RATIFIED   Minutes of M.No.14/11 held on 06.07.2010 of Norms Committee (NC­I) (DES.I Section)   The  meeting  No.  14/11  of  the  Norms  Committee  (NC­I)  for  the  licensing  year  2010­2011  due  for 06.07.2010 was actually held on 06.07.2010, 08.07.2010 and 20.07.2010 under the Chairmanship of Shri V.K. Srivastava,  Addl.  Director  General  of  Foreign  Trade  to  consider  the  applications  under  Duty  Exemption  / Remission Schemes (Chapter­4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429 A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh.  K.K.  Funda,  Asstt.  Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. A.K. Aggarwal, 3rd Floor   Deptt.  of  C&CP, Shastri Bhavan 5. Sh. A.K. Mishra, AIA     M/o Steel, U.B. 6. Sh. B.D. Ghosh, Jt.IA 399 23063355 M/o Steel, U.B. 7. Sh.  Rajinder  Pal  Singh  Dy.DGFT, 486 23061562 Extn.345 DGFT, U.B. 8. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.   The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon were as under: ­ 1

Case No.:3/14/80­ALC2/2008

Party Name: MACMET INDIA LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00479/AM09/ RLA File :02/24/040/00031/AM09/ Lic.No/Date:0210113457 11.06.2008   Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No.14/11 held on 20.7.2010. As per the written comments of DHI communicated  vide  their  U.O.  No.   3(62)/09­TSW(B)/321    dated  28.06.2010,  the  Committee  decided  to ratify the norms in respect of the subject advance authorization as under:­   “The items proposed for import are all components.  But some of the items are supplied intact which implies that there is no manufacturing activity involved in it. Therefore the Committee accept the deletion of these items. These items are I­sieve of item no 2,  item 9,10 & item  no  13.  All  other  items  recommended  for import under GN­4”.   The Regional Authority may take necessary action accordingly.  

Case No.:20/14/80­ALC2/2008

Party Name:THERMAX LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved

2 HQ File :01/80/050/00496/AM09/ RLA File :31/21/040/00073/AM09/ Lic.No/Date:3110034061 17.06.2008   Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. As per the written comments of DHI communicated vide their U.O. No.  3(11)/09­TSW(B)/  dated 05.07.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export The total export weight is 551.4 MT & the same may be incorporated in the licence. Import 1.        Item no 1 & 2­ Total quantity to be allowed is 70. 5 MT without any wastage as stated by the firm during application. 2.        Item no 3 to 7 are components. The same may be allowed under GN­4.   Weight of import item no 3 i.e.13,000 kg may be incorporated in the list along with numbers.       3

Case No.:13/26/80­ALC2/2008

Party Name:POLY MEDICURE LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/01049/AM09/ RLA File :05/24/040/00381/AM09/ Lic.No/Date:0510227332 11.09.2008

Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. As per the written comments of C&PC  communicated  vide  their  U.O.  No.    46011/106/2009­PC­II    dated  18.01.2010,  the  Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Item to be exported Quantity Non­Pyrogenic Sterile Intravenous Infusion Sets (IV Set) 1. No. Raw­material sought to be imported Quantity 1.      PP Granules   2.      Polyacetal Resin   3.      Relevant Latex Rubber (latex Bulb) 4.      Relevant Needle (Stainless Steel) 5.      Relevant Luer Lock with Cap 6.      Relevant Y­Site 7.            For  1  kg  Components  /  Parts  made  of  PVC Compound i)        PVC Resin ii)              Dioctyl  Phthalate  (DOP)  /  Di­isononyl Cyclohexane/Hexamoil Dinch iii)     Epoxidised Soyabean Oil iv)     Dioctyl Adipate (DOA) / Plastom Oil DOA v)      Calcium Zinc Stablizer vi)     Calcium Stearate 8.      Medical Kraft Paper (GSM 70+/­20%)   9.      Polyester Polylaminte Zfilm (50 Microns+/­10%) 1.05  kg/kg  content  in export product 1.05  kg/kg  content  in export product Net+2% wastage Net+2% wastage Net+2% wastage Net+2% wastage     0.704 kg 0.330 kg   0.033 kg 0.0165 kg 0.0110 kg 0.0055 kg As per Packing Policy As per Packing Polic     4

Case No.:8/30/80­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/01138/AM09/ RLA File :09/24/040/00263/AM09/ Lic.No/Date:0910035492 30.09.2008

DHI communicated vide their U.O. No.  3(23)/09­TSW(B)/267  dated 28.05.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export product – weight of turbine 236 MT and generator 215 MT may be incorporated in the licence.   Import items ­ 1.           Items at Sl. No.1 to 31, 33 to 53,56, 57,62 to 64, 68 & 77 to 80   may  be  allowed as  per GN4 conditions. 2.      Item No.32 may be deleted as it is not part of the export product. 3.      Item at Sl No.54 to 55,58 to 61, 65 to67, 69 to 72 ,74to 76 may be allowed as applied for as wastage is only 3%. 4.      Item no 73 may be allowed at 7029 kg with 1% wastage     5

Case No.:11/32/80­ALC2/2008

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/01191/AM09/ RLA File :09/24/040/00280/AM09/ Lic.No/Date:0910035658 16.10.2008 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The representative of the DHI vide  U.O. Note No.3(23)/09­TSW(B)/270 dt.28.05.2010 informed the Committee  that the firm has furnished incomplete information. The Committee, therefore, decided to write to Executive Director with a copy to Chief    Managing  Director  of  the  firm  along  with  U.O.  Note  dated  28.5.10  to  furnish  the  complete information  otherwise  the  case  will  be  rejected  without  any  further  opportunity  and  no  further representation will be entertained.  The case stands deferred for relisting on 17.08.2010.   6

Case No.:6/38/80­ALC2/2008

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/01505/AM09/ RLA File :09/24/040/00324/AM09/ Lic.No/Date:0910036139 01.12.2008 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The representative of the DHI vide U.O.    No.3(42)/10­TSW(B)/315  dt.28.06.2010  informed  the  Committee  that  the  firm  has  furnished  the incomplete  information.  The  Committee  decided  to  write  to  Executive  Director  with  a  copy  to  Chief  Managing Director of the firm along with DHI UO note dt.28.06.2010 to furnish the following  information otherwise the case will be rejected without any further opportunity and no further representation will be entertained :­   1.       The details of each type of pump to be exported & their weight separately. 2.       Sl no 6 of SDL for each type of pump has not been given. 3.       Sl no 11 of SDL for all raw materials to be imported has not been given. Some calculation has been given. But relationship with the list of import items not known. 4.       Finished weight and gross weight of item no 86 of import.    The case stands deferred for re­listing  on 17.08.2010.

7

Case No.:43/5/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00051/AM10/ RLA File :03/94/040/00897/AM09/ Lic.No/Date:0310502444 13.01.2009 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010.  The  representative  of  the  DHI informed the Committee that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   8

Case No.:3/48/80­ALC2/2008

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/01764/AM09/ RLA File :05/24/040/00706/AM09/ Lic.No/Date:0510235844 05.02.2009 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010.  The  representative  of  the  DHI   9

Case No.:23/48/80­ALC2/2008

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/01784/AM09/ RLA File :09/24/040/00408/AM09/ Lic.No/Date:0910037050 12.02.2009 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The representative of the DHI vide  U.O.   No.3(42)/10­TSW(B)/316 dt.28.06.2010 informed the Committee  that the firm has furnished the incomplete  information.   The  Committee  decided  to  write  to  Executive  Director  with  a  copy  to  Chief  Managing Director of the firm along with DHI UO note dt.28.06.2010 to furnish the following information otherwise the case will be rejected without any further opportunity and no further representation will be entertained:­   1.             The details of each type of pump to be exported & their weight separately. 2.             Sl no 6 of SDL for each type of pump has not been given. 3.             Sl no 11 of SDL for all raw materials to be imported has not been given. Some calculation has been given. But relationship with the list of import items not known. 4.              Finished weight and gross weight of item no 101 of import.    The case stands deferred for re­listing on 17.08.2010.  

Case No.:33/48/80­ALC2/2008

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/01794/AM09/ RLA File :09/24/040/00419/AM09/ Lic.No/Date:0910037105 17.02.2009   h di ifi i f i f b h i i id d b h

10 Norms Committee (NC­I) in its Meeting No.14/11held on  20.07.2010. As per the written comments of DHI communicated vide their UO No3(6)/10/TSW(B)/271  dated 28.05.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export 1. The description of export product may be amended to “boiler parts consisting of Economiser & super heater” & its export weight is 239 MT may be incorporated in the licence. Import 1.        Item no 1 & 2­ The firm has increased quantity of import marginally and sought wastage of 2% on tubes which is reasonable. Hence this Office recommends for import of tubes at 130 MT for item no 1 & 50 MT for item no 2 as applied by the firm with 2% wastage.  2.        Item no 3­ “Tube sheet, Blind Flange, Cover Flange” may be deleted from the description of import item. Quantity of import is 11 numbers which may be incorporated along with the weight.   The difference between FOB Value of Export & CIF value of import is only Rs 4.1 Lakhs (Value addition is only 1.9%) & the firm is using 54 tons of indigenous materials like plates, tubes & electrodes etc. Taking into account the value of indigenous inputs, total value of inputs may exceed fob value.     11

Case No.:17/27/80­ALC2/2009

Party Name:CARCLO TECHNICAL PLASTICS PVT.LTD, Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00406/AM10/ RLA File :07/24/040/00666/AM09/ Lic.No/Date:0710063731 19.03.2009 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that no reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information. The Committee, therefore, decided to issue  final reminder to the firm for expediting the said information within a period of 15 days from the date of issue of communication otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.   12

Case No.:26/17/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00224/AM10/ RLA File :04/24/040/00079/AM10/ Lic.No/Date:0410106106 14.07.2009 Defer Date:17.08.2010     13

Case No.:26/17/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00253/AM10/ RLA File :04/24/040/00034/AM10/ Lic.No/Date:0410106305 21.07.2009 Defer Date:17.08.2010 D i i Th di ifi i f i f b h i i id d b h

reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information. The Committee, therefore, decided to issue  final reminder to the firm for expediting the said   14

Case No.:38/51/80­ALC2/2009

Party Name:WALVOIL FLUID POWER (INDIA) PVT.LTD, Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00829/AM10/ RLA File :07/21/040/00394/AM10/ Lic.No/Date:0710066108 23.07.2009 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information. The Committee, therefore, decided to issue final reminder to the firm for expediting the said   15

Case No.:22/19/80­ALC2/2009

Party Name:THE INDURE PVT. LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00278/AM10/ RLA File :05/24/040/00206/AM10/ Lic.No/Date:0510247147 04.08.2009 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010.  The  representative  of  the  DHI   16

Case No.:39/7/80­ALC2/2010

Party Name:KONECRANES  INDIA PRIVATE  LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status:   Deferred HQ File :01/80/050/00113/AM11/ RLA File :31/21/040/00143/AM10/ Lic.No/Date:3110039822 03.09.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.The representative of the DHI   17

Case No.:10/27/80­ALC2/2009

Party Name:STANZEN TOYOTETSU INDIA PVT.LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00399/AM10/ RLA File :07/24/040/00225/AM10/ Lic.No/Date:0710067109 18.09.2009 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010.  The  representative  of  the  DHI   C N 9/27/80 ALC2/2009 P t N SOLO M t N /D t 14/80 St t

18

Case No.:9/27/80­ALC2/2009

Party Name:SOLO MANUFACTURING PVT LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00398/AM10/ RLA File :05/24/040/00313/AM10/ Lic.No/Date:0510249709 22.09.2009 Defer Date:17.08.2010   19

Case No.:32/37/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00591/AM10/ RLA File :03/95/040/00336/AM10/ Lic.No/Date:0310539120 24.09.2009 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on      20.07.2010.The  representative  of  the  DHI   20

Case No.:6/29/80­ALC2/2009

Party Name:TEKSONS LTD Meet No/Date:14/80­ ALC2/2010 06.07.201 Status: Deferred HQ File :01/80/050/00435/AM10/ RLA File :03/95/040/00291/AM10/ Lic.No/Date:0310540943 08.10.2009 Defer Date:17.08.2010   21

Case No.:9/29/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00438/AM10/ RLA File :04/24/040/00158/AM10/ Lic.No/Date:0410108279 08.10.2009 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010.  The  representative  of  the  DHI   22

Case No.:10/29/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00439/AM10/ RLA File :04/24/040/00159/AM10/ Lic.No/Date:0410108280 08.10.2009 Defer Date:17.08.2010  

Case No :45/33/80 ALC2/2009

Part Name:BHARAT HEAVY Meet No/Date:14/80 Status:

23

Case No.:45/33/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00511/AM10/ RLA File :11/24/040/00015/AM10/ Lic.No/Date:1110021160 13.10.2009 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010.  The  representative  of  the  DHI   24

Case No.:33/33/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00499/AM10/ RLA File :04/24/040/00155/AM10/ Lic.No/Date:0410108786 23.10.2009   Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  As per the written comments of DHI  communicated  vide  their  UO  No  3(39)/10­TSW(B)/    dated  07.06.2010,  the  Committee  decided  to ratify the norms in respect of the subject advance authorization as under:­   EXPORT The  description  of  the  export  product  may  be  modified  to  “piping  system  for  2X500MW  steam generator for DVC Koderama Thermal Power station”& total export weight is 12391 MT & the same may be incorporated in the licence. IMPORT 1.  Item no 1­ (Carbon Steel)The quantity of seamless tube/ pipe to be allowed is 1225 MT & that of welded tube is 25 MT with 2% wastage as applied by the firm. 2. Item no 2­ (Alloy Steel)The quantity of seamless tube/ pipe to be allowed is 1500 MT& with 2% wastage as applied by the firm. “Welded” may be deleted from the description of import item. 3. Item no 3­ (Stainless Steel)The quantity of seamless tube/ pipe to be allowed is 16 MT& with 2% wastage as applied by the firm. “Welded” may be deleted from the description of import item. 4.  Item no 4­ The total weight is 266 MT & the same may be incorporated in the licence. The item may be allowed under GN­4 as applied for. 5. Item no­5­ Welding electrodes­ Quantity applied is only 12 MT which is with in the norms normally allowed. NC recommend import as applied for. 6. Item  no­6­  Item  is  a  component  &  may  be  allowed  under  GN­4.  The  weight  is  20  MT  may  be incorporated in the licence. 7. Item no 7­ The quantity of import may be amended to “constant load hangers­180 Nos & Variable Load hangers­ 220 Nos” & total weight is 100 MT may be incorporated in the licence. 8.  Item no 8 to 12­ These are components & may be allowed under GN­4.     25

Case No.:41/35/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00557/AM10/ RLA File :04/24/040/00185/AM10/ Lic.No/Date:0410109109 06.11.2009 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above authorization was considered by the

informed  the  Committee  that  they  have  not  received  the  reply  of  the  firm.  The  Committee,  therefore, decided  to  handover  the  firm’s  reply  to  the  technical  authority  for  examination  and  submission  of comments. The   case may be relist on 17.08.2010.       26

Case No.:42/35/80­ALC2/2009

Party Name:PRABHA EXPORTS(P) LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00558/AM10/ RLA File :03/95/040/00466/AM10/ Lic.No/Date:0310544453 06.11.2009   DIPP  communicated  vide  their  note    dated  06.07.2010,  the  Committee  decided  to  ratify  the  norms  in respect of the subject advance authorization with following modifications:­   1. Words “length 5.72 mtrs.” May be suffixed with the description of export product. 2. Quantities of import items from Sl.No. 1 to 8 may be allowed on net to net basis with accountability clause.     27

Case No.:36/35/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00552/AM10/ RLA File :04/24/040/00157/AM10/ Lic.No/Date:0410109323 11.11.2009   Decision : The case regarding ratification of norms in respect of above authorization was considered by the

DHI  communicated  vide  their  UO  No  3(39)/10­TSW(B)    dated  07.06.2010,  the  Committee  decided  to ratify the norms in respect of the subject advance authorization as under:­   EXPORT The description of the export product may be modified to “piping system for 1X500 MW Kalpakkam Nuclear  power  project”&  total  export  weight  is  2544  MT  &  the  same  may  be  incorporated  in  the licence. IMPORT 1.  Item no 1­ (Carbon Steel)The quantity of seamless tube/ pipe to be allowed is 950 MT & that of welded tube is 25 MT with 2% wastage as applied by the firm. 2. Item no 2­ (Alloy Steel)The quantity of seamless tube/ pipe to be allowed is 510 MT& with 2% wastage as applied by the firm. “Welded” may be deleted from the description of import item. 3.  Item no 3­ The total weight is 415 MT & the same may be incorporated in the licence. The item may be allowed under GN­4 as applied for. 4. Item no­4­ Welding electrodes­ Quantity applied is only 6 MT which is with in the norms normally allowed. We may recommend import as applied for. 5. Item no­5­ Item is a component 7 & may be allowed under GN­4. The weight is 10 MT may be incorporated in the licence. 6. Item no 6­ The quantity of import may be amended to “constant load hangers­80 Nos & Variable Load hangers­ 120 Nos” & total weight is 40 MT may be incorporated in the licence. 7.  Item no 7­ The quantity of import may be amended to “Snubber Assembly ­25 Nos & Rigid Struts­ 10 Nos” & total weight is 8 MT may be incorporated in the licence.     28

Case No.:8/35/80­ALC2/2009

Party Name:A RAYMOND FASTENERS INDIA PRIVATE LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00524/AM10/ RLA File :31/24/040/00158/AM10/ Lic.No/Date:3110040658 13.11.2009 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information. The Committee, therefore, decided to issue final reminder to the firm for expediting the said information  within a period of 15 days from the date of issue of communication otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.   29

Case No.:24/35/80­ALC2/2009

Party Name:A RAYMOND FASTENERS INDIA PRIVATE LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00540/AM10/ RLA File :31/24/040/00159/AM10/ Lic.No/Date:3110040728 19.11.2009 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on  20.07.2010.  The  representative  of  the  DHI informed  the  Committee  that  they  have  not  received  the  reply  of  the  firm.  The  Committee,  therefore, decided  to  handover  the  firm’s  reply  to  the  technical  authority  for  examination  and  submission  of comments. The    case may be relist on 17.08.2010.  

Case No :3/37/80­ALC2/2009

Party Name:S M PULP Meet No/Date:14/80­ Status:

30

Case No.:3/37/80­ALC2/2009

Party Name:S.M.PULP PACKAGING PVT.LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00562/AM10/ RLA File :05/24/040/00378/AM10/ Lic.No/Date:0510253563 27.11.2009 Defer Date:17.08.2010   31

Case No.:20/37/80­ALC2/2009

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00579/AM10/ RLA File :07/24/040/00324/AM10/ Lic.No/Date:0710068624 02.12.2009 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information. The Committee, therefore, decided to issue final reminder to the firm for expediting the said   32

Case No.:35/51/80­ALC2/2009

Party Name:THERMAX LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00826/AM10/ RLA File :31/24/040/00153/AM10/ Lic.No/Date:3110040979 08.12.2009   DHI communicated vide their U.O. No.  3(14)/10­TSW(B)/330  dated 05.07.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export 1.        The total export weight is 889 MT & the same may be incorporated in the licence. Import 1. Item  no  1­Quantity  of  import  requested  is  77327  meters  with  nil  wastage  &  the  same  may  be recommended. Its weight is 320.4 MT may be incorporated in the license. 2. Item no 2­ it is a component & may be allowed under GN­4. 3. Item no 3­ the word “finished” may be prefixed to the description& the weight is 11.7 MT may be incorporated to the license. 4. Item no 4­ The firm has neither given the weight nor dimension of import. The same may, therefore, be deleted. 5. Item  no  5­  Quantity  of  import  requested  is  63.5  MT  with  nil  wastage  &  the  same  may  be recommended. 6.   Item  no  6­Quantity  of  import  requested  is  11850  meters  with  nil  wastage  &  the  same  may  be recommended. Its weight is 56.9 MT may be incorporated in the license.    

Case No.:2/1/80­ALC2/2010

Party Name:APEX TEST Meet No/Date:14/80­ Status:

33

Case No.:2/1/80 ALC2/2010

Party Name:APEX TEST TECHNOLOGIES, Meet No/Date:14/80 ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00831/AM10/ RLA File :07/21/040/00797/AM10/ Lic.No/Date:0710069015 21.12.2009 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010.  The  representative  of  the  DHI   34

Case No.:13/42/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00659/AM10/ RLA File :04/24/040/00240/AM10/ Lic.No/Date:0410110329 22.12.2009 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that the firm did not furnish the required information in time and decided to write to Executive Director with a  copy to Chief  Managing Director for taking appropriate action and defer the consideration and to relist the case on 17.08.2010.   35

Case No.:17/43/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00682/AM10/ RLA File :04/24/040/00242/AM10/ Lic.No/Date:0410110351 23.12.2009   Norms Committee (NC­I) in its Meeting No.14/11held on 20.07.2010. As per the written comments of DHI communicated vide their UO No 3(39)/10­TSW(B) dated 07.06.2010 the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   EXPORT The  description  of  the  export  product  may  be  modified  to  “piping  system  for  2X500MW  Steam Generator for Shimadri STPS”& total export weight is 2663 MT & the same may be incorporated in the licence. IMPORT 1.  Item no 1­ (Carbon Steel)The quantity of seamless tube/ pipe to be allowed is 900 MT & that of welded tube is 30 MT with 2% wastage as applied by the firm. 2. Item  no  2­  (Alloy  Steel)The  quantity  of  seamless  tube/  pipe  to  be  allowed  is  50  MT&  with  2% wastage as applied by the firm. “Welded” may be deleted from the description of import item. 3.  Item no 3­ (Stainless Steel)The quantity of seamless tube/ pipe to be allowed is 6 MT& with 2% wastage as applied by the firm. 4. Item no­4­ The total weight is 99 MT & the same may be incorporated in the licence. The item may be allowed under GN­4 as applied for. 5. Item no­5­ Welding electrodes­ Quantity applied is only 2 MT which is with in the norms normally allowed. We may recommend import as applied for.    

Case No.:36/47/80­ALC2/2009

Party Name:INJECTOPLAST Meet No/Date:14/80­ Status:

36

Case No.:36/47/80 ALC2/2009

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:14/80 ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00755/AM10/ RLA File :06/24/040/00038/AM10/ Lic.No/Date:0610016960 05.01.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that both DC(MSME) and Deptt. of C&PC have furnished written Comments. It was decided to defer  consideration of the case and re­list the same on 17.08.2010 with comments of C&PC.   37

Case No.:3/42/80­ALC2/2009

Party Name:CETHAR VESSELS LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00649/AM10/ RLA File :04/24/040/00260/AM10/ Lic.No/Date:0410110662 07.01.2010 Defer Date:17.08.2010   38

Case No.:29/9/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00142/AM11/ RLA File :31/21/040/00290/AM10/ Lic.No/Date:3110041389 07.01.2010 Defer Date:17.08.2010   39

Case No.:4/45/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00691/AM10/ RLA File :03/94/040/00766/AM10/ Lic.No/Date:0310554385 08.01.2010 Defer Date:17.08.2010   40

Case No.:16/42/80­ALC2/2009

Party Name:KOMET PRECISION TOOLS INDIA PVT LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00662/AM10/ RLA File :07/24/040/00381/AM10/ Lic.No/Date:0710069369 11.01.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above authorization was considered by the

Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  On  the  recommendation of  the representative  of  DHI  present  in  the  meeting.  It  was  decided  by  the  Norms  Committee to    call  for  the following information / clarification from the firm and decided to defer the consideration of the case and relist on 17.08.2010:­   1. Total weight of the export product.    2.  Total weight of the import product. 3. Manufacturing process involved in the manufacturing process.   41

Case No.:22/51/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00813/AM10/ RLA File :09/24/040/00412/AM10/ Lic.No/Date:0910040591 12.01.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information. The Committee, therefore, decided to issue final reminder to Executive Director with a copy to Chief Managing Director of the firm for expediting the said information within a period of 15 days from the date of issue of communication otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.   42

Case No.:2/43/80­ALC2/2009

Party Name:LION HOLDINGS PVT. LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00667/AM10/ RLA File :05/23/040/00139/AM10/ Lic.No/Date:0510256222 14.01.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on      20.07.2010.  The  representative  of  the DC(MSME) informed the Committee that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   43

Case No.:8/43/80­ALC2/2009

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00673/AM10/ RLA File :05/24/040/00450/AM10/ Lic.No/Date:0510256489 18.01.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The representative of the DIPP informed the Committee that they have not received firm’s reply and therefore it was decided to forward a copy of the same to them. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   44

Case No.:10/43/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00675/AM10/ RLA File :07/21/040/00932/AM10/ Lic.No/Date:0710069460 19.01.2010   Decision : The case regarding ratification of norms in respect of above authorization was considered by the

DIT communicated vide their U.O. No.  17(20)/2010­IPHW  dated 11.06.2010, the Committee decided to ratify the norms of subject Advance Authorization on net­to­net basis with accountability clause.     45

Case No.:22/43/80­ALC2/2009

Party Name:ECOCAT INDIA PVT.LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00687/AM10/ RLA File :05/23/040/00162/AM10/ Lic.No/Date:0510256628 19.01.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  The representative of the DHI   46

Case No.:9/51/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00800/AM10/ RLA File :07/21/040/00933/AM10/ Lic.No/Date:0710069461 19.01.2010   DIT communicated vide their U.O. No.  17(25)/2010­IPHW  dated 11.06.2010, the Committee decided to ratify the norms of subject Advance Authorization on net­to­net basis with accountability clause.     47

Case No.:1/45/80­ALC2/2009

Party Name:STARION INDIA P.LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00688/AM10/ RLA File :31/24/040/00211/AM10/ Lic.No/Date:3110041587 20.01.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. On  the  recommendation  of  the representative  of  DIT  present  in  the  meeting.   It  was  decided  by  the  Norms  Committee  to  call  for  the following information / clarification from the firm and  defer  consideration of the case for re­listing on 17.08.2010:­   1. Details of the final product in which the import & export items would be used. 2. Usage of each of the import items in the export product. 3. Justification for the wastage of each of imports items, as claimed by the firm. 4. Whether the Norms Committee has ratified the norms of similar licence on the past. If yes, kindly provide a copy of the same.   48

Case No.:9/45/80­ALC2/2009

Party Name:THERMAX LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00696/AM10/ RLA File :31/24/040/00184/AM10/ Lic.No/Date:3110041632 22.01.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above authorization was considered by the

ec s o : e case ega d g at cat o o o s espect o above aut o at o was co s de ed by t e informed  the  Committee  that  they  have  not  received  the  reply  of  the  firm.  The  Committee,  therefore, decided to forward the firm’s reply to the technical authority for examination and submission of comments. The   case may be relisted on 17.08.2010.   49

Case No.:12/45/80­ALC2/2009

Party Name:MECHSOL TECHNOLOGIES PVT.LTD, Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00699/AM10/ RLA File :07/24/040/00364/AM10/ Lic.No/Date:0710069609 25.01.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for  expediting  the  said   50

Case No.:17/45/80­

ALC2/2009 Party Name:OGNIBENE INDIA PRIVATE LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00704/AM10/ RLA File :31/24/040/00217/AM10/ Lic.No/Date:3110041696 27.01.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. On the recommendation of the representative  of  DHI  present  in  the  meeting.  It  was  decided  by  the  Norms  Committee  to  call  for  the following information / clarification from the firm and decided to defer the consideration of the case to be relist on 17.08.2010:­         1.   Sl.  No 3,4,5 and 11 of SDL. 2.   Dimension of tubes & rods proposed for import.   51

Case No.:19/45/80­ALC2/2009

Party Name:SHOWA INDIA PRIVATE LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00706/AM10/ RLA File :05/24/040/00458/AM10/ Lic.No/Date:0510256995 27.01.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.    The  committee  noted  that  the Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 17.08.2010.  

Case No.:21/45/80­ALC2/2009

Party Name:THERMAX LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00708/AM10/ RLA File :31/24/040/00200/AM10/ Lic.No/Date:3110041728 28.01.2010 Defer Date:17.08.2010

52 g g p y Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  On  the  recommendation of  the representative  of  DHI  present  in  the  meeting.  It  was  decided  by  the  Norms  Committee  to  call  for  the following information / clarification from the firm and decided to defer the consideration of the case to be re­ listed on 17.08.2010:­ 1.Sl. No. 5,9, & 11 of SDL. 2.Net Weight & gross weight of castings & forging proposed for import. 3. Break up of  different types of pipes in to seamless & ERW and the respective quantity in length & weight. 4. Complete specification of item no.24 to 32 of import.   53

Case No.:15/51/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00806/AM10/ RLA File :11/24/040/00042/AM10/ Lic.No/Date:1110021676 28.01.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  The  representative  of  the  DHI   54

Case No.:22/45/80­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00709/AM10/ RLA File :31/24/040/00220/AM10/ Lic.No/Date:3110041743 29.01.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on  20.07.2010. The Committee observed that no reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information. The Committee, therefore, decided to issue final reminder to the firm for expediting the said   55

Case No.:25/45/80­ALC2/2009

Party Name:ALTEM POWER LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00712/AM10/ RLA File :31/24/040/00222/AM10/ Lic.No/Date:3110041766 01.02.2010 Defer Date:17.08.2010 informed  the  Committee  that  they  have  not  received  the  reply  of  the  firm.  The  Committee,  therefore, decided to forward the firm’s reply to the technical authority for examination and submission of comments. The   case may be relist on 17.08.2010.  

Case No.:28/45/80­ALC2/2009

Party Name:TERUMO PENPOL LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00715/AM10/ RLA File :53/24/040/00013/AM10/ Lic.No/Date:5310010091 01.02.2010  

56 g g p y C&PC communicated vide their O.M. No. 46011/21/2009­PC.II  dated 07.07.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Item to be Exported Quantity Blood Bags 1 No. Raw­material Recommended for Import Quantity 1.      PVC compound (Medical Grade)   2.            Relevant  Stainless  Steel  Needle Assembly 3.      Evident Paper – Plastic (Self Adhesive) 4.      Aluminium Foil Cover 5.      Relevant Plasma Cap (Rubber Cap) 6.      Relevant Luer Adapter 7.      Relevant Oxygen Absorber 8.      Stamping Foil Tape 9.      Thermal Transfer Ribbon 10.  Relevant Big Beak off Valve Assembly 11.  Y­ Connector 1.10 kg/kg content in export product Net + 3% wastage   Net + 5% wastage   Net + 1% wastage Net + 1% wastage Net + 1% wastage Net + 1% wastage Net + 1% wastage Net + 1% wastage Net + 1% wastage   Net + 1% wastage       57

Case No.:8/51/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00799/AM10/ RLA File :07/21/040/01035/AM10/ Lic.No/Date:0710069725 01.02.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010.  The  DIT  vide  their  letter  No. 17(30)/2010­IPHW dated 21.6.2010 has written to the firm for deputing their representative for technical discussion. The Committee decided to remind the firm to comply with the requirements of DIT    and defer  consideration  of the case for re­listing  on 17.08.2010.   58

Case No.:3/1/80­ALC2/2010

Party Name:WEBB INDIA PVT. LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00832/AM10/ RLA File :07/24/040/00411/AM10/ Lic.No/Date:0710069722 01.02.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on   20.07.2010.  On  the  recommendation  of  the representative of DHI present in the meeting the Committee decided to call for the following information / clarification from the firm and  defer  consideration of the case for re­listing on 17.08.2010:­   1. Specific item of export with its use. 2. Sl no 4,5,8 & 11 of SDL export product wise.    

Case No.:26/45/80­ALC2/2009

Party Name: DRIPLEX WATER Meet No/Date:14/80­ Status:

59 ENGINEERING LTD. ALC2/2010 06.07.2010 Deferred HQ File :01/80/050/00713/AM10/ RLA File :05/23/040/00147/AM10/ Lic.No/Date:0510257387 02.02.2010 Defer Date:17.08.2010 informed the Committee that they have not received the firm’s reply. It was decided by the committee to refer  a  copy  of  firm’s  reply  to  DHI  for  examination  and    comments.  The  case  may  be  relisted  on  17.08.2010.   60

Case No.:27/45/80­ALC2/2009

Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00714/AM10/ RLA File :05/23/040/00148/AM10/ Lic.No/Date:0510257390 02.02.2010 Defer Date:17.08.2010 informed the Committee that they have not received the firm’s reply. It was decided by the committee to refer  a  copy  of  firm’s  reply  to  DHI  for  examination  and    comments.  The  case  may  be  relisted  on  17.08.2010.   61

Case No.:29/45/80­ALC2/2009

Party Name:TRELLEBORG SEALING SOLUTIONS (INDIA) PVT LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00716/AM10/ RLA File :07/24/040/00365/AM10/ Lic.No/Date:0710069753 02.02.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010.  The  representative  of  the  DHI defer consideration and to relist the case on 17.08.2010.       62

Case No.:30/45/80­ALC2/2009

Party Name:PSK ENGINEERING PVT LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00717/AM10/ RLA File :07/24/040/00349/AM10/ Lic.No/Date:0710069760 02.02.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for  expediting  the  said  

Case No.:31/45/80­ALC2/2009

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00718/AM10/ RLA File :05/24/040/00466/AM10/ Lic.No/Date:0510257485 Defer

63 02.02.2010 Date:17.08.2010   64

Case No.:13/51/80­ALC2/2009

Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00804/AM10/ RLA File :34/24/040/00189/AM10/ Lic.No/Date:3410026224 02.02.2010 Defer Date:17.08.2010     65

Case No.:1/9/80­ALC2/2010

Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00114/AM11/ RLA File :03/94/040/00971/AM10/ Lic.No/Date:0310558549 04.02.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee noted that hard copy  of  firm’s  application  has  not  been  received  so  far  from  concerned  Regional  Authority.    The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 17.08.2010   66

Case No.:31/7/80­ALC2/2010

Party Name:PARIXIT INDUSTRIES LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00105/AM11/ RLA File :34/24/040/00196/AM10/ Lic.No/Date:3410026404 18.02.2010 Defer Date:17.08.2010

Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  On  the  recommendation of  the representative of the C&PC present in the meeting informed vide their letter dated 9th July, 2010 to call some information. The Committee, therefore, decided to ask the following information from the firm:­ 1. Technical  specifications,  ID/OD  and  other  details  including  product  catalogue  of  parts  and component of Drip Irrigation System to be exported alongwith copy of export order. 2. Whether the  weight of 782792.500 kg. indicated for Emitting Pipe is inclusive of Dripper weight or not?  Separate weight of Emitting Pipe and dripper contained in the Emitting Pipe may be furnished. 3. Specific  details  of  master  batch  along  with  %age  composition  (by  weight)  may  be  furnished  for manufacture of Emitting Pipe and Lateral Pipe. 4. Technical specifications, material for construction and weight/piece of dripper to be imported. 5. Detailed  manufacturing  process  alongwith  technical  justification  for  wastages  at  each  stage manufacturing process and also on each of the raw materials may be furnished. 6. Details of production of export products under reference and corresponding consumption of all the raw­materials (both imported and indigenous) during the last three years duly certified and CA may be furnished.    If  the  production  has  not  commenced  in  the  past,  details  from  commencement  of production may be furnished duly certified by CA. 7. Small sample of export  product.     The case may be relisted on 17.08.2010.           67

Case No.:14/51/80­ALC2/2009

Party Name:BGR ENERGY SYSTEMS LIMITED, Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00805/AM10/ RLA File :04/24/040/00301/AM10/ Lic.No/Date:0410111751 22.02.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on  20.07.2010. The Committee observed that no reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information. The Committee, therefore, decided to issue final reminder to the firm for expediting the said   68

Case No.:22/7/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00096/AM11/ RLA File :09/24/040/00447/AM10/ Lic.No/Date:0910041035 22.02.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committed noted that the firm has not furnished their reply and decided to write to Executive Director with a copy to Chief  Managing Director of the firm to furnish the complete information otherwise the case will be rejected without any further chance and no further representation will be entertained and defer the consideration and to relist the case on 17.08.2010.  

Case No.:27/51/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG CO LTD Meet No/Date:14/80­ ALC2/2010 Status: D f d

69 MFG. CO. LTD., ALC2/2010 06.07.2010 Deferred HQ File :01/80/050/00818/AM10/ RLA File :03/94/040/01010/AM10/ Lic.No/Date:0310561529 23.02.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  The representative of the DIPP informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.    70

Case No.:25/51/80­ALC2/2009

Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00816/AM10/ RLA File :05/23/040/00188/AM10/ Lic.No/Date:0510259390 24.02.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that the comments called for from DIT/C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 17.08.2010.   71

Case No.:23/51/80­ALC2/2009

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00814/AM10/ RLA File :05/23/040/00179/AM10/ Lic.No/Date:0510259450 25.02.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that the comments called for from M/o Mines  are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be relisted on 17.08.2010.   72

Case No.:20/51/80­ALC2/2009

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00811/AM10/ RLA File :07/24/040/00459/AM10/ Lic.No/Date:0710070262 26.02.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information  despite  reminder.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for expediting  the  said  information  within  a  period  of  15  days  from  the  date  of  issue  of  communication otherwise their case will be rejected and no further representation will be entertained.   The case may be re­ listed on 17.08.2010.       73

Case No.:28/51/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00819/AM10/ RLA File :04/24/040/00290/AM10/ Lic.No/Date:0410112044 02.03.2010 Defer Date:17.08.2010 i ( ) i i i / h ld h i d d h h fi

Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committed noted that the firm has not furnished their reply and decided to write to Executive Director with a copy to Chief  Managing Director of the firm to furnish the complete information otherwise the case will be rejected without any further chance and no further representation will be entertained and defer the consideration and to relist the case on 17.08.2010.   74

Case No.:3/51/80­ALC2/2009

Party Name:MIKROTEK MACHINES LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00794/AM10/ RLA File :07/24/040/00458/AM10/ Lic.No/Date:0710070360 04.03.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on     20.07.2010.  The  committee  noted  that  the Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 17.08.2010.   75

Case No.:4/51/80­ALC2/2009

Party Name:MIKROTEK MACHINES LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00795/AM10/ RLA File :07/24/040/00457/AM10/ Lic.No/Date:0710070361 04.03.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010.  The  committee  noted  that  the Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 17.08.2010.   76

Case No.:36/51/80­ALC2/2009

Party Name:MARKS PRYOR MARKING TECHNOLOGY PRIVATE LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00827/AM10/ RLA File :31/24/040/00213/AM10/ Lic.No/Date:3110042306 10.03.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  On  the  recommendation of  the representative of the DHI present in the meeting it was decided by the Committee to ask the following information/ clarification from the firm:­   1. Sl.No. 4, 5 & 11 of SDL.     77

Case No.:21/7/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00095/AM11/ RLA File :09/24/040/00522/AM10/ Lic.No/Date:0910041258 10.03.2010 Defer Date:17.08.2010 N C i (NC I) i i M i N 14/11h ld 20 07 2010 Th C i d d h h fi

Norms Committee (NC­I) in its Meeting No.14/11held on 20.07.2010. The Committed noted that the firm has not furnished their reply and decided to write to Executive Director with a copy to Chief  Managing Director of the firm to furnish the complete information otherwise the case will be rejected without any further opportunity  and no further representation will be entertained. The case stands deferred for re­listing on 17.08.2010.   78

Case No.:29/51/80­ALC2/2009

Party Name:PIONEER FRICTION LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00820/AM10/ RLA File :02/24/040/00236/AM10/ Lic.No/Date:0210139134 11.03.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  On  the  recommendation of  the representative of the DHI present in the meeting it was decided by the Committee to ask the following information / clarification from the firm:­   1.Sl no 3,4,5  & 11 of SDL     79

Case No.:32/51/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00823/AM10/ RLA File :03/95/040/00808/AM10/ Lic.No/Date:0310564122 11.03.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information  despite  reminder.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for expediting the said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.   80

Case No.:16/7/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00090/AM11/ RLA File :03/94/040/01060/AM10/ Lic.No/Date:0310564639 12.03.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that the comments called for from DIT  are yet to be received. The Committee, therefore, decided to remind the firm  to  comply  with  the  requirements  of  DIT’s  letter  dt.21.06.2010.  The  case  may  be  relisted  on 17.08.2010.   81

Case No.:37/51/80­ALC2/2009

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00828/AM10/ RLA File :05/24/040/00517/AM10/ Lic.No/Date:0510260519 15.03.2010 Defer Date:17.08.2010 N C itt (NC I) i it M ti N 14/11h ld 20 07 2010 Th t ti f th DIPP

Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The representative of the DIPP informed the Committee that the case was under their study. The Committee, therefore, decided to defer the   82

Case No.:1/1/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00830/AM10/ RLA File :07/24/040/00475/AM10/ Lic.No/Date:0710070572 17.03.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information  despite  reminder.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for expediting the said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.   83

Case No.:7/1/80­ALC2/2010

Party Name:SKF TECHNOLOGIES (INDIA) PRIVATE LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00836/AM10/ RLA File :07/24/040/00469/AM10/ Lic.No/Date:0710070610 19.03.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information  despite  reminder.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for expediting the said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.   84

Case No.:9/1/80­ALC2/2010

Party Name:SEC INDUSTRIES PVT.LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00838/AM10/ RLA File :09/24/040/00501/AM10/ Lic.No/Date:0910041387 19.03.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee decided to forward a copy of firm’s application  to M/o Defence  for examination and  comments. The case stands deferred for re­listing on 3.8.2010.   85

Case No.:34/7/80­ALC2/2010

Party Name:RESHAM ROOSEN INDIA PVT.LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00108/AM11/ RLA File :06/24/040/00051/AM10/ Lic.No/Date:0610017515 19.03.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on  20.07.2010. The Committee handed over the case file to DIPP for examination and  comments. The case stands deferred for re­listing on 17.08.2010.   

Case No.:35/7/80­ALC2/2010

Party Name:PRAG RUBBER INDUSTRIES (P) LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00109/AM11/ RLA File :06/24/040/00050/AM10/ Lic.No/Date:0610017518 19 03 2010

86 19.03.2010 DHI communicated vide their U.O. No.  3(11)/09­TSW(B)/  dated 05.07.2010, the Committee decided to ratify  the  norms  in  respect  of  the  subject  advance  authorization    under  GN­4  as  items  of  import  are components.     87

Case No.:8/1/80­ALC2/2010

Party Name:SATA VIKAS INDIA PRIVATE LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00837/AM10/ RLA File :05/24/040/00529/AM10/ Lic.No/Date:0510260906 22.03.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010.  The  representative  of  the DC(MSME)  informed  the  Committee  that  they  have  not  received  the  application  of  the  firm.    The Committee,  therefore,  decided  to  forward  a  copy  of  firm’s  application  to  the  technical  authority  for examination and   comments.   The case may be relisted on 17.08.2010.    88

Case No.:10/1/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00839/AM10/ RLA File :07/24/040/00476/AM10/ Lic.No/Date:0710070638 22.03.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information  despite  reminder.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for expediting the requisite information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.   89

Case No.:12/1/80­ALC2/2010

Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Closed HQ File :01/80/050/00841/AM10/ RLA File :61/24/040/00056/AM10/ Lic.No/Date:6110000403 22.03.2010   Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that RA has issued Advance Authorisation to the firm under General Note No.4 on net to  net  basis  in terms of  policy Circular No.20 dt.05.12.2007.  The Committee, therefore decided  to close the case.   90

Case No.:13/1/80­ALC2/2010

Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Closed HQ File :01/80/050/00842/AM10/ RLA File :61/24/040/00057/AM10/ Lic.No/Date:6110000404 22.03.2010   Norms Committee (NC I) in its Meeting No 14/11held on 20 07 2010 The Committee observed that RA

Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that RA has issued Advance Authorisation to the firm under General Note No.4 on net to net basis in terms of  policy Circular No.20 dt.05.12.2007.  The Committee, therefore decided  to close the case.   91

Case No.:14/1/80­ALC2/2010

Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Closed HQ File :01/80/050/00843/AM10/ RLA File :61/24/040/00058/AM10/ Lic.No/Date:6110000405 22.03.2010   Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that RA has issued Advance Authorisation to the firm under General Note No.4 on net to net basis in terms of  policy Circular No.20 dt.05.12.2007.  The Committee, therefore decided  to close the case.   92

Case No.:15/1/80­ALC2/2010

Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Closed HQ File :01/80/050/00844/AM10/ RLA File :61/24/040/00059/AM10/ Lic.No/Date:6110000406 22.03.2010   Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that RA has issued Advance Authorisation to the firm under General Note No.4 on net to net basis in terms of  policy Circular No.20 dt.05.12.2007.  The Committee, therefore decided  to close the case.     93

Case No.:16/1/80­ALC2/2010

Party Name:THERMAX LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00845/AM10/ RLA File :31/24/040/00242/AM10/ Lic.No/Date:3110042472 23.03.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. On  the  recommendation  of  the representative of the DHI present in the meeting. It was decided by the Committee to ask the following   1. Sl no 5,9 & 11 of SDL. 2. Details of Auxiliaries proposed for export with their weight & the items required for the manufacture of the same. 3. Net weight & gross weight of item no 1 of import.     94

