DGFT Committee Minutes
DIRECTORATE GENERAL OF FOREIGN TRADE - (DES I SECTION)
MINUTES OF MEETING NO. 01/80 OF THE NORMS COMMITTEE-I DATED 20.05.2020 held on 17.06.2020
Meeting No. 01/80 of the Norms Committee (NC-I) for the licensing year 2020-2021 (originally scheduled for 20.05.2020) held on 17.06.2020 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -
==> picture [464 x 214] intentionally omitted <==
----- Start of picture text -----<br> Sl. No. Name of the representatives & their Designation Department<br>1. Shri K.S. Sodhi, Asst. Director MSME<br>2 Shri Sushil Kumar Jangid, Scientist ‘B’ MeitY<br>3. Shri Shaish Kumar, (Tech-1) Consultant<br>4. Shri V.C. Agarwal, (Tech-3) Consultant<br>5. Shri S. K. Bhatnagar, Consultant<br>In Attendance<br>1. Shri K.V. Tirumala, Deputy DGFT DGFT<br>2. Shri Pranav Upadhyay, Assistant Director ISS DGFT<br>----- End of picture text -----<br>
Note:
-
In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.
-
Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.
-
All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail addressnc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.
-
Minutes of Meeting 23/80 dated 13.03.2020 and Meeting 24/80 dated 25.03.2020 were circulated on 20.05.2020, to all the members of the Committee and the comments (if any), there upon received, were incorporated in the Minutes and therefore the said minutes were uploaded on dgft.gov.in on 08.06.2020.
1 | P a g e
MEETING NUMBER: 1/80-ALC2/2020 MEETING DATE: 20.05.2020
Case No.:70/15/80-ALC2/2018 Party Name: BHARAT HEAVY Meet No/Date:1/80- Status: ELECTRICALS LIMITED ALC2/2020 Approved 20.05.2020 HQ File RLA File Lic.No/Date:0710108519 :01/80/050/00412/AM19/ :07/24/040/00095/AM16/ 15.07.2015
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of MeitY vide U. O. No.: W-21/29/2020-IPHW-MeitY dated 27.05.2020 as under:
1
-
Quantity of import items at Sl. No. 1 to 5, 13, 14, 22, 26, 29, 30, 37 & 51 may be allowed on net to net basis with accountability clause.
-
Quantity of import items at Sl. No. 6 to 12, 15 to 21, 23 to 25, 27, 28, 31 to 36 & 46 to 50 may be allowed on net to net basis with nil wastage.
-
Quantity of import items at Sl. No. 38 to 45 are spares and may be allowed as per DGFT’s Spares Policy on net to net basis with accountability clause.
RA concerned may take further necessary action as per the decision of NC.
2
Case No.:366/15/80- Party Name: FOWLER Meet No/Date:1/80- Status: ALC2/2018 WESTRUP (INDIA) PVT. LTD. ALC2/2020 & 20.05.2020 Deferred HQ File RLA File Lic.No/Date:0710108605 :01/80/050/00708/AM19/ :07/24/040/00106/AM16/ 13.08.2015
Decision: The Committee considered the case as per the agenda and noted that the softcopy of the application has been on 19.05.2020. Hence, the Committee decided to forward the firm’s representation to MSME .
Case is deferred.
3
Case No.:30/1/80- Party Name: FOWLER Meet No/Date:1/80-ALC2/2020 Status: ALC2/2019 WESTRUP (INDIA) PVT. LTD. 20.05.2020 Deferred HQ File RLA File Lic.No/Date:0710108606 :01/80/050/00778/AM19/ :07/24/040/00109/AM16/ 13.08.2015
Decision: The Committee considered the case as per the agenda and noted that the softcopy of the application has been on 19.05.2020. Hence, the Committee decided to forward the firm’s representation to MSME .
Case is deferred.
Case No.: Party Name: PROMAC Meet No/Date:1/80- Status: 363/15/80-ALC2/2018 ENGINEERING INDUSTRIES LTD ALC2/2020 & 20.05.2020 Deferred HQ File RLA File :07/24/040/00184/AM16/ Lic.No/Date:0710108812 Pending with :01/80/050/00705/AM19/ 05.10.2015 Firm
Decision: The Committee considered the case as per the agenda and noted that DHI vide email dated 17.06.2020 informed that the firm’s reply against deficiency letter dated 18.11.2019 is incomplete as the firm has given only 4 the statement of wastage without calculations correlating the same with dimensional drawing. Therefore, the Committee decided to ask again form the firm to furnish the following information as per comments of DHI:
-
To provide calculations correlating with dimensional drawing.
-
To provide details of AA number of similar export product.
Case is deferred.
2 | P a g e
==> picture [476 x 176] intentionally omitted <==
----- Start of picture text -----<br> Case No.:364/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:1/80- Status:<br>ENGINEERING INDUSTRIES ALC2/2020 Deferred<br>LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0710108813 Pending<br>:01/80/050/00706/AM19/ :07/24/040/00185/AM16/ 05.10.2015 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that DHI vide email dated 17.06.2020<br>5 informed that the firm’s reply against deficiency letter dated 18.11.2019 is incomplete as the firm has given only<br>the statement of wastage without calculations correlating the same with dimensional drawing. Therefore, the<br>Committee decided to ask again form the firm to furnish the following information as per comments of DHI:<br>1. To provide calculations correlating with dimensional drawing.<br>2. To provide details of AA number of similar export product.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 119] intentionally omitted <==
----- Start of picture text -----<br> Case No.:215/15/80- Party Name: FOWLER Meet No/Date:1/80- Status:<br>ALC2/2018 WESTRUP (INDIA) PVT. LTD. ALC2/2020 Deferred<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0710110568<br>6 :01/80/050/00557/AM19/ :07/24/040/00201/AM17/ 25.10.2016<br>Decision: The Committee considered the case as per the agenda and noted that the softcopy of the application<br>has been on 19.05.2020. Hence, the Committee decided to forward the firm’s representation to MSME .<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 118] intentionally omitted <==
----- Start of picture text -----<br> Case No.:222/15/80- Party Name: FOWLER Meet No/Date:1/80-ALC2/2020 Status:<br>ALC2/2018 WESTRUP (INDIA) PVT. 20.05.2020 Deferred<br>LTD.<br>HQ File RLA File Lic.No/Date:0710110569<br>7 :01/80/050/00564/AM19/ :07/24/040/00204/AM17/ 25.10.2016<br>Decision: The Committee considered the case as per the agenda and noted that the softcopy of the application<br>has been on 19.05.2020. Hence, the Committee decided to forward the firm’s representation to MSME .<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 119] intentionally omitted <==
----- Start of picture text -----<br> Case No.:380/15/80- Party Name: FOWLER Meet No/Date:1/80- Status:<br>ALC2/2018 WESTRUP (INDIA) PVT. LTD. ALC2/2020 Deferred<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0710110914<br>8 :01/80/050/00722/AM19/ :07/24/040/00302/AM17/ 05.01.2017<br>Decision: The Committee considered the case as per the agenda and noted that the softcopy of the application<br>has been on 19.05.2020. Hence, the Committee decided to forward the firm’s representation to MSME .<br>Case is deferred.<br>----- End of picture text -----<br>
3 | P a g e
==> picture [476 x 152] intentionally omitted <==
----- Start of picture text -----<br> Case No.:402/15/80-ALC2/2018 Party Name: SHIV HYDROMET Meet No/Date:1/80- Status:<br>ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:2410042158 PH<br>:01/80/050/00744/AM19/ :24/24/040/00034/AM17/ 14.03.2017<br>Decision: The Committee considered the case as per agenda and noted that earlier the firm was called for<br>9 personal hearing as per decision taken in M. No. 19/80 dated 15.01.2020. However, the firm vide email dated<br>09.03.2020 requested for more time to appear for personal hearing . Further, the Committee also noted that the<br>firm could not be called for personal hearing due to spread of Covid-19 and ongoing lockdown. Therefore, the<br>Committee decided to allow the firm for personal hearing via video conferencing in the forthcoming NC<br>meeting.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: DIAMOND METAL Meet No/Date:1/80- Status:<br>1/11/80-ALC2/2018 SCREENS (P) LTD. ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File :65/24/040/00003/AM18/ Lic.No/Date:6510000003 Pending with<br>:01/80/050/00192/AM19/ 17.05.2017 Firm<br>10 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 20.05.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information<br>within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 129] intentionally omitted <==
----- Start of picture text -----<br> Case No.:223/15/80- Party Name: ZEECO INDIA Meet No/Date:1/80-ALC2/2020 Status:<br>ALC2/2018 PVT. LTD. 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310814297 Pending with<br>:01/80/050/00565/AM19/ :03/95/040/00271/AM18/ 28.06.2017 RA/Firm<br>11 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai<br>on 20.05.2020. However, no information has been received so far. Therefore, the Committee decided to remind<br>RA, Mumbai & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 189] intentionally omitted <==
----- Start of picture text -----<br> Case No.:107/15/80- Party Name: SEKO BEC Meet No/Date:1/80- Status:<br>ALC2/2018 PRIVATE LIMITED ALC2/2020 & 20.05.2020 Approved<br>HQ File RLA File Lic.No/Date:0910065311<br>:01/80/050/00449/AM19/ :09/24/040/00134/AM18/ 28.07.2017<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>12<br>ITCHS ITCHS Import Recommended<br>Export Item Quantity<br>Code Code Item Norms<br>Boaring Machinery For Earth.<br>Net to net basis<br>(Consisting of sinotruk 6 x 6 truck<br>Sinotruk 6 x with<br>chassis, details as per invoice no.<br>84304110 1.000 Set 87060050 6 Truck accountability<br>NTD170412INS dt. 12.04.2014<br>Chassis clause as per<br>except Consumable and Spare<br>FTP<br>parts.)<br>----- End of picture text -----<br>
4 | P a g e
Note: Export Product would have the same trucks which are imported under the authorisation.
==> picture [476 x 118] intentionally omitted <==
----- Start of picture text -----<br> Case No.:18/19/80-ALC2/2017 Party Name: KINECO KAMAN Meet No/Date:1/80- Status:<br>COMPOSITES - INDIA PVT ALC2/2020 Approved<br>LTD 20.05.2020<br>HQ File RLA File Lic.No/Date:1710006668<br>13 :01/80/050/00299/AM18/ :17/24/040/00050/AM18/ 10.10.2017<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/193/2019-TSW dated 16.06.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.:20/20/80- | Party Name: BIRLA PRECISION | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2017 | TECHNOLOGIES LTD. | ALC2/2020 | Deferred | |||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00384/AM18/ | RLA File :03/94/040/00782/AM18/ | Lic.No/Date:0310818218<br>04.01.2018 | Pending with<br>MSME |
14
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME for examination of the case on 17.02.2020 followed by a reminder on 26.05.2020. However, the representative of MSME informed in meeting that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
| Case No.:23/20/80- | Party Name: BIRLA PRECISION | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2017 | TECHNOLOGIES LTD. | ALC2/2020 | Deferred | |||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00387/AM18/ | RLA File :03/94/040/00784/AM18/ | Lic.No/Date:0310818219<br>04.01.2018 | Pending with<br>MSME |
15
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME for examination of the case on 17.02.2020 followed by a reminder on 26.05.2020. However, the representative of MSME informed in meeting that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:21/20/80- Party Name: BIRLA PRECISION Meet No/Date:1/80- Status:<br>ALC2/2017 TECHNOLOGIES LTD. ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File :03/94/040/00785/AM18/ Lic.No/Date:0310818275 Pending with<br>:01/80/050/00385/AM18/ 05.01.2018 MSME<br>16 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>MSME for examination of the case on 17.02.2020 followed by a reminder on 26.05.2020. However, the<br>representative of MSME informed in meeting that the case is under examination. Hence, the Committee decided<br>to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
5 | P a g e
Case No.:22/20/80- Party Name: BIRLA PRECISION Meet No/Date:1/80- Status: ALC2/2017 TECHNOLOGIES LTD. ALC2/2020 Deferred 20.05.2020 HQ File RLA File :03/94/040/00783/AM18/ Lic.No/Date:0310818273 Pending with :01/80/050/00386/AM18/ 05.01.2018 MSME
17 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME for examination of the case on 17.02.2020 followed by a reminder on 26.05.2020. However, the representative of MSME informed in meeting that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
Case No.:126/15/80-ALC2/2018 Party Name: SHAKTI PUMPS Meet No/Date:1/80- Status: (INDIA) LTD. ALC2/2020 Deferred 20.05.2020 HQ File RLA File Lic.No/Date:5610005299 Pending :01/80/050/00468/AM19/ :56/24/040/00036/AM18/ 08.01.2018 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per written comments of DPIIT vide U. O. No.: P-47011/328/2018-TSW dated 05.05.2020:
- Weight of each of the imported and indigenous input, separately for each product, for the purpose of
18 material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated. i.e. weight of “Nut” and weight of Stainless Steel strip in the Stainless steel clamping strip (Export item)
- Detailed calculation as to how the quantity of raw material proposed for import has been arrived at including the net weight of components to be manufactured out of the imported material (SS Sheet/Coil/Strip), wastage claimed at each stage of manufactured with complete justification and supported by documentary evidence/drawing etc.
Case is deferred.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:20/1/80-ALC2/2019 Party Name: ZTT INDIA Meet No/Date:1/80- Status:<br>PRIVATE LIMITED ALC2/2020 Approved<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0410163956<br>19 :01/80/050/00768/AM19/ :04/24/040/00212/AM18/ 07.02.2018<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of MeitY vide U. O. No.: W-21/12/2020-IPHW-MeitY dated 20.03.2020. (Copy enclosed)
6 | P a g e
| Case No.:10/1/80-ALC2/2019 | Party Name: MAGNA | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| AUTOMOTIVE INDIA | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00758/AM19/ | RLA File<br>:04/24/040/00001/AM19/ | Lic.No/Date:0410164172<br>06.04.2018 | Pending<br>with Firm |
20 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 12.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 176] intentionally omitted <==
----- Start of picture text -----<br> Case No.:397/15/80-ALC2/2018 Party Name: PROMAC Meet No/Date:1/80- Status:<br>ENGINEERING INDUSTRIES ALC2/2020 Deferred<br>LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0710113276 Pending<br>:01/80/050/00739/AM19/ :07/24/040/00357/AM18/ 14.05.2018 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that DHI vide email dated 17.06.2020<br>21 informed that the firm’s reply against deficiency letter dated 18.11.2019 is incomplete as the firm has given only<br>the statement of wastage without calculations correlating the same with dimensional drawing. Therefore, the<br>Committee decided to ask again form the firm to furnish the following information as per comments of DHI:<br>1. To provide calculations correlating with dimensional drawing.<br>2. To provide details of AA number of similar export product.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 175] intentionally omitted <==
----- Start of picture text -----<br> Case No.:133/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:1/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0910066357 Pending<br>:01/80/050/00475/AM19/ :09/24/040/00058/AM19/ 20.06.2018 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that DHI vide email dated 17.06.2020<br>22 informed that the firm’s reply against deficiency letter dated 20.05.2020 is incomplete as the firm has not given<br>the calculation in its reply. Therefore, the Committee decided to ask again form the firm to furnish the following<br>information as per comments of DHI:<br>1. To submit calculation of requirement supported by Engineering Drawing with relevant dimensions<br>highlighted.<br>Case is deferred.<br>----- End of picture text -----<br>
7 | P a g e
==> picture [476 x 173] intentionally omitted <==
----- Start of picture text -----<br> Case No.:165/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:1/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0910066427 Pending<br>:01/80/050/00507/AM19/ :09/24/040/00139/AM19/ 06.07.2018 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that DHI vide email dated<br>23 17.06.2020 informed that the firm’s reply against deficiency letter dated 20.05.2020 is incomplete as the firm<br>has not given the calculation in its reply. Therefore, the Committee decided to ask again form the firm to furnish<br>the following information as per comments of DHI :<br>1. To submit calculation of requirement supported by Engineering Drawing with relevant dimensions<br>highlighted.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:166/15/80-ALC2/2018 | Party Name: BHARAT HEAVY | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| ELECTRICALS LIMITED | ALC2/2020 | Deferred | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00508/AM19/ | RLA File<br>:09/24/040/00171/AM19/ | Lic.No/Date:0910066472<br>18.07.2018 | PH |
24 Decision: The Committee considered the case as per agenda and noted that as per decision taken in M. No. 23/80 dated 13.03.2020, the firm could not be called for personal hearing due to spread of Covid-19 and ongoing lockdown. Therefore, the Committee decided to allow the firm for personal hearing via video conferencing in the forthcoming NC meeting.
