IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2011-02-08

DGFT Committee Minutes

Document text

RATIFIED   Minutes of Meeting No.37/11 scheduled on 08.02.2011 of Norms Committee(NC­I) (DES.I Section)   The meeting No. 37/11 of the Norms Committee (NC­I) for the licensing year 2010­2011 actually held on 08.02.2011 under the Chairmanship of Sh. N.P.S. Monga, Additional  Director General of Foreign Trade to consider  the  applications  under  Duty  Exemption  /  Remission  Schemes  (Chapter­4)  of  Foreign  Trade  Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. A.K. Mishra, AIA   23063332 M/o Steel, U.B. 4. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 5. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.   I ­The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon were as under: ­ 1

Case No.:12/14/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Rejected HQ File :01/80/050/00182/AM10/ RLA File :09/24/040/00048/AM10/ Lic.No/Date:0910038038 28.05.2009   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.    The Regional Authority may take necessary action accordingly.   2

Case No.:31/23/80­ALC2/2009

Party Name:HINDUSTAN AERONAUTICS LTD, Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00353/AM10/ RLA File :07/24/040/00651/AM09/ Lic.No/Date:0710066776 02.09.2009 Defer Date:22.03.2011 Decision : The Committee observed that the comments called for from DGCA are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 22.03.2011   3

Case No.:39/7/80­

ALC2/2010 Party Name:KONECRANES INDIA PRIVATE LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00113/AM11/ RLA File :31/21/040/00143/AM10/ Lic.No/Date:3110039822 03.09.2009 Defer Date:22.03.2011 Decision : The Committee decided to forward a copy of firm’s reply to DHI for examination and comments.  The case may be re­listed on  22.03.2011.

4

Case No.:11/28/80­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00429/AM10/ RLA File :31/24/040/00124/AM10/ Lic.No/Date:3110040186 07.10.2009 Defer Date:22.03.2011 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  to  DIPP  for  examination  and comments.  The case may be re­listed on  22.03.2011.   5

Case No.:10/28/80­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00428/AM10/ RLA File :31/24/040/00121/AM10/ Lic.No/Date:3110040185 07.10.2009 Defer Date:22.03.2011 Decision : The Committee decided to forward a copy of firm’s reply to DIPP for examination and comments.  The case may be re­listed on  22.03.2011.   6

Case No.:16/31/80­ALC2/2009

Party Name:SUTURES INDIA PRIVATE LIMITED, Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00464/AM10/ RLA File :07/24/040/00263/AM10/ Lic.No/Date:0710067849 28.10.2009 Defer Date:22.03.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 22.03.2011   7

Case No.:2/39/80­ALC2/2009

Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00598/AM10/ RLA File :31/24/040/00152/AM10/ Lic.No/Date:3110041006 11.12.2009 Defer Date:22.03.2011 Decision :The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information.   The case may be re­listed on 22.03.2011.       8

Case No.:21/39/80­ALC2/2009

Party Name:VEM TECHNOLOGIES P.LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00617/AM10/ RLA File :09/24/040/00373/AM10/ Lic.No/Date:0910040368 18.12.2009 Defer Date:22.03.2011 Decision  :  The  Committee  observed  that  the  comments  called  for  from  Min.  of  Defence  are  yet  to  be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 22.03.2011   9

Case No.:12/47/80­ALC2/2009

Party Name:RAINA ENGINEERS Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00731/AM10/ RLA File :03/95/040/00641/AM10/ Lic.No/Date:0310553727 05.01.2010 Defer Date:22.03.2011

Decision : The Committee noted that  the firm has sought time vide their letter dated 10.11.10 for submission reply. The Committee, therefore, decided to remind the firm for expediting the said information.  The case may be re­listed on  22.03.2011.   10

Case No.:1/45/80­ALC2/2009

Party Name:STARION INDIA P.LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00688/AM10/ RLA File :31/24/040/00211/AM10/ Lic.No/Date:3110041587 20.01.2010 Defer Date:22.03.2011 Decision : The Committee observed that the comments called for from DIT are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 22.03.2011   11

Case No.:21/45/80­ALC2/2009

Party Name:THERMAX LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Approved HQ File :01/80/050/00708/AM10/ RLA File :31/24/040/00200/AM10/ Lic.No/Date:3110041728 28.01.2010   Decision  :  As  per  written  comments  of  DHI  vide  their  U.O.  Note  No.3(14)/10­TSW(B)/55    dated 18.01.2011 the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export The export weight 11456.098 MT incorporated in the license. Import 1.      Item no 1­ Allowed 100MT with 3% wastage as applied for. 2.      Item no 2­ Allowed 273845 kg of length 44180 meters with 2% wastage. 3.      Item no 3­ Allowed 196,840 kg of length 2908 meters with 2% wastage. 4.      Item no 4­ Allowed 376,508 kg of length 62,258 meters with 2% wastage. 5.      Item no 5­ Allowed 184,150 kg of length 4759 meters with 2% wastage. 6.      Item no 6 to9 – These are components & allowed under GN­4. 7.           Item no  10­  The  firm  has  stated  that  there  will  be  no  machining.  The  word  “Finished”  to  be prefixed to the description of import product & its weight is 200 MT to be incorporated along with quantity in number given by the firm. 8.      Item no 11­ Allowed 3600 kg of length 10,780 meters with out any wastage. 9.           Item no  12­  The  firm  has  stated  that  there  will  be  no  machining.  The  word  “Finished”  to  be prefixed to the description of import product & its weight is 4 MT to be incorporated along with quantity in number given by the firm. 10.  Item no 13­ This is welding material. The firm has sought import of 68.6 MT which is coming less than 1% of weight of equipment. Allowed as applied for. 11.  Item no 14 to 32­ these are components & allowed under GN­4.     12

Case No.:22/45/80­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Rejected HQ File :01/80/050/00709/AM10/ RLA File :31/24/040/00220/AM10/ Lic.No/Date:3110041743 29.01.2010   Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply after personal hearing in the absence of which, it was not possible to decide the requirement of inputs.

  13

Case No.:22/7/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00096/AM11/ RLA File :09/24/040/00447/AM10/ Lic.No/Date:0910041035 22.02.2010 Defer Date:22.03.2011 Decision  :The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The Committee, therefore, decided to defer the consideration and to relist the case  for 22.03.2011   14

Case No.:21/7/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00095/AM11/ RLA File :09/24/040/00522/AM10/ Lic.No/Date:0910041258 10.03.2010 Defer Date:22.03.2011 Decision : The Committee decided to defer the case as the comments received from DHI will be considered in the next meeting will be held on 22.03.2011.   15

Case No.:16/7/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00090/AM11/ RLA File :03/94/040/01060/AM10/ Lic.No/Date:0310564639 12.03.2010 Defer Date:22.03.2011 Decision :The Committee observed that the comments called for from DIT are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 22.03.2011   16

Case No.:34/7/80­ALC2/2010

Party Name:RESHAM ROOSEN INDIA PVT.LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00108/AM11/ RLA File :06/24/040/00051/AM10/ Lic.No/Date:0610017515 19.03.2010 Defer Date:22.03.2011 Decision : The Committee observed that the firm vide their letter dated 20.11.2010 indicated quantities of export products  at  Sl.  No.  1,  2  &  3  as  Nil    3405  Kgs  and  850  Kgs.  respectively  as  against  615  Kgs., 17699.11 Kgs. & 1375.13 Kgs respectively in the application/Advance Authorisation. Similarly, quantities of  import  items  indicated  by  them  now  does  not  match  with  the  quantities  of  import  items  in  the application/Advance Authorisation. On the recommendation of the representative of DIPP, the Committee decided to ask the firm to clarify the above and the case may be relisted for 22.03.2011.   17

Case No.:8/1/80­ALC2/2010

Party Name:SATA VIKAS INDIA PRIVATE LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00837/AM10/ RLA File :05/24/040/00529/AM10/ Lic.No/Date:0510260906 22.03.2010 Defer Date:22.03.2011 Decision :    The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments. The case may be relisted on 22.03.2011    

Case No.:16/1/80­ALC2/2010

Party Name:THERMAX LTD., Status:

18 Meet No/Date:37/80­ ALC2/2010 08.02.2011 Deferred HQ File :01/80/050/00845/AM10/ RLA File :31/24/040/00242/AM10/ Lic.No/Date:3110042472 23.03.2010 Defer Date:22.03.2011 Decision : The Committee decided to defer the case as the comments received from DHI will be considered in the next meeting will be held on 22.03.2011   19

Case No.:32/5/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00065/AM11/ RLA File :05/23/040/00225/AM10/ Lic.No/Date:0510261296 26.03.2010 Defer Date:22.03.2011 Decision : The Committee noted firm’s request vide their letter dated 20.01.2011 seeking the DGFT letter dated  01.11.2010  and  also  time  for  furnishing  information.    The  Committee  also  noted  D.L.  dated 01.11.2010 has already sent to the firm and defer the case.   The case may be re­listed on 22.03.2011.   20

Case No.:36/5/80­ALC2/2010

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00069/AM11/ RLA File :05/23/040/00214/AM10/ Lic.No/Date:0510261354 29.03.2010 Defer Date:22.03.2011 Decision  :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The Committee, therefore, decided to defer the consideration and to relist the case  for22.03.2011   21

Case No.:21/29/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00456/AM11/ RLA File :11/24/040/00050/AM10/ Lic.No/Date:1110022130 29.03.2010 Defer Date:22.03.2011 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  to  DHI  for  examination  and comments.  The case may be re­listed on  22.03.2011.   22

