DGFT Committee Minutes
RATIFIED Minutes of Mee埀�ng No.08/14 scheduled on 09.07.2013 of Norms CommiĀee(NC‐I) (DES.I Sec埀�on) The mee埀�ng No. 08/14 of the Norms CommiĀee (NC‐I) for the licensing year 2012‐2013 was held on 09.07.2013 under the Chairmanship of Sh. L.B. Singhal, Addi埀�onal Director General of Foreign Trade to consider the applica埀�ons under Duty Exemp埀�on Schemes (Chapter‐4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume‐I. The following Members of the CommiĀee were present in the mee埀�ng: ‐ Sl.No Name of the representa埀�ves & their Designa埀�on Room No. Telephone No. DepĀ. 1. Sh K.K. Tiwari, I.A, 476 23063321 DHI, U.B. 2. Sh S.K. Jain, D.O. 428A 23063166 DIPP, U.B. 3. Sh. K.K. Funda, AssĀ. Dir. (Mech) 736A 23063802 Extn.2459 DC(MSME),N.B. 4. Sh. Parveen Sharma, Dy.DGFT 312 23061562 Extn.146 DGFT, U.B. 5. Sh. K.C. Raju, FTDO 404 23061562 Ext.265 DGFT, U.B. The CommiĀee first considered the minutes of the Norms CommiĀee‐I Mee埀�ng No. 07/14 dated 25.6.2013 for confirma埀�on and confirmed and adopted the same without any change. 1
Case No.:21/39/80‐ALC2/2009
Party Name:VEM TECHNOLOGIES P.LTD., Meet No/Date:8/80‐ALC2/2013 09.07.2013 Rejected HQ File :01/80/050/00617/AM10/ RLA File :09/24/040/00373/AM10/ Lic.No/Date:0910040368 18.12.2009 Decision : The CommiĀee noted that firm aĀend personal hearing on 22.1.2013 and therea韆�er they were to make a wriĀen submission based on discussion in personal hearing. Firm was again reminded on 23.3.2013 and a final reminder was sent to firm on 14.5.2013. Since no reply was received from firm, the CommiĀee constrained to reject the with direc埀�on to the firm to pay custom duty and applicable interest immediately. RLA may take necessary ac埀�on accordingly. 2
Case No.:32/31/80‐ALC2/2010
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. 09.07.2013 Status: Deferred HQ File :01/80/050/00510/AM11/ RLA File :06/24/040/00028/AM11/ Lic.No/Date:0610018929 30.08.2010 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 4.7.2013 and decided to remind them for expedi埀�ng their reply. 3
Case No.:1/25/80‐ALC2/2012
Party Name:RANGSONS ELECTRONICS PVT LTD 09.07.2013 Status:Deferred HQ File :01/80/050/00533/AM13/ RLA File :07/24/040/00250/AM11/ Lic.No/Date:0710074552 01.10.2010 Defer Date:20.08.2013 Decision : The CommiĀee noted that this authoriza埀�on was issued in October 2010 but the case was aĀached to online agenda recently. The CommiĀee has not received copy of applica埀�on either from RA or from firm 埀�ll date. The CommiĀee decided to request RA/firm to immediately provide one set of applica埀�on for considera埀�on. 4
Case No.:4/4/80‐ALC2/2013
Party Name:BASIC WATER NEEDS INDIA PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00051/AM14/ RLA File :25/24/040/00007/AM11/ Lic.No/Date:2510003024 22.10.2010 Defer Date:20.08.2013
Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 3.7.2013 and decided to remind them for 5
Case No.:4/19/85‐ALC3/2011
Party Name:BOOM SYSTEMS PVT. LTD., 09.07.2013 Status:Deferred HQ File :01/85/050/00097/AM12/ RLA File :05/23/040/00156/AM12/ Lic.No/Date:0510297632 26.07.2011 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of firm’s reply has been forwarded to DHI. The CommiĀee also noted that firm is making deemed export supply to a hydroelectric project but a copy of the Project Authority Cer埀�ficate was not available in the file. The CommiĀee decided to ask the firm to submit a copy of PAC for further examina埀�on of the case. 6
Case No.:6/21/80‐ALC2/2011
Party Name:SATTVA ETECH INDIA PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00426/AM12/ RLA File :07/24/040/00296/AM12/ Lic.No/Date:0710083749 04.11.2011 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DIT and decided to remind them for expedi埀�ng their comments. 7
Case No.:16/25/80‐ALC2/2011
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., 09.07.2013 Status:Deferred HQ File :01/80/050/00495/AM12/ RLA File :34/24/040/00186/AM12/ Lic.No/Date:3410032547 14.12.2011 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of C&PC and decided to await comments. 8
Case No.:43/25/80‐ALC2/2011
Party Name:SGL CARBON INDIA PVT.LTD 09.07.2013 Status:Deferred HQ File :01/80/050/00522/AM12/ RLA File :31/83/040/00218/AM12/ Lic.No/Date:3110052856 08.02.2012 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 1.4.2013 foll.owed by reminder dated 14.5.2013 and final reminder dated 4.7.2013 and decided to await 15 days more to received reply from firm. 9
Case No.:27/25/80‐ALC2/2012
Party Name:BIO ‐ TECH VISION CARE PVT.LTD 09.07.2013 Approved HQ File :01/80/050/00559/AM13/ RLA File :08/24/040/00065/AM13/ Lic.No/Date:0810112711 18.06.2012 Decision : The CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per C&PC OM No. 46011/35/2011‐PC‐II dated 30.4.2013 (copy to be forwarded to firm and RA). As men埀�oned by C&PC in this OM, the CommiĀee also decided to revise quan埀�ty of import item to 1.12 nos in respect of firm’s AA No.0810112711 dated 18.6.2013 which was ra埀�fied in NC‐I mee埀�ng No.6/14 dated 11.6.2013. RLA may take necessary ac埀�on accordingly. 10
Case No.:4/10/81‐ALC2/2012
Party Name:DEE DEVELOPMENT ENGINEERS LTD. 09.07.2013 Status:Deferred HQ File :01/81/050/00199/AM13/ RLA File :05/23/040/00134/AM13/ Lic.No/Date:0510329855 17.07.2012 Defer Date:20.08.2013 Decision : The CommiĀee noted that this case was referred to EPCG Division for clarifica埀�on and decided to remind them for providing their comments immediately.
Case No.:24/13/80‐ALC2/2012
Party Name:MOTHERSON SUMI SYSTEMS LTD 09.07.2013 Status:Deferred
11 HQ File :01/80/050/00279/AM13/ RLA File :05/24/040/00149/AM13/ Lic.No/Date:0510330419 24.07.2012 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of C&PC and decided to await comments. 12
Case No.:14/16/81‐ALC2/2012
Party Name:BHARAT HEAVY ELECTRICALS LIMITED 09.07.2013 Status:Deferred HQ File :01/81/050/00321/AM13/ RLA File :09/24/040/00186/AM13/ Lic.No/Date:0910053414 02.08.2012 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm is making supply of 20 MW Steam Generator against Invalida埀�on LeĀer of EPCG issued to M/s Grazim Industries Ltd. Accordingly, the CommiĀee decided to refer the case to EPCG Division for clarifica埀�on on firm’s eligibility for advance authoriza埀�on. 13
Case No.:22/22/80‐ALC2/2012
Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 09.07.2013 Status:Deferred HQ File :01/80/050/00469/AM13/ RLA File :07/24/040/00287/AM13/ Lic.No/Date:0710091411 16.10.2012 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 1.4.2013 followed by reminder dated 14.5.2013 and final reminder dated 4.7.2013 and decided to await 15 days more to receive reply from firm. 14
Case No.:6/22/80‐ALC2/2012
Party Name:GEA ECOFLEX INDIA PVT.LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00453/AM13/ RLA File :03/94/040/00582/AM13/ Lic.No/Date:0310713179 18.10.2012 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 25.3.2013 followed by reminder dated 17.5.2013 and final reminder dated 3.7.2013 and decided to await 15 days more to receive reply from firm. 15
Case No.:17/22/80‐ALC2/2012
Party Name:DYNAMATIC TECHNOLOGIES LIMITED, 09.07.2013 Rejected HQ File :01/80/050/00464/AM13/ RLA File :07/21/040/00507/AM13/ Lic.No/Date:0710091489 22.10.2012 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 22.2.2013 followed by reminder dated 25.3.2013 and final reminder dated 17.5.2013. Since no reply has been received from firm, the CommiĀee constrained to reject the case with direc埀�on to the firm to pay custom duty and applicable interest. 16
Case No.:24/22/80‐ALC2/2012
Party Name:SATTVA ETECH INDIA PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00471/AM13/ RLA File :07/24/040/00300/AM13/ Lic.No/Date:0710091567 25.10.2012 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DIT and decided to await comments. 17
Case No.:7/22/80‐ALC2/2012
Party Name:GEA ECOFLEX INDIA PVT.LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00454/AM13/ RLA File :03/94/040/00610/AM13/ Lic.No/Date:0310714432 06.11.2012 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 25.3.2013 followed by reminder dated 3.7.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for regulariza埀�on of the licence.
18
Case No.:1/22/80‐ALC2/2012
Party Name:G & T OIL STATES INDUSTRIES PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00448/AM13/ RLA File :03/94/040/00625/AM13/ Lic.No/Date:0310714469 07.11.2012 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm vide leĀer dated 26.3.2013 informed that they will be filing amendment applica埀�on with RA and hence requested to hold their case for fixa埀�on of norms for a few weeks. 19
Case No.:2/22/80‐ALC2/2012
Party Name:G & T OIL STATES INDUSTRIES PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00449/AM13/ RLA File :03/94/040/00626/AM13/ Lic.No/Date:0310714471 07.11.2012 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm vide leĀer dated 6.5.2013 informed that they will be filing amendment applica埀�on with RA and hence requested to hold their case for fixa埀�on of norms for a few weeks. 20
Case No.:19/22/80‐ALC2/2012
Party Name:PHOENIX FOILS PVT. LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00466/AM13/ RLA File :03/95/040/00342/AM13/ Lic.No/Date:0310716381 05.12.2012 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 1.4.2013 followed by reminder dated 14.5.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for 21
Case No.:29/22/80‐ALC2/2012
Party Name:BHARAT HEAVY ELECTRICALS LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00476/AM13/ RLA File :04/24/040/00158/AM13/ Lic.No/Date:0410141543 05.12.2012 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 12.4.2013 followed by reminder dated 14.5.2013 and final reminder dated 8.7.2013 and decided to await 15 days more to receive reply from firm. 22
Case No.:21/25/80‐ALC2/2012
Party Name:GMM PFAUDLER LIMITED Meet No/Date:8/80‐ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00553/AM13/ RLA File :03/94/040/00854/AM13/ Lic.No/Date:0310719957 09.01.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 25.3.2013 followed by reminder dated 17.5.2013 and final reminder dated 3.7.2013 and decided to await 15 days more to receive reply from firm. 23
Case No.:24/25/80‐ALC2/2012
Party Name:TEMA INDIA LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00556/AM13/ RLA File :03/95/040/00774/AM13/ Lic.No/Date:0310720380 11.01.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 1.4.2013 followed by reminder dated 14.5.2013 and final reminder dated 4.7.2013 and decided to await 15 days more to receive reply from firm.
Case No.:25/25/80‐ALC2/2012
Party Name:TEMA INDIA LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00557/AM13/ RLA File :03/95/040/00778/AM13/
24 Lic.No/Date:0310720388 11.01.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 14.5.2013 followed by reminder dated 4.7.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for 25
Case No.:28/25/80‐ALC2/2012
Party Name:WHIRLPOOL OF INDIA LTD., 09.07.2013 Status:Deferred HQ File :01/80/050/00560/AM13/ RLA File :05/24/040/00338/AM13/ Lic.No/Date:0510343819 21.01.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 15.3.2013 followed by reminder dated 14.5.2013 and final reminder dated 4.7.2013 and decided to await 15 days more to receive reply from firm. 26
Case No.:7/25/80‐ALC2/2012
Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., 09.07.2013 Approved HQ File :01/80/050/00539/AM13/ RLA File :04/24/040/00165/AM13/ Lic.No/Date:0410142834 23.01.2013 Decision : The CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per MSME UO note No. 30(03)2013‐ME dated 30.5.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac埀�on accordingly. 27
Case No.:8/25/80‐ALC2/2012
Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., 09.07.2013 Approved HQ File :01/80/050/00540/AM13/ RLA File :04/24/040/00169/AM13/ Lic.No/Date:0410142833 23.01.2013 Decision : The CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per MSME UO note No. 30(03)2013‐ME dated 30.5.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac埀�on accordingly. 28
Case No.:9/25/80‐ALC2/2012
Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., 09.07.2013 Approved HQ File :01/80/050/00541/AM13/ RLA File :04/24/040/00166/AM13/ Lic.No/Date:0410142832 23.01.2013 Decision : The CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per MSME UO note No. 30(04)2011‐ME dated 30.5.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac埀�on accordingly. 29
Case No.:10/25/80‐ALC2/2012
Party Name:BOYSEN INDIA LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00542/AM13/ RLA File :05/23/040/00433/AM13/ Lic.No/Date:0510344308 29.01.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of firm’s reply dated 3.7.2013 has been forwarded to MSME for examina埀�on and comments. 30
Case No.:29/25/80‐ALC2/2012
Party Name:BRAKES INDIA LIMITED, 09.07.2013 Status:Deferred HQ File :01/80/050/00561/AM13/ RLA File :04/24/040/00205/AM13/ Lic.No/Date:0410143034 31.01.2013 Defer Date:20.08.2013 Decision : The CommiĀee decided to forward copy of firm’s applica埀�on to DHI for examina埀�on. On the recommenda埀�on of DHI representa埀�ve present in the mee埀�ng, the CommiĀee also decided to ask the firm to furnish informa埀�on on composi埀�on material balancing for each product.
31
Case No.:47/2/80‐ALC2/2013
Party Name:VEM TECHNOLOGIES PVT LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00047/AM14/ RLA File :09/24/040/00491/AM13/ Lic.No/Date:0910054874 31.01.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 14.5.2013 followed by reminder dated 3.7.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for 32
Case No.:16/2/80‐ALC2/2013
Party Name:CICB CHEMICON PRIVATE LIMITED, 09.07.2013 Status:Deferred HQ File :01/80/050/00016/AM14/ RLA File :07/24/040/00452/AM13/ Lic.No/Date:0710093506 01.02.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of reply dated 30.6.2013 has been forwarded to DIPP for examina埀�on and comments. 33
Case No.:24/4/80‐ALC2/2013
Party Name:VEM TECHNOLOGIES PVT LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00071/AM14/ RLA File :09/24/040/00484/AM13/ Lic.No/Date:0910054916 04.02.2013 Defer Date:20.08.2013 Decision : The CommiĀee decided to again forward copy of applica埀�on to MSME for examina埀�on and comments. 34
Case No.:45/2/80‐ALC2/2013
Party Name:SHAKTI PUMPS (INDIA) LTD., 09.07.2013 Status:Deferred HQ File :01/80/050/00045/AM14/ RLA File :56/24/040/00037/AM13/ Lic.No/Date:5610001637 06.02.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 4.7.2013 and decided to remind them for 35
Case No.:2/4/80‐ALC2/2013
Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., 09.07.2013 Status:Deferred HQ File :01/80/050/00049/AM14/ RLA File :03/95/040/00855/AM13/ Lic.No/Date:0310723297 07.02.2013 Defer Date:20.08.2013 Decision : The CommiĀee decided to ask the firm to provide ra埀�fica埀�on details of its past authoriza埀�on similar to the subject authoriza埀�on. 36
Case No.:46/2/80‐ALC2/2013
Party Name:CHAK RADER FARM EQUIPMENTS PRIVATE LIMITED 09.07.2013 Approved HQ File :01/80/050/00046/AM14/ RLA File :09/24/040/00475/AM13/ Lic.No/Date:0910055037 13.02.2013 Decision : The CommiĀee decided to ra埀�fy norms of subject authority as per MSME UO note No. 30(15)/13‐ME dated 24.6.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac埀�on accordingly. 37
Case No.:6/2/80‐ALC2/2013
Party Name:ALFA LAVAL (INDIA)LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00006/AM14/ RLA File :31/83/040/00192/AM13/ Lic.No/Date:3110057162 15.02.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has noted replied to deficiency leĀer dated 17.5.2013 followed by reminder dated 3.7.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the
CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for 38
Case No.:22/2/80‐ALC2/2013
Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00022/AM14/ RLA File :05/23/040/00432/AM13/ Lic.No/Date:0510346352 18.02.2013 Defer Date:20.08.2013 Decision : The CommiĀee decided to forward copy of firm’s applica埀�on to DIPP (Chemical Division) and C&PC for examina埀�on and comments. 39
Case No.:34/2/80‐ALC2/2013
Party Name:PRIJAI HEAT EXCHANGERS PVT. LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00034/AM14/ RLA File :03/95/040/00888/AM13/ Lic.No/Date:0310724586 19.02.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has noted replied to deficiency leĀer dated 14.5.2013 followed by reminder dated 4.7.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for regulariza埀�on of the licence 40
Case No.:20/8/80‐ALC2/2013
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 09.07.2013 Status:Deferred HQ File :01/80/050/00130/AM14/ RLA File :09/24/040/00539/AM13/ Lic.No/Date:0910055081 19.02.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DHI and decided to await comments. 41
Case No.:5/25/80‐ALC2/2012
Party Name:CHEMICO SYNTHETICS LTD., 09.07.2013 Closed HQ File :01/80/050/00537/AM13/ RLA File :05/23/040/00473/AM13/ Lic.No/Date:0510346896 21.02.2013 Decision : The CommiĀee noted that CLA vide leĀer No. 05/23/40/00473/AM13/ZALC‐I/CLA/999021 dated 27.7.2013 informed that subject authoriza埀�on was issued as per Para 4.7.1 of HBP Vol.I. The CommiĀee therefore decided to close the case. RLA may take necessary ac埀�on accordingly. 42
Case No.:36/2/80‐ALC2/2013
Party Name:STERICAT GUTSTRINGS PVT. LTD. Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00036/AM14/ RLA File :05/24/040/00432/AM13/ Lic.No/Date:0510346969 21.02.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of C&PC and decided to await comments. 43
Case No.:23/2/80‐ALC2/2013
Party Name:M M AQUA TECHNOLOGIES LTD. Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Approved HQ File :01/80/050/00023/AM14/ RLA File :05/24/040/00123/AM13/ Lic.No/Date:0510347204 22.02.2013 Decision : The CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per C&PC OM No. 46011/253/2004‐PC‐II dated 3.6.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac埀�on accordingly.
Case No.:39/4/80‐ALC2/2013
Status:Deferred
44 Party Name:ADORE MEDI PRIVATE LIMITED 09.07.2013 HQ File :01/80/050/00086/AM14/ RLA File :05/23/040/00492/AM13/ Lic.No/Date:0510347369 25.02.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 3.7.2013 and decided to remind them for 45
Case No.:17/4/80‐ALC2/2013
Party Name:HINDUSTAN AERONAUTICS LTD, 09.07.2013 Status:Deferred HQ File :01/80/050/00064/AM14/ RLA File :07/24/040/00484/AM13/ Lic.No/Date:0710094023 04.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm was requested to appear before the CommiĀee for personal hearing to explain their case but firm did not appear nor provided any wriĀen in埀�ma埀�on. The CommiĀee, therefore, decided to give the firm a second opportunity of personal hearing on 20.8.2013 at 2.30 pm in DGFT, Room No.11, Udyog Bhavan, New Delhi. 46
Case No.:41/4/80‐ALC2/2013
Party Name:GEA ECOFLEX INDIA PVT.LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00088/AM14/ RLA File :03/94/040/00961/AM13/ Lic.No/Date:0310726638 04.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 3.7.2013 and decided to remind them for 47
Case No.:41/2/80‐ALC2/2013
Party Name:DAEWON INDIA AUTOPARTS PVT LTD 09.07.2013 Status:Deferred HQ File :01/80/050/00041/AM14/ RLA File :04/24/040/00268/AM13/ Lic.No/Date:0410143868 05.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 3.7.2013 and decided to remind them for 48
Case No.:29/4/80‐ALC2/2013
Party Name:SANDVIK ASIA PVT. LIMITED Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00076/AM14/ RLA File :31/83/040/00203/AM13/ Lic.No/Date:3110057347 05.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer and decided to await comments. 49
Case No.:12/2/80‐ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00012/AM14/ RLA File :05/23/040/00487/AM13/ Lic.No/Date:0510348281 06.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 3.7.2013 and decided to remind them for 50
Case No.:13/2/80‐ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00013/AM14/ RLA File :05/23/040/00507/AM13/ Lic.No/Date:0510348353 06.03.2013 Defer Date:20.08.2013
Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 17.5.2013 followed by reminder dated 3.7.2013. However, the firm has vide leĀer dated 18.6.2013 sought more 埀�me for providing their reply. 51
Case No.:42/2/80‐ALC2/2013
Party Name:MODINE THERMAL SYSTEMS PVT. LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00042/AM14/ RLA File :04/24/040/00260/AM13/ Lic.No/Date:0410143936 06.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 3.7.2013 and decided to remind them for 52
Case No.:43/2/80‐ALC2/2013
Party Name:MODINE THERMAL SYSTEMS PVT. LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00043/AM14/ RLA File :04/24/040/00261/AM13/ Lic.No/Date:0410143937 06.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 3.7.2013 and decided to remind them for 53
Case No.:30/2/80‐ALC2/2013
Party Name:UNDERCARRIAGE AND TRACTOR PARTS PVT.LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00030/AM14/ RLA File :03/95/040/00957/AM13/ Lic.No/Date:0310727478 08.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 6.6.2013 followed by reminder dated 4.7.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for regulariza埀�on of the licence 54
Case No.:1/4/80‐ALC2/2013
Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00048/AM14/ RLA File :05/23/040/00506/AM13/ Lic.No/Date:0510348513 08.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee decided to remind RA / firm to immediately forward copy of applica埀�on for considera埀�on of the case. 55
Case No.:21/2/80‐ALC2/2013
Party Name:MVS ENGINEERING LTD Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Approved HQ File :01/80/050/00021/AM14/ RLA File :05/24/040/00458/AM13/ Lic.No/Date:0510348726 11.03.2013 Decision : Based on DIPP wriĀen comments dated 8.7.2013, the CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per GN4 for Engineering Products. RLA may take necessary ac埀�on accordingly. 56
Case No.:44/2/80‐ALC2/2013
Party Name:EXCELLENT HI‐CARE PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00044/AM14/ RLA File :04/24/040/00266/AM13/ Lic.No/Date:0410144188 14.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that C&PC vide leĀer No. 46011/41/2013‐PC‐II dated 28.5.2013 asked firm to provide certain informa埀�on required by them for examina埀�on of the case. The CommiĀee decided to remind firm to immediately provide the informa埀�on.
