DGFT Committee Minutes
pdfcrowd.com PRO version Are you a developer? Try out the HTML to PDF API Directorate General of Foreign Trade Udyog Bhawan DES-V Section
Minutes of the Meeting NC-V held on 27.11.2008
The Meeting No. 35/AM-09 for the licensing year 2008-09 to consider the cases under Duty Exemption Schemes (Chapter-4) of 27.11.2008 in Room No.4 of DGFT under the Chairmanship of Shri A.K.Singh, Jt. DGFT. The following officers were present: - Sl. No. Name of the representatives & their designation Department 1. Sh. Shaish Kumar, Industrial Advisor DIPP 2. Sh. Ashok Kumar Arora, Dy.DGFT DGFT 3. Sh. J.D.Giri, Vice President Nominee, AEPC 4. Sh. Kuldeep Singh, Asstt. Director DC (MSME) 5. Sh. Pramod Kumar, Technical Officer DOR 6. Sh. Pradip Kumar, F.T.D.O DGFT
(TEXTILES AND LEATHER ITEMS)
At the outset the Minutes of NC Meeting No. 33/AM09 dated 13.11.2008 and NC Meeting No. 34/AM09 dated 20.11.2008 were ratified. However, the following amendment was made in the Minutes of NC meeting No. 30/09 dated 23.10.2008 as under: -
In the minutes of NC meeting No. 30/AM09 dated 23.10.2008, as regards outside agenda case No. 1 of M/s Eastern Silk Industries Ltd., inadvertently the total wastage was allowed with 15%, whereas the actual total wastage of 10% was recommended by O/o DC (MSME) vide their U.O No. 37(5)/33/2007-08/Hosy. dated
PRO version 21.10.2008 in this case for manufacturing of finished silk yarn (Gassed) from Grey silk yarn on the basis of their report of visit. It was therefore decided to allow the total wastage of 10% instead of 15% by amending the Minutes of NC No. 30/AM09 dated 23.10.2008.
Thereafter, Agenda for individual cases for Meeting No. 35/AM09 was taken up for discussion and the decision taken in respect of each case is enumerated below: -
MEETING NUMBER : 35/84-ALC3/2008 MEETING DATE : 27.11.2008
Online case 1
Case No.:7/45/84-ALC3/2007
Party Name:KLASS INTERNATIONAL, Meet No/Date:35/84-ALC3/2008 27.11.2008 Status: Deferred HQ File :01/84/050/00244/AM08/ RLA File :07/24/040/00095/AM05/ Lic.No/Date:0710029472 18.05.2004 Defer Date:08.01.2009 Decision: The Committee considered the case as per agenda alongwith other relevant papers and observed that status called for from R.A as to whether this case has been ratified by ALC or not is still awaited. It was therefore decided to remind R.A as well as firm and defer the case for re-listing on 08.01.2009.
2
Case No.:1/24/84-ALC3/2008
Party Name:LASTOLITE IMAGING SOLUTIONS PRIVATE LIMITED, 27.11.2008 Status: Rejected HQ File :01/84/050/00283/AM09/ RLA File :04/24/040/00126/AM09/ Lic.No/Date:0410097814 07.08.2008
that firm have not indicated the clearly the exact use of various import items. The identification of difuser fabric and GSM of the same have also not been mentioned. Further, measurement, calculation sheet and sketch have
PRO version also not submitted in absence of which Qty. of inputs cannot be computed. Hence, Committee was constrained to reject the case. RLA may take suitable consequential action accordingly.
3
Case No.:6/23/84-ALC3/2008
Party Name:KANTI FLOOR FURNISHERS 27.11.2008 Status: Deferred HQ File :01/84/050/00263/AM09/ RLA File :10/24/040/00057/AM09/ Lic.No/Date:1010030689 25.08.2008 Defer Date: 11.12.2008 Decision: The Committee considered the case as per agenda and observed that team of officers of DGFT, DIPP, DC (MSME) and R.O of TC, Noida has already visited the unit of the applicant firm and report is under preparation. Hence, it was decided to defer the case for re-listing on 11.12.2008.
4
Case No.:7/23/84-ALC3/2008
Party Name:BROS INDIA GROUP 27.11.2008 Status: Deferred HQ File :01/84/050/00264/AM09/ RLA File :10/24/040/00051/AM09/ Lic.No/Date:1010030690 25.08.2008 Defer Date: 11.12.2008 Decision: The Committee considered the case as per agenda and observed that team of officers of DGFT, DIPP, DC (MSME) and R.O of TC, Noida has already visited the unit of the applicant firm and report is under preparation. Hence, it was decided to defer the case for re-listing on 11.12.2008.
5
Case No.:8/23/84-ALC3/2008
Party Name:KANTI FLOOR FURNISHERS 27.11.2008 Status: Deferred HQ File :01/84/050/00265/AM09/ RLA File :10/24/040/00059/AM09/ Lic.No/Date:1010030691 25.08.2008 Defer Date: 11.12.2008 Decision: The Committee considered the case as per agenda and observed that team of officers of DGFT, DIPP, DC (MSME) and R.O of TC, Noida has already visited the unit of the applicant firm and report is under preparation. Hence, it was decided to defer the case for re-listing on 11.12.2008.
PRO version
6
Case No.:9/23/84-ALC3/2008
Party Name:KANTI FLOOR FURNISHERS 27.11.2008 Status: Deferred HQ File :01/84/050/00266/AM09/ RLA File :10/24/040/00066/AM09/ Lic.No/Date:1010030692 25.08.2008 Defer Date: 11.12.2008 Decision: The Committee considered the case as per agenda and observed that team of officers of DGFT, DIPP, DC (MSME) and R.O of TC, Noida has already visited the unit of the applicant firm and report is under preparation. Hence, it was decided to defer the case for re-listing on 11.12.2008.
7
Case No.:19/23/84-ALC3/2008
Party Name:PALM FIBRE (INDIA) PRIVATE LIMITED 27.11.2008 Status: Deferred HQ File :01/84/050/00276/AM09/ RLA File :10/24/040/00068/AM09/ Lic.No/Date:1010030746 27.08.2008 Defer Date: 11.12.2008 Decision: The Committee considered the case as per agenda and observed that team of officers of DGFT, DIPP, DC (MSME) and R.O of TC, Noida has already visited the unit of the applicant firm and report is under preparation. Hence, it was decided to defer the case for re-listing on 11.12.2008.
8
Case No.:3/24/84-ALC3/2008
Party Name:REFLEXIONS NARAYANI IMPEX PVT. LTD 27.11.2008 Status: Rejected HQ File :01/84/050/00285/AM09/ RLA File :02/24/040/00138/AM09/ Lic.No/Date:0210116699 29.08.2008
Decision: The Committee considered the case as per agenda and observed that information/ details submitted by the firm is not specific, in absence of which it is not possible to compute the requirement of inputs asked for in this case. Hence, Committee was constrained to reject the case. RLA may take suitable consequential action accordingly.
PRO version
9
Case No.:5/24/84-ALC3/2008
Party Name:GANESH POLYTEX LTD., 27.11.2008 Status: Deferred HQ File :01/84/050/00287/AM09/ RLA File :06/24/040/00025/AM09/ Lic.No/Date:0610014094 01.09.2008 Defer Date:25.12.2008 Decision: The Committee considered the case as per agenda and decided to examine the case on file.
10
Case No.:7/24/84-ALC3/2008
Party Name: SHUBH SWASAN INDIA PVT.LTD., 27.11.2008 Status: Rejected HQ File :01/84/050/00289/AM09/ RLA File :04/24/040/00144/AM09/ Lic.No/Date:0410098304 01.09.2008
Decision: The Committee considered the case as per agenda and observed that information/ details called for from firm vide DGFT letter dated 08.10.2008 is still awaited, in absence of which it is not possible to compute the requirement of inputs asked for in this case. Hence, Committee was constrained to reject the case. RLA may take suitable consequential action accordingly.
11
Case No.:2/28/84-ALC3/2008
Party Name:GOPAL CLOTHING CO P LTD Meet No/Date:35/84-ALC3/2008 27.11.2008 Status: Rejected HQ File :01/84/050/00327/AM09/ RLA File :05/24/040/00432/AM09/ Lic.No/Date:0510228703 01.10.2008
PRO version p g g p p that applicant firm have neither forwarded calculation sheet nor CAD/CAM/Laymarker/Measurement/Style No., which are mandatory in terms of Policy Circular No. 34/(RE-07)/2004-2009 dated 24th March, 2008. Further, copy of application has also not been received. In view of this, Committee was constrained to reject. RLA may take suitable consequential action accordingly.
12
Case No.:3/28/84-ALC3/2008
Party Name:KESHAV KNITWEARS LTD., 27.11.2008 Status: Rejected HQ File :01/84/050/00328/AM09/ RLA File :05/24/040/00427/AM09/ Lic.No/Date:0510228732 01.10.2008
Decision: The Committee considered the case as per agenda alongwith other relevant papers and in consultation with the representatives of technical authorities present in the meeting decided to call for the following information/documents from firm: - (i) Style No has not been mentioned; (ii) Denierage of yarn not given; (iii) Calculation sheet, Measurement and weight of export product are not mentioned. In absence of the above details, it is not possible to compute the requirement of inputs. Hence, Committee was constrained to reject. RLA may take suitable consequential action accordingly.
13
Case No.:2/29/84-ALC3/2008
Party Name:INDIX 27.11.2008 Status: Deferred HQ File :01/84/050/00335/AM09/ RLA File :03/94/040/00624/AM09/ Lic.No/Date:0310488916 03.10.2008 Defer Date: 11.12.2008 that copy of application has not been received in this case. It was decided to await the same and defer the
PRO version case for re-listing on 11.12.2008.
14
Case No.:6/28/84-ALC3/2008
Party Name:RAHMAN INDUSTRIES LTD 27.11.2008 Status: Deferred HQ File :01/84/050/00331/AM09/ RLA File :06/24/040/00029/AM09/ Lic.No/Date:0610014368 06.10.2008 Defer Date: 11.12.2008
15
Case No.:8/28/84-ALC3/2008
Party Name:MACCAFERRI ENVIRONMENTAL SOLUTIONS PVT. LTD. 27.11.2008 Status: Deferred HQ File :01/84/050/00333/AM09/ RLA File :31/24/040/00081/AM09/ Lic.No/Date:3110035660 06.10.2008 Defer Date: 25.12.2008 Decision: The Committee considered the case as per agenda alongwith other relevant papers and decided to link the earlier relevant file wherein similar case of the firm have been ratified and defer the case for re-listing on 25.12.2008.
16
Case No.:3/29/84-ALC3/2008
Party Name:RICHA & CO 27.11.2008 Status: Rejected HQ File :01/84/050/00336/AM09/ RLA File :05/24/040/00440/AM09/ Lic.No/Date:0510228994 08.10.2008
that applicant firm have neither forwarded calculation sheet nor CAD/CAM/Laymarker/Measurement/Style No., which are mandatory in terms of Policy Circular No. 34/(RE-07)/2004-2009 dated 24th March, 2008. Further,
PRO version y y ( ) copy of application has also not been received. In view of this, Committee was constrained to reject. RLA may take suitable consequential action accordingly.
17
Case No.:10/34/84-ALC3/2008
Party Name:CLIOVENUS INC, 27.11.2008 Status: Deferred HQ File :01/84/050/00371/AM09/ RLA File :07/24/040/00400/AM09/ Lic.No/Date:0710060962 07.11.2008 Defer Date: 25.12.2008 that firm have not given the following information/details:- (i) Dimension of both the export items; (ii) Whether the item of import No.1 is gummed or degummed; (iii) Complete manufacturing process indicating the stage-wise wastage. In absence of above details, quantitative requirements of inputs cannot be computed. Firm may be advised to furnish the above details and defer the case for re-listing on 25.12.2008.
18
Case No.:11/34/84-ALC3/2008
Party Name:DAMAN POLYTHREAD LTD., 27.11.2008 Status: Deferred HQ File :01/84/050/00372/AM09/ RLA File :03/94/040/00779/AM09/ Lic.No/Date:0310493570 10.11.2008 Defer Date: 25.12.2008 Decision: The Committee considered the case as per agenda alongwith other relevant papers and decided to link the earlier relevant file wherein similar case of the firm have been ratified and defer the case for re-listing on 25.12.2008.
PRO version
19
Case No.:12/34/84-ALC3/2008
Party Name:FIRST STEPS BABYWEAR PVT LTD 27.11.2008 Status: Deferred HQ File :01/84/050/00373/AM09/ RLA File :07/24/040/00423/AM09/ Lic.No/Date:0710061002 11.11.2008 Defer Date: 11.12.2008
20
Case No.:13/34/84-ALC3/2008
Party Name:KANTI FLOOR FURNISHERS 27.11.2008 Status: Deferred HQ File :01/84/050/00374/AM09/ RLA File :10/24/040/00098/AM09/ Lic.No/Date:1010031546 12.11.2008 Defer Date: 11.12.2008 Decision: The Committee considered the case as per agenda and observed that team of officers of DGFT, DIPP, DC (MSME) and R.O of TC, Noida has already visited the unit of the applicant firm and report is under preparation. Hence, it was decided to defer the case for re-listing on 11.12.2008.
PRO version
21
Case No.:14/34/84-ALC3/2008
Party Name:ADITYA BIRLA NUVO LIMITED., 27.11.2008 Status: Approved HQ File :01/84/050/00375/AM09/ RLA File :02/24/040/00199/AM09/ Lic.No/Date:0210119683 14.11.2008
Decision: The Committee considered the case as per agenda and in consultation with the representative of technical authorities present in the meeting decided to ratify the Advance authorization issued in this case by allowing 2% wastage on repeat basis as detailed below: - Export item Export Qty. Import Item Qty. allowed 100% Flax/Linen Yarn Auto cone spliced 30000 Kgs 100% Flax/Linen Yarn upto 80 LEA/NM 30600 Kgs. The R.A shall be advised to take necessary action subject to compliance of other usual conditions.
22
Case No.:15/34/84-ALC3/2008
Party Name:INDO RAMA SYNTHETICS (INDIA) LTD 27.11.2008 Status: Rejected HQ File :01/84/050/00376/AM09/ RLA File :11/24/040/00049/AM09/ Lic.No/Date:1110018961 14.11.2008
Decision: The Committee considered the case as per agenda and observed there cannot be content of HDPE in yarn. Further, bifurcated quantity of HDPE, PP granules and segregated quantity of HDPE & PP in the export product have not been given, in absence of which it is not possible to compute the requirement of inputs asked for in this case. Hence, Committee was constrained to reject the case. RLA may take suitable consequential action accordingly.
Case No.:16/34/84-ALC3/2008
Party Name:SHAHI EXPORTS PVT. LTD. 27.11.2008 Status: Deferred HQ File :01/84/050/00377/AM09/ RLA File :05/24/040/00506/AM09/ Lic.No/Date:0510230780 Defer Date:
PRO version 23 Q e :0 /8 /050/00377/ 09/ e :05/ /0 0/00506/ 09/ c.No/ ate:05 0 30780 14.11.2008 e e ate: 11.12.2008
24
Case No.:17/34/84-ALC3/2008
Party Name:ASHIMA DYECOT LTD. 27.11.2008 Status: Deferred HQ File :01/84/050/00378/AM09/ RLA File :08/24/040/00165/AM09/ Lic.No/Date:0810075982 17.11.2008 Defer Date: 25.12.2008 that firm have not given the following information/details: - (i) % Solid content of Silicon Emulsion; (ii) Blend ratio of Grey cotton and Lycra in the export item; (iii) Bifurcation of Qty. of white & printed items and details where Optical whitening Agent is required. In absence of above details, quantitative requirements of inputs cannot be computed. Firm may be advised to furnish the above details and defer the case for re-listing on 25.12.2008.
25
Case No.:18/34/84-ALC3/2008
Party Name:SYSTEM 5S PVT. LTD. 27.11.2008 Status: Deferred HQ File :01/84/050/00379/AM09/ RLA File :04/24/040/00198/AM09/ Lic.No/Date:0410100036 17.11.2008 Defer Date: 25.12.2008 Decision: The Committee considered the case as per agenda alongwith other papers and decided to refer the relevant details pertaining to this case to DC (MSME) for their examination and comments. Hence, it was
PRO version decided to defer the case for re-listing on 25.12.2008.
26
Case No.:19/34/84-ALC3/2008
Party Name:GAURAV INTERNATIONAL 27.11.2008 Status: Deferred HQ File :01/84/050/00380/AM09/ RLA File :05/24/040/00519/AM09/ Lic.No/Date:0510230975 18.11.2008 Defer Date: 11.12.2008
27
Case No.:20/34/84-ALC3/2008
Party Name:V.TEX GARMENTS, 27.11.2008 Status: Deferred HQ File :01/84/050/00381/AM09/ RLA File :32/24/040/00040/AM09/ Lic.No/Date:3210039128 18.11.2008 Defer Date: 11.12.2008
28
Case No.:1/35/84-ALC3/2008
Party Name:GUPTA EXIM (I) PVT.LTD. 27.11.2008 Status: Deferred HQ File :01/84/050/00382/AM09/ RLA File :05/24/040/00520/AM09/ Lic.No/Date:0510231196 20.11.2008 Defer Date: 12.11.2008
PRO version
29
Case No.:2/35/84-ALC3/2008
Party Name:SB J-VON COMPOUNDERS PVT.LTD., 27.11.2008 Status: Approved HQ File :01/84/050/00383/AM09/ RLA File :08/24/040/00112/AM07/ Lic.No/Date:0810076084 20.11.2008
Decision: The Committee considered the case as per agenda and in consultation with the representative of technical authorities present in the meeting decided to ratify the Advance authorization issued in this case by allowing 5% wastage as detailed below: - Export item Export Qty. Import Item Qty. allowed Air Pillo Gel Insoles containing SEBS 58% - 5240 Kgs. 9035 Kgs Styrene Ethylene Butylenes thermoplastic copolymer (SEBS) of various grades 5502 Kgs. The R.A shall be advised to take necessary action subject to compliance of other usual conditions.
30
Case No.:3/35/84-ALC3/2008
Party Name:EASTERN SILK INDUSTRIES LIMITED 27.11.2008 Status: Deferred HQ File :01/84/050/00384/AM09/ RLA File :02/24/040/00194/AM09/ Lic.No/Date:0210119991 20.11.2008 Defer Date: 11.12.2008
PRO version
Manual agenda cases
Case No. 473
M/s Ganga Acrowools Ltd., Ludhiana NC35/09 dt.27.11.2008 F.NO.1/84/162/96/AM09-DES-V Ratification of input output norms in respect of Advance Authorization No. 3010055042 dt. 14.02.2008 – under Para 4.7 of HBP (Vol1) 2004-2009. Decision: The Committee considered the case as per agenda alongwith other relevant papers and observed that comments from R.O, TC, Noida are still awaited. It was therefore decided to remind them and defer the case for re- listing on 25.12.2008.
Case No. 474
M/s Kaytee Corporation, Mumbai F.NO.1/84/162/501/AM08-DES-V 03100436974 dt. 20.07.2007. Decision: The Committee considered the case as per agenda alongwith other relevant papers and observed that comments from R.O, TC, Mumbai are still awaited. It was therefore decided to remind them and defer the case for re-listing on 25.12.2008.
PRO version
Case No. 475
M/s Subbarow Apparels, Chennai F.NO.1/84/50/190/AM09-DES-V 0410097036 dt. 08.07.2008 – under Para 4.7 of HBP (Vol1) 2004-2009. Decision: The Committee considered the case as per agenda and in consultation with the representatives of technical authorities present in the meeting decided to ratify the Advance authorization issued in this case as per written comments of DC (MSME) conveyed vide their U.O No. 37(5)/40/2008-09/Hosy. dated 24.11.2008 as detailed below: - Export item Import item Quantity allowed Men’s Under pant (boxer shorts) made from 100% cotton yarn dyed fabric, GSM-100+/-10% 100% cotton yarn dyed fabric, GSM-100+/-10% 1.08 Sq mtrs./Pc The GSM should match in import & Export. The R.A. shall be advised to take necessary action subject to compliance of other usual conditions.
Case No. 476
M/s Parveen Exports, Chennai F.NO.1/84/50/555/AM05-DES-V 0410066620 dt. 27.01.2005 – under Para 4.7 of HBP (Vol1) 2004-2009.
PRO version Decision: The Committee considered the case as per agenda alongwith other relevant papers and observed that case is under examination of DC (MSME). It was therefore decided to defer the case for re-listing on 25.12.2008.
Case No. 477
M/s Aspinwall & Co. Ltd. F.NO.1/85/162/96/AM09-DES-V 1010029741 dt. 10.06.2008 – under Para 4.7 of HBP (Vol1) 2004-2009. Decision: The Committee considered the case as per agenda and observed that team of officers of DGFT, DIPP, DC (MSME) and R.O of TC, Noida has already visited the unit of similar manufacturing firm and report is under preparation. Hence, it was decided to defer the case for re-listing on 11.12.2008.
Case No. 478
M/s Jaya Shree Textiles (a unit of Aditya Birla Nuvo Ltd.) NC35/09 dt. 27.11.2008 F.NO.1/84/162/137/AM09-DES-V Fixation of standard input output norms for Auto cone spliced flax/linen yarn Decision: The Committee considered the case as per agenda and perused the re-vised written comments of DC (MSME) conveyed vide their U.O No. 37(5)/135/2005-06/Hosy. dated 25.11.2008 whereby a total 4.5% wastage has been recommended in this case. The Committee after detailed deliberations in consultation with representatives of technical authorities present in the meeting decided to fix the Standard Input Output norms for auto cone spliced flax/linen yarn as detailed below: - S. Export Item Quantity Import Item Quantity
PRO version
No
allowed
J-
370
100%
Flax/Linen yarn
(Auto
cone
spliced).
1 Kg
100%
Flax/Linen
yarn
(Uneven & Knotted)
1.045 Kg/Kg.
of export item.
It was therefore decided to issue a Public Notice on the above line with the approval of DG.
Case No. 479
M/s Loyal Textiles Mills Ltd., Kovilpatti F.NO.1/84/50/136/AM09-DES-V 3510023604 dt. 28.05.2007 – under Para 4.7 of HBP (Vol1) 2004-2009. Decision: The Committee considered the case as per agenda alongwith other relevant papers and observed that case is under examination of DC (MSME). It was therefore decided to defer the case for re-listing on 25.12.2008.
Case No. 480
M/s Chelsea Mills, New Delhi F.NO.1/84/50/157/AM06-DES-V 0510158636 dt. 30.05.2005 – under Para 4.7 of HBP (Vol1) 2004-2009. Decision: The Committee considered the case as per agenda alongwith other relevant papers and decided to defer the case for re-listing on 04.12.2008.
Case No. 481
M/s Chelsea Mills, New Delhi F.NO.1/84/50/592/AM06-DES-V 0510171001 dt. 05.12.2005 – under Para 4.7 of HBP (Vol1) 2004-2009.
PRO version Decision: The Committee considered the case as per agenda alongwith other relevant papers and decided to defer the case for re-listing on 04.12.2008.
Case No. 482
M/s Chelsea Mills, New Delhi F.NO.1/84/50/545/AM07-DES-V 0510200771 dt. 12.03.2007 – under Para 4.7 of HBP (Vol1) 2004-2009. Decision: The Committee considered the case as per agenda alongwith other relevant papers and decided to defer the case for re-listing on 04.12.2008.
Case No. 483
M/s Chelsea Mills, New Delhi F.NO.1/84/50/316/AM06-DES-V 0510192062 dt. 04.10.2006 – under Para 4.7 of HBP (Vol1) 2004-2009. Decision: The Committee considered the case as per agenda alongwith other relevant papers and decided to defer the case for re-listing on 04.12.2008.
Case No. 484
M/s Chinar forge Ltd., Jallandhar F.NO.1/84/50/157/AM06-DES-V 3010057469 dt. 08.08.2008 – under Para 4.7 of HBP (Vol1) 2004-2009. Decision: The Committee considered the case as per agenda alongwith other relevant papers and decided to link the earlier relevant file wherein similar case of the firm have been ratified and defer the case for re-listing on 25.12.2008.
Outside agenda cases
PRO version
Case No. 1 M/s Luminous International, Kolkata F.NO.1/84/50/450/AM07-DES-V 0210096718 dt. 27.12.2006 – under Para 4.7 of HBP (Vol1) 2004-2009. Decision: The Committee considered the case as per agenda and in consultation with the representatives of technical authorities present in the meeting decided to ratify the Advance authorization issued in this case as per written comments of DC (MSME) conveyed vide their U.O No. 37(5)/60/2008-09/Hosy. dated 24.11.2008 in partial modification of earlier decision as detailed below: - Export item Import item Quantity allowed Industrial Leather Hand Gloves with Interlock Lining 40% Kevlar 60% Stainless Steel inside. 40% Kevlar 60% Stainless Steel Lining fabric, GSM- 200+/-10% 0.126 Sq mtrs./Pair The GSM should match in import & Export. The R.A. shall be advised to take necessary action subject to compliance of other usual conditions.
Case No. 2 M/s Chelsea Mills, New Delhi F.NO.1/84/162/318/AM08-DES-V 0510221307 dt. 30.05.2005 – under Para 4.7 of HBP (Vol1) 2004-2009. Decision: The Committee considered the case as per agenda and in consultation with the representatives of technical authorities present in the meeting decided to ratify the Advance authorization issued in this case by amending the earlier decision as detailed below: -
For the export product No. 2
PRO version
The items of import at S.No. 3 and 4, which were allowed in Nos. earlier may be allowed in Sets i.e as
applied by the firm.
The R.A. shall be advised to take necessary action subject to compliance of other usual conditions.
Case No. 3 M/s Chelsea Mills, New Delhi F.NO.1/84/50/235/AM09-DES-V 0510224899 dt. 01.08.2008 – under Para 4.7 of HBP (Vol1) 2004-2009. Decision: The Committee considered the case as per agenda and in consultation with the representatives of technical authorities present in the meeting decided to ratify the Advance authorization issued in this case by amending the earlier decision as detailed below: -
For the export product No. 3 and 4
The items of import at S.No. 4 and 5, which were allowed in Nos. earlier may be allowed in Sets i.e as
applied by the firm.
The R.A. shall be advised to take necessary action subject to compliance of other usual conditions.
PRO version
Case No. 4
M/s Richa & Co., New Delhi
F.NO.1/84/162/492/AM09-DES-V
Clarification regarding exported item under Target Plus Licence as to whether Pillow
cover is covered under SION, J -169.
The Committee considered this case as per agenda. It is seen that in this case the export of Pillow Cover has been
made against which the exporter has earned the duty credit scrip issued under Target Plus Scheme and now the
applicant firm has imported 100% Linen dyed woven fabric. In this case, Applicant is seeking a clarification as to
whether “Pillow Cover” is covered under SION, S.No. J-169.
The Committee observed that in the SION, S.No. J-169, export product is described as under: -
SION entry Export product
SION, S.No. J-169 Dyed placemat, Napkin, Table Cloth, Cushion
Cover and Comfort Cover, etc.
The representatives of technical authorities present in the meeting observed that Cushion Cover/Comfort
Cover are similar to Pillow Covers and since the words ‘etc’. are used in this SION, Pillow Covers are covered by this SION entry. This may be transferred to PC-3 Section for giving necessary clarification on nexus on import of inputs in Target Plus Scheme.
Case No. 5 M/s Vanasthali, Textile Industries, ltd. Mumbai NC 35/09 dt. 27.11.2008 F.NO.1/84/162/1038/AM08-DES-V Ratification of input output norms in respect of Advance Authorization No.0510212555 dt. 26.11.2007 – under Para 4.7 of HBP (Vol1) 2004-2009. Decision: The Committee considered the case as per agenda alongwith relevant papers while Sh. Raghuram, an authorized representative of firm alongwith other representatives was also present in the meeting for personal hearing. They explained the case alongwith relevant details/information pertaining to this case. The Committee after
PRO version deliberations decided to refer the details submitted by the firm to DC (MSME) for their examination and comments. It was therefore decided to defer the case for re-listing on 25.12.2008.
@@@@@@
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.