RATIFIED Minutes of MeeƟng No.26/13 scheduled on 19.03.2013 of Norms CommiƩee(NC‐I) (DES.I SecƟon) The meeƟng No. 26/13 of the Norms CommiƩee (NC‐I) for the licensing year 2012‐2013 was held on 19.03.2013 under the Chairmanship of Sh. L.B. Singhal, AddiƟonal Director General of Foreign Trade to consider the applicaƟons under Duty ExempƟon Schemes (Chapter‐4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume‐I. The following Members of the CommiƩee were present in the meeƟng: ‐ Sl. No Name of the representaƟves & their DesignaƟon Room No. Telephone No. DepƩ. 1. Sh K.K. Tiwari I.A 476 23062622 DHI, U.B. 2. Sh S.K. Jain, D.O. 428A 23063166 DIPP, U.B. 3. Sh. K.K. Funda, AssƩ. Dir. (Mech) 736A 23063802 Extn.2459 DC(MSME),N.B. 4. Sh. Parveen Sharma, Dy.DGFT 312 23061562 Extn.146 DGFT, U.B. 5. Sh. K.C. Raju, FTDO 404 23061562 Ext.265 DGFT, U.B. The CommiƩee first considered the minutes of the Norms CommiƩee MeeƟng No.25/13 dated 5.3.2013 for confirmaƟon and confirmed and adopted the same without any change. 1
Case No.:27/1/80‐ALC2/2011
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00910/AM11/ RLA File :06/24/040/00051/AM11/ Lic.No/Date:0610020480 07.01.2011 Defer Date:30.04.2013 Decision : The CommiƩee noted that firm had aƩended personal hearing on 5.3.2013 and to make a wriƩen reply within one week. Since no reply was received from firm, the CommiƩee decided to remind them for expediƟng their reply. 2
Case No.:14/38/80‐ALC2/2010
Party Name:VASUNDRA MANUFACTURING SYSTEMS PVT.LTD, Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00784/AM11/ RLA File :07/21/040/00786/AM11/ Lic.No/Date:0710077109 03.02.2011 Defer Date:30.04.2013 Decision : The CommiƩee noted that DIT has sought some informaƟon from firm and firm’s reply is awaited. 3
Case No.:36/7/80‐ALC2/2011
Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00142/AM12/ RLA File :04/24/040/00051/AM12/ Lic.No/Date:0410124216 20.05.2011 Defer Date:30.04.2013 Decision : The CommiƩee noted that firm has not replied to deficiency leƩer and decided to remind them for expediƟng their reply.
Case No.:30/2/80‐ALC2/2012
Party Name:RYALI ENGINEERS Meet No/Date:26/80‐ ALC2/2012 Approved
4 19.03.2013 HQ File :01/80/050/00619/AM12/ RLA File :09/24/040/00020/AM12/ Lic.No/Date:0910050866 19.01.2012 Decision : Based on DIPP wriƩen comments dated 19.3.2013, the CommiƩee decided to raƟfy norms of subject authorizaƟon as under: 1 Words “ Capacity 6 KL” may be suffixed with the descripƟon of export item at Sl. No. 1. 2 Words “ Capacity 4 KL” may be suffixed with the descripƟon of export item at Sl. No. 2. 1. Net weight of export products at Sl. No. 1, 2 & 3 may be specified as 33.5 MT, 1.875 MT and 5.95 MT respecƟvely 2. Word ‘Relevant” may be prefixed with the descripƟons of import items at Sl. No. 1 , 2 & 3 and their quanƟƟes may be allowed as 1.02 Kgs./Kg. content in the export products as claimed by the firm. RLA may take necessary acƟon accordingly. 5
Case No.:29/2/80‐ALC2/2012
Party Name:OMEGA ICEHILL PRIVATE LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00618/AM12/ RLA File :05/24/040/00384/AM12/ Lic.No/Date:0510316908 08.02.2012 Defer Date:30.04.2013 Decision : It was decided to forward a copy of applicaƟon and reply received from firm to DIPP. 6
Case No.:35/2/80‐ALC2/2012
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00624/AM12/ RLA File :31/82/040/00361/AM12/ Lic.No/Date:3110053099 22.02.2012 Decision : Based on DIT leƩer No. 17(58)/2012‐IPHW dated 4.9.2012, the CommiƩee decided to raƟfy norms of subject authorizaƟon on Net to Net basis with accountability clause. RLA may take necessary acƟon accordingly. 7
Case No.:15/8/80‐ALC2/2012
Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Rejected HQ File :01/80/050/00161/AM13/ RLA File :07/24/040/00028/AM13/ Lic.No/Date:0710088129 09.05.2012 Decision : The CommiƩee noted that firm has not replied to deficiency leƩer dated 6.8.2012 followed by reminder dated 10.9.2013 and final reminder dated 13.2.2013. Since no reply was received from firm, the CommiƩee is constrained to reject their case with direcƟon to pay the Customs Duty and applicable interest for regularizaƟon of the licence. RLA may take necessary acƟon accordingly. 8
Case No.:16/8/80‐ALC2/2012
Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Rejected HQ File :01/80/050/00162/AM13/ RLA File :07/24/040/00029/AM13/ Lic.No/Date:0710088131 09.05.2012 Decision : The CommiƩee noted that firm has not replied to deficiency leƩer dated 6.8.2012 followed by reminder dated 10.9.2013 and final reminder dated 13.2.2013. Since no reply was received from firm, the CommiƩee is constrained to reject their case with direcƟon to pay the Customs Duty and applicable interest for regularizaƟon of the licence. RLA may take necessary acƟon accordingly.
9
Case No.:26/14/80‐ALC2/2012
Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00312/AM13/ RLA File :07/24/040/00043/AM13/ Lic.No/Date:0710088185 14.05.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that copy of firm’s reply for the second Ɵme deficiency leƩer was again forwarded to MSME for examinaƟon and comments. 10
Case No.:15/11/80‐ALC2/2012
Party Name:YOKOGAWA INDIA LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00229/AM13/ RLA File :07/21/040/00120/AM13/ Lic.No/Date:0710088440 24.05.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of DIT and decided to await comments. 11
Case No.:2/8/80‐ALC2/2012
Party Name:SULZER INDIA LTD Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00148/AM13/ RLA File :31/83/040/00036/AM13/ Lic.No/Date:3110054707 18.06.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that firm has not replied deficiency leƩer dated 4.1.2013 followed by reminder dated 18.2.2013 and decided to send a final reminder requesƟng them to expedite their reply within 15 days, failing which the CommiƩee shall be constrained to reject their case with direcƟon to pay the Customs duty and applicable interest for regularizaƟon of the licence. 12
Case No.:36/14/80‐ALC2/2012
Party Name:H L E ENGINEERS PVT LTD, Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00322/AM13/ RLA File :52/24/040/00009/AM13/ Lic.No/Date:5210038596 21.06.2012 Decision : Based on DIPP wriƩen comments dated 19.3.2013, the CommiƩee decided to raƟfy norms of subject authorizaƟon as under: 1. Net weight of 16.25 MT may be specified with quanƟty of export product. 2. QuanƟƟes of import items at Sl. No. 1 & 2 may be allowed as 1.02 Kgs./Kg. content in the export product. 3. QuanƟƟes of import items from Sl. No. 3 to 13 may be allowed on net to net basis with accountability clause. 4. QuanƟty of import item at Sl. No. 14 may be allowed as applied for i.e. 30 Kgs. 5. QuanƟƟes of import items from Sl. No. 15 to 28 may be allowed on net to net basis with accountability clause. 6. QuanƟty of import item at Sl. No. 29 may be allowed as 1.05 Kgs./Kg. content in the export product. 7. QuanƟty of import item at Sl. No. 30 may be allowed on net to net basis. 8. QuanƟty of import item at Sl. No. 31 may be allowed as 1.02 Kgs./Kg. content in the export product. 9. QuanƟƟes of import items from Sl. No. 32 to 42 may be allowed as 1.05 Kgs./Kg. content in the export product.
10. QuanƟƟes of import items at Sl. No. 43 & 44 may be allowed as 1.02 Kgs./Kg. content in the export product. 11. QuanƟƟes of import items from Sl. No 45 to 47 may be allowed on net to net basis with accountability clause. 12. QuanƟƟes of import items from Sl. No. 48 to 56 may be allowed as 1.05 Kgs./Kg. content in the export product. 13
Case No.:24/14/80‐ALC2/2012
Party Name:TEXMACO RAIL & ENGINEERING LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00310/AM13/ RLA File :02/24/040/00036/AM13/ Lic.No/Date:0210178842 22.06.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that firm’s reply dated 28.1.2013 was sent to DHI for examinaƟon and comments. 14
Case No.:44/14/80‐ALC2/2012
Party Name:SATTVA ETECH INDIA PRIVATE LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00330/AM13/ RLA File :07/24/040/00149/AM13/ Lic.No/Date:0710089403 02.07.2012 Defer Date:30.04.2013 Decision :The CommiƩee noted that DIT has sought some informaƟon from firm for examinaƟon of the case and firm’s reply is awaited. 15
Case No.:17/11/80‐ALC2/2012
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00231/AM13/ RLA File :05/24/040/00129/AM13/ Lic.No/Date:0510329275 10.07.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of C&PC and decided to await comments. 16
Case No.:19/11/80‐ALC2/2012
Party Name:HARI MACHINES LTD Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00233/AM13/ RLA File :23/24/040/00001/AM13/ Lic.No/Date:2310003202 10.07.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that firm was asked to provide informaƟon as per DHI UO No. 3(104)/12‐ TSW(B)/38 dated 22.2.2013 and decided to remind them for expediƟng their reply. 17
Case No.:9/11/80‐ALC2/2012
Party Name:BENGAL INDUSTRIES PVT. LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00223/AM13/ RLA File :05/23/040/00131/AM13/ Lic.No/Date:0510329934 17.07.2012 Defer Date:30.04.2013 Decision : The CommiƩee observed that firm has revised their applicaƟon and submiƩed copies to NC and RLA. On the recommendaƟon of DIPP, the CommiƩee decided to ask firm to provide informaƟon as per Sr.No.3,6,8 & 9 of Standard Deficiency Format and value of indigenous inputs in export product.
18
Case No.:17/14/80‐ALC2/2012
Party Name:BERCO UNDERCARRIAGES (INDIA) PVT LTD Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00303/AM13/ RLA File :09/24/040/00194/AM13/ Lic.No/Date:0910053312 20.07.2012 Decision : The CommiƩee decided to raƟfy norms of subject authorizaƟon as per DHI UO No. 3/97/12/TSW(B)/28 dated 8.2.2013 (copy to be forwarded to firm and RA). RLA may take necessary acƟon accordingly. 19
Case No.:13/14/80‐ALC2/2012
Party Name:HIND HIGH VACUUM COMPANY PVT LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Rejected HQ File :01/80/050/00299/AM13/ RLA File :07/24/040/00157/AM13/ Lic.No/Date:0710089992 01.08.2012 Decision : The CommiƩee noted that firm has not provided reply as per deficiency leƩer dated 22.10.2012 followed by reminder dated 13.12.2012 and final reminder dated 21.1.2013 and also granted addiƟonal 15 days to receive reply from firm. Since no reply was received from firm within this period, the CommiƩee is constrained to reject their case with direcƟon to pay the Customs Duty and applicable interest for regularizaƟon of the licence. RLA may take necessary acƟon accordingly. 20
Case No.:2/11/80‐ALC2/2012
Party Name:ABB LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00216/AM13/ RLA File :07/24/040/00202/AM13/ Lic.No/Date:0710090030 02.08.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that DIT has issued a deficiency leƩer to firm and their reply is awaited. The CommiƩee decided to remind them for expediƟng their reply failing which the case will be rejected. 21
Case No.:15/14/80‐ALC2/2012
Party Name:EMMVEE SOLAR SYSTEMS PVT LTD., Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00301/AM13/ RLA File :07/24/040/00195/AM13/ Lic.No/Date:0710090019 02.08.2012 Decision : The CommiƩee decided to raƟfy norms of subject authorizaƟon as per comments in MSME UO Note No. 30(229)2011‐ME dated 8.3.2013 (copy to be forwarded to firm and RA). RLA may take necessary acƟon accordingly. 22
Case No.:27/14/80‐ALC2/2012
Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00313/AM13/ RLA File :07/24/040/00180/AM13/ Lic.No/Date:0710090071 03.08.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that copy of firm’s reply for the second Ɵme deficiency leƩer was again forwarded to MSME for examinaƟon and comments.
Case No.:8/14/80‐ALC2/2012
Party Name:BOYSEN INDIA LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred
23 HQ File :01/80/050/00294/AM13/ RLA File :05/23/040/00149/AM13/ Lic.No/Date:0510331556 08.08.2012 Defer Date:30.04.2013 Decision : The CommiƩee decided to forward copy of applicaƟon to DHI and MSME for examinaƟon and comments. 24
Case No.:1/17/80‐ALC2/2012
Party Name:TEMA INDIA LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00366/AM13/ RLA File :03/95/040/00333/AM13/ Lic.No/Date:0310704473 08.08.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that firm was requested to provide copy of applicaƟon and the same is sƟll awaited. The CommiƩee decided to request firm / RA to forward one set of applicaƟon for consideraƟon of the case. 25
Case No.:5/14/80‐ALC2/2012
Party Name:ADVANTEC COILS PVT LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00291/AM13/ RLA File :05/23/040/00151/AM13/ Lic.No/Date:0510331765 09.08.2012 Decision : The CommiƩee decided to raƟfy norms of subject authorizaƟon as per C&PC OM No. 46011/120/2012‐ PC‐II dated 4.3.2013 (copy to be forwarded to firm and RA). RLA may take necessary acƟon accordingly. 26
Case No.:19/14/80‐ALC2/2012
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00305/AM13/ RLA File :05/23/040/00166/AM13/ Lic.No/Date:0510331795 09.08.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of DHI and decided to await comments. 27
Case No.:21/14/80‐ALC2/2012
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00307/AM13/ RLA File :07/24/040/00188/AM13/ Lic.No/Date:0710090187 10.08.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that DIT has asked firm to provide some informaƟon and firm’s reply is sƟll awaited. The CommiƩee decided to remind them for expediƟng their reply failing which the case will be rejected. 28
Case No.:6/14/80‐ALC2/2012
Party Name:GRAZIANO TRASMISSIONI INDIA PVT LTD Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00292/AM13/ RLA File :05/23/040/00200/AM13/ Lic.No/Date:0510333669 05.09.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of MSME and decided to await comments.
Case No.:39/14/80‐ALC2/2012
Party Name:DOOSAN CHENNAI WORKS PRIVATE LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred
29 HQ File :01/80/050/00325/AM13/ RLA File :04/24/040/00102/AM13/ Lic.No/Date:0410139508 05.09.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that firm has not replied to deficiency leƩer dated 26.2.2013 and decided to remind them for expediƟng their reply. 30
Case No.:1/14/80‐ALC2/2012
Party Name:GRAZIANO TRASMISSIONI INDIA PVT LTD Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00287/AM13/ RLA File :05/23/040/00214/AM13/ Lic.No/Date:0510334461 12.09.2012 Decision : The CommiƩee decided to raƟfy norms of subject authorizaƟon as per comments in MSME UO Note No. 30(270)11‐ME dated 26.2.2013 (copy to be forwarded to firm and RA). RLA may take necessary acƟon accordingly. 31
Case No.:24/20/80‐ALC2/2012
Party Name:KILBURN ENGINEERING LTD Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00440/AM13/ RLA File :03/94/040/00515/AM13/ Lic.No/Date:0310710999 28.09.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that firm has not replied to deficiency leƩer followed by reminder and decided to send a final reminder requesƟng them to expedite their reply within 15 days, failing which the CommiƩee shall be constrained to reject their case with direcƟon to pay the Customs duty and applicable interest for regularizaƟon of the licence. 32
Case No.:4/20/80‐ALC2/2012
Party Name:DIA ALUMINIUM INDIA PRIVATE LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00420/AM13/ RLA File :31/83/040/00065/AM13/ Lic.No/Date:3110055921 01.10.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that firm has not replied to deficiency leƩer dated 18.1.2013 followed by reminder dated 1.3.2013 and decided to send a final reminder requesƟng them to expedite their reply within 15 days, failing which the CommiƩee shall be constrained to reject their case with direcƟon to pay the Customs duty and applicable interest for regularizaƟon of the licence. 33
Case No.:23/20/80‐ALC2/2012
Party Name:ICEM ENGINEERING COMPANY PRIVATE LIMITED, Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00439/AM13/ RLA File :03/94/040/00546/AM13/ Lic.No/Date:0310711364 03.10.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that firm has not replied to deficiency leƩer 21.1.2013 followed by reminder dated 26.2.2013 and decided to send a final reminder requesƟng them to expedite their reply within 15 days, failing which the CommiƩee shall be constrained to reject their case with direcƟon to pay the Customs duty and applicable interest for regularizaƟon of the licence. 34
Case No.:15/20/80‐ALC2/2012
Party Name:ROTHE ERDE INDIA PRIVATE LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred
HQ File :01/80/050/00431/AM13/ RLA File :31/83/040/00110/AM13/ Lic.No/Date:3110056019 09.10.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that firm has not replied to deficiency leƩer 28.2.2013 and decided to remind them for expediƟng their reply. 35
Case No.:2/17/80‐ALC2/2012
Party Name:PLAST TECH ENGINEERING Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00367/AM13/ RLA File :04/24/040/00136/AM13/ Lic.No/Date:0410140373 11.10.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of C&PC and decided to await their comments. 36
Case No.:26/20/80‐ALC2/2012
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00442/AM13/ RLA File :03/94/040/00442/AM13/ Lic.No/Date:0310712579 12.10.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that copy of reply received from firm and RA have been forwarded to DIPP for examinaƟon and comments. 37
Case No.:5/20/80‐ALC2/2012
Party Name:FENIX PROCESS TECHNOLOGIES PVT.LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00421/AM13/ RLA File :31/83/040/00127/AM13/ Lic.No/Date:3110056062 15.10.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that firm has not replied to deficiency leƩer 21.1.2013 followed by reminder dated 1.3.2013 and decided to send a final reminder requesƟng them to expedite their reply within 15 days, failing which the CommiƩee shall be constrained to reject their case with direcƟon to pay the Customs duty and applicable interest for regularizaƟon of the licence. 38
Case No.:3/20/80‐ALC2/2012
Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00419/AM13/ RLA File :05/24/040/00264/AM13/ Lic.No/Date:0510337411 18.10.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of DHI and decided to await comments. 39
Case No.:21/20/80‐ALC2/2012
Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00437/AM13/ RLA File :11/24/040/00024/AM12/ Lic.No/Date:1110027289 19.10.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of DIPP and decided to await comments. 40
Case No.:13/20/80‐ALC2/2012
Party Name:KOBELCO CRANES INDIA PRIVATE LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00429/AM13/ RLA File :05/23/040/00266/AM13/
Lic.No/Date:0510337585 23.10.2012 Decision : Based on DHI wriƩen comments dated 19.3.2013, the CommiƩee decided to raƟfy norms of subject authorizaƟon as per GN4 for Engineering Products. RLA may take necessary acƟon accordingly. 41
Case No.:6/20/80‐ALC2/2012
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00422/AM13/ RLA File :05/23/040/00276/AM13/ Lic.No/Date:0510337677 26.10.2012 Defer Date:30.04.2013 Decision : DIPP has provided wriƩen comments vide leƩer dated 19.3.2013. The CommiƩee, however, noted that firm was asked to clarify whether it is a case of Deemed Exports or Physical Exports and their reply is awaited. 42
Case No.:3/17/80‐ALC2/2012
Party Name:HONDA CARS INDIA LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00368/AM13/ RLA File :05/23/040/00279/AM13/ Lic.No/Date:0510337700 29.10.2012 Decision : The CommiƩee decided to raƟfy norms of subject authorizaƟon as per comments in DHI UO No. 3(140)/12‐TSW(B)/53 dated 7.3.2013 (copy to be forwarded to firm and RA). RLA may take necessary acƟon accordingly. 43
Case No.:20/20/80‐ALC2/2012
Party Name:POLY MEDICURE LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00436/AM13/ RLA File :05/24/040/00269/AM13/ Lic.No/Date:0510338313 06.11.2012 Decision : The CommiƩee considered C&PC wriƩen comments received vide OM No. 46011/106/2009‐PC‐II dated 13.3.2013 and decided to raƟfy norms as under: Export Product: I.V. Cannula ‐1No. Import Item : Sr.No.1 to 10 – Net to Net basis with accountability clause. Import Item: Sr.No.11 & 12 – As per Packing Policy. 44
Case No.:30/20/80‐ALC2/2012
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00446/AM13/ RLA File :61/24/040/00034/AM13/ Lic.No/Date:6110000889 07.11.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of DHI and decided to await comments. 45
Case No.:19/20/80‐ALC2/2012
Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00435/AM13/ RLA File :05/24/040/00298/AM13/ Lic.No/Date:0510338939 12.11.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that firm has not replied to deficiency leƩer 21.1.2013 followed by reminder dated 18.2.2013 and decided to send a final reminder requesƟng them to expedite their reply within 15 days, failing which
the CommiƩee shall be constrained to reject their case with direcƟon to pay the Customs duty and applicable interest for regularizaƟon of the licence. 46
Case No.:10/26/80‐ALC2/2012
Party Name:HTD HEAT TRACE(INDIA)PVT LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00571/AM13/ RLA File :09/24/040/00407/AM13/ Lic.No/Date:0910054497 12.12.2012 Defer Date:30.04.2013 Decision : Based on DIPP recommendaƟon, the CommiƩee decided to ask firm to provide informaƟon on following: 1. InformaƟon in respect of Sl. No. 3 & 11 of Standard Deficiency Format. 2. Detailed calculaƟons/basis for the quanƟƟes of import items Further, firm was also asked to clarify whether it is a case of Deemed Exports or Physical Exports and their reply is awaited. 47
Case No.:29/26/80‐ALC2/2012
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00590/AM13/ RLA File :09/24/040/00435/AM13/ Lic.No/Date:0910054516 14.12.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of DHI and decided to await comments. 48
Case No.:30/26/80‐ALC2/2012
Party Name:WELD FUSE PVT. LTD . Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00591/AM13/ RLA File :09/24/040/00441/AM13/ Lic.No/Date:0910054541 18.12.2012 Decision : Based on DIPP wriƩen comments dated 19.3.2013, the CommiƩee decided to raƟfy norms of subject authorizaƟon on repeat basis as per firm’s Advance AuthorizaƟon No. 0910054423 dated 03.12.2012 raƟfied in NC meeƟng dated 19/02/2012: 1. Net weight of export product at Sl. No. 1 may be specified as “44649 Kgs. containing 22904 Kgs. of Galvanised wire, 7849 Kgs. of PVC items & 16040 Kgs. of MS/Galvanized Flats/Angles”. 2. Word ‘Relevant” may be prefixed with the descripƟons of import items at Sl. No. 1 & 3 and their quanƟƟes may be allowed as applied for i.e. 23133.6 Kgs. & 16200 Kgs. respecƟvely inclusive of 1 % wastage. 3. QuanƟty of import item at Sl. No. 2 may be allowed as applied for i.e. 7927.2 Kgs. inclusive of 1 % wastage. 49
Case No.:37/26/80‐ALC2/2012
Party Name:PAM‐GLATT PHARMA TECHNOLOGIES PVT.LTD Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00598/AM13/ RLA File :03/95/040/00700/AM13/ Lic.No/Date:0310717702 19.12.2012 Defer Date:30.04.2013 Decision : The CommiƩee noted that copy of applicaƟon has not been received in NC and decided to request RA to forward copy of applicaƟon for consideraƟon of the case.
Case No.:1/23/80‐ALC2/2012
Party Name:FREEDOM OPTHALMIC PRIVATE LIMITED, Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved
50 HQ File :01/80/050/00480/AM13/ RLA File :04/24/040/00200/AM13/ Lic.No/Date:0410142170 28.12.2012 Decision : The CommiƩee decided to raƟfy norms of subject authorizaƟon as per C&PC OM No. 46011/79/2010‐PC‐ II dated 4.3.2013 (copy to be forwarded to firm and RA). RLA may take necessary acƟon accordingly. 51
Case No.:13/26/80‐ALC2/2012
Party Name:HINDUSTAN AERONAUTICS LTD, Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00574/AM13/ RLA File :07/24/040/00366/AM13/ Lic.No/Date:0710092780 31.12.2012 Defer Date:30.04.2013 Decision : The CommiƩee decided to again forward copy of applicaƟon to DHI and MSME for examinaƟon and comments. 52
Case No.:4/26/80‐ALC2/2012
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00565/AM13/ RLA File :07/24/040/00389/AM13/ Lic.No/Date:0710092818 01.01.2013 Decision : Based on DIPP wriƩen comments dated 19.3.2013, the CommiƩee decided to raƟfy norms of subject authorizaƟon as under: 1. Import items from Sl. No. 1 to 56 may be allowed on net to net basis with accountability clause. 2. Import items from Sl. Nos. 57 to 69 may be allowed as 1.02 Mtr./Mtr. content in the export products. 3. Import item at Sl. No. 70 may be allowed as per packing policy 53
Case No.:23/26/80‐ALC2/2012
Party Name:PSK ENGINEERING PVT LTD Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00584/AM13/ RLA File :07/24/040/00420/AM13/ Lic.No/Date:0710092968 08.01.2013 Defer Date:30.04.2013 Decision : The CommiƩee noted that reply submiƩed by the firm is not complete and they may again submit informaƟon on following: 1. QuanƟƟes of each export product in Nos. also in addiƟon to their weights. 2. InformaƟon in respect of Sl. No.3, 4, 5 & 11 of Standard Deficiency Format.‐export product wise. 54
Case No.:8/26/80‐ALC2/2012
Party Name:JINDAL RAIL INFRASTRUCTURE LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00569/AM13/ RLA File :05/23/040/00400/AM13/ Lic.No/Date:0510342981 10.01.2013 Defer Date:30.04.2013 Decision : The CommiƩee noted that copy of applicaƟon was forwarded to DHI for examinaƟon and comments. The firm was also asked to clarify whether it is a case of Deemed Exports or Physical Exports and their reply is awaited.
Case No.:26/26/80‐ALC2/2012
Party Name:SOGEFI MNR FILTRATION INDIA PVT LTD, Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred
55 HQ File :01/80/050/00587/AM13/ RLA File :07/24/040/00424/AM13/ Lic.No/Date:0710093032 10.01.2013 Defer Date:30.04.2013 Decision : The CommiƩee decided to forward copy of applicaƟon to MSME for examinaƟon and comments. 56
Case No.:32/26/80‐ALC2/2012
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00593/AM13/ RLA File :05/23/040/00412/AM13/ Lic.No/Date:0510342940 10.01.2013 Defer Date:30.04.2013 Decision : The CommiƩee considered the case and decided to advise firm to produce a cerƟficate from the Directorate General of Hydro Carbon in the Ministry of Petroleum & Natural Gas staƟng that goods being supplied are required for petroleum gases, in terms of condiƟon No.41, Sr.No.356 of Custom NoƟficaƟon No.12 dated 17.3.2012. The CommiƩee further noted that a few similar cases where firm has replied staƟng that the above provision will not apply in their case and accordingly a reference was made to Policy SecƟon‐VI for examinaƟon of their eligibility for advance authorizaƟon. The CommiƩee also observed that earlier some similar cases of the firm were raƟfied in the NC and hence the CommiƩee decided to ask firm / RA to provide details of all such advance authorizaƟons. 57
Case No.:27/26/80‐ALC2/2012
Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00588/AM13/ RLA File :31/83/040/00164/AM13/ Lic.No/Date:3110056801 11.01.2013 Defer Date:30.04.2013 Decision : Based on DIPP recommendaƟon, the CommiƩee decided to seek informaƟon on following from firm: i. InformaƟon in respect of Sl. No. 4, 5 & 11 of Standard Deficiency Format. ii. Specific use of import items at Sl. No 5 & 6. 58
Case No.:31/26/80‐ALC2/2012
Party Name:ROBONIK ( INDIA ) PVT. LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00592/AM13/ RLA File :03/95/040/00550/AM13/ Lic.No/Date:0310720573 14.01.2013 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of DIT and decided to await comments. 59
Case No.:17/26/80‐ALC2/2012
Party Name:BLUE STAR LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00578/AM13/ RLA File :03/94/040/00825/AM13/ Lic.No/Date:0310720787 15.01.2013 Defer Date:30.04.2013 Decision : On the recommendaƟon of DIPP, the CommiƩee decided to ask firm to provide informaƟon as per Sr.No. 3,4,5,6,&11 of Standard Deficiency Format‐Export Wise.
Case No.:19/26/80‐ALC2/2012
Party Name:HUF INDIA PVT LTD Meet No/Date:26/80‐ ALC2/2012 Status: Deferred
60 19.03.2013 HQ File :01/80/050/00580/AM13/ RLA File :31/83/040/00174/AM13/ Lic.No/Date:3110056821 15.01.2013 Defer Date:30.04.2013 Decision : The CommiƩee decided to forward copy of applicaƟon to MSME for examinaƟon and comments. 61
Case No.:16/26/80‐ALC2/2012
Party Name:GMM PFAUDLER LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00577/AM13/ RLA File :03/94/040/00855/AM13/ Lic.No/Date:0310720873 16.01.2013 Decision : Based on DIPP wriƩen comments dated 19.3.2013, the CommiƩee decided to raƟfy norms of subject authorizaƟon as per General Note‐ 4 for Engineering Products. RLA may take necessary acƟon accordingly. 62
Case No.:22/26/80‐ALC2/2012
Party Name:PUTZMEISTER CONCRETE MACHINES PRIVATE LIMITED, Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00583/AM13/ RLA File :17/24/040/00059/AM13/ Lic.No/Date:1710005169 16.01.2013 Decision : Based on DHI wriƩen comments dated 19.3.2013, the CommiƩee decided to raƟfy norms of subject authorizaƟon as per GN4 for Engineering Products. RLA may take necessary acƟon accordingly. 63
Case No.:7/26/80‐ALC2/2012
Party Name:GRAND PRIX ENGINEERING PVT.LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00568/AM13/ RLA File :05/23/040/00420/AM13/ Lic.No/Date:0510343805 21.01.2013 Defer Date:30.04.2013 Decision : On the recommendaƟon of DIPP, the CommiƩee decided to ask firm to provide informaƟon as per Sr.NO. 3,5 & 11 of Standard Deficiency Format. 64
Case No.:34/26/80‐ALC2/2012
Party Name:LION HOLDINGS PRIVATE LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00595/AM13/ RLA File :05/23/040/00423/AM13/ Lic.No/Date:0510343833 21.01.2013 Defer Date:30.04.2013 Decision : On the recommendaƟon of MSME, the CommiƩee decided to ask firm to provide informaƟon as per Sr.NO. 4 & 5 of Standard Deficiency Format. 65
Case No.:28/26/80‐ALC2/2012
Party Name:SINTERCOM INDIA PVT LTD Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00589/AM13/ RLA File :31/83/040/00182/AM13/ Lic.No/Date:3110056897 22.01.2013 Defer Date:30.04.2013 Decision : The CommiƩee decided to forward copy of applicaƟon to DHI for examinaƟon and comments.
Case No.:11/26/80‐ALC2/2012
Party Name:ALSTOM TRANSPORT INDIA LIMITED Meet No/Date:26/80‐ ALC2/2012 Status: Deferred
66 19.03.2013 HQ File :01/80/050/00572/AM13/ RLA File :07/21/040/00439/AM13/ Lic.No/Date:0710093277 23.01.2013 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of DHI. The CommiƩee decided to ask firm to clarify whether it is a case of Deemed Exports or Physical Exports. 67
Case No.:12/26/80‐ALC2/2012
Party Name:ALSTOM TRANSPORT INDIA LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00573/AM13/ RLA File :07/21/040/00413/AM13/ Lic.No/Date:0710093279 23.01.2013 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of DHI. The CommiƩee decided to ask firm to clarify whether it is a case of Deemed Exports or Physical Exports. 68
Case No.:15/26/80‐ALC2/2012
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00576/AM13/ RLA File :03/95/040/00791/AM13/ Lic.No/Date:0310722249 29.01.2013 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of DHI. The CommiƩee also noted that firm was asked to clarify whether it is a case of Deemed Exports or Physical Exports and their reply is awaited. 69
Case No.:24/26/80‐ALC2/2012
Party Name:NASH INDUSTRIES (I) PVT LTD Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00585/AM13/ RLA File :07/24/040/00455/AM13/ Lic.No/Date:0710093402 29.01.2013 Decision : Based on DIPP wriƩen comments, the CommiƩee decided to raƟfy norms of subject authorizaƟon on repeat basis: 1. N e weight of export product may be modified as 192119 Kg. containing “180252.8 Kgs. of HR High Tensile Steel Sheet”. 2. QuanƟty of import item at Sl. No. 1 may be allowed as 189265 Kgs. inclusive of 5 % wastage. 70
Case No.:20/26/80‐ALC2/2012
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00581/AM13/ RLA File :34/24/040/00237/AM13/ Lic.No/Date:3410035974 30.01.2013 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of C&PC and decided to await comments. 71
Case No.:25/26/80‐ALC2/2012
Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00586/AM13/ RLA File :07/24/040/00367/AM13/ Lic.No/Date:0710093431 30.01.2013 Defer Date:30.04.2013 Decision : The CommiƩee decided to forward copy of applicaƟon to DIPP for examinaƟon and comments.
72
Case No.:38/26/80‐ALC2/2012
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Status: Deferred HQ File :01/80/050/00599/AM13/ RLA File :04/24/040/00216/AM13/ Lic.No/Date:0410142973 30.01.2013 Defer Date:30.04.2013 Decision : The CommiƩee noted that the case is under examinaƟon of DHI and decided to await comments. 73
Case No.:18/26/80‐ALC2/2012
Party Name:ADLER MEDIEQUIP PRIVATE LIMITED., Meet No/Date:26/80‐ ALC2/2012 19.03.2013 Approved HQ File :01/80/050/00579/AM13/ RLA File :03/94/040/00931/AM13/ Lic.No/Date:0310722490 31.01.2013 Decision : Based on DIPP wriƩen comments dated 19.3.2013, the CommiƩee decided to raƟfy norms of subject authorizaƟon on repeat basis as per firm’s Advance AuthorizaƟon No.0310663899 dated 08.11.2011 raƟfied in NC meeƟng dated 27/12/2011: 1. Word “relevant” may be prefixed with the descripƟon of import items from S.Nos. 1 to 4. 2. The quanƟty of import item No.1 may be allowed as 453.245 Kgs. inclusive of 368.5 % wastage aPara 4.7 of HBP Vol.‐I The CommiƩee decided to modify / raƟfy norms of 52 Advance AuthorizaƟons as per details given in DIPP wriƩen comments dated 19.3.2013 (copy to be forwarded to firm and RA). The wastage norms are for regularizaƟon purpose only. In case of expired licence, no fresh import to be permiƩed. RLA may take necessary acƟon accordingly.