DGFT Committee Minutes
MINUTES OF MEETING NO. 23/80 OF NORMS COMMITTEE- I (DES-I SECTION) DATED 13.03.2020
Meeting No. 23/80 of the Norms Committee (NC-I) for the licensing year 2019-2020 held on 13.03.2020 under the Chairmanship of Sh. R. P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -
==> picture [458 x 173] intentionally omitted <==
----- Start of picture text -----<br> Sl. No. Name of the representatives & their Designation Department<br>1. Shri B. C. Nayak, D. O. DHI<br>2. Shri K.S. Sodhi, Asst. Director MSME<br>3. Shri Shaish Kumar, (Tech-1) Consultant<br>4. Shri V.C. Agarwal, (Tech-3) Consultant<br>5. Shri S. K. Bhatnagar, (SKB) Consultant<br>In Attendance<br>1. Shri K.V. Tirumala, Deputy DGFT DGFT<br>2. Shri Pranav Upadhyay, Assistant Director ISS DGFT<br>----- End of picture text -----<br>
Note:
-
In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M. No. of the scanned copy is reflected in the minutes.
-
Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.
-
All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail address- nc1.dgft@nic.in . All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.
-
Minutes of Meeting 21/80 dated 18.02.2020 were circulated on 04.03.2020 to all the members of the Committee and the comments (if any), there upon received, were incorporated in the Minutes and the said minutes were unanimously approved.
1 | P a g e
MEETING NUMBER: 23/80-ALC2/2019 MEETING DATE: 13.03.2020
1
| Case No.:70/15/80-ALC2/2018 | Party Name: BHARAT HEAVY | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ELECTRICALS LIMITED | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00412/AM19/ | RLA File<br>:07/24/040/00095/AM16/ | Lic.No/Date:0710108519<br>15.07.2015 | Pending with<br>MeitY |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MeitY for examination of the case on 08.01.2020 followed by a reminder 06.03.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
2
| Case No.:363/15/80-ALC2/2018 | Party Name: PROMAC | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING INDUSTRIES | ALC2/2019 | Deferred | |||||
| LIMITED | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00705/AM19/ | RLA File<br>:07/24/040/00184/AM16/ | Lic.No/Date:0710108812<br>05.10.2015 | Pending<br>with DHI |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 17.02.2020 for examination of the case. However, the representative of DHI informed in meeting that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
3
| Case No.:364/15/80-ALC2/2018 | Party Name: PROMAC | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING INDUSTRIES | ALC2/2019 | Deferred | |||||
| LIMITED | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00706/AM19/ | RLA File<br>:07/24/040/00185/AM16/ | Lic.No/Date:0710108813<br>05.10.2015 | Pending<br>with DHI |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 17.02.2020 for examination of the case. However, the representative of DHI informed in meeting that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:402/15/80-ALC2/2018 | Party Name: SHIV HYDROMET | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | Deferred | |||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00744/AM19/ | RLA File<br>:24/24/040/00034/AM17/ | Lic.No/Date:2410042158<br>14.03.2017 | PH |
4 Decision: The Committee considered the case as per the agenda and noted that the firm was called for personal hearing to explain the case before Norms Committee. However, the firm vide email dated 09.03.2020requested to grant more time to appear for personal hearing. Hence, the Committee decided to call again the firm for personal hearing in the forthcoming NC meeting.
Case is deferred.
2 | P a g e
==> picture [476 x 522] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/23/80-ALC2/2019 Party Name: INTERPUMP Meet No/Date:23/80-ALC2/2019 Status:<br>HYDRAULICS INDIA PVT. 13.03.2020<br>LTD.<br>HQ File RLA File Lic.No/Date:0410162906 Approved<br>:01/80/050/00346/AM20/ :04/24/040/00221/AM17/ 21.03.2017<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on repeat<br>basis as approved for AA No. 0410160379 dated 01.04.2015 in M. No. 19/80 dated20.12.2016 as per written<br>comments of MSME as under:<br>Sl.<br>ITCHS Sl. ITCHS Recommended<br>No. Export Item Quantity Import Item<br>Code No. Code Norms<br> Hydraulic<br>Seamless steel<br>Accessories<br>pipes RAW Tube<br>Base Tube<br>For Base Dia 169 Import allowed<br>CAM HF169<br>X 1289 Type for 3137 Kgs<br>1280 L= 1289 2367.360<br>1 90328100 1 73041910 E355 (48 Nos.) inclusive of<br>C/E= 45 48 Nos. Kg<br>(Each no.73.40 32.5% net<br>each No. is<br>kg.) Length of wastage<br>49.32 kgs.)<br>each no. 1294<br>Length is 1289<br>mm<br>5 mm each<br> Hydraulic<br>Accessories Seamless steel<br>Base Tube pipes Raw Tube<br>Import allowed<br>CAM HF169 For Base Dia 169<br>for 18275 Kgs<br>1360 L=1364 13844.160 x1364 Type E355<br>2 90328100 2 73041910 inclusive of<br>C/E=45 (264 Kg (264 Nos.) (each<br>32% net<br>nos. each No. is No.77.60 kg )<br>wastage<br>52.44 kgs.) Length each No.<br>Length is is 1369mm<br>1364mm each<br>Hydraulic<br>Seamless steel<br>Accessories<br>pipes Raw Tube<br>Base Tube<br>For Base Dia 169 Import allowed<br>CAM PF-H169<br>X1439 Type for 29794Kgs<br>1430 L= 1439 22570.560<br>3 90328100 3 73041910 E355 (408 Nos.) inclusive of<br>C/E =45 (408 Kg<br>(Each No. 81.80 32% net<br>nos. each no. is<br>kgs.) Length of wastage<br>55.32<br>each No is 1444<br>kgs.)Length is<br>mm<br>1439mm each<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
3 | P a g e
==> picture [476 x 165] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/11/80-ALC2/2018 Party Name: DIAMOND Meet No/Date:23/80- Status:<br>METAL SCREENS (P) LTD ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:6510000003 D/L<br>:01/80/050/00192/AM19/ :65/24/040/00003/AM18/ 17.05.2017<br>Decision: The Committee considered the case as per the agenda and decided to ask form the firm to furnish the<br>6<br>following information as per advice of the representative of MSME:<br>1. To clarify, how the net weight of export is 51671 Kg as per Shipping Bill details while as per License<br>export is 49761 Kg.<br>2. To provide License Amendment Sheet.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:223/15/80-ALC2/2018 | Party Name: ZEECO INDIA | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| PVT.LTD. | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00565/AM19/ | RLA File<br>:03/95/040/00271/AM18/ | Lic.No/Date:0310814297<br>28.06.2017 | RA/Firm |
7 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
- 8
| Case No.:107/15/80-ALC2/2018 | Party Name: SEKO BEC | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00449/AM19/ | RLA File<br>:09/24/040/00134/AM18/ | Lic.No/Date:0910065311<br>28.07.2017 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 11.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 55] intentionally omitted <==
----- Start of picture text -----<br> Case No.:80/11/80-ALC2/2018 Party Name: MACAWBER Meet No/Date:23/80- Status:<br>BEEKAY PVT. LTD. ALC2/2019&13.03.2020 Rejected<br>HQ File RLA File Lic.No/Date:0510403845<br>:01/80/050/00271/AM19/ :05/24/040/00230/AM18/ 29.08.2017<br>----- End of picture text -----<br>
- 9 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 17.12.2019 followed by final reminder on 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, New Delhi .
Case is rejected.
4 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:18/19/80-ALC2/2017 Party Name: KINECO KAMAN Meet No/Date:23/80- Status:<br>COMPOSITES - INDIA PVT ALC2/2019 Deferred<br>LTD 13.03.2020<br>HQ File RLA File Lic.No/Date:1710006668 Pending<br>:01/80/050/00299/AM18/ :17/24/040/00050/AM18/ 10.10.2017 with DPIIT<br>10<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>DPIIT on 18.02.2020 and again on 12.03.2020 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
Case No.:26/20/80-ALC2/2017 Party Name: ICEM Meet No/Date:23/80- Status: ENGINEERING COMPANY ALC2/2019 Rejected PRIVATE LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:0310817800 :01/80/050/00390/AM18/ :03/94/040/00742/AM18/ 15.12.2017
11 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Mumbai .
Case is rejected.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:20/20/80-ALC2/2017 Party Name: BIRLA Meet No/Date:23/80- Status:<br>PRECISION ALC2/2019 Deferred<br>TECHNOLOGIES LTD. 13.03.2020<br>HQ File RLA File Lic.No/Date:0310818218 Pending with<br>:01/80/050/00384/AM18/ :03/94/040/00782/AM18/ 04.01.2018 MSME<br>12<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>MSME on 17.02.2020 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
13
| Case No.:23/20/80-ALC2/2017 | Party Name: BIRLA | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRECISION | ALC2/2019 | Deferred | |||||
| TECHNOLOGIES LTD. | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00387/AM18/ | RLA File<br>:03/94/040/00784/AM18/ | Lic.No/Date:0310818219<br>04.01.2018 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 17.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
Case is deferred.
5 | P a g e
14
| Case No.:21/20/80-ALC2/2017 | Party Name: BIRLA | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRECISION | ALC2/2019 | Deferred | |||||
| TECHNOLOGIES LTD. | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00385/AM18/ | RLA File<br>:03/94/040/00785/AM18/ | Lic.No/Date:0310818275<br>05.01.2018 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 17.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
Case is deferred.
15
| Case No.:22/20/80-ALC2/2017 | Party Name: BIRLA | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRECISION | ALC2/2019 | Deferred | |||||
| TECHNOLOGIES LTD. | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00386/AM18/ | RLA File<br>:03/94/040/00783/AM18/ | Lic.No/Date:0310818273<br>05.01.2018 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 17.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:126/15/80-ALC2/2018 Party Name: SHAKTI PUMPS Meet No/Date:23/80- Status:<br>(INDIA) LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:5610005299 Pending<br>:01/80/050/00468/AM19/ :56/24/040/00036/AM18/ 08.01.2018 with DPIIT<br>16<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>DPIIT on 12.03.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 142] intentionally omitted <==
----- Start of picture text -----<br> Case No.:20/1/80-ALC2/2019 Party Name: ZTT INDIA Meet No/Date:23/80- Status:<br>PRIVATE LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0410163956 Pending<br>:01/80/050/00768/AM19/ :04/24/040/00212/AM18/ 07.02.2018 with firm<br>17<br>Decision: The Committee considered the case as per the agenda and noted that MeitY has sought certain<br>information from the firm vide letter dated 16.12.2019 followed by a reminder letter dated 04.02.2020. The firm<br>was again reminded on 06.03.2020 for furnishing the requisite information. However, no information has been<br>received yet. Hence, the Committee decided to wait for the reply/comments.<br>Case is deferred.<br>----- End of picture text -----<br>
6 | P a g e
==> picture [476 x 163] intentionally omitted <==
----- Start of picture text -----<br> Case No.:393/15/80-ALC2/2018 Party Name: SARTORIUS Meet No/Date:23/80- Status:<br>STEDIM INDIA PVT. LTD. ALC2/2019 Approved<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0710113010<br>:01/80/050/00735/AM19/ :07/24/040/00348/AM18/ 23.03.2018<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>18<br>written comments of MSME as under:<br>1. Quantity of relevant import items at Sl. No. 1 to 108, 112, 117 to 121, 125 to 147, 152 to 159, & 164 to<br>177 may be allowed as per GN-4.<br>2. Quantity of rest of the import items may be allowed on net to net basis with nil wastage .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
19
| Case No.:10/1/80-ALC2/2019 | Party Name: MAGNA | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| AUTOMOTIVE INDIA | ALC2/2019 | Deferred | |||||
| PRIVATE LIMITED | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00758/AM19/ | RLA File<br>:04/24/040/00001/AM19/ | Lic.No/Date:0410164172<br>06.04.2018 | Pending<br>with firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 12.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
==> picture [476 x 280] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/8/80-ALC2/2018 Party Name: L & T-MHPS Meet No/Date:23/80- Status:<br>TURBINE GENERATORS ALC2/2019 Approved<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0310820724<br>:01/80/050/00129/AM19/ :03/95/040/01112/AM18/ 27.04.2018<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on the<br>recommendation of the representative of DHI as under:<br>Export item:<br>1. Weight of export product is 570 MT.<br>20<br>Import items:<br>1. Quantity of import item at Sl. No. 1 may be allowed with 78% wastage after taking 20% recovery.<br>2. Quantity of import item at Sl. No. 16 may be allowed with 77% wastage after taking 20% recovery.<br>3. Quantity of import item at Sl. No. 168 may be allowed with 78% wastage after taking 20% recovery.<br>4. Quantity of import item at Sl. No. 164 (Primer-1500 Liter) may be allowed as applied for (Only 0.03%<br>of FoB value).<br>5. Import items at Sl. No. 163 & 165 to 167 may be deleted as per the firm’s request.<br>6. Quantity of rest of the import items may be allowed as per GN-4 .<br>Note: The material balancing given in Annexure-1 may be incorporated to the AA.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
7 | P a g e
21
| Case No.:397/15/80-ALC2/2018 | Party Name: PROMAC | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING INDUSTRIES | ALC2/2019 | Deferred | |||||
| LIMITED | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00739/AM19/ | RLA File<br>:07/24/040/00357/AM18/ | Lic.No/Date:0710113276<br>14.05.2018 | Pending<br>with DHI |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 17.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.
Case is deferred.
==> picture [476 x 222] intentionally omitted <==
----- Start of picture text -----<br> Case No.:133/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910066357 D/L<br>:01/80/050/00475/AM19/ :09/24/040/00058/AM19/ 20.06.2018<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per advice of the representative of DHI:<br>22 1. List of specific items of export.<br>2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Calculation of requirement supported by Engineering Drawing with relevant dimensions highlighted.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 221] intentionally omitted <==
----- Start of picture text -----<br> Case No.:165/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910066427 D/L<br>:01/80/050/00507/AM19/ :09/24/040/00139/AM19/ 06.07.2018<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per advice of the representative of DHI:<br>23 1. List of specific items of export.<br>2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Calculation of requirement supported by Engineering Drawing with relevant dimensions highlighted.<br>Case is deferred.<br>----- End of picture text -----<br>
8 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:166/15/80- Party Name: BHARAT HEAVY Meet No/Date:23/80- Status:<br>ALC2/2018 ELECTRICALS LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File :09/24/040/00171/AM19/ Lic.No/Date:0910066472 PH<br>:01/80/050/00508/AM19/ 18.07.2018<br>24<br>Decision: The Committee considered the case as per the agenda and the representative of DHI informed that the<br>reply submitted by the firm is vague. Therefore, the Committee decided to call the firm for personal hearing to<br>explain the case before Norms Committee in the forthcoming NC meeting.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 119] intentionally omitted <==
----- Start of picture text -----<br> Case No.:76/11/80-ALC2/2018 Party Name: HIMACHAL Meet No/Date:23/80- Status:<br>FUTURISTIC ALC2/2019 Approved<br>COMMUNICATIONS LTD. 13.03.2020<br>HQ File RLA File Lic.No/Date:0510407445<br>25 :01/80/050/00267/AM19/ :05/23/040/00215/AM19/ 06.08.2018<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of MeitY vide U. O. No.: 17(43)/2018-IPHW dated 19.02.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.:19/11/80-ALC2/2018 | Party Name: ICEM | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING COMPANY | ALC2/2019 | Rejected | ||||
| PRIVATE LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00210/AM19/ | RLA File<br>:03/94/040/00306/AM19/ | Lic.No/Date:0310822939<br>09.08.2018 |
26 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 13.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Mumbai .
Case is rejected.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:179/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:23/80- Status:<br>ENGINEERING INDUSTRIES ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0710113710 Pending<br>:01/80/050/00521/AM19/ :07/24/040/00102/AM19/ 13.08.2018 with firm<br>27<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 11.02.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
9 | P a g e
==> picture [476 x 131] intentionally omitted <==
----- Start of picture text -----<br> Case No.:34/1/80-ALC2/2019 Party Name: KINECO KAMAN Meet No/Date:23/80- Status:<br>COMPOSITES - INDIA PVT. ALC2/2019 Deferred<br>LTD. 13.03.2020<br>HQ File RLA File Lic.No/Date:1710006716 Pending<br>:01/80/050/00782/AM19/ :17/24/040/00017/AM19/ 20.08.2018 with DPIIT<br>28<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was forwarded to<br>DPIIT on 18.02.2020 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided to remind DPIIT for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
29
| Case No.:183/15/80-ALC2/2018 | Party Name: M M R | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| MINING EQUIPMENTS | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00525/AM19/ | RLA File<br>:09/24/040/00242/AM19/ | Lic.No/Date:0910066589<br>24.08.2018 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 11.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:23/11/80-ALC2/2018 Party Name: JAYESH METALS Meet No/Date:23/80- Status:<br>AND FERRO ALLOYS LLP ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310823416 PH<br>:01/80/050/00214/AM19/ :03/94/040/00488/AM19/ 29.08.2018<br>30<br>Decision: The Committee considered the case as per the agenda and decided to call the firm for personal<br>hearing to explain the case before Norms Committee, as decided in M. No. 21/80 dated 18.02.2020, in the<br>forthcoming NC meeting.<br>Case is deferred.<br>----- End of picture text -----<br>
31
| Case No.:28/11/80-ALC2/2018 | Party Name: L & T-MHPS | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2019 | Deferred | |||||
| PRIVATE LIMITED | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00219/AM19/ | RLA File<br>:03/95/040/00466/AM19/ | Lic.No/Date:0310823400<br>29.08.2018 | Pending<br>with firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 13.02.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.
Case is deferred.
10 | P a g e
==> picture [476 x 131] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/1/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:23/80- Status:<br>TURBINE GENERATORS ALC2/2019 Deferred<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0310823645 Pending<br>:01/80/050/00757/AM19/ :03/95/040/00469/AM19/ 07.09.2018 with firm<br>32<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 13.02.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:201/15/80-ALC2/2018 | Party Name: DYNAMATIC | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| TECHNOLOGIES LIMITED | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00543/AM19/ | RLA File<br>:07/24/040/00155/AM19/ | Lic.No/Date:0710113852<br>17.09.2018 | Pending<br>with firm |
33 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 18.11.2019 followed by reminders on 07.01.2020 & 06.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:57/11/80-ALC2/2018 Party Name: GL&V INDIA Meet No/Date:23/80- Status:<br>PRIVATE LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3110067179 PH<br>:01/80/050/00248/AM19/ :31/83/040/00096/AM19/ 26.09.2018<br>34<br>Decision: The Committee considered the case as per the agenda and noted that the firm was called for personal<br>hearing to explain the case before Norms Committee. However, the firm vide email dated 09.03.2020 requested<br>for another date of personal hearing. Therefore, the Committee decided to call the firm for personal hearing to<br>explain the case before Norms Committee in the forthcoming meeting.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:82/11/80-ALC2/2018 Party Name: ANSTECH Meet No/Date:23/80- Status:<br>ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3410044543 RA/Firm<br>:01/80/050/00273/AM19/ :34/24/040/00218/AM19/ 04.10.2018<br>35 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Vadodara & the firm and in this regard a letter was sent to RA, Vadodara and<br>the firm on 08.07.2019 followed by reminders on 25.09.2019, 18.10.2019, 08.01.2020 & 03.02.2020. However,<br>no information has been received so far. Therefore, the Committee decided to remind again RA, Vadodara &<br>the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
11 | P a g e
| Case No.:247/15/80-ALC2/2018 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Rejected | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00589/AM19/ | RLA File<br>:09/24/040/00324/AM19/ | Lic.No/Date:0910066802<br>02.11.2018 |
36 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .
Case is rejected.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:249/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Rejected<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910066804<br>:01/80/050/00591/AM19/ :09/24/040/00329/AM19/ 02.11.2018<br>----- End of picture text -----<br>
37 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .
Case is rejected.
==> picture [476 x 146] intentionally omitted <==
----- Start of picture text -----<br> Case No.:253/15/80-ALC2/2018 Party Name: BHARAT HEAVY Meet No/Date:23/80- Status:<br>ELECTRICALS LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0910066870 Pending<br>:01/80/050/00595/AM19/ :09/24/040/00340/AM19/ 16.11.2018 with DHI<br>38<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s<br>reply (hardcopy) was sent to DHI on 13.01.2020 for examination of the case. However, the representative of<br>DHI informed that the case is under examination. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:259/15/80- | Party Name: DYNAMATIC | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2018 | TECHNOLOGIES LIMITED | ALC2/2019 | Deferred | |||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00601/AM19/ | RLA File<br>:07/24/040/00182/AM19/ | Lic.No/Date:0710114156<br>22.11.2018 | Pending with<br>MSME |
39 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 18.11.2019 followed by reminders on 07.01.2020 & 06.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
12 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:270/15/80-ALC2/2018 Party Name: VEM Meet No/Date:23/80- Status:<br>TECHNOLOGIES PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0910066924 Pending<br>:01/80/050/00612/AM19/ :09/24/040/00428/AM19/ 29.11.2018 with DPIIT<br>40<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>DPIIT on 11.03.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
41
| Case No.:17/1/80-ALC2/2019 | Party Name: MUDHRA | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| FINE BLANC PRIVATE | ALC2/2019 | Deferred | |||||
| LTD. | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00765/AM19/ | RLA File<br>:04/24/040/00207/AM19/ | Lic.No/Date:0410164995<br>17.12.2018 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 18.10.2019 followed by ID reminders on 07.01.2020 & 06.03.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:274/15/80-ALC2/2018 Party Name: STERLITE Meet No/Date:23/80- Status:<br>TECHNOLOGIES LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310825720 Pending<br>:01/80/050/00616/AM19/ :03/95/040/00812/AM19/ 18.12.2018 with firm<br>----- End of picture text -----<br>
42 Decision: The Committee considered the case as per the agenda and noted that MeitY sought again certain information from the firm vide letter dated 05.12.2019 followed by a reminder letter dated 12.02.2020. MeitY again sought for justification from the firm on 11.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the reply/comments.
Case is deferred.
==> picture [476 x 142] intentionally omitted <==
----- Start of picture text -----<br> Case No.:293/15/80-ALC2/2018 Party Name: STERLITE POWER Meet No/Date:23/80- Status:<br>TRANSMISSION LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310826313 Pending<br>:01/80/050/00635/AM19/ :03/95/040/00869/AM19/ 10.01.2019 with firm<br>43<br>Decision: The Committee considered the case as per the agenda and noted that MeitY sought again certain<br>information from the firm vide letter dated 05.12.2019 followed by a reminder letter dated 12.02.2020. MeitY<br>again sought for justification from the firm on 11.03.2020. However, no reply has been received yet. Hence, the<br>Committee decided to wait for the reply/comments.<br>Case is deferred.<br>----- End of picture text -----<br>
13 | P a g e
==> picture [476 x 131] intentionally omitted <==
----- Start of picture text -----<br> Case No.:298/15/80-ALC2/2018 Party Name: ULTRA Meet No/Date:23/80- Status:<br>ENGINEERS ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3110067288 Pending<br>:01/80/050/00640/AM19/ :31/83/040/00164/AM19/ 16.01.2019 with firm<br>44<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 11.02.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:23/1/80-ALC2/2019 Party Name: PARKER Meet No/Date:23/80- Status:<br>HANNIFIN INDIA PVT. ALC2/2019 Deferred<br>LTD. 13.03.2020<br>HQ File RLA File Lic.No/Date:0410165142 Pending with<br>:01/80/050/00771/AM19/ :04/24/040/00223/AM19/ 28.01.2019 MSME<br>45<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply has been sent to<br>MSME for examination of the case on 15.01.2020 followed by an ID reminder on 06.03.2020. However, no<br>comments have been revived yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 55] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: LARSEN Meet No/Date:23/80-ALC2/2019 Status:<br>42/1/80-ALC2/2019 &TOUBRO LIMITED 13.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310827622 Pending with<br>:01/80/050/00790/AM19/ :03/95/040/01295/AM19/ 12.03.2019 Tech-3<br>----- End of picture text -----<br>
46 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply along with physical file was sent to Consultant (Tech-3) on 11.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments .
Case is deferred.
==> picture [476 x 118] intentionally omitted <==
----- Start of picture text -----<br> Case No.:46/1/80-ALC2/2019 Party Name: ISGEC TITAN Meet No/Date:23/80- Status:<br>METAL FABRICATORS ALC2/2019 Approved<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0510409960<br>47 :01/80/050/00794/AM19/ :05/23/040/00557/AM19/ 15.03.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/28/2020-TSW dated 20.02.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
14 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:18/5/80-ALC2/2019 Party Name: MAINI Meet No/Date:23/80- Status:<br>PRECISION PRODUCTS ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0710114732 Pending with<br>:01/80/050/00056/AM20/ :07/24/040/00306/AM19/ 29.03.2019 firm<br>48<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 14.02.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
49
| Case No.:5/2/80-ALC2/2019 | Party Name: VIPRA CLOSURES | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00005/AM20/ | RLA File<br>:03/95/040/01384/AM19/ | Lic.No/Date:0310828134<br>03.04.2019 | Pending<br>with firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 07.01.2020 followed by a reminder on 06.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:14/5/80-ALC2/2019 Party Name: UNI VTL Meet No/Date:23/80- Status:<br>PRECISION PVT. LTD. ALC2/2019 Approved<br>13.03.2020<br>HQ File RLA File Lic.No/Date:6510000027<br>:01/80/050/00052/AM20/ :65/24/040/00006/AM19/ 05.04.2019<br>----- End of picture text -----<br>
| Case No.:14/5/80-ALC2/2019Party Name: UNI VTL<br>PRECISION PVT. LTD.<br>Meet No/Date:23/80-<br>ALC2/2019<br>13.03.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00052/AM20/<br>RLA File<br>:65/24/040/00006/AM19/<br>Lic.No/Date:6510000027<br>05.04.2019 | Case No.:14/5/80-ALC2/2019 <br> | Case No.:14/5/80-ALC2/2019 <br> | Party Name: UNI VTL<br>PRECISION PVT. LTD. | Party Name: UNI VTL<br>PRECISION PVT. LTD. | Party Name: UNI VTL<br>PRECISION PVT. LTD. | Meet No/Date:23/80-<br>ALC2/2019<br>13.03.2020 | Meet No/Date:23/80-<br>ALC2/2019<br>13.03.2020 | Status:<br>Approved |
|---|---|---|---|---|---|---|---|---|
| HQ File<br>:01/80/050/00052/AM20/<br> <br>: | RLA File<br>65/24/040/00006/AM19/ | Lic.No/Date:6510000027<br>05.04.2019 | ||||||
| 50 | Decision:The Committee considered the case as per the agenda and decided toratifythe ad-hoc norms as per<br>written comments of**Consultant (Tech-3)**as under: | |||||||
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended<br>Norms | |||
| 84099990 | HY 55 Semi-<br>Finished Shroud<br>Plates (156000<br>Numbers) | 39936.000<br>Kgs | 73261990 | Billets, 131 mm diameter<br>x 86.5 mm long ( SS<br>Grade 321) | 175718 Kgs | |||
| Note: Grade of imported steel will be same as used in Export Product.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of Consultant (Tech-3) as under:
51
| Case No.:3/3/80-ALC2/2019 | Party Name: MUDHRA FINE | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| BLANC PRIVATE LTD. | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00009/AM20/ | RLA File<br>:04/24/040/00294/AM19/ | Lic.No/Date:0410165451<br>11.04.2019 | Pending<br>with DHI |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI for examination of the case on 12.12.2019 followed by a reminder on 12.02.2020. However, the representative of DHI informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
15 | P a g e
==> picture [476 x 119] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/3/80-ALC2/2019 Party Name: VEELINE MEDIA Meet No/Date:23/80- Status:<br>LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0210209114 Pending<br>52 :01/80/050/00010/AM20/ :02/24/040/00003/AM20/ 16.04.2019 with firm<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 07.01.2020 followed by a reminder on 06.03.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 362] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/3/80-ALC2/2019 Party Name: SMC Meet No/Date:23/80- Status:<br>CORPORATION (INDIA) ALC2/2019 Approved<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0510410292<br>:01/80/050/00011/AM20/ :05/24/040/00020/AM20/ 18.04.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of Consultant (Tech-3) by considering the reply dated 24.02.2020 as under:<br>Sl. Sl.<br>ITCHS Export ITCHS Recommen<br>No. Quantity No. Import Item<br>Code Item Code ded Norms<br>Body B<br>14501 (Weig 996353.000 Brass Bar<br>1 84819090 1 74072110 3896 Kgs<br>ht = 2252 Number C3604-6-8-4M<br>53 Kgs)<br>Body B<br>145113 113716.000 Brass Bar<br>2 84819090 2 74072110 942 Kgs<br>( Weight = Number C3604-6-10-4M<br>483 Kgs)<br> Body B<br>Brass Bar<br>145111 73958.000<br>3 84819090 3 74072110 C3604-6-12 (13.5) - 1224 Kgs<br>( Weight = Number<br>4M<br>692 Kgs)<br>Note:<br>1. Weight of export product at Sl. No. 1 is 2252 Kgs.<br>2. Weight of export product at Sl. No. 2 is 483 Kgs.<br>3. Weight of export product at Sl. No. 3 is 692 Kgs.<br>4. Grade & Composition of brass to match in import & export items.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 119] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/3/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:23/80- Status:<br>TURBINE GENERATORS ALC2/2019 Deferred<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0310828481 Pending<br>54 :01/80/050/00014/AM20/ :03/95/040/01354/AM19/ 23.04.2019 with DHI<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI<br>for examination of the case on 12.03.2020. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
16 | P a g e
| Case No.:5/5/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Rejected | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00043/AM20/ | RLA File<br>:09/24/040/00061/AM20/ | Lic.No/Date:0910067528<br>15.05.2019 |
55 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .
Case is rejected.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/5/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Rejected<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910067529<br>:01/80/050/00044/AM20/ :09/24/040/00059/AM20/ 15.05.2019<br>----- End of picture text -----<br>
56 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .
Case is rejected.
| Case No.:7/5/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Rejected | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00045/AM20/ | RLA File<br>:09/24/040/00060/AM20/ | Lic.No/Date:0910067530<br>15.05.2019 |
57 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .
Case is rejected.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/5/80-ALC2/2019 Party Name: PAHARPUR Meet No/Date:23/80- Status:<br>COOLING TOWERS LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0210209171 Pending<br>:01/80/050/00039/AM20/ :02/24/040/00012/AM20/ 16.05.2019 with firm<br>58<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 06.03.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>
17 | P a g e
==> picture [476 x 176] intentionally omitted <==
----- Start of picture text -----<br> Case No.:13/5/80-ALC2/2019 Party Name: HEURTEY Meet No/Date:23/80- Status:<br>PETROCHEM INDIA PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:3410045150 D/L<br>:01/80/050/00051/AM20/ :34/24/040/00059/AM20/ 17.05.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>59 following information as per advice of the representative of DHI:<br>1. Manufacturing process of the export product showing the use of imported raw materials/comments.<br>2. Calculations of the proposed wastage.<br>3. Draft of the final norms proposed.<br>4. Any other connected information.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:12/5/80-ALC2/2019 | Party Name: DILIGENT SCM | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| SOLUTIONS PRIVATE | ALC2/2019 | Rejected | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00050/AM20/ | RLA File<br>:09/24/040/00078/AM20/ | Lic.No/Date:0910067545<br>20.05.2019 |
60 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 14.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .
Case is rejected.
61
| Case No.:21/5/80-ALC2/2019 | Party Name: CERATIZIT INDIA | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ROUND TOOL SOLUTIONS | ALC2/2019 | Withdrawn | |||||
| P.LTD. | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00059/AM20/ | RLA File<br>:07/24/040/00017/AM20/ | Lic.No/Date:0710114952<br>24.05.2019 |
Decision: The Committee considered the case as per the agenda and noted that the firm vide email dated 20.02.2020 informed that they have surrendered the above AA. Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, Bangalore .
Case is withdrawn.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/7/80-ALC2/2019 Party Name: CROWN Meet No/Date:23/80- Status:<br>CLOSURES PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310829905 Pending<br>:01/80/050/00098/AM20/ :03/94/040/00246/AM20/ 25.06.2019 with firm<br>62<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by Consultant (Tech-1) was sent to the firm on 06.03.2020. However, no reply has been<br>received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>
18 | P a g e
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/7/80-ALC2/2019 Party Name: OSWAL PUMPS Meet No/Date:23/80- Status:<br>LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3310030557 Pending<br>:01/80/050/00099/AM20/ :33/24/040/00012/AM20/ 25.06.2019 with firm<br>63<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 06.03.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>
64
| Case No.:3/7/80-ALC2/2019 | Party Name: OAM SAAI | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INTERNATIONAL INC. | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00100/AM20/ | RLA File<br>:05/24/040/00181/AM20/ | Lic.No/Date:0510411061<br>26.06.2019 | Pending<br>with firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 07.01.2020 followed by a reminder on 06.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910067697 Pending<br>:01/80/050/00101/AM20/ :09/24/040/00138/AM20/ 26.06.2019 with firm<br>----- End of picture text -----<br>
65 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a reminder on 10.12.2019 &06.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
| Case No.:5/7/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Rejected | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00102/AM20/ | RLA File<br>:09/24/040/00142/AM20/ | Lic.No/Date:0910067698<br>26.06.2019 |
66 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 11.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .
Case is rejected.
19 | P a g e
| Case No.:6/7/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Rejected | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00103/AM20/ | RLA File<br>:09/24/040/00140/AM20/ | Lic.No/Date:0910067699<br>26.06.2019 |
67 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 11.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .
Case is rejected.
Case No.:7/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status: ENGINEERING PRIVATE ALC2/2019 Rejected LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:0910067700 :01/80/050/00104/AM20/ :09/24/040/00139/AM20/ 26.06.2019
68 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 11.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .
Case is rejected.
Case No.:8/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status: ENGINEERING PRIVATE ALC2/2019 Rejected LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:0910067701 :01/80/050/00105/AM20/ :09/24/040/00137/AM20/ 26.06.2019
69 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 11.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .
Case is rejected.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Rejected<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910067702<br>:01/80/050/00106/AM20/ :09/24/040/00141/AM20/ 26.06.2019<br>----- End of picture text -----<br>
70 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 11.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .
Case is rejected.
20 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/7/80-ALC2/2019 Party Name: P. M. ELECTRO Meet No/Date:23/80- Status:<br>AUTO PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3110067458 RA/Firm<br>:01/80/050/00107/AM20/ :31/83/040/00048/AM20/ 28.06.2019<br>71 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>08.08.2019 followed by reminders on 11.11.2019, 08.01.2020, 03.02.2020 & 26.02.2020. However, no<br>information has been received so far. Therefore, the Committee decided to remind again RA, Pune & the firm<br>for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/7/80-ALC2/2019 Party Name: POLYCAB INDIA Meet No/Date:23/80- Status:<br>LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310830021 Pending<br>:01/80/050/00108/AM20/ :03/95/040/00295/AM20/ 01.07.2019 with firm<br>72 Decision: The Committee considered the case as per the agenda and noted that MeitY has sought following<br>information from the firm vide letter dated 16.12.2019 followed by a reminder letter dated 04.02.2020. MeitY<br>again sought for justification from the firm on 20.02.2020 and DGFT also reminded to the firm on 06.03.2020<br>for furnishing the requisite information. However, no reply has been received yet. Hence, the Committee<br>decided to wait for the reply/comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/7/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:23/80- Status:<br>CORPORATION PANSE ALC2/2019 Deferred<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:3110067460 D/L<br>:01/80/050/00109/AM20/ :31/83/040/00050/AM20/ 01.07.2019<br>73 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per advice of the representative of DHI:<br>1. Detailed working calculation showing stager-wise wastage supported by dimensional drawing, justifying<br>quantitative requirements of raw material especially Fin and Tube.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:13/7/80- Party Name: BANGALORE Meet No/Date:23/80- Status:<br>ALC2/2019 BIOTECH LABS PVT. ALC2/2019 Deferred<br>LTD. 13.03.2020<br>HQ File RLA File Lic.No/Date:0710115122 Pending with<br>:01/80/050/00110/AM20/ :07/24/040/00082/AM20/ 03.07.2019 MSME<br>74<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME for examination of the case on 12.07.2019 followed by reminder on 17.09.2019 & 13.02.2020.<br>However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for<br>expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
21 | P a g e
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:15/7/80-ALC2/2019 Party Name: DOOWON Meet No/Date:23/80- Status:<br>CLIMATE CONTROL INDIA ALC2/2019 Deferred<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:6610000035 RA/Firm<br>:01/80/050/00112/AM20/ :66/24/040/00003/AM20/ 03.07.2019<br>75 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Vijayawada and in this regard a letter was sent to the firm & RA,<br>Vijayawada on 18.10.2019 followed by reminders on 08.01.2020 & 03.02.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again RA, Vijayawada & the firm for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:43/11/80-ALC2/2019 | Party Name: ERBATECH | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| MACHINERY PRIVATE | ALC2/2019 | Rejected | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00169/AM20/ | RLA File<br>:32/21/040/00061/AM20/ | Lic.No/Date:3210079031<br>19.07.2019 |
76 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 13.12.2019 followed by a reminder on 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Coimbatore .
Case is rejected.
==> picture [476 x 154] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/9/80-ALC2/2019 Party Name: DYNA FORCE Meet No/Date:23/80- Status:<br>HYDRAULICS PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:3110067484 RA/Firm<br>:01/80/050/00128/AM20/ :31/83/040/00067/AM20/ 25.07.2019<br>77 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Pune and in this regard a letter was sent to RA, Pune on 18.10.2019<br>followed by reminders on 08.01.2020 & 03.02.2020. However, no information has been received so far.<br>Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:4/9/80-ALC2/2019 | Party Name: RATNAMANI | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| METALS AND TUBES LTD. | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00129/AM20/ | RLA File<br>:08/24/040/00135/AM20/ | Lic.No/Date:0810145826<br>25.07.2019 | Pending<br>with firm |
78 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 20.11.2019 followed by reminders on 07.01.2020 & 09.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
22 | P a g e
Case No.:42/11/80- Party Name: PREMIER Meet No/Date:23/80- Status: ALC2/2019 INDUSTRIAL ALC2/2019 Approved CORPORATION LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:0310830608 :01/80/050/00168/AM20/ :03/95/040/00377/AM20/ 26.07.2019
| Case No.:42/11/80-<br>ALC2/2019<br>Party Name: PREMIER<br>INDUSTRIAL<br>CORPORATION LIMITED<br>Meet No/Date:23/80-<br>ALC2/2019<br>13.03.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00168/AM20/<br>RLA File<br>:03/95/040/00377/AM20/<br>Lic.No/Date:0310830608<br>26.07.2019 | Case No.:42/11/80-<br>ALC2/2019 | Party Name: PREMIER<br>INDUSTRIAL<br>CORPORATION LIMITED | Meet No/Date:23/80-<br>ALC2/2019<br>13.03.2020 | Status:<br>Approved |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00168/AM20/ | RLA File<br>:03/95/040/00377/AM20/ | Lic.No/Date:0310830608<br>26.07.2019 | ||
| 79 | **Decision:The Committee considered the case as per the agenda and decided to ratify the norms as per written<br>comments ofConsultant (SKB)**as under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended Norms<br>81122100<br>Chromium<br>Metal Powder<br>20000.000<br>KG<br>81122100<br>Chromium Metal<br>Lumps / Chips<br>20200Kg (1.01 Kgs/Kg<br>content in the export<br>product)<br>Note: Percentage of ‘Chromium’ in export/import item should be 100%.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
Decision: The Committee considered the case as per the agenda and decided to ratify the norms as per written comments of Consultant (SKB) as under:
80
| Case No.:12/9/80-ALC2/2019 | Party Name: VICTORA | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| AUTO PVT. LTD. | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00137/AM20/ | RLA File<br>:05/24/040/00251/AM20/ | Lic.No/Date:0510411435<br>02.08.2019 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 14.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
Case is deferred.
==> picture [476 x 266] intentionally omitted <==
----- Start of picture text -----<br> Case No.:41/11/80-ALC2/2019 Party Name: PHOENIX FOILS Meet No/Date:23/80- Status:<br>PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310830770 D/L<br>:01/80/050/00167/AM20/ :03/95/040/00459/AM20/ 02.08.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the<br>following information as per written comments of DPIIT vide U. O. No.: P-47011/190/2019-TSW dated<br>13.03.2020:<br>1. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>81 material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>2. Assembly drawings/diagrams of the resultant product showing placement and exact use of components<br>in the export product (s).<br>3. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured out<br>of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>
23 | P a g e
==> picture [476 x 119] intentionally omitted <==
----- Start of picture text -----<br> Case No.:13/9/80-ALC2/2019 Party Name: SSP PVT.LTD. Meet No/Date:23/80- Status:<br>ALC2/2019 Approved<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0510411438<br>82 :01/80/050/00138/AM20/ :05/24/040/00259/AM20/ 05.08.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/267/2019-TSW dated 13.03.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
83
| Case No.:45/11/80-ALC2/2004 | Party Name: L&T- MHPS | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2019 | Deferred | |||||
| PRIVATE LIMITED | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00171/AM20/ | RLA File<br>:03/95/040/00574/AM20/ | Lic.No/Date:0310831568<br>16.09.2019 | Pending<br>with firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 06.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
84
| Case No.:46/11/80-ALC2/2004 | Party Name: L&T-MHPS | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| BOILERS PVT. LTD. | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00172/AM20/ | RLA File<br>:03/95/040/00588/AM20/ | Lic.No/Date:0310831569<br>16.09.2019 | Pending<br>with DHI |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI for examination of the case on 19.12.2019 followed by a reminder on 06.03.2020. However, no comments been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/13/80-ALC2/2019 Party Name: RONCH Meet No/Date:23/80- Status:<br>POLYMERS PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310832012 RA/Firm<br>:01/80/050/00186/AM20/ :03/95/040/00654/AM20/ 04.10.2019<br>85 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 17.12.2019 followed by a reminder on 13.02.2020. However, no information has been received so<br>far. Therefore, the Committee decided to remind again RA, Mumbai & the firm for submitting the complete set<br>of application.<br>Case is deferred.<br>----- End of picture text -----<br>
24 | P a g e
==> picture [476 x 152] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/13/80-ALC2/2019 Party Name: FERRUM Meet No/Date:23/80- Status:<br>EXTREME ENGINEERING ALC2/2019 Deferred<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0510412040 RA/Firm<br>:01/80/050/00187/AM20/ :05/23/040/00265/AM20/ 07.10.2019<br>86 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 17.12.2019 followed by a reminder on 13.02.2020. However, no information has been received so far.<br>Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
87
| Case No.:3/13/80-ALC2/2019 | Party Name: AVLIGHT | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| AUTOMOTIVES PVT. | ALC2/2019 | Deferred | |||||
| LTD. | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00188/AM20/ | RLA File<br>:05/23/040/00266/AM20/ | Lic.No/Date:0510412058<br>09.10.2019 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 21.01.2020 followed by a reminder on 09.03.2020. However, no comments been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
88
| Case No.:4/13/80-ALC2/2019 | Party Name: L&T- MHPS | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2019 | Deferred | |||||
| PRIVATE LIMITED | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00189/AM20/ | RLA File<br>:03/95/040/00681/AM20/ | Lic.No/Date:0310832116<br>10.10.2019 | Pending<br>with firm |
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 09.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: L&T- MHPS Meet No/Date:23/80- Status:<br>5/13/80-ALC2/2019 TURBINE GENERATORS ALC2/2019 Deferred<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0310832159 Pending<br>:01/80/050/00190/AM20/ :03/95/040/00655/AM20/ 11.10.2019 with firm<br>89 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 11.02.2020. However, the firm vide letter dated<br>11.03.2020 informed that the Project Engineering & Detail Design is in progress and is expected to complete by<br>30 June 2020. Hence, they requested for extension of time till 30 [th] June 2020 to furnish the requisite information.<br>Therefore, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>
25 | P a g e
| Case No.: | Party Name: GODREJ & | Meet No/Date: 23/80- | Status: | |||
|---|---|---|---|---|---|---|
| 6/13/80-ALC2/2019 | BOYCE MFG. CO. LTD. | ALC2/2019 | Deferred | |||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00191/AM20/ | RLA File<br>:03/94/040/00505/AM20/ | Lic.No/Date:0310832178<br>11.10.2019 | PH |
90 Decision: The Committee considered the case as per the agenda and noted that the firm was called for personal hearing to explain the case before Norms Committee. However, the firm vide email dated 12.03.2020informed that they were unable to come to attend personal hearing and requested for another date for personal hearing. Therefore, the Committee decided to grant another date for personal hearing to the firm.
Case is deferred.
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:7/13/80-ALC2/2019 Party Name: ISGEC HITACHI Meet No/Date:23/80- Status:<br>ZOSEN LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0510412096 RA/Firm<br>:01/80/050/00192/AM20/ :05/23/040/00269/AM20/ 11.10.2019<br>91 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 17.12.2019 followed by a reminder on 13.02.2020. However, no information has been received so far.<br>Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/13/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910068080 RA/Firm<br>:01/80/050/00193/AM20/ :09/24/040/00347/AM20/ 14.10.2019<br>92 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA,<br>Hyderabad on 17.12.2019 and again on 13.02.2020 & 17.02.2020. However, no information has been received<br>so far. Therefore, the Committee decided to remind again RA, Hyderabad & the firm for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/13/80-ALC2/2019 Party Name: GENESIS Meet No/Date:23/80- Status:<br>PACKAGING PVT.LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0710115559 Pending with<br>:01/80/050/00194/AM20/ :07/24/040/00152/AM20/ 14.10.2019 MSME<br>93<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME for examination of the case on 01.11.2019 followed by a reminder on 12.02.2020. However, no<br>comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the<br>comments.<br>Case is deferred.<br>----- End of picture text -----<br>
26 | P a g e
==> picture [476 x 188] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/13/80-ALC2/2019 Party Name: GOLD MOHUR Meet No/Date:23/80- Status:<br>PROFILES LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0510412119 D/L<br>:01/80/050/00195/AM20/ :05/23/040/00279/AM20/ 15.10.2019<br>Decision: The Committee considered the case as per the agenda and Consultant (Tech-1) informed that the<br>firm’s reply against deficiency letter dated 11.02.2020 is deficient due to following reasons:<br>94<br>1. Why is Rubber Content Weight given instead of Rubber Compound Weight for export item at Sl. No.<br>2?<br>2. Why is the composition for 100Kg indicated as 103.445Kg for export item at Sl. No. 3?<br>Therefore, the Committee decided to ask from the firm for clarification on the above mentioned deficiencies.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 118] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/13/80-ALC2/2019 Party Name: Meet No/Date:23/80- Status:<br>GLOVIS INDIA (P) LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0410166162 Pending with<br>95 :01/80/050/00196/AM20/ :04/24/040/00111/AM20/ 15.10.2019 MSME<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME for examination of the case on 14.11.2019 followed by ID reminders on 07.01.2020 & 06.03.2020.<br>However, no comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/15/80-ALC2/2019 Party Name: ULTRA Meet No/Date:23/80- Status:<br>ENGINEERS ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3110067586 RA/Firm<br>:01/80/050/00210/AM20/ :31/83/040/00099/AM20/ 05.11.2019<br>96<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Pune & the firm and in this regard an email has been sent on 15.01.2020<br>followed by a reminder on 09.03.2020. However, no information has been received yet. Hence, the Committee<br>decided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/17/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:23/80- Status:<br>PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0510412724 RA/Firm<br>:01/80/050/00233/AM20/ :05/24/040/00513/AM20/ 29.11.2019<br>97<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm and in this regard an email has been sent on 15.01.2020<br>followed by a reminder on 09.03.2020. However, no information has been received yet. Hence, the Committee<br>decided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
27 | P a g e
| Case No.:2/17/80-ALC2/2019 | Party Name: SULZER PUMPS | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| INDIA LIMITED | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00234/AM20/ | RLA File<br>:03/95/040/00827/AM20/ | Lic.No/Date:0310833126<br>02.12.2019 | RA/Firm |
98 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email has been sent on 15.01.2020 followed by a reminder on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/17/80-ALC2/2019 Party Name: SULZER PUMPS Meet No/Date:23/80- Status:<br>INDIA LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310833143 RA/Firm<br>:01/80/050/00235/AM20/ :03/95/040/00828/AM20/ 02.12.2019<br>----- End of picture text -----<br>
99 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email has been sent on 15.01.2020 followed by a reminder on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:4/17/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Rejected | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00236/AM20/ | RLA File<br>:09/24/040/00438/AM20/ | Lic.No/Date:0910068243<br>02.12.2019 |
100 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 10.12.2019 followed by a reminder on 17.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .
Case is rejected.
| Case No.:5/17/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Deferred | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00237/AM20/ | RLA File<br>:09/24/040/00439/AM20/ | Lic.No/Date:0910068244<br>02.12.2019 | RA/Firm |
101 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 03.02.2020. However, no information has been received yet. Therefore, the Committee decided to remindRA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
28 | P a g e
| Case No.:9/17/80-ALC2/2019 | Party Name: HANNING | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| MOTORS INDIA P. LTD. | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00241/AM20/ | RLA File<br>:34/24/040/00270/AM20/ | Lic.No/Date:3410045677<br>03.12.2019 | RA/Firm |
102 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 15.01.2020 followed by a reminder on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:10/17/80-ALC2/2019 | Party Name: HANNING | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| MOTORS INDIA P. LTD. | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00242/AM20/ | RLA File<br>:34/24/040/00271/AM20/ | Lic.No/Date:3410045679<br>03.12.2019 | RA/Firm |
103 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 15.01.2020 followed by a reminder on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/17/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910068247 RA/Firm<br>:01/80/050/00243/AM20/ :09/24/040/00437/AM20/ 04.12.2019<br>104<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on<br>03.02.2020. However, no information has been received yet. Therefore, the Committee decided to remindRA,<br>Hyderabad & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
105
| Case No.:12/17/80- | Party Name: DOOWON | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | CLIMATE CONTROL INDIA | ALC2/2019 | Deferred | ||||
| PRIVATE LIMITED | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00244/AM20/ | RLA File<br>:26/24/040/00012/AM20/ | Lic.No/Date:2610012887<br>04.12.2019 | Pending with<br>DHI |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 29.01.2020 and again on 06.03.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to wait for the comments.
Case is deferred.
29 | P a g e
Case No.:13/17/80-ALC2/2019 Party Name: KABY Meet No/Date:23/80- Status: PRECISION MACHINING ALC2/2019 Deferred PRIVATE LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:0910068268 Pending with 106 :01/80/050/00245/AM20/ :09/24/040/00447/AM20/ 06.12.2019 DPIIT
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 06.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments. Case is deferred.
Case No.:1/19/80-ALC2/2019 Party Name: BAUMER Meet No/Date:23/80- Status: TECHNOLOGIES INDIA ALC2/2019 Deferred PRIVATE LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:5210043275 Pending with 107 :01/80/050/00266/AM20/ :52/24/040/00051/AM20/ 23.12.2019 Tech-3
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) on 19.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (Tech-3) for expediting the comments. Case is deferred.
| Case No.:2/19/80-ALC2/2019 | Party Name: DILIGENT SCM | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| SOLUTIONS PR IVATE | ALC2/2019 | Deferred | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00267/AM20/ | RLA File<br>:09/24/040/00474/AM20/ | Lic.No/Date:0910068302<br>24.12.2019 | RA/Firm |
108 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 03.02.2020&14.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 217] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/19/80- Party Name: DIGI DRIVES Meet No/Date:23/80- Status:<br>ALC2/2019 PRIVATE LIMITED ALC2/2019 Approved<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0510413072<br>:01/80/050/00268/AM20/ :05/23/040/00375/AM20/ 24.12.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms on the basis of<br>inputs given by Technical Authorities as under:<br>109<br>ITCHS Export Sl. ITCHS Recommended<br>Quantity Import Item<br>Code Item No. Code Norms<br>1 84615029 Cutting Head As per GN-4<br>Colour<br>84798100 Coating 1.000 2 85372000 Electrical Panel As per GN-4<br>Line Set 3 80511020 Electrical Motor And As per GN-4<br>Accessories<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
30 | P a g e
110
| Case No.:4/19/80-ALC2/2019 | Party Name: CRYOGAS | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| EQUIPMENT PVT. LTD. | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00269/AM20/ | RLA File<br>:34/24/040/00287/AM20/ | Lic.No/Date:3410045738<br>24.12.2019 | Pending<br>with DPIIT |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 28.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DPIIT for expediting the comments.
Case is deferred.
Case No.:7/19/80-ALC2/2019 Party Name: DAMPER Meet No/Date:23/80- Status: TECHNOLOGY INDIA PVT. ALC2/2019 Approved LTD. 13.03.2020 HQ File RLA File Lic.No/Date:3210079311 :01/80/050/00272/AM20/ :32/24/040/00099/AM20/ 27.12.2019
111 Decision: The Committee considered the case as per the agenda and decided to ratify the norms on the recommendation of the representative of DHI as under:
-
Quantity of import item at Sl. No. 6 may be allowed on net to net basis .
-
Quantity of rest of the import items may be allowed under GN-4 .
RA concerned may take further necessary action as per the decision of NC.
112
| Case No.:9/19/80-ALC2/2019 | Party Name: BONATRANS | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDIA PRIVATE LIMITED | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00274/AM20/ | RLA File<br>:03/94/040/00785/AM20/ | Lic.No/Date:0310833747<br>27.12.2019 | Pending<br>with DHI |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 24.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.
Case is deferred.
113
| Case No.:8/19/80-ALC2/2019 | Party Name: TEGA | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INDUSTRIES LIMITED | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00273/AM20/ | RLA File<br>:02/24/040/00148/AM20/ | Lic.No/Date:0210209647<br>30.12.2019 | Pending with<br>Tech-1/DPIIT |
Decision: The Committee considered the case as per the agenda and noted that the case was referred to Consultant (Tech-1) for comments on import items at Sl. No. 2 to 4 and decided to refer the case to DPIIT for comments on import item at Sl. No. 1.
Case is deferred.
31 | P a g e
==> picture [476 x 301] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/19/80-ALC2/2019 Party Name: BANGALORE Meet No/Date:23/80- Status:<br>BIOTECH LABS PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0710115950 D/L<br>:01/80/050/00275/AM20/ :07/24/040/00223/AM20/ 30.12.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the<br>following information as per written comments of DPIIT vide U. O. No.: P-47011/190/2019-TSW dated<br>13.03.2020:<br>1. Model number, technical specification and specific quantity-both in terms of number (if any) and/or<br>weight, of each export product (Appendix-33 of current HBP refers).<br>2. Weight of each Export Product.<br>114<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license, if<br>any, may also be indicated.<br>4. Assembly drawings/diagrams of the resultant product showing placement and exact use of components<br>in the export product (s).<br>5. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured<br>out of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:11/19/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Deferred | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00276/AM20/ | RLA File<br>:09/24/040/00489/AM20/ | Lic.No/Date:0910068312<br>31.12.2019 | RA/Firm |
115
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 03.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:12/19/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Deferred | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00277/AM20/ | RLA File<br>:09/24/040/00490/AM20/ | Lic.No/Date:0910068313<br>31.12.2019 | RA/Firm |
116 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 03.02.2020. However, no information has been received yet. Therefore, the Committee decided to remindRA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
32 | P a g e
Case No.:13/19/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:23/80- Status: CORPORATION PANSE ALC2/2019 Deferred PRIVATE LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:3110067645 Send to 117 :01/80/050/00278/AM20/ :31/83/040/00128/AM20/ 31.12.2019 Tech-3
Decision: The Committee considered the case as per the agenda and decided to refer the case to Consultant (Tech-3) for examination & comments. Case is deferred.
Case No.:14/19/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:23/80- Status: ENGINEERING LIMITED ALC2/2019 Deferred 13.03.2020 HQ File RLA File Lic.No/Date:0510413163 Pending 118 :01/80/050/00279/AM20/ :05/23/040/00381/AM20/ 01.01.2020 with DPIIT
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 24.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DPIIT for expediting the comments. Case is deferred.
119
Case No.:15/19/80-ALC2/2019 Party Name: SOGEFI ENGINE Meet No/Date:23/80- Status: SYSTEMS INDIA PRIVATE ALC2/2019 Deferred LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:0710115971 RA/Firm :01/80/050/00280/AM20/ :07/24/040/00097/AM20/ 02.01.2020
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm and in this regard an email has been sent on 13.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Bangalore & the firm for submitting the complete set of application. Case is deferred.
Case No.:16/19/80-ALC2/2019 Party Name: MICRON Meet No/Date:23/80- Status: INSTRUMENTS PVT LTD ALC2/2019 Deferred 13.03.2020 HQ File RLA File Lic.No/Date:0510413177 Pending 120 :01/80/050/00281/AM20/ :05/24/040/00590/AM20/ 02.01.2020 with DPIIT
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 12.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments. Case is deferred.
121
| Case No.:17/19/80-ALC2/2019 | Party Name: ISGEC HEAVY | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING LIMITED | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File :01/80/050/00282/AM20/ | RLA File :05/23/040/00378/AM20/ | Lic.No/Date:0510413181<br>02.01.2020 | Pending with<br>DHI |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 24.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.
Case is deferred.
33 | P a g e
| Case No.:1/21/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Deferred | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00295/AM20/ | RLA File<br>:09/24/040/00522/AM20/ | Lic.No/Date:0910068392<br>21.01.2020 | RA/Firm |
122 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910068393 RA/Firm<br>:01/80/050/00296/AM20/ :09/24/040/00523/AM20/ 21.01.2020<br>----- End of picture text -----<br>
123 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:3/21/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Deferred | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00297/AM20/ | RLA File<br>:09/24/040/00524/AM20/ | Lic.No/Date:0910068394<br>21.01.2020 | RA/Firm |
124 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910068395 RA/Firm<br>:01/80/050/00298/AM20/ :09/24/040/00528/AM20/ 21.01.2020<br>----- End of picture text -----<br>
125 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
34 | P a g e
| Case No.:5/21/80-ALC2/2019 | Party Name: MAHINDRA | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| DEFENCE SYSTEMS LTD | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00299/AM20/ | RLA File<br>:05/24/040/00602/AM20/ | Lic.No/Date:0510413404<br>21.01.2020 | RA/Firm |
126 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
127
| Case No.:6/21/80-ALC2/2019 | Party Name: MICRON | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00300/AM20/ | RLA File<br>:05/24/040/00675/AM20/ | Lic.No/Date:0510413411<br>21.01.2020 | Pending<br>with DPIIT |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 12.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:7/21/80-ALC2/2019 | Party Name: LM WIND POWER | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00301/AM20/ | RLA File<br>:34/24/040/00329/AM20/ | Lic.No/Date:3410045799<br>21.01.2020 | RA/Firm |
128 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
129
| Case No.:8/21/80-ALC2/2019 | Party Name: LM WIND POWER | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00302/AM20/ | RLA File<br>:34/24/040/00330/AM20/ | Lic.No/Date:3410045800<br>21.01.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
35 | P a g e
130
| Case No.:9/21/80-ALC2/2019 | Party Name: MICRON | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| INSTRUMENTS PVT LTD | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00303/AM20/ | RLA File<br>:05/24/040/00398/AM20/ | Lic.No/Date:0510413428<br>23.01.2020 | Pending with<br>DPIIT |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 12.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:10/21/80-ALC2/2019 | Party Name: THERMAL | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| SYSTEMS (HYDERABAD) P. | ALC2/2019 | Deferred | ||||
| LTD. | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00304/AM20/ | RLA File<br>:09/24/040/00506/AM20/ | Lic.No/Date:0910068410<br>24.01.2020 | RA/Firm |
131 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:11/21/80-ALC2/2019 | Party Name: CHEMICO | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| SYNTHETICS LTD., | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00305/AM20/ | RLA File<br>:05/23/040/00408/AM20/ | Lic.No/Date:0510413441<br>24.01.2020 | RA/Firm |
132 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:12/21/80-ALC2/2019 | Party Name: KAY BOUVET | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING LTD | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00306/AM20/ | RLA File<br>:31/83/040/00139/AM20/ | Lic.No/Date:3110067666<br>27.01.2020 | RA/Firm |
133 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
36 | P a g e
| Case No.:13/21/80-ALC2/2019 | Party Name: HANNING | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| MOTORS INDIA P LTD | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00307/AM20/ | RLA File<br>:34/24/040/00336/AM20/ | Lic.No/Date:3410045818<br>28.01.2020 | RA/Firm |
134 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:14/21/80-ALC2/2019 | Party Name: HANNING | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| MOTORS INDIA P LTD | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00308/AM20/ | RLA File<br>:34/24/040/00337/AM20/ | Lic.No/Date:3410045819<br>28.01.2020 | RA/Firm |
135 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:15/21/80-ALC2/2019 Party Name: HANNING Meet No/Date:23/80- Status:<br>MOTORS INDIA P LTD ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3410045820 RA/Firm<br>:01/80/050/00309/AM20/ :34/24/040/00338/AM20/ 28.01.2020<br>136<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Vadodara& the firm and in this regard an email has been sent on 09.03.2020.<br>However, no information has been received yet. Hence, the Committee decided to wait for the complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:16/21/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Deferred | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00310/AM20/ | RLA File<br>:09/24/040/00525/AM20/ | Lic.No/Date:0910068424<br>29.01.2020 | RA/Firm |
137 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
37 | P a g e
| Case No.:17/21/80-ALC2/2019 | Party Name: AVLIGHT | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| AUTOMOTIVES PVT. LTD. | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00311/AM20/ | RLA File<br>:05/23/040/00359/AM20/ | Lic.No/Date:0510413478<br>29.01.2020 | RA/Firm |
138 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:18/21/80-ALC2/2019 | Party Name: LM WIND POWER | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00312/AM20/ | RLA File<br>:34/24/040/00341/AM20/ | Lic.No/Date:3410045830<br>30.01.2020 | RA/Firm |
139 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:19/21/80-ALC2/2019 Party Name: BENGAL Meet No/Date:23/80- Status:<br>INDUSTRIES PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0510413481 RA/Firm<br>:01/80/050/00313/AM20/ :05/23/040/00415/AM20/ 30.01.2020<br>140<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm and in this regard an email has been sent on 09.03.2020.<br>However, no information has been received yet. Hence, the Committee decided to wait for the complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:20/21/80-ALC2/2019 | Party Name: LM WIND POWER | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00314/AM20/ | RLA File<br>:34/24/040/00344/AM20/ | Lic.No/Date:3410045838<br>30.01.2020 | RA/Firm |
141 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
38 | P a g e
| Case No.:21/21/80-ALC2/2019 | Party Name: BHARAT HEAVY | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ELECTRICALS LIMITED | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00315/AM20/ | RLA File<br>:11/24/040/00011/AM20/ | Lic.No/Date:1110028681<br>31.01.2020 | RA/Firm |
142 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bhopal & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:22/21/80-ALC2/2019 | Party Name: JAIN IRRIGATION | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| SYSTEMS LTD. | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00316/AM20/ | RLA File<br>:03/94/040/00435/AM20/ | Lic.No/Date:0310834593<br>03.02.2020 | RA/Firm |
143 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:23/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910068441 RA/Firm<br>:01/80/050/00317/AM20/ :09/24/040/00557/AM20/ 03.02.2020<br>144<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on<br>06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the<br>complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:24/21/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Deferred | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00318/AM20/ | RLA File<br>:09/24/040/00559/AM20/ | Lic.No/Date:0910068442<br>03.02.2020 | RA/Firm |
145 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
39 | P a g e
| Case No.:25/21/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Deferred | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00319/AM20/ | RLA File<br>:09/24/040/00552/AM20/ | Lic.No/Date:0910068443<br>03.02.2020 | RA/Firm |
146 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
| Case No.:26/21/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Deferred | ||||
| LIMITED | 13.03.2020 | |||||
| HQ File<br>:01/80/050/00320/AM20/ | RLA File<br>:09/24/040/00554/AM20/ | Lic.No/Date:0910068444<br>03.02.2020 | RA/Firm |
147 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:27/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910068445 RA/Firm<br>:01/80/050/00321/AM20/ :09/24/040/00553/AM20/ 03.02.2020<br>148<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on<br>06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the<br>complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
149
| Case No.:28/21/80-ALC2/2019 | Party Name: FRIZAIR | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00322/AM20/ | RLA File<br>:09/24/040/00556/AM20/ | Lic.No/Date:0910068449<br>04.02.2020 | Pending<br>with DHI |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 24.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.
Case is deferred.
40 | P a g e
==> picture [476 x 142] intentionally omitted <==
----- Start of picture text -----<br> Case No.:29/21/80-ALC2/2019 Party Name: COFLE Meet No/Date:23/80- Status: Deferred<br>TAYLOR INDIA ALC2/2019<br>CONTROL CABLES & 13.03.2020<br>SYSTEMS PRIVAT<br>HQ File RLA File Lic.No/Date:0410166495 Pending with<br>150 :01/80/050/00323/AM20/ :04/24/040/00167/AM20/ 05.02.2020 MSME<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent<br>to MSME on 11.03.2020 for examination of the case. However, no comments have been received yet. Hence,<br>the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
151
| Case No.:30/21/80-ALC2/2019 | Party Name: AYYAPPA | Meet No/Date:23/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| CNC PVT LTD | ALC2/2019 | ||||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00324/AM20/ | RLA File<br>:07/24/040/00262/AM20/ | Lic.No/Date:0710116097<br>05.02.2020 | Pending with<br>MSME |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 24.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.
Case is deferred.
| Case No.:31/21/80-ALC2/2019 | Party Name: TEMA INDIA | Meet No/Date:23/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2019 | Deferred | ||||
| 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00325/AM20/ | RLA File<br>:03/95/040/01062/AM20/ | Lic.No/Date:0310834668<br>06.02.2020 | RA/Firm |
152 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
153
| Case No.:32/21/80-ALC2/2019 | Party Name: IND-SPHINX | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| PRECISION LIMITED | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00326/AM20/ | RLA File<br>:30/24/040/00122/AM20/ | Lic.No/Date:3010105038<br>07.02.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Ludhiana & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.
Case is deferred.
41 | P a g e
154
| Case No.:2/23/80-ALC2/2019 | Party Name: MANN AND | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| HUMMEL FILTER PVT.LTD. | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00347/AM20/ | RLA File<br>:07/24/040/00271/AM20/ | Lic.No/Date:0710116157<br>20.02.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm. Therefore, the Committee decided to request from RA, Bangalore and the firm to furnish the hard copy of application for examination of the case.
Case is deferred.
155
| Case No.:4/23/80-ALC2/2019 | Party Name: RONCH | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| POLYMERS PVT LTD | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00349/AM20/ | RLA File<br>:03/95/040/01089/AM20/ | Lic.No/Date:0310834951<br>20.02.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the hard copy of application for examination of the case.
Case is deferred.
156
| Case No.:3/23/80-ALC2/2019 | Party Name: AVLIGHT | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| AUTOMOTIVES LTD. | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00348/AM20/ | RLA File<br>:05/23/040/00424/AM20/ | Lic.No/Date:0510413679<br>21.02.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.
Case is deferred.
157
| Case No.:5/23/80-ALC2/2019 | Party Name: HANNING | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| MOTORS INDIA P LTD | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00350/AM20/ | RLA File<br>:34/24/040/00368/AM20/ | Lic.No/Date:3410045900<br>21.02.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the hard copy of application for examination of the case.
Case is deferred.
42 | P a g e
158
| Case No.:6/23/80-ALC2/2019 | Party Name: L & T-MHPS | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2019 | Deferred | |||||
| PRIVATE LIMITED | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00351/AM20/ | RLA File<br>:03/95/040/01074/AM20/ | Lic.No/Date:0310835043<br>25.02.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the hard copy of application for examination of the case.
Case is deferred.
159
| Case No.:7/23/80-ALC2/2019 | Party Name: LM WIND POWER | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| BLADES INDIA PVT. LTD | ALC2/2019 | Deferred | |||||
| 13.03.2020 | |||||||
| HQ File<br>:01/80/050/00352/AM20/ | RLA File<br>:34/24/040/00375/AM20/ | Lic.No/Date:3410045913<br>28.02.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the hard copy of application for examination of the case.
Case is deferred.
160
| Case No.:8/23/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Deferred | |||||
| LIMITED | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00353/AM20/ | RLA File<br>:09/24/040/00595/AM20/ | Lic.No/Date:0910068531<br>02.03.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the hard copy of application for examination of the case.
Case is deferred.
161
| Case No.:9/23/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2019 | Deferred | |||||
| LIMITED | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00354/AM20/ | RLA File<br>:09/24/040/00594/AM20/ | Lic.No/Date:0910068532<br>02.03.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the hard copy of application for examination of the case.
Case is deferred.
43 | P a g e
162
Case No.:10/23/80-ALC2/2019 Party Name: MAK CONTROLS Meet No/Date:23/80- Status: AND SYSTEMS PVT LTD. ALC2/2019 Deferred 13.03.2020 HQ File RLA File Lic.No/Date:3210079436 RA/Firm :01/80/050/00355/AM20/ :32/21/040/00178/AM20/ 02.03.2020
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Coimbatore & the firm. Therefore, the Committee decided to request from RA, Coimbatore and the firm to furnish the hard copy of application for examination of the case.
Case is deferred.
163
Case No.:11/23/80-ALC2/2019 Party Name: MAK CONTROLS Meet No/Date:23/80- Status: AND SYSTEMS PVT LTD. ALC2/2019 Deferred 13.03.2020 HQ File RLA File Lic.No/Date:3210079437 RA/Firm :01/80/050/00356/AM20/ :32/21/040/00236/AM20/ 02.03.2020
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Coimbatore & the firm. Therefore, the Committee decided to request from RA, Coimbatore and the firm to furnish the hard copy of application for examination of the case.
Case is deferred.
164
| Case No.:12/23/80-ALC2/2019 | Party Name: ACEINOTEC | Meet No/Date:23/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| MANUFACTURING PRIVATE | ALC2/2019 | Deferred | |||||
| LIMITED | 13.03.2020 | ||||||
| HQ File<br>:01/80/050/00357/AM20/ | RLA File<br>:07/24/040/00294/AM20/ | Lic.No/Date:0710116194<br>02.03.2020 | RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm. Therefore, the Committee decided to request from RA, Bangalore and the firm to furnish the hard copy of application for examination of the case.
Case is deferred.
44 | P a g e
Manual Cases
| Manual Cases | |
|---|---|
| Sl. No. 758 | |
| Case No.36/21/80-ALC2/2016 | Status: |
| NAVKAR FITTINGS &<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 | |
| FORGINGS PVT. LTD.<br>Lic. No.: 0310808954 Date: 03.11.2016 | |
| HQ. No.: 01/80/050/00496/AM17<br>**Subject:**Request for fixation of ad-hoc norms | Deferred |
| RLA No.: 03/95/040/00606/AM17 | |
| **Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No. | |
| 04/80-ALC2/2017dated 23.05.2017 due to non-submission of reply of deficiency letter raised by DIPP vide UO | |
| No.12/13/2017-TSW/81 dated 02/03/2017. | |
| However, the firm had furnished the reply with a request to re-open the case and fix the ad-hoc norms. | |
| The Committee noted that the firm’s representation was forwarded toMSMEon 28.11.2018 followed by ID | |
| reminders on 17.09.2019, 10.01.2020& 06.03.2020 for expediting the comments. However, no comments have | |
| been received yet. Hence, the Committee decided to wait for the comments. | |
| Case is deferred. |
==> picture [476 x 83] intentionally omitted <==
----- Start of picture text -----<br> Sl. No. 759<br>Case No. 2/4/80-ALC2/2015 Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 Terumo Penpol Ltd.<br>Lic. No.: 5310008377 dated 28.05.2009<br>HQ. No.: 01/80/050/00073/AM16 Subject: Request for fixation of ad-hoc Deferred<br>RLA No.: 53/21/040/00002/AM10 norms<br>Decision: The Committee considered the case as per the agenda and noted its decision of Meeting 11/19 date<br>----- End of picture text -----<br>
30.11.2018 in which representative of MSME stated that the norms may be fixed on the basis of DIPP recommendation vide No. 07/9/20l6-TSW dt. 08.12.2017 for License No. 5310019514 dt. 05.10.2017 as ratified in Meeting No. 16/80 dated 14.11.2017. However, the Committee observed that the description of export item in the subject application does not exactly match with that appearing in the recommendation of DIPP and due to this it was requested to MSME to provide comments. Based on the deliberations & as per advice of MSME, the Committee decided that Consultant (Tech - 1) to look into the issue. Hence, the case was referred to Consultant (Tech -1) on 16.10.2019 for examination & comments . Consultant (Tech-1) informed that a similar case of the firm has already been referred to PLEXCOUNCIL and Department of C & PC. PLEXCOUNCIL vide email dated 17.12.2019 had requested for 15 days time to reply the query and no information has been received from Deptt. of C & PC. The Committee noted that Deptt. of C & PC and PLEXCOUNCIL were reminded on 12.02.2020 for the expediting the matter. PLEXCOUNCIL’s reply was received and forwarded to Consultant (Tech-1) on 11.03.2020 for examination of the case. However, Consultant (Tech-1) informed in the meeting that PLEXCONCIL reply mentions Acetic Anhydride as the export product, which does not make any sense. Hence the Committee decided to again request PLEXCONCIL and send a D.O. Letter to JS Deptt. Of C&PC to provide their comments in the matter at the earliest. Case is deferred.
45 | P a g e
Sl. No. 760
| Sl. No. 760 | |
|---|---|
| Case No.26/11/80-ALC2/2016<br>Dee Development Engineers Ltd.<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No.: 0510398701 dated 01.06.2017 | |
| HQ. No.: 01/80/050/00299/AM17<br>**Subject:**Request for fixation of ad-hoc<br>norms<br>Deferred<br>RLA No.: 05/23/040/00101/AM17 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting<br>No. 09/80 dated 01.08.2017 due to non-submission of reply of deficiency letter dated 19.04.2017.<br>The Committee reconsidered the case and noted that the firm was reminded on 11.03.2020 for<br>furnishingthe requisite information as per the decision of M. No. 21/80 dated 18.02.2020. However, no reply has<br>been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred. |
Sl. No. 761
| Case No.21/6/80-ALC2/2016<br>Status: |
|---|
| Dee Development Engineers Ltd.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 |
| Lic. No.: 0510398216 dated 13.04.2016 |
| HQ. No.: 01/80/050/00180/AM17<br>**Subject:**Request for fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 05/23/040/00015/AM17 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting |
| No. 09/80 dated 01.08.2017 due to non-submission of reply of deficiency letter dated 19.04.2017. |
| However, the firm had furnished the reply with a request to re-open case and fix the ad-hoc norms. The |
| Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised byDPIIT |
| was sent to the firm on 16.12.2019 followed by a reminder on 12.02.2020. However, no reply has been received |
| yet. Therefore, the Committee decided to sendfinal reminderto the firm for furnishing the requisite information |
| within the 15 days. |
| Case is deferred. |
Sl. No. 762
| Sl. No. 762 | ||
|---|---|---|
| Case No.15/2/80-ALC2/2016 | Status: | |
| Deepeeka Exports Pvt. Ltd.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 | ||
| Lic. No.: 0510396524 dated 04.12.2015 | ||
| HQ. No.: 01/80/050/00018/AM17<br>**Subject:**Request for fixation of ad-hoc norms<br>RLA No.: 05/23/040/00371/AM16 | Deferred | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected | in Meeting | |
| No. 14/80 dated 11.10.2016 due to non-submission of reply of deficiency letter dated 04.08.2016. | ||
| The Committee noted that the firm’s reply against deficiency letter dated 15.01.2019 was sent to | MSMEfor | |
| examination of the case on 21.10.2019 followed by a reminder on 12.02.2020. However, no comments have been | ||
| received yet. Therefore, the Committee decided toremind MSMEfor expediting the comments. | ||
| Case is deferred. |
46 | P a g e
Sl. No. 763
| Sl. No. 763 | |
|---|---|
| Case No.45/24/80-ALC2/2013<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No.: 0310766285 dated 15.01.2014 | Kelvion India Pvt. Ltd.<br>Status: |
| HQ. No.: 01/80/050/00522/AM14<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred<br>RLA No.: 03/94/040/00880/AM14 | |
| Decision:The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.<br>22/80 dated 20.01.2015 due to non-submission of reply of deficiency letter dated 30.07.2014.<br>The firm furnished the reply vide letter dated 20.11.2017 with a request to fix the ad-hoc norms. The Committee<br>considered the case as per agenda and noted that the firm’s reply was forwarded toDPIITon 11.03.2020 for<br>examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for<br>the comments.<br>Case is deferred. |
Sl. No. 764
| Sl. No. 764 | |
|---|---|
| Case No. A/R 16/19 | Status: |
| TATA Sikorsky Aerospace Ltd.<br>M. No.: 23/80-<br>ALC2/2019 dated<br>13.03.2020 | |
| HQ. No.:<br>01/80/162/301/AM18/<br>DES-18<br>**Subject:**EOU- M/s. TATA Sikorsky Aerospace Ltd., LOP No. PER:<br>076/EOU/VSEZ/HYD/2011 dated 25.07.2011 for fixation of wastage<br>norms for export product “Helicopter cabin kits & parts and accessories<br>for Aircraft” against import items 1. Stainless Steel bars/rods 2. Stainless<br>Steel Tube/Pipes 3. Stainless Steel round bars | Deferred |
| **Decision:**The Committee considered the case as per the agenda and noted that the application of the firm was sent | |
| to DIPP on 10.07.2018 and also to DHI on 03.08.2018 for their examinations/comments. Since, they had stated that | |
| the export product is not under the purview of DIPP/DHl, so it was forwarded toMSMEon 18.03.2019 followed | |
| by reminders on24.09.2019, 10.01.2020 & 12.02.2020. However, no comments have been received yet. Therefore, | |
| the Committee decided toremind again MSMEfor expending the comments. | |
| Case is deferred. |
Sl. No. 765
| Case No.67/2/80-ALC2/2016 | Status: |
|---|---|
| ECOCAT INDIA PVT.LTD<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 | |
| Lic. No.: 0510397548 dated 09.02.2016 | |
| HQ. No.: 01/80/050/00070/AM17<br>**Subject:**Request for fixation of ad-hoc | Deferred |
| norms<br>RLA No.: 05/23/040/00472/AM16 | |
| **Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No. | |
| 15/80 dated 06.03.2019 due to non-submission of reply of deficiency letter dated 11.10.2018. | |
| However, the firm had requested for fixation of ad-hoc norms. The Committee noted that the firm’s | |
| representation was forwarded toMSMEon 11.07.2019 followed by reminders on 24.09.2019, 10.01.2020& | |
| 06.03.2020, for examination of the case. However, no comments have been received yet. Hence, the Committee | |
| decided to wait for the comments. | |
| Case is deferred. |
47 | P a g e
Sl. No. 766
==> picture [476 x 64] intentionally omitted <==
----- Start of picture text -----<br> Case No. 27/9/80-ALC2/2017 Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 TERUMO PENPOL PRIVATE LIMITED<br>Lic. No.: 5310019417 dated 15.06.2017<br>HQ. No.: 01/80/050/00205/AM18 Subject: Request for fixation of ad-hoc norms Deferred<br>RLA No.: 53/24/040/00003/AM18<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda noted that the case was approved in Meeting No. 03/80 dated 09.05.2018 as per written comments of DIPP (TSW section) vide letter No.: 07/9/2016-TSW dated 08.12.2017. However the firm requested to re-fix the norms and also allow them for Personal Hearing .
Decision: The Committee considered the case as per the agenda noted that the case was approved in Meeting No. 03/80 dated 09.05.2018 as per written comments of DIPP (TSW section) vide letter No.: 07/9/2016-TSW dated 08.12.2017. However the firm requested to re-fix the norms and also allow them for Personal Hearing . In continuation to Meeting 09/80 dated 14.09.2019, the Committee noted that the firm appeared for PH in its Meeting 09/80 dated 14.09.2019 and explained the reason for higher wastage claimed. Based on the deliberations, the Committee decided that Consultant (Tech 1) to look into the issue. Consultant (Tech-1) pointed out that firm is requesting to increase the wastage norms for PVC compound from 10% to 16% on the basis ofDeptt. of C&PC suggestion vide letter dated 10.09.2012 for amending the SION H-67 and AA of the firm has been ratified on the basis of SION H-67 which allows for only 10%. Consultant (Tech 1) suggested that PLEXCOUNCIL may be requested to provide Production/Consumption data of other manufacturers. The Committee noted that the case was referred to PLEXCOUNCIL &Deptt. Of C & PC on 18.10.2019 & 05.11.2019 respectively. However, PLEXCOUNCIL vide email dated 17.12.2019 had requested for 15 days time to reply the query and no information has been received from Deptt. Of C&PC. The Committee noted that Deptt. of C&PC and PLEXCOUNCIL were reminded on 12.02.2020 for the expediting the matter. PLEXCOUNCIL’s reply was received and forwarded to Consultant (Tech-1) on 11.03.2020 for examination of the case. However, Consultant (Tech-1) informed in the meeting that PLEXCONCIL reply mentions Acetic Anhydride as the export product, which does not make any sense. Hence the Committee decided to again request PLEXCONCIL and send a D.O. Letter to JS Deptt. Of C&PC to provide their comments in the matter at the earliest. Case is deferred.
Sl. No. 767
| Sl. No. 767 | |
|---|---|
| Case No. : 61/25/80-ALC2/2016 | Status: |
| M/s. BARODA EQUIPMENT AND<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 | |
| VESSELS PVT. LTD.<br>Lic. No. /date: 3410042545 dated 21.09.2016 | |
| HQ. No.: 01/80/50/621/AM17/DES-I<br>**Subject:**Request for reviewing of ad-hoc | Deferred |
| norms<br>RLA No.: 34/24/040/00182/AM17 | |
| **Decision:**The Committee considered the case as per the agenda noted that the case was rejected in | M. No. 14/80- |
| ALC2/2017dated 10.10.2017due to non submission of reply of deficiency raised by DPIIT. | |
| However, the firm furnished the reply vide letter dated 31.07.2019 with a request to fix the ad-hoc | |
| norms. The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised | |
| byDPIITwas sent to the firm on 19.11.2019, 13.01.2019& 07.03.2020. However, no reply has been received yet. | |
| Hence, the Committee decided to wait for the firm’s reply. | |
| Case is deferred. |
48 | P a g e
Sl. No. 768
| Case No. :24/19/80-ALC2/2014<br>Status: |
|---|
| M/s SHAKTI PUMPS (INDIA) LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 |
| Lic. No. /date: 5610004450 Date: 21.10.2014 |
| HQ. No.: 01/80/050/00458/AM15<br>**Subject:**Request for re-fixation of ad-hoc<br>norms<br>Deferred<br>RLA No.: 56/24/040/00042/AM15 |
| **Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No. |
| 5/80-ALC2/2016dated 07.06.2016as per recommendation of DIPP vide ID Note No. 12/46/2016-TSW/11 dated |
| 03.06.2016. |
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case as |
| per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on |
| 07.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. |
| Case is deferred. |
Sl. No. 769
| Case No. :No.:9/12/80-ALC2/2017<br>SMC PNEUMATICS (INDIA) PRIVATE<br>LIMITED<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0510403402 dated 14.07.2017 |
|---|
| HQ. No.: 01/80/050/00223/AM18<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 05/24/040/00172/AM18 |
| Decision:The Committee considered the case as per the agenda noted that the case was approved in M. No. 3/80- |
| ALC2/2016 dated 09.05.2018as per recommendation of DHI, DIPP and MSME present in the meeting. |
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case as per agenda |
| and the written comments has been received from Consultant Tech-3. However, the Committee decided to forward |
| the comments of consultant tech-3 to DPIIT on the same similar cases have been examined /recommended by them. |
| Case is deferred. |
Sl. No. 770
| Case No. :16/8/80-ALC2/2018<br>**M/s.**SMC PNEUMATICS (INDIA)<br>PRIVATE LIMITED<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No.: 0510407130 Date: 09.07.2018 |
|---|
| HQ. No.: 01/80/050/139/AM19<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 05/24/040/00207/AM19 |
| **Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No. |
| 4/80-ALC2/2019 dated 22.05.2018as per written comments ofDPIITvide U. O. No.: P-47011/289/2018-TSW |
| dated 25.04.2019. |
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case as per agenda |
| and the written comments has been received from Consultant Tech-3. However, the Committee decided to forward |
| the reviewed comments of consultant tech-3 to DPIIT who had earlier recommended the norms |
| Case is deferred. |
49 | P a g e
Sl. No. 771
| Sl. No. 771 | ||
|---|---|---|
| Case No.41/3/80-ALC2/2015 | Status: | |
| Y-TEC INDIA PVT. LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 | ||
| Lic. No.: 0510393093 dated 05.02.2015 | ||
| HQ. No.: 01/80/050/00041/AM16<br>**Subject:**Request for fixation of ad-hoc norms | Deferred | |
| RLA No.: 05/24/040/00523/AM15 | ||
| **Decision:**The Committee considered the case as per the agenda noted that the case was rejected in | Meeting No. | |
| 18/80 dated 08.12.2015 due to non-submission of reply of deficiency letter dated 22.06.2015. | ||
| However, the firm vide letter dated 20.12.2018 submitted the representation with a request | to fix the ad- | |
| hoc norms. The Committee reconsidered the case and noted that a deficiency letter seeking certain information as | ||
| raised by**Consultant (Tech-1)**was sent to the firm on 22.11.2019 followed by reminders on | 13.01.2020& | |
| 07.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. | ||
| Case is deferred. |
Sl. No. 772
| Case No.:39/5/80-ALC2/2017<br>L & T-MHPS TURBINE GENERATORS<br>PRIVATE LIMITED<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0310813078 Date: 05.05.2017 |
|---|
| HQ. No.: 01/80/050/00100/AM18<br>**Subject:**Request for re-fixation of ad-hoc<br>norms<br>Deferred<br>RLA No.: 03/95/040/01041/AM17 |
| **Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No. |
| 15/80-ALC2/2018 dated06.03.2019 as per the written comments of DHI vide their U.O. No. DES-I/L&T/Tu-1- |
| 2018-HEI dated 24.12.2018. |
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and noted |
| that a deficiency letter seeking certain information as raised byDHIwas sent to the firm on 07.03.2020. However, |
| no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. |
| Case is deferred. |
Sl. No. 773
| Sl. No. 773 | ||||
|---|---|---|---|---|
| Case No.:13/16/80-ALC2/2017<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0310815484 Date: 01.09.2017 | L & T-MHPS TURBINE GENERATORS<br>PRIVATE LIMITED | Status: | ||
| HQ. No.: 01/80/050/00276/AM18 | **Subject:**Request for fixation of ad-hoc norms | Deferred | ||
| RLA No.: 03/95/040/00052/AM18 | ||||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting | ||||
| No.<br>06/80-ALC2/2018dated<br>11.07.2018<br>on<br>the<br>ground<br>that<br>the<br>parts<br>of<br>the | import | items | ||
| given ( Unit of Measurement) in sets and number of parts in each set and their composition is not known. The | ||||
| Committee found that it was very difficult to enforce accountability and rejected the case. | ||||
| However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case | and noted that | |||
| the firm’s reply was sent toDHIon 21.02.2020 | for examination of the case. However, no comments have | been | ||
| received yet. Therefore, the Committee decided toremind DHIfor expediting the comments. | ||||
| Case is deferred. |
50 | P a g e
==> picture [472 x 165] intentionally omitted <==
----- Start of picture text -----<br> Sl. No. 774<br>M. No.: 23/80-ALC2/2019 dated<br>Astha Corporation Pvt. Ltd. Status:<br>13.03.2020<br>HQ File No: Subject: Request for 100% EOU for fixation of Norms for<br>Deferred<br>01/80/162/003/AM20/DES1 Precision Metal Machined Parts<br>Decision: The Committee considered the case as per agenda and noted that the representation received from O/o<br>Development Commissioner Vishakhapatnam Special Economic Zone, Hyderabad has forwarded the application of<br>M/s Astha corporation Pvt. Ltd., for 100% EOU for fixation of Norms for Precision Metal Machined Parts.<br> The firm had requested for fixation of norms. The Committee noted that the case was referred to MSME<br>for examination on 27.08.2019 followed by reminders on 08.11.2019, 06.01.2020& 06.03.2020. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per agenda and noted that the representation received from O/o Development Commissioner Vishakhapatnam Special Economic Zone, Hyderabad has forwarded the application of M/s Astha corporation Pvt. Ltd., for 100% EOU for fixation of Norms for Precision Metal Machined Parts.
Sl. No. 775
==> picture [484 x 241] intentionally omitted <==
----- Start of picture text -----<br> Case No.: 46/24/80-ALC2/2012<br>BHARAT HEAVY ELECTRICALS LIMITED Status :<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No.: 0410112044 dated.02.03.2011<br>HQ File No: 01/80/050/00819/AM10/ Subject: Request for revision of ad-hoc norms Deferred<br>RA.F.No.04/24/040/00290/AM10<br>Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting<br>No.07/80 dated 25.06.2013 as per written of DHI UO No. 3(23)/13-TSW(B)/89 dated 6.5.2013.<br> The firm vide letter dated 17.10.2019 requested for revision of ad-hoc norms. The firm stated that they have not<br>requested DGFT to amend the UOM as “Number” for the items which have UOM as “SET”. Based on their<br>requirement, they have only provided the break-up details. The firm has further stated that the quantity of material they<br>have imported in terms of “Number” is same as that they have declared to DGFT earlier. Now, they have requested to<br>revise Unit of Measurement (UoM).<br> The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by<br>DPIIT was sent to the firm on 14.01.2020. The firm vide their e-mail dated 13.02.2020 informed that D/L e-mail has<br>not been received by them. Hence, the deficiency letter was again sent to the firm on 09.03.2020. However, no reply<br>has been received yet. The Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>
The firm vide letter dated 17.10.2019 requested for revision of ad-hoc norms. The firm stated that they have not requested DGFT to amend the UOM as “Number” for the items which have UOM as “SET”. Based on their requirement, they have only provided the break-up details. The firm has further stated that the quantity of material they have imported in terms of “Number” is same as that they have declared to DGFT earlier. Now, they have requested to revise Unit of Measurement (UoM).
The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 14.01.2020. The firm vide their e-mail dated 13.02.2020 informed that D/L e-mail has not been received by them. Hence, the deficiency letter was again sent to the firm on 09.03.2020. However, no reply has been received yet. The Committee decided to wait for the firm’s reply.
Sl. No. 776
| Case No.:53/2/80-ALC2/2016 | Status: |
|---|---|
| ALSTOM INDIA LIMITED<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 | |
| Lic. No. /date: 0310795652 Date: 30.04.2015 | |
| HQ. No.: 01/80/050/00056/AM17/<br>**Subject:**Request for fixation of ad-hoc norms | Deferred |
| RLA No.: 03/94/040/00060/AM16/ | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in M. No. | |
| 20/80-ALC2/2016 dated03.01.2017 due to non-submission of reply of deficiency letter dated 24.10.2016 raised | |
| by DHI. | |
| The firm vide letter dated 28.09.2019 had requested for fixation of ad-hoc norms. The Committee reconsidered the | |
| case and noted that a deficiency letter seeking certain information as raised byDHIwas sent to the firm on | |
| 11.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply. | |
| Case is deferred. |
51 | P a g e
Sl. No. 777
| Case No.:58/12/80-ALC2/2014<br>Status: |
|---|
| GEA ECOFLEX INDIA PVT.LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 |
| Lic. No. /date: 3110064489 Date: 27.06.2014 |
| HQ. No.: 01/80/050/00307/AM15/<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred |
| RLA No.: 31/83/040/00082/AM15 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in M. No. |
| 3/80-ALC2/2015 dated12.05.2015 due to non-submission of reply of deficiency letter dated 07.10.2014. |
| The firm vide letter dated 02.11.2019 has furnished the reply and requested for fixation of ad-hoc norms. The |
| Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised byDPIIT |
| was sent to the firm on 07.03.2020. However, no reply has been received yet. Hence, the Committee decided to |
| wait for the firm’s reply. |
| Case is deferred. |
Sl. No. 778
| Case No.:10/8/80-ALC2/2015<br>Status: |
|---|
| GEA ECOFLEX INDIA PVT. LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 |
| Lic. No. /date: 0310795103 Date: 06.04.2015 |
| HQ. No.: 01/80/050/00116/AM16<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred |
| RLA No.: 03/94/040/01169/AM15 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting |
| No.20/80-ALC2/2015 dated05.01.2016 due to non-submission of reply of deficiency letter dated 22.09.2015 |
| raised by DIPP. |
| The firm vide letter dated 02.11.2019 has furnished the reply and requested for fixation of ad-hoc norms. |
| The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by |
| DPIITwas sent to the firm on 07.03.2020. However, no reply has been received yet. Hence, the Committee |
| decided to wait for the firm’s reply. |
| Case is deferred. |
Sl. No. 779
| Case No.:39/22/80-ALC2/2014<br>Status: |
|---|
| GEA ECOFLEX INDIA PVT.LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 |
| Lic. No. /date: 0310789333 Date: 17.09.2014 |
| HQ. No.: 01/80/050/00520/AM15/<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred |
| RLA No.: 03/94/040/00580/AM15/ |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in M. No. |
| 10/80-ALC2/2015 dated17.08.2015 due to non-submission of reply of deficiency letter dated 20.03.2015 raised |
| by DIPP. |
| The firm vide letter dated 02.11.2019 has furnished the reply and requested for fixation of ad-hoc norms. |
| The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by |
| DPIITwas sent to the firm on 07.03.2020. However, no reply has been received yet. Hence, the Committee |
| decided to wait for the firm’s reply. |
| Case is deferred. |
52 | P a g e
Sl. No. 780
| Case No.:20/19/80-ALC2/2014<br>Status: |
|---|
| GEA ECOFLEX INDIA PVT.LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 |
| Lic. No. /date: 0310788788 Date: 05.09.2014 |
| HQ. No.: 01/80/050/00454/AM15<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred |
| RLA No.: 03/94/040/00415/AM15 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting |
| No.4/80-ALC2/2015 dated26.05.2015 due to non-submission of reply of deficiency letter dated 09.02.2015 |
| raised by DIPP. |
| The firm vide letter dated 02.11.2019 has furnished the reply and requested for fixation of ad-hoc norms. |
| The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by |
| DPIITwas sent to the firm on 07.03.2020. However, no reply has been received yet. Hence, the Committee |
| decided to wait for the firm’s reply. |
| Case is deferred. |
Sl. No. 781
| Case No.:4/8/80-ALC2/2018<br>Status: |
|---|
| CHIRAG UDYOG<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 |
| Lic. No. /date: 0510406909 Date: 19.06.2018 |
| HQ. No.: 01/80/050/00127/AM19<br>**Subject:**Request for re-fixation of ad-hoc<br>norms<br>Deferred<br>RLA No.: 05/23/040/00141/AM19/ |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in M. No. |
| 10/80-ALC2/2019 dated11.09.2019 on the basis of inputs given by the Technical Authorities present in the |
| meeting. |
| The firm vide letter dated 21.10.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered |
| the case and noted that the firm’s representation was forwarded to**Consultant (Tech-3)**on 06.03.2020 for the |
| examination & comments. However, no comments have been received yet. Hence, the Committee decided to wait |
| for the comments. |
| Case is deferred. |
Sl. No. 782
| Sl. No. 782 | |
|---|---|
| Case No.:13/11/80-ALC2/2018<br>9/3/80-ALC2/2018 | Status: |
| MICRON INSTRUMENTS PVT LTD<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 | |
| Lic. No. /date: 0510407381 Date: 31.07.2018<br>0510405742 Date: 28.02.2018 | |
| HQ. No.: 01/80/050/00204/AM19<br>01/80/050/00009/AM19<br>**Subject:**Request for re-fixation of ad-hoc norms | Deferred |
| RLA No.: 05/24/040/00265/AM19<br>05/24/040/00599/AM18 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.3/80- | |
| ALC2/2019 dated08.05.2019 as per written comments of DPIIT vide F. No.: P-47011/85/2019-TSW dated 18.04.2019. | |
| The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.3/80-ALC2/2019 | |
| dated08.05.2019 as per written comments of DPIIT vide F. No.: P-47011/85/2019-TSW dated 16.04.2019. | |
| The firm vide letters dated 15.07.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and | |
| noted that the firm’s representation was referred toDPIITon 06.01.2020. However, no comments have been received yet. | |
| Therefore, the Committee decided toremind DPIITfor expediting the comments. | |
| Case is deferred. |
53 | P a g e
Sl. No. 783
| Case No.:20/9/80-ALC2/2017<br>CORNING TECHNOLOGIES INDIA<br>PVT. LTD.<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0510403029 Date: 05.06.2017 |
|---|
| HQ. No.: 01/80/050/00198/AM18/<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 05/23/040/00081/AM18/ |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting |
| No.11/80-ALC2/2018 dated06.12.2018 as per the written comments of MeitY vide U. O. No. 17/ (18)/2017- |
| IPHW dated 13.11.2018. |
| However, the firm has requested for fixation of ad-hoc norms.The Committee reconsidered the case and |
| noted that the firm’s representation forwarded toMeitYon 09.03.2020for examination & comments. However, no |
| comments have been received yet. Hence, the Committee decided to wait for the comments. |
| Case is deferred. |
Sl. No. 784
| Sl. No. 784 | |
|---|---|
| Case No.:25/14/80-ALC2/2018<br>SPIROTECH HEAT EXCHANGERS<br>PVT. LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0510386129 Date: 09.05.2014 | Status: |
| HQ. No.: 01/80/050/00341/AM19<br>**Subject:**Request for re-fixation of ad-hoc | Deferred |
| norms<br>RLA No.: 05/24/040/00051/AM15/ | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting | |
| No.14/80-ALC2/2018 dated20.02.2019 as per written comments of DPIIT vide F. No.: P-47011/24/2019-TSW | |
| dated 20.02.2019. | |
| The firm vide letter dated 22.04.2019 has requested for re-fixation of ad-hoc norms.The Committee | |
| reconsidered the case and noted that the firm’s representation forwarded toDPIITon 29.01.2020&11.03.2020 for | |
| examination & comments. However, no comments have been received yet. Hence, the Committee decided to wait | |
| for the comments. | |
| Case is deferred. |
Sl. No. 785
==> picture [476 x 62] intentionally omitted <==
----- Start of picture text -----<br> Case No.: 53/3/80-ALC2/2017 Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 GL&V INDIA PRIVATE LIMITED<br>Lic. No. /date: 3110066640 Date: 29.03.2017<br>HQ. No.: 01/80/050/00053/AM18/ Subject: Request for fixation of ad-hoc norms Deferred<br>RLA No.: 31/83/040/00185/AM17<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 7/80-ALC2/2019 dated 17.07.2019 due to non-submission of reply of deficiency letter dated 07.03.2019 raised by Consultant (Tech-3).
The firm vide letter dated 30.12.2019 has furnished the reply and requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that the firm’s representation forwarded to Consultant (Tech-3) vide email dtd. 09.03.2020 for examination & comments. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
54 | P a g e
Sl. No. 786
| Case No.: 11/14/80-ALC2/2018<br>Status: |
|---|
| TIL LIMITED<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 |
| Lic. No. /date: 0210208838 Dated:07.12.2018 |
| HQ. No.: 01/80/050/00327/AM19/<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 02/24/040/00107/AM19 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting |
| No. 14/80-ALC2/2018dated20.02.2019 as per written comments of DHI vide U.O. No.: DES-1/TILL/OTRS-1- |
| 2019-HEI dated 19.02.2019. |
| The firm vide letter dated 13.08.2019 & 22.01.2020 has requested for re-fixation of ad-hoc norms. The |
| Committee reconsidered the case and noted that the firm’s representation forwarded toDHIon 09.03.2020for |
| examination & comments. However, no comments have been received yet. Hence, the Committee decided to wait |
| for the comments. |
| Case is deferred. |
Sl. No. 787
| Case No.:40/8/80-ALC2/2018 | Status: | ||
|---|---|---|---|
| M. No.: 23/80-ALC2/2019 dated 13.03.2020 | SARA SAE PRIVATE LIMITED | ||
| Lic. No. /date: 6110001499 Date: 16.04.2018 | |||
| HQ. No.: 01/80/050/00163/AM19 | **Subject:**Request for fixation of ad-hoc norms | Deferred | |
| RLA No.: 61/24/040/00001/AM19 | |||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting | |||
| No.15/80-ALC2/2019 dated15.11.2019 due to non-submission of reply of deficiency letter dated 06.05.2019 | |||
| raised by MSME. | |||
| The firm vide letter dated 01.02.2020 has furnished the reply and requested for fixation of ad-hoc | |||
| norms.The Committee reconsidered the case and | noted that the firm’s representation forwarded | toMSMEon | |
| 09.03.2020for examination & comments. However, no comments have been received yet. Hence, | the Committee | ||
| decided to wait for the comments. | |||
| Case is deferred. |
Sl. No. 788
| Case No.:23/8/80-ALC2/2018 | Status: |
|---|---|
| M. No.: 23/80-ALC2/2019 dated 13.03.2020 | GE POWER INDIA LIMITED |
| Lic. No. /date: 0310821275 Date: 28.05.2018 | |
| HQ. No.: 01/80/050/00146/AM19 | **Subject:**Request for re-fixation of ad-hoc<br>Deferred |
| RLA No.: 03/94/040/00164/AM19 | norms |
| **Decision:**The Committee considered the case | as per the agenda and noted that the case was rejected in Meeting |
| No.4/80-ALC2/2019 dated22.05.2019 due | to non-submission of reply of deficiency letter dated 28.12.2018 |
| raised by DHI. | |
| The firm vide letter dated 27.09.2019 has furnished the reply and requested for fixation of ad-hoc norms. | |
| The Committee reconsidered the case and noted that the firm’s representation forwarded toMSMEon 09.03.2020 | |
| for examination & comments. However, no comments have been received yet. Hence, the Committee decided to | |
| wait for the comments. | |
| Case is deferred. |
55 | P a g e
Sl. No. 789
| Case No.:4/10/80-ALC2/2018<br>BHARAT HEAVY ELECTRICALS<br>LIMITED<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0410164525 Date: 24.07.2018 |
|---|
| HQ. No.: 01/80/050/00190/AM19<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 04/24/040/00061/AM19 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting |
| No. 16/80-ALC2/2019dated04.12.2019 on the recommendation of the representative ofDHI. |
| The firm vide letter dated 02.01.2020 has requested for re-fixation of ad-hoc norms. The Committee |
| reconsidered the case and noted that the firm’s representation forwarded toDHIon 09.03.2020for examination & |
| comments. However, no comments have been received yet. Hence, the Committee decided to wait for the |
| comments. |
| Case is deferred. |
Sl. No. 790
| Case No.:31/13/80-ALC2/2013<br>31/4/80-ALC2/2013 | Status: | |
|---|---|---|
| M. No.: 23/80-ALC2/2019 dated 13.03.2020 | NASH INDUSTRIES (I) PVT LTD | |
| Lic. No. /date: 0710095300 Date: 09.05.2013<br>0710094430 Date: 22.03.2013 | ||
| HQ. No.: 01/80/050/00236/AM14<br>01/80/050/00078/AM14 | **Subject:**Request for re-fixation of ad-hoc norms | Deferred |
| RLA No.: 07/24/040/00032/AM14<br>07/24/040/00527/AM13 | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.23/80- | ||
| ALC2/2013 dated04.02.2014 on the basis of comments of DIPP vide U. O. No. 12/18/2014-TSW/17 dated 04.02.2014. | ||
| The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.20/80-ALC2/2013 | ||
| dated24.12.2013 on repeat basis, as per DIPP U. O. No. 12/115/2013-TSW/20 dated 24/12/2013. | ||
| The firm vide letter dated 15.10.2019 had requested for re-fixation of ad-hoc norms. The Committee reconsidered the | ||
| case and decided to forward the firm’s representation toDPIITfor examination & comments. | ||
| Case is deferred. |
Sl. No. 791
| Case No.:48/1/80-ALC2/2019<br>118/15/80-ALC2/2018 | Status: |
|---|---|
| LMT TOOLS INDIA PRIVATE LIMITED<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 | |
| Lic. No. /date: 3110067349 Date: 12.03.2019<br>3110067025 Date: 06.04.2018 | |
| HQ. No.: 01/80/050/00796/AM19<br>01/80/050/00460/AM19<br>**Subject:**Request for re-fixation of ad-hoc<br>norms | Deferred |
| RLA No.: 31/83/040/00189/AM19<br>31/83/040/00001/AM19 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 14/80- | |
| ALC2/2019 dated06.11.2019 as per written comments given by Consultant (Tech-3). | |
| The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 17/80**-**ALC2/2019 | |
| dated 18.12.2019 as per written comments given by Consultant (Tech-3). | |
| The firm vide letter dated 21.01.2020 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the | |
| case and decided to forward the firm’s representation to**Consultant (Tech-3)**for examination & comments. | |
| Case is deferred. |
56 | P a g e
Sl. No. 792
| Case No.:26/14/80-ALC2/2012<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0710088185 Date: 14.05.2012 | PRANITA ENGINEERING SOLUTIONS<br>PRIVATE LIMITED | Status: |
|---|---|---|
| HQ. No.: 01/80/050/00312/AM13 | **Subject:**Request for re-fixation of ad-hoc norms | Deferred |
| RLA No.: 07/24/040/00043/AM13 | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 18/80- | ||
| ALC2/2013 dated26.11.2013 due to non-submission of reply of deficiency letter dated 12.04.2013. | ||
| The firm vide letter dated 04.11.2019 has requested for fixation of ad-hoc norms. The Committee reconsidered the | ||
| case and decided to forward the firm’s representation toMSMEfor examination & comments. | ||
| Case is deferred. |
Sl. No. 793
==> picture [476 x 57] intentionally omitted <==
----- Start of picture text -----<br> Case No.: 13/8/80-ALC2/2018 Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 S AND P ENTERPRISES<br>Lic. No. /date: 0410164514 Date: 20.07.2018<br>HQ. No.: 01/80/050/00136/AM19 Subject: Request for re-fixation of ad-hoc norms Deferred<br>RLA No.: 04/24/040/00088/AM19<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 2/80ALC2/2019dated24.04.2019 due to non-submission of reply of deficiency letter dated 12.11.2018 (Raised by MSME).
The firm vide letter dated 14.11.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and decided to forward the firm’s representation to MSME for examination & comments.
Case is deferred.
Sl. No. 794
| Sl. No. 794 | ||
|---|---|---|
| Case No.:21/4/80-ALC2/2015 | Status: | |
| M. No.: 23/80-ALC2/2019 dated 13.03.2020 | ISGEC HEAVY ENGINEERING LIMITED | |
| Lic. No. /date: 0510394195 Date: 11.05.2015 | ||
| HQ. No.: 01/80/050/00092/AM16 | **Subject:**Request for re-fixation of ad-hoc norms | Deferred |
| RLA No.: 05/23/040/00004/AM16 | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 14/80- | ||
| ALC2/2015 dated13.10.2015 as per the written comments of DIPP vide ID No. 12/114/2015/TSW/70 dated 13.10.2015. | ||
| The firm vide letter dated 16.12.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the | ||
| case and decided to forward the firm’s representation toDPIITfor examination & comments. | ||
| Case is deferred. |
Sl. No. 795
Case No.: 27/5/80-ALC2/2018 Status: M. No.: 23/80-ALC2/2019 dated 13.03.2020 ISGEC HEAVY ENGINEERING LIMITED Lic. No. /date: 0510406287 Date: 01.05.2018 HQ. No.: 01/80/050/00076/AM19 Subject: Request for re-fixation of ad-hoc norms Deferred RLA No.: 05/23/040/00038/AM19 Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 5/80ALC2/2019 dated06.06.2019 as per written comments of Consultant (Tech-3).
The firm vide letter dated 18.12.2019 had requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and decided to forward the firm’s representation to Consultant (Tech-3) for examination & comments.
Case is deferred.
57 | P a g e
Sl. No. 796
| Sl.No. 796 | ||
|---|---|---|
| Case No.:3/20/80-ALC2/2015 | Status: | |
| M. No.: 23/80-ALC2/2019 dated 13.03.2020 | ISGEC HITACHI ZOSEN LIMITED | |
| Lic. No. /date: 0510396378 Date: 19.11.2015 | ||
| HQ. No.: 01/80/050/00380/AM16 | **Subject:**Request for re-fixation of ad-hoc norms | Deferred |
| RLA No.: 05/23/040/00342/AM16 | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 26/80- | ||
| ALC2/2015 dated29.03.2016 as per the written comments of DIPP vide ID No. 12/25/2016/TSW/96 dated 05.04.2016. | ||
| The firm vide letter dated 16.12.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the | ||
| case and decided to forward the firm’s representation toDPIITfor examination & comments. | ||
| Case is deferred. |
Sl. No. 797
| Sl. No. 797 | |
|---|---|
| Case No.:47/3/80-ALC2/2018 | Status: |
| ISGEC HITACHI ZOSEN LIMITED<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 | |
| Lic. No. /date: 0510405848 Date: 13.03.2018 | |
| HQ. No.: 01/80/050/00047/AM19<br>**Subject:**Request for re-fixation of ad-hoc norms | Deferred |
| RLA No.: 05/23/040/00486/AM18 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.6/80- | |
| ALC2/2018 dated11.07.2018 on the recommendation of technical member of DHI/DIPP/MSME. | |
| The firm vide letter dated 16.12.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the | |
| case and decided to forward the firm’s representation toDPIITfor examination & comments. | |
| Case is deferred. |
Sl. No. 798
| Sl. No. 798 | ||
|---|---|---|
| Case No.:1/3/80-ALC2/2019 | Status: | |
| M. No.: 23/80-ALC2/2019 dated 13.03.2020 | ISGEC HITACHI ZOSEN LIMITED | |
| Lic. No. /date: 0510410182 Date: 09.04.2019 | ||
| HQ. No.: 01/80/050/00007/AM20 | **Subject:**Request for re-fixation of ad-hoc norms | Deferred |
| RLA No.: 05/23/040/00578/AM19 | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.11/80- | ||
| ALC2/2019 dated25.09.2019 as per written comments of DPIIT vide U.O. No.: P-47011/98/2019-TSW dated 29.08.2019. | ||
| The firm vide letter dated 11.11.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the | ||
| case and decided to forward the firm’s representation toDPIITfor examination & comments. | ||
| Case is deferred. |
Sl. No. 799
Case No.: 33/8/80-ALC2/2013 Status: THYSSENKRUPP INDUSTRIES INDIA PVT. M. No.: 23/80-ALC2/2019 dated 13.03.2020 LTD. Lic. No. /date: 0310733011 Date: 01.05.2013 HQ. No.: 01/80/050/00143/AM14 Subject: Request for re-fixation of ad-hoc norms Deferred RLA No.: 03/95/040/00063/AM14 Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 03/80ALC2/2019 dated 08.05.2019 as per written comments of DHI vide F. No.: 3/127/209-TSW(B)/226 dated 11.10.2013.
The firm vide letter dated 31.05.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and decided to forward the firm’s representation to DHI for examination & comments.
Case is deferred.
58 | P a g e
Sl. No. 800
| Case No.:21/8/80-ALC2/2015<br>GESTEK ENGINEERING PRIVATE<br>LIMITED<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0510394420 Date: 03.06.2015 | Status: |
|---|---|
| HQ. No.: 01/80/050/00127/AM16<br>**Subject:**Request for re-fixation of ad-hoc norms | Deferred |
| RLA No.: 05/23/040/00070/AM16 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No.6/80- | |
| ALC2/2016dated21.06.2016 due to non-submission of reply of deficiency letter. | |
| The firm vide letter dated 29.07.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the | |
| case and decided to forward the firm’s representation toDPIITfor examination & comments. | |
| Case is deferred. |
Sl. No. 801
| Sl. No. 801 | ||
|---|---|---|
| Case No.:21/14/80-ALC2/2018 | Status: | |
| M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0710110190 Date: 29.07.2016 | MANN AND HUMMEL FILTER PVT.LTD, | |
| HQ. No.: 01/80/050/00337/AM19 | **Subject:**Request for re-fixation of ad-hoc norms | Deferred |
| RLA No.: 07/24/040/00144/AM17 | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.14/80- | ||
| ALC2/2018 dated20.02.2019 on the recommendation of representative of DHI. | ||
| The firm vide letter dated 18.12.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the | ||
| case and decided to forward the firm’s representation toDHIfor examination & comments. | ||
| Case is deferred. |
Sl. No. 802
| Case No.:15/19/80-ALC2/2014<br>DOOSAN POWER SYSTEMS INDIA<br>PRIVATE LIMITED<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0410159541 Date: 08.10.2014 |
|---|
| HQ. No.: 01/80/050/00449/AM15<br>**Subject:**Request for re-fixation of ad-hoc norms<br>Deferred |
| RLA No.: 04/24/040/00141/AM15 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.16/80- |
| ALC2/2015 dated10.11.2015 as per written of DHI vide their UO Note No. 3(157)/14-TSW(B) dated 13.11.2015. |
| The firm vide letter dated 13.09.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the |
| case and decided to forward the firm’s representation toDHIfor examination & comments. |
| Case is deferred. |
Sl. No. 803
| Sl. No. 803 | ||
|---|---|---|
| Case No.:1/14/80-ALC2/2018 | Status: | |
| M. No.: 23/80-ALC2/2019 dated 13.03.2020 | AUTO COMP INDIA PVT. LTD | |
| Lic. No. /date: 3110067225 Date: 02.11.2018 | ||
| HQ. No.: 01/80/050/00317/AM19 | **Subject:**Request for re-fixation of ad-hoc norms | Deferred |
| RLA No.: 31/83/040/00121/AM19 | ||
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.2/80- | ||
| ALC2/2019 dated24.04.2019 on repeat basis as approved for AA No. 3110067175 dated 12.09.2018 as | per the written | |
| recommendation of DHI vide their U. O. No.: DES-1/DASI/RDCA-2-2019-HEI dated 28.02.2019. | ||
| The firm vide letter dated 20.01.2020 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the | ||
| case and decided to forward the firm’s representation toDHIfor examination & comments. | ||
| Case is deferred. |
59 | P a g e
Sl. No. 804
| Sl. No. 804 | |
|---|---|
| Case No.:27/14/80-ALC2/2012<br>PRANITA ENGINEERING SOLUTIONS<br>PRIVATE LIMITED,<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0710090071 Date: 03.08.2012 | Status: |
| HQ. No.: 01/80/050/00313/AM13<br>**Subject:**Request for re-fixation of ad-hoc | Deferred |
| norms<br>RLA No.: 07/24/040/00180/AM13 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting | |
| No. 18/80-ALC2/2013 dated26.11.2013 due to non-submission of reply of deficiency letter dated 12.04.2013. | |
| The firm vide letter dated 18.12.2019 has requested for fixation of ad-hoc norms. The Committee | |
| reconsidered the case and decided to forward the firm’s representation toMSMEfor examination & comments. | |
| Case is deferred. |
60 | P a g e
61 | P a g e
==> picture [469 x 632] intentionally omitted <==
62 | P a g e
63 | P a g e
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.