RATIFIED   Minutes of Meeting No.21/12 scheduled on 10.01.2012 of Norms Committee(NC­I) (DES.I Section)   The meeting No. 21/12 of the Norms Committee (NC­I) for the licensing year 2011­2012 was held on 10.01.2012 under the Chairmanship of Sh. N.P.S. Monga, Additional  Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­ 4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Department 1. Sh B. C. Nayak. D.O. 429A,  Udyog Bhavan 23063321 Extn.3318 DHI 2. Sh  S.K. Jain,  D.O. 429A,  Udyog Bhavan 23063321 Extn.3318 DIPP 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A,  Nirman Bhavan   DC(MSME) 4. Sh. A.K. Mishra, AIA Udyog Bhavan 23063332 M/o Steel 5. Sh. G. Parthasarthi, Dy.DGFT 312, Udyog Bhavan 23061563 Extn.301 DGFT 6. Sh. K.C. Raju, FTDO 404, Udyog Bhavan 23061562 Ext.265 DGFT   I ­The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon are as under: ­ 1

Case No.:31/23/80­ALC2/2009

Party Name:HINDUSTAN AERONAUTICS LTD, Meet No/Date:21/80­ALC2/2011 10.01.2012 Status: Deferred HQ File :01/80/050/00353/AM10/ RLA File :07/24/040/00651/AM09/ Lic.No/Date:0710066776 02.09.2009 Defer Date:21.02.2012 Decision : The Committee noted that a D.O.letter has been sent to Ministry of Defence on 17.11.2011 for expediting their comments.  The Committee, therefore, decided to send  reminder to Ministry of Defence for expediting their comments and to re­list the case on 21.02.2012.   2

Case No.:16/31/80­ALC2/2009

Party Name:SUTURES INDIA PRIVATE LIMITED, 10.01.2012 Status: Deferred HQ File :01/80/050/00464/AM10/ RLA File :07/24/040/00263/AM10/ Lic.No/Date:0710067849 28.10.2009 Defer Date:21.02.2012 Decision : The Committee noted  that the firm’s application has been sent to C&PC again on 21.12.2011 and the case is under examination of C&PC. The case may be re­listed on  21.02.2012.   3

3

Case No.:3/37/80­ALC2/2009

Party Name:S.M.PULP PACKAGING PVT.LTD 10.01.2012 Status: Withdrawn HQ File :01/80/050/00562/AM10/ RLA File :05/24/040/00378/AM10/ Lic.No/Date:0510253563 27.11.2009   Decision:The Committee noted that the case was already discussed in last meeting on 27.12.2011 and  the case was again attached due to technical error in on line agenda. It has been decided to withdraw the case.   4

Case No.:21/39/80­ALC2/2009

Party Name:VEM TECHNOLOGIES P.LTD., 10.01.2012 Status: Deferred HQ File :01/80/050/00617/AM10/ RLA File :09/24/040/00373/AM10/ Lic.No/Date:0910040368 18.12.2009 Defer Date:21.02.2012 Decision : The Committee noted that a D.O.letter has been sent to Ministry of Defence on 17.11.2011 for expediting their comments.  The Committee, therefore, decided to send reminder to Ministry of Defence for expediting their comments and to re­list the case on 21.02.2012.   5

Case No.:18/15/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED 10.01.2012 Status: Deferred HQ File :01/80/050/00225/AM11/ RLA File :04/24/040/00061/AM11/ Lic.No/Date:0410114584 15.06.2010 Defer Date:21.02.2012 Decision : The Committee noted that the firm has sought time vide their letter dated 07.12.2011 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice.  The case may be re­listed on 21.02.2012.   6

Case No.:1/14/81­ALC2/2010

Party Name: FITCAST FOUNDERS & ENGINEERS PVT. LTD. 10.01.2012 Status: Approved HQ File :01/81/050/00081/AM11/ RLA File :08/24/040/00082/AM11/ Lic.No/Date:0810089995 24.06.2010   Decision : The Committee deliberated the written comments of DIPP received  vide their UO Note dated10.01.2012 and decided to allow quantities of import items as per SION   C­384 in respect of the subject advance authorization  after due approval of M/o Steel.   The RLA may take necessary action accordingly.   7

Case No.:40/31/80­ALC2/2010

Party Name: BHARAT HEAVY ELECTRICALS LIMITED 10.01.2012 Status: Deferred HQ File :01/80/050/00518/AM11/ RLA File :09/24/040/00195/AM11/ Lic.No/Date:0910043236 24.08.2010 Defer Date:21.02.2012 Decision : The Committee noted that  a copy of firm’s reply dated  02.09.2011 has already been sent to DHI for examination and comments and the case is under examination.  The case may be re­listed on 21.02.2012.

8

Case No.:32/31/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. 10.01.2012 Status: Deferred HQ File :01/80/050/00510/AM11/ RLA File :06/24/040/00028/AM11/ Lic.No/Date:0610018929 30.08.2010 Defer Date:21.02.2012 Decision : The Committee noted that a D.O.letter has been sent to Ministry of Defence on 17.11.2011 for expediting their comments.  The Committee, therefore, decided to send reminder to Ministry of Defence for expediting their comments and to re­list the case on 21.02.2012.   9

Case No.:47/31/80­ALC2/2010

Party Name:SIEMENS ROLLING STOCK PVT.LTD. 10.01.2012 Status: Deferred HQ File :01/80/050/00525/AM11/ RLA File :03/95/040/00491/AM11/ Lic.No/Date:0310593387 22.09.2010 Defer Date:21.02.2012 Decision : The Committee noted that the written comments received from DHI vide their UO Note No.3(99)/10­TSW(B)/705 dated 22.12.2011. DHI observed that the calculation details of raw materials furnished by the firm are not correlating with the drawing dimension of individual parts. The Committee, therefore, decided to advise the firm to appear before the NC to explain their case in person along with technical expert and full facts of the case. The case may be re­listed on 21.02.2012.   10

Case No.:42/31/80­ALC2/2010

Party Name:STARION INDIA P.LTD 10.01.2012 Status: Approved HQ File :01/80/050/00520/AM11/ RLA File :31/24/040/00129/AM11/ Lic.No/Date:3110044900 06.10.2010   Decision :The Committee deliberated the written comments of MC&IT received  vide their UO No.17(73)/2010­IPHW dated 22.12.2011 and decided to ratify the norms in respect of the subject advance authorization  as under:­ Sl No. Import item description Total  wastage calculated  as  per details given by the party  (on  the  Net weight) in % Total  Import  qty. recommended  (In M.T.) 1. Lumax  Resin  GN5006FC KC21(Tray Disc) 2.34% 120.938   Lumax  Resin  GN5006FC KC21(Main Base) 0% 2. Resin  abs  AF303G92649 (Bezel Assembly) 11.96% 37.150   Resin  abs  AF303G92649 (Bezel Door) 10.91%   Resin  abs  AF303G92649 (Door) 9.72% 3 Resin Lupos GP2100KA02 18 00% 14 750

Resin Lupos GP2100KA02 18.00% 14.750 4. F20­03  natural  POM (Polyacetal  Resin)­Chassis Outset 85.18% 66.983   F20­03  natural  POM (Polyacetal  Resin)­Clamp Assembly 66.74%   F20­03  natural  POM (Polyacetal  Resin)­Gear Idle 200%   F20­03  natural  POM (Polyacetal  Resin)­Gear Loading 100%   F20­03  natural  POM (Polyacetal  Resin)­Pulley Gear 250%   F20­03  natural  POM (Polyacetal  Resin)­Pully Motor 300%   F20­03  natural  POM (POLYACETAL  RESIN)­ Guide Up­Down 18.31%   F20­03  natural  POM (Polyacetal  Resin)­Lever Emergency 50% 5. Master batch black MMB­ S315­guide feed 0.00% 0.240 6. Master  batch  blue  MMB­ B207­Clamp assembly 97.89% 0.376 7.   13.97% 254.25 8.   53.50% 38.375 9.   14.06% 137.688 10.   95.5% 203.3 11.   14.64% 13.665 12.   20.00% 6.0 13.   30.00% 2.6     11

Case No.:17/41/81­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS Meet No/Date:21/80­ALC2/2011 Status:

Case No.:17/41/81 ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:21/80 ALC2/2011 10.01.2012 Status: Deferred HQ File :01/81/050/00436/AM11/ RLA File :09/24/040/00315/AM11/ Lic.No/Date:0910044003 21.10.2010 Defer Date:21.02.2012 Decision : The Committee noted  that firm’s reply dt.05.09.2011 has been again sent to DHI on 14.12.2011 and the case is under examination of DHI. The case may be re­listed on  21.02.2012.   12

Case No.:6/37/80­ALC2/2010

LIMITED 10.01.2012 Status: Deferred HQ File :01/80/050/00744/AM11/ RLA File :09/24/040/00384/AM11/ Lic.No/Date:0910044581 06.12.2010 Defer Date:21.02.2012 Decision : The Committee noted  that firm’s reply dt.05.09.2011 has been again sent to DHI on 14.12.2011 and the case is under examination of DHI. The case may be re­listed on  21.02.2012.   13

Case No.:2/37/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL 10.01.2012 Status: Deferred HQ File :01/80/050/00740/AM11/ RLA File :05/23/040/00293/AM11/ Lic.No/Date:0510281598 17.01.2011 Defer Date:21.02.2012 Decision : The Committee noted  that firm’s reply dt.23.12.2011 has been sent to DHI on 05.01.2012 and the case is under examination of DHI. The case may be re­listed on  21.02.2012.   14

Case No.:21/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 10.01.2012 Status: Deferred HQ File :01/80/050/00759/AM11/ RLA File :09/24/040/00478/AM11/ Lic.No/Date:0910045222 25.01.2011 Defer Date:21.02.2012 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 21.02.2012.   15

Case No.:23/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 10.01.2012 Status: Deferred HQ File :01/80/050/00761/AM11/ RLA File :09/24/040/00476/AM11/ Lic.No/Date:0910045224 25.01.2011 Defer Date:21.02.2012 Decision : The Committee decided to forward a copy of firm’s reply dt.11.01.2012 to DHI for examination and comments. The case may be re­ listed on  21.02.2012.   16

Case No.:2/39/80­ALC2/2010

LIMITED 10.01.2012 Status: Deferred HQ File :01/80/050/00804/AM11/ RLA File :04/24/040/00257/AM11/ Lic.No/Date:0410121550 Defer

Q 11.02.2011 Date:21.02.2012 Decision :  The  representative  of  the  firm  Shri  C.  Kathirvelu,  Sr.  Deputy  General  Manager,  Product  Engineering  (FB)  appeared  before  the Committee for personal hearing and explained their case. The firm was requested to furnish details of specific export items, numbers, broad specifications and specific reply to DL pertaining to Sl. No.14, 24 & 25 and also data sought by DHI within 15 days.  The Committee, therefore, decided to defer the case and to re­list the case on 21.02.2012.   17

Case No.:10/40/80­ALC2/2010

Party Name:GL&V INDIA PRIVATE LIMITED 10.01.2012 Status: Approved HQ File :01/80/050/00860/AM11/ RLA File :31/24/040/00258/AM11/ Lic.No/Date:3110047111 25.02.2011   Decision :The Committee deliberated the written comments of DC(MSME) received  vide their UO Note No. 30(87) 2011­ME dated07.12.2011 and decided to ratify the norms in respect of the subject advance authorization  as under:­ 1. Total weight of Export product to be indicated as 8502 Kg. 2. Item of import at sl no. 1 & 2 being used as components and therefore be allowed on Net to net basis with accountability clause. 3. Item of import at sl no. 3 of import list to be allowed as 253 Kg, after taking one­third recovery including 14% wastage. 4. Item of import at sl no 4 of import list to be allowed as 4,809 Kg, after taking one­third recovery including 8% wastage. 5. Item of import at sl no 5 of import list to be allowed as 1,945Kg, after taking one­third recovery including 12% wastage. 6. Item no 6 to be allowed as 150 Kg i.e. within 2% of the weight of the Plate/Sheets to be welded.     18

Case No.:26/40/80­ALC2/2010

LIMITED 10.01.2012 Status: Deferred HQ File :01/80/050/00876/AM11/ RLA File :09/24/040/00553/AM11/ Lic.No/Date:0910045827 07.03.2011 Defer Date:21.02.2012 Decision : The Committee noted  that firm’s reply dt.05.09.2011 has been again sent to DHI on 14.12.2011 and the case is under examination of DHI. The case may be re­listed on  21.02.2012.   19

Case No.:28/40/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL 10.01.2012 Status: Deferred HQ File :01/80/050/00878/AM11/ RLA File :05/23/040/00348/AM11/ Lic.No/Date:0510285314 08.03.2011 Defer Date:21.02.2012 Decision : The Committee decided to forward a copy of firm’s reply dt.10.01.2012 to DHI for examination and comments. The case may be re­ listed on  21.02.2012.   20

Case No.:31/40/80­ALC2/2010

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. 10.01.2012 Status: Deferred HQ File :01/80/050/00881/AM11/ RLA File :03/95/040/00926/AM11/ Lic.No/Date:0310620641 Defer

10.03.2011 Date:21.02.2012 Decision : The Committee noted that the firm’s reply dt.05.12.2011 has been sent  to DHI on 29.12.2011 for examination and comments as the case is under examination with DHI. The case may be re­listed on  21.02.2012.   21

Case No.:21/3/80­ALC2/2011

Party Name:REALTIME TECHSOLUTIONS PVT.LTD., 10.01.2012 Status: Approved HQ File :01/80/050/00026/AM12/ RLA File :07/21/040/00889/AM11/ Lic.No/Date:0710077962 10.03.2011   Decision :The Committee deliberated the written comments of MC&IT received  vide their UO No. 17(97)/2011­IPHW dated 23.12.2011 and decided to ratify the norms in respect of the subject advance authorization on net to net basis with accountability clause.     22

Case No.:2/6/80­ALC2/2011

Party Name:THE TATA POWER COMPANY LTD 10.01.2012 Status: Deferred HQ File :01/80/050/00079/AM12/ RLA File :07/21/040/00953/AM11/ Lic.No/Date:0710078147 21.03.2011 Defer Date:21.02.2012 Decision : The Committee noted that a D.O.letter has been sent to MC&IT on 21.12.2011 for expediting their comments as the case is under examination with DIT and to re­list the case on 21.02.2012.   23

Case No.:17/9/80­ALC2/2011

LIMITED 10.01.2012 Status: Deferred HQ File :01/80/050/00185/AM12/ RLA File :09/24/040/00563/AM11/ Lic.No/Date:0910046078 25.03.2011 Defer Date:21.02.2012 Decision  :  The  Committee  noted    that  the  firm’s  reply  dt.05.09.2011  again  has  been  sent  to  DHI  on  14.12.2011  and  the  case  is  under examination of DHI. The case may be re­listed on  21.02.2012.   24

Case No.:5/3/80­ALC2/2011

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. 10.01.2012 Status: Deferred HQ File :01/80/050/00010/AM12/ RLA File :05/23/040/00019/AM12/ Lic.No/Date:0510288064 13.04.2011 Defer Date:21.02.2012 Decision : The Committee noted that a DL dated 09.12.2011 has been issued to the firm. The Committee, therefore, decided to defer the case and to re­list the case on 21.02.2012.   25

Case No.:8/3/80­ALC2/2011

Party Name:PRANAV VIKAS (INDIA) LTD. 10.01.2012 Status: Approved HQ File :01/80/050/00013/AM12/ RLA File :05/24/040/00454/AM11/ Lic.No/Date:0510288376 20 04 2011

20.04.2011 Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated10.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Quantity of import item at Sl. No. 1 to be allowed as applied for on net to net basis with accountability clause. 2.      Quantity of import item at Sl. No. 2 to be allowed as 21 Kgs. inclusive of 2 % wastage. 3.      Quantities of import items at Sl. No. 3 & 4  to be allowed as 609 Kgs. & 97.3 Kgs. respectively inclusive of 3 % wastage. 4.      Quantities  of import items at Sl. No. 5, 6 & 7 to be allowed as 91.4 Kgs., 252 Kgs. & 63.7 Kgs respectively  inclusive of 2 % wastage. 5.      Quantity of import item at Sl. No. 8 to be allowed as 1200 Nos. on net to net basis. However, duty free weight of this item may be allowed as 92 Kgs. inclusive of 5 % wastage. 6.      Total  quantities of import items from Sl. No.  9 to 11 put together to be allowed within 2 % of FOB value of exports.     26

Case No.:29/3/80­ALC2/2011

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:21/80­ALC2/2011 10.01.2012 Status: Deferred HQ File :01/80/050/00034/AM12/ RLA File :05/24/040/00011/AM12/ Lic.No/Date:0510288857 27.04.2011 Defer Date:21.02.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to   27

Case No.:8/9/80­ALC2/2011

Party Name:CICB CHEMICON PRIVATE LIMITED, 10.01.2012 Status: Approved HQ File :01/80/050/00176/AM12/ RLA File :07/24/040/00029/AM12/ Lic.No/Date:0710078936 03.05.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated10.01.2012 and decided to ratify the   1.          Net Weight of export products to be specified as under:   Export Product Sl. No. Net Export Wt.(Kgs) Export Product Sl. No. Net Export Wt.(Kgs) Export Product Sl. No. Net Export Wt.(Kgs) 1 4568 9 2468 17 1486 2 1414 10 1943 18 1806 3 4463 11 1733 19 4803 4 1313 12 15745 20 5775 5 3675 13 4305 21 5224 6 1943 14 18463 22 3777

7 5357 15 5056 23 4316 8 19665 16 1486       2.      Quantities of import items at Sl. No. 1 & 2 to be allowed as 2390 Kgs. & 2245 Kgs. respectively inclusive of  5% wastage. 3.      Quantity of import item at Sl. No. 3 to be allowed as applied for i.e. 219.246 Kgs. on net to net basis. 4.      Quantities of import items at Sl. No. 4 & 8 to be allowed as 3708 Kgs. & 580 Kgs. respectively inclusive of  5% wastage. 5.      Quantities of import items at Sl. No. 6, 7, 11, 12, 18, 21 & 22  to be deleted as informed by the firm. 6.      Quantities of import items at Sl. No. 5, 9, 10, 13 to 17, 19, 20, 23, 39, 42 & 44 may be allowed as applied for on net to net basis. 7.      Quantities of import items from  Sl. No. 24 to 38   to be deleted as these items not imported by the firm.  8.      Quantities of import items at Sl. No. 40, 41 & 43  to be allowed as 649 Kgs., 9.5 Kgs. & 1332 Kgs. respectively inclusive of  5% wastage.     28

Case No.:13/9/80­ALC2/2011

Party Name:OILGEAR TOWLER POLYHYDRON PVT.LTD., 10.01.2012 Status: Deferred HQ File :01/80/050/00181/AM12/ RLA File :07/21/040/00115/AM12/ Lic.No/Date:0710079344 23.05.2011 Defer Date:21.02.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to   29

Case No.:17/6/80­ALC2/2011

Party Name:GL&V INDIA PRIVATE LIMITED 10.01.2012 Status: Approved HQ File :01/80/050/00094/AM12/ RLA File :31/83/040/00028/AM12/ Lic.No/Date:3110048282 27.05.2011   Decision :The Committee deliberated the written comments of DC(MSME) received vide their UO Note No. 30(48) 2011­ME dated 07.12.2011 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Total weight of Export product to be indicated as 31421 Kg. 2. Item of import at Sl. No. 1 & 2 being used as components and therefore be allowed on Net to net basis with accountability clause. 3. Item of import at Sl. No. 3 of import list to be allowed as 17,294 Kg, after taking one­third recovery including wastage of 14%. 4. Item of import at Sl. No.4 of import list to be allowed as 5,873 Kg, after taking on­third recovery including wastage of 12%. 5. Item of import at Sl. No. 5 of import list to be allowed without wastage as applied for by the firm. 6. Item No. 6 to be recommended as applied for i.e. within 2% of the weight of the Plate / Sheets to be welded.     30

Case No.:11/9/80­ALC2/2011

LIMITED 10.01.2012 Status: Deferred HQ File :01/80/050/00179/AM12/ RLA File :61/24/040/00010/AM12/ Lic.No/Date:6110000625 31 05 2011 Defer Date:21 02 2012

31.05.2011 Date:21.02.2012 Decision :The Committee noted that the written comments of DHI are to be considered after ratification of repeat basis Advance Authorization No.6110000472 dated 15.7.2010.   31

Case No.:19/15/80­ALC2/2011

Party Name: BLUE STAR LTD. 10.01.2012 Status: Approved HQ File :01/80/050/00316/AM12/ RLA File :03/94/040/00190/AM12/ Lic.No/Date:0310633805 31.05.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated 10.01.2012 and decided to ratify the   1. Net Weight of export products to be specified as under:   Export Product Sl. No. Net Export Wt.(MT) Export Product Sl. No. Net Export Wt.(MT) Export Product Sl. No. Net Export Wt.(MT 1 107.06 17 8.97 33 10.96 2 92.89 18 5.46 34 10.84 3 60.61 19 24.53 35 3.06 4 102.84 20 1.187 36 11.66 5 23.31 21 1.73 37 0.935 6 86.39 22 11.96 38 4.76 7 97.20 23 7.16 39 5.75 8 95.31 24 7.16 40 37.87 9 26.12 25 11.40 41 33.57 10 7.22 26 1.97 42 15.8 11 26.15 27 3.97 43 18.67 12 50.06 28 10.85 44 0.436 13 31.76 29 2.56 45 0.436 14 18.66 30 3.37 46 0.873 15 16.66 31 13.65 47 2.38 16 11.12 32 1.83 48 0.476 2.          Word “relevant” to be prefixed with the description of import items at S.No. 1 to 3 & 11. 3.          Quantity of import  item at Sl No. 1 to be allowed as 1.01 Kgs./Kg. content in the export product 4.           Quantity of import item at Sl No. 2 to be allowed as 1.02 Kgs./Kg. content in the export product. 5.          Quantity of import item at Sl.No. 3  to be allowed as 1.05 Sq.Mtrs./Sq.Mtr.. content in the export product. 6.          Quantities of import items at S.No. 4  to 10  to be allowed on net to net basis with accountability clause. 7.          Quantity of import  item at Sl. No. 11 to be allowed as applied for on net to net basis.   The RLA may take necessary action accordingly

  32

Case No.:27/6/80­ALC2/2011

Party Name:JOHN DEERE INDIA PVT LTD 10.01.2012 Status: Closed HQ File :01/80/050/00104/AM12/ RLA File :31/82/040/00021/AM12/ Lic.No/Date:3110048382 01.06.2011   Decision : The Committee noted that RA, Pune informed vide e­mail dt.22.12.2011 that the Advance Authorization has been issued under GN­ 4. The Committee, therefore, decided to close the case on the part of NC.     33

Case No.:5/11/81­ALC2/2011

Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. 10.01.2012 Status: Approved HQ File :01/81/050/00074/AM12/ RLA File :05/23/040/00081/AM12/ Lic.No/Date:0510292480 02.06.2011   Decision :The Committee deliberated the written comments of C&PC received  vide their O.M. No.46011/67/2011­PC.II dated10.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Items at sl.no. 1 to 5 to be allowed “5% wastage on the net content of the relevant Nylon Resins/compound contained in the export product i.e. Parts of automobile – connectors (connector housing) and lock”. 2. Items at sr.no.7 & 8 to be allowed as applied for on net to net basis with accountability clause.     34

Case No.:29/6/80­ALC2/2011

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., 10.01.2012 Status: Deferred HQ File :01/80/050/00106/AM12/ RLA File :03/95/040/00177/AM12/ Lic.No/Date:0310634527 06.06.2011 Defer Date:21.02.2012 Decision :The Committee noted that the firm has sought time vide their letter dated 10.12.2011 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice and to re­list the case on 21.02.2012.   35

Case No.:15/9/80­ALC2/2011

Party Name:AQUASUB ENGINEEING 10.01.2012 Status: Rejected HQ File :01/80/050/00183/AM12/ RLA File :32/24/040/00016/AM12/ Lic.No/Date:3210048550 23.06.2011   Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dt.12.08.2011and subsequent reminder 12.12.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.

requirement of inputs.     36

Case No.:3/9/80­ALC2/2011

Party Name:LARSEN & TOUBRO LIMITED 10.01.2012 Status: Deferred HQ File :01/80/050/00170/AM12/ RLA File :03/95/040/00166/AM12/ Lic.No/Date:0310640468 05.07.2011 Defer Date:21.02.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to   37

Case No.:5/15/80­ALC2/2011

Party Name:H.L.EQUIPMENTS 10.01.2012 Status: Approved HQ File :01/80/050/00302/AM12/ RLA File :52/24/040/00016/AM12/ Lic.No/Date:5210035817 12.07.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated10.01.2012 and decided to ratify the   1. Net weights of 7500 Kgs., 7500Kgs. & 900 Kgs.  to be specified with quantities of export products at Sl. No. 1, 2 & 3 respectively. 2. Word ‘Relevant” to be prefixed and words “ 3 MM to 19 MM thk” to be suffixed with the description of import item at Sl. No.1 and its quantity to be allowed as applied for i.e. 3082  Kgs on net to net basis.  3. Quantity of import item at Sl.No. 2  to be allowed as 249  Kgs.      38

Case No.:26/9/80­ALC2/2011

Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY 10.01.2012 Status: Deferred HQ File :01/80/050/00194/AM12/ RLA File :05/23/040/00132/AM12/ Lic.No/Date:0510296453 13.07.2011 Defer Date:21.02.2012 Decision : The Committee noted that DO from DDG sent to MC&IT on 21.12.2011 and the case is under examination with MC&IT. The case is to be re­listed on 21.02.2012.   39

Case No.:18/15/80­ALC2/2011

Party Name:ARUL LINU GRABS PRIVATE LIMITED., 10.01.2012 Status: Deferred HQ File :01/80/050/00315/AM12/ RLA File :17/24/040/00037/AM12/ Lic.No/Date:1710004457 11.08.2011 Defer Date:21.02.2012 Decision:  As  per  DHI  UO  note  No.3(48)/11­TSW(B)/18  dated  11.01.2012,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  21.02.2012: ­

1. Firm to furnish information in respect of Sl.No.4,5, & 11 of the Standard Deficiency Format.   40

Case No.:4/15/80­ALC2/2011

Party Name:LEADER VALVES LTD. 10.01.2012 Status: Approved HQ File :01/80/050/00301/AM12/ RLA File :30/24/040/00023/AM12/ Lic.No/Date:3010078058 25.08.2011   Decision  :The  Committee  deliberated  the  written  comments  of  DC(MSME)  received    vide  their  UO  Note  No.  30(88)  2011­ME  dated 14.12.2011 and decided to ratify the norms in respect of the subject advance authorization on Net­to­Net basis with accountability clause.     41

Case No.:13/15/80­ALC2/2011

Party Name:DIAMOND METAL SCREENS (P) LTD 10.01.2012 Status: Approved HQ File :01/80/050/00310/AM12/ RLA File :07/24/040/00150/AM12/ Lic.No/Date:0710081817 26.08.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated10.01.2012 and decided to ratify the   1.      Word “relevant” to be prefixed with the description of import items at Sl. No. 1, 2 & 3. 2.      Quantity of import item at Sl. No. 1 to be allowed as 5434 Kgs. inclusive of 10 % wastage after 1/3rd recovery of scrap. 3.      Quantity of import item at Sl. No. 2 to be allowed as applied for i.e. 5745 Kgs.  inclusive of 2 % wastage. 4.      Quantity of import item at Sl. No. 3 to be allowed as applied for i.e. 9810 Kgs.  inclusive of 4 % wastage.     42

Case No.:15/15/80­ALC2/2011

Party Name:ARUL LINU GRABS PRIVATE LIMITED., 10.01.2012 Status: Deferred HQ File :01/80/050/00312/AM12/ RLA File :17/24/040/00049/AM12/ Lic.No/Date:1710004496 05.09.2011 Defer Date:21.02.2012 Decision  :  As  per  DHI  UO  note  No.3(48)/11­TSW(B)/17  dated  11.01.2012,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  21.02.2012: ­   1. Firm to furnish information in respect of Sl.No.4,5, & 11 of the Standard Deficiency Format.   43

Case No.:8/15/80­ALC2/2011

Party Name:METSO PAPER INDIA PVT.LTD. 10.01.2012 Status: Deferred HQ File :01/80/050/00305/AM12/ RLA File :05/24/040/00200/AM12/ Lic.No/Date:0510301760 08.09.2011 Defer Date:21.02.2012

Decision :The Committee noted that the firm has sought time vide their letter dated 10.12.2011 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice as the case is to be re­list on 21.02.2012.   44

Case No.:9/15/80­ALC2/2011

Party Name:MAGNETI MARELLI UM ELECTRONICS SYSTEMS PVT.LTD., 10.01.2012 Status: Approved HQ File :01/80/050/00306/AM12/ RLA File :05/24/040/00202/AM12/ Lic.No/Date:0510301975 12.09.2011   Decision :The Committee deliberated the written comments of MC&IT received  vide their UO No.17(84)/2011­IPHW dated03.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Import item at S. No. 1­13 On  net  to  net  basis  with accountability clause 2. Import  item  at  S.  No.  14­ 16 As  applied  for  by  the  party inclusive of wastage of 2%.     45

Case No.:6/15/80­ALC2/2011

Party Name: MONTAN HYDRAULIK (INDIA) PVT LTD 10.01.2012 Status: Deferred HQ File :01/80/050/00303/AM12/ RLA File :04/24/040/00178/AM12/ Lic.No/Date:0410128126 15.09.2011 Defer Date:21.02.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to   46

Case No.:2/21/80­ALC2/2011

Party Name: BIRLA FURUKAWA FIBRE OPTICS LIMITED, 10.01.2012 Status: Deferred HQ File :01/80/050/00422/AM12/ RLA File :17/24/040/00053/AM12/ Lic.No/Date:1710004532 16.09.2011 Defer Date:21.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to MC&IT on 23.12.2011 and the case is under examination. The case is to be re­listed on 21.02.2012.   47

Case No.:11/21/80­ALC2/2011

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., 10.01.2012 Status: Deferred HQ File :01/80/050/00431/AM12/ RLA File :34/24/040/00108/AM12/ Lic.No/Date:3410031582 16.09.2011 Defer Date:21.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to C&PC  on 09.01.2012 and the case is under examination. The case is to be re­listed on 21.02.2012.

48

Case No.:20/15/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., 10.01.2012 Status: Approved HQ File :01/80/050/00317/AM12/ RLA File :03/94/040/00446/AM12/ Lic.No/Date:0310654528 19.09.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated10.01.2012 and decided to ratify the   1.      Net empty export weights of 5300 Kgs., 5300 Kgs., 9200 Kgs., 9200 Kgs., 9570 Kgs., & 4760 Kgs.  to be specified with the quantities of export products at  Sl. No. 1 to 6  respectively. 2.      Quantity of import item at Sl. No. 1 to be allowed as  180 Kgs.    (2 Nos.) on net to net  basis with accountability clause. 3.      Quantity of import item at Sl. No. 2 to be allowed as  854 Kgs.    (30 Nos.) on net to net  basis with accountability clause . 4.      Quantity of import item at Sl. No. 3 to be allowed as 176 Nos. on net to net basis. However, duty free weight of this item to be allowed as  13894 Kg inclusive of  5 % wastage. 5.      Word “Relevant” may be prefixed with the descriptions of import items at Sl. No. 4 to 7. 6.      Quantity of import item at Sl. No. 4  to be allowed as 403 Kgs.      ( 21.7 Mtrs.) on net to net basis. 7.      Quantity of import item at Sl. No. 5  to be allowed as 30.84 Kgs.      ( 4.42 Mtrs.) inclusive of 2 % wastage. 8.      Quantity of import item at Sl. No.6  to be allowed as applied for i.e. 3360 Kgs.  inclusive of 2 % wastage. 9.      Quantity of import item at Sl. No. 7  to be allowed as 23600 Kgs. inclusive of 8.1 % wastage after 1/3rd recovery. 10.  Quantity of import item at Sl. No. 8 to be allowed as  90 Kgs.      (2 Nos.) on net to net  basis with accountability clause . 11.  Quantity of import item at Sl. No. 9 to be allowed as  100 Kgs.    (2 Nos.) on net to net  basis with accountability clause . 12.  Quantity of import item at Sl. No. 10 to be allowed as  260 Kgs.    (2 Nos.) on net to net  basis with accountability clause . 13.  Quantities of import items at Sl. Nos. 11, 12 & 13 ( Welding Consumables)  may be allowed as 406 Kgs. each. 14.  Following two additional import items to be allowed on net to net basis. (i)         Elbows/Fittings SA 420 WPL 6­ Qty.13 Nos. (35 Kgs.) (ii)       Elbows/Fittings SA 403 WPS 316L ­ Qty. 1 Nos. (31 Kgs.)     49

Case No.:14/15/80­ALC2/2011

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. 10.01.2012 Status: Approved HQ File :01/80/050/00311/AM12/ RLA File :05/23/040/00230/AM12/ Lic.No/Date:0510303170 20.09.2011   Decision :The Committee deliberated the written comments of DC(MSME) received  vide their UO Note No 30(88) 2011­ME dated09.12.2011 and decided to ratify the norms in respect of the subject advance authorization on Net­to­Net basis with accountability clause and nil wastage”.    

Case No.:11/15/80­ALC2/2011

Party Name:H.L.EQUIPMENTS 10 01 2012 Status: A d

50 10.01.2012 Approved HQ File :01/80/050/00308/AM12/ RLA File :52/24/040/00027/AM12/ Lic.No/Date:5210036502 21.09.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated10.01.2012 and decided to ratify the   1. Net weights of 15000 Kgs.. & 450 Kgs.  may be specified with quantities  of export products at Sl. No. 1 & 2 respectively. 2. Word “relevant” may be prefixed with the description of import items at Sl. No. 1 & 3. 3. Quantity of import item at Sl. No. 1  may be allowed as 4316   Kgs. on net to net basis. 4. Quantity of import item at Sl.No. 2  may be allowed as 287  Kgs.  5. Quantity of import item at Sl. No. 3  may be allowed as 30   Kgs. on net to net basis. 6. Import item at Sl. No. 4 may be deleted as the same not imported by the firm..     51

Case No.:1/18/80­ALC2/2011

Party Name:ASAHITEC STENCILS P.LTD., 10.01.2012 Status: Deferred HQ File :01/80/050/00355/AM12/ RLA File :04/24/040/00183/AM12/ Lic.No/Date:0410128353 21.09.2011 Defer Date:21.02.2012 Decision :The Committee noted that the firm did not replied to this office letter dt.12.12.2011 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice. The case is to be re­list on 21.02.2012.   52

Case No.:3/21/80­ALC2/2011

Party Name:BIRLA FURUKAWA FIBRE OPTICS LIMITED, 10.01.2012 Status: Deferred HQ File :01/80/050/00423/AM12/ RLA File :17/24/040/00055/AM12/ Lic.No/Date:1710004540 23.09.2011 Defer Date:21.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to MC&IT on 23.12.2011 and the case is under examination. The case is to be re­listed on 21.02.2012.   53

Case No.:14/18/80­ALC2/2011

LIMITED 10.01.2012 Status: Deferred HQ File :01/80/050/00368/AM12/ RLA File :04/24/040/00146/AM12/ Lic.No/Date:0410128602 27.09.2011 Defer Date:21.02.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to   54

Case No.:1/15/80­ALC2/2011

Party Name:STARION INDIA P.LTD 10 01 2012 Status: Approved

10.01.2012 Approved HQ File :01/80/050/00298/AM12/ RLA File :31/83/040/00127/AM12/ Lic.No/Date:3110050667 28.09.2011   Decision :The Committee deliberated the written comments of MC&IT received  vide their UO No. 17(98)/2011­IPHW dated02.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   S. No. Import Item Description Total  wastage calculated  as  per details given by the part  (on  the  Net weight) in % Total  Import Qty. recommended (in MT) 1. Lumax  Resin  GN5006FC KC21­ Tray Disc 2.34% 174.15   Lumax  Resin  GN5006FC KC21­Main Base 0% 2. Resin ABS AF303G92649 BEZEL Assembly 11.96% 44.58   Resin  ABS  AF303692649 (Bezel Assembly) 10.91%   Resin  ABS  AF  30G92649 (Door Tray) 9.72% 3. Resin  Lupos  GP2100 KA02 (Base Up Down) 18.00% 21.24 4. F20­03  Natural  POM (Polyacetal  Resin)  (Gear Idle) 200.00% 89.422   F20­03  Nutural  POM (Polyacetal  Resin)  (Pulley Gear) 250.00%   F20­03  Nutural  POM (Polyacetal  Resin)  (Clamp Assembly) 66.74%   F20­03  Nutural  POM (Polyacetal Resin) (Chassis Outsert) 85.19%   F20­03  Nutural  POM (Polyacetal  Resin)  (Pully Motor) 300%   F20­03  Nutural  POM (Polyacetal  Resin)  (Gear Loading) 100.00%

Loading)   F20­03  Nutural  POM (Polyacetal  Resin)  (Guide UP Down) 18.31%   F20­03  Nutural  POM (Polyacetal  Resin)  (Lever Emergency) 50.00% 5. Master  Batch  Block  MB S315 Black Guide Feed 0% 0.336 6. Master Batch Block MB – B207­CLAM ASS (Clamp Assemblyl) 97.89% 0.282 7. Electrolytic  Galvanised Steel  Coil  Cold Coldrolledo. 6MMx242MM  Steel  Coil (Cabinet Assembly 13.86% 305.10 8. Electrolytic  Galvanised Steel  Sheet  Cold  Rolled 0.5MMx169.5MMx600M Steel  Sheet  Cabinet Assembly  (Cabnet Assembly) 53.50% 46.050 9. Electrolytic  Galvanised Steel  Coil  Cold  Tolled 0.5MMx182.8MM  Steel Coil (Bottom Assembly) 14.06% 165.225 10. Electrolytic  Galvanised Steel  Coil  Cold  Rolled 1.6MMx130MM  Steel; Coil (Chassis Outsert) 95.50% 317.412   Electrolytic  Galvanised Steel  Coil  Cold  Rolled 1.6MMx130Mm Steel Coil – (Bracket) 0% 11. TX  31  Natural  TX31 Guide Feed 20% 8.4 12. Acrylic  Resin  IH  830 (Lens Model) (Lens) 30.00% 3.640  

y y g y   55

Case No.:3/18/80­ALC2/2011

LIMITED 10.01.2012 Status: Deferred HQ File :01/80/050/00357/AM12/ RLA File :04/24/040/00095/AM12/ Lic.No/Date:0410129108 11.10.2011 Defer Date:21.02.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to   56

Case No.:7/18/80­ALC2/2011

Party Name:M M AQUA TECHNOLOGIES LTD. 10.01.2012 Status: Approved HQ File :01/80/050/00361/AM12/ RLA File :05/24/040/00042/AM12/ Lic.No/Date:0510305085 12.10.2011   Decision :The Committee deliberated the written comments of C&PC received  vide their OM No. 46011/253/2004­PC­II dated15.12.2011 and decided to ratify the norms in respect of the subject advance authorization  as under:­   Item to be exported Quantity PVC Fill Media 1 Kg. Raw – Material Recommended for import Quantity PVC  Sheet  (Thickness  0.175  mm  to  0.80 mm) 1.15 Kg.     57

Case No.:2/18/80­ALC2/2011

LIMITED 10.01.2012 Status: Deferred HQ File :01/80/050/00356/AM12/ RLA File :04/24/040/00128/AM12/ Lic.No/Date:0410129210 13.10.2011 Defer Date:21.02.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to   58

Case No.:9/18/80­ALC2/2011

Party Name:MOTHERSON SUMI SYSTEMS LTD 10.01.2012 Status: Deferred HQ File :01/80/050/00363/AM12/ RLA File :05/24/040/00251/AM12/ Lic.No/Date:0510305773 18.10.2011 Defer Date:21.02.2012 Decision : The Committee noted that C&PC has returned the application of the firm as it does not pertain to them. Therefore, the committee decided to send a copy of firm’s application to DHI for examination and comments. The case is to be re­listed on 21.02.2012.

59

Case No.:6/18/80­ALC2/2011

Party Name:KONE ELEVATOR INDIA PVT LTD 10.01.2012 Status: Deferred HQ File :01/80/050/00360/AM12/ RLA File :04/24/040/00208/AM12/ Lic.No/Date:0410129476 19.10.2011 Defer Date:21.02.2012 Decision :The Committee noted that the firm did not furnish a reply to this office letter dated 12.12.2011 requesting for certain  information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be re­list on 21.02.2012.     60

Case No.:1/21/80­ALC2/2011

Party Name:NICOMET INDUSTRIES LTD. 10.01.2012 Status: Approved HQ File :01/80/050/00421/AM12/ RLA File :03/95/040/00592/AM12/ Lic.No/Date:0310660730 19.10.2011 Defer Date:21.02.2012 Decision : On the basis of recommendation of MSME representative based on sub committee report, the Committee decided to ratify the norms of the subject Advance Authorization on repeat basis at 1.0963Kg/Kg content in cobalt concentrate (on cobalt concentrate basis) for export of 1Kg of cobalt metal.   61

Case No.:8/18/80­ALC2/2011

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:21/80­ALC2/2011 10.01.2012 Status: Deferred HQ File :01/80/050/00362/AM12/ RLA File :05/24/040/00249/AM12/ Lic.No/Date:0510306346 21.10.2011 Defer Date:21.02.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to     62

Case No.:12/21/80­ALC2/2011

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 10.01.2012 Status: Deferred HQ File :01/80/050/00432/AM12/ RLA File :09/24/040/00340/AM12/ Lic.No/Date:0910049436 21.10.2011 Defer Date:21.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 09.01.2012 and the case is under examination. The case is to be re­listed on 21.02.2012.     63

Case No.:13/18/80­ALC2/2011

Party Name:EMMVEE SOLAR SYSTEMS PVT LTD., 10.01.2012 Status: Approved HQ File :01/80/050/00367/AM12/ RLA File :07/24/040/00293/AM12/ Lic.No/Date:0710083569 27.10.2011   Decision :The Committee deliberated the written comments of DC(MSME) received  vide their UO Note No. 30(88) 2011­ME dated09.01.2012

and decided to ratify the norms in respect of the subject advance authorization on Net­to­Net basis with accountability clause”.     64

Case No.:11/18/80­ALC2/2011

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., 10.01.2012 Status: Approved HQ File :01/80/050/00365/AM12/ RLA File :04/24/040/00212/AM12/ Lic.No/Date:0410129764 28.10.2011   Decision  :  The  Committee  deliberated  the  written  comments  of  DC(MSME)  received    vide  their  UO  Note  No.  30(94)2011­ME  dated 07.12.2011 and decided to ratify the norms in respect of the subject advance authorization  as under:­   “After going through the application, it is seen that the Unit is exporting Rocker Arm shaft assy and for which components and Inserts are being imported. The unit has stated in their application that the inserts are being used as consumables and these were earlier recommended by ALC as 0.75% of FOB value, in the meeting No.30/80 ALC 2/2009 dated 27.10.2009. The Committee decided to ratify the norms based on DC(MSME) recommending Inserts as 0.75% of FOB value (as recommended earlier by MSME). Other components may be allowed on net­to­net basis with accountability clause”.     65

Case No.:12/18/80­ALC2/2011

Party Name:BRAKES INDIA LIMITED, 10.01.2012 Status: Deferred HQ File :01/80/050/00366/AM12/ RLA File :04/24/040/00136/AM12/ Lic.No/Date:0410129812 31.10.2011 Defer Date:21.02.2012 Decision  :As  per  DHI  UO  note  No.3(67)/11­TSW(B)/15  dated  11.01.2012,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  21.02.2012: ­   1.      Firm to furnish information in respect of Sl.No.4,5 & 11 of the Standard Deficiency Format.   66

Case No.:6/21/80­ALC2/2011

Party Name:SATTVA ETECH INDIA PRIVATE LIMITED 10.01.2012 Status: Deferred HQ File :01/80/050/00426/AM12/ RLA File :07/24/040/00296/AM12/ Lic.No/Date:0710083749 04.11.2011 Defer Date:21.02.2012 Decision : The Committee decided that a copy of firm’s application forward to MC&IT for their examination and comments. The case is to be re­listed on 21.02.2012   67

Case No.:4/18/80­ALC2/2011

Party Name:COMAU INDIA P.LTD, 10.01.2012 Status: Deferred HQ File :01/80/050/00358/AM12/ RLA File :31/82/040/00187/AM12/ Lic.No/Date:3110051335 08 11 2011 Defer Date:21 02 2012

08.11.2011 Date:21.02.2012 Decision : The Committee decided that a copy of firm’s application forward to DHI for their examination and comments. The case is to be re­ listed on 21.02.2012   68

Case No.:5/18/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., 10.01.2012 Status: Deferred HQ File :01/80/050/00359/AM12/ RLA File :03/94/040/00694/AM12/ Lic.No/Date:0310664263 09.11.2011 Defer Date:21.02.2012 Decision :As per DIPP UO note dated 11.01.2012, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  21.02.2012: ­ 1.      Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Format. 2.      Quantity  of import item at Sl. No. 1 in Nos. also in addition to its weight. 3.      Quantity of import item at Sl. No. 3  in meters also in addition to its weights.   69

Case No.:5/21/80­ALC2/2011

Party Name:SEJASMI INDUSTRIES (INDIA) PVT. LTD. 10.01.2012 Status: Approved   HQ File :01/80/050/00425/AM12/ RLA File :08/24/040/00189/AM12/ Lic.No/Date:0810105732 18.11.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated10.01.2012 and decided to ratify the   1.      Quantity of import item at Sl.  No. 1 may be allowed as applied for i.e. 52500 Kgs. inclusive of 5 % wastage. 2.      Weight of 25000 Kgs may be specified with the quantity of import item at Sl. No.2. 3.       Quantity of import item at Sl. No.2 may be allowed as 500000 Nos. (25000 Kgs.) on net to net basis.     70

Case No.:10/21/80­ALC2/2011

Party Name:YORK INDIA LTD 21.02.2012 Status: Approved HQ File :01/80/050/00430/AM12/ RLA File :31/82/040/00206/AM12/ Lic.No/Date:3110051561 10.01.2012   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated10.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as per GN­4 for Engineering Products.    

Case No.:8/21/80­ALC2/2011

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. 10.01.2012 Status: Deferred HQ Fil 01/80/050/00428/AM12/ RLA Fil 07/24/040/00331/AM12/ Li N /D t 0710084167 D f

71 HQ File :01/80/050/00428/AM12/ RLA File :07/24/040/00331/AM12/ Lic.No/Date:0710084167 22.11.2011 Defer Date:21.02.2012 Decision :The Committee noted that the firm’s application has been sent to DIPP on 09.01.2012 for their examination and comments. The case is to be re­listed on 21.02.2012.   72

Case No.:7/21/80­ALC2/2011

Party Name:POLY MEDICURE LTD. 10.01.2012 Status: Deferred HQ File :01/80/050/00427/AM12/ RLA File :05/24/040/00281/AM12/ Lic.No/Date:0510309080 23.11.2011 Defer Date:21.02.2012 Decision : The Committee noted that the firm’s application has been sent to C&PC on 09.01.2012 for their examination and comments. The case is to be re­listed on 21.02.2012.   73

Case No.:9/21/80­ALC2/2011

Party Name:POLY MEDICURE LTD. 10.01.2012 Status: Deferred HQ File :01/80/050/00429/AM12/ RLA File :05/24/040/00297/AM12/ Lic.No/Date:0510309616 28.11.2011 Defer Date:21.02.2012 Decision : The Committee noted that the firm’s application has been sent to C&PC on 09.01.2012 for their examination and comments. The case is to be re­listed on 21.02.2012.   74

Case No.:4/21/80­ALC2/2011

Party Name:RATNAMANI METALS & TUBES LIMITED 10.01.2012 Status: Deferred HQ File :01/80/050/00424/AM12/ RLA File :08/24/040/00191/AM12/ Lic.No/Date:0810106224 01.12.2011 Defer Date:21.02.2012 Decision : The Committee noted that the firm’s application has been sent to DIPP on 09.01.2012 for their examination and comments. The case is to be re­listed on 21.02.2012. S.No.24

Case No.  A ­ 09

M/s.  Jhagadia Copper LTd.,   HQ F.No.01/80/162/00542/AM10/DES.I Lic.No. & Date Meeting No.21/12  RA.F.No.34/24/039/00001/AM10 3410024795 dt.29.07.2009 Date: 10.01.2012 Ratification of  norms. As per DC(MSME) UO note No.30(110) 2011­ME dated 12.01.2012, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  21.02.2012: ­   1. Chemical Composition of import item indicating % of copper and other inputs there in against each import item. 2. Details of export made during the year 2009­10 against subject advance authorization. 3. Reason to import primary metals mentioned at srl no 8 and 11 for mfg export product. 4. Process flow chart indicating stepwise wastage by using different imported inputs. 5. Certified consumption data of all items showing consumption against production of export items.

p g p g p p 6. Wastage justification.   S.No.25

Case No.  A ­ 14

M/s.  Larson  & Toubro Ltd.,   HQ F.No.01/80/162/00522/AM11/DES.I Lic.No. & Date Meeting No.21/12  RA.F.No.03/95/039/00004/AM10 0310541346 dt.12.10.2009 Date: 10.01.2012 Ratification of  norms   The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to re­list the case on 21.02.2012.   S.No.26

Case No.  A ­ 03

M/s.  Larson  & Toubro  Ltd., Mumbai   HQ F.No.01/80/162/00845/AM12/DES.I Lic.No. & Date Meeting No.21/12  RA.F.No.03/95/039/00001/AM12 0310643682 dt.21.07.2011 Date: 10.01.2012 Fixation  of  norms  for  annual requirement As per DHI UO note No.3(61)/11­TSW(B)/11 dated 11.01.2012, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  21.02.2012: ­   1.  Sl.No.5,9 &1of SDL export product wise. 2.  Specification of electrical & instrument item of import like different types of pumps & item no 102 to 104, 170,179,184,188, 217 etc. 3.   Item given in set may be given in number. 4.   The specific items covered “Accessories”. There are number of item under Accessories like item No. 22,35,32,35,40,42,51 etc. 5.   Weight of some of the raw material like item No. 10 has not been given. 6.   The firm may explain how item No. 268 & 269 (Plate & Angles) are components. The unit of plate has been given in meters which needs clarification. 7.   Item No. 6 is said to be a component but unit of measurement in MT. Detail use of iem along with clarification is needed. 8.   Item No. 13 & 14­ Accessories are to be imported in both the heading. Needs clarification. 9.   Calculation of welding material. Item No. 11 & 12. 10. Break up of seam less & welded pipes / Tubular. (item no. 9 & 10). 11. Calculation of item No. 124 & 125 (Chemicals & Lubricants) & specification of the same. 12. Calculation of item Nos. 162,262,263,315,316,317,319,325 to 327 etc. 13. Specific use of components like item No. 485, 487 etc. 14. Name of all consumables & their calculation. 15. List of EP/Input along with “AA’ copy + CTH   S. No.508

Case No.  A/R­40

M/s.  Bharat  Heavy Electricals  Ltd., Haridwar HQ F.No.01/80/162/00539/AM09/DES.I Lic.No. & Date Meeting No.21/12 RA F.No.61/24/040/00036/AM09 6110000254 dt.05.12.2008   Date: 10.01.2012 Ratification of norms   The representative of the DHI informed the Committee that the case is under examination The Committee therefore decided to defer the case and to

The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to re­list the case on 21.02.2012.   Sl.No.509

Case No.A/R­161

M/s. Thermax LTd., HQ F.No.01/80/050/01549/AM09/ DES­I Lic.No. & Date Meeting No.21/12 RA F.No.31/21/040/00295/AM09 3110036392 dt.11.12.2008 Date: 10.01.2012 Ratification of norms   The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to re­list the case on 21.02.2012.   S.No.510

Case No.A/R­53

M/s.  Andritz  Hydro Pvt.  Ltd.,  Palwal (Har.) HQ F.No.01/80/050/00009/AM12/ DES­I Lic.No. & Date Meeting No.21/12 RA F.No.05/23/040/00009/AM12 0510287936 dt.11.04.2011 Date: 10.01.2012 Ratification   of Norms   The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to re­list the case on 21.02.2012.   S.No.511

Case No.A/R­54

M/s.  Andritz  Hydro Pvt.  Ltd.,  Palwal (Har.) HQ F.No.01/80/050/00864/AM11/ DES­I Lic.No. & Date Meeting No.21/12 RA F.No.05/23/040/00340/AM11 0510284704 dt.01.03.2011 Date: 10.01.2012 Ratification   of Norms   The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to re­list the case on 21.02.2012.   S.No.512

Case No.A/R­57

M/s.  Thermax Limited HQ F.No.01/81/050/00310/AM06/ DES­I Lic.No. & Date Meeting No.21/12 RA F.No.31/24/040/00017/AM06 3110021206 dt.14.07.2005 Date: 10.01.2012 Revision of norms   The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to re­list the case on 21.02.2012.   S.No.513

Case No.A/R­77

M/s.  The  Saraswati Industrial  Syndicate Ltd., HQ F.No.01/80/050/00313/AM11/ DES­I Lic.No. & Date Meeting No.21/12 RA F.No.05/24/040/00157/AM11 0510269795 dt.05.08.2010 Date: 10.01.2012 Revision  of Norms     The Committee deliberated the written comments of DIPP received  vide their UO Note dated10.01.2012 and decided to amend the

1.      Quantity of import items at Sl. No. 34 may be allowed as 10 Nos. (6660 Kgs. inclusive of 4.2 % wastage). 2.      Quantity of import items at Sl. No. 38 may be allowed as 4 Nos. (26 Kgs. inclusive of 4 % wastage). 3.      Quantity of import items at Sl. No. 53 may be allowed as 8 Nos. (40 Kgs. inclusive of 3 % wastage 4.      No change  may be made in  the quantities of import items at Sl No. 9, 10, 24, 25, 39, 40, 54, 55, 70, 71, 86 & 87.     S.No.514

Case No.A/R­134

M/s.  Aseem Technologies  Pvt. Ltd., Indore HQ F.No.01/80/050/00428/AM09/ DES­I Lic.No. & Date Meeting No.21/12 RA F.No.11/24/040/00008/AM09 1110017303 dt.30.05.2008 Date: 10.01.2012 Revision  of Norms   The Committee deliberated the written comments of DIPP received  vide their UO Note dated 10.01.2012 and decided to amend the   1.    Words “ Model  namely, 6441054701 &  6441055201” may also be suffixed with the description of export product.     S.No.515

Case No.A/R­151

M/s.  Larsen  & Toubro  Ltd., Mumbai HQ F.No.01/80/050/00008/AM08/ DES­I Lic.No. & Date Meeting No.21/12 RA F.No.03/95/040/01638/AM07 0310425615 dt.04.04.2007 Date: 10.01.2012 Amendment of Norms   The Committee noted the reply dated 30.12.2011 received from the firm submitting the Report of Statutory Auditors of Company and decided to inform RA, Mumbai that 235 Nos of Cone Reducers imported under the Advance Authorization had been utilized by the firm in the resultant product and, therefore, authorization may be considered for redemption on this account.   S.No.516

Case No.A/R­152

M/s.  Eastern Equipment  & Engineers  Pvt. Ltd., Kolkata HQ F.No.01/80/050/00724/AM11/ DES­I Lic.No. & Date Meeting No.21/12 RA F.No.02/24/040/00168/AM11 0210152463 dt.23.12.2010 Date: 10.01.2012 Fixation of  Norms   The  Committee  noted  that  the  firm’s  reply  dt.11.01.2012  has  been  sent  to  DIPP  for  examination  and  comments.  The  case  may  be  re­listed  on  21.02.2012.   S.No.517

Case No.A/R­153

M/s.  Thermax Ltd., HQ F.No.01/81/162/00480/AM07/ DES­I Lic.No. & Date Meeting No.21/12 RA F.No.31/24/040/00186/AM07 3110026329 dt.04.09.2006 Date: 10.01.2012 Ratification  of  Norms

The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 21.02.2012.   S.No.518

Case No. A/R­ 168

M/s.  Godrej  & Boyce  Mfg.  Co. LTd., Mumbai  F.No. 01/80/50/ 01741/AM09/DES.I Lic.No. & Date Meeting No.21/12 RA F.No.03/94/040/00798/AM09 0310497146 dt.10.12.2008 Date: 10.01.2012 Ratification of norms   The Committee noted that the firm has requested by e­mail dt. 06.01.2012 for postponement of P.H. to  21.02.2012. The Committee therefore decided to defer the PH and  to relist the case on 21.02.2012.   S.No.519

Case No.A/R­155

M/s.  Boving Fouress  (P)  Ltd., Bangalore HQ F.No.01/80/162/00218/AM09/ DES­I Lic.No. & Date Meeting No.21/12 RA F.No.07/24/040/00524/AM09 0710061697 dt.15.12.2008 Date: 10.01.2012 Fixation of norms   The representatives of the firm Shri Ravi Prakash, Manager [Commerce] appeared before the Committee for personal hearing and explained their case. The representative of the firm was requested to furnish the details of specific export items, numbers & broad specifications and specific reply to DL issued earlier within 15 days.  The Committee therefore, decided to defer the case and to re­list the case on 21.02.2012.   Sl.No.171

Case No. C ­ 09

M/s.  Addison  &  Co.  Ltd., Chennai F.No. 01/81/80/162/00372/AM10/DES.I Meeting No.21/12 Modification  of SION for the export product “Cutting Tools­Multiple Point of High Speed Steel(Cobalt Grade)/Tool Steel” Date: 10.01.2012   The Committee noted that the firm did not reply to this office letter dated 16.12.2011 requesting for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice. The case is to be re­listed on 21.02.2012.   Sl.No.172

Case No. C­ 17

M/s. Lucas   TVS  Ltd.,  Chennai received  through DC(MEPZ­SEZ), Chennai F.No. 01/81/80/162/00379/AM10/DES.I Meeting No.21/12 Fixation  of  regular  wastage  norms  for manufacturing of different types of “Starter, Alterator, Wiper Motor and Compressor”. Date: 10.01.2012   The  Committee  noted  that  the  firm  has  requested  by  e­mail  dt.02.01.2012  for  postponement  of  P.H.  to  24.01.2012.  The  Committee therefore decided to postpone the PH and  to  re­list the case  on 24.01.2012.   Sl.No.173

Case No. C­ 18

M/s.  Pipavav  Shipyards F.No. 01/81/80/162/00612/AM11/DES.I

p py Ltd., Amreli Meeting No.21/12 Fixation of input output norms in respect of 100%  EOU  for  the  export  product  “  Ship, Cargo  Ships,  Barges  &  Vessels  for Transport,  Factory  Ship,  Life  Boats,  Hulls and  Vessels  falls  under  Chapter  89  of ITC(HS) – reg. Date: 10.01.2012 The Committee observed that the comments called for from M/o Shipping are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 21.02.2012.   Sl.No.174

Case No.  C – 18

M/s.  Bhukanvala Diamond  Systems  Pvt. Ltd., Navsari HQ F.No.01/80/162/00056/AM12/DES­I Meeting No.21/12 Request  for  fixation  of  Standard  Input Output Norms (SION) for the export product “Die  Sets  and  PVC  Blister  Moulds”  in respect of 100% EOU Date: 10.01.2012   The Committee noted that the firm’s application with details pertaining to item of ‘Die Set’s’ has been sent to DHI on 06.01.2012 for examination and comments as the case is to be re­listed on 21.02.2012   Sl.No.175

Case No.  C – 32

M/s. Botil Oil Tools India Pvt. Ltd., New Delhi HQ F.No.01/80/162/00851/AM12/DES­I Meeting No.21/12 Application for issuance of Advance Authorization under Duty Exemption Scheme under SION at Sl. No.C­1624, C­1625 and C­1628. Date: 10.01.2012   The Committee noted that firm vide letter dated 06.01.2012 informed that they have resubmitted their application with revised details and awaiting a reply from RA. The Committee therefore decided to await for further communication from the firm and the case to be re­list on 21.02.2012.   Sl.No.176

Case No.  C – 33

M/s.  M+Acer Automotive  Systems Pvt. Ltd., Bangalore HQ F.No.01/80/162/00914/AM12/DES­I Meeting No.21/12 Fixation  of  Scrap/Wastage  norms  for  the export  product  “Level  Indicator  Assembly” in respect of 100% EOU. Date: 10.01.2012   The Committee noted that a copy of the firm’s application has been forwarded to DHI for their examination and comments. The case is to be re­listed on 21.02.2012.  