IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2010-01-05

DGFT Committee Minutes

Document text

RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   MINUTES OF THE NORMS COMMITTEE­II MEETING NO. 39/10 SCHEDULED TO BE HELD ON 29.12.2009 BUT ACTUALLY HELD ON 05.01.2010. The Meeting No. 39/10 of Norms Committee­II was held on 05.01.2010 for the licensing year 2009­2010 under the Chairmanship of Sh. A. KOMU, Addl. Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorisations under Duty Exemption Scheme (Chapter­4) of Foreign Trade Policy 2004­2009. The following members were present in the meeting:­ S.No Name of the representatives & their Designation   Deptt.   1. 2. 3. 4.     Sh. Gajraj Singh, Sr. D.O. Sh. S.K. Jain, D.O. Sh. K.K. Funda, Asst. Dir. Sh. Shyam Sunder, DDG   DHI DIPP DC(MSME) DGFT   1

Case No.:507/26/80­ALC2/2007

Party Name:NICCO CORPORATION LTD. Meet No/Date:39/81­ALC2/2009 29.12.2009 Status:Case Added HQ File :01/80/050/00859/AM06/ RLA File :02/24/042/00020/AM05/ Lic.No/Date:0210082642 05.10.2005 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 16.02.2010: ­   1.      Information in respect of S.No. 12 of Standard Deficiency Letter.       2

Case No.:8/39/81­ALC2/2009

Party Name:NYPRO FORBES PRODUCTS PVT LTD., 29.12.2009 Status:Case Added

HQ File :01/81/050/00364/AM10/ RLA File :04/24/040/00148/AM09/ Lic.No/Date:0410098581 15.09.2008 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The committee observed that  the  comments  from  MIT  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands deferred and to be relisted on 16.02.2010.   3

Case No.:19/39/81­ALC2/2009

Party Name:BIMETAL BEARINGS LIMITED, 29.12.2009 Status:Case Added HQ File :01/81/050/00375/AM10/ RLA File :32/24/040/00017/AM10/ Lic.No/Date:3210040968 03.08.2009 Defer Date 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The Committee decided that a copy of the application received from the firm may be forwarded to DC(MSME) for examination and comments. The case stands deferred and to be relisted on 16.02.2010.   4

Case No.:9/39/81­ALC2/2009

Party Name:EURO SOLO ENERGY SYSTEMS LIMITED 29.12.2009 Status:Case Added HQ File :01/81/050/00365/AM10/ RLA File :03/94/040/00298/AM10/ Lic.No/Date:0310532623 06.08.2009 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1.      Information in respect of S.No. 4, 5 & 11 of Standard Deficiency Letter.       5

Case No.:10/39/81­ALC2/2009

Party Name:CHANDAN STEEL LIMITED 29.12.2009 Status:Case Added HQ File :01/81/050/00366/AM10/ RLA File :03/94/040/00417/AM10/ Lic.No/Date:0310534528 20.08.2009 Defer Date:

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The committee observed that the comments from MOS are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 16.02.2010.   6

Case No.:16/39/81­ALC2/2009

Party Name:MILESTONE ALUMINIUM CO PTE LTD 29.12.2009 Status:Case Added HQ File :01/81/050/00372/AM10/ RLA File :07/24/040/00199/AM10/ Lic.No/Date:0710066705 28.08.2009 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1. Information in respect of S.No. 3, 5 &11 of Standard Deficiency Letter.       7

Case No.:24/39/81­ALC2/2009

Party Name:HIGH ENERGY BATTERIES ( INDIA ) LIMITED, 29.12.2009 Status:Case approved HQ File :01/81/050/00380/AM10/ RLA File :04/24/040/00142/AM10/ Lic.No/Date:0410107733 11.09.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.No.  39/81  scheduled  to  be  held  on  29.12.2009  but  actually  held  on  05.01.2010.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.      Words “No. of Cells 1050” may be suffixed with the description of export product. 2.      Word “relevant” may be prefixed with the description of import item at S.No.1 and its quantity may be allowed as 336 sq.mtrs. inclusive of wastage of 2%. 3.      Quantity of import item at S.No.2 may be allowed as 1050 Nos. on net to net basis with accountability clause.   R/A may take suitable consequential action accordingly.   8

Case No.:25/39/81­ALC2/2009

Party Name:AMPHENOL OMNICONNECT INDIA PVT LTD 29.12.2009 Status:Case Added

HQ File :01/81/050/00381/AM10/ RLA File :04/24/040/00089/AM10/ Lic.No/Date:0410107839 15.09.2009 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The Committee decided that a copy of the application received from the firm may be forwarded to MIT for examination and comments. The case stands deferred and to be relisted on 16.02.2010.     9

Case No.:14/39/81­ALC2/2009

Party Name:BHARAT ELECTRONICS LTD. 29.12.2009 Status:Case Added HQ File :01/81/050/00370/AM10/ RLA File :07/24/040/00202/AM10/ Lic.No/Date:0710067161 23.09.2009 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1. Information in respect of S.No. 3, 4, 5 &11 of Standard Deficiency Letter­ Export product wise.     10

Case No.:21/39/81­ALC2/2009

Party Name:INNO FAB (INDIA)PVT LTD. 29.12.2009 Status:Case Added HQ File :01/81/050/00377/AM10/ RLA File :09/24/040/00242/AM10/ Lic.No/Date:0910039370 23.09.2009 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 16.02.2010.     11

Case No.:11/39/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 29.12.2009 Status:Case  approved HQ File :01/81/050/00367/AM10/ RLA File :03/95/040/00395/AM10/ Lic.No/Date:0310539130 24.09.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The committee observed that  the  comments  from  MIT  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands deferred and to be relisted on 16.02.2010.       12

Case No.:13/39/81­ALC2/2009

Party Name:CHHAPERIA INTERNATIONAL COMPANY 29.12.2009 Status:Case approved HQ File :01/81/050/00369/AM10/ RLA File :07/24/040/00211/AM10/ Lic.No/Date:0710067182 24.09.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.No.  39/81  scheduled  to  be  held  on  29.12.2009  but  actually  held  on  05.01.2010.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.      Words “Width 6 MM to 80 MM” may be suffixed with the description of export product. 2.      Words “Width 1000 MM or more” may be suffixed with the description of item of import and its quantity may be allowed as applied for i.e. 10 MT inclusive of 2% wastage.   R/A may take suitable consequential action accordingly.   13

Case No.:18/39/81­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 29.12.2009 Status:Case Added HQ File :01/81/050/00374/AM10/ RLA File :06/24/040/00020/AM10/ Lic.No/Date:0610016330 24.09.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 16.02.2010.   14

Case No.:6/39/81­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 29.12.2009 Status:Case Added HQ File :01/81/050/00362/AM10/ RLA File :03/94/040/00532/AM10/ Lic.No/Date:0310539275 24.09.2009 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 16.02.2010.

15

Case No.:7/39/81­ALC2/2009

Party Name:TRANSLLOY INDIA PVT. LTD., 29.12.2009 Status:Case Added HQ File :01/81/050/00363/AM10/ RLA File :03/95/040/00402/AM10/ Lic.No/Date:0310539377 25.09.2009 Defer Date16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. On the recommendation of the  representative  of  DC(MSME)  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the  following information/clarification from the firm and to re­list the case on 16.02.2010: ­   1. Chemical composition of each export Product indicating the contents of Brass scrap and other inputs therein. 2. Process of manufacturing with process flow chart and wastage justification. 3. Justification for import of Brass scrap. 4. Relevant standard/specification of export product.     16

Case No.:15/39/81­ALC2/2009

Party Name:CHHAPERIA ELECTRO COMPONENTS PVT.LTD., 29.12.2009 Status:Case Added HQ File :01/81/050/00371/AM10/ RLA File :07/24/040/00236/AM10/ Lic.No/Date:0710067289 30.09.2009 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1.      Information in respect of S.No. 3, 4, 5 &11 of Standard Deficiency Letter­ Export product wise.       17

Case No.:22/39/81­ALC2/2009

Party Name:THE METAL POWDER COMPANY LTD, 29.12.2009 Status:Case Added HQ File :01/81/050/00378/AM10/ RLA File :35/24/040/00019/AM10/ Lic.No/Date:3510027797 30.09.2009 Defer Date16.02.2010

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The Committee decided that a copy of the application received from the firm may be forwarded to DC(MSME) for examination and comments. The case stands deferred and to be relisted on 16.02.2010.   18

Case No.:28/39/81­ALC2/2009

Party Name:ROTOMAG MOTORS AND CONTROLS P LTD 29.12.2009 Status:Case Added HQ File :01/81/050/00384/AM10/ RLA File :34/24/040/00106/AM10/ Lic.No/Date:3410025296 07.10.2009 Defer Date16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1. Information in respect of S.No 5 &11 of Standard Deficiency Letter­ Export product wise.       19

Case No.:12/39/81­ALC2/2009

Party Name:GLASTRONIX 29.12.2009 Status:Case Added HQ File :01/81/050/00368/AM10/ RLA File :07/24/040/00247/AM10/ Lic.No/Date:0710067699 21.10.2009 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1. Information in respect of S.No. 3, 4 ,5 &11 of Standard Deficiency Letter­ Export product wise.     20

Case No.:20/39/81­ALC2/2009

Party Name:KALPANA INTERNATIONAL 29.12.2009 Status:Case Added HQ File :01/81/050/00376/AM10/ RLA File :06/24/040/00026/AM10/ Lic.No/Date:0610016467 28.10.2009 Defer Date: 16.02.2010

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1. Information in respect of S.No. 3, 4, 5 &11 of Standard Deficiency Letter­ Export product wise.     21

Case No.:1/39/81­ALC2/2009

Party Name:PERSANG ALLOY INDUSTRIES PVT LTD 29.12.2009 Status:Case Added HQ File :01/81/050/00357/AM10/ RLA File :34/24/040/00121/AM10/ Lic.No/Date:3410025476 30.10.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The committee decided to transfer the case to NC­I as the matter pertains to them and to close the case on the part of NC­II.   22

Case No.:17/39/81­ALC2/2009

Party Name:CARTOON SANITATION PVT. LTD. 29.12.2009 Status:Case Added HQ File :01/81/050/00373/AM10/ RLA File :06/24/040/00028/AM10/ Lic.No/Date:0610016529 04.11.2009 Defer Date16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1. Name and quantity of each sanitary/bathroom fitting in Nos. 2. Information in respect of item at Sl.No. 4, 5 & 11 of Standard Deficiency Format export product­wise. 3.   Use of import item at Sl.No.2  as export products are Chromium plated     23

Case No.:27/39/81­ALC2/2009

Party Name:HIGH ENERGY BATTERIES ( INDIA ) LIMITED, 29.12.2009 Status:Case Added HQ File :01/81/050/00383/AM10/ RLA File :04/24/040/00201/AM10/ Lic.No/Date:0410109497 18.11.2009 Defer Date: 16.02.2010

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1. Information in respect of S.No. 3, 4, 5 &11 of Standard Deficiency Letter­ Export product wise.     24

Case No.:26/39/81­ALC2/2009

Party Name:EASTMAN IMPEX 29.12.2009 Status:Case approved HQ File :01/81/050/00382/AM10/ RLA File :30/24/040/00021/AM10/ Lic.No/Date:3010064154 24.11.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.No.  39/81  scheduled  to  be  held  on  29.12.2009  but  actually  held  on  05.01.2010.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.      Quantity of export product at S.No.1 may also be specified as 15 Nos. in addition to its weight of 61.039 MT. 2.      Quantity of export product at S.No.2 may also be specified as 2 Nos. and its weight may also be modified to 11.134 MT. 3.      Quantity of import item at S.No.1 may be allowed as 37.39 MT inclusive of 2% wastage. 4.      Quantity of import item at S.No.2 may be allowed as applied for i.e. 8.16 MT.   R/A may take suitable consequential action accordingly.                                    25

Case No.:2/39/81­ALC2/2009

Party Name:ABB LIMITED 29.12.2009 Status:Case Added HQ File :01/81/050/00358/AM10/ RLA File :07/24/040/00353/AM10/ Lic.No/Date:0710068749 08.12.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The committee observed that the hard copy of the application is not received but the inputs are seen to be components. Hence, decided  to  clear  as  per  GN4.                                                                                                                                                                                                                                                                                                                                        R/A may take suitable consequential action accordingly.