Case No.:6/5/80­ALC2/2010

Party Name:ULTRA ENGINEERS Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00039/AM11/ RLA File :31/24/040/00002/AM11/ Lic.No/Date:3110042881 15.04.2010 Defer Date:22.03.2011 Committee, therefore, decided to defer the consideration and to relist the case for  22.02.2011.   23

Case No.:25/5/80­ALC2/2010

Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00058/AM11/ RLA File :31/24/040/00009/AM11/ Lic.No/Date:3110042996 26.04.2010 Defer Date:22.03.2011 Decision : The Committee observed that no reply of the firm had been received by this office in response to

24

Case No.:17/9/80­ALC2/2010

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00130/AM11/ RLA File :05/23/040/00233/AM10/ Lic.No/Date:0510263362 29.04.2010 Defer Date:22.03.2011 Committee, therefore, decided to defer the consideration and to relist the case for  22.03.2011.   25

Case No.:3/7/80­ALC2/2010

Party Name:LINCOLN HELIOS ( I ) LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00077/AM11/ RLA File :07/24/040/00021/AM11/ Lic.No/Date:0710071374 30.04.2010 Defer Date:22.03.2011 Decision : The Committee observed that firm vide their letter dated 06.09.2010 has submitted incomplete reply and the firm has mentioned that they will submit request for enhancement in quantity of import after NC decision.  The firm has also not furnished any reply to this office letter.   On the recommendation of the representative  of  DHI,  the  Committee,  therefore,  decided  to  remind  the  firm  to  submit  the  following information:   (i)                The firm’s request of enhancement in quantity of import after NC decision with justification of import and corresponding calculation; (ii)              Information in respect of Sl.No.5 of the Standard Deficiency Format. export product wise; (iii)               Import items given in the list are not correlated with the calculation given in the reply. Unit of import is also not available; (iv)            The firm has mentioned that steel ball is required  for the manufacture of export product.  But its source, either indigenous or imported and if imported  it is imported as raw material or component is not available ; (v)              The firm may also give the sample of the export product for examination.    The case may be re­listed on 22.03.2011.   26

Case No.:8/7/80­ALC2/2010

Party Name:TRF LIMITED, Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Approved HQ File :01/80/050/00082/AM11/ RLA File :02/24/040/00254/AM10/ Lic.No/Date:0210141744 06.05.2010   Decision : As per written comments of DHI vide their U.O. Note No.3(05)/10­TSW(B)  dated 18.11.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   (i)                  On the clarification of the firm description of  export product to be amended  to “Coal Handling Plant”. (ii)                Allowed import  item No.40 as applied under GN­4.     27

Case No.:9/7/80­ALC2/2010

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00083/AM11/ RLA File :31/24/040/00012/AM11/ Lic.No/Date:3110043149 06.05.2010 Defer Date:22.03.2011 Decision  :      The  Committee  decided  to  forward  a  copy  of  firm’s  reply  to  DIPP  for  examination  and comments.  The case may be relisted on 22.03.2011.

28

Case No.:18/11/80­ALC2/2010

Party Name:ULTRA ENGINEERS Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00164/AM11/ RLA File :31/24/040/00019/AM11/ Lic.No/Date:3110043194 11.05.2010 Defer Date:22.03.2011 Committee, therefore, decided to defer the consideration and to relist the case  for 22.03.2011   29

Case No.:15/7/80­ALC2/2010

Party Name:THE INDURE PVT. LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Approved HQ File :01/80/050/00089/AM11/ RLA File :05/24/040/00020/AM11/ Lic.No/Date:0510264158 12.05.2010   Decision : As per written comments of DHI vide their U.O. Note No.3(70)/10­TSW(B)/  dated 03.01.2011 the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export Product:  Allowed for amendment of the export product to “Ash Handling plant for 3X500 MW Vallur STPP containing 30 kms Ash Slurry pipe line of ID 420 mm & 4985 meters of Bottom Ash Slurry pipe line of ID 250 mm ”. Import 1.Item no 9 & 10­ Allowed under GN­4 without any wastage. 2.Item no 1 to 8 & 11­  Allowed under GN­4. 3. Item no 12­ This is spares for item no 11 & to be allowed as per spares policy for item no 11.     30

Case No.:10/9/80­ALC2/2010

Party Name:SOLO MANUFACTURING PVT LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00123/AM11/ RLA File :05/24/040/00056/AM11/ Lic.No/Date:0510264643 21.05.2010 Defer Date:22.03.2011   31

Case No.:20/9/80­ALC2/2010

Party Name:KINECO PVT. LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00133/AM11/ RLA File :17/24/040/00004/AM11/ Lic.No/Date:1710003338 21.05.2010 Defer Date:22.03.2011 Decision : The Committee decided to consider the comments received from DHI on file and the case may be re­listed for 22.03.2011.  

Case No.:18/18/80­ALC2/2010

Party Name:NEWTON ENGINEERING AND CHEMICALS LTD, Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Approved HQ File :01/80/050/00271/AM11/ RLA File :34/24/040/00034/AM11/ Lic.No/Date:3410027089 28.05.2010   Decision :  As  per  written  comments  of  DIPP  vide  their  U.O. Note    dated  08.02.2011,  the  Ccommittee decided to ratify the norms in respect of the subject advance authorization as under:­

32   1.    Net empty weight of export product may be specified as 9100 Kgs. 2.     Quantities of import items at Sl. No.1 & 2 may be allowed as 456 Kgs. & 150 Kgs. respectively inclusive of 5 % wastage. 3.    Total quantity of import items at Sl. No. 3 & 4 put together may be allowed as 4923 Kgs. inclusive of 5 % wastage. 4.    Quantitys of import item at Sl. No.5 may be allowed as 1810 Kgs. inclusive of 28 % wastage after 1/3rd recovery.     33

Case No.:24/15/80­ALC2/2010

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00231/AM11/ RLA File :05/23/040/00058/AM11/ Lic.No/Date:0510265601 07.06.2010 Defer Date:22.03.2011 Decision  :    The  Committee  observed  that  the  comments  called  for  from  Min.  of  Mines  are  yet  to  be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 22.03.2011   34

Case No.:6/27/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Rejected HQ File :01/80/050/00403/AM11/ RLA File :09/24/040/00087/AM11/ Lic.No/Date:0910042297 11.06.2010   Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.      35

Case No.:18/15/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00225/AM11/ RLA File :04/24/040/00061/AM11/ Lic.No/Date:0410114584 15.06.2010 Defer Date:22.03.2011   36

Case No.:19/15/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00226/AM11/ RLA File :11/24/040/00011/AM11/ Lic.No/Date:1110022638 18.06.2010 Defer Date:22.03.2011  

Case No.:4/15/80­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred

37 HQ File :01/80/050/00211/AM11/ RLA File :03/94/040/00261/AM11/ Lic.No/Date:0310580285 23.06.2010 Defer Date:22.03.2011 Committee, therefore, decided to defer the consideration and to relist the case for  22.02.2011.   38

Case No.:31/13/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Rejected   HQ File :01/80/050/00207/AM11/ RLA File :04/24/040/00060/AM11/ Lic.No/Date:0410114911 24.06.2010   Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.      39

Case No.:1/14/81­ALC2/2010

Party  Name FITCAST FOUNDERS  & ENGINEERS PVT. LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status Deferred HQ File :01/81/050/00081/AM11/ RLA File :08/24/040/00082/AM11/ Lic.No/Date:0810089995 24.06.2010 Defer Date:22.03.2011   40

Case No.:1/15/80­ALC2/2010

Party Name:ARMOR PLAST LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Rejected HQ File :01/80/050/00208/AM11/ RLA File :07/24/040/00092/AM11/ Lic.No/Date:0710072431 24.06.2010   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.        41

Case No.:5/15/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00212/AM11/ RLA File :53/24/040/00010/AM11/ Lic.No/Date:5310010688 25.06.2010 Defer Date:22.03.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 22.03.2011   42

Case No.:1/16/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00242/AM11/ RLA File :09/24/040/00114/AM11/ Lic.No/Date:0910042665 08.07.2010 Defer Date:22.03.2011

expediting the said informaion.   The case may be re­listed on 22.03.2011.   43

Case No.:1/18/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00254/AM11/ RLA File :05/24/040/00126/AM11/ Lic.No/Date:0510267954 12.07.2010 Defer Date:22.03.2011   44

Case No.:10/18/80­ALC2/2010

Party Name:MIKROTEK MACHINES LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00263/AM11/ RLA File :07/24/040/00102/AM11/ Lic.No/Date:0710072868 13.07.2010 Defer Date:22.03.2011 Decision :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s submission of comments. The case may be relisted on 22.03.2011.   45

Case No.:51/31/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00529/AM11/ RLA File :61/24/040/00030/AM11/ Lic.No/Date:6110000473 15.07.2010 Defer Date:22.03.2011   46

Case No.:22/18/80­ALC2/2010

Party Name:SAI DIVYA ENGINEERS Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00275/AM11/ RLA File :09/24/040/00047/AM11/ Lic.No/Date:0910042702 19.07.2010 Defer Date:22.03.2011 this office letter calling for certain information. The Committee, therefore, decided to remind the firm for a final time for expediting the said information.   The case may be re­listed on 22.03.2011.   47

Case No.:18/22/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00329/AM11/ RLA File :04/24/040/00090/AM11/ Lic.No/Date:0410115602 19.07.2010 Defer Date:22.03.2011 Decision :  The  Committee  decided  to  await  for  reply  from   the  firm.      The  case  may  be  re­listed  on 22.03.2011.  

Case No.:19/22/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred

48 HQ File :01/80/050/00330/AM11/ RLA File :04/24/040/00091/AM11/ Lic.No/Date:0410115603 19.07.2010 Defer Date:22.03.2011 Decision :  The  Committee  decided  to  await  for  reply  from   the  firm.      The  case  may  be  re­listed  on 22.03.2011.   49

Case No.:53/18/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00306/AM11/ RLA File :09/24/040/00133/AM11/ Lic.No/Date:0910042746 20.07.2010 Defer Date:22.03.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case  for22.03.2011   50

Case No.:54/18/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00307/AM11/ RLA File :09/24/040/00138/AM11/ Lic.No/Date:0910042748 20.07.2010 Defer Date:22.03.2011 Decision :The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case  for 22.03.2011   51

Case No.:35/22/80­ALC2/2010

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00346/AM11/ RLA File :03/94/040/00335/AM11/ Lic.No/Date:0310584224 20.07.2010 Defer Date:22.03.2011 Decision  :  The  Committee  observed  that  reply  submitted  by  the  firm  vide  their  letter  dated  9.12.2010 pertains  to  some  other  advancer  authorization.    On  the  recommendation  of  the  representative  of  DIPP present in the meeting,  the firm may be asked to submit reply for the present advance authorization. The Committee decided to call for the following information/clarification again from the firm and to re­list the case for 22.03.2011.   1.      Information in respect of Sl.No.5 6 & 9 of the Standard Deficiency Format. 2.      Quantities of import items in Nos. also in addition to the weights in Kgs.     52

Case No.:4/27/80­ALC2/2010

Party Name:R.D.ENGINEERS (INDIA) PVT.LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00401/AM11/ RLA File :03/95/040/00297/AM11/ Lic.No/Date:0310584240 20.07.2010 Defer Date:22.03.2011 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm  reply  to  DIPP  for  examination  and comments.  The case may be re­listed on 22.03.2011.   53

Case No.:1/29/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00436/AM11/ RLA File :09/24/040/00140/AM11/

Lic.No/Date:0910042747 20.07.2010 Defer Date:22.03.2011 Decision : The Committee decided to forward a copy of firm reply to DHI for examination and comments.  The case may be re­listed on 22.03.2011.   54

Case No.:7/27/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Rejected HQ File :01/80/050/00404/AM11/ RLA File :09/24/040/00155/AM11/ Lic.No/Date:0910042828 22.07.2010   Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.      55

Case No.:1/22/80­ALC2/2010

Party Name:ABB LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00312/AM11/ RLA File :07/24/040/00158/AM11/ Lic.No/Date:0710073410 05.08.2010 Defer Date:22.03.2011 submission of comments. The case may be relisted on 22.03.2011..   56

Case No.:17/31/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00495/AM11/ RLA File :09/24/040/00169/AM11/ Lic.No/Date:0910043002 06.08.2010 Defer Date:22.03.2011   57

Case No.:6/22/80­ALC2/2010

Party Name:ABB LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00317/AM11/ RLA File :07/24/040/00174/AM11/ Lic.No/Date:0710073560 11.08.2010 Defer Date:22.03.2011   58

Case No.:6/24/80­ALC2/2010

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00378/AM11/ RLA File :04/24/040/00109/AM11/ Lic.No/Date:0410116180 11.08.2010 Defer Date:22.03.2011

59

Case No.:15/22/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00326/AM11/ RLA File :05/24/040/00175/AM11/ Lic.No/Date:0510270440 12.08.2010 Defer Date:22.03.2011   60

Case No.:14/22/80­ALC2/2010

Party Name:J.D. JONES & CO. PVT. LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Approved HQ File :01/80/050/00325/AM11/ RLA File :02/24/040/00091/AM11/ Lic.No/Date:0210146504 13.08.2010   Decision : As per written comments of C&PC vide their O.M. No.46011/2/2008­PC­II  dated 25.01.2011 the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Item to be exported Quantity Pacmaan Gland Packing 1 Kg Raw­material Recommended for Import Quantity Graphite Composite Fiber (Expanded PTEE Graphite) 1.05 kg/kg content in the export produect     61

Case No.:38/27/80­ALC2/2010

Party Name:ULTRA ENGINEERS Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00435/AM11/ RLA File :31/24/040/00091/AM11/ Lic.No/Date:3110044331 13.08.2010 Defer Date:22.03.2011 Decision :  The Committee  noted that  the matter pertains to DHI. Therefore the reply of the firm was handed over to DHI.  The case may be relisted on 22.03.2011.   62

Case No.:20/22/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00331/AM11/ RLA File :05/24/040/00176/AM11/ Lic.No/Date:0510270623 16.08.2010 Defer Date:22.03.2011   63

Case No.:38/22/80­ALC2/2010

Party Name:ULTRA ENGINEERS Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00349/AM11/ RLA File :31/24/040/00077/AM11/ Lic.No/Date:3110044345 16.08.2010 Defer Date:22.03.2011

64

Case No.:37/22/80­ALC2/2010

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00348/AM11/ RLA File :05/24/040/00181/AM11/ Lic.No/Date:0510270714 17.08.2010 Defer Date:22.03.2011   65

Case No.:22/27/80­ALC2/2010

Party Name:MERIL LIFE SCIENCES PVT LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00419/AM11/ RLA File :52/24/040/00008/AM11/ Lic.No/Date:5210031621 17.08.2010 Defer Date:22.03.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 22.03.2011   66

Case No.:16/31/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00494/AM11/ RLA File :09/24/040/00176/AM11/ Lic.No/Date:0910043125 17.08.2010 Defer Date:22.03.2011   67

Case No.:34/31/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00512/AM11/ RLA File :31/21/040/00158/AM11/ Lic.No/Date:3110044407 19.08.2010 Defer Date:22.03.2011 Decision :The Committee noted that the subject matter does not pertain to DIT as informed in  their letter dated 06.01.2011.  The Committee, therefore, handed over the firm’s application  to DHI for examination &  comments. The case may be re­listed on 22.03.2011   68

Case No.:60/22/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00371/AM11/ RLA File :04/24/040/00111/AM11/ Lic.No/Date:0410116559 24.08.2010 Defer Date:22.03.2011   69

Case No.:40/31/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00518/AM11/ RLA File :09/24/040/00195/AM11/

Lic.No/Date:0910043236 24.08.2010 Defer Date:22.03.2011 Decision :  The  Committee  decided  to  await  for  reply  from   the  firm.      The  case  may  be  re­listed  on 22.03.2011.   70

Case No.:32/31/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00510/AM11/ RLA File :06/24/040/00028/AM11/ Lic.No/Date:0610018929 30.08.2010 Defer Date:22.03.2011 Decision : The Committee observed that the comments called for from Ministry of Defence are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 22.03.2011   71

Case No.:44/31/80­ALC2/2010

Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00522/AM11/ RLA File :31/24/040/00111/AM11/ Lic.No/Date:3110044526 30.08.2010 Defer Date:22.03.2011   72

Case No.:20/31/80­ALC2/2010

Party Name:A RAYMOND FASTENERS INDIA PRIVATE LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00498/AM11/ RLA File :31/24/040/00073/AM11/ Lic.No/Date:3110044527 31.08.2010 Defer Date:22.03.2011 Decision :  The  Committee  decided  to  await  for  reply  from   the  firm.      The  case  may  be  re­listed  on 22.03.2011.   73

Case No.:18/24/80­ALC2/2010

Party Name:BGR ENERGY SYSTEMS LIMITED, Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00390/AM11/ RLA File :04/24/040/00132/AM11/ Lic.No/Date:0410116988 06.09.2010 Defer Date:22.03.2011 Decision :  The  representative  of  the  DIPP  informed  the  Committee  that  the  case  is  under  study.    The   74

Case No.:31/31/80­ALC2/2010

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00509/AM11/ RLA File :31/24/040/00113/AM11/ Lic.No/Date:3110044584 06.09.2010 Defer Date:22.03.2011  

Case No.:60/31/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status:Deferred HQ File :01/80/050/00538/AM11/ RLA File :53/24/040/00014/AM11/

75 Lic.No/Date:5310011297 06.09.2010 Defer Date:22.03.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 22.03.2011   76

Case No.:2/25/80­ALC2/2010

Party Name:NOV SARA INDIA PRIVATE LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00392/AM11/ RLA File :61/24/040/00047/AM11/ Lic.No/Date:6110000492 08.09.2010 Defer Date:22.03.2011 Decision  :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s   77

Case No.:5/25/80­ALC2/2010

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00395/AM11/ RLA File :04/24/040/00136/AM11/ Lic.No/Date:0410117138 14.09.2010 Defer Date:22.03.2011   78

Case No.:39/31/80­ALC2/2010

Party Name:R.D.ENGINEERS (INDIA) PVT.LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00517/AM11/ RLA File :03/95/040/00480/AM11/ Lic.No/Date:0310592767 16.09.2010 Defer Date:22.03.2011 Decision :    The  Committee  decided  to  send  a  copy  of  firm’s  application  to  DIPP  for  examination  and comments.  The case may be re­listed on 22.023.2011.   79

Case No.:33/27/80­ALC2/2010

Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00430/AM11/ RLA File :61/24/040/00049/AM11/ Lic.No/Date:6110000494 21.09.2010 Defer Date:22.03.2011   80

Case No.:37/31/80­ALC2/2010

Party Name:SPRAY ENGINEERING DEVICES LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00515/AM11/ RLA File :22/24/040/00040/AM11/ Lic.No/Date:2210010434 21.09.2010 Defer Date:22.03.2011

81

Case No.:47/31/80­ALC2/2010

Party Name:SIEMENS ROLLING STOCK PVT.LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00525/AM11/ RLA File :03/95/040/00491/AM11/ Lic.No/Date:0310593387 22.09.2010 Defer Date:22.03.2011   82

Case No.:15/31/80­ALC2/2010

Party Name:ENDRESS AND HAUSER (INDIA) AUTOMATION INSTRU­ Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00493/AM11/ RLA File :03/94/040/00556/AM11/ Lic.No/Date:0310593566 23.09.2010 Defer Date:22.03.2011 Decision : The Committee observed that DIT has sought some information from the firm and decided to await for DIT comments. The case may be re­listed on 22.03.2011   83

Case No.:36/31/80­ALC2/2010

Party Name:RUBAMIN LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Withdrawn HQ File :01/80/050/00514/AM11/ RLA File :34/24/040/00139/AM11/ Lic.No/Date:3410028082 23.09.2010 Defer Date:28.12.2010 Decision :    The  Committee  noted  that  the  case  has  already  approved  in  a  meeting  No.  34/11  held  on 28.12.2010 and decided to withdraw the case.   84

Case No.:18/27/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00415/AM11/ RLA File :04/24/040/00168/AM11/ Lic.No/Date:0410117473 24.09.2010 Defer Date:22.03.2011 Decision :  The  Committee  decided  to  await  for  reply  from   the  firm.      The  case  may  be  re­listed  on 22.03.2011.   85

Case No.:31/27/80­ALC2/2010

Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00428/AM11/ RLA File :04/24/040/00175/AM11/ Lic.No/Date:0410117536 27.09.2010 Defer Date:22.03.2011   86

Case No.:32/27/80­ALC2/2010

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00429/AM11/ RLA File :05/24/040/00230/AM11/ Lic.No/Date:0510273715 27.09.2010 Defer Date:22.03.2011

87

Case No.:11/31/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00489/AM11/ RLA File :04/24/040/00173/AM11/ Lic.No/Date:0410117541 27.09.2010 Defer Date:22.03.2011 Committee, therefore, decided to defer the consideration and to relist the case for  22.02.2011.   88

Case No.:12/31/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00490/AM11/ RLA File :04/24/040/00172/AM11/ Lic.No/Date:0410117538 27.09.2010 Defer Date:22.03.2011 Committee, therefore, decided to defer the consideration and to relist the case for  22.02.2011.   89

Case No.:36/27/80­ALC2/2010

Party Name:THERMAX LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00433/AM11/ RLA File :31/24/040/00124/AM11/ Lic.No/Date:3110044780 28.09.2010 Defer Date:22.03.2011 Decision :  The  representative  of  DHI  vide  their  U.O.  Note No.3(14)/10­TSW(B)/74    dated  20.01.2011 expressed doubts over the value addition in his written comments indicated by the firm. The Committee decided to examine the case on file. The case may be re­listed on 22.03.2011.     90

Case No.:46/31/80­ALC2/2010

Party Name:TEMA INDIA LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00524/AM11/ RLA File :03/95/040/00512/AM11/ Lic.No/Date:0310594253 28.09.2010 Defer Date:22.03.2011   91

Case No.:37/27/80­ALC2/2010

Party Name:LIPI BOILERS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Approved HQ File :01/80/050/00434/AM11/ RLA File :31/24/040/00132/AM11/ Lic.No/Date:3110044797 29.09.2010   Decision  :  As  per  written  comments  of  DHI  vide  their  U.O.  Note  No.3(93)/09­TSW(B)/42    dated 18.01.2011 the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export The  description  of  export  product  may  be  amended  to  “LIPI  MAKE  BAGASSE  FIRED  BOILER  of capacity 130 TPH” . Quantity of export is two number & the same may be incorporated .    Import The firm proposes to import tubes in cut to sizes. The import may be allowed under GN­4.

  92

Case No.:13/31/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00491/AM11/ RLA File :04/24/040/00182/AM11/ Lic.No/Date:0410117729 01.10.2010 Defer Date:22.03.2011   93

Case No.:42/31/80­ALC2/2010

Party Name:STARION INDIA P.LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00520/AM11/ RLA File :31/24/040/00129/AM11/ Lic.No/Date:3110044900 06.10.2010 Defer Date:22.03.2011 Decision :    The  Committee  decided  to  await  for  reply  from   the firm.     The  case  may  be  re­listed  on 22.03.2011.   94

Case No.:49/31/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00527/AM11/ RLA File :61/24/040/00055/AM11/ Lic.No/Date:6110000502 08.10.2010 Defer Date:22.03.2011   95

Case No.:43/29/80­ALC2/2010

Party Name:ORIENTAL CONTAINERS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00478/AM11/ RLA File :03/95/040/00525/AM11/ Lic.No/Date:0310596095 11.10.2010 Defer Date:22.03.2011 this office letter calling for certain information.  The Office of Zonal DGFT has also reminded to the firm in this regard vide their letter dated 19.01.2011.  The Committee, therefore, decided to remind the firm for  

Case No.:7/31/80­ALC2/2010

Party Name:POLY MEDICURE LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Approved HQ File :01/80/050/00485/AM11/ RLA File :05/24/040/00250/AM11/ Lic.No/Date:0510274962 15.10.2010   Decision : As per written comments of C&PC vide their O.M. No.46011/106/2009­PC­II  dated 27.01.2011 the Committee decided to ratify the norms in respect of the subject advance authorization as under:­     Item to be exported Quantity Plastics  made  Ups  of  Medical  Grade  PVC  Compound (Such as Extension Tube, suction Catheter, Rectal Catheter, Ryles  tubes,  Leving  tube,  Stomach  Tube,  Infant  Feeding 1 Kg

96 Tube,  Thoracic  Catheter,  Umbilical  Catheter,  Redon Drainage  tube,  Abdominal  Drainage  Catheter,  Redon Drainage tube, Abdominal Draining Catheter and Various other Catheter) Raw­material Recommended for Import Quantity For  1  kg  Part/Components  made  of  PVC  Compound (Medical Grade) 1. P.V.C. Resin 2. Di­Octy 1 Phathalate/Hexamoll Dinch 3. Di­Octy 1 Adipathe (DOA) 4. Exlpoxidised Soyabean Oil 5. Calcium Zine Stabilizer 6. Calcium Stearate 7. Medical Kraft Paper (GSM 70+20@) 8. Polyester Polylaminate Film (50 Microns + /10% 1.05 kg/kg content in the export produect 0.73600 kg 0.34500 kg 0.01725 kg 0.03450 kg 0.01150 kg 0.00575 kg As per Packing Policy As per Packing Policy     97

Case No.:9/31/80­ALC2/2010

Party Name:SAVAS ENGINEERING COMPANY PVT. LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00487/AM11/ RLA File :31/24/040/00137/AM11/ Lic.No/Date:3110045065 15.10.2010 Defer Date:22.03.2011   98

Case No.:18/31/80­ALC2/2010

Party Name:TEMA INDIA LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00496/AM11/ RLA File :03/95/040/00570/AM11/ Lic.No/Date:0310597405 18.10.2010 Defer Date:22.03.2011   99

Case No.:10/31/80­ALC2/2010

Party Name:BIO ­ TECH VISION CARE PVT.LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00488/AM11/ RLA File :08/24/040/00205/AM11/ Lic.No/Date:0810093165 19.10.2010 Defer Date:22.03.2011 Decision :The Committee observed that the comments called for from DC(MSME) are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­ listed on 22.03.2011   100

Case No.:29/31/80­ALC2/2010

Party Name:SIEMENS ROLLING STOCK PVT.LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00507/AM11/ RLA File :03/95/040/00592/AM11/ Lic.No/Date:0310598354 22.10.2010 Defer Date:22.03.2011

Decision : The Committee noted that the firm has mentioned in the process of manufacture that it involves machining  for  ratification  under  GN­4.  The  firm  has  mentioned  in  the  process  of  manufacture  that  it involves machining.  Hence import may not be allowed under GN­4. On the recommendation of DHI  their U.O. Note No.3(99)/10­TSW(B)/40  dated 18.01.2011,  the Committee, therefore,  decided to ask the firm to give gross weight of import & net weight after machining so as to examine their request.  The case may be relisted on 22.03.2011.   101

Case No.:30/31/80­ALC2/2010

Party Name:METSO POWER INDIA PRIVATE LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00508/AM11/ RLA File :04/24/040/00195/AM11/ Lic.No/Date:0410118269 25.10.2010 Defer Date:22.03.2011 Decision : The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information.   The case may be re­listed on 22.03.2011.   102

Case No.:45/31/80­ALC2/2010

Party Name:ARMOR PLAST LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00523/AM11/ RLA File :07/24/040/00289/AM11/ Lic.No/Date:0710075019 25.10.2010 Defer Date:22.03.2011 Decision : On the recommendation of the representative of DIPP present in the meeting,  the Committee decided to call for the following information/clarification again from the firm and to re­list the case on  22.03.2011:­   1.      Information in respect of Sl.No.3 & 6 of the Standard Deficiency Format. 2.           Justification/basis for the requirement of 1,58,600 Nos. of Stainless Steel tubing(import items at Sl. No. 1 & 2) for export of 1,43,500 Nos. of export product namely, Stainless Steel tubing cut into different sizes.   103

Case No.:52/31/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00530/AM11/ RLA File :03/95/040/00573/AM11/ Lic.No/Date:0310598942 27.10.2010 Defer Date:22.03.2011 Decision : The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information.   The case may be re­listed on 22.03.2011.   104

Case No.:54/31/80­ALC2/2010

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00532/AM11/ RLA File :03/95/040/00607/AM11/ Lic.No/Date:0310599033 27.10.2010 Defer Date:22.03.2011 Decision :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The  

Case No.:55/31/80­ALC2/2010

Party Name:BOYSEN INDIA LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Approved HQ File :01/80/050/00533/AM11/ RLA File :05/23/040/00204/AM11/

105 Lic.No/Date:0510275831 27.10.2010 Decision  :  As  per  written  comments  of  DHI  vide  their  U.O.  Note  No.3(67)/10­TSW(B)/43    dated 18.01.2011 the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export   The firm has not given the export quantity in numbers. As cut to size pipes are imported, the quantity of export in numbers must match quantity of import in numbers & same may be incorporated in the license. Import (i)                  Item No 1­ Allowed import of  38,270 kg; (ii)                Item No. 2­ Allowed import of  21,318 kg; (iii)         Item No. 3­ Allowed import of 7 268 kg ; (iv)              Item No. 4 – Allowed import of  3, 7752 kg & (v)                Item No. 5 – Allowed import of  39,882 kg  with  2% wastage.     106

Case No.:56/31/80­ALC2/2010

Party Name:SPIG COOLING TOWERS INDIA PVT LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00534/AM11/ RLA File :03/95/040/00604/AM11/ Lic.No/Date:0310599828 02.11.2010 Defer Date:22.03.2011 Decision : The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information.   The case may be re­listed on 22.03.2011.   107

Case No.:58/31/80­ALC2/2010

Party Name:MAGNETI MARELLI UM ELECTRONICS SYSTEMS PVT.LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Approved HQ File :01/80/050/00536/AM11/ RLA File :05/24/040/00275/AM11/ Lic.No/Date:0510276249 02.11.2010   Decision : As per written comments of DIT vide their U.O. Note No.17(6)/2011­IPHW  dated 18.01.2011 the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.      Import item S.No. 1­12 Net­to­net basis with accountability clause. 2.      Import item S. No. 13­15 As applied for with accountability clause.     108

Case No.:59/31/80­ALC2/2010

Party Name:TEMA INDIA LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00537/AM11/ RLA File :03/95/040/00626/AM11/ Lic.No/Date:0310600063 03.11.2010 Defer Date:22.03.2011 Decision : The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information.   The case may be re­listed on 22.03.2011.  

Case No.:61/31/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred

109 HQ File :01/80/050/00539/AM11/ RLA File :07/24/040/00305/AM11/ Lic.No/Date:0710075238 04.11.2010 Defer Date:22.03.2011 Decision :  The  Committee  noted  that  the  firm’s  reply  has  been  received  and  decided  to  send  them  to DC(MSME) for  their comments. The case may be re­listed on  22.03.2011.   110

Case No.:62/31/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00540/AM11/ RLA File :07/24/040/00304/AM11/ Lic.No/Date:0710075239 04.11.2010 Defer Date:22.03.2011 Decision :  The  Committee  noted  that  the  firm’s  reply  has  been  received  and  decided  to  send  them  to DC(MSME) for  their comments. The case may be re­listed on  22.03.2011.   111

Case No.:63/31/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00541/AM11/ RLA File :07/24/040/00306/AM11/ Lic.No/Date:0710075240 04.11.2010 Defer Date:22.03.2011 Decision :  The  Committee  noted  that  the  firm’s  reply  has  been  received  and  decided  to  send  them  to DC(MSME) for  their comments. The case may be re­listed on  22.03.2011..   112

Case No.:7/37/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00745/AM11/ RLA File :09/24/040/00343/AM11/ Lic.No/Date:0910044474 26.11.2010 Defer Date:22.03.2011 Decision :    The  Committee  noted  that  the  firm’s  application  has  been  sent  to  DHI  on  25.01.2011  for examination and comments and decided to re­list the case for 22.03.2011.   113

Case No.:19/37/80­ALC2/2010

Party Name:PSK ENGINEERING PVT LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00757/AM11/ RLA File :07/24/040/00325/AM11/ Lic.No/Date:0710075814 02.12.2010 Defer Date:22.03.2011   114

Case No.:5/37/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00743/AM11/ RLA File :09/24/040/00370/AM11/ Lic.No/Date:0910044582 06.12.2010 Defer Date:22.03.2011 Decision :On the recommendation of the representative of DHI present in the meeting, the Committee decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  for 22.03.2011:­   1. Some of the items proposed for import are not multiples of 28 which needs clarification. 2. Use of each component proposed for import in the manufacture of export product

115

Case No.:6/37/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00744/AM11/ RLA File :09/24/040/00384/AM11/ Lic.No/Date:0910044581 06.12.2010 Defer Date:22.03.2011 Decision :On  the  recommendation  of  the  representative  of  DHI  present  in  the  meeting  the  Committee decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case    for 22.03.2011:­   1.      Information in respect of Sl.No.4,5,9 & 11 of the Standard Deficiency Format export product wise. (Turbine & generator, Heat Exchanger & auxiliaries  separately). 2.      Specific item of export product and their weight separately (Steam turbine, generator, Heat Exchanger separately) with details of Auxiliaries & its weight separately. 3.      Net weight & gross weight of different casting & forgings. 4.      Use of each component proposed for import in the manufacture of export product. 5.      Indicate serial no of insulating material & their total cost. 6.       Length of different type of steel pipes proposed for import.   116

Case No.:8/37/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00746/AM11/ RLA File :09/24/040/00363/AM11/ Lic.No/Date:0910044578 06.12.2010 Defer Date:22.03.2011 Decision : On the recommendation of the representative of DHI present in the meeting, the Committee decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  for 22.03.2011:­   1.      Information in respect of Sl.No.4,5,9 & 11 of the Standard Deficiency Format. export product wise.(Turbine & generator separately). 2.       Use of each component proposed for import in the manufacture of export product 3.      Indicate serial no of insulating material & their total cost. 4.      Dimension, weight & calculation for item no 74 of import. 5.       Constituents of different kits like that at item no 86, 94 & 101 of import. 6.      Calculation of item no 89 of import with its specification.   117

Case No.:10/37/80­ALC2/2010

Party Name:CMI FPE LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00748/AM11/ RLA File :03/94/040/00715/AM11/ Lic.No/Date:0310604608 06.12.2010 Defer Date:22.03.2011   118

Case No.:1/34/80­ALC2/2010

Party Name:POLY MEDICURE LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00627/AM11/ RLA File :05/24/040/00310/AM11/ Lic.No/Date:0510279357 14.12.2010 Defer Date:22.03.2011 Decision : The Committee observed that the firm’s application has been sent to C & PC on 25.01.2011. The Committee, therefore, decided to remind them for expediting their comments. The case may be re­ listed on 22.03.2011

119

Case No.:9/37/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00747/AM11/ RLA File :11/24/040/00019/AM11/ Lic.No/Date:1110023814 24.12.2010 Defer Date:22.03.2011 Decision : On the recommendation of the representative of DHI present in the meeting, he Committee decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  for 22.03.2011:­   1.      Information in respect of Sl.No.4 & 5 of the Standard Deficiency Format. 2.      Percentage of wastage given in appendix 11A does not match with calculation. 3.      Net content of steel plates for item no 3 of export is not available. 4.           Tube sheet  quantity  given  in  Appendix  11a  does  not  match  with  the  total  quantity  to  be imported. 5.      Quantity of export item no 4 may be clarified if it is 4 sets or 80 numbers. Specification may also be given.   120

Case No.:4/37/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00742/AM11/ RLA File :07/24/040/00388/AM11/ Lic.No/Date:0710076497 05.01.2011 Defer Date:22.03.2011 Decision  :  The  Committee  decided  to  forward  the  firm’s  application  to  DIT  for  examination  and comments. The case may be re­listed on 22.03.2011.   121

Case No.:31/37/80­ALC2/2010

Party Name:BHARAT PUMPS & COMPRESSORS LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Approved HQ File :01/80/050/00769/AM11/ RLA File :06/24/040/00048/AM11/ Lic.No/Date:0610020432 05.01.2011   Decision : Based on the recommendation of the representative of  the DIPP present in the meeting, the Committee decided to ratify the norms in respect of the subject advance authorization as per GN­4, net­to­ net basis with accountability clause.   Regional Authority may take necessary action accordingly.   122

Case No.:30/37/80­ALC2/2010

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00768/AM11/ RLA File :06/24/040/00050/AM11/ Lic.No/Date:0610020523 11.01.2011 Defer Date:22.03.2011 Decision  :    The  Committee  observed  that  the  firm’s  application  has  been  sent  to  C  &  PC    and DC(MSME)on 01.02.2011. The Committee decided to defer the case and to re­listed for 22.03.2011.    

Case No.:32/37/80­ALC2/2010

Party Name:WOLFRA­ TECH PVT LTD Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00770/AM11/ RLA File :07/24/040/00291/AM11/ Lic.No/Date:0710076697 12.01.2011 Defer Date:22.03.2011

Decision  :  The  Committee  observed  that  the  firm’s  application  has  been  sent  to  DC(MSME)on 01.02.2011. The Committee also decided to forward the firm’s application to DIPP for examination and comments.  The case may be re­listed on 22.03.2011.   124

Case No.:1/37/80­ALC2/2010

Party Name:ACCURATE INDUSTRIAL CONTROLS PVT.LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00739/AM11/ RLA File :31/24/040/00225/AM11/ Lic.No/Date:3110046461 17.01.2011 Defer Date:22.03.2011   125

Case No.:2/37/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00740/AM11/ RLA File :05/23/040/00293/AM11/ Lic.No/Date:0510281598 17.01.2011 Defer Date:22.03.2011 Decision : The Committee observed that the firm’s application has been sent to DHI on 04.02.2011. The Committee, therefore, decided to defer the case and to re­listed for 22.03.2011.   126

Case No.:12/37/80­ALC2/2010

Party Name:HIMSON ENGINEERING PVT. LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00750/AM11/ RLA File :52/24/040/00043/AM11/ Lic.No/Date:5210033513 17.01.2011 Defer Date:22.03.2011   127

Case No.:3/37/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00741/AM11/ RLA File :05/24/040/00341/AM11/ Lic.No/Date:0510281781 18.01.2011 Defer Date:22.03.2011   128

Case No.:11/37/80­ALC2/2010

Party Name:REYNOLD INDIA PVT.LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Approved HQ File :01/80/050/00749/AM11/ RLA File :05/24/040/00336/AM11/ Lic.No/Date:0510281874 18.01.2011   Decision : Based on the recommendation of the representative of  the DIPP present in the meeting, the committee decided to ratify the norms in respect of the subject advance authorization as per GN­4 net­to­ net basis with accountability clause.   Regional Authority may take necessary action accordingly.

129

Case No.:13/37/80­ALC2/2010

Party Name:BOSCH LIMITED, Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00751/AM11/ RLA File :07/24/040/00417/AM11/ Lic.No/Date:0710076813 19.01.2011 Defer Date:22.03.2011 Decision :    The  Committee  noted  that  the  firm’s  application  has  been  sent  to  DHI  on  04.02.2011  for examination and comments.  The case may be relisted on 22.03.2011.   130

Case No.:14/37/80­ALC2/2010

Party Name:PENNWALT LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00752/AM11/ RLA File :03/95/040/00763/AM11/ Lic.No/Date:0310611983 20.01.2011 Defer Date:22.03.2011 Decision :On the recommendation of the representative of DIPP present in the meeting,  the Committee decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  for 22.03.2011: ­   1. Information in respect of details of Import item Sl.No.1.   131

Case No.:15/37/80­ALC2/2010

Party Name:VEE KAY VIKRAM & CO Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00753/AM11/ RLA File :08/24/040/00131/AM11/ Lic.No/Date:0810095664 21.01.2011 Defer Date:22.03.2011 Decision :The Committee observed that the comments called for from C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments.  The case may be relisted on 22.03.2011.   132

Case No.:16/37/80­ALC2/2010

Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00754/AM11/ RLA File :05/24/040/00345/AM11/ Lic.No/Date:0510282154 21.01.2011 Defer Date:22.03.2011   133

Case No.:17/37/80­ALC2/2010

Party Name:M M AQUA TECHNOLOGIES LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Closed HQ File :01/80/050/00755/AM11/ RLA File :05/24/040/00202/AM11/ Lic.No/Date:0510282179 24.01.2011   Decision  :  The  Committee  noted  that  R.A.  has  informed  vide  their  letter  No.  05/24/040/00202/AM11/ ZAKX/CLA the subject advance authorization issued to the firm as per para 4.7.1; 3.9.1 and 3.7 therefore R.A. has not sent the application of the firm.  The Committee accordingly decided to close the case on the part of NC.   The Regional Authority may take note of the NC decision for information.  

Case No.:18/37/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:37/80­ ALC2/2010 Status: Deferred

134 08.02.2011 HQ File :01/80/050/00756/AM11/ RLA File :05/24/040/00347/AM11/ Lic.No/Date:0510282244 24.01.2011 Defer Date:22.03.2011   135

Case No.:20/37/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00758/AM11/ RLA File :53/24/040/00026/AM11/ Lic.No/Date:5310012092 24.01.2011 Defer Date:22.03.2011 Decision : The Committee noted that the firm’s application has been sent to C&PC on 07.02.2011 for examination and comments.  The case may be relisted on 22.03.2011.   136

Case No.:21/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00759/AM11/ RLA File :09/24/040/00478/AM11/ Lic.No/Date:0910045222 25.01.2011 Defer Date:22.03.2011 Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and   137

Case No.:22/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00760/AM11/ RLA File :09/24/040/00477/AM11/ Lic.No/Date:0910045223 25.01.2011 Defer Date:22.03.2011   138

Case No.:23/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00761/AM11/ RLA File :09/24/040/00476/AM11/ Lic.No/Date:0910045224 25.01.2011 Defer Date:22.03.2011   139

Case No.:24/37/80­ALC2/2010

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00762/AM11/ RLA File :07/24/040/00423/AM11/ Lic.No/Date:0710076901 25.01.2011 Defer Date:22.03.2011 Decision : On the recommendation of the representative of DIPP present in the meeting,  the Committee decided to call for the following information/clarification again from the firm and to re­list the case for 22.03.2011: ­

1.      Information in respect of Sl.No. 4  & 5 of the Standard Deficiency Format. 2.      Information in respect of S.No.11 of Standard Deficiency Format in respect of import item at Sl. No. 1 to 6, 82 to 86 & 98 to 100. 3.      Details of import item at Sl. 4,5 6 i.e. whether plate or round and size thereof.   140

Case No.:25/37/80­ALC2/2010

Party Name:THERMAX LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00763/AM11/ RLA File :31/24/040/00226/AM11/ Lic.No/Date:3110046595 25.01.2011 Defer Date:22.03.2011   141

Case No.:26/37/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00764/AM11/ RLA File :31/21/040/00334/AM11/ Lic.No/Date:3110046646 28.01.2011 Defer Date:22.03.2011   142

Case No.:28/37/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00766/AM11/ RLA File :31/21/040/00331/AM11/ Lic.No/Date:3110046679 28.01.2011 Defer Date:22.03.2011   143

Case No.:27/37/80­ALC2/2010

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00765/AM11/ RLA File :03/94/040/00933/AM11/ Lic.No/Date:0310613264 31.01.2011 Defer Date:22.03.2011   144

Case No.:29/37/80­ALC2/2010

Party Name:G.R.ENGINEERING PRIVATE LTD., Meet No/Date:37/80­ ALC2/2010 08.02.2011 Status: Deferred HQ File :01/80/050/00767/AM11/ RLA File :03/94/040/00926/AM11/ Lic.No/Date:0310613280 31.01.2011 Defer Date:22.03.2011

S.No.29

Case No.  A ­ 09

M/s.  Jhagadia  Copper LTd.,   HQ F.No.01/80/162/00542/AM10/DES.I Lic.No. & Date Meeting No.37/11  RA.F.No.34/24/039/00001/AM10 3410024795 dt.29.07.2009 Date: 08.02.2011 Ratification of  norms.   The Committee observed that the comments called for from Ministry of Mines are yet to be received.  The Committee,  therefore,  decided  to  remind  them  for  expediting  their  comments.  The  case  may  be  re­listed  on 22.03.2011   S.No.30

Case No.  A ­ 14

M/s. Larson & Toubro Ltd.,   HQ F.No.01/80/162/00522/AM11/DES.I Lic.No. & Date Meeting No.37/11  RA.F.No.03/95/039/00004/AM10 0310541346 dt.12.10.2009 Date: 08.02.2011 Ratification of  norms   The Committee observed that the firm has not replied to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 22.03.2011       S. No.416

Case No.  A/R­40

M/s.  Bharat  Heavy Electricals Ltd., Haridwar HQ F.No.01/80/162/00539/AM09/DES.I Lic.No. & Date Meeting No.37/11 RA F.No.61/24/040/00036/AM09 6110000254 dt.05.12.2008   Date: 08.02.2011 Ratification of norms   The representative of the DHI informed the Committee that the case is under study.  The Committee, therefore, decided to defer the consideration and to relist the case  for 22.03.2011   S.No.417

Case No.  A/R­47

M/s. Thermax Ltd., HQ F.No.01/80/050/00682/AM08/DES­I Lic.No. & Date Meeting No.37/11 RA F.No.05/24/040/00393/AM08 3110033083 dt.11.03.2008   Date: 08.02.2011   The  Committee  deliberated  the  written  comments  received  from  DHI  vide  their  U.O.  Note  No.3(74)/10­ TSW(B)/63    dated  18.01.2011  and  decided  to  request  DHI  to  indicate  wastage  in  their  comments  (Original comments enclosed).  The case may be re­listed on 22.03.2011   S.No.418

Case No.  A/R­117

M/s. Thermax Ltd., HQ F.No.01/80/050/01034/AM09/DES­I Lic.No. & Date Meeting No.37/11 RA F.No.31/24/040/000143/AM09 3110035317 dt.09.09.2008 Date: 08.02.2011   The representative of DHI informed that the reply received from the firm vide their letter dated 14.10.10 is incomplete. The Committee, therefore, decided to seek the following clarification/information from the firm and relist the case for 22.03.2011:­         1. Item no 8 of import­ The firm had applied for total 1 MT of electrode/welding rods & 10 MT of flux. Since no calculation was given, 0.5 MT each of flux, electrode & welding rod was recommended. As per standard practice, same quantity of flux as that of welding rod is allowed. The firm has not given any justification of 10 MT of flux.   2.           The views of DHI regarding reduction of export product weight as the indigenous dispatches from vendors were not taken into account will be examined on the file by DGFT.

Sl.No.419

Case  No.  A/R­

87 M/s.    Jord Engineers  India Ltd., Vadodara HQ F.No.01/80/50/00412/AM10/DES­I Lic. No. & Date Meeting No.37/11 RLA No.34/24/040/00094/AM10 3410025191  dt.24.09.2009 Date: 08.02.2011   As per written comments of DIPP vide their U.O. Note  dated 08.02.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1. Net empty weight of export product to be modified as 48.39 MT. 2. Import item at Sl. No. 1 and to be allowed on net to net basis with accountability clause. 3. Import items at Sl. No. 2  & 3 to be deleted as  desired by the firm.     Sl.No.420

Case No.  A/R­130

M/s.  GEA  BGR  Energy System India LTd., Chennai HQ F.No.01/80/050/00566/AM09/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.04/24/040/00085/AM09 0410096891 dt.01.07.2008   Date: 08.02.2011   As  per  written  comments  of  DHI  vide  their  U.O.  Note  No.3(74)/10­TSW(B)/63    dated  18.01.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­ Export Weight of export product  20,312kg to be incorporated in the license. Import Import of 3752.5 kg as applied for with 5% wastage.     Sl.No.421

Case No.A/R­149

M/s. IDMC Limited HQ F.No.01/80/050/00972/AM09/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.34/24/040/00030/AM09 3410021368 dt.09.05.2008 Date: 08.02.2011   As  per  written  comments  of  DHI  vide  their  U.O.  Note  No.3(99)/10­TSW(B)/38    dated  17.01.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­ Export The firm has now stated that the weight of export products have changed to 7188 kg & 3980 kg respectively for item no 1 & 2 & the same may be incorporated in the license.   Import Import Item no 1 tom 7 ­ Allowed as applied for with 3% wastage. Item no 8 to 10­ Allowed under GN­4.     Sl.No.422

Case No.A/R­156

M/s.  Dickinson  Fowler Ltd., Bangalore HQ F.No.01/80/050/00308/AM10/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.07/24/040/00188/AM10 0710066532 dt.18.08.2009 Date: 08.02.2011   As  per  written  comments  of  DHI  vide  their  U.O.  Note  No.3(155)/09­TSW(B)/30    dated  14.01.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­

The firm has represented vide their letter of dated 30­10­10 & stated that these items will be used for packing of the export product. Therefore, import of item no 52 to 55 are allowed as per packing policy.     Sl.No.423

Case No.A/R­157

M/s.  Bharat  Heavy Electricals  LTd., Trichirapalli HQ F.No.01/80/050/00498/AM10/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.04/24/040/00143/AM10 0410108784 dt.17.11.2009 Date: 08.02.2011   decided to defer the consideration and to relist the case for  22.03.2011.   Sl.No.424

Case No.A/R­158

M/s.  Bharat  Heavy Electricals LTd., Bhopal HQ F.No.01/80/050/00167/AM06/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.11/24/040/00011/AM06 1110010869 dt.11.05.2005 Date: 08.02.2011   decided to defer the consideration and to relist the case for  22.03.2011.   Sl.No.425

Case No.A/R­159

M/s.  Bharat  Heavy Electricals LTd., Ranipet HQ F.No.01/80/050/00283/AM08/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.04/24/040/00204/AM08 0410091231 dt.27.09.2007 Date: 08.02.2011   decided to defer the consideration and to relist the case for  22.03.2011.   Sl.No.426

Case No.A/R­160

M/s.  Thermal  Systems (Hyderabad) Pvt. LTd., HQ F.No.01/80/050/00137/AM10/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.09/24/040/00063/AM09 0910038107 dt.03.06.2007 Date: 08.02.2011   The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case for  22.03.2011.   Sl.No.427

Case No.A/R­161

M/s. Thermax LTd., HQ F.No.01/80/050/01549/AM09/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.31/21/040/00295/AM09 3110036392 dt.11.12.2008 Date: 08.02.2011   decided to defer the consideration and to relist the case for  22.03.2011.   Sl.No.428

Case No.A/R­162

M/s.  Vidyut  Metallics  Pvt. Ltd., Thane HQ F.No.01/80/050/00854/AM10/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.03/95/040/00818/AM10 0310567032 dt.29.03.2010 Date: 08.02.2011   The Committee decided to forward a copy of  firm’s reply to DIPP for examination and comments and to relist the case for 22.03.2011.     S.No.429

Case No. A/R­163

F.No.01/80/50/01747/AM09/DES.I Lic.No. & Date

M/s. CIM Tools Pvt. Ltd., Bangalore Meeting No.37/11 RA F.No.07/24/040/00599/AM09 0710062744 dt.04.02.2009 Date: 08.02.2011   The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.      S.No.430

Case  No.    A/R  –

6 M/s.  Value  Industries LTd., Mumbai   HQ F.No.01/80/162/00194/AM10/DES.I Lic.No. & Date Meeting No.37/11  RA.F.No.03/95/040/00012/AM10 0310527117 dt.03.07.2009 Date: 08.02.2011 Ratification of  norms   The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.      S.No.431

Case No. A/R­112

  M/s.  VA  Tech Wabag  Limited, Chennai F.No. 01/80/50/01035/AM09/DES.I Lic.No. & Date Meeting No.37/11 RA F.No.04/24/040/00145/AM09 0410098434 dt.09.09.2008 Date: 08.02.2011   As per written comments of DIPP vide their U.O. Note  dated 08.02.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.      Firm has informed that they have applied for issue of export licence as the export products are covered under  list  of  SCOMET  items  and  the Advance  authorization  to  be  ratified  subject  to  their  obtaining export licence. 2.      Total net weight of export product may be modified  as 218.68 MT. 3.      Word “Relevant” to be prefixed with the descriptions of import items from Sl. No. 1 & 2. 4.      Quantity of import item at Sl. No.1 to be allowed as 14.45 MT  inclusive of 5 % wastage. 5.      Quantity of import item at Sl. No. 2 to be allowed as 9.34 MT inclusive of 5 % wastage. 6.      Weight of 400 Kgs. to be specified with the quantity of import item at Sl. No. 3 and the same may be allowed on net to net basis. 7.      Total weight of 5.821 MT to be specified with the quantities of import items at Sl. No. 4 & 5 put together and quantities of these items  to be allowed on net to net basis.               S.No.432 Case No. A/R – 150 M/s.  Bharat  Heavy Electricals  LTd., Bhopal   HQ F.No.01/80/50/01469/AM08/DES.I Lic.No. & Date Meeting No.37/11  RA.F.No.11/24/040/00042/AM08 1110016562 dt.17.12.2007 Date: 08.02.2011 Ratification of  norms.

The representative of DHI present in the meeting and deliberated the case.  It was decided by the Committee to advise the firm to appear before the NC to explain their case in person along with full facts. The case may be relisted on  22.03.2011.   S.No.433

Case No. A/R­109

  M/s. Denso Haryana Pvt. LTd., Gurgaon F.No. 01/80/50/ 00394/AM10/DES.I Lic.No. & Date Meeting No.37/11 RA F.No.05/23/040/00025/AM10 0510249539 dt.18.09.2009 Date: 08.02.2011 Re­store an important raw material in the export product   The representative of DHI present in the meeting and deliberated the case.  It was decided by the Committee to advise  the  firm  to  appear  before  the  NC  to  explain  their  case  in  person  along  with  full  facts  and  following information and  to re­list the case for 22.03.2011   1.      Information in respect of Sl.No.3,8 & 11 of the Standard Deficiency Format. 2.      Drawing of mould (Dimensional).   S.No.434

Case No. A/R­72

  M/s.  The  Saraswati Industrial  Syndicate LTd., F.No. 01/80/50/ 00075/AM10/DES.I Lic.No. & Date Meeting No.37/11 RA F.No.05/24/040/00057/AM10 0510240867 dt.05.05.2009 Date: 08.02.2011 Ratification of  norms.   The Committee noted that  the firm has sought extension of time vide their letter dated 21.01.11 for submission documents within 4 weeks.     The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said information.  The case may be re­listed on  22.03.2011.   S.No.435

Case No. A/R­90

  M/s.  Larson  Toubro Ltd., F.No. 01/80/50/00742/AM10/DES.I Lic.No. & Date Meeting No.37/11 RA F.No.03/95/040/00713/AM10 0310558679 dt.04.02.2010 Date: 08.02.2011 Ratification of  norms.   The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information.   The case may be re­listed on 22.03.2011.   S.No.436

Case  No.    A/R­

166 M/s.  Bharat Heavy Electricals LTd., Bhopal HQ F.No.01/80/050/00339/AM10/DES.I Lic. No. & date Meeting  No. 37/11 RA.F.No.11/24/040/00010/AM10 1110020832 dt.04.08.2009 Date: 08.02.2011   The  Committee  noted  that  the  firm  has  requested  to  amend  the  import  licence  to  include  4  nos.  of  Rough machined Runner Casting with a CIF Value of Rs. 16.80 Crores (Rs. 4.20 Crores each).  The Committee decided to permit the firm to amend the import license as per their request subject to ratification of norms.  The case may be relisted on 22.03.2011.  

Case No.A/R­176

M/s. IDMC Limited Vithal Udyognagar HQ F.No.01/80/050/00477/AM10/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.34/24/040/00104/AM10 3410025225 dt.30.09.2009 Date: 08.02.2011

S no Item description Weight  per  piece  in gms Quantity  in numbers 1 131073002(Plastic  Plug)  made of poly propylene 1.82 6,620,000 The Committee decided to obtain the documentary evidence (copy of invoice and bill entry) from the firm in support of their request and to re­list the case for 22.03.2011.  

Case No.A/R­177

M/s. CPS Color India Pvt. LTd., Munmbai HQ F.No.01/80/050/01279/AM06/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.03/94/040/01080/AM06 0310361349 dt.29.12.2009 Date: 08.02.2011   The Committee deliberated the details of  the case and decided to ratify the norms in respect of the subject advance authorization as per GN­4, net­to­net basis with accountability clause.   Regional Authority may take necessary action accordingly.  

Case No.A/R­178

M/s. United Drilling Tools Ltd., Delhi HQ F.No.01/80/050/00397/AM10/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.05/24/040/00318/AM10 0510249707 dt.22.09.2009 Date: 08.02.2011   decided to defer the consideration and to relist the case for  22.03.2011.  

Case No.A/R­179

M/s. A Raymond Fasteners India Pvt. LTd., Pune HQ F.No.01/80/050/00524/AM10/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.31/24/040/00158/AM10 3110040658 dt.13.11.2009 Date: 08.02.2011   As  per  written  comments  of  DHI  vide  their  U.O.  Note  No.  3(128)/2009­TSW(B)  dated  28.12.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­     Export The export description & quantity of import may be amended as given below:           Allow import of 12.42 MT of  polyacetal with 3% wastage as applied by the firm.   Regional Authority may take necessary action accordingly.    

Case No.A/R­180

M/s.  Blue  Star  Ltd., Mumbai HQ F.No.01/80/050/00223/AM10/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.03/94/040/01112/AM09 0310528757 dt.14.07.2009 Date: 08.02.2011   The Committee observed that net    weight  of  export  product  ratified  earlier  also  included  weight  of  packing material also. As per written comments of DIPP vide their U.O. Note  dated 08.02.2011, the Committee decided net export weights at Sl. No. 1,2,3 & 4 may be modified as 41.447 MT, 4.545 MT, 0.494 MT and 1.56 MT respectively in respect of the subject advance authorization.      

Case No.A/R­181

M/s.  Blue  Star  Ltd., Mumbai HQ F.No.01/80/050/00282/AM10/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.03/94/040/00107/AM10 0310528936 dt.15.07.2009 Date: 08.02.2011

On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case for 22.02.2011.   1. Information in respect of Sl.No.5 of the Standard Deficiency Format export product wise.  

Case No.A/R­182

M/s.  Bharat  Heavy Electricals Ltd., Ranipet HQ F.No.01/80/050/01333/AM09/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.04/24/040/00001/AM09 0410100307 dt.25.11.2008 Date: 08.02.2011   decided to defer the consideration and to relist the case for  22.03.2011.  

Case No.A/R­183

M/s.  Microtek  Machines Ltd., HQ F.No.01/80/050/00794/AM10/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.07/24/040/00458/AM10 0710070360 dt.04.03.2010 Date: 08.02.2011   The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be re­listed on 22.03.2011.    

Case No.A/R­184

M/s.  Micron  Instruments Pvt. LTd., HQ F.No.01/80/050/00156/AM11/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.05/24/040/00075/AM11 0510265105 dt.01.06.2010 Date: 08.02.2011   As per written comments of DIPP vide their U.O. Note  dated 08.02.2011, the Committee decided to ratify the norms on repeat basis as per Advance Authorization No. 0510217631 dated 10.03.2008 in respect of the subject advance authorization as under:­   1.      Net weight of export product may be specified as 638.4 Kgs. 2.      Quantity of import item may be allowed as 2796.2 Kgs. inclusive of 338% wastage after taking 6% recovery from scrap.    

Case No.A/R­185

M/s.  Precihole  Machine Pvt. LTd., HQ F.No.01/80/050/00266/AM11/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.03/95/040/00294/AM08 0310583509 dt.14.07.2010 Date: 08.02.2011   As  per  written  comments  of  DHI  vide  their  U.O.  Note  No.  3(128)/2009­TSW(B)  dated  28.12.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export item – 2 units of COLLAR 4 ¾ inches of weight 329.23 kg.   Since the firm has applied for only two units, recovery will not result in reduction of number of import.  Allow import of two units of weight 751.16 kg as applied for.      

Case No.A/R­186

M/s.  Omniscient  Process Equipments Pvt. LTd., HQ F.No.01/80/050/00106/AM10/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.03/95/040/00968/AM09 0310517220  dt.24.04.2009 Date: 08.02.2011

As per written comments of DIPP vide their U.O. Note  dated 08.02.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.      It has been informed by the firm that exports under this Advance Authorisation are to a 100 % EOU in India & therefore  SCOMET angle is not applicable in this case. RA may verify the same. 2.           Net weight  of export products at Sl. No. 1 &  2    to  be  specified  as  925  Kgs.  &  2356  Kgs. respectively. 3.      Word “Relevant” to be prefixed with the description of import items from Sl. No. 1 to 9. 4.            Quantities  of  import  items  at    Sl.  No.  1  &  2  to  be  allowed  as  480.7  Kgs.  &  721.3  Kgs. respectively inclusive of 3 % wastage. 5.      Quantity of import item at  Sl. No. 3 to be allowed as 175.7 Kgs. inclusive of 2% wastage. 6.      Quantity of import item at  Sl. No. 4  to be allowed as 9.15 Lbs. inclusive of 2 % wastage. 7.      Quantity of import item at  Sl. No. 5 to be allowed as applied for i.e. 60 Lbs. inclusive of 2 % wastage. 8.      Quantities of import items at  Sl. No. 6 & 7 to be allowed as 200.3 Kgs. & 32.8 Kgs. respectively inclusive of 3 % wastage. 9.      Quantities of import items at  Sl. No. 8 & 9 to be allowed as applied for i.e. 17.14 ft. & 12.32 ft. respectively  inclusive of 2 % wastage.    

Case No.A/R­187

M/s.  Motherson  Sumi System Ltd., New Delhi HQ F.No.01/80/050/00169/AM07/ DES­I Lic.No. & Date Meeting No.37/11 RA F.No.25/24/040/00002/AM07 2510001667 dt.16.05.2006 Date: 08.02.2011   The Committee observed that the comments called for from C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 22.03.2011.    Sl.No.73

Case No. C­ 09

M/s.  Addison  &  Co.  Ltd., Chennai F.No. 01/81/80/162/00372/AM10/DES.I Meeting No.37/11 Modification    of  SION  for  the  export  product “Cutting  Tools­Multiple  Point  of  High  Speed Steel(Cobalt Grade)/Tool Steel” Date: 08.02.2011   The Committee deliberated the comments recommending the request received from DHI vide their U.O. Note No. 3(05)/2010­TSW(B)/93 dated 09.02.2011 and desired that DHI may re­look into wastage and furnish the comments again. The case may be relisted on 22.03.2011.   Sl.No.74

Case No. C­ 17

M/s.  Lucas  TVS  Ltd., Chennai  received  through DC(MEPZ­SEZ), Chennai F.No. 01/81/80/162/00379/AM10/DES.I Meeting No.37/11 Fixation  of  regular  wastage  norms  for manufacturing  of  different  types  of  “Starter, Alterator, Wiper Motor and Compressor”. Date: 08.02.2011   decided to defer the consideration and to relist the case for 22.03.2011.   Sl.No.75

Case No. C­ 18

M/s. Pipavav Shipyards LTd., Amreli F.No. 01/81/80/162/00612/AM11/DES.I Meeting No.37/11 Fixation  of  input  output  norms  in  respect  of 100% EOU for the export product “ Ship, Cargo Ships, Barges & Vessels for Transport, Factory Ship, Life Boats, Hulls and Vessels falls under Chapter 89 of ITC(HS) – reg. Date: 08.02.2011

The Committee observed that the comments called for from Ministry of Shipping are yet to be received.  The Committee,  therefore,  decided  to  remind  them  for  expediting  their  comments.  The  case  may  be  re­listed  on 22.03.2011   Sl.No.76

Case No.  C ­06

M/s.  Indo  Schottle Auto Parts Pvt. Ltd.,   HQ F.No.01/81/80/162/00576/AM10/DES.I Meeting No.37/11 Fixation  of  wastage    norms  for  the  export  product “Central Housing  Cover,  Coller,  Thrust,  Coupling, Injector Plunger, Fitting High Pressure Fuel etc.” Date: 08.02.2011   The representative of the DHI informed the Committee that they have received the firm reply and the case is under study.  The Committee, therefore, decided to defer the consideration and to relist the case for 22.03.2011.   Sl.No.77

Case No. C – 14

M/s.    Kerns  Aero Products Pvt. LTd., HQ F.No.01/80/162/00423/AM11/DES­I Meeting No.37/11 Request for fixation of regular wastage norms Date: 08.02.2011   As  per  written  comments  of  DHI  vide  their  U.O.  Note  No.  3(79)/08­TSW(B)/37  dated  17.01.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Item no 1­ Support Outer   Raw material­ Forging part No­ 5100T07P01 Finished product ­ Support Outer part no 5100T07P01M2. The quantity to be allowed may be net to net on number basis Item no 2­ Support Seal   The manufacturing process involves machining. Raw material ­ Forging part no 5100TO7P04 Finished product ­ Support Seal part no 5100T07P04M5 . The quantity to be allowed may be net to net on number basis.     Sl.No.78

Case No. C ­ 13

M/s.    GTN  Engineering (India) Ltd., Coimbatore(TN) HQ F.No.01/92/180/Norms/AM11/PC­VI/ DES­I Meeting No.37/11 Modification  of  SION  at  SL.  No.  C­689  for  the export  product  “Industrial  Valves”  in  respect  of LOP  No:PER:A/2004/055  EOU­TN dt.10.11.2004 Date: 08.02.2011   The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information.   The case may be re­listed on 22.03.2011.                                                                     *****

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied