Agenda for Approval Committee meeting for SEZ Pune Cluster to be held on 09 February 2024 — 02-2midc-pune-sez
SEEPZ SPECIAL ECONOMIC ZONE ANDHERI (EAST), MUMBAI.
AGENDA FOR
MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR IT/ITES AT PUNE OF MIDC-SEZ
DATE : 09.02.2024
TIME : 4.00 P.M.
MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR IT/ITES AT PUNE, UNDER THE CHAIRMANSHIP OF DEVELOPMENT COMMISSIONER, SEEPZ-SEZ ON 09.02.2024 INDEX
Agenda Item No.
Subject
Agenda Item No. 01: - Confirmation of the Minutes of the meeting held on 18.12.2023 Agenda Item No. 02: - Monitoring of Performance for M/s Fulcrum Digital Pvt Ltd. Agenda Item No. 03: - Application for extension of LOA submitted by M/s Xcaliber Infotech Pvt Ltd. Agenda Item No. 04:- Application for List of Materials submitted by M/s MIDC (Developer) Agenda Item No. 05:- Application for Application for List of Materials submitted by M/s MIDC (Developer) Agenda Item No. 06:- Application for List of Materials submitted by M/s Nxtra Digital Ltd (Co-Developer) Agenda Item No. 07:- Application for List of Materials submitted by M/s Nxtra Digital Ltd (Co-Developer) Agenda Item No. 08:- Application for installation of Solar System submitted by M/s Tata Consultancy Services Ltd. Agenda Item No. 09:- Application for installation of Solar System submitted by M/s Tudip Technologies Pvt Ltd. Agenda Item No. 10:- Application for approval of Change in Board of Directors submitted by M/s. Nxtra Digial Ltd. (Unit) Agenda Item No. 11:- Application for approval of Change in Board of Directors submitted by M/s. Nxtra Digial Ltd. (Co-Developer) Agenda Item No. 12:- Application for Change in Shareholding Pattern submitted by M/s. Tata Technologies
GOVT. OF INDIA, OFFICE OF THE ZONAL DEVELOPMENT COMMISSIONER, SEEPZ – SEZ (PUNE CLUSTER),
AGENDA NOTE FOR CONSIDERATION OF THE APPROVAL COMMITTEE
a. Proposal: Monitoring of the performance of M/s. Fulcrum Digital Pvt Ltd., for 4 years of 1st Block (FY 2018-19 to FY 2021-22) b. Specific Issue on which decision of UAC is required: Monitoring of performance for the period 2018-19 to 2021-22 (4 years of 1st block period) under Rule 54 of SEZ Rules, 2006
The details of the export projections are as detailed below:
c. Approved export Projections for Ist Block Period: (Rs. in Crores)
Year
1
2
3
4
5
Total
FOB Value of Exports
33.00
34.65
36.38
38.20
40.11
182.34
FE Outgo
1.19
0.36
0.38
0.40
0.42
2.74
NFE achieved
31.81
34.29
36.00
37.80
39.69
179.60
d. Performance as compared to projections: FY 2018-19 to 2022-23
(Rs. In Crores)
Year
Export
F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2018-19 33.00 64.34 0 0 0 1.74 1.87 2019-20 34.65 67.89
0 2.18 2020-21 36.38 82.68
0 0 2021-22 38.20 19.49
0 0 Total : 142.23 234.40
0 1.74 4.05 Cumulative NFE achieved: FY 2018-19 to 2022 -23 (Rs. in crores)
Year Cumulative NFE Achieved Cumulative % NFE Achieved 2018-19 62.30 96.82% 2019-20 127.83 96.67% 2020-21 210.34 97.87% 2021-22 229.65 97.97%
Employment Achievement (Direct): FY 2018-19 to 2021-22
The Unit has achieved employment of 593 employees (Men – 498 & Women – 95) as on 31.03.2022 e. Other Information: File No.S-SEZ-MONT0MIDC/9/2023-JDCP
LOA No. & Date LOA No SEEPZ/PUNE(23)2007- 08/45 DATED 28.02.2008 (As Amended)
Location of Unit Plot No. 23/4, MIDC-SEZ, RGIP, Phase III, Hinjewadi, Pune 411057. Validity of LOA 11.08.2023 Item(s) of manufacture/ Services IT/ITES Date of commencement of production 12.08.2013 Execution of BLUT 2.10 Crores
Outstanding Rent dues NA Labour Dues NA Validity of Lease Agreement
Pending CRA Objection, if any NA Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA a. No. of employees as on 31.03.2022 593 Quantity and value of goods exported under Rule 34 (unutilized goods)
NA Value Addition during the monitoring period
NA Whether all the APRs being considered now has been filed well within the time limit, or otherwise.
If no, details of the Year along with no of days delayed to be given.
Yes
The Specified Officer has submitted a report vide letter dated 05.01.2024, in the
prescribed format along with point-wise reply to the discrepancies as follows:-
a. Export
Details of year-wise export as per the prescribed format:
From the year 2018-2019 to 2021-2022
(Rs. In
Crores)
Year/Pe
riod
Figures as
per APR
Figures as per Softex/
SB / Customs Records
Difference if
any
Reason for
Difference/Remark
(1)
(2)
(3)
(4)
(5)
2018-19
64.34
64.12
0.21
Difference is due to
Exchange Rate
variation.
2019-20
67.88
70.48
(-)2.59
Difference is due to
File No.S-SEZ-MONT0MIDC/9/2023-JDCP
Exchange Rate variation. 2020-21 82.68 84.69 (-)2.01 Difference is due to Exchange Rate variation. 2021-22 19.48 19.30 0.18 Difference is due to Exchange Rate variation.
b. Import i. (Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis
(Rs. In Crores)
Year/Per iod Figures as per APR (RM Imported) Figures as per Customs Records / Bond Register Difference if any Reason for Difference/Remark 2018-19 1.73 1.73 NIL NIL 2019-20 NIL NIL NIL NIL 2020-21 NIL NIL NIL NIL 2021-22 NIL NIL NIL NIL c. BLUT (Rs. In Crores) 1 Value of BLUT Executed (Duty foregone) (including for CG / Raw Material / Services) Value of Additional BLUT executed TOTAL Duty value of BLUT Executed in Lakhs: No. SEEPZ-SEZ/PUNE/7D/2007- 08TO 2017/VOL-II/3066 DATED 11.03.2020 Rs. 2.40 Crores.
2 Total Duty Foregone on goods & services
procured
Category Wise:Year Wise
(Rs.in Lakhs)
F.Y. Goods Services Imp. & Ind. 2018-19 0.35 0.00 2019-20 0.04 0.00 2020-21 0.10 0.08 2021-22 0.25 0.05 Total 0.74 0.13
3 Has the Unit procured goods and or services without having sufficient balance in their BLUT.
No File No.S-SEZ-MONT0MIDC/9/2023-JDCP
If yes, Month & Year when the BLUT was exhausted Details of the consignments and Total value of Goods procured without having sufficient or nil balance in BLUT
(d ) Employment made as on date- (as on end of block period / year up to which monitoring is being done) As on 31.03.2022 Men – 498 Women – 95 Total - 593 (e) Details of pending Foreign Remittance beyond Permissible period, if any (as on……….) To cross-check the same and verify whether necessary permission from AD Bank / RBI has been obtained. No
(f) Whether all softex has been filed for the said period. If no, details thereof. SO to also check whether unit has obtained Softex condonation from DC office / RBI and if approved, whether they have filed such pending Softex. Yes (g) Whether all Softex has been certified, if so till which month has the same been certified. If not, provide details of the Softex and reasons for pendency. Yes. All the Softex Forms upto June, 2021 since there was no export thereafter for 09 months from July, 2021 to March, 2022. (h) Whether unit has filed any request for Cancellation of Softex NO (i) Whether any Services provided in DTA / SEZ/EOU/STPI etc. against payment in INR in r/o IT/ITES Unit during the period. If yes, details thereof (year wise details to be provided) NO.
(j) SO to verify & certify the unit has updated the BLUT ledger Module in SEZ Online. As per Office Order No. 02/2023 dated 16.03.2023, Uploading of BLUT online is kept in File No.S-SEZ-MONT0MIDC/9/2023-JDCP
abeyance. (k) Has the unit cleared any Capital Goods procured duty free in DTA against payment of Duty, or otherwise. Full details to be provided along with value of assets and duty discharged No. (l) Is the unit sharing any of their infrastructures with other units or are utilizing infrastructure of another unit in the same or other SEZ. If so, details thereof, including the details of the unit with whom the sharing is being made, and the payment terms If approval for sharing of common infrastructure has been obtained from UAC / DC office, the date of UAC / Approval letter to be indicated
NO.
(m ) Whether all DSPF for services procured during the said monitoring period under consideration has been filed by the unit and whether the same has been processed for approval by the SO Office. Yes (n) Whether unit has filed all DTA procurement w.r.t. the goods procured by them during the monitoring period for the relevant period. If no, details thereof Yes (o) Details of the request IDs pending for OOC in respect of DTA procurement on the date of submission of monitoring report NIL. (p) Has the unit set up any cafeteria / canteen / food court in unit premises. If yes, whether permission from UAC / DC office has been issued, or otherwise office has been issued, or otherwise Whether unit has availed any duty paid goods / services for setting up such facility? If yes, whether unit has discharged such duty / tax benefit availed? details to be given including amount of duty / tax recovered or No.
File No.S-SEZ-MONT0MIDC/9/2023-JDCP
yet to be recovered (q) Whether any violation of any of the provision of law has been noticed/observed by Specified Officer during the period under monitoring. NA
f. Relevant provisions:
Rule 54 of SEZ Rules, 2006 “Performance of the Unit shall be monitored by the Approval Committee as per the guidelines given in Annexure appended to these rules”
ADC’s observations:
• The Unit has achieved cumulative export revenue of Rs. 234.40 Crores as against projected export of Rs. 142.23 Crores (which is 164.80% of projected export) and achieved cumulative NFE of 229.65 Crores which is 97.97% in 4 years of 2nd Block Period i.e. during ( FY 2018-19 to 2021-22) • The unit has achieved Employment of 593 employees (Men – 498 & Women – 95) as on 31.03.2022. • Approval Committee may like to monitor the performance of the Unit for FY 2018-19 to 2021-22 (4 years of 2nd Block period).
File No.S-SEZ-MONT0MIDC/9/2023-JDCP
GOVT. OF INDIA, SEEPZ – SEZ (PUNE CLUSTER)
AGENDA NOTE FOR CONSIDERATION OF THE APPROVAL COMMITTEE
a. Proposal :
Request of M/s. Xcaliber Infotech Pvt Ltd., located at Plot No. 12/1, Rajiv Gandhi Infotech Park, Phase III, Hinjewadi, Pune for extension of Letter of Approval bearing No. SEEPZ/MIDC-SEZ/XIPL/83/2022-23/2161 dated 17.02.2023 which will expire on 16.02.2024.
LOA issued on:
17.02.2023 Valid upto 16.02.2024.
Nature of business of the Unit
: IT/ITES Software Electronics Robotics software.
No. of extensions:
No. Extensio n of Vide approval letter dated Validity up to Approved by/in Original LOA 17.02.2023 16.02.2024 Development Commissioner, Seepz, Mumbai.
Request:
For further extension for one year, up to 16.02.2025
b) Detailed reasons for extension of LOA:
The Unit could not submit lease deed within 06 months after the LOA was issued. As per the request of the Unit, the Approval Committee in its meeting held on 21.09.2023 has granted extension of further six months for submission of Registered Lease Deed in terms 2nd Proviso to Rule 18(2)(ii) of SEZ Rules, 2006. The Unit has submitted the reason for extension is that the draft lease deed took more time than expected in MIDC Mumbai Office to get approved. The Unit vide email dated 05.02.2024 has informed that they will be submitting the lease deed before end of February 2024.
c. Relevant provision:
Proviso to Rule 19 (4) of SEZ Rules, 2006
“Provided that upon a request by the entrepreneur, further extension may be granted by the Development Commissioner for File No.S-SEZ-PRO0MIDC/36/2022-JDCP I/3744/2024 166
valid reasons to be recorded in writing for a further period not exceeding two years. :”
Documents submitted by the Unit:
i. Application for extension of LOA
d. ADC observation :
MIDC Pune SEZ Developer has allotted vacant land admeasuring 19,858 Sq. Meter to the unit at plot no 12/1, Rajiv Gandhi Infotech Park, Hinjewadi, Phase III, Pune. The Unit has informed that they will be submitting lease deed before the end of February 2024. Further the Unit will require time to complete the construction activity in their SEZ Unit premises. The Approval Committee may like to consider the proposal of the Unit for extension of further one year in terms of the provisions of Rule 19(4) of SEZ Rules, 2006.
***************
File No.S-SEZ-PRO0MIDC/36/2022-JDCP I/3744/2024 167
GOVT.OF INDIA OFFICE OF THE ZONAL DEVELOPMENT COMMISSIONER SEEPZ-SEZ, (PUNE CLUSTER)
AGENDA NOTE FOR CONSIDERATION OF THE APPROVAL COMMITTEE
a. Proposal: -
•
Application of M/s. Maharashtra Industrial Development Corporation -
Developer, located at Jog Centre, 4th Floor, Wakadewadi, Pune 411003, (Area
- MIDC, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 411057) for approval of List of Material required for Maintenance and Repair of Water supply scheme and providing FRP porta security cabin and toilet in HSR premises for authorized operation.
b. Specific Issue on which decision of Approval Committee is required: - • Approval for List of material required for Maintenance and Repair of Water supply scheme and providing FRP porta security cabin and toilet in HSR premises for authorized operation totally valued at Rs. 7,44,918/-
c. Relevant Provisions: - • As per Rule 12 (2) of SEZ Rules, 2006 “The Developer shall make an application, after obtaining approval for the authorized operation under rule 9, to the Development Commissioner, along with the list of goods and services, including machinery, equipments and construction material required for the authorized operations, duly certified by a Chartered Engineer for approval by the Approval Committee”. d. List of Materials for Authorized Operations :
Sr. No. List of materials required for the below mentioned Authorized operations Estimated value for Goods purchased from DTA (Amount in Rs.) Estimated value for
Goods purchased from Import (Amount in Rs.) Estimated Total Value of Goods (Amount in Rs.) 1. Maintenance and Repair of Water supply scheme and providing FRP porta security cabin and toilet in HSR premises for authorized operation 7,44,918.00 0.00 7,44,918.00
TOTAL 7,44,918.00 0.00 7,44,918.00
Detail List of Material is as follows: Estimated material cost (in Rs.) Sr No Description of Item Unit Qty Source Value of Goods applied for (in Rs.) 1 Manufacturing & Supply of FRP Cabin Size –8’x6’x8’ (ht) wall : Number 2.00 Indigenous 3,99,600.00 File No.S-SEZ-PRO0MIDC/2/2022-JDCP I/3675/2024 57
45mm thk. With 2mm thk. FRP Lining from both side & wooden Frame made with M.S.Angle 50x50x5mm. 2 Manufacturing & Supply and Errection of FRP Standard Toilet of Size – 4’x4’x8’ (ht) wall : 45mm thk. With 2mm thk. FRP Sheet from both side & wooden Frame made of M.S. Number 2.00 Indigenous 1,96,000.00 3 Providing and fixing hume pipe Septic tank 900 mm diameter Number 2.00 Indigenous 34,121.00 4 Providing soak pit of size 120cm x 120cmx120cm Number 2.00 Indigenous 6,022.00 5 Providing & laying 15mm dia. Medium grade having embossed as ISI Mark galvanized iron pipes. RMT 100.00 Indigenous 37,700.00 6 Providing laying and fixing P.V.C. pipe of 110mm dia. RMT 20.00 Indigenous 12,118.00 7 Providing and Constructing Brick Masonry Inspection Chamber 60cm x 45cm x 90cm Number 4.00 Indigenous 37,732.00 8 Providing and constructing Brick Masonry Inspection Chamber 90cm x 45cm 90cm Number 2.00 Indigenous 21,985.00
Total 7,44,918.00
e. Other Information: - • M/s. Maharashtra Industrial Development Corporation - Developer has been granted Letter of Approval No. F.2/129/2005-EPZ dated 07.06.2007 • The Developer has submitted List of Materials duly certified by the Chartered Engineer Shri Amit Bogawat, (Registration No. M-1474545) dated 22.12.2023 for M & R of Water supply scheme and providing FRP porta security cabin and toilet in HSR for authorized operation • The total value of the list of material is Rs. 7,44,918.00 • The Developer has submitted that they need the list of material for Maintenance and Repair of Water supply scheme and providing FRP porta security cabin and toilet in HSR for authorized operation at MIDC-SEZ. • They will keep the record of utilization of the approved list of material. • The Developer has submitted the following documents with the application i. List of materials ii. Chartered Engineer’s Certificate • The Specified Officer has submitted verification report dated 04.01.2023 and informed that the list of material submitted by the Developer has been verified and found in Order. Bond Balance as on date is Rs.3,66,17,297/- which is sufficient for the procurement of Indigenous material of estimated value of Rs. 7,44,918/- covered under the aforementioned application. • The procurement of goods is allowed in terms of Rule 12(2) of SEZ Rules, 2006 read with Rule 10 of SEZ Rules, 2006.
File No.S-SEZ-PRO0MIDC/2/2022-JDCP I/3675/2024 58
f. ADC’s Observation :
The Approval Committee may consider the proposal of the Developer for approval of list of material valued at Rs. 7,44,918/- in terms of Rule 12(2) of SEZ Rules, 2006.
File No.S-SEZ-PRO0MIDC/2/2022-JDCP I/3675/2024 59
GOVT.OF INDIA, SEEPZ-SEZ (PUNE CLUSTER)
AGENDA NOTE FOR CONSIDERATION OF THE APPROVAL COMMITTEE
a. Proposal: -
•
Application of M/s. Maharashtra Industrial Development Corporation – SEZ
Developer, located at Jog Centre, 4th Floor, Wakadewadi, Pune 411003, (Area
- MIDC, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 411057) for approval of List of Material required for Maintenance and Repair of Water supply scheme and providing and applying Anatomical Concrete Repair Systems (ACPRS) followed by Polymer Concrete Repair System (PLCR) method of high strength protective coating material to inside HSR of capacity 1500 Cubic Meter at Hinjewadi phase III for authorized operation.
b. Specific Issue on which decision of Approval Committee is required: - • Approval for List of material required for Maintenance and Repair of Water supply scheme and providing and applying Anatomical Concrete Repair Systems (ACPRS) followed by Polymer Concrete Repair System (PLCR) method of high strength protective coating material to inside HSR of capacity 1500 Cubic Meter at Hinjewadi phase III for authorized operation totally valued at Rs. 28,15,970.00
c. Relevant Provisions: - • As per Rule 12 (2) of SEZ Rules, 2006 “The Developer shall make an application, after obtaining approval for the authorized operation under rule 9, to the Development Commissioner, along with the list of goods and services, including machinery, equipments and construction material required for the authorized operations, duly certified by a Chartered Engineer for approval by the Approval Committee”.
d. List of Materials for Authorized Operations :
Sr. No. List of materials required for the
below
mentioned Authorized operations Estimated value for
Goods purchased from DTA (Amount in Rs.) Estimated value
for Goods purchased from Import (Amount
in Rs.) Estimated Total Value of Goods (Amount
in Rs.) 1. Maintenance and Repair of Water supply scheme and providing
and
applying Anatomical Concrete Repair Systems (ACPRS) followed by Polymer
Concrete
Repair System (PLCR) method of high strength protective coating material to inside HSR of 28,15,970.00 0.00 28,15,970.00 File No.S-SEZ-PRO0MIDC/2/2022-JDCP-Part(1) I/3688/2024 6
capacity 1500 Cubic Meter for authorized operation
TOTAL 28,15,970.00 0.00 28,15,970.00
Details of List of Material is as follows:
Estimated material cost (in Rs.) Sr No Particulars Unit Qty Source Value of Goods applied for (in Rs.) 1 CMM 960 (DPS coat) KG 500.00 Indigenous 3,40,000.00 2 Cement KG 250.00 Indigenous 5,000.00 3 SBR (Slurry coat) KG 500.00 Indigenous 34,121.00 4 SG 78 (Repair mortar) KG 800.00 Indigenous 4,54,000.00 5 Epoxy Resin WBC (Primer coat) KG 200.00 Indigenous 2,25,000.00 6 Epoxy HRD WBC (Primer coat) KG 200.00 Indigenous 4,18,990.00 7 Aqua PU HRD (ACPRS coat) KG 200.00 Indigenous 3,17,500.00 8 Aqua PU Resin (ACPRS coat KG 1000.00 Indigenous 6,55,540.00
Total 28,15,970.00
e. Other Information: - • M/s. Maharashtra Industrial Development Corporation - Developer has been granted Letter of Approval No. F.2/129/2005-EPZ dated 07.06.2007 • The Developer has submitted List of Materials duly certified by the Chartered Engineer Shri Amit Bogawat, (Registration No. M-1474545) dated 09.01.2024 for M & R of Water supply scheme and providing and applying ACPRS followed by PLCR method of high strength protective coating material to inside HSR of capacity 1500 Cu. M at Hinjewadi phase III for authorized operation • The total value of the list of material is Rs. 28,15,970.00 • The Developer has submitted that they need the list of material for Maintenance and Repair of Water supply scheme and providing and applying ACPRS followed by PLCR method of high strength protective coating material to inside HSR of capacity 1500 Cu. M at Hinjewadi phase III for authorized operation at MIDC-SEZ. • They will keep the record of utilization of the approved list of material. • The Developer has submitted the following documents with the application (i) List of materials (ii)Chartered Engineer’s Certificate • The Specified Officer has submitted verification report dated 15.01.2024 and informed that the list of material submitted by the Developer has been verified and found in Order. Bond Balance as on date is Rs.3,64,83,212/- which is sufficient for the procurement of Indigenous material of estimated value of Rs. 28,15,970/- covered under the aforementioned application. • The procurement of goods are allowed in terms of Rule 12(2) of SEZ Rules, 2006. File No.S-SEZ-PRO0MIDC/2/2022-JDCP-Part(1) I/3688/2024 7
f. ADC’s Observation :
The Approval Committee may like to consider the proposal of the Developer for approval of list of material valued at Rs. 28,15,970.00 in terms of Rule 12(2) of SEZ Rules, 2006.
File No.S-SEZ-PRO0MIDC/2/2022-JDCP-Part(1) I/3688/2024 8
GOVT.OF INDIA, SEEPZ-SEZ (PUNE CLUSTER)
AGENDA NOTE FOR CONSIDERATION OF THE APPROVAL COMMITTEE
a. Proposal: -
•
Application of M/s. Nxtra Data Limited, SEZ Co-Developer, located at Plot
No. 13/10A, 28, MIDC, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi,
Pune 411057 for approval of List of Material for Operation & Maintenance by
the Co-Developer for authorized operation.
b. Specific Issue on which decision of Approval Committee is required: - • Approval for List of material required for Operation and Maintenance of Data Center Building by the Co-Developer for authorized operation totally valued at Rs. 11,96,67,454.00
c. Relevant Provisions: - • As per Rule 12 (2) of SEZ Rules, 2006 “The Developer shall make an application, after obtaining approval for the authorized operation under rule 9, to the Development Commissioner, along with the list of goods and services, including machinery, equipments and construction material required for the authorized operations, duly certified by a Chartered Engineer for approval by the Approval Committee”.
d. List of Materials for Authorized Operations :
Sr. No. List of materials required for the
below
mentioned Authorized operations Estimated value for
Goods purchased from DTA (Amount in Rs.) Estimated value
for Goods purchased from Import (Amount
in Rs.) Estimated Total Value of Goods (Amount
in Rs.) 1. for providing infrastructural facilities in the area of the Co- Developer (Nxtra Digital Ltd – Co-Developer) at Plot No 28 & 13/10/A, 13/10/B, P-1/1 & P-1/2, Rajiv Gandhi Infotech Park, Hinjewadi, Phase III, MIDC IT-ITES SEZ, Pune 411057 11,96,67,454
0.00 11,96,67,454
TOTAL 11,96,67,454
0.00 11,96,67,454
Detail List of Material is as follows:
File No.S-SEZ-PRO0MIDC/19/2022-JDCP-Part(1) I/3689/2024 8
Estimated material cost (in Rs.) Sr No Description of Item Unit Qty Rate Total A Operation and Maitanance
1
11KV, 630A, 31.5KA/1 Sec
Indoor Type ICOG Panel
(HVICOG)
Number
8
5,71,059.00
45,68,472.00
2
11KV, 800A/, 31.5KA/1 Sec
Indoor Type 3 Panel (HV
Changeover Switchboard)
Number
3
16,27,185.00
48,81,555.00
3 11KV, 2000A, 31.5A/1 Sec Indoor
Type 13 (DC-GF-MVRMA-MHVSB) Number
2
84,57,265.00 1,69,14,530.00
4
11KV, 2000A, 31.5A/1 Sec Indoor
Type 17 Panel Board (DC-GF-
MVRMAHVDG-SYNC)
Number
2
98,87,522.00 1,97,75,044.00
5 11KV Bus Side Earthing Truck
Number
4
75,500.00
3,02,000.00
6 11KV Cable Side Earthing Truck
Number
4
75,500.00
3,02,000.00
7 11KV VCB Handling Trolley
Number
1
50,000.00
50,000.00
8 Supply of Adapter Box & Busbars Number
5
2,55,000.00
12,75,000.00
9
Supply of 11KV, 800 Amp, 25
Ka/3 Sec DG Oncomer Panel with
breaker mounted PT along with
Thermal sensors & HMI for
existing Panel.
Number
2
13,50,000.00
27,00,000.00
10 SITC of 3Cx300Sq. mm AL. Armd.
(UE) 11 KV, (UE) FRLS Cable
Mtr
150
2,850.00
4,27,500.00
11 SITC of End Termination for
3Cx300Sq. mm Cable
Number
12
16,000.00
1,92,000.00
12
Supply of 600 X 50 mm 14/16
SWG Ladder type cable tray with
required coupling plates,
Hardware and accessories.
Mtr
70
1,800
1,26,000.00
13 Supply of MS fabricated & powder
coated/painted Supports.
Kg
800
175
1,40,000.00
14
Dell Precision T3660 Core i7-
12700 (12 core 25MB
cache)/16GB RAM/512 SSD/Win
10 Pro/No Monitor/DVDRW/3
Yrs PS / 500W /NVIDIA® T1000,
4 GB GDDR6, 4 mDP to DP
adapters/Additional 16 GB RAM
DDR5 (ADATA)/Additional 2TB
HDD (Seagate)
Number
1
1,10,843.00
1,10,843.00
15 Battery replacement for Non-IT
Set Up 12V
Set
14
0 16 Supply of 1.5 TR Inverter split AC along with accessories Number 2 1,20,000.00 2,40,000.00 17 Supply of 3 TR Mega split AC along with accessories Nos 6 1,50,000.00 9,00,000.00 18 SITC of 55 Inches 4K UHD LED Numbers 4 80,000.00 3,20,000.00 File No.S-SEZ-PRO0MIDC/19/2022-JDCP-Part(1) I/3689/2024 9
TV
19 Supply of 2 door controller
Numbers
2
1,28,600.00
2,57,200.00
20 Supply of proxy reader
Numbers
4
19,200.00
76,800.00
21 Supply of DOUBLE door
magnetic lock
Numbers
2
12,200.00
24,400.00
22 Supply of Break glass unit
Numbers
2
2,800.00
5,600.00
23 Supply of Buzzer.
Numbers
2
3,900.00
7,800.00
24 Supply of 8 core cable
Mtr
250
189.00
47,250.00
25 Supply of 4 core cable
Mtr
300
135.00
40,500.00
26 Supply of Cat6 cable
Mtr
220
118.00
25,960.00
27 Supply of 2 MP dome camera
Numbers
2
29,500.00
59,000.00
28 Battery replacement for IT Set Up
12V 730 W
Set
6
32,94,900.00 1,97,69,400.00
Total 11,96,67,454.00
e. Other Information: -
•
M/s. Nxtra Data Limited, Co- Developer has been granted Letter of Approval
No. F.2/129/2005-SEZ dated 14.12.2017
•
The Co-Developer has submitted List of Materials duly certified by the
Chartered Engineer Makarand Kulkarni, (Registration No. 093577-0) dated
13.12.2023 for providing infrastructural facilities in the area at Plot No 28 &
13/10/A, 13/10/B, P-1/1 & P-1/2, Rajiv Gandhi Infotech Park, Hinjewadi,
Phase III, MIDC IT-ITES SEZ, Pune 411057 which is authorized operation for
development of their SEZ located at M/s. Nxtra Data Limited, Co- Developer,
Plot No. 13/10A, 28, MIDC, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi,
Pune 411 057.
•
The Co-Developer has informed that the list of material required for providing
infrastructural facilities in the Co-Developer area situated at Plot No 28 &
13/10/A, 13/10/B, P-1/1 & P-1/2, Rajiv Gandhi Infotech Park, Hinjewadi,
Phase III, MIDC IT-ITES SEZ, Pune 411057.
•
The total value of said materials is Rs. 11,96,67,454.00
•
SO has been requested vide letter dated 15.01.2024 to submit verification
report and SO verification report and informed that the list of material
submitted by the Co-Developer has been verified and found in order.
•
Bond balance as on date is 66,69,51,390/-which is sufficient for the
procurement of Indigenous material of estimated value of Rs. 11,96,67,454/-.
f. Observation : - • Approval Committee may kindly consider the request of the Co-Developer for approval of list of material as per Rule 12(2) of SEZ Rules, 2006. ******************
File No.S-SEZ-PRO0MIDC/19/2022-JDCP-Part(1) I/3689/2024 10
GOVT.OF INDIA, SEEPZ-SEZ (PUNE CLUSTER)
AGENDA NOTE FOR CONSIDERATION OF THE APPROVAL COMMITTEE
a. Proposal: -
•
Application of M/s. Nxtra Data Limited, Co- Developer, located at Plot No.
13/10A, 28, MIDC, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune
411057 for approval of List of Material for Information
Technology/Information Technology Enabled Services (IT/ITES) for
authorized operation.
b. Specific Issue on which decision of Approval Committee is required: -
•
Approval for List of material required for providing infrastructural facilities in
the aforesaid sector specific SEZ for Information Technology/Information
Technology Enabled Services (IT/ITES) for authorized operation totally valued
at Rs. 91,74,128.00
c. Relevant Provisions: -
•
As per Rule 12 (2) of SEZ Rules, 2006 “The Developer shall make an
application, after obtaining approval for the authorized operation
under rule 9, to the Development Commissioner, along with the list of
goods and services, including machinery, equipments and construction
material required for the authorized operations, duly certified by a
Chartered Engineer for approval by the Approval Committee”.
d. List of Materials for Authorized Operations :
Sr. No. List of materials required for the below mentioned Authorized operations Estimated value for Goods purchased from DTA (Amount in Rs.) Estimated value
for Goods purchased from
Import (Amount
in Rs.) Estimated Total Value of Goods (Amount in Rs.) 1. For
Information Technology/Information Technology
Enabled Services (IT/ITES) for Authorised Operations i.e. Operation & Maintenance of Data Centre Building. 91,74,128.00 0.00 91,74,128.00
TOTAL 91,74,128.00 0.00 91,74,128.00
File No.S-SEZ-PRO0MIDC/19/2022-JDCP-Part(2) I/3695/2024 13
Detail List of Material is as follows:
Estimated mateiaa osst ia ss) Si Ns Desoiaptis sf Item U at Qty sate Tsta 1 Battery Circuit Breaker with Enclosure, 630A, 3 Pole, for 276-300 cells, for EXL S1 / Liebert Sx+ UPS Nos 8 199500 1596000 2 Cable, PVC, Copper, 3 Core, 1.5 Sq. mm, 660 / 1100 V Grade, Shielded Mtr 200 175 35000 3 PCA, PIB for Monolithic, 80-eXL, 15B10981G2 Nos 3 28500 85500 4 Service Charges: -BCB Installation -Configuration of BCB with UPS -Supervision charges -Integration of additionally installed BMS sensors with BMS system. Ls 1 105000 105000 CKT-1 Works
1 MS Socket Providing and fixing of MS 'C' class Socket inplace of existing nipple welding.
i) 10 mm dia Nos 25 120 3000 ii) 15 mm dia Nos 25 140 3500 iii) 20 mm dia Nos 8 160 1280 iv) 25 mm dia Nos 8 180 1440 v) 32 mm dia Nos 4 250 1000 vi) 40 mm dia Nos 4 320 1280 vii) 50 mm dia Nos 4 380 1520 2 BALL VALVE (Hand-lever operated Valves): Rating PN-16
i) 10 mm dia with with MS Nipple (and end cap if needed) Nos 25 120 3000 ii) 15 mm dia with with MS Nipple (and end cap if needed) Nos 25 120 3000 iii) 20 mm dia with with MS Nipple (and end cap if needed) Nos 8 1300 10400 iv) 25 mm dia with with MS Nipple (and end cap if needed) Nos 8 1558 38,950 v) 32 mm dia with with MS Nipple (and end cap if needed) Nos 4 3036 75,900 vi) 40 mm dia with with MS Nipple (and end Nos 4 4308 34,464 I/3695/2024 14
cap if needed) vii) 50 mm dia with with MS Nipple (and end cap if needed) Nos 4 6780 54,240 3 MOTORIZED BUTTERFLY VALVE (PN-16).
i) 200 mm dia Nos 6 88300 5,29,800 b) Supply of communication cable for MBFV shall be as per required running meter. The cable shall be compatible for BMS and outdoor condition with 120 minutes fire rated. Vender needs to make wire connection for both motor/actuator and BMS. This includes cable tray and necessary support horizontal/vertical. (Neither BMS interconnectivity nor the setting of logic and programming in BMS is in scope. This to be taken by client directly) RM 650 330 2,14,500 4 Pressure
Gauges: Providing in position dial type SS pressure gauges, glycerene filled (industrial type), PN16, with syphon and isolating ball valves in both the scales (meters & British units). Scope also includes replacement of existing gauge for safe and correct installation, as needed at site. Nos. 24 1,850 44,400 5 Temperature
Gauges: Providing in position the stamp type (dial type) grade (PN-16) SS-304 temperature gauge with isolating thermowell. Scope also includes replacement of existing gauge for safe and correct installation, as needed at site. The gauge shall be rugged duty industrial usage type only. Nos. 12 2,420 29,040 6 Gear
Operated
Wheel Supply of suitable size of operating wheel for butterfly valve. At site condition, existing operating wheel is larger size as per space available. To address this issue, need to replace with new one. The wheel hole shall be match with existing shaft with its key. Nos. 8 2,000 16,000 7 Supporting Block
ii 300mm pipe size support block Nos. 2 680 1,360 ii) 100mm pipe size support block Nos. 2 350 700 iii) 50mm pipe size support block Nos. 2 210 420 8 MS
FABRICATION
WORKS Providing in position, MS Working platform work. Steel Framework of required size using MS angle, C-Sections, tees and MS flats and other sections including cutting, welding, grinding, Kg 1000 95 95,000 I/3695/2024 15
hoisting, fixing in position with painting of one cote of primer and two cote of synthetic enamel paint. 10 Supply of Nitrile foam Insulation for Chilled Water Pipe including fitting like, elbow, flanges, union, valves, band, etc. with 25+25 mm thick. The nitrile foam density should be 40 Kg/M3, close cell, O- class, insulation with alluminium cladding (of 24/26 gauge) complete in all respects. measurement of valve will be twice of that of pipe, in straight length for specific diameter). It shall be complete as per specifications:
i 700 mm dia pipe RM 20 7,900 1,58,000 ii 600 mm dia pipe RM 20 6,850 1,37,000 iii 500 mm dia pipe RM 12 6,500 78,000 iv 400 mm dia pipe RM 15 5,460 81,900 v 200 mm dia pipe RM 40 3,450 1,38,000 vi 50 mm dia pipe RM 15 860 12,900 vii 40 mm dia pipe RM 15 780 11,700 viii 32 mm dia pipe RM 15 685 10,275 ix 25 mm dia pipe RM 15 615 9,225 CKT-2 Works
1 WCC Work at Ground Floor
1.1 BUTTERFLY VALVE (For Gear Operated & hand-lever operated Valves): Rating PN-16
Supply of Butterfly Valve of following size. All Sure Flow Butterfly Valves meet API- 609, MSS SP-67, and ISO 5752 face-to- face dimensions. Bodies are ductile iron 65-45-12, Non-Corrosive Bushings. Tested bi-directional no leakage. Suitable for ASME Class 125 and ASME Class 150 flanges
i) 350 mm dia (Gear Operated) Nos 2 64010 1,28,020 ii) 300 mm dia (Gear Operated) Nos 2 44820 89,640 2 MS Socket Providing and fixing of MS 'C' class Socket inplace of existing nipple welding.
i) 10 mm dia Nos 20 120 2,400 ii) 15 mm dia Nos 7 140 980 iii) 20 mm dia Nos 7 160 1,120 iv) 25 mm dia Nos 7 180 1,260 v) 32 mm dia Nos 7 250 1,750 vi) 40 mm dia Nos 7 320 2,240 vii) 50 mm dia Nos 7 380 2,660 3 BALL VALVE (Hand-lever operated Valves): Rating PN-16
I/3695/2024 16
i) 10 mm dia with with MS Nipple (and end cap if needed)
20 120 2400 ii) 15 mm dia with with MS Nipple (and end cap if needed) Nos 7 900 6,300 iii) 20 mm dia with with MS Nipple (and end cap if needed) Nos 7 1300 9,100 iv) 25 mm dia with with MS Nipple (and end cap if needed) Nos 7 1558 10,906 v) 32 mm dia with with MS Nipple (and end cap if needed) Nos 7 3036 21,252 vi) 40 mm dia with with MS Nipple (and end cap if needed) Nos 7 4308 30,156 vii) 50 mm dia with with MS Nipple (and end cap if needed) Nos 7 6780 47,460 4 Supporting Block
i) 350mm pipe size support block Nos. 4 880 3,520 5 MS FABRICATION WORKS Providing in position, MS Working platform work. Steel Framework of required size using MS angle, C-Sections, tees and MS flats and other sections including cutting, welding, grinding, hoisting, fixing in position with painting of one cote of primer and two cote of synthetic enamel paint. Kg 150 95 14,250 10 PIPING
INSULATION: Supplying of Nitrile foam Insulation for Chilled Water Pipe including fitting like, elbow, flanges, union, valves, band, etc. with 25+25 mm thick. The nitrile foam density should be 40 Kg/M3, close cell, O- class, insulation with alluminium cladding (of 24/26 gauge) complete in all respects. measurement of valve will be twice of that of pipe, in straight length for specific diameter). It shall be complete as per specifications:
i 700 mm dia pipe RM 5 7,900 39,500 ii 600 mm dia pipe RM 5 6,850 34,250 iii 500 mm dia pipe RM 5 6,500 32,500 iv 400 mm dia pipe RM 10 5,460 54,600 v 200 mm dia pipe RM 10 3,450 34,500 vi 50 mm dia pipe RM 5 860 4,300 vii 40 mm dia pipe RM 5 780 3,900 viii 32 mm dia pipe RM 5 685 3,425 ix 25 mm dia pipe RM 5 615 3,075 1 PIPING & VALVES:
1.1 Material: M.S pipe Class 'C' conforming to IS:1239 for pipes upto 150 mm dia and IS:3589-1991 for pipes above 150 mm dia.
I/3695/2024 17
i) 200 mm dia Rmt 24 4980 1,19,520 1.2 MS bend C-Class (Heavy)
i) 200 mm dia Nos 20 3200 44,000 1.3 Tee / Shoe connection
i) 200 mm dia Nos 9 5700 33,210 2.0 BUTTERFLY VALVE (For Gear Operated & hand-lever operated Valves): Rating PN-16
i) 400 mm dia (Gear Operated) Nos 2 82940 165880 ii) 200 mm dia (Gear Operated) Nos 18 20600 370800 3 MS
Socket Providing and fixing of MS 'C' class Socket inplace of existing nipple welding.
i) 10 mm dia Nos 40 120 4,800 ii) 15 mm dia Nos 12 140 1,680 iii) 20 mm dia Nos 5 160 800 iv) 25 mm dia Nos 5 180 900 v) 32 mm dia Nos 5 250 1,250 vi) 40 mm dia Nos 5 320 1,600 vii) 50 mm dia Nos 5 380 1,900 4 BALL VALVE (Hand-lever operated Valves): Rating PN-16
i) 10 mm dia with with MS Nipple (and end cap if needed) Nos 40 120 4,800 ii) 15 mm dia with with MS Nipple (and end cap if needed) Nos 12 900 10,800 iii) 20 mm dia with with MS Nipple (and end cap if needed) Nos 5 1300 6,500 iv) 25 mm dia with with MS Nipple (and end cap if needed) Nos 5 1558 7,790 v) 32 mm dia with with MS Nipple (and end cap if needed) Nos 5 3036 15,180 vi) 40 mm dia with with MS Nipple (and end cap if needed) Nos 5 4308 21,540 vii) 50 mm dia with with MS Nipple (and end cap if needed) Nos 5 6780 33,900
5 MOTORIZED BUTTERFLY VALVE
Providing in position the following motorized butterfly valves (PN-16).
a) Supplying of Motorized Open / Closed Control Butterfly valves. The large torque rotory type actuator shall be capable of nominal voltage AC/DC 24 V electric signal, transformer duly encased and including necessary control wiring etc. The valves & actuators shall be compatible with Building Automation System as well as manual operation. The valve shall be
I/3695/2024 18
suitable for following pipe sizes including Nut, Bolt, Washer, Gasket etc. (PN-16) i) 400 mm dia Nos 2 270085 5,40,170 b) Supply of communication cable for MBFV shall be as per required running meter. The cable shall be compitable for BMS and outdoor condition with 120 minuts fire rated. Vender need to make wire connection for both motor/actuator and BMS. This include cable tray and necessary support horizontal/vertical. (Set of logic and programing in BMS is not in scope) RM 950 330 3,13,500 7 Pressure Gauges:
i) Providing in position dial type SS pressure gauges, glycerene filled (industrial type), PN16, with syphon and isolating ball valves in both the scales (meters & British units). Scope also includes replacement of existing gauge for safe and correct installation, as needed at site. Nos. 36 1,450 52,200 8 Temperature Gauges:
i) Providing in position the stamp type (dial type) grade (PN-16) SS-304 temperature gauge with isolating thermowell. Scope also includes replacement of existing gauge for safe and correct installation, as needed at site. The gauge shall be rugged duty industrial usage type only. Nos. 18 1,850 33,300 9 MS FABRICATION WORKS
Work is in part/ pieces as per site conditions and need
Providing in position, MS Working platform work. Steel Framework of required size using MS angle, C-Sections, tees and MS flats and other sections including cutting, welding, grinding, hoisting, fixing in position with painting of one cote of primer and two cote of synthetic enamel paint. Kg 250 95 23,750 13 PIPING
INSULATION: Supplying of Nitrile foam Insulation for Chilled Water Pipe including fitting like, elbow, flanges, union, valves, band, etc. with 25+25 mm thick. The nitrile foam density should be 40 Kg/M3, close cell, O- class, insulation with alluminium cladding (of 24/26 gauge) complete in all respects. measurement of valve will be twice of that of pipe, in straight length for specific diameter). It shall be complete as per specifications:
I/3695/2024 19
i 700 mm dia pipe RM 10 7,900 79,000 ii 600 mm dia pipe RM 10 6,850 68,500 iii 500 mm dia pipe RM 15 6,500 97,500 iv 400 mm dia pipe RM 30 5,460 1,63,800 v 200 mm dia pipe RM 45 3,450 1,55,250 vi 50 mm dia pipe RM 10 860 8,600 vii 40 mm dia pipe RM 10 780 7,800 viii 32 mm dia pipe RM 10 685 6,850 ix 25 mm dia pipe RM 10 615 6,150 1 Emergency Ventilation Fans for Lobby
i) Axial Flow Fan
a) 18000 CFM, with 40 mmwg Lift lobby pressurization Nos. 1 6,17,500 6,17,500 b) The starter panel (IP54) shall comprise of starters with 3 tapping at 50%, 65% and 80%. ON-OFF-TRIP LED type indicating lamps, suppressed scale ammeter, Ammeter selector switch . (to be co- ordianted
with
operationtional requirement of procured fans). With air cooled auto transformer. Frequency of operation 6 starts per hour, starting time 12 second. With in built thermal cutoff, contactors-AC3 duty rated at 55 deg centigrad.
Protection:- Overload - through thermal overload relay. earth leakage. ELR + CBCT, under voltage and over voltage, enclosure IP54
i 7.5 KW starter panel Nos 1 85,000 85,000 1.1 POWER CABLE
Supply of following sizes of 1.1kV grade LT XLPE insulated, HR PVC sheathed, stranded Copper conductor, Armoured/ Unarmoured cables as per IS:7089 part-I on existing cable trays/ in existing hume pipes/ PVC pipes/ GI pipes/ on surface of slabs, walles or masonry/ including Cable termination with double compression gland, cable ties, GI saddles, clamps and necessary hard ware etc.
a) 4C x 10Sqmm (Copper) Armoured Power cable Rmt 50 875 43,750 2 SITE FABRICATED SHEET METAL DUCTING WORKS & ANCILLARIES
Supply of GI sheet ducting suitable for 1" wg duct pressure & zinc coating of 120 gms/sqmt , construction as per ISI standard, All duct -to - duct joints shall be with flanges type or equivalent, rivets,
I/3695/2024 20
electro -galvanized bolts, nuts & washers with silicon sealant, double neoprene gaskets, double skin access door, supports, etc.as per specifications. The contractor shall use electric seamers and cutters shall be used for assembly for ducts and collars, Mallets and Chisels shall not be used. All necessary scaffolding required for lifting and installation of ducts shall be arranged by the contractor and in accordance with approved drawings. Ducting support shall be slotted type GI channel. Duct Supports & Gauges shall be selected as per ISI std. 2.1 0.63 mm (24G) Sqm 300 1,450 4,35,000 2.2 0.80 mm (22G) Sqm 10 1,650 16,500 3 OPPOSED BLADE MOTORISED FIRE & SMOKE DAMPER
Leak proof air tight motorized fire damper for emergency ventilation fans in DC's PAHU room. All work to be undertaken under operational DC environment.
3.1 The Fire damper as per UL 555S (SEALED & STAMPED), with outer shell of 16G galvanized steel frame and the blade/Leaf of 16G thick GSS. And with necessary flanges
for
connection
as
per specifications. The damper shall be of 180 min fire rating. Sqmt. 30 22,400 6,72,000 3.2 Rotory Actuator with Control Panel for fire dampers Nos. 32 15,000 4,80,000 3.3 3C X 1.5 Sqmm shielded power and communication control cable between the panels and actuators. Note- Fire signal and BMS connection by third party (in client scope). Rmt. 500 270 1,35,000 4 VOLUME CONTROL DAMPER
4.1 Supply of volume control dampers of 16G Aluminum frame and aluminum blades complete with handle, calibration knob etc. and measurement of damper area minimum will be 0.1 sqm. Sqm 1 7,000 7,000 6 ALUMINUM POWDER COATED GRILLES
6.1 Supply of Wall/Duct mounted supply / return air grilles of bar type (0º / 15º / 45º) made with extruded aluminum sections
complete
with
extruded aluminum section and measurement of grill area minimum will be 0.1 sqm. Sqmt. 2 8,500 17,000 9 Supply the damaged Gypsum/Grid ceiling tile with new one. Vendor need to work to Sft 240 225 54,000 I/3695/2024 21
match the site finish. All necessary works to be part of this, to bring back to original finish.
Total 91,74,128.00
Other Information: -
•
M/s. Nxtra Data Limited, Co- Developer has been granted Letter of Approval
No. F.2/129/2005-SEZ dated 14.12.2017
•
The Co-Developer has submitted List of Materials duly certified by the
Chartered Engineer Makarand Kulkarni, (Registration No. 093577-0) dated
24.01.2024 for providing Infrastructural facilities in the aforesaid sector
Specific SEZ for Information Technology/Information Technology Enabled
Services (IT/ITES) which is authorized operation for development of their SEZ
located at M/s. Nxtra Data Limited, Co- Developer, Plot No. 13/10A, 28,
MIDC, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 411 057.
•
The Co-Developer has informed that the list of material required for providing
Infrastructural facilities in the aforesaid sector Specific SEZ for Information
Technology/Information Technology Enabled Services (IT/ITES) which is
authorized operation for development of their SEZ in the aforesaid sector
specific SEZ for IT /ITES.
•
The total value of said materials is Rs. 91,74,128.00
•
SO has been requested vide letter dated 25.01.2024 to submit verification
report and SO’s verification report dated 30.01.2024 mentions that list of
material submitted by M/s Nxtra Data Ltd. (Co-Developer) have been verified
and found in order. The Bond Balance as on date is Rs. 64,54,11,248/-
which is sufficient for procurement of Indigenous material of estimated value
of Rs. 91,74,128/- covered under the aforementioned application. Approval
sought for the list of material is in order and also the Chartered Engineer has
certified that these materials are required for Authorized Operation and
hence the request of the Co-Developer may be considered.
f. Observation : -
• Approval Committee may kindly consider the request of the Co-Developer for approval of list of material as per Rule 12(2) of SEZ Rules, 2006.
******************
I/3695/2024 22
GOVT. OF INDIA, SEEPZ – SEZ (PUNE CLUSTER)
AGENDA NOTE FOR CONSIDERATION OF THE APPROVAL COMMITTEE a. Proposal : Request of M/s Tata Consultancy Services Limited, IT/ITES, SEZ Unit Located at Plot No. 5, MIDC-IT-ITES-SEZ, Rajiv Gandhi Infotech Park, Phase III, Hinjewadi, Pune for approval of setting up of rooftop Non-Conventional Solar Power Generation System for captive consumption. b. Specific Issue on which decision of Approval Committee is required: Approval of the Approval Committee for setting up of rooftop Non- Conventional Solar Power Generation System for captive consumption in terms of Office Memorandum dated 07.06.2021 issued in addendum to Power Guidelines dated 16.02.2016 issued by MOC&I as detailed below : 1 Name of the Vendor of Solar Power Plant M/s Kirloskar Solar Technologies Pvt Ltd. 2 Vendor-Service Engineering, Procurement, Commissioning of Complete Solar Power Plant. 3 Capacity 264 KWP 4 Annual Generation in capacity 259573 kWP/Year 5 Tax – 13.80% Tax amount : Rs. 18,63,000/- c. Relevant provisions :
As per MOC&I’s O.M. dated 07-06-2021 issued under F. No. K-43014(16)/8/2020- SEZ, in partial modification of Power guidelines issued vide letter No. P-6/03/2006- SEZ (Vo,.III) dated 16.02.2016, following proviso under para (iii) has been appended :
“Provided that, with the approval of Unit Approval Committee, a Unit may
setup a non-conventional power plant within the premises of the Unit for the
exclusive purpose of captive consumption subject to the condition that no
tax/duty benefits stipulated under Section 26 of SEZ Act, 2005 shall be
available for setting up as well as operations and maintenance of such
power plant. Such captive generating power plants shall comply with all
rules, regulations and technical standards framed under the Electricity Act,
2003 as amended from time to time. Captive generative power plants with
capacity 500KW and above has to be re-registered with Central Electricity
Authority”.
d. Other Information :
•
LOA No. SEEPZ-SEZ/MIDC-SEZ/TCSL/50/2014-15/05554 dated
01.03.2018 (Original LOA)
•
Location: Plot No. 5, MIDC-IT-ITES-SEZ, Rajiv Gandhi Infotech Park, Phase
III, Hinjewadi, Pune 411057.
•
Date of Commencement of Production: 20.01.2020
•
Validity of LOA: 19.01.2025
File No.S-SEZ-PRO0MIDC/15/2022-JDCP
I/3746/2024
193
•
The Unit has submitted that:
a. They are proposing to install 264 KWP solar power generation system.
b. The Solar modules will be installed on roof top of their building at (Tower 1 &
Tower 2) located at Plot No. Plot No. 5, MIDC-IT-ITES-SEZ, Rajiv Gandhi
Infotech Park, Phase III, Hinjewadi, Pune 411057.
c. The said Solar Power Plant shall be set up exclusively for captive
consumption purpose only.
d. The said solar power plant will be set up by their vendor i.e. M/s Kirloskar
Solar Technologies Pvt. Ltd., in accordance to the revised power guidelines.
e. The Unit will not be availing any duty/tax benefits on material and
installation under SEZ Act or Rules for setting up, operations and maintenance of
such power plant.
•
Further, the Unit has submitted undertaking that :
•
No tax/duty benefit stipulated under Section 26 of SEZ Act, 2005 shall be
available for setting up as well as operations and maintenance of such power
plant.
•
Such Captive generating power plants shall comply with all rules, regulations
and technical standards framed under the Electricity Act, 2003 as amended
from time to time.
•
Captive generative power plants with capacity 500 KW and above has to be
registered with Central Electricity Authority. They will register with Central
Electricity Authority if power generation capacity exceeds 500 KW.
f. ADC Observations :
- The proposal may be considered subject to the condition that : a. the Unit will not be eligible for any exemptions, drawback, concessions or any other benefit available under Section 7 or Section 26 of the SEZ Act for creating or operating such facilities. b. the unit will have to fulfill any conditions / safeguards laid down by the State Government / Electricity department, from time to time c. the non-conventional solar power generated will be used only for captive consumption and will not be sold outside .They will register with Central Electricity Authority if power generation capacity exceeds 500 KW. 2. The proposal of the unit for installation of 264 KWP rooftop Non-conventional Solar Power Generation System, on roof top of building for captive consumption only, aligns with the O.M. issued under F. No. K-43014(16)/8/2020-SEZ. dated 07-06-2021 in amendment to Power guidelines dated 16.02.2016 issued by MOC&I.
File No.S-SEZ-PRO0MIDC/15/2022-JDCP I/3746/2024 194
GOVT. OF INDIA, SEEPZ – SEZ (PUNE CLUSTER)
AGENDA NOTE FOR CONSIDERATION OF THE APPROVAL COMMITTEE
a. Proposal : Request of M/s Tudip Technologies Pvt. Ltd., IT/ITES SEZ Unit Located at Plot No. 11/2, MIDC-IT-ITES-SEZ, Hinjewadi, Pune for approval of setting up of rooftop Non-Conventional Solar Panel for captive consumption.
b. Specific Issue on which decision of Approval Committee is required:
Approval of the Committee for setting up of rooftop Non-Conventional Solar Panel for captive consumption in terms of Office Memorandum dated 07.06.2021 issued in addendum to Power Guidelines dated 16.02.2016 issued by MOC&I as detailed below :
1 Name of the Vendor of Solar Power Plant Shree Solar Tech 2 Vendor-Service Design, Supply, Installation & Commissioning of Rooftop Solar power 3 Capacity 138.24 KW 4 Annual Generation in capacity 166000 KWH 5 Tax – 13.80% INR 75,04,027/-
c. Relevant provisions :
As per MO&I’s O.M. dated 07-06-2021 issued under F. No. K-43014(16)/8/2020- SEZ, in partial modification of Power guidelines issued vide letter No. P-6/03/2006- SEZ (Vo,.III) dated 16.02.2016, following proviso under para (iii) has been appended :
“Provided that, with the approval of Unit Approval Committee, a Unit may setup a non-conventional power plant within the premises of the Unit for the exclusive purpose of captive consumption subject to the condition that no tax/duty benefits stipulated under Section 26 of SEZ Act, 2005 shall be available for setting up as well as operations and maintenance of such power plant. Such captive generating power plants shall comply with all rules, regulations and technical standards framed under the Electricity Act, 2003 as amended from time to time. Captive generative power plants with capacity 500KW and above has to be re-registered with Central Electricity Authority”.
File No.S-SEZ-PRO0MIDC/1/2024-JDCP I/3677/2024 13
d. Other Information :
•
LOA No. SEEPZ-SEZ/MIDC-SEZ/TTPL/67/2019-20/ dated 08.03.2019 &
29.03.2020 (Original LOA & Addition of Location)
•
Location: Plot No. 11/2, Lower Ground Floor, Ground & First Floor, MIDC-IT-
ITES-SEZ, RGIP, Hinjewadi, Phase III, Pune 411057.
•
Date of Commencement of Production: 16.01.2020
•
Validity of LOA: 15.01.2025
•
The Unit has submitted that:
a. They are proposing to install 138.24 KW solar power generation system.
b. The Solar modules will be installed on roof top of their building located at
Plot No. 11/2, Lower Ground Floor, Ground & First Floor, MIDC-IT-ITES-
SEZ, RGIP, Hinjewadi, Phase III, Pune 411057.
c. The said Solar Power Plant shall be set up exclusively for captive
consumption purpose only.
d. The said solar power plant will be set up by their vendor i.e. M/s
Shree Solar Tech in accordance to the revised power guidelines.
e. The Unit will not be availing any duty/tax benefits on material and
installation under SEZ Act or Rules for setting up, operations and
maintenance of such power plant.
• Further, the Unit has submitted undertaking that : • No tax/duty benefit stipulated under Section 7 and section 26 of SEZ Act, 2005 shall be available for setting up as well as operation and maintenance of such power plant. • They shall comply with all rules, regulations and technical standards framed under the Electricity Act, 2003 as amended from time to time. • Captive generative power plant with capacity 500 KW and above has to be registered with Central Electricity Authority. They will register with Central Electricity Authority if power generation capacity exceeds 500 KW.
e. ADC Observations :
• The proposal may be considered subject to the condition that • the Unit will not be eligible for any exemptions, drawback, concessions or any other benefit available under Section 7 or Section 26 of the SEZ Act for creating or operating such facilities. • The unit will have to fulfill any conditions / safeguards laid down by the State Government / Electricity department, from time to time • The non-conventional solar power generated will be used only for captive consumption and will not be sold outside • They will register with Central Electricity Authority if power generation capacity exceeds 500 KW.
• The proposal of the unit for installation of 138.24 KW rooftop Non- conventional Solar Panel PV System, on roof top of building for captive consumption only in terms of the O.M. issued under F. No. K- 43014(16)/8/2020-SEZ. dated 07-06-2021 in amendment to Power guidelines dated 16.02.2016 issued by MOC&I , may be considered by Approval Committee.
File No.S-SEZ-PRO0MIDC/1/2024-JDCP I/3677/2024 14
GOVT. OF INDIA, SEEPZ – SEZ (PUNE CLUSTER)
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
a. Proposal: - Application submitted by M/s. Nxtra Data Ltd., IT/ITES unit located in MIDC-SEZ, Hinjewadi, Phase III, Pune 411057 for Change in the Board of Director.
b. Specific Issue on which decision of Approval Committee is required: -Approval of the Committee for Change in Board of Director, in terms of Instruction No. 109 dated 18.10.2021, as detailed below:
Existing List of Board of Director: Sr. No. Name of the Director Designation Cessation/ Resignation Date Date of Appointment 1. Mr. Neeraj Bhardwaj Director
15.10.2020 2. Mr. Kapil Modi Director
15.10.2020 3. Mr. Ashish Arora Director
02.12.2020 4 Mr. Harjeet Singh Kohli Director
02.12.2020 5 Mr.
Rajesh
Shrinivas Tapadia Director
13.12.2019 6 Ms Vani Venkatesh Director
01.11.2021 7 Gary Joseph Wojtaszek Director
10.07.2022 8 Ganapathi
S Lakshminarayanan Director
21.08.2023 9 Aruna Pidikiti Director 01.12.2023
Proposed List of Board of Director: Sr. No. Name of the Director Designation 1. Neeraj Bhardwaj Director 2. Kapil Modi Director 3. Ashish Arora Director 4 Harjeet Singh Kohli Director 5 Rajesh Shrinivas Tapadia Director 6 Ms Vani Venkatesh Director 7 Gary Joseph Wojtaszek Director 8 Ganapathi S Lakshminarayanan Director
File No.S-SEZ-PRO0MIDC/22/2022-JDCP I/3674/2024 211
c. Relevant provisions: - As per para (i) of Instruction no. 109, dated 18.10.2021,
“Reorganization including change of name, Change of Shareholding pattern, business transfer arrangements, court approved mergers and demergers, change of constitution, Change of Directors, etc. may be undertaken by the Unit Approval Committee (UAC) concerned subject to the condition that the Developer/Co-developer/ Unit shall not opt out or exit out of the Special Economic Zone and continues to operate as a going concern. All liabilities of the Developer/Co-Developer/Unit shall remain unchanged on such reorganization.” …
d. Other Information: - • M/s. Nxtra Data Ltd., is granted LOA NO. SEEPZ- SEZ/NEWSEZ/NDL/294/2017-18 dated 05.02.2018 is located at Plot No. 28 & 13/10/A Rajiv Gandhi Infotech Park, Hinjewadi, Phase III, Pune 411057. • DCP: 20.10.2019 • LOA valid till: - 19.10.2024 • The Unit has submitted following documents: Online Application Updated list of directors’ as on MCA Website screen shot. Form DIR 12 for Resigned Director with ROC along with its challan Undertaking in terms of Instruction no. 109 Copy of Board’s Resolution Undertaking from the Company for future liabilities.
• Reason for change in Board of Director:
The unit has submitted that the reason for change in Board of Directors is due to the Resignation submitted by Aruna Pidikiti, Director dated 01.12.2023.
d. ADC’s Recommendation:
• Approval Committee may kindly consider the proposal of the unit for Change in Board of Director, in terms of Instruction no. 109 issued by MOC&I.
File No.S-SEZ-PRO0MIDC/22/2022-JDCP I/3674/2024 212
GOVT. OF INDIA, SEEPZ – SEZ (PUNE CLUSTER)
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
a. Proposal: - Application submitted by M/s. Nxtra Data Ltd., (Co-Developer), located in MIDC-SEZ, Hinjewadi, Phase III, Pune 411057 for Change in the Board of Director.
b. Specific Issue on which decision of Approval Committee is required: -Approval of the Committee for Change in Board of Director, in terms of Instruction No. 109 dated 18.10.2021, as detailed below:
Existing List of Board of Director: Sr. No. Name of the Director Designation Cessation/ Resignation Date Date of Appointment 1. Mr. Neeraj Bhardwaj Director
15.10.2020 2. Mr. Kapil Modi Director
15.10.2020 3. Mr. Ashish Arora Director
02.12.2020 4 Mr. Harjeet Singh Kohli Director
02.12.2020 5 Mr.
Rajesh
Shrinivas Tapadia Director
13.12.2019 6 Ms Vani Venkatesh Director
01.11.2021 7 Gary Joseph Wojtaszek Director
10.07.2022 8 Ganapathi
S Lakshminarayanan Director
21.08.2023 9 Aruna Pidikiti Director 01.12.2023
Proposed List of Board of Director: Sr. No. Name of the Director Designation 1. Neeraj Bhardwaj Director 2. Kapil Modi Director 3. Ashish Arora Director 4 Harjeet Singh Kohli Director 5 Rajesh Shrinivas Tapadia Director 6 Ms Vani Venkatesh Director 7 Gary Joseph Wojtaszek Director 8 Ganapathi S Lakshminarayanan Director File No.S-SEZ-PRO0MIDC/19/2022-JDCP I/3676/2024 309
c. Relevant provisions: - As per para (i) of Instruction no. 109, dated 18.10.2021,
“Reorganization including change of name, Change of Shareholding pattern, business transfer arrangements, court approved mergers and demergers, change of constitution, Change of Directors, etc. may be undertaken by the Unit Approval Committee (UAC) concerned subject to the condition that the Developer/Co-developer/ Unit shall not opt out or exit out of the Special Economic Zone and continues to operate as a going concern. All liabilities of the Developer/Co-Developer/Unit shall remain unchanged on such reorganization.” …
d. Other Information: - • M/s. Nxtra Data Ltd.,Co-Developer is granted LOA NO. F.2/129/2005 – SEZ dated 14.12.2017 located at Plot No. 28 & 13/10/Am 13/10/B, P-1/ 1, & P- 1/2, Rajiv Gandhi Infotech Park, Hinjewadi, Phase III, Pune 411057. • DCP: N.A • LOA valid till: - N.A • The Co-Developer has submitted following documents: Online Application Updated list of directors’ as on MCA Website screen shot. Form DIR 12 for Resigned Director with ROC along with its challan Undertaking in terms of Instruction no. 109 Copy of Board’s Resolution Undertaking from the Company for future liabilities.
• Reason for change in Board of Director:
The Co-Developer has submitted that the reason for change in Board of Director is due to the Resignation dated 01.12.2023 submitted by Aruna Pidikiti, Director
d. ADC’s Recommendation:
• Approval Committee may consider the proposal of the Co-Developer for Change in Board of Director, in terms of Instruction no. 109 issued by MOC&I.
File No.S-SEZ-PRO0MIDC/19/2022-JDCP I/3676/2024 310
GOVT. OF INDIA, SEEPZ – SEZ (PUNE CLUSTER)
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
a. Proposal: - Proposal submitted by M/s. Tata Technologies Limited, located at MIDC – IT/ITES – SEZ, Phase III, Hinjewadi, Pune 411058 for Change in Shareholding pattern.
b. Specific Issue on which decision of Approval Committee is required: - Approval for Change in Shareholding pattern, in terms of Instruction No. 109 dated 18.10.2021, as detailed below:
Shareholding Pattern as on 31.03.2023 : Sr. No. Name of Shareholders Number of Shares Percentage (%) of paid up Capital 01 Tata Motors Limited 30,30,06,000 74.69 02 Other Tata Group Entities 5,93,65,630 14.63 03 Public 4,32,96,900 10.68
Total 40,56,68,530 100.00
Revised Shareholding Pattern as on 30.11.2023 Post IPO of the Company :
Sr. No. Name of Shareholders No. of Shares Percentage (%)of paid up Capital 01 Tata Motors Limited 21,65,69,816 53.38 02 Other Tata Group Entities 4,47,90,352 11.04 03 Public 14,43,08,362 35.58
TOTAL 40,56,68,530 100.00
c. Relevant provisions: - As per para (i) of Instruction no. 109, dated 18.10.2021,
“Reorganization including change of name, Change of Shareholding pattern, business transfer arrangements, court approved mergers and demergers, change of constitution, Change of Directors, etc. may be undertaken by the Unit Approval Committee (UAC) concerned subject to the condition that the Developer/Co-developer/ Unit shall not opt out or exit out of the Special Economic Zone and continues to operate as a going concern. All liabilities of the Developer/Co-Developer/Unit shall remain unchanged on such reorganization”… d. Other Information: - • LOA No SEEPZ-SEZ/MIDC-SEZ/Co-Dev-JKB/TTL/64/2018-19.258 dated 18.09.2018. File No.S-SEZ-PRO0MIDC/30/2022-JDCP I/3749/2024 344
• The Unit has submitted following documents: i. Board Resolution for Public issue. ii. Form MGT-14 and Receipt G.A.R.-7 submitted to MCA. iii.Shareholding pattern signed by Company Secretary of Tata Technologies Limited. d. Reason for change in Shareholding pattern:
• Recent Initial Public Officer (IPO) of the Company.
e. ADC’s observation: • Approval committee may kindly consider the proposal of the Unit - M/s TATA Technologies Limited, for Change in Shareholding pattern, in terms of Instruction no. 109 issued by MOC&I.
File No.S-SEZ-PRO0MIDC/30/2022-JDCP I/3749/2024 345