26

Case No.:3/39/81­ALC2/2009

Party Name:MAHENDRA INDUSTRIES 29.12.2009 Status:Case Added HQ File :01/81/050/00359/AM10/ RLA File :07/24/040/00342/AM10/ Lic.No/Date:0710068801 10.12.2009 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 16.02.2010.   27

Case No.:4/39/81­ALC2/2009

Party Name:SIMMONDS MARSHALL LTD. 29.12.2009 Status:Case Added HQ File :01/81/050/00360/AM10/ RLA File :03/95/040/00591/AM10/ Lic.No/Date:0310550421 11.12.2009 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 16.02.2010.   28

Case No.:5/39/81­ALC2/2009

Party Name:NICOMET INDUSTRIES LTD. 29.12.2009 Status:Case Added HQ File :01/81/050/00361/AM10/ RLA File :03/95/040/00509/AM10/ Lic.No/Date:0310550696 14.12.2009 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 16.02.2010.     29

Case No.:23/39/81­ALC2/2009

Party Name:EXIDE INDUSTRIES LTD 29.12.2009 Status:Case Added HQ File :01/81/050/00379/AM10/ RLA File :02/24/040/00175/AM10/ Lic.No/Date:0210135240 15.12.2009 Defer Date16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The Committee decided that a copy of the application received from the firm and forwarded to DIPP  for examination and comments. The case stands deferred and to be relisted on 16.02.2010.

30

Case No.:29/39/81­ALC2/2009

Party Name:V.K.UDYOG LTD. 29.12.2009 Status:Case Added HQ File :01/81/050/00385/AM10/ RLA File :02/24/040/00142/AM10/ Lic.No/Date:0210135352 16.12.2009 Defer Date: 16.02.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 16.02.2010.                                                                     PART ­AR­FRESH  

Case No. AR­48

 M/S  Raychem RPG Ltd., Mumbai             Meeting No.39/81 F.No.01/81/162/522/AM09/DES­II Dated 29­12­2009 Annual Advance License No.0310459698 dt.  31.01.08   RlA F.No.03/95/39/0004/AM08 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. Based on the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1. Description of Export products  and their weights may be specified as under:   Sl.No. Description Export Weight 1 SS Band  304/316  Grade  16 mm x 0.75 mm x 50 m 4.72 Kgs 2 SS Band  304/316  Grade  19 mm x 0.75 mm x 50 m 5.60 Kgs   2. Quantities of import items may be allowed as under:

Sl.No. Description Quantity For Export product at Sl No. 1 above 1 SS  Strip  Gr  304/316    0.75 mm  thick 4.814  Kgs  inclusive  of  a wastage of 2 % For Export product at Sl No. 2 above 2 SS  Strip  Gr  304/316    0.75 mm  thick 5.712  Kgs  inclusive  of  a wastage of 2 %                  R/A may take suitable consequential action accordingly.      

Case No. AR­49

 M/S  Crompton Greaves  Ltd., Mumbai             Meeting No.39/81 F.No.01/86/050/233/AM05/DES­VII/DES­II Dated 29­12­2009 Advance License No.0310213162 dt.09.07.2003   RlA F.No.03/24/42/267/AM03 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010.The Committee observed that the file may be forwarded to DHI for examination and comments. The case stands deferred and to be relisted on 16.02.2010.  

Case No. AR­50

 M/S  Crompton Greaves  Ltd., Mumbai             Meeting No.39/81 F.No.01/80/050/279/AM05/DES­I/DES­II Dated 29­12­2009 Advance License No.0310274196 dt.11.06.2004   RlA F.No.03/24/40/248/AM05 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The Committee observed that the file may be forwarded to DHI for examination and comments. The case stands deferred and to be relisted on 16.02.2010.    

Case No. AR­51

 M/S  Crompton Greaves  Ltd., Mumbai             Meeting No.39/81 F.No.01/80/050/1209/AM06/DES­I/DES­II Dated 29­12­2009 Advance License No.0310359961 dt.16.12.2005   RlA F.No.03/94/40/960/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The Committee observed that the file may be forwarded to DHI for examination and comments. The case stands deferred and to be relisted on 16.02.2010.

Case No. AR­52

 M/S  Crompton Greaves  Ltd., Mumbai             Meeting No.39/81 F.No.01/80/050/1499/AM06/DES­I/DES­II Dated 29­12­2009 Advance License No.0310367373 dt. 17.02.2006   RlA F.No.03/94/40/1267/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010.The Committee observed that the file may be forwarded to DHI for examination and comments. The case stands deferred and to be relisted on 16.02.2010.      

Case No. AR­53

 M/S  Crompton Greaves  Ltd., Mumbai             Meeting No.39/81 F.No.01/80/162/1164/AM06/DES­I/DES­II Dated 29­12­2009 Advance License No.0310366784 dt. 17.02.2006   RlA F.No.03/94/40/1237/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The Committee observed that the file may be forwarded to DHI for examination and comments. The case stands deferred and to be relisted on 16.02.2010.    

Case No. AR­54

 M/S  Ambica Steel Ltd.,  Ghaziabad             Meeting No.39/81 F.No.01/80/050/657/AM09/DES­I/DES­II Dated 29­12­2009 Advance License No.0510221167 dt. 29.05.2008   RlA F.No.05/24/40/108/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The committee observed that the comments from MOS are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 16.02.2010.    

Case No. AR­55

 M/S  Ambica Steel Ltd.,  Ghaziabad             Meeting No.39/81 F.No.01/80/050/658/AM09/DES­I/DES­II Dated 29­12­2009 Advance License No.0510221168 dt. 29.05.2008   RlA F.No.05/24/40/109/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The committee observed that the comments from MOS are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 16.02.2010.

Case No. AR­56

 M/S  Banaras Beads Ltd.,  Varanasi             Meeting No.39/81 F.No.01/84/050/641/AM06/DES­I/DES­II Dated 29­12­2009 Advance License No.1510003017 dt. 28.12.2005   RlA F.No.15/80/40/016/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The committee observed that the case is under examination of DC(MSME). The case stands deferred and to be relisted on 16.02.2010.                 PART –B­ FRESH  

Case No. B­2

 M/S  Uniflex Cables Ltd.,Mumbai             Meeting No.39/81 F.No.01/81/162/373/AM10/DES­II Dated 29­12­2009 Advance License No.0312031177 dt. 16.10­2003 and 0310240217 dt.08.12.2003   RlA F.No.03/24/040/1177/AM03 & 03/24/040/1744/AM03 Decision : The case regarding clarification sought by PC­4 section was considered by the Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. NC noted that the request of the exporter is for revalidation & E.O extension. PC­4 Section in DGFT has sought clarification of inputs. The exact point of clarification required from NC may be made clear by PC­4 section.    

Case No. B­3

 M/S  Abacus Metals Pvt.Ltd. Jaipur             Meeting No.39/81 F.No.01/81/162/012853/AM60/DES­II Dated 29­12­2009     RlA F.No.03/135/2000/100%/EOU/NSEZ Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. Based on the order passed by the High Court of  Rajasthan,  the  issue  regarding  review  of  wastage  norms  was  taken  up  by  the  Norms  Committee.  The  NC  debated  the recommendation of DIPP contained in their U.O. No. 7/256/06­TSW dated 01.01.2010 and it was decided to allow the wastage of 9% from  Brass  Ingot/rod  for  manufacture  of  Brass  Builder  hardware.  Since  the  exporter  is  a  100%  EOU,  the  wastage  norm  was  fixed without taking into account the recoverable wastage.

DC(SEZ)/RA may take suitable consequential action accordingly.   PART –C­ FRESH  

Case No. C­18

 M/S  Bimetal Bearing Ltd.Coimbatore.             Meeting No.39/81 F.No.01/81/162/00375/AM10//DES­II Dated 29­12­2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The committee observed that the case is under examination of DC(MSME). The case stands deferred and to be relisted on 16.02.2010.    

Case No. C­19

 M/S  Andritz Hydro Pvt.Ltd.(formerly known VA Tech Hydro India Pvt.Ltd.)             Meeting No.39/81 F.No.01/81/162/00464/AM10//DES­II Dated 29­12­2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 39/81 scheduled to be held on 29.12.2009 but actually held on 05.01.2010. The Committee decided that a copy of the application received from the firm may be forwarded to DHI for examination and comments. The case stands deferred and to be relisted on 16.02.2010.

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied