RATIFIED Minutes of Meeting No.40/11 of Norms Committee(NCI) due for 22.03.2011 was actually held on 24.03.2011 & 25.3.2011 (DES.I Section) The meeting No. 40/11 of the Norms Committee (NCI) for the licensing year 20102011 due for 22.03.2011 was actually held on 24.03.2011 & 25.03.2011 under the Chairmanship of Sh. N.P.S. Monga, Additional Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure VolumeI. The following Members of the Committee were present in the meeting: Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh. B.D. Ghosh, Jt.I.A. 399 23063355 M/o Steel, U.B. 2. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 3. Sh S.K. Jain, D.O. 429A 23063321 Extn.3318 DIPP, U.B. 4. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A DC(MSME),N.B. 5. Sh. A.K. Mishra, AIA 13 A 23063332 M/o Steel, U.B. 6. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 7. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B. I The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon were as under: 1
Case No.:1/50/83ALC1/2008
Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/83/050/01338/AM09/ RLA File :07/24/040/00623/AM09/ Lic.No/Date:0710063295 26.02.2009 Defer Date:03.05.2011 Decision : The Committee noted that the case has been transferred from NC IV (DESIV). The Committee decided to collect the complete information from DESIV Section along with file and send the same to DIPP. The case may be relisted on 03.05.2011. 2
Case No.:31/23/80ALC2/2009
Party Name:HINDUSTAN AERONAUTICS LTD, Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00353/AM10/ RLA File :07/24/040/00651/AM09/ Lic.No/Date:0710066776 02.09.2009 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from DGCA are yet to be received. The Committee, therefore, decided to remind them through D.O. letter for expediting their comments. The case may be relisted on 03.05.2011. 3
Case No.:39/7/80
ALC2/2010 Party Name:KONECRANES INDIA PRIVATE LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00113/AM11/ RLA File :31/21/040/00143/AM10/ Lic.No/Date:3110039822 03.09.2009 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply on 28.02.2011 and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 03.05.2011.
4
Case No.:10/28/80ALC2/2009
Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00428/AM10/ RLA File :31/24/040/00121/AM10/ Lic.No/Date:3110040185 07.10.2009 Defer Date:03.05.2011 Decision : The Committee noted that the firm has not given proper reply after the personal hearing. On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Information in respect of Sl.No.11 of the Standard Deficiency Format. 2. Blank size for each export product supported by size of the export product. 3. Sheet lay out diagram indicating the wastage during blanking, export productwise. 5
Case No.:11/28/80ALC2/2009
Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00429/AM10/ RLA File :31/24/040/00124/AM10/ Lic.No/Date:3110040186 07.10.2009 Defer Date:03.05.2011 Decision : The Committee noted that the firm has not given proper reply as per personal hearing. On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Information in respect of Sl.No.11 of the Standard Deficiency Format. 2. Blank size for each export product supported by size of the export product. 3. Sheet lay out diagram indicating the wastage during blanking, export productwise. 6
Case No.:16/31/80ALC2/2009
Party Name:SUTURES INDIA PRIVATE LIMITED, Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00464/AM10/ RLA File :07/24/040/00263/AM10/ Lic.No/Date:0710067849 28.10.2009 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be re listed 03.05.2011. 7
Case No.:2/39/80ALC2/2009
Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00598/AM10/ RLA File :31/24/040/00152/AM10/ Lic.No/Date:3110041006 11.12.2009 Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 17.01.2011 and subsequent reminder dated 25.02.02.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs. The Regional Authority may take necessary action accordingly. 8
Case No.:21/39/80ALC2/2009
Party Name:VEM TECHNOLOGIES P.LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00617/AM10/ RLA File :09/24/040/00373/AM10/ Lic.No/Date:0910040368 18.12.2009 Defer Date:03.05.2011 Decision : The Committee observed that the comments called from Ministry of Defence yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted 03.05.2011.
9
Case No.:19/41/80ALC2/2009
Party Name:PLAST TECH ENGINEERING Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00640/AM10/ RLA File :04/24/040/00216/AM10/ Lic.No/Date:0410110358 23.12.2009 Defer Date:03.05.2011 Decision : The Committee observed the comments of DC(MSME) is not available and the case is under study. The Committee decided to remind the DC(MSME) for their comment.. The case may be relisted on 03.05.2011. 10
Case No.:12/47/80ALC2/2009
Party Name:RAINA ENGINEERS Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00731/AM10/ RLA File :03/95/040/00641/AM10/ Lic.No/Date:0310553727 05.01.2010 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s reply to DIPP for examination and comments. The case may be relisted on 03.05.2011. 11
Case No.:1/45/80ALC2/2009
Party Name:STARION INDIA P.LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00688/AM10/ RLA File :31/24/040/00211/AM10/ Lic.No/Date:3110041587 20.01.2010 Defer Date:03.05.2011 Decision : The Committee observed that DIT has sought information from the firm vide their letter dated 31.05.2010 & 26.08.2010. The Committee, therefore, decided to remind the firm last time for expediting the requisite information to DIT so as to obtain their comments otherwise the case will be rejected without further notice. (A copy may please be endorsed to DIT). The case may be relisted on 03.05.2011. 12
Case No.:22/7/80ALC2/2010
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00096/AM11/ RLA File :09/24/040/00447/AM10/ Lic.No/Date:0910041035 22.02.2010 Decision : As per written comments of DHI received vide their U.O. Note No.3(42)/10TSW(B)/109 dated 15.02.201, the Committee decided to ratify the norms in respect of the subject advance authorization as under: The export product description to be modified to “20 nos of XRP1003 Mills for 2X500 MW power stations”. Import Item no 1 to 19 The firm has clarified that these are components. Allowed under GN4. Item no 20 to 37 These arte spares & allowed as per spares policy.
Case No.:21/7/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00095/AM11/ RLA File :09/24/040/00522/AM10/ Lic.No/Date:0910041258 10.03.2010
13 Decision : As per written comments of DHI received vide their U.O. Note No.3(42)/10TSW(B)/107 dated 15.02.2011, The Committee decided to ratify the norms in respect of the subject advance authorization as under: Export The total export weight is 1461.48 MT & the same to be incorporated in the license. Import 1. Item no 1to 89 except item no 36,45, 49, 57 ,65 & 73 Some of the items are given in sets which to be changed to numbers. These are components & allowed under GN4. 2. Item no 36 This is a tool & hence to be deleted. 3. Item no 45 The item to be deleted as it is not used in the export product from the description of the import given. 4. Item no 49 The word “Finished” be prefixed to the description & allowed under GN4. 5. Item no 57 The import weight is 2.5 Kg each to be incorporated to the license. 6. Item no 65 The firm has only given the statement of wastage with out giving calculation supported by drawing. The item is used for the manufacture of blades. The firm has asked for wastage of 470%. The Committee agree for 300% wastage & with 20% recovery allowed for import of 5393 kg say 5400 kg.(Net wastage 240%) 7. Item no 90 to 103 except item no 92, These are insulating materials & to be allowed as applied for. 8. Item no 92 This is a component & to be allowed under GN4. 9. Item no 104 to 107 The firm has sought wastage of 1%. Allowed import as applied for. 10.Item no 108 The item to be allowed at 2547 kg with 1% wastage. 11. Item no 109 to 111 Allowed as applied for as low value item. 12. Item no 112 to 114 These are components & allowed under Gn4. 13. Item no 73 &115 this is a tool & hence to be deleted 14
Case No.:16/7/80ALC2/2010
Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00090/AM11/ RLA File :03/94/040/01060/AM10/ Lic.No/Date:0310564639 12.03.2010 Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs. 15
Case No.:34/7/80ALC2/2010
Party Name:RESHAM ROOSEN INDIA PVT.LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00108/AM11/ RLA File :06/24/040/00051/AM10/ Lic.No/Date:0610017515 19.03.2010 Defer Date:03.05.2011 Decision : The Committee noted of firm’s reply has been received by DIPP and await their comments. The case may be relisted on 03.05.2011. 16
Case No.:8/1/80ALC2/2010
Party Name:SATA VIKAS INDIA PRIVATE LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00837/AM10/ RLA File :05/24/040/00529/AM10/ Lic.No/Date:0510260906 22.03.2010 Defer Date:03.05.2011 Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted 03.05.2011.
17
Case No.:16/1/80ALC2/2010
Party Name:THERMAX LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00845/AM10/ RLA File :31/24/040/00242/AM10/ Lic.No/Date:3110042472 23.03.2010 Decision : The Committee deliberated the written comments of DHI vide their U.O. Note No.3(14)/10 TSW(B)/49 & 113 dated 18.01.2011 & 15.02.2011 received and decided to ratify the norms in respect of the subject advance authorization as under: Export The total export weight is 611.28 MT & the same to be incorporated in the license. Import 1. Item no 1 Allowed 10425 kg without any wastage. 2. Item no 2 Allowed 79122 kg of length 1413 meters without any wastage. 3. Item no 3 Allowed 22506 kg of length 299 meters without any wastage. 4. Item no 4 Allowed 1252 kg without any wastage. 5. Item no 5 Allowed 255466kg of length 41460 meters without any wastage. 6. Item no 6 Allowed 52744 kg of length 10560 meters without any wastage. 7. Item no 7 Allowed 14,986 kg of length 2222 meters without any wastage. 8. Item no 8 Allowed restricted to 15,509 kg as applied for. 9. Item no 9 & 10 The firm has not sought any wastage. Allowed as applied for. 10. Item no 11 to 17 Allowed as applied for under GN4. 11. Item no 18 to 20 These are welding material. The total quantity asked is only 6866 kg which is reasonable. Allowed as applied for. 18
Case No.:32/5/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00065/AM11/ RLA File :05/23/040/00225/AM10/ Lic.No/Date:0510261296 26.03.2010 Decision : As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. Details of components at import item at Sl. No. 1 and constituents of Sets for import items at Sl. Nos. 1, 2, 5, 8, 9, 11 & 12 as submitted by the firm (copy enclosed) to be incorporated in the list of import items. 2. Quantity of import items at Sl. No. 1 to be allowed on net to net basis with accountability clause. 3. Quantities of import items from Sl. No. 2 to 12 to be allowed as per policy for spares. 19
Case No.:36/5/80ALC2/2010
Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00069/AM11/ RLA File :05/23/040/00214/AM10/ Lic.No/Date:0510261354 29.03.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The Committee, therefore, decided to defer the case and to relist the case on 03.05.2011.
Case No.:21/29/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred
20 HQ File :01/80/050/00456/AM11/ RLA File :11/24/040/00050/AM10/ Lic.No/Date:1110022130 29.03.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the case and to relist the case on 03.05.2011. 21
Case No.:6/5/80ALC2/2010
Party Name:ULTRA ENGINEERS Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00039/AM11/ RLA File :31/24/040/00002/AM11/ Lic.No/Date:3110042881 15.04.2010 Decision : The Committee noted the firm proposes to (i) export 2 nos of collar of weight 596.8 Kg. for which it proposes to import carpenter alloy bar of weight 990.65 kg. The recovery will not result in the reduction of import by whole number. As per written comments of DHI received their U.O. Note No.3(125)/09TSW(B)/136 dated 03.03.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: (ii) Allow import as applied for & the quantity of import of 2 numbers of bar may be incorporated in the license. 22
Case No.:25/5/80ALC2/2010
Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00058/AM11/ RLA File :31/24/040/00009/AM11/ Lic.No/Date:3110042996 26.04.2010 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s reply to DHI for examination and comments. The case may be relisted on 03.05.2011. 23
Case No.:17/9/80ALC2/2010
Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00130/AM11/ RLA File :05/23/040/00233/AM10/ Lic.No/Date:0510263362 29.04.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 03.05.2011. 24
Case No.:3/7/80ALC2/2010
Party Name:LINCOLN HELIOS ( I ) LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00077/AM11/ RLA File :07/24/040/00021/AM11/ Lic.No/Date:0710071374 30.04.2010 Defer Date:03.05.2011 Decision : The Committee observed that the firm has not replied to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice and to relist the case on 03.05.2011.
Case No.:9/7/80ALC2/2010
Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00083/AM11/ RLA File :31/24/040/00012/AM11/ Lic.No/Date:3110043149 06.05.2010 Defer Date:03.05.2011
25 Decision : The Committee noted that the firm has not given proper reply. On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Information in respect of Sl.No.11 of the Standard Deficiency Format. 2. Blank size for each export product supported by size of the export product. 3. Sheet lay out diagram indicating the wastage during blanking, export productwise. 26
Case No.:18/11/80ALC2/2010
Party Name:ULTRA ENGINEERS Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00164/AM11/ RLA File :31/24/040/00019/AM11/ Lic.No/Date:3110043194 11.05.2010 Decision : The Committee noted the firm proposes to (i) export 2 nos of collar of weight 1464,82 kg. for which it proposes to import incoloy bar of weight 2474.393 kg. The recovery will not result in the reduction of import by whole number. As per written comments of DHI received their U.O. Note No.3(125)/09TSW(B)/138 dated 03.03.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: (ii) Allow import as applied for & the quantity of import of 2 numbers of bar may be incorporated in the license. 27
Case No.:10/9/80ALC2/2010
Party Name:SOLO MANUFACTURING PVT LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00123/AM11/ RLA File :05/24/040/00056/AM11/ Lic.No/Date:0510264643 21.05.2010 Defer Date:03.05.2011 Decision : The Committee deliberated the written comments of DHI received vide their U.O. Note No. 3(30)/08TSW(B)/155 dated 11.03.2011 present in the meeting and decided to advise the firm to appear before the NC to explain their case in person along with technical team with full facts of the case. The case may be relisted on 03.05.2011. 28
Case No.:24/15/80ALC2/2010
Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00231/AM11/ RLA File :05/23/040/00058/AM11/ Lic.No/Date:0510265601 07.06.2010 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from Ministry of Mines are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted 03.05.2011. 29
Case No.:18/15/80ALC2/2010
Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00225/AM11/ RLA File :04/24/040/00061/AM11/ Lic.No/Date:0410114584 15.06.2010 Defer Date:03.05.2011
Decision : On the recommendation of the representative of DHI present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Item 11 The firm has neither given calculation nor any details about the item. The firm may be asked to submit the calculation supported by drawing as per sl no 11 of SDL. 2. Item no 12 The firm has submitted the statement of requirement. It is not correlated with drawing. The firm may be asked to submit the calculation supported by drawing as per sl no 11 of SDL. 30
Case No.:19/15/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00226/AM11/ RLA File :11/24/040/00011/AM11/ Lic.No/Date:1110022638 18.06.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The 31
Case No.:4/15/80ALC2/2010
Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00211/AM11/ RLA File :03/94/040/00261/AM11/ Lic.No/Date:0310580285 23.06.2010 Decision : The Committee noted that the firm has applied for ratification of norms of export of 4 nos. of Turbine shaft of weight 270.829 MT for which it proposes to import 12 nos. of proof machined shaft forgings of weight 301.028 MT. The recovery from the machining of shaft will not result of reduction of quantity of import by whose number. As per written comments of DHI received their U.O. Note No.3(31)/10TSW(B)/112 dated 15.02.2011, the Committee decided to ratify the norms of import as applied for in respect of the subject advance authorization. 32
Case No.:1/14/81ALC2/2010
Party Name:FITCAST FOUNDERS & ENGINEERS PVT. LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/81/050/00081/AM11/ RLA File :08/24/040/00082/AM11/ Lic.No/Date:0810089995 24.06.2010 Defer Date:03.05.2011 03.05.2011 1. Information in respect of Sl.No.5 & 11 of the Standard Deficiency Format for each export product. 2. Export item in number 3. Export item Composition for all the export product separately 4. Specification of items no. 3 & 6 33
Case No.:5/15/80ALC2/2010
Party Name:TERUMO PENPOL LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00212/AM11/ RLA File :53/24/040/00010/AM11/ Lic.No/Date:5310010688 25.06.2010 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. listed 03.05.2011.
34
Case No.:1/16/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00242/AM11/ RLA File :09/24/040/00114/AM11/ Lic.No/Date:0910042665 08.07.2010 35
Case No.:1/18/80ALC2/2010
Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00254/AM11/ RLA File :05/24/040/00126/AM11/ Lic.No/Date:0510267954 12.07.2010 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s reply to DIPP for examination and comments. The case may be relisted on 03.05.2011. 36
Case No.:10/18/80ALC2/2010
Party Name:MIKROTEK MACHINES LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00263/AM11/ RLA File :07/24/040/00102/AM11/ Lic.No/Date:0710072868 13.07.2010 Defer Date:03.05.2011 submission of comments. The case may be relisted 03.05.2011. 37
Case No.:51/31/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00529/AM11/ RLA File :61/24/040/00030/AM11/ Lic.No/Date:6110000473 15.07.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The 38
Case No.:22/18/80ALC2/2010
Party Name:SAI DIVYA ENGINEERS Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00275/AM11/ RLA File :09/24/040/00047/AM11/ Lic.No/Date:0910042702 19.07.2010 39
Case No.:18/22/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00329/AM11/ RLA File :04/24/040/00090/AM11/ Lic.No/Date:0410115602 19.07.2010 Defer Date:03.05.2011
Decision :The Committee observed that the firm has not replied to this office letter calling for certain information. The Committee, therefore, decided to remind the firm finally for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 03.05.2011. 40
Case No.:19/22/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00330/AM11/ RLA File :04/24/040/00091/AM11/ Lic.No/Date:0410115603 19.07.2010 Defer Date:03.05.2011 information. The Committee, therefore, decided to remind the firm finally for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 03.05.2011. 41
Case No.:53/18/80ALC2/2010
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00306/AM11/ RLA File :09/24/040/00133/AM11/ Lic.No/Date:0910042746 20.07.2010 Decision : As per written comments of DHI received vide their U.O. Note No.3(6)/10TSW(B)/160 dated 11.03.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Export The export weight is 89.7 MT & the same may be incorporated in the licence. Import 1. Item no 1 The firm has given calculation for 51 MT with 2% wastage. But it proposes to import 50 MT & the balance quantity is to be procured indigenously. We may agree to firm’s request. 2. Item no 2 – The description may be amended to “Girth Flange” & total 8 numbers may be allowed with weight 4 MT under GN4. 3. Item no 3 to 6 These are component & may be allowed under GN4.
Case No.:54/18/80ALC2/2010
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00307/AM11/ RLA File :09/24/040/00138/AM11/ Lic.No/Date:0910042748 20.07.2010
42 Decision : As per written comments of DHI received vide their U.O. Note No.3(6)/10TSW(B)/161 dated 11.03.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Export The export weight is 299 MT to be incorporated in the licence. Import 1. Item no 1The firm has given calculation for 25.7 MT with 2% wastage. But the firm has requested for import of 24 MT & the balance quantity is to be procured indigenously. The Committee allowed import of 24 MT as applied for. However the size of pies is OD 114.3 mm & thickness 8.56 mm to be incorporated in the license. 2. Item no 2 Allowed to import 10 MT with 2% wastage as applied for as per the calculation given. 3. Item no 3 Allowed to import 65 MT with 2% wastage as applied for as per the calculation given. 4. Item no 4 Allowed to import 124 MT with 2% wastage as applied for as per the calculation given. 5. Item no 5 The firm proposes to import 145 nos of weight 2 MT. Allowed under GN4. The quantity is 145 numbers & its weight is 2 MT may be incorporated in the license 6. Item no 6 The firm proposes to import 16 nos of Girth Flanges of weight 15 MT. Allowed under GN4. The description of the import to be amended to “Girth Flange” & the quantity is 16 nos of weight 15 MT to be incorporated in the license. 7. Item no 7 This is a component & to be allowed under GN4. 43
Case No.:35/22/80ALC2/2010
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00346/AM11/ RLA File :03/94/040/00335/AM11/ Lic.No/Date:0310584224 20.07.2010 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s reply to DIPP for examination and comments. The case may be relisted on 03.05.2011. 44
Case No.:4/27/80ALC2/2010
Party Name:R.D.ENGINEERS (INDIA) PVT.LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00401/AM11/ RLA File :03/95/040/00297/AM11/ Lic.No/Date:0310584240 20.07.2010 Defer Date:03.05.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, the Committee 03.05.2011 1. Information in respect of Sl.No.4, 5 & !! of the Standard Deficiency Format.
Case No.:1/29/80ALC2/2010
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00436/AM11/ RLA File :09/24/040/00140/AM11/ Lic.No/Date:0910042747 20.07.2010
45 Decision : As per written comments of DHI received vide their U.O. Note No.3(6)/10TSW(B)/159 dated 11.03.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Export The export weight is 151.58 MT incorporated in the licence. Import 1. Item no 1The firm to be allowed import of 5 MT as applied for with 2% wastage. However the size of pipes is OD 73 mm & thickness 7.03 mm to be incorporated in the license. 2. Item no 2 Allowed import of 6 MT as applied for with 2% wastage. 3. Item no 3 Allowed import of 20 MT as applied for with 2% wastage. 4. Item no 4 Allowed import of 44 MT as applied for with 2% wastage. 5. Item no 5 –Allowed three numbers of Girth Flanges of weight 2 MT & three numbers of Blind Flange of weight 4 MT & the same to be incorporated in the license. 6. Item no 6 This is a component & allowed under GN4. 46
Case No.:1/22/80ALC2/2010
Party Name:ABB LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00312/AM11/ RLA File :07/24/040/00158/AM11/ Lic.No/Date:0710073410 05.08.2010 Defer Date:03.05.2011 Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s submission of comments. The case may be relisted 03.05.2011. 47
Case No.:17/31/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00495/AM11/ RLA File :09/24/040/00169/AM11/ Lic.No/Date:0910043002 06.08.2010 48
Case No.:6/22/80ALC2/2010
Party Name:ABB LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00317/AM11/ RLA File :07/24/040/00174/AM11/ Lic.No/Date:0710073560 11.08.2010 Defer Date:03.05.2011 submission of comments. The case may be relisted 03.05.2011. 49
Case No.:6/24/80ALC2/2010
Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00378/AM11/ RLA File :04/24/040/00109/AM11/ Lic.No/Date:0410116180 11.08.2010 Defer Date:03.05.2011 Decision : The Committee noted that reminder has been sent to the firm on 03.03.2011 and decided to await the firm’s reply. The case may be relisted on 03.05.2011.
50
Case No.:15/22/80ALC2/2010
Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00326/AM11/ RLA File :05/24/040/00175/AM11/ Lic.No/Date:0510270440 12.08.2010 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s reply to DIPP for examination and comments. The case may be relisted on 03.05.2011. 51
Case No.:38/27/80ALC2/2010
Party Name:ULTRA ENGINEERS Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00435/AM11/ RLA File :31/24/040/00091/AM11/ Lic.No/Date:3110044331 13.08.2010 Defer Date:03.05.2011 Decision : The Committee deliberated the written comments of DHI received vide their U.O. Note No. 3(125)/09TSW(B)/139 dated 03.03.2011, it was decided by the Committee to advise the firm to appear before the NC to explain their case in person along their technical team and with full facts of the case. The case may be relisted on 03.05.2011. 52
Case No.:20/22/80ALC2/2010
Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00331/AM11/ RLA File :05/24/040/00176/AM11/ Lic.No/Date:0510270623 16.08.2010
Decision : As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the 1. Net empty weights of 81.54 MT, 163.08 MT, 366.04 MT & 346.64 MT. to be specified with the quantities of export products at Sl. Nos. 1, 2, 3 & 4 respectively. 2. Word “Relevant” to be prefixed with the description of import items at S.Nos.1, 2, 3, 9, 10, 11, 17 to 25, 32 & 40. 3. Quantities of import items at S.Nos. 1, 9, 11, 18 & 21 to be allowed as applied for inclusive of 4.2 % wastage. 4. Quantity of import item at S.No. 2 to be allowed as 43880 Mtrs. (32982 Kgs.) on net to net basis. 5. Quantities of import item at S.No. 3 to be allowed as applied for inclusive of 4.7 % wastage. 6. Quantity of import item at Sl. No.4 to be allowed as 2 Nos. ( 4294 Kgs.) on net to net basis. 7. Quantities of import item from Sl. Nos. 5 to 8 to be allowed as applied for. 8. Quantity of import item at S.No. 10 to be allowed as 87760 Mtrs. (65964 Kgs.) on net to net basis 9. Quantity of import item at Sl. No. 12 to be allowed as 4 Nos. ( 8588 Kgs.) on net to net basis. 10. Quantities of import item from Sl. Nos. 13 to 16 to be allowed as applied for. 11. Quantity of import item at S.No. 17 to be allowed 86.44 MT inclusive of 5 % wastage 12. Quantities of import items at S.Nos. 19 & 20 to be allowed 5.591 MT & 7.72 MT respectively inclusive of 5 % wastage 13. Quantity of import item at S.No. 22 to be allowed as 34552 Mtrs. (63826 Kgs.) on net to net basis. 14. Quantity of import item at S.No. 23 to be allowed as 16274 Mtrs. (19792 Kgs.) on net to net basis. 15. Quantity of import item at S.No. 24 may be allowed as 17081 Mtrs. (26694 Kgs.) on net to net basis. 16. Quantity of import item at S.No. 25 may be allowed as 17081 Mtrs. (26678 Kgs.) on net to net basis.
17. Quantity of import item at Sl. No. 26 may be allowed as 6 Nos. on net to net basis. However, duty free weight of this item may be restricted as 21274 Kg inclusive of 53.3 % wastage after 20 % recovery. 18. Quantity of import item at Sl. No. 27 may be allowed as 4 Nos. on net to net basis. However, duty free weight of this item may be restricted as 14072 Kg inclusive of 53.3 % wastage after 20 % recovery. 19. Quantity of import item at Sl. No. 28 may be allowed as 10 Nos. (15600 Kgs. inclusive of 2 % wastage). 20. Quantity of import item at S.No. 29 to be allowed as 20 Nos. (6518 Kgs.) on net to net basis. 21. Quantity of import item at Sl. No. 30 may be allowed as 10 Nos. (16100 Kgs. inclusive of 2 % wastage). 22. Quantity of import item at S.No. 31 to be allowed as 20 Nos. (5864 Kgs.) on net to net basis. 23. Quantity of import item at S.No. 32 to be allowed as applied for i.e. 600 Kgs. on net to net basis. 24. Quantities of import item from Sl. Nos. 33 to 36 to be allowed as applied for 25. Quantity of import item at S.No. 37 to be allowed as 16 Nos. (56550 Kgs. inclusive of 2% wastage). 26. Quantity of import item at S.No. 38 to be allowed as 16 Nos. (80150 Kgs. inclusive of 2% wastage). 27. Quantity of import item at S.No. 39 to be allowed as 16 Nos. (3500 Kgs. inclusive of 2% wastage). 28. Quantity of import item at S.No. 40 to be allowed as 100000 Mtrs. (121241 Kgs.) inclusive of 2% wastage. 29. Quantity of import item from Sl. No.41 to be allowed as applied for. 30. Quantity of import item at S.No. 42 to be allowed as 1800 Kgs. 31. Import of components to be allowed with accountability clause. 53
Case No.:38/22/80ALC2/2010
Party Name:ULTRA ENGINEERS Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00349/AM11/ RLA File :31/24/040/00077/AM11/ Lic.No/Date:3110044345 16.08.2010 Decision : The Committee noted the firm proposes to (i) export 3 nos of collar of weight 2197.2kg. for which it proposes to import incoloy bar of weight 3711.58 kg with value addition of 75%. The recovery will not result in the reduction of import by whole number. As per written comments of DHI received their U.O. Note No.3(125)/09TSW(B)/136 dated 03.03.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: (i) Allow import as applied for & the quantity of import of 3 numbers of bar may be incorporated in the license. 54
Case No.:37/22/80ALC2/2010
Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00348/AM11/ RLA File :05/24/040/00181/AM11/ Lic.No/Date:0510270714 17.08.2010 Defer Date:03.05.2011
Decision : The Committee noted that the firm has sought time vide their letter dated 22.03.11 for submission of detailed information. The Committee, therefore, decided to defer the case. The case may be relisted on 03.05.2011. 55
Case No.:22/27/80ALC2/2010
Party Name:MERIL LIFE SCIENCES PVT LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00419/AM11/ RLA File :52/24/040/00008/AM11/ Lic.No/Date:5210031621 17.08.2010 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. listed 03.05.2011. 56
Case No.:16/31/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00494/AM11/ RLA File :09/24/040/00176/AM11/ Lic.No/Date:0910043125 17.08.2010 Decision :The Committee decided to reject the case on the ground that the firm did not furnish any 57
Case No.:34/31/80ALC2/2010
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00512/AM11/ RLA File :31/21/040/00158/AM11/ Lic.No/Date:3110044407 19.08.2010 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s application to DHI for examination and comments. The case may be relisted on 03.05.2011. 58
Case No.:60/22/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00371/AM11/ RLA File :04/24/040/00111/AM11/ Lic.No/Date:0410116559 24.08.2010 Decision :The Committee decided to reject the case on the ground that the firm did not furnish any 59
Case No.:40/31/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00518/AM11/ RLA File :09/24/040/00195/AM11/ Lic.No/Date:0910043236 24.08.2010 Defer Date:03.05.2011 information. The Committee, therefore, decided to remind the firm finally for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 03.05.2011.
S no Item description Weight per piece in gms Quantity in numbers 1 Part no131073002 made of poly propylene 1.82 11,512,000 60
Case No.:32/31/80ALC2/2010
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00510/AM11/ RLA File :06/24/040/00028/AM11/ Lic.No/Date:0610018929 30.08.2010 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from Min. of Defence are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted 03.05.2011. 61
Case No.:44/31/80ALC2/2010
Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00522/AM11/ RLA File :31/24/040/00111/AM11/ Lic.No/Date:3110044526 30.08.2010 Defer Date:03.05.2011 Decision :On the recommendation of the representative of DHI present in the meeting, the Committee 03.05.2011 1. Information in respect of Sl.No.11 of the Standard Deficiency Format. 2. The firm has stated in the application the export product as “1 set” but as per drawing, it is 2 numbers. The firm may clarify the same. 3. Value of indigenous inputs. 4. The firm has stated in their reply that boiler drum is not part of the export product. But it has given the manufacturing process of the same in the application which needs clarification. 62
Case No.:20/31/80ALC2/2010
Party Name:A RAYMOND FASTENERS INDIA PRIVATE LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00498/AM11/ RLA File :31/24/040/00073/AM11/ Lic.No/Date:3110044527 31.08.2010 Decision : As per written comments of DHI received their U.O. Note No.3(128)/2009TSW(B) dated 16.03.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Export The export description & quantity of import may be amended as given below. Allowed import of 21.6 MT of poly propylene granules with 3% wastage as applied by the firm.
Case No.:18/24/80ALC2/2010
Party Name:BGR ENERGY SYSTEMS LIMITED, Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00390/AM11/ RLA File :04/24/040/00132/AM11/ Lic.No/Date:0410116988 06.09.2010
63 Decision : As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the 1. Total net empty weight of export products to be specified as 828 MT. 2. Quantity of import item at Sl. No. 1 to be allowed as 69 Nos. on net to net basis with accountability clause and spare blades to be allowed as per policy for spares. 3. Import item at Sl. No. 2 to be allowed as 69 Nos. on net to net basis with accountability clause. 4. Weight of 1510 Kgs. to be specified with the quantity of import item at Sl. No. 3 and the same to be allowed on net to net basis with accountability clause. 5. Word “relevant” to be prefixed with the descriptions of import items at Sl. Nos. 4, 5, 6 & 8. 6. Weights of 16120 Kgs. & 65.75 MT to be specified with the quantities of import items at Sl. No. 4 & 5 respectively and the same may be allowed on net to net basis. 7. Quantity of import item at Sl. No. 6 to be allowed as 28235 Kgs inclusive of a wastage of 3 %. 8. Weight of 17 MT. to be specified with the quantity of import item at Sl. No. 7 and the same to be allowed on net to net basis with accountability clause. 9. Quantity of import item at Sl. No. 8 to be allowed as applied for i.e. 113300Kgs. inclusive of a wastage of 3 %. 64
Case No.:31/31/80ALC2/2010
Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00509/AM11/ RLA File :31/24/040/00113/AM11/ Lic.No/Date:3110044584 06.09.2010 65
Case No.:60/31/80ALC2/2010
Party Name:TERUMO PENPOL LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00538/AM11/ RLA File :53/24/040/00014/AM11/ Lic.No/Date:5310011297 06.09.2010 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. listed 03.05.2011. 66
Case No.:2/25/80ALC2/2010
Party Name:NOV SARA INDIA PRIVATE LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00392/AM11/ RLA File :61/24/040/00047/AM11/ Lic.No/Date:6110000492 08.09.2010 Defer Date:03.05.2011 submission of comments. The case may be relisted 03.05.2011.
Case No.:5/25/80ALC2/2010
Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred
67 HQ File :01/80/050/00395/AM11/ RLA File :04/24/040/00136/AM11/ Lic.No/Date:0410117138 14.09.2010 Defer Date:03.05.2011 Decision : The Committee noted that the firm has been reminded on 03.03.2011 to furnish the information. The Committee decided to await the firm’s reply and to relist the case on 03.05.2011. 68
Case No.:39/31/80ALC2/2010
Party Name:R.D.ENGINEERS (INDIA) PVT.LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00517/AM11/ RLA File :03/95/040/00480/AM11/ Lic.No/Date:0310592767 16.09.2010 Defer Date:03.05.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, the Committee 03.05.2011 1. Information in respect of Sl.No.4, 5 & 11 of the Standard Deficiency Format. 69
Case No.:33/27/80ALC2/2010
Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00430/AM11/ RLA File :61/24/040/00049/AM11/ Lic.No/Date:6110000494 21.09.2010 Defer Date:03.05.2011 submission of comments. The case may be relisted 03.05.2011. 70
Case No.:37/31/80ALC2/2010
Party Name:SPRAY ENGINEERING DEVICES LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00515/AM11/ RLA File :22/24/040/00040/AM11/ Lic.No/Date:2210010434 21.09.2010 Decision : As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the 1. Quantity of import item at Sl. No. 1 to be allowed as 9524 Kgs inclusive of a wastage of 5 %. 71
Case No.:47/31/80ALC2/2010
Party Name:SIEMENS ROLLING STOCK PVT.LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00525/AM11/ RLA File :03/95/040/00491/AM11/ Lic.No/Date:0310593387 22.09.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 03.05.2011. 72
Case No.:15/31/80ALC2/2010
Party Name:ENDRESS AND HAUSER (INDIA) AUTOMATION INSTRU Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00493/AM11/ RLA File :03/94/040/00556/AM11/ Lic.No/Date:0310593566 23.09.2010 Defer Date:03.05.2011
Decision : The Committee observed that the comments called for from DIT are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted 03.05.2011. 73
Case No.:18/27/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00415/AM11/ RLA File :04/24/040/00168/AM11/ Lic.No/Date:0410117473 24.09.2010 Defer Date:03.05.2011 failing which their case will be rejected without any further notice and to relist the case on 03.05.2011. 74
Case No.:31/27/80ALC2/2010
Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00428/AM11/ RLA File :04/24/040/00175/AM11/ Lic.No/Date:0410117536 27.09.2010 Decision : As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the 1. Description of Export product to be modified as “ Elevators Model No. CMONOGREEN PW22/1519 Quantity 12 Nos. & , Model No. C MONOGREEN PW15/1019 Quantity 2 Nos.” 2. Word “relevant” to be prefixed with the description of import items at Sl. Nos. 50 to 53. 3. Import items from S.No.1 to 53 to be allowed on net to net basis with accountability clause 75
Case No.:32/27/80ALC2/2010
Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00429/AM11/ RLA File :05/24/040/00230/AM11/ Lic.No/Date:0510273715 27.09.2010 Defer Date:03.05.2011 Decision : The Committee noted that the firm has sought time vide their letter dated 23.03.11 for submission of documents/information. The Committee, therefore, decided to defer the case. The case may be relisted on 03.05.2011. 76
Case No.:11/31/80ALC2/2010
Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00489/AM11/ RLA File :04/24/040/00173/AM11/ Lic.No/Date:0410117541 27.09.2010 Defer Date:03.05.2011 Decision : The Committee observed that the firm has not submitted S.No. 11 of SDL. They have submitted the statement & not calculation. On the recommendation of the representative of DHI present in the meeting, the Committee decided to ask the firm to submit the calculation supported by drawing as per of Sl.No.11 of the Standard Deficiency Format to examine their case and to relist the case on 03.05.2011.
Case No.:12/31/80ALC2/2010
Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred
77 HQ File :01/80/050/00490/AM11/ RLA File :04/24/040/00172/AM11/ Lic.No/Date:0410117538 27.09.2010 Defer Date:03.05.2011 Decision : The Committee observed that the firm has submitted the statement & not calculation. On the recommendation of the representative of DHI present in the meeting, the Committee decided to ask the firm to submit the calculation supported by drawing as per of Sl.No.11 of the Standard Deficiency Format to examine their case and to relist the case on 03.05.2011. 78
Case No.:36/27/80ALC2/2010
Party Name:THERMAX LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00433/AM11/ RLA File :31/24/040/00124/AM11/ Lic.No/Date:3110044780 28.09.2010 Defer Date:03.05.2011 Decision : The Committee observed that value addition of the said advance authorization is 13.5% which is less than minimum prescribed of 15%. The Committee decided to ask R.A. to clarify the same and to relist the case on 03.05.2011. 79
Case No.:46/31/80ALC2/2010
Party Name:TEMA INDIA LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00524/AM11/ RLA File :03/95/040/00512/AM11/ Lic.No/Date:0310594253 28.09.2010 Defer Date:03.05.2011 80
Case No.:13/31/80ALC2/2010
Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00491/AM11/ RLA File :04/24/040/00182/AM11/ Lic.No/Date:0410117729 01.10.2010 Decision : As per written comments of DHI received vide their U.O. Note No.3(74)/10TSW(B)/150 dated 11.03.2011, The Committee decided to ratify the norms in respect of the subject advance authorization as under: Import 1. Item no 1,2, 5 & 6 These are components & may be allowed under GN4. 2. Item no 3 The firm needs 12 nos per set as per information in Appendix 11A. So import of 24 nos Ball Valves to be allowed under GN4. 3. Item no 4 The firm has stated that there will be no machining. The total import weight is 3040 Kg & the same may be incorporated in the license & allowed under GN4. 81
Case No.:42/31/80ALC2/2010
Party Name:STARION INDIA P.LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00520/AM11/ RLA File :31/24/040/00129/AM11/ Lic.No/Date:3110044900 06.10.2010 Defer Date:03.05.2011 information. The Committee, therefore, decided to remind the firm finally for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 03.05.2011
82
Case No.:49/31/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00527/AM11/ RLA File :61/24/040/00055/AM11/ Lic.No/Date:6110000502 08.10.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The 83
Case No.:43/29/80ALC2/2010
Party Name:ORIENTAL CONTAINERS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00478/AM11/ RLA File :03/95/040/00525/AM11/ Lic.No/Date:0310596095 11.10.2010 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s reply to DIPP for examination and comments. The case may be relisted on 03.05.2011. 84
Case No.:9/31/80ALC2/2010
Party Name:SAVAS ENGINEERING COMPANY PVT. LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00487/AM11/ RLA File :31/24/040/00137/AM11/ Lic.No/Date:3110045065 15.10.2010 Defer Date:03.05.2011 submission of comments. The case may be relisted on 03.05.2011. 85
Case No.:18/31/80ALC2/2010
Party Name:TEMA INDIA LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00496/AM11/ RLA File :03/95/040/00570/AM11/ Lic.No/Date:0310597405 18.10.2010 86
Case No.:10/31/80ALC2/2010
Party Name:BIO TECH VISION CARE PVT.LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00488/AM11/ RLA File :08/24/040/00205/AM11/ Lic.No/Date:0810093165 19.10.2010 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s application to C&PC for examination and comments. The case may be relisted on 03.05.2011.
Case No.:17/41/81ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/81/050/00436/AM11/ RLA File :09/24/040/00315/AM11/ Lic.No/Date:0910044003 21.10.2010 Defer Date:03.05.2011
87 Decision : On the recommendation of the representative of DHI present in the meeting, the Committee 03.05.2011 1. Information in respect of Sl.No.4,5,9 & 11 of the Standard Deficiency Format export product wise.(Turbine & generator separately) 2. Use of each component proposed for import in the manufacture of export product 3. Indicate serial no of insulating material & their total cost. 4. Net weight & gross weight of item no 34 of import.. 88
Case No.:29/31/80ALC2/2010
Party Name:SIEMENS ROLLING STOCK PVT.LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00507/AM11/ RLA File :03/95/040/00592/AM11/ Lic.No/Date:0310598354 22.10.2010 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 03.05.2011. 89
Case No.:30/31/80ALC2/2010
Party Name:METSO POWER INDIA PRIVATE LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00508/AM11/ RLA File :04/24/040/00195/AM11/ Lic.No/Date:0410118269 25.10.2010 90
Case No.:45/31/80ALC2/2010
Party Name:ARMOR PLAST LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00523/AM11/ RLA File :07/24/040/00289/AM11/ Lic.No/Date:0710075019 25.10.2010 Defer Date:03.05.2011 failing which their case will be rejected without any further notice and to relist the case on 03.05.2011.
Case No.:52/31/80ALC2/2010
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00530/AM11/ RLA File :03/95/040/00573/AM11/ Lic.No/Date:0310598942 27.10.2010
91 Decision : As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the 1. Net empty weight of 344 MT to be specified with the quantity of export product. 2. Word “Relevant” to be prefixed with the descriptions of import items from Sl. No. 1 to 6. 3. Quantities of import items at Sl. No.1, 3, 4 & 5 and the same to be allowed as 1.03 Kgs./Kg content in the export product as claimed by the firm. 4. Quantity of import item at Sl. No.2 and the same to be allowed as 59167 Kgs. inclusive of 35.5 % wastage after 1/3rd recovery. 5. Quantity of import item at Sl. No. 6 to be allowed as 470 Mtrs.(7010 Kgs.). inclusive of 2 % wastage. 6. Weights of 52.532 MT, 8.2 MT, 1 MT, 5.13MT, 0.1 MT & 5.2 MT may be specified with the quantities of import items at Sl. Nos. 7, 8, 9, 10, 11 & 12 respectively and the same to be allowed on net to net basis. 7. Import item at Sl. No. 9 to be supplied with the export products. 8. Quantities of import items at Sl. Nos. 13 to 17 are welding consumables which to be allowed as applied for. 9. Import of components to be allowed with accountability clause 92
Case No.:54/31/80ALC2/2010
Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00532/AM11/ RLA File :03/95/040/00607/AM11/ Lic.No/Date:0310599033 27.10.2010 Decision : The Committee deliberated the written comments of DHI received vide their U.O. Note No.3(73)/09TSW(B)/117 dated 15.02.2011. On the request of the representative of the Ministry of Steel and after discussion, the Committee decided to reduce the entitlement of the firm to 8271 kg. the Export item – 8 units of COLLAR high flow 8 EWR of weight 4982.64 kg Import 8 units round bar of 8.5 inches dia of weight 9120 kg. The firm has submitted calculation of requirement suppoted by drawing. Firm’s entitlement comes to 8271 kg resulting in 7.2 units of round bar with net wastage of 66 % & 20% recovery. Allowed import of 8 number of bars of weight 9120 kg. as applied for. The firm entitlement is approved to the extent of 8271 kg. Only. 93
Case No.:8/41/81ALC2/2010
Party Name:AUTO COMP INDIA PVT. LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/81/050/00427/AM11/ RLA File :31/24/040/00130/AM11/ Lic.No/Date:3110045269 28.10.2010 Defer Date:19.04.2011 Decision : The Committee received written comments of DHI received vide their U.O. Note 3(77)/10 TSW(B)/574 dated 02.12.2010, and decided to examine the case on file in respect of the subject advance authorization on repeat basis as per Advance authorization License No. 3110043464 dated 02.06.2010 and to relist the case on 19.04.2011.
Case No.:56/31/80ALC2/2010
Party Name:SPIG COOLING TOWERS INDIA PVT LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00534/AM11/ RLA File :03/95/040/00604/AM11/ Lic.No/Date:0310599828 02.11.2010
94 Decision : The Committee decided to reject the case on the ground that the firm did not furnish any 95
Case No.:59/31/80ALC2/2010
Party Name:TEMA INDIA LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00537/AM11/ RLA File :03/95/040/00626/AM11/ Lic.No/Date:0310600063 03.11.2010 96
Case No.:61/31/80ALC2/2010
Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Closed HQ File :01/80/050/00539/AM11/ RLA File :07/24/040/00305/AM11/ Lic.No/Date:0710075238 04.11.2010 Decision : The firm has informed vide their letter dated 5th January, 2011 that they have surrendered the subject Advance authorization to the R.A., Bangalore. The Committee therefore decided to close the case on the part of NC. The Regional Authority may take note of the NC decision for information. 97
Case No.:62/31/80ALC2/2010
Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Closed HQ File :01/80/050/00540/AM11/ RLA File :07/24/040/00304/AM11/ Lic.No/Date:0710075239 04.11.2010 Decision : The firm has informed vide their letter dated 5th January, 2011 that they have surrendered the subject Advance authorization to the R.A., Bangalore. The Committee therefore decided to close the case on the part of NC. The Regional Authority may take note of the NC decision for information. 98
Case No.:63/31/80ALC2/2010
Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Closed HQ File :01/80/050/00541/AM11/ RLA File :07/24/040/00306/AM11/ Lic.No/Date:0710075240 04.11.2010 Decision : The firm has informed vide their letter dated 5th January, 2011 that they have surrendered the subject Advance authorization to the R.A., Bangalore. The Committee therefore decided to close the case on the part of NC. The Regional Authority may take note of the NC decision for information.
99
Case No.:7/37/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00745/AM11/ RLA File :09/24/040/00343/AM11/ Lic.No/Date:0910044474 26.11.2010 Defer Date:03.05.2011 03.05.2011 1. Information in respect of Sl.No.4,5,9 & 11 of the Standard Deficiency Format SDL export product wise.( Wet gas compressors with steam turbine & auxiliaries separately) 2. Weight of each export product separately (Wet gas compressors with steam turbine separately) with details of Auxiliaries & its weight separately. 3. Net weight & gross weight of different casting & forgings. 4. Use of each component proposed for import in the manufacture of export product. 100
Case No.:19/37/80ALC2/2010
Party Name:PSK ENGINEERING PVT LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00757/AM11/ RLA File :07/24/040/00325/AM11/ Lic.No/Date:0710075814 02.12.2010 Decision : As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: Word “relevant” to be prefixed with the description of import item and its quantity may be allowed as 3371 Kgs inclusive of 21.6 % wastage after 1/3rd recovery 101
Case No.:5/37/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00743/AM11/ RLA File :09/24/040/00370/AM11/ Lic.No/Date:0910044582 06.12.2010 Defer Date:03.05.2011 failing which their case will be rejected without any further notice and to relist the case on 03.05.2011. 102
Case No.:6/37/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00744/AM11/ RLA File :09/24/040/00384/AM11/ Lic.No/Date:0910044581 06.12.2010 Defer Date:03.05.2011 failing which their case will be rejected without any further notice and to relist the case on 03.05.2011. 103
Case No.:8/37/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00746/AM11/ RLA File :09/24/040/00363/AM11/ Lic.No/Date:0910044578 06.12.2010 Defer Date:03.05.2011
failing which their case will be rejected without any further notice and to relist the case on 03.05.2011. 104
Case No.:10/37/80ALC2/2010
Party Name:CMI FPE LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00748/AM11/ RLA File :03/94/040/00715/AM11/ Lic.No/Date:0310604608 06.12.2010 Defer Date:03.05.2011 105
Case No.:1/34/80ALC2/2010
Party Name:POLY MEDICURE LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00627/AM11/ RLA File :05/24/040/00310/AM11/ Lic.No/Date:0510279357 14.12.2010 Defer Date:03.05.2011 Decision :The Committee observed that the comments called for from C&PC are yet to be received. listed 03.05.2011. 106
Case No.:9/37/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00747/AM11/ RLA File :11/24/040/00019/AM11/ Lic.No/Date:1110023814 24.12.2010 Defer Date:03.05.2011 failing which their case will be rejected without any further notice and to relist the case on 03.05.2011. 107
Case No.:4/37/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00742/AM11/ RLA File :07/24/040/00388/AM11/ Lic.No/Date:0710076497 05.01.2011 Decision : The Committee observed that R.A., Bangalore has informed that the firm has requested vide their letter dated 11.03.2011 for inclusion of additional import items, as the items declared as components and claimed with “Nil” wastage. Firm request has been considered on nettonet basis with accountability clause as per Sl. No. 4 general note for Engg. Products, Handbook of Procedures (Vol.II) 20092014 (Copy of amendment sheet No. 1 dated 15.03.2011 forwarded to NCI). The Committee, therefore, decided to approve the case on the part of NCI. The Regional Authority and DIT may please be informed accordingly. 108
Case No.:30/37/80ALC2/2010
Party Name:INJECTOPLAST PVT.LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00768/AM11/ RLA File :06/24/040/00050/AM11/ Lic.No/Date:0610020523 11.01.2011 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. listed 03.05.2011.
109
Case No.:32/37/80ALC2/2010
Party Name:WOLFRA TECH PVT LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00770/AM11/ RLA File :07/24/040/00291/AM11/ Lic.No/Date:0710076697 12.01.2011 Decision : As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the Committee decided that after taking clue from SION C1317, quantities of import items at Sl. No. 1 & 2 are allowed as applied for i.e. 3300 Kgs. and 300 Kgs. respectively in respect of the subject advance authorization. 110
Case No.:1/37/80ALC2/2010
Party Name:ACCURATE INDUSTRIAL CONTROLS PVT.LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00739/AM11/ RLA File :31/24/040/00225/AM11/ Lic.No/Date:3110046461 17.01.2011 Defer Date:03.05.2011 111
Case No.:2/37/80ALC2/2010
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00740/AM11/ RLA File :05/23/040/00293/AM11/ Lic.No/Date:0510281598 17.01.2011 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The Committee, therefore, decided to defer the case and to relist the case on 03.05.2011. 112
Case No.:12/37/80ALC2/2010
Party Name:HIMSON ENGINEERING PVT. LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00750/AM11/ RLA File :52/24/040/00043/AM11/ Lic.No/Date:5210033513 17.01.2011 Defer Date:03.05.2011 Decision : The Committee noted the information furnished by the Office of Jt.D.GFT, Surat vide their letter dated 04.05.2011 and observed that the information the import item 93 to 98 is not clear. The Committee therefore decided to clarify the mater from R.A. and the firm. The case may be relisted on 03.05.2011. 113
Case No.:3/37/80ALC2/2010
Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00741/AM11/ RLA File :05/24/040/00341/AM11/ Lic.No/Date:0510281781 18.01.2011 Defer Date:03.05.2011 Decision : On the recommendation of the representative DIPP present in the meeting, the Committee 03.05.2011 1. Information in respect of Sl.No.3,4,5 & 11 of the Standard Deficiency Format for export product wise
Case No.:13/37/80ALC2/2010
Party Name:BOSCH LIMITED, Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred
114 HQ File :01/80/050/00751/AM11/ RLA File :07/24/040/00417/AM11/ Lic.No/Date:0710076813 19.01.2011 Defer Date:03.05.2011 Decision :The representative of the DHI informed the Committee that the case is under study. The 115
Case No.:14/37/80ALC2/2010
Party Name:PENNWALT LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00752/AM11/ RLA File :03/95/040/00763/AM11/ Lic.No/Date:0310611983 20.01.2011 Decision : As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. Words “VNotch Chlorinators” to be prefixed with the description of import item at Sl. No. 1. 2. Import items from Sl. No 1 to 7 to be allowed as per GN4 for Engineering Products. 116
Case No.:15/37/80ALC2/2010
Party Name:VEE KAY VIKRAM & CO Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00753/AM11/ RLA File :08/24/040/00131/AM11/ Lic.No/Date:0810095664 21.01.2011 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. listed 03.05.2011. 117
Case No.:16/37/80ALC2/2010
Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00754/AM11/ RLA File :05/24/040/00345/AM11/ Lic.No/Date:0510282154 21.01.2011 Defer Date:03.05.2011 03.05.2011 1. Information in respect of Sl. No. 9 of the Standard Deficiency Format. 2. Break up import item 1 given in sets to numbers. 118
Case No.:18/37/80ALC2/2010
Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00756/AM11/ RLA File :05/24/040/00347/AM11/ Lic.No/Date:0510282244 24.01.2011 Defer Date:03.05.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Information in respect of Sl.No.3,4,5,11 & 13 of the Standard Deficiency Format.
119
Case No.:20/37/80ALC2/2010
Party Name:TERUMO PENPOL LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00758/AM11/ RLA File :53/24/040/00026/AM11/ Lic.No/Date:5310012092 24.01.2011 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. listed 03.05.2011. 120
Case No.:21/37/80ALC2/2010
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00759/AM11/ RLA File :09/24/040/00478/AM11/ Lic.No/Date:0910045222 25.01.2011 Defer Date:03.05.2011 03.05.2011 1. Information in respect of Sl.No 11 of the Standard Deficiency Format. 121
Case No.:22/37/80ALC2/2010
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00760/AM11/ RLA File :09/24/040/00477/AM11/ Lic.No/Date:0910045223 25.01.2011 Defer Date:03.05.2011 03.05.2011 1. Information in respect of Sl.No. 11 of the Standard Deficiency Format. 122
Case No.:23/37/80ALC2/2010
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00761/AM11/ RLA File :09/24/040/00476/AM11/ Lic.No/Date:0910045224 25.01.2011 Defer Date:03.05.2011 03.05.2011 1. Use of item .No. 3 to 5 of import. 2. Information in respect of Sl.No. 11 of the Standard Deficiency Format. 123
Case No.:24/37/80ALC2/2010
Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00762/AM11/ RLA File :07/24/040/00423/AM11/ Lic.No/Date:0710076901 25.01.2011 Defer Date:03.05.2011 failing which their case will be rejected without any further notice and to relist the case on 03.05.2011.
124
Case No.:25/37/80ALC2/2010
Party Name:THERMAX LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00763/AM11/ RLA File :31/24/040/00226/AM11/ Lic.No/Date:3110046595 25.01.2011 Defer Date:03.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The 125
Case No.:26/37/80ALC2/2010
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00764/AM11/ RLA File :31/21/040/00334/AM11/ Lic.No/Date:3110046646 28.01.2011 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s application to DHI for information and necessary action. The case may be relisted on 03.05.2011. 126
Case No.:28/37/80ALC2/2010
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00766/AM11/ RLA File :31/21/040/00331/AM11/ Lic.No/Date:3110046679 28.01.2011 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s application to DHI for information and necessary action. The case may be relisted on 03.05.2011. 127
Case No.:27/37/80ALC2/2010
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00765/AM11/ RLA File :03/94/040/00933/AM11/ Lic.No/Date:0310613264 31.01.2011 Defer Date:03.05.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Information in respect of Sl.No.3,4,5, 11 & 13 of the Standard Deficiency Format. 2. Quantities of import items at Sl. No. 1, 2, 3 & 4 in Nos. also in addition to their weight. 128
Case No.:29/37/80ALC2/2010
Party Name:G.R.ENGINEERING PRIVATE LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00767/AM11/ RLA File :03/94/040/00926/AM11/ Lic.No/Date:0310613280 31.01.2011 Decision : As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. Net Empty Export weights of 141.5 MT & 154.974 MT to be specified with the quantities of export products at S.No.1 & 2 respectively. 2. Word “Relevant” to be prefixed with the description of import item at Sl. No.1. 3. Quantity of import item at S.No.1 to be allowed as 1.05 Kgs/ Kg. content in the export products. 4. Weight of “10.658 MT ” to be added with the quantity of import item at Sl.No.2 and quantity of this item to be allowed on net to net basis.
129
Case No.:1/40/80ALC2/2010
Party Name:TERUMO PENPOL LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00851/AM11/ RLA File :53/24/040/00028/AM11/ Lic.No/Date:5310012323 22.02.2011 Defer Date:03.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received. listed 03.05.2011. 130
Case No.:2/40/80ALC2/2010
Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00852/AM11/ RLA File :05/24/040/00388/AM11/ Lic.No/Date:0510284537 23.02.2011 Decision : As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the Committee decided to ratify the norms in respect of the subject advance authorization on repeat basis as per Advance Authorization No. 0510265105 dated 01.06.2010 ratified in Norms Committee Meeting No. 37/11 dated 08.02.2011 as under: 1. Net weight of export product may be specified as 575.7 Kgs. 2. Quantity of import item may be allowed as applied for i.e. 2522 Kgs. inclusive of 338% wastage after taking 6% recovery from scrap. 131
Case No.:3/40/80ALC2/2010
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00853/AM11/ RLA File :05/24/040/00385/AM11/ Lic.No/Date:0510284538 23.02.2011 Decision : The Committee noted that R.A. vide their letter No. 05/24/040/385/AM 11/ZALC/CLA/775978 dated 11.03.2011has informed the subject advance authorization was issued to the firm as per para 4.7.1 of H.B.P. 200920014 on repeat basis as per decision of Norms Committee in Meeting No. 13/80 dated 29.06.2010; 3.9.1 of Policy Circular No. 20 dated 05.12.2007 and 3.7 of Policy Circular No. 20 dated 05.12.2007. Therefore, R.A. has not sent the application of the firm. The Committee accordingly decided to close the case on the part of NC. The Regional Authority may take note of the NC decision for information. 132
Case No.:5/40/80ALC2/2010
Party Name:SAGE METALS LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00855/AM11/ RLA File :05/24/040/00371/AM11/ Lic.No/Date:0510284565 23.02.2011 Defer Date:03.05.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Information in respect of Sl.No.3, 5 & 11 of the Standard Deficiency Format, pump accessories wise. 2. Name of pump accessories and their respective quantities in Nos. also in addition to their weights. 3. Specific description of import item at Sl. No 5 and its quantity in Nos. also in addition to its weight.
133
Case No.:6/40/80ALC2/2010
Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00856/AM11/ RLA File :03/95/040/00943/AM11/ Lic.No/Date:0310617569 23.02.2011 Defer Date:03.05.2011 134
Case No.:4/40/80ALC2/2010
Party Name:WOLFRA TECH PVT LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00854/AM11/ RLA File :07/24/040/00464/AM11/ Lic.No/Date:0710077564 24.02.2011 Defer Date:03.05.2011 135
Case No.:7/40/80ALC2/2010
Party Name:STANDARD RADIATORS PVT.LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00857/AM11/ RLA File :34/24/040/00306/AM11/ Lic.No/Date:3410029421 24.02.2011 Defer Date:03.05.2011 Decision : The Committee decided to forward a copy of firm’s application to DHI for information and necessary action. The case may be relisted on 03.05.2011. 136
Case No.:8/40/80ALC2/2010
Party Name:LLOYD ELECTRIC & ENGG. LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00858/AM11/ RLA File :05/23/040/00335/AM11/ Lic.No/Date:0510284587 24.02.2011 Defer Date:03.05.2011 Decision :On the recommendation of the representative of DIPP present in the meeting, the Committee 03.05.2011 1. Information in respect of Sl.No.4,5 & 11 of the Standard Deficiency Format for each capacity of Split AirConditioners. 2. Quantities of Split AirConditioners, capacity wise. 137
Case No.:9/40/80ALC2/2010
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00859/AM11/ RLA File :03/95/040/00889/AM11/ Lic.No/Date:0310617962 25.02.2011 Defer Date:03.05.2011 138
Case No.:10/40/80ALC2/2010
Party Name:GL&V INDIA PRIVATE LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00860/AM11/ RLA File :31/24/040/00258/AM11/ Lic.No/Date:3110047111 25.02.2011 Defer Date:03.05.2011
Decision : The representative of the DC(MSME) informed the Committee that they received the firm’s application on 14.03.2011 and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 03.05.2011. 139
Case No.:11/40/80ALC2/2010
Party Name:INGERSOLLRAND (INDIA) LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00861/AM11/ RLA File :03/94/040/01050/AM11/ Lic.No/Date:0310618072 25.02.2011 Defer Date:03.05.2011 140
Case No.:12/40/80ALC2/2010
Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00862/AM11/ RLA File :31/24/040/00265/AM11/ Lic.No/Date:3110047120 28.02.2011 Defer Date:03.05.2011 Decision : The Committee noted that the firm has not given proper reply. On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Information in respect of Sl.No.11 of the Standard Deficiency Format. 2. Blank size for each export product supported by size of the export product. 3. Sheet lay out diagram indicating the wastage during blanking, export productwise. 141
Case No.:13/40/80ALC2/2010
Party Name:XYTEL INDIA PVT.LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00863/AM11/ RLA File :31/24/040/00256/AM11/ Lic.No/Date:3110047133 28.02.2011 Defer Date:3.05.2011 Decision : The representative of the DIPP informed the Committee that the case is under study. The 142
Case No.:14/40/80ALC2/2010
Party Name:ANDRITZ HYDRO PRIVATE LIMITED, Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Rejected HQ File :01/80/050/00864/AM11/ RLA File :05/23/040/00340/AM11/ Lic.No/Date:0510284704 01.03.2011 Decision : The representative of DHI informed the Committee that the firm has submitted request for ratification of norms for export of 3X40 MW Rangat Hydro project. The firm has informed at appendix 11A of the application that the wastage is it is “under design & will furnish later”. Since the design is not complete & the wastage is not final, the request is premature. The Committee decided to reject the case.
Case No.:15/40/80ALC2/2010
Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00865/AM11/ RLA File :05/24/040/00408/AM11/ Lic.No/Date:0510284722 01.03.2011
143 Decision : As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the Committee decided to ratify the norms in respect of the subject advance authorization as under: 1. Net weight of export product may be specified as 461.7 Kgs. 2. Quantity of import item may be allowed as 243 Nos on net to net basis. However, the weight of import item may be allowed as 1307 Kgs inclusive of 183 % wastage after taking 6 % recovery from scrap 144
Case No.:16/40/80ALC2/2010
Party Name:JAY NIKKI INDUSTRIES LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00866/AM11/ RLA File :05/23/040/00338/AM11/ Lic.No/Date:0510284736 01.03.2011 Defer Date:3.05.2011 Decision : The Committee noted that the firm’s application has been sent to DC(MSME) on 08.03.2011. The Committee also decided to forward the firm’s application to DIPP for examination and comments. The case may be relisted on 03.05.2011. 145
Case No.:17/40/80ALC2/2010
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00867/AM11/ RLA File :05/24/040/00401/AM11/ Lic.No/Date:0510284820 01.03.2011 Defer Date:3.05.2011 Decision : The Committee decided to forward the firm’s application to C&PC for examination and comments. The case may be relisted on 03.05.2011. 146
Case No.:20/40/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00870/AM11/ RLA File :61/21/040/00002/AM11/ Lic.No/Date:6110000573 01.03.2011 Defer Date:3.05.2011 decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Information in respect of Sl.No.4,5,9 & 11 of the Standard Deficiency Format export product wise. 2. Weight & length of different types of pipes proposed for import. 3. Identification of insulating material proposed for import & their total price 4. Input Weight of each casting/ forging and corresponding finished weight. (Item wise). 5. Use of each component proposed for import in the manufacture of export product. 147
Case No.:22/40/80ALC2/2010
Party Name:ACCURATE INDUSTRIAL CONTROLS PVT.LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00872/AM11/ RLA File :31/24/040/00272/AM11/ Lic.No/Date:3110047155 01.03.2011 Defer Date:3.05.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Information in respect of Sl.No.6,8 & 9 of the Standard Deficiency Format. 2. Capacity of Export product namely Industrial Refrigerator.
148
Case No.:23/40/80ALC2/2010
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00873/AM11/ RLA File :05/23/040/00339/AM11/ Lic.No/Date:0510284857 01.03.2011 Decision : The Committee noted that firm’s application has not been received so far. However, according to online data, items of import appear to be covered in GN4 for the Engineering Products. The Committee therefore presumed the subject Authorisation may have been issued under GN4. The Committee accordingly decided to revert back the case to the concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dated 05.12.2007. 149
Case No.:19/40/80ALC2/2010
Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00869/AM11/ RLA File :03/95/040/00963/AM11/ Lic.No/Date:0310619026 02.03.2011 Defer Date:3.05.2011 150
Case No.:18/40/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00868/AM11/ RLA File :04/24/040/00316/AM11/ Lic.No/Date:0410122233 03.03.2011 Defer Date:3.05.2011 decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Information in respect of Sl.No.5 & 11 of the Standard Deficiency Format of each export product separately. 2. Quantity of seamless and welded pipes separately both in weight and length for each type of steel i.e. CS, AS and SS. 151
Case No.:21/40/80ALC2/2010
Party Name:BAUER KOMPRESSOREN INDIA PRIVATE LIMITED., Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00871/AM11/ RLA File :31/24/040/00264/AM11/ Lic.No/Date:3110047187 03.03.2011 Defer Date:3.05.2011 Decision : The Committee noted that the firm application has been sent to DHI on 17.03.2011. The Committee also decided to forward a copy of firm’s application to DIPP for information and necessary action. The case may be relisted on 03.05.2011. 152
Case No.:25/40/80ALC2/2010
Party Name:NOVA INTERGRATED SYSTEMS LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00875/AM11/ RLA File :05/24/040/00374/AM11/ Lic.No/Date:0510285051 03.03.2011 Defer Date:3.05.2011 Decision : The Committee noted that the firm application has been sent to DC(MSME) & DIT on 23.03.2011 for examination and comments. The Committee, therefore decided to await their comments. The case may be relisted on 03.05.2011.
153
Case No.:24/40/80ALC2/2010
Party Name:CEEYES METAL ENGINEERING P LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Approved HQ File :01/80/050/00874/AM11/ RLA File :04/24/040/00320/AM11/ Lic.No/Date:0410122293 07.03.2011 Decision : The Committee noted that firm’s application has not been received so far. However, according to online data, items of import appear to be covered in GN4 for the Engineering Products. The Committee therefore presumed the subject Authorisation may have been issued under GN4. The Committee accordingly decided to revert back the case to the concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dated 05.12.2007. 154
Case No.:26/40/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00876/AM11/ RLA File :09/24/040/00553/AM11/ Lic.No/Date:0910045827 07.03.2011 Defer Date:3.05.2011 155
Case No.:27/40/80ALC2/2010
Party Name:ALFA LAVAL (INDIA)LIMITED Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00877/AM11/ RLA File :31/21/040/00371/AM11/ Lic.No/Date:3110047239 07.03.2011 Defer Date:3.05.2011 156
Case No.:28/40/80ALC2/2010
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00878/AM11/ RLA File :05/23/040/00348/AM11/ Lic.No/Date:0510285314 08.03.2011 Defer Date:3.05.2011 Decision : The representative of the DHI informed the Committee that the case is under study. The 157
Case No.:29/40/80ALC2/2010
Party Name:POLY MEDICURE LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00879/AM11/ RLA File :05/24/040/00406/AM11/ Lic.No/Date:0510285427 08.03.2011 Defer Date:3.05.2011 Decision : The Committee noted that the firm’s application has been sent to C&PC on 23.03.2011. The Committee, therefore, decided to await the comments of C&PC. The case may be relisted 03.05.2011. 158
Case No.:30/40/80ALC2/2010
Party Name:XYTEL INDIA PVT.LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00880/AM11/ RLA File :31/24/040/00269/AM11/ Lic.No/Date:3110047258 08.03.2011 Defer Date:3.05.2011
159
Case No.:31/40/80ALC2/2010
Party Name:L&T MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00881/AM11/ RLA File :03/95/040/00926/AM11/ Lic.No/Date:0310620641 10.03.2011 Defer Date:3.05.2011 160
Case No.:32/40/80ALC2/2010
Party Name:ATHERM THERMAL SOLUTIONS INDIA PVT LTD Meet No/Date:40/80 ALC2/2010 22.03.2011 Status: Deferred HQ File :01/80/050/00882/AM11/ RLA File :07/24/040/00463/AM11/ Lic.No/Date:0710077971 10.03.2011 Defer Date:3.05.2011 S.No.34
Case No. A 09
M/s. Jhagadia Copper LTd., HQ F.No.01/80/162/00542/AM10/DES.I Lic.No. & Date Meeting No.40/11 RA.F.No.34/24/039/00001/AM10 3410024795 dt.29.07.2009 Date: 22.03.2011 Ratification of norms. The Committee observed that the comments called for from Ministry of Mines are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted 03.05.2011. S.No.35
Case No. A 14
M/s. Larson & Toubro Ltd., HQ F.No.01/80/162/00522/AM11/DES.I Lic.No. & Date Meeting No.40/11 RA.F.No.03/95/039/00004/AM10 0310541346 dt.12.10.2009 Date: 22.03.2011 Ratification of norms The representative of the DHI informed the Committee that the case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 03.05.2011. S. No.490
Case No. A/R40
M/s. Bharat Heavy Electricals Ltd., Haridwar HQ F.No.01/80/162/00539/AM09/DES.I Lic.No. & Date Meeting No.40/11 RA F.No.61/24/040/00036/AM09 6110000254 dt.05.12.2008 Date: 22.03.2011 Ratification of norms The representative of the DHI informed the Committee that the case is under study. The Committee, S.No.491
Case No. A/R47
M/s. Thermax Ltd., HQ F.No.01/80/050/00682/AM08/DESI Lic.No. & Date Meeting No.40/11 RA F.No.05/24/040/00393/AM08 3110033083 dt.11.03.2008 Date: 22.03.2011 The Committee deliberated the written comments of DHI received vide their U.O. Note No.3(14)/10 TSW(B)/48 & 114 dated 18.01.2011 & 15.02.2011 and decided to ratify the norms in respect of the subject advance authorization as under:
Export The export weight 316.692 MT incorporated in the license. Import 1. Item no 1 Allowed 51322 kg of length 16482 meters without any wastage. 2. Item no 2 Allowed 57000 kg of length 542 meters without any wastage. 3. Item no 3 to 5 These are components & allowed under GN4. S.No.492
Case No. A/R117
M/s. Thermax Ltd., HQ F.No.01/80/050/01034/AM09/DESI Lic.No. & Date Meeting No.40/11 RA F.No.31/24/040/000143/AM09 3110035317 dt.09.09.2008 Date: 22.03.2011 The Committee decided to forward a copy of firm’s reply to DHI for examination and comments. The case may be relisted on 03.05.2011. Sl.No.493
Case No.A/R157
M/s. Bharat Heavy Electricals LTd., Trichirapalli HQ F.No.01/80/050/00498/AM10/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.04/24/040/00143/AM10 0410108784 dt.17.11.2009 Date: 22.03.2011 As per written comments of DHI, vide their U.O. Note No.3(29)/09TSW(B)/99 dated 10.02.2011, the Committee decided to ratify the norms in respect of the subject advance authorization with an amendment to Import item No 40 (which is to be allowed) as under: Export The description of export product may be amended & their weight incorporated as given below. 1. ESP 8 numbers 19,132MT 2. APH 8 numbers2960 MT 3. FAN16 numbers810 MT 4. Dampers & gates 1264 MT Import 1. Item no 1 Allowed at 2000 MT with 3% wastage as applied for. 2. Item no 2 The firm has reduced the requirement of the item. The item to be allowed at 985 MT with 5% wastage. 3. Item no 3 The firm has sought import of 20 MT. But during application it had applied for 14 MT. The same may be allowed. 4. Item no 4 The firm has reduced the requirement of the item. The item may be allowed at 1244 MT with negligible wastage. 5. Item no 5The description may be amended. SS wires may be allowed at 67.88 MT with negligible wastage. Allow import of 28 MT of SS rounds with 10 % wastage. 6. Item no 40 To be allowed subject to the condition that they will be exported. 7. All other items up to item no 58 are either components or spares. Components may be allowed under Gn4 & spares as per spares policy. Sl.No.494
Case No.A/R158
M/s. Bharat Heavy Electricals LTd., Bhopal HQ F.No.01/80/050/00167/AM06/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.11/24/040/00011/AM06 1110010869 dt.11.05.2005 Date: 22.03.2011 The representative of the DHI informed the Committee that the case is under study. The Committee, Sl.No.495
Case No.A/R159
M/s. Bharat Heavy Electricals LTd., Ranipet HQ F.No.01/80/050/00283/AM08/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.04/24/040/00204/AM08 0410091231 dt.27.09.2007 Date: 22.03.2011 As per written comments of DHI, vide their U.O. Note No.3(29)/09TSW(B)/97 dated 10.02.2011, the Export The description of export product may be amended to “Boiler Auxiliaries consisting of ESP, APH, FAN, Dampers & gates” & total weight is 1895 MT & the same may be incorporated in the license. Import 1. Item no 1 Allowed at 5 MT with 1% wastage as applied for. 2. Item no 2 Allowed at 100 MT with 1.22 % wastage as applied for. 3. Item no 3 to 7 These are components & allowed under GN4. Sl.No.496
Case No.A/R160
M/s. Thermal Systems (Hyderabad) Pvt. LTd., HQ F.No.01/80/050/00137/AM10/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.09/24/040/00063/AM09 0910038107 dt.03.06.2007 Date: 22.03.2011 The Committee noted that the firm has replied vide letter of dated 010211 enclosing letters of dated 0402 10, 190510. The reply is incomplete & needs clarifications. On the recommendation of the representative of DHI present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. The weight of the export product is said to be 224 MT in the material balancing sheet now submitted, but in the drawing submitted it is stated to be 71MT which needs clarification. The firm may be asked to submit legible drawing highlighting the weight & correlating it with the export weight. 2. The firm stated in the letter of dated 010210 that items like “ Shell, drum, tube sheet &n dished end” are not required in the water tube boiler. But they have mentioned in their letter of dated 190510 that these will be procured indigenously. Also in the drawing submitted, steel drum is there. The firm is to clarify the same. 3. The firm may be asked to submit Sl no 11 of SDL supported by drawing along with above clarifications to examine their request. 4. As per the copy of purchase order submitted, the delivery date was December 2009. The firm may clarify again if the same has been supplied or not. If supplied, copy of shipping bill may be submitted. Sl.No.497
Case No.A/R161
M/s. Thermax LTd., HQ F.No.01/80/050/01549/AM09/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.31/21/040/00295/AM09 3110036392 dt.11.12.2008 Date: 22.03.2011 The representative of the DHI informed the Committee that the case is under study. The Committee, Sl.No.498
Case No.A/R162
M/s. Vidyut Metallics Pvt. Ltd., Thane HQ F.No.01/80/050/00854/AM10/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.03/95/040/00818/AM10 0310567032 dt.29.03.2010 Date: 22.03.2011 The Committee considered the written reply of the firm dated 20.03.2010 and 27.01.2011 and deliberated the written comments of DIPP received vide their U.O. Note No. dated 24.03.2011. The Committee observed that the license was ratified on repeat basis on repeat basis as per Advance Authorization No. 0310514778 dated 06.04.2009 ratified in Meeting No. 26/80 dated 29.09.2009 and there are no grounds to reconsider the norms in respect of the subject advance authorization/case
S.No.499 Case No. A/R – 150 M/s. Bharat Heavy Electricals LTd., Bhopal HQ F.No.01/80/50/01469/AM08/DES.I Lic.No. & Date Meeting No.40/11 RA.F.No.11/24/040/00042/AM08 1110016562 dt.17.12.2007 Date: 22.03.2011 Ratification of norms. The firm’s representative Sh. Dilip Supekar, Dy. General Manager, Material Management (FE) and Sh. J.S. Hanspal, Additional General Manager appeared on personal hearing and informed that their reply dated 20.03.2010 answers all the queries given point wise. The Committee, therefore decided to refer the reply of the firm to DHI for examining the case to furnish their comments. The case may be relisted on 03.05.2011. S.No.500
Case No. A/R109
M/s. Denso Haryana Pvt. LTd., Gurgaon F.No. 01/80/50/ 00394/AM10/DES.I Lic.No. & Date Meeting No.40/11 RA F.No.05/23/040/00025/AM10 0510249539 dt.18.09.2009 Date: 22.03.2011 Restore an important raw material in the export product The representative of the firm Shri Parveen Bhatt, Sr. Manager (Procurement) appeared before the Committee for personal hearing. They explained the case to the Committee. The Committee therefore decided to ratify the import item No. 7 as applied for with 5% wastage. . S.No.501
Case No. A/R72
M/s. The Saraswati Industrial Syndicate LTd., F.No. 01/80/50/ 00075/AM10/DES.I Lic.No. & Date Meeting No.40/11 RA F.No.05/24/040/00057/AM10 0510240867 dt.05.05.2009 Date: 22.03.2011 Ratification of norms. The Committee decided to forward a copy of firm’s reply to DIPP for examination and comments. The case may be relisted on 03.05.2011. S.No.502
Case No. A/R90
M/s. Larson Toubro Ltd., F.No. 01/80/50/00742/AM10/DES.I Lic.No. & Date Meeting No.40/11 RA F.No.03/95/040/00713/AM10 0310558679 dt.04.02.2010 Date: 22.03.2011 Ratification of norms. The Committee noted that the firm has decided to restrict the quantity of Clad Plates for import under the authorization and source remaining quantity locally and requested to treat amendment in authorization as “withdrawn”. The Committee therefore decided to close their case on the part of NC. The Regional Authority may take note of the NC decision for information. S.No.503
Case No. A/R
166 M/s. Bharat Heavy Electricals LTd., Bhopal HQ F.No.01/80/050/00339/AM10/DES.I Lic. No. & date Meeting No.40/11 RA.F.No.11/24/040/00010/AM10 1110020832 dt.04.08.2009 Date: 22.03.2011 The representative of the DHI informed the Committee that the case is under study. The Committee, S.No.504
Case No.A/R176
M/s. IDMC Limited Vithal Udyognagar HQ F.No.01/80/050/00477/AM10/ DESI Lic.No. & Date
Meeting No.40/11 RA F.No.34/24/040/00104/AM10 3410025225 dt.30.09.2009 Date: 22.03.2011 The representative of the DIPP informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 03.05.2011. S.No.505
Case No.A/R178
M/s. United Drilling Tools Ltd., Delhi HQ F.No.01/80/050/00397/AM10/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.05/24/040/00318/AM10 0510249707 dt.22.09.2009 Date: 22.03.2011 The representative of the DHI informed the Committee that the case is under study. The Committee, S.No.506
Case No.A/R181
M/s. Blue Star Ltd., Mumbai HQ F.No.01/80/050/00282/AM10/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.03/94/040/00107/AM10 0310528936 dt.15.07.2009 Date: 22.03.2011 The representative of the DIPP informed the Committee that the case is under study. The Committee, S.No.507
Case No.A/R182
M/s. Bharat Heavy Electricals Ltd., Ranipet HQ F.No.01/80/050/01333/AM09/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.04/24/040/00001/AM09 0410100307 dt.25.11.2008 Date: 22.03.2011 As per written comments of DHI, vide their U.O. Note No.3(29)/09TSW(B)/122 dated 24.02.2011, the Export The description of export product may be amended & their weight incorporated as given below. 1. ESP 16,060 MT 2. APH 2958 MT 3. FAN 810 MT 4. Dampers & gates 1252 MT Import 1. Item no 1 Allowed at 900 MT with 3% wastage as applied for. 2. Item no 2 Allowed at 600 MT with 4 % wastage. 3. Item no 3 Allowed at 18.3 MT with 3 % wastage as per calculation given. 4. Item no 4 Allowed at 300 MT with 2 % wastage as applied for. 5. Item no 5 The firm has reduced the requirement. Allowed at 1238 MT with 2.5% wastage as applied for. 6. Item no 6The description may be amended to “SS wires” & 70 MT to be allowed as applied for with 1% wastage. 7. Item no 24 this is a tool & hence to be deleted. 8. All other items up to item no 32 are either components or spares. Components may be allowed under Gn4 & spares as per spares policy. The Regional Authority may take note of the NC decision for information. S.No.508
Case No.A/R183
M/s. Microtek Machines Ltd., HQ F.No.01/80/050/00794/AM10/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.07/24/040/00458/AM10 0710070360 dt.04.03.2010 Date: 22.03.2011 The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments.
The case may be relisted on 03.05.2011. S.No.509
Case No.A/R187
M/s. Motherson Sumi System Ltd., New Delhi HQ F.No.01/80/050/00169/AM07/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.25/24/040/00002/AM07 2510001667 dt.16.05.2006 Date: 22.03.2011 The Committee observed that the comments called for from C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 03.05.2011.
Case No.A/R197
M/s. GEA BGR Energy System India Ltd., Chennai HQ F.No.01/80/050/01283/AM09/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.04/24/040/00196/AM09 0410099962 dt.12.11.2008 Date: 22.03.2011 The Committee deliberated the request of the firm and decided to forward the firm’s representation for examination and comments. The case may be relisted on 03.05.2011
Case No.A/R198
M/s. G.R. Engineering Pvt. LTd., Mumbai HQ F.No.01/80/050/01594/AM06/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.03/94/040/01368/AM06 0310372828 dt.23.03.2006 Date: 22.03.2011 Amendment in the description of export item As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the Committee decided Description of Export Products and their net export weight to be modified to in respect of the subject advance authorization as under: Sl. No. Description Quantity Net Export Weight 1 Roaster 1 No. 63.091 MT 2 Oxide Bin 1 No. 24.881 MT 3 Storage Tanks 6 Nos. 104.874 MT (17.479 MT x 6 Nos.)
Case No.A/R199
M/s. Automat Irrigation Pvt. Ltd., HQ F.No.01/80/050/00369/AM10/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.05/24/040/00148/Am10 0510248965 dt.09.09.2009 Date: 22.03.2011 Ratification of Norms The representative of the DIPP informed the Committee that the case is under study. The Committee,
Case No.A/R200
M/s. AIA Engineering Ltd., Ahmedabad HQ F.No.01/80/050/00175/AM10/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.08/24/040/00009/AM10 0810079414 dt.21.04.2010 Date: 22.03.2011 Ratification of Norms The representative of the DHI informed the Committee that the case is under study. The Committee,
Case No.A/R201
M/s. Air Liquid Engineering India Pvt. Ltd., Hyderabd HQ F.No.01/80/050/00745/AM10/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.09/70/040/00140/AM10 0910039855 dt.06.11.2009 Date: 22.03.2011 Ratification of Norms The representative of the DIPP informed the Committee that the case is under study. The Committee,
Case No.A/R202
M/s. Chandan Steel Ltd., Mumbai HQ F.No.01/80/050/01350/AM07/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.03/94/040/01140/AM07 0310419440 dt.13.02.2007 Date: 22.03.2011 Ratification of Norms
The representative of the Ministry of Steel informed the Committee that the case is under study. The
Case No.A/R203
M/s. Engser Limited, Kolkata HQ F.No.01/80/050/0493/AM08/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.02/24/040/00191/AM08 0210105023 dt.09.10.2007 Date: 22.03.2011 Modification of Norms On the recommendation of the representative of DIPP present in the meeting, the Committee decided the firm to give actual breakup of quantities and weights of different sizes of Locknuts exported against the Advance Authorisation as the firm has already completed E.O. and to relist the case on 03.05.2011
Case No.A/R204
M/s. The Saraswati Industrial Syndicate Ltd., HQ F.No.01/80/050/0702/AM10/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.05/24/040/00453/AM10 0510256922 dt.25.01.2010 Date: 22.03.2011 Revision of Norms As per written comments of DIPP received vide their U.O. Note No. dated 24.03.2011, the Committee decided to modify the norms in respect of the subject advance authorization as under: 1. Weight of import item at Sl. No. 10 to be corrected to 138 Kgs.
Case No.A/R205
M/s. Intrans Engineering Ltd., (formerly Pioneer Friction Ltd.,) HQ F.No.01/80/050/00820/AM10/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.02/24/040/00236/AM10 0210139134 dt.11.03.2010 Date: 22.03.2011 Ratification of Norms As per written comments of DHI, vide their U.O. Note No.3(29)/09TSW(B)/122 dated 24.02.2011, the 1. The total export weight is 240 MT & the same may be incorporated in the license along with quantity in number. 2. Import of nitrile rubber may be allowed at 16935 kg with 5% wastage.
Case No.A/R206
M/s. Mikroteck machines LTd., HQ F.No.01/80/050/00176/AM11/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.07/24/040/00048/AM11 0710070361 dt.04.03.2010 Date: 22.03.2011 Ratification of Norms On the recommendation of the representative of DC (MSME) present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Weight along with drawing/Design of each Export Product. 2. Process of Manufacturing. to be carried out on these die blanks. 3. Weight of each imported inputs. 4. Bifurcation of the quantity of export product number/weight wise with its complete specification.
Case No.A/R207
M/s. Tema India LTd., HQ F.No.01/80/050/01221/AM09/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.03/95/040/00655/AM09 0310491632 dt.23.10.2008 Date: 22.03.2011 Ratification of Norms The Committee decided to forward a copy of representation again to DIPP and to relist the case on 03.05.2011.
Case No.A/R208
M/s. Llyod Electric & Engineering Ltd., HQ F.No.01/80/050/00273/AM11/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.05/23/040/00056/AM11 0510266063 dt.15.06.2010 Date: 22.03.2011 Ratification of Norms On the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Information in respect of Sl.No.4,5 & 11 of the Standard Deficiency Format for each capacity of Split AirConditioners. 2. Quantities of Split AirConditioners, capacity wise.
Case No.A/R209
M/s. The Indure Pvt. LTd., HQ F.No.01/80/050/00385/AM09/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.05/24/040/00822/AM08 0510217071 dt.27.02.2008 Date: 22.03.2011 Ratification of Norms The representative of the firm Shri Shan Singh, Executive Directoer, Sh. Vergis K. George, General Manager; Sh. M.P. Tiwari, General Manager appeared before the Committee for personal hearing. They explained the case to the Committee. The firm propose to export of two number of Ash Handling plant. It has stated that it will not import item no. 2 of import which is spares of the compressors and same is agreed. As per written comments of DHI received vide their U.O. Note No.3(50)/08TSW(B) dated 25.03.2011, the Committee decided to add the 2 nos Air Compressors at Sl. No. 12 (revised list enclosed) in respect of the subject advance authorization subject to the condition that firms submit written undertaken confirming that the said import items are mandatory parts of the import items. The firm has already submitted the required written undertaking.
Case No.A/R210
M/s. Bharat Heavy Electricals LTd., HQ F.No.01/80/050/01779/AM09/ DESI Lic.No. & Date Meeting No.40/11 RA F.No.11/24/040/00073/AM09 1110019584 dt.10.02.2009 Date: 22.03.2011 Ratification of Norms The representative of the firm Shri Dalip Supekar, Dy. General Manager; Sh. Hazari Lal, General Manager & Sh. J.S. Bhanspal, Addl. General Manager appeared before the Committee for personal hearing. They explained the case to the Committee. After deliberated the case, the Committee decided that the deletion of Import Item No. 27 – “Torque Wrench” may continue as it is a tool. However, the Committee decided to ratify the Import item No. 7 – “ Cyclone Separator” is Accessories subject to its accountability in the export items Sl.No.86
Case No. C 09
M/s. Addison & Co. Ltd., Chennai F.No. 01/81/80/162/00372/AM10/DES.I Meeting No.40/11 Modification of SION for the export product “Cutting ToolsMultiple Point of High Speed Steel(Cobalt Grade)/Tool Steel” Date: 22.03.2011 The Committee decided DHI should relook the wastage of written comments of DHI received vide their U.O. Note No.3(05)/2010TSW(B)/93 dated 09.02.2011 and furnish their comments again. The case may be relisted on 03.05.2011. Sl.No.87
Case No. C 17
M/s. Lucas TVS Ltd., Chennai received through DC(MEPZ SEZ), Chennai F.No. 01/81/80/162/00379/AM10/DES.I Meeting No.40/11 Fixation of regular wastage norms for manufacturing of different types of “Starter, Alterator, Wiper Motor and Compressor”. Date: 22.03.2011 On the recommendation of the representative of DHI present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 03.05.2011 1. Information in respect of Sl.No.3,4 & 11 of the Standard Deficiency Format. 2. Item of manufacture visa – vis input required for them with quantity of input. Sl.No.88
Case No. C 18
M/s. Pipavav Shipyards LTd., Amreli F.No. 01/81/80/162/00612/AM11/DES.I Meeting No.40/11 Fixation of input output norms in respect of 100% EOU for the export product “ Ship, Cargo Ships, Barges & Vessels for Transport, Factory Ship, Life Boats, Hulls and Vessels falls under Chapter 89 of ITC(HS) – reg. Date: 22.03.2011 The Committee observed that the comments called for from Ministry of Shipping are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted 03.05.2011. Sl.No.89
Case No. C 06
M/s. Indo Schottle Auto Parts Pvt. Ltd., HQ F.No.01/81/80/162/00576/AM10/DES.I Meeting No.40/11 Fixation of wastage norms for the export product “Central Housing Cover, Coller, Thrust, Coupling, Injector Plunger, Fitting High Pressure Fuel etc.” Date: 22.03.2011 The Committee decided the case will be discussed in next meeting and to relist the case on 08.03.3011. Sl.No.90
Case No. C – 13
M/s. GTN Engineering (India) Ltd., Coimbatore (TN) HQ F.No.01/92/180/Norms/AM11/PCVI/ DESI Meeting No.40/11 Modification of I at SL. No. C689 for the export product “Industrial Valves” in respect of LOP No:PER:A/2004/055 EOUTN dt.10.11.2004 Date: 22.03.2011 The representative of the I informed the I that they received the firm’s reply and case is under study. The I,
Case No. C – 20
M/s. Amvian Automotive Pvt. LTd., Vadodara HQ F.No.01/81/80/92/00180/Norms/AM11/DES.I Meeting No.40/11 Modification of input output norms in respect of EOUs for the export product “Standard Roof Map Lamp Bracket” Date: 22.03.2011 The Committee noted that firm’s representation has been sent to DIPP and DC(MSME) for examination and comments. The case may be relisted on 03.05.2011.