Case is deferred.
| Case No.:179/15/80-ALC2/2018 | Party Name: PROMAC | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| ENGINEERING INDUSTRIES | ALC2/2020 | Deferred | ||||
| LIMITED | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00521/AM19/ | RLA File<br>:07/24/040/00102/AM19/ | Lic.No/Date:0710113710<br>13.08.2018 | Pending<br>with Firm |
25 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 11.02.2020 followed by a reminder on 20.05.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 119] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: KINECO KAMAN Meet No/Date:1/80- Status:<br>34/1/80-ALC2/2019 COMPOSITES - INDIA PVT ALC2/2020 Approved<br>LTD 20.05.2020<br>HQ File RLA File Lic.No/Date:1710006716<br>26 :01/80/050/00782/AM19/ :17/24/040/00017/AM19/ 20.08.2018<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/193/2019-TSW dated 16.06.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
8 | P a g e
==> picture [476 x 203] intentionally omitted <==
----- Start of picture text -----<br> Case No.:183/15/80- Party Name: M M R MINING Meet No/Date:1/80- Status:<br>ALC2/2018 EQUIPMENTS ALC2/2020 & 20.05.2020 Approved<br>HQ File RLA File :09/24/040/00242/AM19/ Lic.No/Date:0910066589<br>:01/80/050/00525/AM19/ 24.08.2018<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>ITCHS ITCHS Recommended<br>27 Export Item Quantity Import Item<br>Code Code Norms<br>Truck Mounted Dth Sinotruk Howo 6x4 Cargo<br>Net to net basis<br>Drilling Rig, Model Truck Chassis (Left Hand<br>1.000 with<br>84304110 Mmr 1500 Mounted 87060042 Drive) (Imported For Mounting<br>Number accountability<br>On Sinotruk Howo 6x4 Drill Rig On The Truck And<br>clause as per FTP<br>Truck For Further Export)<br>Note: Export Product would have the same trucks which are imported under the authorisation.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:23/11/80- Party Name: JAYESH METALS AND Meet No/Date:1/80- Status:<br>ALC2/2018 FERRO ALLOYS LLP ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File :03/94/040/00488/AM19/ Lic.No/Date:0310823416 PH<br>:01/80/050/00214/AM19/ 29.08.2018<br>28 Decision: The Committee considered the case as per agenda and noted that as per decision taken in M. No.<br>21/80 dated 18.02.2020, the firm could not be called for personal hearing due to spread of Covid-19 and<br>ongoing lockdown. Therefore, the Committee decided to allow the firm for personal hearing via video<br>conferencing in the forthcoming NC meeting.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:28/11/80- Party Name: L & T-MHPS TURBINE Meet No/Date:1/80- Status:<br>ALC2/2018 GENERATORS PRIVATE LIMITED ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File :03/95/040/00466/AM19/ Lic.No/Date:0310823400 Pending with<br>:01/80/050/00219/AM19/ 29.08.2018 Firm<br>29 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 13.02.2020 followed by a reminder on 20.05.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/1/80- Party Name: L & T-MHPS TURBINE Meet No/Date:1/80- Status:<br>ALC2/2019 GENERATORS PRIVATE LIMITED ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File :03/95/040/00469/AM19/ Lic.No/Date:0310823645 Pending with<br>:01/80/050/00757/AM19/ 07.09.2018 Firm<br>30 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 13.02.2020 followed by a reminder on 20.05.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
9 | P a g e
==> picture [476 x 129] intentionally omitted <==
----- Start of picture text -----<br> Case No.:201/15/80-ALC2/2018 Party Name: DYNAMATIC Meet No/Date:1/80- Status:<br>TECHNOLOGIES LIMITED ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:0710113852 Pending<br>:01/80/050/00543/AM19/ :07/24/040/00155/AM19/ 17.09.2018 with Firm<br>31 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 07.01.2020 followed by a reminder on 06.03.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:57/11/80-ALC2/2018 Party Name: GL&V INDIA Meet No/Date:1/80- Status:<br>PRIVATE LIMITED ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:3110067179 Pending<br>:01/80/050/00248/AM19/ :31/83/040/00096/AM19/ 26.09.2018 with Firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>32<br>following information as per advice of the representative of MSME:<br>1. Quality and quantity of steel that has been imported and its net content in the export product.<br>2. Excel sheet of the calculation.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 55] intentionally omitted <==
----- Start of picture text -----<br> Case No.:82/11/80- Party Name: ANSTECH Meet No/Date:1/80-ALC2/2020 Status:<br>ALC2/2018 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410044543 Pending with<br>:01/80/050/00273/AM19/ :34/24/040/00218/AM19/ 04.10.2018 RA/Firm<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not 33 yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 08.07.2019 followed by reminders on 25.09.2019, 18.10.2019, 08.01.2020, 03.02.2020 & 20.05.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 164] intentionally omitted <==
----- Start of picture text -----<br> Case No.:253/15/80-ALC2/2018 Party Name: BHARAT HEAVY Meet No/Date:1/80- Status:<br>ELECTRICALS LIMITED ALC2/2020 Deferred<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0910066870<br>:01/80/050/00595/AM19/ :09/24/040/00340/AM19/ 16.11.2018<br>Decision: The Committee considered the case as per the agenda and noted the comments of DHI wherein DHI<br>34<br>stated that the firm has requested to club two AAs, i.e. AA No. 0910066870 and 0910065863 as they have<br>imported items under two licenses for the same/single export item to manufacture. Hence, DHI has requested to<br>provide final list of export & import items, to examine the case. Therefore, the Committee decided to request RA<br>to examine two licenses that have been issued to the firm for one/single export item and submit a report. The<br>firm is directed to provide complete list of license wise import and export items.<br>Case is deferred.<br>----- End of picture text -----<br>
10 | P a g e
| Case No.:259/15/80-ALC2/2018 | Party Name: DYNAMATIC | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| TECHNOLOGIES LIMITED | ALC2/2020 | Deferred | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00601/AM19/ | RLA File<br>:07/24/040/00182/AM19/ | Lic.No/Date:0710114156<br>22.11.2018 | Pending<br>with Firm |
35 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 07.01.2020 followed by a reminder on 06.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
Case No.:270/15/80- Party Name: VEM Meet No/Date:1/80- Status: ALC2/2018 TECHNOLOGIES PVT. LTD. ALC2/2020 Deferred 20.05.2020 HQ File RLA File :09/24/040/00428/AM19/ Lic.No/Date:0910066924 :01/80/050/00612/AM19/ 29.11.2018 36
Decision: The Committee considered the case as per the agenda and noted that DPIIT vide U. O. No.: P- 47011/326/2018-TSW dated 28.04.2020 informed that the case does not pertains to it. Therefore, the Committee decided to refer the case to Consultant (SKB) for examination & comments.
Case is deferred.
Case No.:17/1/80-ALC2/2019 Party Name: MUDHRA FINE Meet No/Date:1/80- Status: BLANC PRIVATE LTD ALC2/2020 Approved 20.05.2020 HQ File RLA File Lic.No/Date:0410164995 :01/80/050/00765/AM19/ :04/24/040/00207/AM19/ 17.12.2018
==> picture [470 x 63] intentionally omitted <==
----- Start of picture text -----<br> Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>ITCHS ITCHS Recommended<br>Export Item Quantity Import Item<br>Code Code Norms<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:
| 37 | 87089900<br>CAM-0000-1452<br>LH CAM-0000-<br>1756 RH CAM-<br>0000-1339 LH<br>CAM-0000-1488<br>RH<br>143260<br>Number<br>72269230 | ITLA BONAITI S.R.L.<br>SPEC: UNI EN10132-4<br>Material Grade:<br>SAE4130 Material<br>Description:<br>25CRMO4KE 120 X4<br>Coil And 25CRMO4KE<br>98 X 4 COIL | 6720 Kgs<br>(4365 Kg for 120mm<br>width + 2355 Kg for<br>98mm width)<br>inclusive of 103%<br>wastage after<br>affecting 1/3rd<br>recoveryfrom scrap. | ||
| Note:<br>1. Per unit weight of CAM 1452 is 26 Gram. (Quantity in EP is 41955 nos.)<br>2. Per unit weight of CAM 1756 is 26 Gram. (Quantity in EP is 41955 nos.)<br>3. Per unit weight of CAM 1339 is 19 Gram. (Quantity in EP is 29675 nos.)<br>4. Per unit weight of CAM 1488 is 19 Gram. (Quantity in EP is 29675 nos.)<br>5. The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
11 | P a g e
Case No.:274/15/80-ALC2/2018 Party Name: STERLITE Meet No/Date:1/80- Status: TECHNOLOGIES LTD. ALC2/2020 Approved 20.05.2020 HQ File RLA File Lic.No/Date:0310825720 38 :01/80/050/00616/AM19/ :03/95/040/00812/AM19/ 18.12.2018
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of MeitY vide U. O. No.: W-21/11/2020-IPHW-MeitY dated 19.03.2020. (Copy enclosed)
Case No.:293/15/80-ALC2/2018 Party Name: STERLITE POWER Meet No/Date:1/80- Status: TRANSMISSION LIMITED ALC2/2020 Approved 20.05.2020 HQ File RLA File Lic.No/Date:0310826313 39 :01/80/050/00635/AM19/ :03/95/040/00869/AM19/ 10.01.2019
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of MeitY vide U. O. No.: W-21/10/2020-IPHW-MeitY dated 19.03.2020. (Copy enclosed)
40
| Case No.:298/15/80-ALC2/2018 | Party Name: ULTRA | Meet No/Date:1/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERS | ALC2/2020 | Deferred | |||||
| 20.05.2020 | |||||||
| HQ File<br>:01/80/050/00640/AM19/ | RLA File<br>:31/83/040/00164/AM19/ | Lic.No/Date:3110067288<br>16.01.2019 | Pending<br>with DHI |
Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was forwarded to DHI on 09.06.2020 for examination of the case. However, DHI vide email dated 17.06.2020 informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
Case No.:23/1/80-ALC2/2019 Party Name: PARKER Meet No/Date:1/80- Status: HANNIFIN INDIA PVT. LTD. ALC2/2020 Approved 20.05.2020 HQ File RLA File Lic.No/Date:0410165142 :01/80/050/00771/AM19/ :04/24/040/00223/AM19/ 28.01.2019
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per 41 written comments of MSME as under:
-
Quantity of relevant import items at Sl. Nos. 12, 13, 30, 44 to 46, 59 to 62, 64, 67 & 68 may be allowed on net to net basis .
-
The rest of the import items may be allowed as per GN-4.
12 | P a g e
Case No.: Party Name: LARSEN & TOUBRO Meet No/Date:1/80- Status: 42/1/80-ALC2/2019 LIMITED ALC2/2020 & 20.05.2020 Deferred HQ File RLA File :03/95/040/01295/AM19/ Lic.No/Date:0310827622 Pending with :01/80/050/00790/AM19/ 12.03.2019 Tech-3
- 42 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply along with physical file was again sent to Consultant (Tech-3) on 11.03.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (Tech-3) for expediting the comments.
Case is deferred.
Case No.: Party Name: MAINI PRECISION Meet No/Date:1/80- Status: 18/5/80-ALC2/2019 PRODUCTS LIMITED ALC2/2020 Approved 20.05.2020 HQ File RLA File :07/24/040/00306/AM19/ Lic.No/Date:0710114732 :01/80/050/00056/AM20/ 29.03.2019
| Case No.:<br>18/5/80-ALC2/2019<br>Party Name: MAINI PRECISION<br>PRODUCTS LIMITED<br>Meet No/Date:1/80-<br>ALC2/2020<br>20.05.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00056/AM20/<br>RLA File :07/24/040/00306/AM19/ Lic.No/Date:0710114732<br>29.03.2019 | Case No.:<br>18/5/80-ALC2/2019 | Party Name: MAINI PRECISION<br>PRODUCTS LIMITED | Meet No/Date:1/80-<br>ALC2/2020<br>20.05.2020 | Status:<br>Approved |
|---|---|---|---|---|
| HQ File<br>:01/80/050/00056/AM20/ | RLA File :07/24/040/00306/AM19/ | Lic.No/Date:0710114732<br>29.03.2019 | ||
| 43 | Decision:The Committee considered the case as per the agenda and decided toratifythe ad-hoc norms on<br>repeat basisas approved forAA No.0710114051 dated 25.10.2018 in M. No. 16/80 dated 04.12.2019 as per<br>written comments ofDHIas under:<br>Sl.<br>No.<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>Sl.<br>No.<br>ITCHS<br>Code<br>Import Item<br>Recommended<br>Norms<br>1<br>87089900<br>P/N: 4306963 - Yoke,<br>Release Roller (Child<br>Part of Assembly,<br>Yoke Roller - A-8133)<br>11590<br>Number<br>1<br>73259999<br>Casting, Yoke,<br>clutch Release<br>D7003 Ductile<br>Iron<br>Net to net basis<br>2<br>87089900<br>P/N: 4306964 - Ring,<br>Snap (Child Part of<br>Assembly, Yoke Roller<br>- A-8133)<br>23180<br>Number<br>2<br>73182990<br>Stainless Steel<br>302 Stainless<br>Steel<br>As per GN-4<br>3<br>87089900<br>P/N: 4306957 - Ring,<br>Quad (Child Part of<br>Assembly, Yoke Roller<br>- A-8133)<br>46360<br>Number<br>3<br>74152100<br>SAE J200MHK<br>710Z1Z2<br>As per GN-4<br>4<br>87089900<br>P/N: 4306955 -<br>Bushing (Child Part of<br>Assembly, Yoke Roller<br>- A-8133)<br>23180<br>Number<br>4<br>84822011<br>Steel Backed,<br>Lead Free Broz,<br>Zic or<br>Molbdenum<br>Sulfied and<br>P.T.F.E<br>Deleted<br>5<br>87089900<br>P/N:4306965-Pin,<br>Yoke (Child Part of<br>Assembly, Yoke Roller<br>- A-8133)<br>23180<br>Number<br>5<br>72210019<br>Stainless Steel<br>440C Stainless<br>Steel<br>Deleted<br>6<br>87089900<br>P/N: 4306954- Roller,<br>Yoke (Child Part of<br>Assembly, Yoke Roller<br>- A-8133)<br>23180<br>Number<br>6<br>72286012<br>Alloy steel SAE<br>8620<br>SAE 8620<br>Deleted<br>Note: Import items at Sl. No. 4, 5 & 6 may be deleted as these items have been procured from indigenous<br>source.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms on repeat basis as approved for AA No. 0710114051 dated 25.10.2018 in M. No. 16/80 dated 04.12.2019 as per written comments of DHI as under:
Note: Import items at Sl. No. 4, 5 & 6 may be deleted as these items have been procured from indigenous source.
13 | P a g e
| Case No.:5/2/80-ALC2/2019 | Party Name: VIPRA CLOSURES | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| PRIVATE LIMITED | ALC2/2020 | Deferred | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00005/AM20/ | RLA File<br>:03/95/040/01384/AM19/ | Lic.No/Date:0310828134<br>03.04.2019 | Pending<br>with Firm |
44 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 07.01.2020 followed by a reminder on 06.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 291] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/3/80-ALC2/2019 Party Name: MUDHRA FINE Meet No/Date:1/80- Status:<br>BLANC PRIVATE LTD ALC2/2020 Deferred<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0410165451 Pending<br>:01/80/050/00009/AM20/ :04/24/040/00294/AM19/ 11.04.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that DHI vide email dated 17.06.2020<br>informed that the firm’s reply against deficiency letter dated 05.07.2019 is incomplete as they have only<br>submitted the statement of wastage without giving calculations. It has sought nil wastage while manufacturing<br>from steel strips, which is not possible. Therefore, the Committee decided to ask again form the firm to furnish<br>the following information as per comments of DHI :<br>45 1. To submit calculation of raw material supported by dimensional engineering drawing with relevant<br>dimensions highlighted.<br>2. Starting from the specification of the export product, basic calculation as to how of raw material proposed<br>for import has been arrived at, including the net weight of components to be manufactured out of these<br>imported materials, wastages claimed at each stage of manufacturing with complete justification and<br>supported by documentary evidence/drawings etc.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 142] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: VEELINE MEDIA Meet No/Date:1/80- Status:<br>4/3/80-ALC2/2019 LIMITED ALC2/2020 Deferred<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0210209114 Pending<br>:01/80/050/00010/AM20/ :02/24/040/00003/AM20/ 16.04.2019 with Firm<br>46<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 07.01.2020 followed by a reminder on 06.03.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
14 | P a g e
==> picture [476 x 152] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/3/80-ALC2/2019 Party Name: L & T-MHPS Meet No/Date:1/80- Status:<br>TURBINE GENERATORS ALC2/2020 Deferred<br>PRIVATE LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0310828481 Pending<br>:01/80/050/00014/AM20/ :03/95/040/01354/AM19/ 23.04.2019 with Firm<br>47 Decision: The Committee considered the case as per the agenda and noted that DHI vide email dated<br>17.06.2020 informed that the firm’s reply dated 11.03.2020 is incomplete. Therefore, the Committee decided to<br>ask again form the firm to furnish the following information as per comments of DHI:<br>1. To submit Annexure-2.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:1/5/80-ALC2/2019 | Party Name: PAHARPUR | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| COOLING TOWERS LIMITED | ALC2/2020 | Deferred | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00039/AM20/ | RLA File<br>:02/24/040/00012/AM20/ | Lic.No/Date:0210209171<br>16.05.2019 | Pending<br>with Firm |
48 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 06.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:13/5/80-ALC2/2019 | Party Name: HEURTEY | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| PETROCHEM INDIA PRIVATE | ALC2/2020 | Deferred | ||||
| LIMITED | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00051/AM20/ | RLA File<br>:34/24/040/00059/AM20/ | Lic.No/Date:3410045150<br>17.05.2019 | Pending<br>with Firm |
49 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 20.05.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:1/7/80-ALC2/2019 | Party Name: CROWN | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| CLOSURES PVT. LTD. | ALC2/2020 | Deferred | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00098/AM20/ | RLA File<br>:03/94/040/00246/AM20/ | Lic.No/Date:0310829905<br>25.06.2019 | Pending<br>with Firm |
50 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 06.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
15 | P a g e
| Case No.:2/7/80-ALC2/2019 | Party Name: OSWAL PUMPS | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| LIMITED | ALC2/2020 | Deferred | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00099/AM20/ | RLA File<br>:33/24/040/00012/AM20/ | Lic.No/Date:3310030557<br>25.06.2019 | Pending<br>with Firm |
51 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 06.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:3/7/80-ALC2/2019 | Party Name: OAM SAAI | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| INTERNATIONAL INC. | ALC2/2020 | Deferred | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00100/AM20/ | RLA File<br>:05/24/040/00181/AM20/ | Lic.No/Date:0510411061<br>26.06.2019 | Pending<br>with Firm |
52 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 07.01.2020 followed by a reminder on 06.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/7/80-ALC2/2019 Party Name: AZAD Meet No/Date:1/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0910067697<br>:01/80/050/00101/AM20/ :09/24/040/00138/AM20/ 26.06.2019<br>53<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 16.10.2019 followed by reminders on 10.12.2019 &<br>06.03.2020. However, no reply has been received yet. Hence, the Committee decided to final reminder to the<br>firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/7/80-ALC2/2019 Party Name: P. M. ELECTRO Meet No/Date:1/80- Status:<br>AUTO PVT. LTD. ALC2/2020 Deferred<br>20.05.2020<br>HQ File RLA File Lic.No/Date:3110067458<br>:01/80/050/00107/AM20/ :31/83/040/00048/AM20/ 28.06.2019<br>54 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>08.08.2019 followed by reminders on 11.11.2019, 08.01.2020, 03.02.2020 & 26.02.2020. However, no<br>information has been received so far. Therefore, the Committee decided to remind again RA, Pune & the firm<br>for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
16 | P a g e
==> picture [476 x 118] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: POLYCAB INDIA Meet No/Date:1/80- Status:<br>11/7/80-ALC2/2019 LIMITED ALC2/2020 Approved<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0310830021<br>55 :01/80/050/00108/AM20/ :03/95/040/00295/AM20/ 01.07.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of MeitY vide U. O. No.: W-21/17/2020-IPHW-MeitY dated 30.03.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
Case No.:12/7/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:1/80- Status: CORPORATION PANSE ALC2/2020 Deferred PRIVATE LIMITED 20.05.2020 HQ File RLA File Lic.No/Date:3110067460 Pending :01/80/050/00109/AM20/ :31/83/040/00050/AM20/ 01.07.2019 with Firm
56 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 20.05.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: BANGALORE Meet No/Date:1/80- Status:<br>13/7/80-ALC2/2019 BIOTECH LABS PVT. LTD. ALC2/2020 Approved<br>20.05.2020<br>HQ File RLA File :07/24/040/00082/AM20/ Lic.No/Date:0710115122<br>:01/80/050/00110/AM20/ 03.07.2019<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:
57
-
Quantity of import items at Sl. No. 123 to 132, 228 to 233 & 244 to 247 may be allowed @ 1.01 Meters/Meter of export product.
-
Quantity of relevant import item at Sl. No. 210 may be allowed @ 1.04 Meters/Meter of export product.
-
Quantity of rest of the import items may be allowed as per GN-4 .
| Case No.: | Party Name: DOOWON CLIMATE | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| 15/7/80-ALC2/2019 | CONTROL INDIA PRIVATE | ALC2/2020 | Deferred | |||
| LIMITED | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00112/AM20/ | RLA File :66/24/040/00003/AM20/ | Lic.No/Date:6610000035<br>03.07.2019 |
58 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 28.05.2020 for examination of the case. However, DHI vide email dated 17.06.2020 requested again to send a copy of application. Therefore, the Committee decided to send again a copy of application to DHI for examination of the case.
Case is deferred.
17 | P a g e
59
Case No.:43/11/80-ALC2/2019 Party Name: ERBATECH Meet No/Date:1/80- Status: MACHINERY PRIVATE ALC2/2020 Withdrawn LIMITED 20.05.2020 HQ File RLA File Lic.No/Date:3210079031 :01/80/050/00169/AM20/ :32/21/040/00061/AM20/ 19.07.2019
Decision: The Committee considered the case as per the agenda and noted that the case was rejected in M. No. 23/80 dated 13.03.2020 due to non-submission of reply of deficiency letter. Therefore, the Committee decided to withdraw the case from the agenda.
Case is withdrawn.
Case No.: Party Name: DYNA FORCE Meet No/Date:1/80- Status: 3/9/80-ALC2/2019 HYDRAULICS PRIVATE ALC2/2020 Deferred LIMITED 20.05.2020 HQ File RLA File Lic.No/Date:3110067484 Pending with :01/80/050/00128/AM20/ :31/83/040/00067/AM20/ 25.07.2019 RA/Firm
60 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 18.10.2019 followed by reminders on 08.01.2020, 03.02.2020 & 20.05.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 129] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/9/80-ALC2/2019 Party Name: RATNAMANI Meet No/Date:1/80- Status:<br>METALS AND TUBES LTD. ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File :08/24/040/00135/AM20/ Lic.No/Date:0810145826<br>:01/80/050/00129/AM20/ 25.07.2019<br>61 Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>Consultant (Tech-3) on 21.05.2020 for examination of the case. However, in the meeting, Consultant (Tech-3)<br>requested also to send again, a copy of application, to him. Therefore, the Committee decided to send a copy of<br>application to Consultant (Tech-3).<br>Case is deferred.<br>----- End of picture text -----<br>
18 | P a g e
==> picture [476 x 430] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/9/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:1/80- Status:<br>PVT. LTD. ALC2/2020 Approved<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0510411435<br>:01/80/050/00137/AM20/ :05/24/040/00251/AM20/ 02.08.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>Sl. ITCHS Recommended<br>ITCHS<br>No. Code Export Item Quantity Import Item Norms (EP<br>Code<br>wise)<br>Silencers (mufflers) and<br>exhaust pipes; parts 22566 kgs<br>thereof - Part Name: inclusive of<br>35036<br>1 87089200 Bracket Stiffner Rear, Part 14% wastage<br>Number<br>No. 16.08.208.50.0100C after 1/3 [rd]<br>(19795.620 KGS = 35036 recovery<br>62 Nos.)<br>Silencers (mufflers) and<br>exhaust pipes; parts Stainless<br>21271 kgs<br>thereof - Part Name: Steel Coil<br>inclusive of<br>Bracket Stiffner Front, 25641 UNS S43932<br>2 87089200 72193290 22% wastage<br>Part No. Number 1.4509 439<br>after 1/3 [rd]<br>16.08.208.50.0060E TI1 4.0X1500<br>recovery<br>(17435.890 KGS = 25641 MM<br>Nos.)<br>Silencers (mufflers) and<br>exhaust pipes; parts 19879 kgs<br>thereof - Part Name: Inlet inclusive of<br>15738<br>3 87089200 Pipe Re-inforcement, Part 70.7% wastage<br>Number<br>No. 16.08.208.33.1010H after 1/3 [rd]<br>(11645.900 KGS = 15738 recovery<br>Nos.)<br>Note: The firm should import relevant items only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.:41/11/80-ALC2/2019 | Party Name: PHOENIX FOILS | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| PVT. LTD. | ALC2/2020 | Deferred | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00167/AM20/ | RLA File<br>:03/95/040/00459/AM20/ | Lic.No/Date:0310830770<br>02.08.2019 | Pending<br>with Firm |
63 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 21.05.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
19 | P a g e
| Case No.:45/11/80-ALC2/2004 | Party Name: L&T- MHPS | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| TURBINE GENERATORS | ALC2/2020 | Deferred | ||||
| PRIVATE LIMITED | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00171/AM20/ | RLA File<br>:03/95/040/00574/AM20/ | Lic.No/Date:0310831568<br>16.09.2019 | Pending<br>with Firm |
64 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 06.03.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
| Case No.:46/11/80-ALC2/2004 | Party Name: L & T -MHPS | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| BOILERS PVT. LTD. | ALC2/2020 | Deferred | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00172/AM20/ | RLA File<br>:03/95/040/00588/AM20/ | Lic.No/Date:0310831569<br>16.09.2019 | Pending<br>with DHI |
65 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI for examination of the case on 19.12.2019 followed by reminders on 06.03.2020 & 26.05.2020. However, DHI vide email dated 17.06.2020 informed that the case is under examination. Hence, the Committee decided to wait for the comments.
Case is deferred.
==> picture [476 x 129] intentionally omitted <==
----- Start of picture text -----<br> Case No.:1/13/80- Party Name: RONCH Meet No/Date:1/80-ALC2/2020 Status:<br>ALC2/2019 POLYMERS PVT. LTD. 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310832012<br>:01/80/050/00186/AM20/ :03/95/040/00654/AM20/ 04.10.2019<br>66 Decision: The Committee considered the case as per agenda and noted that Tech 1 is examining similar case of<br>the firm vide AA no. 0310834951 dt. 20.02.2020 and a deficiency letter has been communicated by Tech 1 in<br>the matter. Therefore, the Committee decided to transfer this case also to Tech 1 from MSME and directed the<br>firm to provide consolidated reply to the deficiency raised in the matter vide AA no. 0310834951 dt 20.02.2020.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: FERRUM Meet No/Date:1/80- Status:<br>2/13/80-ALC2/2019 EXTREME ENGINEERING ALC2/2020 Deferred<br>PRIVATE LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0510412040 Pending with<br>:01/80/050/00187/AM20/ :05/23/040/00265/AM20/ 07.10.2019 RA/Firm<br>67 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 17.12.2019 followed by reminders on 13.02.2020 & 21.05.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting<br>the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
20 | P a g e
==> picture [476 x 267] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/13/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:1/80- Status:<br>AUTOMOTIVES PVT. LTD. ALC2/2020 Deferred<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0510412058 Pending<br>:01/80/050/00188/AM20/ :05/23/040/00266/AM20/ 09.10.2019 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the<br>following information as per written comments of MSME:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>68 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured out<br>of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/13/80-ALC2/2019 Party Name: L&T- MHPS Meet No/Date:1/80- Status:<br>TURBINE GENERATORS ALC2/2020 Deferred<br>PRIVATE LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0310832116 Pending<br>:01/80/050/00189/AM20/ :03/95/040/00681/AM20/ 10.10.2019 with DHI<br>69<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI<br>on 20.05.2020 for examination of the case. However, DHI vide email dated 17.06.2020 informed that the case is<br>under examination. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/13/80-ALC2/2019 Party Name: L&T- MHPS Meet No/Date:1/80- Status:<br>TURBINE GENERATORS ALC2/2020 Deferred<br>PRIVATE LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0310832159 Pending<br>:01/80/050/00190/AM20/ :03/95/040/00655/AM20/ 11.10.2019 with Firm<br>----- End of picture text -----<br>
- 70 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 11.02.2020. However, the firm vide letter dated 11.03.2020 informed that the Project Engineering & Detail Design is in progress and is expected to complete by 30[th] June 2020. Hence, they requested for extension of time till 30[th] June 2020 to furnish the requisite information. Therefore, the Committee decided to wait for the firm’s reply.
Case is deferred.
21 | P a g e
==> picture [476 x 129] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: GODREJ & Meet No/Date:1/80- Status:<br>6/13/80-ALC2/2019 BOYCE MFG. CO. LTD. ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310832178 PH<br>:01/80/050/00191/AM20/ :03/94/040/00505/AM20/ 11.10.2019<br>71 Decision: The Committee considered the case as per agenda and noted that as per decision taken in M. No.<br>21/80 dated 18.02.2020, the firm could not be called for personal hearing due to spread of Covid-19 and ongoing<br>lockdown. Therefore, the Committee decided to allow the firm for personal hearing via video conferencing in<br>the forthcoming NC meeting.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 360] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: ISGEC HITACHI Meet No/Date:1/80- Status:<br>7/13/80-ALC2/2019 ZOSEN LIMITED ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510412096 Pending with<br>:01/80/050/00192/AM20/ :05/23/040/00269/AM20/ 11.10.2019 Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the<br>following information as per written comments of DPIIT vide U. O. No.: P-47011/98/2019-TSW dated<br>29.04.2020:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>72 in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured out<br>of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>5. Weight of Steel, which requires imported welding material, giving break-up of,<br>i. Steel Plates/Sheets upto 30 mm thicknesses.<br>ii. Steel Plates/Sheets more than 30 mm thickness and upto 70 mm thickness.<br>iii. Steel Plates/Sheets more than 70 mm thickness.<br>iv. Others e.g. Flanges, Pipes, Tubes, Bars/Rods, Castings/Forgings etc.<br>6. Quantities of import items at Sl. No. 4 & 5 in Nos. also in addition to their weight.<br>7. Detailed calculations for the quantities of welding materials required for overlay (Sl. No. 9 to 11)<br>supported by overlay areas and thickness.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 129] intentionally omitted <==
----- Start of picture text -----<br> Case No.:8/13/80- Party Name: AZAD Meet No/Date:1/80-ALC2/2020 Status:<br>ALC2/2019 ENGINEERING PVT LTD 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:0910068080 Pending with<br>:01/80/050/00193/AM20/ :09/24/040/00347/AM20/ 14.10.2019 RA/Firm<br>73 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA,<br>Hyderabad on 17.12.2019 followed by reminders on 17.02.2020 & 20.05.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again RA, Hyderabad & the firm for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
22 | P a g e
==> picture [476 x 239] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: GENESIS Meet No/Date:1/80-ALC2/2020 Status:<br>9/13/80-ALC2/2019 PACKAGING PVT. LTD. 20.05.2020 Approved<br>HQ File RLA File Lic.No/Date:0710115559<br>:01/80/050/00194/AM20 :07/24/040/00152/AM20/ 14.10.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms as per written<br>comments of MSME as under:<br>ITCHS Export ITCHS Recommended<br>Quantity Import Item<br>74 Code Item Code Norms<br>Lid (Net<br>Cold Rolled Stainless Steel 50081 Kgs<br>Content of<br>Sheet, Slit Edge, 430 Ba Gold inclusive of 24.50<br>Import Item 1312500<br>83099090 72193590 With Black / White PVC On % wastage after<br>= 40228 Number<br>Main Side 0.30 mm X 820 1/3 [rd] recovery<br>Kgs)<br>Mm X 1055mm from scrap<br>Note: The firm should import relevant items only.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
| Case No.:10/13/80-ALC2/2019 | Party Name: GOLD MOHUR | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| PROFILES LIMITED | ALC2/2020 | Deferred | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00195/AM20/ | RLA File<br>:05/23/040/00279/AM20/ | Lic.No/Date:0510412119<br>15.10.2019 | Pending<br>with Firm |
75
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 26.05.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.
Case is deferred.
==> picture [476 x 165] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/13/80-ALC2/2019 Party Name: GLOVIS INDIA (P) Meet No/Date:1/80- Status:<br>LTD. ALC2/2020 & 20.05.2020 Approved<br>HQ File RLA File Lic.No/Date:0410166162<br>:01/80/050/00196/AM20/ :04/24/040/00111/AM20/ 15.10.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms as per written<br>comments of MSME as under:<br>76<br>1. Quantity of relevant import item at Sl. No. 1 may be allowed upto 2% of FoB value.<br>2. Quantity of relevant import items at Sl. No. 9 & 10 may be allowed @ 1.03 Meters/Meter of export<br>product.<br>3. Quantity of rest of the import items may be allowed as per GN-4 .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
23 | P a g e
Case No.: Party Name: ULTRA Meet No/Date:1/80-ALC2/2020 Status: 2/15/80-ALC2/2019 ENGINEERS 20.05.2020 Approved HQ File RLA File Lic.No/Date:3110067586 :01/80/050/00210/AM20 :31/83/040/00099/AM20 05.11.2019
Decision: The Committee considered the case as per the agenda and decided to ratify the norms as per written comments of Consultant (Tech-3) as under:
77
==> picture [451 x 151] intentionally omitted <==
----- Start of picture text -----<br> ITCHS Sl. ITCHS Recommended<br>Export Item Quantity Import Item<br>Code No. Code Norms<br>Parts Of Oil Field<br>Equipment, *Carr/Tube, Mech Tubing 3.125<br>3.12FRACTAL Flex , 6/60, OD X 0 .313 Wall, 261570 Kgs<br>20KSI, 1 FT Part No- 1 73043119 135KSI Yield including 10%<br>102698725 101395796 (Qty wastage<br>84139190 (Export Product Net weight 30643 61,913.30 FT)<br>Number<br>1) Mech Tubing = 30643<br>*7.76 = 237790 Kgs & 2) Protector, Female,<br>Protector Female 3.12 2 39269099 3.12 ISGS As per GN-4<br>ISGS = 30643 0.0990 101387417 (Qty<br>Kgs2 = 6067.314 Kgs) 6067.31 KG)<br>----- End of picture text -----<br>
Note: Type & grade of tubing will be same as used in export product.
==> picture [476 x 142] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: VICTORA Meet No/Date:1/80-ALC2/2020 Status:<br>1/17/80-ALC2/2019 AUTO PVT. LTD. 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510412724 Pending with<br>:01/80/050/00233/AM20/ :05/24/040/00513/AM20/ 29.11.2019 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>78<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 15.01.2020 followed by a reminder on 09.03.2020. However, no information has been received so far.<br>Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting the complete set<br>of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 153] intentionally omitted <==
----- Start of picture text -----<br> Case No.:2/17/80- Party Name: SULZER PUMPS Meet No/Date:1/80- Status:<br>ALC2/2019 INDIA LIMITED ALC2/2020 Deferred<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0310833126 Pending with<br>:01/80/050/00234/AM20/ :03/95/040/00827/AM20/ 02.12.2019 RA/Firm<br>79 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai<br>on 15.01.2020 followed by a reminder on 09.03.2020. However, no information has been received so far.<br>Therefore, the Committee decided to remind again RA, Mumbai & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
24 | P a g e
==> picture [476 x 152] intentionally omitted <==
----- Start of picture text -----<br> Case No.:3/17/80- Party Name: SULZER PUMPS Meet No/Date:1/80- Status:<br>ALC2/2019 INDIA LIMITED ALC2/2020 Deferred<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0310833143 Pending with<br>:01/80/050/00235/AM20/ :03/95/040/00828/AM20/ 02.12.2019 RA/Firm<br>80 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai<br>on 15.01.2020 followed by a reminder on 09.03.2020. However, no information has been received so far.<br>Therefore, the Committee decided to remind again RA, Mumbai & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:5/17/80- Party Name: AZAD Meet No/Date:1/80- Status:<br>ALC2/2019 ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0910068244 Pending with<br>:01/80/050/00237/AM20/ :09/24/040/00439/AM20/ 02.12.2019 RA/Firm<br>----- End of picture text -----<br>
81 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 03.02.2020 followed by a reminder on 20.05.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/17/80- Party Name: HANNING Meet No/Date:1/80-ALC2/2020 Status:<br>ALC2/2019 MOTORS INDIA P. LTD. 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410045677 Pending with<br>:01/80/050/00241/AM20/ :34/24/040/00270/AM20/ 03.12.2019 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>82<br>yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA,<br>Vadodara on 15.01.2020 followed by a reminder on 09.03.2020. However, no information has been received so<br>far. Therefore, the Committee decided to remind again RA, Vadodara & the firm for submitting the complete<br>set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 55] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/17/80- Party Name: HANNING Meet No/Date:1/80- Status:<br>ALC2/2019 MOTORS INDIA P. LTD. ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410045679 Pending with<br>:01/80/050/00242/AM20/ :34/24/040/00271/AM20/ 03.12.2019 RA/Firm<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not 83 yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 15.01.2020 followed by a reminder on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
25 | P a g e
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:11/17/80- Party Name: AZAD Meet No/Date:1/80- Status:<br>ALC2/2019 ENGINEERING PVT LTD ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:0910068247 Pending with<br>:01/80/050/00243/AM20/ :09/24/040/00437/AM20/ 04.12.2019 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>84<br>yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA,<br>Hyderabad on 03.02.2020 followed by a reminder on 20.05.2020. However, no information has been received<br>so far. Therefore, the Committee decided to remind again RA, Hyderabad & the firm for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 165] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/17/80-ALC2/2019 Party Name: DOOWON Meet No/Date:1/80- Status:<br>CLIMATE CONTROL INDIA ALC2/2020 Deferred<br>PRIVATE LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:2610012887 Pending<br>:01/80/050/00244/AM20/ :26/24/040/00012/AM20/ 04.12.2019 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the<br>85<br>following information as per comments of DHI:<br>1. To provide detailed justification along with working calculation supported by dimensional drawing for<br>operations with high wastage such as Trimming, Notching, Blanking, Piercing etc. and complete item<br>descriptions.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 279] intentionally omitted <==
----- Start of picture text -----<br> Case No.:13/17/80-ALC2/2019 Party Name: KABY PRECISION Meet No/Date:1/80- Status:<br>MACHINING PRIVATE ALC2/2020 Deferred<br>LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0910068268 Pending<br>:01/80/050/00245/AM20/ :09/24/040/00447/AM20/ 06.12.2019 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the<br>following information as per written comments of DPIIT vide U. O. No.: P-47011/72/2020-TSW dated<br>28.04.2020:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>86<br>2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material proposed<br>for import has been arrived at, including the net weight of components to be manufactured out of these<br>imported materials, wastages claimed at each stage of manufacturing with complete justification and<br>supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>
26 | P a g e
Case No.:1/19/80-ALC2/2019 Party Name: BAUMER Meet No/Date:1/80- Status: TECHNOLOGIES INDIA ALC2/2020 Deferred PRIVATE LIMITED 20.05.2020 HQ File RLA File Lic.No/Date:5210043275 Pending :01/80/050/00266/AM20/ :52/24/040/00051/AM20/ 23.12.2019 with Firm
87 Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of Consultant (Tech-3):
- Drawing of each export product with all dimensions & corresponding blank with size & weight.
Case is deferred.
Case No.:2/19/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:1/80- Status: SOLUTIONS PR IVATE ALC2/2020 Deferred LIMITED 20.05.2020 HQ File RLA File Lic.No/Date:0910068302 Pending with :01/80/050/00267/AM20/ :09/24/040/00474/AM20/ 24.12.2019 RA/Firm
- 88 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 14.02.2020 followed by a reminder on 26.05.2020. However, no information has been received so far. Therefore, the Committee decided to remind again RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
Case No.:4/19/80-ALC2/2019 Party Name: CRYOGAS Meet No/Date:1/80- Status: EQUIPMENT PVT. LTD. ALC2/2020 Deferred 20.05.2020 HQ File RLA File Lic.No/Date:3410045738 Pending :01/80/050/00269/AM20/ :34/24/040/00287/AM20/ 24.12.2019 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per written comments of DPIIT vide U. O. No.: P-47011/70/2020-TSW dated 22.04.2020:
- Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.
89
-
Weight of each Export Product.
-
Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
-
Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
27 | P a g e
==> picture [476 x 207] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/19/80-ALC2/2019 Party Name: BONATRANS Meet No/Date:1/80- Status:<br>INDIA PRIVATE LIMITED ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310833747 Pending<br>:01/80/050/00274/AM20/ :03/94/040/00785/AM20/ 27.12.2019 with Firm<br>Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to<br>DHI on 24.02.2020 for examination of the case. DHI vide email dated 17.06.2020 informed that the firm in its<br>letter dated 07.02.2020 has claimed that import items are components but from the description of items, it<br>90 appears that there is machining activity involved. However, keeping in view of DHI comments, the matter was<br>discussed in the meeting and the Committee decided to ask from the firm to furnish the following information as<br>per advice of Consultant (Tech-3):<br>1. Detailed drawing of import & export items.<br>2. Weight of each import & export items.<br>3. Manufacturing processes with stage-wise wastage with justification.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.: | Party Name: TEGA | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| 8/19/80-ALC2/2019 | INDUSTRIES LIMITED | ALC2/2020 & 20.05.2020 | Deferred | |||
| HQ File :01/80/050/00273/AM20 | RLA File<br>:02/24/040/00148/AM20 | Lic.No/Date:0210209647<br>30.12.2019 |
91 Decision: The Committee considered the case as per agenda and noted that DPIIT informed vide U. O. No.: P- 47011/25/2020-TSW dated 17.06.2020 that the case does not pertain to it. Therefore, the Committee decided to refer the case to Consultant (SKB) for examination & comments.
Case is deferred.
92
| Case No.:10/19/80- | Party Name: BANGALORE | Meet No/Date:1/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | BIOTECH LABS PVT. LTD. | ALC2/2020 & 20.05.2020 | Deferred | ||||
| HQ File<br>:01/80/050/00275/AM20/ | RLA File :07/24/040/00223/AM20/ | Lic.No/Date:0710115950<br>30.12.2019 |
Decision: The Committee considered the case as per agenda and noted that the deficiency letter is being sent to the firm as raised by DPIIT in M. No. 23/80 dated 13.03.2020.
Case is deferred.
==> picture [476 x 142] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: AZAD Meet No/Date:1/80- Status:<br>11/19/80-ALC2/2019 ENGINEERING PVT LTD ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File :09/24/040/00489/AM20 Lic.No/Date:0910068312 Pending with<br>:01/80/050/00276/AM20 31.12.2019 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>93<br>yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA,<br>Hyderabad on 03.02.2020 followed by a reminder on 20.05.2020. However, no information has been received<br>so far. Therefore, the Committee decided to remind again RA, Hyderabad & the firm for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
28 | P a g e
==> picture [476 x 141] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/19/80- Party Name: AZAD Meet No/Date:1/80- Status:<br>ALC2/2019 ENGINEERING PVT LTD ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:0910068313 Pending with<br>:01/80/050/00277/AM20/ :09/24/040/00490/AM20/ 31.12.2019 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>94<br>yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA,<br>Hyderabad on 03.02.2020 followed by a reminder on 20.05.2020. However, no information has been received<br>so far. Therefore, the Committee decided to remind again RA, Hyderabad & the firm for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:13/19/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:1/80- Status:<br>CORPORATION PANSE ALC2/2020 Deferred<br>PRIVATE LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:3110067645 Pending with<br>:01/80/050/00278/AM20/ :31/83/040/00128/AM20/ 31.12.2019 Tech-3<br>95<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>Consultant (Tech-3) on 16.03.2020 for examination of the case. However, no comments have been received<br>yet. Therefore, the Committee decided to remind Consultant (Tech-3) for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 55] intentionally omitted <==
----- Start of picture text -----<br> Case No.:14/19/80- Party Name: ISGEC HEAVY Meet No/Date:1/80- Status:<br>ALC2/2019 ENGINEERING LIMITED ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File :05/23/040/00381/AM20/ Lic.No/Date:0510413163<br>:01/80/050/00279/AM20/ 01.01.2020<br>----- End of picture text -----<br>
96 Decision: The Committee considered the case as per agenda and noted that DPIIT informed vide U. O. No.: P- 47011/60/2019-TSW dated 29.04.2020 that the case does not pertain to it. Therefore, the Committee decided to refer the case to Consultant (SKB) for examination & comments.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:15/19/80- Party Name: SOGEFI ENGINE Meet No/Date:1/80- Status:<br>ALC2/2019 SYSTEMS INDIA PVT LTD ALC2/2020 & 20.05.2020 Deferred<br>HQ File RLA File Lic.No/Date:0710115971 Pending with<br>:01/80/050/00280/AM20/ :07/24/040/00097/AM20/ 02.01.2020 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>97<br>yet been received from the firm & RA, Bangalore and in this regard a letter was sent to the firm & RA,<br>Bangalore on 13.02.2020 followed by a reminder on 26.05.2020. However, no information has been received so<br>far. Therefore, the Committee decided to remind again RA, Bangalore & the firm for submitting the complete<br>set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
29 | P a g e
Case No.:16/19/80-ALC2/2019 Party Name: MICRON Meet No/Date:1/80- Status: INSTRUMENTS PVT LTD ALC2/2020 & 20.05.2020 Approved HQ File RLA File Lic.No/Date:0510413177 :01/80/050/00281/AM20/ :05/24/040/00590/AM20/ 02.01.2020
Decision: The Committee considered the case as per the agenda and decided to ratify the norms as per written comments of DPIIT vide U. O. No. 47011/17/2019-TSW dated 30.04.2020 as under:
ITCHS ITCHS Recommended 98 Export Item Quantity Import Item Code Code Norms Pyromet CTX-909. 1641 Kgs @ 2.935 Hercules Rotor Adaptor Pyromet CTX-909 HI Kgs/Kg content in the for 5-16 BRG. Hercules 4948 90229090 72285090 Temp Alloy Sol Anl export product after Rotor Adaptor for 5-16 Number Grd AMS 5884 Dia taking 6% recovery BRG. Part No-2288812. 1.77 Inch. from scrap
Note: Net weight of export item may be specified as 559.12 Kgs.
Case No.:17/19/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:1/80- Status: ENGINEERING LIMITED ALC2/2020 & 20.05.2020 Deferred HQ File RLA File Lic.No/Date:0510413181 Pending :01/80/050/00282/AM20/ :05/23/040/00378/AM20/ 02.01.2020 with Firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the following information as per comments of DHI:
-
Specification of export product.
-
Weight of each Export Product.
-
99 3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
- Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
Case No.:1/21/80- Party Name: AZAD Meet No/Date:1/80-ALC2/2020 Status: ALC2/2019 ENGINEERING PRIVATE 20.05.2020 Deferred LIMITED HQ File RLA File Lic.No/Date:0910068392 Pending with :01/80/050/00295/AM20/ :09/24/040/00522/AM20/ 21.01.2020 RA/Firm 100 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 06.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
30 | P a g e
| Case No.:2/21/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00296/AM20/ | RLA File<br>:09/24/040/00523/AM20/ | Lic.No/Date:0910068393<br>21.01.2020 | Pending with<br>RA/Firm |
101 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 06.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:3/21/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00297/AM20/ | RLA File<br>:09/24/040/00524/AM20/ | Lic.No/Date:0910068394<br>21.01.2020 | Pending with<br>RA/Firm |
102 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 06.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/21/80- Party Name: AZAD Meet No/Date:1/80- Status: Deferred<br>ALC2/2019 ENGINEERING PRIVATE ALC2/2020<br>LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0910068395 Pending with<br>:01/80/050/00298/AM20/ :09/24/040/00528/AM20/ 21.01.2020 RA/Firm<br>103<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA,<br>Hyderabad on 06.03.2020. However, no information has been received so far. Therefore, the Committee<br>decided to remind RA, Hyderabad & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:5/21/80- | Party Name: MAHINDRA | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | DEFENCE SYSTEMS LTD | ALC2/2020 | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00299/AM20/ | RLA File<br>:05/24/040/00602/AM20/ | Lic.No/Date:0510413404<br>21.01.2020 | Pending with<br>RA/Firm |
104 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
31 | P a g e
==> picture [476 x 246] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/21/80-ALC2/2019 Party Name: MICRON Meet No/Date:1/80- Status:<br>INSTRUMENTS PVT. LTD. ALC2/2020 Approved<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0510413411<br>:01/80/050/00300/AM20/ :05/24/040/00675/AM20/ 21.01.2020<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms as per written<br>comments of DPIIT vide U. O. No. 47011/17/2019-TSW dated 30.04.2020 as under:<br>ITCHS ITCHS Recommended<br>105 Export Item Quantity Import Item<br>Code Code Norms<br>Cathode Kovar Dilaton 29/18 Iron - 413.95 Kgs @<br>Support Tube- nickel- Cobalt Sealing 3.262 Kgs/Kg<br>Vajra. Cathode 564 Alloy ASTM - F15 - content in the<br>90229040 72285010<br>Kovar Support Number 04. (Dilaton 29/18 Dia export product after<br>Tube-Vajra. Part 35 mm Tolerance +1/-0 taking 6% recovery<br>No - 2340432 mm) from scrap<br>Note: Net weight of export item may be specified as 126.90 Kgs.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
106
| Case No.:7/21/80- | Party Name: LM WIND | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | ALC2/2020 | |||||
| PVT. LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00301/AM20/ | RLA File<br>:34/24/040/00329/AM20/ | Lic.No/Date:3410045799<br>21.01.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:8/21/80- | Party Name: LM WIND | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | ALC2/2020 | ||||
| PVT. LTD. | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00302/AM20/ | RLA File<br>:34/24/040/00330/AM20/ | Lic.No/Date:3410045800<br>21.01.2020 | Pending with<br>RA/Firm |
107
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
32 | P a g e
==> picture [476 x 313] intentionally omitted <==
----- Start of picture text -----<br> Case No.:9/21/80-ALC2/2019 Party Name: MICRON Meet No/Date:1/80- Status:<br>INSTRUMENTS PVT. LTD. ALC2/2020 Deferred<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0510413428 Pending with<br>:01/80/050/00303/AM20/ :05/24/040/00398/AM20/ 23.01.2020 Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the<br>following information as per written comments of DPIIT vide U. O. No.: P-47011/17/2019-TSW dated<br>30.04.2020:<br>1. Detail technical note on manufacturing process including the relevant flow sheet.<br>2. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>108 3. Weight of each Export Product.<br>4. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>5. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured out<br>of these imported materials, wastages claimed at each stage of manufacturing with complete justification<br>and supported by documentary evidence/drawings etc.<br>6. Recovery from scrap generated during manufacturing process with sale price of scrap supported by<br>documentary evidence like copy of sale invoice.<br>Case is deferred.<br>----- End of picture text -----<br>
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/21/80-ALC2/2019 Party Name: THERMAL Meet No/Date:1/80- Status:<br>SYSTEMS (HYDERABAD) P. ALC2/2020 Deferred<br>LTD. 20.05.2020<br>HQ File RLA File Lic.No/Date:0910068410 Pending with<br>:01/80/050/00304/AM20/ :09/24/040/00506/AM20/ 24.01.2020 RA/Firm<br>109<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA,<br>Hyderabad on 09.03.2020. However, no information has been received so far. Therefore, the Committee<br>decided to remind RA, Hyderabad & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:11/21/80- | Party Name: CHEMICO | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | SYNTHETICS LTD. | ALC2/2020 | Deferred | |||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00305/AM20/ | RLA File<br>:05/23/040/00408/AM20/ | Lic.No/Date:0510413441<br>24.01.2020 | Pending with<br>RA/Firm |
110 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
33 | P a g e
| Case No.:12/21/80- | Party Name: KAY BOUVET | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING LTD. | ALC2/2020 | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00306/AM20/ | RLA File<br>:31/83/040/00139/AM20/ | Lic.No/Date:3110067666<br>27.01.2020 | Pending with<br>RA/Firm |
111 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Pune & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:13/21/80- | Party Name: HANNING | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MOTORS INDIA P. LTD. | ALC2/2020 | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00307/AM20/ | RLA File<br>:34/24/040/00336/AM20/ | Lic.No/Date:3410045818<br>28.01.2020 | Pending with<br>RA/Firm |
112 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:14/21/80- Party Name: HANNING Meet No/Date:1/80- Status: Deferred<br>ALC2/2019 MOTORS INDIA P. LTD. ALC2/2020<br>20.05.2020<br>HQ File RLA File Lic.No/Date:3410045819 Pending with<br>:01/80/050/00308/AM20/ :34/24/040/00337/AM20/ 28.01.2020 RA/Firm<br>113<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA,<br>Vadodara on 09.03.2020. However, no information has been received so far. Therefore, the Committee<br>decided to remind RA, Vadodara & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:15/21/80- | Party Name: HANNING | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MOTORS INDIA P. LTD. | ALC2/2020 | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00309/AM20/ | RLA File<br>:34/24/040/00338/AM20/ | Lic.No/Date:3410045820<br>28.01.2020 | Pending with<br>RA/Firm |
114 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
34 | P a g e
| Case No.:17/21/80- | Party Name: AVLIGHT | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | AUTOMOTIVES PVT. LTD. | ALC2/2020 | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00311/AM20/ | RLA File<br>:05/23/040/00359/AM20/ | Lic.No/Date:0510413478<br>29.01.2020 | Pending with<br>RA/Firm |
115 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:18/21/80- | Party Name: LM WIND POWER | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | BLADES INDIA PVT. LTD. | ALC2/2020 | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00312/AM20/ | RLA File<br>:34/24/040/00341/AM20/ | Lic.No/Date:3410045830<br>30.01.2020 | Pending with<br>RA/Firm |
116 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:19/21/80- Party Name: BENGAL Meet No/Date:1/80- Status: Deferred<br>ALC2/2019 INDUSTRIES PVT. LTD. ALC2/2020<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0510413481 Pending with<br>:01/80/050/00313/AM20/ :05/23/040/00415/AM20/ 30.01.2020 RA/Firm<br>117<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to<br>remind RA, New Delhi & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:20/21/80- | Party Name: LM WIND | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | ALC2/2020 | ||||
| PVT. LTD. | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00314/AM20/ | RLA File<br>:34/24/040/00344/AM20/ | Lic.No/Date:3410045838<br>30.01.2020 | Pending with<br>RA/Firm |
118 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
35 | P a g e
| Case No.:21/21/80- | Party Name: BHARAT HEAVY | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ELECTRICALS LIMITED | ALC2/2020 | Deferred | |||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00315/AM20/ | RLA File<br>:11/24/040/00011/AM20/ | Lic.No/Date:1110028681<br>31.01.2020 | Pending with<br>RA/Firm |
119 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Bhopal and in this regard a letter was sent to the firm & RA, Bhopal on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Bhopal & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:22/21/80- | Party Name: JAIN IRRIGATION | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | SYSTEMS LTD. | ALC2/2020 | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00316/AM20/ | RLA File<br>:03/94/040/00435/AM20/ | Lic.No/Date:0310834593<br>03.02.2020 | Pending with<br>RA/Firm |
120
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Mumbai & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:23/21/80- Party Name: AZAD Meet No/Date:1/80- Status: Deferred<br>ALC2/2019 ENGINEERING PRIVATE ALC2/2020<br>LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0910068441 Pending with<br>:01/80/050/00317/AM20/ :09/24/040/00557/AM20/ 03.02.2020 RA/Firm<br>121<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA,<br>Hyderabad on 06.03.2020. However, no information has been received so far. Therefore, the Committee<br>decided to remind RA, Hyderabad & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:24/21/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00318/AM20/ | RLA File<br>:09/24/040/00559/AM20/ | Lic.No/Date:0910068442<br>03.02.2020 | Pending with<br>RA/Firm |
122 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 06.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
36 | P a g e
123
| Case No.:25/21/80-ALC2/2019 | Party Name: AZAD | Meet No/Date:1/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| ENGINEERING PRIVATE | ALC2/2020 | Deferred | |||||
| LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00319/AM20/ | RLA File<br>:09/24/040/00552/AM20/ | Lic.No/Date:0910068443<br>03.02.2020 | Pending<br>with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 06.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:26/21/80- Party Name: AZAD Meet No/Date:1/80- Status: Deferred<br>ALC2/2019 ENGINEERING PRIVATE ALC2/2020<br>LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0910068444 Pending with<br>:01/80/050/00320/AM20/ :09/24/040/00554/AM20/ 03.02.2020 RA/Firm<br>----- End of picture text -----<br>
124 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 06.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:27/21/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00321/AM20/ | RLA File<br>:09/24/040/00553/AM20/ | Lic.No/Date:0910068445<br>03.02.2020 | Pending with<br>RA/Firm |
125 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 06.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 164] intentionally omitted <==
----- Start of picture text -----<br> Case No.:28/21/80- Party Name: FRIZAIR Meet No/Date:1/80- Status:<br>ALC2/2019 PRIVATE LIMITED ALC2/2020 & 20.05.2020 Approved<br>HQ File RLA File Lic.No/Date:0910068449<br>:01/80/050/00322/AM20/ :09/24/040/00556/AM20/ 04.02.2020<br>Decision: The Committee considered the case as per the agenda and decided to ratify the norms as per<br>written comments of DPIIT vide U. O. No. 47011/63/2020-TSW dated 22.04.2020 as under:<br>126<br>ITCHS Sl. ITCHS Recommended<br>Export Item Quantity Import Item<br>Code No Code Norms<br>Condensor/ Relevant Copper Tubes 1.01 Kgs/Kg<br>68429<br>84159000 Evaporator 1 74111000 Refrigeration Quality - content in the<br>Kgs<br>Coils used as Dia. 1/8" to 1/4" export product<br>----- End of picture text -----<br>
37 | P a g e
| heat Exchangers<br>for Air<br>Conditioning &<br>Refrigerator<br>purpose. Model<br>: Condensor-<br>R38 (51840 Nos<br>= 68429 Kgs) | 2 | 76082000 | Relevant Aluminium<br>Tubes Refrigeration<br>Quality - Dia. 1/8" to<br>1/4"<br> <br> <br> | 1.01 Kgs/Kg<br>content in the<br>export product<br>1.02 Kgs/Kg<br>content in the<br>exportproduct<br>Up to 0.5% of FoB<br>value of export<br>Net to net basis<br>with accountability<br>clause | |||
|---|---|---|---|---|---|---|---|
| 3 | 76072090 | Relevant Aluminium Fin<br>Stock thickness 0.10<br>MM to 0.20 MM<br> <br> <br> | |||||
| 4 | 83119000 | Brazing Materials<br> <br> | |||||
| 5 | 74121000 | U Bends<br> <br> <br> | |||||
| Note:<br>1. Import items at Sl. No. 1, 3 & 4 are allowed as per SION C-1175.<br>2. Import item at Sl. No. 2 is allowed taking cue from SION C-1175.<br>RA concerned maytake further necessaryaction asper the decision of NC. |
Note:
1. Import items at Sl. No. 1, 3 & 4 are allowed as per SION C-1175.
2. Import item at Sl. No. 2 is allowed taking cue from SION C-1175.
| Case No.:29/21/80- | Party Name: COFLE TAYLOR | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | INDIA CONTROL CABLES & | ALC2/2020 | ||||
| SYSTEMS PRIVAT | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00323/AM20 | RLA File<br>:04/24/040/00167/AM20/ | Lic.No/Date:0410166495<br>05.02.2020 | Pending with<br>RA/Firm |
127 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA, Chennai on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Chennai & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 130] intentionally omitted <==
----- Start of picture text -----<br> Case No.:30/21/80- Party Name: AYYAPPA CNC Meet No/Date:1/80- Status: Deferred<br>ALC2/2019 PVT. LTD. ALC2/2020 & 20.05.2020<br>HQ File RLA File Lic.No/Date:0710116097 Pending with<br>:01/80/050/00324/AM20/ :07/24/040/00262/AM20/ 05.02.2020 RA/Firm<br>128 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Bangalore and in this regard a letter was sent to the firm & RA,<br>Bangalore on 09.03.2020. However, no information has been received so far. Therefore, the Committee<br>decided to remind RA, Bangalore & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:31/21/80- | Party Name: TEMA INDIA | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | LIMITED | ALC2/2020 | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00325/AM20/ | RLA File<br>:03/95/040/01062/AM20/ | Lic.No/Date:0310834668<br>06.02.2020 | Pending with<br>RA/Firm |
129 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA, Mumbai on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Mumbai & the firm for submitting the complete set of application.
Case is deferred.
38 | P a g e
| Case No.:32/21/80- | Party Name: IND-SPHINX | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | PRECISION LIMITED | ALC2/2020 | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00326/AM20/ | RLA File<br>:30/24/040/00122/AM20/ | Lic.No/Date:3010105038<br>07.02.2020 | Pending with<br>RA/Firm |
130 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Ludhiana and in this regard a letter was sent to the firm & RA, Ludhiana on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Ludhiana & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 66] intentionally omitted <==
----- Start of picture text -----<br> Case No.:15/22/80- Party Name: SULZER INDIA Meet No/Date:1/80- Status: Deferred<br>ALC2/2019 PRIVATE LIMITED ALC2/2020<br>20.05.2020<br>HQ File RLA File Lic.No/Date:3110067680 Pending with<br>:01/80/050/00341/AM20/ :31/83/040/00145/AM20/ 11.02.2020 RA/Firm<br>----- End of picture text -----<br>
131 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 09.03.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Pune & the firm for submitting the complete set of application.
Case is deferred.
132
| Case No.:2/23/80-ALC2/2019 | Party Name: MANN AND | Meet No/Date:1/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| HUMMEL FILTER PVT. LTD. | ALC2/2020 | Deferred | |||||
| 20.05.2020 | |||||||
| HQ File<br>:01/80/050/00347/AM20/ | RLA File<br>:07/24/040/00271/AM20/ | Lic.No/Date:0710116157<br>20.02.2020 | Pending<br>with DHI |
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 26.05.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DHI for expediting the comments.
Case is deferred.
==> picture [476 x 165] intentionally omitted <==
----- Start of picture text -----<br> Case No.:4/23/80- Party Name: RONCH Meet No/Date:1/80- Status:<br>ALC2/2019 POLYMERS PVT. LTD. ALC2/2020 Deferred<br>20.05.2020<br>HQ File RLA File Lic.No/Date:0310834951<br>:01/80/050/00349/AM20/ :03/95/040/01089/AM20/ 20.02.2020<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish<br>133<br>the following information as per advice of the Consultant (Tech 1):<br>1. Appendix 4E with all technical details indicating % wastage applied for.<br>2. Manufacturing process in detail with wastage involved at every step.<br>3. Net content of each import item in export.<br>Case is deferred.<br>----- End of picture text -----<br>
39 | P a g e
| Case No.:3/23/80-ALC2/2019 | Party Name: AVLIGHT | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| AUTOMOTIVES LTD. | ALC2/2020 | Deferred | ||||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00348/AM20/ | RLA File<br>:05/23/040/00424/AM20/ | Lic.No/Date:0510413679<br>21.02.2020 | Pending with<br>RA/Firm |
134
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New Delhi on 26.05.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, New Delhi & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:5/23/80- | Party Name: HANNING | Meet No/Date:1/80- | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | MOTORS INDIA P. LTD. | ALC2/2020 | Deferred | |||
| 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00350/AM20/ | RLA File<br>:34/24/040/00368/AM20/ | Lic.No/Date:3410045900<br>21.02.2020 | Pending with<br>RA/Firm |
135 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 26.05.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:6/23/80- Party Name: L & T-MHPS Meet No/Date:1/80- Status:<br>ALC2/2019 TURBINE GENERATORS ALC2/2020 Deferred<br>PRIVATE LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0310835043 Pending with<br>:01/80/050/00351/AM20/ :03/95/040/01074/AM20/ 25.02.2020 RA/Firm<br>136<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 20.05.2020. However, no information has been received so far. Therefore, the Committee decided<br>to remind RA, Mumbai & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:7/23/80- | Party Name: LM WIND | Meet No/Date:1/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | POWER BLADES INDIA | 20.05.2020 | Deferred | |||
| PVT. LTD. | ||||||
| HQ File<br>:01/80/050/00352/AM20/ | RLA File<br>:34/24/040/00375/AM20/ | Lic.No/Date:3410045913<br>28.02.2020 | Pending with<br>RA/Firm |
137 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA, Vadodara on 26.05.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Vadodara & the firm for submitting the complete set of application.
Case is deferred.
40 | P a g e
| Case No.:8/23/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00353/AM20/ | RLA File<br>:09/24/040/00595/AM20/ | Lic.No/Date:0910068531<br>02.03.2020 | Pending with<br>RA/Firm |
138 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.05.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
| Case No.:9/23/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | ENGINEERING PRIVATE | ALC2/2020 | ||||
| LIMITED | 20.05.2020 | |||||
| HQ File<br>:01/80/050/00354/AM20/ | RLA File<br>:09/24/040/00594/AM20/ | Lic.No/Date:0910068532<br>02.03.2020 | Pending with<br>RA/Firm |
139 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA, Hyderabad on 20.05.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Hyderabad & the firm for submitting the complete set of application.
Case is deferred.
==> picture [476 x 140] intentionally omitted <==
----- Start of picture text -----<br> Case No.:10/23/80- Party Name: MAK CONTROLS Meet No/Date:1/80- Status: Deferred<br>ALC2/2019 AND SYSTEMS PVT LTD. ALC2/2020<br>20.05.2020<br>HQ File RLA File Lic.No/Date:3210079436 Pending with<br>:01/80/050/00355/AM20/ :32/21/040/00178/AM20/ 02.03.2020 RA/Firm<br>140<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Coimbatore and in this regard a letter was sent to the firm & RA,<br>Coimbatore on 26.05.2020. However, no information has been received so far. Therefore, the Committee<br>decided to remind RA, Coimbatore & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>
| Case No.:11/23/80- | Party Name: MAK | Meet No/Date:1/80-ALC2/2020 | Status: | |||
|---|---|---|---|---|---|---|
| ALC2/2019 | CONTROLS AND | 20.05.2020 | Deferred | |||
| SYSTEMS PVT LTD. | ||||||
| HQ File<br>:01/80/050/00356/AM20/ | RLA File<br>:32/21/040/00236/AM20/ | Lic.No/Date:3210079437<br>02.03.2020 | Pending with<br>RA/Firm |
141 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm & RA, Coimbatore and in this regard a letter was sent to the firm & RA, Coimbatore on 26.05.2020. However, no information has been received so far. Therefore, the Committee decided to remind RA, Coimbatore & the firm for submitting the complete set of application.
Case is deferred.
41 | P a g e
==> picture [476 x 163] intentionally omitted <==
----- Start of picture text -----<br> Case No.:12/23/80-ALC2/2019 Party Name: ACEINOTEC Meet No/Date:1/80- Status:<br>MANUFACTURING PRIVATE ALC2/2020 Deferred<br>LIMITED 20.05.2020<br>HQ File RLA File Lic.No/Date:0710116194 Pending<br>:01/80/050/00357/AM20/ :07/24/040/00294/AM20/ 02.03.2020 with Firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the<br>142<br>following information as per comments of MSME :<br>1. Manufacturing process with step-wise wastage.<br>2. Per unit weight of export product.<br>3. Use of casting blanks.<br>Case is deferred.<br>----- End of picture text -----<br>
143
Case No.:1/1/80- Party Name: AAVID Meet No/Date:1/80- Status: Deferred ALC2/2020 THERMALLOY INDIA PVT. ALC2/2020 LTD. 20.05.2020 HQ File RLA File Lic.No/Date:3410045959 Pending with :01/80/050/00377/AM20/ :34/24/040/00395/AM20/ 18.03.2020 RA/Firm
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
144
Case No.:2/1/80- Party Name: AVLIGHT Meet No/Date:1/80- Status: Deferred ALC2/2020 AUTOMOTIVES PVT. LTD. ALC2/2020 20.05.2020 HQ File RLA File Lic.No/Date:0510413923 Pending with :01/80/050/00378/AM20/ :05/23/040/00470/AM20/ 19.03.2020 RA/Firm
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
145
| Case No.:3/1/80- | Party Name: TRILLIUM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | FLOW TECHNOLOGIES | ALC2/2020 | |||||
| INDIA PRIVATE LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00379/AM20/ | RLA File<br>:03/95/040/01192/AM20/ | Lic.No/Date:0310835556<br>20.03.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
42 | P a g e
146
| Case No.: | Party Name: COFLE TAYLOR | Meet No/Date:1/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| 4/1/80-ALC2/2020 | INDIA CONTROL CABLES & | ALC2/2020 | Deferred | ||||
| SYSTEMS PRIVAT | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00380/AM21 | RLA File<br>:04/24/040/00206/AM20/ | Lic.No/Date:0410166648<br>02.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Chennai & the firm. Therefore, the Committee decided to request from RA, Chennai and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
147
| Case No.:5/1/80- | Party Name: WHEELS | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | INDIA LIMITED | ALC2/2020 | |||||
| 20.05.2020 | |||||||
| HQ File<br>:01/80/050/00381/AM21/ | RLA File<br>:04/24/040/00205/AM20/ | Lic.No/Date:0410166653<br>02.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Chennai & the firm. Therefore, the Committee decided to request from RA, Chennai and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
148
| Case No.: | Party Name: NEO STRUCTO | Meet No/Date:1/80- | Status: | ||||
|---|---|---|---|---|---|---|---|
| 6/1/80-ALC2/2020 | CONSTRUCTION PVT. LTD. | ALC2/2020 | Deferred | ||||
| 20.05.2020 | |||||||
| HQ File<br>:01/80/050/00382/AM21/ | RLA File :52/24/040/00083/AM20/ | Lic.No/Date:5210043372<br>04.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Surat & the firm. Therefore, the Committee decided to request from RA, Surat and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
149
| Case No.:7/1/80- | Party Name: UNI VTL | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | PRECISION PVT. LTD. | ALC2/2020 | |||||
| 20.05.2020 | |||||||
| HQ File<br>:01/80/050/00383/AM21/ | RLA File<br>:07/24/040/00002/AM21/ | Lic.No/Date:0710116329<br>07.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Bangalore & the firm. Therefore, the Committee decided to request from RA, Bangalore and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
43 | P a g e
150
| Case No.:11/1/80- | Party Name: IND-SPHINX | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | PRECISION LIMITED | ALC2/2020 | |||||
| 20.05.2020 | |||||||
| HQ File<br>:01/80/050/00387/AM21/ | RLA File<br>:30/24/040/00140/AM20/ | Lic.No/Date:3010105121<br>07.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Ludhiana & the firm. Therefore, the Committee decided to request from RA, Ludhiana and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
151
| Case No.: | Party Name: AUTO TECH | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| 8/1/80-ALC2/2020 | INDUSTRIES INDIA PVT. | ALC2/2020 | |||||
| LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00384/AM21/ | RLA File<br>:04/24/040/00002/AM21/ | Lic.No/Date:0410166662<br>08.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Chennai & the firm. Therefore, the Committee decided to request from RA, Chennai and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
152
| Case No.: | Party Name: NIPHA EXPORTS | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| 9/1/80-ALC2/2020 | PRIVATE LIM ITED | ALC2/2020 | |||||
| 20.05.2020 | |||||||
| HQ File<br>:01/80/050/00385/AM21/ | RLA File<br>:02/24/040/00199/AM20/ | Lic.No/Date:0210209839<br>09.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Kolkata & the firm. Therefore, the Committee decided to request from RA, Kolkata and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
153
| Case No.:10/1/80- | Party Name: TPI | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | COMPOSITES INDIA | ALC2/2020 | |||||
| PRIVATE LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00386/AM21/ | RLA File<br>:04/24/040/00001/AM21/ | Lic.No/Date:0410166666<br>13.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Chennai & the firm. Therefore, the Committee decided to request from RA, Chennai and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
44 | P a g e
154
| Case No.:13/1/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00389/AM21/ | RLA File<br>:09/24/040/00647/AM20/ | Lic.No/Date:0910068616<br>17.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
155
| Case No.:14/1/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00390/AM21/ | RLA File<br>:09/24/040/00648/AM20/ | Lic.No/Date:0910068617<br>17.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
156
| Case No.:15/1/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00391/AM21/ | RLA File<br>:09/24/040/00649/AM20/ | Lic.No/Date:0910068618<br>17.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
157
| Case No.:16/1/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00392/AM21/ | RLA File<br>:09/24/040/00650/AM20/ | Lic.No/Date:0910068619<br>17.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
45 | P a g e
158
| Case No.:17/1/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00393/AM21/ | RLA File<br>:09/24/040/00651/AM20/ | Lic.No/Date:0910068620<br>17.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
159
| Case No.:18/1/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00394/AM21/ | RLA File<br>:09/24/040/00652/AM20/ | Lic.No/Date:0910068621<br>17.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
160
| Case No.:19/1/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00395/AM21/ | RLA File<br>:09/24/040/00653/AM20/ | Lic.No/Date:0910068622<br>17.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
161
| Case No.:20/1/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00396/AM21/ | RLA File<br>:09/24/040/00654/AM20/ | Lic.No/Date:0910068623<br>17.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
46 | P a g e
==> picture [476 x 142] intentionally omitted <==
----- Start of picture text -----<br> Case No.: Party Name: Meet No/Date:1/80-ALC2/2020 Status:<br>12/1/80-ALC2/2020 UNDERCARRIAGE AND 20.05.2020 Deferred<br>TRACTOR PARTS<br>PRIVATE LIMITED<br>HQ File RLA File Lic.No/Date:0310835622 Pending with<br>162 :01/80/050/00388/AM21 :03/95/040/01188/AM20/ 18.04.2020 RA/Firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA,<br>Mumbai and the firm to furnish the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>
163
| Case No.:21/1/80- | Party Name: TPI | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | COMPOSITES INDIA | ALC2/2020 | |||||
| PRIVATE LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00397/AM21/ | RLA File<br>:04/24/040/00003/AM21/ | Lic.No/Date:0410166684<br>22.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Chennai & the firm. Therefore, the Committee decided to request from RA, Chennai and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
164
| Case No.:22/1/80- | Party Name: ACEINOTEC | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | MANUFACTURING | ALC2/2020 | |||||
| PRIVATE LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00398/AM21/ | RLA File<br>:07/24/040/00016/AM21/ | Lic.No/Date:0710116365<br>23.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Bangalore & the firm. Therefore, the Committee decided to request from RA, Bangalore and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
165
| Case No.:23/1/80- | Party Name: KINECO | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | KAMAN COMPOSITES - | ALC2/2020 | |||||
| INDIA PVT LTD | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00399/AM21/ | RLA File<br>:03/94/040/01087/AM20/ | Lic.No/Date:0310835847<br>25.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Mumbai & the firm. Therefore, the Committee decided to request from RA, Mumbai and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
47 | P a g e
166
| Case No.:24/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | ALC2/2020 | |||||
| LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00400/AM21/ | RLA File<br>:34/24/040/00022/AM19/ | Lic.No/Date:3410046010<br>27.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
167
| Case No.:25/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | ALC2/2020 | |||||
| LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00401/AM21/ | RLA File<br>:34/24/040/00028/AM19/ | Lic.No/Date:3410046013<br>27.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
168
| Case No.:26/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | ALC2/2020 | |||||
| LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00402/AM21/ | RLA File<br>:34/24/040/00088/AM19/ | Lic.No/Date:3410046015<br>27.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
169
| Case No.:27/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | ALC2/2020 | |||||
| LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00403/AM21/ | RLA File<br>:34/24/040/00245/AM19/ | Lic.No/Date:3410046016<br>27.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
48 | P a g e
170
| Case No.:28/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | ALC2/2020 | |||||
| LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00404/AM21/ | RLA File<br>:34/24/040/00267/AM18/ | Lic.No/Date:3410046009<br>27.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
171
| Case No.:29/1/80- | Party Name: NETAFIM | Meet No/Date:1/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | 20.05.2020 | Deferred | ||||
| LTD. | |||||||
| HQ File<br>:01/80/050/00405/AM21/ | RLA File<br>:34/24/040/00313/AM16/ | Lic.No/Date:3410046014<br>27.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
172
| Case No.:30/1/80- | Party Name: NETAFIM | Meet No/Date:1/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | 20.05.2020 | Deferred | ||||
| LTD. | |||||||
| HQ File<br>:01/80/050/00406/AM21/ | RLA File<br>:34/24/040/00326/AM18/ | Lic.No/Date:3410046012<br>27.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
173
| Case No.:31/1/80- | Party Name: NETAFIM | Meet No/Date:1/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | 20.05.2020 | Deferred | ||||
| LTD. | |||||||
| HQ File<br>:01/80/050/00407/AM21/ | RLA File<br>:34/24/040/00368/AM18/ | Lic.No/Date:3410046011<br>27.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
49 | P a g e
174
Case No.:32/1/80- Party Name: NETAFIM Meet No/Date:1/80-ALC2/2020 Status: Deferred ALC2/2020 IRRIGATION INDIA PVT. 20.05.2020 LTD. HQ File RLA File Lic.No/Date:3410046017 Pending with :01/80/050/00408/AM21/ :34/24/040/00246/AM18/ 27.04.2020 RA/Firm
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
175
Case No.:33/1/80- Party Name: NETAFIM Meet No/Date:1/80-ALC2/2020 Status: Deferred ALC2/2020 IRRIGATION INDIA 20.05.2020 PVT. LTD. HQ File RLA File Lic.No/Date:3410046018 Pending with :01/80/050/00409/AM21/ :34/24/040/00375/AM18/ 27.04.2020 RA/Firm
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
176
| Case No.:34/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | ALC2/2020 | |||||
| LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00410/AM21/ | RLA File<br>:34/24/040/00250/AM18/ | Lic.No/Date:3410046019<br>27.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
177
| Case No.:35/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA | ALC2/2020 | |||||
| PVT. LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00411/AM21/ | RLA File<br>:34/24/040/00289/AM18/ | Lic.No/Date:3410046020<br>27.04.2020 | Pending with RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
50 | P a g e
178
| Case No.:36/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA | ALC2/2020 | |||||
| PVT. LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00412/AM21/ | RLA File<br>:34/24/040/00251/AM18/ | Lic.No/Date:3410046021<br>27.04.2020 | Pending with RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
179
| Case No.:37/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | ALC2/2020 | |||||
| LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00413/AM21/ | RLA File<br>:34/24/040/00395/AM18/ | Lic.No/Date:3410046022<br>27.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
180
| Case No.:38/1/80- | Party Name: NETAFIM | Meet No/Date:1/80-ALC2/2020 | Status: | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA | 20.05.2020 | Deferred | ||||
| PVT. LTD. | |||||||
| HQ File<br>:01/80/050/00414/AM21/ | RLA File<br>:34/24/040/00310/AM18/ | Lic.No/Date:3410046023<br>27.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
181
| Case No.:39/1/80- | Party Name: NETAFIM | Meet No/Date:1/80-ALC2/2020 | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA | 20.05.2020 | |||||
| PVT. LTD. | |||||||
| HQ File<br>:01/80/050/00415/AM21/ | RLA File<br>:34/24/040/00258/AM18/ | Lic.No/Date:3410046024<br>27.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
51 | P a g e
182
| Case No.:40/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA | ALC2/2020 | |||||
| PVT. LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00416/AM21/ | RLA File<br>:34/24/040/00268/AM18/ | Lic.No/Date:3410046025<br>27.04.2020 | Pending with RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
183
| Case No.:41/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | ALC2/2020 | |||||
| LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00417/AM21/ | RLA File<br>:34/24/040/00187/AM19/ | Lic.No/Date:3410046026<br>27.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
184
| Case No.:42/1/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00418/AM21/ | RLA File<br>:09/24/040/00639/AM20/ | Lic.No/Date:0910068678<br>28.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
185
| Case No.:43/1/80- | Party Name: AZAD | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | ENGINEERING PRIVATE | ALC2/2020 | |||||
| LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00419/AM21/ | RLA File<br>:09/24/040/00640/AM20/ | Lic.No/Date:0910068679<br>28.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Hyderabad & the firm. Therefore, the Committee decided to request from RA, Hyderabad and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
52 | P a g e
186
Case No.:44/1/80- Party Name: NETAFIM Meet No/Date:1/80- Status: Deferred ALC2/2020 IRRIGATION INDIA PVT. ALC2/2020 LTD. 20.05.2020 HQ File RLA File Lic.No/Date:3410046027 Pending with :01/80/050/00420/AM21/ :34/24/040/00192/AM18/ 28.04.2020 RA/Firm
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
187
Case No.:45/1/80- Party Name: NETAFIM Meet No/Date:1/80- Status: Deferred ALC2/2020 IRRIGATION INDIA PVT. ALC2/2020 LTD. 20.05.2020 HQ File RLA File Lic.No/Date:3410046028 Pending with :01/80/050/00421/AM21/ :34/24/040/00342/AM18/ 28.04.2020 RA/Firm
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
188
| Case No.:46/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | ALC2/2020 | |||||
| LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00422/AM21/ | RLA File<br>:34/24/040/00325/AM18/ | Lic.No/Date:3410046029<br>28.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
189
| Case No.:47/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | ALC2/2020 | |||||
| LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00423/AM21/ | RLA File<br>:34/24/040/00030/AM20/ | Lic.No/Date:3410046030<br>28.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
53 | P a g e
190
| Case No.:48/1/80- | Party Name: NETAFIM | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | IRRIGATION INDIA PVT. | ALC2/2020 | |||||
| LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00424/AM21/ | RLA File<br>:34/24/040/00029/AM20/ | Lic.No/Date:3410046031<br>28.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
191
| Case No.:49/1/80- | Party Name: HUMANETICS | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | INNOVATIVE SOLUTIONS | ALC2/2020 | |||||
| INDIA PRIVATE LIMI | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00425/AM21/ | RLA File<br>:07/24/040/00001/AM21/ | Lic.No/Date:0710116407<br>30.04.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Bangalore & the firm. Therefore, the Committee decided to request from RA, Bangalore and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
192
| Case No.:50/1/80- | Party Name: AVLIGHT | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | AUTOMOTIVES PVT. LTD. | ALC2/2020 | |||||
| 20.05.2020 | |||||||
| HQ File<br>:01/80/050/00426/AM21/ | RLA File<br>:05/23/040/00005/AM21/ | Lic.No/Date:0510414101<br>04.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
193
| Case No.:51/1/80- | Party Name: TEGA | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | INDUSTRIES LIMITED | ALC2/2020 | |||||
| 20.05.2020 | |||||||
| HQ File<br>:01/80/050/00427/AM21/ | RLA File<br>:02/24/040/00005/AM21/ | Lic.No/Date:0210209859<br>06.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Kolkata & the firm. Therefore, the Committee decided to request from RA, Kolkata and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
54 | P a g e
194
| Case No.:52/1/80- | Party Name: DEE | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | DEVELOPMENT | ALC2/2020 | |||||
| ENGINEERS LIMITED | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00428/AM21/ | RLA File<br>:05/23/040/00020/AM21/ | Lic.No/Date:0510414127<br>08.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
195
| Case No.:53/1/80- | Party Name: MICRON | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | INSTRUMENTS PVT. LTD. | ALC2/2020 | |||||
| 20.05.2020 | |||||||
| HQ File<br>:01/80/050/00429/AM21/ | RLA File<br>:05/24/040/00746/AM20/ | Lic.No/Date:0510414135<br>08.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, New Delhi & the firm. Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
196
| Case No.:54/1/80- | Party Name: LM WIND | Meet No/Date:1/80- | Status: Deferred | ||||
|---|---|---|---|---|---|---|---|
| ALC2/2020 | POWER BLADES INDIA | ALC2/2020 | |||||
| PVT. LTD. | 20.05.2020 | ||||||
| HQ File<br>:01/80/050/00430/AM21/ | RLA File<br>:34/24/040/00021/AM21/ | Lic.No/Date:3410046049<br>11.05.2020 | Pending with<br>RA/Firm |
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from RA, Vadodara & the firm. Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the complete set of application for examination of the case.
Case is deferred.
55 | P a g e
Offline Cases
Sl. No. 1
| Case No.45/24/80-ALC2/2013<br>Kelvion India Pvt. Ltd.,<br>Status: |
|---|
| (Formerly known GEA ECOFLEX INDIA<br>M. No.: 01/80-ALC2/2020 dated 20.05.2020 |
| PVT. LTD.)<br>Lic. No.: 0310766285 dated 15.01.2014 |
| HQ. No.: 01/80/050/00522/AM14<br>**Subject:**Request for fixation of ad-hoc norms<br>Deferred<br>RLA No.: 03/94/040/00880/AM14 |
| **Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No. |
| 22/80 dated 20.01.2015 due to non-submission of reply of deficiency letter dated 30.07.2014. |
| The firm furnished the reply vide letter dated 20.11.2017 with a request to fix the ad-hoc norms. The Committee |
| reconsidered the case as per the agenda and noted that the firm’s reply was forwarded toDPIITon 11.03.2020 for |
| examination of the case. However, DPIIT informed vide U. O. No.: P-47011/271/2018-TSW dated 03.06.2020 that |
| the firm has been asked to furnish certain information multiple times but the firm are not submitted the required |
| information yet and forward the same information every time. However, it was decided to remind the firm to |
| furnish the requisite information as called by DPIIT |
| Case is Deferred. |
Sl. No. 2
| Case No. :No.:9/12/80-ALC2/2017<br>SMC PNEUMATICS (INDIA) PRIVATE<br>LIMITED<br>Status:<br>M. No.: 01/80-ALC2/2020 dated 20.05.2020<br>Lic. No. /date: 0510403402 dated 14.07.2017 |
|---|
| HQ. No.: 01/80/050/00223/AM18<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 05/24/040/00172/AM18 |
| Decision:The Committee considered the case as per the agenda noted that the case was approved in M. No. 3/80- |
| ALC2/2016 dated 09.05.2018as per recommendation of DHI, DIPP and MSME present in the meeting. |
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case as per the |
| agenda and noted that the written comments ofConsultant (Tech-3)have been sent toDPIIT on 01.06.2020 for |
| verification as same/similar cases have been examined/ recommended by them. However, no information has been |
| received so far. Therefore, the Committee decided toremind DPIITfor expediting the comments. |
| Case is deferred. |
Sl. No. 3
| Case No. :16/8/80-ALC2/2018<br>**M/s.**SMC PNEUMATICS (INDIA)<br>PRIVATE LIMITED<br>Status:<br>M. No.: 01/80-ALC2/2020dated 20.05.2020<br>Lic. No.: 0510407130 Date: 09.07.2018 |
|---|
| HQ. No.: 01/80/050/139/AM19<br>**Subject:**Request for re-fixation of ad-hoc<br>Deferred |
| norms<br>RLA No.: 05/24/040/00207/AM19 |
| **Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No. |
| 4/80-ALC2/2019 dated 22.05.2018as per written comments ofDPIITvide U. O. No.: P-47011/289/2018-TSW |
| dated 25.04.2019. |
| However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case as per the |
| agenda and noted that the written comments ofConsultant (Tech-3)have been sent toDPIIT on 01.06.2020 for |
| verification as same/similar cases have been examined/ recommended by them. However, no information has been |
| received so far. Therefore, the Committee decided toremind DPIITfor expediting the comments. |
| Case is deferred. |
56 | P a g e
==> picture [478 x 153] intentionally omitted <==
----- Start of picture text -----<br> Sl. No. 4<br>M. No.: 01/80-ALC2/2020 dated<br>Astha Corporation Pvt. Ltd. Status:<br>20.05.2020<br>HQ File No: Subject: Request for 100% EOU for fixation of Norms for<br>Approved<br>01/80/162/003/AM20/DES1 Precision Metal Machined Parts<br>Decision: The Committee considered the case as per agenda and noted that O/o Development Commissioner<br>Vishakhapatnam Special Economic Zone, Hyderabad has forwarded the application of M/s Astha corporation Pvt.<br>Ltd., for 100% EOU for fixation of Norms for Precision Metal Machined Parts.<br> The firm had requested for fixation of norms. On the basis of comments given by MSME vide email dated<br>21.05.2020, the Committee decided to ratify the ad-hoc norms. (Copy enclosed)<br>O/o DC Vishakhapatnam SEZ, Hyderabad may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per agenda and noted that O/o Development Commissioner Vishakhapatnam Special Economic Zone, Hyderabad has forwarded the application of M/s Astha corporation Pvt. Ltd., for 100% EOU for fixation of Norms for Precision Metal Machined Parts.
Sl. No. 5
==> picture [476 x 72] intentionally omitted <==
----- Start of picture text -----<br> Case No.: 58/12/80-ALC2/2014 Kelvion India Pvt. Ltd., Status:<br>M. No.: 01/80-ALC2/2020 dated 25.05.2020 (Formerly known GEA ECOFLEX INDIA<br>Lic. No. /date: 3110064489 Date: 27.06.2014 PVT. LTD.)<br>HQ. No.: 01/80/050/00307/AM15/ Subject: Request for fixation of ad-hoc norms Defer<br>RLA No.: 31/83/040/00082/AM15<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the case was rejected in M. No. 3/80-ALC2/2015 dated 12.05.2015 due to non-submission of reply of deficiency letter dated 07.10.2014.
The firm vide letter dated 02.11.2019 had furnished the reply and requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that DPIIT informed vide U. O. No.: P-47011/15/2020-TSW dated 03.06.2020 that the firm has been asked to furnish certain information multiple times but the firm are not submitted the required information yet and forward the same information every time. However, it was decided to remind the firm to furnish the requisite information as called by DPIIT
Case is Defer.
Sl. No. 6
| Case No.:10/8/80-ALC2/2015<br>Kelvion India Pvt. Ltd.,<br>(Formerly known GEA ECOFLEX INDIA<br>Status:<br>M. No.: 01/80-ALC2/2019 dated 20.05.2020 |
|---|
| PVT. LTD.)<br>Lic. No. /date: 0310795103 Date: 06.04.2015 |
| HQ. No.: 01/80/050/00116/AM16<br>**Subject:**Request for fixation of ad-hoc norms<br>Defer |
| RLA No.: 03/94/040/01169/AM15 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting |
| No.20/80-ALC2/2015 dated05.01.2016 due to non-submission of reply of deficiency letter dated 22.09.2015 |
| raised by DIPP. |
| The firm vide letter dated 02.11.2019 had furnished the reply and requested for fixation of ad-hoc norms. |
| The Committee reconsidered the case and noted that DPIIT informed vide U. O. No.: P-47011/15/2020-TSW dated |
| 03.06.2020 that the firm has been asked to furnish certain information multiple times but the firm are not submitted |
| the required information yet and forward the same information every time. However, it was decided to remind the |
| firm to furnish the requisite information as called by DPIIT |
| Case is Defer. |
57 | P a g e
Sl. No. 7
| Case No.:39/22/80-ALC2/2014<br>Kelvion India Pvt. Ltd.,<br>(Formerly known GEA ECOFLEX INDIA<br>Status:<br>M. No.: 01/80-ALC2/2020 dated 20.05.2020 |
|---|
| PVT. LTD.)<br>Lic. No. /date: 0310789333 Date: 17.09.2014 |
| HQ. No.: 01/80/050/00520/AM15/<br>**Subject:**Request for fixation of ad-hoc norms<br>Defer |
| RLA No.: 03/94/040/00580/AM15/ |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in M. No. |
| 10/80-ALC2/2015 dated17.08.2015 due to non-submission of reply of deficiency letter dated 20.03.2015 raised |
| by DIPP. |
| The firm vide letter dated 02.11.2019 had furnished the reply and requested for fixation of ad-hoc norms. |
| The Committee reconsidered the case and noted that DPIIT informed vide U. O. No.: P-47011/15/2020-TSW dated |
| 03.06.2020 that the firm has been asked to furnish certain information multiple times but the firm are not submitted |
| the required information yet and forward the same information every time. However, it was decided to remind the |
| firm to furnish the requisite information as called by DPIIT |
| Case is Defer. |
Sl. No. 8
| Case No.:20/19/80-ALC2/2014<br>Kelvion India Pvt. Ltd.,<br>(Formerly known GEA ECOFLEX INDIA<br>Status:<br>M. No.: 01/80-ALC2/2019 dated 25.05.2020 |
|---|
| PVT. LTD.)<br>Lic. No. /date: 0310788788 Date: 05.09.2014 |
| HQ. No.: 01/80/050/00454/AM15<br>**Subject:**Request for fixation of ad-hoc norms<br>Defer |
| RLA No.: 03/94/040/00415/AM15 |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting |
| No.4/80-ALC2/2015 dated26.05.2015 due to non-submission of reply of deficiency letter dated 09.02.2015 |
| raised by DIPP. |
| The firm vide letter dated 02.11.2019 has furnished the reply and requested for fixation of ad-hoc norms. |
| The Committee reconsidered the case and noted that DPIIT informed vide U. O. No.: P-47011/15/2020-TSW dated |
| 03.06.2020 that the firm has been asked to furnish certain information multiple times but the firm are not submitted |
| the required information yet and forward the same information every time. However, it was decided to remind the |
| firm to furnish the requisite information as called by DPIIT. |
| Case is Defer. |
58 | P a g e
Sl. No. 9
Case No.: 13/11/80-ALC2/2018 Status: 9/3/80-ALC2/2018 M. No.: 01/80-ALC2/2020 dated 20.05.2020 MICRON INSTRUMENTS PVT LTD Lic. No. /date: 0510407381 Date: 31.07.2018 0510405742 Date: 28.02.2018 HQ. No.: 01/80/050/00204/AM19 Subject: Request for re-fixation of ad-hoc norms Approved 01/80/050/00009/AM19 RLA No.: 05/24/040/00265/AM19 05/24/040/00599/AM18 AA No.: 0510407381 dated 31.07.2018:-
Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 3/80ALC2/2019 dated 08.05.2019 as per written comments of DPIIT vide F. No.: P-47011/85/2019-TSW dated 18.04.2019.
The firm vide letter dated 15.07.2019 had requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and noted the comments of DPIIT wherein it is stated that earlier the firm had not submitted any documentary evidence regarding the sale price of the scrap generated during the manufacturing process. Now, the firm has submitted the representation supported by documentary evidence i.e. invoice of sale of scarp and therefore, norms have been revised. In view of DPIIT comments, the Committee decided to re-fix the ratified ad-hoc norms as per written comments of DPIIT vide U. O. No.: P- 47011/85/2019-TSW dated 29.04.2020 as under:
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended Norms |
|---|---|---|---|---|---|
| 90229090 | Anode frame<br>Frange A Kov<br>Anode Frame<br>Frange A Kov MA<br>4132 K 09A | 793<br>Number | 72223099 | Dilaton 29/18 Iron- nickel-<br>Cobalt Sealing Alloy ASTM-<br>F15-04. (Dilaton 29/18 Dia<br>232 mm Tolerance +1/-0 mm) | 5995.08 Kgs @<br>4.20Kgs/Kg content in<br>the export product after<br>taking 6% recovery from<br>scrap |
Note: Net weight of export item may be specified as 1427.40 Kgs.
AA No.: 0510405742 dated 28.02.2018:-
Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 3/80ALC2/2019 dated 08.05.2019 as per written comments of DPIIT vide F. No.: P-47011/85/2019-TSW dated 16.04.2019.
The firm vide letter dated 15.07.2019 had requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and noted the comments of DPIIT wherein it is stated that earlier the firm had not submitted any documentary evidence regarding the sale price of the scrap generated during the manufacturing process. Now, the firm has submitted the representation supported by documentary evidence i.e. invoice of sale of scarp and therefore, norms have been revised. In view of DPIIT comments, the Committee decided to re-fix the ratified ad-hoc norms as per written comments of DPIIT vide U. O. No.: P- 47011/85/2019-TSW dated 29.04.2020 as under:
| ITCHS<br>Code | Export Item | Quantity | ITCHS<br>Code | Import Item | Recommended Norms |
|---|---|---|---|---|---|
| Anode Frame Frange | Dilaton 29/18 | 3447.36Kgs @ | |||
| 90229090 | A Kov<br>Anode Frame Frange<br>A Kov-MA 4132 K | 456<br>Number | 72223099 | Iron- Nickel- Cobalt<br>Sealing Alloy ASTM - F15-<br>04 (Dilaton 29/18 Dia 232 | 4.20Kgs/Kg content in<br>the export product after<br>taking 6% recovery from |
| 09A. | mm Tolerance +1/-0 mm) | scrap |
Note: Net weight of export item may be specified as 820.80 Kgs.
59 | P a g e
Sl. No. 10
| Sl. No. 10 | |
|---|---|
| Case No.:31/13/80-ALC2/2013<br> 31/4/80-ALC2/2013 | Status: |
| NASH INDUSTRIES (I) PVT LTD<br>M. No.: 01/80-ALC2/2020 dated 20.05.2020 | |
| Lic. No. /date: 0710095300 Date: 09.05.2013 | |
| 0710094430 Date: 22.03.2013 | |
| HQ. No.: 01/80/050/00236/AM14<br>01/80/050/00078/AM14<br>**Subject:**Request for re-fixation of ad-hoc<br>norms | Deferred |
| RLA No.: 07/24/040/00032/AM14 | |
| 07/24/040/00527/AM13 | |
| **Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting | |
| No.23/80-ALC2/2013 dated04.02.2014 on the basis of comments of DIPP vide U. O. No. 12/18/2014-TSW/17 | |
| dated 04.02.2014. | |
| The Committee considered the case as per the agenda and noted that the case was approved in Meeting No.20/80- | |
| ALC2/2013 dated24.12.2013 on repeat basis, as per DIPP U. O. No. 12/115/2013-TSW/20 dated 24/12/2013. | |
| The firm vide letter dated 15.10.2019 had requested for re-fixation of ad-hoc norms. The Committee | |
| reconsidered the case and decided to ask from the firm to furnish following information,in respect | of both AAs, |
| as per written comments ofDPIITvide U. O. No.: P-47011/94/2020-TSW dated 08.06.2020: | |
| 1. To provide information about the use of import item at Sl. No. 2 and justification for its quantity. | |
| 2. Assembly drawings/diagrams of the resultant product showing placement and exact use of components in | |
| the export product (s). | |
| 3. Bifurcated quantities of components to be accounted for in the resultant product and the requirement of | |
| components as spares. Raw Material / Consumables. | |
| Case is deferred. |
Sl. No. 11
==> picture [476 x 64] intentionally omitted <==
----- Start of picture text -----<br> Case No.: 21/4/80-ALC2/2015 Status:<br>ISGEC HEAVY ENGINEERING<br>M. No.: 23/80-ALC2/2019 dated 13.03.2020<br>LIMITED<br>Lic. No. /date: 0510394195 Date: 11.05.2015<br>HQ. No.: 01/80/050/00092/AM16 Subject: Request for re-fixation of ad-hoc Approved<br>RLA No.: 05/23/040/00004/AM16 norms<br>----- End of picture text -----<br>
Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 14/80-ALC2/2015 dated 13.10.2015 as per the written comments of DIPP vide ID No. 12/114/2015/TSW/70 dated 13.10.2015.
Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 14/80-ALC2/2015 dated 13.10.2015 as per the written comments of DIPP vide ID No. 12/114/2015/TSW/70 dated 13.10.2015. The firm vide letter dated 16.12.2019 had requested for reviewing the norms for welding consumables considering the design and size of forging. The Committee reconsidered the case and decided to re-fix the ratified ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/60/2019-TSW dated 10.06.2020. (Copy enclosed) Note: The decision for rest of the import items will remain unchanged as decided in Meeting No. 14/80ALC2/2015 dated 13.10.2015. RA concerned may take further necessary action as per the decision of NC.
60 | P a g e
==> picture [469 x 643] intentionally omitted <==
61 | P a g e
==> picture [469 x 625] intentionally omitted <==
62 | P a g e
==> picture [469 x 671] intentionally omitted <==
63 | P a g e
==> picture [469 x 638] intentionally omitted <==
64 | P a g e
==> picture [469 x 644] intentionally omitted <==
65 | P a g e
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 6] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 6] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 6] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 6] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 6] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 6] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
66 | P a g e
67 | P a g e
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 6] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 6] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 6] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 6] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 6] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 6] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
==> picture [469 x 5] intentionally omitted <==
68 | P a g e
==> picture [469 x 627] intentionally omitted <==
69 | P a g e
==> picture [469 x 662] intentionally omitted <==
70 | P a g e
==> picture [469 x 662] intentionally omitted <==
71 | P a g e
==> picture [469 x 662] intentionally omitted <==
72 | P a g e
==> picture [469 x 662] intentionally omitted <==
73 | P a g e
==> picture [469 x 662] intentionally omitted <==
74 | P a g e
==> picture [469 x 662] intentionally omitted <==
75 | P a g e
==> picture [469 x 665] intentionally omitted <==
76 | P a g e
==> picture [469 x 665] intentionally omitted <==
77 | P a g e
==> picture [469 x 657] intentionally omitted <==
78 | P a g e
==> picture [469 x 654] intentionally omitted <==
79 | P a g e
==> picture [469 x 630] intentionally omitted <==
80 | P a g e
==> picture [469 x 652] intentionally omitted <==
81 | P a g e
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.