RATIFIED  MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION) MINUTES OF THE NORMS COMMITTEE­II MEETING NO. 15/81  SCHEDULED TO BE HELD ON 08.10.2013 BUT ACTUALLY HELD ON 22.10.2013. The Meeting No. 15/81 of Norms Committee­II was held on 22.10.2013 for the licensing year 2013­14 under the Chairmanship of Sh. Hardeep Singh, Joint Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorisations  under  Duty  Exemption  Scheme  (Chapter­4)  of  Foreign  Trade  Policy  2009­2014.  The  following  members  were  present  in  the meeting:­ S.No Name of the representatives & their Designation Deptt. 1. Shri S.K.Jain, D.O.                                                                            DIPP 2. Shri K.K. Funda, Asst. Director                                                        MSME Further Shri Daya Shankar, Dy. DG and Shri Raman Kumar, F.T.D.O., DGFT    were present in the meeꬅng. 1

Case No.:34/15/81­ALC2/2013

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:15/81­ALC2/2013 08.10.2013 Status:Deferred and Re­ indexed HQ File :01/81/050/00249/AM14/ RLA File :11/24/040/00068/AM11/ Lic.No/Date:1110024366 23.03.2011 Defer Date: 19.11.2013 Decision : NC observed that hard copy of the application has not been received from RA and decided to send a letter to RA to forward hard copy of application. The case stands deferred and to be re­listed on 19.11.2013.   2

Case No.:11/8/80­ALC2/2011

Party Name:ANKIT FASTENERS PVT LTD., 08.10.2013 Status:Deferred and Re­indexed HQ File :01/80/050/00159/AM12/ RLA File :07/24/040/00050/AM12/ Lic.No/Date:0710079421 27.05.2011 Defer Date:19.11.2013 Decision : NC observed that the reply of the firm is received and being forwarded to DIPP. The case stands deferred and to be re­listed on 19.11.2013.   3

Case No.:13/16/81­ALC2/2011

Party Name:K.S.INSTRUMENTS PVT.LTD., 08.10.2013 Status:Deferred and Re­indexed

HQ File :01/81/050/00114/AM12/ RLA File :07/24/040/00061/AM12/ Lic.No/Date:0710079473 30.05.2011 Defer Date:19.11.2013 Decision: NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to expedite reply. The case stands deferred and to be re­listed on 19.11.2013.   4

Case No.:11/23/81­ALC2/2011

Party Name:DELTA POWER SOLUTIONS INDIA PVT.LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00191/AM12/ RLA File :25/24/040/00007/AM12/ Lic.No/Date:2510003291 08.07.2011 Defer Date:19.11.2013 Decision: NC observed that comments of DIT is still awaited, hence decided to send a reminder to DIT. The case stands deferred and to be re­listed on 19.11.2013.   5

Case No.:2/35/81­ALC2/2011

Party Name:DELTON CABLES LTD. 08.10.2013 indexed HQ File :01/81/050/00279/AM12/ RLA File :05/23/040/00171/AM12/ Lic.No/Date:0510305311 14.10.2011 Defer Date:19.11.2013 Decision: NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to furnish the reply of D/L dtd 12.3.2013 of DIPP. The case stands deferred and to be re­listed on 19.11.2013.   6

Case No.:18/41/81­ALC2/2011

Party Name:DYNAMIC CABLES PVT. LTD. 08.10.2013 indexed HQ File :01/81/050/00363/AM12/ RLA File :13/24/040/00026/AM12/ Lic.No/Date:1310037288 24.10.2011 Decision: NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to expedite reply. The case stands deferred and to be re­listed on 19.11.2013.   7

Case No.:17/25/81­ALC2/2012

Party Name:P E S ENGINEERS PRIVATE LIMITED 08.10.2013 indexed HQ File :01/81/050/00468/AM13/ RLA File :05/24/040/00439/AM12/ Lic.No/Date:0510319788 07.03.2012 Decision: NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to expedite reply. The case stands deferred and to be re­listed on 19.11.2013.   8

Case No.:9/5/81­ALC2/2012

Party Name:PRECISION ELECTRONICS LTD. 08.10.2013 indexed HQ File :01/81/050/00076/AM13/ RLA File :05/24/040/00025/AM13/ Lic.No/Date:0510323037

24.04.2012 Decision: NC observed that comments of DIT is still awaited, hence decided to send a reminder to DIT. The case stands deferred and to be re­listed on 19.11.2013.   9

Case No.:11/5/81­ALC2/2012

Party Name:PRECISION ELECTRONICS LTD. 08.10.2013 indexed HQ File :01/81/050/00078/AM13/ RLA File :05/24/040/00012/AM13/ Lic.No/Date:0510323036 24.04.2012 Decision: NC observed that comments of DIT is still awaited, hence decided to send a reminder to DIT. The case stands deferred and to be re­listed on 19.11.2013.   10

Case No.:37/8/81­ALC2/2012

Party Name:HINDALCO INDUSTRIES LIMITED Meet No/Date:12/81­ALC2/2013 27.08.2013 Status: Approved HQ File :01/81/050/00160/AM13/ RLA File :02/24/040/00031/AM13/ Lic.No/Date:0210177812 22.05.2012 Defer Date: Decision : NC decided to ratify the norms of above AA as per written comments of MSME vide U.O. No. 30(193/187)/11­ME  dated 03.10.2013  on repeat basis as per AA No. 0210176896 dtd 25.4.12, as under:­                                 The import of aluminium coil is allowed with 1% wastage.   R/A may take suitable consequential action accordingly.   11

Case No.:3/12/81­ALC2/2012

Party Name:BHANSALI CABLES & CONDUCTORS (P) LTD., 08.10.2013 Status: Reject HQ File :01/81/050/00234/AM13/ RLA File :05/23/040/00024/AM13/ Lic.No/Date:0510329213 10.07.2012 Defer Date: Decision: NC observed that reply of the firm has not been received despite reminders. NC decided to reject the case on ground of non submission reply from the firm.   12

Case No.:39/13/81­ALC2/2012

Party Name:PHOENIX FOILS PVT. LTD. Meet No/Date:12/81­ALC2/2013 27.08.2013 indexed HQ File :01/81/050/00298/AM13/ RLA File :03/95/040/00237/AM13/ Lic.No/Date:0310701722 12.07.2012 Defer Date: Decision : NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to expedite reply. The case stands deferred and to be re­listed on 19.11.2013.

13

Case No.:5/13/81­ALC2/2012

Party Name:ASAWA INSULATION PVT. LTD. 08.10.2013 indexed HQ File :01/81/050/00264/AM13/ RLA File :03/94/040/00183/AM13/ Lic.No/Date:0310703691 01.08.2012 Decision: NC observed that reply of the firm has  been received and being forwarded to DIPP. The case stands deferred and to be re­listed on 19.11.2013.   14

Case No.:3/13/81­ALC2/2012

Party Name:NIRLEP APPLIANCES LIMITED 08.10.2013 Status: Approved HQ File :01/81/050/00262/AM13/ RLA File :03/95/040/00341/AM13/ Lic.No/Date:0310704730 09.08.2012 Defer Date: Decision: NC decided to ratify the norms of above AA as per written comments of DIPP vide U.O. No. 12/51/2013­TSW/14  dated 22.10.2013 as under:­   1. Words “Containing 86940 Kgs. of Aluminium circle, with interior PTFE coating of 25 Micron and Exterior Heat Resistant Paint &  with Bakelite Handle” may be suffixed with the description of export product. 2. Quantity of import item at Sl. No.1  may be allowed as 93026 Kgs. as 1.07 Kg /Kg content in the Export Product taking clue from SION Sl.No. C­ 2046. 3. Quantity of import item at Sl. No.2 may be allowed as 0.128 ltrs  perSqMtrs of internal coating area as per SION at Sl.No. C­23. 4. Quantity of import item at Sl. No.3 may be allowed as 0.128 ltrs  perSqMtrs of external coating area as per SION at Sl.No. C­23. 5. Quantities of import items at Sl. Nos. 4 &  5   may be allowed as 300000 Nos. on net to net basis with accountability clause. 6. Quantity of import item at Sl. No. 6 may be allowed on net to net basis with accountability clause. 7. Quantity of import item at S.No.7 may be allowed as per packing policy.     15

Case No.:31/13/81­ALC2/2012

Party Name:LAXMI ELECTRONICS MOULDS & PRECISION ENGG P.LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00290/AM13/ RLA File :07/24/040/00201/AM13/ Lic.No/Date:0710090219 14.08.2012 Defer Date:19.11.2013 Decision: NC observed that comments of C&PC is still awaited, hence decided to send a reminder to C&PC. The case stands deferred and to be re­listed on 19.11.2013.   16

Case No.:26/13/81­ALC2/2012

Party Name:STRESSMAC PRESTRESSING SYSTEMS 08.10.2013 Status: Reject HQ File :01/81/050/00285/AM13/ RLA File :08/24/040/00162/AM13/ Lic.No/Date:0810114372 21.08.2012 Defer Date: Decision: NC observed that reply of the firm has not been received despite reminders. NC decided to reject the case on ground of non submission reply from the

firm.   17

Case No.:1/13/81­ALC2/2012

Party Name:GE INDIA INDUSTRIAL PRIVATE LIMITED 08.10.2013 Status: Reject HQ File :01/81/050/00260/AM13/ RLA File :05/23/040/00186/AM13/ Lic.No/Date:0510332474 23.08.2012 Defer Date: Decision: NC observed that reply of the firm has not been received despite reminders. NC decided to reject the case on ground of non submission reply from the firm.   18

Case No.:20/16/81­ALC2/2012

Party Name:CABLEX SYSTEMS INDIA PVT LTD 08.10.2013 Status: Reject HQ File :01/81/050/00327/AM13/ RLA File :07/21/040/00412/AM13/ Lic.No/Date:0710090483 30.08.2012 Defer Date: Decision: NC observed that reply of the firm has not been received despite reminders. NC decided to reject the case on ground of non submission reply from the firm.   19

Case No.:11/13/81­ALC2/2012

Party Name:TRAFOMEC INDIA MAGNETICS PVT LTD 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00270/AM13/ RLA File :07/24/040/00216/AM13/ Lic.No/Date:0710090674 11.09.2012 Defer Date:19.11.2013 Decision: NC observed that firm has not furnished the requisite information as asked by DHI. Hence NC decided to send a final reminder to firm to submit reply within 15 days. The case stands deferred and to be re­listed on 19.11.2013.   20

Case No.:4/16/81­ALC2/2012

Party Name:CROMPTON GREAVES LIMITED, 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00311/AM13/ RLA File :03/94/040/00128/AM13/ Lic.No/Date:0310709770 20.09.2012 Defer Date:19.11.2013 Decision:  NC  decided  to  send  a  letter  to  firm  to  submit  the  following  information  as  per  written  comments  of  DHI  vide  U.O.No. 3(35)/2012/TSW(B)/151   dated  09/07/2013 (copy enclosed). The case stands deferred and to be re­listed on 19.11.2013.   21

Case No.:6/16/81­ALC2/2012

Party Name:CROMPTON GREAVES LIMITED, 08.10.2013 Status:Deferred and Re­indexed

HQ File :01/81/050/00313/AM13/ RLA File :03/94/040/00129/AM13/ Lic.No/Date:0310709777 20.09.2012 Defer Date:19.11.2013 Decision NC decided to send a letter to firm to submit the following information as per   written comments of DHI vide U.O. No. 3(35)/2012/TSW(B)/136  dated 01.07.2013 as under:­            1.       Net weight per unit of Export Product.            2.       Revised weight balancing statement as per Sl. No. 5 of SDL.     22

Case No.:17/16/81­ALC2/2012

Party Name:JAYACHANDRAN ALLOYS PRIVATE LIMITED, 08.10.2013 Status: Approved HQ File :01/81/050/00324/AM13/ RLA File :32/24/040/00040/AM13/ Lic.No/Date:3210057855 11.10.2012 Defer Date: Decision: NC decided to ratify the norms of above taking clue from   SION­C1153.   23

Case No.:20/25/81­ALC2/2012

Party Name:VEER­O­ METALS PVT .LTD 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00471/AM13/ RLA File :07/24/040/00285/AM13/ Lic.No/Date:0710091297 11.10.2012 Defer Date:19.11.2013 Decision: NC observed that case is under examination of DIPP. The case stands deferred and to be re­listed on 19.11.2013.   24

Case No.:28/22/81­ALC2/2012

Party Name:ESWARI METAL INDUSTRIES 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00425/AM13/ RLA File :07/24/040/00278/AM13/ Lic.No/Date:0710091491 22.10.2012 Defer Date:19.11.2013 Decision: NC observed that case is under examination of MSME. The case stands deferred and to be re­listed on 19.11.2013.   25

Case No.:1/16/81­ALC2/2012

Party Name:ELIN ELECTRONICS LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00308/AM13/ RLA File :05/23/040/00257/AM13/ Lic.No/Date:0510337600 23.10.2012 Defer Date:19.11.2013 Decision: NC observed that comments of DIT is still awaited, hence decided to send a reminder to DIT. The case stands deferred and to be re­listed on 19.11.2013.   26

Case No.:3/19/81­ALC2/2012

Party Name:MAGNETI MARELLI UM Status:

ELECTRONIC SYSTEMS PVT.LTD., 08.10.2013 Reject HQ File :01/81/050/00368/AM13/ RLA File :05/24/040/00272/AM13/ Lic.No/Date:0510337701 29.10.2012 Defer Date: Decision: NC observed that reply of the firm has not been received despite reminders. NC decided to reject the case on ground of non submission reply from the firm.   27

Case No.:9/19/81­ALC2/2012

Party Name:DYNAMIC CABLES PVT. LTD. 08.10.2013 Status: Reject HQ File :01/81/050/00374/AM13/ RLA File :13/24/040/00032/AM13/ Lic.No/Date:1310041433 29.10.2012 Defer Date: Decision: NC observed that reply of the firm has not been received despite reminders. NC decided to reject the case on ground of non submission reply from the firm.   28

Case No.:11/19/81­ALC2/2012

Party Name:COMET EXPORTS 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00376/AM13/ RLA File :29/24/040/00006/AM13/ Lic.No/Date:2910018933 29.10.2012 Defer Date:19.11.2013 Decision: NC observed that firm has not furnished the requisite information as asked by MSME. Hence NC decided to send a final reminder to firm to   29

Case No.:4/25/81­ALC2/2012

Party Name:DYNAMIC CABLES PVT. LTD. 08.10.2013 indexed HQ File :01/81/050/00455/AM13/ RLA File :13/24/040/00036/AM13/ Lic.No/Date:1310041437 30.10.2012 Decision: NC observed that firm has not furnished the requisite information as asked by DIPP. Hence NC decided to send a final reminder to firm to   30

Case No.:21/22/81­ALC2/2012

Party Name:PEARL INSULATIONS PVT. LIMITED 08.10.2013 Status: Reject HQ File :01/81/050/00418/AM13/ RLA File :07/24/040/00311/AM13/ Lic.No/Date:0710091717 02.11.2012 Defer Date: Decision: NC observed that reply of the firm has not been received despite reminders. NC decided to reject the case on ground of non submission reply from the firm.

31

Case No.:18/22/81­ALC2/2012

Party Name:FRICTION METAL FIBRES (INDIA) P.LTD 08.10.2013 Status: Reject HQ File :01/81/050/00415/AM13/ RLA File :05/23/040/00245/AM13/ Lic.No/Date:0510338445 07.11.2012 Defer Date: Decision: NC observed that reply of the firm has not been received despite reminders. NC decided to reject the case on ground of non submission reply from the firm.   32

Case No.:19/25/81­ALC2/2012

Party Name:MAINI PRECISION PRODUCTS P LTD 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00470/AM13/ RLA File :07/24/040/00314/AM13/ Lic.No/Date:0710091811 07.11.2012 Defer Date:19.11.2013 Decision: NC observed that firm has not furnished the requisite information as asked by DIPP. Hence NC decided to send a final reminder to firm to   33

Case No.:29/22/81­ALC2/2012

Party Name:WIELAND METALS INDIA PRIVATE LTD ., 08.10.2013 Status: Approved HQ File :01/81/050/00426/AM13/ RLA File :07/24/040/00303/AM13/ Lic.No/Date:0710091865 08.11.2012 Defer Date: Decision: NC decided to ratify the norms of above AA as per written comments of MSME vide U.O. No. 30(64)2013­ME dated 09.09.2013 as under:­ The import is allowed with 3% wastage.   34

Case No.:5/25/81­ALC2/2012

Party Name:CMI LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00456/AM13/ RLA File :05/23/040/00336/AM13/ Lic.No/Date:0510339213 20.11.2012 Defer Date:19.11.2013 Decision: NC observed that firm has not furnished the requisite information as asked by DIPP. Hence NC decided to send a final reminder to firm to   35

Case No.:22/22/81­ALC2/2012

Party Name:SHINKWANG ELECTRONICS PRIVATE LIMITED 08.10.2013 Status: Reject HQ File :01/81/050/00419/AM13/ RLA File :05/24/040/00313/AM13/ Lic.No/Date:0510339369 23.11.2012 Defer Date: Decision: NC observed that reply of the firm has not been received despite reminders. NC decided to reject the case on ground of non submission reply from the

firm.   36

Case No.:24/22/81­ALC2/2012

Party Name:MANDEEP CABLE PVT.LTD. 08.10.2013 Status: Reject HQ File :01/81/050/00421/AM13/ RLA File :05/24/040/00297/AM13/ Lic.No/Date:0510339368 23.11.2012 Defer Date: Decision: NC observed that reply of the firm has not been received despite reminders. NC decided to reject the case on ground of non submission reply from the firm.   37

Case No.:31/25/81­ALC2/2012

Party Name:LAXMI ELECTRONICS MOULDS & PRECISION ENGG P.LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00482/AM13/ RLA File :07/24/040/00342/AM13/ Lic.No/Date:0710092095 26.11.2012 Defer Date:19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm.   The case stands deferred and to be relisted on 19.11.2013.   38

Case No.:1/22/81­ALC2/2012

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00398/AM13/ RLA File :11/24/040/00020/AM13/ Lic.No/Date:1110027311 27.11.2012 Defer Date:19.11.2013 Decision: NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to expedite reply. The case stands deferred and to be re­listed on 19.11.2013.   39

Case No.:2/22/81­ALC2/2012

Party Name:KALYANI THERMAL SYSTEMS LTD., 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00399/AM13/ RLA File :31/83/040/00145/AM13/ Lic.No/Date:3110056380 05.12.2012 Defer Date:19.11.2013 Decision: NC observed that firm has not furnished the requisite information as asked by DIPP. Hence NC decided to send a final reminder to firm to   40

Case No.:20/22/81­ALC2/2012

Party Name:HIGHTEMP FURNACES LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00417/AM13/ RLA File :07/24/040/00357/AM13/ Lic.No/Date:0710092293 05.12.2012 Defer Date:19.11.2013

Decision: NC observed that comments of DHI is still awaited, hence decided to send a reminder to DHI. The case stands deferred and to be re­listed on 19.11.2013.   41

Case No.:30/22/81­ALC2/2012

Party Name:VOITH HYDRO PRIVATE LIMITED 08.10.2013 Status: Reject HQ File :01/81/050/00427/AM13/ RLA File :05/24/040/00334/AM13/ Lic.No/Date:0510340125 05.12.2012 Defer Date: Decision: NC observed that reply of the firm has not been received despite reminders. NC decided to reject the case on ground of non submission reply from the firm.   42

Case No.:11/22/81­ALC2/2012

Party Name:JINDAL SAW LTD 08.10.2013 Status: Reject HQ File :01/81/050/00408/AM13/ RLA File :05/23/040/00359/AM13/ Lic.No/Date:0510340521 10.12.2012 Defer Date: Decision: NC observed that reply of the firm has not been received despite reminders. NC decided to reject the case on ground of non submission reply from the firm.   43

Case No.:24/25/81­ALC2/2012

Party Name:PEARL INSULATIONS PVT. LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00475/AM13/ RLA File :07/24/040/00375/AM13/ Lic.No/Date:0710092468 13.12.2012 Defer Date:19.11.2013 Decision: NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to expedite reply. The case stands deferred and to be re­listed on 19.11.2013.   44

Case No.:29/25/81­ALC2/2012

Party Name:KEC INTERNATIONAL LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00480/AM13/ RLA File :03/94/040/00757/AM13/ Lic.No/Date:0310717933 21.12.2012 Defer Date:19.11.2013 Decision: NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to expedite reply. The case stands deferred and to be re­listed on 19.11.2013.   45

Case No.:8/25/81­ALC2/2012

Party Name:A­1 FENCE PRODUCTS CO.PVT.LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00459/AM13/ RLA File :03/94/040/00788/AM13/ Lic.No/Date:0310718506 Defer

28.12.2012 Date:19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   46

Case No.:25/25/81­ALC2/2012

Party Name:LUMINO INDUSTRIES LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00476/AM13/ RLA File :02/24/040/00152/AM13/ Lic.No/Date:0210185111 04.01.2013 Defer Date:19.11.2013 Decision: NC observed that case is under examination of DIPP. The case stands deferred and to be re­listed on 19.11.2013.   47

Case No.:14/25/81­ALC2/2012

Party Name:POLYCAB WIRES PVT.LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00465/AM13/ RLA File :03/95/040/00784/AM13/ Lic.No/Date:0310721167 17.01.2013 Defer Date:19.11.2013 Decision: NC observed that case is under examination of DIPP. The case stands deferred and to be re­listed on 19.11.2013.   48

Case No.:7/25/81­ALC2/2012

Party Name:GRAVITA INDIA LTD., 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00458/AM13/ RLA File :13/24/040/00047/AM13/ Lic.No/Date:1310041928 18.01.2013 Defer Date:19.11.2013 Decision: NC decided to refer the case to Chemical Division of MSME.   The case stands deferred and to be relisted on 19.11.2013.   49

Case No.:11/25/81­ALC2/2012

Party Name:WIELAND METALS INDIA PRIVATE LTD ., 08.10.2013 Status: Approved HQ File :01/81/050/00462/AM13/ RLA File :07/24/040/00440/AM13/ Lic.No/Date:0710093248 22.01.2013 Defer Date: Decision: NC decided to ratify the norms of above AA as per written comments of DHI vide U.O. No. 3(65)/2013­ME  dated 09.09.2013 as under:­ The import is allowed with 3% wastage.   50

Case No.:23/25/81­ALC2/2012

Party Name:MC COM INDUSTRIES (INDIA) PVT. LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00474/AM13/ RLA File :03/95/040/00818/AM13/ Lic.No/Date:0310721688 22.01.2013 Defer Date:19.11.2013 Decision: NC observed that the reply of the firm is received and being forwarded to MSME. The case stands deferred and to be re­listed on 19.11.2013.

51

Case No.:27/25/81­ALC2/2012

Party Name:NICO EXTRUSIONS PVT.LTD. 08.10.2013 Status: Approved HQ File :01/81/050/00478/AM13/ RLA File :03/95/040/00795/AM13/ Lic.No/Date:0310722016 24.01.2013 Defer Date: Decision : NC decided to ratify the norms of above AA as per written comments of MSME vide U.O. No. 30(301)2011­ME  dated 03.10.2013 on repeat basis as per earlier AA No. 0310573289 dtd 7.5.2010 as under:­ Taking clue from SION C­1575/1627, the import is allowed as 1.06Kg/Kg content in export product.                            52

Case No.:9/25/81­ALC2/2012

Party Name:GENERAL CABLE ENERGY INDIA PVT. LTD., 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00460/AM13/ RLA File :05/23/040/00441/AM13/ Lic.No/Date:0510344170 28.01.2013 Defer Date:19.11.2013 Decision: NC observed that firm has not furnished the requisite information as asked by DIPP. Hence NC decided to send a final reminder to firm to   53

Case No.:6/25/81­ALC2/2012

Party Name:DYNAMIC CABLES PVT. LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00457/AM13/ RLA File :13/24/040/00048/AM13/ Lic.No/Date:1310042004 29.01.2013 Defer Date:19.11.2013 Decision: NC observed that firm has not furnished the requisite information as asked by DIPP. Hence NC decided to send a final reminder to firm to   54

Case No.:28/25/81­ALC2/2012

Party Name:MENON BEARINGS LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00479/AM13/ RLA File :03/95/040/00848/AM13/ Lic.No/Date:0310722451 30.01.2013 Defer Date:19.11.2013 Decision: NC observed that firm has not furnished the requisite information as asked by DIPP. Hence NC decided to send a final reminder to firm to   55

Case No.:36/25/81­ALC2/2012

Party Name:PLAST TECH ENGINEERING 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00487/AM13/ RLA File :04/24/040/00218/AM13/ Lic.No/Date:0410142970 30.01.2013 Defer Date:19.11.2013

Decision: NC observed the case and decided to refer the case with a copy of application to C&PC. The case stands deferred and to be re­listed on 19.11.2013.   56

Case No.:22/25/81­ALC2/2012

Party Name:STERLITE TECHNOLOGIES LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00473/AM13/ RLA File :03/95/040/00820/AM13/ Lic.No/Date:0310722786 04.02.2013 Defer Date:19.11.2013 Decision: NC observed that firm has not furnished the requisite information as asked by DIPP. Hence NC decided to send a final reminder to firm to   57

Case No.:21/25/81­ALC2/2012

Party Name:PYROTECH ELECTRONICS PVT. LTD., 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00472/AM13/ RLA File :13/21/040/00145/AM13/ Lic.No/Date:1310042080 05.02.2013 Defer Date:19.11.2013 Decision: NC observed that comments of DIT is still awaited, hence decided to send a reminder to DIT. The case stands deferred and to be re­listed on 19.11.2013.   58

Case No.:1/25/81­ALC2/2012

Party Name:SANDVIK ASIA LIMITED 08.10.2013 Status: closed HQ File :01/81/050/00452/AM13/ RLA File :08/24/040/00371/AM13/ Lic.No/Date:0810118791 25.02.2013 Defer Date: Decision: NC decided to close the case as authorisation has been issued by RA on repeat basis.   59

Case No.:2/25/81­ALC2/2012

Party Name:GLOBEX INDUSTRIES PRIVATE LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00453/AM13/ RLA File :56/24/040/00039/AM13/ Lic.No/Date:5610001764 28.02.2013 Defer Date:19.11.2013 Decision: NC observed the case and decided to refer the case with a copy of application to MSME. The case stands deferred and to be re­listed on 19.11.2013.   60

Case No.:2/2/81­ALC2/2013

Party Name:SANDVIK ASIA LIMITED 08.10.2013 Status: closed HQ File :01/81/050/00003/AM14/ RLA File :08/24/040/00468/AM13/ Lic.No/Date:0810120175 10.04.2013 Defer Date: Decision: NC decided to close the case as authorisation has been issued by RA on repeat basis.

61

Case No.:9/9/81­ALC2/2013

Party Name:SHIRODKAR PRECI COMP PRIVATE LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00137/AM14/ RLA File :31/83/040/00004/AM14/ Lic.No/Date:3110057930 15.04.2013 Defer Date:19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   62

Case No.:5/5/81­ALC2/2013

Party Name:PEARL INSULATIONS PVT. LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00107/AM14/ RLA File :07/24/040/00534/AM13/ Lic.No/Date:0710094882 17.04.2013 Defer Date:19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   63

Case No.:10/5/81­ALC2/2013

Party Name:KEI INDUSTRIES LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00112/AM14/ RLA File :05/23/040/00503/AM13/ Lic.No/Date:0510352513 29.04.2013 Defer Date:19.11.2013 Decision: NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to expedite reply. The case stands deferred and to be re­listed on 19.11.2013.   64

Case No.:11/5/81­ALC2/2013

Party Name:KEI INDUSTRIES LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00113/AM14/ RLA File :05/23/040/00018/AM14/ Lic.No/Date:0510352511 29.04.2013 Defer Date:19.11.2013 Decision: NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to expedite reply. The case stands deferred and to be re­listed on 19.11.2013.   65

Case No.:11/9/81­ALC2/2013

Party Name:APAR INDUSTRIES LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00139/AM14/ RLA File :03/94/040/00009/AM14/ Lic.No/Date:0310733061 01.05.2013 Defer Date:19.11.2013 Decision: NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to expedite reply. The case stands deferred and to be re­listed on 19.11.2013.   66

Case No.:13/5/81­ALC2/2013

Party Name:MET TRADE (INDIA) LTD. Status:Deferred and

08.10.2013 Re­indexed HQ File :01/81/050/00115/AM14/ RLA File :05/24/040/00030/AM14/ Lic.No/Date:0510353167 03.05.2013 Defer Date:19.11.2013 Decision: NC observed that case is under examination of DIPP(Chemical wing). The case stands deferred and to be re­listed on 19.11.2013.   67

Case No.:7/9/81­ALC2/2013

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00135/AM14/ RLA File :31/83/040/00201/AM13/ Lic.No/Date:3110058180 03.05.2013 Defer Date:19.11.2013 Decision: NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to expedite reply. The case stands deferred and to be re­listed on 19.11.2013.   68

Case No.:12/9/81­ALC2/2013

Party Name:APAR INDUSTRIES LIMITED 08.10.2013 indexed HQ File :01/81/050/00140/AM14/ RLA File :03/94/040/01105/AM13/ Lic.No/Date:0310734159 13.05.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/68   dated  22/10/2013 as under:­ 1.      Voltage rating of cables 2.       Detailed calculations for the requirement of each raw material, export product wise  supported by the Cross sectional diagram of the cable/ Buyers data sheet. 3.      Net weight of  each Cable 4.      Material balancing viz. net content of each imported and indigenous input, export product wise. 5.      Total requirement of each raw material, export product wise, in a tabular form     69

Case No.:15/15/81­ALC2/2013

Party Name:SRI VAARU METALLURGICALS (PVT) LTD 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00230/AM14/ RLA File :07/24/040/00540/AM13/ Lic.No/Date:0710095378 15.05.2013 Defer Date:19.11.2013 Decision: NC observed that case is under examination at MSME. The case stands deferred and to be re­listed on 19.11.2013.   70

Case No.:21/15/81­ALC2/2013

Party Name:AMARTARA PVT. LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00236/AM14/ RLA File :03/94/040/00119/AM14/ Lic.No/Date:0310734664 Defer Date:

16.05.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   71

Case No.:3/9/81­ALC2/2013

Party Name:NICOMET INDUSTRIES LTD. 08.10.2013 Status: Approved HQ File :01/81/050/00131/AM14/ RLA File :03/95/040/00141/AM14/ Lic.No/Date:0310734818 17.05.2013 Defer Date: Decision : NC decided to ratify the norms of above AA as per written comments of MSME vide U.O. No. 30(77)2013­ME  dated 08.10.2013 on repeat basis as per earlier AA No. 0310672448 dtd 22.12.2011 as under:­      The import is allowed as 1.096 Kg/Kg content in export product.                    72

Case No.:4/9/81­ALC2/2013

Party Name:MAYFAIR INTERNATIONAL 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00132/AM14/ RLA File :03/95/040/00142/AM14/ Lic.No/Date:0310735078 21.05.2013 Defer Date:19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   73

Case No.:6/5/81­ALC2/2013

Party Name:MAHENDRA INDUSTRIES 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00108/AM14/ RLA File :07/24/040/00047/AM14/ Lic.No/Date:0710095556 24.05.2013 Defer Date:19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   74

Case No.:1/9/81­ALC2/2013

Party Name:STEAMLINE INDUSTRIES LTD. 08.10.2013 indexed HQ File :01/81/050/00129/AM14/ RLA File :08/24/040/00069/AM14/ Lic.No/Date:0810121524 29.05.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/74   1.            OD  and WT of import item and export product. 2.             Manufacturing process with reduction in diameter and wall thickness at each stage of pilgering/drawing and wastage claimed at each stage with complete justification.

  75

Case No.:14/5/81­ALC2/2013

Party Name:JMW INDIA (P) LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00116/AM14/ RLA File :05/23/040/00062/AM14/ Lic.No/Date:0510355876 31.05.2013 Defer Date:19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   76

Case No.:62/15/81­ALC2/2013

Party Name:PHOENIX INDUSTRIES PVT. LTD 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00277/AM14/ RLA File :03/95/040/01000/AM13/ Lic.No/Date:0310736260 31.05.2013 Defer Date: 19.11.2013 Decision: NC observed that case is under examination of MOS. The case stands deferred and to be re­listed on 19.11.2013.   77

Case No.:3/15/81­ALC2/2013

Party Name:BOSCH LIMITED, 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00218/AM14/ RLA File :07/24/040/00005/AM14/ Lic.No/Date:0710095743 04.06.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   78

Case No.:8/9/81­ALC2/2013

Party Name:CHECON SHIVALIK CONTACT SOLUTIONS PRIVATE LIMITED 08.10.2013 indexed HQ File :01/81/050/00136/AM14/ RLA File :05/23/040/00070/AM14/ Lic.No/Date:0510356225 05.06.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of MSME vide U.O.No. 30(75)/2013­ME   dated  01/10/2013 as under:­   1.         Use of export product with its complete specifications showing content of              imported inputs there in. 2.         Stepwise process of manufacturing, and stage wise wastage, if any.

3.         Process of Mfg to be carried out on tape which involve wastage. 4.         Material balancing showing weight of different inputs.     79

Case No.:30/15/81­ALC2/2013

Party Name:INDIAN TECHNOMETAL COMPANY LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00245/AM14/ RLA File :05/23/040/00081/AM14/ Lic.No/Date:0510356388 06.06.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   80

Case No.:10/15/81­ALC2/2013

Party Name:ACG PHARMAPACK PVT LTD 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00225/AM14/ RLA File :03/94/040/00193/AM14/ Lic.No/Date:0310737110 07.06.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   81

Case No.:11/15/81­ALC2/2013

Party Name:ACG PHARMAPACK PVT LTD 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00226/AM14/ RLA File :03/94/040/00192/AM14/ Lic.No/Date:0310737103 07.06.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   82

Case No.:7/15/81­ALC2/2013

Party Name:APAR INDUSTRIES LIMITED 08.10.2013 indexed HQ File :01/81/050/00222/AM14/ RLA File :03/94/040/00115/AM14/ Lic.No/Date:0310737263 11.06.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/82   1.      Voltage rating of cables from Sl. No. 19 to 36. 2.       Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the cable/ Buyers data sheet. 3.      Net weight of  each Cable

g 4.      Material balancing viz. net content of each imported and indigenous input, export product wise. 5.      Total requirement of each raw material, export product wise, in a tabular form     83

Case No.:60/15/81­ALC2/2013

08.10.2013 indexed HQ File :01/81/050/00275/AM14/ RLA File :03/95/040/00143/AM14/ Lic.No/Date:0310737561 13.06.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/83   1.      Size of conductors in cables alongwith quantities of cables  inKms, conductor size wise. 2.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the cable/Buyers data sheet. 3.      Net weight per KM of  each Cable 4.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 5.      Total requirement of each raw material, export product wise, in a tabular form     84

Case No.:20/15/81­ALC2/2013

Party Name:EUROBOND INDUSTRIES PVT. LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00235/AM14/ RLA File :03/94/040/00239/AM14/ Lic.No/Date:0310737867 17.06.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   85

Case No.:61/15/81­ALC2/2013

Party Name:REXNORD ELECTRONICS & CONTROLS LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00276/AM14/ RLA File :03/95/040/00214/AM14/ Lic.No/Date:0310738768 24.06.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   86

Case No.:16/15/81­ALC2/2013

Party Name:STERLITE TECHNOLOGIES LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00231/AM14/ RLA File :03/95/040/00243/AM14/ Lic.No/Date:0310739482 Defer Date:

28.06.2013 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   87

Case No.:44/15/81­ALC2/2013

Party Name:LAXMI ELECTRONICS MOULDS & PRECISION ENGG P.LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00259/AM14/ RLA File :07/24/040/00073/AM14/ Lic.No/Date:0710096325 28.06.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   88

Case No.:45/15/81­ALC2/2013

Party Name:LAXMI ELECTRONICS MOULDS & PRECISION ENGG P.LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00260/AM14/ RLA File :07/24/040/00099/AM14/ Lic.No/Date:0710096318 28.06.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   89

Case No.:18/15/81­ALC2/2013

08.10.2013 indexed HQ File :01/81/050/00233/AM14/ RLA File :03/95/040/00244/AM14/ Lic.No/Date:0310739968 03.07.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/89   2.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the 4.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 5.       Total requirement of each raw material, export product wise, in a tabular form     90

Case No.:19/15/81­ALC2/2013

Party Name:KSH INTERNATIONAL PVT.LTD. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00234/AM14/ RLA File :03/94/040/00171/AM14/ Lic.No/Date:0310740139 03.07.2013 Defer Date: 19.11.2013

Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   91

Case No.:14/15/81­ALC2/2013

Party Name:LARSEN & TOUBRO LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00229/AM14/ RLA File :03/95/040/00228/AM14/ Lic.No/Date:0310740426 05.07.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   92

Case No.:17/15/81­ALC2/2013

Party Name:LARSEN & TOUBRO LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00232/AM14/ RLA File :03/95/040/00242/AM14/ Lic.No/Date:0310740423 05.07.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   93

Case No.:48/15/81­ALC2/2013

Party Name:WIELAND METALS INDIA PRIVATE LTD ., 08.10.2013 indexed HQ File :01/81/050/00263/AM14/ RLA File :07/24/040/00100/AM14/ Lic.No/Date:0710096503 08.07.2013 Defer Date: 19.11.2013 Decision: NC observed hard copy of application has been received and being forwarded to MSME for comments.The case stands deferred and to be re­listed on 19.11.2013.   94

Case No.:36/15/81­ALC2/2013

Party Name:APAR INDUSTRIES LIMITED 08.10.2013 indexed HQ File :01/81/050/00251/AM14/ RLA File :03/94/040/00208/AM14/ Lic.No/Date:0310740838 09.07.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/94   1.      Voltage rating of cables. 2.       Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the cable/ Buyers data sheet. 3.      Net weight of  each Cable 4.      Material balancing viz. net content of each imported and indigenous input, export product wise.

  95

Case No.:9/15/81­ALC2/2013

Party Name:LEITWIND SHRIRAM MANUFACTURING LIMITED, 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00224/AM14/ RLA File :04/24/040/00072/AM14/ Lic.No/Date:0410147962 15.07.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   96

Case No.:12/15/81­ALC2/2013

Party Name:LEITWIND SHRIRAM MANUFACTURING LIMITED, 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00227/AM14/ RLA File :04/24/040/00069/AM14/ Lic.No/Date:0410147963 15.07.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   97

Case No.:54/15/81­ALC2/2013

Party Name:SUZLON ENERGY LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00269/AM14/ RLA File :31/83/040/00051/AM14/ Lic.No/Date:3110059373 16.07.2013 Defer Date: 19.11.2013 Decision: NC decided to refer the case with a copy of application to C&PC. The case stands deferred and to be relisted on 19.11.2013.   98

Case No.:25/15/81­ALC2/2013

Party Name:APAR INDUSTRIES LIMITED 08.10.2013 indexed HQ File :01/81/050/00240/AM14/ RLA File :03/94/040/00293/AM14/ Lic.No/Date:0310742213 19.07.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/98   1.      Voltage rating of cables. 2.       Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the cable/ Buyers data sheet. 3.      Net weight of  each Cable 4.      Material balancing viz. net content of each imported and indigenous input, export product wise.

  99

Case No.:24/15/81­ALC2/2013

Party Name:RAHEE TRACK TECHNOLOGIES PRIVATE LIMITED, 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00239/AM14/ RLA File :02/24/040/00049/AM14/ Lic.No/Date:0210192121 22.07.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   100

Case No.:29/15/81­ALC2/2013

Party Name:MPP TECHNOLOGIES PRIVATE LTD., 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00244/AM14/ RLA File :07/24/040/00089/AM14/ Lic.No/Date:0710096990 23.07.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   101

Case No.:31/15/81­ALC2/2013

Party Name:DIANA METALS 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00246/AM14/ RLA File :04/24/040/00076/AM14/ Lic.No/Date:0410148198 23.07.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   102

Case No.:22/15/81­ALC2/2013

Party Name:SUNDER IMPEX,PVT. LTD. 08.10.2013 Status: Approved HQ File :01/81/050/00237/AM14/ RLA File :05/24/040/00111/AM14/ Lic.No/Date:0510360747 24.07.2013 Defer Date: Decision: NC decided to ratify the norms of above AA as per written comments of DIPP vide U.O. No. 12/51/2013­TSW/102  dated 22.10.2013  on repeat basis as under:­   1. Words “containing 78.26 MT. of Cold Rolled Stainless Steel Circles ( Grade201)” may be suffixed with the description of export product. 2. Words “of relevant thickness” may be suffixed with the description of import item  and its  quantity  may be allowed as 86.086 MT inclusive of a wastage of 10 %.   103

Case No.:59/15/81­ALC2/2013

Party Name:SHIVA STAINLESS STEEL PVT. LTD., Status:Deferred and

08.10.2013 Re­indexed HQ File :01/81/050/00274/AM14/ RLA File :05/24/040/00132/AM14/ Lic.No/Date:0510360783 25.07.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   104

Case No.:32/15/81­ALC2/2013

Party Name:JLC ELECTROMET PVT. LTD., 08.10.2013 Status: Approved HQ File :01/81/050/00247/AM14/ RLA File :13/24/040/00016/AM14/ Lic.No/Date:1310043833 26.07.2013 Defer Date: Decision: NC decided to ratify the norms of above AA as per written comments of DIPP vide U.O. No. 12/51/2013­TSW/104 dated 22.10.2013 as under:­   1.      Taking clue from SION C­1579, quantities of import items at Sl Nos. 1  & 2  may be allowed as applied for  i.e. 24877 Kgs. & 21011  Kgs respectively inclusive of 3 % wastage.     105

Case No.:8/15/81­ALC2/2013

Party Name:SALZER ELECTRONICS LTD 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00223/AM14/ RLA File :32/24/040/00003/AM14/ Lic.No/Date:3210065536 30.07.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   106

Case No.:33/15/81­ALC2/2013

Party Name:WIELAND METALS INDIA PRIVATE LTD ., 08.10.2013 indexed HQ File :01/81/050/00248/AM14/ RLA File :07/24/040/00127/AM14/ Lic.No/Date:0710097183 30.07.2013 Defer Date: 19.11.2013 Decision: NC observed hard copy of application has been received and being forwarded to MSME for comments.The case stands deferred and to be re­ listed on 19.11.2013.   107

Case No.:55/15/81­ALC2/2013

Party Name:TRIDENT TOOLS LIMITED. 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00270/AM14/ RLA File :03/95/040/00253/AM14/ Lic.No/Date:0310743492 30.07.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy

    108

Case No.:13/15/81­ALC2/2013

Party Name:KUMAR INDUSTRIES 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00228/AM14/ RLA File :05/23/040/00175/AM14/ Lic.No/Date:0510361504 01.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   109

Case No.:35/15/81­ALC2/2013

Party Name:MPP TECHNOLOGIES PRIVATE LTD., 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00250/AM14/ RLA File :07/24/040/00128/AM14/ Lic.No/Date:0710097262 01.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   110

Case No.:6/15/81­ALC2/2013

Party Name:ALSTOM INDIA LIMITED, 08.10.2013 indexed HQ File :01/81/050/00221/AM14/ RLA File :03/94/040/00356/AM14/ Lic.No/Date:0310743965 02.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm.   The case stands deferred and to be relisted on 19.11.2013.   111

Case No.:23/15/81­ALC2/2013

Party Name:MET TRADE (INDIA) LTD. 08.10.2013 indexed HQ File :01/81/050/00238/AM14/ RLA File :05/24/040/00159/AM14/ Lic.No/Date:0510361579 02.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   112

Case No.:53/15/81­ALC2/2013

Party Name:SUZLON ENERGY LIMITED 08.10.2013 indexed HQ File :01/81/050/00268/AM14/ RLA File :31/83/040/00067/AM14/ Lic.No/Date:3110059669 02.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the

  113

Case No.:63/15/81­ALC2/2013

Party Name:VIKARSH STAMPINGS INDIA PVT. LTD. 08.10.2013 indexed HQ File :01/81/050/00278/AM14/ RLA File :31/83/040/00063/AM14/ Lic.No/Date:3110059679 02.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   114

Case No.:37/15/81­ALC2/2013

Party Name:ASEEM GLOBAL LIMITED 08.10.2013 indexed HQ File :01/81/050/00252/AM14/ RLA File :05/23/040/00157/AM14/ Lic.No/Date:0510362089 06.08.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of MSME vide U.O.No. 30(84)/11­ME     1.    Chemical composition of export product showing % of alloying elements        there in. 2.    Stepwise process of manufacturing export product and stepwise wastage        there in. 3.    Details of imported inputs with their chemical composition. 4.    Wastage jusitification.     115

Case No.:42/15/81­ALC2/2013

Party Name:SHRI KRISHNA INTERNATIONAL 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00257/AM14/ RLA File :05/24/040/00158/AM14/ Lic.No/Date:0510362097 06.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   116

Case No.:46/15/81­ALC2/2013

Party Name:DHOOT TRANSMISSION PVT. LTD., Meet No/Date:15/81­ALC2/2013 08.10.2013 indexed HQ File :01/81/050/00261/AM14/ RLA File :03/94/040/00381/AM14/ Lic.No/Date:0310744384 06.08.2013 Defer Date: 19.11.2013

Decision: NC observed the case and decided to refer the case with a copy of application to DHI. The case stands deferred and to be re­listed on 19.11.2013.   117

Case No.:66/15/81­ALC2/2013

Party Name:DHOOT TRANSMISSION PVT. LTD., Meet No/Date:15/81­ALC2/2013 08.10.2013 indexed HQ File :01/81/050/00281/AM14/ RLA File :03/94/040/00382/AM14/ Lic.No/Date:0310744385 06.08.2013 Defer Date: 19.11.2013 Decision: NC   decided to refer the case with a copy of application to DHI. The case stands deferred and to be re­listed on 19.11.2013.   118

Case No.:38/15/81­ALC2/2013

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00253/AM14/ RLA File :05/24/040/00126/AM14/ Lic.No/Date:0510362197 07.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   119

Case No.:2/12/81­ALC2/2013

Party Name:CASABLANCA INDUSTRIES PRIVATE LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00202/AM14/ RLA File :05/23/040/00207/AM14/ Lic.No/Date:0510362568 13.08.2013 Defer Date:19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   120

Case No.:49/15/81­ALC2/2013

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00264/AM14/ RLA File :06/24/040/00009/AM14/ Lic.No/Date:0610033449 13.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy   121

Case No.:50/15/81­ALC2/2013

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 08.10.2013 Status:Deferred and Re­indexed HQ File :01/81/050/00265/AM14/ RLA File :06/24/040/00008/AM14/ Lic.No/Date:0610033448 13.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy

122

Case No.:76/15/81­ALC2/2013

08.10.2013 indexed HQ File :01/81/050/00291/AM14/ RLA File :03/95/040/00379/AM14/ Lic.No/Date:0310745261 14.08.2013 Defer Date: 19.11.2013 Decision:  NC  decided  to  send  a  letter  to  firm  to  submit  the  following  information  as  per  written  comments  of  DIPP  vide  U.O.No.  12/51/2013­ TSW/122   dated  22/10/2013 as under:­ 1.      Detailed calculations for the requirement of each raw material, export product wise  supported by the Cross sectional diagram of the 2.      Net weight per KM of  each Cable 3.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 4.      Total requirement of each raw material, export product wise, in a tabular form     123

Case No.:65/15/81­ALC2/2013

Party Name:ALSTOM INDIA LIMITED, 08.10.2013 indexed HQ File :01/81/050/00280/AM14/ RLA File :03/94/040/00333/AM14/ Lic.No/Date:0310745498 16.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   124

Case No.:77/15/81­ALC2/2013

Party Name:MILEEN ENGINEERS 08.10.2013 indexed HQ File :01/81/050/00292/AM14/ RLA File :03/95/040/00397/AM14/ Lic.No/Date:0310745599 16.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   125

Case No.:3/12/81­ALC2/2013

Party Name:JLC ELECTROMET PVT. LTD., 08.10.2013 indexed HQ File :01/81/050/00203/AM14/ RLA File :13/24/040/00017/AM14/ Lic.No/Date:1310044018 19.08.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the

126

Case No.:43/15/81­ALC2/2013

Party Name:ESSAR FERRO ALLOYS COMPANY Meet No/Date:15/81­ALC2/2013 08.10.2013 indexed HQ File :01/81/050/00258/AM14/ RLA File :05/23/040/00146/AM14/ Lic.No/Date:0510362904 19.08.2013 Defer Date: 19.11.2013 Decision:  NC  decided  to  send  a  letter  to  firm  to  submit  the  following  information  as  per  written  comments  of  DIPP  vide  U.O.No.  12/51/2013­ TSW/126   dated  22/10/2013 as under:­ 2.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the 3.      Net weight per KM of  each Cable. 4.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 5.      Total requirement of each raw material, export product wise, in a tabular form     127

Case No.:26/15/81­ALC2/2013

Party Name:PEARL INSULATIONS PVT. LIMITED 08.10.2013 indexed HQ File :01/81/050/00241/AM14/ RLA File :07/24/040/00148/AM14/ Lic.No/Date:0710097633 21.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   128

Case No.:47/15/81­ALC2/2013

Party Name:CROMPTON GREAVES LIMITED, 08.10.2013 indexed HQ File :01/81/050/00262/AM14/ RLA File :03/94/040/01127/AM13/ Lic.No/Date:0310746162 21.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   129

Case No.:68/15/81­ALC2/2013

Party Name:CROMPTON GREAVES LIMITED, 08.10.2013 indexed HQ File :01/81/050/00283/AM14/ RLA File :03/94/040/00759/AM13/ Lic.No/Date:0310746159 21.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the  

Case No.:71/15/81­ALC2/2013

130 y 08.10.2013 indexed HQ File :01/81/050/00286/AM14/ RLA File :03/95/040/00401/AM14/ Lic.No/Date:0310746353 22.08.2013 Defer Date: 19.11.2013 Decision:  NC  decided  to  send  a  letter  to  firm  to  submit  the  following  information  as  per  written  comments  of  DIPP  vide  U.O.No.  12/51/2013­ TSW/130   dated  22/10/2013 as under:­ 2.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the 4.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 5.      Total requirement of each raw material, export product wise, in a tabular form       131

Case No.:72/15/81­ALC2/2013

08.10.2013 indexed HQ File :01/81/050/00287/AM14/ RLA File :03/95/040/00342/AM14/ Lic.No/Date:0310746331 22.08.2013 Defer Date: 19.11.2013 Decision:  NC  decided  to  send  a  letter  to  firm  to  submit  the  following  information  as  per  written  comments  of  DIPP  vide  U.O.No.  12/51/2013­ TSW/131   dated  22/10/2013 as under:­ 2.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the 4.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 5.      Total requirement of each raw material, export product wise, in a tabular form     132

Case No.:73/15/81­ALC2/2013

08.10.2013 indexed HQ File :01/81/050/00288/AM14/ RLA File :03/95/040/00300/AM14/ Lic.No/Date:0310746349 22.08.2013 Defer Date: 19.11.2013 Decision:  NC  decided  to  send  a  letter  to  firm  to  submit  the  following  information  as  per  written  comments  of  DIPP  vide  U.O.No.  12/51/2013­ TSW/132   dated  22/10/2013 as under:­

2.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the 4.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product.       133

Case No.:74/15/81­ALC2/2013

08.10.2013 indexed HQ File :01/81/050/00289/AM14/ RLA File :03/95/040/00318/AM14/ Lic.No/Date:0310746355 22.08.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/133 2.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the 4.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product.     134

Case No.:75/15/81­ALC2/2013

08.10.2013 indexed HQ File :01/81/050/00290/AM14/ RLA File :03/95/040/00355/AM14/ Lic.No/Date:0310746338 22.08.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/134 2.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the 4.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product.  

135

Case No.:78/15/81­ALC2/2013

08.10.2013 indexed HQ File :01/81/050/00293/AM14/ RLA File :03/95/040/00077/AM14/ Lic.No/Date:0310746334 22.08.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/135 2.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the 4.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product.     136

Case No.:51/15/81­ALC2/2013

Party Name:CORDS CABLE INDUSTRIES LTD. 08.10.2013 indexed HQ File :01/81/050/00266/AM14/ RLA File :05/23/040/00209/AM14/ Lic.No/Date:0510363403 23.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   137

Case No.:69/15/81­ALC2/2013

Party Name:CROMPTON GREAVES LIMITED, 08.10.2013 indexed HQ File :01/81/050/00284/AM14/ RLA File :03/94/040/00319/AM14/ Lic.No/Date:0310746689 23.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   138

Case No.:80/15/81­ALC2/2013

08.10.2013 indexed HQ File :01/81/050/00295/AM14/ RLA File :03/95/040/00267/AM14/ Lic.No/Date:0310746833 26.08.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/138

2.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the 4.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product.     139

Case No.:82/15/81­ALC2/2013

08.10.2013 indexed HQ File :01/81/050/00297/AM14/ RLA File :03/95/040/00011/AM14/ Lic.No/Date:0310746958 26.08.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/139 2.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the 4.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 5.   Total requirement of each raw material, export product wise, in a tabular form     140

Case No.:79/15/81­ALC2/2013

08.10.2013 indexed HQ File :01/81/050/00294/AM14/ RLA File :03/95/040/00415/AM14/ Lic.No/Date:0310747072 27.08.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/140 2.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the 4.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 5.   Total requirement of each raw material, export product wise, in a tabular form  

141

Case No.:81/15/81­ALC2/2013

08.10.2013 indexed HQ File :01/81/050/00296/AM14/ RLA File :03/95/040/00424/AM14/ Lic.No/Date:0310747065 27.08.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/141 2.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the 4.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 5.   Total requirement of each raw material, export product wise, in a tabular form     142

Case No.:57/15/81­ALC2/2013

Party Name:DYNAMIC CABLES PVT. LTD. 08.10.2013 indexed HQ File :01/81/050/00272/AM14/ RLA File :13/24/040/00018/AM14/ Lic.No/Date:1310044136 28.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   143

Case No.:64/15/81­ALC2/2013

Party Name:RUBY MICA COMPANY LIMITED, 08.10.2013 Status: Approved HQ File :01/81/050/00279/AM14/ RLA File :02/24/040/00070/AM14/ Lic.No/Date:0210193517 28.08.2013 Defer Date: Decision: NC decided to ratify the norms of above AA as per written comments of DIPP vide U.O. No. 12/51/2013­TSW/143  dated 22.10.2013 as under:­                       The above Advance Authorization is ratified   on repeat basis as per firm’s Advance Authorization No. 0210164755  dated 26.08.2011ratified in Norms Committee Meeting No.  48/81 dated  14/02/2012 as under: 1. Net weight of export product may be specified as 4290 Kgs. 2. Quantity of import item at Sl.No.1  may be allowed as   848.02  Kgs. inclusive of    2 % wastage 3.   Word “relevant” may be prefixed with the description of import item at S.No.2   and its quantity may be allowed as 294.996  Kgs. inclusive of 1% wastage.

144

Case No.:52/15/81­ALC2/2013

Party Name:INDIAN TECHNOMETAL COMPANY LIMITED 08.10.2013 indexed HQ File :01/81/050/00267/AM14/ RLA File :05/23/040/00220/AM14/ Lic.No/Date:0510363889 29.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   145

Case No.:39/15/81­ALC2/2013

Party Name:POLMOR STEEL PVT LTD 08.10.2013 indexed HQ File :01/81/050/00254/AM14/ RLA File :09/24/040/00248/AM14/ Lic.No/Date:0910057432 30.08.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   146

Case No.:56/15/81­ALC2/2013

Party Name:B.C. POWER CONTROLS PRIVATE LIMITED 08.10.2013 Status: Approved HQ File :01/81/050/00271/AM14/ RLA File :05/23/040/00201/AM14/ Lic.No/Date:0510364094 02.09.2013 Defer Date: Decision: NC decided to ratify the norms of above AA as per written comments of DIPP vide U.O. No. 12/51/2013­TSW/146  dated 22.10.2013 as under:­   1        Taking clue from Engineering Table­5, quantity of import item is allowed as 115945  Kgs.     147

Case No.:58/15/81­ALC2/2013

Party Name:SALZER ELECTRONICS LTD 08.10.2013 indexed HQ File :01/81/050/00273/AM14/ RLA File :32/24/040/00007/AM14/ Lic.No/Date:3210066905 05.09.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   148

Case No.:28/15/81­ALC2/2013

Party Name:WIELAND METALS INDIA PRIVATE LTD ., 08.10.2013 indexed HQ File :01/81/050/00243/AM14/ RLA File :07/24/040/00147/AM14/ Lic.No/Date:0710098134 06.09.2013 Defer Date: 19.11.2013 Decision: NC observed that case is under examination of MSME. The case stands deferred and to be re­listed on 19.11.2013.

149

Case No.:67/15/81­ALC2/2013

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 08.10.2013 indexed HQ File :01/81/050/00282/AM14/ RLA File :05/23/040/00216/AM14/ Lic.No/Date:0510364934 06.09.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   150

Case No.:41/15/81­ALC2/2013

Party Name:SHARDA MOTOR INDS LTD 08.10.2013 indexed HQ File :01/81/050/00256/AM14/ RLA File :05/24/040/00197/AM14/ Lic.No/Date:0510365038 09.09.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   151

Case No.:40/15/81­ALC2/2013

Party Name:KEI INDUSTRIES LIMITED 08.10.2013 indexed HQ File :01/81/050/00255/AM14/ RLA File :05/23/040/00213/AM14/ Lic.No/Date:0510365517 13.09.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   152

Case No.:70/15/81­ALC2/2013

Party Name:PRECISION WIRES INDIA LTD. 08.10.2013 indexed HQ File :01/81/050/00285/AM14/ RLA File :03/95/040/00476/AM14/ Lic.No/Date:0310749637 16.09.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   153

Case No.:1/15/81­ALC2/2013

Party Name:CROMPTON GREAVES LIMITED, 08.10.2013 indexed HQ File :01/81/050/00216/AM14/ RLA File :03/94/040/00985/AM13/ Lic.No/Date:0310750038 18.09.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the

154

Case No.:27/15/81­ALC2/2013

Party Name:CORDS CABLE INDUSTRIES LTD. 08.10.2013 indexed HQ File :01/81/050/00242/AM14/ RLA File :05/23/040/00258/AM14/ Lic.No/Date:0510366080 19.09.2013 Defer Date: 19.11.2013 Decision: NC decided to send a letter to firm to submit the following information as per written comments of DIPP vide U.O.No. 12/51/2013­TSW/154 1.      Detailed calculations for the requirement of each  raw material, export product wise  supported by the Cross sectional diagram of the 2.      Net weight per KM of  each Cable 3.      Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 4.      Total requirement of each raw material, export product wise, in a tabular form     155

Case No.:2/15/81­ALC2/2013

Party Name:AMC COOKWARE ( INDIA) PVT.LTD. 08.10.2013 indexed HQ File :01/81/050/00217/AM14/ RLA File :07/24/040/00171/AM14/ Lic.No/Date:0710098543 25.09.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   156

Case No.:4/15/81­ALC2/2013

Party Name:HEAVY METAL & TUBES LIMITED 08.10.2013 indexed HQ File :01/81/050/00219/AM14/ RLA File :08/24/040/00290/AM14/ Lic.No/Date:0810125221 30.09.2013 Defer Date: 19.11.2013 Decision: The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the   157

Case No.:5/15/81­ALC2/2013

Party Name:SANDVIK ASIA LIMITED 08.10.2013 Status: Closed HQ File :01/81/050/00220/AM14/ RLA File :08/24/040/00288/AM14/ Lic.No/Date:0810125260 01.10.2013 Defer Date: Decision: It is presumed that ratification of norms of the above authorisation is not required as RA has issued the authorisation on repeat basis.  The case may be treated as closed.

Offline Agenda of M. No. 15/81 dated 08.10.2013   Sl. No. 167  

CASE NO. AR­92

M/s Singhania Alu Foil Containers Meeting No. 15/81 F. No. 01/81/50/309/AM11/DES­II Dated:  08.10.2013 Advance Licence No. 0510274796 dated 12.10.2010 Decision: NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to expedite reply. The case stands deferred and to be re­ listed on 19.11.2013.   Sl. No. 168  

CASE NO. AR­93

M/s Singhania Alu Foil Containers Meeting No. 15/81 F. No. 01/81/50/46/AM11/DES­II Dated:  08.10.2013 Advance Licence No. 0510286840 dated 25.03.2011 Decision: NC observed that reply of the firm is still awaited hence decided to send a reminder to firm to expedite reply. The case stands deferred and to be re­ listed on 19.11.2013.   Sl. No. 169  

CASE NO. AR­96

M/s Vijai Electricals Ltd., Hyderabad Meeting No. 15/81 F. No. 01/81/50/210/AM12/DES­II Dated:  08.10.2013 Advance Licence No. 0910047197 dated 20.6.2011 Decision : NC observed that case is under examination at DHI. The case stands deferred and to be relisted on 19.11.2013. Sl. No. 170  

CASE NO. AR­75

M/s Rahee Track Technologies (P) Ltd.,

Meeting No. 15/81 F. No. 01/81/50/239/AM­12/DES­II Dated:  08.10.2013 Advance Licence No. 0210161414 dated 30.06.2011 Decision: NC decided to send a letter to firm to appear before NC for personal hearing. The case stands deferred and to be relisted on 19.11.2013. Sl. No. 171  

CASE NO. AR­3

M/s Sterlite Industries (I) Pvt. Ltd., Meeting No. 15/81 F. No. 01/81/162/96/AM­12/DES­II Dated:  08.10.2013 Advance Licence No. 3510030590 dated 16.06.2010 Decision: NC decided to send a letter to MSME to re­examine the representation of the firm for fixation of norms for all export product.   The case stands deferred and to be re­listed on 19.11.2013.   Sl. No. 172  

CASE NO. AR­24

M/s Panasonic Energy India Co. Ltd., Vadodara Meeting No. 15/81 F. No. 01/81/162/1179/AM­12/DES­II Dated:  08.10.2013 Advance Licence No. 3410002060 dated 25.05.2001 Decision: NC observed the case and decided to refer the case with a copy of application to DIPP. The case stands deferred and to be re­listed on 19.11.2013.   Part­C   Sl. No. 32  

Case No. C­15

M/s Chansuba Pumps (P) Ltd., Coimbatore Meeting No. 15/81 F. No. 01/81/162/00171/AM14/DES­II Dated: 08.10.2013 Development Commissioner (MEPZ) Chennai, forward the application of M/s Chansuba Pumps (P) Ltd., Coimbatore  100% (EOU) for fixation of regular wastage Norms. Decision: NC observed that case is under examination at MSME. The case stands deferred and to be re­listed on 19.11.2013.

Sl. No.  33  

Case No. C­13

M/s Uniflex Cables Ltd. Meeting No. 15/81 F. No. 01/94/180/373/AM10/PRC/DES­II Dated:­ 08.10.2013 Clarification regarding change in export product form jelly Cables to Power Cables in r/o AA No. 0310231177 dated 16.10.2003 and  0310240217 dated 18.12.2003. Decision: NC discussed the case at length in view of decision of PRC dated 15.01.2013 and   written comments of DIPP vide U.O. No. 12/51/2013­TSW/C­13  dated 22.10.2013 and observed that:­ 1.      Firm has requested for change in export products from “Telephone Cables” to “Power cables” in respect of two old Advance Authorizations issued in year 2003 and discharge of export obligation  against these old Advance Authorizations by export of power cables from their current Advance Authorizations(4 Nos.) which they have taken for export of Power cables of various sizes/Grades. 2.      In one old Advance Authorization (No.0310231177 dated 16.10.2003), some of the import items like Filling Jelly/master Jelly etc.  will not be required for the manufacture of Power cables and, therefore these  import items can not allowed if the item of export is changed  from “Telephone Cables” to “Power cables”. 3.      In other old Advance Authorization (No. 0310240217 dated 08.12.2003), firm has imported “Semi­finished Telephone Copper Cable”, which will not be required for the manufacture of power cables. NC decided to  inform the above position to PRC . ­­­­­­­­­­