RATIFIED Minutes of Meeting No.22/12 scheduled on 24.01.2012 of Norms Committee(NC­I) (DES.I Section) The meeting No. 22/12 of the Norms Committee (NC­I) for the licensing year 2011­2012 was held on 24.01.2012  under  the  Chairmanship  of  Sh.  N.P.S.  Monga,  Additional    Director  General  of  Foreign  Trade  to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2009– 2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­ Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh K. K. Tiwari,  I.A. 476 23063321 Extn.3322 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 5. Sh. K.C. Raju, FTDO 404 23061562 Ext.265 DGFT, U.B.   I ­The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon are as under: ­ 1

Case No.:18/41/80­ALC2/2009

Party Name:KE­BURGMANN FLEXIBLES INDIA PVT.LTD., Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00639/AM10/ RLA File :04/24/040/00247/AM10/ Lic.No/Date:0410110339 22.12.2009 Defer Date:06.03.2012 Decision  :  The  Committee  observed  that  the  comments  called  from  C&PC  are  yet  to  be  received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 06.03.2012.

Case No.:19/18/80­ALC2/2010

Party Name:STARION INDIA P.LTD Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00272/AM11/ RLA File :31/24/040/00028/AM11/ Lic.No/Date:3110043412 31.05.2010   Decision  :The  Committee  deliberated  the  written  comments  of  MCIT  received    vide  their  UO  No. 17(49)/2010­IPHW    dated22.12.2011  and  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization  as under:­   S. No. Import item Description Total  Wastage calculated  as per  details given  by  the party  (on  the Net  weight)  in % Total  Import qty. recommended (In M.T.) 1. Lumax  Resin  GN5006FC KC21­Tray Disc 2.34% 120.937   Lumax  Resin  GN5006FC KC21­Main Base 0.00% 2. Resin ABS AF303G92649­ Bezel Assembly 11.96% 29.72   Resin ABS AF303G92649­ (Bezel Assembly) 10.91%   Resin  ABS  AF303G92649 (Door) 9.72% 3. Resin  ABS  AF  303 ( l bl 11.96% 14.86

2 G8C104  (Bezel  Assembly Ivory)   Resin  ABS  AF  303 G8C104  (Bezel  Assembly Ivory) 10.91%   Resin  ABS  AF  303 G8C104 (Door Ivory) 9.72% 4. F20­03  Natural  POM (Polyacetal  Resin)  – (Chassis Outsert) 85.19% 75.667   F20­03  Natural  POM (Polyacetal  Resin)  – (Clamp Assembly) 66.74%   F20­03  Natural  POM (Polyacetal Resin) – Pulley Gear) 250.0%   F20­03  Natural  POM (Polyacetal  Resin)  –  Gear Idie) 200.0%   F20­03  Natural  POM (Polyacetal  Resin)  (Lever Emergency) 50%   F20­03  Natural  POM (Pulley Motor) 300%   F20­03  Natural  POM (Pulley Motor) 100%   F20­03  Natural  POM (Pulley Motor) 18.31% 5. Master  Batch  Black  MB­ S315­(Chassis Outsert) 84.99%

ency) 50%   F20­03  Natural  POM (Pulley Motor) 300%   F20­03  Natural  POM (Pulley Motor) 100%   F20­03  Natural  POM (Pulley Motor) 18.31% 5. Master  Batch  Black  MB­ S315­(Chassis Outsert) 84.99% 0.69 6. Master  Batch  Blue  MB­ B207­(Chassis Outsert) 84.99% 1.104   Master  Batch  Blue  MB­ B207­(Clamp Assembly) 97.89%   7. Electrolytic  Galvanished Steel  Coil  Cold  Rolled 0.6mmx242mm Steel Coil­ Cabinet Assembly 13.86% 305.1 8. Electrolytic  Galvanished Steel  Sheet  Cold  Rolled 0.5mmx169.5mmx600m Steel  Sheet  Cabinet Assembly 53.50% 46.05 9. Electrolytic  Galvanished 0.5mmx182.8mm  Steel Coil­(Bottom Assembly) 14.06% 165.225 10. Electrolytic  Galvanished Steel  Coil  Cold  Tolled 1.6mmx130mm  Steel  Coil – (Chassis Outsert) 95.50% 264.51   Electrolytic  Galvanished 1.6mmx130mm  Steel­ (Bracket) 0% 11 El t l ti G l i d 14 60% 15 026

Electrolytic  Galvanised 0.8mmx121mm  Steel  – (Clamp Assembly) 14.60% 15.026 12. TX 31 natural TX31­Guide Feed 20.00% 6.600 13. Acrylic Resin 1H 830­Lens Model 30.00% 2.860 14. Resin Lupos GP2100KA01 (Base Up Down) 18.00% 14.750   The RLA may take necessary action accordingly.   3

Case No.:15/18/80­ALC2/2010

Party Name:INDUS PRO AUTO ENGINEERS PVT.LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00268/AM11/ RLA File :05/23/040/00054/AM11/ Lic.No/Date:0510266316 17.06.2010   Decision :  The  representatives  of  the  firm  Shri  Rakesh  Sharma,  Managing  Director,  appeared  before  the Committee for personal hearing and explained their case. The Committee deliberated the details of the case. After taking clue from SION H­88, the Committee decided to allow import item “Vinyl Sheeting Sierra Black  Skin” at 1.05 Sq Yard/Sq Yard content in the export product.         4

Case No.:45/18/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00298/AM11/ RLA File :06/24/040/00018/AM11/ Lic.No/Date:0610018429 07.07.2010 Defer Date:06.03.2012 Decision : The Committee noted that the written comments called from Ministry of Defence and case is under examination with Ministry of Defence and the case is to be re­listed on 06.03.2012.   5

Case No.:47/18/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00300/AM11/ RLA File :06/24/040/00017/AM11/ Lic.No/Date:0610018428 07.07.2010 Defer Date:06.03.2012 Decision : The Committee noted that the written comments called from Ministry of Defence and case is under examination with Ministry of Defence and the case is to be re­listed on 06.03.2012.   6

Case No.:21/18/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00274/AM11/ RLA File :61/24/040/00029/AM11/ Lic.No/Date:6110000472 15.07.2010 Defer Date:06.03.2012 Decision :As per DHI UO note No.3(69)/10­TSW(B)/711 dated 28.12.2011, the Committee decided to ask firm to furnish proper justification for the import quantity for item No. 139 to 141 and also give calculation of requirement of each raw material from the dimensions from the firm  and to re­list the case on  06.03.2012.

Case No.:29/22/80­ALC2/2010

Party Name:SHRI LAKSHMI Meet No/Date:22/80­ Status:

7 DEFENCE SOLUTIONS LTD. ALC2/2011 24.01.2012 Deferred HQ File :01/80/050/00340/AM11/ RLA File :06/24/040/00022/AM11/ Lic.No/Date:0610018565 21.07.2010 Defer Date:06.03.2012 Decision : The Committee noted that the written comments called from Ministry of Defence and case is under examination with Ministry of Defence and the case is to be re­listed on 06.03.2012.   8

Case No.:30/22/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00341/AM11/ RLA File :06/24/040/00023/AM11/ Lic.No/Date:0610018566 21.07.2010 Defer Date:06.03.2012 Decision : The Committee noted that the written comments called from Ministry of Defence and case is under examination with Ministry of Defence and the case is to be re­listed on 06.03.2012. 9

Case No.:24/29/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00459/AM11/ RLA File :03/94/040/00501/AM11/ Lic.No/Date:0310591600 08.09.2010 Defer Date:06.03.2012 Decision :The  committee  noted  that  a  copy  of  firm’s  reply  dated  16.12.2011  has  been  sent  to  MCIT    on 06.01.2012 and the case is under examination. The case is to be re­listed on 06.03.2012.   10

Case No.:29/29/80­ALC2/2010

Party Name:BIRLA ERICSSON OPTICAL LTD., Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00464/AM11/ RLA File :11/24/040/00038/AM11/ Lic.No/Date:1110023211 16.09.2010   Decision  :The  Committee  deliberated  the  written  comments  of  MCIT  received    vide  their  UO  No. 17(76)/2011­IPHW  dated09.12.2011  and  decided  to  ratify  the  norms  in  respect  of  the  subject  advance   S.No. Import Item Total  Quantity requested  for  by  the party (Km) Total  qty recommended for  desired length (Km) 1. Optical Fibre 5304.416 5304.416 2. Polyethylene 14490.04 14075.928   a)      Import quantity of optical fibre recommended is baased on 5% additional length over the length of the cable. b)      Import quantity of Polyethylene material recommended is inclusive of wastage of 2%.     11

Case No.:29/27/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00426/AM11/ RLA File :03/95/040/00354/AM11/ Lic.No/Date:0310593772 24.09.2010   Decision :On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­ Export Product weight – 73 MT Imports Items 1 Item No 1 – 34MT – to be allowed with 5% wastage

1. Item No. 1    34MT       to be allowed with 5% wastage. 2.   Item No. 2  – 16.33 MT – with no wastage. 3.   Item No. 3  ­  24.23 MT   ­  to be  allowed with 2% wastage. 4.   Item No. 7,8,9 ­  2% of the weight of item No.1 @ 680 Kg. put together. 5.   Item No.  5 – As applied fro by the firm. 6.  Rest of the items to be allowed on the  net to net basis with accountability clause.     12

Case No.:30/27/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00427/AM11/ RLA File :03/95/040/00360/AM11/ Lic.No/Date:0310593860 24.09.2010 Defer Date:06.03.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 06.03.2012.   13

Case No.:6/35/80­ALC2/2010 Party Name:GATRAY ENVIROTECH

 SYSTEMS Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00633/AM11/ RLA File :31/24/040/00144/AM11/ Lic.No/Date:3110045144 20.10.2010 Defer Date:06.03.2012 Decision : The Committee noted that the written comments called from Ministry of Defence and case is under examination with Ministry of Defence and the case is to be re­listed on 06.03.2012.   14

Case No.:22/35/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00649/AM11/ RLA File :04/24/040/00194/AM11/ Lic.No/Date:0410118622 04.11.2010   Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms on repeat basis as allowed under advance authorization No.0410115603 dt.19.07.2010     15

Case No.:2/32/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00543/AM11/ RLA File :03/95/040/00446/AM11/ Lic.No/Date:0310600429 08.11.2010   Decision :On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­ Export Product 1. Item No. 1 ­ 50 MT 2. Item No. 2 ­ 68 MT 3. Item No. 3 ­ 75 MT 4. Item No. 4 ­ 128 MT Imports Item No.1 ­ As applied for with 5% wastage 1. Item No.2 ­ As applied for with 5% wastage 2. Item No.3­ As applied for with ‘Nil’ wastage. 3. Item No.4 – To be allowed of  31.74 MT with 2% wastage. 4. Item No.5 – To be allowed of  0.79 MT allowed with ‘Nil’ wastage.

g 5. Item No.6 – To be allowed of  1 MT allowed with ‘Nil’ wastage. 6. Item No.7 – To be allowed of  0.40 MT allowed with ‘Nil’ wastage. 7. Item No.9 – To be allowed of  1210 Kg. 8. Item No.10 – To be allowed of  3690 Kg. 9. Item No.11 – To be allowed of  3690 Kg. with 2% wastage.     16

Case No.:25/35/80­ALC2/2010

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00652/AM11/ RLA File :03/95/040/00545/AM11/ Lic.No/Date:0310601333 15.11.2010 Defer Date:06.03.2012   17

Case No.:53/35/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00680/AM11/ RLA File :61/24/040/00067/AM11/ Lic.No/Date:6110000536 01.12.2010 Defer Date:06.03.2012   18

Case No.:45/35/80­ALC2/2010

Party Name:BOSCH LIMITED, Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00672/AM11/ RLA File :07/24/040/00332/AM11/ Lic.No/Date:0710075865 07.12.2010   ratify the norms in respect of the subject advance authorization  as under:­ 1. Item No. 4 – to be allowed of 10,564 KG with 47% wastage after taking 1/3 recovery. 2. Item Nos. 2,5,7,9 and 11 to be allowed at 2% of FOB value put together. 3. All other items are components and to be  allowed on net to net basis with accountability clause.     19

Case No.:36/35/80­ALC2/2010

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00663/AM11/ RLA File :05/23/040/00263/AM11/ Lic.No/Date:0510279826 20.12.2010 Defer Date:06.03.2012 Decision  :The  Committee  noted  that  the  firm  did  not  reply  to  this  office    letter  dated  27.12.2011.  The Committee, therefore, decided to remind the firm for expediting the requisite information failing which  their case will be rejected without any further notice. The case is to be re­listed on 06.03.2012.   20

Case No.:23/36/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status:   HQ File :01/80/050/00722/AM11/ RLA File :61/24/040/00072/AM11/ Lic.No/Date:6110000544 04.01.2011   Decision :  On  the  recommendation  of  DHI  representative,  the  Committee  decided  to  ratify  the  norms  of Advance Authorization No. 6110000544 dated 04.01.2011as per DHI written comments provided vide UO No.3(69)/10­

p p ( ) TSW(B)/373 dated 12/13.7.2011 in Advance Authorization No.6110000536 dated 1.12.2010.   RLA may take necessary action accordingly.   21

Case No.:27/1/80­ALC2/2011

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00910/AM11/ RLA File :06/24/040/00051/AM11/ Lic.No/Date:0610020480 07.01.2011 Defer Date:06.03.2012 Decision : The Committee noted that the written comments called from Ministry of Defence and case is under examination with Ministry of Defence and the case is to be re­listed on 06.03.2012.   22

Case No.:17/39/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00819/AM11/ RLA File :61/24/040/00074/AM11/ Lic.No/Date:6110000553 25.01.2011   ratify the norms on repeat basis of the subject advance authorization No.6110000286 dated 06.02.2009..      23

Case No.:14/38/80­ALC2/2010

Party Name:VASUNDRA MANUFACTURING SYSTEMS PVT.LTD, Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00784/AM11/ RLA File :07/21/040/00786/AM11/ Lic.No/Date:0710077109 03.02.2011 Defer Date:06.03.2012 Decision  :  The  Committee  noted  that  the  firm  did  not  reply  to  this  office    letter  dated  29.12.201.  The Committee, therefore, decided to remind the firm for expediting requisite information failing which  their case will be rejected without any further notice. The case is to be re­listed on 06.03.2012.   24

Case No.:16/38/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00786/AM11/ RLA File :05/23/040/00309/AM11/ Lic.No/Date:0510283074 03.02.2011 Defer Date:06.03.2012 Decision :The representative of the DHI informed that the products in the Advance Authorization are large and wastage is high and asked for a Team Visit to evaluate on wastage. The Committee, therefore, decided to send a team consisting of representatives of DHI, MSME & DDG and submit a report. The case is to be re­ listed on 06.03.2012.   25

Case No.:23/39/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00825/AM11/ RLA File :61/24/040/00078/AM11/ Lic.No/Date:6110000557 03.02.2011   ratify the norms on repeat basis of the subject advance authorization No.6110000286 dated 06.02.2009..

Case No.:43/1/80­ALC2/2011

Party Name:SPRAY ENGINEERING Meet No/Date:22/80­ Status:

26 DEVICES LTD., ALC2/2011 24.01.2012 Deferred HQ File :01/80/050/00926/AM11/ RLA File :22/24/040/00090/AM11/ Lic.No/Date:2210010955 04.02.2011 Defer Date:06.03.2012   27

Case No.:31/38/80­ALC2/2010

Party Name:STARION INDIA P.LTD Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00801/AM11/ RLA File :31/24/040/00239/AM11/ Lic.No/Date:3110046834 09.02.2011   Decision  :The  Committee  deliberated  the  written  comments  of  MCIT  received    vide  their  UO  No. 17(99)/2011­IPHW  dated23.12.2011  and  decided  to  ratify  the  norms  in  respect  of  the  subject  advance Sl. No. Impot item description Total wastage calculated  as per  details given  by  the party  (on  the Net  weight) in % Total  Import qty recommended (In M.T.) 1. Lumax Resin GN5006FC KC21­Tray Disc 2.34% 145.125   Lumax Resin GN5006FC KC21­Main Base 0.%   2. Resin  ABS AF303G92649­Bezel Assembly 11.96% 35.66   Resin  ABS AF303G92649­Bezel Knob 10.91%     Resin  ABS AF303G92649 Door 9.72%   3. Resin Gp 2100 kas02 Up Down 18.00% 17.700 4. F20­03  Natural  POM (Polyacetal  Resin)  – Puller Gear 250.00% 6.16   F20­03  Natural  POM (Polyacetal  Resin)­  Gear Idle 200.00% 5.940   F20­03  Natural  POM (Polyacetal  Resin)  Geal Loading 100.00% 7.480   F20­03  Natural  POM (Polyacetal  Resin)­ Pulley Motor 300.00% 1.760   F20­03  Natrual  POM (Polyacetal Resin)­Clamp Assembly 66.74 8.712   F20­03  Natural  POM (Polyacetal  Resin)­ Chassis Outsert 85.19 23.835 l

l  POM (Polyacetal  Resin)­ Pulley Motor 300.00% 1.760   F20­03  Natrual  POM (Polyacetal Resin)­Clamp Assembly 66.74 8.712   F20­03  Natural  POM (Polyacetal  Resin)­ Chassis Outsert 85.19 23.835 l

F20­03  Natural  POM (Polyacetal  Resin)­Guide Up Down 18.31% 18.480   F20­03  Natural  POM (Polyacetal Resin)­ Lever Emergency 50.00% 3.300 5. Master Batch Black MB­ S315­Guide Feed 10.09 0.264 6. Master  Batch  Blue  MB­ B207­Clam Assy. 97.89 0.414 7. Electrolytic  Galvanished 0.6mmx242mm  Steel Coil­Cabinet Assembly 13.86% 244.08 8. Electrolytic  Galvanished 0.5mmx169.5mmx600m  Steel  sheet­Cabinet Assembly 53.50% 36.840 9. Electrolytic  Galvanished 0.5mmx182.8mm    Steel Coil – Bottom Assembly 14.06% 132.18 10. Electrolytic  Galvanished 1.6mmx130mm    Steel Coil  –  Chassis  Outsert Assembly 95.5 264.51   Electrolytic  Galvanished 1.6mmx130mm    Steel  – Bracket Assembly 0   11. Electrolytic  Galvanished 0.8mmx121mm    Steel  ­ Clamp Assembly 14.64% 15.031 12. TX  31  Natural  TX31­ Guide Feed 20 6.6 13. Acrylic  Resin  IH  830  – Lens Model 30.00% 2.860     28

Case No.:22/1/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00905/AM11/ RLA File :04/24/040/00244/AM11/ Lic.No/Date:0410121548 11.02.2011   ratify the norms on repeat basis as allowed under advance authorization No.0410121550 dt. 11.02.2011.

Case No.:32/1/80­ALC2/2011

Party Name:PSK ENGINEERING PVT LTD Meet No/Date:22/80­ ALC2/2011 Status: Deferred

29 24.01.2012 HQ File :01/80/050/00915/AM11/ RLA File :07/24/040/00449/AM11/ Lic.No/Date:0710077436 18.02.2011 Defer Date:06.03.2012 Decision : The Committed observed that the firm has furnish same reply again and  again  and  decided  to inform and ask for pointwise reply to DL dated 4.1.2012 The case is to be re­listed on 06.03.2012.   30

Case No.:4/1/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00886/AM11/ RLA File :04/24/040/00298/AM11/ Lic.No/Date:0410122003 28.02.2011   Decision : The Committee deliberated the written comments of DHI received  vide their UO No 3(40)/10­ TSW(B)/707    dated  22.12.2011  and  decided  to  ratify  the  norms  in  respect  of  the  subject  advance Export Total weight of export product for five sets is to be allowed at 1843 MT. The word “Auxiliaries” may be deleted from the description of export product. Import Taking clue from SION C­1742, 1. Item No.1 – CS Plate – to be allowed at 94.6 MT with 5% wastage as per SION 2. Item No. 2 – CS Seamless Pipe – The item may be allowed at 467MT with 2% wastage as per SION. 3. Item NO. 3 – AS Seamless Piper – to be allowed at 60.5 MT with 2% wastage as per SION. 4. Item NO. 4 – SS Seamless Pipe – to be allowed at 19 MT with 2% wastage as per SION as applied for. 5. Item No. 5 – Welding material – Allowed as applied for. 6. Item No. 6& 8 – These are components & to be allowed under GN­4. 7. Item No.7 – Valves – to be allow as applied for under GN­4 with accountability clause.     31

Case No.:30/7/80­ALC2/2011

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00136/AM12/ RLA File :03/95/040/00945/AM11/ Lic.No/Date:0310620136 08.03.2011 Defer Date:06.03.2012 Decision :The Committee noted that a copy of RA, Mumbai amendment sheet dt.09.11.2011 has been sent to DHI on 27.12.2011 and the case is under their examination and case is to be re­listed on 06.03.2012.   32

Case No.:12/1/80­ALC2/2011

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00894/AM11/ RLA File :05/24/040/00419/AM11/ Lic.No/Date:0510286112 15.03.2011 Defer Date:06.03.2012 Decision : The representative of DHI informed the Committee that the export product with part numbers are not recognizable from the documents mentioned by the firm. The Committee decided to advice the firm to appear in Personal Hearing alongwith their documents as well as a sample of the export product and Scrap Blank strip to present their case in person along with technical expert and full facts of the case. The case may be re­listed on 06.03.2012.   33

Case No.:32/7/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00138/AM12/ RLA File :11/24/040/00009/AM12/ Lic.No/Date:1110024726 11.05.2011 Defer Date:06.03.2012

Decision : The representative of the DHI informed the Committee that the case is under  examination. The   34

Case No.:15/7/80­ALC2/2011

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00121/AM12/ RLA File :04/24/040/00046/AM12/ Lic.No/Date:0410124251 20.05.2011 Defer Date:06.03.2012 Decision : The Committee noted that a copy of firm’s reply dt.24.01.2012 received on 31.01.2012 forward to DHI for examination and comments. The case is to be re­listed on 06.03.2012. 35

Case No.:16/7/80­ALC2/2011

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00122/AM12/ RLA File :04/24/040/00045/AM12/ Lic.No/Date:0410124249 20.05.2011 Defer Date:06.03.2012 Decision : The Committee noted that a copy of firm’s reply dt.24.01.2012 received on 31.01.2012 forward to DHI for examination and comments. The case is to be re­listed on 06.03.2012.   36

Case No.:36/7/80­ALC2/2011

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00142/AM12/ RLA File :04/24/040/00051/AM12/ Lic.No/Date:0410124216 20.05.2011 Defer Date:06.03.2012 Decision  :The  Committee  noted  that  the  firm  did  not  reply  to  this  office  letter  dated  27.12.2011.  The Committee, therefore, decided to remind the firm for expediting requisite information failing which  their case will be rejected without any further notice. The case is to be re­listed on 06.03.2012.   37

Case No.:2/10/80­ALC2/2011

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00197/AM12/ RLA File :03/94/040/00034/AM12/ Lic.No/Date:0310633321 27.05.2011 Defer Date:06.03.2012 Decision  :The  Committee  noted  that  a  copy  of  firm’s  reply  dt.29.11.2011  has  been  sent  to  MCIT  on 27.12.2011 and the case under their examination. The case is to be re­listed on 06.03.2012.   38

Case No.:3/10/80­ALC2/2011

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00198/AM12/ RLA File :03/94/040/00035/AM12/ Lic.No/Date:0310633340 27.05.2011 Defer Date:06.03.2012 Decision : The Committee noted that a copy of firm’s reply dt.29.11.2011 has been sent to MCIT on 27.12.2011 and the case under their examination. The case is to be re­listed on 06.03.2012.   39

Case No.:35/7/80­ALC2/2011

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00141/AM12/ RLA File :03/95/040/00125/AM12/ Lic.No/Date:0310633816 31.05.2011 Defer Date:06.03.2012

Case No.:1/7/80­ALC2/2011

Party Name:THERMAL SYSTEMS Meet No/Date:22/80­ Status:

40

Case No.:1/7/80 ALC2/2011

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:22/80 ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00107/AM12/ RLA File :09/24/040/00119/AM12/ Lic.No/Date:0910046990 03.06.2011 Defer Date:06.03.2012 Decision : The Committee noted that a copy of firm’s reply dt.19.01.2012 received on 30.01.2012 forward to DHI for examination and comments. The case is to be re­listed on 06.03.2012.   41

Case No.:2/7/80­ALC2/2011

Party Name:DENSO HARYANA PVT. LTD., Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00108/AM12/ RLA File :05/23/040/00066/AM12/ Lic.No/Date:0510292671 06.06.2011   ratify the norms the subject advance authorization as under:­ 1. Item No. 1 to 6 – Components – to be allowed on net to net basis. 2. Item No. 7 –  to be allowed of 1.05 kg/kg content of the export product. 3. Item No. 8 ­  As applied for.     42

Case No.:11/7/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00117/AM12/ RLA File :04/24/040/00065/AM12/ Lic.No/Date:0410124734 08.06.2011   ratify the norms on repeat basis as allowed udner advance authorization No.0410124435 dt. 27.05.2011.        43

Case No.:12/7/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00118/AM12/ RLA File :04/24/040/00067/AM12/ Lic.No/Date:0410124735 08.06.2011   ratify the norms on repeat basis of the subject advance authorization No.0410080519 dt.18.04.2006     44

Case No.:14/10/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00209/AM12/ RLA File :61/24/040/00012/AM12/ Lic.No/Date:6110000627 08.06.2011 Defer Date:06.03.2012 Decision : As per DHI UO note No.3(69)/10­TSW(B)/711 dated 28.12.2011, the Committee decided to asked to furnish proper justification for the import quantity for item No. 139 to 141 and also give calculation of requirement of each raw material from the dimensions from the firm  and to re­list the case on  06.03.2012

Case No.:13/7/80­ALC2/2011

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred

45 HQ File :01/80/050/00119/AM12/ RLA File :03/95/040/00126/AM12/ Lic.No/Date:0310635194 09.06.2011 Defer Date:06.03.2012 Committee, therefore, decided to defer the case and to re­list the case on 6.3.2012.   46

Case No.:18/7/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00124/AM12/ RLA File :04/24/040/00317/AM11/ Lic.No/Date:0410124882 13.06.2011   Decision :The Committee deliberated the written comments of DHI received  vide their UO No 3(40)/10­ TSW(B)/706  dated  22.12.2011  and  decided  to  ratify  the  norms  in  respect  of  the  subject  advance Export : The total weight of export product for three sets is 3108 MT & the same may be incorporated in the licence. The word “Auxiliaries” may be deleted from the description of export. Import : The equivalent Standard Input Output Norms is C­1742 1. Item No 1 – CS Plate – to be  allowed at 72 MT with 5 % wastage as per SION. 2. Item No. 2 – CS Seamless Pipe – to be allowed at 147.5 MT with 2% wastage as per SION. 3. Item No. 3 – AS Seamless Pipe – to be allowed at 20.7 MT with 2% wastage as per SION. 4. Item No. 4 – SS Seamless Pipe – to be allowed at 14.7 MT with 2% wastage as per SION. 5. Item No. 5 – Welding material – Allowed as applied for. 6. Item No. 6 – This is a component & may be allowed under GN­4.     47

Case No.:19/7/80­ALC2/2011

Party Name:PRANAV VIKAS (INDIA) LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00125/AM12/ RLA File :05/24/040/00090/AM12/ Lic.No/Date:0510293230 13.06.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated 24.01.2012 and decided to ratify the norms in respect of the subject advance authorization  on repeat basis as per Advance Authorization No.   0510288376    dated      20.04.2011 ratified  in  Norms  Committee  Meeting dated 10.01.2012. Details are as under:­ 1.      Quantity of import item at Sl. No. 1 to be allowed as applied for i.e. 7200 Nos. on net to net basis with accountability clause. 2.      Quantity of import item at Sl. No. 2 to be allowed as 42 Kgs. inclusive of 2 % wastage. 3.      Quantities of import items at Sl. No. 3 & 4  to be allowed as 1218 Kgs. &  194.6 Kgs. respectively inclusive of 3 % wastage. 4.      Quantities  of import items at Sl. No. 5, 6 & 7 to be allowed as 182.8 Kgs.,   504 Kgs. & 127.4 Kgs respectively  inclusive of 2 % wastage. 5.      Quantity of import item at Sl. No. 8 to be allowed as 2400 Nos. on net to net basis. However, duty free weight of this item may be allowed as 184 Kgs. inclusive of 5 % wastage. 6.      Total  quantities of import items from Sl. No.  9 to 11 put together to be allowed within 2 % of FOB value of exports.     48

Case No.:1/10/80­ALC2/2011

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00196/AM12/ RLA File :03/94/040/00231/AM12/ Lic.No/Date:0310635806 Defer

48 HQ File :01/80/050/00196/AM12/ RLA File :03/94/040/00231/AM12/ Lic.No/Date:0310635806 13.06.2011 Defer Date:06.03.2012 Decision : The Committee noted that a copy of firm’s reply dt.15.11.2011 has been sent to MCIT on 27.12.2011 and the case under their examination. The case is to be re­listed on 06.03.2012.   49

Case No.:20/7/80­ALC2/2011

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00126/AM12/ RLA File :05/23/040/00102/AM12/ Lic.No/Date:0510293271 14.06.2011 Defer Date:06.03.2012 Decision : The representative of the DHI informed that the products in the Advance Authorization are large and wastage is high and asked for a Team Visit to evaluate on wastage. The Committee, therefore, decided to send a team consisting of representatives of DHI, MSME & DDG and submit a report. The case is to be re­ listed on 06.03.2012.   50

Case No.:15/10/80­ALC2/2011

Party Name:LALITHA & COMPANY PAPER PRODUCTS PVT LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00210/AM12/ RLA File :09/24/040/00067/AM12/ Lic.No/Date:0910047134 15.06.2011 Defer Date:06.03.2012 Decision  :The  Committee  noted  that  the  firm  did  not  reply  to  this  office  letter  dated  27.12.2011.  The Committee, therefore, decided to remind the firm for expediting requsite information failing which  their case will be rejected without any further notice. The case is to be re­listed on 06.03.2012.   51

Case No.:41/7/80­ALC2/2011

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00147/AM12/ RLA File :05/23/040/00111/AM12/ Lic.No/Date:0510293870 20.06.2011 Defer Date:06.03.2012 Decision : The representative of the DHI informed that the products in the Advance Authorization are large and wastage is high and asked for a Team Visit to evaluate on wastage. The Committee, therefore, decided to send a team consisting of representatives of DHI, MSME & DDG and submit a report. The case is to be re­ listed on 06.03.2012.   52

Case No.:2/13/80­ALC2/2011

Party Name:RAJ ENGINEERING CO Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00247/AM12/ RLA File :03/95/040/00153/AM12/ Lic.No/Date:0310639510 30.06.2011 Defer Date:06.03.2012 Decision  :The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dt.17.01.2012  to  DIPP  for  their examination and comments. The case is to be re­listed on 06.03.2012.

Case No.:7/10/80­ALC2/2011

Party Name:PRANAV VIKAS (INDIA) LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00202/AM12/ RLA File :05/24/040/00138/AM12/ Lic.No/Date:0510297044 20.07.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated 24.01.2012 and decided to ratify the norms in respect of the subject advance authorization  on repeat basis as per Advance Authorization No.   0510288376    dated      20.04.2011 ratified  in  Norms  Committee  Meeting dated 10.01.2012. The details are as unde:­ 1.            Quantity of import item at Sl. No. 1 to be allowed as applied for i.e. 7200 Nos. on net to net basis

53 with accountability clause. 2.            Quantity of import item at Sl. No. 2 to be allowed as 42 Kgs. inclusive of 2 % wastage. 3.            Quantities of import items at Sl. No. 3 & 4  to be allowed as 1218 Kgs. &  194.6 Kgs. respectively inclusive of 3 % wastage. 4.            Quantities  of import items at Sl. No. 5, 6 & 7 to be allowed as 182.8 Kgs.,   504 Kgs. & 127.4 Kgs respectively  inclusive of 2 % wastage. 5.            Quantity of import item at Sl. No. 8 to be allowed as 2400 Nos. on net to net basis. However, duty free weight of this item to be allowed as 184 Kgs. inclusive of 5 % wastage. 6.            Total  quantities of import items from Sl. No.  9 to 11 put together to be allowed within 2 % of FOB value of exports.     54

Case No.:8/10/80­ALC2/2011

Party Name:NEUMAN & ESSER ENGINEERING (INDIA) PVT LTD Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00203/AM12/ RLA File :31/82/040/00099/AM12/ Lic.No/Date:3110049329 20.07.2011 Defer Date:06.03.2012 Decision : The Committee noted  that the firm’s did not attend the Personal Hearing on 24.01.2012.  The Committee again decided to advise the firm to appear before the NC to explain their case in person regarding manufacturing activities involved in the project. The case may be re­listed on 06.03.2012.   55

Case No.:3/13/80­ALC2/2011

Party Name:J PAN TUBULAR COMPONENTS PVT.LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00248/AM12/ RLA File :05/23/040/00167/AM12/ Lic.No/Date:0510298976 08.08.2011 Defer Date:06.03.2012 Decision  :The  Committee  noted  that  the  firm  did  not  reply  to  this  office  letter  dated  27.12.2011.  The Committee, therefore, decided to remind the firm for expediting requisite information failing which their case will be rejected without any further notice. The case is to be re­listed on 06.03.2012.   56

Case No.:4/13/80­ALC2/2011

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00249/AM12/ RLA File :05/24/040/00169/AM12/ Lic.No/Date:0510299731 17.08.2011 Defer Date:06.03.2012   57

Case No.:5/13/80­ALC2/2011

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00250/AM12/ RLA File :05/24/040/00170/AM12/ Lic.No/Date:0510299733 17.08.2011 Defer Date:06.03.2012 Decision : The representative of the DHI informed the Committee that the case is under  examination. The   58

Case No.:4/19/80­ALC2/2011

Party Name:TITANIUM TANTALUM PRODUCTS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00372/AM12/ RLA File :04/24/040/00129/AM12/ Lic.No/Date:0410127409 25.08.2011 Defer Date:06.03.2012 h i d h h fi did l hi ffi l d d h

Decision  :  The  Committee  noted  that  the  firm  did  not  reply  to  this  office  letter  dated  28.12.2011.  The Committee, therefore, decided to remind the firm for expediting requisite information failing which  their case will be rejected without any further notice. The case is to be re­listed on 06.03.2012.     59

Case No.:5/19/80­ALC2/2011

Party Name:TITANIUM TANTALUM PRODUCTS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00373/AM12/ RLA File :04/24/040/00132/AM12/ Lic.No/Date:0410127411 25.08.2011 Defer Date:06.03.2012 Decision  :  The  Committee  noted  that  the  firm  did  not  reply  to  this  office    letter  dated  28.12.2011  for furnishing the information. The Committee, therefore, decided  to  remind  the  firm  for  expediting  requisite information failing which  their case will be rejected without any further notice. The case is to be re­listed on 06.03.2012.     60

Case No.:1/19/80­ALC2/2011

Party Name:SOLOGUARD MEDICAL DEVICES PVT LTD Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00369/AM12/ RLA File :04/24/040/00161/AM12/ Lic.No/Date:0410127648 30.08.2011   Decision  :The  Committee  deliberated  the  written  comments  of  C&PC  received    vide  their  OM No.46011/107/2011­PC­II dated 10.01.2012 and decided to ratify the norms in respect of the subject advance Item to be Exported Quantity Single Use 2ml / 5ml Syringes with needle 1 No. Raw­material  recommended  for Import Quantity / kg 1.      HDPE Granules 2.      Polypropylene Granules 3.      Bulk needles 4.      Printed Ink Black Gravure 5.      Paper 60 Gsm Bleached 6.      Paper 180 gsm Unbleached 7.      LDPE Plastic Film Natural 8.      Coated White Board 1.01 kg./kg content in the export product 1.01 kg./kg content in the export product Net to net 0.00007 gram As per packing policy As per packing policy As per packing policy As per packing policy     61

Case No.:16/24/85­ALC3/2011

Party Name:VELANKANI INFRASTRUCTURE & PROJECTS PVT LTD, Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/85/050/00138/AM12/ RLA File :07/24/040/00209/AM12/ Lic.No/Date:0710082007 05.09.2011 Defer Date: 06.03.2012 Decision : The Committee noted  that the firm’s application  has been returned by DHI.  The Committee decided to  advise the firm to  appear  in Personal Hearing   before  the  NC  to  explain  their  case  in  person alongwith name of the equipment and  No manufacturing activities. The case may be re­listed on 06.03.2012.   62

Case No.:2/19/80­ALC2/2011

Party Name:SREE ATREYA ENTERPRISES Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00370/AM12/ RLA File :04/24/040/00170/AM12/ Lic.No/Date:0410128603 27 09 2011 Defer Date:06 03 2012

27.09.2011 Date:06.03.2012 call for the following information/clarification from the firm and to re­list the case on  06.03.2012: ­ 1. The firm to submit in respect of Sl.No.11 of the Standard Deficiency Format.   63

Case No.:9/19/80­ALC2/2011

Party Name:MICRO TECH.CNC PRIVATE LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00377/AM12/ RLA File :07/24/040/00237/AM12/ Lic.No/Date:0710082914 29.09.2011 Defer Date:06.03.2012 Decision :The Committed noted that RA, Bangalore amendment sheet No. 1 dated 02.01.2012 forward to DHI for examination and comments. The case is to be re­listed on 06.03.2012.   64

Case No.:4/22/80­ALC2/2011

Party Name:DIAMOND METAL SCREENS (P) LTD Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00436/AM12/ RLA File :07/24/040/00251/AM12/ Lic.No/Date:0710082954 30.09.2011   Decision :The Committee deliberated the written comments of DIPP received  vide  their  UO  Note  dated 24.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Quantity of import item at Sl. No. 1 to be allowed as 61227 Kgs. inclusive of 10 % wastage after 1/3rd recovery of scrap. 2.      Quantity of import item at Sl. No. 2 to be allowed as 19058 Kgs. inclusive of 10 % wastage after 1/3rd recovery of scrap.     65

Case No.:15/19/80­ALC2/2011

Party Name:POLY MEDICURE LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00383/AM12/ RLA File :05/24/040/00234/AM12/ Lic.No/Date:0510304857 10.10.2011   Decision  :The  Committee  deliberated  the  written  comments  of  C&PC  received    vide  their  OM  No 46011/52/2009­PC­II  dated  11.01.2012  and  decided  to  ratify  the  norms  in  respect  of  the  subject  advance Item to be Exported Quantity Single Blood Bag Size 350 ml(NOA No. RITES/MSM/NACP/05/2010/406  dated 14.06.2011  for  supply  to  National  Aids Control Project) 1 No. Raw­material recommended for Import Quantity 1. PVC Sheet 1.25  kg/kg  of  PV  C  Sheet contained in the export product 2. Poly Carbonate resins/granules 1.05  kg./kg  content  in  the  export product 3. P.P. Granules 1.05  kg./kg  content  in  the  export product 4. Adenine Net+/­5% wastage 5. Blood Bag Labels Net+/­5% wastage 6. Relevant Needle­Stainless Steel Net+/­5% wastage 7.  For  1  kg  components/parts  made  of PVC d

PVC compound (i)   PVC Resin (ii)  Di­Octyl  Phthalate  (DOP)/Hexamoll Dinch (i)        Epoxidised Soylabean Oil (ii)   Calcium Zinc Stablizer (iii) Calcium Stearate   0.692 kg 0.324 kg   0.032 kg 0.010 kg 0.005 kg 8. Polyester Polylaminate Film As per packing Policy 9. Alumnium Pouch As per packing Policy     66

Case No.:21/22/80­ALC2/2011

Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00453/AM12/ RLA File :05/24/040/00236/AM12/ Lic.No/Date:0510304983 11.10.2011   Decision :The Committee deliberated and decided to ratify the norm for the subject advance authorization No. 0510304983 dated 11.10.2011 under GN­4 with accountability clause.     67

Case No.:1/16/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00318/AM12/ RLA File :03/94/040/00499/AM12/ Lic.No/Date:0310659138 12.10.2011   Decision :The Committee deliberated the written comments of DIPP received  vide  their  UO  Note  dated 24.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Net empty export weight of 23.12 MT  to be specified with the quantity of export product. 2.      Word “Relevant” to be prefixed with the description of import item at Sl. No. 1 and quantity of this item may be allowed as applied for i.e. 26035  Kgs. inclusive of 16 % wastage after 1/3rd recovery. 3.      Quantities of import items at Sl. Nos. 2, 3 & 4 ( Welding Consumables)  to be allowed as 225 Kgs. each.     68

Case No.:6/19/80­ALC2/2011

Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00374/AM12/ RLA File :05/23/040/00265/AM12/ Lic.No/Date:0510305825 18.10.2011 Defer Date:06.03.2012 Decision  :The  Committee  noted  that  the  firm  did  not  reply  to  this  office    letter  dated  27.12.2011  for furnishing the information. The Committee, therefore, decided  to  remind  the  firm  for  expediting  requisite information failing which their case will be rejected without any further notice. The case is to be re­listed on 06.03.2012.   69

Case No.:5/22/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00437/AM12/ RLA File :11/24/040/00034/AM12/ Lic.No/Date:1110026003 24.10.2011 Defer Date:06.03.2012 Committee therefore decided to defer the case and to re­list the case on 06 03 2012

Committee, therefore, decided to defer the case and to re list the case on 06.03.2012.   70

Case No.:7/22/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00439/AM12/ RLA File :11/24/040/00036/AM12/ Lic.No/Date:1110026004 24.10.2011 Defer Date:06.03.2012 Decision : The representative of the DHI informed the Committee that the case is under  examination. The   71

Case No.:27/22/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00459/AM12/ RLA File :61/24/040/00045/AM12/ Lic.No/Date:6110000698 24.10.2011 Defer Date:06.03.2012 Decision : The representative of the DHI informed the Committee that the case may be considered under repeat basis as per Advance Authorization No.6110000313.   72

Case No.:10/19/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00378/AM12/ RLA File :07/24/040/00252/AM12/ Lic.No/Date:0710083574 27.10.2011   Decision : The Committee deliberated the written comments of MCIT received  vide their UO No 17(100) 2011­IPHW dated 20.12.2011 and decided to ratify the norms in respect of the subject advance authorization on Net­to­Net basis with accountability clause.     73

Case No.:3/22/80­ALC2/2011

Party Name:NICOMET INDUSTRIES LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00435/AM12/ RLA File :03/95/040/00616/AM12/ Lic.No/Date:0310662448 31.10.2011   Decision :The Committee deliberated the written comments of DC(MSME) received  vide their UO Note No30(112)/2011­ME  dated  16.01.2012  and  decided  to  ratify  the  norms  in  respect  of  the  subject  advance   “The  import  of  Cobalt  Concentrate  is  allowed  as  1.0963  Kg/kg  content  in  cobalt  concentrate  (On  cobalt concentrate basis) for export of 1 kg of cobalt metal.”

Case No.:16/19/80­ALC2/2011

Party Name:POLY MEDICURE LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00384/AM12/ RLA File :05/24/040/00252/AM12/ Lic.No/Date:0510307049 02.11.2011   Decision  :The  Committee  deliberated  the  written  comments  of  C&PC  received    vide  their  OM  No 46011/106/2009­PC­II dated 10.01.2012 and decided to ratify the norms in respect of the subject advance

74   Item to be Exported Quantity Close Wound Suction Unit (Polyvac Set) 1 No. Raw­material recommended for import Quantity 1. LDPE Granules   2. PP Granules   3. Relevant C­Clamp 4. Relevant Trocar 5. For  1  kg  Components/Parts  made of PVC Compound (i)                 PVC Resin (ii)               Dioctyl Phthalate(DIO) (iii)             Dioctyl Adipate (DOA) (iv)             Epoxidised Soyabean Oil (v)               Calcium Zinc Stabilizer (vi)             Calcium Stearate 6. Medical Kraft Paper 7. Polyester Polylaminate Film 1.05  kg/kg  content  in  the export product 1.05  kg/kg  content  in  the export product Net+/­2% wastage Net+/­2% wastage     0.704 kg 0.330 kg 0.0165 kg 0.033 kg 0.0110 kg 0.0055 kg As per packing Policy As per packing Policy     75

Case No.:6/22/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00438/AM12/ RLA File :11/24/040/00033/AM12/ Lic.No/Date:1110026067 03.11.2011 Defer Date:06.03.2012   76

Case No.:41/22/80­ALC2/2011

Party Name:JAYANITA EXPORTS PVT. LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00473/AM12/ RLA File :05/23/040/00287/AM12/ Lic.No/Date:0510307107 03.11.2011   Decision :The Committee deliberated the written comments of DIPP received  vide  their  UO  Note  dated 24.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Quantities of import items  at Sl. No. 1, 2 & 3  to be allowed as applied for on net to net basis with accountability clause. 2.      Quantity of import item at Sl. No. 4 (Glue) to  be allowed as applied for i.e. 5 Kgs..     77

Case No.:11/19/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00379/AM12/ RLA File :04/24/040/00222/AM12/ Lic.No/Date:0410130298 15.11.2011 Defer Date:06.03.2012

78

Case No.:11/22/80­ALC2/2011

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00443/AM12/ RLA File :05/23/040/00282/AM12/ Lic.No/Date:0510308174 16.11.2011 Defer Date:06.03.2012 Decision : The representative of the DHI informed that the products in the Advance Authorization are large and wastage is high and asked for a Team Visit to evaluate on wastage. The Committee, therefore, decided to send a team consisting of representatives of DHI, MSME & DDG and submit a report. The case is to be re­ listed on 06.03.2012.   79

Case No.:13/19/80­ALC2/2011

Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00381/AM12/ RLA File :05/24/040/00279/AM12/ Lic.No/Date:0510308223 17.11.2011   Decision : On the recommendation of DHI representative present in the meeting,  and committee decided to ratify the norms in respect of the subject advance authorization  as per GN­4 for Engineering Products.     80

Case No.:14/19/80­ALC2/2011

Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00382/AM12/ RLA File :05/24/040/00280/AM12/ Lic.No/Date:0510308225 17.11.2011   Decision : On the recommendation of DHI representative present in the meeting,  and committee decided to ratify the norms in respect of the subject advance authorization  as per GN­4 for Engineering Products.     81

Case No.:17/22/80­ALC2/2011

Party Name:PRANAV VIKAS (INDIA) LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00449/AM12/ RLA File :05/24/040/00278/AM12/ Lic.No/Date:0510308694 21.11.2011   Decision :The Committee deliberated the written comments of DIPP received  vide  their  UO  Note  dated 24.01.2012 and decided to ratify the norms in respect of the subject advance authorization on repeat basis as per Advance Authorization No.0510288376  dated   20.04.2011 ratified in Norms Committee Meeting dated 10.01.2012. The details are as under:­   1.            Quantity of import item at Sl. No. 1 to be allowed as applied for i.e. 14400 Nos. on net to net basis with accountability clause. 2.            Quantity of import item at Sl. No. 2 to be allowed as 84 Kgs. inclusive of 2 % wastage. 3.            Quantities of import items at Sl. No. 3 & 4  to be allowed as 2436 Kgs. &  389.2 Kgs. respectively inclusive of 3 % wastage. 4.            Quantities  of import items at Sl. No. 5, 6 & 7 to be allowed as 365.6 Kgs.,   1008 Kgs. & 254.8 Kgs respectively  inclusive of 2 % wastage. 5.            Quantity of import item at Sl. No. 8 to be allowed as 4800 Nos. on net to net basis. However, duty free weight of this item to be allowed as 368 Kgs. inclusive of 5 % wastage. 6.            Total  quantities of import items from Sl. No.  9 to 11 put together to be allowed within 2 % of FOB value of exports.  

82

Case No.:18/22/80­ALC2/2011

Party Name:NEUMAN & ESSER ENGINEERING (INDIA) PVT LTD Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00450/AM12/ RLA File :31/82/040/00246/AM12/ Lic.No/Date:3110051581 22.11.2011 Defer Date:06.03.2012 Decision :  The  Committee  noted    that  the  firm’s  application  has  been  sent  to  DIPP  on  28.11.2011.    The Committee decided to advise the firm to again appear before the NC to explain their case in person regarding manufacturing activities involved in the project. The case may be re­listed on 06.03.2012.     83

Case No.:13/22/80­ALC2/2011

Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00445/AM12/ RLA File :05/23/040/00318/AM12/ Lic.No/Date:0510309896 30.11.2011   Decision : On the recommendation of DHI representative present in the meeting,  and committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Item No. 1 to 7, 10 and 11 allowed under GN­4 for engineering product. 2.      Item 8 & 9 allowed on net to net basis with accountability clause.     84

Case No.:31/22/80­ALC2/2011

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00463/AM12/ RLA File :03/95/040/00656/AM12/ Lic.No/Date:0310668209 30.11.2011   Decision :The Committee deliberated the written comments of DIPP received  vide  their  UO  Note  dated 24.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Net export weight of 300 MT to be specified with the quantity of export product. 2.       Import items at Sl. Nos. 1, 2 &  3 shall be of relevant grade and thickness as contained in the export product 3.      Quantities of import items at from Sl. No 1 & 3 to be allowed as applied for i.e. 205682 Kgs. & 22063 Kgs. respectively inclusive of a wastage of 3 %. 4.      Quantity of import item at Sl. No 2 to be allowed as 54788 Kgs. inclusive of a wastage of 15 % after 1/3rd recovery. 5.      Weight of 30.3  MT to be specified with the quantity of import item at Sl. Nos. 4 and this item to be allowed on net to net basis with accountability clause. 6.      Quantities of import items from Sl. Nos. 5 to 10 (welding Consumables) to be allowed as applied for i.e. 2000 Kgs., 1600 Kgs., 1050 Kgs., 6883 Kgs. , 1144 Kgs.   & 4744   Kgs. respectively.     85

Case No.:14/22/80­ALC2/2011

Party Name:ANAND EXPORTS Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00446/AM12/ RLA File :06/24/040/00041/AM12/ Lic.No/Date:0610024849 01.12.2011   Decision : On the recommendation of DHI representative present in the meeting,  the  Committee decided to ratify the norms in respect of the subject advance authorization  as per GN­4 for Engineering Products.

  86

Case No.:24/22/80­ALC2/2011

Party Name:UNITED ENGINEERING (EASTERN)CORPN., Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00456/AM12/ RLA File :02/24/040/00151/AM12/ Lic.No/Date:0210170116 01.12.2011 Defer Date:06.03.2012 Decision :The Committee noted that the firm’s application has been sent to DHI on 12.01.2012. However, the committee decided to forward a copy of firm’s application to DC(MSME) for examination and comments, as the case pertains to them. The case is to be re­listed on 06.03.2012.   87

Case No.:8/22/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00440/AM12/ RLA File :04/24/040/00217/AM12/ Lic.No/Date:0410131227 02.12.2011   ratify the norms on repeat basis as per advance authorization No.0410118621 dt.04.11.2010.     88

Case No.:28/22/80­ALC2/2011

Party Name:ENGINEERS TRIO Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00460/AM12/ RLA File :30/24/040/00045/AM12/ Lic.No/Date:3010081270 02.12.2011 Defer Date:06.03.2012 Decision : The Committee noted that the firm’s application has been sent to DHI on 11.01.2012. However, the committee decided to forward a copy of firm’s application to DC(MSME) for examination and comments, as the case pertains to them. The case is to be re­listed on 06.03.2012.   89

Case No.:42/22/80­ALC2/2011

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00474/AM12/ RLA File :07/24/040/00343/AM12/ Lic.No/Date:0710084372 02.12.2011 Defer Date:06.03.2012 Decision : The Committee noted that the application received from the firm is incomplete. The Committee decided to inform the RA/firm about it and request for complete information. The case is to be re­listed on 06.03.2012.   90

Case No.:12/22/80­ALC2/2011

Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00444/AM12/ RLA File :05/23/040/00334/AM12/ Lic.No/Date:0510310395 07.12.2011 Defer Date:06.03.2012 Decision : On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  06.03.2012: ­   1.      Firm to submit information in respect of Sl.No.4,5 and 11 of the Standard Deficiency Format.

Case No.:16/22/80­ALC2/2011

Party Name:GAS TECH PROCESS ENGINEERING INDIA PVT. LTD., Meet No/Date:22/80­ ALC2/2011 24 01 2012 Status: Deferred

91 24.01.2012 HQ File :01/80/050/00448/AM12/ RLA File :05/23/040/00329/AM12/ Lic.No/Date:0510310399 07.12.2011 Defer Date:06.03.2012 Decision  :The  Committee  noted  that  the  firm  did  not  replied  to  this  office  letter  dated  11.01.2012  for furnishing  the  information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said information failing which  their case will be rejected without any further notice. The case is to be re­listed on 06.03.2012.   92

Case No.:20/22/80­ALC2/2011

Party Name:PERSANG ALLOY INDUSTRIES PVT LTD Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00452/AM12/ RLA File :34/24/040/00185/AM12/ Lic.No/Date:3410032430 07.12.2011 Defer Date:06.03.2012 Decision : As per  DC(MSME) UO note No.30(113) 2011­ME dated 16.01.2012 and the committee decided to ask the following information from the firm:   1. Process flow chart indicating process of manufacturing, stage wise wastage for export product. 2. Reason to importing primary product at Sl. No.1 and 4 in shape of bar. 3. Size, Specification and composition of export product.   93

Case No.:32/22/80­ALC2/2011

Party Name:H.L.EQUIPMENTS Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00464/AM12/ RLA File :52/24/040/00040/AM12/ Lic.No/Date:5210037266 07.12.2011 Defer Date:06.03.2012 Decision : On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  06.03.2012: ­ 1. Firm to submit information in respect of Sl.No.4,5 and 11 of the Standard Deficiency Format Export product wise.   94

Case No.:10/22/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00442/AM12/ RLA File :04/24/040/00231/AM12/ Lic.No/Date:0410131397 09.12.2011 Defer Date:06.03.2012   95

Case No.:15/22/80­ALC2/2011

Party Name:LIFELONGINDIA LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00447/AM12/ RLA File :05/23/040/00327/AM12/ Lic.No/Date:0510310610 09.12.2011 Defer Date:06.03.2012 Decision : The Committee noted that the firm’s application has been sent to DIPP on 05.01.2012. However, the committee decided to forward a copy of firm’s application to C&PC for examination and comments, as the case pertains to them. The case is to be re­listed on 06.03.2012.   96

Case No.:9/22/80­ALC2/2011

Party Name:MOTHERSON TECHNO TOOLS LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00441/AM12/ RLA File :05/24/040/00315/AM12/ Lic.No/Date:0510311119 13.12.2011 Defer Date:06.03.2012 Decision  :  The  Committee  noted  that  the  firm’s  application  has  been  sent  to  DHI  on  05.01.2012  for

examination and comments. The case is to be re­listed on 06.03.2012.   97

Case No.:25/22/80­ALC2/2011

Party Name:ALLMINERAL ASIA PRIVATE LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00457/AM12/ RLA File :02/24/040/00150/AM12/ Lic.No/Date:0210171021 16.12.2011 Defer Date:06.03.2012 Decision : The Committee noted that the firm did not reply vide this office letter  dated 16.01.2012. The Committee, therefore, decided to remind the firm for expediting requisite information failing which their case will be rejected without any further notice. The case is to be re­listed on 06.03.2012.

Case No.:26/22/80­ALC2/2011

Party Name:H.L.EQUIPMENTS Meet No/Date:22/80­ ALC2/2011 Status: D f d

102 ALC2/2011 24.01.2012 Deferred HQ File :01/80/050/00458/AM12/ RLA File :52/24/040/00042/AM12/ Lic.No/Date:5210037449 16.12.2011 Defer Date:06.03.2012 Decision : On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  06.03.2012: ­   1. Firm to submit information in respect of Sl.No.4,5 and 11 of the Standard Deficiency Format Export product wise.   103

Case No.:34/22/80­ALC2/2011

Party Name:MAHINDRA NAVISTAR ENGINES PVT. LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00466/AM12/ RLA File :03/95/040/00731/AM12/ Lic.No/Date:0310671168 16.12.2011 Defer Date:06.03.2012 Decision  :  The  Committee  noted  that  the  firm’s  application  has  been  sent  to  DHI  on  16.01.2012  for examination and comments. The case is to be re­listed on 06.03.2012.   104

Case No.:30/22/80­ALC2/2011

Party Name:SUPERMAX PERSONALCARE PRIVATE LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00462/AM12/ RLA File :03/95/040/00732/AM12/ Lic.No/Date:0310671588 19.12.2011 Defer Date:06.03.2012 Decision  :  The  Committee  noted  that  the  firm’s  application  has  been  sent  to  MSME  on  17.01.2012. However,  the  committee  decided  to  forward  a  copy  of  firm’s  application  to  DIPP  for  examination  and comments, as the case pertains to them. The case is to be re­listed on 06.03.2012.   105

Case No.:40/22/80­ALC2/2011

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00472/AM12/ RLA File :04/24/040/00246/AM12/ Lic.No/Date:0410131869 20.12.2011 Defer Date:06.03.2012 Decision  :The  representative  of  the  DC(MSME)  informed  the  Committee  that  the  case  is  under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 06.03.2012.   106

Case No.:35/22/80­ALC2/2011

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00467/AM12/ RLA File :07/24/040/00371/AM12/ Lic.No/Date:0710084884 21.12.2011 Defer Date:06.03.2012 Decision  :  The  representative  of  the  DC(MSME)  informed  the  Committee  that  the  case  is  under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 06.03.2012.   107

Case No.:33/22/80­ALC2/2011

Party Name:NICOMET INDUSTRIES LTD. Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00465/AM12/ RLA File :03/95/040/00758/AM12/ Lic.No/Date:0310672301 22.12.2011   Decision : The Committee deliberated the written comments of DC(MSME) received  vide their UO Note No30(112)/2011­ME dated  16.01.2012 and  decided to  ratify  the  norms  in  respect  of  the  subject  advance   “The import of Cobalt  Concentrate  is  allowed  as  1.0963  Kg/kg  content  in  cobalt  concentrate  (On  cobalt t t b i ) f t f 1 k f b lt t l ”

concentrate basis) for export of 1 kg of cobalt metal.”     108

Case No.:36/22/80­ALC2/2011

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00468/AM12/ RLA File :07/24/040/00370/AM12/ Lic.No/Date:0710084928 22.12.2011 Defer Date:06.03.2012 Decision  :  The  representative  of  the  DC(MSME)  informed  the  Committee  that  the  case  is  under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 06.03.2012.   109

Case No.:37/22/80­ALC2/2011

Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00469/AM12/ RLA File :05/24/040/00328/AM12/ Lic.No/Date:0510312194 23.12.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated 24.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   Advance  Authorization  to  be  ratified  as  under  on  repeat  basis  as  per  Advance  Authorization  No. 0510295994 dated 07.07.2011 ratified in Norms Committee Meeting No. 09/12 dated 26/07/2011:    1.       Net weight of export product to be specified as 345.6 Kgs. 2.      Quantity of import item to be allowed as 1451.5 Kgs. inclusive of 320% wastage after taking 6% recovery from scrap     110

Case No.:38/22/80­ALC2/2011

Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00470/AM12/ RLA File :05/24/040/00327/AM12/ Lic.No/Date:0510312193 23.12.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their UO Note dated 24.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   Advance  Authorization  to  be  ratified  as  under  on  repeat  basis  as  per  Advance  Authorization  No. 0510265105 dated 01.06.2010 ratified in Norms Committee Meeting No. 37/11 dated 08.02.2011.   1.       Net weight of export product to be specified as 383.8 Kgs. 2.             Quantity of import item to be allowed as 1681 Kgs. inclusive of 338% wastage after taking 6% recovery from scrap.     111

Case No.:1/22/80­ALC2/2011

Party Name:GUDEL INDIA PRIVATE LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Approved HQ File :01/80/050/00433/AM12/ RLA File :31/82/040/00285/AM12/ Lic.No/Date:3110052171 30.12.2011   Decision :On the recommendation of DHI representative present in the meeting, the committee decided to ratify the norm on Net to Net basis with accountability clause.

  112

Case No.:2/22/80­ALC2/2011

Party Name:TEMA INDIA LIMITED Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00434/AM12/ RLA File :03/95/040/00814/AM12/ Lic.No/Date:0310673988 02.01.2012 Defer Date:06.03.2012 Decision : On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  06.03.2012: ­   1. Firm to submit information in respect of Sl.No.4,5 and 11 of the Standard Deficiency Format.   113

Case No.:29/22/80­ALC2/2011

Party Name:BROSE INDIA AUTOMOTIVE SYSTEMS PVT LTD Meet No/Date:22/80­ ALC2/2011 24.01.2012 Status: Deferred HQ File :01/80/050/00461/AM12/ RLA File :31/83/040/00196/AM12/ Lic.No/Date:3110052234 04.01.2012 Defer Date:06.03.2012 Decision  :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments. The case may be re­listed on 06.03.2012.   S.No.520

Case  No.    A/R­

136 M/s. Bharat Heavy Electricals  Ltd., Haridwar HQ F.No.01/80/50/00319/AM10/DES.I Lic. No. & date Meeting No. 22/12 RA.F.No.61/24/040/00020/AM10 6110000343 dt.19.08.2009 Date: 24.01.2012 Ratification of norms   The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The  Committee, therefore, decided to defer the case and to re­list the case on 06.03.2012.   S.No.521

Case  No.    A/R­

18 M/s. Theyssenkrup Industries  India Pvt. LTd., Pune HQF.No.01/80/050/00022/AM11/DES.I Lic. No. & date Meeting  No. 22/12 RA.F.No.31/24/040/00198/AM10 3110041936 dt.15.02.2010 Date: 24.01.2012   The Committee noted that the firm did not furnish the replied vide this office letter dated 09.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice. The case is to be re­listed on 06.03.2012   S.No.522

Case  No.    A/R­

20 M/s.  Marks  Pryor Marketing Technology  Pvt. LTd., HQF.No.01/80/050/00827/AM10/DES.I Lic. No. & date Meeting  No. 22/12 RA.F.No.31/24/040/00213/AM10 3110042306 dt.10.03.2010   Date: 24.01.2012   The representative of the DHI informed the Committee that the case is under  examination. The Committee,   S.No.523

Case  No.    A/R­

23 M/s.  Bharat Heavy Electricals d id HQF.No.01/80/050/00232/AM11/DES.I Lic. No. & date

Ltd., Haridwar Meeting  No. 22/12 RA.F.No.61/24/040/00024/AM11 6110000457 dt.17.06.2010   Date: 24.01.2012   On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms on repeat basis as per advance authorization No.6110000286 dt. 06.02.2009.     S.No.524

Case  No.   A/R­

58 M/s.  Elecon Engineering Co.  Ltd., Gujarat HQF.No.01/80/162/0000518/AM11/DES.I Lic. No. & date Meeting  No. 22/12 RA.F.No.34/82/042/00007/AM04 3410008330 dt.29.08.2003 Date: 24.01.2012   The representative of the DHI informed the Committee that the case is under  examination. The Committee,     S.No.525

Case  No.    A/R­

63 M/s.  The Saraswati Industrial Syndicate  Ltd., New Delhi HQF.No.01/81/050/00052/AM08/DES.I Lic. No. & date Meeting  No. 22/12 RA.F.No.05/24/040/01081/AM07 0510202875 dt.24.04.2007 Date: 24.01.2012 Revision of norms   The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The  Committee,   S.No.526

Case  No.    A/R­

139 M/s.  Cartoon Sanitation Pvt. Ltd., Mathura(UP) HQF.No.01/80/050/00824/AM11/DES.I Lic. No. & date Meeting  No. 22/12 RA.F.No.06/24/040/00056/AM11 0610020559 dt.12.01.2011 Date: 24.01.2012   The Committee noted that the firm’s reply dated09.12.2011 has been sent to DIPP on 27.12.2011 and case is under examination with DIPP. The case is to be re­listed on 06.03.2012.   S.No.527

Case  No.    A/R­

140 M/s.  G.B. Engineering  Pvt. LTd., Tiruchirapalli HQF.No.01/80/050/00682/AM11/DES.I Lic. No. & date Meeting  No. 22/12 RA.F.No.04/24/040/00196/AM11 0410119183 dt.25.11.2010 Date: 24.01.2012   The Committee noted that the firm’s reply dated 20.12.2011 has been sent to DHI on 28.12.2011 and case is under examination with DHI. The case is to be re­listed on 06.03.2012.   S.No.528

Case  No.    A/R­

141 M/s.  Atherm Thermal  Solutions India  Pvt.  Ltd., Bangalore HQF.No.01/80/050/00882/AM11/DES.I Lic. No. & date Meeting  No. 22/12 RA.F.No.07/24/040/00463/AM11 0710077971 dt.10.03.2011 Date: 24.01.2012   The Committee deliberated the written comments of DC(MSME) received vide their UO Note No 30(84) 2011­

The Committee deliberated the written comments of DC(MSME) received  vide their UO Note No.30(84) 2011 ME dated 19.12.2011 and decided to ratify the norms in respect of the subject advance authorization on Net­to­Net basis with accountability clause.     S.No.529

Case  No.    A/R­

153 M/s.  Maini Precision  Products Pvt. Ltd., Bangalore HQF.No.01/80/050/00147/AM06/DES.I Lic. No. & date Meeting  No. 22/12 RA.F.No.07/24/040/00091/AM06 0710037715 dt.09.05.2005 Date: 24.01.2012   The Committee noted that the firm’s reply dated 13.01.2012 has been sent to DIPP on 16.01.2012 and case is under examination with DIPP. The case is to be re­listed on 06.03.2012.       S.No.530 CaseNo.A/R­156 M/s.  Lloyd Electric  & Engineering  Ltd., New Delhi HQF.No.01/80/050/00101/AM12/DES.I Lic. No. & date Meeting No. 22/12 RA.F.No.05/23/040/00076/AM12 0510292264 dt.31.05.2011 Date: 24.01.2012 Revision of norms   The Committed noted that the firm’s representation has been sent to DIPP for examination and comments and case is under examination with DIPP. The case is to be re­listed on 06.03.2012.   S.No.531 CaseNo.A/R­157 M/s.  Boysen India  Limited, Noida HQF.No.01/80/050/00782/AM11/DES.I Lic. No. & date Meeting No. 22/12 RA.F.No.05/23/040/00316/AM11 0510282994 dt.03.02.2011 Date: 24.01.2012 Revision of norms   Based on the recommendation of DHI representative present in the meeting, the Committee decided to  reject the request of the firm.     S.No.532 CaseNo.A/R­158 M/s.  Boysen India  Limited, Noida HQF.No.01/80/050/00035/AM12/DES.I Lic. No. & date Meeting No. 22/12 RA.F.No.05/23/040/00037/AM12 0510288928 dt.17.04.2011 Date: 24.01.2012 Revision of norms   Based on the recommendation of DHI representative present in the meeting, the Committee decided to  reject the request of the firm.     S.No.533 CaseNo.A/R­159 M/s.  The Saraswati Industrial

norms   Based on the recommendation of DHI representative present in the meeting, the Committee decided to  reject the request of the firm.     S.No.533 CaseNo.A/R­159 M/s.  The Saraswati Industrial Syndicate Ltd.,  HQF.No.01/80/050/00082/AM11/DES.I Lic. No. & date Meeting No. 22/12 RA.F.No.05/24/040/00020/AM12 0510272363 dt.08.09.2010 Date: 24.01.2012 Revision of norms   On the recommendation of DIPP representative present in the meeting, the Committee decided to correct export weight as 750.29 MT.     S.No.534 CaseNo.A/R­160 M/s.  Shakti Pumps India P HQF.No.01/80/050/00150/AM12/DES.I Lic. No. & date Meeting No 22/12 RA F No 11/24/040/00031/AM11 1110024619

Pumps  India  P. Ltd., Indore  Meeting No. 22/12 RA.F.No.11/24/040/00031/AM11 1110024619 dt.27.04.2011 Date: 24.01.2012 Revision of norms   The  representative  of  the  DIPP  informed  the  Committee  that  the  case  is  under    examination.  The  Committee,     S.No.535 CaseNo.A/R­161 M/s.  The  Indure P.  Ltd., Bangalore  HQF.No.01/80/050/00089/AM11/DES.I Lic. No. & date Meeting No. 22/12 RA.F.No.05/24/040/00020/AM11 0510264158 dt.12.05.2010 Date: 24.01.2012 Revision of norms   The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The  Committee,     S.No.536 CaseNo.A/R­162 M/s.  Bharat Heavy  Electricals LTd., Haridwar  HQF.No.01/80/050/00529/AM11/DES.I Lic. No. & date Meeting No. 22/12 RA.F.No.61/24/040/00030/AM11 6110000473 dt.15.07.2010 Date: 24.01.2012 Revision of norms

harat Heavy  Electricals LTd., Haridwar  HQF.No.01/80/050/00529/AM11/DES.I Lic. No. & date Meeting No. 22/12 RA.F.No.61/24/040/00030/AM11 6110000473 dt.15.07.2010 Date: 24.01.2012 Revision of norms   On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms on repeat basis as per advance authorization No.6110000286 dt. 06.02.2009.       S.No.537 CaseNo.A/R­163 M/s.  Bharat Heavy  Electricals LTd., Haridwar  HQF.No.01/80/050/00870/AM11/DES.I Lic. No. & date Meeting No. 22/12 RA.F.No.61/21/040/00002/AM11 6110000573 dt.01.03.2011 Date: 24.01.2012 Revision of norms   On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms on repeat basis as per advance authorization No.6110000286 dt. 06.02.2009.       S.No.538 CaseNo.A/R­164 M/s.  Bharat Heavy  Electricals LTd., Bhopal HQF.No.01/80/050/00226/AM11/DES.I Lic. No. & date Meeting No. 22/12 RA.F.No.11/24/040/00011/AM11 1110022638 dt.18.06.2010 Date: 24.01.2012 Revision of norms   The representative of the DHI informed the Committee that the case is under  examination. The Committee,       Sl.No.177

Case No. C­ 17

M/s. Lucas  TVS Ltd., Chennai received through  DC(MEPZ­SEZ), Chennai F.No. 01/81/80/162/00379/AM10/DES.I Meeting No.22/12 Fixation  of  regular  wastage  norms  for manufacturing  of  different  types  of  “Starter, Alterator, Wiper Motor and Compressor”. Date: 24.01.2012   The  representative  of  the  firm  Shri  S.  Emperumanar,  Officer  (Finance)  attended  the  Personal  Hearing  and explained the details of the case. The Committee noted that the firm’s representative had shown product samples to DHI representative in the meeting and firm had to incorporate certain amendments in their calculations and submit to DHI. The case is to be re­listed on 06.03.2012.   S.No.178

Case No. C­01

M/s.  BOSCH  Limited, Bangalore  F.No.01/80/162/1193/AM09/DES.I Meeting No. 22/12 Fixation  of  SION  for  the  export  product  “Common  Rail Injector Parts” Date: 24.01.2012   The  Committee  noted  that  firm  reply  dated  10.12.2011  has  been  sent  to  DHI  on  27.12.2011  and  reply dt.10.01.2012 also forward to DHI and case is under examination. The case is to be re­listed on 06.03.2012.   S.No.179

Case No. C­ 04

M/s.  International  Tubular Services  (India)  Pvt.  Ltd., Taloja  F.No.01/80/162/00007/AM12/DES.I Meeting No. 22/12 Fixation of wastage norms for the export product “4 ¾ Energie Jar (Parts of Oil Field Equipment / Drilling Machinery) and components in respect of 100% EOU Date: 24.01.2012   The representative of the DHI informed in the meeting informed that the case will be examined after the proposed visit  to  M/s.  Botil  Oil  Tools  India  Pvt.  Ltd.,  New  Delhi  as  is  a  similar  case.  The  case  is  to  be  re­listed  on 06.03.2012.   S.No.180

Case No.  C ­ 07

M/s.  BOSCH Limited, Bangalore HQF.No.01/80/162/00683/AM10/DES.I Meeting No. 22/12 Request for fixation of SION for the export product “Viz. Common Rail Pump” Date: 24.01.2012   The representative of the DHI informed the Committee that the case is under  examination. The Committee,   S.No.181

Case No.  C ­ 08

M/s.  Ultra  Engineers, Pune HQF.No.01/80/162/00262/AM12/DES.I Meeting No. 22/12 Fixation  of  wastage  norms  for  special  Brand  Rate  Duty Draw Back against deemed export” Date: 24.01.2012   The Committee noted the written comments of DIPP dated 24.01.2012 and decided to seek comments from RA, Pune as to why ratification of NC is required in the cases when the “Special Brand Rate Duty Draw Back to 100% EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.     S.No.182

Case No.  C ­ 09

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00263/AM12/DES.I Meeting No. 22/12 Fixation  of  wastage  norms  for  special  Brand  Rate Duty Draw Back against deemed export” Date: 24.01.2012   EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.   S.No.183

Case No.  C ­ 10

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00249/AM12/DES.I Meeting No. 22/12 Fixation  of  wastage  norms  for  special  Brand  Rate Duty Draw Back against deemed export” Date: 24.01.2012   EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.

S.No.184

Case No.  C ­ 20

M/s.  ITS  India  Pvt. Ltd.,  Taloja (Mahrashtra) HQF.No.01/80/162/00287/AM12/DES.I Meeting No. 22/12 Fixation of input output norms for the export product “6 ½  Energie Jar (Parts of Oil Field Equipment/ Drilling Machinery) and components thereof”. Date: 24.01.2012   The representative of the DHI informed in the meeting informed that the case will be examined after the proposed visit  to  M/s.  Botil  Oil  Tools  India  Pvt.  Ltd.,  New  Delhi  as  is  a  similar  case.  The  case  is  to  be  re­listed  on 06.03.2012.   S.No.185

Case No.  C ­ 21

M/s.  ITS  India  Pvt. Ltd.,  Taloja (Mahrashtra) HQF.No.01/80/162/00234/AM12/DES.I Meeting No. 22/12 Fixation  of  ad­hoc  norms  under  para  6.8(e)  of  FTP 2009­14 for the export product “ 8” Energie Energizaer (Parts of Oil field Equipment / Drilling Machinery) and components thereof”. Date: 24.01.2012   The representative of the DHI informed in the meeting informed that the case will be examined after the proposed visit  to  M/s.  Botil  Oil  Tools  India  Pvt.  Ltd.,  New  Delhi  as  is  a  similar  case.  The  case  is  to  be  re­listed  on 06.03.2012.   S.No.186

Case No.  C ­ 23

Reference  received from  PC­VI  of  M/s. Getrag Hi­Tech Gears Pvt.  TLd., Bhiwani(Rajasthan) HQF.No.01/80/92/180/NORMS/AM12/PC­VI/DES.I Meeting No. 22/12 Fixation of input output wastage norms for eh export product  “Timing  Gears”  in  respect  of  LOP  NO.03­ 129/99­100%EOU. Date: 24.01.2012   The representative of the DHI informed the Committee that the case is under  examination. The Committee, S.No.187

Case No.  C ­ 24

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00635/AM12/DES.I Meeting No. 22/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 24.01.2012   EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.   S.No.188

Case No.  C ­ 25

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00637/AM12/DES.I Meeting No. 22/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 24.01.2012   EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.   S.No.189

Case No.  C ­ 26

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00638/AM12/DES.I Meeting No. 22/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 24.01.2012   i fi d h b i f l d il f i h d b h fi h i b li d

EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.   S.No.190

Case No.  C ­ 27

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00639/AM12/DES.I Meeting No. 22/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 24.01.2012   EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.   S.No.191

Case No.  C ­ 28

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00640/AM12/DES.I Meeting No. 22/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 24.01.2012   EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.   S.No.192

Case No.  C ­ 29

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00636/AM12/DES.I Meeting No. 22/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 24.01.2012   EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.   S.No.193

Case No.  C ­ 30

M/s.  Ultra Engineers, Pune HQF.No.01/80/162/00634/AM12/DES.I Meeting No. 22/12 Fixation  of  wastage  norms  for  Special  Brand  Rate Duty  Draw  Back  against  Export  Supplies  to  100% EOU. Date: 24.01.2012   EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.     Sl.No.194

Case No.C­12

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00247/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.   Sl N 195

Sl.No.195

Case No.C­13

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00246/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.   Sl.No.196

Case No.C­14

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00245/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.   Sl.No.197

Case No.C­15

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00248/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   Pune as to why ratification of NC is required in the case  when the “Special Brand Rate Duty Draw Back to 100% EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.     Sl.No.198

Case No.C­16

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00243/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   Pune as to why ratification of NC is required in the case when the “Special Brand Rate Duty Draw Back to 100% EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.   Sl.No.199

Case No.C­17

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00244/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   Pune as to why ratification of NC is required in the case when the “Special Brand Rate Duty Draw Back to 100% EOU”  is  fixed  on  the  basis  of  actual  wastage  details  furnished  by  the  firm.  The  case  is  to  be  re­listed  on 06.03.2012.   Sl.No.200

Case No.  C – 34

M/s.  LEO  Primecomp HQ F.No.01/80/162/00914/AM12/DES­I

p Pvt. Ltd., Puducherry Q Meeting No.22/12 Fixation of input output norms for the export product  “Machined,  Assembled  and  Plastic Components  meant  for  Banking  Sector”    in respect of 100% EOU. Date: 24.01.2012   The  Committee  noted  that  the  firm’s  application  has  been  sent  to  DIPP  on  06.01.2012  for  examination  and comments and case under examination with DIPP. The case is to be re­listed on 06.03.2012.   Sl.No.201

Case No.  C – 35

M/s.  Poly  Medicure Ltd., Haryana HQ F.No.01/80/162/00947/AM12/DES­I Meeting No.22/12 Fixation of wastage norms in respect of 100% EOU. Date: 24.01.2012   The  Committee  noted  that  the  firm’s  application  has  been  sent  to  C&PC  on  16.01.2012  for  examination  and comments and case under examination with C&PC. The case is to be re­listed on 06.03.2012.


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6649 --apply.

Citation copied