IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2011-11-19

DGFT Committee Minutes

Document text

RATIFIED   Minutes of Meeting No.18/12 scheduled on 29.11.2011 of Norms Committee(NC­I) (DES.I Section)   The meeting No. 18/12 of the Norms Committee (NC­I) for the licensing year 2011­2012 was held on 29.11.2011 under the Chairmanship of Sh. N.P.S. Monga, Additional  Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 5. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.   I ­The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon are as under: ­ 1

Case No.:31/23/80­ALC2/2009

Party Name:HINDUSTAN AERONAUTICS LTD, Meet No/Date:18/80­ALC2/2011 29.11.2011 Status: Deferred HQ File :01/80/050/00353/AM10/ RLA File :07/24/040/00651/AM09/ Lic.No/Date:0710066776 02.09.2009 Defer Date:10.01.2012 Decision : The Committee noted that a D.O.letter has been sent to Min. of Defence on 17.11.2011 for expediting their comments.  The Committee, therefore, decided to send the reminder to Ministry of Defence for expediting their comments and to re­list the case on 10.01.2012.   2

Case No.:16/31/80­ALC2/2009

Party Name:SUTURES INDIA PRIVATE LIMITED, Meet No/Date:18/80­ALC2/2011 29.11.2011 Status: Deferred HQ File :01/80/050/00464/AM10/ RLA File :07/24/040/00263/AM10/ Lic.No/Date:0710067849 28.10.2009 Defer Date:10.01.2012 Decision :The Committee decided to issue a reminder to C&PC and also check of the status on phone and to re­list the case on 10.01.2012.   3

Case No.:21/39/80­ALC2/2009

Party Name:VEM TECHNOLOGIES P.LTD., Meet No/Date:18/80­ALC2/2011 29.11.2011 Status: Deferred HQ File :01/80/050/00617/AM10/ RLA File :09/24/040/00373/AM10/ Lic.No/Date:0910040368 18.12.2009 Defer Date:10.01.2012 Decision :The Committee noted that a D.O.letter has been sent to Min. of Defence on 17.11.2011 for expediting their comments.  The Committee, therefore, decided to send the reminder to Ministry of Defence for expediting their comments and to re­list the case on 10.01.2012.   4

Case No.:18/15/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED 29.11.2011 Status: Deferred HQ File :01/80/050/00225/AM11/ RLA File :04/24/040/00061/AM11/ Lic.No/Date:0410114584 15.06.2010 Defer Date:10.01.2012 Decision : The Committee noted the deficiency raised by DHI vide their U.O. Note No. 3(74)/10­TSW(B) dated 11.11.2011 and decided to seek the clarification/details from the firm.  The case may be re­listed on 10.01.2012.   5

Case No.:1/14/81­ALC2/2010

Party Name:FITCAST FOUNDERS & ENGINEERS PVT. LTD. 29.11.2011 Status: Deferred HQ File :01/81/050/00081/AM11/ RLA File :08/24/040/00082/AM11/ Lic.No/Date:0810089995 24.06.2010 Decision : The Committee decided to send the file to DIPP for examination and to re­list the case on 10.01.2012.   6

Case No.:24/22/80­ALC2/2010

Party Name:DEE DEVELOPMENT ENGINEERS LTD. 29.11.2011 Status: Approved HQ File :01/80/050/00335/AM11/ RLA File :05/23/040/00106/AM11/ Lic.No/Date:0510268585 21.07.2010   Decision : On the firm request vide their letter dated 08.11.2011, the Committee decided to ratify the norms of import items  in respect of the subject advance authorization on net to net basis with accountability clause as per GN­4 for engineering product.   The RLA may take necessary action accordingly.   7

Case No.:22/27/80­ALC2/2010

Party Name:MERIL LIFE SCIENCES PVT LTD 29.11.2011 Status: Rejected HQ File :01/80/050/00419/AM11/ RLA File :52/24/040/00008/AM11/ Lic.No/Date:5210031621 17.08.2010   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply to C&PC’s letter dated 24.11.2010, 26.09.2011 and this office final remainder dated 27.10.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.

  8

Case No.:40/31/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 29.11.2011 Status: Deferred HQ File :01/80/050/00518/AM11/ RLA File :09/24/040/00195/AM11/ Lic.No/Date:0910043236 24.08.2010 Defer Date:10.01.2012 Decision : The Committee decided to forward a copy of firm’s reply dated  02.09.2011 to DHI again for examination and comments.  The case may be re­listed on 10.01.2012.   9

Case No.:32/31/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. 29.11.2011 Status: Deferred HQ File :01/80/050/00510/AM11/ RLA File :06/24/040/00028/AM11/ Lic.No/Date:0610018929 30.08.2010 Defer Date:10.01.2012 Decision  :  :The  Committee  noted  that  a  D.O.  letter  has  been  sent  to  Min.  of  Defence  on  17.11.2011  for  expediting  their  comments.    The Committee, therefore, decided to send the reminder to Ministry of Defence for expediting their comments and to re­list the case on 10.01.2012.   10

Case No.:47/31/80­ALC2/2010

Party Name:SIEMENS ROLLING STOCK PVT.LTD. 29.11.2011 Status: Deferred HQ File :01/80/050/00525/AM11/ RLA File :03/95/040/00491/AM11/ Lic.No/Date:0310593387 22.09.2010 Defer Date:10.01.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 27.10.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  10.01.2012.   11

Case No.:42/31/80­ALC2/2010

Party Name:STARION INDIA P.LTD 29.11.2011 Status: Deferred HQ File :01/80/050/00520/AM11/ RLA File :31/24/040/00129/AM11/ Lic.No/Date:3110044900 06.10.2010 Defer Date:10.01.2012 Decision :The representative of the DIT informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 10.01.2012.   12

Case No.:17/41/81­ALC2/2010

LIMITED 29.11.2011 Status: Deferred HQ File :01/81/050/00436/AM11/ RLA File :09/24/040/00315/AM11/ Lic.No/Date:0910044003 21.10.2010 Defer Date:10.01.2012 Decision : The Committee decided to forward a copy of firm’s reply dated  05.09.2011 to DHI again for examination and comments.  The case may be re­listed on 10.01.2012.   13

Case No.:6/37/80­ALC2/2010

LIMITED 29.11.2011 Status: Deferred HQ File :01/80/050/00744/AM11/ RLA File :09/24/040/00384/AM11/ Lic.No/Date:0910044581 06.12.2010 Defer Date:10.01.2012 Decision : The Committee decided to forward a copy of firm’s reply dated  05.09.2011 to DHI again for examination and comments.  The case may be re­listed on 10.01.2012.   14

Case No.:2/37/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL 29.11.2011 Status: Deferred HQ File :01/80/050/00740/AM11/ RLA File :05/23/040/00293/AM11/ Lic.No/Date:0510281598 17.01.2011 Defer Date:10.01.2012 Decision:As per DHI U.O. Note No. 3(08)/11­TSW(B) dated 14.11.2011, the Committee decided to ask the firm to furnish catalogue of the export product highlighting the inputs as the difference is not clear and to re­list the case on 10.01.2012.   15

Case No.:21/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 29.11.2011 Status: Deferred HQ File :01/80/050/00759/AM11/ RLA File :09/24/040/00478/AM11/ Lic.No/Date:0910045222 25.01.2011 Defer Date:10.01.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 27.10.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  10.01.2012.   16

Case No.:23/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 29.11.2011 Status: Deferred HQ File :01/80/050/00761/AM11/ RLA File :09/24/040/00476/AM11/ Lic.No/Date:0910045224 25.01.2011 Defer Date:10.01.2012 Decision :  The Committee noted that the firm has sought time vide their letter dated 22.11.2011.  The Committee, therefore, decided to issue final reminder to the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­ listed on 10.01.2012.

17

Case No.:10/40/80­ALC2/2010

Party Name:GL&V INDIA PRIVATE LIMITED 29.11.2011 Status: Deferred HQ File :01/80/050/00860/AM11/ RLA File :31/24/040/00258/AM11/ Lic.No/Date:3110047111 25.02.2011 Defer Date:10.01.2012 Decision : The representative of the DC(MSME) informed the Committee that they have received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to re­list the case on 10.01.2012   18

Case No.:11/3/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:18/80­ALC2/2011 29.11.2011 Status: Approved HQ File :01/80/050/00016/AM12/ RLA File :03/94/040/00985/AM11/ Lic.No/Date:0310618433 28.02.2011   Decision : As per the written comments of  DHI  received  vide their U.O. Note No. 3(81)/10­TSW(B) dated 14.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   Export Item­    FM Bridge Carriage Assembly­ 4 sets.      The  total  export  weight  of 360 MT  may be incorporated in the license. Import 1.      Item no 1 to 18 except item no 8 & 9 are allowed under GN­4 with accountability clause. 2.      Item  no  8­(Al Bronze bars) To be allowed import of  10.5 kg  with 26% net wastage with 50% recovery. 3.       Item no 9 ­ (Al Bronze alloy) To be allowed import of 79 kg   with 50% net wastage with 50% recovery. 4.      Item no 19­ To be allow ed as per spares policy for item no 1.     19

Case No.:22/3/80­ALC2/2011

Party Name:TOSHIBA JSW TURBINE AND GENERATOR PRIVATE LIMITED 29.11.2011 Status: Rejected HQ File :01/80/050/00027/AM12/ RLA File :04/24/040/00299/AM11/ Lic.No/Date:0410122107 01.03.2011   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 28.09.2011and subsequent reminder dated 27.10.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.     20

Case No.:26/40/80­ALC2/2010

LIMITED 29.11.2011 Status: Deferred HQ File :01/80/050/00876/AM11/ RLA File :09/24/040/00553/AM11/ Lic.No/Date:0910045827 07.03.2011 Defer Date:10.01.2012 Decision : The Committee decided to forward a copy of firm’s reply dated  05.09.2011 to DHI again for examination and comments.  The case may be re­listed on 10.01.2012.   21

Case No.:28/40/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL 29.11.2011 Status: Deferred HQ File :01/80/050/00878/AM11/ RLA File :05/23/040/00348/AM11/ Lic.No/Date:0510285314 08.03.2011 Defer Date:10.01.2012 Decision : The Committee noted that the firm has replied vide their letter dated 14.06.2011 that import item No. 3 is used for manufacture of export item No. 1 & 2.  It has claimed wastage of 33% in dome given drawing. As per DHI U.O. Note No. 3(08)/11­TSW(B) dated 14.11.2011, the Committee decided to ask the firm the firm to furnish calculations supported by drawing and dimensions highlighted and to re­list the case on 10.01.2012.   22

Case No.:31/40/80­ALC2/2010

Party Name:L&T – MHI TURBINE GENERATORS PVT.LTD. 29.11.2011 Status: Deferred HQ File :01/80/050/00881/AM11/ RLA File :03/95/040/00926/AM11/ Lic.No/Date:0310620641 10.03.2011 Defer Date:10.01.2012 Decision  :The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  dated  28.10.2011  calling  for  certain  information.  The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 10.01.2012.   23

Case No.:21/3/80­ALC2/2011

Party Name:REALTIME TECHSOLUTIONS PVT.LTD., 29.11.2011 Status: Deferred HQ File :01/80/050/00026/AM12/ RLA File :07/21/040/00889/AM11/ Lic.No/Date:0710077962 10.03.2011 Defer Date:10.01.2012 Decision : The Committee decided to send the DL of DIT dated 28.11.2011 to the firm  for furnishing requisite information .  The case may be re­ listed  on 10.01.2012.   24

Case No.:2/6/80­ALC2/2011

Party Name:THE TATA POWER COMPANY LTD 29.11.2011 Status: Deferred HQ File :01/80/050/00079/AM12/ RLA File :07/21/040/00953/AM11/ Lic.No/Date:0710078147 21.03.2011 Defer Date:10.01.2012

Decision :The Committee observed that the comments called for from DIT are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 10.01.2012.   25

Case No.:17/9/80­ALC2/2011

LIMITED 29.11.2011 Status: Deferred HQ File :01/80/050/00185/AM12/ RLA File :09/24/040/00563/AM11/ Lic.No/Date:0910046078 25.03.2011 Defer Date:10.01.2012 Decision : The Committee decided to forward a copy of firm’s reply dated  20.09.2011 to DHI again for examination and comments.  The case may be re­listed on 10.01.2012.   26

Case No.:5/3/80­ALC2/2011

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. 29.11.2011 Status: Deferred HQ File :01/80/050/00010/AM12/ RLA File :05/23/040/00019/AM12/ Lic.No/Date:0510288064 13.04.2011 Defer Date:10.01.2012 Decision : The Committee decided to forward a copy of firm’s reply dated 25.11.2011 to DC(MSME) for examination and comments.  The case may be re­listed on 10.01.2012.   27

Case No.:8/3/80­ALC2/2011

Party Name:PRANAV VIKAS (INDIA) LTD. 29.11.2011 Status: Deferred HQ File :01/80/050/00013/AM12/ RLA File :05/24/040/00454/AM11/ Lic.No/Date:0510288376 20.04.2011 Defer Date:10.01.2012 Decision : The Committee decided to forward a copy of firm’s reply dated 25.11.2011 to DIPP for examination and comments.  The case may be re­listed on 10.01.2012.   28

Case No.:29/3/80­ALC2/2011

Party Name:MINDA SILCA ENGINEERING LTD. 29.11.2011 Status: Deferred HQ File :01/80/050/00034/AM12/ RLA File :05/24/040/00011/AM12/ Lic.No/Date:0510288857 27.04.2011 Defer Date:10.01.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 27.10.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  10.01.2012.   29

Case No.:8/9/80­ALC2/2011

Party Name:CICB CHEMICON PRIVATE LIMITED, 29.11.2011 Status: Deferred HQ File :01/80/050/00176/AM12/ RLA File :07/24/040/00029/AM12/ Lic.No/Date:0710078936 03.05.2011 Defer Date:10.01.2012 Decision : The Committee decided to forward a copy of firm’s reply dated 24.11.2011 to DIPP for examination and comments.  The case may be re­listed 10.01.2012   30

Case No.:13/9/80­ALC2/2011

Party Name:OILGEAR TOWLER POLYHYDRON PVT.LTD., 29.11.2011 Status: Deferred HQ File :01/80/050/00181/AM12/ RLA File :07/21/040/00115/AM12/ Lic.No/Date:0710079344 23.05.2011 Defer Date:10.01.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 01.11.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  10.01.2012.   31

Case No.:10/6/80­ALC2/2011

LIMITED 29.11.2011 Status: Approved HQ File :01/80/050/00087/AM12/ RLA File :04/24/040/00327/AM11/ Lic.No/Date:0410124434 27.05.2011   Decision : As per the written comments of  DHI  received  vide their U.O. Note No. 3(39)/10­TSW(B)634 dated 24.10.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­ EXPORT The total export w eight of 2117 MT  to   he allowed.   IMPORT 1.  Item no  1­  (Carbon Steel)  To  be allowed  at  450  MT  as  applied  for  with  2%  wastage.  “Welded”  to   be deleted from  the description of import item. 2.  Item  no  2­  (Alloy  Steel) To  be allowed  at  600  MT  as  applied  for  with  2%  wastage.  “Welded”  to   be deleted from  the description of import item. 3.  Item no 3­ (Stainless Steel) To be allowed at 2 MT with 2% wastage as applied by the firm. “Welded” to be deleted from the description of import item. 4.   Item no 4­ The word “Finished” to be prefixed to the description of import. The quantity of import to  be  restricted  to  72 MT  &  to be ll d d GN 4 li d f

allow ed under GN­4 as applied for. 5.  Item no­5 ­ Welding material ­ To be allowed at 6 MT as  applied  for. 6.  Item no­6 to 13 ­ To be allowed under GN­4 with accountability clause.         7.  Item  no  14 ­ To be allowed as per spares policy for item no 13.     32

Case No.:11/6/80­ALC2/2011

LIMITED 29.11.2011 Status: Approved HQ File :01/80/050/00088/AM12/ RLA File :04/24/040/00325/AM11/ Lic.No/Date:0410124435 27.05.2011   Decision : As per the written comments of  DHI  received  vide their U.O. Note No. 3(39)/10­TSW(B)635 dated 24.10.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   EXPORT   Piping  system  2X660  MW  Barh  TPS  project  –  2  set.  (for  Steam  turbine Generator Package) ­ The total export w eight of 4206 MT  t o   be allowed.   IMPORT   1.   Item  no  1­  (Carbon  Steel)  To  be allowed at 1600 MT as  applied  for with  2%  wastage.  “Welded”  to be deleted from  the description of import item. 2.  Item  no  2­  (Alloy  Steel)  To  be allowed  at  130  MT  as  applied  for  with  2%  wastage.  “Welded” to  be deleted from  the description of import item. 3. Item no 3­ (Stainless Steel) To be allowed at 8 MT with 2% wastage as applied by the firm. “Welded” to be deleted from the description of import item. 4.  Item  no  4 ­The  word  “Finished”  to be  prefixed  to  the  description  of import. The  quantity  of  import  t o   be  restricted  to  318MT & allow import in number under GN­4 as applied for. 5.  Item no­5­ Welding material­ Quantity of 2 MT to be allowed as applied for. 6.  Item  no­6 & 7­  To be allowed  under GN­4 with accountability clause.     33

Case No.:12/6/80­ALC2/2011

LIMITED 29.11.2011 Status: Approved HQ File :01/80/050/00089/AM12/ RLA File :04/24/040/00318/AM11/ Lic.No/Date:0410124436 27.05.2011   Decision :As per the written comments of  DHI  received  vide their U.O. Note No. 3(29)/09­TSW(B) dated 17.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   Export The description of export product to  be amended &            their weight incorporated as given below. 1.  ESP­ 4 numbers­ 8295 MT 2.  SCAPH­ 2 numbers­16 MT 3.  FAN­8 numbers­397 MT 4.  Dampers & gates­ (38+ 48)­691 MT   The total export weight  to be allowed at 9399 MT per boiler (Total 18,798 MT for two boilers).     Import There are 44 items which consists raw material &  components.   Item No. Name Qty recommended 1 CS Pl t 4 000 MT ith 3% astage as applied for

1 CS Plate 4,000 MT with 3% wastage as applied for 2 AS plate 800 MT with 4% wastage as amended by the firm. 3 Haste Alloy Sheet 12.5 MT with 1% wastage .(nonferrous item) 4 CS Pipe To be allowed 820 MT as applied for. 5 SS wires   SS rounds 73 MT with 1%wastage   12 MT with 10% wastage 12 Templates To be allowed with accountability clause. 13 lead wire To be allowed under GN­4 with accountability  with out any wastage. All other Items up to 44           to 44   Components  To be allowed under GN­4         34

Case No.:13/6/80­ALC2/2011

LIMITED 29.11.2011 Status: Approved HQ File :01/80/050/00090/AM12/ RLA File :04/24/040/00324/AM11/ Lic.No/Date:0410124437 27.05.2011   Decision :As per the written comments of  DHI  received  vide their U.O. Note No. 3(29)/09­TSW(B) dated  17.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   Export The description of export product to be amended & their weight incorporated as given below. 1.  ESP­ 2 numbers­ 3577 MT 2.  APH­ 2 numbers­530 MT 3.  FAN­8 numbers­220 MT 4.  Dampers & gates­ (26+ 28)­198 MT   The total export weight is 4575 MT per boiler (Total 22,875 MT for five boilers) to be allowed.   Import There are 49 items  which consists raw material & components.   Item No. Name Qty recommended 1 CS Plate 2,000 MT with 3% wastage as applied for 2 AS plate 800 MT ith 4% astage as applied for

2 AS plate 800 MT with 4% wastage as applied for 3 Haste Alloy Sheet 12.5 MT with 1%  wastage (nonferrous item) 4 CS Pipe To be allowed 800 MT as applied for.     5 SS wires  SS rounds 73 MT with 1% wastage 12 MT with 10% wastage Item no 5 to 49 Components To be allowed under GN­4     35

Case No.:14/6/80­ALC2/2011

LIMITED 29.11.2011 Status: Approved HQ File :01/80/050/00091/AM12/ RLA File :04/24/040/00323/AM11/ Lic.No/Date:0410124438 27.05.2011   Decision :As per the written comments of  DHI  received  vide their U.O. Note No. 3(29)/09­TSW(B) dated 17.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­    Export The description of  export  product  to            be amended & their weight incorporated as given below. 1.  ESP­ 2 numbers­ 3577 MT 2.  SCAPH­ 2 numbers­530 MT 3.  FAN­8 numbers­220 MT 4.  Dampers & gates­ (26+ 28)­198 MT The  total  export  weight of 4525  MT  per  boiler  (Total  22,625  MT  for five boilers) to be allowed.   Import   Item No. Name Qty recommended 1 CS Plate 4,000 MT with 3% wastage as applied for 2 AS plate 300 MT with 4% wastage as amended by the firm. 3 Haste Alloy Sheet 19.7 MT with 1%  wastage (nonferrous item). 4 CS Pipe 800 MT with 2% wastage as applied for.

5 SS wires   SS rounds 57.3 MT with 1%wastage   69.3 MT with 10% wastage 24 Templates To be allowed with accountability clause. 25 lead wire  To be allowed under GN­4 with accountability clause without any wastage. wawastage. All other Items up to 49 Components To be allowed under GN­4     36

Case No.:15/6/80­ALC2/2011

LIMITED 29.11.2011 Status: Approved HQ File :01/80/050/00092/AM12/ RLA File :04/24/040/00326/AM11/ Lic.No/Date:0410124439 27.05.2011   Decision : As per the written comments of  DHI  received  vide their U.O. Note No. 3(39)/10­TSW(B)633 dated 24.10.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   EXPORT Piping system 2X660 MW Barh TPS project – 2 set. (for Steam Generator Package) The total export w eight of  6568 MT to be allowed.   IMPORT 1. Item no 1­ (Carbon Steel) To be allowed at 650 MT as applied for with 2% wastage. “Welded” to be deleted from the description of import item. 2. Item no 2­ (Alloy Steel)­ To be allowed at 2000 MT as applied for with 2% wastage. “Welded” to be deleted from the description of import item. 3. Item no 3­ (Stainless Steel)To be allowed at 4 MT with 2% wastage as applied by the firm. “Welded” to be deleted from the description of import item. 4.  Item no 4­ The word “Finished”  to be prefixed to the description of import & the same to be incorporated in the license. The quantity of import at 180MT to be allowed under GN­4 as applied for. 5. Item no­5­ Welding material­ Quantity of 20 MT to  be allowed as applied  for. 6. Item no­6 to 15 except item no 14­ To be allowed under GN­4 with accountability clause. 7. Item no 14­ To be allowed as per spares policy for item No 13.     37

Case No.:16/6/80­ALC2/2011

LIMITED 29.11.2011 Status: Approved HQ File :01/80/050/00093/AM12/ RLA File :04/24/040/00328/AM11/ Lic.No/Date:0410124440 27.05.2011   Decision : As per the written comments of  DHI  received  vide their U.O. Note No. 3(39)/10­TSW(B)636 dated 24.10.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­ EXPORT The total export w eight at 1330 MT to be allowed.   IMPORT 1.   Item no  1­ (Carbon Steel) To be allowed at  460 MT as  applied  for with  2%        wastage. “Welded” to be deleted from the description of import item. 2.    Item  no  2­  (Alloy  Steel) To  be allowed  is  25  MT  as  applied  for  with  2%  wastage.  “Welded”  t o   be deleted from the description of import item. 3.     Item no 3­ (Stainless Steel) ­To be allowed is 3 MT with 2% wastage as applied by the firm. “Welded” to be deleted from the description of import item. 4.     Item no 4­ The word “Finished” to be prefixed to the description of import & the same may be  incorporated in the license. The quantity of 98MT in number  to be  allow ed under GN­4 as applied for. 5.    Item no­5­ Welding material – 2 MT to be allowed as applied  for. 6.  Item  no­6 &7­  To be allowed  under GN­4 with accountability clause.     38

Case No.:17/6/80­ALC2/2011

Party Name:GL&V INDIA PRIVATE LIMITED 29.11.2011 Status: Deferred HQ File :01/80/050/00094/AM12/ RLA File :31/83/040/00028/AM12/ Lic.No/Date:3110048282 27.05.2011 Defer Date:10.01.2012 Decision :The representative of the DC(MSME) informed the Committee that they have received the firm’s reply and case is under study. The C itt th f d id d t d f th id ti d t li t th 10 01 2012

Committee, therefore, decided to defer the consideration and to re­list the case on 10.01.2012.   39

Case No.:18/6/80­ALC2/2011

Party Name:STARION INDIA P.LTD 29.11.2011 Status: Rejected HQ File :01/80/050/00095/AM12/ RLA File :31/83/040/00031/AM12/ Lic.No/Date:3110048311 27.05.2011   Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply to DIT’s letter dated 05.08.2011, 26.09.2011 and this office final remainder dated 27.10.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.     40

Case No.:11/9/80­ALC2/2011

LIMITED 29.11.2011 Status: Deferred HQ File :01/80/050/00179/AM12/ RLA File :61/24/040/00010/AM12/ Lic.No/Date:6110000625 31.05.2011 Defer Date:10.01.2012 Decision : The Committee noted the written comments of  DHI  received  vide their U.O. Note No. 3(69)/10­TSW(B)594 dated 04.10.2011 for ratification of norms on repeat basis as per AA No.6110000472 dated 15.07.10 which is yet to be ratified.  The Committee, therefore, decided to defer and  to re­list  the case on 10.01.2012.   41

Case No.:19/15/80­ALC2/2011

Party Name:BLUE STAR LTD. 29.11.2011 Status: Deferred HQ File :01/80/050/00316/AM12/ RLA File :03/94/040/00190/AM12/ Lic.No/Date:0310633805 31.05.2011 Defer Date:10.01.2012 Decision :  The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  dated  27.10.2011  calling  for  certain  information.  The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 10.01.2012.   42

Case No.:27/6/80­ALC2/2011

Party Name:JOHN DEERE INDIA PVT LTD 29.11.2011 Status: Deferred HQ File :01/80/050/00104/AM12/ RLA File :31/82/040/00021/AM12/ Lic.No/Date:3110048382 01.06.2011 Defer Date:10.01.2012 Decision :  The  Committee  noted  that  RA  neither  reported  the  status  of  the  case nor forwarded the four set of application & on­line data in response to this office letter and subsequent its reminder.  The Committee, therefore, decided to address a D.O. letter from DDG to R.A.to send firm’s application & on­line data  failing which it will be presumed that ratification of norms of the subject authorization is not  required and the matter will be closed.  The case may be re­listed on 10.01.2012.   43

Case No.:5/11/81­ALC2/2011

Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. 29.11.2011 Status: Deferred HQ File :01/81/050/00074/AM12/ RLA File :05/23/040/00081/AM12/ Lic.No/Date:0510292480 02.06.2011 Defer Date:10.01.2012 Decision : The Committee decided to forward a copy of firm’s reply dated 23.11.2011 to C&PC for examination and comments.  The case may be re­listed on 10.01.2012.   44

Case No.:29/6/80­ALC2/2011

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., 29.11.2011 Status: Deferred HQ File :01/80/050/00106/AM12/ RLA File :03/95/040/00177/AM12/ Lic.No/Date:0310634527 06.06.2011 Defer Date:10.01.2012 Decision :As per DHI U.O. Note No. 3(73)/09­TSW(B) dated 23.11.2011, the Committee decided to ask the firm  to furnish the export weight from approximate volume of the export product and to re­list the case on 10.01.2012.   45

Case No.:14/9/80­ALC2/2011

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. 29.11.2011 Status: Approved HQ File :01/80/050/00182/AM12/ RLA File :07/24/040/00064/AM12/ Lic.No/Date:0710079750 13.06.2011   Decision :As per the written comments of  DIPP  received  vide their U.O. Note dated 29.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Quantities of import items from Sl. Nos. 1 to 102 & 106 to 131 to be allowed on net to net basis with accountability clause. 2.      Quantities of import items at  Sl. Nos. 103, 104  & 105  to be allowed as   527 Kgs., 807 Kgs. & 2335  Kgs. respectively inclusive of 2 % wastage.    

Case No.:5/9/80­ALC2/2011

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., 29.11.2011 Status: Approved HQ File :01/80/050/00173/AM12/ RLA File :04/24/040/00072/AM12/ Lic.No/Date:0410125099 17.06.2011

46 Decision : As per written comments of  DC(MSME) vide their U.O. Note No. 30(39)/2011­ME dated 04.11.2011, the Committee decided to ratify the norms in respect of  the subject advance authorization on repeat basis as per firm Advance Authorization No.  0410120014 dated 21.12.2010 ratified in Norms Committee Meeting No.14/12 held on 04.10.2011.   The Regional Authority may take necessary action accordingly.   47

Case No.:15/9/80­ALC2/2011

Party Name:AQUASUB ENGINEEING 29.11.2011 Status: Deferred HQ File :01/80/050/00183/AM12/ RLA File :32/24/040/00016/AM12/ Lic.No/Date:3210048550 23.06.2011 Defer Date:10.01.2012 Decision :  The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  dated  27.10.2011  calling  for  certain  information.  The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 10.01.2012.   48

Case No.:2/9/80­ALC2/2011

Party Name:TRANTER INDIA PRIVATE LIMITED Meet No/Date:18/80­ALC2/2011 29.11.2011 Status: Rejected HQ File :01/80/050/00169/AM12/ RLA File :31/83/040/00063/AM12/ Lic.No/Date:3110049045 05.07.2011   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 21.09.2011 and subsequent reminder dated 27.10.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.     49

Case No.:3/9/80­ALC2/2011

Party Name:LARSEN & TOUBRO LIMITED 29.11.2011 Status: Deferred HQ File :01/80/050/00170/AM12/ RLA File :03/95/040/00166/AM12/ Lic.No/Date:0310640468 05.07.2011 Defer Date:10.01.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 27.10.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  10.01.2012.   50

Case No.:5/15/80­ALC2/2011

Party Name:H.L.EQUIPMENTS 29.11.2011 Status: Deferred HQ File :01/80/050/00302/AM12/ RLA File :52/24/040/00016/AM12/ Lic.No/Date:5210035817 12.07.2011 Defer Date:10.01.2012 Decision : The Committee decided to forward a copy of firm’s reply dated 21.11.2011 to DIPP for examination and comments.  The case may be re­listed on 10.01.2012.   51

Case No.:26/9/80­ALC2/2011

Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY 29.11.2011 Status: Deferred HQ File :01/80/050/00194/AM12/ RLA File :05/23/040/00132/AM12/ Lic.No/Date:0510296453 13.07.2011 Defer Date:10.01.2012 Decision : The  Committee observed that the comments called for from DIT have not been received despite several reminders and D.O. from Addl D.G.  to Joint. Secretary. The Committee therefore, decided to send a D.O. from DDG to DIT enclosing a list of all pending cases and request for expediting their comments.  The case may be re­listed on 10.01.2012.   52

Case No.:43/14/80­ALC2/2011

Party Name:BIRLA FURUKAWA FIBRE OPTICS LIMITED, 29.11.2011 Status: Approved HQ File :01/80/050/00297/AM12/ RLA File :17/24/040/00030/AM12/ Lic.No/Date:1710004421 28.07.2011   Decision : As per the written comments of  Deptt. of  Information & Technology received  vide their U.O. Note No.17(82)/2011­IPHW dated  31.10.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   Sl.No  Import item Import  Quantity Requested (Kgs) Import  Quantity Recommended (Kgs) 1 PRE­FORM  of SILICA 3000 2789.7 2 UV RESIN 1 2200 2040 3 UV RESIN 11 2400 2217.48     53

Case No.:18/15/80­ALC2/2011

Party Name:ARUL LINU GRABS PRIVATE LIMITED., 29.11.2011 Status: Deferred HQ File :01/80/050/00315/AM12/ RLA File :17/24/040/00037/AM12/ Lic.No/Date:1710004457 11.08.2011 Defer Date:10.01.2012 Decision : The Committee noted that the firm application has been sent to DHI  on 10.10.2011 for examination and comments. The committee decided to defer the case and to re­list the case on 10.01.2012.

54

Case No.:1/12/80­ALC2/2011

Party Name:FRANCOIS COMPRESSORS INDIA PRIVATE LIMITED 29.11.2011 Status: Approved HQ File :01/80/050/00243/AM12/ RLA File :31/83/040/00097/AM12/ Lic.No/Date:3110049779 12.08.2011   Decision : As per the written comments of  DIPP  received  vide their U.O. Note dated 29.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1.  Net weight of 16450 Kgs. to be specified  with the quantity of export product. 2.  Quantity of import item at Sl. No. 1 to be allowed as 50 Nos. on net to net basis. However, duty free weight of this item to be  restricted to 17450 Kgs. inclusive of 6 % wastage after 20 % recovery.     55

Case No.:2/12/80­ALC2/2011

Party Name:KONE ELEVATOR INDIA PVT LTD 29.11.2011 Status: Approved HQ File :01/80/050/00244/AM12/ RLA File :04/24/040/00119/AM12/ Lic.No/Date:0410127166 17.08.2011   Decision : As per the written comments of  DIPP  received  vide their U.O. Note dated 29.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Description of Export product to be modified as  “ Elevators /Lifts              Model No. B­PASS­AUTO  PT 20/10­15”               2.      Word “relevant” to be prefixed with the description of import items at Sl. Nos. 29 to 31. 3.      Import items from S.No.1 to 31  to be allowed on net to net basis with accountability clause     56

Case No.:17/15/80­ALC2/2011

Party Name:BIRLA FURUKAWA FIBRE OPTICS LIMITED, 29.11.2011 Status: Approved HQ File :01/80/050/00314/AM12/ RLA File :17/24/040/00039/AM12/ Lic.No/Date:1710004471 23.08.2011   Decision : As per the written comments of  Deptt. of  Information & Technology received  vide their U.O. Note No.17(86)/2011­IPHW dated  08.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   Sl.No  Import item Import  Quantity Requested (Kgs) Import  Quantity Recommended (Kgs) 1 PRE­FORM  of SILICA 3000 2789.7 2 UV RESIN 1 2200 2040 3 UV RESIN 11 2400 2217.48     57

Case No.:4/15/80­ALC2/2011

Party Name:LEADER VALVES LTD. 29.11.2011 Status: Deferred HQ File :01/80/050/00301/AM12/ RLA File :30/24/040/00023/AM12/ Lic.No/Date:3010078058 25.08.2011 Defer Date:10.01.2012 Decision :The Committee noted that the firm’s application has been sent to DC(MSME) on 22.11.2011 and also noted that the export & import items are same in the application. The Committee, therefore, decided to ask the firm to clarify the same and to re­list the case on 10.01.2012   58

Case No.:12/15/80­ALC2/2011

Party Name:DIAMOND METAL SCREENS (P) LTD 29.11.2011 Status: Approved HQ File :01/80/050/00309/AM12/ RLA File :07/24/040/00191/AM12/ Lic.No/Date:0710081770 25.08.2011   Decision : As per the written comments of  DIPP  received  vide their U.O. Note dated 29.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1.               Quantity of Export Product may also be specified as 17400 Nos. in addition to its quantity as 99727 Kgs. 2.               Quantity of import item to be allowed as 151620 Kgs  inclusive of 52 % wastage after 1/3rd  recovery.     

Case No.:13/15/80­ALC2/2011

Party Name:DIAMOND METAL SCREENS (P) Status:

59 y ( ) LTD 29.11.2011 Deferred HQ File :01/80/050/00310/AM12/ RLA File :07/24/040/00150/AM12/ Lic.No/Date:0710081817 26.08.2011 Defer Date:10.01.2012 Decision  :On  the  recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  10.01.2012   1.      Information in respect of Sl.No.5 & 11 of the Standard Deficiency Format.   60

Case No.:15/15/80­ALC2/2011

Party Name:ARUL LINU GRABS PRIVATE LIMITED., 29.11.2011 Status: Deferred HQ File :01/80/050/00312/AM12/ RLA File :17/24/040/00049/AM12/ Lic.No/Date:1710004496 05.09.2011 Defer Date:10.01.2012 Decision : The Committee noted that the firm application has been sent to DHI  on 10.10.2011 for examination and comments. The committee   61

Case No.:8/15/80­ALC2/2011

Party Name:METSO PAPER INDIA PVT.LTD. 29.11.2011 Status: Deferred HQ File :01/80/050/00305/AM12/ RLA File :05/24/040/00200/AM12/ Lic.No/Date:0510301760 08.09.2011 Defer Date:10.01.2012 Decision  :As  per  DHI  U.O.  Note  No.  3(34)/09­TSW(B)  dated  17.11.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  10.01.2012: ­       1.  The detail  b reak up of items in set s.     2.  The na me of t he items who se pa rt nu mbe r ha s been given   & highlighted in the picture of  the expo rt  p roduct .      3. Spec ific use of eac h ite m of import   62

Case No.:16/15/80­ALC2/2011

Party Name:BIRLA FURUKAWA FIBRE OPTICS LIMITED, 29.11.2011 Status: Approved HQ File :01/80/050/00313/AM12/ RLA File :17/24/040/00046/AM12/ Lic.No/Date:1710004497 08.09.2011   Decision : As per the written comments of  Deptt. of  Information Technology  received  vide their U.O. Note No.17(85)/2011­IPHW dated 08.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   Sl.No  Import item Import  Quantity Requested (Kgs) Import  Quantity Recommended (Kgs) 1 PRE­FORM  of SILICA 3000 2789.7 2 UV RESIN 1 2200 2040 3 UV RESIN 11 2400 2217.48     63

Case No.:9/15/80­ALC2/2011

Party Name:MAGNETI MARELLI UM ELECTRONICS SYSTEMS PVT.LTD., 29.11.2011 Status: Deferred HQ File :01/80/050/00306/AM12/ RLA File :05/24/040/00202/AM12/ Lic.No/Date:0510301975 12.09.2011 Defer Date:10.01.2012 Decision : The Committee observed that the firm’s has not replied to the DIT’s  letter dated 24.10.2011.  The Committee, therefore, decided to send a reminder to the firm failing which there case will be rejected.   The case may be re­listed on 10.01.2012.   64

Case No.:6/15/80­ALC2/2011

Party Name:MONTAN HYDRAULIK (INDIA) PVT LTD 29.11.2011 Status: Deferred HQ File :01/80/050/00303/AM12/ RLA File :04/24/040/00178/AM12/ Lic.No/Date:0410128126 15.09.2011 Defer Date:10.01.2012 Decision : The Committee noted that the firm application has been sent to DHI  on 27.10.2011 for examination and comments. The committee   65

Case No.:7/15/80­ALC2/2011

Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY 29.11.2011 Status: Approved HQ File :01/80/050/00304/AM12/ RLA File :05/23/040/00216/AM12/ Lic.No/Date:0510302590 15.09.2011   Decision : As per the written comments of  DIT  received  vide their U.O. Note No. 17 (83)/2011­IPHW dated 25.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as applied for by the firm inclusive of 1% wastage.  

66

Case No.:10/15/80­ALC2/2011

Party Name:CAMFIL FARR AIR FILTRATION INDIA PVT. LTD. 29.11.2011 Status: Approved HQ File :01/80/050/00307/AM12/ RLA File :05/23/040/00225/AM12/ Lic.No/Date:0510302882 19.09.2011   Decision : As per the written comments of  DC(MSME)  received  vide their U.O. Note  No. 30(75)/2011­ME dated 14.11.2011, the Committee decided to ratify the norms  in respect of the subject advance authorization as under:­   1.      After taking clue from C­1799, import inputs i.e. relevant filter papers to be allowed at 1.02 Kg./Kg content in export product.     67

Case No.:20/15/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., 29.11.2011 Status: Deferred HQ File :01/80/050/00317/AM12/ RLA File :03/94/040/00446/AM12/ Lic.No/Date:0310654528 19.09.2011 Defer Date:10.01.2012 Decision : The Committee decided to forward a copy of firm’s reply dated 24.11.2011 to DIPP for examination and comments.  The case may be re­listed on 10.01.2012.   68

Case No.:14/15/80­ALC2/2011

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. 29.11.2011 Status: Deferred HQ File :01/80/050/00311/AM12/ RLA File :05/23/040/00230/AM12/ Lic.No/Date:0510303170 20.09.2011 Defer Date:10.01.2012 Decision : The Committee decided to forward a copy of firm’s reply dated 28.11.2011 to DC(MSME) for examination and comments.  The case may be re­listed on 10.01.2012.   69

Case No.:11/15/80­ALC2/2011

Party Name:H.L.EQUIPMENTS 29.11.2011 Status: Deferred HQ File :01/80/050/00308/AM12/ RLA File :52/24/040/00027/AM12/ Lic.No/Date:5210036502 21.09.2011 Decision :  The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  dated  27.10.2011  calling  for  certain  information.  The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 10.01.2012.   70

Case No.:1/18/80­ALC2/2011

Party Name:ASAHITEC STENCILS P.LTD., 29.11.2011 Status: Deferred HQ File :01/80/050/00355/AM12/ RLA File :04/24/040/00183/AM12/ Lic.No/Date:0410128353 21.09.2011 Decision : The Committee noted the deficiency raised by DC(MSME) vide their U.O. Note No. 30(96)/2011­ME dated 07.12.2011 and decided to seek the clarification/details from the firm.  The case may be re­listed on 10.01.2012.     71

Case No.:14/18/80­ALC2/2011

LIMITED 29.11.2011 Status: Deferred HQ File :01/80/050/00368/AM12/ RLA File :04/24/040/00146/AM12/ Lic.No/Date:0410128602 27.09.2011 Decision : The Committee noted that the firm application has been sent to DHI  on 17.11.2011 for examination and comments. The committee   72

Case No.:1/15/80­ALC2/2011

Party Name:STARION INDIA P.LTD 29.11.2011 Status: Deferred HQ File :01/80/050/00298/AM12/ RLA File :31/83/040/00127/AM12/ Lic.No/Date:3110050667 28.09.2011 Defer Date:10.01.2012 Decision : The Committee noted that the firm application has been sent to DIT  on 18.11.2011 for examination and comments. The committee   73

Case No.:2/15/80­ALC2/2011

Party Name:G.R.ENGINEERING PRIVATE LTD., Meet No/Date:18/80­ALC2/2011 29.11.2011 Status: Approved HQ File :01/80/050/00299/AM12/ RLA File :03/94/040/00570/AM12/ Lic.No/Date:0310657167 30.09.2011   Decision : As per the written comments of  DIPP  received  vide their U.O. Note dated 29.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Net Empty Export weight of 21.6 MT to be specified with the quantity of each export product at S.No.1, 2, 11 & 12. 2. Net Empty Export weights of 9.5 MT, 43.5 MT, 17 MT, 4.625 MT, 41 MT &  3.3 MT  to be specified with the quantities of export products at S.No.3, 4, 5, 6, 7 & 8  respectively. 3. Net Empty Export weight of 13.5 MT to be specified with the quantity of  each export product at Sl. No. 9 & 10. 4. Net Empty Export weights of 3 MT & 1.9 MT to be specified with the quantities of  export products at Sl. No. 13 & 14 respectively.

5. Word “Relevant” to be prefixed with the description of import items at Sl. Nos. 1 & 3. 6. Quantity of import item at S.No.1 to be allowed as 1.05 Kg/ Kg. content in the export products. 7. Weight of “49.35 MT ” to be added with the quantity of import item at Sl.No.2 and quantity of this item to be allowed on net to net basis. 8. Weight of “112.536 MT ” to be added with the quantity of import item at Sl.No.3 and quantity of this item  to be allowed as 1.02 Mtr/ Mtr. content in the export products     74

Case No.:3/18/80­ALC2/2011

LIMITED 29.11.2011 Status: Deferred HQ File :01/80/050/00357/AM12/ RLA File :04/24/040/00095/AM12/ Lic.No/Date:0410129108 11.10.2011 Decision :The Committee noted that the firm application has been sent to DHI  on 15.11.2011 for examination and comments. The committee   75

Case No.:7/18/80­ALC2/2011

Party Name:M M AQUA TECHNOLOGIES LTD. Meet No/Date:18/80­ALC2/2011 29.11.2011 Status: Deferred HQ File :01/80/050/00361/AM12/ RLA File :05/24/040/00042/AM12/ Lic.No/Date:0510305085 12.10.2011 Decision : The Committee noted that the firm application has been sent to C&PC  on 18.11.2011 for examination and comments. The committee   76

Case No.:2/18/80­ALC2/2011

LIMITED 29.11.2011 Status: Deferred HQ File :01/80/050/00356/AM12/ RLA File :04/24/040/00128/AM12/ Lic.No/Date:0410129210 13.10.2011 Decision : The Committee noted that the firm application has been sent to DHI  on 11.11.2011 for examination and comments. The committee   77

Case No.:10/18/80­ALC2/2011

Party Name:CORE METAL KRAFTS LTD., 29.11.2011 Status: Approved HQ File :01/80/050/00364/AM12/ RLA File :22/24/040/00048/AM12/ Lic.No/Date:2210012023 14.10.2011   Decision : Based on the recommendation of the representative of  the DIPP present in the meeting, the Committee decided to ratify the norms in respect of the subject advance authorization as per GN­4, net­to­net basis with accountability clause.     78

Case No.:9/18/80­ALC2/2011

Party Name:MOTHERSON SUMI SYSTEMS LTD 29.11.2011 Status: Deferred HQ File :01/80/050/00363/AM12/ RLA File :05/24/040/00251/AM12/ Lic.No/Date:0510305773 18.10.2011 Decision : The Committee noted that C&PC has returned the firm application as the subject matter does not pertain to them. The Committee, therefore, decided to forward a copy of firm’s application to DIPP  and to defer the case on 10.01.2012.   79

Case No.:6/18/80­ALC2/2011

Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:18/80­ALC2/2011 29.11.2011 Status: Deferred HQ File :01/80/050/00360/AM12/ RLA File :04/24/040/00208/AM12/ Lic.No/Date:0410129476 19.10.2011 Decision :As per DIPP U.O. Note dated 29.11.2011, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  10.01.2012: ­   1. Information in respect of Sl.No.1, 6 & 9 of the Standard Deficiency Format. 2. Information in respect of S.No.11 & 11A of Standard Deficiency Format for import items from  S.No. 31 to 34.   80

Case No.:8/18/80­ALC2/2011

Party Name:MINDA SILCA ENGINEERING LTD. 29.11.2011 Status: Deferred HQ File :01/80/050/00362/AM12/ RLA File :05/24/040/00249/AM12/ Lic.No/Date:0510306346 21.10.2011 Decision : The Committee noted that the firm application has been sent to DHI  on 18.11.2011 for examination and comments. The committee   81

Case No.:13/18/80­ALC2/2011

Party Name:EMMVEE SOLAR SYSTEMS PVT LTD., 29.11.2011 Status: Deferred HQ File :01/80/050/00367/AM12/ RLA File :07/24/040/00293/AM12/ Lic.No/Date:0710083569 27.10.2011 Decision : The Committee noted the deficiency raised by DC(MSME) vide their U.O. Note No. 30(88)/2011­ME dated 07.12.2011 and decided to seek the clarification/details from the firm.  The case may be re­listed on 10.01.2012.

82

Case No.:11/18/80­ALC2/2011

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., 29.11.2011 Status: Deferred HQ File :01/80/050/00365/AM12/ RLA File :04/24/040/00212/AM12/ Lic.No/Date:0410129764 28.10.2011 Decision : The Committee noted that the firm application has been sent to DC(MSME)  on  18.11.2011  for  examination  and  comments.  The committee decided to defer the case and to re­list the case on 10.01.2012.   83

Case No.:12/18/80­ALC2/2011

Party Name:BRAKES INDIA LIMITED, 29.11.2011 Status: Deferred HQ File :01/80/050/00366/AM12/ RLA File :04/24/040/00136/AM12/ Lic.No/Date:0410129812 31.10.2011 Decision : The Committee noted that the firm application has been sent to DHI  on 18.11.2011 for examination and comments. The committee   84

Case No.:4/18/80­ALC2/2011

Party Name:COMAU INDIA P.LTD, 29.11.2011 Status: Deferred HQ File :01/80/050/00358/AM12/ RLA File :31/82/040/00187/AM12/ Lic.No/Date:3110051335 08.11.2011 Decision :The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be re­listed on 10.01.2012.   85

Case No.:5/18/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:18/80­ALC2/2011 29.11.2011 Status: Deferred HQ File :01/80/050/00359/AM12/ RLA File :03/94/040/00694/AM12/ Lic.No/Date:0310664263 09.11.2011 Decision : The Committee noted that the firm application has been sent to DHI  on 25.11.2011. The Committee decided to forward the firm’s application to DIPP as the case pertains to them and to re­list the case on 10.01.2012.   S.No.21

Case No.  A ­ 09

M/s.  Jhagadia Copper LTd.,   HQ F.No.01/80/162/00542/AM10/DES.I Lic.No. & Date Meeting No.18/12  RA.F.No.34/24/039/00001/AM10 3410024795 dt.29.07.2009 Date: 29.11.2011 Ratification of  norms.   The Committee noted that Ministry of Mines has retuned the firm’s  representation &informed vide their O.M. No.4(37)2010­Met.HI/L that the subject matter does not pertain to them. The Committee, therefore, decided to forward a copy of firm’s representation along with all enclosure to DC(MSME)  and to defer the case on 10.01.2012.   S.No.22

Case No.  A ­ 14

M/s.  Larson  & Toubro Ltd.,   HQ F.No.01/80/162/00522/AM11/DES.I Lic.No. & Date Meeting No.18/12  RA.F.No.03/95/039/00004/AM10 0310541346 dt.12.10.2009 Date: 29.11.2011 Ratification of  norms   The Committee noted  that the firm’s reply has been sent to DHI on 17.10.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  10.01.2012.   S.No.23

Case No.  A ­ 03

M/s.  Larson  & Toubro  Ltd., Mumbai   HQ F.No.01/80/162/00845/AM12/DES.I Lic.No. & Date Meeting No.18/12  RA.F.No.03/95/039/00001/AM12 0310643682 dt.21.07.2011 Date: 29.11.2011 Fixation  of  norms  for  annual requirement   The Committee noted  that the firm’s representation  has been sent to DHI on 18.11.2011 for examination and comments.  The Committee, therefore,   S. No.458

Case No.  A/R­40

M/s.  Bharat  Heavy Electricals  Ltd., Haridwar HQ F.No.01/80/162/00539/AM09/DES.I Lic.No. & Date Meeting No.18/12 RA F.No.61/24/040/00036/AM09 6110000254 dt.05.12.2008   Date: 29.11.2011 Ratification of norms   The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 10.01.2012.   Sl.No.459

Case No.A/R­161

M/s. Thermax LTd., HQ F.No.01/80/050/01549/AM09/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.31/21/040/00295/AM09 3110036392 dt.11.12.2008 Date: 29.11.2011 Ratification of norms   The Committee noted  that the firm’s reply has been sent to DHI on 18.11.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  10.01.2012.   S.No.460

Case No. A/R­72

  M/s. The Saraswati Industrial Syndicate LTd., F.No. 01/80/50/ 00075/AM10/DES.I Lic.No. & Date Meeting No.18/12 RA F.No.05/24/040/00057/AM10 0510240867 dt.05.05.2009 Date: 29.11.2011 Ratification of  norms.

As per the written comments of  DIPP  received  vide their U.O. Note dated 29.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Net empty weight of 16063 Kgs., 2261 Kgs., 2261 Kgs., 42097 Kgs., 17488 Kgs., 7159 Kgs. & 8900 Kgs. to be specified with the quantities of export products at Sl.No. 1 to 7 respectively. 2.      Total weight of import items at Sl. Nos. 5, 15  &  25 put together to be specified as 5303.3 Kgs. 3.      Total weight of import items at Sl. Nos. 36  &  47 put together to be specified as  24843 Kgs. 4.      Total weight of import items at Sl. Nos. 37, 48 &  52 put together to be specified as  2102 Kgs. 5.      Total weight of import items at Sl. Nos. 2, 3, 4, 12, 13, 14, 22, 23, 24, 33, 34, 35, 44, 45 & 46 put together to be specified as  13185 Kgs.     S.No.461

Case No.A/R­49

M/s.  Kone  Elevator India  Pvt.  Ltd., Chennai HQ F.No.01/80/050/00380/AM11/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.04/24/040/00092/AM11 0410116119 dt.09.08.2010 Date: 29.11.2011 Revision   of Norms   The Committee noted the firm’s reply dated 14.11.2011 and decided to close the case.   The RLA take necessary action accordingly.   S.No.462

Case No.A/R­50

M/s.  Kone  Elevator India  Pvt.  Ltd., Chennai HQ F.No.01/80/050/00336/AM11/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.04/24/040/00121/AM11 0410116336 dt.17.08.2010 Date: 29.11.2011 Revision   of Norms   The Committee noted the firm’s reply dated 14.11.2011 and decided to close the case.   The RLA take necessary action accordingly.   S.No.463

Case No.A/R­51

M/s.  Kone  Elevator India  Pvt.  Ltd., Chennai HQ F.No.01/80/050/00299/AM11/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.04/24/040/00044/AM11 0410115366 dt.08.07.2010 Date: 29.11.2011 Revision   of Norms   The Committee noted the firm’s reply dated 14.11.2011 and decided to close the case.   The RLA take necessary action accordingly.   S.No.464

Case No.A/R­52

M/s.  Kone  Elevator India  Pvt.  Ltd., Chennai HQ F.No.01/80/050/00280/AM11/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.04/24/040/00081/AM11 0410115530 dt.14.07.2010 Date: 29.11.2011 Revision   of Norms   The Committee noted the firm’s reply dated 14.11.2011 and decided to close the case.   The RLA take necessary action accordingly.   S.No.465

Case No.A/R­53

M/s.  Andritz  Hydro Pvt.  Ltd.,  Palwal (Har.) HQ F.No.01/80/050/00009/AM12/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.05/23/040/00009/AM12 0510287936 dt.11.04.2011 Date: 29.11.2011 Ratification   of Norms   The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 10.01.2012.   S.No.466

Case No.A/R­54

M/s.  Andritz  Hydro Pvt.  Ltd.,  Palwal (Har.) HQ F.No.01/80/050/00864/AM11/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.05/23/040/00340/AM11 0510284704 dt.01.03.2011 Date: 29.11.2011 Ratification   of Norms   The Committee noted  that the firm’s reply has been received by DHI for comments .  The Committee, therefore, decided to defer the case and to re­list the case on  10.01.2012.   S.No.467

Case No.A/R­57

M/s.  Thermax Limited HQ F.No.01/81/050/00310/AM06/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.31/24/040/00017/AM06 3110021206 dt.14.07.2005 Date: 29.11.2011 Revision of norms   The Committee noted  that the firm’s reply has been sent to DHI on 27.10.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  10.01.2012.   S.No.468

Case No A/R­76

M/s The Saraswati HQ FNo 01/80/050/00254/AM11/ DES­I Lic No & Date

Case No.A/R 76

M/s.  The  Saraswati Industrial  Syndicate Ltd., HQ F.No.01/80/050/00254/AM11/ DES I Lic.No. & Date Meeting No.18/12 RA F.No.05/24/040/00126/AM11 0510267954 dt.12.07.2010 Date: 29.11.2011 Revision  of Norms   As per the written comments of  DIPP  received  vide their U.O. Note dated 29.11.2011, the Committee decided the following modification of the norms in respect of the subject advance authorization to be incorporated in norms :­   1.            Quantities of import items at Sl. Nos. 7 &  8 to be allowed as 1048 Kgs. & 1000 Kgs. respectively. 2.            No change is recommended in the weights of import items at Sl. No. 3 & 4.     S.No.469

Case No.A/R­77

M/s.  The  Saraswati Industrial  Syndicate Ltd., HQ F.No.01/80/050/00313/AM11/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.05/24/040/00157/AM11 0510269795 dt.05.08.2010 Date: 29.11.2011 Revision  of Norms   As per DIPP U.O. Note dated 29.11.2011, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  10.01.2012: ­   1.      Net weights of import items at Sl. No. 38 & 53 in the export products.   S.No.470

Case No.A/R­134

M/s.  Aseem Technologies  Pvt. Ltd., Indore HQ F.No.01/80/050/00428/AM09/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.11/24/040/00008/AM09 1110017303 dt.30.05.2008 Date: 29.11.2011 Revision  of Norms   The Committee decided to forward a copy of firm’s e­mail reply dated 23.11.20112 to DIPP for examination and comments.  The case may be re­listed on 10.01.2012.   S.No.471

Case No.A/R­135

M/s.  Hit­Tech Elastomers  Ltd., Ahmedabad HQ F.No.01/80/050/00151/AM05/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.08/80/040/00074/AM05 0810038630 dt.14.05.2004 Date: 29.11.2011 Ratification  of Norms   As per the written comments of  DIPP  received  vide their U.O. Note dated 29.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Net Export weight of 40.9 MT to be specified with the quantity of export product at Sl.No.1. 2. Quantity of import item at Sl.No.1 to be allowed as 2 Nos. on net to net basis with accountability clause. 3. Quantities of import items from Sl.No.2 to 5 & 8 to 10 to be allowed on net to net basis with accountability clause. 4. Quantities of import items at Sl.No.6, 7 & 11 to be allowed as 1.02 Kgs./Kg. content in the export product at Sl. No. 1.     S.No.472

Case No.A/R­136

M/s.  Hit­Tech Elastomers  Ltd., Ahmedabad HQ F.No.01/80/050/00291/AM05/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.08/80/040/00135/AM05 0810039493 dt.14.06.2004 Date: 29.11.2011 Ratification  of Norms   As per the written comments of  DIPP  received  vide their U.O. Note dated 29.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Net Export weights of 62.91 MT, 29.48 MT & 64.22 MT to be specified with the quantities of export products at Sl.No.1, 2 & 3 respectively. 2. Quantities of import items at Sl.No.A­01 & A­02   to be allowed as 1.05 Kgs./Kg. content in the export product at Sl. No. 1. 3. Quantity of import item at Sl.No.A­03 to be allowed as 1.02 Kgs./Kg.. content in the export product at Sl. No. 1. 4. Rest of the import items at Sl. No. B­01 to B­05 and C­01 to C­06 to be deleted as these import items not imported by the firm.     S.No.473 Case No.A/R­ 137 M/s. Hit­Tech Elastomers Ltd., Ahmedabad HQ F.No.01/80/050/00788/AM06/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.08/80/040/00420/AM050810050849 dt.22.09.2005                                                                                                                                                                                        Date: 29.11.2011 Ratification  of Norms   As per the written comments of  DIPP  received  vide their U.O. Note dated 29.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Net Export weights of 42.06 MT, 10.419 MT, 3.948 MT, 14.21 MT, 3.462 MT  & 3.01 MT to be specified with the quantities of export products at Sl. No. 1 to 6 respectively. 2. Import items from Sl. No. 1 to 5 to be deleted as these import items not imported by the firm. 3. Quantity of import item at Sl.No.6 to be allowed as 1.05 Kgs./Kg. content in the export products.  

S.No.474

Case No.A/R­138

M/s.  Bio  –  Tech Vision  Care  Pvt. Ltd., Ahmedabd HQ F.No.01/80/050/00721/AM11/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.08/24/040/00264/AM11 0810094482 dt.09.12.2010 Date: 29.11.2011 Correction  of Norms   Based on the written comments of C&PC received vide their O.M. No.46011/35/2011­PC­II  dated 02.11.2011, the Committee decided to amend in the export product earlier ratified in Meeting No. 05/12 dated 31.05.2011 and the same may be read as under:­   Existing item of export   “Intraocular Lens Acrylic (Foldable)”   Recommended item of export   “Intra Ocular Lens Acrylic (Foldable)”     S.No.475

Case No.A/R­151

M/s.  Larsen  & Toubro  Ltd., Mumbai HQ F.No.01/80/050/00008/AM08/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.03/95/040/01638/AM07 0310425615 dt.04.04.2007 Date: 29.11.2011 Amendment of Norms   The Committee deliberated the details of the firm request and decided to ask the firm to furnish a report from their Statutory Auditor confirming the use of 235 Nos. of cone reducers in the export the product and to re­list the case on 10.01.2012.   S.No.476

Case No.A/R­152

M/s.  Eastern Equipment  & Engineers  Pvt. Ltd., Kolkata HQ F.No.01/80/050/00724/AM11/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.02/24/040/00168/AM11 0210152463 dt.23.12.2010 Date: 29.11.2011 Fixation of  Norms   As per DIPP U.O. Note dated 29.11.2011, the Committee decided to call for the following information/clarification from the firm and to re­list the case on 10.01.2012: ­   1.      Information in respect of Sl. No. 5 & 11 of Standard Deficiency Format, export product wise. 2.      Separate quantities of MS Plates & MS Angles/Channels for import item at Sl. No. 2.   S.No.477

Case No.A/R­153

M/s.  Tharmax Ltd., HQ F.No.01/81/162/00480/AM07/ DES­I Lic.No. & Date Meeting No.18/12 RA F.No.31/24/040/00186/AM07 3110026329 dt.04.09.2006 Date: 29.11.2011 Ratification  of  Norms The Committee noted  that the firm’s representation has been sent to DHI on 21.11.2011.  The Committee, therefore, decided to defer the case and to re­ list the case on 10.01.2012.   Sl.No.137

Case No. C ­ 09

M/s.  Addison  &  Co.  Ltd., Chennai F.No. 01/81/80/162/00372/AM10/DES.I Meeting No.18/12 Modification  of SION for the export product “Cutting Tools­Multiple Point of High Speed Steel(Cobalt Grade)/Tool Steel” Date: 29.11.2011   The Committee noted the reply dated 27.08.2011 received from the firm informing that they are only requesting for correcting in the description of import item as Sl. No.1 i.e. High Speed steel (cobalt grade)/tool steel under SION C­921. The Committee also noted that the firm has not furnished the details sought by DHI for fixation of wastage for the said import item.               The matter was discussed and it was decided that firm may be informed that  while amending description of import item, it has also been decided to review wastage norms for the import items in SION C­921.               The Committee observed that in the absence of requisite inform/data, it will not be possible to review the wastage for the amended/corrected import item “High Speed steel (cobalt grade)/tool steel”.   In view of this, the Committee decided to again ask the firm/EEPC to furnish the requisite data/inform without which it will be constrained to suspend the operation of SION C­921. The case may be re­listed on 10.01.2012.   Sl.No.138

Case No. C­ 17

M/s. Lucas  TVS Ltd., Chennai received through  DC(MEPZ­SEZ), Chennai F.No. 01/81/80/162/00379/AM10/DES.I Meeting No.18/12 Fixation  of  regular  wastage  norms  for manufacturing  of  different  types  of  “Starter, Alterator, Wiper Motor and Compressor”. Date: 29.11.2011   The Committee noted the observation of DHI(U.O. Note No. 3(11)/11­TSW(B) dated 21.11.2011) that the firm’s reply vide letter dated 06.09.2011 is incomplete. The calculation has not been properly made as may be seen for  item no. 2 of import.  Item No.4, the calculation has not been properly explained. The Calculation for copper components has also not been  properly given.  The Committee, therefore, decided to advise the firm to appear before the NC to explain their case in person along with technical expert and full facts of the case. The case may be re­listed on 10.01.2012.   Sl.No.139

Case No. C­ 18

M/s.  Pipavav  Shipyards LTd., Amreli F.No. 01/81/80/162/00612/AM11/DES.I Meeting No.18/12 Fixation of input output norms in respect of 100% EOU for the export product “ Ship,

00% OU o t e e po t p oduct S p, Cargo  Ships,  Barges  &  Vessels  for Transport,  Factory  Ship,  Life  Boats,  Hulls and  Vessels  falls  under  Chapter  89  of ITC(HS) – reg. Date: 29.11.2011   The Committee observed that the comments called for from Ministry of Shipping  has not been received despite several reminders and a D.O. from DDG was  sent  on  16.08.2011.The  Committee,  therefore,  decided  to  remind  them  through  D.O.  from  DDG    to  Mnistry  of  Shipping  for  expediting  their comments. The case may be re­listed on10.01.2012.   Sl.No.140

Case No. C – 06

Reference  received  from  PC­ 4(B)  of  M/s.  Gripwell  Tools Industries, Jalandhar HQ F.No.01/80/94/180/00604/AM10/PC­4(B)/DES­I Meeting No.18/12 Clarification as whether the export product “Digging Bar / Spud Bar” is covered under Sl. No. 123 of the DEPB rate schedule of product  Group  “Engineering  “  (Product Code  :  61)  for  the  purpose  of  DEPBN benefit. Date: 29.11.2011   The Committee noted that DEPB scheme is over on 30.09.2011 and no decision in the matter is required.  The Committee, therefore, decided  to revert back the case to DEPB.   DEPB may take necessary action accordingly.   Sl.No.141

Case No.  C – 18

M/s.  Bhukanvala Diamond  Systems  Pvt. Ltd., Navsari HQ F.No.01/80/162/00056/AM12/DES­I Meeting No.18/12 Request  for  fixation  of  Standard  Input Output Norms (SION) for the export product “Die  Sets  and  PVC  Blister  Moulds”  in respect of 100% EOU Date: 29.11.2011   The Committee noted the comments of “PVC blisters” of C&PC received vide their O.M. No. 4011/18/2011­PC­II dated 21.11.2011.  However, as fixation of wastage norms for manufacture of die sets pertains to DHI,  the Committee decided to forward a copy of the firm’s application with all details pertains to die sets to DHI for examination and comments. The case may be re­listed on 10.01.2012.   Sl.No.142

Case No.  C – 32

M/s. Botil Oil Tools India Pvt. LTd., New Delhi HQ F.No.01/80/162/00851/AM12/DES­I Meeting No.18/12 Application for issuance of Advance Authorization under Duty Exemption Scheme under SION at Sl. No.C­1624, C­1625 and C­1628. Date: 29.11.2011   The Committee noted  that the firm’s representation/application for issuance of Advance Authorization under Duty Exemption Scheme under SION at S.No. C­1624, C­1625 and C­1628  has been sent to DHI on 09.11.2011.  On the firm request vide their e­mail letter dated 14.11.2011 for granting personal hearing for detail of the case, the Committee, therefore, decided to advise the firm to appear before the NC to explain their case in person along with technical expert and full facts of the case. The case may be re­listed on 10.01.2012.


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied