RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   Minutes of the Norms Committee­II Meeting No. 39/09 scheduled to be held on 23.12.2008 but actually held on 06.01.2009.  The Meeting No. 39/09 of Norms Committee­II was held on 06.01.2009 for the licensing year 2008­2009 under the Chairmanship of  Sh.  O.P.  Hisaria,  Joint  Director  General  of  Foreign  Trade  (OPH)  to  consider  the  applications  under  Duty  Exemption  Scheme (Chapter­4) of Foreign Trade Policy 2004­2009. The following members were present in the meeting:­ S.No Name of the representatives & their Designation   Deptt.   1. Shri K.K. Tiwari, AIA DHI   2. 3. 4. Shri B.D.Ghosh, Jt.IA Sh. S.K. Jain, D.O. Shri A. K. Mishra, Asst IA M/o Steel DIPP M/o Steel 5. 6.   Shri K.K. Funda, AD Shri Narendra Vashista, FTDO DC(SSI) DGFT               The Committee took up the individual cases of the agenda of this meeting for discussion and the decision taken in respect of each case as follows:   1

Case No.:6/5/81­ALC2/2008

Party Name:POLYCAB WIRES PVT.LTD. Meet No/Date:39/81­ALC2/2008 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00061/AM09/ RLA File :03/24/042/00327/AM05/ Lic.No/Date:0310314825 02.02.2005 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that this case has already been approved on 01/03/2005. Hence decided to withdraw the case.

2

Case No.:266/26/80­ALC2/2007

Party Name:NARAYAN POWERTECH PVT LTD 23.12.2008 Status:Deffered and Re­indexed HQ File :01/80/050/00282/AM06/ RLA File :34/24/040/00175/AM05/ Lic.No/Date:3410013557 01.06.2005 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 03.02.2009.   3

Case No.:16/48/81­ALC2/2007

Party Name:INVENSYS INDIA PVT., LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00506/AM08/ RLA File :31/24/040/00005/AM08/ Lic.No/Date:3110029006 18.04.2007 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited by DC(SSI) despite many reminders and therefore decided to issue a final reminder from DGFT side to the firm to expedite the reply. If reply is not received before 10.02.2009 the case will be rejected and no further representation will be entertained. The case stands deferred and to be relisted on 17.02.2009.   4

Case No.:49/48/81­ALC2/2007

Party Name:SUZLON ENERGY LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00539/AM08/ RLA File :31/24/040/00079/AM08/ Lic.No/Date:3110029542 14.06.2007 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that a visit to the factory of the firm is scheduled for 09.01.2009 and the case will be decided on the recommendations of the team after their visit. The case stands deferred and to be relisted on 17.02.2009.   5

Case No.:66/48/81­ALC2/2007

Party Name:DELTON CABLES LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00556/AM08/ RLA File :05/24/040/00281/AM08/ Lic.No/Date:0510206040 11.07.2007 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 17.02.2009.

6

Case No.:121/48/81­ALC2/2007

Party Name:EFD INDUCTION LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00611/AM08/ RLA File :07/24/040/00416/AM08/ Lic.No/Date:0710053305 12.09.2007 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee decided that a copy of the reply of the firm may be referred to DHI. The case stands deferred and to be relisted on 17.02.2009.   7

Case No.:145/48/81­ALC2/2007

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00635/AM08/ RLA File :05/24/040/00563/AM08/ Lic.No/Date:0510210514 16.10.2007 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and   8

Case No.:165/48/81­ALC2/2007

Party Name:CONTINENTAL DEVICE INDIA LTD 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00655/AM08/ RLA File :22/21/040/00123/AM08/ Lic.No/Date:2210007223 07.11.2007 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that this case has already been approved on 10/12/2008. Hence decided to withdraw the case.   9

Case No.:10/40/81­ALC2/2007

Party Name:OMEGA PRODUCTS PVT.LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00448/AM08/ RLA File :03/95/040/00838/AM08/ Lic.No/Date:0310450840 20.11.2007 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 17.02.2009.     10

Case No.:12/40/81­ALC2/2007

Party Name:POWER GEAR LTD. 23.12.2008 Status:Deffered and Re­indexed

HQ File :01/81/050/00450/AM08/ RLA File :07/24/040/00600/AM08/ Lic.No/Date:0710054616 22.11.2007 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and   11

Case No.:3/52/81­ALC2/2007

Party Name:KING METAL WORKS 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00686/AM08/ RLA File :03/94/040/00939/AM08/ Lic.No/Date:0310459427 29.01.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. Based on the recommendation of the representative of DC(SSI) present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation on net­to­net basis with nil wastage.     R/A may take suitable consequential action accordingly.   12

Case No.:3/11/81­ALC2/2008

Party Name:SUZLON GENERATORS PRIVATE LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00121/AM09/ RLA File :31/24/040/00354/AM08/ Lic.No/Date:3110032606 07.02.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per written recommendations of DHI vide their letter No. 3(6)/08 dated 22.12.2008(copy enclosed).         13

Case No.:10/9/81­ALC2/2008

Party Name:ALSTOM PROJECTS INDIA LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00110/AM09/ RLA File :03/94/040/01133/AM08/ Lic.No/Date:0310461077 14.02.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. On the recommendation of the representative of DHI present in the meeting,

it  was  decided  by  the  Committee  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 17.02.2009: ­   1.      The meaning/details of ACC.TO WTI­121072R0001 to 08 mentione4d along with Export product. If above is a Model number, the details of same with catalogue and specifications. 2.      The difference between S. No. 1 & 2 of export product. 3.      S. No. 5 & 11 of Standard Deficiency Format.     14

Case No.:5/50/81­ALC2/2007

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00683/AM08/ RLA File :11/24/040/00051/AM08/ Lic.No/Date:1110016857 26.02.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and   15

Case No.:9/11/81­ALC2/2008

Party Name:EFD INDUCTION LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00127/AM09/ RLA File :07/24/040/00750/AM08/ Lic.No/Date:0710056489 19.03.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and     16

Case No.:10/11/81­ALC2/2008

Party Name:EFD INDUCTION LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00128/AM09/ RLA File :07/24/040/00751/AM08/ Lic.No/Date:0710056492 19.03.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. On the recommendation of the representative of DHI present in the meeting, it  was  decided  by  the  Committee  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 17.02.2009: ­   1.            The  units  of  inputs  and  output  indicated  by  the  applicant  are  not  consistent  for  the  material  balancing.  It  may  be confirmed/amended.

17

Case No.:4/11/81­ALC2/2008

Party Name:EFD INDUCTION LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00122/AM09/ RLA File :07/24/040/00749/AM08/ Lic.No/Date:0710056491 19.03.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. On the recommendation of the representative of DHI present in the meeting, it  was  decided  by  the  Committee  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 17.02.2009: ­   1.  The  units  of  inputs  and  output  indicated  by  the  applicant  are  not  consistent  for  the  material  balancing.  It  may  be confirmed/amended.     18

Case No.:41/15/81­ALC2/2008

Party Name:SUMI MOTHERSON INNOVATIVE ENGINEERING LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00209/AM09/ RLA File :05/24/040/00046/AM09/ Lic.No/Date:0510219762 25.04.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009.The committee observed that the firm has informed that the ratification of the said authorization is not required as they obtained the authorization of the basis of previous norms. However the previous norms referred by the firm were for the year 2005 and the validity of the ad­hoc norms is one year only. Hence a reminder to the firm may be issued for furnishing of the reply. The case stands deferred and to be relisted on 17.02.2009.   19

Case No.:24/11/81­ALC2/2008

Party Name:CIM TOOLS PVT.LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00142/AM09/ RLA File :07/24/040/00048/AM09/ Lic.No/Date:0710057420 14.05.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited despite many reminders and therefore decided to issue a final reminder to the firm to expedite the reply. If reply is not received before 10.02.2009 the case will be rejected and no further representation will be entertained.  It has also been decided to refer a copy of the application of the firm to DIPP. The case stands deferred and to be relisted on 17.02.2009.   20

Case No.:23/11/81­ALC2/2008

Party Name:MPP TECHNOLOGIES PRIVATE LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00141/AM09/ RLA File :07/24/040/00052/AM09/ Lic.No/Date:0710057471 Defer

19.05.2008 Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and   21

Case No.:72/15/81­ALC2/2008

Party Name:SAINT GOBAIN SEVA ENGINEERING INDIA LTD, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00240/AM09/ RLA File :07/24/040/00091/AM09/ Lic.No/Date:0710057668 02.06.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 03.02.2009.   22

Case No.:11/11/81­ALC2/2008

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00129/AM09/ RLA File :05/24/040/00065/AM09/ Lic.No/Date:0510221545 04.06.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee decided that a copy of the reply of the firm may be referred to DHI. The case stands deferred and to be relisted on 17.02.2009.     23

Case No.:12/11/81­ALC2/2008

Party Name:KEI INDUSTRIES LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00130/AM09/ RLA File :05/24/040/00847/AM08/ Lic.No/Date:0510221745 09.06.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. Based on the recommendation of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation with the following modifications:­   1. Words “Copper Conductor,  PVC Insulated, Armoured, 1 KV” may be suffixed with the description of export products at S.No. 1 & 2. 2. Words  “Copper  Conductor,  XLPE  Insulated,    PVC Sheathed,    Armoured”  may  be  suffixed  with  the  description  of  export products at  S.No.3 and 4. 3. Words “Copper Conductor, PVC Insulated, Armoured, 1 KV” may be suffixed with the description of export products from S.Nos. 5 to 13.

4. Words “Copper Conductor, PVC Insulated, Al. Wire Armoured, 1 KV” may be suffixed with the description of export products at S.Nos. 14 & 15. 5. Words “Copper Conductor, PVC Insulated, Armoured, 1 KV” may be suffixed with the description of export products at  S.No. 16. 6.  Words “Copper Conductor, Un ­armoured, 1KV” may be suffixed with the description of export products from  S.Nos. 17 to 23. 7. Words “Copper Conductor, PVC Insulated, Armoured, 1 KV” may be suffixed with the description of export product at S.No. 24. 8. The  quantities  of  import  item  at  S.No  1  viz.Copper  Wire  Rod/CC  Rod(EC  Grade)/Copper  Cathode  (99.99%  purity) (Electrolytic grade )may be allowed as under: a)     For Export products mentioned at Sl Nos. 1 & 2 as per Engineering Table 5. b)     For Export products mentioned at Sl Nos. 3 to 12, 14, 16, & 19 to 24 as per Engineering Table 6. c)      For Export products mentioned at Sl No. 13 as 3481 Kgs./KM, at S.No.15 as 5825 Kgs./KM at S.No.17 as 2311 Kg./KM and at S.No.18 as 1664 Kgs./KM after taking clue from Engineering Table 6.   9. The quantities of import item at S.No.2 viz. Aluminium Wire Rod  (Electrolytic Grade) may be allowed as under: a) For export products mentioned at S.No. 14 & 15 as 1.01 Kgs./Kg. content in the export product.   10. The quantities of import item No.3 viz. PVC Compound may be allowed as under: a)      For Export products mentioned at Sl No 1 & 2 as per Engineering Table 5. b)     For Export products mentioned at Sl Nos. 3, 4 & 13 as 1.05 Kgs/Kg content in the Export Product. c)      For Export products mentioned at Sl No 5 to 12, 14 & 24 as per Engineering Table 6. d)     For export products mentioned at A.No.15 & 16 as applied for i.e. 1177.6 Kg./KM and 1293.3 Kgs./KM respectively.   11. The quantities of import item No 4 viz. XLPE Insulation  Compound  may  be  allowed  as1.05  Kgs./Kg.  content  in  export product at S.Nos. 3 &4.       24

Case No.:4/19/81­ALC2/2008

Party Name:ADLEC SYSTEMS (P) LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00289/AM09/ RLA File :05/24/040/00126/AM09/ Lic.No/Date:0510221997 12.06.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee decided to refer a copy of the application of the firm to DHI. Further, on the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 17.02.2009: ­

1. Description of the items of import.   25

Case No.:14/13/81­ALC2/2008

Party Name:SUZLON GENERATORS PRIVATE LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00167/AM09/ RLA File :31/24/040/00078/AM09/ Lic.No/Date:3110034113 20.06.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per written recommendations of DHI vide their letter No. 3(6)/08 dated 22/12/2008(copy enclosed).       26

Case No.:3/19/81­ALC2/2008

Party Name:POWER GEAR LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00288/AM09/ RLA File :07/24/040/00140/AM09/ Lic.No/Date:0710058261 01.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and   27

Case No.:1/17/81­ALC2/2008

Party Name:AREVA T & D INDIA LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00248/AM09/ RLA File :06/24/040/00017/AM09/ Lic.No/Date:0610013648 08.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and   28

Case No.:2/17/81­ALC2/2008

Party Name:CIM TOOLS PVT.LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00249/AM09/ RLA File :07/24/040/00160/AM09/ Lic.No/Date:0710058366 08.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received.

Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 17.02.2009.   29

Case No.:10/17/81­ALC2/2008

Party Name:PRECISION SHEET METAL WORKS (P) LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00257/AM09/ RLA File :07/24/040/00155/AM09/ Lic.No/Date:0710058408 09.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has been issued on net to net basis.  The case stands deferred and to be relisted on 17.02.2009.   30

Case No.:12/17/81­ALC2/2008

Party Name:POWER GEAR LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00259/AM09/ RLA File :07/24/040/00151/AM09/ Lic.No/Date:0710058414 09.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and     31

Case No.:14/17/81­ALC2/2008

Party Name:PRAGATHI CONTROLS, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00261/AM09/ RLA File :07/24/040/00179/AM09/ Lic.No/Date:0710058416 09.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   32

Case No.:7/17/81­ALC2/2008

Party Name:DEVI POLYMERS PRIVATE LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00254/AM09/ RLA File :04/24/040/00049/AM09/ Lic.No/Date:0410097082 09.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. Based on the recommendation of the representative of DC(SSI) present in

the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as applied for inclusive of 5% wastage.       33

Case No.:8/17/81­ALC2/2008

Party Name:TATA BP SOLAR INDIA LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00255/AM09/ RLA File :07/24/040/00161/AM09/ Lic.No/Date:0710058399 09.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. On the recommendation of the representative of DC(SSI) present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 17.02.2009: ­   1. Detailed process chart along with justification for the wastage claimed for each item.       34

Case No.:9/17/81­ALC2/2008

Party Name:L M GLASFIBER (INDIA) PVT LTD 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00256/AM09/ RLA File :07/24/040/00758/AM08/ Lic.No/Date:0710058407 09.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee decided that a copy of the reply of the firm may be referred to IA(Chemical) DIPP. The case stands deferred and to be relisted on 17.02.2009.   35

Case No.:15/17/81­ALC2/2008

Party Name:MAHENDRA INDUSTRIES 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00262/AM09/ RLA File :07/24/040/00137/AM09/ Lic.No/Date:0710058421 10.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred   36

Case No.:6/17/81­ALC2/2008

Party Name:BHANSALI CABLES & Status:Deffered

CONDUCTORS (P) LTD., 23.12.2008 and Re­indexed HQ File :01/81/050/00253/AM09/ RLA File :05/24/040/00995/AM08/ Lic.No/Date:0510223640 10.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorisation, as per written comments of DOT  vide their I.D. No. 15­03/2008­IP dated 10.11.2008 (copy enclosed).     37

Case No.:16/17/81­ALC2/2008

Party Name:TECHNICAL CONSULTANCY & SERVICES 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00263/AM09/ RLA File :03/95/040/00305/AM09/ Lic.No/Date:0310478477 14.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee decided that a copy of the reply of the firm may be referred to MIT. The case stands deferred and to be relisted on 17.02.2009.   38

Case No.:19/17/81­ALC2/2008

Party Name:VASUNDARA AUTOMATION & ENGG.SERVICES PVT LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00266/AM09/ RLA File :07/21/040/00378/AM09/ Lic.No/Date:0710058484 14.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   39

Case No.:24/17/81­ALC2/2008

Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:39/81­ALC2/2008 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00271/AM09/ RLA File :05/24/040/00235/AM09/ Lic.No/Date:0510223772 14.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee decided that a copy of the reply of the firm may be referred to DIPP. The case stands deferred and to be relisted on 17.02.2009.   40

Case No.:25/17/81­ALC2/2008

Party Name:CONTROL & SWITCHGEAR CO LTD. 23.12.2008 Status:Deffered and Re­indexed

HQ File :01/81/050/00272/AM09/ RLA File :05/24/040/00253/AM09/ Lic.No/Date:0510223814 14.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee decided that a copy of the reply of the firm may be referred to DC(SSI). The case stands deferred and to be relisted on 17.02.2009.   41

Case No.:21/17/81­ALC2/2008

Party Name:BLOOMENERGY INDIA PRIVATE LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00268/AM09/ RLA File :07/24/040/00175/AM09/ Lic.No/Date:0710058553 15.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. Based on the recommendation of the representative of DC(SSI) present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation on net­to­net basis with nil wastage.       42

Case No.:22/17/81­ALC2/2008

Party Name:BLOOMENERGY INDIA PRIVATE LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00269/AM09/ RLA File :07/24/040/00176/AM09/ Lic.No/Date:0710058554 15.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. Based on the recommendation of the representative of DC(SSI) present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation on net­to­net basis with nil wastage.       43

Case No.:23/17/81­ALC2/2008

Party Name:BLOOMENERGY INDIA PRIVATE LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00270/AM09/ RLA File :07/24/040/00177/AM09/ Lic.No/Date:0710058555 15.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. Based on the recommendation of the representative of DC(SSI) present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation on net­to­net basis with nil wastage.

  44

Case No.:26/17/81­ALC2/2008

Party Name:BHANSALI CABLES & CONDUCTORS (P) LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00273/AM09/ RLA File :05/24/040/00096/AM09/ Lic.No/Date:0510223839 15.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and     45

Case No.:28/17/81­ALC2/2008

Party Name:INDIC EMS ELECTRONICS PVT.LTD, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00275/AM09/ RLA File :07/24/040/00186/AM09/ Lic.No/Date:0710058567 16.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   46

Case No.:29/17/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00276/AM09/ RLA File :06/24/040/00016/AM09/ Lic.No/Date:0610013695 17.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and   47

Case No.:30/17/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00277/AM09/ RLA File :11/24/040/00011/AM09/ Lic.No/Date:1110017835 17.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and

  48

Case No.:31/17/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00278/AM09/ RLA File :11/24/040/00079/AM08/ Lic.No/Date:1110017836 17.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. On the recommendation of the representative of DHI present in the meeting, it  was  decided  by  the  Committee  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 17.02.2009: ­   1. Information in respect of item at S.No.  4 and 11 of Standard Deficiency Format.   49

Case No.:35/17/81­ALC2/2008

Party Name:PEARL INSULATIONS PVT. LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00282/AM09/ RLA File :07/24/040/00195/AM09/ Lic.No/Date:0710058618 18.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred   50

Case No.:36/17/81­ALC2/2008

Party Name:VEM TECHNOLOGIES P.LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00283/AM09/ RLA File :09/24/040/00157/AM09/ Lic.No/Date:0910034715 21.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 17.02.2009.   51

Case No.:37/17/81­ALC2/2008

Party Name:VIJAI ELECTRICALS LTD 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00284/AM09/ RLA File :09/24/040/00156/AM09/ Lic.No/Date:0910034716 21.07.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and

52

Case No.:1/23/81­ALC2/2008

Party Name:LOTUS POWERGEAR P.LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00335/AM09/ RLA File :07/24/040/00272/AM09/ Lic.No/Date:0710059147 18.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has     53

Case No.:2/23/81­ALC2/2008

Party Name:EFD INDUCTION LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00336/AM09/ RLA File :07/24/040/00235/AM09/ Lic.No/Date:0710059149 18.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee decided that a copy of the reply of the firm may be referred to DHI. The case stands deferred and to be relisted on 17.02.2009.   54

Case No.:3/23/81­ALC2/2008

Party Name:EFD INDUCTION LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00337/AM09/ RLA File :07/24/040/00236/AM09/ Lic.No/Date:0710059150 18.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and   55

Case No.:4/23/81­ALC2/2008

Party Name:VASUNDARA AUTOMATION & ENGG.SERVICES PVT LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00338/AM09/ RLA File :07/21/040/00498/AM09/ Lic.No/Date:0710059154 18.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   56

Case No.:5/23/81­ALC2/2008

Party Name:EFD INDUCTION LIMITED, 23.12.2008 Status:Deffered and Re­indexed

HQ File :01/81/050/00339/AM09/ RLA File :07/24/040/00239/AM09/ Lic.No/Date:0710059202 19.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee decided that a copy of the reply of the firm may be referred to DHI. The case stands deferred and to be relisted on 17.02.2009.     57

Case No.:10/23/81­ALC2/2008

Party Name:ABB LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00344/AM09/ RLA File :07/24/040/00282/AM09/ Lic.No/Date:0710059286 21.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   58

Case No.:11/23/81­ALC2/2008

Party Name:PEARL METAL PRODUCTS (BANGALORE) PVT. LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00345/AM09/ RLA File :07/24/040/00261/AM09/ Lic.No/Date:0710059289 21.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred   59

Case No.:7/23/81­ALC2/2008

Party Name:POWER GEAR LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00341/AM09/ RLA File :07/24/040/00266/AM09/ Lic.No/Date:0710059261 21.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and     60

Case No.:8/23/81­ALC2/2008

Party Name:TATA BP SOLAR INDIA LTD. 23.12.2008 Status:Deffered and Re­indexed

HQ File :01/81/050/00342/AM09/ RLA File :07/24/040/00265/AM09/ Lic.No/Date:0710059262 21.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. On the recommendation of the representative of DC(SSI) present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 17.02.2009: ­   1. Detailed process chart along with justification for the wastage claimed for each item.     61

Case No.:9/23/81­ALC2/2008

Party Name:S.V. KARANTH TECHNO SYSTEMS Meet No/Date:39/81­ALC2/2008 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00343/AM09/ RLA File :07/24/040/00276/AM09/ Lic.No/Date:0710059267 21.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   62

Case No.:12/23/81­ALC2/2008

Party Name:ALSTOM PROJECTS INDIA LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00346/AM09/ RLA File :03/94/040/00407/AM09/ Lic.No/Date:0310483438 22.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. On the recommendation of the representative of DHI present in the meeting, it  was  decided  by  the  Committee  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 17.02.2009: ­     1. Information in respect of item at S.No.  1, 5 and 11 of Standard Deficiency Format.     63

Case No.:13/23/81­ALC2/2008

Party Name:FLUIDTHERM TECHNOLOGY P LTD 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00347/AM09/ RLA File :04/24/040/00131/AM09/ Lic.No/Date:0410098141 22.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. On the recommendation of the representative of DHI present in the meeting,

it  was  decided  by  the  Committee  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 17.02.2009: ­     1. Information in respect of item at S.No. 1, 3, 4, 5, 8 and 11 of Standard Deficiency Format.   64

Case No.:6/23/81­ALC2/2008

Party Name:VIJAI ELECTRICALS LTD 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00340/AM09/ RLA File :09/24/040/00208/AM09/ Lic.No/Date:0910035122 22.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. On the recommendation of the representative of DHI present in the meeting, it  was  decided  by  the  Committee  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 17.02.2009: ­     1. Information in respect of item at S.No. 11 of Standard Deficiency Format.   65

Case No.:17/23/81­ALC2/2008

Party Name:SHAKUN POLYMERS LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00351/AM09/ RLA File :34/24/040/00093/AM09/ Lic.No/Date:3410022173 26.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred     66

Case No.:18/23/81­ALC2/2008

Party Name:PRAGATHI CONTROLS, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00352/AM09/ RLA File :07/24/040/00277/AM09/ Lic.No/Date:0710059308 26.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   67

Case No.:21/23/81­ALC2/2008

Party Name:SUN TECHNICS ENERGY SYSTEMS PVT LTD 23.12.2008 Status:Deffered and Re­indexed

HQ File :01/81/050/00355/AM09/ RLA File :07/21/040/00548/AM09/ Lic.No/Date:0710059321 27.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   68

Case No.:22/23/81­ALC2/2008

Party Name:SALZER ELECTRONICS LTD 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00356/AM09/ RLA File :32/24/040/00022/AM09/ Lic.No/Date:3210038649 27.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred   69

Case No.:23/23/81­ALC2/2008

Party Name:VIJAI ELECTRICALS LTD 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00357/AM09/ RLA File :09/24/040/00616/AM08/ Lic.No/Date:0910035161 28.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and   70

Case No.:24/23/81­ALC2/2008

Party Name:VIJAI ELECTRICALS LTD 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00358/AM09/ RLA File :09/24/040/00617/AM08/ Lic.No/Date:0910035162 28.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and   71

Case No.:25/23/81­ALC2/2008

Party Name:DELTON CABLES LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00359/AM09/ RLA File :05/24/040/00986/AM08/ Lic.No/Date:0510226406 28.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms

Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the reply from the firm is still awaited and   72

Case No.:28/23/81­ALC2/2008

Party Name:CARPO ELECTRONIKS LTD, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00362/AM09/ RLA File :06/24/040/00022/AM09/ Lic.No/Date:0610014072 28.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   73

Case No.:29/23/81­ALC2/2008

Party Name:LARSEN & TOUBRO LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00363/AM09/ RLA File :03/95/040/00480/AM09/ Lic.No/Date:0310484417 29.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   74

Case No.:30/23/81­ALC2/2008

Party Name:LARSEN & TOUBRO LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00364/AM09/ RLA File :03/95/040/00448/AM09/ Lic.No/Date:0310484438 29.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   75

Case No.:31/23/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00365/AM09/ RLA File :03/95/040/00503/AM09/ Lic.No/Date:0310484506 29.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 17.02.2009.

76

Case No.:32/23/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00366/AM09/ RLA File :03/95/040/00501/AM09/ Lic.No/Date:0310484510 29.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 17.02.2009.   77

Case No.:33/23/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00367/AM09/ RLA File :03/95/040/00502/AM09/ Lic.No/Date:0310484556 29.08.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 17.02.2009.     78

Case No.:4/25/81­ALC2/2008

Party Name:ABB LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00372/AM09/ RLA File :07/24/040/00286/AM09/ Lic.No/Date:0710059515 02.09.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   79

Case No.:6/25/81­ALC2/2008

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00374/AM09/ RLA File :05/24/040/00374/AM09/ Lic.No/Date:0510227042 08.09.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the case is under examination of MIT. The case stands deferred and to be re­listed on 17.02.2009.   80

Case No.:1/32/81­ALC2/2008

Party Name:VIJAI ELECTRICALS LTD 23.12.2008 Status:Deffered and Re­indexed

HQ File :01/81/050/00467/AM09/ RLA File :09/24/040/00272/AM09/ Lic.No/Date:0910035661 17.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. On the recommendation of the representative of DHI present in the meeting, it  was  decided  by  the  Committee  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 17.02.2009: ­     1. Information in respect of item at S.No. 11 of Standard Deficiency Format.   81

Case No.:2/32/81­ALC2/2008

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00468/AM09/ RLA File :35/24/040/00049/AM08/ Lic.No/Date:3510024905 17.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the comments from M/o Mines are still awaited and therefore decided to remind them to expedite the comments. The case stands deferred and to be relisted on 17.02.2009.   82

Case No.:3/32/81­ALC2/2008

Party Name:ALCAN COMPOSITES INDIA PVT. LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00469/AM09/ RLA File :03/94/040/00487/AM09/ Lic.No/Date:0310491128 20.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.N0.  39/81  held  on  06.01.2009.  On  the  recommendation  of  the  representative  of  DIPP  present  in  the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 17.02.2009: ­   1.      Total thickness of Aluminium Composite Panel and thickness of PE core in the Composite Panel 2.      Thickness of Aluminium Coil/sheet. 3.      Information in respect of items at Sl.Nos. 5 & 11 of SDF.     83

Case No.:4/32/81­ALC2/2008

Party Name:FINOLEX CABLES LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00470/AM09/ RLA File :31/24/040/00159/AM09/ Lic.No/Date:3110035847 21.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee – II in its M.N0. 39/81 held on 06.01.2009. The committee decided to refer a copy of the application of the firm to DOT

for examination and comments. The case stands deferred and to be re­listed on 17.02.2009.   84

Case No.:5/32/81­ALC2/2008

Party Name:ABB LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00471/AM09/ RLA File :07/24/040/00414/AM09/ Lic.No/Date:0710060548 21.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has     85

Case No.:6/32/81­ALC2/2008

Party Name:ABB LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00472/AM09/ RLA File :07/24/040/00413/AM09/ Lic.No/Date:0710060549 21.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   86

Case No.:7/32/81­ALC2/2008

Party Name:LOAD CONTROLS INDIA PVT.LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00473/AM09/ RLA File :07/24/040/00399/AM09/ Lic.No/Date:0710060554 21.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   87

Case No.:10/32/81­ALC2/2008

Party Name:ELINS SWITCH BOARDS PVT. LTD. Meet No/Date:39/81­ALC2/2008 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00476/AM09/ RLA File :07/24/040/00418/AM09/ Lic.No/Date:0710060617 22.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received.

Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has     88

Case No.:8/32/81­ALC2/2008

Party Name:PEARL INSULATIONS PVT. LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00474/AM09/ RLA File :07/24/040/00408/AM09/ Lic.No/Date:0710060562 22.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation with the following modifications:­   1. Quantity of import items for export items at S.No. 1 may be allowed as applied for inclusive of 1% wastage. 2. Quantity of import items for export items at S.No. 2 may be reduced to 278.863 Kg. inclusive of 5% wastage. 3. Quantity of import items for export items at S.No. 3 may be allowed as applied for inclusive of 3% wastage.       89

Case No.:9/32/81­ALC2/2008

Party Name:FINE TOOLS(INDIA) PRIVATE LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00475/AM09/ RLA File :07/24/040/00406/AM09/ Lic.No/Date:0710060608 22.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the case is under examination of DC(SSI). The case stands deferred and to be re­listed on 17.02.2009.   90

Case No.:11/32/81­ALC2/2008

Party Name:CONTROL INFOTECH PRIVATE LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00477/AM09/ RLA File :07/24/040/00417/AM09/ Lic.No/Date:0710060644 23.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has

91

Case No.:12/32/81­ALC2/2008

Party Name:FANUC INDIA PVT LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00478/AM09/ RLA File :07/24/040/00404/AM09/ Lic.No/Date:0710060658 23.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   92

Case No.:13/32/81­ALC2/2008

Party Name:GAVIRANGA ENTERPRISES 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00479/AM09/ RLA File :07/24/040/00401/AM09/ Lic.No/Date:0710060660 23.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   93

Case No.:14/32/81­ALC2/2008

Party Name:GAVIRANGA ENTERPRISES 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00480/AM09/ RLA File :07/24/040/00415/AM09/ Lic.No/Date:0710060661 23.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has     94

Case No.:15/32/81­ALC2/2008

Party Name:SUNCHIRIN AUTOPARTS INDIA PVT. LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00481/AM09/ RLA File :07/24/040/00425/AM09/ Lic.No/Date:0710060663 23.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.N0.  39/81  held  on  06.01.2009.  On  the  recommendations  of  the  representative  of  DHI,  the  Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation with the following modifications:­

1. Quantity of import items for export items at S.No. 1­10 may be allowed on net­to­net basis. 2. Quantity of import items for export items at S.No. 11­13 may be allowed within 2% of FOB value.     95

Case No.:16/32/81­ALC2/2008

Party Name:RAM RATNA WIRES LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00482/AM09/ RLA File :03/95/040/00506/AM09/ Lic.No/Date:0310491845 24.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. Based on the recommendation of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation with the following modifications:­   Taking clue from SIONs  C­1323 & C­206, quantities of import items may be allowed as under 1.      Quantity of import item at Sl. No. 1 may be allowed as 50,500 Kgs inclusive of 1 % wastage. 2.      Quantity of import item at Sl. No. 2 may be allowed as within 5% of FOB value of exports.       96

Case No.:17/32/81­ALC2/2008

Party Name:GEM ELECTRO MECHANICALS PVT. LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00483/AM09/ RLA File :13/24/040/00016/AM09/ Lic.No/Date:1310027235 24.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.N0.  39/81  held  on  06.01.2009.  On  the  recommendation  of  the  representative  of  DIPP  present  in  the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 17.02.2009: ­   1.            Specific description and quantities of each export product, as the existing description of is very generic. 2.            Requirement of each item of import, export product wise. 3.            Information in respect of Sl Nos. 4,5 & 11 export product wise.

97

Case No.:18/32/81­ALC2/2008

Party Name:ABB LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00484/AM09/ RLA File :07/24/040/00430/AM09/ Lic.No/Date:0710060679 24.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm or the status if licence has   98

Case No.:24/32/81­ALC2/2008

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00490/AM09/ RLA File :05/24/040/00479/AM09/ Lic.No/Date:0510229948 24.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. On the recommendation of the representative of DHI present in the meeting, it  was  decided  by  the  Committee  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 17.02.2009: ­     1. Information in respect of item at S.No. 11 of Standard Deficiency Format.     99

Case No.:19/32/81­ALC2/2008

Party Name:SURINDRA ENGINEERING CO.LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00485/AM09/ RLA File :03/95/040/00608/AM09/ Lic.No/Date:0310492004 27.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. Based on the recommendation of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation with the following modifications:­   1.            Words “SS 400B Alloy” may be suffixed with the descriptions of export products at S.Nos. 1 & 2. 2.            Net weights of export products at S.No. 1 & 2 may be specified as 593.4 MT & 107.4 MT respectively (cumulative net export weight 700.8 MT). 3.            Quantity of import item may be allowed as 735.84 MT inclusive of 5% wastage after taking clue from SION at S.No. C­593.  

100

Case No.:20/32/81­ALC2/2008

Party Name:CARPO ELECTRONIKS LTD, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00486/AM09/ RLA File :06/24/040/00039/AM09/ Lic.No/Date:0610014486 27.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. Based on the recommendation of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per GN4 on net­to­net basis with nil wastage.         101

Case No.:21/32/81­ALC2/2008

Party Name:ISOVOLTA (INDIA) PVT. LTD. 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00487/AM09/ RLA File :03/94/040/00729/AM09/ Lic.No/Date:0310492136 27.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. Based on the recommendation of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as applied for inclusive of 5% wastage.     102

Case No.:22/32/81­ALC2/2008

Party Name:CROWN CORPORATION PVT. LTD. Meet No/Date:39/81­ALC2/2008 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00488/AM09/ RLA File :03/94/040/00658/AM09/ Lic.No/Date:0310492157 27.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred   103 Case No.:23/32/81­ALC2/2008 Party Name:MAHENDRA INDUSTRIES 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00489/AM09/ RLA File :07/24/040/00429/AM09/ Lic.No/Date:0710060731 Defer

27.10.2008 Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred     104

Case No.:25/32/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00491/AM09/ RLA File :11/24/040/00027/AM09/ Lic.No/Date:1110018793 27.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. On the recommendation of the representative of DHI present in the meeting, it  was  decided  by  the  Committee  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 17.02.2009: ­     1. Information in respect of item at S.No. 11 of Standard Deficiency Format.   105

Case No.:26/32/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00492/AM09/ RLA File :11/24/040/00024/AM09/ Lic.No/Date:1110018794 27.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. On the recommendation of the representative of DHI present in the meeting, it  was  decided  by  the  Committee  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 17.02.2009: ­     1. Information in respect of item at S.No. 11 of Standard Deficiency Format.   106

Case No.:27/32/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00493/AM09/ RLA File :11/24/040/00028/AM09/ Lic.No/Date:1110018795 27.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred

107

Case No.:28/32/81­ALC2/2008

Party Name:MITTAL APPLIANCES LIMITED, 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00494/AM09/ RLA File :11/24/040/00044/AM09/ Lic.No/Date:1110018796 27.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred   108

Case No.:29/32/81­ALC2/2008

Party Name:COPPER STRIPS PVT LTD 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00495/AM09/ RLA File :11/24/040/00045/AM09/ Lic.No/Date:1110018799 27.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. Based on the recommendation of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation with the following modifications:­     1. Description of import item may be modified as “ Copper Flat bars in Coil, Thickness 7.00 MM to 12.00 MM, Width: 25.00 MM to 35.00 MM”   2. Quantity of import item may be allowed as 25452 Kgs inclusive of 1 % wastage.     109

Case No.:30/32/81­ALC2/2008

Party Name:VINDHYA TELELINKS LTD., 23.12.2008 Status:Deffered and Re­indexed HQ File :01/81/050/00496/AM09/ RLA File :11/24/040/00043/AM09/ Lic.No/Date:1110018801 27.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee decided to refer a copy of the application of the firm to DOT for examination and comments. The case stands deferred and to be re­listed on 17.02.2009.     110

Case No.:31/32/81­ALC2/2008

Party Name:AMBICA STEELS LTD. Status:Deffered

23.12.2008 and Re­indexed HQ File :01/81/050/00497/AM09/ RLA File :05/24/040/00487/AM09/ Lic.No/Date:0510229979 27.10.2008 Defer Date:23.12.2008 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred           PART ’A ’ DEFFER   S.No 77

Case No.A  ­ 285

M/s P.P.Rolling Mills Mfging Co.Pvt.Ltd.New Delhi Meeting No.39/81 F.No.01/81/162/1072 /AM08/DES­II Dated: 23­12­2008 Advance Licence No 0510212239    dt  19­11­2007              RLA F.No.05/24/40/649/am08               Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee decided to refer a copy of the application of the firm to DHI for examination and comments. The case stands deferred and to be re­listed on 17.02.2009.     PART ’AR’ DEFFER S.No. 45

Case No. AR 18

 M/S  Crompton Greaves Ltd.            Meeting No. 39/81 F.No.01/81/50/175 /AM02/DES­II Dated: 23­12­2008 Advance Licence No.0310114300 dt. 13­12­2001           RLA F.No. 03/24/42/1125/AM02 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 03.02.2009.

S.No. 46

Case No. AR 18

 M/S  Crompton Greaves Ltd.            Meeting No.39/81 F.No.01/81/50/217 /AM02/DES­II Dated: 23­12­2008 Advance Licence No.0310114303 dt. 13­12­2001           RLA F.No. 03/24/42/0104/AM02 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 03.02.2009.     S.No.47                                                                                   P.H.Case

Case No. AR­38

 M/S Kalptaru Power Transmission Ltd., Gandhinagar        Meeting No.39/81 F.No.01/81/162/036/AM09/DES­II Dated 23­12­2008       Decision : The case regarding amendment of SIOn S. No. C­220 was considered by the Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The representatives of the firm appeared for personal hearing and the Norms Committee decided to refer the case to EEPC for provoding the data for amendment of SION C­220. The case stands deferred and to be re­listed on 17.02.2009. PART –C­ DEFFER S.No.45

Case No. C­8

 M/S  .Suzlon Generators Pvt.Ltd.          Meeting No.39/81 F.No.01/81/ 162/00068/AM09/DES­II Dated: 23­12­2008            Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that a visit to the factory of the firm is scheduled for 09.01.2009 and the  case  will  be  decided  on  the  recommendations  of  the  team  after  their  visit.  The  case  stands  deferred  and  to  be  relisted  on 17.02.2009.     S.NO.46

Case No. C ­ 4

M/s   Honeywell Electrical Devices and Systems India Ltd.           Meeting No.39/81 F.No.01/81/162/1189 /AM08/DES­II Dated: 23­12­2008          Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the case was examined on file and the same was rejected.     S.No. 47

Case No.C ­11

M/s  Vijai Electricals Ltd.

Meeting No 39/81 F.No. 01/81/162/677/am08/DES­II Dated: 23­12­2008                Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that a visit to the factory of the firm is scheduled for 16.01.2009 and the  case  will  be  decided  on  the  recommendations  of  the  team  after  their  visit.  The  case  stands  deferred  and  to  be  relisted  on 17.02.2009.     S.No. 48

Case No C­1

M/s B.H.E.L.Bhopal Meeting No.39/81 F.No.01/80/162/2/AM07/DES­I/DES­II Dated: 23­12­2008   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009.The representative of DHI informed that the firm wants to withdraw the request. The case may be closed after the communication in the matter is received from the firm.     S.No.49

Case No.C  ­ 18

M/s Nirlep Applianaces Ltd. Aurangabad Meeting No.39/81 F.No.01/81/162/259/AM08/DES­I//DES­II Dated: 23­12­2008                Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 39/81 held on 06.01.2009. The committee observed that the case is under examination of DC(SSI). The case stands deferred and to be re­listed on 03.02.2009.  


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied