IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2009-04-14

DGFT Committee Minutes

Document text

RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   Minutes of the Norms Committee­II Meeting No. 02/09 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Meeting No. 02/09 of Norms Committee­II was held on 14.04.2009 for the licensing year 2009­2010 under the Chairmanship of Sh. O.P. Hisaria, Joint Director General of Foreign Trade (OPH) to consider the applications under Duty Exemption Scheme (Chapter­4) of Foreign Trade Policy 2004­2009. The following members were present in the meeting:­ S.No Name of the representatives & their Designation   Deptt.   1. Shri B.D. Ghosh, AIA M/o Steel   2. 3.   4. Sh. N.L. Goswami, Sr. DO Sh. S.K. Jain, D.O. Shri A. K. Mishra, Asst IA DHI DIPP M/o Steel 5. 6. Shri K.K. Funda, AD Shri Narendra Vashista, FTDO DC(SSI) DGFT               The Committee took up the individual cases of the agenda of this meeting for discussion and the decision taken in respect of each case as follows:   1

Case No.:16/48/81­ALC2/2007

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:2/81­ALC2/2009 14.04.2009 Status:Deffered and Re­ indexed HQ File :01/81/050/00506/AM08/ RLA File :31/24/040/00005/AM08/ Lic.No/Date:3110029006 18.04.2007 Defer Date:14.04.2009 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the reply received from the firm to DHI for examination and comments. The case stands deferred and to be re­listed on 09.06.2009.     2

Case No.:49/48/81­ALC2/2007

Party Name:SUZLON ENERGY LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00539/AM08/ RLA File :31/24/040/00079/AM08/ Lic.No/Date:3110029542 14.06.2007 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms

Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the application of the firm to C&PC for examination and comments. The case stands deferred and to be re­listed on 09.06.2009.   3

Case No.:66/48/81­ALC2/2007

Party Name:DELTON CABLES LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00556/AM08/ RLA File :05/24/040/00281/AM08/ Lic.No/Date:0510206040 11.07.2007 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 09.06.2009.   4

Case No.:145/48/81­ALC2/2007

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00635/AM08/ RLA File :05/24/040/00563/AM08/ Lic.No/Date:0510210514 16.10.2007 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Norms Committee, after deliberating upon the case, decided to call for some information from the firm as per DHI letter dated…………       5

Case No.:5/50/81­ALC2/2007

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00683/AM08/ RLA File :11/24/040/00051/AM08/ Lic.No/Date:1110016857 26.02.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   6

Case No.:9/11/81­ALC2/2008

Party Name:EFD INDUCTION LIMITED, 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00127/AM09/ RLA File :07/24/040/00750/AM08/ Lic.No/Date:0710056489 19.03.2008 Defer Date:31.03.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the reply received from the firm to DHI for examination and comments. The case stands deferred and to be re­ listed on 09.06.2009.   7

Case No.:41/15/81­ALC2/2008

Party Name:SUMI MOTHERSON INNOVATIVE ENGINEERING LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00209/AM09/ RLA File :05/24/040/00046/AM09/ Lic.No/Date:0510219762 25.04.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the reply received from the firm to DHI & DC(SSI) for examination and comments. The case stands deferred and to be re­listed on 09.06.2009.     8

Case No.:24/11/81­ALC2/2008

Party Name:CIM TOOLS PVT.LTD., 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00142/AM09/ RLA File :07/24/040/00048/AM09/ Lic.No/Date:0710057420 14.05.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   9

Case No.:23/11/81­ALC2/2008

Party Name:MPP TECHNOLOGIES PRIVATE LTD., 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00141/AM09/ RLA File :07/24/040/00052/AM09/ Lic.No/Date:0710057471 19.05.2008 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DHI present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per SION S.No. C­1860.     R/A may take suitable consequential action accordingly.   10

Case No.:4/46/81­ALC2/2008

Party Name:GAVIRANGA ENTERPRISES Status:Deffered

14.04.2009 and Re­indexed HQ File :01/81/050/00687/AM09/ RLA File :07/24/040/00057/AM09/ Lic.No/Date:0710057567 26.05.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 09.06.2009.     11

Case No.:11/11/81­ALC2/2008

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00129/AM09/ RLA File :05/24/040/00065/AM09/ Lic.No/Date:0510221545 04.06.2008 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DHI present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.      Weight of the export product may be indicated as 21600 kg. in the licence. 2.      Quantity of import items is recommended as applied for. 3.      Alloy word may be added in description of the export product.     12

Case No.:4/19/81­ALC2/2008

Party Name:ADLEC SYSTEMS (P) LTD., 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00289/AM09/ RLA File :05/24/040/00126/AM09/ Lic.No/Date:0510221997 12.06.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   13

Case No.:15/13/81­ALC2/2008

Party Name:SUZLON ENERGY LIMITED 14.04.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00168/AM09/ RLA File :31/24/040/00075/AM09/ Lic.No/Date:3110034115 20.06.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the application of the firm to C&PC for examination and comments. The case stands deferred and to be re­listed on 09.06.2009.   14

Case No.:3/19/81­ALC2/2008

Party Name:POWER GEAR LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00288/AM09/ RLA File :07/24/040/00140/AM09/ Lic.No/Date:0710058261 01.07.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 26.05.2009.   15

Case No.:1/17/81­ALC2/2008

Party Name:AREVA T & D INDIA LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00248/AM09/ RLA File :06/24/040/00017/AM09/ Lic.No/Date:0610013648 08.07.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 26.05.2009.   16

Case No.:12/17/81­ALC2/2008

Party Name:POWER GEAR LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00259/AM09/ RLA File :07/24/040/00151/AM09/ Lic.No/Date:0710058414 09.07.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 26.05.2009.   17

Case No.:8/17/81­ALC2/2008

Party Name:TATA BP SOLAR INDIA LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00255/AM09/ RLA File :07/24/040/00161/AM09/ Lic.No/Date:0710058399 09.07.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed

that the reply furnished by the firm is not proper and decided to call the firm for personal hearing. The firm may also be requested to  come  with  separate  replies  for  all  their  cases  at  the  time  of  hearing.  The  case  stands  deferred  and  to  be  re­listed  on 28.04.2009.   18

Case No.:9/17/81­ALC2/2008

Party Name:L M GLASFIBER (INDIA) PVT LTD 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00256/AM09/ RLA File :07/24/040/00758/AM08/ Lic.No/Date:0710058407 09.07.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the application of the firm to C&PC for examination and comments. The case stands deferred and to be re­listed on 09.06.2009.   19

Case No.:15/17/81­ALC2/2008

Party Name:MAHENDRA INDUSTRIES 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00262/AM09/ RLA File :07/24/040/00137/AM09/ Lic.No/Date:0710058421 10.07.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   20

Case No.:25/17/81­ALC2/2008

Party Name:CONTROL & SWITCHGEAR CO LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00272/AM09/ RLA File :05/24/040/00253/AM09/ Lic.No/Date:0510223814 14.07.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1.                    Information  in  respect  of  S.No.  3,  4,  5(with  cost  of  indigenous  inputs)  and  11of  Standard Deficiency Format.

21

Case No.:26/17/81­ALC2/2008

Party Name:BHANSALI CABLES & CONDUCTORS (P) LTD., 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00273/AM09/ RLA File :05/24/040/00096/AM09/ Lic.No/Date:0510223839 15.07.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that  the  comments  from  DOT  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands deferred and to be relisted on 09.06.2009.   22

Case No.:29/17/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00276/AM09/ RLA File :06/24/040/00016/AM09/ Lic.No/Date:0610013695 17.07.2008 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DHI present in the meeting, the Norms Committee, after deliberating upon the case,   1. Weight of export product may be indicated as 126.80 MT. 2. Quantity of import item at S.No. 1 may be reduced to 61.418 MT inclusive of 7% wastage. 3. Quantity of import item at S.No. 2may be reduced to 21.225 MT inclusive of 1% wastage.     23

Case No.:30/17/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00277/AM09/ RLA File :11/24/040/00011/AM09/ Lic.No/Date:1110017835 17.07.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   24

Case No.:31/17/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00278/AM09/ RLA File :11/24/040/00079/AM08/ Lic.No/Date:1110017836 17.07.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms

Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of DHI  vide their U.O. No. 3(27)/09/TSW/B/154 dated 27.03.2009. (copy enclosed).     25

Case No.:36/17/81­ALC2/2008

Party Name:VEM TECHNOLOGIES P.LTD., 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00283/AM09/ RLA File :09/24/040/00157/AM09/ Lic.No/Date:0910034715 21.07.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the application of the firm to DC(SSI) for examination and comments. The case stands deferred and to be re­listed on 09.06.2009.   26

Case No.:37/17/81­ALC2/2008

Party Name:VIJAI ELECTRICALS LTD 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00284/AM09/ RLA File :09/24/040/00156/AM09/ Lic.No/Date:0910034716 21.07.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 26.05.2009.     27

Case No.:12/21/81­ALC2/2008

Party Name:SUZLON ENERGY LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00323/AM09/ RLA File :31/24/040/00129/AM09/ Lic.No/Date:3110034801 08.08.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the application of the firm to C&PC for examination and comments. The case stands deferred and to be re­listed on 09.06.2009.   28

Case No.:11/23/81­ALC2/2008

Party Name:PEARL METAL PRODUCTS (BANGALORE) PVT. LIMITED 14.04.2009 Status:Deffered and Re­ indexed HQ File :01/81/050/00345/AM09/ RLA File :07/24/040/00261/AM09/ Lic.No/Date:0710059289 21.08.2008 Defer Date:14.04.2009

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA  for forwarding the copy of the   29

Case No.:7/23/81­ALC2/2008

Party Name:POWER GEAR LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00341/AM09/ RLA File :07/24/040/00266/AM09/ Lic.No/Date:0710059261 21.08.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1. Information in respect of item at S.No.  3, 4, 5, 8, 9 and 11  of Standard Deficiency Format. 2. Catalogue and end use of item at S. no. 10. 3. Quantity of few components to be imported is not in multiple of quantity of export product. 4. Exact weight of Aluminium items, bifurcated for sheets/plates and other shapes which require imported Aluminium welding wire.     30

Case No.:8/23/81­ALC2/2008

Party Name:TATA BP SOLAR INDIA LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00342/AM09/ RLA File :07/24/040/00265/AM09/ Lic.No/Date:0710059262 21.08.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply furnished by the firm is not proper and decided to call the firm for personal hearing. The firm may also be requested to  come  with  separate  replies  for  all  their  cases  at  the  time  of  hearing.  The  case  stands  deferred  and  to  be  re­listed  on 28.04.2009.   31

Case No.:12/23/81­ALC2/2008

Party Name:ALSTOM PROJECTS INDIA LIMITED, 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00346/AM09/ RLA File :03/94/040/00407/AM09/ Lic.No/Date:0310483438 22.08.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 26.05.2009.

32

Case No.:13/23/81­ALC2/2008

Party Name:FLUIDTHERM TECHNOLOGY P LTD 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00347/AM09/ RLA File :04/24/040/00131/AM09/ Lic.No/Date:0410098141 22.08.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 26.05.2009.     33

Case No.:6/23/81­ALC2/2008

Party Name:VIJAI ELECTRICALS LTD 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00340/AM09/ RLA File :09/24/040/00208/AM09/ Lic.No/Date:0910035122 22.08.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the reply received from the firm to DHI for examination and comments. The case stands deferred and to be re­ listed on 09.06.2009.   34

Case No.:22/23/81­ALC2/2008

Party Name:SALZER ELECTRONICS LTD 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00356/AM09/ RLA File :32/24/040/00022/AM09/ Lic.No/Date:3210038649 27.08.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that RA has issued the AA under ad­hoc norms category. Hence, decide to close the case.   35

Case No.:23/23/81­ALC2/2008

Party Name:VIJAI ELECTRICALS LTD 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00357/AM09/ RLA File :09/24/040/00616/AM08/ Lic.No/Date:0910035161 28.08.2008 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DHI present in the meeting, the Norms Committee, after deliberating upon the case,   1. Weight of export product may be indicated as 37311 kg.

2. Quantity of import item at S.No. 1 may be allowed as applied for.           36

Case No.:24/23/81­ALC2/2008

Party Name:VIJAI ELECTRICALS LTD 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00358/AM09/ RLA File :09/24/040/00617/AM08/ Lic.No/Date:0910035162 28.08.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the reply received from the firm to DHI for examination and comments. The case stands deferred and to be re­ listed on 09.06.2009.   37

Case No.:25/23/81­ALC2/2008

Party Name:DELTON CABLES LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00359/AM09/ RLA File :05/24/040/00986/AM08/ Lic.No/Date:0510226406 28.08.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that this case has already been approved in meeting dated 17.02.2009. Hence decided to withdraw the case.   38

Case No.:31/23/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00365/AM09/ RLA File :03/95/040/00503/AM09/ Lic.No/Date:0310484506 29.08.2008 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. Based on the written recommendations of MIT, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.            Items of import nos. 1­4 may be allowed on net to net basis. 2.            Items of import nos. 5­7 may be allowed as per packing policy.  

39

Case No.:32/23/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00366/AM09/ RLA File :03/95/040/00501/AM09/ Lic.No/Date:0310484510 29.08.2008 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. Based on the written recommendations of MIT, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.            Items of import nos. 1­4 may be allowed on net to net basis. 2.            Items of import nos. 5­7 may be allowed as per packing policy.     40

Case No.:33/23/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00367/AM09/ RLA File :03/95/040/00502/AM09/ Lic.No/Date:0310484556 29.08.2008 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. Based on the written recommendations of MIT, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.            Items of import nos. 1­4 may be allowed on net to net basis. 2.            Items of import nos. 5­7 may be allowed as per packing policy.     41

Case No.:1/32/81­ALC2/2008

Party Name:VIJAI ELECTRICALS LTD 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00467/AM09/ RLA File :09/24/040/00272/AM09/ Lic.No/Date:0910035661 17.10.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to

refer a copy of the reply received from the firm to DHI for examination and comments. The case stands deferred and to be re­ listed on 09.06.2009.   42

Case No.:2/32/81­ALC2/2008

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00468/AM09/ RLA File :35/24/040/00049/AM08/ Lic.No/Date:3510024905 17.10.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 09.06.2009.   43

Case No.:3/32/81­ALC2/2008

Party Name:ALCAN COMPOSITES INDIA PVT. LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00469/AM09/ RLA File :03/94/040/00487/AM09/ Lic.No/Date:0310491128 20.10.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   44

Case No.:4/32/81­ALC2/2008

Party Name:FINOLEX CABLES LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00470/AM09/ RLA File :31/24/040/00159/AM09/ Lic.No/Date:3110035847 21.10.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that  the  comments  from  DOT  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands deferred and to be relisted on 09.06.2009.     45

Case No.:9/32/81­ALC2/2008

Party Name:FINE TOOLS(INDIA) PRIVATE LIMITED, 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00475/AM09/ RLA File :07/24/040/00406/AM09/ Lic.No/Date:0710060608 22.10.2008 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms

Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DHI present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as 1.05 kg/Kg. content in the export product.       46

Case No.:13/32/81­ALC2/2008

Party Name:GAVIRANGA ENTERPRISES 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00479/AM09/ RLA File :07/24/040/00401/AM09/ Lic.No/Date:0710060660 23.10.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   47

Case No.:14/32/81­ALC2/2008

Party Name:GAVIRANGA ENTERPRISES 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00480/AM09/ RLA File :07/24/040/00415/AM09/ Lic.No/Date:0710060661 23.10.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the     48

Case No.:17/32/81­ALC2/2008

Party Name:GEM ELECTRO MECHANICALS PVT. LTD., 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00483/AM09/ RLA File :13/24/040/00016/AM09/ Lic.No/Date:1310027235 24.10.2008 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.            Word “relevant” may be prefixed with the description of import items at S.Nos. 1,3 & 4..

2.            Taking clue from SION C­504, quantities  of import items at S.Nos.1 & 2  may be allowed as 22937 Kgs & 1049 Kgs respectively. 3.            Quantities of import items at S.No.3  & 4  may be allowed as 5006 Kgs & 28195 Kgs respectively inclusive of 2 % wastage.     49

Case No.:24/32/81­ALC2/2008

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00490/AM09/ RLA File :05/24/040/00479/AM09/ Lic.No/Date:0510229948 24.10.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 26.05.2009.     50

Case No.:23/32/81­ALC2/2008

Party Name:MAHENDRA INDUSTRIES 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00489/AM09/ RLA File :07/24/040/00429/AM09/ Lic.No/Date:0710060731 27.10.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   51

Case No.:26/32/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00492/AM09/ RLA File :11/24/040/00024/AM09/ Lic.No/Date:1110018794 27.10.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred

52

Case No.:27/32/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00493/AM09/ RLA File :11/24/040/00028/AM09/ Lic.No/Date:1110018795 27.10.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred     53

Case No.:28/32/81­ALC2/2008

Party Name:MITTAL APPLIANCES LIMITED, 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00494/AM09/ RLA File :11/24/040/00044/AM09/ Lic.No/Date:1110018796 27.10.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   54

Case No.:31/32/81­ALC2/2008

Party Name:AMBICA STEELS LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00497/AM09/ RLA File :05/24/040/00487/AM09/ Lic.No/Date:0510229979 27.10.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of M/o Steel. The case stands deferred and to be re­listed on 26.05.2009.   55

Case No.:6/38/81­ALC2/2008

Party Name:DIAMOND ENGINEERING (CHENNAI) PVT LTD 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00551/AM09/ RLA File :04/24/040/00204/AM09/ Lic.No/Date:0410100294 25.11.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the reply received from the firm to DIPP for examination and comments. The case stands deferred and to be re­ listed on 09.06.2009.

56

Case No.:3/40/81­ALC2/2008

Party Name:FCI OEN CONNECTORS LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00601/AM09/ RLA File :10/24/040/00109/AM09/ Lic.No/Date:1010031862 11.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of MIT  vide their U.O. No. 17(12)/2009­IPHW dated 27.02.2009. (copy enclosed).     57

Case No.:4/40/81­ALC2/2008

Party Name:JINDAL SAW LTD 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00602/AM09/ RLA File :31/21/040/00195/AM09/ Lic.No/Date:3110036402 11.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   58

Case No.:5/40/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00603/AM09/ RLA File :03/95/040/00531/AM09/ Lic.No/Date:0310497516 12.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 26.05.2009.     59

Case No.:10/40/81­ALC2/2008

Party Name:L M GLASFIBER (INDIA) PVT LTD 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00608/AM09/ RLA File :07/24/040/00489/AM09/ Lic.No/Date:0710061678 15.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to

refer a copy of the application of the firm to C&PC for examination and comments. The case stands deferred and to be re­listed on 09.06.2009.   60

Case No.:12/40/81­ALC2/2008

Party Name:CIM TOOLS PVT.LTD., 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00610/AM09/ RLA File :07/24/040/00510/AM09/ Lic.No/Date:0710061686 15.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1. Information in respect of S.No. 3, 4, 5 & 11 of Standard Deficiency Format – export product wise. 2. Input raw material blanks size without cutting allowance – export product wise. 3. Input raw material blanks weight without cutting allowance – export product wise. 4. Cutting allowance and any other allowance / wastage export product wise.       61

Case No.:14/40/81­ALC2/2008

Party Name:RAVIN CABLES LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00612/AM09/ RLA File :03/95/040/01211/AM08/ Lic.No/Date:0310497852 15.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   62

Case No.:16/40/81­ALC2/2008

Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00614/AM09/ RLA File :31/24/040/00242/AM09/ Lic.No/Date:3110036418 15.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. On the recommendation of the  representative  of  DC(SSI)  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the  following information/clarification from the firm and to re­list the case on 09.06.2009: ­

1.      Basis to calculate the requirement of item mentioned at S. No. 1­7 of import list, with supporting data, along with their use. 2.      Use of Aluminium castings and justification of its quantity. 3.      Wastage justification for all the items of import.       63

Case No.:17/40/81­ALC2/2008

Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00615/AM09/ RLA File :31/24/040/00241/AM09/ Lic.No/Date:3110036419 15.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. On the recommendation of the  representative  of  DC(SSI)  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the  following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1.      Basis to calculate the requirement of item mentioned at S. No. 1­7 of import list, with supporting data, along with their use. 2.      Use of Aluminium castings and justification of its quantity. 3.      Wastage justification for all the items of import.     64

Case No.:19/40/81­ALC2/2008

Party Name:MITTAL APPLIANCES LIMITED, 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00617/AM09/ RLA File :11/24/040/00063/AM09/ Lic.No/Date:1110019186 15.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred     65

Case No.:7/40/81­ALC2/2008

Party Name:MACCAFERRI ENVIRONMENTAL SOLUTIONS PVT. LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00605/AM09/ RLA File :03/95/040/00514/AM09/ Lic.No/Date:0310497803 15.12.2008 Defer Date:14.04.2009

Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1. Words “ made of GI Wire” may be suffixed with the description of export product. 2. Words “ of relevant diameter” may be suffixed with the description of import item and quantity of this item may be allowed as 659736 Kgs. inclusive of 2% wastage.     66

Case No.:8/40/81­ALC2/2008

Party Name:MINEX METALLURGICAL COMPANY LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00606/AM09/ RLA File :03/95/040/00711/AM09/ Lic.No/Date:0310497822 15.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of M/o Steel. The case stands deferred and to be re­listed on 26.05.2009.   67

Case No.:9/40/81­ALC2/2008

Party Name:RAVIN CABLES LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00607/AM09/ RLA File :03/95/040/01228/AM08/ Lic.No/Date:0310497835 15.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   68

Case No.:20/40/81­ALC2/2008

Party Name:S.P.FABRICATORS PVT.LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00618/AM09/ RLA File :03/95/040/00789/AM09/ Lic.No/Date:0310498217 16.12.2008 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,

1. Word “relevant” may be prefixed with the description of import item at S.No. 1 and quantity of this item may be allowed as applied for i.e. 246001 Kgs inclusive of 2 wastage 2. Quantity of import item at S.No.2 may be allowed as 13475 Sq. Mtrs. inclusive of 10 % wastage. 3. Quantities  of import items at S.Nos.3 & 4 may be allowed as 8034 Kgs. & 19076 Kgs respectively inclusive of 5 % wastage.. 4. Quantity of import item at S.No.5 may be allowed as 18953  Sq. Mtrs. inclusive of 5 % wastage.     69

Case No.:21/40/81­ALC2/2008

Party Name:RAVIN CABLES LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00619/AM09/ RLA File :03/95/040/00133/AM09/ Lic.No/Date:0310498224 16.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred     70

Case No.:25/40/81­ALC2/2008

Party Name:HAVELLS INDIA LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00623/AM09/ RLA File :05/24/040/00548/AM09/ Lic.No/Date:0510232760 16.12.2008 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.            Quantity of import item at S.No. 1 may be allowed as 102308  Kgs.  inclusive of 1 % wastage. 2.            Quantity of import item at Sl. No. 2  may be allowed as applied for  i.e. 12576 Kgs.  inclusive of 2 % wastage. 3.            Quantities of import items at S.Nos. 3, 4 & 5 may be allowed as 35896 Kgs., 18993  Kgs. & 1889.3 Kgs. respectively inclusive of 5% wastage.     71

Case No.:24/40/81­ALC2/2008

Party Name:CHANDAN STEEL LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00622/AM09/ RLA File :03/94/040/00747/AM09/ Lic.No/Date:0310498393 Defer

17.12.2008 Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of M/o Steel. The case stands deferred and to be re­listed on 26.05.2009.   72

Case No.:26/40/81­ALC2/2008

Party Name:DELTON CABLES LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00624/AM09/ RLA File :05/24/040/00365/AM09/ Lic.No/Date:0510232761 17.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the reply received from the firm to DIPP for examination and comments. The case stands deferred and to be re­ listed on 09.06.2009.   73

Case No.:29/40/81­ALC2/2008

Party Name:SAINT GOBAIN SEVA ENGINEERING INDIA LTD, 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00627/AM09/ RLA File :07/24/040/00494/AM09/ Lic.No/Date:0710061793 18.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   74

Case No.:32/40/81­ALC2/2008

Party Name:MAINI PRECISION PRODUCTS P LTD 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00630/AM09/ RLA File :07/24/040/00466/AM09/ Lic.No/Date:0710061856 22.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   75

Case No.:33/40/81­ALC2/2008

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00631/AM09/ RLA File :05/24/040/00607/AM09/ Lic.No/Date:0510233151 22.12.2008 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms

Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DC(SSI) present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as 1.01 kg/kg content in the export product           76

Case No.:34/40/81­ALC2/2008

Party Name:THEETA ELECTRICALS PVT LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00632/AM09/ RLA File :05/24/040/00069/AM09/ Lic.No/Date:0510233176 23.12.2008 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   Quantities  of import items may be allowed as given below on net to net basis as claimed by the firm:   Import item Sl. No. Quantity in Kgs Import item Sl. No. Quantity in Kgs 1 202.8 39 4.4 2 186.6 40 197.5 3 15.6 41 79 4 23.2 42 181.7 5 21.4 43 9.9 6 1.0 44 375 7 12 45 100 8 10.8 46 345 9 0.3 47 35 10 34.3 48 21.6 11 32.2 49 19.8 12 1.5 50 0.6 13 19.2 51 203.4 14 17.9 52 190.8 15 0.91 53 14.4 16 23.2 54 720 17 21.4 55 230

18 1.0 56 890 19 36.2 57 80 20 33.5 58 70 21 2.0 59 1800 22 27 60 1070 23 25.2 61 930 24 1.3 62 80 25 54 63 70 26 50.3 64 1800 27 2.6 65 1150 28 82.7 66 570 29 75.6 67 1440 30 5.1 68 110 31 56.7 69 70 32 52.8 70 1800 33 2.9 71 1840 34 46.6 72 1480 35 43.7 73 90 36 2.9 74 70 37 67 75 180 38 54         77

Case No.:35/40/81­ALC2/2008

Party Name:SARRALLE EQUIPMENT INDIA PRIVATE LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00633/AM09/ RLA File :02/24/040/00229/AM09/ Lic.No/Date:0210121439 23.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred   78

Case No.:36/40/81­ALC2/2008

Party Name:GAVIRANGA ENTERPRISES 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00634/AM09/ RLA File :07/24/040/00533/AM09/ Lic.No/Date:0710061932 23.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms

Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA  for forwarding the copy of the           79

Case No.:8/42/81­ALC2/2008

Party Name:CARPO ELECTRONIKS LTD, 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00642/AM09/ RLA File :06/24/040/00051/AM09/ Lic.No/Date:0610014848 24.12.2008 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the application of the firm to MIT for examination and comments. The case stands deferred and to be re­listed on 09.06.2009.   80

Case No.:1/46/81­ALC2/2008

Party Name:HALLMARK STEEL PVT. LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00684/AM09/ RLA File :03/94/040/00957/AM09/ Lic.No/Date:0310503348 21.01.2009 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Norms Committee, after  deliberating  upon  the  case,  decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorisation,  as  per  written comments of M/o Steel  vide their U.O. No. 2(5)/2008­TW dated 30.03.2009. (copy enclosed).     81

Case No.:2/46/81­ALC2/2008

Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00685/AM09/ RLA File :31/24/040/00282/AM09/ Lic.No/Date:3110037092 21.01.2009 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,

1. Quantities of import items at S.No.1, 2 & 3 may be allowed as 5782 Kgs.,    5782 Kgs & 46254 Kgs. respectively inclusive of 6% wastage. 2. Quantities of import items at S.No. 4 & 5 put together may be allowed within 2 % of FOB value of exports.   82

Case No.:3/46/81­ALC2/2008

Party Name:MAHINDRA COMPOSITES LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00686/AM09/ RLA File :31/24/040/00278/AM09/ Lic.No/Date:3110037097 21.01.2009 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. On the recommendation of the  representative  of  DC(SSI)  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the  following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1.      Drawing/design/specifications of export product. 2.      Weight of out brought brass item/hardware as well as moulding compound separately in each export product. 3.      Process of manufacturing with process flow chart and wastage stage wise. 4.      Wastage justification for the imported inputs.     83

Case No.:5/46/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00688/AM09/ RLA File :11/24/040/00053/AM09/ Lic.No/Date:1110019444 22.01.2009 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1.      Export product wise information in respect of item at S.No.  4, 5, 8, 9, 11  & 11(a) of Standard Deficiency Format.       84

Case No.:6/46/81­ALC2/2008

Party Name:MAHENDRA INDUSTRIES 14.04.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00689/AM09/ RLA File :07/24/040/00569/AM09/ Lic.No/Date:0710062504 22.01.2009 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer a copy of the firm’s application to DIPP for examination and comments. The case stands deferred and to be re­listed on 09.06.2009.   85

Case No.:10/46/81­ALC2/2008

Party Name:KDDL LTD., 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00693/AM09/ RLA File :07/24/040/00579/AM09/ Lic.No/Date:0710062546 23.01.2009 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   86

Case No.:11/46/81­ALC2/2008

Party Name:PRAGATHI CONTROLS, 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00694/AM09/ RLA File :07/24/040/00575/AM09/ Lic.No/Date:0710062551 23.01.2009 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DHI present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per GN 4.         87

Case No.:7/46/81­ALC2/2008

Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00690/AM09/ RLA File :31/24/040/00281/AM09/ Lic.No/Date:3110037128 23.01.2009 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,

1. Quantities of import items at S.No.1, 2, 3, 4, 5  & 6 may be allowed as 5782 Kgs.,    7709  Kgs , 13491 Kgs., 21200 Kgs., 25054 Kgs. & 17345 Kgs. respectively inclusive of 6% wastage. 2. Quantities of import items at S.No.7  & 8 put together  may be allowed within 2 %   of FOB value of exports     88

Case No.:8/46/81­ALC2/2008

Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00691/AM09/ RLA File :31/24/040/00283/AM09/ Lic.No/Date:3110037129 23.01.2009 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1. Quantities of import items at S.No.1, 2  & 3 may be allowed as 17345 Kgs.,    38545 Kgs & 46254 Kgs. respectively inclusive of 6% wastage. 2. Quantities of import items at S.No.4  & 5 put together may be allowed within 2 % of FOB value of exports.       89

Case No.:9/46/81­ALC2/2008

Party Name:DEVI POLYMERS PRIVATE LIMITED, 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00692/AM09/ RLA File :04/24/040/00241/AM09/ Lic.No/Date:0410101869 23.01.2009 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   90

Case No.:12/46/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 14.04.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00695/AM09/ RLA File :03/95/040/00887/AM09/ Lic.No/Date:0310503864 27.01.2009 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. Based on the written recommendations of MIT, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   a. Items of import nos. 1­4 may be allowed on net to net basis. b. Items of import nos. 5­7 may be allowed as per packing policy.       91

Case No.:13/46/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00696/AM09/ RLA File :03/95/040/00529/AM09/ Lic.No/Date:0310503868 27.01.2009 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the case  is under examination of MIT. The case stands deferred and to be relisted on 09.06.2009.   92

Case No.:14/46/81­ALC2/2008

Party Name:POWER GEAR LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00697/AM09/ RLA File :07/24/040/00551/AM09/ Lic.No/Date:0710062589 27.01.2009 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 09.06.2009: ­   1. Export product wise information in respect of item at S.No.  3, 4, 5, 8, 9, 11  & 17 of Standard Deficiency Format.       93

Case No.:15/46/81­ALC2/2008

Party Name:VIKARSH STAMPINGS INDIA PVT. LTD. 14.04.2009 Status:Deffered and Re­indexed

HQ File :01/81/050/00698/AM09/ RLA File :31/24/040/00293/AM09/ Lic.No/Date:3110037170 28.01.2009 Defer Date:14.04.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA  for forwarding the copy of the   94

Case No.:18/46/81­ALC2/2008

Party Name:MAHARASHTRA SEAMLESS LTD 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00701/AM09/ RLA File :05/24/040/00653/AM09/ Lic.No/Date:0510235197 28.01.2009 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.      Words “ Alloy Steel “ may be prefixed with the description of export products at Sl. No 1 & 2. 2.      Quantities of export products  at Sl. No. 1 & 2  may also be specified as 3240 Mtrs. & 5720 Mtrs. respectively in addition to quantity in weight.   Quantities of import items may be allowed as under:     a)     Word “ Relevant” may be pre­fixed with the description of import item at Sl.No.1 and its quantity may be allowed as 699.9 MT after taking clue from SIONs at Sl. No. C­495 & C­1289 b)     Quantities of import items from  Sl.No.  2, 3 & 4 may be allowed as    957 Kgs, 2098 Kgs & 20336 Kgs respectively  after taking clue from SION at Sl.No.  C­ 1289.       95

Case No.:19/46/81­ALC2/2008

Party Name:HYDRIL JINDAL INTERNATIONAL PVT. LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00702/AM09/ RLA File :05/24/040/00669/AM09/ Lic.No/Date:0510235204 28.01.2009 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the

recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1. Words “Range 2” may be added in the description of export product. 2. Word “Relevant” may be prefixed and words “ 2­7/8” OD ” may be suffixed with the description of import item at Sl.No. 1. 3. Quantities of import items at S.Nos. 1, 2  & 3  may be allowed as applied for as per SION C­391    4.    Quantity of import item at S.No.4 may be allowed on net to net basis.     96

Case No.:22/46/81­ALC2/2008

Party Name:HYDRIL JINDAL INTERNATIONAL PVT. LTD. 14.04.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00705/AM09/ RLA File :05/24/040/00682/AM09/ Lic.No/Date:0510235206 28.01.2009 Defer Date:14.04.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee  ­  II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1. Words “Range 3” may be added in the description of export product. 2. Quantities of import items at S.Nos. 1, 2  & 4  may be allowed as applied for as per SION C­362    3.    Quantity of import item at S.No.3 may be allowed on net to net basis.         97

Case No.:1/2/81­ALC2/2009

Party Name:BHANSALI CABLES & CONDUCTORS (P) LTD., 14.04.2009 Status:Case Added HQ File :01/81/050/00001/AM10/ RLA File :05/24/040/00777/AM09/ Lic.No/Date:0510239346 01.04.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the

98

Case No.:2/2/81­ALC2/2009

Party Name:SUNLAND METAL RECYCLING INDUSTRIES 14.04.2009 Status:Case Added HQ File :01/81/050/00002/AM10/ RLA File :03/95/040/00958/AM09/ Lic.No/Date:0310514002 01.04.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the   99

Case No.:3/2/81­ALC2/2009

Party Name:PRAKASH STEELAGE LTD. 14.04.2009 Status:Case Added HQ File :01/81/050/00003/AM10/ RLA File :03/95/040/00838/AM09/ Lic.No/Date:0310514047 01.04.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA  for forwarding the copy of the     100

Case No.:4/2/81­ALC2/2009

Party Name:BEKAERT INDUSTRIES PVT. LTD. 14.04.2009 Status:Case Added HQ File :01/81/050/00004/AM10/ RLA File :31/24/040/00341/AM09/ Lic.No/Date:3110037984 01.04.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA  for forwarding the copy of the       PART –A ­DEFFER S.No 1

Case No.A  ­ 285

M/s P.P.Rolling Mills Mfging Co.Pvt.Ltd.New Delhi Meeting No.2/81/09 F.No.01/81/162/1072 /AM08/DES­II Dated: 14­04­2009 Advance Licence No 0510212239    dt  19­11­2007              RLA F.No.05/24/40/649/am08               Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under  examination  of  MIT.  The  case  stands  deferred  and  to  be  re­listed  on 26.05.2009.                                                                                                                                                                                      PART ­AR – DEFFER   S.No.1                                                                        

Case No. AR­38

 M/S Kalptaru Power Transmission Ltd., Gandhinagar        Meeting No.2/81/09 F.No.01/81/162/036/AM09/DES­II Dated 17­02­2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to close the case on the  part  of  NC  and  decided  to  advise  the  firm  to  apply  for  ad­hoc  wastage  norms  with  the  approval  of  concerned  development commissioner.   S.No 2 Case No.AR M/s Raychem RPG Ltd.Mumbai Meeting No.2/81/09 F.No.01/81/162/772 /AM07/DES­II Dated: 14­04­2009 Advance Licence No 0310340407    dt  21­07­2005              RLA F.No.03/95/39/0003/am06             Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 09.06.2009.   S.No.3

Case No. AR 27

 M/S Suzlon Generators Pvt. Ltd., Pune            Meeting No. 2/81/09 F.No.01/81/50/387/AM08/DES­II Dated: 14­04­2009 Advance Licence No.3110031266 dt. 31­10­2007           RLA F.No. 31/24/40/244/AM08 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  The  committee  observed  that  the recommendations of the team of technical members, who visited the factory of the firm are still awaited and it has been decided to remind them to furnish the same. The case stands deferred and to be relisted on 09.06.2009.

S.No.4

Case No. AR 28

 M/S Suzlon Generators Pvt. Ltd., Pune            Meeting No. 2/81/09 F.No.01/81/50/397/AM08/DES­II Dated14­04­2009 Advance Licence No.3110031274 dt. 24­10­2007           RLA F.No. 31/24/40/244/AM08 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  The  committee  observed  that  the recommendations of the team of technical members, who visited the factory of the firm are still awaited and it has been decided to remind them to furnish the same. The case stands deferred and to be relisted on 09.06.2009.     PART ­B­ DEFFER S.No.1

Case No. B­1

 M/S Hindustan Copper Ltd.,Kolkata           Meeting No.2/81/09 F.No.01/81/162/444/AM09/DES­II Dated 14­04­2009 Adv.Lic.No.0210086800 dt.06­03­2006 & Adv.Lic.No.0210085319 dt.06­03­2008   RLAF.No.05/26/076/0013/AM09  Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to refer the matter to M/o Mines for examination and comments. The case stands deferred and to be relisted on 09.06.2009.   PART –C  ­  DEFFER S.No.1

Case No. C­35

 M/S  Raajratna Fasteners Pvt.Ltd.Ahmedabad Through EEPC,Kolkata            Meeting No.2/81/09 F.No.01/81/162/646/AM09/DES­II Dated 14­04­2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of M/o Steel. It has also been decided to refer a copy of the application of the firm to DIPP. The case stands deferred and to be re­listed on 09.06.2009.                                                              S.No.2

Case No. C­8

 M/S  .Suzlon Generators Pvt. Ltd.

Meeting No 2/81/09 F.No.01/81/ 162/00068/AM09/DES­II Dated: 14­04­2009            Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II  in  its  M.N0.  02/81  scheduled  to  be  held  on  14.04.2009  but  actually  held  on  21.04.2009.  The  committee  observed  that  the recommendations of the team of technical members, who visited the factory of the firm are still awaited and it has been decided to remind them to furnish the same. The case stands deferred and to be relisted on 09.06.2009.     S.No. 3

Case No.C ­11

M/s  Vijai Electricals Ltd.             Meeting No 2/81/09 F.No. 01/81/162/677/am08/DES­II Dated: 14­04­2008                Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee decided to constitute a team of following members to visit the factory of the firm before finalization of the amendment of SIONs:­                           1. Sh. Shyam Sunder, DDG ­           DGFT                         2. Sh. B.D. Ghosh                             ­           M/o Steel                         3. Sh. B.C. Nayak, D.O.                   ­           DHI   The case stands deferred and to be relisted on 09.06.2009.       PART ­D – DEFFER S.No.1

Case No D­1

 M/S Nagreeka Foils Ltd.,Mumbai Through EEPC,Kolkata            Meeting No.2/81/09 F.No.01/81/162/648/AM09/DES­II Dated 14­04­2009  . Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 02/81 scheduled to be held on 14.04.2009 but actually held on 21.04.2009. The committee observed that the case is under examination of DIPP. The case stands deferred and to be re­listed on 26.05.2009.                                                 


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied