2018 Party Name: BIRLA

PRECISION TECHNOLOGIES LTD., Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00278/AM19/
RLA File :03/94/040/00598/AM19/
Lic.No/Date:0310824375 11.10.2018 Deferred Decision: The Committee considered the case as per the agenda and the firm’s representative explained the case before Norms Committee. The Committee directed to the representatives to furnish the following information:

  1. Specific item of export wherever description of export item generic or non-specific.
  2. Drawing of the export product vis-à-vis drawing of the blank for round products, if number of
  3. Drawing of the export product vis-à-vis drawing of the sheet for flat products, if number of

Case is deferred.

16

Case No.:12/12/80-

ALC2/2018
Party Name: BIRLA PRECISION TECHNOLOGIES LTD., Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00285/AM19/
RLA File :03/94/040/00597/AM19/
Lic.No/Date:0310824374 11.10.2018 Deferred Decision: The Committee considered the case as per the agenda and the firm’s representative explained the case before Norms Committee. The Committee directed to the representatives to furnish the following information:

  1. Specific item of export wherever description of export item generic or non-specific.
  2. Drawing of the export product vis-à-vis drawing of the blank for round products, if number of
  3. Drawing of the export product vis-à-vis drawing of the sheet for flat products, if number of

Case is deferred.

17

Case No.:22/12/80-

ALC2/2018
Party Name: CPS OIL & GAS EQUIPMENTS PVT LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00295/AM19/
RLA File :03/94/040/00630/AM19/
Lic.No/Date:0310824383 11.10.2018 Deferred was sent to MSME on 18.12.2019for examination of the case. However, no comments have been

Case is deferred.

7

18

Case No.:1/12/80-ALC2/2018 Party Name: JAICO

ENTERPRISE LLP Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00274/AM19/
RLA File :03/94/040/00612/AM19/
Lic.No/Date:0310824420 12.10.2018 Deferred application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 09.05.2019 followed by reminders on 07.06.2019, 24.07.2019,05.09.2019& 02.01.2020. However, no information has been received so far. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

19

Case No.:23/12/80-

ALC2/2018
Party Name: GENERAL INSTRUMENTS CONSORTIUM SOLE PROP.KULKARNI Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00296/AM19/
RLA File :03/94/040/00640/AM19/
Lic.No/Date:0310824478 16.10.2018 Deferred application has not yet been received from the firm &RA, Mumbai and in this regard a letter was sent to the firm &RA, Mumbai on 09.05.2019 followed by reminders on 24.07.2019 & 06.11.2019. However, no information has been received so far. Therefore, the Committee decided to remind RA, Mumbai& the firm, again, for submitting the complete set of application.

Case is deferred.

20

Case No.:267/15/80-

ALC2/2018
Party Name: LARSEN & TOUBRO LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00609/AM19/
RLA File :03/95/040/00583/AM19/
Lic.No/Date:0310825583 11.12.2018 Deferred application has not yet been received from the firm &RA, Mumbai and in this regard a letter was sent to the firm &RA, Mumbai on 29.07.2019 followed by a reminder on 06.11.2019. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Mumbai& the firm for submitting the complete set of application.

Case is deferred.

8

21

Case No.:268/15/80-

ALC2/2018
Party Name: LARSEN & TOUBRO LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00610/AM19/
RLA File :03/95/040/00579/AM19/
Lic.No/Date:0310825584 11.12.2018 Withdrawn seeking certain information as raised by DPIIT was sent to the firm on 29.11.2019. However, in their reply the firm is stating that the Advance authorization is issued on self ratification basis since the ratification of norms is not required in the subject authorization. Hence, the Committee decided to withdraw the case from the online agenda.

Case is deferred.

22

Case No.:269/15/80-

ALC2/2018
Party Name: LARSEN &TOUBRO LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00611/AM19/
RLA File :03/95/040/00585/AM19/
Lic.No/Date:0310825585 11.12.2018 Deferred seeking certain information as raised by DHI was sent to the firm on 04.11.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.

Case is deferred.

23

Case No.:276/15/80-

ALC2/2018
Party Name: BIRLA FURUKAWA FIBRE OPTICS LIMITED, Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00618/AM19/
RLA File :03/94/040/00758/AM19/
Lic.No/Date:0310825749 18.12.2018 Deferred seeking certain information as raised by MeitY was sent to the firm on 27.09.2019 followed by a reminder on 19.11.2019. However, no reply has been received yet. Therefore, the Committee decided to remind again the firm for furnishing the requisite information within 15 days.
Case is deferred.

24

Case No.:14/6/80-ALC2/2019 Party Name: IND-SPHINX

PRECISION LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00085/AM20/
RLA File :22/24/040/00069/AM19/
Lic.No/Date:2210016034 18.12.2018 Deferred seeking certain information as raised by MSME was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. Case is deferred.

9

25

Case No.:20/14/80-

ALC2/2018
Party Name: ULTRA ENGINEERS Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00336/AM19/
RLA File :31/83/040/00150/AM19/
Lic.No/Date:3110067260 19.12.2018 Deferred Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per advice of representative of DHI:

  1. To provide Appendix 4K.

Case is deferred.

26

Case No.:7/14/80-ALC2/2018 Party Name: ROTZLER

SERVICES PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00323/AM19/
RLA File :07/24/040/00236/AM19/
Lic.No/Date:0710114403 16.01.2019 Deferred was sent to MSME on 07.10.2019for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

27

Case No.:300/15/80-

ALC2/2018
Party Name: DILIGENT SCM SOLUTIONS PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00642/AM19/
RLA File :09/24/040/00487/AM19/
Lic.No/Date:0910067093 18.01.2019 Deferred was sent to MSME on 01.01.2020 for examination of the case. However, no comments have been

Case is deferred.

28

Case No.:313/15/80-

ALC2/2018
Party Name: OMEGA ICEHILL PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00655/AM19/
RLA File :05/24/040/00627/AM19/
Lic.No/Date:0510409545 31.01.2019 Deferred seeking certain information as raised by DPIIT was sent to the firm on 19.11.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information.

Case is deferred.

10

29 Case No.: 15/6/80-ALC2/2019
Party Name: BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00086/AM20/
RLA File :11/24/040/00024/AM19/
Lic.No/Date:1110028485 04.02.2019 Deferred seeking certain information as raised by DHI was sent to the firm on 04.10.2019 followed by a reminder on 19.11.2019. However, no reply has been received from the firm, the Committee decided to wait for reply of the firm.

Case is deferred.

30

Case No.:310/15/80-

ALC2/2018
Party Name: TERUMO PENPOL PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00652/AM19/
RLA File :53/24/040/00013/AM19/
Lic.No/Date:5310019913 05.02.2019 Deferred seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 21.08.2019 followed by a reminder on 04.11.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information.

Case is deferred.

31 Case No.: 6/1/80-ALC2/2019
Party Name: APAR INDUSTRIES LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00754/AM19/
RLA File :03/94/040/00999/AM19/
Lic.No/Date:0310827307 26.02.2019 Deferred Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per written comments of MeitY vide letter. No.: 17(23)/2019- IPHW dated 05.12.2019:

  1. Details of export product i.e. design, drawing etc.
  2. Quantity of import item required for manufacturing one unit of export product.
  3. Wastage claimed in manufacturing process.
  4. Justification of wastage.

Case is deferred.

11

32

Case No.:8/1/80-ALC2/2019 Party Name: DAGGER

MASTER TOOL INDUSTRIES LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00756/AM19/
RLA File :03/94/040/01048/AM19/
Lic.No/Date:0310827404 01.03.2019 Deferred seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 22.07.2019 followed by reminders on 04.10.2019& 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.

Case is deferred.

33

Case No.:44/1/80-ALC2/2019 Party Name: COFLE

TAYLOR INDIA CONTROL CABLES & SYSTEMS PRIVAT Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00792/AM19/
RLA File :04/24/040/00266/AM19/
Lic.No/Date:0410165321 14.03.2019 Deferred was sent to MSME for examination of the case on 17.05.2019 followed by I.D. reminders on 22.07.2019 & 05.11.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.

Case is deferred.

34

Case No.:12/2/80-ALC2/2019 Party Name: VICTORA

AUTO PVT. LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00805/AM19/
RLA File :05/24/040/00738/AM19/
Lic.No/Date:0510410085 28.03.2019 Deferred seeking certain information as raised by MSME was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. Case is deferred.

35 Case No.: 3/2/80-ALC2/2019
Party Name: AUTOCOMP CORPORATION PANSE PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00003/AM20/
RLA File :31/83/040/00298/AM19/
Lic.No/Date:3110067366 02.04.2019 Deferred Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per advice of representative of DHI:

  1. Calculation of the requirement of raw material supported by dimensional engineering drawing.
  2. Sheet lay out plan with dimensions indicating the wastage. Case is deferred.

12

36

Case No.:1/4/80-ALC2/2019 Party Name: STERLITE

POWER TRANSMISSION LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00016/AM20/
RLA File :03/95/040/00051/AM20/
Lic.No/Date:0310828571 24.04.2019 Deferred Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MeitY for examination of the case on 31.10.2019 followed by a reminder on 26.12.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

37

Case No.:2/4/80-ALC2/2019 Party Name: SULZER INDIA

PRIVATE LIMITED. Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00017/AM20/
RLA File :31/83/040/00009/AM20/
Lic.No/Date:3110067390 24.04.2019 Deferred seeking certain information as raised by DPIIT was sent to the firm on 22.07.2019 followed by reminders on 04.10.2019& 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

38

Case No.:3/4/80-ALC2/2019 Party Name: SULZER INDIA

PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00018/AM20/
RLA File :31/83/040/00010/AM20/
Lic.No/Date:3110067391 24.04.2019 Deferred seeking certain information as raised by DPIIT was sent to the firm on 22.07.2019 followed by reminders on 04.10.2019& 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.

39 Case No.: 4/4/80-ALC2/2019
Party Name: SULZER INDIA PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00019/AM20/
RLA File :31/83/040/00011/AM20/
Lic.No/Date:3110067392 24.04.2019 Deferred seeking certain information as raised by DPIIT was sent to the firm on 23.07.2019 followed by reminders on 04.10.2019& 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.

13

40

Case No.:5/4/80-ALC2/2019 Party Name: VICTORA

AUTO PVT. LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00020/AM20/
RLA File :05/24/040/00033/AM20/
Lic.No/Date:0510410376 25.04.2019 Deferred seeking certain information as raised by MSME was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

41

Case No.:7/4/80-ALC2/2019 Party Name: SHIVALIK

BIMETAL CONTROLS LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00022/AM20/
RLA File :05/24/040/00016/AM20/
Lic.No/Date:0510410395 26.04.2019 Deferred Decision: The Committee considered the case as per the agenda and noted that the copy of application was sent to MSME for examination of the case on 10.06.2019 followed by I.D. reminders on 22.07.2019 & 05.11.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.

Case is deferred.

42

Case No.:9/4/80-ALC2/2019 Party Name: ERBATECH

MACHINERY P LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00024/AM20/
RLA File :32/24/040/00004/AM20/
Lic.No/Date:3210078932 29.04.2019 Deferred was sent to DHI on 18.12.2019 for examination of the case. However, the representative of DHI informed in the meeting that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

43 Case No.: 12/4/80-ALC2/2019
Party Name: FREEDOM OPTHALMIC PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00027/AM20/ RLA File :04/24/040/00018/AM20/
Lic.No/Date:0410165526 30.04.2019 Deferred Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-1) on 18.12.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

14

44

Case No.:13/4/80-ALC2/2019 Party Name: SRI RAM

INDUSTRIES Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00028/AM20/
RLA File :04/24/040/00157/AM19/
Lic.No/Date:0410165532 01.05.2019 Deferred seeking certain information as raised by DHI was sent to the firm on 04.10.2019 followed by a reminder on 19.11.2019. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

45

Case No.:14/4/80-ALC2/2019 Party Name: KINECO

KAMAN COMPOSITES - INDIA PVT LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00029/AM20/
RLA File :03/94/040/01131/AM19/
Lic.No/Date:0310828702 01.05.2019 Deferred Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per written comments of DPIIT vide U. O. No.: P- 47011/193/2019-TSW dated 23.12.2019:

  1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
  2. Assembly drawings/diagrams of the resultant product showing placement and exact use of components in the export product (s).
  3. Bifurcated quantities of components to be accounted for in the resultant product and the requirement of components as spares. Raw Material / Consumables.
  4. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
  5. Details of import item (description has been indicated in code-numbers for some items) and their specific use in the export items.
  6. Basis/Justification for the quantities of import items. Case is deferred.

46

Case No.:15/4/80-ALC2/2019 Party Name: CHIRAG

UDYOG Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00030/AM20/
RLA File :05/23/040/00054/AM20/
Lic.No/Date:0510410451 02.05.2019 Deferred seeking certain information as raised by MSME was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. Case is deferred.

15

47

Case No.:16/4/80-ALC2/2019 Party Name: BLISS ANAND

PVT.LTD. Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00031/AM20/
RLA File :05/23/040/00051/AM20/
Lic.No/Date:0510410480 03.05.2019 Deferred was sent to MSME for examination of the case on 03.06.2019 followed by I.D. reminders on 22.07.2019 & 05.11.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.

Case is deferred.

48

Case No.:21/4/80-ALC2/2019 Party Name: MASU BRAKE

PADS PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00036/AM20/
RLA File :05/24/040/00057/AM20/
Lic.No/Date:0510410488 06.05.2019 Deferred Decision: The Committee considered the case as per the agenda and noted that firm’s reply was sent to Consultant (Tech 1) on 03.12.2019. However, in the meeting Consultant (Tech 1) informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.

49

Case No.:19/4/80-ALC2/2019 Party Name: VICTORA

AUTO PVT. LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00034/AM20/
RLA File :05/24/040/00762/AM19/
Lic.No/Date:0510410518 08.05.2019 Deferred seeking certain information as raised by MSME was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

50

Case No.:18/4/80-ALC2/2019 Party Name: DILIGENT SCM

SOLUTIONS PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00033/AM20/
RLA File :09/24/040/00058/AM20/
Lic.No/Date:0910067492 10.05.2019 Deferred seeking certain information as raised by MSME was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

16

51

Case No.:28/5/80-ALC2/2019 Party Name: SHIRODKAR

PRECI COMP PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00066/AM20/
RLA File :31/83/040/00028/AM20/
Lic.No/Date:3110067433 29.05.2019 Deferred seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 04.10.2019 & 19.11.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.

Case is deferred.

52

Case No.:29/5/80-ALC2/2019 Party Name: SHIRODKAR

PRECI COMP PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00067/AM20/
RLA File :31/83/040/00027/AM20/
Lic.No/Date:3110067434 29.05.2019 Deferred seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 04.10.2019 & 19.11.2019. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.

Case is deferred.

53

Case No.:30/5/80-ALC2/2019 Party Name: TIAGO CHEM

Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00068/AM20/
RLA File :34/24/040/00075/AM20/
Lic.No/Date:3410045178 30.05.2019 Deferred application has not yet been received from the firm &RA, Vadodara and in this regard a letter was sent to the firm &RA, Vadodara on 26.07.2019 followed by a reminder on 06.11.2019. However, no information has been received so far. Therefore, the Committee decided to remind RA, Vadodara& the firm for submitting the complete set of application.
Case is deferred.

54

Case No.:32/5/80-ALC2/2019 Party Name: FUTURE TECH

ENGINEERING PVT.LTD, Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00070/AM20/
RLA File :07/24/040/00050/AM20/
Lic.No/Date:0710115000 31.05.2019 Deferred was sent to MSME for examination of the case on 13.08.2019 followed by a reminder on 05.11.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.
Case is deferred.

17

55

Case No.:33/5/80-ALC2/2019 Party Name: GRAND PRIX

ENGINEERING PVT.LTD. Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00071/AM20/
RLA File :05/23/040/00096/AM20/
Lic.No/Date:0510410791 03.06.2019 Deferred was sent to MSME for examination of the case on 03.07.2019 followed by I.D. reminders on 23.08.2019& 26.12.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

56

Case No.:1/6/80-ALC2/2019 Party Name: SHIVALIK

BIMETAL CONTROLS LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00072/AM20/
RLA File :05/24/040/00129/AM20/
Lic.No/Date:0510410810 04.06.2019 Deferred was sent to MSME on 24.12.2019for examination of the case. However, no comments have been

Case is deferred.

57

Case No.:2/6/80-ALC2/2019 Party Name: LAXMI

DENTAL EXPORT PVT. LTD. Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00073/AM20/
RLA File :03/95/040/00207/AM20/
Lic.No/Date:0310829403 04.06.2019 Deferred seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

58

Case No.:4/6/80-ALC2/2019 Party Name: MAGNA

AUTOMOTIVE INDIA PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00075/AM20/
RLA File :04/24/040/00049/AM20/
Lic.No/Date:0410165680 06.06.2019 Deferred was sent to MSME for examination of the case on 30.07.2019 followed by a reminder on 05.11.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.

Case is deferred.

