DGFT Committee Minutes
RATIFIED Minutes of Mee៝�ng No.11/14 held on 20.08.2013 of Norms Commiោ�ee(NC‐I) (DES.I Sec៝�on) The mee៝�ng No. 11/14 of the Norms Commiោ�ee (NC‐I) for the licensing year 2012‐2013 was held on 20.08.2013 under the Chairmanship of Dr. L.B. Singhal, Addi៝�onal Director General of Foreign Trade to consider the applica៝�ons under Duty Exemp៝�on Schemes (Chapter‐4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume‐I. The following Members of the Commiោ�ee were present in the mee៝�ng: ‐ Sl.No Name of the representa៝�ves & their Designa៝�on Room No. Telephone No. Depោ�. 1. Sh K.K. Tiwari I.A 476 23063321 DHI, U.B. 2. Sh. K.K. Funda, Assោ�. Dir. (Mech) 736A 23063802 Extn.2459 DC(MSME),N.B. 3. Sh. Parveen Sharma, Dy.DGFT 312 23061562 Extn.146 DGFT, U.B. 4. Sh. K.C. Raju, FTDO 404 23061562 Ext.265 DGFT, U.B. 1
Case No.:32/31/80‐ALC2/2010
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00510/AM11/ RLA File :06/24/040/00028/AM11/ Lic.No/Date:0610018929 30.08.2010 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 4.7.2013 followed by reminder dated 30.7.2013 and decided to send a final reminder for providing informa៝�on required from firm in the personal hearing. 2
Case No.:1/25/80‐ALC2/2012
Party Name:RANGSONS ELECTRONICS PVT LTD Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00533/AM13/ RLA File :07/24/040/00250/AM11/ Lic.No/Date:0710074552 01.10.2010 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that copy of applica៝�on has not been received in NC and decided to request RA/firm to immediately forward copy of applica៝�on for considera៝�on of the case. 3
Case No.:4/4/80‐ALC2/2013
Party Name:BASIC WATER NEEDS INDIA PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00051/AM14/ RLA File :25/24/040/00007/AM11/ Lic.No/Date:2510003024 22.10.2010 Decision : The Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per MSME UO note No. 30(20)2013‐ME dated 19.8.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly. 4
Case No.:4/19/85‐ALC3/2011
Party Name:BOOM SYSTEMS PVT. LTD., Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/85/050/00097/AM12/ RLA File :05/23/040/00156/AM12/ Lic.No/Date:0510297632 26.07.2011 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 30.7.2013 and decided to remind them for expedi៝�ng their reply.
5
Case No.:6/21/80‐ALC2/2011
Party Name:SATTVA ETECH INDIA PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00426/AM12/ RLA File :07/24/040/00296/AM12/ Lic.No/Date:0710083749 04.11.2011 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that DIT has issued a reminder on 9.7.2013 seeking certain informa៝�on required for examina៝�on of the case. The Commiោ�ee decided to remind the for expedi៝�ng their reply. 6
Case No.:16/25/80‐ALC2/2011
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00495/AM12/ RLA File :34/24/040/00186/AM12/ Lic.No/Date:3410032547 14.12.2011 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on of C&PC and decided to await comments. 7
Case No.:43/25/80‐ALC2/2011
Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00522/AM12/ RLA File :31/83/040/00218/AM12/ Lic.No/Date:3110052856 08.02.2012 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 1.4.2013 followed by reminder dated 14.5.2013 and final reminder dated 4.7.2013. The Commiោ�ee decided to remind firm by email for expedi៝�ng their reply. 8
Case No.:4/10/81‐ALC2/2012
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/81/050/00199/AM13/ RLA File :05/23/040/00134/AM13/ Lic.No/Date:0510329855 17.07.2012 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that this case was referred to EPCG Division for clarifica៝�on on firm’s eligibility for advance authoriza៝�on against subject authoriza៝�on and reply from EPCG Division is awaited. 9
Case No.:24/13/80‐ALC2/2012
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00279/AM13/ RLA File :05/24/040/00149/AM13/ Lic.No/Date:0510330419 24.07.2012 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on of C&PC and decided to await comments. 10
Case No.:14/16/81‐ALC2/2012
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/81/050/00321/AM13/ RLA File :09/24/040/00186/AM13/ Lic.No/Date:0910053414 02.08.2012 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that this case was referred to EPCG Division for clarifica៝�on on firm’s eligibility for advance authoriza៝�on against subject authoriza៝�on and reply from EPCG Division is awaited.
Case No.:22/22/80‐ALC2/2012
Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:11/80‐ ALC2/2013 Status: Deferred
11 20.08.2013 HQ File :01/80/050/00469/AM13/ RLA File :07/24/040/00287/AM13/ Lic.No/Date:0710091411 16.10.2012 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on of MSME and decided to await comments. 12
Case No.:6/22/80‐ALC2/2012
Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00453/AM13/ RLA File :03/94/040/00582/AM13/ Lic.No/Date:0310713179 18.10.2012 Decision : Based on DIPP wriោ�en comments dated 20.8.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1. Net weight of export products at Sl. No. 1 to 5 may be specified as 12884 Kgs. , 13094 Kgs., 20343 Kgs., 19580 Kgs. & 12884 Kgs respec៝�vely. 2. Quan៝�ty of import item at Sl. No. 1 may be allowed as 3922 Nos. (9605 Kgs. a�er taking 1/3rd recovery from scrap). 3. Quan៝�ty of import item at Sl. No. 2 may be allowed as 3986 Nos. (16899 Kgs. inclusive of wastage of 29 % a�er taking 1/3rd recovery). 4. Quan៝�ty of import item at Sl. No. 3 may be allowed as 15482 Nos. (21448 Kgs. inclusive of wastage of 5.4 % a�er taking 1/3rd recovery). 5. Quan៝�ty of import item at Sl. No. 4 may be allowed as 8687 Nos. (20860 Kgs. inclusive of wastage of 6.5 % a�er taking 1/3rd recovery). 6. Quan៝�ty of import item at Sl. No. 5 may be allowed as 3922 Nos. (16629 Kgs. inclusive of wastage of 29 % a�er taking 1/3rd recovery). RLA may take necessary ac៝�on accordingly. 13
Case No.:24/22/80‐ALC2/2012
Party Name:SATTVA ETECH INDIA PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00471/AM13/ RLA File :07/24/040/00300/AM13/ Lic.No/Date:0710091567 25.10.2012 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that DIT has issued a reminder on 9.7.2013 seeking certain informa៝�on required for examina៝�on of the case. The Commiោ�ee decided to remind the for expedi៝�ng their reply. 14
Case No.:7/22/80‐ALC2/2012
Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00454/AM13/ RLA File :03/94/040/00610/AM13/ Lic.No/Date:0310714432 06.11.2012 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that earlier reply of firm is not complete. The Commiោ�ee decided to ask the firm to provide informa៝�on in respect of Sr.3,4,11,11A of Standard Deficiency Format. 15
Case No.:1/22/80‐ALC2/2012
Party Name:G & T OIL STATES INDUSTRIES PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00448/AM13/ RLA File :03/94/040/00625/AM13/ Lic.No/Date:0310714469 07.11.2012 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm vide leោ�er dated 26.3.2013 informed that they are applying for amendment of import list. The Commiោ�ee noted that it is nearly five months and no further reply has been received from firm. Therefore, the Commiោ�ee decided to ask the firm / RA to let the Commiោ�ee know whether firm has filed applica៝�on for amendment of
authoriza៝�on and in case RA has amended the authoriza៝�on, then a copy of the amendment sheet may be forwarded to the Commiោ�ee immediately for examina៝�on of the case. 16
Case No.:2/22/80‐ALC2/2012
Party Name:G & T OIL STATES INDUSTRIES PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00449/AM13/ RLA File :03/94/040/00626/AM13/ Lic.No/Date:0310714471 07.11.2012 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm vide leោ�er dated 26.3.2013 informed that they are applying for amendment of import list. The Commiោ�ee noted that it is nearly five months and no further reply has been received from firm. Therefore, the Commiោ�ee decided to ask the firm / RA to let the Commiោ�ee know whether firm has filed applica៝�on for amendment of authoriza៝�on and in case RA has amended the authoriza៝�on, then a copy of the amendment sheet may be forwarded to the Commiោ�ee immediately for examina៝�on of the case. 17
Case No.:19/22/80‐ALC2/2012
Party Name:PHOENIX FOILS PVT. LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00466/AM13/ RLA File :03/95/040/00342/AM13/ Lic.No/Date:0310716381 05.12.2012 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 1.4.2013 followed by reminder dated 14.5.2013 and final reminder dated 4.7.2013 and decided to send an email to firm reques៝�ng them to immediately forward their reply. 18
Case No.:29/22/80‐ALC2/2012
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00476/AM13/ RLA File :04/24/040/00158/AM13/ Lic.No/Date:0410141543 05.12.2012 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 24.7.2013 and decided to remind them for 19
Case No.:21/25/80‐ALC2/2012
Party Name:GMM PFAUDLER LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00553/AM13/ RLA File :03/94/040/00854/AM13/ Lic.No/Date:0310719957 09.01.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 19.7.2013 and decided to remind them for 20
Case No.:24/25/80‐ALC2/2012
Party Name:TEMA INDIA LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00556/AM13/ RLA File :03/95/040/00774/AM13/ Lic.No/Date:0310720380 11.01.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 1.4.2013 followed by reminder dated 14.5.2013 and final reminder dated 4.7.2013 and decided to send an email to firm reques៝�ng them to expedite their reply.
Case No.:25/25/80‐ALC2/2012
Party Name:TEMA INDIA LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred
21 HQ File :01/80/050/00557/AM13/ RLA File :03/95/040/00778/AM13/ Lic.No/Date:0310720388 11.01.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 14.5.2013 followed by reminder dated 4.7.2013 and final reminder dated 30.7.2013 and decided to send an email to firm reques៝�ng them to expedite their reply. 22
Case No.:28/25/80‐ALC2/2012
Party Name:WHIRLPOOL OF INDIA LTD., Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00560/AM13/ RLA File :05/24/040/00338/AM13/ Lic.No/Date:0510343819 21.01.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 25.3.2013 followed by reminder dated 14.5.2013 and final reminder dated 4.7.2013 and decided to send an email to firm reques៝�ng them to expedite their reply. 23
Case No.:10/25/80‐ALC2/2012
Party Name:BOYSEN INDIA LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00542/AM13/ RLA File :05/23/040/00433/AM13/ Lic.No/Date:0510344308 29.01.2013 Decision : The Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per MSME UO note No. 30(05)/13‐ME dated 10.7.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly. 24
Case No.:29/25/80‐ALC2/2012
Party Name:BRAKES INDIA LIMITED, Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00561/AM13/ RLA File :04/24/040/00205/AM13/ Lic.No/Date:0410143034 31.01.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 16.8.2013 and decided to remind them for 25
Case No.:47/2/80‐ALC2/2013
Party Name:VEM TECHNOLOGIES PVT LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00047/AM14/ RLA File :09/24/040/00491/AM13/ Lic.No/Date:0910054874 31.01.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 4.5.2013 followed by reminder dated 3.7.2013 and final reminder dated 31.7.2013 and decided to send an email to firm for expedi៝�ng their reply. 26
Case No.:16/2/80‐ALC2/2013
Party Name:CICB CHEMICON PRIVATE LIMITED, Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00016/AM14/ RLA File :07/24/040/00452/AM13/ Lic.No/Date:0710093506 01.02.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on of DIPP and decided to await comments. 27
Case No.:24/4/80‐ALC2/2013
Party Name:VEM TECHNOLOGIES PVT LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00071/AM14/ RLA File :09/24/040/00484/AM13/ Lic.No/Date:0910054916 04.02.2013 Defer Date:01.10.2013
Decision : The Commiោ�ee decided to seek certain informa៝�on from firm as per MSME UO No. 30(58)/13‐ME dated 20.8.2013 for examina៝�on of the case. 28
Case No.:45/2/80‐ALC2/2013
Party Name:SHAKTI PUMPS (INDIA) LTD., Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00045/AM14/ RLA File :56/24/040/00037/AM13/ Lic.No/Date:5610001637 06.02.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 4.7.2013 followed by reminder dated 30.7.2013 and decided to send a final reminder for expedi៝�ng their reply. 29
Case No.:2/4/80‐ALC2/2013
Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Withdrawn HQ File :01/80/050/00049/AM14/ RLA File :03/95/040/00855/AM13/ Lic.No/Date:0310723297 07.02.2013 Decision : The Commiោ�ee noted that this case was already decided in mee៝�ng dated 6.8.2013 and hence decided to withdraw the case. 30
Case No.:6/2/80‐ALC2/2013
Party Name:ALFA LAVAL (INDIA)LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00006/AM14/ RLA File :31/83/040/00192/AM13/ Lic.No/Date:3110057162 15.02.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 17.5.2013 followed by reminder dated 3.7.2013 and final reminder dated 30.7.2013 and decided to send an email to firm for expedi៝�ng their reply. 31
Case No.:22/2/80‐ALC2/2013
Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00022/AM14/ RLA File :05/23/040/00432/AM13/ Lic.No/Date:0510346352 18.02.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that copy of applica៝�on has been forwarded to DIPP and C&PC for examina៝�on of the case. 32
Case No.:34/2/80‐ALC2/2013
Party Name:PRIJAI HEAT EXCHANGERS PVT. LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status:Deferred HQ File :01/80/050/00034/AM14/ RLA File :03/95/040/00888/AM13/ Lic.No/Date:0310724586 19.02.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 14.5.2013 followed by reminder dated 4.7.2013 and final reminder dated 30.7.2013 and decided to send an email to firm for expedi៝�ng their reply. 33
Case No.:20/8/80‐ALC2/2013
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00130/AM14/ RLA File :09/24/040/00539/AM13/ Lic.No/Date:0910055081 19.02.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that a deficiency leោ�er has been received from DHI and decided to ask firm to provide the informa៝�on for examina៝�on of the case.
34
Case No.:36/2/80‐ALC2/2013
Party Name:STERICAT GUTSTRINGS PVT. LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00036/AM14/ RLA File :05/24/040/00432/AM13/ Lic.No/Date:0510346969 21.02.2013 Decision : The Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per C&PC OM No. 46011/103/2011‐PC‐II dated 30.7.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly. 35
Case No.:39/4/80‐ALC2/2013
Party Name:ADORE MEDI PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00086/AM14/ RLA File :05/23/040/00492/AM13/ Lic.No/Date:0510347369 25.02.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 3.7.2013 followed by reminder dated 30.7.2013 and decided to send a final reminder for furnishing the informa៝�on. 36
Case No.:17/4/80‐ALC2/2013
Party Name:HINDUSTAN AERONAUTICS LTD, Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00064/AM14/ RLA File :07/24/040/00484/AM13/ Lic.No/Date:0710094023 04.03.2013 Defer Date:01.10.2013 Decision : Shri H.N. Srinivasa Reddy, Senior Manager (Ring Rolling Shop), HAL, Export Market Department, Foundry and Forge Division, HAL has aោ�ended before the Commiោ�ee and explained the manufacturing ac៝�vity. The Commiោ�ee advised the firm to make a wriោ�en submission giving details of imported inputs, detailed manufacturing process undertaken on the inputs and details of export product. 37
Case No.:41/4/80‐ALC2/2013
Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00088/AM14/ RLA File :03/94/040/00961/AM13/ Lic.No/Date:0310726638 04.03.2013 Decision : The Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per DIPP leោ�er dated 20.8.2013 as under: 1. Net weight of export products at Sl. No. 1 to 7 may be specified as 38879 Kgs. , 6616 Kgs., 6616 Kgs., 27876 Kgs. 12884 Kgs. 15027 Kgs. & 11491 Kgs respec៝�vely. 2. Quan៝�ty of import item at Sl. No. 1 may be allowed as 9382 Nos. (45625 Kgs. a�er taking 17.3 % wastage a�er taking 1/3rd recovery from scrap). 3. Quan៝�ty of import item at Sl. No. 2 may be allowed as 2014 Nos. (4952 Kgs. a�er taking 1/3rd recovery). 4. Quan៝�ty of import item at Sl. No. 3 may be allowed as 2014 Nos. (7059 Kgs. inclusive of wastage of 6.7 % a�er taking 1/3rd recovery). 5. Quan៝�ty of import item at Sl. No. 4 may be allowed as 5021 Nos. (33627 Kgs. inclusive of wastage of 20.6 % a�er taking 1/3rd recovery). 6. Quan៝�ty of import item at Sl. No. 5 may be allowed as 3922 Nos. (9604 Kgs. a�er taking 1/3rd recovery). 7. Quan៝�ty of import item at Sl. No. 6 may be allowed as 6667 Nos. (16009 Kgs. inclusive of wastage of 6.5 % a�er taking 1/3rd recovery). 8. Quan៝�ty of import item at Sl. No. 7 may be allowed as 3498 Nos. (12259 Kgs. inclusive of wastage of 6.7 % a�er taking 1/3rd recovery).
38
Case No.:41/2/80‐ALC2/2013
Party Name:DAEWON INDIA AUTOPARTS PVT LTD Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00041/AM14/ RLA File :04/24/040/00268/AM13/ Lic.No/Date:0410143868 05.03.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 15.7.2013 and decided to remind them for 39
Case No.:29/4/80‐ALC2/2013
Party Name:SANDVIK ASIA PVT. LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00076/AM14/ RLA File :31/83/040/00203/AM13/ Lic.No/Date:3110057347 05.03.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 25.7.2013 and decided to remind them for 40
Case No.:12/2/80‐ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Closed HQ File :01/80/050/00012/AM14/ RLA File :05/23/040/00487/AM13/ Lic.No/Date:0510348281 06.03.2013 Decision : The Commiោ�ee noted that firm vide leោ�er dated 15.7.2013 informed that they have surrendered the authoriza៝�on to CLA who have cancelled the authoriza៝�on as per surrendered leោ�er issued from file No. 05/23/165/00050/AM14 dated 4.7.2013. The Commiោ�ee decided to close the case. 41
Case No.:13/2/80‐ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00013/AM14/ RLA File :05/23/040/00507/AM13/ Lic.No/Date:0510348353 06.03.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on of DIPP and decided to await comments. 42
Case No.:42/2/80‐ALC2/2013
Party Name:MODINE THERMAL SYSTEMS PVT. LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00042/AM14/ RLA File :04/24/040/00260/AM13/ Lic.No/Date:0410143936 06.03.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 3.7.2013 followed by reminder dated 30.7.2013 and decided to send a final reminder reques៝�ng them to expedite their reply. 43
Case No.:43/2/80‐ALC2/2013
Party Name:MODINE THERMAL SYSTEMS PVT. LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00043/AM14/ RLA File :04/24/040/00261/AM13/ Lic.No/Date:0410143937 06.03.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 3.7.2013 followed by reminder dated 30.7.2013 and decided to send a final reminder reques៝�ng them to expedite their reply.
Case No.:30/2/80‐ALC2/2013
Approved
44 Party Name:UNDERCARRIAGE AND TRACTOR PARTS PVT.LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 HQ File :01/80/050/00030/AM14/ RLA File :03/95/040/00957/AM13/ Lic.No/Date:0310727478 08.03.2013 Decision : The commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per MSME UO No. 30(21)2013‐ME dated 14.8.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly. 45
Case No.:1/4/80‐ALC2/2013
Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Withdrawn HQ File :01/80/050/00048/AM14/ RLA File :05/23/040/00506/AM13/ Lic.No/Date:0510348513 08.03.2013 Decision : The Commiោ�ee noted that this case was already decided in NC mee៝�ng dated 6.8.2013 and decided to withdraw the case. 46
Case No.:44/2/80‐ALC2/2013
Party Name:EXCELLENT HI‐CARE PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00044/AM14/ RLA File :04/24/040/00266/AM13/ Lic.No/Date:0410144188 14.03.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 28.5.2013 followed by reminder dated 30.7.2013 and decided to send a final reminder reques៝�ng the to expedite their reply. 47
Case No.:19/4/80‐ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00066/AM14/ RLA File :07/24/040/00516/AM13/ Lic.No/Date:0710094271 15.03.2013 Decision : The Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per DIT UO No. W‐27/28/2013‐IPHW dated 5.7.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly. 48
Case No.:12/4/80‐ALC2/2013
Party Name:METAL LAND INDUSTRIES Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00059/AM14/ RLA File :10/24/040/00091/AM13/ Lic.No/Date:1010052903 19.03.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee decided to ask firm to provide certain informa៝�on as per MSME UO No. 30(44)/13‐ME dated 16.8.2013 required for examina៝�on of the case. 49
Case No.:32/4/80‐ALC2/2013
Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00079/AM14/ RLA File :05/24/040/00472/AM13/ Lic.No/Date:0510349578 19.03.2013 Decision : The Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per DIT UO No. W‐27/30/2013‐IPHW dated 23.7.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly
Case No.:35/4/80‐ALC2/2013
Approved
50 Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 HQ File :01/80/050/00082/AM14/ RLA File :05/24/040/00471/AM13/ Lic.No/Date:0510349577 19.03.2013 Decision : The Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per DIT UO No. W‐27/29/2013‐IPHW dated 5.7.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly 51
Case No.:20/4/80‐ALC2/2013
Party Name:UNDERCARRIAGE AND TRACTOR PARTS PVT.LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00067/AM14/ RLA File :03/95/040/01027/AM13/ Lic.No/Date:0310728824 20.03.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that a deficiency leោ�er has been received from MSME and decided to ask firm to provide the informa៝�on required by MSME for examina៝�on of the case. 52
Case No.:21/4/80‐ALC2/2013
Party Name:UNDERCARRIAGE AND TRACTOR PARTS PVT.LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00068/AM14/ RLA File :03/95/040/01035/AM13/ Lic.No/Date:0310728822 20.03.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that a deficiency leោ�er has been received from MSME and decided to ask firm to provide the informa៝�on required by MSME for examina៝�on of the case. 53
Case No.:31/4/80‐ALC2/2013
Party Name:NASH INDUSTRIES (I) PVT LTD Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00078/AM14/ RLA File :07/24/040/00527/AM13/ Lic.No/Date:0710094430 22.03.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 4.7.2013 followed by reminder dated 30.7.2013 and decided to send a final reminder reques៝�ng them to expedite their reply. 54
Case No.:40/2/80‐ALC2/2013
Party Name:TERUMO PENPOL LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00040/AM14/ RLA File :53/24/040/00015/AM13/ Lic.No/Date:5310016509 27.03.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on of C&PC and decided to await comments. 55
Case No.:16/4/80‐ALC2/2013
Party Name:CANARA HYDRAULICS PVT LTD Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00063/AM14/ RLA File :07/24/040/00501/AM13/ Lic.No/Date:0710094546 28.03.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm was asked to provide informa៝�on as per DHI UO No. 3(45)/13‐TSW(B)/155 dated 12.7.2013 vide NC leោ�er dated 23.7.2013 and decided to remind them for expedi៝�ng their reply.
Case No.:21/8/80‐ALC2/2013
Party Name:BERCO UNDERCARRIAGES (INDIA) PVT LTD Meet No/Date:11/80‐ ALC2/2013 Status: Deferred
56 20.08.2013 HQ File :01/80/050/00131/AM14/ RLA File :09/24/040/00625/AM13/ Lic.No/Date:0910055625 28.03.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on of DHI. The Commiោ�ee also decided to forward copy of applica៝�on to MSME for examina៝�on. 57
Case No.:15/4/80‐ALC2/2013
Party Name:MVS ENGINEERING LTD Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00062/AM14/ RLA File :05/24/040/00483/AM13/ Lic.No/Date:0510350651 03.04.2013 Decision : Based on DIPP leោ�er dated 20.8.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1. Words “Purity 95 % to 99 %” given in the descrip៝�on of export product may be replaced with “Purity 99 %” 2. Import item may be allowed as per General Note‐ 4 for Engineering Products. 58
Case No.:22/4/80‐ALC2/2013
Party Name:YUTAKA AUTOPARTS INDIA (P)LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00069/AM14/ RLA File :05/24/040/00492/AM13/ Lic.No/Date:0510350699 03.04.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee decided to forward copy of applica៝�on to MSME for examina៝�on and comments. 59
Case No.:34/4/80‐ALC2/2013
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00081/AM14/ RLA File :34/24/040/00317/AM13/ Lic.No/Date:3410036590 05.04.2013 Decision : The Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per C&PC OM No. 46011/55/2010‐PC‐II dated 20.8.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly. 60
Case No.:8/4/80‐ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Closed HQ File :01/80/050/00055/AM14/ RLA File :05/23/040/00531/AM13/ Lic.No/Date:0510350890 08.04.2013 Decision : The Commiោ�ee noted that firm vide leោ�er dated 15.7.2013 informed that they have surrendered the authoriza៝�on to CLA who have cancelled the authoriza៝�on as per surrendered leោ�er issued from file No. 05/23/165/00083/AM14 dated 25.6.2.2013. The Commiោ�ee decided to close the case. 61
Case No.:18/4/80‐ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00065/AM14/ RLA File :05/23/040/00534/AM13/ Lic.No/Date:0510350891 08.04.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 30.7.2013 and decided to remind them for
Case No.:36/4/80‐ALC2/2013
Status:
62 Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Deferred HQ File :01/80/050/00083/AM14/ RLA File :07/24/040/00503/AM13/ Lic.No/Date:0710094700 08.04.2013 Defer Date:01.10.2013 Decision : MSME representa៝�ve informed that reply submiោ�ed by the firm in incomplete. The Commiោ�ee decided to ask the firm to provide complete informa៝�on immediately for examina៝�on of the case. 63
Case No.:26/4/80‐ALC2/2013
Party Name:TOSHIBA JSW TURBINE AND GENERATOR PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00073/AM14/ RLA File :04/24/040/00001/AM14/ Lic.No/Date:0410144942 10.04.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 6.6.2013 followed by reminder dated 4.7.2013 and final reminder dated 30.7.2013 and decided to send an email to firm for providing their reply immediately. 64
Case No.:27/4/80‐ALC2/2013
Party Name:TOSHIBA JSW TURBINE AND GENERATOR PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00074/AM14/ RLA File :04/24/040/00272/AM13/ Lic.No/Date:0410144941 10.04.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm vide leោ�er dated 18.7.2013 has requested for 4 weeks more ៝�me for providing informa៝�on / documents. 65
Case No.:28/8/80‐ALC2/2013
Party Name:K.T.A. SPINDLE TOOLINGS Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00138/AM14/ RLA File :31/83/040/00223/AM13/ Lic.No/Date:3110057922 15.04.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm was asked vide leោ�er dated 26.7.2013 to provide informa៝�on as per DHI UO No. 3(49)/13‐TSW(B)/162 dated 22.7.2013 and decided to remind them for expedi៝�ng their reply. 66
Case No.:31/8/80‐ALC2/2013
Party Name:SHIRODKAR PRECI COMP PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00141/AM14/ RLA File :31/83/040/00002/AM14/ Lic.No/Date:3110057929 15.04.2013 Defer Date:01.10.2013 Decision : As per DIPP leោ�er dated 20.8.2013, the Commiោ�ee decided to ask the firm to provide informa៝�on on the following: 1. Informa៝�on in respect of Sl. No. 11 of Standard Deficiency Format for import items at Sl. No. 1, 3 & 4. 2. Basis for raw material blank sizes taken for import items at Sl. No. 1, 3 & 4 supported by size of components to be manufactured therefrom. 67
Case No.:27/8/80‐ALC2/2013
Party Name:SHIRODKAR PRECI COMP PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00137/AM14/ RLA File :31/83/040/00005/AM14/ Lic.No/Date:3110057984 17.04.2013 Defer Date:01.10.2013 Decision : As per DIPP leោ�er dated 20.8.2013, the Commiោ�ee decided to ask the firm to provide informa៝�on on the following: 1. Informa៝�on in respect of Sl. No. 11 of Standard Deficiency Format for import items at Sl. No. 1, 4 & 5.
2. Basis for raw material blank sizes taken for import items at Sl. No. 1, 4 & 5 supported by size of components to be manufactured therefrom. 68
Case No.:29/8/80‐ALC2/2013
Party Name:KOSO INDIA PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00139/AM14/ RLA File :31/82/040/00346/AM13/ Lic.No/Date:3110057977 17.04.2013 Decision : Based on DIPP leោ�er dated 20.8.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1. Quan៝�៝�es of import items at Sl. No.1, 2 & 3 may be allowed on net to net basis with accountability clause 2. Quan៝�ty of import item at Sl. No.4 may be allowed as 540 Kgs. inclusive of 109 % wastage a�er taking 15 % recovery from scrap. 3. Quan៝�ty of import item at Sl. No.5 may be allowed as 248.7 Kgs. inclusive of 115 % wastage a�er taking 15 % recovery from scrap. 69
Case No.:30/8/80‐ALC2/2013
Party Name:FOURESS ENGGINEERING (INDIA ) LIMITED. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00140/AM14/ RLA File :07/24/040/00543/AM13/ Lic.No/Date:0710094883 17.04.2013 Defer Date:01.10.2013 Decision : As per DIPP leោ�er dated 20.8.2013, the Commiោ�ee decided to ask the firm to provide informa៝�on on the following: 1. Informa៝�on in respect of Sl. No. 11 of Standard Deficiency Format for import items at Sl. No. 1 & 2‐ export product wise. 2. For net weight of components to be manufactured from import items at Sl. No. 1& 2 details of components with net weights thereof may be indicated. 3. Informa៝�on in respect of Sl. No. 13 of Standard Deficiency Format for import item at Sl. No. 6‐export product wise. 70
Case No.:17/8/80‐ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00127/AM14/ RLA File :04/24/040/00253/AM13/ Lic.No/Date:0410145648 30.04.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 2.8.2013 and decided to remind them for 71
Case No.:25/8/80‐ALC2/2013
Party Name:FENIX PROCESS TECHNOLOGIES PVT.LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00135/AM14/ RLA File :31/83/040/00013/AM14/ Lic.No/Date:3110058143 30.04.2013 Defer Date:01.10.2013 Decision : As per DIPP leោ�er dated 20.8.2013, the Commiោ�ee decided to ask the firm to provide informa៝�on on the following: 1. Informa៝�on in respect of Sl. No. 3, 4, 5 & 11 of Standard Deficiency Format.‐export product wise. 2. Total requirement of each import items, export product wise, in a tabular form 72
Case No.:24/8/80‐ALC2/2013
Party Name:ALFA LAVAL (INDIA) LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00134/AM14/ RLA File :31/82/040/00020/AM14/ Lic.No/Date:3110058178 03.05.2013
Decision : Based on DIPP leោ�er dated 20.8.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1. Import items from Sl. No. 1 to 652 may be allowed on net to net basis with accountability clause. 73
Case No.:26/8/80‐ALC2/2013
Party Name:ROTHE ERDE INDIA PRIVATE LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00136/AM14/ RLA File :31/83/040/00012/AM14/ Lic.No/Date:3110058219 08.05.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee decided to seek informa៝�on from firm as per Sr.No.4,5,11 of Standard Deficiency Format. 74
Case No.:43/4/80‐ALC2/2013
Party Name:EURO LABS Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00090/AM14/ RLA File :03/94/040/00057/AM14/ Lic.No/Date:0310733779 09.05.2013 Decision : The Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per MSME UO note No. 30(56)2013‐ME dated 16.8.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly. 75
Case No.:1/5/80‐ALC2/2013
Party Name:POLY MEDICURE LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00091/AM14/ RLA File :05/24/040/00043/AM14/ Lic.No/Date:0510354168 14.05.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on of C&PC and decided to await comments. 76
Case No.:10/8/80‐ALC2/2013
Party Name:BANCO PRODUCTS (INDIA) LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00120/AM14/ RLA File :34/24/040/00030/AM14/ Lic.No/Date:3410036871 14.05.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted a deficiency leោ�er has been received from DHI and decided to ask firm to provide the informa៝�on for examina៝�on of the case. 77
Case No.:4/8/80‐ALC2/2013
Party Name:IN TRANS ENGINEERING LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00114/AM14/ RLA File :02/24/040/00012/AM14/ Lic.No/Date:0210189641 15.05.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 26.7.2013 and decided to remind them for
Case No.:5/8/80‐ALC2/2013
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00115/AM14/ RLA File :52/24/040/00050/AM13/ Lic.No/Date:5210039740 15.05.2013 Decision : Based on DIPP leោ�er dated 20.8.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1. Net Fabricated weight of 268 MT may be specified with the quan៝�ty of export product.
78 2. Import items at Sl. No. 1 & 2 shall be of relevant grade and thickness as contained in the export product. 3. Quan៝�ty of import item at Sl. No. 1 may be allowed as applied for i.e. 193023 Kgs. as 1.03 Kgs./Kg. in the export product. 4. Quan៝�ty of import item at Sl. No. 2 may be allowed as 32975 Kgs. inclusive of a wastage of 23.6 % a�er taking 1/3rd recovery from scrap. 5. Weights of import items at Sl. No. 3, 9 & 10 may be specified as 12.711 MT, 0.7 MT & 3 MT respec៝�vely. 6. Quan៝�៝�es of import items at Sl. No.3, 9 & 10 may be allowed on net to net basis with accountability clause. 7. Quan៝�៝�es of import items at Sl. No. 4 to 8 (welding Consumables) may be allowed as applied for i.e. 500 Kgs., 6000 Kgs., 5160 Kgs., 16880 Kgs. & 22880 Kgs. respec៝�vely. 79
Case No.:6/8/80‐ALC2/2013
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00116/AM14/ RLA File :52/24/040/00049/AM13/ Lic.No/Date:5210039741 15.05.2013 Decision : : Based on DIPP leោ�er dated 20.8.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1. Net Fabricated weights of 245 MT, 1003.25 MT & 408.84 MT may be specified with the quan៝�៝�es of export products at Sl. No. 1, 2 & 3 respec៝�vely. 2. Import item at Sl. No. 1 shall be of relevant grade and thickness as contained in the export product. 3. Quan៝�ty of import item at Sl. No. 1 may be allowed as applied for i.e. 1608432 Kgs. as 1.03 Kgs./Kg. in the export product. 4. Weights of import items at Sl. No. 2, 4 & 8 may be specified as 51.78 MT, 10.408 MT & 22 MT respec៝�vely. 5. Quan៝�៝�es of import items at Sl. No. 2, 4 & 8 may be allowed on net to net basis with accountability clause. 6. Import item at Sl. No. 3 shall be of relevant grade and dia. as contained in the export product. 7. Quan៝�ty of import item at Sl. No. 3 may be allowed as 39 Meters (12991 Kgs.) inclusive of a wastage of 2 %. 8. Quan៝�៝�es of import items at Sl. No. 5, 6 & 7 (welding Consumables) may be allowed as applied for i.e. 54732 Kgs., 20000 Kgs. & 54732 Kgs. respec៝�vely. 80
Case No.:40/8/80‐ALC2/2013
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00150/AM14/ RLA File :03/95/040/00108/AM14/ Lic.No/Date:0310734626 16.05.2013 Decision : Based on DIPP leោ�er dated 20.8.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1. Net Empty weight of 129 MT may be specified with the quan៝�ty of export product. 2. Import item at Sl. No. 1 shall be of relevant grade and thickness as contained in the export product. 3. Quan៝�ty of import item at Sl. No. 1 may be allowed as applied for i.e. 4400 Kgs. as 1.05 Kgs./Kg. in the export product. 4. Weights of import items at Sl. No. 2 & 5 may be specified as 14.9 MT & 0.4 MT respec៝�vely. 5. Quan៝�៝�es of import items at Sl. No.2 & 5 may be allowed on net to net basis with accountability clause. 6. Quan៝�ty of import item at Sl. No. 3 may be allowed as 24 Nos. on net to net basis. Duty free weight of this item may be allowed as 57.3 MT inclusive of 9.6 % wastage a�er 20 % recovery from scrap. 7. Quan៝�ty of import item at Sl. No. 4 may be allowed as 27000 Meters (58000 Kgs.) inclusive of a wastage of 2 %. 8. Quan៝�៝�y of import item at Sl. No. 6 (welding Consumables) may be allowed as 1394 Kgs.
Case No.:12/8/80‐ALC2/2013
Party Name:PLAST TECH ENGINEERING Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred
81 HQ File :01/80/050/00122/AM14/ RLA File :04/24/040/00030/AM14/ Lic.No/Date:0410146308 17.05.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that C&PC has issued a deficiency leោ�er dated 31.7.2013 and firm’s reply is awaited. The Commiោ�ee decided to remind the firm for expedi៝�ng their reply. 82
Case No.:13/8/80‐ALC2/2013
Party Name:SSP PVT.LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00123/AM14/ RLA File :05/24/040/00046/AM14/ Lic.No/Date:0510354749 21.05.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee decided to seek informa៝�on from firm as per Sr.No.3,4,5,11 of Standard Deficiency Format. 83
Case No.:7/8/80‐ALC2/2013
Party Name:BOYSEN INDIA LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00117/AM14/ RLA File :05/23/040/00049/AM14/ Lic.No/Date:0510355247 27.05.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted a deficiency leោ�er has been received from MSME and decided to ask firm to provide the informa៝�on for examina៝�on of the case. 84
Case No.:15/8/80‐ALC2/2013
Party Name:BOYSEN INDIA LIMITED Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00125/AM14/ RLA File :05/23/040/00050/AM14/ Lic.No/Date:0510355250 27.05.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 16.8.2013 and decided to remind them for 85
Case No.:14/8/80‐ALC2/2013
Party Name:SPIROTECH HEAT EXCHANGERS PVT. LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00124/AM14/ RLA File :05/24/040/00491/AM13/ Lic.No/Date:0510355533 29.05.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee decided to seek informa៝�on from firm as per Sr.No.3,4,5,11 of Standard Deficiency Format. 86
Case No.:9/8/80‐ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00119/AM14/ RLA File :05/23/040/00077/AM14/ Lic.No/Date:0510355910 31.05.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 30.7.2013 and decided to remind them for 87
Case No.:16/8/80‐ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00126/AM14/ RLA File :05/23/040/00076/AM14/ Lic.No/Date:0510355908 31.05.2013 Defer Date:01.10.2013
Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 30.7.2013 and decided to remind them for 88
Case No.:18/8/80‐ALC2/2013
Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00128/AM14/ RLA File :04/24/040/00018/AM14/ Lic.No/Date:0410147002 11.06.2013 Decision : The Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per MSME UO No. 30(41)/2013‐ME dated 8.7.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly. 89
Case No.:11/8/80‐ALC2/2013
Party Name:METSO MINERALS (INDIA) PVT.LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00121/AM14/ RLA File :05/24/040/00074/AM14/ Lic.No/Date:0510357008 13.06.2013 Defer Date:01.10.2013 Decision :The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 30.7.2013 and decided to remind them for 90
Case No.:23/8/80‐ALC2/2013
Party Name:HARI MACHINES LTD Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Approved HQ File :01/80/050/00133/AM14/ RLA File :23/24/040/00002/AM13/ Lic.No/Date:2310003372 13.06.2013 Decision : The Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per DHI UO note No. 3(104)/12‐TSW(B)/179 dated 14.8.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly. 91
Case No.:1/11/80‐ALC2/2013
Party Name:BAXTER (INDIA) PVT.LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00202/AM14/ RLA File :05/23/040/00090/AM14/ Lic.No/Date:0510357232 17.06.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee decided to ask RA/firm to provide copy of applica៝�on for considera៝�on. 92
Case No.:2/11/80‐ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00203/AM14/ RLA File :05/23/040/00094/AM14/ Lic.No/Date:0510357230 17.06.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 30.7.2013 and decided to remind them for 93
Case No.:1/8/80‐ALC2/2013
Party Name:VEE KAY VIKRAM & CO LLP Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00111/AM14/ RLA File :08/24/040/00153/AM13/ Lic.No/Date:0810122023 18.06.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that copy of applica៝�on has not been received from RA and decided to request RA/firm to immediately forward copy of applica៝�on for examina៝�on of the case.
94
Case No.:19/8/80‐ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00129/AM14/ RLA File :05/23/040/00098/AM14/ Lic.No/Date:0510357512 19.06.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 30.7.2013 and decided to remind them for 95
Case No.:3/11/80‐ALC2/2013
Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00204/AM14/ RLA File :05/24/040/00094/AM14/ Lic.No/Date:0510357870 21.06.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that copy of applica៝�on has not been received from RA and decided to request RA/firm to immediately forward copy of applica៝�on for examina៝�on of the case. 96
Case No.:3/8/80‐ALC2/2013
Party Name:BIRLA FURUKAWA FIBRE OPTICS LIMITED, Meet No/Date:11/80‐ ALC2/2013 20.08.2013 Status: Deferred HQ File :01/80/050/00113/AM14/ RLA File :17/24/040/00042/AM14/ Lic.No/Date:1710005396 25.06.2013 Defer Date:01.10.2013 Decision : The Commiោ�ee noted that copy of applica៝�on has not been received from RA and decided to request RA/firm to immediately forward copy of applica៝�on for examina៝�on of the case. S.No.263
Case No. A/R‐98
M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/00573/AM11/DES.I Lic. No. & date Mee៝�ng No.11/14 RA.F.No.09/24/040/00223/AM11 0910043468 dt.09.09.2010 Date: 20.08.2013 Fixa៝�on of Norms The Commiោ�ee noted that the case was referred to EPCG Division for clarifica៝�on and comments is awaited. Case deferred to 1.10.2013. S.No.264
Case No. A/R‐107
M/s. Bharat Heavy Electricals Ltd., Chennai HQF.No.01/80/050/00078/AM06/DES.I Lic. No. & date Mee៝�ng No.11/14 RA.F.No.04/24/042/00102/AM05 0410069858 dt.25.04.2005 Date: 20.08.2013 Amendment of Norms The Commiោ�ee considered the leោ�er dated 24.5.2013 submiោ�ed by the firm. In this case when the norms were fixed vide Norms Commiោ�ee mee៝�ng No.6/8/80‐ALC2/2005 dated 28.6.2005 it had been decided that the weight of the export product shall be 2928 MT. Now the firm has stated that they have made a supply of 1643 MT and they have received payment for 1440 MT as billing rate and 203 MT as no៝�onal billing rate. The norms for this product has already been fixed vide above stated Norms Commiោ�ee and it needs to be actually ascertained from the documents submiោ�ed by BHEL as to how much quan៝�ty has been actually supplied and for how much quan៝�ty payment has been received. RA may call for the necessary documents from BHEL and depending upon the quan៝�ty actually supplied and payment actually received by BHEL, they may work out the import en៝�tlement of BHEL, as per the norms already fixed vide Norms Commiោ�ee mee៝�ng No.6/8/80‐ALC2/2005 dated 28.6.2005. RA may also verify the actual quan៝�ty of import effected by BHEL. In case any excess import has been effected, a�er working out the en៝�tlement as above, RA may recover custom duty and interest for the excess import. RLA may take necessary ac៝�on accordingly. S.No.265
Case No. A/R‐118
M/s. Bharat Heavy Electricals Ltd., Hyderabad HQF.No.01/80/050/00495/AM11/DES.I Lic. No. & date Mee៝�ng No.11/14 RA.F.No.09/24/040/00169/AM11 0910043002 dt.06.08.2010 Date: 20.08.2013 Fixa៝�on of Norms The Commiោ�ee noted that the case was referred to EPCG Division for clarifica៝�on and comments is awaited. Case deferred to 1.10.2013. S.No.266
Case No. A/R‐126
HQF.No.01/80/050/00077/AM06/DES.I Lic. No. & date
Mee៝�ng No.11/14 M/s. Bharat Heavy Electricals Ltd., Chennai RA.F.No.04/24/040/00101/AM05 0410069856 dt.25.04.2005 Date: 20.08.2013 Fixa៝�on of Norms The Commiោ�ee considered the leោ�er dated 24.5.2013 submiោ�ed by the firm. In this case when the norms were fixed vide Norms Commiោ�ee mee៝�ng No.5/8/80‐ALC2/2005 dated 28.6.2005 it had been decided that the weight of the export product shall be 2800 MT. Now the firm has stated that they have made a supply of 1829MT and they have received payment for 1648 MT as billing rate and 181 MT as no៝�onal billing rate. The norms for this product has already been fixed vide above stated Norms Commiោ�ee and it needs to be actually ascertained from the documents submiោ�ed by BHEL as to how much quan៝�ty has been actually supplied and for how much quan៝�ty payment has been received. RA may call for the necessary documents from BHEL and depending upon the quan៝�ty actually supplied and payment actually received by BHEL, they may work out the import en៝�tlement of BHEL, as per the norms already fixed vide Norms Commiោ�ee mee៝�ng No.5/8/80‐ALC2/2005 dated 28.6.2005. RA may also verify the actual quan៝�ty of import effected by BHEL. In case any excess import has been effected, a�er working out the en៝�tlement as above, RA may recover custom duty and interest for the excess import. RLA may take necessary ac៝�on accordingly. S.No.267
Case No. A/R‐109
M/s. Poly Medicure Ltd., New Delhi HQF.No.01/80/050/00391/AM2/DES.I Lic. No. & date Mee៝�ng No.11/14 RA.F.No.05/24/040/00241/AM12 0510305885 dt.19.10.2011 Date: 20.08.2013 Revision of norms The Commiោ�ee noted that the case is under examina៝�on of C&PC and decided to await comments. Case deferred to 1.10.2013. S.No.268
Case No. A/R‐110
M/s. Poly Medicure Ltd., New Delhi HQF.No.01/80/050/00427/AM12/DES.I Lic. No. & date Mee៝�ng No.11/14 RA.F.No.05/24/040/00281/AM12 0510309080 dt.19.10.2011 Date: 20.08.2013 Revision of norms The Commiោ�ee noted that the case is under examina៝�on of C&PC and decided to await comments. Case deferred to 1.10.2013. S.No.269
Case No. A/R‐111
M/s. Poly Medicure Ltd., New Delhi HQF.No.01/80/050/00390/AM12/DES.I Lic. No. & date Mee៝�ng No.11/14 RA.F.No.05/24/040/00238/AM12 0510304858 dt.10.10.2011 Date: 20.08.2013 Revision of norms The Commiោ�ee noted that the case is under examina៝�on of C&PC and decided to await comments. Case deferred to 1.10.2013. S.No.270
Case No. A/R‐114
M/s. Godrej & Boyce Co. Ltd., Mumbai HQF.No.01/80/050/01085/AM12/DES.I Lic. No. & date Mee៝�ng No.11/14 RA.F.No.03/94/040/01092/AM08 0310460269 dt.06.02.2008 Date: 20.08.2013 Amendment of norms The Commiោ�ee noted that firm has vide leោ�er dated 12.8.2013 sought more ៝�me for providing informa៝�on / documents. Case deferred to 1.10.2013. S.No.271
Case No. A/R‐140
M/s. Alstom Projects India Ltd., Mumbai HQF.No.01/80/050/01450/AM04/DES.I Lic. No. & date Mee៝�ng No.11/14 RA.F.No.03/24/042/00205/AM04 0310247081 dt.12.01.2004 Date: 20.08.2013 Fixa៝�on of norms The Commiោ�ee noted that the case was referred to EPCG Division for clarifica៝�on and comments is awaited. Case deferred to 1.10.2013. S.No.272
Case No. A/R‐149
M/s. Weatherford Drilling & Produc៝�on Services Pvt. Ltd., Baroda HQF.No.01/81/050/00489/AM08/DES.I Lic. No. & date Mee៝�ng No.11/14 RA.F.No.34/24/040/00185/AM08 3410020553 dt.07.01.2008 Date: 20.08.2013 Fixa៝�on of norms The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 23.5.2013 followed by reminder dated 4.7.2013 and final reminder dated 31.7.2013 and decided to send an email reques៝�ng them to immediately provide their reply. Case deferred to 1.10.2013. S.No.273
Case No. A/R‐09
M/s. Radiant Industries, Pune HQF.No.01/80/050/00394/AM12/DES.I Lic. No. & date Mee៝�ng No.11/14 RA.F.No.31/83/040/00182/AM12 3110051726 dt.07.12.2011 Date: 20.08.2013 Fixa៝�on of norms The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 5.8.2013 and decided to remind them for expedi៝�ng their reply. Case deferred to 1.10.2013.
S.No.274
Case No. A/R‐10
M/s. Minda Sai Ltd., Mumbai HQF.No.01/80/050/00903/AM08/DES.I Lic. No. & date Mee៝�ng No.11/14 RA.F.No.03/95/040/00474/AM08 0310440650 dt.23.08.2007 Date: 20.08.2013 Amendment / revision of norms The Commiោ�ee noted that copy of firm’s representa៝�on was forwarded to MSME. Subsequently on receipt of the reply from firm, it was no៝�ced that this case actually pertains to DIPP and this case was earlier dealt by DIPP. Accordingly, the Commiោ�ee decided to forward copy of applica៝�on and copy of reply from firm to DIPP for examina៝�on and comments. Case deferred to 1.10.2013. S.No.275
Case No. A/R‐11
M/s. Saraswa៝� Industrial Syndicate Ltd., HQF.No.01/80/050/00254/AM11/DES.I Lic. No. & date Mee៝�ng No.11/14 RA.F.No.05/24/040/00126/AM11 0510267954 dt.12.07.2010 Date: 20.08.2013 Revision of norms The Commiោ�ee noted that copy of applica៝�on was forwarded to DIPP for examina៝�on and comments. Case deferred to 1.10.2013. S.No.276
Case No. A/R‐27
M/s. IFB Industries Limited, Kolkata HQF.No.01/80/162/00047/AM14/DES.I Lic. No. & date Mee៝�ng No.11/14 RLA, No.02/73/040/00818/AM92 RLA, No.02/73/040/00026/AM93 RLA, No.02/73/040/00881/AM92 RLA, No.02/73/040/01020/AM90 RLA, No.02/73/040/00203/AM93 RLA, No.02/73/040/00075/AM93 RLA, No.02/73/040/03976/AM90 RLA, No.02/73/040/01827/AM90 RLA, No.02/73/040/00227/AM91 RLA, No.02/73/040/00014/AM91 RLA, No.02/73/040/00750/AM92 (i) 3321963 dt.30.04.1992 (ii) 3327432 dt.29.09.1992 (iii) 3321987 dt.19.05.1992 (iv) 3204053 dt.21.07.1989 (v) 3388496 dt.30.03.1993 (vi) 3227504 dt.04.12.1992 (vii) 3206667 dt.01.11.1989 (viii) 3204858 dt.09.08.1989 (ix) 3262973 dt.05.02.1991 (x) 3259424 dt.28.02.1992 (xi) 3325249 dt.30.06.1992 Date: 20.08.2013 Fixa៝�on of norms The Commiោ�ee noted that the case is under examina៝�on of DHI and decided to await comments. Case deferred to 1.10.2013. S.No.277
Case No. A/R‐43
M/s. Godrej & Boyce Mfg. Co. Ltd., Mumbai HQF.No.01/80/050/00455/AM13/DES.I Lic. No. & date Mee៝�ng No.11/14 RLA, No.03/94/040/00575/AM13 0310713034 dt.17.10.2012 Date: 20.08.2013 Revision of norms The Commiោ�ee noted that copy of applica៝�on was forwarded to DIPP for examina៝�on and comments. Case deferred to 1.10.2013. S.No.278
Case No. A/R‐44
M/s. Godrej & Boyce Mfg. Co. Ltd., Mumbai HQF.No.01/80/050/00487/AM13/DES.I Lic. No. & date Mee៝�ng No.11/14 RLA, No.03/94/040/00650/AM13 0310715387 dt.21.11.2012 Date: 20.08.2013 Revision of norms The Commiោ�ee noted that copy of applica៝�on was forwarded to DIPP for examina៝�on and comments. Case deferred to 1.10.2013. S.No.279
Case No. A/R‐46
M/s. Prijai Heat Exchangers Pvt. Ltd., HQF.No.01/80/050/00657/AM11/DES.I Lic. No. & date Mee៝�ng No.11/14 RLA, No.03/95/040/00558/AM11 0310603942 dt.01.12.2010 Date: 20.08.2013 Revision of norms The Commiោ�ee noted that copy of applica៝�on was forwarded to DIPP for examina៝�on and comments. Case deferred to 1.10.2013.
S.No.280
Case No. A/R‐47
M/s. Saraswa៝� Industrial Syndicate Ltd., HQF.No.01/80/050/00119/AM11/DES.I Lic. No. & date Mee៝�ng No.11/14 RLA, No.05/24/040/00063/AM11 0510264573 dt.19.05.2010 Date: 20.08.2013 Revision / amendment of norms The Commiោ�ee noted that copy of applica៝�on was forwarded to DIPP for examina៝�on and comments. Case deferred to 1.10.2013. S.No.281
Case No. A/R‐48
M/s. Gas Tech Engineering India Pvt. Ltd., Faridabad HQF.No.01/80/050/00575/AM13/DES.I Lic. No. & date Mee៝�ng No.11/14 RLA, No.05/23/040/00447/AM13 0510345184 dt.07.02.2013 Date: 20.08.2013 Request for addi៝�on of import items in subject authoriza៝�on The Commiោ�ee noted that based on firm’s request, CLA has been requested to accept firm’s applica៝�on for amendment of authoriza៝�on and amendment sheet from CLA is awaited. Case deferred to 1.10.2013. Sl.No.282
Case No. C – 06
M/s. Precihole Machine Tools Pvt. Ltd., Mumbai HQ F.No.01/80/162/00082/AM13/DES‐I Mee៝�ng No.11/14 Fixa៝�on of Ad‐hoc Norms for the export product “Collar High Flow 8 Inch EWR Phase 4” – reg. Date: 20.08.2013 The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 5.8.2013 and decided to remind them for expedi៝�ng their reply. Case deferred to 1.10.2013. Sl.No.283
Case No. C – 09
M/s. MTAR Technologies Pvt. Ltd., Hyderabad HQ F.No.01/80/162/00462/AM13/DES‐I Mee៝�ng No.11/14 Fixa៝�on of input output wastage Ad‐hoc Norms for the export product “Oil & Gas Explora៝�on components, Catalina Hot Box & Aero Space Parts” in respect of 100% EOU –reg. Date: 20.08.2013 The Commiោ�ee noted that the case is under examina៝�on of DHI and products details are not clear. Hence the Commiោ�ee decided to request the firm to aោ�end for personal hearing before the Commiោ�ee on 1.10.2013 at 2.30 p.m. in DGFT, Udyog Bhawan to explain the details of manufacturing of export products. Case deferred to 1.10.2013. Sl.No.284
Case No. C – 03
M/s. Berco Undercarriage (India) Pvt. Ltd., Hyderabad HQ F.No.01/80/162/00484/AM13/DES‐I Mee៝�ng No.11/14 Fixa៝�on of Standard Input Output Norms (SION) for the export product “Roller Sha� (Parts for Excavators, Bulldozers)” covered under Product Group Engineering –reg. Date: 20.08.2013 The Commiោ�ee noted that a reply has been received from firm and decided to examine the case. Case deferred to 1.10.2013.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.