IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2011-03-24

DGFT Committee Minutes

Document text

RATIFIED   Minutes of Meeting No.40/11 of Norms Committee(NC­I) due for 22.03.2011 was actually held on 24.03.2011 & 25.3.2011 (DES.I Section)   The meeting No. 40/11 of the Norms Committee (NC­I) for the licensing year 2010­2011  due for 22.03.2011 was actually held on 24.03.2011 & 25.03.2011 under the Chairmanship of Sh. N.P.S. Monga, Additional    Director  General  of  Foreign  Trade  to  consider  the  applications  under  Duty  Exemption  / Remission Schemes (Chapter­4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh. B.D. Ghosh, Jt.I.A. 399 23063355 M/o Steel, U.B. 2. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 3. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 4. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 5. Sh. A.K. Mishra, AIA 13 A 23063332 M/o Steel, U.B. 6. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 7. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.     I ­The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon were as under: ­ 1

Case No.:1/50/83­ALC1/2008

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/83/050/01338/AM09/ RLA File :07/24/040/00623/AM09/ Lic.No/Date:0710063295 26.02.2009 Defer Date:03.05.2011 Decision  :    The  Committee  noted  that  the  case  has  been  transferred  from  NC  IV  (DES­IV).      The Committee decided to collect the complete information from DES­IV Section along with file and send the same to DIPP.  The case may be re­listed on 03.05.2011.   2

Case No.:31/23/80­ALC2/2009

Party Name:HINDUSTAN AERONAUTICS LTD, Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00353/AM10/ RLA File :07/24/040/00651/AM09/ Lic.No/Date:0710066776 02.09.2009 Defer Date:03.05.2011 Decision :  The Committee observed that the comments called for from DGCA are yet to be received.  The Committee, therefore, decided to remind them through D.O. letter for expediting their comments. The case may be re­listed on 03.05.2011.   3

Case No.:39/7/80­

ALC2/2010 Party Name:KONECRANES INDIA PRIVATE LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00113/AM11/ RLA File :31/21/040/00143/AM10/ Lic.No/Date:3110039822 03.09.2009 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply on 28.02.2011 and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 03.05.2011.

4

Case No.:10/28/80­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00428/AM10/ RLA File :31/24/040/00121/AM10/ Lic.No/Date:3110040185 07.10.2009 Defer Date:03.05.2011 Decision : The Committee noted that the firm has not given proper reply after the personal hearing. On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm  and to re­list the case on 03.05.2011   1.      Information in respect of Sl.No.11 of the Standard Deficiency Format. 2.      Blank size for each export product supported by size of the export product. 3.      Sheet lay out diagram indicating the wastage during blanking, export product­wise.   5

Case No.:11/28/80­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00429/AM10/ RLA File :31/24/040/00124/AM10/ Lic.No/Date:3110040186 07.10.2009 Defer Date:03.05.2011 Decision : The Committee noted that the firm has not given proper reply as per personal hearing. On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm  and to re­list the case on 03.05.2011   1.      Information in respect of Sl.No.11 of the Standard Deficiency Format. 2.      Blank size for each export product supported by size of the export product. 3.      Sheet lay out diagram indicating the wastage during blanking, export product­wise.   6

Case No.:16/31/80­ALC2/2009

Party Name:SUTURES INDIA PRIVATE LIMITED, Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00464/AM10/ RLA File :07/24/040/00263/AM10/ Lic.No/Date:0710067849 28.10.2009 Defer Date:03.05.2011 Decision :  The Committee observed that the comments called for from C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­ listed 03.05.2011.   7

Case No.:2/39/80­ALC2/2009

Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00598/AM10/ RLA File :31/24/040/00152/AM10/ Lic.No/Date:3110041006 11.12.2009   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 17.01.2011 and subsequent reminder dated 25.02.02.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.    The Regional Authority may take necessary action accordingly.   8

Case No.:21/39/80­ALC2/2009

Party Name:VEM TECHNOLOGIES P.LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00617/AM10/ RLA File :09/24/040/00373/AM10/ Lic.No/Date:0910040368 18.12.2009 Defer Date:03.05.2011 Decision  :  The  Committee  observed  that  the  comments  called    from  Ministry  of  Defence  yet  to  be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed 03.05.2011.

9

Case No.:19/41/80­ALC2/2009

Party Name:PLAST TECH ENGINEERING Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00640/AM10/ RLA File :04/24/040/00216/AM10/ Lic.No/Date:0410110358 23.12.2009 Defer Date:03.05.2011 Decision :  The Committee observed the comments  of  DC(MSME)  is  not  available  and  the  case  is under study. The Committee decided to remind the DC(MSME) for their comment.. The case may be relisted on 03.05.2011.   10

Case No.:12/47/80­ALC2/2009

Party Name:RAINA ENGINEERS Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00731/AM10/ RLA File :03/95/040/00641/AM10/ Lic.No/Date:0310553727 05.01.2010 Defer Date:03.05.2011 Decision :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  to  DIPP  for  examination  and comments. The case may be re­listed on 03.05.2011.   11

Case No.:1/45/80­ALC2/2009

Party Name:STARION INDIA P.LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00688/AM10/ RLA File :31/24/040/00211/AM10/ Lic.No/Date:3110041587 20.01.2010 Defer Date:03.05.2011 Decision : The Committee observed that DIT has sought information from the firm  vide  their  letter dated 31.05.2010 & 26.08.2010. The Committee, therefore, decided to remind the firm last time for expediting the requisite information to DIT so as to obtain their comments otherwise the case will be rejected without further notice. (A copy may please be endorsed to DIT). The case may be re­listed on 03.05.2011.   12

Case No.:22/7/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00096/AM11/ RLA File :09/24/040/00447/AM10/ Lic.No/Date:0910041035 22.02.2010   Decision : As per written comments of DHI received vide their U.O. Note No.3(42)/10­TSW(B)/109  dated    15.02.201,  the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization as under:­   The export product description to be modified to “20 nos of XRP­1003 Mills for 2X500 MW power stations”. Import Item no 1 to 19­ The firm has clarified that these are components. Allowed under GN­4. Item no 20 to 37­ These arte spares & allowed as per spares policy.    

Case No.:21/7/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00095/AM11/ RLA File :09/24/040/00522/AM10/ Lic.No/Date:0910041258 10.03.2010

13 Decision : As per written comments of DHI received vide their U.O. Note No.3(42)/10­TSW(B)/107  dated    15.02.2011,    The  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization as under:­   Export The total export weight is 1461.48 MT & the same to be incorporated in the license. Import 1. Item no 1to 89 except item no 36,45, 49, 57 ,65 & 73­ Some of the items are given in sets which to be changed to numbers. These are components &  allowed under GN­4. 2. Item no 36­ This is a tool & hence  to be deleted. 3. Item no 45­ The item to be deleted as it is not used in the export product from the description of the import given. 4. Item no 49­ The word “Finished”  be prefixed to the description & allowed under GN­4. 5. Item no 57­ The import weight is 2.5 Kg each to be incorporated to the license. 6.  Item  no  65­  The  firm  has  only  given  the  statement  of  wastage  with  out  giving  calculation  supported  by drawing.  The  item  is  used  for  the  manufacture  of  blades.  The  firm  has  asked  for  wastage  of  470%.  The Committee  agree  for  300%  wastage  &  with  20%  recovery  allowed  for  import  of  5393  kg  say  5400  kg.(Net wastage 240%) 7. Item no 90 to 103 except item no 92, ­ These are insulating materials & to be allowed as applied for. 8. Item no 92­ This is a component & to be allowed under GN­4. 9. Item no 104 to 107­ The firm has sought wastage of 1%.   Allowed import as applied for. 10.Item no 108­ The item to be allowed at 2547 kg with 1% wastage. 11. Item no 109 to 111­ Allowed as applied for as low value item. 12. Item no 112 to 114­ These are components &  allowed under Gn­4. 13. Item no 73 &115­ this is a tool & hence to be deleted     14

Case No.:16/7/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00090/AM11/ RLA File :03/94/040/01060/AM10/ Lic.No/Date:0310564639 12.03.2010   Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.      15

Case No.:34/7/80­ALC2/2010

Party Name:RESHAM ROOSEN INDIA PVT.LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00108/AM11/ RLA File :06/24/040/00051/AM10/ Lic.No/Date:0610017515 19.03.2010 Defer Date:03.05.2011 Decision : The Committee noted of firm’s reply has been received by DIPP and await  their  comments. The case may be re­listed on 03.05.2011.   16

Case No.:8/1/80­ALC2/2010

Party Name:SATA VIKAS INDIA PRIVATE LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00837/AM10/ RLA File :05/24/040/00529/AM10/ Lic.No/Date:0510260906 22.03.2010 Defer Date:03.05.2011 Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be re­listed 03.05.2011.

17

Case No.:16/1/80­ALC2/2010

Party Name:THERMAX LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00845/AM10/ RLA File :31/24/040/00242/AM10/ Lic.No/Date:3110042472 23.03.2010   Decision :  The Committee deliberated the written comments of DHI vide their U.O. Note No.3(14)/10­ TSW(B)/49 & 113  dated 18.01.2011 &  15.02.2011 received and decided to ratify the norms in respect of the subject advance authorization as under:­   Export The total export weight is 611.28 MT & the same to be incorporated in the license. Import 1.      Item no 1­ Allowed 10425 kg without any wastage. 2.      Item no 2­ Allowed 79122 kg of length 1413 meters without any wastage. 3.      Item no 3­ Allowed 22506 kg of length 299 meters without any wastage. 4.      Item no 4­ Allowed 1252 kg without any wastage. 5.      Item no 5­ Allowed 255466kg of length 41460 meters without any wastage. 6.      Item no 6­ Allowed 52744 kg of length 10560 meters without any wastage. 7.      Item no 7­ Allowed 14,986 kg of length 2222 meters without any wastage. 8.      Item no 8­ Allowed restricted to 15,509 kg as applied for. 9.      Item no 9 & 10­ The firm has not sought any wastage. Allowed as applied for. 10.  Item no 11 to 17­ Allowed as applied for under GN­4. 11.   Item no 18 to 20­ These are welding material. The total quantity asked is only 6866 kg which is reasonable.  Allowed as applied for.     18

Case No.:32/5/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00065/AM11/ RLA File :05/23/040/00225/AM10/ Lic.No/Date:0510261296 26.03.2010   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.      Details of components at import item at Sl. No. 1 and constituents of Sets for import items at Sl. Nos. 1, 2, 5, 8, 9, 11 & 12 as submitted by the firm (copy enclosed)  to be incorporated in the list of import items. 2.      Quantity of import items at Sl. No. 1 to be allowed on net to net basis with accountability clause. 3.      Quantities of import items from Sl. No. 2 to 12 to be allowed as per policy for spares.     19

Case No.:36/5/80­ALC2/2010

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00069/AM11/ RLA File :05/23/040/00214/AM10/ Lic.No/Date:0510261354 29.03.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study.  The Committee, therefore, decided to defer the case and to relist the case on 03.05.2011.  

Case No.:21/29/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred

20 HQ File :01/80/050/00456/AM11/ RLA File :11/24/040/00050/AM10/ Lic.No/Date:1110022130 29.03.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the case and to relist the case on 03.05.2011.   21

Case No.:6/5/80­ALC2/2010

Party Name:ULTRA ENGINEERS Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00039/AM11/ RLA File :31/24/040/00002/AM11/ Lic.No/Date:3110042881 15.04.2010   Decision : The Committee noted the firm proposes to (i) export 2 nos of collar of weight 596.8 Kg. for which it proposes to import carpenter alloy bar of weight 990.65 kg.  The recovery will not result in the reduction  of  import  by  whole  number.  As  per  written  comments  of  DHI  received  their  U.O.  Note No.3(125)/09­TSW(B)/136  dated  03.03.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­          (ii)               Allow import as applied for & the quantity of import of 2 numbers of bar may be incorporated in the license.      22

Case No.:25/5/80­ALC2/2010

Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00058/AM11/ RLA File :31/24/040/00009/AM11/ Lic.No/Date:3110042996 26.04.2010 Defer Date:03.05.2011 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  to  DHI  for  examination  and comments. The case may be re­listed on 03.05.2011.   23

Case No.:17/9/80­ALC2/2010

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00130/AM11/ RLA File :05/23/040/00233/AM10/ Lic.No/Date:0510263362 29.04.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study.  The Committee, therefore, decided to defer the consideration and to relist the case on 03.05.2011.   24

Case No.:3/7/80­ALC2/2010

Party Name:LINCOLN HELIOS ( I ) LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00077/AM11/ RLA File :07/24/040/00021/AM11/ Lic.No/Date:0710071374 30.04.2010 Defer Date:03.05.2011 Decision : The Committee observed that the firm has not replied to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice and  to relist the case on 03.05.2011.  

Case No.:9/7/80­ALC2/2010

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00083/AM11/ RLA File :31/24/040/00012/AM11/ Lic.No/Date:3110043149 06.05.2010 Defer Date:03.05.2011

25 Decision : The Committee noted that the firm has not given proper reply. On the recommendation of the representative  of  DIPP  present  in  the  meeting,  the  Committee  decided  to  call  for  the  following information/clarification from the firm  and to re­list the case on 03.05.2011   1.      Information in respect of Sl.No.11 of the Standard Deficiency Format. 2.      Blank size for each export product supported by size of the export product. 3.      Sheet lay out diagram indicating the wastage during blanking, export product­wise.   26

Case No.:18/11/80­ALC2/2010

Party Name:ULTRA ENGINEERS Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00164/AM11/ RLA File :31/24/040/00019/AM11/ Lic.No/Date:3110043194 11.05.2010   Decision : The Committee noted the firm proposes to (i) export 2 nos of collar of weight 1464,82 kg. for which it proposes to import incoloy bar of weight 2474.393 kg.  The recovery will not result in the reduction  of  import  by  whole  number.  As  per  written  comments  of  DHI  received  their  U.O.  Note No.3(125)/09­TSW(B)/138  dated  03.03.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­         (ii)               Allow import as applied for & the quantity of import of 2 numbers of bar            may be incorporated in the license.     27

Case No.:10/9/80­ALC2/2010

Party Name:SOLO MANUFACTURING PVT LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00123/AM11/ RLA File :05/24/040/00056/AM11/ Lic.No/Date:0510264643 21.05.2010 Defer Date:03.05.2011 Decision : The Committee deliberated the written comments of  DHI received vide their U.O. Note No. 3(30)/08­TSW(B)/155 dated 11.03.2011 present in the meeting and decided to advise the firm to appear before the NC to explain their case in person along with technical team with full facts of the case. The case may be relisted on  03.05.2011.   28

Case No.:24/15/80­ALC2/2010

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00231/AM11/ RLA File :05/23/040/00058/AM11/ Lic.No/Date:0510265601 07.06.2010 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from Ministry of Mines are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed 03.05.2011.   29

Case No.:18/15/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00225/AM11/ RLA File :04/24/040/00061/AM11/ Lic.No/Date:0410114584 15.06.2010 Defer Date:03.05.2011

Decision : On the recommendation of the representative of DHI present in the meeting, the Committee decided  to  call  for  the  following  information/clarification  from  the  firm    and  to  re­list  the  case  on 03.05.2011   1. Item 11­ The firm has neither given calculation nor any details about the item. The firm may be asked to submit the calculation supported by drawing as per sl no 11 of SDL. 2. Item  no  12­  The  firm  has  submitted  the  statement  of  requirement.  It  is  not  correlated  with drawing. The firm may be asked to submit the calculation supported by drawing as per sl no 11 of SDL.   30

Case No.:19/15/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00226/AM11/ RLA File :11/24/040/00011/AM11/ Lic.No/Date:1110022638 18.06.2010 Defer Date:03.05.2011 Decision :  The representative of the DHI informed the Committee that the case is under study.  The   31

Case No.:4/15/80­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00211/AM11/ RLA File :03/94/040/00261/AM11/ Lic.No/Date:0310580285 23.06.2010   Decision : The Committee noted that the firm has applied for ratification of norms of export of 4 nos. of Turbine shaft of weight 270.829 MT for which it proposes to import 12 nos. of proof machined shaft forgings of weight 301.028 MT.  The recovery from the machining of shaft will not result of reduction of quantity of import by whose number. As per written comments of DHI received their  U.O.  Note No.3(31)/10­TSW(B)/112  dated  15.02.2011,  the Committee decided to ratify the norms of import as applied for in respect of the subject advance authorization.     32

Case No.:1/14/81­ALC2/2010

Party Name:FITCAST FOUNDERS &  ENGINEERS PVT. LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/81/050/00081/AM11/ RLA File :08/24/040/00082/AM11/ Lic.No/Date:0810089995 24.06.2010 Defer Date:03.05.2011 03.05.2011   1.      Information in respect of Sl.No.5 & 11 of the Standard Deficiency Format for each export product. 2.      Export item in number 3.      Export item Composition for all the export product separately 4.      Specification of items  no. 3 & 6   33

Case No.:5/15/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00212/AM11/ RLA File :53/24/040/00010/AM11/ Lic.No/Date:5310010688 25.06.2010 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  listed 03.05.2011.

34

Case No.:1/16/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00242/AM11/ RLA File :09/24/040/00114/AM11/ Lic.No/Date:0910042665 08.07.2010       35

Case No.:1/18/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00254/AM11/ RLA File :05/24/040/00126/AM11/ Lic.No/Date:0510267954 12.07.2010 Defer Date:03.05.2011 Decision :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  to  DIPP  for  examination  and comments. The case may be re­listed on 03.05.2011.   36

Case No.:10/18/80­ALC2/2010

Party Name:MIKROTEK MACHINES LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00263/AM11/ RLA File :07/24/040/00102/AM11/ Lic.No/Date:0710072868 13.07.2010 Defer Date:03.05.2011 submission of comments. The case may be re­listed 03.05.2011.   37

Case No.:51/31/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00529/AM11/ RLA File :61/24/040/00030/AM11/ Lic.No/Date:6110000473 15.07.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study.  The   38

Case No.:22/18/80­ALC2/2010

Party Name:SAI DIVYA ENGINEERS Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00275/AM11/ RLA File :09/24/040/00047/AM11/ Lic.No/Date:0910042702 19.07.2010       39

Case No.:18/22/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00329/AM11/ RLA File :04/24/040/00090/AM11/ Lic.No/Date:0410115602 19.07.2010 Defer Date:03.05.2011

Decision :The Committee observed that the firm has not replied to this office letter calling for certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  finally  for  expediting  the  said information failing which  their case will be rejected without any further notice. The case may be re­ listed on 03.05.2011.   40    

Case No.:19/22/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00330/AM11/ RLA File :04/24/040/00091/AM11/ Lic.No/Date:0410115603 19.07.2010 Defer Date:03.05.2011 information.  The  Committee,  therefore,  decided  to  remind  the  firm  finally  for  expediting  the  said information failing which  their case will be rejected without any further notice. The case may be re­ listed on 03.05.2011.   41

Case No.:53/18/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00306/AM11/ RLA File :09/24/040/00133/AM11/ Lic.No/Date:0910042746 20.07.2010   Decision : As per written comments of DHI received vide their U.O. Note No.3(6)/10­TSW(B)/160  dated    11.03.2011,    the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization as under:­   Export The export weight is 89.7 MT & the same may be incorporated in the licence. Import 1. Item no 1­ The firm has given calculation for 51 MT with 2% wastage. But it proposes to import 50 MT & the balance quantity is to be procured indigenously. We may agree to firm’s request. 2. Item  no  2  –  The  description  may  be  amended  to  “Girth  Flange”  &  total  8  numbers  may  be allowed with weight 4 MT under GN­4. 3. Item no 3 to 6­ These are component & may be allowed under GN­4.    

Case No.:54/18/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00307/AM11/ RLA File :09/24/040/00138/AM11/ Lic.No/Date:0910042748 20.07.2010

42 Decision :  As  per  written  comments  of  DHI  received  vide  their  U.O.  Note  No.3(6)/10­TSW(B)/161 dated    11.03.2011,    the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization as under:­   Export The export weight is 299 MT  to  be incorporated in the licence. Import 1. Item  no  1­The  firm  has  given  calculation  for  25.7  MT  with  2%  wastage.  But  the  firm  has requested  for  import  of  24  MT  &  the  balance  quantity  is  to  be  procured  indigenously.  The Committee allowed import of 24 MT as applied for. However the size of pies is OD 114.3 mm & thickness 8.56 mm to be incorporated in the license. 2. Item no 2 ­ Allowed to import 10 MT with 2% wastage as applied for as per the calculation given. 3. Item no 3 ­ Allowed to import 65 MT with 2% wastage as applied for as per the calculation given. 4. Item no 4 ­ Allowed to import 124 MT with 2% wastage as applied for as per the calculation given. 5. Item no 5­ The  firm  proposes  to  import  145  nos  of  weight  2  MT.  Allowed  under  GN­4.  The quantity is 145 numbers & its weight is 2 MT may be incorporated in the license 6. Item no 6­ The firm proposes to import 16 nos of Girth Flanges of weight 15 MT.  Allowed under GN­4. The description of the import to be amended to “Girth Flange” & the quantity is 16 nos of weight 15 MT to be incorporated in the license. 7.      Item no 7­ This is a component & to be allowed under GN­4.     43

Case No.:35/22/80­ALC2/2010

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00346/AM11/ RLA File :03/94/040/00335/AM11/ Lic.No/Date:0310584224 20.07.2010 Defer Date:03.05.2011 Decision :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  to  DIPP  for  examination  and comments. The case may be re­listed on 03.05.2011.   44

Case No.:4/27/80­ALC2/2010

Party Name:R.D.ENGINEERS (INDIA) PVT.LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00401/AM11/ RLA File :03/95/040/00297/AM11/ Lic.No/Date:0310584240 20.07.2010 Defer Date:03.05.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, the Committee 03.05.2011   1. Information in respect of Sl.No.4, 5 & !! of the Standard Deficiency Format.  

Case No.:1/29/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00436/AM11/ RLA File :09/24/040/00140/AM11/ Lic.No/Date:0910042747 20.07.2010

45 Decision : As per written comments of DHI received vide their U.O. Note No.3(6)/10­TSW(B)/159  dated    11.03.2011,    the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization as under:­   Export The export weight is 151.58 MT  incorporated in the licence. Import 1. Item no 1­The firm to be allowed import of 5 MT as applied for with 2% wastage. However the size of pipes is OD 73 mm & thickness 7.03 mm to be incorporated in the license. 2. Item no 2 ­ Allowed import of 6 MT as applied for with 2% wastage. 3. Item no 3 ­ Allowed import of 20 MT as applied for with 2% wastage. 4. Item no 4 ­ Allowed import of 44 MT as applied for with 2% wastage. 5.  Item no 5 –Allowed three numbers of Girth Flanges of weight 2 MT & three numbers of Blind Flange of weight 4 MT & the same to be incorporated in the license. 6. Item no 6­ This is a component &  allowed under GN­4.     46

Case No.:1/22/80­ALC2/2010

Party Name:ABB LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00312/AM11/ RLA File :07/24/040/00158/AM11/ Lic.No/Date:0710073410 05.08.2010 Defer Date:03.05.2011 Decision :  The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s submission of comments. The case may be re­listed 03.05.2011.   47

Case No.:17/31/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00495/AM11/ RLA File :09/24/040/00169/AM11/ Lic.No/Date:0910043002 06.08.2010       48

Case No.:6/22/80­ALC2/2010

Party Name:ABB LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00317/AM11/ RLA File :07/24/040/00174/AM11/ Lic.No/Date:0710073560 11.08.2010 Defer Date:03.05.2011 submission of comments. The case may be re­listed 03.05.2011.   49

Case No.:6/24/80­ALC2/2010

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00378/AM11/ RLA File :04/24/040/00109/AM11/ Lic.No/Date:0410116180 11.08.2010 Defer Date:03.05.2011 Decision : The Committee noted that reminder has been sent to the firm on 03.03.2011 and decided to await the firm’s reply. The case may be re­listed on 03.05.2011.

50

Case No.:15/22/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00326/AM11/ RLA File :05/24/040/00175/AM11/ Lic.No/Date:0510270440 12.08.2010 Defer Date:03.05.2011 Decision :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  to  DIPP  for  examination  and comments. The case may be re­listed on 03.05.2011.   51

Case No.:38/27/80­ALC2/2010

Party Name:ULTRA ENGINEERS Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00435/AM11/ RLA File :31/24/040/00091/AM11/ Lic.No/Date:3110044331 13.08.2010 Defer Date:03.05.2011 Decision : The Committee deliberated the written comments of  DHI received vide their U.O. Note No. 3(125)/09­TSW(B)/139 dated 03.03.2011, it was decided by the Committee to advise the firm to appear before the NC to explain their case in person along their technical team and with full facts of the case. The case may be relisted on 03.05.2011.   52

Case No.:20/22/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00331/AM11/ RLA File :05/24/040/00176/AM11/ Lic.No/Date:0510270623 16.08.2010

Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the   1.           Net  empty  weights  of  81.54  MT,  163.08  MT,  366.04  MT  &  346.64    MT.  to  be specified with the quantities of export products at Sl. Nos. 1, 2, 3 & 4 respectively. 2.        Word “Relevant” to be prefixed with the description of import items at S.Nos.1, 2, 3, 9, 10, 11, 17 to 25,  32 & 40. 3.      Quantities of import items at S.Nos. 1, 9, 11, 18 &  21  to be allowed as  applied for   inclusive of 4.2 % wastage. 4.      Quantity of import item at S.No. 2 to be allowed as  43880 Mtrs.  (32982 Kgs.)  on net to net basis. 5.      Quantities of import item at S.No. 3  to be allowed as  applied for   inclusive of 4.7 % wastage. 6.      Quantity of import item at Sl. No.4 to be allowed as 2 Nos. ( 4294 Kgs.) on net to net basis. 7.      Quantities of import item from Sl. Nos. 5 to 8 to be allowed as applied for. 8.      Quantity of import item at S.No. 10 to be allowed as  87760 Mtrs.  (65964 Kgs.)  on net to net basis 9.      Quantity of import item at Sl. No. 12 to be allowed as 4 Nos.  ( 8588 Kgs.) on net to net basis.  10.  Quantities of import item from Sl. Nos. 13 to 16 to be allowed as applied for. 11.   Quantity of import item at S.No. 17  to be allowed 86.44 MT   inclusive of 5 % wastage 12.  Quantities of import items at S.Nos. 19 & 20  to be allowed 5.591 MT  & 7.72 MT respectively  inclusive of 5 % wastage 13.  Quantity of import item at S.No. 22 to be allowed as  34552 Mtrs.  (63826 Kgs.)  on net to net basis. 14.  Quantity of import item at S.No. 23 to be allowed as  16274 Mtrs.  (19792 Kgs.)  on net to net basis. 15.  Quantity of import item at S.No. 24 may be allowed as  17081 Mtrs.  (26694 Kgs.)  on net to net basis. 16.  Quantity of import item at S.No. 25 may be allowed as  17081 Mtrs.  (26678 Kgs.)  on net to net basis.

17.  Quantity of import item at Sl. No. 26 may be allowed as 6 Nos. on net to net basis. However, duty free weight of this item may be restricted as 21274 Kg inclusive of 53.3 % wastage after 20 % recovery. 18.  Quantity of import item at Sl. No. 27 may be allowed as 4 Nos. on net to net basis. However, duty free weight of this item may be restricted as 14072 Kg inclusive of 53.3 % wastage after 20 % recovery. 19.  Quantity of import item at Sl. No. 28 may be allowed as 10 Nos.          (15600 Kgs.  inclusive of 2 % wastage). 20.  Quantity of import item at S.No. 29 to be allowed as  20 Nos.  (6518 Kgs.)  on net to net basis. 21.  Quantity of import item at Sl. No. 30 may be allowed as 10 Nos.          (16100 Kgs.  inclusive of 2 % wastage). 22.  Quantity of import item at S.No. 31 to be allowed as  20 Nos.  (5864 Kgs.)  on net to net basis. 23.  Quantity of import item at S.No. 32 to be allowed as applied for i.e. 600 Kgs. on net to net basis. 24.  Quantities of import item from Sl. Nos. 33 to 36 to be allowed as applied for 25.  Quantity of import item at S.No. 37 to be allowed as  16 Nos.  (56550 Kgs.  inclusive of 2% wastage). 26.  Quantity of import item at S.No. 38 to be allowed as  16 Nos.  (80150 Kgs.  inclusive of 2% wastage). 27.  Quantity of import item at S.No. 39 to be allowed as  16 Nos.  (3500 Kgs.  inclusive of 2% wastage). 28.  Quantity of import item at S.No. 40 to be allowed as  100000 Mtrs.  (121241 Kgs.)  inclusive of 2% wastage. 29.  Quantity of import item from Sl. No.41 to be allowed as applied for. 30.  Quantity of import item at S.No. 42 to be allowed as  1800 Kgs. 31.  Import of components to be allowed with accountability clause.       53

Case No.:38/22/80­ALC2/2010

Party Name:ULTRA ENGINEERS Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00349/AM11/ RLA File :31/24/040/00077/AM11/ Lic.No/Date:3110044345 16.08.2010   Decision : The Committee noted the firm proposes to (i) export 3 nos of collar of weight 2197.2kg. for which it proposes to import incoloy bar of weight 3711.58 kg with value addition of 75%.  The recovery will not result in the reduction of import by whole number. As per written comments of DHI received their U.O. Note No.3(125)/09­TSW(B)/136  dated  03.03.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­         (i)                 Allow import as applied for & the quantity of import of 3 numbers of bar may be incorporated in the license.      54

Case No.:37/22/80­ALC2/2010

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00348/AM11/ RLA File :05/24/040/00181/AM11/ Lic.No/Date:0510270714 17.08.2010 Defer Date:03.05.2011

Decision  :  The  Committee  noted  that    the  firm  has  sought  time  vide  their  letter  dated  22.03.11  for submission of detailed information. The Committee, therefore, decided to defer the case.  The case may be re­listed on  03.05.2011.   55

Case No.:22/27/80­ALC2/2010

Party Name:MERIL LIFE SCIENCES PVT LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00419/AM11/ RLA File :52/24/040/00008/AM11/ Lic.No/Date:5210031621 17.08.2010 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  listed 03.05.2011.   56

Case No.:16/31/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00494/AM11/ RLA File :09/24/040/00176/AM11/ Lic.No/Date:0910043125 17.08.2010   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any     57

Case No.:34/31/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00512/AM11/ RLA File :31/21/040/00158/AM11/ Lic.No/Date:3110044407 19.08.2010 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s application  to DHI for examination and comments. The case may be re­listed on 03.05.2011.   58

Case No.:60/22/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00371/AM11/ RLA File :04/24/040/00111/AM11/ Lic.No/Date:0410116559 24.08.2010   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any     59

Case No.:40/31/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00518/AM11/ RLA File :09/24/040/00195/AM11/ Lic.No/Date:0910043236 24.08.2010 Defer Date:03.05.2011 information.  The  Committee,  therefore,  decided  to  remind  the  firm  finally  for  expediting  the  said information failing which  their case will be rejected without any further notice. The case may be re­ listed on 03.05.2011.

S no Item description Weight  per  piece  in gms Quantity  in numbers 1 Part  no­131073002  made  of poly propylene 1.82 11,512,000 60

Case No.:32/31/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00510/AM11/ RLA File :06/24/040/00028/AM11/ Lic.No/Date:0610018929 30.08.2010 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from Min. of  Defence are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed 03.05.2011.   61

Case No.:44/31/80­ALC2/2010

Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00522/AM11/ RLA File :31/24/040/00111/AM11/ Lic.No/Date:3110044526 30.08.2010 Defer Date:03.05.2011 Decision :On the recommendation of the representative of DHI present in the meeting, the Committee 03.05.2011   1.      Information in respect of Sl.No.11 of the Standard Deficiency Format. 2.      The firm has stated in the application the export product as “1 set” but as per drawing, it is 2 numbers. The firm may clarify the same. 3.      Value of indigenous inputs. 4.      The firm has stated in their reply that boiler drum is not part of the export product. But it has given the manufacturing process of the same in the application which needs clarification.   62

Case No.:20/31/80­ALC2/2010

Party Name:A RAYMOND FASTENERS INDIA PRIVATE LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00498/AM11/ RLA File :31/24/040/00073/AM11/ Lic.No/Date:3110044527 31.08.2010   Decision : As per written comments of DHI received their U.O. Note No.3(128)/2009­TSW(B)  dated  16.03.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export The export description & quantity of import may be amended as given below.              Allowed import of 21.6 MT of poly propylene granules with 3% wastage as applied by the firm.    

Case No.:18/24/80­ALC2/2010

Party Name:BGR ENERGY SYSTEMS LIMITED, Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00390/AM11/ RLA File :04/24/040/00132/AM11/ Lic.No/Date:0410116988 06.09.2010

63 Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the   1.      Total net empty weight of export products to be specified as  828 MT. 2.      Quantity of import item at Sl. No. 1 to be allowed as 69 Nos. on net to net basis with accountability clause and spare blades to be allowed as per policy for spares. 3.      Import item at Sl. No. 2 to be allowed as 69 Nos.  on net to net basis with accountability clause. 4.      Weight of 1510 Kgs. to be specified with the quantity of import item at Sl. No. 3 and the same to be allowed on net to net basis with accountability clause. 5.      Word “relevant” to be prefixed with the descriptions of import items at Sl. Nos. 4, 5, 6  & 8. 6.      Weights of 16120 Kgs. & 65.75 MT to be specified with the quantities of import items at Sl. No. 4 & 5 respectively and the same may be allowed on net to net basis. 7.       Quantity of import  item at Sl. No. 6 to be allowed as 28235 Kgs  inclusive of a wastage of 3 %. 8.      Weight of 17 MT. to be specified with the quantity of import item at Sl. No. 7 and the same to be allowed on net to net basis with accountability clause. 9.           Quantity of import  item at Sl. No. 8 to be allowed as applied for  i.e.  113300Kgs.  inclusive of a wastage of 3 %.     64

Case No.:31/31/80­ALC2/2010

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00509/AM11/ RLA File :31/24/040/00113/AM11/ Lic.No/Date:3110044584 06.09.2010       65

Case No.:60/31/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00538/AM11/ RLA File :53/24/040/00014/AM11/ Lic.No/Date:5310011297 06.09.2010 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  listed 03.05.2011.   66

Case No.:2/25/80­ALC2/2010

Party Name:NOV SARA INDIA PRIVATE LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00392/AM11/ RLA File :61/24/040/00047/AM11/ Lic.No/Date:6110000492 08.09.2010 Defer Date:03.05.2011 submission of comments. The case may be re­listed 03.05.2011.   

Case No.:5/25/80­ALC2/2010

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred

67 HQ File :01/80/050/00395/AM11/ RLA File :04/24/040/00136/AM11/ Lic.No/Date:0410117138 14.09.2010 Defer Date:03.05.2011 Decision  :  The  Committee  noted  that  the  firm  has  been  reminded  on  03.03.2011  to  furnish  the information.  The Committee decided to await the firm’s reply and to relist the case on 03.05.2011.   68

Case No.:39/31/80­ALC2/2010

Party Name:R.D.ENGINEERS (INDIA) PVT.LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00517/AM11/ RLA File :03/95/040/00480/AM11/ Lic.No/Date:0310592767 16.09.2010 Defer Date:03.05.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, the Committee 03.05.2011   1. Information in respect of Sl.No.4, 5 & 11 of the Standard Deficiency Format.   69

Case No.:33/27/80­ALC2/2010

Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00430/AM11/ RLA File :61/24/040/00049/AM11/ Lic.No/Date:6110000494 21.09.2010 Defer Date:03.05.2011 submission of comments. The case may be re­listed 03.05.2011.   70

Case No.:37/31/80­ALC2/2010

Party Name:SPRAY ENGINEERING DEVICES LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00515/AM11/ RLA File :22/24/040/00040/AM11/ Lic.No/Date:2210010434 21.09.2010   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the     1. Quantity of import  item at Sl. No. 1 to be allowed as 9524 Kgs  inclusive of a wastage of 5 %.     71

Case No.:47/31/80­ALC2/2010

Party Name:SIEMENS ROLLING STOCK PVT.LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00525/AM11/ RLA File :03/95/040/00491/AM11/ Lic.No/Date:0310593387 22.09.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 03.05.2011.   72

Case No.:15/31/80­ALC2/2010

Party Name:ENDRESS AND HAUSER (INDIA) AUTOMATION INSTRU­ Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00493/AM11/ RLA File :03/94/040/00556/AM11/ Lic.No/Date:0310593566 23.09.2010 Defer Date:03.05.2011

Decision :  The Committee observed that the comments called for from DIT are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed 03.05.2011.   73

Case No.:18/27/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00415/AM11/ RLA File :04/24/040/00168/AM11/ Lic.No/Date:0410117473 24.09.2010 Defer Date:03.05.2011 failing which  their case will be rejected without any further notice and to relist the case on 03.05.2011.   74

Case No.:31/27/80­ALC2/2010

Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00428/AM11/ RLA File :04/24/040/00175/AM11/ Lic.No/Date:0410117536 27.09.2010   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the   1.      Description of Export product to be modified as  “ Elevators              Model No. C­MONO­GREEN PW22/15­19 Quantity 12 Nos. & ,                                                          Model No.  C­ MONO­GREEN PW15/10­19 ­ Quantity 2 Nos.” 2.      Word “relevant”  to be prefixed with the description of import items at Sl. Nos. 50 to 53. 3.      Import items from S.No.1 to 53 to be allowed on net to net basis with accountability clause     75

Case No.:32/27/80­ALC2/2010

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00429/AM11/ RLA File :05/24/040/00230/AM11/ Lic.No/Date:0510273715 27.09.2010 Defer Date:03.05.2011 Decision :  The  Committee  noted  that    the  firm  has  sought  time  vide  their  letter  dated  23.03.11  for submission of  documents/information. The Committee, therefore, decided to defer the case.  The case may be re­listed on  03.05.2011.   76

Case No.:11/31/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00489/AM11/ RLA File :04/24/040/00173/AM11/ Lic.No/Date:0410117541 27.09.2010 Defer Date:03.05.2011 Decision : The Committee observed that the firm has not  submitted S.No. 11 of  SDL.   They have submitted the statement & not calculation. On the recommendation of the representative of DHI present in the meeting, the Committee decided to ask the firm to submit the calculation supported by drawing as per  of  Sl.No.11  of  the  Standard  Deficiency  Format  to  examine  their  case  and  to  re­list  the  case  on  03.05.2011.  

Case No.:12/31/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred

77 HQ File :01/80/050/00490/AM11/ RLA File :04/24/040/00172/AM11/ Lic.No/Date:0410117538 27.09.2010 Defer Date:03.05.2011 Decision : The Committee observed that the firm has  submitted the statement & not calculation. On the recommendation of the representative of DHI present in the meeting, the Committee decided to ask the firm  to  submit  the  calculation  supported  by  drawing  as  per  of  Sl.No.11  of  the  Standard  Deficiency Format to examine their case and to re­list the case on  03.05.2011.   78

Case No.:36/27/80­ALC2/2010

Party Name:THERMAX LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00433/AM11/ RLA File :31/24/040/00124/AM11/ Lic.No/Date:3110044780 28.09.2010 Defer Date:03.05.2011 Decision :  The Committee observed that value addition of the said advance authorization is 13.5% which is less than minimum prescribed of 15%.  The Committee decided to ask R.A. to clarify the same and to relist the case on 03.05.2011.   79

Case No.:46/31/80­ALC2/2010

Party Name:TEMA INDIA LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00524/AM11/ RLA File :03/95/040/00512/AM11/ Lic.No/Date:0310594253 28.09.2010 Defer Date:03.05.2011     80

Case No.:13/31/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00491/AM11/ RLA File :04/24/040/00182/AM11/ Lic.No/Date:0410117729 01.10.2010   Decision : As per written comments of DHI received vide their U.O. Note No.3(74)/10­TSW(B)/150  dated    11.03.2011,    The  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization as under:­ Import 1. Item no 1,2, 5 & 6­ These are components & may be allowed under GN­4. 2. Item no 3 ­ The firm needs 12 nos per set as per information in Appendix 11A. So import of 24 nos Ball Valves to be allowed under GN­4. 3. Item no 4­ The firm has stated that there will be no machining. The total import weight is 3040 Kg & the same may be incorporated in the license & allowed under GN­4.     81

Case No.:42/31/80­ALC2/2010

Party Name:STARION INDIA P.LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00520/AM11/ RLA File :31/24/040/00129/AM11/ Lic.No/Date:3110044900 06.10.2010 Defer Date:03.05.2011 information.  The  Committee,  therefore,  decided  to  remind  the  firm    finally  for  expediting  the  said information failing which  their case will be rejected without any further notice. The case may be re­ listed on 03.05.2011

82

Case No.:49/31/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00527/AM11/ RLA File :61/24/040/00055/AM11/ Lic.No/Date:6110000502 08.10.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study.  The   83

Case No.:43/29/80­ALC2/2010

Party Name:ORIENTAL CONTAINERS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00478/AM11/ RLA File :03/95/040/00525/AM11/ Lic.No/Date:0310596095 11.10.2010 Defer Date:03.05.2011 Decision :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  to  DIPP  for  examination  and comments. The case may be re­listed on 03.05.2011.   84

Case No.:9/31/80­ALC2/2010

Party Name:SAVAS ENGINEERING COMPANY PVT. LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00487/AM11/ RLA File :31/24/040/00137/AM11/ Lic.No/Date:3110045065 15.10.2010 Defer Date:03.05.2011 submission of comments. The case may be re­listed on 03.05.2011.   85

Case No.:18/31/80­ALC2/2010

Party Name:TEMA INDIA LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00496/AM11/ RLA File :03/95/040/00570/AM11/ Lic.No/Date:0310597405 18.10.2010       86

Case No.:10/31/80­ALC2/2010

Party Name:BIO ­ TECH VISION CARE PVT.LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00488/AM11/ RLA File :08/24/040/00205/AM11/ Lic.No/Date:0810093165 19.10.2010 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s application  to C&PC for examination and comments. The case may be re­listed on 03.05.2011.  

Case No.:17/41/81­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/81/050/00436/AM11/ RLA File :09/24/040/00315/AM11/ Lic.No/Date:0910044003 21.10.2010 Defer Date:03.05.2011

87 Decision : On the recommendation of the representative of DHI present in the meeting, the Committee 03.05.2011   1. Information in respect of Sl.No.4,5,9 & 11 of the Standard Deficiency Format export product wise.(Turbine & generator separately) 2. Use of each component proposed for import in the manufacture of export product 3. Indicate serial no of insulating material & their total cost. 4.  Net weight & gross weight of item no 34 of import..   88

Case No.:29/31/80­ALC2/2010

Party Name:SIEMENS ROLLING STOCK PVT.LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00507/AM11/ RLA File :03/95/040/00592/AM11/ Lic.No/Date:0310598354 22.10.2010 Defer Date:03.05.2011 Decision :  The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 03.05.2011.   89

Case No.:30/31/80­ALC2/2010

Party Name:METSO POWER INDIA PRIVATE LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00508/AM11/ RLA File :04/24/040/00195/AM11/ Lic.No/Date:0410118269 25.10.2010       90

Case No.:45/31/80­ALC2/2010

Party Name:ARMOR PLAST LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00523/AM11/ RLA File :07/24/040/00289/AM11/ Lic.No/Date:0710075019 25.10.2010 Defer Date:03.05.2011 failing which  their case will be rejected without any further notice and to relist the case on 03.05.2011.  

Case No.:52/31/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00530/AM11/ RLA File :03/95/040/00573/AM11/ Lic.No/Date:0310598942 27.10.2010

91 Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the   1.      Net empty weight of 344 MT to be specified with the quantity of export product. 2.      Word “Relevant”  to be prefixed with the descriptions of import items from Sl. No. 1 to 6. 3.      Quantities of import items at Sl. No.1, 3, 4 & 5 and the same to be allowed as 1.03 Kgs./Kg content in the export product as claimed by the firm. 4.      Quantity of import item at Sl. No.2 and the same to be allowed as 59167 Kgs. inclusive of 35.5 % wastage after 1/3rd recovery. 5.      Quantity of import item at Sl. No. 6 to be allowed as 470 Mtrs.(7010 Kgs.). inclusive of 2 % wastage. 6.      Weights of 52.532 MT, 8.2 MT, 1 MT, 5.13MT, 0.1 MT & 5.2 MT may be specified with the quantities of import items at Sl. Nos. 7, 8, 9, 10, 11 & 12 respectively and the same to be allowed on net to net basis. 7.      Import item at Sl. No. 9   to be supplied with the export products. 8.      Quantities of import items at Sl. Nos. 13 to 17 are welding consumables which to be allowed as applied for. 9.      Import of components to be allowed with accountability clause     92

Case No.:54/31/80­ALC2/2010

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00532/AM11/ RLA File :03/95/040/00607/AM11/ Lic.No/Date:0310599033 27.10.2010   Decision :  The  Committee  deliberated  the  written  comments  of  DHI  received  vide  their  U.O.  Note No.3(73)/09­TSW(B)/117  dated  15.02.2011. On the request of the representative of the Ministry of Steel and after discussion, the Committee decided to reduce the entitlement of the firm to 8271 kg. the   Export item – 8 units of COLLAR high flow 8 EWR of weight 4982.64 kg Import­ 8 units round bar of 8.5 inches dia of weight 9120  kg. The firm has submitted calculation of requirement suppoted by drawing. Firm’s entitlement comes to 8271 kg resulting in 7.2 units of round bar with net wastage of 66 % & 20% recovery. Allowed import of 8 number of bars of weight 9120  kg. as applied for.  The firm entitlement is approved to the extent of 8271 kg. Only.     93

Case No.:8/41/81­ALC2/2010

Party Name:AUTO COMP INDIA PVT. LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/81/050/00427/AM11/ RLA File :31/24/040/00130/AM11/ Lic.No/Date:3110045269 28.10.2010 Defer Date:19.04.2011 Decision : The Committee received written comments of DHI received vide their U.O. Note 3(77)/10­ TSW(B)/574    dated    02.12.2010,  and  decided  to  examine  the  case  on  file  in  respect  of  the  subject advance  authorization  on  repeat  basis  as  per  Advance  authorization  License  No.  3110043464  dated 02.06.2010 and to re­list the case on 19.04.2011.  

Case No.:56/31/80­ALC2/2010

Party Name:SPIG COOLING TOWERS INDIA PVT LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00534/AM11/ RLA File :03/95/040/00604/AM11/ Lic.No/Date:0310599828 02.11.2010

94 Decision : The Committee decided to reject the case on the ground that the firm did not furnish any     95

Case No.:59/31/80­ALC2/2010

Party Name:TEMA INDIA LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00537/AM11/ RLA File :03/95/040/00626/AM11/ Lic.No/Date:0310600063 03.11.2010       96

Case No.:61/31/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Closed HQ File :01/80/050/00539/AM11/ RLA File :07/24/040/00305/AM11/ Lic.No/Date:0710075238 04.11.2010   Decision : The firm has informed vide their letter dated 5th January, 2011 that they have surrendered the subject Advance authorization to the R.A., Bangalore. The Committee therefore decided to close the case on the part of NC.   The Regional Authority may take note of the NC decision for information.   97

Case No.:62/31/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Closed HQ File :01/80/050/00540/AM11/ RLA File :07/24/040/00304/AM11/ Lic.No/Date:0710075239 04.11.2010   Decision : The firm has informed vide their letter dated 5th January, 2011 that they have surrendered the subject Advance authorization to the R.A., Bangalore. The Committee therefore decided to close the case on the part of NC.   The Regional Authority may take note of the NC decision for information.   98

Case No.:63/31/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Closed HQ File :01/80/050/00541/AM11/ RLA File :07/24/040/00306/AM11/ Lic.No/Date:0710075240 04.11.2010   Decision : The firm has informed vide their letter dated 5th January, 2011 that they have surrendered the subject Advance authorization to the R.A., Bangalore. The Committee therefore decided to close the case on the part of NC.   The Regional Authority may take note of the NC decision for information.