18

59

Case No.:5/6/80-ALC2/2019 Party Name: ERBATECH

MACHINERY PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00076/AM20/
RLA File :32/24/040/00017/AM20/
Lic.No/Date:3210078986 06.06.2019 Deferred seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 22.08.2019 followed by reminders on 04.11.2019& 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.

Case is deferred.

60

Case No.:6/6/80-ALC2/2019 Party Name: TEMA INDIA

LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00077/AM20/
RLA File :03/95/040/00221/AM20/
Lic.No/Date:0310829486 07.06.2019 Deferred seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

61

Case No.:7/6/80-ALC2/2019 Party Name: TEMA INDIA

LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00078/AM20/
RLA File :03/95/040/00206/AM20/
Lic.No/Date:0310829488 07.06.2019 Deferred seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

62

Case No.:10/6/80-ALC2/2019 Party Name: TEMA INDIA

LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00081/AM20/
RLA File :03/95/040/00229/AM20/
Lic.No/Date:0310829553 11.06.2019 Deferred seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

19

63

Case No.:12/6/80-ALC2/2019 Party Name: VICTORA

AUTO PVT. LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00083/AM20/
RLA File :05/24/040/00144/AM20/
Lic.No/Date:0510410880 11.06.2019 Deferred was sent to MSME for examination of the case on 31.07.2019 followed by a reminder on 05.11.2019. However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for expediting the comments.

Case is deferred.

64

Case No.:13/6/80-ALC2/2019 Party Name: VEELINE

MEDIA LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00084/AM20/
RLA File :02/24/040/00038/AM20/
Lic.No/Date:0210209240 11.06.2019 Deferred was sent to MSME for examination of the case on 14.08.2019 followed by a reminder on 26.12.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

65

Case No.:16/6/80-ALC2/2019 Party Name: TEMA INDIA

LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00087/AM20/
RLA File :03/95/040/00239/AM20/
Lic.No/Date:0310829596 12.06.2019 Deferred seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

66 Case No.: 17/6/80-ALC2/2019
Party Name: AVLIGHT AUTOMOTIVES LTD. Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00088/AM20/
RLA File :05/23/040/00062/AM20/
Lic.No/Date:0510410932 14.06.2019 Deferred Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 03.12.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

20

67

Case No.:18/6/80-ALC2/2019 Party Name: AVLIGHT

AUTOMOTIVES LTD. Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00089/AM20/
RLA File :05/23/040/00063/AM20/
Lic.No/Date:0510410933 14.06.2019 Deferred was sent to MSME on 03.12.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

68

Case No.:21/6/80-ALC2/2019 Party Name: ISGEC

HITACHI ZOSEN LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00092/AM20/
RLA File :05/23/040/00111/AM20/
Lic.No/Date:0510410946 14.06.2019 Deferred seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

69

Case No.:1/8/80-ALC2/2019 Party Name: MODEL INFRA

CORPORATION PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00113/AM20/
RLA File :07/24/040/00081/AM20/
Lic.No/Date:0710115134 05.07.2019 Deferred was sent to MSME on 11.12.2019 for examination of the case. However, no comments have been

Case is deferred.

70

Case No.:2/8/80-ALC2/2019 Party Name: KABY

PRECISION MACHINING PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00114/AM20/
RLA File :09/24/040/00176/AM20/
Lic.No/Date:0910067755 05.07.2019 Deferred Decision: The Committee considered the case as per the agenda and decided to refer the case to Consultant (Tech-3) for examination & comments.

Case is deferred.

21

71

Case No.:7/8/80-ALC2/2019 Party Name: MICRON

SPECMA (INDIA) PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00119/AM20/
RLA File :33/24/040/00015/AM20/
Lic.No/Date:3310030562 08.07.2019 Deferred application has not yet been received from the firm & RA, Panipat and in this regard a letter was sent to the firm & RA, Panipat on 23.08.2019 followed by a reminder on 06.11.2019. However, no information has been received so far. Therefore, the Committee decided to remind RA, Panipat & the firm for submitting the complete set of application.

Case is deferred.

72

Case No.:3/8/80-ALC2/2019 Party Name: ULTRA

ENGINEERS Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00115/AM20/
RLA File :31/83/040/00058/AM20/
Lic.No/Date:3110067470 10.07.2019 Deferred was sent to Consultant (Tech-3) on 26.12.2019 for examination of the case. However, Consultant (Tech-3) requested to send again a complete set of application. Hence, the Committee decided to wait for the comments.

Case is deferred.

73

Case No.:5/8/80-ALC2/2019 Party Name: VALEO INDIA

PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00117/AM20/
RLA File :04/24/040/00067/AM20/
Lic.No/Date:0410165826 12.07.2019 Deferred was sent to MSME for examination of the case on 05.08.2019 followed by a reminder on 26.12.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

74

Case No.:6/8/80-ALC2/2019 Party Name: DILIGENT SCM

SOLUTIONS PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00118/AM20/
RLA File :09/24/040/00199/AM20/
Lic.No/Date:0910067781 12.07.2019 Deferred seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 04.10.2019 followed by a reminder on 19.11.2019. However, no reply has been received yet. Therefore, the Committee decided to remind again the firm for furnishing the requisite information.
Case is deferred.

22

75 Case No.: 8/8/80-ALC2/2019
Party Name: AUTO TECH INDUSTRIES (INDIA) PVT. LTD. Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00120/AM20/
RLA File :04/24/040/00068/AM20/
Lic.No/Date:0410165827 15.07.2019 Deferred Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per advice of Consultant (Tech-3):

  1. Detail technical note on manufacturing process including the relevant flow sheet.
  2. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
  3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated.

ous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated. 4. Assembly drawings/diagrams of the resultant product showing placement and exact use of components in the export product (s). 5. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc. 6. Use of export product. 7. Quantity of import in numbers. 8. Drawing of item of import.

Case is deferred.

76

Case No.:9/8/80-ALC2/2019 Party Name: ANSTECH

Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00121/AM20/
RLA File :34/24/040/00127/AM20/
Lic.No/Date:3410045281 15.07.2019 Deferred application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 23.08.2019 followed by a reminder on 06.11.2019. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Vadodara & the firm for submitting the complete set of application.

Case is deferred.

23

77

Case No.:10/8/80-ALC2/2019 Party Name: ULTRA

ENGINEERS Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00122/AM20/
RLA File :31/83/040/00056/AM20/
Lic.No/Date:3110067477 17.07.2019 Deferred was sent to Consultant (Tech-3) on 26.12.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

78

Case No.:11/8/80-ALC2/2019 Party Name: APAR

INDUSTRIES LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00123/AM20/
RLA File :03/94/040/00303/AM20/
Lic.No/Date:0310830379 17.07.2019 Deferred was sent to MeitY on 26.11.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MeitY for expediting the comments.

Case is deferred.

79

Case No.:12/8/80-ALC2/2019 Party Name: ZOBELE INDIA

PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00124/AM20/
RLA File :03/95/040/00352/AM20/
Lic.No/Date:0310830415 18.07.2019 Deferred application has not yet been received from the firm &RA, Mumbai and in this regard a letter was sent to the firm &RA, Mumbai on 23.08.2019 followed by a reminder on 06.11.2019. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Mumbai& the firm for submitting the complete set of application.

Case is deferred.

80

Case No.:13/8/80-ALC2/2019 Party Name: HORIZON

CHUTES PVT LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00125/AM20/
RLA File :31/83/040/00064/AM20/
Lic.No/Date:3110067480 18.07.2019 Deferred application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 23.08.2019 followed by a reminder on 06.11.2019. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set of application.
Case is deferred.

24

81

Case No.:3/9/80-ALC2/2019 Party Name: DYNA FORCE

HYDRAULICS PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00128/AM20/
RLA File :31/83/040/00067/AM20/
Lic.No/Date:3110067484 25.07.2019 Deferred application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 14.10.2019 followed by a reminder on 06.11.2019. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set of application.

Case is deferred.

82

Case No.:1/10/80-ALC2/2019 Party Name: HANNING

MOTORS INDIA P LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00139/AM20/
RLA File :34/24/040/00138/AM20/
Lic.No/Date:3410045343 06.08.2019 Deferred was sent to MSME on 09.12.2019 for examination of the case. However, no comments have been

Case is deferred.

83

Case No.:2/10/80-ALC2/2019 Party Name: DOOWON

AUTOMOTIVE SYSTEMS INDIA PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00140/AM20/
RLA File :04/24/040/00079/AM20/
Lic.No/Date:0410165942 07.08.2019 Deferred application has not yet been received from the firm &RA, Chennai and in this regard a letter was sent to the firm &RA, Chennai on 14.10.2019 followed by a reminder on 06.11.2019. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Chennai& the firm for submitting the complete set of application.
Case is deferred.

84

Case No.:4/10/80-ALC2/2019 Party Name: HANNING

MOTORS INDIA P LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00142/AM20/
RLA File :34/24/040/00145/AM20/
Lic.No/Date:3410045361 08.08.2019 Deferred was sent to MSME on 09.12.2019 for examination of the case. However, no comments have been Case is deferred.

25

85

Case No.:5/10/80-ALC2/2019 Party Name: JKS

ENGINEERING Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00143/AM20/
RLA File :32/24/040/00033/AM20/
Lic.No/Date:3210079060 08.08.2019 Deferred application has not yet been received from the firm &RA, Coimbatore and in this regard a letter was sent to the firm &RA, Coimbatore on 11.10.2019 followed by a reminder on 06.11.2019. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Coimbatore& the firm for submitting the complete set of application.

Case is deferred.

86

Case No.:6/10/80-ALC2/2019 Party Name: LM WIND

POWER BLADES INDIA PVT. LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00144/AM20/
RLA File :34/24/040/00152/AM20/
Lic.No/Date:3410045365 09.08.2019 Deferred application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 14.10.2019 followed by a reminder on 06.11.2019. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Vadodara & the firm for submitting the complete set of application.

Case is deferred.

87

Case No.:7/10/80-ALC2/2019 Party Name: MAINI

PRECISION PRODUCTS LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00145/AM20/
RLA File :07/24/040/00106/AM20/
Lic.No/Date:0710115278 13.08.2019 Deferred seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. Case is deferred.

88

Case No.:8/10/80-ALC2/2019 Party Name: SHAKTI

PUMPS INDIA LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00146/AM20/
RLA File :56/24/040/00012/AM20/
Lic.No/Date:5610005668 13.08.2019 Deferred was sent to DPIIT on 26.12.2019 for examination of the case. However, no comments have been Case is deferred.

26

89

Case No.:10/10/80-

ALC2/2019
Party Name: SHAKTI PUMPS INDIA LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00148/AM20/
RLA File :56/24/040/00013/AM20/
Lic.No/Date:5610005671 19.08.2019 Deferred was sent to DPIIT on 26.12.2019 for examination of the case. However, no comments have been

Case is deferred.

90

Case No.:11/10/80-

ALC2/2019
Party Name: AVLIGHT AUTOMOTIVES PVT. LTD. Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00149/AM20/
RLA File :05/23/040/00164/AM20/
Lic.No/Date:0510411553 20.08.2019 Deferred Decision: The Committee considered the case as per the agenda and decided to refer the case to MSME for examination & comments.

Case is deferred.

91

Case No.:12/10/80-

ALC2/2019
Party Name: KINECO KAMAN COMPOSITES - INDIA PVT LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00150/AM20/
RLA File :03/94/040/00329/AM20/
Lic.No/Date:0310831081 20.08.2019 Deferred was sent to DPIIT for examination of the case on 09.12.2019. However, no comments have been

Case is deferred.

92

Case No.:13/10/80-

ALC2/2019
Party Name: CAPCO WATER SOLUTIONS PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00151/AM20/
RLA File :03/94/040/00273/AM20/
Lic.No/Date:0310831168 22.08.2019 Deferred was sent to MSME for examination of the case on 11.09.2019 followed by a reminder on 26.12.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

27

93

Case No.:14/10/80-

ALC2/2019
Party Name: PENGUIN PETROLEUM SERVICES PVT.LTD, Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00152/AM20/
RLA File :03/95/040/00505/AM20/
Lic.No/Date:0310831190 23.08.2019 Withdrawn Decision: The Committee considered the case as per the agenda and noted that the case was already considered in M. No. 14/80 dated 06.11.2019. Therefore, the Committee decided to withdraw the case from the agenda.

Case is withdrawn.

94

Case No.:15/10/80-

ALC2/2019
Party Name: LM WIND POWER BLADES INDIA PVT. LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00153/AM20/
RLA File :34/24/040/00164/AM20/
Lic.No/Date:3410045391 23.08.2019 Deferred application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 11.10.2019 followed by a reminder on 06.11.2019. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Vadodara & the firm for submitting the complete set of application.

Case is deferred.

95

Case No.:16/10/80-

ALC2/2019
Party Name: LARSEN & TOUBRO LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00154/AM20/
RLA File :03/95/040/00393/AM20/
Lic.No/Date:0310831221 26.08.2019 Withdrawn Decision: The Committee considered the case as per the agenda and noted that the above AA has been obtained under AEO status. Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, Mumbai.

Case is withdrawn.

96

Case No.:17/10/80-

ALC2/2019
Party Name: MAGNETI MARELLI TALBROS CHASSIS SYSTEMS PRIVATE LI Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00155/AM20/ RLA File :05/24/040/00304/AM20/
Lic.No/Date:0510411630 26.08.2019 Approved Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on Net to Net basis without any wastage on the recommendation of representative of DHI.

RA concerned may take further necessary action as per the decision of NC.

28

97

Case No.:18/10/80-

ALC2/2019
Party Name: DECON INDIA PLASTICS PVT LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00156/AM20/
RLA File :31/83/040/00079/AM20/
Lic.No/Date:3110067515 26.08.2019 Deferred application has not yet been received from the firm &RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 11.10.2019 followed by a reminder on 06.11.2019. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set of application.

Case is deferred.

98

Case No.:19/10/80-

ALC2/2019
Party Name: DILIGENT SCM SOLUTIONS PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00157/AM20/
RLA File :09/24/040/00272/AM20/
Lic.No/Date:0910067939 27.08.2019 Deferred was sent to MSME for examination of the case on 18.09.2019 followed by a reminder on 22.11.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

99

Case No.:20/10/80-

ALC2/2019
Party Name: OSWAL PUMPS LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00158/AM20/
RLA File :33/24/040/00017/AM20/
Lic.No/Date:3310030578 27.08.2019 Deferred was sent to DPIIT on 26.12.2019 for examination of the case. However, no comments have been

Case is deferred.

100

Case No.:21/10/80-

ALC2/2019
Party Name: AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00159/AM20/
RLA File :04/24/040/00091/AM20/
Lic.No/Date:0410166015 28.08.2019 Deferred Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per advice of representative of DHI:

  1. Detail technical note on manufacturing process including the relevant flow sheet.
  2. Weight of each Export Product.

29

  1. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
  2. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
  3. Details of similar AA ratified if any.

Case is deferred.

101

Case No.:22/10/80-

ALC2/2019
Party Name: ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00160/AM20/
RLA File :05/23/040/00208/AM20/
Lic.No/Date:0510411660 28.08.2019 Deferred seeking certain information as raised by DHI was sent to the firm on 26.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

102

Case No.:1/12/80-

ALC2/2019
Party Name: AYYAPPA CNC PVT LTD Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00173/AM20/
RLA File :07/24/040/00135/AM20/
Lic.No/Date:0710115448 18.09.2019 Deferred was sent to MSME on 26.11.2019 for examination of the case. However, no comments have been

Case is deferred.

103

Case No.:2/12/80-

ALC2/2019
Party Name: HEURTEY PETROCHEM INDIA PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00174/AM20/
RLA File :34/24/040/00185/AM20/
Lic.No/Date:3410045459 19.09.2019 Deferred Decision: The Committee considered the case as per the agenda and decided to refer the case to DPIIT for examination & comments as per advice of representative of DHI.

Case is deferred.

30

104

Case No.:3/12/80-

ALC2/2019
Party Name: FINE PAC STRUCTURES PRIVATE LIMITED Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00175/AM20/
RLA File :31/83/040/00088/AM20/
Lic.No/Date:3110067537 20.09.2019 Deferred was sent to MSME for examination of the case on 21.10.2019 followed by a reminder on 26.12.2019. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

105

Case No.:4/12/80-

ALC2/2019
Party Name: FREUDENBERG FILTRATION TECHNOLOGIES INDIA PVT.LTD. Meet No/Date:18/80- ALC2/2019 02.01.2020 Status:
HQ File :01/80/050/00176/AM20/ RLA File : 31/83/040/00008/AM20/
Lic.No/Date:3110067543 24.09.2019 Deferred application has not yet been received from RA, Pune & the firm and in this regard an email was sent on 29.11.2019. However, no information has been received yet. Therefore, the Committee decided to remind RA, Pune & the firm for submitting the complete set of application.

Case is deferred.

106

Subject: Request for fixation of ad-

hoc norms Deferred RLA No.: 03/95/040/00052/AM18 Decision: The committee considered the case as per agenda and noted that the case was rejected in Meeting No. 6/80-ALC2/2018 dated 11.07.2018 as the parts of the import items given (unit of measurement) in sets and each set consist of how many numbers and their composition is not known.

However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and decided to ask from the firm to furnish the following information as per advice of representative of DHI:

  1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
  2. Weight of each Export Product.
  3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
  4. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc. 5. Sheet layout diagram of the material indicating the wastage during blanking. 6. Item number of consumables like paints, thinner & primers etc., their total value. 7. Raw material weight & finished weight of casting & forging proposed for import. 8. It is observed that both blading material, blade forging and finished blades are being imported.

54

The firm is requested to give import item number of all the above items weight their specific use and their placement in the turbine. 9. AA number of the similar export product & copy of NC decision.

Case is deferred.

Sl. No. 528

Case No. 13/5/80-ALC2/2017

Case No. 29/19/80-ALC2/2016

Case No. 8/14/80-ALC2/2018

M/s SENIOR INDIA PRIVATE LIMITED

Status: Adv. Lic. No. 0510402202 dated 12.04.2017
Adv. Lic. No. 0510399661 dated 08.09.2016
Adv. Lic. No. 0510409022 dated 20.12.2018 HQ. No. 01/80/050/00074/AM18 HQ. No. 01/80/050/00424/AM17 HQ. No. 01/80/050/00324/AM19

Subject: Request for re-fixation of ad-hoc

norms in respect of 3 AA issued to M/s SENIOR INDIA PRIVATE LIMITED, under Para 4.7 of HBP (Vol.-I) – reg. Deferred RLA No. 05/24/040/00012/AM18 RLA No. 05/24/040/00288/AM17 RLA No. 05/24/040/00435/AM19
Decision: The Committee considered the case as per the agenda noted that the above three cases were approved by NC in Meeting No. 8/80 dated 18.07.2017, Meeting No. 22/80 dated 31.01.2017 and Meeting No. 06/80 dated 03.07.2019 as per the written comments of DIPP letter no. 12/54/2017-TSW/105 dated 18.7.2017, written comments of DIPP vide UO No. 12/6/2017-TSW/56 dated 31.01.2017 and written comments of DPIIT vide U.O. No.: P-47011/416/2018-TSW dated 03.07.2019 respectively. However, the firm has requested for re-viewing of ad-hoc norms. The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 24.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. Case is deferred.

Sl. No. 529

Case No. : 24/17/80-ALC2/2014

M/s GEA BGR ENERGY SYSTEM INDIA LIMITED. Status: Lic. No.: 0410159425 Date: 16.09.2014 HQ. No.: 01/80/050/00396/AM15 norms Deferred RLA No.: 04/24/040/00154/AM15 Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 5/80-ALC2/2016 dated 08.06.2015 due to non submission reply of deficiency letter dated
14.11.2014 (raised by DHI). However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and noted that the firm’s representation was referred to DHI for examination of the case on 21.08.2019 followed by reminders on 18.10.2019 & 24.12.2019. The representative of DHI again requested for the complete set of firm’s representation. Therefore, the Committee decided to ask the firm to furnish complete set of application along with all relevant documents.
Case is deferred.

55

Sl. No. 530

Case No. : 12/7/80-ALC2/2016

M/s HONDA TRADING CORPORATION INDIA PVT. LTD. Status: Lic. No.: 0510398531 Date: 17.05.2016 HQ. No.: 01/80/050/00233/AM17 norms Deferred RLA No.: 05/23/040/00053/AM17 Meeting No. 11/80 dated 19.08.2017 due to non submission reply of deficiency letter dated 26.04.2017 (raised by DHI).

             However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered 

the case and decided to ask from the firm to furnish the following information as per advice of Consultant (Tech-3):

  1. To explain why the consumption per unit in past is 1.448 gm while requirement in present case is given as 0.384 gm per unit.
  2. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

Case is deferred.

Sl. No. 531

Case No. : 37/19/80 ALC2/2017

M/s GODREJ & BOYCE MFG. CO. LTD. Status: Lic. No.: 0310815644 dated 08.09.2017 HQ. No.: 01/80/050/00318/AM18

Subject: Request for re-fixation of ad-hoc

norms
Deferred RLA No.:03/94/040/00432/AM18 Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 4/80-ALC2/2018 dated 23.05.2018 on the recommendation of technical representatives of DHI, DIPP and MSME.

             However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered 

the case and noted that the firm’s representation was forwarded to DPIIT on 24.12.2019 for examination of the case. The representative of DPIIT again requested for the complete set of firm’s representation. Therefore, the Committee decided to forward the complete set of firm’s representation to DPIIT. Case is deferred.

56

Sl. No. 532

Case No. : 17/31/80-ALC2/2010

M/s BHARAT HEAVY ELECTRICALS LIMITED Status: Lic. No.: 0910043002 Date: 06.08.2010 HQ. No.: 01/80/050/00495/AM11 norms Deferred RLA No.: 09/24/040/00169/AM11 Meeting No. 40/80 dated 22.03.2011 due to non submission reply of deficiency letter as raised by DHI.

However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and decided to ask from the firm to furnish the following information as per advice of the representative of DHI:

  1. Weight of each Export Product.
  2. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
  3. Bifurcated quantities of components to be accounted for in the resultant product and the requirement of components as spares. Raw Material / Consumables.
  4. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
  5. Turbine, Generator, boiler feed pump are different items.

terials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc. 5. Turbine, Generator, boiler feed pump are different items. Items proposed for import to be given separately (Information about the inputs required per unit of the resultant product as per Sl. No. 1 of Appendix-11A appearing in current HBP (Vol. I) separately for each product.)
6. Specification of each item of export.
7. Input Weight of each casting/ forging and corresponding finished weight
8. Use of each item of import. 9. To provide clarification for as import of 35,000 liters of paint which it has claimed as component and also calculation of the requirement for item at Sl. No. 81). 10. To provide proper calculation of the raw material, as the calculations given for raw material have not been linked with drawing & their dimensions submitted. (Item at Sl. No. 12 to 15, 50, 51, 53 & 77 to 82).

Case is deferred.

Sl. No. 533

Case No. : 17/33/80-ALC2/2010

M/s BHARAT HEAVY ELECTRICALS LIMITED Status: Lic. No.: 0910043468 dated 09.09.2010 HQ. No.: 01/80/050/00573/AM11 norms Deferred RLA No.: 09/24/040/00223/AM11 Meeting No. 2/80 dated 19.04.2011 due to non submission reply of deficiency letter as raised by DHI.

             However, the firm has requested for fixation of ad-hoc norms. The Committee considered the 

case and decided to ask from the firm to furnish the following information as per advice of the representative of DHI:

57

  1. Details of associated Accessories along with individual weight & raw material & components required for each export items.
  2. Inputs weight of each casting / forging and corresponding finished weight.
  3. Length & weight of different types of pipes proposed for import separately.
  4. Use of each item of import.
  5. Weight of each Export Product.
  6. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
  7. Bifurcated quantities of components to be accounted for in the resultant product and the requirement of components as spares. Raw Material / Consumables.

ense, if any, may also be indicated. 7. Bifurcated quantities of components to be accounted for in the resultant product and the requirement of components as spares. Raw Material / Consumables. 8. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc. 9. Net weight & gross weight of item No. 76 of import.

Case is deferred.

Sl. No. 534

Case No. : 23/9/80ALC2/2012

M/s BHARAT HEAVY ELECTRICALS LIMITED Status: Lic. No.: 0910053032 dated 13.06.2012 HQ. No.: 01/80/050/00203/AM13

Subject: Request for re-fixation of ad-hoc

norms Deferred RLA No.: 09/24/040/00136/AM13 Decision: The Committee considered the case as per the agenda and noted that the case was withdrawn from the meeting owing to non receipt of comments from EPCG Division in Meeting No. 23/80 dated 16.02.2016.

             However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered 

the case and noted that the firm’s representation was referred to DHI on 18.10.2019 for examination of the case. However, the representative of DHI requested for the complete set of application with other relevant documents of the case. However, the representative of DHI requested for the complete set of application. Therefore, the Committee decided to ask from the firm to furnish the complete set of application for examination of the case.

Case is deferred.

Sl. No. 535

Case No. : 30/33/80-ALC2/2009

M/s BHARAT HEAVY ELECTRICALS LIMITED Status: Lic. No.: 0910039076 dated 27.08.2009 HQ. No.: 01/80/050/00496/AM10 norms Deferred RLA No.:09/24/040/00184/AM10 Meeting No. 48/80 dated 02.03.2010 due to non submission reply of the deficiency later as raised by DHI.

58

             However, the firm has requested for fixation of ad-hoc norms. The Committee considered the 

case and noted that the firm’s representation was referred to DHI on 07.10.2019 for examination of the case. However, the representative of DHI requested for the complete set of application. Therefore, the Committee decided to ask from the firm to furnish the complete set of application for examination of the case.

Case is deferred.

Sl. No. 536

Case No. : 23/17/80-ALC2/2014

M/s GEA BGR ENERGY SYSTEM INDIA LIMITED Status: Lic. No.: 0410159424 dated 16.09.2014 HQ. No.: 01/80/050/00395/AM15 norms Deferred RLA No.: 04/24/040/00155/AM15 Meeting No. 05/80 dated 08.06.2015due to non submission reply of deficiency letter dated 14.11.2014 (raised by DHI).

             However, the firm has requested for fixation of ad-hoc norms. The Committee considered the 

case and decided to ask from the firm to furnish the following information as per advice of the representative of DHI:

  1. List of import & export items.
  2. Copy of ANF- 4A along with complete set of application.

Case is deferred.

Sl. No. 537

Case No. : 1/33/85-ALC3/2008

M/s BOVING FOURESS LIMITED Status: Lic. No.: 0710061697 dated 15.12.2008 HQ. No.: 01/85/050/00218/AM09 norms Deferred RLA No.: 07/24/040/00524/AM09 Meeting No. 2/80 dated 13.04.2010 due to non submission reply of deficiency letter as raised by DHI.

             However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered 

the case and decided to ask from the firm to furnish the following information as per advice of the representative of DHI:

  1. Specific item of export with weight with rating & complete specification.
  2. Import quantity is not multiples of the export. Justification for the same.
  3. Weight of each Export Product.
  4. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
  5. Assembly drawings/diagrams of the resultant product showing placement and exact use of

uct and sought to be imported/procured from sources other than the license, if any, may also be indicated. 5. Assembly drawings/diagrams of the resultant product showing placement and exact use of

59

components in the export product (s). 6. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

Case is deferred.

Sl. No. 538

Case No. 2/17/80-ALC2/2017

M/s VEM TECHNOLOGIES PVT. LTD. Status: Lic. No.: 0910065045 Date: 15.05.2017 HQ. No.: 01/80/050/00281/AM18 norms Deferred RLA No.: 09/24/040/00055/AM18 Meeting No. 05/80 dated 06.06.2019 due to non submission reply of deficiency letter dated 14.01.2019as raised by DPIIT. However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and decided to ask from the firm to furnish the following information as per advice of Consultant (Tech-3):

  1. Copy of application.
  2. Copy of Advance Authorization.
  3. List of import & export items.
  4. The weight of each export item.
  5. Stage-wise wastage.

Case is deferred.

Sl. No. 539

Case No. 47/14/80-ALC2/2014

M/s ALSTOM TRANSPORT INDIA LIMITED Status: Lic. No. /date: 0710105249 dated 20.06.2014 HQ. No.: 01/80/050/00368/AM15 norms. Deferred RLA No.: 07/24/040/00092/AM15 Decision: In continuation to Meeting No. 12/80 dated 09.10.2019, the Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 11/80 dated 01.09.2015 due to non- submission reply of deficiency letter as raised by DHI.

Thereafter, the firm represented against the rejection and requested for a review. The case was again considered and deferred in Meeting no. 11/19 dated 06.12.2018 with following decision:

“The Committee noted that a personal hearing was already given to the firm on 06.12.2018. In the personal hearing the firm informed the committee that it has taken various AA’s for supply of 33 rail/tramway coaches. Further, firm stated that it has taken an additional license for supplementary material required for these very 33 rail/tramway coaches. However, it has an additional export obligation of another 33 rail/tramway coaches in this license. The Committee observed that the given submission is not tenable. The committee decided to seek a detailed report from the concerned RA regarding of all such licenses issued to the firm, admissibility and current status.”

hat the given submission is not tenable. The committee decided to seek a detailed report from the concerned RA regarding of all such licenses issued to the firm, admissibility and current status.”

60

             In response to Norm Committee’s e-mail dated 23.04.2019, Addl. DGFT Bangalore informed 

that firm has obtained several license, which are pending for the wants of norms and also informed about a letter from ECA-II, DGFT, New Delhi seeking information regarding alleged corrupt practices followed by M/s Alstom Transport India.

In this matter, the committee noted that the firm had approach the Policy Relaxation Committee (PRC) and the matter was taken up vide Meeting No. 17/AM20 held on 27.08.2019. The PRC noted the submissions by the firm as under:

“They have stated that initially, 7 Advance Authorizations were applied for duty free import of inputs required for the manufacture and supply of 33 Metro Train sets to Chennai Metro Rail Limited being a deemed export project. ATIL sought amendment in all 7 Advance Authorizations to include residual items that were required to manufacture the 33 Train sets but the request was rejected citing technical reasons by RA. Thereupon, ATIL was compelled to apply for additional Advance Authorization No.0710105249 dated 20.06.2014 for importing residual inputs that were missed out and not covered under earlier 7 Advance Authorizations.

was compelled to apply for additional Advance Authorization No.0710105249 dated 20.06.2014 for importing residual inputs that were missed out and not covered under earlier 7 Advance Authorizations. Acquisition of Alstom India limited who was the manufacturer of key sub-assemblies also lead to inclusion of components required for manufacture of sub-assemblies in the captioned Advance Authorization. However, while applying for the said Advance Authorization (8th AA), export obligation of 33 Metro Train sets was declared inadvertently, as the system did not allow the applicant to apply for a new license unless the export obligation was declared. In fact, there is no separate EO under the Advance Authorization No.0710105249 dated 20.06.2014 as all imported inputs were used for manufacture of 33 train sets declared under previous 7 Advance licenses. The Advance Authorization No.0710105249 dated 20.06.2014 under which parts required for manufacture of 33 Metro Trains have been imported has been issued after 22 months from the date of earliest Advance Authorization in the clubbing set. Hence, request is to treat the supplies of 33 Train sets to the Metro Project supplied against Advance Authorizations as one and to discharge the EO. “

The policy relaxation committee vide PRC Meeting No.

quest is to treat the supplies of 33 Train sets to the Metro Project supplied against Advance Authorizations as one and to discharge the EO. “

The policy relaxation committee vide PRC Meeting No. 17/AM20 dated 27.08.2019 gave the following decision in the matter:

“Decision: The Committee heard the submission made by the firm and discussed the matter at length and decided to relax the conditions as laid down in Para 4.38 (vi), (vii) and (xii) of HBP 2015-20 as amended vide Public Notice No.70/2015-20 dated 30.01.2019 for clubbing of eight Advance Authorizations No.(i)0710090351 dated 21.08.2012, (ii)0710090531 dated 31.08.2012, (iii)0710095554 dated 23.05.2013, (iv)0710096369 dated 02.07.2013, (v)0710096370 dated 02.07.2013, (vi)0710099232 dated 28.10.2013 and (vii)0710101246 dated 10.01.2014 and (viii) 0710105249 dated 20.06.2014. It is subject to verification that amendments request of the firm made in the AAs was rejected by the RA, as claimed by the firm and all inputs imported in the 8 AAs are fully accounted for in the supplies. The other terms and conditions for clubbing shall remain same as per policy/HBP provisions. The firm shall approach RA within 30 days from the date of uploading of the minutes of meeting.”

This Committee observed that the PRC has clubbed all the eight authorizations for imports and export purposes. Export obligation of AA No. 0710105249 dt. 20.06.2014 would remain as it is even after clubbing. Hence, the Committee in its Meeting No. 10/80 dated 11.09.2019, asked the firm to furnish following information:

of AA No. 0710105249 dt. 20.06.2014 would remain as it is even after clubbing. Hence, the Committee in its Meeting No. 10/80 dated 11.09.2019, asked the firm to furnish following information:

  1. To provide detailed statement to account for the inputs in the export products against this license.
  2. Relevant technical drawings and wastage details may be provided in relevant formats for examination by the technical authorities for the purpose of fixation of norms.

61

And also sought clarification from the PRC cell on 05.11.2019 regarding the export obligation of the eighth authorization if it would run concurrently with the export obligation of the first seven authorizations.

PRC in its meeting no. 23/AM20 dt. 03.12.2019, decided as follows:

“The committee reviewed the case and observed that request of the firm and minutes recorded in the earlier PRC decision were very clear. It reiterated that in view of the submission made by the firm, all the above 8 advance authorizations need to be clubbed for imports and exports purposes wherein export obligation of the 8th advance authorization no. 0710105249 dt. 20.06.2014 be treated as NIL as its EO is subsumed in the export obligation of the other 7 advance authorizations taken together. The firm shall approach RA within 30 days from the date of uploading of the minutes of meeting for clubbing.”

The Committee noted that the firm’s reply dated 06.11.2019 forwarded to DHI on 02.12.2019for examination of the case.

n 30 days from the date of uploading of the minutes of meeting for clubbing.”

The Committee noted that the firm’s reply dated 06.11.2019 forwarded to DHI on 02.12.2019for examination of the case. On the advice of representative of DHI, the Committee decided to ask from the firm to furnish the following information:

  1. Specific use of items imported under the eighth authorization vis a vis those imported under other seven authorizations.

Case is deferred.

Sl. No. 540

Case No. 57/17/80-ALC2/2015

M/s BIRLA FURUKAWA FIBRE OPTICS PRIVATE LIMITED

Status: Lic. No.: 1710006165 Date: 27.08.2015 HQ. No.: 01/80/050/00361/AM16 norms

Deferred RLA No.: 17/24/040/00043/AM16 Meeting No. 23/80 dated 16.02.2016 due to non submission reply of deficiency letter dated 02.02.2015 as raised by DEIT.

             However, the firm has requested for fixation of ad-hoc norms. The Committee considered the 

case and noted that the firm’s representation was referred to MeitYfor examination of the case on 09.10.2019 followed by an ID reminder on 02.12.2019. However, no comments have received yet. Therefore, the Committee decided to remind MeitY again for expediting the comments.

Case is deferred.

Sl. No. 541

Case No. 1/25/80-ALC2/2015

M/s UNITED DRILLING TOOLS LTD

Status: Lic. No.: 0510397442 Date: 29.01.2016 HQ. No.: 01/80/050/00441/AM16/ norms Deferred RLA No.: 05/24/040/00493/AM16/ Meeting No. 05/80 dated 07.06.2016 due to non submission reply of deficiency letter dated 29.03.2016 as raised by DHI.

62

             However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered 

the case and noted that the firm’s representation was referred to Consultant (Tech-3) on 23.12.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Sl. No. 542

Case No. 19/23/80-ALC2/2016

M/s AZAD ENGINEERING PRIVATE LIMITED

Status: Lic. No.: 0910064137 Date: 14.09.2016 HQ. No.: 01/80/050/00522/AM17/ norms Deferred RLA No.: 09/24/040/00295/AM17/ Meeting No. 02/80-ALC2/2017 dated 25.04.2017 on repeat basis as approved for AA No. 0910064137 dated 14.09.2016 on the recommendation of the representative of DHI.

             However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered 

the case and decided to ask from the firm to furnish the following information as per advice of the representative of DHI:

  1. Clarification whether export product is fitted with stator or rotor of steam turbine or gas turbine.
  2. Calculation of the requirement of raw material supported by dimensional engineering drawing with dimensions clearly highlighted.

Case is deferred.

Sl. No. 543

Case No. 1/19/80-ALC2/2017

M/s DAGGER MASTER TOOL INDUSTRIES LIMITED

Status: Lic No.: 0310817719 Date: 12.12.2017 HQ File No.: 01/80/050/00282/AM18/ norms Deferred RLA File No.: 03/94/040/00728/AM18 Meeting No.4/80-ALC2/2018 dated 23.05.2018on the recommendation of representatives of DHI, DIPP & MSME.

However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and decided to forward the firm’s representation to MSME for examination of the case as per advice of representative of DPIIT.

Case is deferred.

63

Sl. No. 544

Case No. 29/48/80-ALC2/2007

M/s JANDIA ENGINEERING PRIVATE LIMITED

Status: Lic No.: 3210035131 Date: 02.04.2007 HQ File No: 01/80/050/00675/AM08/ norms Deferred RLA File No: 32/21/040/00328/AM07/ Decision: The Committee considered the case as per the agenda and noted the decision of Meeting 10/80-ALC2/2009 dated 09.06.2009:

“The Committee noted that RA neither reported the status of the case nor forwarded the four sets of application in response to this office letter and subsequent reminder. Since, the subject authorization is quite old; the Committee presumed that ratification of norms of the subject authorization is not required to RA so that the case may be closed on the part of NC.”

             However, the firm has requested for fixation of ad-hoc norms. The Committee re-considered 

the case and noted that the query letter as raised in Meeting No. 10/80 dated 11.09.2019 was sent to RA, Coimbatore on 07.10.2019 followed by a reminder on 02.12.2019. However, no information has been received yet. Therefore, the Committee decided to remind RA, Coimbatore for submitting requisite information.

Case is deferred.

Sl. No. 545

Case No. 37/19/80-ALC2/2014

M/s KAMAR INFRASTRUCTURE PVT LTD.

Status: Licence No.: 0310788243 Date: 21.08.2014 HQ File No: 01/80/050/00471/AM15/ norms Deferred RLA File No: 03/94/040/00449/AM15/ Meeting No. 06/80 dated 20.06.2017 due to non submission reply of deficiency letter.

             However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered 

the case and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 23.12.2019. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Sl. No. 546

Case No. 53/23/80-ALC2/2016

M/s RADIANT HEAT EXCHANGER PVT.LTD Status: Lic. No.: 3110066440 Date: 09.12.2016 HQ. No.: 01/80/050/00556/AM17 hoc norms Deferred RLA No.: 31/83/040/00112/AM17 M. No. 03/80 dated 09.05.2018 on the recommendation of Technical Representatives of DHI, DIPP and MSME.

      However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the 

case and noted that the firm’s representation was referred to DPIIT on 23.12.2019 for examination of the

64

case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Sl. No. 547

Case No. 3/10/80-ALC2/2017

M/s HINDUSTAN RUBBER INDUSTRIES Status: Lic. No. 0510402563 Date: 16.05.2017 HQ. No.: 01/80/050/00213/AM18 norms Deferred RLA No.: 05/23/040/00043/AM18 Meeting No. 15/80-ALC2/2018 dated 06.03.2019 due to non submission of reply of deficiency letter dated 08.10.2018.

             However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered 

the case and noted that the reply of deficiency letter dated 08.10.2018 has not yet been submitted by the firm. It was also noted that a letter was sent to the firm on 02.11.2019, asked to submit the reply of deficiency letter dated 08.10.2018. However, no reply has been received yet. Therefore, the Committee decided to remind the firm to furnish the reply of deficiency letter dated 08.10.2018.

Case is deferred.

Sl. No. 548

Case No. 8/23/80-ALC2/2015

M/s HINDUSTAN RUBBER INDUSTRIES Status: Lic. No. 0510395884 Date: 12.10.2015 HQ. No.: 01/80/050/00421/AM16 norms Deferred RLA No.: 05/23/040/00292/AM16 Meeting No. 06/80-ALC2/2016dated 21.06.2016 due to non submission of reply of deficiency letter dated 19.04.2016 as raised by DIPP (Chemical) vide ID No.7/77/2016-TSW dated 26.02.2016.

   However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case 

and noted that the reply of deficiency letter dated 19.04.2016has not yet been submitted by the firm. It was also noted that a letter was sent to the firm on 02.11.2019, asked to submit the reply of deficiency letter dated 19.04.2016. However, no reply has been received yet. Therefore, the Committee decided to remind the firm to furnish the reply of deficiency letter dated 08.10.2018.

Case is deferred.

65

Sl. No. 549

Case No. 14/12/80-ALC2/2017

M/s GOLD MOHUR PROFILES LIMITED Status: Lic. No. 0510403501 Date: 25.07.2017 HQ. No.: 01/80/050/00228/AM18 norms Deferred RLA No.: 05/23/040/00156/AM18 Meeting No. 15/80-ALC2/2018 dated 06.03.2019 due to non submission of reply of deficiency letter dated 12.10.2018 as raised by DIPP (Chemical).

            However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the 

case and noted that the reply of deficiency letter dated 12.10.2018 has not yet been submitted by the firm. It was also noted that a letter was sent to the firm on 02.11.2019, asked to submit the reply of deficiency letter dated 12.10.2018. However, no reply has been received yet. Therefore, the Committee decided to remind the firm to furnish the reply of deficiency letter dated 12.10.2018.

Case is deferred.

Sl. No. 550

Case No. 1/8/80-ALC2/2018

M/s CORNING TECHNOLOGIES INDIA PVT. LTD. Status: Lic. No. 0510406690 Date: 30.05.2018 HQ. No.: 01/80/050/00124/AM19 norms Deferred RLA No.: 05/23/040/00089/AM19 Meeting No. 06/80-ALC2/2019 dated 03.07.2019 due to non submission reply of deficiency letter 11.02.2019 as raised by MeitY.

         However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the 

case and noted that the firm’s representation was referred to MeitYon 05.11.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MeitY for expediting the comments.

Case is deferred.

Sl. No. 551

Case No. 282/15/80-ALC2/2018

M/s CORNING TECHNOLOGIES INDIA PVT. LTD. Status: Lic. No 0510409144 Date: 01.01.2019 HQ. No.: 01/80/050/00624/AM19 norms Deferred RLA No.: 05/23/040/00395/AM19 Meeting No. 7/80-ALC2/2019 dated 17.07.2019 due to non submission of reply of deficiency letter dated 06.05.2019 as raised by MeitY.

However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that the firm’s representation was referred to MeitYon 05.11.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MeitY for expediting the comments.
Case is deferred.

66

Sl. No. 552

Case No. 13/12/80-ALC2/2018

M/s NIDEC INDIA PRIVATE LIMITED. Status: Lic. No. /date 0510408160 Date: 22.10.2018 HQ. No.: 01/80/050/00286/AM19 norms Deferred RLA No.: 05/24/040/00408/AM19 Meeting No. 06/80-ALC2/2019 dated 03.07.2019 due to non submission of reply of deficiency letter as raised by DPIIT.

            However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the 

case and decided to ask from the firm to furnish the following information as per written comments of DPIIT vide U. O. No.: P-47011/8/2019-TSW dated 23.12.2019:

  1. Justification for the quantities of Resins, Adhesive, Coating Material etc. at Sl. No. 1 to 4, 17, 18, 19, 21 to 24 and 28 to 31 of the import items.
  2. Information as per Sl. No. 11 of SDF (Starting from the specification of the export product, basic calculation as to how the raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.) for export items at Sl. No. 9 and 32 (Copper Wire).

Case is deferred.

Sl. No. 553

Case No. 19/19/80-ALC2/2016

L & T-MHPS TURBINE GENERATORS PRIVATE LIMITED Status: Lic. No. 0310807493 Date: 31.08.2016 HQ. No.: 01/80/050/00414/AM17 hoc norms Deferred RLA No.: 03/95/040/00292/AM17 M. No. 15/80-ALC2/2018 dated 06.03.2019 as per the written comments of DHI vide their U.O. No. 3/96/2016/TSW(B) dated 24.12.2018

            However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the 

case and noted that the firm’s representation was forwarded to DHI on 02.12.2019 for examination of the case. However, the representative of DHI informed in the meeting that the case is under examination. Therefore, the Committee decided to wait for the comments.

Case is deferred.

Sl. No. 554

Case No. 33/20/80-ALC2/2017

AUTOCOMP CORPORATION PANSE PRIVATE LIMITED Status: Lic. No. 3110066981 Date: 13.02.2018 HQ. No.: 01/80/050/00397/AM18 hoc norms Deferred RLA No.: 31/83/040/00154/AM18 M. No. 3/80-ALC2/2019 dated 08.05.2019 as per written comments of DHI vide their U. O. No.: 3/26/2018-TSW(B) through e-mail dated 16.04.19 on repeat basis similar to Export product 22 of AA

67

No. 3110067246 dated 27.11.2018.

However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and noted that the firm’s representation was referred to Consultant (Tech-3) on 23.12.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Sl. No. 555

Case No. 31/5/80-ALC2/2018

AUTOCOMP CORPORATION PANSE PRIVATE LIMITED

Status: Lic. No. 3110067040 Date: 07.05.2018 HQ. No.: 01/80/050/00080/AM19 hoc norms Deferred RLA No.: 31/83/040/00011/AM19 M. No. 3/80-ALC2/2019 dated 08.05.19 as per written comments of DHI vide their U. O. No.: 3/26/2018-TSW(B) through e-mail dated 16.04.19 on repeat basis similar to Export product 22 of AA No. 3110067246 dated 27.11.2018.

However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and noted that the firm’s representation was referred to Consultant (Tech-3) on 23.12.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Sl. No. 556

Case No. 30/5/80-ALC2/2018

AUTOCOMP CORPORATION PANSE PRIVATE LIMITED Status: Lic. No. 3110067039 Date: 07.05.2018 HQ. No.: 01/80/050/00079/AM19 hoc norms Deferred RLA No.: 31/83/040/00010/AM19 M. No. 3/80-ALC2/2019 dated 08.05.2019 as per written comments of DHI vide their U. O. No.: 3/26/2018-TSW(B) through e-mail dated 16.04.19 on repeat basis to Export product 22 and 24 of AA No. 3110067246 dated 27.11.2018.

However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and noted that the firm’s representation was referred to Consultant (Tech-3) on 23.12.2019 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

68

Sl. No. 557

Case No. 22/8/80-ALC2/2018

ULTRA ENGINEERS Status: Lic. No. 3110067126 Date: 26.07.2018 HQ. No.: 01/80/050/00145/AM19 hoc norms Deferred RLA No.: 31/83/040/00063/AM19 M. No. 14/80-ALC2/2018 dated 20.02.2019 on the recommendation of representative of DHI.

However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case and decided to ask from the firm to furnish the following information as per advice of the representative of DHI:

  1. Volumetric calculation of requirement of item No. 3 of import supported by dimensional engineering drawing with relevant dimensions highlighted.
  2. Weight of each Export Product.
  3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

Case is deferred.

Sl. No. 558

Case No. 68/2/80-ALC2/2016

MINDA SILCA ENGINEERING PRIVATE LIMITED Status: Lic. No. 0510397530 Date: 08.02.2016 HQ. No.: 01/80/050/00071/AM17/ hoc norms Deferred RLA No.: 05/24/040/00541/AM16/ M. No. 2/80-ALC2/2019 dated 24.04.2019 as per written comments of MSME.

However, the firm vide letter dated 07.11.2019 had requested for re-viewing the ad-hoc norms. The Committee reconsidered the case and decided to refer the firm’s representation to MSME for

Case is deferred.

Sl. No. 559

Case No.: 11/33/80-ALC2/2009

IDMC LIMITED Status: Lic. No. 3410025225 Date: 30.09.2009 HQ. No.: 01/80/050/00477/AM10/ norms Deferred RLA No.: 34/24/040/00104/AM10/ M. No. 4/80-ALC2/2010 dated 27.04.2010 due to non-submission of reply of deficiency letter as raised by DIPP.

              However, the firm vide letter dated 16.09.2018, 08.11.2019 & 24.12.2019 has requested for

69

fixation of ad-hoc norms. The Committee reconsidered the case and the matter was discussed in the meeting. However, the representative of DPIIT asked for the list of items. Therefore, the Committee decided to send the list of items to DHI for examination of the case.

Case is deferred.

Sl. No. 560

Case No.: 67/5/80-ALC2/2018

BHARAT HEAVY ELECTRICALS LIMITED Status: Lic. No. 0410164150 Date: 02.04.2018 HQ. No.: 01/80/050/00116/AM19/ hoc norms Deferred RLA No.: 04/24/040/00267/AM18/ M. No. 3/80-ALC2/2019 dated 08.05.2019 as per written comments of DHI vide email dated 06.05.2019.

However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case and noted that the firm has made some amendment in the AA after ratification of norms. The matter was discussed in the meeting and the Committee decided to refer the case to DHI for examination & comments.

Case is deferred.

Sl. No. 561

Case No.: 21/14/80-ALC2/2016

VEE KAY VIKRAM & CO LLP Status: Lic. No. 0810135377 Date: 27.05.2015 HQ. No.: 01/80/050/00371/AM17/ norms Deferred RLA No.: 08/24/040/00060/AM16/ M. No. 26/80-ALC2/2016 dated 28.03.2017 due to non-submission of reply of deficiency letter dated 27.12.2016 as raised by MSME.

However, the firm vide letter dated 17.09.2019 has requested for fixation of the ad-hoc norms. The Committee reconsidered the case and decided to refer the firm’s representation to MSME for

Case is deferred.

70

Sl. No. 562

Case No.: 44/19/80-ALC2/2017

LARSEN & TOUBRO LIMITED Status: Lic. No. 0310816114 Date: 04.10.2017 HQ. No.: 01/80/050/00325/AM18/ hoc norms Deferred RLA No.: 03/95/040/00365/AM18/ M. No. 4/80-ALC2/2018 dated 23.05.2018 on the recommendation of technical representatives of DHI, DIPP and MSME.

However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case and decided to refer the firm’s representation to DPIIT for examination of the case.

Case is deferred.


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6850 --apply.

Citation copied