57
Case No.:25/2/80‐ALC2/2013
Party Name:CAMFIL FARR AIR FILTRATION INDIA PVT. LTD. 09.07.2013 Approved HQ File :01/80/050/00025/AM14/ RLA File :05/23/040/00519/AM13/ Lic.No/Date:0510349255 15.03.2013 Decision : The CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per MSME UO note No. 30(07)/2013‐ME dated 17.6.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac埀�on accordingly. 58
Case No.:19/4/80‐ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00066/AM14/ RLA File :07/24/040/00516/AM13/ Lic.No/Date:0710094271 15.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DIT and decided to await comments. The CommiĀee also noted that firm has not informed whether it is a case of supply against Invalida埀�on LeĀer of EPCG as asked vide leĀer dated 28.5.2013 followed by reminder dated 4.7.2013 and decided to send a final reminder to firm for furnishing the informa埀�on immediately. 59
Case No.:12/4/80‐ALC2/2013
Party Name:METAL LAND INDUSTRIES Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00059/AM14/ RLA File :10/24/040/00091/AM13/ Lic.No/Date:1010052903 19.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of MSME and decided to await comments. 60
Case No.:23/4/80‐ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED 09.07.2013 Approved HQ File :01/80/050/00070/AM14/ RLA File :04/24/040/00240/AM13/ Lic.No/Date:0410144211 19.03.2013 Decision : The DHI representa埀�ve informed that it is a case of SEZ which is a physical supply. Therefore, based on DHI wriĀen comments dated 9.7.2013, the CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as under: Weight of EP is 2200 MT to be incorporated in AA. Item No. 1 to 3 – 1.02 kg/kg content. Item No.4 – Net to Net basis with accountability clause. Word “Relevant” to be prefixed before item 1 to 4. Item No.5 – As applied for. RLA may take necessary ac埀�on accordingly. 61
Case No.:32/4/80‐ALC2/2013
Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00079/AM14/ RLA File :05/24/040/00472/AM13/ Lic.No/Date:0510349578 19.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DIT and decided to await comments. 62
Case No.:35/4/80‐ALC2/2013
Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00082/AM14/ RLA File :05/24/040/00471/AM13/ Lic.No/Date:0510349577 19.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DIT and decided to await comments.
63
Case No.:20/4/80‐ALC2/2013
Party Name:UNDERCARRIAGE AND TRACTOR PARTS PVT.LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00067/AM14/ RLA File :03/95/040/01027/AM13/ Lic.No/Date:0310728824 20.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 7.6.2013 followed by reminder dated 4.7.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for 64
Case No.:21/4/80‐ALC2/2013
Party Name:UNDERCARRIAGE AND TRACTOR PARTS PVT.LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00068/AM14/ RLA File :03/95/040/01035/AM13/ Lic.No/Date:0310728822 20.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 7.6.2013 followed by reminder dated 4.7.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for 65
Case No.:31/4/80‐ALC2/2013
Party Name:NASH INDUSTRIES (I) PVT LTD 09.07.2013 Status:Deferred HQ File :01/80/050/00078/AM14/ RLA File :07/24/040/00527/AM13/ Lic.No/Date:0710094430 22.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 4.7.2013 and decided to remind them for 66
Case No.:33/4/80‐ALC2/2013
Party Name:REYNOLD INDIA PVT.LTD. 09.07.2013 Approved HQ File :01/80/050/00080/AM14/ RLA File :05/24/040/00454/AM13/ Lic.No/Date:0510350060 22.03.2013 Decision : Based on DIPP wriĀen comments dated 8.7.2013, the CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per General Note‐4 for Engineering Products. RLA may take necessary ac埀�on accordingly. 67
Case No.:40/2/80‐ALC2/2013
Party Name:TERUMO PENPOL LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00040/AM14/ RLA File :53/24/040/00015/AM13/ Lic.No/Date:5310016509 27.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of C&PC and decided to await comments. 68
Case No.:16/4/80‐ALC2/2013
Party Name:CANARA HYDRAULICS PVT LTD 09.07.2013 Status:Deferred HQ File :01/80/050/00063/AM14/ RLA File :07/24/040/00501/AM13/ Lic.No/Date:0710094546 28.03.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DHI and decided to await comments. 69
Case No.:21/8/80‐ALC2/2013
Party Name:BERCO UNDERCARRIAGES (INDIA) PVT LTD 09.07.2013 Status:Deferred HQ File :01/80/050/00131/AM14/ RLA File :09/24/040/00625/AM13/ Lic.No/Date:0910055625 28.03.2013 Defer Date:20.08.2013
Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 4.7.2013 and decided to remind them for 70
Case No.:15/4/80‐ALC2/2013
Party Name:MVS ENGINEERING LTD 09.07.2013 Status:Deferred HQ File :01/80/050/00062/AM14/ RLA File :05/24/040/00483/AM13/ Lic.No/Date:0510350651 03.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 3.7.2013 and decided to remind them for 71
Case No.:22/4/80‐ALC2/2013
Party Name:YUTAKA AUTOPARTS INDIA (P)LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00069/AM14/ RLA File :05/24/040/00492/AM13/ Lic.No/Date:0510350699 03.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DHI and decided to await comments. 72
Case No.:34/4/80‐ALC2/2013
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00081/AM14/ RLA File :34/24/040/00317/AM13/ Lic.No/Date:3410036590 05.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of C&PC and decided to await comments. 73
Case No.:8/4/80‐ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00055/AM14/ RLA File :05/23/040/00531/AM13/ Lic.No/Date:0510350890 08.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 3.7.2013 and decided to remind them for expedi埀�ng their reply. 74
Case No.:18/4/80‐ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00065/AM14/ RLA File :05/23/040/00534/AM13/ Lic.No/Date:0510350891 08.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee decided to seek informa埀�on on following from firm: 1. Informa埀�on in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Format‐export product wise. 2. Quan埀�埀�es of import items at Sl. Nos. 3 & 5 in Nos. also in addi埀�on to their weights. 3. Quan埀�埀�es of import items at Sl. No. 6 & 7 in meters also in addi埀�on to their weights. 75
Case No.:36/4/80‐ALC2/2013
Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 09.07.2013 Status:Deferred HQ File :01/80/050/00083/AM14/ RLA File :07/24/040/00503/AM13/ Lic.No/Date:0710094700 08.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 3.6.2013 followed by reminder dated 4.7.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for regulariza埀�on of the licence
Case No.:22/8/80‐ALC2/2013
Approved
76 Party Name:BHARAT HEAVY ELECTRICALS LIMITED 09.07.2013 HQ File :01/80/050/00132/AM14/ RLA File :09/24/040/00594/AM13/ Lic.No/Date:0910055690 09.04.2013 Decision : Based on DHI wriĀen comments dated 9.7.2013, the CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per General Note‐4 of Engineering Produc埀�ons and spares as per Policy. RLA may take necessary ac埀�on accordingly. 77
Case No.:26/4/80‐ALC2/2013
Party Name:TOSHIBA JSW TURBINE AND GENERATOR PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00073/AM14/ RLA File :04/24/040/00001/AM14/ Lic.No/Date:0410144942 10.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 6.6.2013 followed by reminder dated 4.7.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for 78
Case No.:27/4/80‐ALC2/2013
Party Name:TOSHIBA JSW TURBINE AND GENERATOR PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00074/AM14/ RLA File :04/24/040/00272/AM13/ Lic.No/Date:0410144941 10.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that firm has not replied to deficiency leĀer dated 6.6.2013 followed by reminder dated 4.7.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for regulariza埀�on of the licence 79
Case No.:28/8/80‐ALC2/2013
Party Name:K.T.A. SPINDLE TOOLINGS Meet No/Date:8/80‐ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00138/AM14/ RLA File :31/83/040/00223/AM13/ Lic.No/Date:3110057922 15.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DHI and decided to await comments. 80
Case No.:31/8/80‐ALC2/2013
Party Name:SHIRODKAR PRECI COMP PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00141/AM14/ RLA File :31/83/040/00002/AM14/ Lic.No/Date:3110057929 15.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on ofDIPPI and decided to await comments. 81
Case No.:27/8/80‐ALC2/2013
Party Name:SHIRODKAR PRECI COMP PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00137/AM14/ RLA File :31/83/040/00005/AM14/ Lic.No/Date:3110057984 17.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DIPP and decided to await comments. 82
Case No.:29/8/80‐ALC2/2013
Party Name:KOSO INDIA PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00139/AM14/ RLA File :31/82/040/00346/AM13/ Lic.No/Date:3110057977 17.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of applica埀�on was forwarded to DHI. The CommiĀee observed that this pertains to DIPP and accordingly decided to forward copy of applica埀�on to DIPP for examina埀�on and comments.
83
Case No.:30/8/80‐ALC2/2013
Party Name:FOURESS ENGGINEERING (INDIA ) LIMITED. 09.07.2013 Status:Deferred HQ File :01/80/050/00140/AM14/ RLA File :07/24/040/00543/AM13/ Lic.No/Date:0710094883 17.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of applica埀�on was forwarded to DHI. The CommiĀee observed that this pertains to DIPP and accordingly decided to forward copy of applica埀�on to DIPP for examina埀�on and comments. 84
Case No.:17/8/80‐ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00127/AM14/ RLA File :04/24/040/00253/AM13/ Lic.No/Date:0410145648 30.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DHI and decided to await comments. 85
Case No.:25/8/80‐ALC2/2013
Party Name:FENIX PROCESS TECHNOLOGIES PVT.LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00135/AM14/ RLA File :31/83/040/00013/AM14/ Lic.No/Date:3110058143 30.04.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DIPP and decided to await comments. 86
Case No.:24/8/80‐ALC2/2013
Party Name:ALFA LAVAL (INDIA) LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00134/AM14/ RLA File :31/82/040/00020/AM14/ Lic.No/Date:3110058178 03.05.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of applica埀�on was forwarded to DIT. The CommiĀee observed that this pertains to DIPP and accordingly decided to forward copy of applica埀�on to DIPP for examina埀�on and comments. 87
Case No.:26/8/80‐ALC2/2013
Party Name:ROTHE ERDE INDIA PRIVATE LIMITED 09.07.2013 Status:Deferred HQ File :01/80/050/00136/AM14/ RLA File :31/83/040/00012/AM14/ Lic.No/Date:3110058219 08.05.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of applica埀�on was forwarded to DHI. The CommiĀee observed that this pertains to DIPP and accordingly decided to forward copy of applica埀�on to DIPP for examina埀�on and comments. 88
Case No.:43/4/80‐ALC2/2013
Party Name:EURO LABS 09.07.2013 Status:Deferred HQ File :01/80/050/00090/AM14/ RLA File :03/94/040/00057/AM14/ Lic.No/Date:0310733779 09.05.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of applica埀�on was forwarded to DIPP. The CommiĀee observed that this pertains to MSME and accordingly decided to forward copy of applica埀�on to DIPP for examina埀�on and comments. 89
Case No.:1/5/80‐ALC2/2013
Party Name:POLY MEDICURE LTD. 09.07.2013 Status:Deferred HQ File :01/80/050/00091/AM14/ RLA File :05/24/040/00043/AM14/ Lic.No/Date:0510354168 14.05.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of C&PC and decided to await comments.
90
Case No.:10/8/80‐ALC2/2013
Party Name:BANCO PRODUCTS (INDIA) LIMITED Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00120/AM14/ RLA File :34/24/040/00030/AM14/ Lic.No/Date:3410036871 14.05.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of applica埀�on was forwarded to DIPP. The CommiĀee observed that this pertains to DHI and accordingly decided to forward copy of applica埀�on to DIPP for examina埀�on and comments. 91
Case No.:4/8/80‐ALC2/2013
Party Name:IN TRANS ENGINEERING LIMITED Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00114/AM14/ RLA File :02/24/040/00012/AM14/ Lic.No/Date:0210189641 15.05.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DHI and decided to await comments. 92
Case No.:5/8/80‐ALC2/2013
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00115/AM14/ RLA File :52/24/040/00050/AM13/ Lic.No/Date:5210039740 15.05.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of applica埀�on was forwarded to DHI. The CommiĀee observed that this pertains to DIPP and accordingly decided to forward copy of applica埀�on to DIPP for examina埀�on and comments. 93
Case No.:6/8/80‐ALC2/2013
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00116/AM14/ RLA File :52/24/040/00049/AM13/ Lic.No/Date:5210039741 15.05.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DIPP and decided to await comments. 94
Case No.:12/8/80‐ALC2/2013
Party Name:PLAST TECH ENGINEERING Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00122/AM14/ RLA File :04/24/040/00030/AM14/ Lic.No/Date:0410146308 17.05.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of C&PC and decided to await comments. 95
Case No.:13/8/80‐ALC2/2013
Party Name:SSP PVT.LTD. Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00123/AM14/ RLA File :05/24/040/00046/AM14/ Lic.No/Date:0510354749 21.05.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of applica埀�on was forwarded to DHI. The CommiĀee observed that this pertains to DIPP and accordingly decided to forward copy of applica埀�on to DIPP for examina埀�on and comments. 96
Case No.:8/8/80‐ALC2/2013
Party Name:KOBELCO CONSTRUCTION EQUIPMENT INDIA PVT.LTD. 09.07.2013 Approved HQ File :01/80/050/00118/AM14/ RLA File :05/23/040/00044/AM14/ Lic.No/Date:0510354810 22.05.2013
Decision : Based on DHI wriĀen comments dated 9.7.2013, the CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per General Note‐4 of Engineering Products. RLA may take necessary ac埀�on accordingly. 97
Case No.:7/8/80‐ALC2/2013
Party Name:BOYSEN INDIA LIMITED Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00117/AM14/ RLA File :05/23/040/00049/AM14/ Lic.No/Date:0510355247 27.05.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of applica埀�on was forwarded to DHI. The CommiĀee observed that this pertains to MSME and accordingly decided to forward copy of applica埀�on to MSME for examina埀�on and comments. 98
Case No.:15/8/80‐ALC2/2013
Party Name:BOYSEN INDIA LIMITED Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00125/AM14/ RLA File :05/23/040/00050/AM14/ Lic.No/Date:0510355250 27.05.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of applica埀�on was forwarded to DHI. The CommiĀee observed that this pertains to MSME and accordingly decided to forward copy of applica埀�on to MSME for examina埀�on and comments. 99
Case No.:14/8/80‐ALC2/2013
Party Name:SPIROTECH HEAT EXCHANGERS PVT. LTD. Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00124/AM14/ RLA File :05/24/040/00491/AM13/ Lic.No/Date:0510355533 29.05.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of DIPP and decided to await comments. 100
Case No.:9/8/80‐ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00119/AM14/ RLA File :05/23/040/00077/AM14/ Lic.No/Date:0510355910 31.05.2013 Defer Date:20.08.2013 Decision : The representa埀�ve of DHI observed that in this case the descrip埀�on of export product and import items are similar. The CommiĀee decided to seek firm’s explana埀�on on this point. 101
Case No.:16/8/80‐ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00126/AM14/ RLA File :05/23/040/00076/AM14/ Lic.No/Date:0510355908 31.05.2013 Defer Date:20.08.2013 Decision : The representa埀�ve of DHI observed that in this case the descrip埀�on of export product and import items are similar. The CommiĀee decided to seek firm’s explana埀�on on this point. 102
Case No.:18/8/80‐ALC2/2013
Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00128/AM14/ RLA File :04/24/040/00018/AM14/ Lic.No/Date:0410147002 11.06.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that the case is under examina埀�on of MSME and decided to await comments.
103
Case No.:11/8/80‐ALC2/2013
Party Name:METSO MINERALS (INDIA) PVT.LTD. Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00121/AM14/ RLA File :05/24/040/00074/AM14/ Lic.No/Date:0510357008 13.06.2013 Defer Date:20.08.2013 Decision : On the recommenda埀�on of DHI, the CommiĀee decided to ask the firm to provide informa埀�on on weight balancing and difference between export and import product. 104
Case No.:23/8/80‐ALC2/2013
Party Name:HARI MACHINES LTD Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00133/AM14/ RLA File :23/24/040/00002/AM13/ Lic.No/Date:2310003372 13.06.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of applica埀�on was forwarded to DIT. The CommiĀee observed that this pertains to DHI and accordingly decided to forward copy of applica埀�on to DIPP for examina埀�on and comments. 105
Case No.:1/8/80‐ALC2/2013
Party Name:VEE KAY VIKRAM & CO LLP Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00111/AM14/ RLA File :08/24/040/00153/AM13/ Lic.No/Date:0810122023 18.06.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of applica埀�on has not been received in NC and decided to request RA / firm to immediately forward copy of applica埀�on for considera埀�on. 106
Case No.:19/8/80‐ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00129/AM14/ RLA File :05/23/040/00098/AM14/ Lic.No/Date:0510357512 19.06.2013 Defer Date:20.08.2013 Decision : The representa埀�ve of DHI observed that in this case the descrip埀�on of export product and import items are similar. The CommiĀee decided to seek firm’s explana埀�on on this point. 107
Case No.:2/8/80‐ALC2/2013
Party Name:MHI‐VST DIESEL ENGINES PVT.LTD, 09.07.2013 Approved HQ File :01/80/050/00112/AM14/ RLA File :07/24/040/00041/AM14/ Lic.No/Date:0710096175 25.06.2013 Decision : Based on DHI wriĀen comments dated 9.7.2013, the CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per General Note‐4 of Engineering Products. RLA may take necessary ac埀�on accordingly. 108
Case No.:3/8/80‐ALC2/2013
Party Name:BIRLA FURUKAWA FIBRE OPTICS LIMITED, Meet No/Date:8/80‐ ALC2/2013 09.07.2013 Status:Deferred HQ File :01/80/050/00113/AM14/ RLA File :17/24/040/00042/AM14/ Lic.No/Date:1710005396 25.06.2013 Defer Date:20.08.2013 Decision : The CommiĀee noted that copy of applica埀�on has not been received in NC and decided to ask RA/firm to immediately forward copy of applica埀�on for considera埀�on. S.No.192
Case No. A/R‐98
M/s. Bharat Heavy Electricals Ltd., HQF.No.01/80/050/00573/AM11/DES.I Lic. No. & date
Hyderabad Mee埀�ng No.08/14 RA.F.No.09/24/040/00223/AM11 0910043468 dt.09.09.2010 Date: 09.07.2013 Fixa埀�on of Norms The CommiĀee noted that this case was referred to EPCG Division for clarifica埀�on and comments is s埀�ll awaited. The CommiĀee decided to remind EPCG Division to provide the necessary comments at the earliest. Case deferred to 20.08.2013. S.No.193
Case No. A/R‐88
M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/01436/AM08/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.09/24/040/00556/AM07 0910030003 dt.16.04.2007 Date: 09.07.2013 Fixa埀�on of Norms The CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per DHI leĀer No. 3(73)/2007 TSWB dated 16.11.2012 (copy to be forwarded to firm and RA). The wastage norms are for regulariza埀�on purpose only. In case of expired licence, no fresh import to be permiĀed. RLA may take necessary ac埀�on accordingly. S.No.194
Case No. A/R‐107
M/s. Bharat Heavy Electricals Ltd., Chennai HQF.No.01/80/050/00078/AM06/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.04/24/042/00102/AM05 0410069858 dt.25.04.2005 Date: 09.07.2013 Amendment of Norms The CommiĀee noted that clarifica埀�on/reply is awaited from firm and decided to remind them for expedi埀�ng the same. Case deferred to 20.08.2013. S.No.195
Case No. A/R‐118
M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/00495/AM11/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.09/24/040/00169/AM11 0910043002 dt.06.08.2010 Date: 09.07.2013 Fixa埀�on of Norms The CommiĀee noted that this case was referred to EPCG Division for clarifica埀�on and comments is s埀�ll awaited. The CommiĀee decided to remind EPCG Division to provide the necessary comments at the earliest. Case deferred to 20.08.2013 S.No.196
Case No. A/R‐126
M/s. Bharat Heavy Electricals Ltd., Chennai HQF.No.01/80/050/00077/AM06/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.04/24/040/00101/AM05 0410069856 dt.25.04.2005 Date: 09.07.2013 Fixa埀�on of Norms The CommiĀee noted that clarifica埀�on/reply is awaited from firm and decided to remind them for expedi埀�ng the same. Case deferred to 20.08.2013. S.No.197
Case No. A/R‐128
M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/00180/AM10/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.09/24/040/00004/AM10 0910037842 dt.06.05.2009 Date: 09.07.2013 Fixa埀�on of Norms The CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per DHI leĀer No. 3(3)/2013‐TSW(B) dated 21.1.2013 (copy to be forwarded to firm and RA). The wastage norms are for regulariza埀�on purpose only. In case of expired licence, no fresh import to be permiĀed. RLA may take necessary ac埀�on accordingly. S.No.198
Case No. A/R‐109
M/s. Poly Medicure Ltd., New Delhi HQF.No.01/80/050/00391/AM2/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.05/24/040/00241/AM12 0510305885 dt.19.10.2011 Date: 09.07.2013 Revision of norms The CommiĀee noted that the case is under examina埀�on of C&PC and decided to await comments. Case deferred to 20.08.2013. S.No.199
Case No. A/R‐110
M/s. Poly Medicure Ltd., New Delhi HQF.No.01/80/050/00427/AM12/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.05/24/040/00281/AM12 0510309080 dt.19.10.2011 Date: 09.07.2013 Revision of norms The CommiĀee noted that the case is under examina埀�on of C&PC and decided to await comments. Case deferred to 20.08.2013. S.No.200
Case No. A/R‐111
M/s. Poly Medicure Ltd., New Delhi HQF.No.01/80/050/00390/AM12/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.05/24/040/00238/AM12 0510304858 dt.10.10.2011 Date: 09.07.2013 Revision of norms The CommiĀee noted that the case is under examina埀�on of C&PC and decided to await comments. Case deferred to 20.08.2013.
S.No.201
Case No. A/R‐114
M/s. Godrej & Boyce Co. Ltd., Mumbai HQF.No.01/80/050/01085/AM12/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.03/94/040/01092/AM08 0310460269 dt.06.02.2008 Date: 09.07.2013 Amendment of norms The CommiĀee noted that firm has not replied to deficiency leĀer dated 25.3.2013 followed by reminder dated 17.5.2013 and final reminder dated 3.7.2013 and decided to await 15 days more to receive reply from firm. Case deferred to 20.08.2013. S.No.202
Case No. A/R‐140
M/s. Alstom Projects India Ltd., Mumbai HQF.No.01/80/050/01450/AM04/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.03/24/042/00205/AM04 0310247081 dt.12.01.2004 Date: 09.07.2013 Fixa埀�on of norms The CommiĀee noted that this case was referred to EPCG Division for clarifica埀�on and comments is s埀�ll awaited. The CommiĀee decided to remind EPCG Division to provide the necessary comments at the earliest. Case deferred to 20.08.2013. S.No.203
Case No. A/R‐141
M/s. Avlight Automo埀�ve Ltd., New Delhi HQF.No.01/80/050/01174/AM08/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.05/24/040/00691/AM08 0510213511 dt.13.12.2007 Date: 09.07.2013 Fixa埀�on of norms The CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per C&PC OM No. 46011/166/2004‐PC‐II dated 29.5.2013 (copy to be forwarded to firm and RA). The wastage norms are for regulariza埀�on purpose only. In case of expired licence, no fresh import to be permiĀed. RLA may take necessary ac埀�on accordingly. S.No.204
Case No. A/R‐143
M/s. Rites Ltd., HQF.No.01/81/050/00010/AM08/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.05/24/040/01062/AM08 0510201943 dt.30.03.2007 Date: 09.07.2013 Fixa埀�on of norms The CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per DHI UO No. 3/26/13/TSW(B) dated 9.7.2013 (copy to be forwarded to firm and RA). The wastage norms are for regulariza埀�on purpose only. In case of expired licence, no fresh import to be permiĀed. RLA may take necessary ac埀�on accordingly. S.No.205
Case No. A/R‐144
M/s. SMC Pneuma埀�cs India Pvt. Ltd., HQF.No.01/80/050/00388/AM12/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.05/24/040/00229/AM12 0510304366 dt.30.09.2011 Date: 09.07.2013 Fixa埀�on of norms Based on DIPP wriĀen comments dated 8.7.2013, the CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as under: 1. Quan埀�埀�es of import items from Sl. No. 1 to 10 and 16 to 82 may be allowed on net to net basis with accountability clause. 2. Quan埀�ty of import item at Sl. No. 11 may be allowed as 1356220 gms. inclusive of 50.3 % wastage a韆�er 50 % recovery. 3. Quan埀�ty of import item at Sl. No. 12 may be allowed as 1346449 gms. inclusive of 55 % wastage a韆�er 50 % recovery. 4. Quan埀�ty of import item at Sl. No. 13 may be allowed as 1359173 gms. inclusive of 49.6 % wastage a韆�er 50 % recovery. 5. Quan埀�ty of import item at Sl. No. 14 may be allowed as 3069300 gms. inclusive of 123 % wastage a韆�er 50 % recovery. 6. Quan埀�ty of import item at Sl. No. 15 may be allowed as 1265416 gms. inclusive of 102 % wastage a韆�er 50 % recovery. RLA may take necessary ac埀�on accordingly. S.No.206
Case No. A/R‐149
M/s. Weatherford Drilling & Produc埀�on Services Pvt. Ltd., Baroda HQF.No.01/81/050/00489/AM08/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.34/24/040/00185/AM08 3410020553 dt.07.01.2008 Date: 09.07.2013 Fixa埀�on of norms The CommiĀee noted that firm has not replied to deficiency leĀer dated 23.5.2013 followed by reminder dated 4.7.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for regulariza埀�on of the licence. Case deferred to 20.08.2013. S.No.207
Case No. A/R‐08
M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/00701/AM11/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.09/24/040/00450/AM11 0910045023 dt.03.01.2011 Date: 09.07.2013 Fixa埀�on of norms The CommiĀee decided to ra埀�fy norms of subject authoriza埀�on as per DHI UO No. 3(42)/2010/TSW(B)/112 dated 31.5.2013 (copy to be forwarded to firm and RA). The wastage norms are for regulariza埀�on purpose only. In case of expired licence, no fresh import to be permiĀed. RLA may take necessary ac埀�on accordingly. S.No.208
Case No. A/R‐09
M/s. Radiant Industries, Pune HQF.No.01/80/050/00394/AM12/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.31/83/040/00182/AM12 3110051726 dt.07.12.2011 Date: 09.07.2013 Fixa埀�on of norms The CommiĀee considered DHI UO No. 3(8)/12‐TSW(B)/142 dated 4.7.2013 and decided to ask the firm to provide calcula埀�ons from raw material as per DHI leĀer dated 14.8.2012. Case deferred to 20.08.2013. S.No.209
Case No. A/R‐10
M/s. Minda Sai Ltd., Mumbai HQF.No.01/80/050/00903/AM08/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.03/95/040/00474/AM08 0310440650 dt.23.08.2007 Date: 09.07.2013 Amendment / revision of norms The CommiĀee noted that firm has not replied to deficiency leĀer dated 10.5.2013 followed by reminder dated 3.7.2013 and decided to send a final reminder reques埀�ng them to expedite their reply within 15 days, failing which the CommiĀee shall be constrained to reject their case with direc埀�on to pay the Customs duty and applicable interest for regulariza埀�on of the licence. Case deferred to 20.08.2013. S.No.210
Case No. A/R‐11
M/s. Saraswa埀� Industrial Syndicate Ltd., HQF.No.01/80/050/00254/AM11/DES.I Lic. No. & date Mee埀�ng No.08/14 RA.F.No.05/24/040/00126/AM11 0510267954 dt.12.07.2010 Date: 09.07.2013 Revision of norms The CommiĀee noted that copy of applica埀�on has been forwarded to DHI. The CommiĀee observed that this case pertains to DIPP and accordingly decided to forward copy of applica埀�on to DIPP for examina埀�on and comments. Case deferred to 20.08.2013. S.No.211
Case No. A/R‐27
M/s. IFB Industries Limited, Kolkata HQF.No.01/80/162/00047/AM14/DES.I Lic. No. & date Mee埀�ng No.08/14 RLA, No.02/73/040/00818/AM92 RLA, No.02/73/040/00026/AM93 RLA, No.02/73/040/00881/AM92 RLA, No.02/73/040/01020/AM90 RLA, No.02/73/040/00203/AM93 RLA, No.02/73/040/00075/AM93 RLA, No.02/73/040/03976/AM90 RLA, No.02/73/040/01827/AM90 RLA, No.02/73/040/00227/AM91 RLA, No.02/73/040/00014/AM91 RLA, No.02/73/040/00750/AM92 (i) 3321963 dt.30.04.1992 (ii) 3327432 dt.29.09.1992 (iii) 3321987 dt.19.05.1992 (iv) 3204053 dt.21.07.1989 (v) 3388496 dt.30.03.1993 (vi) 3227504 dt.04.12.1992 (vii) 3206667 dt.01.11.1989 (viii) 3204858 dt.09.08.1989 (ix) 3262973 dt.05.02.1991 (x) 3259424 dt.28.02.1992 (xi) 3325249 dt.30.06.1992 Date: 09.07.2013 Fixa埀�on of norms The CommiĀee noted that the case is under examina埀�on of DHI and decided to await comments. Case deferred to 20.08.2013. S.No.212
Case No. A/R‐30
M/s. Saraswa埀� Industrial Syndicate Ltd., HQF.No.01/80/050/00326/AM11/DES.I Lic. No. & date Mee埀�ng No.08/14 RLA, No.05/24/040/00175/Am11 0510270440 dt.12.08.2010
Date: 09.07.2013 Revision/amendment of norms Based on DIPP wriĀen comments dated 8.7.2013, the CommiĀee decided to modify norms of subject authoriza埀�on as under: 1. Quan埀�埀�es of import item from Sl. Nos. 13 & 14 (welding consumables) may be allowed as 1250 Kgs. each. 2. Quan埀�埀�es of import item from Sl. Nos. 31, 34 & 36 (welding consumables) may be allowed as 9450 Kgs. , 2000 Kgs. & 3000 Kgs. respec埀�vely. 3. Import items at Sl.No. 32, 33 & 35 (welding consumables for overlay) may be allowed as 18848 Kgs., 12000 Kgs. & 1074 Kgs. respec埀�vely. 4. Quan埀�埀�es of import item from Sl. Nos. 40 & 41 (welding consumables) may be allowed as 4000 Kgs. & 5000 Kgs. respec埀�vely. 5. Quan埀�埀�es of import item from Sl. Nos. 45 & 46 (welding consumables) may be allowed as 6750 Kgs.. & 2450 Kgs. respec埀�vely. 6. Weight of import item at Sl. No. 44 may be allowed as 4275 Kgs. on net to net basis. 7. No change may be made in the quan埀�埀�es of import items at Sl. No. 1, 7,15,16,20 & 21 as the weight of these items have been reduced a韆�er taking recovery from the scrap generated during the manufacturing opera埀�ons The wastage norms are for regulariza埀�on purpose only. In case of expired licence, no fresh import to be permiĀed. RLA may take necessary ac埀�on accordingly. S.No.213
Case No. A/R‐31
M/s. Saraswa埀� Industrial Syndicate Ltd., HQF.No.01/80/050/00741/AM11/DES.I Lic. No. & date Mee埀�ng No.08/14 RLA, No.05/24/040/00341/AM11 0510281781 dt.18.01.2011 Date: 09.07.2013 Revision/amendment of norms Based on DIPP wriĀen comments dated 8.7.2013, the CommiĀee decided to maintain status quo and firm’s representa埀�on for revision / amendment of norms is rejected as quan埀�埀�es of import items at Sl. No. 1, 3 & 4 have been reduced a韆�er taking recovery from the scrap generated during the manufacturing opera埀�ons and closed the case. RLA may take necessary ac埀�on accordingly. S.No.214
Case No. A/R‐43
M/s. Godrej & Boyce Mfg. Co. Ltd., Mumbai HQF.No.01/80/050/00455/AM13/DES.I Lic. No. & date Mee埀�ng No.08/14 RLA, No.03/94/040/00575/AM13 0310713034 dt.17.10.2012 Date: 09.07.2013 Revision of norms The CommiĀee noted that the case is under examina埀�on of DIPP and decided to await comments. Case deferred to 20.08.2013. S.No.215
Case No. A/R‐44
M/s. Godrej & Boyce Mfg. Co. Ltd., Mumbai HQF.No.01/80/050/00487/AM13/DES.I Lic. No. & date Mee埀�ng No.08/14 RLA, No.03/94/040/00650/AM13 0310715387 dt.21.11.2012 Date: 09.07.2013 Revision of norms The CommiĀee noted that the case is under examina埀�on of DIPP and decided to await comments. Case deferred to 20.08.2013. S.No.216
Case No. A/R‐45
M/s. Super Max Personal Care Pvt. Ltd., HQF.No.01/80/050/00445/AM13/DES.I Lic. No. & date Mee埀�ng No.08/14 RLA, No.03/95/040/00543/AM13 0310713230 dt.19.10.2012 Date: 09.07.2013 Revision / amendment of norms Based on DIPP wriĀen comments dated 8.7.2013, the CommiĀee decided to modify norms of subject authoriza埀�on as under: 1. Quan埀�ty of export product may be corrected as 500,000 thousand Nos. 2. Taking clue from SION C‐829, quan埀�ty of import item at Sl. No. 1 may be allowed as 494,000 Kgs. 3. Quan埀�埀�es of import items at Sl. No. 2 &3 may be allowed as per SION C‐829. RLA may take necessary ac埀�on accordingly. S.No.217
Case No. A/R‐46
M/s. Prijai Heat Exchangers Pvt. Ltd., HQF.No.01/80/050/00657/AM11/DES.I Lic. No. & date Mee埀�ng No.08/14 RLA, No.03/95/040/00558/AM11 0310603942 dt.01.12.2010 Date: 09.07.2013 Revision of norms The CommiĀee noted that firm has not replied to deficiency leĀer dated 24.6.2013 and decided to remind them for expedi埀�ng their reply. Case deferred to 20.08.2013. S.No.218
Case No. A/R‐47
M/s. Saraswa埀� Industrial Syndicate Ltd., HQF.No.01/80/050/00119/AM11/DES.I Lic. No. & date Mee埀�ng No.08/14 RLA, No.05/24/040/00063/AM11 0510264573 dt.19.05.2010 Date: 09.07.2013 Revision / amendment of norms The CommiĀee noted that copy of applica埀�on has been forwarded to DHI. The CommiĀee observed that this case pertains to DIPP and accordingly decided to forward copy of applica埀�on to DIPP for examina埀�on and comments. Case deferred to 20.08.2013. Sl.No.219
Case No. C – 06
M/s. Precihole Machine Tools Pvt. Ltd., Mumbai HQ F.No.01/80/162/00082/AM13/DES‐I Mee埀�ng No.08/14 Fixa埀�on of Ad‐hoc Norms for the export product “Collar High Flow 8 Inch EWR Phase 4” – reg. Date: 09.07.2013 The CommiĀee decided to ask the firm to provide adhoc norms fixa埀�on details of its past case similar to the subject case. Case deferred to 20.08.2013. Sl.No.220
Case No. C – 09
M/s. MTAR Technologies Pvt. Ltd., Hyderabad HQ F.No.01/80/162/00462/AM13/DES‐I Mee埀�ng No.08/14 Fixa埀�on of input output wastage Ad‐hoc Norms for the export product “Oil & Gas Explora埀�on components, Catalina Hot Box & Aero Space Parts” in respect of 100% EOU –reg. Date: 09.07.2013 The CommiĀee noted that the case is under examina埀�on of DHI and decided to await comments. Case deferred to 20.08.2013. Sl.No.221
Case No. C – 03
M/s. Berco Undercarriage (India) Pvt. Ltd., Hyderabad HQ F.No.01/80/162/00484/AM13/DES‐I Mee埀�ng No.08/14 Fixa埀�on of Standard Input Output Norms (SION) for the export product “Roller Sha韆� (Parts for Excavators, Bulldozers)” covered under Product Group Engineering –reg. Date: 09.07.2013 The CommiĀee noted that the firm has not replied to deficiency leĀer dated 3.7.2013 and decided to remind them for furnishing the informa埀�on immediately. Case deferred to 20.08.2013. S.No.222
Case No. A/R‐48
M/s. Gas Tech Engineering India Pvt. Ltd., Faridabad HQF.No.01/80/050/00575/AM13/DES.I Lic. No. & date Mee埀�ng No.08/14 RLA, No.05/23/040/00447/AM13 0510345184 dt.07.02.2013 Date: 09.07.2013 Request for addi埀�on of import items in subject authoriza埀�on The CommiĀee noted that this authoriza埀�on was already ra埀�fied as per GN‐4 for Engineering Products. Subsequently, firm has submiĀed request for addi埀�on of import items. Firm’s request was forwarded to CLA for accep埀�ng applica埀�on of firm for addi埀�on of import items subject to licence being valid and subject to ra埀�fica埀�on in NC. The CommiĀee decided that ra埀�fica埀�on of authoriza埀�on will be considered upon receipt of authoriza埀�on amendment sheet from RA. Case deferred to 20.08.2013.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.