Case No.:14/1/85­ALC3/2010

Party Name:BOVING FOURESS PRIVATE LIMITED, Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/85/050/00265/AM10/ RLA File :07/24/040/00477/AM10/ Lic.No/Date:0710070643 23.03.2010 Defer Date:17.08.2010 Norms Committee (NC I) in its Meeting No 14/11held on 20 07 2010 The committee noted that the

Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on     20.07.2010.  The  committee  noted  that  the Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 17.08.2010.   95

Case No.:17/1/80­ALC2/2010

Party Name:ZINSER TEXTILE SYSTEMS PVT. LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00846/AM10/ RLA File :03/95/040/00831/AM10/ Lic.No/Date:0310566228 24.03.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010. The  representative  of  the  DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the   96

Case No.:21/1/80­ALC2/2010

Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00850/AM10/ RLA File :05/24/040/00535/AM10/ Lic.No/Date:0510261287 26.03.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  On  the  recommendation of  the representative of the DHI present in the meeting, it was decided by the Committee to ask the following   1. Sl no 3,4 5, & 11  of SDL along with sample of export product     97

Case No.:23/1/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00852/AM10/ RLA File :04/24/040/00321/AM10/ Lic.No/Date:0410112741 29.03.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committed noted that the firm has not furnished their reply and decided to write to Executive Director with a copy to Chief  Managing Director of the firm to furnish the complete information otherwise the case will be rejected without any further opportunity  and no further representation will be entertained. The case stands deferred for re­listing on 17.08.2010.   98

Case No.:24/1/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00853/AM10/ RLA File :04/24/040/00322/AM10/ Lic.No/Date:0410112742 29.03.2010 Defer Date:17.08.2010 Norms Committee (NC I) in its Meeting No 14/11held on 20 07 2010 The representative of the DHI

Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010. The  representative  of  the  DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the   99

Case No.:21/9/80­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00134/AM11/ RLA File :03/94/040/01139/AM10/ Lic.No/Date:0310567657 31.03.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010. The  representative  of  the  DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the   100

Case No.:22/9/80­ALC2/2010

Party Name:ATLAS COPCO (INDIA) LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00135/AM11/ RLA File :03/94/040/00850/AM10/ Lic.No/Date:0310567659 31.03.2010   the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. As per written comments of DIPP communicated vide note dated 06.07.2010, the Committee, decided to ratify the norms in respect of the subject advance authorization as per GN­4.   101

Case No.:24/9/80­ALC2/2010

Party Name:ATLAS COPCO (INDIA) LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00137/AM11/ RLA File :03/94/040/01003/AM10/ Lic.No/Date:0310567686 31.03.2010   DIPP communicated vide note dated 06.07.2010, the Committee, decided to ratify the norms in respect of the subject advance authorization as per GN­4.   The Regional Authority may take necessary action accordingly   102

Case No.:27/9/80­ALC2/2010

Party Name:GENESIS MEMBRANE SEPRATECH PRIVATE LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00140/AM11/ RLA File :03/94/040/01143/AM10/ Lic.No/Date:0310567775 01.04.2010   DIPP communicated vide note dated 06.07.2010, the Committee, decided to ratify the norms in respect of the subject advance authorization as per GN­4.    

Case No.:28/7/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:14/80­ ALC2/2010 Status: Deferred

103 G ON N V . ., C / 0 0 06.07.2010 e e ed HQ File :01/80/050/00102/AM11/ RLA File :34/24/040/00219/AM10/ Lic.No/Date:3410026751 06.04.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that the comments called for from  Deptt of C&PC are yet to be received.  The Committee, therefore, decided to remind them for   expediting their comments. The case may be re­listed on 17.08.2010.   104

Case No.:29/7/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00103/AM11/ RLA File :34/24/040/00228/AM10/ Lic.No/Date:3410026752 06.04.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that the comments called for from  Deptt of C&PC are yet to be received.  The Committee, therefore, decided to remind them   for expediting their comments. The case may be re­listed on 17.08.2010   105

Case No.:30/7/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00104/AM11/ RLA File :34/24/040/00232/AM10/ Lic.No/Date:3410026753 06.04.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that the comments called for from  Deptt of C&PC are yet to be received.  The Committee, therefore, decided to remind them   for expediting their comments. The case may be re­listed on 17.08.2010.   106

Case No.:37/7/80­ALC2/2010

Party Name:ELECTROMECH MATERIAL HANDLING SYSTEMS(I) PVT LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00111/AM11/ RLA File :31/21/040/00402/AM10/ Lic.No/Date:3110042767 06.04.2010   the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  . As per written comments of DIPP communicated vide note dated 06.07.2010, the Committee, decided to ratify the norms in respect of the subject advance authorization as under:­   1. Words “Consisting of Hoisting Mechanism with motor and  Gear  Box”  may  be  suffixed  with  the description of import item. 2. Import items may be allowed as per  GN­4        

Case No.:25/9/80­ALC2/2010

Party Name:ATLAS COPCO (INDIA) LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00138/AM11/ RLA File :03/94/040/00999/AM10/ Lic.No/Date:0310568208 06.04.2010

107 Decision : The case regarding ratification of norms in respect of above authorization was considered by DIPP communicated vide note dated 06.07.2010 the Committee, decided to ratify the norms in respect of the subject advance authorization as per GN­4.     108

Case No.:26/7/80­ALC2/2010

Party Name:WOLFRA­ TECH PVT LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00100/AM11/ RLA File :07/24/040/00402/AM10/ Lic.No/Date:0710070813 07.04.2010   the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  As per written comments of DIPP communicated vide note dated 06.07.2010, the Committee, decided to ratify the norms in respect of the subject advance authorization with the following modification:­    “After taking clue from SION at S.No. C­1316, quantities of import items Sl. No. 1&2  may be allowed as applied for i.e.1060 Kgs and 70 Kgs. respectively”.     109

Case No.:7/9/80­ALC2/2010

Party Name:KOSTWEIN INDIA COMPANY PVT. LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00120/AM11/ RLA File :08/24/040/00011/AM11/ Lic.No/Date:0810088351 20.04.2010   DIPP communicated vide note dated 06.07.2010, the Committee, decided to ratify the norms in respect of the subject advance authorization as per GN­4.     110

Case No.:28/9/80­ALC2/2010

Party Name:CARTOON SANITATION PVT. LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00141/AM11/ RLA File :06/24/040/00006/AM11/ Lic.No/Date:0610017739 20.04.2010 Defer Date:17.08.2010 the  Norms  Committee  (NC­I)  in  its  Meeting  No.14/11held  on      20.07.2010.  The  representative  of DC(MSME) present in the meeting informed that the case is under their examination. It was decided to defer consideration of case for 17.8.2010.     111

Case No.:23/7/80­ALC2/2010

Party Name:DONALDSON INDIA FILTER SYSTEMS PVT. LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00097/AM11/ RLA File :05/23/040/00229/AM10/ Lic.No/Date:0510262793 22.04.2010 Defer Date:17.08.2010

the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee decided to forward  a  copy  of  application  to  Deptt  of  C&CP  for  comments  and  defer  the  same  for  re­listing  on 17.08.2010.   112

Case No.:26/9/80­ALC2/2010

Party Name:HAWA VALVES (INDIA) PVT. LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00139/AM11/ RLA File :03/94/040/00077/AM11/ Lic.No/Date:0310571019 23.04.2010   the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  As per written comments of DC  (MSME)  communicated  vide  U.O.  note  No.  30(119)  2008­ME  dated  10.06.2010,  the  Committee  decided to ratify the norms in respect of the subject advance authorization as per GN­4.     113

Case No.:13/9/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00126/AM11/ RLA File :03/95/040/00027/AM11/ Lic.No/Date:0310571475 27.04.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for  expediting  the  said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.   114

Case No.:16/9/80­ALC2/2010

Party Name:BOYSEN INDIA LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00129/AM11/ RLA File :05/23/040/00023/AM11/ Lic.No/Date:0510263144 27.04.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   115

Case No.:15/9/80­ALC2/2010

Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00128/AM11/ RLA File :05/23/040/00012/AM11/ Lic.No/Date:0510263163 28.04.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on 20.07.2010. On the recommendation of the

the Norms Committee (NC I) in its Meeting No.14/11held on   20.07.2010. On the recommendation of the   1. Calculation & justification of quantity of import of item no 8. 2. Sl no 8 of SDL for item no 5 & justification of quantity of import     116

Case No.:1/7/80­ALC2/2010

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00075/AM11/ RLA File :05/24/040/00027/AM11/ Lic.No/Date:0510263356 29.04.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that DIT vide letter dated 5.7.2010 has asked for the following documents/information from the firm:­ a)          ICAM System; b)          SK with Basic controller; c)          24 VDC 8 Sink in 8 Relay out, DNET COMMS, Screw; d)          Control net 2 X capacity bridge MOD redundant media; e)          10­31 VDC Input/Out 32 Pts (36 pin); f)            Logix 5564 16 MB Controllers     117

Case No.:17/9/80­ALC2/2010

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00130/AM11/ RLA File :05/23/040/00233/AM10/ Lic.No/Date:0510263362 29.04.2010 Defer Date:17.08.2010   1. Specific item of export. 2. Use of the export product. 3. Break up of all import items to Seamless & welded pipes. 4. The firm has mentioned in the manufacturing process that pipe fittings are manufactured from pipes. Again pipe fittings are imported. The firm may clarify 5. SL Non 3,5 & 11 of SDL. 6. Net weight & gross weight of Steel flanges & castings proposed for import. 7. Details of item no 13 of import & its use.    

Case No.:23/9/80­ALC2/2010

Party Name:ATLAS COPCO (INDIA) LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00136/AM11/ RLA File :03/94/040/00076/AM11/ Lic.No/Date:0310572023 29.04.2010

118 Decision : The case regarding ratification of norms in respect of above authorization was considered by DIPP communicated vide note dated 06.07.2010;08.07.2010 and 20.07.2010, the Committee, decided to ratify the norms in respect of the subject advance authorization as per GN­4.     119

Case No.:2/7/80­ALC2/2010

Party Name:MIKROTEK MACHINES LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00076/AM11/ RLA File :07/24/040/00025/AM11/ Lic.No/Date:0710071365 30.04.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee noted that hardcopy  of  firm’s  application  has  not  been  received  so  far  from  concerned  Regional  Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI for examination and submission of comments. The case may be relisted on 17.08.2010.   120

Case No.:3/7/80­ALC2/2010

Party Name:LINCOLN HELIOS ( I ) LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00077/AM11/ RLA File :07/24/040/00021/AM11/ Lic.No/Date:0710071374 30.04.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for  expediting  the  said information otherwise their case will be rejected and no further representation will be entertained. The case may be re­listed on 17.08.2010.   121

Case No.:4/7/80­ALC2/2010

Party Name:WINDLASS ENGINEERS & SERVICES PVT.LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00078/AM11/ RLA File :61/24/040/00013/AM11/ Lic.No/Date:6110000431 30.04.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee noted that hardcopy  of  firm’s  application  has  not  been  received  so  far  from  concerned  Regional  Authority.    The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 17.08.2010.   122

Case No.:24/7/80­ALC2/2010

Party Name:VA TECH WABAG LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00098/AM11/ RLA File :04/24/040/00025/AM11/ Lic.No/Date:0410113509 30.04.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on  20.07.2010. The representative of the DIPP

( ) g p informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.    123

Case No.:14/9/80­ALC2/2010

Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00127/AM11/ RLA File :11/24/040/00002/AM11/ Lic.No/Date:1110022305 30.04.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on  20.07.2010. On the recommendation of the   1.  Information in respect of Sl. No. 4, 5, 11 & 13 of Standard Deficiency Format. 2. Size/specifications of items of imports.   The case may be re­listed on 17.08.2010.   124

Case No.:5/7/80­ALC2/2010

Party Name:PSK ENGINEERING PVT LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00079/AM11/ RLA File :07/24/040/00022/AM11/ Lic.No/Date:0710071387 03.05.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The representative of the DIPP informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   125

Case No.:6/7/80­ALC2/2010

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00080/AM11/ RLA File :07/24/040/00024/AM11/ Lic.No/Date:0710071392 03.05.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  The Committee noted that hard copy of firm’s application has not been received so far from concerned Regional Authority.    The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 17.08.2010.   126

Case No.:7/7/80­ALC2/2010

Party Name:IPG PHOTONICS (INDIA) PVT LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00081/AM11/ RLA File :07/24/040/00018/AM11/ Lic.No/Date:0710071394 03.05.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee noted that

( ) g hardcopy  of  firm’s  application  has  not  been  received  so  far  from  concerned  Regional  Authority.    The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 17.08.2010.   127

Case No.:8/7/80­ALC2/2010

Party Name:TRF LIMITED, Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00082/AM11/ RLA File :02/24/040/00254/AM10/ Lic.No/Date:0210141744 06.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above authorization   20.07.2010. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.    128

Case No.:9/7/80­ALC2/2010

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00083/AM11/ RLA File :31/24/040/00012/AM11/ Lic.No/Date:3110043149 06.05.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above authorization   20.07.2010. On the recommendation of the representative of the DIPP present in the meeting, it was decided by the Committee to ask the following information / clarification from the firm:­         1. Sl. No. 5 & 11 of Standard Deficiency Format. 2. Blank size for each export product supported by size of the export product. 3. Sheet lay out diagram indicating the wastage during blanking, export product­wise. The case may re­listed on 17.08.2010.   129

Case No.:12/9/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00125/AM11/ RLA File :03/95/040/00069/AM11/ Lic.No/Date:0310572951 06.05.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on  20.07.2010. The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for  expediting  the  said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.   130

Case No.:10/7/80­ALC2/2010

Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00084/AM11/ RLA File :04/24/040/00330/AM10/ Lic.No/Date:0410113575 07.05.2010  

DIPP communicated vide note dated 06.07.2010, the Committee  decided to ratify the norms in respect of the subject advance authorization with import from S. No. 1 to 69 on net­to­net basis with accountability clause.         131

Case No.:18/9/80­ALC2/2010

Party Name:BECTON DICKINSON INDIA PRIVATE LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00131/AM11/ RLA File :05/23/040/00025/AM11/ Lic.No/Date:0510263911 07.05.2010   Deptt.  of  C  &  P  communicated  vide  O.M.  No.46011/06/2010­PC.II  dated  31st  March,  2010,  the Committee, decided to ratify the norms in respect of  the  subject advance authorization as under:­   Item to be Exported Quantity Intravenous Cathetor/I.V,Cannula (Venflon)22G 1 No. Raw­material sought to be Imported Quantity 1.Relevant PTFE Tube 2.Relevant Brushing 3.Relevant Cannula 4. Relevant Catheter Hub 5.Relevant Threaded Plug IVC 6. Relevant Grip Venflon 7. Relevant Flow Control Plug­IVC 8. Relevant Protection Hub Venflon –IVC 9. Relevant Cap Venflon 10. Relevant Silicone tube 11. Relevant APET Film12 12. Relevant Tyvak Unprinted Net+ 10% Wastage 1.02  No. 1.02 No. 1.015 No. 1.01 No. 1.02 No. 1.02 No. 1.02 No. 1.01 No. Net + 1.15% wastage 0.00614 SqM 0.00528 SqM     132

Case No.:19/9/80­ALC2/2010

Party Name:ECOCAT INDIA PVT.LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00132/AM11/ RLA File :05/23/040/00035/AM11/ Lic.No/Date:0510264008 10.05.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for  expediting  the  said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.  

Case No.:14/7/80­ALC2/2010

Party Name:CARBONE LORRAINE INDIA PVT LTD Meet No/Date:14/80­ ALC2/2010 06 07 2010 Status: Approved

133 06.07.2010 HQ File :01/80/050/00088/AM11/ RLA File :04/24/040/00031/AM11/ Lic.No/Date:0410113729 12.05.2010   the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  As per written comments of DIPP communicated vide note dated 06.07.2010; the Committee, decided to ratify the norms in respect of the subject advance authorization as per GN­4.     134

Case No.:15/7/80­ALC2/2010

Party Name:THE INDURE PVT. LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00089/AM11/ RLA File :05/24/040/00020/AM11/ Lic.No/Date:0510264158 12.05.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on  20.07.2010. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.    135

Case No.:27/7/80­ALC2/2010

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00101/AM11/ RLA File :03/94/040/00104/AM11/ Lic.No/Date:0310574052 13.05.2010 Defer Date:17.08.2010 representative of the DIPP present in the meeting, it was decided by the Committee to ask the following   1.      Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Format. 2.      Quantities of import items at Sl. Nos. 1 & 2 in Nos. also in addition to their weights.   The case may re­listed on 17.08.2010.   136

Case No.:32/7/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00106/AM11/ RLA File :03/95/040/00086/AM11/ Lic.No/Date:0310574189 13.05.2010 Defer Date:17.08.2010 representative of the DIPP present in the meeting, it was decided by the Committee to ask the firm to furnish the information regarding S.No. 5,11 and 13 of SDL. The case may re­listed on 17.08.2010.       

Case No.:33/7/80­ALC2/2010

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00107/AM11/ RLA File :03/94/040/00135/AM11/ Lic.No/Date:0310574215 13.05.2010 Defer Date:17.08.2010

137 representative of the DIPP present in the meeting, it was decided by the Committee to ask the following   1.      Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Format. 2.      Quantity of import item at Sl. No. 2 in Nos. also in addition to its weights.     138

Case No.:30/9/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00143/AM11/ RLA File :61/24/040/00016/AM11/ Lic.No/Date:6110000447 13.05.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.    139

Case No.:2/9/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00115/AM11/ RLA File :31/21/040/00048/AM11/ Lic.No/Date:3110043252 17.05.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.   The representative of the DHI informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   140

Case No.:3/9/80­ALC2/2010

Party Name:MASTER HANDLERS PVT. LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00116/AM11/ RLA File :31/21/040/00059/AM11/ Lic.No/Date:3110043269 18.05.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee decided that the  firm’s  application    received  from  concerned  RA    may  be  forwarded  to  DHI  for  examination  and  comments. The case stands deferred for re­listing  on 17.08.2010.   141

Case No.:4/9/80­ALC2/2010

Party Name:DAEWON INDIA AUTOPARTS PVT LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00117/AM11/ RLA File :04/24/040/00032/AM11/ Lic.No/Date:0410113880 18.05.2010 Defer Date:17.08.2010

   Sl. No.3,4,5 & 11 of SDL.     142

Case No.:5/9/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00118/AM11/ RLA File :03/95/040/00101/AM11/ Lic.No/Date:0310574966 19.05.2010 Defer Date:17.08.2010   1. Specific item of export & quantity in number and weight separately. 2. Break up of import of steel pipes/tubes in to seamless & welded and Carbon steel, Alloy Steel & stainless steel types. 3. Specific item of import under item no 7 o9f import. 4. Sl no 11 of SDL.     143

Case No.:6/9/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00119/AM11/ RLA File :05/24/040/00063/AM11/ Lic.No/Date:0510264573 19.05.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  On the recommendation of the representative of the DIPP present in the meeting, it was decided by the Committee to ask the following   1. S.No.3,4,5 & 11 SDL     144

Case No.:8/9/80­ALC2/2010

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00121/AM11/ RLA File :03/95/040/00076/AM11/ Lic.No/Date:0310575329 20.05.2010   i d id d d h i d id d if h i f

DIPP communicated vide note dated 06.07.2010, the Committee  decided to ratify the norms in respect of the subject advance authorization as per  SION at S.No. C­1829.     145

Case No.:9/9/80­ALC2/2010

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00122/AM11/ RLA File :03/95/040/00077/AM11/ Lic.No/Date:0310575334 20.05.2010   DIPP communicated vide note dated 06.07.2010; the Committee  decided to ratify the norms in respect of the subject advance authorization as per  SION at S.No. C­1829.     146

Case No.:10/9/80­ALC2/2010

Party Name:SOLO MANUFACTURING PVT LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00123/AM11/ RLA File :05/24/040/00056/AM11/ Lic.No/Date:0510264643 21.05.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee decided that the  firm’s  application  received  from  concerned  RA    may  be  forward  to  DHI  for  examination  and   comments and decided to defer the consideration and to re­list on 17.08.2010.         147

Case No.:11/9/80­ALC2/2010

Party Name:M M AQUA TECHNOLOGIES LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Approved HQ File :01/80/050/00124/AM11/ RLA File :05/24/040/00454/AM10/ Lic.No/Date:0510264645 21.05.2010   the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  As per written comments of C&PC communicated vide OM No.46011/253/2004­PC­II  dated 05.01.2009, the Committee  decided to ratify the norms in respect of the subject advance authorization as under:­   Item to be exported Quantity PVC Fill Media / Drift Eliminator 1 MT   Raw­material  Recommended  for import Quantity PVC  Sheet  (Thickness  0.175  mm  to 0.80 mm) 1.15 MT    

Case No.:20/9/80­ALC2/2010

Party Name:KINECO PVT. LTD. Meet No/Date:14/80­ A C2/2010 Status: f

148 ALC2/2010 06.07.2010 Deferred HQ File :01/80/050/00133/AM11/ RLA File :17/24/040/00004/AM11/ Lic.No/Date:1710003338 21.05.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee decided that the  firm’s  application  received  from  concerned  RA    may  be  forward  to  DHI  for  examination  and  comments and decided to defer the consideration and to re­list on 17.08.2010.   149

Case No.:31/9/80­ALC2/2010

Party Name:ORBIT AUTOMATION & PROJECTS INDIA PVT LTD. Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00144/AM11/ RLA File :09/24/040/00068/AM11/ Lic.No/Date:0910042148 26.05.2010 Defer Date:17.08.2010 the Norms Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee noted that hard copy  of  firm’s  application  has  not  been  received  so  far  from  concerned  Regional  Authority.    The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority for examination and submission of comments. The case may be relisted on 17.08.2010.   150

Case No.:32/9/80­ALC2/2010

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00145/AM11/ RLA File :06/24/040/00010/AM11/ Lic.No/Date:0610018054 26.05.2010 Defer Date:17.08.2010   1.               Serial no3,4,5 & 11 of SDL for each export product. 2.               Sample of product in CKD/SKD condition     151

Case No.:33/9/80­ALC2/2010

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:14/80­ ALC2/2010 06.07.2010 Status: Deferred HQ File :01/80/050/00146/AM11/ RLA File :06/24/040/00011/AM11/ Lic.No/Date:0610018056 26.05.2010 Defer Date:17.08.2010 t ti f th DHI t i th ti it d id d b th C itt t k th f ll i

  1.      Serial no3,4,5 & 11 of SDL for each export product. 2.      Sample of product in CKD/SKD condition   Sl.No.07

Case No. A ­ 08

M/s.  IDMC Limited, Vithal  F.No. 01/80/050/00723/AM06/DES­I A.A. Lic.No. & Date Meeting No.14/11 R.A. F.No.34/24/040/00124/AM06 3410014306 dt.07.09.2005 Date: 06.07.2010;08.07.2010 and 20.07.2010 Ratification of norms   The  case  regarding  ratification  of  norms  in  respect  of  above  authorization  was  considered  by  the  Norms Committee  (NC­I)  in  its  Meeting  No.14/11held  on  20.07.2010.  As  per  the  written  comments  of  DIPP communicated vide their note  dated 06.07.2010, the Committee decided to ratify the norms in respect of the subject advance authorization with following modifications:­   1. Net empty weights of 5442 Kgs., 2938 Kgs., 4454 Kgs., 21604 Kgs., 22180 Kgs., 22994 Kgs., 12314 Kgs., 12775 Kgs. & 8909 Kgs. may be specified with the quantities of export products from Sl. Nos. 1 to 9 respectively.. 2. Quantity of import item at Sl. No.  1 may be allowed as 1760 Kgs. inclusive of 3 % wastage as applied for by the firm. 3. Quantity of import item at Sl. No.  2 may be allowed as 8562 Kgs. inclusive of 3 % wastage as applied for by the firm. 4. Quantity of import item at Sl. No.  3 may be allowed as 20195 Kgs. inclusive of 3 % wastage as applied for by the firm. 5. Quantity of import item at Sl. No.  4 may be allowed as 3395 Kgs. inclusive of 3 % wastage as applied for by the firm. 6. Quantity of import item at Sl. No.  5 may be allowed as 3934 Kgs. inclusive of 3 % wastage as applied for by the firm. 7. Quantity of import item at Sl. No.  6 may be allowed as 7662 Kgs. inclusive of 3 % wastage as applied for by the firm.     Sl.No.08

Case No.  A ­ 02

M/s. IDMC Limited Vithal Udyognagar HQ F.No.01/80/050/00281/AM07/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.34/24/040/00067/AM07 3410016262 dt.15.06.2006   Date: 06.07.2010;08.07.2010  and 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on  20.07.2010. The representative of the DIPP informed the Committee that they have not received firm’s reply and therefore, it was decided to forward a copy of the same to them. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.     Sl.No.09

Case No.  A ­ 03

M/s.  Johnson  Matthey India Pvt. LTd., Gurgaon HQ F.No.01/80/162/00501/AM10/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.05/24/039/00001/AM10 0510240582 dt.29.04.2009 Date: Ratification of norms

Date: 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on 20.07.2010.  On the recommendation of the representative of the DHI present in the meeting, it was decided by the Committee to ask the following information / clarification from the firm:­   1.      Sl. No.11 of  SDL. 2.      The details of  indigenous input with value may also be given as value addition is low. 3.      The firm may be submit a copy of the licence with list of items of import & export.       S.No.10

Case No.  A ­ 09

M/s. Jhagadia Copper LTd.,   HQ F.No.01/80/162/00542/AM10/DES.I Lic.No. & Date Meeting No.14/11  RA.F.No.34/24/039/00001/AM10 3410024795 dt.29.07.2009 Date: 06.07.2010;08.07.2010 and 20.07.2010 Ratification of  norms.   Committee (NC­I) in its Meeting No.14/11held on  20.07.2010. The M/o Mines informed the committee vide their letter dt.30.06.2010 and requested to furnish a copy of ID notes dt.22.03.2010 and 22.04.2010 that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.     S.No.89

Case No.  A/R­111

M/s.  Dickinson  Fowler Pvt. Ltd., Bangalore HQ F.No.01/80/50/01584/AM06/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.07/24/040/01012/AM06 07100438505 dt.21.03.2006   Date: 20.07.2010 Revision of norms   Committee  (NC­I)  in  its  Meeting  No.14/11held  on      20.07.2010.  As  per  the  written  comments  of  DHI communicated vide their U.O. No.  3(155)/09­TSW(B)/  dated 28.06.2010, the Committee after deliberations came to conclusion that as per justification given by firm the item No. 12,13,28,29 & 35 in the licence are same as given in Shipping Bill so far as their use is concerned.  It was decided to recommend item No. 12,13, 28, 29 & 35 mentioned on the subject Advance Authorisation..       S.No.90

Case No.  A/R­113

M/s.  Sona  Okegawa Precison Forgings LTd.,  F.No.01/81/50/00884/AM06/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.05/24/040/00842/AM06 0510175316 dt.27.01.2006 Date: 20.07.2010 Revision of norms   Committee (NC­I) in its Meeting No.14/11 held on  20.07.2010. The representative of the DHI informed the Committee that the case was under their examination The Committee therefore decided to defer the

Committee  that  the  case  was  under  their  examination.  The  Committee,  therefore,  decided  to  defer  the     S.No.91

Case No.  A/R ­ 141

M/s.  Delphi­TVS Diesel  Systems  Ltd., Chennai HQ F.No.01/80/50/01546/AM07/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.04/24/040/00466/AM07 0410088535 dt.23.03.2007 Date: and 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on and  20.07.2010. The representative of the DHI informed the     S.No.92

Case No.  A/R ­ 142

M/s.  Delphi­TVS Diesel  Systems  Ltd., Chennai HQ F.No.01/80/50/00559/AM08/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.04/24/040/00243/AM08 0410091897 dt.05.11.2007 Date: 20.07.2010   Committee  (NC­I)  in  its  Meeting  No.14/11held  on  20.07.2010.  The  representative  of  the  DHI  informed  the     S.No.93

Case No.  A/R – 143

M/s.  Arjun Technologies (I) Ltd., HQ F.No.01/80/50/00296/AM09/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.04/24/040/00410/AM07 0410087487 dt.09.02.2007 Date: 20.07.2010   Committee  (NC­I)  in  its  Meeting  No.14/11held  on  20.07.2010.  As  per  the  written  comments  of  DHI communicated vide their U.O. No.  3(13)/09­TSW(B)/324  dated 28.06.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.      “Export Product weight of 185549 kg. may be incorporated in the license and Import of HR coil  may be allowed to the extent of  40.6 MT”.     S.No.94

Case No.  A/R­171

M/s. GEA BGR Energy System  India  Ltd., Chennai HQ F.No.01/80/50/00505/AM09/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.04/24/040/00077/AM09 0410096594 dt.18.06.2008 Date: and 20.07.2010   Committee  (NC­I)  in  its  Meeting  No.14/11held  on      20.07.2010.  As  per  the  written  comments  of  DHI communicated vide their U O No 3(74)/10­TSW(B)/268 dated 07 06 2010 the Committee decided to ratify

communicated vide their U.O. No.  3(74)/10­TSW(B)/268  dated 07.06.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Import   1.    The  firm  has  requested  for  deletion  of  item  no  2,  5  to  10  of  import  as  they  have          procured  it indigenously. The above items may be deleted. 2.   Item no 1 & 3 & 4 of import are components & the same may be allowed under    GN­4.   S.No.95

Case No.  A/R­172

M/s.  Delphi­TVS Diesel  Systems  Ltd., Chennai HQ F.No.01/80/50/00618/AM09/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.04/24/040/00409/AM08 0410096031 dt.26.05.2008 Date: and 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on  20.07.2010.  The  representative  of  the  DHI  informed  the     S.No.96

Case No.  A/R­175

M/s.  GEA  BGR Energy  System  India Ltd., Chennai HQ F.No.01/80/50/01098/AM08/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.04/24/040/00324/AM08 0410092979 dt.02.01.2008 Date: 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The representative of the DHI informed the     S.No.97 Case No.   A/R ­ 146 M/s.  Delphi­TVS Diesel  Systems  LTd., Chennai   HQ F.No.01/80/50/00624/AM09/DES.I Lic.No. & Date Meeting No.14/11  RA.F.No.04/24/040/00410/AM08 0410096032 dt.26.05.2008 Date: and 20.07.2010 Ratification of  norms.   Committee  (NC­I)  in  its  Meeting  No.14/11held  on  20.07.2010.  The  representative  of  the  DHI  informed  the   S.No.98 Case No.   A/R ­ 147 M/s.  Delphi­TVS Diesel  Systems  LTd., Chennai   HQ F.No.01/80/50/00560/AM08/DES.I Lic.No. & Date Meeting No.14/11  RA.F.No.04/24/040/00244/AM08 0410091900 dt.05.11.2007 Date: and 20.07.2010 Ratification of  norms.

Committee  (NC­I)  in  its  Meeting  No.14/11held  on  20.07.2010.  The  representative  of  the  DHI  informed  the     S.No.99 Case No.   A/R ­ 6 M/s. Value Industries LTd., Mumbai   HQ F.No.01/80/162/00194/AM10/DES.I Lic.No. & Date Meeting No.14/11  RA.F.No.03/95/040/00012/AM10 0310527117 dt.03.07.2009 Date: and 20.07.2010 Ratification of  norms   Committee (NC­I) in its Meeting No.14/11held on  20.07.2010. The representative of the DIPP informed the   S.No.100

Case No.  A/R­40

M/s.  Bharat  Heavy Electricals Ltd., Haridwar HQ F.No.01/80/162/00539/AM09/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.61/24/040/00036/AM09 6110000254 dt.05.12.2008   Date: 20.07.2010   Committee  (NC­I)  in  its  Meeting  No.14/11held  on  20.07.2010.  The  representative  of  the  DHI  informed  the     S.No.101

Case No.  A/R­41

M/s.  Bharat  Heavy Electricals Ltd., Bhopal HQ F.No.01/80/050/00339/AM10/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.11/24/040/00010/AM10 1110020832 dt.04.08.2009   Date: 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on  20.07.2010.  The  representative  of  the  DHI  informed  the   S.No.102

Case No.  A/R­42

M/s.  Bharat  Earth  Movers Ltd., Bangalore HQ F.No.01/80/050/00535/AM08/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.07/24/040/00486/AM08 0710053990 dt.23.10.2007   Date: 20.07.2010   Committee  (NC­I)  in  its  Meeting  No.14/11held  on      20.07.2010.  As  per  the  written  comments  of  DHI communicated vide their U.O. No.  3(68)/07­TSW(B)/323  dated 28.06.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­

(1)   The firm has given the calculation supported by drawing, the wastage claimed is less than 1%  therefore Committee recommends import of item no. 33 to 37 as applied for.     S.No.103

Case No.  A/R­43

M/s.  Bharat  Heavy Electricals Ltd., Bhopal HQ F.No.01/80/050/01778/AM09/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.11/24/040/00073/AM09 1110019583 dt.10.02.2009   Date: 20.07.2010   Committee  (NC­I)  in  its  Meeting  No.14/11held  on  20.07.2010.  The  representative  of  the  DHI  informed  the     S.No.104

Case No.  A/R­44

M/s. Thermax Ltd.., HQ F.No.01/80/050/00680/AM09/DES.I Lic.No. & Date Meeting No.14/11 RA F.No.31/24/040/00367/AM08 3110033041 dt.11.03.2008   Date: 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on 20.07.2010. On the recommendation of the representative of the DHI present in the meeting, it was decided by the Committee to ask the following information / clarification from the firm:­   1.      Revised Sl. No.5 of SDL in view of change in export weight & reduction of import items. 2.      Sl. No.11 of SDL. 3.      Reason for drastic reduction of quantity of import. They may also give reason for applying higher quantity during submitting application.     S.No.105

Case No.  A/R­45

M/s.  Sona  Okegawa Precision  Forgings  Ltd., Gurgaon HQ  F.No.01/81/050/00914/AM07/DES.II/ DES­I Lic.No. & Date Meeting No.14/11 RA F.No.05/24/040/00762/AM07 0510199272 dt.09.02.2007   Date: 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on   20.07.2010.  On the recommendation of the representative of the DHI present in the meeting, it has been noted that firm has not replied to the query raised by this office. The  Committee decided to remind  the firm finally giving 15 days time to furnish the following information /clarification/answer the query  from the issue of this communication otherwise their case will be rejected and no further representation will be entertained.:­   1. Sl. No.3 & 11 of SDL export product wise. The calculation of wastage should be given co­relating the same with drawing. 2. Actual export product weight and quantity in number with corresponding gross weight of raw material for

2. Actual export product weight and quantity in number with corresponding gross weight of raw material for all the models may be given.   The reply to the above may be furnished only when the firm desires ratification of A.A. under para 4.7 of H.B.P.    S.No.106

Case No.  A/R­47

M/s. Thermax Ltd., HQ F.No.01/80/050/00682/AM08/DES­I Lic.No. & Date Meeting No.14/11 RA F.No.05/24/040/00393/AM08 3110033083 dt.11.03.2008   Date: 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on 20.07.2010. The Committee observed that no reply of the firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain  information  despite reminder. The Committee, therefore, decided to issue reminder to the firm for expediting the said information within a period of 15 days from the date of issue of communication otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.     S.No.107 Case No.   A/R – 149 M/s. Thermax LTd.,   HQ F.No.01/81/50/000310/AM06/DES.I Lic.No. & Date Meeting No.14/11  RA.F.No.31/24/040/00017/AM06 3110021206 dt.14.07.2005 Date: and 20.07.2010 Ratification of  norms.   Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The representative of the DHI informed the         S.No.108 Case No.   A/R – 150 M/s.  Bharat  Heavy Electricals  LTd., Bhopal   HQ F.No.01/80/50/01469/AM08/DES.I Lic.No. & Date Meeting No.14/11  RA.F.No.11/24/040/00042/AM08 1110016562 dt.17.12.2007 Date: and 20.07.2010 Ratification of  norms.   Committee (NC­I) in its Meeting No.14/11held on  20.07.2010.  The  representative  of  the  DHI  informed  the   S.No.109 Case No.   A/R – 152 M/s. Thermax LTd.,   HQ F.No.01/81/50/00240/AM08/DES.I Lic.No. & Date Meeting No.14/11  RA.F.No.31/24/040/00153/AM08 3110030218 dt.08.08.2007 Date: and 20.07.2010 Ratification of  norms.

Committee (NC­I) in its Meeting No.14/11held on  20.07.2010.  The  representative  of  the  DHI  informed  the     S.No.110

Case No. A/R. ­ 55

M/s.  ICM Engineering  Pvt. LTd.,   HQ F.No.01/80/162/01053/AM06/DES.I Lic.No. & Date Meeting No.14/11  RA.F.No.05/24/040/00605/AM06 0510170529 dt.11.11.2005 Date: and 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on  20.07.2010.  The  representative  of  the  DHI  informed  the     S.No.111

Case No.  A/R. ­ 56

M/s.  Bharat Heavy Electricals Ltd., Haridwar   HQ F.No.01/80/162/01056/AM08/DES.I Lic.No. & Date Meeting No.14/11  RA.F.No.61/24/040/00045/AM08 6110000134 dt.11.02.2008 Date: and 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on  20.07.2010.  The  representative  of  the  DHI  informed  the             S.No.112

Case No.A/R. ­ 57

M/s.  Bharat Heavy Electricals  Ltd., Bhopal   HQ F.No.01/80/50/00419/AM10/DES.I Lic.No.  & Date Meeting No.14/11   RA.F.No.11/24/040/00016/AM10 1110021021 dt.08.09.2009 Date: and 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The representative of the DHI informed the     S.No.113

Case No.A/R. ­ 58

M/s.  Botil  Oil Tools India  Pvt. Ltd.,  New HQ F.No.01/80/50/01719/AM09/DES.I Lic.No. & Date Meeting No.14/11  RA.F.No.05/24/040/00676/AM09 0510235207

Delhi   dt.28.01.2009 Date: and 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on  20.07.2010. The Committee was informed that the firm was asked  to  submit  the  gross  weight  and  net  weight  of  each  imported    tube  giving  manufacturing  process; justification for wastage at each stage of manufacture which they have not furnished. It was decided to ask the firm to depute their technical person well conversant to appear before the Committee for personal hearing to explain all their cases with complete information and  data etc.  The case may be re­listed on 17.08.2010.     S.No.114

Case No.A/R. ­ 59

M/s.  Botil  Oil Tools India Pvt. Ltd.,  New Delhi   HQ F.No.01/80/50/00875/AM09/DES.I Lic.No. & Date Meeting No.14/11   RA.F.No.05/24/040/00327/AM09 0510225643 dt.18.08.2008 Date: 20.07.2010     Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The Committee was informed that the firm was asked  to  submit  the  gross  weight  and  net  weight  of  each  imported    tube  giving  manufacturing  process; justification for wastage at each stage of  manufacture which they have not furnished. It was decided  to ask the firm to depute their technical person well conversant to appear before the Committee for personal hearing to explain all their cases with complete information and  data etc.  The case may be re­listed on 17.08.2010.     S.No.115

Case No.  A/R. ­ 60

M/s.  Delphi­TVS Diesel  Systems Ltd., Chennai   HQ F.No.01/80/50/00334/AM09/DES.I Lic.No. & Date Meeting No.14/11   RA.F.No.04/24/040/00330/AM08 0410094252 dt.05.03.2008 Date: 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The representative of the DHI informed the     S.No.116

Case No.  A/R. ­ 61

M/s.  Brakes  India Ltd., Chennai   HQ F.No.01/80/50/01248/AM09/DES.I Lic.No. & Date Meeting No.14/11   RA.F.No.04/24/040/00176/AM08 0410099633 dt.31.10.2008 Date: 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on   20.07.2010. The representative of the DHI informed the

S.No.117

Case No.  A/R. ­ 62

M/s.  The  Saraswati Industrial Syndicate LTd.,   HQ F.No.01/81/50/00466/AM07/DES.I Lic.No. & Date Meeting No.14/11   RA.F.No.05/24/040/00482/AM07 0510190825 dt.14.09.2006 Date: 20.07.2010   Committee  (NC­I)  in  its  Meeting  No.14/11held  on    20.07.2010.  The  representative  of  DIPP  informed  the Committee  that  complete  papers  of  the  case  are  readily  not  available  with  them.  The  Committee  therefore handed over the case file  to the technical authority for examination and submission of comments. The case may be relisted on 17.08.2010.   S.No.118

Case No.  A/R. ­ 116

M/s.  GEA  BGR Energy  Systems  Ltd., Chennai   HQ F.No.01/80/50/01284/AM09/DES.I Lic.No. & Date Meeting No. 14/11  RA.F.No04/24/040/00197/AM09 0410099963 dt.12.11.2008 Date: and 20.07.2010 Ratification of  norms.   Committee (NC­I) in its Meeting No.14/11held on 20.07.2010. The Committee was informed that some cases of this firm are pending for want of information from them.  It was decided to club all the pending cases and ask the  firm  to  depute  a  technical  person  with  complete  information  etc.  for  personal  hearing  before  Norms Committee on 10.8.2010.  In the instant case the information may also be provided:­   1. Justification of quantity of import of item no. 6 is not given. 2. Sl. No. 11 of  SDL for raw material (Item No. 12 to 14) has also not been gtiven.   The case may be re­listed on 10.08.2010.     S.No.119

Case No.A/R­19

M/s. Graphite  India Ltd., Nashik HQ F.No.01/80/50/1343/AM06/DES–I   Lic. Nos. & Date Meeting No. 14/11 RLA F.No.03/94/040/01160/AM06 0310364066 dt.20.01.2006 Date: and 20.07.2010   Committee  (NC­I)  in  its  Meeting  No.14/11held  on  20.07.2010.      As  per  written  comments  of  DIPP communicated vide note dated 06.07.2010, the Committee, decided to ratify the norms in respect of the subject advance authorization with the following modification:­    “As the actual net weight of export product is 25.5 MT, it may be corrected to 25.5 MT”.     S.No.18

Case No. C­21

M/s.  Hindustan Impex, Jamnagar  F.No.01/80/162/00686/AM10/DES.I Lic.No. & Date Meeting No.14/11 Fixation of wastage Norms   Date: 20.07.2010

Committee (NC­I) in its Meeting No.14/11held on  20.07.2010. On the recommendation of the representative of the DIPP present in the meeting, it was decided by the Committee to ask the following information / clarification from the firm:­   1. Sl. No. 3,4,5 & 11 of SDL.       S.No.19

Case No. C­13

M/s.    Degania Medical  Devices  Pvt. LTd., Gurgaon  F.No.01/80/162/00160/AM10/DES.I   Lic.No. & Date Meeting No.14/11   Date: and 20.07.2010 Fixation of wastage norms   Committee (NC­I) in its Meeting No.14/11held on 20.07.2010. As per the written comments of DC(MSME) communicated vide their U.O. No.  30(83)/2009­ME  dated 12.07.2010, the Committee decided to ratify the wastage  norms  as  recommended  by  the  office  of  the  Asstt.  Commissioner  Central  Excise,  New  Delhi  and communicated  to  Asstt  Development  Commissioner,  SEZ  Noida  vide  their  letter  No.  CE­ 20/Degania/100%EOU/Destruction/07/2304 dated 12.3.2009.         S.No.20

Case No. C ­ 12

Confederation of Indian Industry, New Delhi ­M/s. Ambica Steels Ltd., Sahibabad, Ghaziabad F.No.01/80/162/00527/AM10/DES­I Meeting No.14/11 Date: 20.07.2010 Streamlining the DEPB benefits on auto spare parts   Committee (NC­I) in its Meeting No.14/11held on    20.07.2010. The representative of the DHI informed the     S.No.21

Case No. C ­ 24

Reference  received  from NSEZ,  Noida  of  M/s. Eurotherm  Hema  Radiators India Ltd.,  F.No. 01/80/162/00842/AM10/DES.I Meeting No.14/11   Fixation of wastage norms Date: and 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on  20.07.2010.  The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder.     Sl.No.22

Case No. C­01

M/s.  BOSCH  Limited, Bangalore  F.No. 01/80/162/1193/AM09/DES.I Meeting No.14/11 Fixation    of  SION  for  the  export  product  “Common  Rail Injector Parts” Date: and 20.07.2010   Committee  (NC­I)  in  its  Meeting  No.14/11held  on  20.07.2010.The  representative  of  the  DHI  informed  the           Sl.No.23

Case No.  C ­06

M/s.  Indo  Schottle Auto Parts Pvt. Ltd.,   HQ F.No.01/81/80/162/00576/AM10/DES.I Meeting No.14/11 Fixation  of  wastage    norms  for  the  export  product “Central  Housing  Cover,  Coller,  Thrust,  Coupling, Injector Plunger, Fitting High Pressure Fuel etc.” Date: 20.07.2010   Committee (NC­I) in its Meeting No.14/11held on  20.07.2010.  The  representative  of  the  DHI  informed  the                                                                                     ***********