99

Case No.:7/37/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00745/AM11/ RLA File :09/24/040/00343/AM11/ Lic.No/Date:0910044474 26.11.2010 Defer Date:03.05.2011 03.05.2011   1.      Information in respect of Sl.No.4,5,9 & 11 of the Standard Deficiency Format SDL export product wise.( Wet gas compressors with steam turbine & auxiliaries  separately) 2.            Weight  of  each  export  product  separately  (Wet  gas  compressors  with  steam  turbine separately) with details of Auxiliaries & its weight separately. 3.      Net weight & gross weight of different casting & forgings. 4.      Use of each component proposed for import in the manufacture of export product.   100

Case No.:19/37/80­ALC2/2010

Party Name:PSK ENGINEERING PVT LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00757/AM11/ RLA File :07/24/040/00325/AM11/ Lic.No/Date:0710075814 02.12.2010   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­          Word “relevant”  to be prefixed with the description of import item and its quantity may be allowed as 3371 Kgs inclusive of 21.6 % wastage after 1/3rd recovery     101

Case No.:5/37/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00743/AM11/ RLA File :09/24/040/00370/AM11/ Lic.No/Date:0910044582 06.12.2010 Defer Date:03.05.2011 failing which  their case will be rejected without any further notice and to relist the case on 03.05.2011.   102

Case No.:6/37/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00744/AM11/ RLA File :09/24/040/00384/AM11/ Lic.No/Date:0910044581 06.12.2010 Defer Date:03.05.2011 failing which  their case will be rejected without any further notice and to relist the case on 03.05.2011.   103

Case No.:8/37/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00746/AM11/ RLA File :09/24/040/00363/AM11/ Lic.No/Date:0910044578 06.12.2010 Defer Date:03.05.2011

failing which  their case will be rejected without any further notice and to relist the case on 03.05.2011.   104

Case No.:10/37/80­ALC2/2010

Party Name:CMI FPE LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00748/AM11/ RLA File :03/94/040/00715/AM11/ Lic.No/Date:0310604608 06.12.2010 Defer Date:03.05.2011   105

Case No.:1/34/80­ALC2/2010

Party Name:POLY MEDICURE LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00627/AM11/ RLA File :05/24/040/00310/AM11/ Lic.No/Date:0510279357 14.12.2010 Defer Date:03.05.2011 Decision :The Committee observed that the comments called for from C&PC are yet to be received.  listed 03.05.2011.   106

Case No.:9/37/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00747/AM11/ RLA File :11/24/040/00019/AM11/ Lic.No/Date:1110023814 24.12.2010 Defer Date:03.05.2011 failing which  their case will be rejected without any further notice and to relist the case on 03.05.2011.   107

Case No.:4/37/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00742/AM11/ RLA File :07/24/040/00388/AM11/ Lic.No/Date:0710076497 05.01.2011   Decision : The Committee observed that R.A., Bangalore has informed that the firm has requested vide their letter dated 11.03.2011 for inclusion of additional import items, as the items declared as components and claimed with “Nil” wastage. Firm request has been considered on net­to­net basis with accountability clause as per Sl. No. 4 general note for Engg. Products, Handbook of Procedures (Vol.II)  2009­2014  (Copy  of  amendment  sheet  No.  1  dated  15.03.2011  forwarded  to  NC­I).    The Committee, therefore, decided to approve the case on the part of NC­I.   The Regional Authority and DIT may please be informed accordingly.   108

Case No.:30/37/80­ALC2/2010

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00768/AM11/ RLA File :06/24/040/00050/AM11/ Lic.No/Date:0610020523 11.01.2011 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  listed 03.05.2011.

109

Case No.:32/37/80­ALC2/2010

Party Name:WOLFRA­ TECH PVT LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00770/AM11/ RLA File :07/24/040/00291/AM11/ Lic.No/Date:0710076697 12.01.2011   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the Committee decided  that after taking clue from SION C­1317, quantities of import items at Sl. No. 1 & 2  are allowed as applied for i.e. 3300 Kgs. and 300 Kgs. respectively in respect of the subject advance authorization.     110

Case No.:1/37/80­ALC2/2010

Party Name:ACCURATE INDUSTRIAL CONTROLS PVT.LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00739/AM11/ RLA File :31/24/040/00225/AM11/ Lic.No/Date:3110046461 17.01.2011 Defer Date:03.05.2011   111

Case No.:2/37/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00740/AM11/ RLA File :05/23/040/00293/AM11/ Lic.No/Date:0510281598 17.01.2011 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study.  The Committee, therefore, decided to defer the case and to relist the case on 03.05.2011.   112

Case No.:12/37/80­ALC2/2010

Party Name:HIMSON ENGINEERING PVT. LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00750/AM11/ RLA File :52/24/040/00043/AM11/ Lic.No/Date:5210033513 17.01.2011 Defer Date:03.05.2011 Decision : The Committee noted the information furnished by the Office of Jt.D.GFT, Surat vide their letter dated 04.05.2011 and observed that the information the import item 93 to 98 is not clear.  The Committee therefore decided to clarify the mater from R.A. and the firm.  The case may be relisted on 03.05.2011.   113

Case No.:3/37/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00741/AM11/ RLA File :05/24/040/00341/AM11/ Lic.No/Date:0510281781 18.01.2011 Defer Date:03.05.2011 Decision : On the recommendation of the representative DIPP present in the meeting, the Committee 03.05.2011   1. Information in respect of Sl.No.3,4,5 & 11 of the Standard Deficiency Format for export product wise  

Case No.:13/37/80­ALC2/2010

Party Name:BOSCH LIMITED, Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred

114 HQ File :01/80/050/00751/AM11/ RLA File :07/24/040/00417/AM11/ Lic.No/Date:0710076813 19.01.2011 Defer Date:03.05.2011 Decision :The representative of the DHI informed the Committee that the case is under study.  The   115

Case No.:14/37/80­ALC2/2010

Party Name:PENNWALT LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00752/AM11/ RLA File :03/95/040/00763/AM11/ Lic.No/Date:0310611983 20.01.2011   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.      Words “V­Notch Chlorinators” to be prefixed with the description of import item at Sl. No. 1. 2.      Import items  from Sl. No 1 to 7 to be allowed as per GN­4 for Engineering Products.     116

Case No.:15/37/80­ALC2/2010

Party Name:VEE KAY VIKRAM & CO Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00753/AM11/ RLA File :08/24/040/00131/AM11/ Lic.No/Date:0810095664 21.01.2011 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  listed 03.05.2011.   117

Case No.:16/37/80­ALC2/2010

Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00754/AM11/ RLA File :05/24/040/00345/AM11/ Lic.No/Date:0510282154 21.01.2011 Defer Date:03.05.2011 03.05.2011   1.      Information in respect of Sl. No. 9 of the Standard Deficiency Format. 2.      Break up import item 1 given in sets to numbers.   118

Case No.:18/37/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00756/AM11/ RLA File :05/24/040/00347/AM11/ Lic.No/Date:0510282244 24.01.2011 Defer Date:03.05.2011 Decision  :  On  the  recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  the Committee decided to call for the following information/clarification from the firm  and to re­list the case on 03.05.2011   1. Information in respect of Sl.No.3,4,5,11 & 13 of the Standard Deficiency Format.

119

Case No.:20/37/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00758/AM11/ RLA File :53/24/040/00026/AM11/ Lic.No/Date:5310012092 24.01.2011 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  listed 03.05.2011.   120

Case No.:21/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00759/AM11/ RLA File :09/24/040/00478/AM11/ Lic.No/Date:0910045222 25.01.2011 Defer Date:03.05.2011 03.05.2011   1. Information in respect of Sl.No 11 of the Standard Deficiency Format.   121

Case No.:22/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00760/AM11/ RLA File :09/24/040/00477/AM11/ Lic.No/Date:0910045223 25.01.2011 Defer Date:03.05.2011 03.05.2011   1. Information in respect of Sl.No. 11 of the Standard Deficiency Format.   122

Case No.:23/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00761/AM11/ RLA File :09/24/040/00476/AM11/ Lic.No/Date:0910045224 25.01.2011 Defer Date:03.05.2011 03.05.2011   1.      Use of item .No. 3 to 5 of  import. 2.      Information in respect of Sl.No. 11 of the Standard Deficiency Format.   123

Case No.:24/37/80­ALC2/2010

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00762/AM11/ RLA File :07/24/040/00423/AM11/ Lic.No/Date:0710076901 25.01.2011 Defer Date:03.05.2011 failing which  their case will be rejected without any further notice and to relist the case on 03.05.2011.

124

Case No.:25/37/80­ALC2/2010

Party Name:THERMAX LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00763/AM11/ RLA File :31/24/040/00226/AM11/ Lic.No/Date:3110046595 25.01.2011 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study.  The   125

Case No.:26/37/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00764/AM11/ RLA File :31/21/040/00334/AM11/ Lic.No/Date:3110046646 28.01.2011 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s application to DHI for information and necessary action.  The case may be relisted on 03.05.2011.   126

Case No.:28/37/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00766/AM11/ RLA File :31/21/040/00331/AM11/ Lic.No/Date:3110046679 28.01.2011 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s application to DHI for information and necessary action.  The case may be relisted on 03.05.2011.   127

Case No.:27/37/80­ALC2/2010

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00765/AM11/ RLA File :03/94/040/00933/AM11/ Lic.No/Date:0310613264 31.01.2011 Defer Date:03.05.2011 Decision  :  On  the  recommendation  of  the  representative  of    DIPP  present  in  the  meeting,  the Committee decided to call for the following information/clarification from the firm  and to re­list the case on 03.05.2011   1.      Information in respect of Sl.No.3,4,5, 11 & 13 of the Standard Deficiency Format. 2.      Quantities of import items at Sl. No. 1, 2, 3 & 4  in Nos. also in addition to their weight.   128

Case No.:29/37/80­ALC2/2010

Party Name:G.R.ENGINEERING PRIVATE LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00767/AM11/ RLA File :03/94/040/00926/AM11/ Lic.No/Date:0310613280 31.01.2011   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1. Net Empty Export weights of 141.5 MT & 154.974 MT to be specified with the quantities of export products at S.No.1 & 2 respectively. 2. Word “Relevant” to be prefixed with the description of import item at Sl. No.1. 3. Quantity of import item at S.No.1 to be allowed as 1.05 Kgs/ Kg. content in the export products. 4. Weight of “10.658 MT ” to be added with the quantity of import item at Sl.No.2 and quantity of this item to be allowed on net to net basis.  

129

Case No.:1/40/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00851/AM11/ RLA File :53/24/040/00028/AM11/ Lic.No/Date:5310012323 22.02.2011 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  listed 03.05.2011.   130

Case No.:2/40/80­ALC2/2010

Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00852/AM11/ RLA File :05/24/040/00388/AM11/ Lic.No/Date:0510284537 23.02.2011   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization on repeat basis as per Advance Authorization No. 0510265105 dated 01.06.2010 ratified in Norms Committee Meeting No. 37/11 dated 08.02.2011 as under:­   1.      Net weight of export product may be specified as 575.7 Kgs. 2.      Quantity of import item may be allowed as applied for i.e. 2522 Kgs. inclusive of 338% wastage after taking 6% recovery from scrap.     131

Case No.:3/40/80­ALC2/2010

Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00853/AM11/ RLA File :05/24/040/00385/AM11/ Lic.No/Date:0510284538 23.02.2011   Decision  :  The  Committee  noted  that  R.A.  vide  their    letter  No.  05/24/040/385/AM 11/ZALC/CLA/775978 dated 11.03.2011has informed the subject advance authorization was issued to the firm as per para 4.7.1 of H.B.P.­ 2009­20014 on repeat basis as per decision of Norms Committee in Meeting No. 13/80 dated 29.06.2010; 3.9.1 of Policy Circular No. 20 dated 05.12.2007 and 3.7 of Policy Circular No. 20 dated 05.12.2007.  Therefore,  R.A. has not sent the application of the firm.  The Committee accordingly decided to close the case on the part of NC.   The Regional Authority may take note of the NC decision for information.   132

Case No.:5/40/80­ALC2/2010

Party Name:SAGE METALS LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00855/AM11/ RLA File :05/24/040/00371/AM11/ Lic.No/Date:0510284565 23.02.2011 Defer Date:03.05.2011 Decision  :  On  the  recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  the Committee decided to call for the following information/clarification from the firm  and to re­list the case on 03.05.2011   1.            Information  in  respect  of  Sl.No.3,  5  &  11  of  the  Standard  Deficiency  Format,  pump accessories wise. 2.      Name of pump accessories and their respective quantities  in Nos. also in addition to their weights. 3.      Specific description of import item at Sl. No 5 and its quantity  in Nos. also in addition to its weight.

133

Case No.:6/40/80­ALC2/2010

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00856/AM11/ RLA File :03/95/040/00943/AM11/ Lic.No/Date:0310617569 23.02.2011 Defer Date:03.05.2011   134

Case No.:4/40/80­ALC2/2010

Party Name:WOLFRA­ TECH PVT LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00854/AM11/ RLA File :07/24/040/00464/AM11/ Lic.No/Date:0710077564 24.02.2011 Defer Date:03.05.2011   135

Case No.:7/40/80­ALC2/2010

Party Name:STANDARD RADIATORS PVT.LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00857/AM11/ RLA File :34/24/040/00306/AM11/ Lic.No/Date:3410029421 24.02.2011 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s application to DHI for information and necessary action.  The case may be relisted on 03.05.2011.   136

Case No.:8/40/80­ALC2/2010

Party Name:LLOYD ELECTRIC & ENGG. LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00858/AM11/ RLA File :05/23/040/00335/AM11/ Lic.No/Date:0510284587 24.02.2011 Defer Date:03.05.2011 Decision :On the recommendation of the representative of DIPP present in the meeting, the Committee 03.05.2011   1.      Information in respect of Sl.No.4,5 & 11 of the Standard Deficiency Format                   for each capacity of  Split Air­Conditioners.   2.      Quantities of Split Air­Conditioners, capacity wise.   137

Case No.:9/40/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00859/AM11/ RLA File :03/95/040/00889/AM11/ Lic.No/Date:0310617962 25.02.2011 Defer Date:03.05.2011   138

Case No.:10/40/80­ALC2/2010

Party Name:GL&V INDIA PRIVATE LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00860/AM11/ RLA File :31/24/040/00258/AM11/ Lic.No/Date:3110047111 25.02.2011 Defer Date:03.05.2011

Decision : The representative of the DC(MSME) informed the Committee that they received the firm’s application  on  14.03.2011  and  case  is  under  study.  The  Committee,  therefore,  decided  to  defer  the consideration and to relist the case on 03.05.2011.   139

Case No.:11/40/80­ALC2/2010

Party Name:INGERSOLL­RAND (INDIA) LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00861/AM11/ RLA File :03/94/040/01050/AM11/ Lic.No/Date:0310618072 25.02.2011 Defer Date:03.05.2011   140

Case No.:12/40/80­ALC2/2010

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00862/AM11/ RLA File :31/24/040/00265/AM11/ Lic.No/Date:3110047120 28.02.2011 Defer Date:03.05.2011 Decision : The Committee noted that the firm has not given proper reply. On the recommendation of the representative of DIPP present in the meeting, the Committee  decided  to  call  for  the  following information/clarification from the firm  and to re­list the case on 03.05.2011   1.      Information in respect of Sl.No.11 of the Standard Deficiency Format. 2.      Blank size for each export product supported by size of the export product. 3.      Sheet lay out diagram indicating the wastage during blanking, export product­wise.   141

Case No.:13/40/80­ALC2/2010

Party Name:XYTEL INDIA PVT.LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00863/AM11/ RLA File :31/24/040/00256/AM11/ Lic.No/Date:3110047133 28.02.2011 Defer Date:3.05.2011 Decision : The representative of the DIPP informed the Committee that the case is under study.  The   142

Case No.:14/40/80­ALC2/2010

Party Name:ANDRITZ HYDRO PRIVATE LIMITED, Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00864/AM11/ RLA File :05/23/040/00340/AM11/ Lic.No/Date:0510284704 01.03.2011   Decision : The representative of  DHI informed the Committee that the firm has submitted request for ratification of norms for export of 3X40 MW Rangat Hydro project. The firm has informed at appendix 11A of the application that the wastage is it is “under design & will furnish later”. Since the design is not complete & the wastage is not final, the request is premature.  The Committee decided to reject the case.     

Case No.:15/40/80­ALC2/2010

Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00865/AM11/ RLA File :05/24/040/00408/AM11/ Lic.No/Date:0510284722 01.03.2011

143 Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.      Net weight of export product may be specified as 461.7 Kgs. 2.      Quantity of import item may be allowed as 243 Nos on net to net basis. However, the weight of import item may be allowed as 1307 Kgs inclusive of 183 % wastage after taking 6 % recovery from scrap     144

Case No.:16/40/80­ALC2/2010

Party Name:JAY NIKKI INDUSTRIES LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00866/AM11/ RLA File :05/23/040/00338/AM11/ Lic.No/Date:0510284736 01.03.2011 Defer Date:3.05.2011 Decision  :    The  Committee  noted  that  the  firm’s  application  has  been  sent  to  DC(MSME)  on 08.03.2011.  The Committee also decided to forward the firm’s application to DIPP for examination and comments.  The case may be relisted on 03.05.2011.   145

Case No.:17/40/80­ALC2/2010

Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00867/AM11/ RLA File :05/24/040/00401/AM11/ Lic.No/Date:0510284820 01.03.2011 Defer Date:3.05.2011 Decision : The Committee decided to forward the firm’s application to C&PC for examination and comments.  The case may be relisted on 03.05.2011.   146

Case No.:20/40/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00870/AM11/ RLA File :61/21/040/00002/AM11/ Lic.No/Date:6110000573 01.03.2011 Defer Date:3.05.2011 decided to call for the following information/clarification  from  the  firm    and  to  re­list  the  case  on 03.05.2011   1.      Information in respect of Sl.No.4,5,9  & 11 of the Standard Deficiency     Format export product wise. 2.      Weight & length of different types of pipes proposed for import. 3.      Identification of insulating material proposed for import & their total price 4.      Input Weight of each casting/ forging and corresponding finished weight. (Item wise). 5.      Use of each component proposed for import in the manufacture of export product.   147

Case No.:22/40/80­ALC2/2010

Party Name:ACCURATE INDUSTRIAL CONTROLS PVT.LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00872/AM11/ RLA File :31/24/040/00272/AM11/ Lic.No/Date:3110047155 01.03.2011 Defer Date:3.05.2011 Decision  :  On  the  recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  the Committee decided to call for the following information/clarification from the firm  and to re­list the case on 03.05.2011   1.      Information in respect of Sl.No.6,8 & 9 of the Standard Deficiency Format. 2.      Capacity of  Export product namely Industrial Refrigerator.

148

Case No.:23/40/80­ALC2/2010

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00873/AM11/ RLA File :05/23/040/00339/AM11/ Lic.No/Date:0510284857 01.03.2011   Decision  :  The  Committee  noted  that  firm’s  application  has  not  been  received  so  far.    However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee therefore presumed the subject Authorisation may have been issued under GN­4. The Committee accordingly decided to revert back the case to the concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dated 05.12.2007.   149

Case No.:19/40/80­ALC2/2010

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00869/AM11/ RLA File :03/95/040/00963/AM11/ Lic.No/Date:0310619026 02.03.2011 Defer Date:3.05.2011   150

Case No.:18/40/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00868/AM11/ RLA File :04/24/040/00316/AM11/ Lic.No/Date:0410122233 03.03.2011 Defer Date:3.05.2011 decided to call for the following information/clarification  from  the  firm    and  to  re­list  the  case  on 03.05.2011   1.      Information in respect of Sl.No.5 & 11 of the Standard Deficiency Format of each export product separately. 2.      Quantity of seamless and welded pipes separately both in weight and length for each type of steel i.e. CS, AS and SS.   151

Case No.:21/40/80­ALC2/2010

Party Name:BAUER KOMPRESSOREN INDIA PRIVATE LIMITED., Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00871/AM11/ RLA File :31/24/040/00264/AM11/ Lic.No/Date:3110047187 03.03.2011 Defer Date:3.05.2011 Decision : The Committee noted that the firm application has been sent to DHI on 17.03.2011. The Committee also decided to forward a copy of firm’s application to DIPP for information and necessary action.  The case may be relisted on 03.05.2011.   152

Case No.:25/40/80­ALC2/2010

Party Name:NOVA INTERGRATED SYSTEMS LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00875/AM11/ RLA File :05/24/040/00374/AM11/ Lic.No/Date:0510285051 03.03.2011 Defer Date:3.05.2011 Decision : The Committee noted that the firm application has been sent to DC(MSME) & DIT on 23.03.2011  for  examination  and  comments.  The  Committee,  therefore  decided  to  await  their comments.  The case may be relisted on 03.05.2011.

153

Case No.:24/40/80­ALC2/2010

Party Name:CEEYES METAL ENGINEERING P LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00874/AM11/ RLA File :04/24/040/00320/AM11/ Lic.No/Date:0410122293 07.03.2011   Decision  :  The  Committee  noted  that  firm’s  application  has  not  been  received  so  far.    However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee therefore presumed the subject Authorisation may have been issued under GN­4. The Committee accordingly decided to revert back the case to the concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dated 05.12.2007.   154

Case No.:26/40/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00876/AM11/ RLA File :09/24/040/00553/AM11/ Lic.No/Date:0910045827 07.03.2011 Defer Date:3.05.2011   155

Case No.:27/40/80­ALC2/2010

Party Name:ALFA LAVAL (INDIA)LIMITED Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00877/AM11/ RLA File :31/21/040/00371/AM11/ Lic.No/Date:3110047239 07.03.2011 Defer Date:3.05.2011   156

Case No.:28/40/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00878/AM11/ RLA File :05/23/040/00348/AM11/ Lic.No/Date:0510285314 08.03.2011 Defer Date:3.05.2011 Decision :  The representative of the DHI informed the Committee that the case is under study.  The   157

Case No.:29/40/80­ALC2/2010

Party Name:POLY MEDICURE LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00879/AM11/ RLA File :05/24/040/00406/AM11/ Lic.No/Date:0510285427 08.03.2011 Defer Date:3.05.2011 Decision : The Committee noted that the firm’s application has been sent to  C&PC on 23.03.2011.  The  Committee,  therefore,  decided  to  await  the  comments  of  C&PC.  The  case  may  be  re­listed 03.05.2011.   158

Case No.:30/40/80­ALC2/2010

Party Name:XYTEL INDIA PVT.LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00880/AM11/ RLA File :31/24/040/00269/AM11/ Lic.No/Date:3110047258 08.03.2011 Defer Date:3.05.2011

  159

Case No.:31/40/80­ALC2/2010

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00881/AM11/ RLA File :03/95/040/00926/AM11/ Lic.No/Date:0310620641 10.03.2011 Defer Date:3.05.2011   160

Case No.:32/40/80­ALC2/2010

Party Name:ATHERM THERMAL SOLUTIONS INDIA PVT LTD Meet No/Date:40/80­ ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00882/AM11/ RLA File :07/24/040/00463/AM11/ Lic.No/Date:0710077971 10.03.2011 Defer Date:3.05.2011 S.No.34

Case No.  A ­ 09

M/s.  Jhagadia  Copper LTd.,   HQ F.No.01/80/162/00542/AM10/DES.I Lic.No. & Date Meeting No.40/11  RA.F.No.34/24/039/00001/AM10 3410024795 dt.29.07.2009 Date: 22.03.2011 Ratification of  norms.   The Committee observed that the comments called for from Ministry of Mines are yet to be received.  The Committee,  therefore,  decided  to  remind  them  for  expediting  their  comments.  The  case  may  be  re­listed 03.05.2011.   S.No.35

Case No.  A ­ 14

M/s. Larson & Toubro Ltd.,   HQ F.No.01/80/162/00522/AM11/DES.I Lic.No. & Date Meeting No.40/11  RA.F.No.03/95/039/00004/AM10 0310541346 dt.12.10.2009 Date: 22.03.2011 Ratification of  norms   The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The  Committee, therefore, decided to defer the consideration and to relist the case on 03.05.2011.   S. No.490

Case No.  A/R­40

M/s.  Bharat  Heavy Electricals Ltd., Haridwar HQ F.No.01/80/162/00539/AM09/DES.I Lic.No. & Date Meeting No.40/11 RA F.No.61/24/040/00036/AM09 6110000254 dt.05.12.2008   Date: 22.03.2011 Ratification of norms   The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The  Committee,   S.No.491

Case No.  A/R­47

M/s. Thermax Ltd., HQ F.No.01/80/050/00682/AM08/DES­I Lic.No. & Date Meeting No.40/11 RA F.No.05/24/040/00393/AM08 3110033083 dt.11.03.2008   Date: 22.03.2011   The  Committee  deliberated  the  written  comments  of  DHI  received    vide  their  U.O.  Note  No.3(14)/10­ TSW(B)/48 & 114  dated 18.01.2011 & 15.02.2011 and decided to ratify the norms in respect of the subject advance authorization as under:­

Export   The export weight 316.692 MT incorporated in the license.   Import 1. Item no 1­ Allowed 51322 kg of length 16482 meters without any wastage. 2. Item no 2­ Allowed 57000 kg of length 542 meters without any wastage. 3. Item no 3 to 5­ These are components & allowed under GN­4.     S.No.492

Case No.  A/R­117

M/s. Thermax Ltd., HQ F.No.01/80/050/01034/AM09/DES­I Lic.No. & Date Meeting No.40/11 RA F.No.31/24/040/000143/AM09 3110035317 dt.09.09.2008 Date: 22.03.2011   The Committee decided to forward a copy of firm’s reply to DHI for examination and comments.  The case may be re­listed on 03.05.2011.   Sl.No.493

Case No.A/R­157

M/s.  Bharat  Heavy Electricals  LTd., Trichirapalli HQ F.No.01/80/050/00498/AM10/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.04/24/040/00143/AM10 0410108784 dt.17.11.2009 Date: 22.03.2011   As  per  written  comments  of  DHI,  vide  their  U.O.  Note  No.3(29)/09­TSW(B)/99  dated  10.02.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization with an amendment to Import item No 40 (which is to be allowed) as under:­   Export The description of export product may be amended & their weight incorporated as given below. 1.        ESP­ 8 numbers­ 19,132MT 2.        APH­ 8 numbers­2960 MT 3.        FAN­16 numbers­810 MT 4.        Dampers & gates­ ­1264 MT Import 1.        Item no 1­ Allowed at 2000 MT with 3% wastage as applied for. 2.        Item no 2­ The firm has reduced the requirement of the item. The item to be allowed at 985 MT with 5% wastage. 3.        Item no 3­ The firm has sought import of 20 MT. But during application it had applied for 14 MT. The same may be allowed. 4.        Item no 4­ The firm has reduced the requirement of the item. The item may be allowed at 1244 MT with negligible wastage. 5.        Item no 5­The description may be amended. SS wires may be allowed at 67.88 MT with negligible wastage.  Allow import of 28 MT of SS rounds with 10 % wastage. 6.        Item no 40­ To be allowed subject to the condition that they will be exported. 7.        All other items up to item no 58 are either components or spares. Components may be allowed under Gn­4 & spares as per spares policy.     Sl.No.494

Case No.A/R­158

M/s.  Bharat  Heavy Electricals LTd., Bhopal HQ F.No.01/80/050/00167/AM06/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.11/24/040/00011/AM06 1110010869 dt.11.05.2005 Date: 22.03.2011   The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The  Committee,   Sl.No.495

Case No.A/R­159

M/s.  Bharat  Heavy Electricals LTd., Ranipet HQ F.No.01/80/050/00283/AM08/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.04/24/040/00204/AM08 0410091231 dt.27.09.2007 Date: 22.03.2011   As  per  written  comments  of  DHI,  vide  their  U.O.  Note  No.3(29)/09­TSW(B)/97  dated  10.02.2011,  the   Export The description of export product may be amended to “Boiler Auxiliaries consisting of ESP, APH, FAN­, Dampers & gates” & total weight is 1895 MT & the same may be incorporated in the license. Import 1.        Item no 1­  Allowed at 5 MT with 1% wastage as applied for. 2.        Item no 2­ Allowed at 100 MT with 1.22 % wastage as applied for. 3.        Item no 3 to 7­ These are components & allowed under GN­4.     Sl.No.496

Case No.A/R­160

M/s.  Thermal  Systems (Hyderabad) Pvt. LTd., HQ F.No.01/80/050/00137/AM10/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.09/24/040/00063/AM09 0910038107 dt.03.06.2007 Date: 22.03.2011   The Committee noted that the firm has replied vide letter of dated 01­02­11 enclosing letters of dated 04­02­ 10, 19­05­10. The reply is incomplete & needs clarifications.  On the recommendation of the representative of DHI present in the meeting, the Committee decided to call for the following information/clarification from the firm  and to re­list the case on 03.05.2011   1. The weight of the export product is said to be 224 MT in the material balancing sheet now submitted, but in the drawing submitted it is stated to be 71MT which needs clarification. The firm may be asked to submit legible drawing highlighting the weight & correlating it with the export weight. 2. The firm stated in the letter of dated 01­02­10 that items like “ Shell, drum, tube sheet &n dished end” are not required in the water tube boiler. But they have mentioned in their letter of dated 19­05­10 that these will be procured indigenously. Also in the drawing submitted, steel drum is there. The firm is to clarify the same. 3. The firm may be asked to submit Sl no 11 of SDL supported by drawing along with above clarifications to examine their request. 4. As per the copy of purchase order submitted, the delivery date was December 2009. The firm may clarify again if the same has been supplied or not. If supplied, copy of shipping bill may be submitted.     Sl.No.497

Case No.A/R­161

M/s. Thermax LTd., HQ F.No.01/80/050/01549/AM09/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.31/21/040/00295/AM09 3110036392 dt.11.12.2008 Date: 22.03.2011   The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The  Committee,   Sl.No.498

Case No.A/R­162

M/s.  Vidyut  Metallics  Pvt. Ltd., Thane HQ F.No.01/80/050/00854/AM10/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.03/95/040/00818/AM10 0310567032 dt.29.03.2010 Date: 22.03.2011   The Committee considered the written reply of the firm dated 20.03.2010 and 27.01.2011 and deliberated the written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011.  The Committee observed that the license was ratified on repeat basis on repeat basis as per Advance Authorization No. 0310514778 dated 06.04.2009 ratified in Meeting No. 26/80 dated 29.09.2009 and there are no grounds to  re­consider the norms in respect of the subject advance authorization/case

  S.No.499 Case No. A/R – 150 M/s.  Bharat  Heavy Electricals  LTd., Bhopal   HQ F.No.01/80/50/01469/AM08/DES.I Lic.No. & Date Meeting No.40/11  RA.F.No.11/24/040/00042/AM08 1110016562 dt.17.12.2007 Date: 22.03.2011 Ratification of  norms.   The firm’s representative Sh. Dilip Supekar, Dy. General Manager, Material Management (FE) and Sh. J.S. Hanspal,  Additional  General  Manager  appeared  on  personal  hearing  and  informed  that  their  reply  dated 20.03.2010 answers all the queries  given point wise.   The Committee, therefore decided to refer the reply of the firm to DHI for examining the case to furnish their comments.  The case may be re­listed on 03.05.2011.   S.No.500

Case No. A/R­109

  M/s. Denso Haryana Pvt. LTd., Gurgaon F.No. 01/80/50/ 00394/AM10/DES.I Lic.No. & Date Meeting No.40/11 RA F.No.05/23/040/00025/AM10 0510249539 dt.18.09.2009 Date: 22.03.2011 Re­store an important raw material in the export product   The  representative  of  the  firm  Shri  Parveen  Bhatt,  Sr.  Manager  (Procurement)  appeared  before  the Committee  for  personal  hearing.    They  explained  the  case  to  the  Committee.    The  Committee  therefore decided to ratify  the import item No. 7 as applied for with 5% wastage. .     S.No.501

Case No. A/R­72

  M/s.  The  Saraswati Industrial  Syndicate LTd., F.No. 01/80/50/ 00075/AM10/DES.I Lic.No. & Date Meeting No.40/11 RA F.No.05/24/040/00057/AM10 0510240867 dt.05.05.2009 Date: 22.03.2011 Ratification of  norms.   The Committee decided to forward a copy of firm’s reply to DIPP for examination and comments.  The case may be re­listed on 03.05.2011.   S.No.502

Case No. A/R­90

  M/s.  Larson  Toubro Ltd., F.No. 01/80/50/00742/AM10/DES.I Lic.No. & Date Meeting No.40/11 RA F.No.03/95/040/00713/AM10 0310558679 dt.04.02.2010 Date: 22.03.2011 Ratification of  norms.   The Committee noted that the firm has decided to restrict the quantity of Clad Plates for import under the authorization and source remaining quantity locally and requested to treat amendment  in authorization as “withdrawn”.  The Committee therefore decided to close their case on the part of NC.   The Regional Authority may take note of the NC decision for information.    S.No.503

Case  No.   A/R­

166 M/s.  Bharat Heavy  Electricals LTd., Bhopal HQ F.No.01/80/050/00339/AM10/DES.I Lic. No. & date Meeting No.40/11 RA.F.No.11/24/040/00010/AM10 1110020832 dt.04.08.2009 Date: 22.03.2011   The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The  Committee,   S.No.504

Case No.A/R­176

M/s. IDMC Limited Vithal Udyognagar HQ F.No.01/80/050/00477/AM10/ DES­I Lic.No. & Date

Meeting No.40/11 RA F.No.34/24/040/00104/AM10 3410025225 dt.30.09.2009 Date: 22.03.2011   The representative of the DIPP informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 03.05.2011.   S.No.505

Case No.A/R­178

M/s. United Drilling Tools Ltd., Delhi HQ F.No.01/80/050/00397/AM10/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.05/24/040/00318/AM10 0510249707 dt.22.09.2009 Date: 22.03.2011   The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The  Committee,   S.No.506

Case No.A/R­181

M/s.  Blue  Star  Ltd., Mumbai HQ F.No.01/80/050/00282/AM10/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.03/94/040/00107/AM10 0310528936 dt.15.07.2009 Date: 22.03.2011   The  representative  of  the  DIPP  informed  the  Committee  that  the  case  is  under  study.    The  Committee,   S.No.507

Case No.A/R­182

M/s.  Bharat  Heavy Electricals Ltd., Ranipet HQ F.No.01/80/050/01333/AM09/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.04/24/040/00001/AM09 0410100307 dt.25.11.2008 Date: 22.03.2011   As  per  written  comments  of  DHI,  vide  their  U.O.  Note  No.3(29)/09­TSW(B)/122  dated  24.02.2011,  the   Export The description of export product may be amended & their weight incorporated as given below. 1.      ESP­  16,060 MT 2.      APH­ 2958 MT 3.      FAN­ 810 MT 4.      Dampers & gates­ 1252 MT Import   1. Item no 1­ Allowed at 900 MT with 3% wastage as applied for. 2. Item no 2­ Allowed at 600 MT with 4 % wastage. 3. Item no 3­ Allowed at 18.3 MT with 3 % wastage as per calculation given. 4. Item no 4­ Allowed at 300 MT with 2 % wastage as applied for. 5. Item no 5­ The firm has reduced the requirement. Allowed at 1238 MT with 2.5% wastage as applied for. 6. Item no 6­The description may be amended to “SS wires” & 70 MT to be allowed as applied for with 1% wastage. 7.  Item no 24­ this is a tool & hence to be deleted. 8.        All other items up to item no 32 are either components or spares. Components may be allowed under Gn­4 & spares as per spares policy.   The Regional Authority may take note of the NC decision for information.    S.No.508

Case No.A/R­183

M/s.  Microtek  Machines Ltd., HQ F.No.01/80/050/00794/AM10/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.07/24/040/00458/AM10 0710070360 dt.04.03.2010 Date: 22.03.2011 The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments.

The case may be relisted on 03.05.2011.   S.No.509

Case No.A/R­187

M/s.  Motherson  Sumi System Ltd., New Delhi HQ F.No.01/80/050/00169/AM07/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.25/24/040/00002/AM07 2510001667 dt.16.05.2006 Date: 22.03.2011   The Committee observed that the comments called for from C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed  on 03.05.2011.    

Case No.A/R­197

M/s.  GEA  BGR Energy  System  India Ltd., Chennai   HQ F.No.01/80/050/01283/AM09/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.04/24/040/00196/AM09 0410099962 dt.12.11.2008 Date: 22.03.2011   The  Committee  deliberated  the  request  of  the  firm    and  decided  to  forward  the  firm’s  representation  for examination and comments.  The case may be re­listed on 03.05.2011  

Case No.A/R­198

M/s.  G.R.  Engineering Pvt. LTd., Mumbai HQ F.No.01/80/050/01594/AM06/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.03/94/040/01368/AM06 0310372828 dt.23.03.2006 Date: 22.03.2011 Amendment in the description of export item   As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the Committee decided Description of Export Products and their net export weight to be modified to in respect of the subject advance authorization as under:­   Sl. No. Description Quantity Net Export Weight 1 Roaster 1 No. 63.091 MT 2 Oxide Bin 1 No. 24.881 MT 3 Storage Tanks 6 Nos. 104.874 MT (17.479 MT x 6 Nos.)    

Case No.A/R­199

M/s.  Automat Irrigation Pvt. Ltd., HQ F.No.01/80/050/00369/AM10/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.05/24/040/00148/Am10 0510248965 dt.09.09.2009 Date: 22.03.2011 Ratification of Norms   The  representative  of  the  DIPP  informed  the  Committee  that  the  case  is  under  study.    The  Committee,  

Case No.A/R­200

M/s.  AIA  Engineering Ltd., Ahmedabad HQ F.No.01/80/050/00175/AM10/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.08/24/040/00009/AM10 0810079414 dt.21.04.2010 Date: 22.03.2011 Ratification of Norms   The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The  Committee,  

Case No.A/R­201

M/s.  Air  Liquid Engineering  India Pvt. Ltd., Hyderabd HQ F.No.01/80/050/00745/AM10/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.09/70/040/00140/AM10 0910039855 dt.06.11.2009 Date: 22.03.2011 Ratification of Norms   The  representative  of  the  DIPP  informed  the  Committee  that  the  case  is  under  study.    The  Committee,  

Case No.A/R­202

M/s.  Chandan  Steel Ltd., Mumbai HQ F.No.01/80/050/01350/AM07/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.03/94/040/01140/AM07 0310419440 dt.13.02.2007 Date: 22.03.2011 Ratification of Norms

The  representative  of  the  Ministry  of  Steel  informed  the  Committee  that  the  case  is  under  study.    The  

Case No.A/R­203

M/s.  Engser  Limited, Kolkata HQ F.No.01/80/050/0493/AM08/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.02/24/040/00191/AM08 0210105023 dt.09.10.2007 Date: 22.03.2011 Modification  of Norms   On the recommendation of the representative of DIPP present in the meeting, the Committee decided  the firm to give actual breakup of quantities and weights of different sizes of Locknuts exported against the Advance Authorisation as the firm has already completed E.O.  and to re­list the case on 03.05.2011      

Case No.A/R­204

M/s.  The  Saraswati Industrial Syndicate Ltd., HQ F.No.01/80/050/0702/AM10/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.05/24/040/00453/AM10 0510256922 dt.25.01.2010 Date: 22.03.2011 Revision  of Norms   As per written comments of DIPP received vide their U.O. Note No.  dated  24.03.2011,  the Committee decided to modify the norms in respect of the subject advance authorization as under:­   1. Weight of import item at Sl. No. 10  to be corrected to 138 Kgs.    

Case No.A/R­205

M/s.  Intrans  Engineering Ltd.,  (formerly  Pioneer Friction Ltd.,) HQ F.No.01/80/050/00820/AM10/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.02/24/040/00236/AM10 0210139134 dt.11.03.2010 Date: 22.03.2011 Ratification  of Norms As  per  written  comments  of  DHI,  vide  their  U.O.  Note  No.3(29)/09­TSW(B)/122  dated  24.02.2011,  the   1. The total export weight is 240 MT & the same may be incorporated in the license along with quantity in number. 2. Import of nitrile rubber may be allowed at 16935 kg with 5% wastage.      

Case No.A/R­206

M/s.  Mikroteck  machines LTd., HQ F.No.01/80/050/00176/AM11/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.07/24/040/00048/AM11 0710070361 dt.04.03.2010 Date: 22.03.2011 Ratification  of Norms   On the recommendation of the representative of DC (MSME) present in the meeting, the Committee decided to call for the following information/clarification from the firm  and to re­list the case on 03.05.2011   1. Weight along with drawing/Design of each Export Product. 2. Process of  Manufacturing. to be carried out on these die blanks. 3. Weight  of each imported inputs. 4. Bifurcation  of  the  quantity  of  export  product  number/weight  wise  with  its  complete specification.    

Case No.A/R­207

M/s. Tema India LTd., HQ F.No.01/80/050/01221/AM09/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.03/95/040/00655/AM09 0310491632 dt.23.10.2008 Date: 22.03.2011 Ratification  of Norms   The Committee decided to forward a copy of representation again to DIPP and to re­list the case on 03.05.2011.

Case No.A/R­208

M/s.  Llyod  Electric  & Engineering Ltd., HQ F.No.01/80/050/00273/AM11/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.05/23/040/00056/AM11 0510266063 dt.15.06.2010 Date: 22.03.2011 Ratification  of Norms   On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm  and to re­list the case on 03.05.2011   1.      Information in respect of Sl.No.4,5 & 11 of the Standard Deficiency Format                   for each capacity of  Split Air­Conditioners.              2.  Quantities of  Split Air­Conditioners, capacity wise.      

Case No.A/R­209

M/s. The Indure Pvt. LTd., HQ F.No.01/80/050/00385/AM09/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.05/24/040/00822/AM08 0510217071 dt.27.02.2008 Date: 22.03.2011 Ratification  of Norms   The  representative  of  the  firm  Shri  Shan  Singh,  Executive  Directoer,  Sh.  Vergis  K.  George,  General Manager; Sh. M.P. Tiwari, General Manager appeared before the Committee for personal hearing.  They explained the case to the Committee.  The firm propose to export of two number of Ash Handling plant.  It has stated that it will not import item no. 2 of import which is spares of the compressors and same is agreed. As per written comments of DHI received vide their U.O. Note No.3(50)/08­TSW(B) dated  25.03.2011,  the Committee decided to add the  2 nos Air Compressors at Sl. No. 12 (revised list enclosed) in respect of the subject advance authorization subject to the condition that firms submit written undertaken confirming that the said import items are mandatory parts of the import items. The firm has already submitted the required written undertaking.      

Case No.A/R­210

M/s.  Bharat  Heavy Electricals LTd., HQ F.No.01/80/050/01779/AM09/ DES­I Lic.No. & Date Meeting No.40/11 RA F.No.11/24/040/00073/AM09 1110019584 dt.10.02.2009 Date: 22.03.2011 Ratification  of Norms   The representative of the firm Shri Dalip Supekar, Dy. General Manager; Sh. Hazari Lal, General Manager & Sh.  J.S.  Bhanspal,  Addl.  General  Manager  appeared  before  the  Committee  for  personal  hearing.    They explained the case to the Committee. After deliberated the case, the Committee decided that the deletion of Import Item No. 27 – “Torque Wrench” may continue as it is a tool.  However,  the Committee decided to ratify the Import item No. 7 – “ Cyclone Separator” is Accessories subject to its accountability  in the export items       Sl.No.86

Case No. C ­ 09

M/s.  Addison  &  Co.  Ltd., Chennai F.No. 01/81/80/162/00372/AM10/DES.I Meeting No.40/11 Modification  of SION for the export product “Cutting Tools­Multiple Point of High Speed Steel(Cobalt Grade)/Tool Steel” Date: 22.03.2011   The Committee decided DHI should re­look the wastage of written comments of DHI received vide their U.O. Note No.3(05)/2010­TSW(B)/93  dated  09.02.2011 and furnish their comments again.  The case may be re­listed on 03.05.2011.           Sl.No.87

Case No. C­ 17

M/s.  Lucas  TVS  Ltd.,  Chennai received  through  DC(MEPZ­ SEZ), Chennai F.No. 01/81/80/162/00379/AM10/DES.I Meeting No.40/11 Fixation  of  regular  wastage  norms  for manufacturing of different types of “Starter, Alterator, Wiper Motor and Compressor”. Date: 22.03.2011   On the recommendation of the representative of DHI present in the meeting, the Committee decided to call for the following information/clarification from the firm  and to re­list the case on 03.05.2011   1.      Information in respect of Sl.No.3,4 & 11 of the Standard Deficiency Format. 2.      Item of manufacture visa – vis input required for them with quantity of input.     Sl.No.88

Case No. C­ 18

M/s.  Pipavav  Shipyards  LTd., Amreli F.No. 01/81/80/162/00612/AM11/DES.I Meeting No.40/11 Fixation of input output norms in respect of 100%  EOU  for  the  export  product  “  Ship, Cargo  Ships,  Barges  &  Vessels  for Transport,  Factory  Ship,  Life  Boats,  Hulls and  Vessels  falls  under  Chapter  89  of ITC(HS) – reg. Date: 22.03.2011   The Committee observed that the comments called for from Ministry of Shipping are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed 03.05.2011.   Sl.No.89

Case No.  C ­06

M/s.  Indo  Schottle  Auto Parts Pvt. Ltd.,   HQ F.No.01/81/80/162/00576/AM10/DES.I Meeting No.40/11 Fixation of wastage  norms for the export product “Central  Housing  Cover,  Coller,  Thrust, Coupling, Injector Plunger, Fitting High Pressure Fuel etc.” Date: 22.03.2011   The Committee decided the case will be discussed in next meeting and to re­list the case on 08.03.3011.    Sl.No.90

Case No. C – 13

M/s.    GTN  Engineering (India)  Ltd.,  Coimbatore (TN) HQ F.No.01/92/180/Norms/AM11/PC­VI/ DES­I Meeting No.40/11 Modification  of  I  at  SL.  No.  C­689  for  the export product “Industrial Valves” in respect of LOP  No:PER:A/2004/055  EOU­TN dt.10.11.2004 Date: 22.03.2011   The representative of the I informed the I that they received the firm’s reply and case is under study. The I,        

Case No.  C – 20

M/s.  Amvian Automotive  Pvt.  LTd., Vadodara   HQ F.No.01/81/80/92/00180/Norms/AM11/DES.I Meeting No.40/11 Modification  of  input  output  norms  in  respect  of EOUs  for  the  export  product  “Standard  Roof  Map Lamp Bracket” Date: 22.03.2011   The Committee noted that firm’s representation has been sent to DIPP and DC(MSME) for examination and comments.  The case may be re­listed on 03.05.2011.  


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied