IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2012-02-21

DGFT Committee Minutes

Document text

RATIFIED   Minutes of Meeting No.25/12 scheduled on 21.02.2012 of Norms Committee(NC­I) (DES.I Section)   The meeting No. 25/12 of the Norms Committee (NC­I) for the licensing year 2011­2012 was held on 21.02.2012  under  the  Chairmanship  of  Sh.  N.P.S.  Monga,  Additional    Director  General  of  Foreign  Trade  to consider  the  applications  under  Duty  Exemption  /  Remission  Schemes  (Chapter­4)  of  Foreign  Trade  Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh K. K. Tiwari. I.A. 476 23062622 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. A.K. Mishra, AIA   23063332 M/o Steel, U.B. 5. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 6. Sh. K.C. Raju, FTDO 404 23061562 Ext.265 DGFT, U.B.   I ­The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon are as under: ­ 1

Case No.:31/23/80­ALC2/2009

Party Name:HINDUSTAN AERONAUTICS LTD, Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00353/AM10/ RLA File :07/24/040/00651/AM09/ Lic.No/Date:0710066776 02.09.2009 Defer Date:03.04.2012 Decision :The Committee noted that the firm vide their letter dt.03.02.2012 again referred to two  Advance Authorizations,  whereas only one case is under consideration of the Norms Committee which is pending with  Ministry of Defence. The Committee therefore  decided to seek a clarification from RA, Bangalore and refer the case to MSME for examination and comments. The case is to be re­listed on 03.04.2012.   2

Case No.:16/31/80­ALC2/2009

Party Name:SUTURES INDIA PRIVATE LIMITED, Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved   HQ File :01/80/050/00464/AM10/ RLA File :07/24/040/00263/AM10/ Lic.No/Date:0710067849 28.10.2009   Decision  :The  Committee  deliberated  the  written  comments  of  C&PC  received    vide  their  OM No.46011/112/2009­PC.II  dated  25.01.2012  and  decided  to  ratify  the  norms  in  respect  of  the  subject advance authorization  as under:­   Item to be Exported Quantity Surgical Sutures USP 1 No. Raw­material Recommended for Import Quantity 1. Relevant  thread  for  surgical sutures (Plyglycolic Acid based) 2. Bottom/Top Aluminium Foil Net+1% wastage   As per packing policy   The RLA may take necessary action accordingly.  

Case No.:21/39/80­ALC2/2009

Status:

3 Party Name:VEM TECHNOLOGIES P.LTD., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Deferred HQ File :01/80/050/00617/AM10/ RLA File :09/24/040/00373/AM10/ Lic.No/Date:0910040368 18.12.2009 Defer Date:03.04.2012 Decision :The Committee noted that a letter of clarification was sent to Ministry of Defence on 07.02.2012 and decided to send another reminder to them requesting to expedite their comments and the case is to be re­listed on 03.04.2012.   4

Case No.:18/15/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00225/AM11/ RLA File :04/24/040/00061/AM11/ Lic.No/Date:0410114584 15.06.2010 Defer Date:03.04.2012 Decision :The  Committee  noted  that  a  copy  of  firm’s  reply  dated  09.02.2012  was  forward  to  DHI  for examination and comments. The case is to be re­listed on 03.04.2012.   5

Case No.:40/31/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00518/AM11/ RLA File :09/24/040/00195/AM11/ Lic.No/Date:0910043236 24.08.2010   Decision  :  The  Committee  deliberated  the  written  comments  of  DHI  received    vide  their  UO  Note dated21.02.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­ (i)                 Import Item Nos. 27­28 – (Tools) – To be deleted. (ii)               Import Item No.29 – To be deleted. (iii)             All other items are allowed on Net to net basis with accountability clause.     6

Case No.:32/31/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00510/AM11/ RLA File :06/24/040/00028/AM11/ Lic.No/Date:0610018929 30.08.2010 Defer Date:03.04.2012 Decision : The Committee noted that a letter of clarification was sent to Ministry of Defence on 07.02.2012 and decided to send another reminder to them requesting to expedite their comments and to be re­listed the case on 03.04.2012.   7

Case No.:47/31/80­ALC2/2010

Party Name:SIEMENS ROLLING STOCK PVT.LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Rejected HQ File :01/80/050/00525/AM11/ RLA File :03/95/040/00491/AM11/ Lic.No/Date:0310593387 22.09.2010   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with  reference  to  this  office  letter  dt.18.05.2011;01.07.2011;  21.09.2011  and  also  did  not  attend  the Personal Hearing to explain their case. In the absence of requisite information, the Committee felt that it was not possible to decide the requirement of inputs.  

8

Case No.:17/41/81­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/81/050/00436/AM11/ RLA File :09/24/040/00315/AM11/ Lic.No/Date:0910044003 21.10.2010   Decision  :  The  Committee  deliberated  the  written  comments  of  DHI  received    vide  their  UO  Note No.3(42)/2010­TSW(B) Vol.9/72 dated 21.02.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   Export Product: 2x20 MW Stea Turbine Generator (Weight: 235 MT) for Tendaho Sugar, Ethiopia   Imports:   Sl. No. Items Quantity  in  Kg(%  wastage) perset   For Steam Turbine   10 Blading  Profiles  for  HP&LP  Guide Blades 386(9%) repeated as per AA No.  0910047823  dt. 22.07.2011 11 Blading Flats for HP and LP (stage 1 & 2) moving blades 1747 (258%) repeated as per AA  No.6110000286  dt. 06.02.2009 12 SS Wires/Caulking wires 47 (1%) 34 LP Moving Blade (for Statge 3) 90 nos per set (net to net) 48 CS Round 46 (2%) 49 AS Round 195  (30%)  repeated  AA 0910047823 50 SS Round 92 (2%) 51 CS Plate 194 (5%) 52 AS Plate 246 (5%) 53 SS Plate 49 (5%)   For Generator   45 Scraper fin profile 100 (3%) 46 I beam profile 812 (2%) 47 Silver Bearing Copper Strip 2452 (1%) 36 to 39 and 42 to 44 Insulating materials Restricted  to  2%  of  FOB value of the export product. All other inputs are inputs are components under net to net basis and are to be allowed with accountability clause.    

Case No.:6/37/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved   HQ File :01/80/050/00744/AM11/ RLA File :09/24/040/00384/AM11/ Lic.No/Date:0910044581 06.12.2010   Decision  :  The  Committee  deliberated  the  written  comments  of  DHI  received    vide  their  letter  No. 3(42)/10­TWS(B)/75 dated 29.2.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­ Sl. No. Items Quantity  in  Kg(%  wastage) per set

9 4 (SS) Flats 5180 (258%) repeated as per AA No.6110000286 12 (SS) Profiles 990(9%) repeated as per AA No.0910047823. 22 SS Strip 306(1%) 48 CS Pipes 4556 (2%) 49 CS Plates 49402(30%) 50 SS Pipes 208(2%) 60 I­Beam Profile (Alloy Steel) 1485 (2%) 69 Scraper  Fin  Profile  (Copper­Zinc Alloy) 250%(3%) 70 Silver Bearing Copper Strips 5000(0.3%) 73 Wedge Profile (Cupro Nickel) 981  (1%)  Repeated  as  per AA No.0910036659. 52,  53,  57, 58,  59,  62, 63,  64,  66, 67, 71, 72 Insulating materials Restricted  to  2%  of  FOB value of the export product. All others inputs are components under net to net basis and are to be allowed with accountability clause.     10

Case No.:2/37/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00740/AM11/ RLA File :05/23/040/00293/AM11/ Lic.No/Date:0510281598 17.01.2011 Defer Date:03.04.2012 Decision : The representative of the DHI informed that the products in the Advance Authorization are large and wastage is high and asked for a Team Visit to evaluate on wastage. The Committee, therefore, decided to send a team consisting of representatives of DHI, MSME & DDG and submit a report. The case is to be re­listed on 03.04.2012.   11

Case No.:21/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00759/AM11/ RLA File :09/24/040/00478/AM11/ Lic.No/Date:0910045222 25.01.2011   Decision :The Committee deliberated the written comments of DHI received  vide their UO Note dated 21.02.2012 and decided to ratify the norms in respect of the subject advance authorization  as per SION C­ 1742.     12

Case No.:23/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00761/AM11/ RLA File :09/24/040/00476/AM11/ Lic.No/Date:0910045224 25.01.2011   Decision : The Committee deliberated the written comments of DHI received  vide their UO Note dated 21.02.2012 and decided to ratify the norms in respect of the subject advance authorization  as per SION C­ 1742 and components are allowed under GN­4.

  13

Case No.:2/39/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00804/AM11/ RLA File :04/24/040/00257/AM11/ Lic.No/Date:0410121550 11.02.2011   Decision  :The  Committee  deliberated  the  written  comments  of  DHI  received    vide  their  UO  Note No.3(40)/10­TSW(B)/639 dated 24.10.2011 and note dated 21.02.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   The export item is 5 sets of Boiler. The total weight of export product for five sets is 45,375 MT & the same to be incorporate in the licence.   Import There are 34 items of import which consists of Raw material, components. 1. Item No. 1 – CS Plate – The item to be allowed at 1700 MT with 2.7% wastage as applied for. 2. Item No. 2 – AS plate – The item to be allowed at 47.8 MT with 5% wastage. 3. Item No. 3 – AS rounds – The item to be allowed at 65 MT with 3% wastage as applied by the firm. 4. Item No.4 – Hollows to be allowed at 2304 MT with 10% wastage. Pipes to be allowed at 4175 MT with 2% wastage. (Total Allowed 6479 MT). 5. Item No. 5 – Blooms to be allowed at 10800 MT with 20% wastage (Taking clue from SION C­797). As tubes / pipes at 4430 MT with 2% wastage. (Total allowed 5510 MT). 6. Item No. 6 – SS Tube – The item to be allowed at 17 MT with 2% wastage. 7. Item No. 7 – Casting/forging – there is only wastage of 3%. Import to be allowed as applied for by firm. The import weight is 300 MT which is to be incorporated along with quantity in number in the licence. 8. Item No. 8 – Welding material – The firm has only applied 250 MT. The firm has not given the calculation of welding material proposed for import. DHI recommend import of 150 MT which is around 2% of steel plate & tubes allowed. 9. Item No. 9 to 23 except item No. 11, 14 – These are components & to be allowed under GN­4 with accountability clause. 10. Item  No.  11  –  Chain  –  The  firm  has  not  sought  any  wastage.  To  be  allowed  under  GN­4  with accountability clause. 11. Item No. 14 – Furnace maintenance platform – may not be allowed as it is not part of export product. 12. Item No. 24 & 25 – Al Sheet & Grill – To be deleted as calculation not given. 13. Item No. 26 to 34 – These are components & to be allowed under GN­4 with accountability clause.     14

Case No.:26/40/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00876/AM11/ RLA File :09/24/040/00553/AM11/ Lic.No/Date:0910045827 07.03.2011 Defer Date:03.04.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 03.04.2012.  

Case No.:28/40/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00878/AM11/ RLA File :05/23/040/00348/AM11/

15 Lic.No/Date:0510285314 08.03.2011 Defer Date:03.04.2012 Decision : The representative of the DHI informed that the products in the Advance Authorization are large and wastage is high and asked for a Team Visit to evaluate on wastage. The Committee, therefore, decided to send a team consisting of representatives of DHI, MSME & DDG and submit a report. The case is to be re­listed on 03.04.2012.   16

Case No.:2/6/80­ALC2/2011

Party Name:THE TATA POWER COMPANY LTD Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00079/AM12/ RLA File :07/21/040/00953/AM11/ Lic.No/Date:0710078147 21.03.2011 Defer Date:03.04.2012 Decision :The Committee noted that the comments called from DIT yet to be received and case is under examination with DIT. Therefore, Committee decided to remind them to expediting their comments. The case is to be re­listed on 03.04.2012.   17

Case No.:17/9/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00185/AM12/ RLA File :09/24/040/00563/AM11/ Lic.No/Date:0910046078 25.03.2011 Defer Date:03.04.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 03.04.2012.   18

Case No.:5/3/80­ALC2/2011

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00010/AM12/ RLA File :05/23/040/00019/AM12/ Lic.No/Date:0510288064 13.04.2011 Defer Date:03.04.2012 Decision :The Committee decided to forward a copy of  firm reply dated 23.02.2012 to DC(MSME) for examination and comments. The case is to be re­listed on 03.04.2012.   19

Case No.:29/3/80­ALC2/2011

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00034/AM12/ RLA File :05/24/040/00011/AM12/ Lic.No/Date:0510288857 27.04.2011 Defer Date:03.04.2012 Decision :The  Committee  noted  that  the  firm  has  been  called  for  Personal  Hearing  on  06.03.2012  and decided to discuss this case during the Personal Hearing. The Committee, therefore, decided to defer the case and to re­list the case on 03.04.2012.   20

Case No.:13/9/80­ALC2/2011

Party Name:OILGEAR TOWLER POLYHYDRON PVT.LTD., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00181/AM12/ RLA File :07/21/040/00115/AM12/ Lic.No/Date:0710079344 23.05.2011   21.02.2012 and decided to ratify the norms of the subject Advance Authorization on net to net basis with accountability clause.

  21

Case No.:11/9/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00179/AM12/ RLA File :61/24/040/00010/AM12/ Lic.No/Date:6110000625 31.05.2011   21.02.2012 decided to ratify the norms of the subject Advance Authorization as allowed under advance authorization No.6110000472 dt.15.07.2010.     22

Case No.:29/6/80­ALC2/2011

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00106/AM12/ RLA File :03/95/040/00177/AM12/ Lic.No/Date:0310634527 06.06.2011 Defer Date:03.04.2012 Decision :The Committee noted that a copy of firm’s reply dt.24.01.2012 has been forwarded to DHI for examination and comments. The case is to be re­listed on 03.04.2012.   23

Case No.:26/9/80­ALC2/2011

Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00194/AM12/ RLA File :05/23/040/00132/AM12/ Lic.No/Date:0510296453 13.07.2011 Defer Date:03.04.2012 Decision : The Committee noted that the comments called from DIT yet to be received and case is under examination with DIT. Therefore, Committee decided to remind them to expediting their comments. The case is to be re­listed on 03.04.2012.   24

Case No.:5/25/80­ALC2/2011

Party Name:EASTERN EQUIPMENT AND ENGINEERS PRIVATE LIMITED. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00484/AM12/ RLA File :02/24/040/00076/AM12/ Lic.No/Date:0210162509 18.07.2011 Defer Date: 03.04.2012 Decision :On the recommendation of DIPP representation present in the meeting, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  03.04.2012: ­   1. Information in respect of Sl.No.4,5 & 11 of the Standard Deficiency Format.   25

Case No.:18/15/80­ALC2/2011

Party Name:ARUL LINU GRABS PRIVATE LIMITED., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00315/AM12/ RLA File :17/24/040/00037/AM12/ Lic.No/Date:1710004457 11.08.2011 Defer Date:03.04.2012 Decision :The Committee noted that the firm did not furnish reply  to this office e­mail   dated 24.01.2012 requesting for some the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice. The case is to be re­listed on 03.04.2012.

26

Case No.:15/15/80­ALC2/2011

Party Name:ARUL LINU GRABS PRIVATE LIMITED., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00312/AM12/ RLA File :17/24/040/00049/AM12/ Lic.No/Date:1710004496 05.09.2011 Defer Date:03.04.2012 Decision : The Committee noted that the firm did not furnish reply  to this office e­mail   dated 24.01.2012 requesting for some information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be re­ listed on 03.04.2012.   27

Case No.:8/15/80­ALC2/2011

Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved   HQ File :01/80/050/00305/AM12/ RLA File :05/24/040/00200/AM12/ Lic.No/Date:0510301760 08.09.2011   21.02.2012  decided  to  ratify  the  norms  of  subject  Advance  Authorization  on  net  to  net  basis  with accountability clause. The Committee also decided to advise RA  to obtain  details of sets and incorporate in the licence.     28

Case No.:6/15/80­ALC2/2011

Party Name:MONTAN HYDRAULIK (INDIA) PVT LTD Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00303/AM12/ RLA File :04/24/040/00178/AM12/ Lic.No/Date:0410128126 15.09.2011   21.02.2012  and decided to ratify the norms of subject Advacne Authorization on Net to Net basis with accountability clause.     29

Case No.:2/21/80­ALC2/2011

Party Name:BIRLA FURUKAWA FIBRE OPTICS LIMITED, Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00422/AM12/ RLA File :17/24/040/00053/AM12/ Lic.No/Date:1710004532 16.09.2011   Decision  :The  Committee  deliberated  the  written  comments  of  DOT  received    vide  their  I.D.  No.15­ 10/2011­IP  (Pt.II)    dated  27.01.2012  and  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization  as under:­   Sl.No. Details  of  import item Recommended Quantity  (including wastage) (Kg) Wastage allowed 1. Preform of Silica 2790 2% 2. UV Resin I 2102 5% 3. UV Resin II 2283 5%  

30

Case No.:11/21/80­ALC2/2011

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00431/AM12/ RLA File :34/24/040/00108/AM12/ Lic.No/Date:3410031582 16.09.2011 Defer Date:03.04.2012 Decision : The Committee noted that the comments called from C&PC yet to be received and case is under examination with C&PC. Therefore, Committee decided to remind them to expedite their comments. The case is to be re­listed on 03.04.2012.   31

Case No.:1/18/80­ALC2/2011

Party Name:ASAHITEC STENCILS P.LTD., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00355/AM12/ RLA File :04/24/040/00183/AM12/ Lic.No/Date:0410128353 21.09.2011 Defer Date:03.04.2012 Decision :Representative of MSME informed the Committee that they need some more details from the firm for examination of the case. The Committee therefore decided to obtain the details and to re­list the case on 03.04.2012.   32

Case No.:3/21/80­ALC2/2011

Party Name:BIRLA FURUKAWA FIBRE OPTICS LIMITED, Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved   HQ File :01/80/050/00423/AM12/ RLA File :17/24/040/00055/AM12/ Lic.No/Date:1710004540 23.09.2011   Decision :  The  Committee  deliberated  the  written  comments  of  DOT  received    vide  their  I.D.  No.15­ 10/2011­IP  (Pt.II)    dated  24.01.2012  and  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization  as under:­   Sl.No. Details  of  import item Recommended Quantity  (including wastage) (Kg) Wastage allowed 1. Preform of Silica 5580 2% 2. UV Resin I 3824 5% 3. UV Resin II 5346 5%     33

Case No.:14/18/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00368/AM12/ RLA File :04/24/040/00146/AM12/ Lic.No/Date:0410128602 27.09.2011 Defer Date:03.04.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 03.04.2012.   34

Case No.:3/18/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00357/AM12/ RLA File :04/24/040/00095/AM12/ Lic.No/Date:0410129108 11.10.2011 Defer Date:03.04.2012 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 03.04.2012.

35

Case No.:2/18/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00356/AM12/ RLA File :04/24/040/00128/AM12/ Lic.No/Date:0410129210 13.10.2011 Defer Date:03.04.2012 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 03.04.2012.   36

Case No.:9/18/80­ALC2/2011

Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00363/AM12/ RLA File :05/24/040/00251/AM12/ Lic.No/Date:0510305773 18.10.2011 Defer Date:03.04.2012 Decision :As per DHI UO note No.7/119/2011­TSW/8 dated 06.02.2012, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  03.04.2012: ­   (a)    Composition of Black Master Batch in terms of various inputs, percentage wise. (b)   Type of plastic used in item No.2 and 3 since only brand name has been mentioned. (c)    Weight of the export and also weight of the import items at S.No. 2 & 3 separately. (d)   Justification for 30% wastage in import item No.1 indicating wastage at each stage of manufacture. (e)    Past production and consumption of all raw materials both imported and indigenous in the past 3 Years, separately, duly certified by a Chartered Engineer.   37

Case No.:6/18/80­ALC2/2011

Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00360/AM12/ RLA File :04/24/040/00208/AM12/ Lic.No/Date:0410129476 19.10.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated 21.02.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Description of Export product may be modified as  “ Elevators /Lifts               Model No. C­MONO­GREEN/ PW 20/18­19­1 No. &               Model No. C­MONO­GREEN/ PW 21/18­19­7 Nos.” 2.      Word “relevant” may be prefixed with the description of import items at Sl. Nos. 31 to 34. 3.      Import items from Sl.No. 1 to 36  may be allowed on net to net basis with accountability clause     38

Case No.:8/18/80­ALC2/2011

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00362/AM12/ RLA File :05/24/040/00249/AM12/ Lic.No/Date:0510306346 21.10.2011 Defer Date:03.04.2012 Decision : The Committee noted that the firm has been called for Personal Hearing on 06.03.2012 and decided to discuss this case during the Personal Hearing. The Committee, therefore, decided to defer the case and to re­list the case on 03.04.2012.  

Case No.:12/21/80­ALC2/2011

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:25/80­ ALC2/2011 Status: Approved

39 21.02.2012 HQ File :01/80/050/00432/AM12/ RLA File :09/24/040/00340/AM12/ Lic.No/Date:0910049436 21.10.2011   Decision :On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms in respect of the subject advance authorization   under SION C­1742. The Committee also decided to ask RA to obtain details of export product and incorporate in the licence”.     40

Case No.:12/18/80­ALC2/2011

Party Name:BRAKES INDIA LIMITED, Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved   HQ File :01/80/050/00366/AM12/ RLA File :04/24/040/00136/AM12/ Lic.No/Date:0410129812 31.10.2011   Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms in respect of the subject advance authorization   Item Sl. No. 23  to be deleted and balance items are to be allowed on net to net basis with accountability clause.     41

Case No.:6/21/80­ALC2/2011

Party Name:SATTVA ETECH INDIA PRIVATE LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00426/AM12/ RLA File :07/24/040/00296/AM12/ Lic.No/Date:0710083749 04.11.2011 Defer Date:03.04.2012 Decision :The Committee noted that a copy of Firm’s application has been send to DIT on 09.02.2012 for examination and comments and therefore decided to remind them to expedite their comments. The case is to be re­listed on 03.04.2012.   42

Case No.:4/18/80­ALC2/2011

Party Name:COMAU INDIA P.LTD, Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00358/AM12/ RLA File :31/82/040/00187/AM12/ Lic.No/Date:3110051335 08.11.2011 Defer Date:03.04.2012 Decision :On the recommendation of DHI representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  03.04.2012: ­   1. Information in respect of Sl.No.1,6 & 8 of the Standard Deficiency Format.   43

Case No.:5/18/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00359/AM12/ RLA File :03/94/040/00694/AM12/ Lic.No/Date:0310664263 09.11.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated 21.02.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Net empty weight of 37006 Kgs may be specified with the quantity of export product. 2.       Word “ Relevant ” may be prefixed with the descriptions of import items at Sl. No. 2 & 3. 3.      Quantity of import item at Sl. No. 1 may be allowed as 10 Nos. on net to net basis. However, duty free weight of this item may be allowed as  5020 Kg inclusive of  30 % wastage after 20 % recovery.

4.      Quantity of import item at Sl. No. 2  may be allowed as 10580 Kgs. inclusive of 39 % wastage after 1/3rd recovery.. 5.      Quantity of import item at Sl. No. 3 may be allowed as 23768 Kgs. (14405 Meters) inclusive of 2 % wastage . 6.      Quantities of import items at Sl. Nos. 4, 5 & 6 ( Welding Consumables)  may be allowed as 215 Kgs. each.     44

Case No.:8/21/80­ALC2/2011

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00428/AM12/ RLA File :07/24/040/00331/AM12/ Lic.No/Date:0710084167 22.11.2011 Defer Date:03.04.2012 Decision  :As  per  DIPP  UO  note  dated  21.02.2012,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  21.02.2012: ­   1. Information in respect of Sl.No.4,5,6 & 9 of the Standard Deficiency Format – export product wise. 2. Information in respect of Sl.No.11 of the Standard Deficiency Format in respect of import items from Sl. No.6 & 16 to 37.   45

Case No.:7/21/80­ALC2/2011

Party Name:POLY MEDICURE LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00427/AM12/ RLA File :05/24/040/00281/AM12/ Lic.No/Date:0510309080 23.11.2011 Defer Date:03.04.2012 Decision : The Committee noted that the comments called from C&PC yet to be received and case is under examination with C&PC. Therefore, committee decided to remind them to expediting their comments. The case is to be re­listed on 03.04.2012.   46

Case No.:9/21/80­ALC2/2011

Party Name:POLY MEDICURE LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00429/AM12/ RLA File :05/24/040/00297/AM12/ Lic.No/Date:0510309616 28.11.2011 Defer Date:03.04.2012 Decision : The Committee noted that the comments called from C&PC yet to be received and case is under examination with C&PC. Therefore, committee decided to remind them to expediting their comments. The case is to be re­listed on 03.04.2012.   47

Case No.:4/21/80­ALC2/2011

Party Name:RATNAMANI METALS & TUBES LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved   HQ File :01/80/050/00424/AM12/ RLA File :08/24/040/00191/AM12/ Lic.No/Date:0810106224 01.12.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated 21.02.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1.       Word  “relevant”  may  be  prefixed  with  the  description  of  import  item  and  its  quantity  may  be allowed as 10500 Kgs. inclusive of 5% wastage after taking clue from SION  C ­ 593.  

48

Case No.:15/25/80­ALC2/2011

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00494/AM12/ RLA File :07/24/040/00346/AM12/ Lic.No/Date:0710084374 02.12.2011 Defer Date:03.04.2012 Decision :The Committee noted that firm’s application has been sent to DC(MSME) on 15.02.2012 for examination and comments and case is under examination  with MSME. The case is to be re­listed on 03.04.2012.   49

Case No.:38/25/80­ALC2/2011

Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00517/AM12/ RLA File :05/23/040/00332/AM12/ Lic.No/Date:0510310579 08.12.2011   Decision :On the recommendation of DHI representative present in the meting, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Import item 1 & 2 to be allowed with 2% wastage. 2. Import Item Nos. 3,4,5 & 6 to be allowed on net to net basis with accountability clause. 3. Item No. 7 ­ to be allowed  to 0.40 MT. 4. Item No. 8 – to be allowed to 0.80 MT. 5. Item No. 9 – to be allowed to 0.40 MT.     50

Case No.:28/25/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00507/AM12/ RLA File :04/24/040/00249/AM12/ Lic.No/Date:0410131396 09.12.2011   Decision :The Committee deliberated the written comments of DHI received  vide their UO Note dated 21.02.2012 and decided to ratify the norms on repeat basis as under:­   1. As  per  Advacne  authorization  No.0410118619  dated  04.11.2010  (TG)  and  0410119698  dated 13.12.2010  (SG) excluding fittings. 2. Item No. 4 – To be allowed on Net to Net basis.     51

Case No.:16/25/80­ALC2/2011

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00495/AM12/ RLA File :34/24/040/00186/AM12/ Lic.No/Date:3410032547 14.12.2011 Defer Date:03.04.2012 Decision  :  The  Committee  noted  that  firm’s  application  has  been  sent  to  C&PC  on  15.02.2012  for examination  and  comments  and  case  is  under  examination    with  C&PC.  The  case  is  to  be  re­listed on03.04.2012.  

Case No.:31/25/80­ALC2/2011

Party Name:DAYCO VIKAS POWER TRANSMISSION PVT. Meet No/Date:25/80­ ALC2/2011 Status: Deferred

52 LTD. 21.02.2012 HQ File :01/80/050/00510/AM12/ RLA File :05/23/040/00348/AM12/ Lic.No/Date:0510311317 15.12.2011 Defer Date:03.04.2012 Decision :On the recommendation of DHI representative present in the meeting, the Committee decided to obtain details of export product from the firm and to re­list the case on  03.04.2012.   53

Case No.:4/25/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00483/AM12/ RLA File :07/24/040/00364/AM12/ Lic.No/Date:0710084747 16.12.2011 Defer Date:03.04.2012 Decision : The Committee noted that a copy of firm’s application forwarded to MCIT for examination and comments. The case is to be re­listed on 03.04.2012.   54

Case No.:13/25/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00492/AM12/ RLA File :11/24/040/00046/AM12/ Lic.No/Date:1110026418 20.12.2011 Defer Date:03.04.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 03.04.2012.   55

Case No.:14/25/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00493/AM12/ RLA File :11/24/040/00037/AM12/ Lic.No/Date:1110026416 20.12.2011 Defer Date:03.04.2012 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 03.04.2012.   56

Case No.:25/25/80­ALC2/2011

Party Name:WELD FUSE PVT. LTD . Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00504/AM12/ RLA File :09/24/040/00424/AM12/ Lic.No/Date:0910050303 20.12.2011 Defer Date:03.04.2012 Decision : On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  03.04.2012: ­   1. Information in respect of Sl.No.4 & 5 of the Standard Deficiency Format.   57

Case No.:26/25/80­ALC2/2011

Party Name:GLOBE HI­FABS Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00505/AM12/ RLA File :05/23/040/00358/AM12/ Lic.No/Date:0510311818 20.12.2011 Defer Date:03.04.2012 Decision : Representative of MSME informed the Committee that they need some more details from the firm for examination of the case. The Committee therefore decided to obtain the details and to re­list the case on 03.04.2012.  

Case No.:27/25/80­ALC2/2011

Status:

58 ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Approved HQ File :01/80/050/00506/AM12/ RLA File :04/24/040/00257/AM12/ Lic.No/Date:0410131871 20.12.2011   Decision :The Committee deliberated the written comments of DHI received  vide their UO Note dated 21.02.2012 and decided to ratify the norms of the subject Advance Authorization on repeat basis as per advance authorization No.0410110394 dated  23.12.2009.     59

Case No.:29/25/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00508/AM12/ RLA File :04/24/040/00230/AM12/ Lic.No/Date:0410131870 20.12.2011 Defer Date:03.04.2012 Decision : The Committee noted that the firm’s application has been sent to DHI on 09.02.2012 and case is under examination with DHI The case is to be re­listed on 03.04.2012.   60

Case No.:30/25/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00509/AM12/ RLA File :04/24/040/00250/AM12/ Lic.No/Date:0410131872 20.12.2011   21.02.2012  decided to ratify the norms on repeat basis as under:­   1. As per Advance authorization No.0410121377 dated 08.02.2011 excluding  fittings. 3. Item No. 4 – To be allowed on Net to Net basis. (Fittings)     61

Case No.:40/25/80­ALC2/2011

Party Name:VITROMED HEALTHCARE Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00519/AM12/ RLA File :05/24/040/00287/AM12/ Lic.No/Date:0510311874 20.12.2011 Defer Date:03.04.2012 Decision : The Committee noted that the firm’s application has been sent to C&PC on 15.02.2012 and case is under examination with C&PC. The case is to be re­listed on 03.04.2012.   62

Case No.:3/25/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00482/AM12/ RLA File :07/24/040/00337/AM12/ Lic.No/Date:0710084945 22.12.2011 Defer Date:03.04.2012 Decision : The Committee noted that a copy of firm’s application forwarded to MCIT for examination and comments. The case is to be re­listed on 03.04.2012.  

Case No.:7/25/80­ALC2/2011

Party Name:H.L.EQUIPMENTS Meet No/Date:25/80­ ALC2/2011 Status: Deferred

63 21.02.2012 HQ File :01/80/050/00486/AM12/ RLA File :52/24/040/00044/AM12/ Lic.No/Date:5210037543 27.12.2011 Defer Date:03.04.2012 Decision  :As  per  DIPP  UO  note  dated  21.02.2012,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  03.04.2012: ­   1. Information in respect of Sl.No.4,5, & 11 of the Standard Deficiency Format.   64

Case No.:9/25/80­ALC2/2011

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00488/AM12/ RLA File :03/95/040/00690/AM12/ Lic.No/Date:0310673188 28.12.2011 Defer Date:03.04.2012 Decision  :As  per  DIPP  UO  note  dated  21.02.2012,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  03.04.2012: ­   1. Information in respect of Sl.No.5, 11 & 13  of the Standard Deficiency Format – export product wise. 2. For net weight of components to be manufactured out of import items at Sl.  No. 1, 2, 3 & 8, name of components with net weights thereof may be indicated. 3. Quantities of Test Coupons  at Sl. No 4 & 5 of list of import items in Nos. and Kgs. 4. Justification for the quantities of Test Coupons.   65

Case No.:10/25/80­ALC2/2011

Party Name:GENSER AEROSPACE & INFORMATION TECHNOLOGIES P.LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00489/AM12/ RLA File :07/24/040/00393/AM12/ Lic.No/Date:0710085074 29.12.2011 Defer Date:03.04.2012 Decision :The Committee noted that the firm’s application has been sent to DHI on 13.02.2012 and decided to  forward  application  to  DC(MSME)  for  examination  and  comments.  The  case  is  to  be  re­listed  on 03.04.2012.   66

Case No.:37/25/80­ALC2/2011

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00516/AM12/ RLA File :05/23/040/00368/AM12/ Lic.No/Date:0510312789 29.12.2011 Defer Date:03.04.2012 Decision : The Committee noted that the firm’s application has been sent to DC(MSME) on 14.02.2012 and case is under examination with MSME. The case is to be re­listed on 03.04.2012.   67

Case No.:2/25/80­ALC2/2011

Party Name:HYDAC (INDIA) PVT. LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00481/AM12/ RLA File :03/94/040/00777/AM12/ Lic.No/Date:0310673741 30.12.2011   Decision :On the recommendation of DHI representative present in the meeting,  the Committee decided to ratify the norms in respect of the subject advance authorization  as per GN­4 for Engineering Products.    

Case No.:8/25/80­ALC2/2011

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:25/80­ ALC2/2011 Status: Deferred

68 21.02.2012 HQ File :01/80/050/00487/AM12/ RLA File :03/95/040/00749/AM12/ Lic.No/Date:0310673619 30.12.2011 Defer Date:03.04.2012 Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to obtain details of export product from the firm and to re­list the case on  03.04.2012.   69

Case No.:33/25/80­ALC2/2011

Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00512/AM12/ RLA File :05/24/040/00342/AM12/ Lic.No/Date:0510312866 30.12.2011   21.02.2012 and decided to ratify the norms of the subject Advacne Authorization on Net to Net basis with accountability clause. The Committee also decided to advise RA to obtain details of sets and incorporate in the licence.     70

Case No.:34/25/80­ALC2/2011

Party Name:MULTITEX FILTRATION ENGINEERS LTD Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00513/AM12/ RLA File :05/24/040/00336/AM12/ Lic.No/Date:0510312860 30.12.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated 21.02.2012 and decided to ratify the norms in respect of the subject advance authorization  on net to net basis with accountability clause.     71

Case No.:6/25/80­ALC2/2011

Party Name:AUROLAB Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00485/AM12/ RLA File :35/24/040/00029/AM12/ Lic.No/Date:3510036982 02.01.2012 Defer Date:03.04.2012 Decision : The Committee noted that the firm’s application has been sent to DC(MSME) on 13.02.2012 and decided to forward application to C&PC for examination and comments as it pertains to them. The case is to be re­listed on 03.04.2012.   72

Case No.:39/25/80­ALC2/2011

Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00518/AM12/ RLA File :05/23/040/00374/AM12/ Lic.No/Date:0510313236 03.01.2012 Defer Date:03.04.2012 Decision  :As  per  DIPP  UO  note  dated  21.02.2012,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  03.04.2012: ­   1.      Information in respect of Sl. No. 3, 4, 5 & 11  of Standard Deficiency Format­export product wise. 2.      Quantities of import items from Sl. Nos. 2, 3  & 4  in Nos. also in addition to their weights. 3.      Quantity of import item at Sl. No. 5 in meters also in addition to its weight.

73

Case No.:12/25/80­ALC2/2011

Party Name:SARA SAE PRIVATE LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00491/AM12/ RLA File :61/24/040/00065/AM12/ Lic.No/Date:6110000741 04.01.2012 Defer Date:03.04.2012 Decision :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments. The case may be re­listed on 03.04.2012.   74

Case No.:20/25/80­ALC2/2011

Party Name:CEMTEC INDIA PRIVATE LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00499/AM12/ RLA File :02/24/040/00158/AM12/ Lic.No/Date:0210172126 09.01.2012   Decision :On the recommendation of DHI representative present in the meeting,  the  Committee decided to ratify the norms in respect of the subject advance authorization  as per GN­4 for Engineering Products.     75

Case No.:21/25/80­ALC2/2011

Party Name:HARI MACHINES LTD Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00500/AM12/ RLA File :02/24/040/00149/AM12/ Lic.No/Date:0210172131 09.01.2012   Decision : On the recommendation of DIPP representative present in the meeting,  the  Committee decided to ratify the norms in respect of the subject advance authorization  as per GN­4 for Engineering Products.     76

Case No.:32/25/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00511/AM12/ RLA File :04/24/040/00265/AM12/ Lic.No/Date:0410132603 09.01.2012   21.02.2012  and  decided  to  ratify  the  norms  of  the  subject  Advance  Authorization  on  repeat  basis  with accountability clause, as per advance authorization No.0410115603 dated  19.07.2010.     77

Case No.:22/25/80­ALC2/2011

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00501/AM12/ RLA File :06/24/040/00055/AM12/ Lic.No/Date:0610025438 10.01.2012 Defer Date:03.04.2012 Decision :  The  Committee  noted  that  the  firm’s  application  has  been  sent  to  C&PC  on  13.02.2012  for examination and comments. The case is to be re­listed on 03.04.2012.  

Case No.:19/25/80­ALC2/2011

Party Name:CANALAIR AIR SOLUTIONS PRIVATE LIMITED, Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred

78 HQ File :01/80/050/00498/AM12/ RLA File :32/21/040/00113/AM12/ Lic.No/Date:3210052122 11.01.2012 Defer Date:03.04.2012 Decision  :As  per  DIPP  UO  note  dated  21.02.2012,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  03.04.2012: ­   1.      Information in respect of Sl. No. 6  & 9  of Standard Deficiency Format­export product wise. 2.      Information in respect of Item at Sl. No. 11 of Standard Deficiency Format in respect of import items from Sl. No.1 & 2.   79

Case No.:18/25/80­ALC2/2011

Party Name:DELKOR TECHNIK INDIA P.LTD. Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00497/AM12/ RLA File :07/24/040/00409/AM12/ Lic.No/Date:0710085428 12.01.2012 Defer Date:03.04.2012 Decision : On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  03.04.2012: ­   1. Information in respect of Sl.No.3, 4, 5 & 11  of the Standard Deficiency Format – export product wise.   80

Case No.:35/25/80­ALC2/2011

Party Name:OM METALS INFRAPROJECTS LTD., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00514/AM12/ RLA File :05/24/040/00353/AM12/ Lic.No/Date:0510314332 12.01.2012 Defer Date:03.04.2012 Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  03.04.2012:­   1. Information in respect of Sl.No.3, 4, 5 & 11  of the Standard Deficiency Format.   81

Case No.:36/25/80­ALC2/2011

Party Name:METSO POWER INDIA PRIVATE LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00515/AM12/ RLA File :04/24/040/00270/AM12/ Lic.No/Date:0410132829 12.01.2012   Decision : On the recommendation of DHI representative present in the meeting,  and Committee decided to ratify the norms, taking cue from SION C­1742 as under:­   (i)                 Import Item Tube/Pipes to be allowed at 1.02 kg/kg. (ii)               RA to obtain details of weight and name of export product and incorporate in the licence.     82

Case No.:11/25/80­ALC2/2011

Party Name: LARSEN & TOUBRO LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00490/AM12/ RLA File :03/95/040/00769/AM12/ Lic.No/Date:0310676564 13.01.2012 Defer Date:03.04.2012

Decision  :  The  Committee  noted  that  the  firms  application  has  been  sent  to  DHI  on  13.02.2012  for examination and comments. The case is to be re­listed on 03.04.2012.   83

Case No.:17/25/80­ALC2/2011

Party Name:TITAN INDUSTRIES LIMITED, Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00496/AM12/ RLA File :07/24/040/00383/AM12/ Lic.No/Date:0710085452 13.01.2012   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated 21.02.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Net weight of export products at Sl. Nos. 1 & 2 may be specified as 177.85  Kgs. & 33.85 Kgs. respectively. 2.      Quantity of import item may be allowed as 3194 Kgs.(7041.6 Lbs.) inclusive of 1409 % wastage after taking 5% recovery from scrap.     84

Case No.:24/25/80­ALC2/2011

Party Name:PERMANENT MAGNETS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00503/AM12/ RLA File :03/95/040/00845/AM12/ Lic.No/Date:0310676553 13.01.2012   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated 21.02.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Quantity of import item at Sl.No.1 may be allowed as applied for i.e. 9450 Kgs. inclusive of 5% wastage. 2.      Quantities of import items at Sl.No.2 & 3 may be allowed as applied for i.e. 9360 Kgs & 6622 Kgs respectively inclusive of 95% wastage after 1/3rd recovery     85

Case No.:23/25/80­ALC2/2011

Party Name:PERMANENT MAGNETS LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Approved HQ File :01/80/050/00502/AM12/ RLA File :03/95/040/00852/AM12/ Lic.No/Date:0310677117 17.01.2012   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated 21.02.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Quantity of import item at Sl.No.1 may be allowed as applied for i.e. 6069.263 Kgs. inclusive of 5% wastage. 2.      Quantities of import items at Sl.No.2 & 3 may be allowed as applied for i.e. 6011.46 Kgs & 4959.455 Kgs respectively inclusive of 95% wastage after 1/3rd recovery.    

Case No.:1/25/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred

86 HQ File :01/80/050/00480/AM12/ RLA File :03/94/040/00914/AM12/ Lic.No/Date:0310679315 31.01.2012 Defer Date:03.04.2012 Decision :The Committee noted that a copy of firm’s application has been sent  to DIPP on 21.02.2012 for examination and comments. The case is to be re­listed on 03.04.2012.   87

Case No.:41/25/80­ALC2/2011

Party Name:ZIEMANN INDIA PRIVATE LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00520/AM12/ RLA File :31/83/040/00221/AM12/ Lic.No/Date:3110052821 07.02.2012 Defer Date:03.04.2012 Decision :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments. The case may be re­listed on 03.04.2012.   88

Case No.:42/25/80­ALC2/2011

Party Name:TEMA INDIA LIMITED Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00521/AM12/ RLA File :03/95/040/00930/AM12/ Lic.No/Date:0310680916 08.02.2012 Defer Date:03.04.2012 Decision :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments. The case may be re­listed on 03.04.2012.   89

Case No.:43/25/80­ALC2/2011

Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:25/80­ ALC2/2011 21.02.2012 Status: Deferred HQ File :01/80/050/00522/AM12/ RLA File :31/83/040/00218/AM12/ Lic.No/Date:3110052856 08.02.2012 Defer Date:03.04.2012 Decision :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments. The case may be re­listed on 03.04.2012.   S.No.27

Case No.  A ­ 09

M/s.  Jhagadia Copper Ltd.,   HQ F.No.01/80/162/00542/AM10/DES.I Lic.No. & Date Meeting No.25/12  RA.F.No.34/24/039/00001/AM10 3410024795 dt.29.07.2009 Date: 21.02.2012 Ratification of  norms.   Representative  of  MSME  informed  the  Committee  that  they  need  some  more  details  from  the  firm  for examination  of  the  case.  The  Committee  therefore  decided  to  obtain  the  details  and  to  re­list  the  case  on 03.04.2012.   S.No.28

Case No.  A ­ 14

M/s.  Larsen  & Toubro Ltd.,   HQ F.No.01/80/162/00522/AM11/DES.I Lic.No. & Date Meeting No.25/12  RA.F.No.03/95/039/00004/AM10 0310541346 dt.12.10.2009 Date: 21.02.2012 Ratification of  norms   The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to re­list the case on 03.04.2012.   S.No.29

Case No.  A ­ 03

HQ F.No.01/80/162/00845/AM12/DES.I Lic.No. & Date

M/s.  Larson  & Toubro  Ltd., Mumbai   Meeting No.25/12  RA.F.No.03/95/039/00001/AM12 0310643682 dt.21.07.2011 Date: 21.02.2012 Fixation  of  norms  for  annual requirement   The Committee noted that the firm has not replied vide this office letter dated 24.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be re­listed on 03.04.2012.   S.No.30

Case No.  A ­ 16

M/s.  VA  Tech Escher  Wyss Flovel  Ltd., Faridabad   HQ F.No.01/80/050/00925/AM12/DES.I Lic.No. & Date Meeting No.25/12  RA.F.No.05/24/040/00940/Am07 0510100700 dt.20.02.2007 Date: 21.02.2012 Fixation of norms   The Committee Noted that the firm’s application has been sent to DHI on 16.02.2012 for examination and comments and case is to be re­listed on 03.04.2012.   S.No.31

Case No.  A ­ 17

M/s.  VA  Tech Escher  Wyss Flovel  Ltd., Faridabad   HQ F.No.01/80/050/00927/AM12/DES.I Lic.No. & Date Meeting No.25/12  RA.F.No.05/24/040/00       /Am07 0510199824 dt.21.02.2007 Date: 21.02.2012 Fixation of norms   The Committee Noted that the firm’s application has been sent to DHI on 16.02.2012 for examination and comments and case is to be re­listed on 03.04.2012.   S. No.603

Case No.  A/R­40

M/s.  Bharat  Heavy Electricals  Ltd., Haridwar HQ F.No.01/80/162/00539/AM09/DES.I Lic.No. & Date Meeting No.25/12 RA F.No.61/24/040/00036/AM09 6110000254 dt.05.12.2008   Date: 21.02.2012 Ratification of norms   The Committee deliberated the written comments of DHI received  vide their UO Note dated 21.02.2012 and decided to ratify the norms on repeat basis as per advance authorization No.6110000286  dated  06.02.2009.     Sl.No.604

Case No.A/R­161

M/s. Thermax LTd., HQ F.No.01/80/050/01549/AM09/ DES­I Lic.No. & Date Meeting No.25/12 RA F.No.31/21/040/00295/AM09 3110036392 dt.11.12.2008 Date: 21.02.2012 Ratification of norms   The  representative of the DHI informed the Committee that the case is under  examination. The Committee,   S.No.605

Case No.A/R­53

M/s.  Andritz  Hydro Pvt.  Ltd.,  Palwal (Har.) HQ F.No.01/80/050/00009/AM12/ DES­I Lic.No. & Date Meeting No.25/12 RA F.No.05/23/040/00009/AM12 0510287936 dt.11.04.2011 Date: 21.02.2012 Ratification   of Norms   The  representative of the DHI informed the Committee that the case is under  examination. The Committee,   S.No.606

Case No.A/R­54

M/s.  Andritz  Hydro Pvt.  Ltd.,  Palwal HQ F.No.01/80/050/00864/AM11/ DES­I Lic.No. & Date

(Har.) Meeting No.25/12 RA F.No.05/23/040/00340/AM11 0510284704 dt.01.03.2011 Date: 21.02.2012 Ratification   of Norms   The  representative of the DHI informed the Committee that the case is under  examination. The Committee,   S.No.607

Case No.A/R­57

M/s.  Thermax Limited HQ F.No.01/81/050/00310/AM06/ DES­I Lic.No. & Date Meeting No.25/12 RA F.No.31/24/040/00017/AM06 3110021206 dt.14.07.2005 Date: 21.02.2012 Revision of norms   The  representative of the DHI informed the Committee that the case is under  examination. The Committee,   S.No.608

Case No.A/R­152

M/s.  Eastern Equipment  & Engineers  Pvt. Ltd., Kolkata HQ F.No.01/80/050/00724/AM11/ DES­I Lic.No. & Date Meeting No.25/12 RA F.No.02/24/040/00168/AM11 0210152463 dt.23.12.2010 Date: 21.02.2012 Fixation of  Norms   The Committee deliberated the written comments of DIPP received  vide their UO Note dated 21.02.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Word “Relevant” may be prefixed with the descriptions of import items at Sl. No. 1 & 2. 2.      Quantity of import item at  Sl. No. 1  may be allowed as 13 MT inclusive of 2 % wastage. 3.      Quantity of import item at  Sl. No. 2  may be allowed under: M.S. Plates: 1.764 MT inclusive of 5 % wastage                         M.S. Angles/Channels: 0.143 MT inclusive of 2 % wastage     S.No.609

Case No.A/R­153

M/s.  Thermax Ltd., HQ F.No.01/81/162/00480/AM07/ DES­I Lic.No. & Date Meeting No.25/12 RA F.No.31/24/040/00186/AM07 3110026329 dt.04.09.2006 Date: 21.02.2012 Ratification  of  Norms   The  representative of the DHI informed the Committee that the case is under  examination. The Committee,   S.No.610

Case No. A/R­ 168

M/s.  Godrej  & Boyce  Mfg.  Co. LTd., Mumbai  F.No. 01/80/50/ 01741/AM09/DES.I Lic.No. & Date Meeting No.25/12 RA F.No.03/94/040/00798/AM09 0310497146 dt.10.12.2008 Date: 21.02.2012 Ratification of norms   The Committee noted that the firm has requested by e­mail dt.01.02.2012and 04.02.2012 for postponement of P.H. to  03.04.2012 instead of 21.02.2012. The Committee therefore decided to defer the PH and  to relist the case on 03.04.2012.   S.No.611

Case No.A/R­155

M/s.  Boving Fouress  (P)  Ltd., Bangalore HQ F.No.01/80/162/00218/AM09/ DES­I Lic.No. & Date Meeting No.25/12 RA F.No.07/24/040/00524/AM09 0710061697 dt.15.12.2008 Date: 21.02.2012 Fixation of norms

The  Committee  noted  that  the  firm  has  not  replied  this  office  e­mail  dated  24.01.2012  for  furnishing  the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be re­listed on 03.04.2012.   Sl.No.207

Case No. C ­ 09

M/s.  Addison  &  Co.  Ltd., Chennai F.No. 01/81/80/162/00372/AM10/DES.I Meeting No.25/12 Modification  of SION for the export product “Cutting Tools­Multiple Point of High Speed Steel(Cobalt Grade)/Tool Steel” Date: 21.02.2012   The Committee noted that the firm has not replied this office reminder e­mail dated 25.01.2012 for furnishing the  information.  The  Committee,  therefore,  decided  to  last  reminder  to  the  firm  for  expediting  the  said information failing which their case will be rejected without any further notice. The case is to be re­listed on 03.04.2012.   Sl.No.208

Case No. C­ 18

M/s.  Pipavav  Shipyards Ltd., Amreli F.No. 01/81/80/162/00612/AM11/DES.I Meeting No.25/12 Fixation of input output norms in respect of 100%  EOU  for  the  export  product  “  Ship, Cargo  Ships,  Barges  &  Vessels  for Transport,  Factory  Ship,  Life  Boats,  Hulls and  Vessels  falls  under  Chapter  89  of ITC(HS) – reg. Date: 21.02.2012   The  Committee  noted  that  a  note  of  clarification  along  with  application  has  again  be  sent  to  Ministry  of Shipping on dt.15.02.2012 and decided to send a reminder to expedite their comments. The case is to be re­listed on 03.04.2012.   Sl.No.209

Case No.  C – 18

M/s.  Bhukanvala Diamond  Systems  Pvt. Ltd., Navsari HQ F.No.01/80/162/00056/AM12/DES­I Meeting No.25/12 Request  for  fixation  of  Standard  Input Output Norms (SION) for the export product “Die  Sets  and  PVC  Blister  Moulds”  in respect of 100% EOU Date: 21.02.2012   The representative of the DHI informed the Committee that the case is under  examination. The Committee,   Sl.No.210

Case No.  C – 32

M/s. Botil Oil Tools India Pvt. Ltd., New Delhi HQ F.No.01/80/162/00851/AM12/DES­I Meeting No.25/12 Application for issuance of Advance Authorization under Duty Exemption Scheme under SION at Sl. No.C­1624, C­1625 and C­1628. Date: 21.02.2012   The Committee noted that the firm informed that they have submitted revised application to RA, New Delhi for issuing the advance authorization and therefore decided to close on the part of NC.     Sl.No.211

Case No.  C – 33

M/s.  M+Acer Automotive  Systems Pvt. Ltd., Bangalore HQ F.No.01/80/162/00914/AM12/DES­I Meeting No.25/12 Fixation  of  Scrap/Wastage  norms  for  the export  product  “Level  Indicator  Assembly” in respect of 100% EOU. Date: 21.02.2012   The representative of the DHI informed the Committee that the case is under  examination. The Committee,


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied