IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2020-03-13

DGFT Committee Minutes

Document text

MINUTES OF MEETING NO. 23/80 OF NORMS COMMITTEE- I (DES-I SECTION) DATED 13.03.2020

Meeting No. 23/80 of the Norms Committee (NC-I) for the licensing year 2019-2020 held on 13.03.2020 under the Chairmanship of Sh. R. P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -

==> picture [458 x 173] intentionally omitted <==

----- Start of picture text -----<br> Sl. No. Name of the representatives & their Designation Department<br>1. Shri B. C. Nayak, D. O. DHI<br>2. Shri K.S. Sodhi, Asst. Director MSME<br>3. Shri Shaish Kumar, (Tech-1) Consultant<br>4. Shri V.C. Agarwal, (Tech-3) Consultant<br>5. Shri S. K. Bhatnagar, (SKB) Consultant<br>In Attendance<br>1. Shri K.V. Tirumala, Deputy DGFT DGFT<br>2. Shri Pranav Upadhyay, Assistant Director ISS DGFT<br>----- End of picture text -----<br>

Note:

  1. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M. No. of the scanned copy is reflected in the minutes.

  2. Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.

  3. All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail address- nc1.dgft@nic.in . All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.

  4. Minutes of Meeting 21/80 dated 18.02.2020 were circulated on 04.03.2020 to all the members of the Committee and the comments (if any), there upon received, were incorporated in the Minutes and the said minutes were unanimously approved.

1 | P a g e

MEETING NUMBER: 23/80-ALC2/2019 MEETING DATE: 13.03.2020

1

Case No.:70/15/80-ALC2/2018 Party Name: BHARAT HEAVY Meet No/Date:23/80- Status:
ELECTRICALS LIMITED ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00412/AM19/ RLA File<br>:07/24/040/00095/AM16/ Lic.No/Date:0710108519<br>15.07.2015 Pending with<br>MeitY

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MeitY for examination of the case on 08.01.2020 followed by a reminder 06.03.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

2

Case No.:363/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:23/80- Status:
ENGINEERING INDUSTRIES ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00705/AM19/ RLA File<br>:07/24/040/00184/AM16/ Lic.No/Date:0710108812<br>05.10.2015 Pending<br>with DHI

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 17.02.2020 for examination of the case. However, the representative of DHI informed in meeting that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

3

Case No.:364/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:23/80- Status:
ENGINEERING INDUSTRIES ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00706/AM19/ RLA File<br>:07/24/040/00185/AM16/ Lic.No/Date:0710108813<br>05.10.2015 Pending<br>with DHI

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 17.02.2020 for examination of the case. However, the representative of DHI informed in meeting that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:402/15/80-ALC2/2018 Party Name: SHIV HYDROMET Meet No/Date:23/80- Status:
ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00744/AM19/ RLA File<br>:24/24/040/00034/AM17/ Lic.No/Date:2410042158<br>14.03.2017 PH

4 Decision: The Committee considered the case as per the agenda and noted that the firm was called for personal hearing to explain the case before Norms Committee. However, the firm vide email dated 09.03.2020requested to grant more time to appear for personal hearing. Hence, the Committee decided to call again the firm for personal hearing in the forthcoming NC meeting.

Case is deferred.

2 | P a g e

==> picture [476 x 522] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/23/80-ALC2/2019 Party Name: INTERPUMP Meet No/Date:23/80-ALC2/2019 Status:<br>HYDRAULICS INDIA PVT. 13.03.2020<br>LTD.<br>HQ File RLA File Lic.No/Date:0410162906 Approved<br>:01/80/050/00346/AM20/ :04/24/040/00221/AM17/ 21.03.2017<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on repeat<br>basis as approved for AA No. 0410160379 dated 01.04.2015 in M. No. 19/80 dated20.12.2016 as per written<br>comments of MSME as under:<br>Sl.<br>ITCHS Sl. ITCHS Recommended<br>No. Export Item Quantity Import Item<br>Code No. Code Norms<br> Hydraulic<br>Seamless steel<br>Accessories<br>pipes RAW Tube<br>Base Tube<br>For Base Dia 169 Import allowed<br>CAM HF169<br>X 1289 Type for 3137 Kgs<br>1280 L= 1289 2367.360<br>1 90328100 1 73041910 E355 (48 Nos.) inclusive of<br>C/E= 45 48 Nos. Kg<br>(Each no.73.40 32.5% net<br>each No. is<br>kg.) Length of wastage<br>49.32 kgs.)<br>each no. 1294<br>Length is 1289<br>mm<br>5 mm each<br> Hydraulic<br>Accessories Seamless steel<br>Base Tube pipes Raw Tube<br>Import allowed<br>CAM HF169 For Base Dia 169<br>for 18275 Kgs<br>1360 L=1364 13844.160 x1364 Type E355<br>2 90328100 2 73041910 inclusive of<br>C/E=45 (264 Kg (264 Nos.) (each<br>32% net<br>nos. each No. is No.77.60 kg )<br>wastage<br>52.44 kgs.) Length each No.<br>Length is is 1369mm<br>1364mm each<br>Hydraulic<br>Seamless steel<br>Accessories<br>pipes Raw Tube<br>Base Tube<br>For Base Dia 169 Import allowed<br>CAM PF-H169<br>X1439 Type for 29794Kgs<br>1430 L= 1439 22570.560<br>3 90328100 3 73041910 E355 (408 Nos.) inclusive of<br>C/E =45 (408 Kg<br>(Each No. 81.80 32% net<br>nos. each no. is<br>kgs.) Length of wastage<br>55.32<br>each No is 1444<br>kgs.)Length is<br>mm<br>1439mm each<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

3 | P a g e

==> picture [476 x 165] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/11/80-ALC2/2018 Party Name: DIAMOND Meet No/Date:23/80- Status:<br>METAL SCREENS (P) LTD ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:6510000003 D/L<br>:01/80/050/00192/AM19/ :65/24/040/00003/AM18/ 17.05.2017<br>Decision: The Committee considered the case as per the agenda and decided to ask form the firm to furnish the<br>6<br>following information as per advice of the representative of MSME:<br>1. To clarify, how the net weight of export is 51671 Kg as per Shipping Bill details while as per License<br>export is 49761 Kg.<br>2. To provide License Amendment Sheet.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:223/15/80-ALC2/2018 Party Name: ZEECO INDIA Meet No/Date:23/80- Status:
PVT.LTD. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00565/AM19/ RLA File<br>:03/95/040/00271/AM18/ Lic.No/Date:0310814297<br>28.06.2017 RA/Firm

7 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

  • 8
Case No.:107/15/80-ALC2/2018 Party Name: SEKO BEC Meet No/Date:23/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00449/AM19/ RLA File<br>:09/24/040/00134/AM18/ Lic.No/Date:0910065311<br>28.07.2017 Pending with<br>MSME

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 11.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 55] intentionally omitted <==

----- Start of picture text -----<br> Case No.:80/11/80-ALC2/2018 Party Name: MACAWBER Meet No/Date:23/80- Status:<br>BEEKAY PVT. LTD. ALC2/2019&13.03.2020 Rejected<br>HQ File RLA File Lic.No/Date:0510403845<br>:01/80/050/00271/AM19/ :05/24/040/00230/AM18/ 29.08.2017<br>----- End of picture text -----<br>

  • 9 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 17.12.2019 followed by final reminder on 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, New Delhi .

Case is rejected.

4 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/19/80-ALC2/2017 Party Name: KINECO KAMAN Meet No/Date:23/80- Status:<br>COMPOSITES - INDIA PVT ALC2/2019 Deferred<br>LTD 13.03.2020<br>HQ File RLA File Lic.No/Date:1710006668 Pending<br>:01/80/050/00299/AM18/ :17/24/040/00050/AM18/ 10.10.2017 with DPIIT<br>10<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>DPIIT on 18.02.2020 and again on 12.03.2020 for examination of the case. However, no comments have been<br>received yet. Therefore, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:26/20/80-ALC2/2017 Party Name: ICEM Meet No/Date:23/80- Status: ENGINEERING COMPANY ALC2/2019 Rejected PRIVATE LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:0310817800 :01/80/050/00390/AM18/ :03/94/040/00742/AM18/ 15.12.2017

11 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Mumbai .

Case is rejected.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:20/20/80-ALC2/2017 Party Name: BIRLA Meet No/Date:23/80- Status:<br>PRECISION ALC2/2019 Deferred<br>TECHNOLOGIES LTD. 13.03.2020<br>HQ File RLA File Lic.No/Date:0310818218 Pending with<br>:01/80/050/00384/AM18/ :03/94/040/00782/AM18/ 04.01.2018 MSME<br>12<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>MSME on 17.02.2020 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided to remind MSME for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

13

Case No.:23/20/80-ALC2/2017 Party Name: BIRLA Meet No/Date:23/80- Status:
PRECISION ALC2/2019 Deferred
TECHNOLOGIES LTD. 13.03.2020
HQ File<br>:01/80/050/00387/AM18/ RLA File<br>:03/94/040/00784/AM18/ Lic.No/Date:0310818219<br>04.01.2018 Pending with<br>MSME

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 17.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

5 | P a g e

14

Case No.:21/20/80-ALC2/2017 Party Name: BIRLA Meet No/Date:23/80- Status:
PRECISION ALC2/2019 Deferred
TECHNOLOGIES LTD. 13.03.2020
HQ File<br>:01/80/050/00385/AM18/ RLA File<br>:03/94/040/00785/AM18/ Lic.No/Date:0310818275<br>05.01.2018 Pending with<br>MSME

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 17.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

15

Case No.:22/20/80-ALC2/2017 Party Name: BIRLA Meet No/Date:23/80- Status:
PRECISION ALC2/2019 Deferred
TECHNOLOGIES LTD. 13.03.2020
HQ File<br>:01/80/050/00386/AM18/ RLA File<br>:03/94/040/00783/AM18/ Lic.No/Date:0310818273<br>05.01.2018 Pending with<br>MSME

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 17.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:126/15/80-ALC2/2018 Party Name: SHAKTI PUMPS Meet No/Date:23/80- Status:<br>(INDIA) LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:5610005299 Pending<br>:01/80/050/00468/AM19/ :56/24/040/00036/AM18/ 08.01.2018 with DPIIT<br>16<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>DPIIT on 12.03.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:20/1/80-ALC2/2019 Party Name: ZTT INDIA Meet No/Date:23/80- Status:<br>PRIVATE LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0410163956 Pending<br>:01/80/050/00768/AM19/ :04/24/040/00212/AM18/ 07.02.2018 with firm<br>17<br>Decision: The Committee considered the case as per the agenda and noted that MeitY has sought certain<br>information from the firm vide letter dated 16.12.2019 followed by a reminder letter dated 04.02.2020. The firm<br>was again reminded on 06.03.2020 for furnishing the requisite information. However, no information has been<br>received yet. Hence, the Committee decided to wait for the reply/comments.<br>Case is deferred.<br>----- End of picture text -----<br>

6 | P a g e

==> picture [476 x 163] intentionally omitted <==

----- Start of picture text -----<br> Case No.:393/15/80-ALC2/2018 Party Name: SARTORIUS Meet No/Date:23/80- Status:<br>STEDIM INDIA PVT. LTD. ALC2/2019 Approved<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0710113010<br>:01/80/050/00735/AM19/ :07/24/040/00348/AM18/ 23.03.2018<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>18<br>written comments of MSME as under:<br>1. Quantity of relevant import items at Sl. No. 1 to 108, 112, 117 to 121, 125 to 147, 152 to 159, & 164 to<br>177 may be allowed as per GN-4.<br>2. Quantity of rest of the import items may be allowed on net to net basis with nil wastage .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

19

Case No.:10/1/80-ALC2/2019 Party Name: MAGNA Meet No/Date:23/80- Status:
AUTOMOTIVE INDIA ALC2/2019 Deferred
PRIVATE LIMITED 13.03.2020
HQ File<br>:01/80/050/00758/AM19/ RLA File<br>:04/24/040/00001/AM19/ Lic.No/Date:0410164172<br>06.04.2018 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 12.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 280] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/8/80-ALC2/2018 Party Name: L & T-MHPS Meet No/Date:23/80- Status:<br>TURBINE GENERATORS ALC2/2019 Approved<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0310820724<br>:01/80/050/00129/AM19/ :03/95/040/01112/AM18/ 27.04.2018<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on the<br>recommendation of the representative of DHI as under:<br>Export item:<br>1. Weight of export product is 570 MT.<br>20<br>Import items:<br>1. Quantity of import item at Sl. No. 1 may be allowed with 78% wastage after taking 20% recovery.<br>2. Quantity of import item at Sl. No. 16 may be allowed with 77% wastage after taking 20% recovery.<br>3. Quantity of import item at Sl. No. 168 may be allowed with 78% wastage after taking 20% recovery.<br>4. Quantity of import item at Sl. No. 164 (Primer-1500 Liter) may be allowed as applied for (Only 0.03%<br>of FoB value).<br>5. Import items at Sl. No. 163 & 165 to 167 may be deleted as per the firm’s request.<br>6. Quantity of rest of the import items may be allowed as per GN-4 .<br>Note: The material balancing given in Annexure-1 may be incorporated to the AA.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

7 | P a g e

21

Case No.:397/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:23/80- Status:
ENGINEERING INDUSTRIES ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00739/AM19/ RLA File<br>:07/24/040/00357/AM18/ Lic.No/Date:0710113276<br>14.05.2018 Pending<br>with DHI

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI on 17.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.

Case is deferred.

==> picture [476 x 222] intentionally omitted <==

----- Start of picture text -----<br> Case No.:133/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910066357 D/L<br>:01/80/050/00475/AM19/ :09/24/040/00058/AM19/ 20.06.2018<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per advice of the representative of DHI:<br>22 1. List of specific items of export.<br>2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Calculation of requirement supported by Engineering Drawing with relevant dimensions highlighted.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 221] intentionally omitted <==

----- Start of picture text -----<br> Case No.:165/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910066427 D/L<br>:01/80/050/00507/AM19/ :09/24/040/00139/AM19/ 06.07.2018<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per advice of the representative of DHI:<br>23 1. List of specific items of export.<br>2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Calculation of requirement supported by Engineering Drawing with relevant dimensions highlighted.<br>Case is deferred.<br>----- End of picture text -----<br>

8 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:166/15/80- Party Name: BHARAT HEAVY Meet No/Date:23/80- Status:<br>ALC2/2018 ELECTRICALS LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File :09/24/040/00171/AM19/ Lic.No/Date:0910066472 PH<br>:01/80/050/00508/AM19/ 18.07.2018<br>24<br>Decision: The Committee considered the case as per the agenda and the representative of DHI informed that the<br>reply submitted by the firm is vague. Therefore, the Committee decided to call the firm for personal hearing to<br>explain the case before Norms Committee in the forthcoming NC meeting.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:76/11/80-ALC2/2018 Party Name: HIMACHAL Meet No/Date:23/80- Status:<br>FUTURISTIC ALC2/2019 Approved<br>COMMUNICATIONS LTD. 13.03.2020<br>HQ File RLA File Lic.No/Date:0510407445<br>25 :01/80/050/00267/AM19/ :05/23/040/00215/AM19/ 06.08.2018<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of MeitY vide U. O. No.: 17(43)/2018-IPHW dated 19.02.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:19/11/80-ALC2/2018 Party Name: ICEM Meet No/Date:23/80- Status:
ENGINEERING COMPANY ALC2/2019 Rejected
PRIVATE LIMITED 13.03.2020
HQ File<br>:01/80/050/00210/AM19/ RLA File<br>:03/94/040/00306/AM19/ Lic.No/Date:0310822939<br>09.08.2018

26 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 13.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Mumbai .

Case is rejected.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:179/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:23/80- Status:<br>ENGINEERING INDUSTRIES ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0710113710 Pending<br>:01/80/050/00521/AM19/ :07/24/040/00102/AM19/ 13.08.2018 with firm<br>27<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 11.02.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

9 | P a g e

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:34/1/80-ALC2/2019 Party Name: KINECO KAMAN Meet No/Date:23/80- Status:<br>COMPOSITES - INDIA PVT. ALC2/2019 Deferred<br>LTD. 13.03.2020<br>HQ File RLA File Lic.No/Date:1710006716 Pending<br>:01/80/050/00782/AM19/ :17/24/040/00017/AM19/ 20.08.2018 with DPIIT<br>28<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was forwarded to<br>DPIIT on 18.02.2020 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided to remind DPIIT for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

29

Case No.:183/15/80-ALC2/2018 Party Name: M M R Meet No/Date:23/80- Status:
MINING EQUIPMENTS ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00525/AM19/ RLA File<br>:09/24/040/00242/AM19/ Lic.No/Date:0910066589<br>24.08.2018 Pending with<br>MSME

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 11.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:23/11/80-ALC2/2018 Party Name: JAYESH METALS Meet No/Date:23/80- Status:<br>AND FERRO ALLOYS LLP ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310823416 PH<br>:01/80/050/00214/AM19/ :03/94/040/00488/AM19/ 29.08.2018<br>30<br>Decision: The Committee considered the case as per the agenda and decided to call the firm for personal<br>hearing to explain the case before Norms Committee, as decided in M. No. 21/80 dated 18.02.2020, in the<br>forthcoming NC meeting.<br>Case is deferred.<br>----- End of picture text -----<br>

31

Case No.:28/11/80-ALC2/2018 Party Name: L & T-MHPS Meet No/Date:23/80- Status:
TURBINE GENERATORS ALC2/2019 Deferred
PRIVATE LIMITED 13.03.2020
HQ File<br>:01/80/050/00219/AM19/ RLA File<br>:03/95/040/00466/AM19/ Lic.No/Date:0310823400<br>29.08.2018 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 13.02.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.

Case is deferred.

10 | P a g e

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/1/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:23/80- Status:<br>TURBINE GENERATORS ALC2/2019 Deferred<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0310823645 Pending<br>:01/80/050/00757/AM19/ :03/95/040/00469/AM19/ 07.09.2018 with firm<br>32<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 13.02.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:201/15/80-ALC2/2018 Party Name: DYNAMATIC Meet No/Date:23/80- Status:
TECHNOLOGIES LIMITED ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00543/AM19/ RLA File<br>:07/24/040/00155/AM19/ Lic.No/Date:0710113852<br>17.09.2018 Pending<br>with firm

33 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 18.11.2019 followed by reminders on 07.01.2020 & 06.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:57/11/80-ALC2/2018 Party Name: GL&V INDIA Meet No/Date:23/80- Status:<br>PRIVATE LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3110067179 PH<br>:01/80/050/00248/AM19/ :31/83/040/00096/AM19/ 26.09.2018<br>34<br>Decision: The Committee considered the case as per the agenda and noted that the firm was called for personal<br>hearing to explain the case before Norms Committee. However, the firm vide email dated 09.03.2020 requested<br>for another date of personal hearing. Therefore, the Committee decided to call the firm for personal hearing to<br>explain the case before Norms Committee in the forthcoming meeting.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:82/11/80-ALC2/2018 Party Name: ANSTECH Meet No/Date:23/80- Status:<br>ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3410044543 RA/Firm<br>:01/80/050/00273/AM19/ :34/24/040/00218/AM19/ 04.10.2018<br>35 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Vadodara & the firm and in this regard a letter was sent to RA, Vadodara and<br>the firm on 08.07.2019 followed by reminders on 25.09.2019, 18.10.2019, 08.01.2020 & 03.02.2020. However,<br>no information has been received so far. Therefore, the Committee decided to remind again RA, Vadodara &<br>the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

11 | P a g e

Case No.:247/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Rejected
LIMITED 13.03.2020
HQ File<br>:01/80/050/00589/AM19/ RLA File<br>:09/24/040/00324/AM19/ Lic.No/Date:0910066802<br>02.11.2018

36 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

Case is rejected.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:249/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Rejected<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910066804<br>:01/80/050/00591/AM19/ :09/24/040/00329/AM19/ 02.11.2018<br>----- End of picture text -----<br>

37 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

Case is rejected.

==> picture [476 x 146] intentionally omitted <==

----- Start of picture text -----<br> Case No.:253/15/80-ALC2/2018 Party Name: BHARAT HEAVY Meet No/Date:23/80- Status:<br>ELECTRICALS LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0910066870 Pending<br>:01/80/050/00595/AM19/ :09/24/040/00340/AM19/ 16.11.2018 with DHI<br>38<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s<br>reply (hardcopy) was sent to DHI on 13.01.2020 for examination of the case. However, the representative of<br>DHI informed that the case is under examination. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:259/15/80- Party Name: DYNAMATIC Meet No/Date:23/80- Status:
ALC2/2018 TECHNOLOGIES LIMITED ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00601/AM19/ RLA File<br>:07/24/040/00182/AM19/ Lic.No/Date:0710114156<br>22.11.2018 Pending with<br>MSME

39 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 18.11.2019 followed by reminders on 07.01.2020 & 06.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

12 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:270/15/80-ALC2/2018 Party Name: VEM Meet No/Date:23/80- Status:<br>TECHNOLOGIES PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0910066924 Pending<br>:01/80/050/00612/AM19/ :09/24/040/00428/AM19/ 29.11.2018 with DPIIT<br>40<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>DPIIT on 11.03.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

41

Case No.:17/1/80-ALC2/2019 Party Name: MUDHRA Meet No/Date:23/80- Status:
FINE BLANC PRIVATE ALC2/2019 Deferred
LTD. 13.03.2020
HQ File<br>:01/80/050/00765/AM19/ RLA File<br>:04/24/040/00207/AM19/ Lic.No/Date:0410164995<br>17.12.2018 Pending with<br>MSME

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 18.10.2019 followed by ID reminders on 07.01.2020 & 06.03.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:274/15/80-ALC2/2018 Party Name: STERLITE Meet No/Date:23/80- Status:<br>TECHNOLOGIES LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310825720 Pending<br>:01/80/050/00616/AM19/ :03/95/040/00812/AM19/ 18.12.2018 with firm<br>----- End of picture text -----<br>

42 Decision: The Committee considered the case as per the agenda and noted that MeitY sought again certain information from the firm vide letter dated 05.12.2019 followed by a reminder letter dated 12.02.2020. MeitY again sought for justification from the firm on 11.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the reply/comments.

Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:293/15/80-ALC2/2018 Party Name: STERLITE POWER Meet No/Date:23/80- Status:<br>TRANSMISSION LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310826313 Pending<br>:01/80/050/00635/AM19/ :03/95/040/00869/AM19/ 10.01.2019 with firm<br>43<br>Decision: The Committee considered the case as per the agenda and noted that MeitY sought again certain<br>information from the firm vide letter dated 05.12.2019 followed by a reminder letter dated 12.02.2020. MeitY<br>again sought for justification from the firm on 11.03.2020. However, no reply has been received yet. Hence, the<br>Committee decided to wait for the reply/comments.<br>Case is deferred.<br>----- End of picture text -----<br>

13 | P a g e

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:298/15/80-ALC2/2018 Party Name: ULTRA Meet No/Date:23/80- Status:<br>ENGINEERS ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3110067288 Pending<br>:01/80/050/00640/AM19/ :31/83/040/00164/AM19/ 16.01.2019 with firm<br>44<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 11.02.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:23/1/80-ALC2/2019 Party Name: PARKER Meet No/Date:23/80- Status:<br>HANNIFIN INDIA PVT. ALC2/2019 Deferred<br>LTD. 13.03.2020<br>HQ File RLA File Lic.No/Date:0410165142 Pending with<br>:01/80/050/00771/AM19/ :04/24/040/00223/AM19/ 28.01.2019 MSME<br>45<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply has been sent to<br>MSME for examination of the case on 15.01.2020 followed by an ID reminder on 06.03.2020. However, no<br>comments have been revived yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 55] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: LARSEN Meet No/Date:23/80-ALC2/2019 Status:<br>42/1/80-ALC2/2019 &TOUBRO LIMITED 13.03.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310827622 Pending with<br>:01/80/050/00790/AM19/ :03/95/040/01295/AM19/ 12.03.2019 Tech-3<br>----- End of picture text -----<br>

46 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply along with physical file was sent to Consultant (Tech-3) on 11.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments .

Case is deferred.

==> picture [476 x 118] intentionally omitted <==

----- Start of picture text -----<br> Case No.:46/1/80-ALC2/2019 Party Name: ISGEC TITAN Meet No/Date:23/80- Status:<br>METAL FABRICATORS ALC2/2019 Approved<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0510409960<br>47 :01/80/050/00794/AM19/ :05/23/040/00557/AM19/ 15.03.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/28/2020-TSW dated 20.02.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

14 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/5/80-ALC2/2019 Party Name: MAINI Meet No/Date:23/80- Status:<br>PRECISION PRODUCTS ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0710114732 Pending with<br>:01/80/050/00056/AM20/ :07/24/040/00306/AM19/ 29.03.2019 firm<br>48<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 14.02.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

49

Case No.:5/2/80-ALC2/2019 Party Name: VIPRA CLOSURES Meet No/Date:23/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00005/AM20/ RLA File<br>:03/95/040/01384/AM19/ Lic.No/Date:0310828134<br>03.04.2019 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 07.01.2020 followed by a reminder on 06.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:14/5/80-ALC2/2019 Party Name: UNI VTL Meet No/Date:23/80- Status:<br>PRECISION PVT. LTD. ALC2/2019 Approved<br>13.03.2020<br>HQ File RLA File Lic.No/Date:6510000027<br>:01/80/050/00052/AM20/ :65/24/040/00006/AM19/ 05.04.2019<br>----- End of picture text -----<br>

Case No.:14/5/80-ALC2/2019Party Name: UNI VTL<br>PRECISION PVT. LTD.<br>Meet No/Date:23/80-<br>ALC2/2019<br>13.03.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00052/AM20/<br>RLA File<br>:65/24/040/00006/AM19/<br>Lic.No/Date:6510000027<br>05.04.2019 Case No.:14/5/80-ALC2/2019 <br> Case No.:14/5/80-ALC2/2019 <br> Party Name: UNI VTL<br>PRECISION PVT. LTD. Party Name: UNI VTL<br>PRECISION PVT. LTD. Party Name: UNI VTL<br>PRECISION PVT. LTD. Meet No/Date:23/80-<br>ALC2/2019<br>13.03.2020 Meet No/Date:23/80-<br>ALC2/2019<br>13.03.2020 Status:<br>Approved
HQ File<br>:01/80/050/00052/AM20/<br> <br>: RLA File<br>65/24/040/00006/AM19/ Lic.No/Date:6510000027<br>05.04.2019
50 Decision:The Committee considered the case as per the agenda and decided toratifythe ad-hoc norms as per<br>written comments of**Consultant (Tech-3)**as under:
ITCHS<br>Code Export Item Quantity ITCHS<br>Code Import Item Recommended<br>Norms
84099990 HY 55 Semi-<br>Finished Shroud<br>Plates (156000<br>Numbers) 39936.000<br>Kgs 73261990 Billets, 131 mm diameter<br>x 86.5 mm long ( SS<br>Grade 321) 175718 Kgs
Note: Grade of imported steel will be same as used in Export Product.<br>RA concerned maytake further necessaryaction asper the decision of NC.

Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of Consultant (Tech-3) as under:

51

Case No.:3/3/80-ALC2/2019 Party Name: MUDHRA FINE Meet No/Date:23/80- Status:
BLANC PRIVATE LTD. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00009/AM20/ RLA File<br>:04/24/040/00294/AM19/ Lic.No/Date:0410165451<br>11.04.2019 Pending<br>with DHI

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI for examination of the case on 12.12.2019 followed by a reminder on 12.02.2020. However, the representative of DHI informed that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

15 | P a g e

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/3/80-ALC2/2019 Party Name: VEELINE MEDIA Meet No/Date:23/80- Status:<br>LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0210209114 Pending<br>52 :01/80/050/00010/AM20/ :02/24/040/00003/AM20/ 16.04.2019 with firm<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 07.01.2020 followed by a reminder on 06.03.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 362] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/3/80-ALC2/2019 Party Name: SMC Meet No/Date:23/80- Status:<br>CORPORATION (INDIA) ALC2/2019 Approved<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0510410292<br>:01/80/050/00011/AM20/ :05/24/040/00020/AM20/ 18.04.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of Consultant (Tech-3) by considering the reply dated 24.02.2020 as under:<br>Sl. Sl.<br>ITCHS Export ITCHS Recommen<br>No. Quantity No. Import Item<br>Code Item Code ded Norms<br>Body B<br>14501 (Weig 996353.000 Brass Bar<br>1 84819090 1 74072110 3896 Kgs<br>ht = 2252 Number C3604-6-8-4M<br>53 Kgs)<br>Body B<br>145113 113716.000 Brass Bar<br>2 84819090 2 74072110 942 Kgs<br>( Weight = Number C3604-6-10-4M<br>483 Kgs)<br> Body B<br>Brass Bar<br>145111 73958.000<br>3 84819090 3 74072110 C3604-6-12 (13.5) - 1224 Kgs<br>( Weight = Number<br>4M<br>692 Kgs)<br>Note:<br>1. Weight of export product at Sl. No. 1 is 2252 Kgs.<br>2. Weight of export product at Sl. No. 2 is 483 Kgs.<br>3. Weight of export product at Sl. No. 3 is 692 Kgs.<br>4. Grade & Composition of brass to match in import & export items.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/3/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:23/80- Status:<br>TURBINE GENERATORS ALC2/2019 Deferred<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0310828481 Pending<br>54 :01/80/050/00014/AM20/ :03/95/040/01354/AM19/ 23.04.2019 with DHI<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI<br>for examination of the case on 12.03.2020. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

16 | P a g e

Case No.:5/5/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Rejected
LIMITED 13.03.2020
HQ File<br>:01/80/050/00043/AM20/ RLA File<br>:09/24/040/00061/AM20/ Lic.No/Date:0910067528<br>15.05.2019

55 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

Case is rejected.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/5/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Rejected<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910067529<br>:01/80/050/00044/AM20/ :09/24/040/00059/AM20/ 15.05.2019<br>----- End of picture text -----<br>

56 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

Case is rejected.

Case No.:7/5/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Rejected
LIMITED 13.03.2020
HQ File<br>:01/80/050/00045/AM20/ RLA File<br>:09/24/040/00060/AM20/ Lic.No/Date:0910067530<br>15.05.2019

57 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

Case is rejected.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/5/80-ALC2/2019 Party Name: PAHARPUR Meet No/Date:23/80- Status:<br>COOLING TOWERS LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0210209171 Pending<br>:01/80/050/00039/AM20/ :02/24/040/00012/AM20/ 16.05.2019 with firm<br>58<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 06.03.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

17 | P a g e

==> picture [476 x 176] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/5/80-ALC2/2019 Party Name: HEURTEY Meet No/Date:23/80- Status:<br>PETROCHEM INDIA PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:3410045150 D/L<br>:01/80/050/00051/AM20/ :34/24/040/00059/AM20/ 17.05.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>59 following information as per advice of the representative of DHI:<br>1. Manufacturing process of the export product showing the use of imported raw materials/comments.<br>2. Calculations of the proposed wastage.<br>3. Draft of the final norms proposed.<br>4. Any other connected information.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:12/5/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:23/80- Status:
SOLUTIONS PRIVATE ALC2/2019 Rejected
LIMITED 13.03.2020
HQ File<br>:01/80/050/00050/AM20/ RLA File<br>:09/24/040/00078/AM20/ Lic.No/Date:0910067545<br>20.05.2019

60 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 14.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

Case is rejected.

61

Case No.:21/5/80-ALC2/2019 Party Name: CERATIZIT INDIA Meet No/Date:23/80- Status:
ROUND TOOL SOLUTIONS ALC2/2019 Withdrawn
P.LTD. 13.03.2020
HQ File<br>:01/80/050/00059/AM20/ RLA File<br>:07/24/040/00017/AM20/ Lic.No/Date:0710114952<br>24.05.2019

Decision: The Committee considered the case as per the agenda and noted that the firm vide email dated 20.02.2020 informed that they have surrendered the above AA. Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, Bangalore .

Case is withdrawn.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/7/80-ALC2/2019 Party Name: CROWN Meet No/Date:23/80- Status:<br>CLOSURES PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310829905 Pending<br>:01/80/050/00098/AM20/ :03/94/040/00246/AM20/ 25.06.2019 with firm<br>62<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by Consultant (Tech-1) was sent to the firm on 06.03.2020. However, no reply has been<br>received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

18 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/7/80-ALC2/2019 Party Name: OSWAL PUMPS Meet No/Date:23/80- Status:<br>LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3310030557 Pending<br>:01/80/050/00099/AM20/ :33/24/040/00012/AM20/ 25.06.2019 with firm<br>63<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 06.03.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

64

Case No.:3/7/80-ALC2/2019 Party Name: OAM SAAI Meet No/Date:23/80- Status:
INTERNATIONAL INC. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00100/AM20/ RLA File<br>:05/24/040/00181/AM20/ Lic.No/Date:0510411061<br>26.06.2019 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 07.01.2020 followed by a reminder on 06.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910067697 Pending<br>:01/80/050/00101/AM20/ :09/24/040/00138/AM20/ 26.06.2019 with firm<br>----- End of picture text -----<br>

65 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by a reminder on 10.12.2019 &06.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:5/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Rejected
LIMITED 13.03.2020
HQ File<br>:01/80/050/00102/AM20/ RLA File<br>:09/24/040/00142/AM20/ Lic.No/Date:0910067698<br>26.06.2019

66 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 11.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

Case is rejected.

19 | P a g e

Case No.:6/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Rejected
LIMITED 13.03.2020
HQ File<br>:01/80/050/00103/AM20/ RLA File<br>:09/24/040/00140/AM20/ Lic.No/Date:0910067699<br>26.06.2019

67 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 11.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

Case is rejected.

Case No.:7/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status: ENGINEERING PRIVATE ALC2/2019 Rejected LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:0910067700 :01/80/050/00104/AM20/ :09/24/040/00139/AM20/ 26.06.2019

68 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 11.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

Case is rejected.

Case No.:8/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status: ENGINEERING PRIVATE ALC2/2019 Rejected LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:0910067701 :01/80/050/00105/AM20/ :09/24/040/00137/AM20/ 26.06.2019

69 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 11.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

Case is rejected.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Rejected<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910067702<br>:01/80/050/00106/AM20/ :09/24/040/00141/AM20/ 26.06.2019<br>----- End of picture text -----<br>

70 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 & 11.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

Case is rejected.

20 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/7/80-ALC2/2019 Party Name: P. M. ELECTRO Meet No/Date:23/80- Status:<br>AUTO PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3110067458 RA/Firm<br>:01/80/050/00107/AM20/ :31/83/040/00048/AM20/ 28.06.2019<br>71 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>08.08.2019 followed by reminders on 11.11.2019, 08.01.2020, 03.02.2020 & 26.02.2020. However, no<br>information has been received so far. Therefore, the Committee decided to remind again RA, Pune & the firm<br>for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/7/80-ALC2/2019 Party Name: POLYCAB INDIA Meet No/Date:23/80- Status:<br>LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310830021 Pending<br>:01/80/050/00108/AM20/ :03/95/040/00295/AM20/ 01.07.2019 with firm<br>72 Decision: The Committee considered the case as per the agenda and noted that MeitY has sought following<br>information from the firm vide letter dated 16.12.2019 followed by a reminder letter dated 04.02.2020. MeitY<br>again sought for justification from the firm on 20.02.2020 and DGFT also reminded to the firm on 06.03.2020<br>for furnishing the requisite information. However, no reply has been received yet. Hence, the Committee<br>decided to wait for the reply/comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/7/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:23/80- Status:<br>CORPORATION PANSE ALC2/2019 Deferred<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:3110067460 D/L<br>:01/80/050/00109/AM20/ :31/83/040/00050/AM20/ 01.07.2019<br>73 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per advice of the representative of DHI:<br>1. Detailed working calculation showing stager-wise wastage supported by dimensional drawing, justifying<br>quantitative requirements of raw material especially Fin and Tube.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/7/80- Party Name: BANGALORE Meet No/Date:23/80- Status:<br>ALC2/2019 BIOTECH LABS PVT. ALC2/2019 Deferred<br>LTD. 13.03.2020<br>HQ File RLA File Lic.No/Date:0710115122 Pending with<br>:01/80/050/00110/AM20/ :07/24/040/00082/AM20/ 03.07.2019 MSME<br>74<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME for examination of the case on 12.07.2019 followed by reminder on 17.09.2019 & 13.02.2020.<br>However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for<br>expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

21 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/7/80-ALC2/2019 Party Name: DOOWON Meet No/Date:23/80- Status:<br>CLIMATE CONTROL INDIA ALC2/2019 Deferred<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:6610000035 RA/Firm<br>:01/80/050/00112/AM20/ :66/24/040/00003/AM20/ 03.07.2019<br>75 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Vijayawada and in this regard a letter was sent to the firm & RA,<br>Vijayawada on 18.10.2019 followed by reminders on 08.01.2020 & 03.02.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again RA, Vijayawada & the firm for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:43/11/80-ALC2/2019 Party Name: ERBATECH Meet No/Date:23/80- Status:
MACHINERY PRIVATE ALC2/2019 Rejected
LIMITED 13.03.2020
HQ File<br>:01/80/050/00169/AM20/ RLA File<br>:32/21/040/00061/AM20/ Lic.No/Date:3210079031<br>19.07.2019

76 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 13.12.2019 followed by a reminder on 12.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Coimbatore .

Case is rejected.

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/9/80-ALC2/2019 Party Name: DYNA FORCE Meet No/Date:23/80- Status:<br>HYDRAULICS PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:3110067484 RA/Firm<br>:01/80/050/00128/AM20/ :31/83/040/00067/AM20/ 25.07.2019<br>77 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Pune and in this regard a letter was sent to RA, Pune on 18.10.2019<br>followed by reminders on 08.01.2020 & 03.02.2020. However, no information has been received so far.<br>Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:4/9/80-ALC2/2019 Party Name: RATNAMANI Meet No/Date:23/80- Status:
METALS AND TUBES LTD. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00129/AM20/ RLA File<br>:08/24/040/00135/AM20/ Lic.No/Date:0810145826<br>25.07.2019 Pending<br>with firm

78 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 20.11.2019 followed by reminders on 07.01.2020 & 09.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

22 | P a g e

Case No.:42/11/80- Party Name: PREMIER Meet No/Date:23/80- Status: ALC2/2019 INDUSTRIAL ALC2/2019 Approved CORPORATION LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:0310830608 :01/80/050/00168/AM20/ :03/95/040/00377/AM20/ 26.07.2019

Case No.:42/11/80-<br>ALC2/2019<br>Party Name: PREMIER<br>INDUSTRIAL<br>CORPORATION LIMITED<br>Meet No/Date:23/80-<br>ALC2/2019<br>13.03.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00168/AM20/<br>RLA File<br>:03/95/040/00377/AM20/<br>Lic.No/Date:0310830608<br>26.07.2019 Case No.:42/11/80-<br>ALC2/2019 Party Name: PREMIER<br>INDUSTRIAL<br>CORPORATION LIMITED Meet No/Date:23/80-<br>ALC2/2019<br>13.03.2020 Status:<br>Approved
HQ File<br>:01/80/050/00168/AM20/ RLA File<br>:03/95/040/00377/AM20/ Lic.No/Date:0310830608<br>26.07.2019
79 **Decision:The Committee considered the case as per the agenda and decided to ratify the norms as per written<br>comments ofConsultant (SKB)**as under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended Norms<br>81122100<br>Chromium<br>Metal Powder<br>20000.000<br>KG<br>81122100<br>Chromium Metal<br>Lumps / Chips<br>20200Kg (1.01 Kgs/Kg<br>content in the export<br>product)<br>Note: Percentage of ‘Chromium’ in export/import item should be 100%.<br>RA concerned maytake further necessaryaction asper the decision of NC.

Decision: The Committee considered the case as per the agenda and decided to ratify the norms as per written comments of Consultant (SKB) as under:

80

Case No.:12/9/80-ALC2/2019 Party Name: VICTORA Meet No/Date:23/80- Status:
AUTO PVT. LTD. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00137/AM20/ RLA File<br>:05/24/040/00251/AM20/ Lic.No/Date:0510411435<br>02.08.2019 Pending with<br>MSME

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME on 14.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

==> picture [476 x 266] intentionally omitted <==

----- Start of picture text -----<br> Case No.:41/11/80-ALC2/2019 Party Name: PHOENIX FOILS Meet No/Date:23/80- Status:<br>PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310830770 D/L<br>:01/80/050/00167/AM20/ :03/95/040/00459/AM20/ 02.08.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the<br>following information as per written comments of DPIIT vide U. O. No.: P-47011/190/2019-TSW dated<br>13.03.2020:<br>1. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>81 material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>2. Assembly drawings/diagrams of the resultant product showing placement and exact use of components<br>in the export product (s).<br>3. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured out<br>of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

23 | P a g e

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/9/80-ALC2/2019 Party Name: SSP PVT.LTD. Meet No/Date:23/80- Status:<br>ALC2/2019 Approved<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0510411438<br>82 :01/80/050/00138/AM20/ :05/24/040/00259/AM20/ 05.08.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/267/2019-TSW dated 13.03.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

83

Case No.:45/11/80-ALC2/2004 Party Name: L&T- MHPS Meet No/Date:23/80- Status:
TURBINE GENERATORS ALC2/2019 Deferred
PRIVATE LIMITED 13.03.2020
HQ File<br>:01/80/050/00171/AM20/ RLA File<br>:03/95/040/00574/AM20/ Lic.No/Date:0310831568<br>16.09.2019 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 06.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

84

Case No.:46/11/80-ALC2/2004 Party Name: L&T-MHPS Meet No/Date:23/80- Status:
BOILERS PVT. LTD. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00172/AM20/ RLA File<br>:03/95/040/00588/AM20/ Lic.No/Date:0310831569<br>16.09.2019 Pending<br>with DHI

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI for examination of the case on 19.12.2019 followed by a reminder on 06.03.2020. However, no comments been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/13/80-ALC2/2019 Party Name: RONCH Meet No/Date:23/80- Status:<br>POLYMERS PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310832012 RA/Firm<br>:01/80/050/00186/AM20/ :03/95/040/00654/AM20/ 04.10.2019<br>85 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 17.12.2019 followed by a reminder on 13.02.2020. However, no information has been received so<br>far. Therefore, the Committee decided to remind again RA, Mumbai & the firm for submitting the complete set<br>of application.<br>Case is deferred.<br>----- End of picture text -----<br>

24 | P a g e

==> picture [476 x 152] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/13/80-ALC2/2019 Party Name: FERRUM Meet No/Date:23/80- Status:<br>EXTREME ENGINEERING ALC2/2019 Deferred<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0510412040 RA/Firm<br>:01/80/050/00187/AM20/ :05/23/040/00265/AM20/ 07.10.2019<br>86 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 17.12.2019 followed by a reminder on 13.02.2020. However, no information has been received so far.<br>Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

87

Case No.:3/13/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:23/80- Status:
AUTOMOTIVES PVT. ALC2/2019 Deferred
LTD. 13.03.2020
HQ File<br>:01/80/050/00188/AM20/ RLA File<br>:05/23/040/00266/AM20/ Lic.No/Date:0510412058<br>09.10.2019 Pending with<br>MSME

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 21.01.2020 followed by a reminder on 09.03.2020. However, no comments been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

88

Case No.:4/13/80-ALC2/2019 Party Name: L&T- MHPS Meet No/Date:23/80- Status:
TURBINE GENERATORS ALC2/2019 Deferred
PRIVATE LIMITED 13.03.2020
HQ File<br>:01/80/050/00189/AM20/ RLA File<br>:03/95/040/00681/AM20/ Lic.No/Date:0310832116<br>10.10.2019 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 09.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: L&T- MHPS Meet No/Date:23/80- Status:<br>5/13/80-ALC2/2019 TURBINE GENERATORS ALC2/2019 Deferred<br>PRIVATE LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0310832159 Pending<br>:01/80/050/00190/AM20/ :03/95/040/00655/AM20/ 11.10.2019 with firm<br>89 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 11.02.2020. However, the firm vide letter dated<br>11.03.2020 informed that the Project Engineering & Detail Design is in progress and is expected to complete by<br>30 June 2020. Hence, they requested for extension of time till 30 [th] June 2020 to furnish the requisite information.<br>Therefore, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

25 | P a g e

Case No.: Party Name: GODREJ & Meet No/Date: 23/80- Status:
6/13/80-ALC2/2019 BOYCE MFG. CO. LTD. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00191/AM20/ RLA File<br>:03/94/040/00505/AM20/ Lic.No/Date:0310832178<br>11.10.2019 PH

90 Decision: The Committee considered the case as per the agenda and noted that the firm was called for personal hearing to explain the case before Norms Committee. However, the firm vide email dated 12.03.2020informed that they were unable to come to attend personal hearing and requested for another date for personal hearing. Therefore, the Committee decided to grant another date for personal hearing to the firm.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/13/80-ALC2/2019 Party Name: ISGEC HITACHI Meet No/Date:23/80- Status:<br>ZOSEN LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0510412096 RA/Firm<br>:01/80/050/00192/AM20/ :05/23/040/00269/AM20/ 11.10.2019<br>91 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 17.12.2019 followed by a reminder on 13.02.2020. However, no information has been received so far.<br>Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/13/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910068080 RA/Firm<br>:01/80/050/00193/AM20/ :09/24/040/00347/AM20/ 14.10.2019<br>92 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA,<br>Hyderabad on 17.12.2019 and again on 13.02.2020 & 17.02.2020. However, no information has been received<br>so far. Therefore, the Committee decided to remind again RA, Hyderabad & the firm for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/13/80-ALC2/2019 Party Name: GENESIS Meet No/Date:23/80- Status:<br>PACKAGING PVT.LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0710115559 Pending with<br>:01/80/050/00194/AM20/ :07/24/040/00152/AM20/ 14.10.2019 MSME<br>93<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME for examination of the case on 01.11.2019 followed by a reminder on 12.02.2020. However, no<br>comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the<br>comments.<br>Case is deferred.<br>----- End of picture text -----<br>

26 | P a g e

==> picture [476 x 188] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/13/80-ALC2/2019 Party Name: GOLD MOHUR Meet No/Date:23/80- Status:<br>PROFILES LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0510412119 D/L<br>:01/80/050/00195/AM20/ :05/23/040/00279/AM20/ 15.10.2019<br>Decision: The Committee considered the case as per the agenda and Consultant (Tech-1) informed that the<br>firm’s reply against deficiency letter dated 11.02.2020 is deficient due to following reasons:<br>94<br>1. Why is Rubber Content Weight given instead of Rubber Compound Weight for export item at Sl. No.<br>2?<br>2. Why is the composition for 100Kg indicated as 103.445Kg for export item at Sl. No. 3?<br>Therefore, the Committee decided to ask from the firm for clarification on the above mentioned deficiencies.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 118] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/13/80-ALC2/2019 Party Name: Meet No/Date:23/80- Status:<br>GLOVIS INDIA (P) LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0410166162 Pending with<br>95 :01/80/050/00196/AM20/ :04/24/040/00111/AM20/ 15.10.2019 MSME<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME for examination of the case on 14.11.2019 followed by ID reminders on 07.01.2020 & 06.03.2020.<br>However, no comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/15/80-ALC2/2019 Party Name: ULTRA Meet No/Date:23/80- Status:<br>ENGINEERS ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3110067586 RA/Firm<br>:01/80/050/00210/AM20/ :31/83/040/00099/AM20/ 05.11.2019<br>96<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Pune & the firm and in this regard an email has been sent on 15.01.2020<br>followed by a reminder on 09.03.2020. However, no information has been received yet. Hence, the Committee<br>decided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/17/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:23/80- Status:<br>PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0510412724 RA/Firm<br>:01/80/050/00233/AM20/ :05/24/040/00513/AM20/ 29.11.2019<br>97<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm and in this regard an email has been sent on 15.01.2020<br>followed by a reminder on 09.03.2020. However, no information has been received yet. Hence, the Committee<br>decided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

27 | P a g e

Case No.:2/17/80-ALC2/2019 Party Name: SULZER PUMPS Meet No/Date:23/80- Status:
INDIA LIMITED ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00234/AM20/ RLA File<br>:03/95/040/00827/AM20/ Lic.No/Date:0310833126<br>02.12.2019 RA/Firm

98 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email has been sent on 15.01.2020 followed by a reminder on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/17/80-ALC2/2019 Party Name: SULZER PUMPS Meet No/Date:23/80- Status:<br>INDIA LIMITED ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0310833143 RA/Firm<br>:01/80/050/00235/AM20/ :03/95/040/00828/AM20/ 02.12.2019<br>----- End of picture text -----<br>

99 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email has been sent on 15.01.2020 followed by a reminder on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:4/17/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Rejected
LIMITED 13.03.2020
HQ File<br>:01/80/050/00236/AM20/ RLA File<br>:09/24/040/00438/AM20/ Lic.No/Date:0910068243<br>02.12.2019

100 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 10.12.2019 followed by a reminder on 17.02.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

Case is rejected.

Case No.:5/17/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00237/AM20/ RLA File<br>:09/24/040/00439/AM20/ Lic.No/Date:0910068244<br>02.12.2019 RA/Firm

101 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 03.02.2020. However, no information has been received yet. Therefore, the Committee decided to remindRA, Hyderabad & the firm for submitting the complete set of application.

Case is deferred.

28 | P a g e

Case No.:9/17/80-ALC2/2019 Party Name: HANNING Meet No/Date:23/80- Status:
MOTORS INDIA P. LTD. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00241/AM20/ RLA File<br>:34/24/040/00270/AM20/ Lic.No/Date:3410045677<br>03.12.2019 RA/Firm

102 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 15.01.2020 followed by a reminder on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:10/17/80-ALC2/2019 Party Name: HANNING Meet No/Date:23/80- Status:
MOTORS INDIA P. LTD. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00242/AM20/ RLA File<br>:34/24/040/00271/AM20/ Lic.No/Date:3410045679<br>03.12.2019 RA/Firm

103 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 15.01.2020 followed by a reminder on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/17/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910068247 RA/Firm<br>:01/80/050/00243/AM20/ :09/24/040/00437/AM20/ 04.12.2019<br>104<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on<br>03.02.2020. However, no information has been received yet. Therefore, the Committee decided to remindRA,<br>Hyderabad & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

105

Case No.:12/17/80- Party Name: DOOWON Meet No/Date:23/80- Status:
ALC2/2019 CLIMATE CONTROL INDIA ALC2/2019 Deferred
PRIVATE LIMITED 13.03.2020
HQ File<br>:01/80/050/00244/AM20/ RLA File<br>:26/24/040/00012/AM20/ Lic.No/Date:2610012887<br>04.12.2019 Pending with<br>DHI

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 29.01.2020 and again on 06.03.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to wait for the comments.

Case is deferred.

29 | P a g e

Case No.:13/17/80-ALC2/2019 Party Name: KABY Meet No/Date:23/80- Status: PRECISION MACHINING ALC2/2019 Deferred PRIVATE LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:0910068268 Pending with 106 :01/80/050/00245/AM20/ :09/24/040/00447/AM20/ 06.12.2019 DPIIT

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 06.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments. Case is deferred.

Case No.:1/19/80-ALC2/2019 Party Name: BAUMER Meet No/Date:23/80- Status: TECHNOLOGIES INDIA ALC2/2019 Deferred PRIVATE LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:5210043275 Pending with 107 :01/80/050/00266/AM20/ :52/24/040/00051/AM20/ 23.12.2019 Tech-3

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) on 19.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (Tech-3) for expediting the comments. Case is deferred.

Case No.:2/19/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:23/80- Status:
SOLUTIONS PR IVATE ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00267/AM20/ RLA File<br>:09/24/040/00474/AM20/ Lic.No/Date:0910068302<br>24.12.2019 RA/Firm

108 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 03.02.2020&14.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 217] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/19/80- Party Name: DIGI DRIVES Meet No/Date:23/80- Status:<br>ALC2/2019 PRIVATE LIMITED ALC2/2019 Approved<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0510413072<br>:01/80/050/00268/AM20/ :05/23/040/00375/AM20/ 24.12.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms on the basis of<br>inputs given by Technical Authorities as under:<br>109<br>ITCHS Export Sl. ITCHS Recommended<br>Quantity Import Item<br>Code Item No. Code Norms<br>1 84615029 Cutting Head As per GN-4<br>Colour<br>84798100 Coating 1.000 2 85372000 Electrical Panel As per GN-4<br>Line Set 3 80511020 Electrical Motor And As per GN-4<br>Accessories<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

30 | P a g e

110

Case No.:4/19/80-ALC2/2019 Party Name: CRYOGAS Meet No/Date:23/80- Status:
EQUIPMENT PVT. LTD. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00269/AM20/ RLA File<br>:34/24/040/00287/AM20/ Lic.No/Date:3410045738<br>24.12.2019 Pending<br>with DPIIT

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 28.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DPIIT for expediting the comments.

Case is deferred.

Case No.:7/19/80-ALC2/2019 Party Name: DAMPER Meet No/Date:23/80- Status: TECHNOLOGY INDIA PVT. ALC2/2019 Approved LTD. 13.03.2020 HQ File RLA File Lic.No/Date:3210079311 :01/80/050/00272/AM20/ :32/24/040/00099/AM20/ 27.12.2019

111 Decision: The Committee considered the case as per the agenda and decided to ratify the norms on the recommendation of the representative of DHI as under:

  1. Quantity of import item at Sl. No. 6 may be allowed on net to net basis .

  2. Quantity of rest of the import items may be allowed under GN-4 .

RA concerned may take further necessary action as per the decision of NC.

112

Case No.:9/19/80-ALC2/2019 Party Name: BONATRANS Meet No/Date:23/80- Status:
INDIA PRIVATE LIMITED ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00274/AM20/ RLA File<br>:03/94/040/00785/AM20/ Lic.No/Date:0310833747<br>27.12.2019 Pending<br>with DHI

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 24.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.

Case is deferred.

113

Case No.:8/19/80-ALC2/2019 Party Name: TEGA Meet No/Date:23/80- Status:
INDUSTRIES LIMITED ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00273/AM20/ RLA File<br>:02/24/040/00148/AM20/ Lic.No/Date:0210209647<br>30.12.2019 Pending with<br>Tech-1/DPIIT

Decision: The Committee considered the case as per the agenda and noted that the case was referred to Consultant (Tech-1) for comments on import items at Sl. No. 2 to 4 and decided to refer the case to DPIIT for comments on import item at Sl. No. 1.

Case is deferred.

31 | P a g e

==> picture [476 x 301] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/19/80-ALC2/2019 Party Name: BANGALORE Meet No/Date:23/80- Status:<br>BIOTECH LABS PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0710115950 D/L<br>:01/80/050/00275/AM20/ :07/24/040/00223/AM20/ 30.12.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the<br>following information as per written comments of DPIIT vide U. O. No.: P-47011/190/2019-TSW dated<br>13.03.2020:<br>1. Model number, technical specification and specific quantity-both in terms of number (if any) and/or<br>weight, of each export product (Appendix-33 of current HBP refers).<br>2. Weight of each Export Product.<br>114<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license, if<br>any, may also be indicated.<br>4. Assembly drawings/diagrams of the resultant product showing placement and exact use of components<br>in the export product (s).<br>5. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured<br>out of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:11/19/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00276/AM20/ RLA File<br>:09/24/040/00489/AM20/ Lic.No/Date:0910068312<br>31.12.2019 RA/Firm

115

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 03.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.

Case is deferred.

Case No.:12/19/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00277/AM20/ RLA File<br>:09/24/040/00490/AM20/ Lic.No/Date:0910068313<br>31.12.2019 RA/Firm

116 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 03.02.2020. However, no information has been received yet. Therefore, the Committee decided to remindRA, Hyderabad & the firm for submitting the complete set of application.

Case is deferred.

32 | P a g e

Case No.:13/19/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:23/80- Status: CORPORATION PANSE ALC2/2019 Deferred PRIVATE LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:3110067645 Send to 117 :01/80/050/00278/AM20/ :31/83/040/00128/AM20/ 31.12.2019 Tech-3

Decision: The Committee considered the case as per the agenda and decided to refer the case to Consultant (Tech-3) for examination & comments. Case is deferred.

Case No.:14/19/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:23/80- Status: ENGINEERING LIMITED ALC2/2019 Deferred 13.03.2020 HQ File RLA File Lic.No/Date:0510413163 Pending 118 :01/80/050/00279/AM20/ :05/23/040/00381/AM20/ 01.01.2020 with DPIIT

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 24.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DPIIT for expediting the comments. Case is deferred.

119

Case No.:15/19/80-ALC2/2019 Party Name: SOGEFI ENGINE Meet No/Date:23/80- Status: SYSTEMS INDIA PRIVATE ALC2/2019 Deferred LIMITED 13.03.2020 HQ File RLA File Lic.No/Date:0710115971 RA/Firm :01/80/050/00280/AM20/ :07/24/040/00097/AM20/ 02.01.2020

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm and in this regard an email has been sent on 13.02.2020. However, no information has been received yet. Therefore, the Committee decided to remind RA, Bangalore & the firm for submitting the complete set of application. Case is deferred.

Case No.:16/19/80-ALC2/2019 Party Name: MICRON Meet No/Date:23/80- Status: INSTRUMENTS PVT LTD ALC2/2019 Deferred 13.03.2020 HQ File RLA File Lic.No/Date:0510413177 Pending 120 :01/80/050/00281/AM20/ :05/24/040/00590/AM20/ 02.01.2020 with DPIIT

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 12.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments. Case is deferred.

121

Case No.:17/19/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:23/80- Status:
ENGINEERING LIMITED ALC2/2019 Deferred
13.03.2020
HQ File :01/80/050/00282/AM20/ RLA File :05/23/040/00378/AM20/ Lic.No/Date:0510413181<br>02.01.2020 Pending with<br>DHI

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 24.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.

Case is deferred.

33 | P a g e

Case No.:1/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00295/AM20/ RLA File<br>:09/24/040/00522/AM20/ Lic.No/Date:0910068392<br>21.01.2020 RA/Firm

122 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910068393 RA/Firm<br>:01/80/050/00296/AM20/ :09/24/040/00523/AM20/ 21.01.2020<br>----- End of picture text -----<br>

123 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:3/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00297/AM20/ RLA File<br>:09/24/040/00524/AM20/ Lic.No/Date:0910068394<br>21.01.2020 RA/Firm

124 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910068395 RA/Firm<br>:01/80/050/00298/AM20/ :09/24/040/00528/AM20/ 21.01.2020<br>----- End of picture text -----<br>

125 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

34 | P a g e

Case No.:5/21/80-ALC2/2019 Party Name: MAHINDRA Meet No/Date:23/80- Status:
DEFENCE SYSTEMS LTD ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00299/AM20/ RLA File<br>:05/24/040/00602/AM20/ Lic.No/Date:0510413404<br>21.01.2020 RA/Firm

126 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

127

Case No.:6/21/80-ALC2/2019 Party Name: MICRON Meet No/Date:23/80- Status:
INSTRUMENTS PVT LTD ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00300/AM20/ RLA File<br>:05/24/040/00675/AM20/ Lic.No/Date:0510413411<br>21.01.2020 Pending<br>with DPIIT

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 12.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:7/21/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:23/80- Status:
BLADES INDIA PVT. LTD ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00301/AM20/ RLA File<br>:34/24/040/00329/AM20/ Lic.No/Date:3410045799<br>21.01.2020 RA/Firm

128 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

129

Case No.:8/21/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:23/80- Status:
BLADES INDIA PVT. LTD ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00302/AM20/ RLA File<br>:34/24/040/00330/AM20/ Lic.No/Date:3410045800<br>21.01.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

35 | P a g e

130

Case No.:9/21/80-ALC2/2019 Party Name: MICRON Meet No/Date:23/80- Status:
INSTRUMENTS PVT LTD ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00303/AM20/ RLA File<br>:05/24/040/00398/AM20/ Lic.No/Date:0510413428<br>23.01.2020 Pending with<br>DPIIT

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 12.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:10/21/80-ALC2/2019 Party Name: THERMAL Meet No/Date:23/80- Status:
SYSTEMS (HYDERABAD) P. ALC2/2019 Deferred
LTD. 13.03.2020
HQ File<br>:01/80/050/00304/AM20/ RLA File<br>:09/24/040/00506/AM20/ Lic.No/Date:0910068410<br>24.01.2020 RA/Firm

131 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:11/21/80-ALC2/2019 Party Name: CHEMICO Meet No/Date:23/80- Status:
SYNTHETICS LTD., ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00305/AM20/ RLA File<br>:05/23/040/00408/AM20/ Lic.No/Date:0510413441<br>24.01.2020 RA/Firm

132 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:12/21/80-ALC2/2019 Party Name: KAY BOUVET Meet No/Date:23/80- Status:
ENGINEERING LTD ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00306/AM20/ RLA File<br>:31/83/040/00139/AM20/ Lic.No/Date:3110067666<br>27.01.2020 RA/Firm

133 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

36 | P a g e

Case No.:13/21/80-ALC2/2019 Party Name: HANNING Meet No/Date:23/80- Status:
MOTORS INDIA P LTD ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00307/AM20/ RLA File<br>:34/24/040/00336/AM20/ Lic.No/Date:3410045818<br>28.01.2020 RA/Firm

134 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:14/21/80-ALC2/2019 Party Name: HANNING Meet No/Date:23/80- Status:
MOTORS INDIA P LTD ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00308/AM20/ RLA File<br>:34/24/040/00337/AM20/ Lic.No/Date:3410045819<br>28.01.2020 RA/Firm

135 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/21/80-ALC2/2019 Party Name: HANNING Meet No/Date:23/80- Status:<br>MOTORS INDIA P LTD ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:3410045820 RA/Firm<br>:01/80/050/00309/AM20/ :34/24/040/00338/AM20/ 28.01.2020<br>136<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Vadodara& the firm and in this regard an email has been sent on 09.03.2020.<br>However, no information has been received yet. Hence, the Committee decided to wait for the complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:16/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00310/AM20/ RLA File<br>:09/24/040/00525/AM20/ Lic.No/Date:0910068424<br>29.01.2020 RA/Firm

137 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

37 | P a g e

Case No.:17/21/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:23/80- Status:
AUTOMOTIVES PVT. LTD. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00311/AM20/ RLA File<br>:05/23/040/00359/AM20/ Lic.No/Date:0510413478<br>29.01.2020 RA/Firm

138 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:18/21/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:23/80- Status:
BLADES INDIA PVT. LTD ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00312/AM20/ RLA File<br>:34/24/040/00341/AM20/ Lic.No/Date:3410045830<br>30.01.2020 RA/Firm

139 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/21/80-ALC2/2019 Party Name: BENGAL Meet No/Date:23/80- Status:<br>INDUSTRIES PVT. LTD. ALC2/2019 Deferred<br>13.03.2020<br>HQ File RLA File Lic.No/Date:0510413481 RA/Firm<br>:01/80/050/00313/AM20/ :05/23/040/00415/AM20/ 30.01.2020<br>140<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm and in this regard an email has been sent on 09.03.2020.<br>However, no information has been received yet. Hence, the Committee decided to wait for the complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:20/21/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:23/80- Status:
BLADES INDIA PVT. LTD ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00314/AM20/ RLA File<br>:34/24/040/00344/AM20/ Lic.No/Date:3410045838<br>30.01.2020 RA/Firm

141 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

38 | P a g e

Case No.:21/21/80-ALC2/2019 Party Name: BHARAT HEAVY Meet No/Date:23/80- Status:
ELECTRICALS LIMITED ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00315/AM20/ RLA File<br>:11/24/040/00011/AM20/ Lic.No/Date:1110028681<br>31.01.2020 RA/Firm

142 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bhopal & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:22/21/80-ALC2/2019 Party Name: JAIN IRRIGATION Meet No/Date:23/80- Status:
SYSTEMS LTD. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00316/AM20/ RLA File<br>:03/94/040/00435/AM20/ Lic.No/Date:0310834593<br>03.02.2020 RA/Firm

143 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:23/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910068441 RA/Firm<br>:01/80/050/00317/AM20/ :09/24/040/00557/AM20/ 03.02.2020<br>144<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on<br>06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the<br>complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:24/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00318/AM20/ RLA File<br>:09/24/040/00559/AM20/ Lic.No/Date:0910068442<br>03.02.2020 RA/Firm

145 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

39 | P a g e

Case No.:25/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00319/AM20/ RLA File<br>:09/24/040/00552/AM20/ Lic.No/Date:0910068443<br>03.02.2020 RA/Firm

146 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:26/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00320/AM20/ RLA File<br>:09/24/040/00554/AM20/ Lic.No/Date:0910068444<br>03.02.2020 RA/Firm

147 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on 06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:27/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 13.03.2020<br>HQ File RLA File Lic.No/Date:0910068445 RA/Firm<br>:01/80/050/00321/AM20/ :09/24/040/00553/AM20/ 03.02.2020<br>148<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm and in this regard an email has been sent on<br>06.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the<br>complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

149

Case No.:28/21/80-ALC2/2019 Party Name: FRIZAIR Meet No/Date:23/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00322/AM20/ RLA File<br>:09/24/040/00556/AM20/ Lic.No/Date:0910068449<br>04.02.2020 Pending<br>with DHI

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 24.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.

Case is deferred.

40 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:29/21/80-ALC2/2019 Party Name: COFLE Meet No/Date:23/80- Status: Deferred<br>TAYLOR INDIA ALC2/2019<br>CONTROL CABLES & 13.03.2020<br>SYSTEMS PRIVAT<br>HQ File RLA File Lic.No/Date:0410166495 Pending with<br>150 :01/80/050/00323/AM20/ :04/24/040/00167/AM20/ 05.02.2020 MSME<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent<br>to MSME on 11.03.2020 for examination of the case. However, no comments have been received yet. Hence,<br>the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

151

Case No.:30/21/80-ALC2/2019 Party Name: AYYAPPA Meet No/Date:23/80- Status: Deferred
CNC PVT LTD ALC2/2019
13.03.2020
HQ File<br>:01/80/050/00324/AM20/ RLA File<br>:07/24/040/00262/AM20/ Lic.No/Date:0710116097<br>05.02.2020 Pending with<br>MSME

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 24.02.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind MSME for expediting the comments.

Case is deferred.

Case No.:31/21/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:23/80- Status:
LIMITED ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00325/AM20/ RLA File<br>:03/95/040/01062/AM20/ Lic.No/Date:0310834668<br>06.02.2020 RA/Firm

152 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

153

Case No.:32/21/80-ALC2/2019 Party Name: IND-SPHINX Meet No/Date:23/80- Status:
PRECISION LIMITED ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00326/AM20/ RLA File<br>:30/24/040/00122/AM20/ Lic.No/Date:3010105038<br>07.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Ludhiana & the firm and in this regard an email has been sent on 09.03.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

41 | P a g e

154

Case No.:2/23/80-ALC2/2019 Party Name: MANN AND Meet No/Date:23/80- Status:
HUMMEL FILTER PVT.LTD. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00347/AM20/ RLA File<br>:07/24/040/00271/AM20/ Lic.No/Date:0710116157<br>20.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm. Therefore, the Committee decided to request from RA, Bangalore and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

155

Case No.:4/23/80-ALC2/2019 Party Name: RONCH Meet No/Date:23/80- Status:
POLYMERS PVT LTD ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00349/AM20/ RLA File<br>:03/95/040/01089/AM20/ Lic.No/Date:0310834951<br>20.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

156

Case No.:3/23/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:23/80- Status:
AUTOMOTIVES LTD. ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00348/AM20/ RLA File<br>:05/23/040/00424/AM20/ Lic.No/Date:0510413679<br>21.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

157

Case No.:5/23/80-ALC2/2019 Party Name: HANNING Meet No/Date:23/80- Status:
MOTORS INDIA P LTD ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00350/AM20/ RLA File<br>:34/24/040/00368/AM20/ Lic.No/Date:3410045900<br>21.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

42 | P a g e

158

Case No.:6/23/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:23/80- Status:
TURBINE GENERATORS ALC2/2019 Deferred
PRIVATE LIMITED 13.03.2020
HQ File<br>:01/80/050/00351/AM20/ RLA File<br>:03/95/040/01074/AM20/ Lic.No/Date:0310835043<br>25.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

159

Case No.:7/23/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:23/80- Status:
BLADES INDIA PVT. LTD ALC2/2019 Deferred
13.03.2020
HQ File<br>:01/80/050/00352/AM20/ RLA File<br>:34/24/040/00375/AM20/ Lic.No/Date:3410045913<br>28.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

160

Case No.:8/23/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00353/AM20/ RLA File<br>:09/24/040/00595/AM20/ Lic.No/Date:0910068531<br>02.03.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

161

Case No.:9/23/80-ALC2/2019 Party Name: AZAD Meet No/Date:23/80- Status:
ENGINEERING PRIVATE ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00354/AM20/ RLA File<br>:09/24/040/00594/AM20/ Lic.No/Date:0910068532<br>02.03.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

43 | P a g e

162

Case No.:10/23/80-ALC2/2019 Party Name: MAK CONTROLS Meet No/Date:23/80- Status: AND SYSTEMS PVT LTD. ALC2/2019 Deferred 13.03.2020 HQ File RLA File Lic.No/Date:3210079436 RA/Firm :01/80/050/00355/AM20/ :32/21/040/00178/AM20/ 02.03.2020

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Coimbatore & the firm. Therefore, the Committee decided to request from RA, Coimbatore and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

163

Case No.:11/23/80-ALC2/2019 Party Name: MAK CONTROLS Meet No/Date:23/80- Status: AND SYSTEMS PVT LTD. ALC2/2019 Deferred 13.03.2020 HQ File RLA File Lic.No/Date:3210079437 RA/Firm :01/80/050/00356/AM20/ :32/21/040/00236/AM20/ 02.03.2020

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Coimbatore & the firm. Therefore, the Committee decided to request from RA, Coimbatore and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

164

Case No.:12/23/80-ALC2/2019 Party Name: ACEINOTEC Meet No/Date:23/80- Status:
MANUFACTURING PRIVATE ALC2/2019 Deferred
LIMITED 13.03.2020
HQ File<br>:01/80/050/00357/AM20/ RLA File<br>:07/24/040/00294/AM20/ Lic.No/Date:0710116194<br>02.03.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm. Therefore, the Committee decided to request from RA, Bangalore and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

44 | P a g e

Manual Cases

Manual Cases
Sl. No. 758
Case No.36/21/80-ALC2/2016 Status:
NAVKAR FITTINGS &<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
FORGINGS PVT. LTD.<br>Lic. No.: 0310808954 Date: 03.11.2016
HQ. No.: 01/80/050/00496/AM17<br>**Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 03/95/040/00606/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
04/80-ALC2/2017dated 23.05.2017 due to non-submission of reply of deficiency letter raised by DIPP vide UO
No.12/13/2017-TSW/81 dated 02/03/2017.
However, the firm had furnished the reply with a request to re-open the case and fix the ad-hoc norms.
The Committee noted that the firm’s representation was forwarded toMSMEon 28.11.2018 followed by ID
reminders on 17.09.2019, 10.01.2020& 06.03.2020 for expediting the comments. However, no comments have
been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

==> picture [476 x 83] intentionally omitted <==

----- Start of picture text -----<br> Sl. No. 759<br>Case No. 2/4/80-ALC2/2015 Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 Terumo Penpol Ltd.<br>Lic. No.: 5310008377 dated 28.05.2009<br>HQ. No.: 01/80/050/00073/AM16 Subject: Request for fixation of ad-hoc Deferred<br>RLA No.: 53/21/040/00002/AM10 norms<br>Decision: The Committee considered the case as per the agenda and noted its decision of Meeting 11/19 date<br>----- End of picture text -----<br>

30.11.2018 in which representative of MSME stated that the norms may be fixed on the basis of DIPP recommendation vide No. 07/9/20l6-TSW dt. 08.12.2017 for License No. 5310019514 dt. 05.10.2017 as ratified in Meeting No. 16/80 dated 14.11.2017. However, the Committee observed that the description of export item in the subject application does not exactly match with that appearing in the recommendation of DIPP and due to this it was requested to MSME to provide comments. Based on the deliberations & as per advice of MSME, the Committee decided that Consultant (Tech - 1) to look into the issue. Hence, the case was referred to Consultant (Tech -1) on 16.10.2019 for examination & comments . Consultant (Tech-1) informed that a similar case of the firm has already been referred to PLEXCOUNCIL and Department of C & PC. PLEXCOUNCIL vide email dated 17.12.2019 had requested for 15 days time to reply the query and no information has been received from Deptt. of C & PC. The Committee noted that Deptt. of C & PC and PLEXCOUNCIL were reminded on 12.02.2020 for the expediting the matter. PLEXCOUNCIL’s reply was received and forwarded to Consultant (Tech-1) on 11.03.2020 for examination of the case. However, Consultant (Tech-1) informed in the meeting that PLEXCONCIL reply mentions Acetic Anhydride as the export product, which does not make any sense. Hence the Committee decided to again request PLEXCONCIL and send a D.O. Letter to JS Deptt. Of C&PC to provide their comments in the matter at the earliest. Case is deferred.

45 | P a g e

Sl. No. 760

Sl. No. 760
Case No.26/11/80-ALC2/2016<br>Dee Development Engineers Ltd.<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No.: 0510398701 dated 01.06.2017
HQ. No.: 01/80/050/00299/AM17<br>**Subject:**Request for fixation of ad-hoc<br>norms<br>Deferred<br>RLA No.: 05/23/040/00101/AM17
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting<br>No. 09/80 dated 01.08.2017 due to non-submission of reply of deficiency letter dated 19.04.2017.<br>The Committee reconsidered the case and noted that the firm was reminded on 11.03.2020 for<br>furnishingthe requisite information as per the decision of M. No. 21/80 dated 18.02.2020. However, no reply has<br>been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.

Sl. No. 761

Case No.21/6/80-ALC2/2016<br>Status:
Dee Development Engineers Ltd.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No.: 0510398216 dated 13.04.2016
HQ. No.: 01/80/050/00180/AM17<br>**Subject:**Request for fixation of ad-hoc<br>Deferred
norms<br>RLA No.: 05/23/040/00015/AM17
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 09/80 dated 01.08.2017 due to non-submission of reply of deficiency letter dated 19.04.2017.
However, the firm had furnished the reply with a request to re-open case and fix the ad-hoc norms. The
Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised byDPIIT
was sent to the firm on 16.12.2019 followed by a reminder on 12.02.2020. However, no reply has been received
yet. Therefore, the Committee decided to sendfinal reminderto the firm for furnishing the requisite information
within the 15 days.
Case is deferred.

Sl. No. 762

Sl. No. 762
Case No.15/2/80-ALC2/2016 Status:
Deepeeka Exports Pvt. Ltd.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No.: 0510396524 dated 04.12.2015
HQ. No.: 01/80/050/00018/AM17<br>**Subject:**Request for fixation of ad-hoc norms<br>RLA No.: 05/23/040/00371/AM16 Deferred
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 14/80 dated 11.10.2016 due to non-submission of reply of deficiency letter dated 04.08.2016.
The Committee noted that the firm’s reply against deficiency letter dated 15.01.2019 was sent to MSMEfor
examination of the case on 21.10.2019 followed by a reminder on 12.02.2020. However, no comments have been
received yet. Therefore, the Committee decided toremind MSMEfor expediting the comments.
Case is deferred.

46 | P a g e

Sl. No. 763

Sl. No. 763
Case No.45/24/80-ALC2/2013<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No.: 0310766285 dated 15.01.2014 Kelvion India Pvt. Ltd.<br>Status:
HQ. No.: 01/80/050/00522/AM14<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred<br>RLA No.: 03/94/040/00880/AM14
Decision:The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.<br>22/80 dated 20.01.2015 due to non-submission of reply of deficiency letter dated 30.07.2014.<br>The firm furnished the reply vide letter dated 20.11.2017 with a request to fix the ad-hoc norms. The Committee<br>considered the case as per agenda and noted that the firm’s reply was forwarded toDPIITon 11.03.2020 for<br>examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for<br>the comments.<br>Case is deferred.

Sl. No. 764

Sl. No. 764
Case No. A/R 16/19 Status:
TATA Sikorsky Aerospace Ltd.<br>M. No.: 23/80-<br>ALC2/2019 dated<br>13.03.2020
HQ. No.:<br>01/80/162/301/AM18/<br>DES-18<br>**Subject:**EOU- M/s. TATA Sikorsky Aerospace Ltd., LOP No. PER:<br>076/EOU/VSEZ/HYD/2011 dated 25.07.2011 for fixation of wastage<br>norms for export product “Helicopter cabin kits & parts and accessories<br>for Aircraft” against import items 1. Stainless Steel bars/rods 2. Stainless<br>Steel Tube/Pipes 3. Stainless Steel round bars Deferred
**Decision:**The Committee considered the case as per the agenda and noted that the application of the firm was sent
to DIPP on 10.07.2018 and also to DHI on 03.08.2018 for their examinations/comments. Since, they had stated that
the export product is not under the purview of DIPP/DHl, so it was forwarded toMSMEon 18.03.2019 followed
by reminders on24.09.2019, 10.01.2020 & 12.02.2020. However, no comments have been received yet. Therefore,
the Committee decided toremind again MSMEfor expending the comments.
Case is deferred.

Sl. No. 765

Case No.67/2/80-ALC2/2016 Status:
ECOCAT INDIA PVT.LTD<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No.: 0510397548 dated 09.02.2016
HQ. No.: 01/80/050/00070/AM17<br>**Subject:**Request for fixation of ad-hoc Deferred
norms<br>RLA No.: 05/23/040/00472/AM16
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
15/80 dated 06.03.2019 due to non-submission of reply of deficiency letter dated 11.10.2018.
However, the firm had requested for fixation of ad-hoc norms. The Committee noted that the firm’s
representation was forwarded toMSMEon 11.07.2019 followed by reminders on 24.09.2019, 10.01.2020&
06.03.2020, for examination of the case. However, no comments have been received yet. Hence, the Committee
decided to wait for the comments.
Case is deferred.

47 | P a g e

Sl. No. 766

==> picture [476 x 64] intentionally omitted <==

----- Start of picture text -----<br> Case No. 27/9/80-ALC2/2017 Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 TERUMO PENPOL PRIVATE LIMITED<br>Lic. No.: 5310019417 dated 15.06.2017<br>HQ. No.: 01/80/050/00205/AM18 Subject: Request for fixation of ad-hoc norms Deferred<br>RLA No.: 53/24/040/00003/AM18<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda noted that the case was approved in Meeting No. 03/80 dated 09.05.2018 as per written comments of DIPP (TSW section) vide letter No.: 07/9/2016-TSW dated 08.12.2017. However the firm requested to re-fix the norms and also allow them for Personal Hearing .

Decision: The Committee considered the case as per the agenda noted that the case was approved in Meeting No. 03/80 dated 09.05.2018 as per written comments of DIPP (TSW section) vide letter No.: 07/9/2016-TSW dated 08.12.2017. However the firm requested to re-fix the norms and also allow them for Personal Hearing . In continuation to Meeting 09/80 dated 14.09.2019, the Committee noted that the firm appeared for PH in its Meeting 09/80 dated 14.09.2019 and explained the reason for higher wastage claimed. Based on the deliberations, the Committee decided that Consultant (Tech 1) to look into the issue. Consultant (Tech-1) pointed out that firm is requesting to increase the wastage norms for PVC compound from 10% to 16% on the basis ofDeptt. of C&PC suggestion vide letter dated 10.09.2012 for amending the SION H-67 and AA of the firm has been ratified on the basis of SION H-67 which allows for only 10%. Consultant (Tech 1) suggested that PLEXCOUNCIL may be requested to provide Production/Consumption data of other manufacturers. The Committee noted that the case was referred to PLEXCOUNCIL &Deptt. Of C & PC on 18.10.2019 & 05.11.2019 respectively. However, PLEXCOUNCIL vide email dated 17.12.2019 had requested for 15 days time to reply the query and no information has been received from Deptt. Of C&PC. The Committee noted that Deptt. of C&PC and PLEXCOUNCIL were reminded on 12.02.2020 for the expediting the matter. PLEXCOUNCIL’s reply was received and forwarded to Consultant (Tech-1) on 11.03.2020 for examination of the case. However, Consultant (Tech-1) informed in the meeting that PLEXCONCIL reply mentions Acetic Anhydride as the export product, which does not make any sense. Hence the Committee decided to again request PLEXCONCIL and send a D.O. Letter to JS Deptt. Of C&PC to provide their comments in the matter at the earliest. Case is deferred.

Sl. No. 767

Sl. No. 767
Case No. : 61/25/80-ALC2/2016 Status:
M/s. BARODA EQUIPMENT AND<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
VESSELS PVT. LTD.<br>Lic. No. /date: 3410042545 dated 21.09.2016
HQ. No.: 01/80/50/621/AM17/DES-I<br>**Subject:**Request for reviewing of ad-hoc Deferred
norms<br>RLA No.: 34/24/040/00182/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in M. No. 14/80-
ALC2/2017dated 10.10.2017due to non submission of reply of deficiency raised by DPIIT.
However, the firm furnished the reply vide letter dated 31.07.2019 with a request to fix the ad-hoc
norms. The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised
byDPIITwas sent to the firm on 19.11.2019, 13.01.2019& 07.03.2020. However, no reply has been received yet.
Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.

48 | P a g e

Sl. No. 768

Case No. :24/19/80-ALC2/2014<br>Status:
M/s SHAKTI PUMPS (INDIA) LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No. /date: 5610004450 Date: 21.10.2014
HQ. No.: 01/80/050/00458/AM15<br>**Subject:**Request for re-fixation of ad-hoc<br>norms<br>Deferred<br>RLA No.: 56/24/040/00042/AM15
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
5/80-ALC2/2016dated 07.06.2016as per recommendation of DIPP vide ID Note No. 12/46/2016-TSW/11 dated
03.06.2016.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case as
per agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on
07.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.

Sl. No. 769

Case No. :No.:9/12/80-ALC2/2017<br>SMC PNEUMATICS (INDIA) PRIVATE<br>LIMITED<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0510403402 dated 14.07.2017
HQ. No.: 01/80/050/00223/AM18<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred
norms<br>RLA No.: 05/24/040/00172/AM18
Decision:The Committee considered the case as per the agenda noted that the case was approved in M. No. 3/80-
ALC2/2016 dated 09.05.2018as per recommendation of DHI, DIPP and MSME present in the meeting.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case as per agenda
and the written comments has been received from Consultant Tech-3. However, the Committee decided to forward
the comments of consultant tech-3 to DPIIT on the same similar cases have been examined /recommended by them.
Case is deferred.

Sl. No. 770

Case No. :16/8/80-ALC2/2018<br>**M/s.**SMC PNEUMATICS (INDIA)<br>PRIVATE LIMITED<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No.: 0510407130 Date: 09.07.2018
HQ. No.: 01/80/050/139/AM19<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred
norms<br>RLA No.: 05/24/040/00207/AM19
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
4/80-ALC2/2019 dated 22.05.2018as per written comments ofDPIITvide U. O. No.: P-47011/289/2018-TSW
dated 25.04.2019.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case as per agenda
and the written comments has been received from Consultant Tech-3. However, the Committee decided to forward
the reviewed comments of consultant tech-3 to DPIIT who had earlier recommended the norms
Case is deferred.

49 | P a g e

Sl. No. 771

Sl. No. 771
Case No.41/3/80-ALC2/2015 Status:
Y-TEC INDIA PVT. LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No.: 0510393093 dated 05.02.2015
HQ. No.: 01/80/050/00041/AM16<br>**Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 05/24/040/00523/AM15
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
18/80 dated 08.12.2015 due to non-submission of reply of deficiency letter dated 22.06.2015.
However, the firm vide letter dated 20.12.2018 submitted the representation with a request to fix the ad-
hoc norms. The Committee reconsidered the case and noted that a deficiency letter seeking certain information as
raised by**Consultant (Tech-1)**was sent to the firm on 22.11.2019 followed by reminders on 13.01.2020&
07.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.

Sl. No. 772

Case No.:39/5/80-ALC2/2017<br>L & T-MHPS TURBINE GENERATORS<br>PRIVATE LIMITED<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0310813078 Date: 05.05.2017
HQ. No.: 01/80/050/00100/AM18<br>**Subject:**Request for re-fixation of ad-hoc<br>norms<br>Deferred<br>RLA No.: 03/95/040/01041/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
15/80-ALC2/2018 dated06.03.2019 as per the written comments of DHI vide their U.O. No. DES-I/L&T/Tu-1-
2018-HEI dated 24.12.2018.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and noted
that a deficiency letter seeking certain information as raised byDHIwas sent to the firm on 07.03.2020. However,
no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.

Sl. No. 773

Sl. No. 773
Case No.:13/16/80-ALC2/2017<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0310815484 Date: 01.09.2017 L & T-MHPS TURBINE GENERATORS<br>PRIVATE LIMITED Status:
HQ. No.: 01/80/050/00276/AM18 **Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 03/95/040/00052/AM18
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No.<br>06/80-ALC2/2018dated<br>11.07.2018<br>on<br>the<br>ground<br>that<br>the<br>parts<br>of<br>the import items
given ( Unit of Measurement) in sets and number of parts in each set and their composition is not known. The
Committee found that it was very difficult to enforce accountability and rejected the case.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that
the firm’s reply was sent toDHIon 21.02.2020 for examination of the case. However, no comments have been
received yet. Therefore, the Committee decided toremind DHIfor expediting the comments.
Case is deferred.

50 | P a g e

==> picture [472 x 165] intentionally omitted <==

----- Start of picture text -----<br> Sl. No. 774<br>M. No.: 23/80-ALC2/2019 dated<br>Astha Corporation Pvt. Ltd. Status:<br>13.03.2020<br>HQ File No: Subject: Request for 100% EOU for fixation of Norms for<br>Deferred<br>01/80/162/003/AM20/DES1 Precision Metal Machined Parts<br>Decision: The Committee considered the case as per agenda and noted that the representation received from O/o<br>Development Commissioner Vishakhapatnam Special Economic Zone, Hyderabad has forwarded the application of<br>M/s Astha corporation Pvt. Ltd., for 100% EOU for fixation of Norms for Precision Metal Machined Parts.<br> The firm had requested for fixation of norms. The Committee noted that the case was referred to MSME<br>for examination on 27.08.2019 followed by reminders on 08.11.2019, 06.01.2020& 06.03.2020. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per agenda and noted that the representation received from O/o Development Commissioner Vishakhapatnam Special Economic Zone, Hyderabad has forwarded the application of M/s Astha corporation Pvt. Ltd., for 100% EOU for fixation of Norms for Precision Metal Machined Parts.

Sl. No. 775

==> picture [484 x 241] intentionally omitted <==

----- Start of picture text -----<br> Case No.: 46/24/80-ALC2/2012<br>BHARAT HEAVY ELECTRICALS LIMITED Status :<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No.: 0410112044 dated.02.03.2011<br>HQ File No: 01/80/050/00819/AM10/ Subject: Request for revision of ad-hoc norms Deferred<br>RA.F.No.04/24/040/00290/AM10<br>Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting<br>No.07/80 dated 25.06.2013 as per written of DHI UO No. 3(23)/13-TSW(B)/89 dated 6.5.2013.<br> The firm vide letter dated 17.10.2019 requested for revision of ad-hoc norms. The firm stated that they have not<br>requested DGFT to amend the UOM as “Number” for the items which have UOM as “SET”. Based on their<br>requirement, they have only provided the break-up details. The firm has further stated that the quantity of material they<br>have imported in terms of “Number” is same as that they have declared to DGFT earlier. Now, they have requested to<br>revise Unit of Measurement (UoM).<br> The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by<br>DPIIT was sent to the firm on 14.01.2020. The firm vide their e-mail dated 13.02.2020 informed that D/L e-mail has<br>not been received by them. Hence, the deficiency letter was again sent to the firm on 09.03.2020. However, no reply<br>has been received yet. The Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

The firm vide letter dated 17.10.2019 requested for revision of ad-hoc norms. The firm stated that they have not requested DGFT to amend the UOM as “Number” for the items which have UOM as “SET”. Based on their requirement, they have only provided the break-up details. The firm has further stated that the quantity of material they have imported in terms of “Number” is same as that they have declared to DGFT earlier. Now, they have requested to revise Unit of Measurement (UoM).

The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 14.01.2020. The firm vide their e-mail dated 13.02.2020 informed that D/L e-mail has not been received by them. Hence, the deficiency letter was again sent to the firm on 09.03.2020. However, no reply has been received yet. The Committee decided to wait for the firm’s reply.

Sl. No. 776

Case No.:53/2/80-ALC2/2016 Status:
ALSTOM INDIA LIMITED<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No. /date: 0310795652 Date: 30.04.2015
HQ. No.: 01/80/050/00056/AM17/<br>**Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 03/94/040/00060/AM16/
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in M. No.
20/80-ALC2/2016 dated03.01.2017 due to non-submission of reply of deficiency letter dated 24.10.2016 raised
by DHI.
The firm vide letter dated 28.09.2019 had requested for fixation of ad-hoc norms. The Committee reconsidered the
case and noted that a deficiency letter seeking certain information as raised byDHIwas sent to the firm on
11.03.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.

51 | P a g e

Sl. No. 777

Case No.:58/12/80-ALC2/2014<br>Status:
GEA ECOFLEX INDIA PVT.LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No. /date: 3110064489 Date: 27.06.2014
HQ. No.: 01/80/050/00307/AM15/<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred
RLA No.: 31/83/040/00082/AM15
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in M. No.
3/80-ALC2/2015 dated12.05.2015 due to non-submission of reply of deficiency letter dated 07.10.2014.
The firm vide letter dated 02.11.2019 has furnished the reply and requested for fixation of ad-hoc norms. The
Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised byDPIIT
was sent to the firm on 07.03.2020. However, no reply has been received yet. Hence, the Committee decided to
wait for the firm’s reply.
Case is deferred.

Sl. No. 778

Case No.:10/8/80-ALC2/2015<br>Status:
GEA ECOFLEX INDIA PVT. LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No. /date: 0310795103 Date: 06.04.2015
HQ. No.: 01/80/050/00116/AM16<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred
RLA No.: 03/94/040/01169/AM15
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No.20/80-ALC2/2015 dated05.01.2016 due to non-submission of reply of deficiency letter dated 22.09.2015
raised by DIPP.
The firm vide letter dated 02.11.2019 has furnished the reply and requested for fixation of ad-hoc norms.
The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by
DPIITwas sent to the firm on 07.03.2020. However, no reply has been received yet. Hence, the Committee
decided to wait for the firm’s reply.
Case is deferred.

Sl. No. 779

Case No.:39/22/80-ALC2/2014<br>Status:
GEA ECOFLEX INDIA PVT.LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No. /date: 0310789333 Date: 17.09.2014
HQ. No.: 01/80/050/00520/AM15/<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred
RLA No.: 03/94/040/00580/AM15/
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in M. No.
10/80-ALC2/2015 dated17.08.2015 due to non-submission of reply of deficiency letter dated 20.03.2015 raised
by DIPP.
The firm vide letter dated 02.11.2019 has furnished the reply and requested for fixation of ad-hoc norms.
The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by
DPIITwas sent to the firm on 07.03.2020. However, no reply has been received yet. Hence, the Committee
decided to wait for the firm’s reply.
Case is deferred.

52 | P a g e

Sl. No. 780

Case No.:20/19/80-ALC2/2014<br>Status:
GEA ECOFLEX INDIA PVT.LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No. /date: 0310788788 Date: 05.09.2014
HQ. No.: 01/80/050/00454/AM15<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred
RLA No.: 03/94/040/00415/AM15
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No.4/80-ALC2/2015 dated26.05.2015 due to non-submission of reply of deficiency letter dated 09.02.2015
raised by DIPP.
The firm vide letter dated 02.11.2019 has furnished the reply and requested for fixation of ad-hoc norms.
The Committee reconsidered the case and noted that a deficiency letter seeking certain information as raised by
DPIITwas sent to the firm on 07.03.2020. However, no reply has been received yet. Hence, the Committee
decided to wait for the firm’s reply.
Case is deferred.

Sl. No. 781

Case No.:4/8/80-ALC2/2018<br>Status:
CHIRAG UDYOG<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No. /date: 0510406909 Date: 19.06.2018
HQ. No.: 01/80/050/00127/AM19<br>**Subject:**Request for re-fixation of ad-hoc<br>norms<br>Deferred<br>RLA No.: 05/23/040/00141/AM19/
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in M. No.
10/80-ALC2/2019 dated11.09.2019 on the basis of inputs given by the Technical Authorities present in the
meeting.
The firm vide letter dated 21.10.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered
the case and noted that the firm’s representation was forwarded to**Consultant (Tech-3)**on 06.03.2020 for the
examination & comments. However, no comments have been received yet. Hence, the Committee decided to wait
for the comments.
Case is deferred.

Sl. No. 782

Sl. No. 782
Case No.:13/11/80-ALC2/2018<br>9/3/80-ALC2/2018 Status:
MICRON INSTRUMENTS PVT LTD<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No. /date: 0510407381 Date: 31.07.2018<br>0510405742 Date: 28.02.2018
HQ. No.: 01/80/050/00204/AM19<br>01/80/050/00009/AM19<br>**Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 05/24/040/00265/AM19<br>05/24/040/00599/AM18
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.3/80-
ALC2/2019 dated08.05.2019 as per written comments of DPIIT vide F. No.: P-47011/85/2019-TSW dated 18.04.2019.
The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.3/80-ALC2/2019
dated08.05.2019 as per written comments of DPIIT vide F. No.: P-47011/85/2019-TSW dated 16.04.2019.
The firm vide letters dated 15.07.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and
noted that the firm’s representation was referred toDPIITon 06.01.2020. However, no comments have been received yet.
Therefore, the Committee decided toremind DPIITfor expediting the comments.
Case is deferred.

53 | P a g e

Sl. No. 783

Case No.:20/9/80-ALC2/2017<br>CORNING TECHNOLOGIES INDIA<br>PVT. LTD.<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0510403029 Date: 05.06.2017
HQ. No.: 01/80/050/00198/AM18/<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred
norms<br>RLA No.: 05/23/040/00081/AM18/
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No.11/80-ALC2/2018 dated06.12.2018 as per the written comments of MeitY vide U. O. No. 17/ (18)/2017-
IPHW dated 13.11.2018.
However, the firm has requested for fixation of ad-hoc norms.The Committee reconsidered the case and
noted that the firm’s representation forwarded toMeitYon 09.03.2020for examination & comments. However, no
comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.

Sl. No. 784

Sl. No. 784
Case No.:25/14/80-ALC2/2018<br>SPIROTECH HEAT EXCHANGERS<br>PVT. LTD.<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0510386129 Date: 09.05.2014 Status:
HQ. No.: 01/80/050/00341/AM19<br>**Subject:**Request for re-fixation of ad-hoc Deferred
norms<br>RLA No.: 05/24/040/00051/AM15/
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No.14/80-ALC2/2018 dated20.02.2019 as per written comments of DPIIT vide F. No.: P-47011/24/2019-TSW
dated 20.02.2019.
The firm vide letter dated 22.04.2019 has requested for re-fixation of ad-hoc norms.The Committee
reconsidered the case and noted that the firm’s representation forwarded toDPIITon 29.01.2020&11.03.2020 for
examination & comments. However, no comments have been received yet. Hence, the Committee decided to wait
for the comments.
Case is deferred.

Sl. No. 785

==> picture [476 x 62] intentionally omitted <==

----- Start of picture text -----<br> Case No.: 53/3/80-ALC2/2017 Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 GL&V INDIA PRIVATE LIMITED<br>Lic. No. /date: 3110066640 Date: 29.03.2017<br>HQ. No.: 01/80/050/00053/AM18/ Subject: Request for fixation of ad-hoc norms Deferred<br>RLA No.: 31/83/040/00185/AM17<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 7/80-ALC2/2019 dated 17.07.2019 due to non-submission of reply of deficiency letter dated 07.03.2019 raised by Consultant (Tech-3).

The firm vide letter dated 30.12.2019 has furnished the reply and requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that the firm’s representation forwarded to Consultant (Tech-3) vide email dtd. 09.03.2020 for examination & comments. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

54 | P a g e

Sl. No. 786

Case No.: 11/14/80-ALC2/2018<br>Status:
TIL LIMITED<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No. /date: 0210208838 Dated:07.12.2018
HQ. No.: 01/80/050/00327/AM19/<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred
norms<br>RLA No.: 02/24/040/00107/AM19
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No. 14/80-ALC2/2018dated20.02.2019 as per written comments of DHI vide U.O. No.: DES-1/TILL/OTRS-1-
2019-HEI dated 19.02.2019.
The firm vide letter dated 13.08.2019 & 22.01.2020 has requested for re-fixation of ad-hoc norms. The
Committee reconsidered the case and noted that the firm’s representation forwarded toDHIon 09.03.2020for
examination & comments. However, no comments have been received yet. Hence, the Committee decided to wait
for the comments.
Case is deferred.

Sl. No. 787

Case No.:40/8/80-ALC2/2018 Status:
M. No.: 23/80-ALC2/2019 dated 13.03.2020 SARA SAE PRIVATE LIMITED
Lic. No. /date: 6110001499 Date: 16.04.2018
HQ. No.: 01/80/050/00163/AM19 **Subject:**Request for fixation of ad-hoc norms Deferred
RLA No.: 61/24/040/00001/AM19
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No.15/80-ALC2/2019 dated15.11.2019 due to non-submission of reply of deficiency letter dated 06.05.2019
raised by MSME.
The firm vide letter dated 01.02.2020 has furnished the reply and requested for fixation of ad-hoc
norms.The Committee reconsidered the case and noted that the firm’s representation forwarded toMSMEon
09.03.2020for examination & comments. However, no comments have been received yet. Hence, the Committee
decided to wait for the comments.
Case is deferred.

Sl. No. 788

Case No.:23/8/80-ALC2/2018 Status:
M. No.: 23/80-ALC2/2019 dated 13.03.2020 GE POWER INDIA LIMITED
Lic. No. /date: 0310821275 Date: 28.05.2018
HQ. No.: 01/80/050/00146/AM19 **Subject:**Request for re-fixation of ad-hoc<br>Deferred
RLA No.: 03/94/040/00164/AM19 norms
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No.4/80-ALC2/2019 dated22.05.2019 due to non-submission of reply of deficiency letter dated 28.12.2018
raised by DHI.
The firm vide letter dated 27.09.2019 has furnished the reply and requested for fixation of ad-hoc norms.
The Committee reconsidered the case and noted that the firm’s representation forwarded toMSMEon 09.03.2020
for examination & comments. However, no comments have been received yet. Hence, the Committee decided to
wait for the comments.
Case is deferred.

55 | P a g e

Sl. No. 789

Case No.:4/10/80-ALC2/2018<br>BHARAT HEAVY ELECTRICALS<br>LIMITED<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0410164525 Date: 24.07.2018
HQ. No.: 01/80/050/00190/AM19<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred
norms<br>RLA No.: 04/24/040/00061/AM19
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No. 16/80-ALC2/2019dated04.12.2019 on the recommendation of the representative ofDHI.
The firm vide letter dated 02.01.2020 has requested for re-fixation of ad-hoc norms. The Committee
reconsidered the case and noted that the firm’s representation forwarded toDHIon 09.03.2020for examination &
comments. However, no comments have been received yet. Hence, the Committee decided to wait for the
comments.
Case is deferred.

Sl. No. 790

Case No.:31/13/80-ALC2/2013<br>31/4/80-ALC2/2013 Status:
M. No.: 23/80-ALC2/2019 dated 13.03.2020 NASH INDUSTRIES (I) PVT LTD
Lic. No. /date: 0710095300 Date: 09.05.2013<br>0710094430 Date: 22.03.2013
HQ. No.: 01/80/050/00236/AM14<br>01/80/050/00078/AM14 **Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 07/24/040/00032/AM14<br>07/24/040/00527/AM13
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.23/80-
ALC2/2013 dated04.02.2014 on the basis of comments of DIPP vide U. O. No. 12/18/2014-TSW/17 dated 04.02.2014.
The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.20/80-ALC2/2013
dated24.12.2013 on repeat basis, as per DIPP U. O. No. 12/115/2013-TSW/20 dated 24/12/2013.
The firm vide letter dated 15.10.2019 had requested for re-fixation of ad-hoc norms. The Committee reconsidered the
case and decided to forward the firm’s representation toDPIITfor examination & comments.
Case is deferred.

Sl. No. 791

Case No.:48/1/80-ALC2/2019<br>118/15/80-ALC2/2018 Status:
LMT TOOLS INDIA PRIVATE LIMITED<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No. /date: 3110067349 Date: 12.03.2019<br>3110067025 Date: 06.04.2018
HQ. No.: 01/80/050/00796/AM19<br>01/80/050/00460/AM19<br>**Subject:**Request for re-fixation of ad-hoc<br>norms Deferred
RLA No.: 31/83/040/00189/AM19<br>31/83/040/00001/AM19
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 14/80-
ALC2/2019 dated06.11.2019 as per written comments given by Consultant (Tech-3).
The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 17/80**-**ALC2/2019
dated 18.12.2019 as per written comments given by Consultant (Tech-3).
The firm vide letter dated 21.01.2020 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the
case and decided to forward the firm’s representation to**Consultant (Tech-3)**for examination & comments.
Case is deferred.

56 | P a g e

Sl. No. 792

Case No.:26/14/80-ALC2/2012<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0710088185 Date: 14.05.2012 PRANITA ENGINEERING SOLUTIONS<br>PRIVATE LIMITED Status:
HQ. No.: 01/80/050/00312/AM13 **Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 07/24/040/00043/AM13
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 18/80-
ALC2/2013 dated26.11.2013 due to non-submission of reply of deficiency letter dated 12.04.2013.
The firm vide letter dated 04.11.2019 has requested for fixation of ad-hoc norms. The Committee reconsidered the
case and decided to forward the firm’s representation toMSMEfor examination & comments.
Case is deferred.

Sl. No. 793

==> picture [476 x 57] intentionally omitted <==

----- Start of picture text -----<br> Case No.: 13/8/80-ALC2/2018 Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020 S AND P ENTERPRISES<br>Lic. No. /date: 0410164514 Date: 20.07.2018<br>HQ. No.: 01/80/050/00136/AM19 Subject: Request for re-fixation of ad-hoc norms Deferred<br>RLA No.: 04/24/040/00088/AM19<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 2/80ALC2/2019dated24.04.2019 due to non-submission of reply of deficiency letter dated 12.11.2018 (Raised by MSME).

The firm vide letter dated 14.11.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and decided to forward the firm’s representation to MSME for examination & comments.

Case is deferred.

Sl. No. 794

Sl. No. 794
Case No.:21/4/80-ALC2/2015 Status:
M. No.: 23/80-ALC2/2019 dated 13.03.2020 ISGEC HEAVY ENGINEERING LIMITED
Lic. No. /date: 0510394195 Date: 11.05.2015
HQ. No.: 01/80/050/00092/AM16 **Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 05/23/040/00004/AM16
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 14/80-
ALC2/2015 dated13.10.2015 as per the written comments of DIPP vide ID No. 12/114/2015/TSW/70 dated 13.10.2015.
The firm vide letter dated 16.12.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the
case and decided to forward the firm’s representation toDPIITfor examination & comments.
Case is deferred.

Sl. No. 795

Case No.: 27/5/80-ALC2/2018 Status: M. No.: 23/80-ALC2/2019 dated 13.03.2020 ISGEC HEAVY ENGINEERING LIMITED Lic. No. /date: 0510406287 Date: 01.05.2018 HQ. No.: 01/80/050/00076/AM19 Subject: Request for re-fixation of ad-hoc norms Deferred RLA No.: 05/23/040/00038/AM19 Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 5/80ALC2/2019 dated06.06.2019 as per written comments of Consultant (Tech-3).

The firm vide letter dated 18.12.2019 had requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and decided to forward the firm’s representation to Consultant (Tech-3) for examination & comments.

Case is deferred.

57 | P a g e

Sl. No. 796

Sl.No. 796
Case No.:3/20/80-ALC2/2015 Status:
M. No.: 23/80-ALC2/2019 dated 13.03.2020 ISGEC HITACHI ZOSEN LIMITED
Lic. No. /date: 0510396378 Date: 19.11.2015
HQ. No.: 01/80/050/00380/AM16 **Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 05/23/040/00342/AM16
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 26/80-
ALC2/2015 dated29.03.2016 as per the written comments of DIPP vide ID No. 12/25/2016/TSW/96 dated 05.04.2016.
The firm vide letter dated 16.12.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the
case and decided to forward the firm’s representation toDPIITfor examination & comments.
Case is deferred.

Sl. No. 797

Sl. No. 797
Case No.:47/3/80-ALC2/2018 Status:
ISGEC HITACHI ZOSEN LIMITED<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020
Lic. No. /date: 0510405848 Date: 13.03.2018
HQ. No.: 01/80/050/00047/AM19<br>**Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 05/23/040/00486/AM18
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.6/80-
ALC2/2018 dated11.07.2018 on the recommendation of technical member of DHI/DIPP/MSME.
The firm vide letter dated 16.12.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the
case and decided to forward the firm’s representation toDPIITfor examination & comments.
Case is deferred.

Sl. No. 798

Sl. No. 798
Case No.:1/3/80-ALC2/2019 Status:
M. No.: 23/80-ALC2/2019 dated 13.03.2020 ISGEC HITACHI ZOSEN LIMITED
Lic. No. /date: 0510410182 Date: 09.04.2019
HQ. No.: 01/80/050/00007/AM20 **Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 05/23/040/00578/AM19
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.11/80-
ALC2/2019 dated25.09.2019 as per written comments of DPIIT vide U.O. No.: P-47011/98/2019-TSW dated 29.08.2019.
The firm vide letter dated 11.11.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the
case and decided to forward the firm’s representation toDPIITfor examination & comments.
Case is deferred.

Sl. No. 799

Case No.: 33/8/80-ALC2/2013 Status: THYSSENKRUPP INDUSTRIES INDIA PVT. M. No.: 23/80-ALC2/2019 dated 13.03.2020 LTD. Lic. No. /date: 0310733011 Date: 01.05.2013 HQ. No.: 01/80/050/00143/AM14 Subject: Request for re-fixation of ad-hoc norms Deferred RLA No.: 03/95/040/00063/AM14 Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 03/80ALC2/2019 dated 08.05.2019 as per written comments of DHI vide F. No.: 3/127/209-TSW(B)/226 dated 11.10.2013.

The firm vide letter dated 31.05.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and decided to forward the firm’s representation to DHI for examination & comments.

Case is deferred.

58 | P a g e

Sl. No. 800

Case No.:21/8/80-ALC2/2015<br>GESTEK ENGINEERING PRIVATE<br>LIMITED<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0510394420 Date: 03.06.2015 Status:
HQ. No.: 01/80/050/00127/AM16<br>**Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 05/23/040/00070/AM16
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No.6/80-
ALC2/2016dated21.06.2016 due to non-submission of reply of deficiency letter.
The firm vide letter dated 29.07.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the
case and decided to forward the firm’s representation toDPIITfor examination & comments.
Case is deferred.

Sl. No. 801

Sl. No. 801
Case No.:21/14/80-ALC2/2018 Status:
M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0710110190 Date: 29.07.2016 MANN AND HUMMEL FILTER PVT.LTD,
HQ. No.: 01/80/050/00337/AM19 **Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 07/24/040/00144/AM17
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.14/80-
ALC2/2018 dated20.02.2019 on the recommendation of representative of DHI.
The firm vide letter dated 18.12.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the
case and decided to forward the firm’s representation toDHIfor examination & comments.
Case is deferred.

Sl. No. 802

Case No.:15/19/80-ALC2/2014<br>DOOSAN POWER SYSTEMS INDIA<br>PRIVATE LIMITED<br>Status:<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0410159541 Date: 08.10.2014
HQ. No.: 01/80/050/00449/AM15<br>**Subject:**Request for re-fixation of ad-hoc norms<br>Deferred
RLA No.: 04/24/040/00141/AM15
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.16/80-
ALC2/2015 dated10.11.2015 as per written of DHI vide their UO Note No. 3(157)/14-TSW(B) dated 13.11.2015.
The firm vide letter dated 13.09.2019 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the
case and decided to forward the firm’s representation toDHIfor examination & comments.
Case is deferred.

Sl. No. 803

Sl. No. 803
Case No.:1/14/80-ALC2/2018 Status:
M. No.: 23/80-ALC2/2019 dated 13.03.2020 AUTO COMP INDIA PVT. LTD
Lic. No. /date: 3110067225 Date: 02.11.2018
HQ. No.: 01/80/050/00317/AM19 **Subject:**Request for re-fixation of ad-hoc norms Deferred
RLA No.: 31/83/040/00121/AM19
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.2/80-
ALC2/2019 dated24.04.2019 on repeat basis as approved for AA No. 3110067175 dated 12.09.2018 as per the written
recommendation of DHI vide their U. O. No.: DES-1/DASI/RDCA-2-2019-HEI dated 28.02.2019.
The firm vide letter dated 20.01.2020 has requested for re-fixation of ad-hoc norms. The Committee reconsidered the
case and decided to forward the firm’s representation toDHIfor examination & comments.
Case is deferred.

59 | P a g e

Sl. No. 804

Sl. No. 804
Case No.:27/14/80-ALC2/2012<br>PRANITA ENGINEERING SOLUTIONS<br>PRIVATE LIMITED,<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>Lic. No. /date: 0710090071 Date: 03.08.2012 Status:
HQ. No.: 01/80/050/00313/AM13<br>**Subject:**Request for re-fixation of ad-hoc Deferred
norms<br>RLA No.: 07/24/040/00180/AM13
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 18/80-ALC2/2013 dated26.11.2013 due to non-submission of reply of deficiency letter dated 12.04.2013.
The firm vide letter dated 18.12.2019 has requested for fixation of ad-hoc norms. The Committee
reconsidered the case and decided to forward the firm’s representation toMSMEfor examination & comments.
Case is deferred.

60 | P a g e

61 | P a g e

==> picture [469 x 632] intentionally omitted <==

62 | P a g e

63 | P a g e

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied