IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2012-07-12

DGFT Committee Minutes

Document text

RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE                                                                                                                           (DES­II SECTION) MINUTES OF THE NORMS COMMITTEE­II MEETING NO. 07/81 SCHEDULED TO BE HELD ON 03.07.2012 BUT ACTUALLY  HELD ON   12.07.2012.  The Meeting No. 07/81 of Norms Committee­II was held on 12.07.2012 for the licensing year 2012­13  under the Chairmanship of Sh. Hardeep Singh, Joint Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorisations under Duty Exemption Scheme (Chapter­4) of Foreign Trade Policy 2009­2014. The following members were present in the meeting:­       S.No Name of the representatives &            their Designation   Deptt.   1.         Shri B.D.Ghosh, Addl. I.A.                                            MOS 2.         Shri Gajraj Singh, Sr.D.O.                                            DHI 3.         Shri S.K.Jain, D.O.                                                         DIPP 4.         Shri  Parveen Sharma, Dy. DG                                    DGFT 5.         Shri  Raman Kumar, FTDO                                          DGFT 1

Case No.:38/27/81­ALC2/2009

Party Name:TATA BP SOLAR INDIA LTD. Meet No/Date:7/81­ALC2/2012 03.07.2012 Status:Deferred and Re­indexed HQ File :01/81/050/00220/AM10/ RLA File :07/24/040/00025/AM10/ Lic.No/Date:0710064531 05.05.2009  Defer Date:14.08.2012 Decision : : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 14.08.2012.   2

Case No.:17/50/81­ALC2/2009

Party Name:ASTRA MICROWAVE PRODUCTS LTD., 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00486/AM10/ RLA File :09/24/040/00065/AM10/ Lic.No/Date:0910039054 24.08.2009 Decision :NC observed that reply of the firm has been received in this case in which firm has stated that they had not utilized the above advance authorization and returned back the same to concerned authorities. NC decided to send a letter to firm to submit proof of having surrendered unutilized authorisation to RA. The case stands deferred and to be relisted on 14.08.2012.   3

Case No.:2/42/81­ALC2/2010

Party Name:VIDEOCON INDUSTRIES LIMITED 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00449/AM11/ RLA File :03/95/040/00551/AM11/ Lic.No/Date:0310603647 30.11.2010 Decision : NC observed that comments of DIT is awaited and decided to send a reminder to DIT to expedite comments. The case stands deferred and to be relisted on 14.08.2012.   4

Case No.:16/50/81­ALC2/2010

Party Name:ABIR INFRASTRUCTURE PRIVATE LIMITED 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00562/AM11/ RLA File :05/23/040/00336/AM11/ Lic.No/Date:0510284584 24.02.2011 Decision : NC observed that reply from the firm is still awaited despite two reminders hence decided to send a final reminder to firm to reply within 15 days. The case stands deferred and to be relisted on 14.08.2012   5

Case No.:11/16/81­ALC2/2011

Party Name:RAPSRI ENGG INDUSTRIES LTD 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00112/AM12/ RLA File :07/24/040/00557/AM11/ Lic.No/Date:0710078770 26.04.2011

Decision : The Committee observed that the reply from the firm is still awaited despite reminder and decided to again remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   6

Case No.:3/16/81­ALC2/2011

Party Name:FINOLEX CABLES LIMITED 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00104/AM12/ RLA File :31/24/040/00009/AM12/ Lic.No/Date:3110048056 10.05.2011 Decision : NC observed that the case is under examination at DIT. The case stands deferred and to be relisted on 14.08.2012.   7

Case No.:3/9/81­ALC2/2011

Party Name:INDIAN TECHNOMAC CO.LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00053/AM12/ RLA File :05/23/040/00060/AM12/ Lic.No/Date:0510291080 19.05.2011 Decision : NC observed that the case is under examination at MOS. The case stands deferred and to be relisted on 14.08.2012.   8

Case No.:13/9/81­ALC2/2011

Party Name:VIKARSH STAMPINGS INDIA PVT. LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00063/AM12/ RLA File :31/83/040/00021/AM12/ Lic.No/Date:3110048214 23.05.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   9

Case No.:27/16/81­ALC2/2011

Party Name:CROMPTON GREAVES LIMITED, 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00129/AM12/ RLA File :03/94/040/00142/AM12/ Lic.No/Date:0310632382 23.05.2011 Decision :NC observed that reply of the firm has been received and being forwarded to DHI. The case stands deferred and to be re­listed on 14.08.2012.   10

Case No.:11/8/80­ALC2/2011

Party Name:ANKIT FASTENERS PVT LTD., 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/80/050/00159/AM12/ RLA File :07/24/040/00050/AM12/ Lic.No/Date:0710079421 27.05.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   11

Case No.:13/16/81­ALC2/2011

Party Name:K.S.INSTRUMENTS PVT.LTD., 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00114/AM12/ RLA File :07/24/040/00061/AM12/ Lic.No/Date:0710079473 30.05.2011 Decision : NC observed that comments of DIT is awaited and decided to send a reminder to DIT to expedite comments. The case stands deferred and to be relisted on 14.08.2012.   12

Case No.:32/16/81­ALC2/2011

Party Name:LEITNER SHRIRAM MANUFACTURING LIMITED, 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00134/AM12/ RLA File :04/24/040/00057/AM12/ Lic.No/Date:0410124485 30.05.2011 Decision : NC observed that the case is under examination at DHI. The case stands deferred and to be relisted on 14.08.2012.   13

Case No.:1/16/81­ALC2/2011

Party Name:LEITNER SHRIRAM MANUFACTURING LIMITED, 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00102/AM12/ RLA File :04/24/040/00063/AM12/ Lic.No/Date:0410124736 08.06.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   14

Case No.:19/16/81­ALC2/2011

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00121/AM12/ RLA File :03/95/040/00155/AM12/ Lic.No/Date:0310636999 17.06.2011

Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   15

Case No.:34/16/81­ALC2/2011

Party Name:POLYCAB WIRES PVT.LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00136/AM12/ RLA File :03/95/040/00243/AM12/ Lic.No/Date:0310639849 01.07.2011 Decision :The committee observed that reply of the firm has been received but it does not pertain to above authorisation. The said reply pertains to AA No. 0310657592 dtd 03.10.2011 which has been surrendered by the firm. Hence NC decided to send a reminder to firm to submit following information in r/o correct authorisation i.e. A No. 0310639849 dated 01..07.2011:­ 1.       Size of conductors in cables alongwith quan럀�럀�es of cables  in Kms. 2.       Detailed calcula럀�ons for the requirement of each  raw material, export product wise  supported by the Cross sec럀�onal diagram of the cable/Buyers data sheet. 3.       Net weight per KM of  each Cable 4.       Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 5.      Total requirement of each raw material, export product wise, in a tabular form. The case stands deferred and to be re­listed on 14.08.2012.   16

Case No.:36/16/81­ALC2/2011

Party Name:INDIAN TECHNOMAC CO.LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00138/AM12/ RLA File :05/23/040/00126/AM12/ Lic.No/Date:0510295525 04.07.2011 Decision : NC observed that the case is under examination at MOS. The case stands deferred and to be relisted on 14.08.2012.   17

Case No.:10/23/81­ALC2/2011

Party Name:DELTA POWER SOLUTIONS INDIA PVT.LTD. 03.07.2012 Status:Deferred and Re­indexed HQ File :01/81/050/00190/AM12/ RLA File :25/24/040/00006/AM12/ Lic.No/Date:2510003290 08.07.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   18

Case No.:11/23/81­ALC2/2011

Party Name:DELTA POWER SOLUTIONS INDIA PVT.LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00191/AM12/ RLA File :25/24/040/00007/AM12/ Lic.No/Date: 2510003291 08.07.2011 Decision : NC observed that the case is under examination at DIT. The case stands deferred and to be relisted on 14.08.2012.   19

Case No.:23/23/81­ALC2/2011

Party Name:MAYFAIR INTERNATIONAL 03.07.2012 Status:Deferred and Re­indexed HQ File :01/81/050/00203/AM12/ RLA File :03/95/040/00300/AM12/ Lic.No/Date:0310643240 20.07.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   20

Case No.:15/23/81­ALC2/2011

Party Name:MAYFAIR INTERNATIONAL 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00195/AM12/ RLA File :03/95/040/00321/AM12/ Lic.No/Date:0310644438 26.07.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   21

Case No.:1/43/81­ALC2/2011

Party Name:CHANDAN STEEL LIMITED 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00366/AM12/ RLA File :03/94/040/00405/AM12/ Lic.No/Date:0310646071 03.08.2011 Decision : NC observed that the case is under examination at MOS. The case stands deferred and to be relisted on 14.08.2012.   22

Case No.:32/37/81­ALC2/2011

Party Name:INDIAN TECHNOMAC CO.LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00319/AM12/ RLA File :05/23/040/00169/AM12/ Lic.No/Date:0510298788 08.08.2011

Decision : NC observed that the case is under examination at MOS. The case stands deferred and to be relisted on 14.08.2012.   23

Case No.:31/37/81­ALC2/2011

Party Name:JINDAL SAW LTD 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00318/AM12/ RLA File :05/23/040/00179/AM12/ Lic.No/Date:0510299161 10.08.2011 Decision : NC observed that the reply of the firm has been received and the  case is under examination at DIPP. The case stands deferred and to be relisted on 14.08.2012.   24

Case No.:34/37/81­ALC2/2011

Party Name:JINDAL SAW LTD 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00321/AM12/ RLA File :05/23/040/00180/AM12/ Lic.No/Date:0510299162 10.08.2011 Decision : NC observed that the case is under examination at DIPP. The case stands deferred and to be relisted on 14.08.2012.   25

Case No.:1/37/81­ALC2/2011

Party Name:ELECTRO COPPER & ALLOYS MFG. CO. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00288/AM12/ RLA File :02/24/040/00081/AM12/ Lic.No/Date:0210163840 12.08.2011 Decision : NC observed that reply from the firm is still awaited despite two reminders hence decided to send a final reminder to firm to reply within 15 days. The case stands deferred and to be relisted on 14.08.2012.   26

Case No.:2/37/81­ALC2/2011

Party Name:OIL COUNTRY TUBULAR LIMITED 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00289/AM12/ RLA File :09/24/040/00233/AM12/ Lic.No/Date:0910048323 22.08.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   27

Case No.:8/30/81­ALC2/2011

Party Name:INDIAN TECHNOMETAL COMPANY LIMITED 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00254/AM12/ RLA File :05/23/040/00210/AM12/ Lic.No/Date:0510301527 07.09.2011 Decision : NC observed that the case is under examination at MOS. The case stands deferred and to be relisted on 14.08.2012.   28

Case No.:6/30/81­ALC2/2011

Party Name:INDIAN TECHNOMAC CO.LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00252/AM12/ RLA File :05/23/040/00222/AM12/ Lic.No/Date:0510302467 15.09.2011 Decision : NC observed that the case is under examination at MOS. The case stands deferred and to be relisted on 14.08.2012.   29

Case No.:10/30/81­ALC2/2011

Party Name:LEITNER SHRIRAM MANUFACTURING LIMITED, 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00256/AM12/ RLA File :04/24/040/00181/AM12/ Lic.No/Date:0410128368 21.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   30

Case No.:9/30/81­ALC2/2011

Party Name:LEITNER SHRIRAM MANUFACTURING LIMITED, 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00255/AM12/ RLA File :04/24/040/00180/AM12/ Lic.No/Date:0410128367 21.09.2011 Decision :NC observed that reply of the firm has been received and forwarded to DHI. The case is under examination at DHI. The case stands deferred and to be relisted on 14.08.2012.   31

Case No.:9/37/81­ALC2/2011

Party Name:TERACOM LIMITED 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00296/AM12/ RLA File :05/24/040/00189/AM12/ Lic.No/Date:0510303637 23.09.2011

Decision : NC observed that the case is under examination at DIPP. The case stands deferred and to be relisted on 14.08.2012.   32

Case No.:5/43/81­ALC2/2011

Party Name:GUJARAT PLUG­IN DEVICES PVT LTD 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00370/AM12/ RLA File :34/24/040/00118/AM12/ Lic.No/Date:3410031722 27.09.2011 Decision : NC observed that reply from the firm is still awaited despite two reminders hence decided to send a final reminder to firm to reply within 15 days. The case stands deferred and to be relisted on 14.08.2012.   33

Case No.:25/37/81­ALC2/2011

Party Name:DEEPAK PRABHU MR. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00312/AM12/ RLA File :07/21/040/00465/AM12/ Lic.No/Date:0710082842 28.09.2011 Decision : NC observed that reply of the firm has been received and forwarded to DIT. The case is under examination at DIT. The case stands deferred and to be relisted on 14.08.2012.   34

Case No.:19/24/85­ALC3/2011

Party Name:RAJGURU ENTERPRISES PVT.LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/85/050/00141/AM12/ RLA File :03/95/040/00509/AM12/ Lic.No/Date:0310657016 29.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   35

Case No.:10/35/81­ALC2/2011

Party Name:CHANDAN STEEL LIMITED 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00287/AM12/ RLA File :03/94/040/00571/AM12/ Lic.No/Date:0310657198 30.09.2011 Decision : NC observed that the case is under examination at MOS. The case stands deferred and to be relisted on 14.08.2012.   36

Case No.:20/30/81­ALC2/2011

Party Name:POLYCAB WIRES PVT.LTD. 03.07.2012 Status:Closed HQ File :01/81/050/00266/AM12/ RLA File :03/95/040/00534/AM12/ Lic.No/Date:0310657592 03.10.2011  Defer Date: Decision :NC decided to close the case as the above authorisation has been surrendered by the firm without utilization. R/A may take suitable consequential action accordingly.     37

Case No.:3/43/81­ALC2/2011

Party Name:LEITNER SHRIRAM MANUFACTURING LIMITED, 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00368/AM12/ RLA File :04/24/040/00206/AM12/ Lic.No/Date:0410128908 04.10.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   38

Case No.:22/30/81­ALC2/2011

Party Name:B.G.SHIRKE CONSTRUCTION TECHNOLOGY LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00268/AM12/ RLA File :31/83/040/00129/AM12/ Lic.No/Date:3110050843 05.10.2011 Decision : NC observed that the case is under examination at DIPP. The case stands deferred and to be relisted on 14.08.2012.   39

Case No.:39/37/81­ALC2/2011

Party Name:SRI VAARU METALLURGICALS (PVT) LTD 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00326/AM12/ RLA File :07/24/040/00248/AM12/ Lic.No/Date:0710083151 12.10.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   40

Case No.:2/35/81­ALC2/2011

Party Name:DELTON CABLES LTD. 03.07.2012 Status:Deferred  and  Re­ indexed

HQ File :01/81/050/00279/AM12/ RLA File :05/23/040/00171/AM12/ Lic.No/Date:0510305311   14.10.2011 Decision : NC observed that the case is under examination at DIPP. The case stands deferred and to be relisted on 14.08.2012.   41

Case No.:6/37/81­ALC2/2011

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 03.07.2012 Status:Deferred and Re­indexed HQ File :01/81/050/00293/AM12/ RLA File :05/23/040/00196/AM12/ Lic.No/Date:0510305232 14.10.2011 Decision : NC observed that similar case is being considered in NC­I and decided to await decision of NC­I.  The case stands deferred and to be relisted on 14.08.2012.   42

Case No.:15/37/81­ALC2/2011

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 03.07.2012 Status:Deferred and Re­indexed HQ File :01/81/050/00302/AM12/ RLA File :05/23/040/00199/AM12/ Lic.No/Date:0510305231 14.10.2011 Decision : NC observed that similar case is being considered in NC­I and decided to await decision of NC­I.  The case stands deferred and to be relisted on 14.08.2012.   43

Case No.:26/37/81­ALC2/2011

Party Name:SVAM PACKAGING INDUSTRIES PRIVATE LIMITED 03.07.2012 Status:Deferred and Re­indexed HQ File :01/81/050/00313/AM12/ RLA File :05/24/040/00213/AM12/ Lic.No/Date:0510305247 14.10.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   44

Case No.:38/43/81­ALC2/2011

Party Name:ALA INDUSTRIAL CORPORATION 03.07.2012 Status:Reject HQ File :01/81/050/00403/AM12/ RLA File :03/94/040/00651/AM12/ Lic.No/Date:0310661017 20.10.2011  Defer Date: Decision : NC observed that reply of the firm has not been received despite three reminders hence decided to reject the case on ground of non submission of reply.     45

Case No.:19/43/81­ALC2/2011

Party Name:S K M TECHNOLOGIES PRIVATE LIMITED 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00384/AM12/ RLA File :09/24/040/00203/AM12/ Lic.No/Date:0910049449 25.10.2011 Decision :NC observed that reply of the firm has been received and being forwarded to DIPP for comments. The case stands deferred and to be re­listed on 14.08.2012.   46

Case No.:45/43/81­ALC2/2011

Party Name:AUREATE INDIA, 03.07.2012 Status:Reject HQ File :01/81/050/00410/AM12/ RLA File :07/24/040/00257/AM12/ Lic.No/Date:0710083609 28.10.2011  Defer Date: Decision : NC observed that reply of the firm has not been received despite three reminders hence decided to reject the case on ground of non submission of reply.     47

Case No.:29/37/81­ALC2/2011

Party Name:AUREATE INDIA, 03.07.2012 Status:Reject HQ File :01/81/050/00316/AM12/ RLA File :07/24/040/00299/AM12/ Lic.No/Date:0710083634 31.10.2011  Defer Date: Decision : NC observed that reply of the firm has not been received despite three reminders hence decided to reject the case on ground of non submission of reply.     48

Case No.:35/37/81­ALC2/2011

Party Name:VIKARSH STAMPINGS INDIA PVT. LTD. 03.07.2012 Status:Deferred  and  Re­ indexed

HQ File :01/81/050/00322/AM12/ RLA File :31/24/040/00002/AM12/ Lic.No/Date:3110051243 31.10.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   49

Case No.:36/37/81­ALC2/2011

Party Name:VIKARSH STAMPINGS INDIA PVT. LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00323/AM12/ RLA File :31/83/040/00034/AM12/ Lic.No/Date:3110051242 31.10.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   50

Case No.:38/37/81­ALC2/2011

Party Name:TRAFOMEC INDIA MAGNETICS PVT LTD 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00325/AM12/ RLA File :07/24/040/00258/AM12/ Lic.No/Date:0710083779 08.11.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   51

Case No.:12/43/81­ALC2/2011

Party Name:CROMPTON GREAVES LIMITED, 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00377/AM12/ RLA File :03/94/040/00505/AM12/ Lic.No/Date:0310664666 14.11.2011 Decision : NC observed that reply of the firm has been received and being forwarded to DHI for comments. The case stands deferred and to be re­listed on 14.08.2012.   52

Case No.:17/37/81­ALC2/2011

Party Name:UNITED INDUSTRIES 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00304/AM12/ RLA File :03/95/040/00602/AM12/ Lic.No/Date:0310665001 15.11.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   53

Case No.:6/43/81­ALC2/2011

Party Name:H. K. IMPEX PVT. LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00371/AM12/ RLA File :03/94/040/00762/AM12/ Lic.No/Date:0310667857 29.11.2011 Decision :   NC observed that the case is under examination at DIPP and MSME. The case stands deferred and to be relisted on 14.08.2012.                                                                              54

Case No.:22/43/81­ALC2/2011

Party Name:INDIAN TECHNOMAC CO.LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00387/AM12/ RLA File :05/23/040/00330/AM12/ Lic.No/Date:0510309970 01.12.2011 Decision : NC observed that the case is under examination at MOS. The case stands deferred and to be relisted on 14.08.2012.   55

Case No.:30/43/81­ALC2/2011

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00395/AM12/ RLA File :05/23/040/00321/AM12/ Lic.No/Date:0510310197 02.12.2011 Decision : NC observed that similar case is being considered in NC­I and decided to await decision of NC­I.  The case stands deferred and to be relisted on 14.08.2012.   56

Case No.:33/43/81­ALC2/2011

Party  Name:THE  WIPE  HOTWIRE  INDIA  THERMAL  EQUIPMENTS PVT.LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00398/AM12/ RLA File :13/24/040/00019/AM12/ Lic.No/Date:1310037858 02.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   57

Case No.:39/43/81­ALC2/2011

Party  Name:THE  WIPE  HOTWIRE  INDIA  THERMAL  EQUIPMENTS PVT.LTD. 03.07.2012 Status:Deferred  and  Re­ indexed

HQ File :01/81/050/00404/AM12/ RLA File :13/24/040/00020/AM12/ Lic.No/Date:1310037857   02.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   58

Case No.:7/43/81­ALC2/2011

Party Name:CROWN CORPORATION PVT. LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00372/AM12/ RLA File :03/94/040/00744/AM12/ Lic.No/Date:0310668835 05.12.2011 Decision : NC observed that reply of the firm has been received and forwarded to DIPP. The case is under examination at DIPP. The case stands deferred and to be relisted on 14.08.2012.   59

Case No.:21/43/81­ALC2/2011

Party Name:GPT STEEL INDUSTRIES LTD 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00386/AM12/ RLA File :08/24/040/00064/AM12/ Lic.No/Date:0810106527 13.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   60

Case No.:25/43/81­ALC2/2011

Party Name:UM CABLES LTD., 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00390/AM12/ RLA File :03/95/040/00773/AM12/ Lic.No/Date:0310673392 29.12.2011 Decision : NC observed that the case is under examination at DIT. The case stands deferred and to be relisted on 14.08.2012.   61

Case No.:11/1/81­ALC2/2012

Party Name:THE METAL POWDER COMPANY LTD, 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00540/AM12/ RLA File :35/24/040/00031/AM12/ Lic.No/Date:3510036938 30.12.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   62

Case No.:2/44/81­ALC2/2011

Party Name:PRAKASH STEELAGE LTD. 03.07.2012 Status:Approved HQ File :01/81/050/00415/AM12/ RLA File :03/95/040/00837/AM12/ Lic.No/Date:0310675475 09.01.2012  Defer Date: Decision :NC decided to ratify the norms of above AA as per written comments of DIPP vide U.O. dated 12.07.2012 as under:­ 1. Size of export product may be modified as “OD less than 25 mm”. 2.   Quan럀�ty of import item may be allowed as applied for i.e. 25.189 MT on repeat basis as per Advance Authoriza럀�on No. 0310514053 dated 01.04.2009 ra럀�fied in Norms Commi𐄀ee Mee럀�ng No. 43/81 dated 10/01/2012.     63

Case No.:3/44/81­ALC2/2011

Party Name:PRAKASH STEELAGE LTD. 03.07.2012 Status:Approved HQ File :01/81/050/00416/AM12/ RLA File :03/95/040/00836/AM12/ Lic.No/Date:0310675490 09.01.2012  Defer Date: Decision : NC decided to ratify the norms of above AA as per written comments of DIPP vide U.O. dated 12.07.2012 as under:­ 1.       Size of export product may be modified as “OD less than 25 mm”. 2.         Quan럀�ty of import item may be allowed as applied for i.e. 25.189 MT on repeat basis as per Advance Authoriza럀�on No. 0310514053 dated 01.04.2009 ra럀�fied in Norms Commi𐄀ee Mee럀�ng No. 43/81 dated 10/01/2012.     64

Case No.:17/1/81­ALC2/2012

Party Name:CHANDA STEEL WORKS PVT LTD 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00546/AM12/ RLA File :05/23/040/00381/AM12/ Lic.No/Date:0510314082 10.01.2012 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   65

Case No.:18/1/81­ALC2/2012

Party Name:MET TRADE (INDIA) LTD. Status:Approved

03.07.2012 HQ File :01/81/050/00547/AM12/ RLA File :05/24/040/00406/AM12/ Lic.No/Date:0510317277 10.02.2012  Defer Date: Decision :NC decided to ratify the norms of above AA as per written comments of MSME vide U.O. No. 30(154)2011­ME dated 10.07.2012 , subject to obtaining other statutory clearance by the firm, as under:­ The import of Remelted Lead Ingot ( containing 96.7796 % lead) is allowed  as 2060 MT with 3% wastage. The nomenclature of the export product is modified as Lead Ingots 99.97 % purity (Refined Lead).     66

Case No.:13/1/81­ALC2/2012

Party Name:WORLDFA EXPORTS PVT. LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00542/AM12/ RLA File :05/24/040/00414/AM12/ Lic.No/Date:0510317704 14.02.2012 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   67

Case No.:9/1/81­ALC2/2012

Party Name:MAGPPIE INTERNATIONAL LTD ,(FORMERLY KNOWN AS 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00538/AM12/ RLA File :05/24/040/00417/AM12/ Lic.No/Date:0510317784 15.02.2012 Decision :NC observed that reply of the firm has been received and being forwarded to DIPP for comments. The case stands deferred and to be re­listed on 14.08.2012.   68

Case No.:20/1/81­ALC2/2012

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 03.07.2012 Status:Approved HQ File :01/81/050/00549/AM12/ RLA File :05/24/040/00397/AM12/ Lic.No/Date:0510317910 15.02.2012  Defer Date: Decision :NC decided to ratify the norms of above AA as per written comments of DIT vide U.O. No. 17(56)/2012­IPHW dated 06.06.2012 as under:­ The norms of above AA is ratified on net to net basis with accountability clause.     69

Case No.:14/1/81­ALC2/2012

Party Name:VIJAI ELECTRICALS LTD 03.07.2012 Status:Deferred and Re­indexed HQ File :01/81/050/00543/AM12/ RLA File :09/24/040/00436/AM12/ Lic.No/Date:0910051342 17.02.2012 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   70

Case No.:16/1/81­ALC2/2012

Party Name:CORDS CABLE INDUSTRIES LTD. 03.07.2012 Status:Approved HQ File :01/81/050/00545/AM12/ RLA File :05/23/040/00458/AM12/ Lic.No/Date:0510318235 21.02.2012  Defer Date: Decision : NC decided to ratify the norms of above AA as per written comments of DIPP vide U.O. dated 12.07.2012 as under:­ 1.       Word “Un‐armoured” may be deleted from the descrip럀�on of export products at  Sl. No.1 & 3. 2.       Words “ Individual pair and overall screened,  PVC Inner Sheathed,  Overall FRLS PVC Sheathed  instrumenta럀�on Analog Cable” may be suffixed with the descrip럀�on of export product at S.No.1. 3.       Words “ Individual pair and overall screened,  PVC Inner Sheathed,  G.I.Wire armoured, Overall FRLS PVC Sheathed  K‐Type Thermocouple  Cable for 500V” may be suffixed with the descrip럀�on of export product at S.No.2. 4.       Words “PVC Inner Sheathed,  Overall FRLS PVC Sheathed  Control Cable” may be suffixed with the descrip럀�on of export product at S.No.3. 2.       Net weights of 15283 Kgs., 18439 Kgs. & 21886 Kgs.  may be specified with the quan럀�럀�es of export products at Sl. No. 1 , 2 & 3 respec럀�vely.  3.       Quan럀�ty of import item at S.No.1 i.e. Copper Wire Rod may be allowed as 1.01 Kgs/Kg. content in the export products at Sl. No. 1, 2 &  3. 4.       Quan럀�ty of import item at S.No.2 i.e. PVC Resin may be allowed as     1.05 Kgs./Kg. content in the export products at  Sl. No. 1,2 &  3. 5.       Quan럀�ty of import item at S.No.3 i.e. Plas럀�ciser may be allowed as     1.05 Kgs./Kg. content in the export products at  Sl. No. 1,2 &  3. 6.       Quan럀�ty of import item at S.No.4  i.e. Galvanised steel Wire may be allowed as 1.02 Kgs./Kg. content in the export products at  Sl. No. 1, 2 &  3 7.       Quan럀�ty of import item at S.No.5  i.e. Nickel Alloy Wire may be allowed as 1.01 Kgs./Kg. content in the export product at  Sl. No. 2.     71

Case No.:1/1/81­ALC2/2012

Party Name:PRITHVI METALS PVT LTD 03.07.2012 Status:Deferred  and  Re­ indexed

HQ File :01/81/050/00530/AM12/ RLA File :07/24/040/00421/AM12/ Lic.No/Date:0710086536   23.02.2012 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012.   72

Case No.:19/1/81­ALC2/2012

Party Name:SOURIAU INDIA PRIVATE LIMITED 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00548/AM12/ RLA File :10/24/040/00069/AM12/ Lic.No/Date:1010048421 23.02.2012 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 14.08.2012.   73

Case No.:3/1/81­ALC2/2012

Party Name:H. K. IMPEX PVT. LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00532/AM12/ RLA File :03/94/040/01046/AM12/ Lic.No/Date:0310684387 01.03.2012 Decision :The case is under examination at MSME. The case stands deferred and to be relisted on 14.08.2012.   74

Case No.:6/1/81­ALC2/2012

Party  Name:LAXMI  ELECTRONICS  MOULDS  &  PRECISION  ENGG P.LTD. 03.07.2012 Status:Approved HQ File :01/81/050/00535/AM12/ RLA File :07/24/040/00502/AM12/ Lic.No/Date:0710086932 12.03.2012  Defer Date: Decision :NC decided to ratify the norms of above AA as per written comments of C&PC vide O.M. No. 46011/84/2009­PC­II dated 11.06.2012 as under:­ Item to be Exported Quan럀�ty Plas럀�c Moulded Components (B Cover Zombia II) 1 Kg Raw‐material recommended for import Quan럀�ty 1.       Relevant Polycarbonate Resin 2.       Relevant QK 1021 PIN Bridge 1.05 kg/kg in the export product Net to Net       75

Case No.:7/1/81­ALC2/2012

Party Name:SHIVALIK BIMETAL CONTROLS LTD. 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00536/AM12/ RLA File :05/24/040/00443/AM12/ Lic.No/Date:0510319832 12.03.2012 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 14.08.2012.   76

Case No.:5/1/81­ALC2/2012

Party Name:MAXOP ENGINEERING COMPANY PRIVATE LIMITED 03.07.2012 Status:Deferred  and  Re­ indexed HQ File :01/81/050/00534/AM12/ RLA File :05/24/040/00445/AM12/ Lic.No/Date:0510320088 14.03.2012 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012. Offline 03.07.2012      Sl. No 109

CASE NO. AR­ 59

M/s. PSL Limited, Mumbai Meeting No. 07/81 F.No.01/81/050/020/AM09/DES­II      Dated:03.07.2012  Advance Licence No. 0310487951 dated 26.09.2008   RLA’s F.No.03/95/040/0545/AM09    Decision : NC observed that the case is under examination at DHI. The case stands deferred and to be relisted on 14.08.2012. Sl No. 110

CASE NO. AR­ 01

M/s. Mercury Industries Ltd.   Meeting No. 07/81 F.No.01/81/050/202/AM12/DES­II      Dated:03.07.2012  Advance Licence No.  0610022807 dtd 12.07.2011       Decision : NC decided to call the firm for personal hearing  on 31.07.2012 to explain their case.   The case stands deferred and to be relisted on 31.07.2012. Sl No. 111

CASE NO. AR­ 03

M/s. KEI Industries limited   Meeting No. 07/81 F.No.01/81/162/970/AM12/DES­II      Dated:03.07.2012 Annual  Advance Licence No.  0510186581 dtd 13.07.2006      Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012. Sl No. 112

CASE  No.  AR‐

121 M/s.   Nexus Electro Steel Limited, Chennai Meeting  No. 07/81 F.No. 01/81/50/507/AM’11/DES‐II  Dated:03.07.2012 Advance Licence No. 0410123241  dated 29.12.2010.   RLA’s  F.No.04/24/40/253/AM’11                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 14.08.2012. Sl No. 113

CASE NO. AR­ 04

M/s Addi Alloys Ltd. Meeting No. 07/81 F.No. 1/81/50/139/AM11/DES­II      Dated:03.07.2012  Advance Licence No. 3010067741 dated 20.6.2010      Decision :NC observed that reply from the firm has been received and being forwarded to MOS for comments. The case stands deferred and to be re­listed on 14.08.2012. Sl No. 114

CASE NO. AR­ 06

M/s BHEL Ltd. Meeting No. 07/81 F.No. 1/81/50/80/AM11/DES­II      Dated:03.07.2012  Advance Licence No. 0610018297 dated 23.6.2010       Decision : NC observed that the case is under examination at DHI. The case stands deferred and to be relisted on 14.08.2012. Sl No. 115

CASE NO. AR­ 16

M/s   Giesecke & Devrient india Pvt. Ltd.

Meeting No. 07/81 F.No. 1/81/50/116/AM08/DES­II      Dated:03.07.2012  Advance Licence No. 0510203871 dated 21.05.2007     Decision :NC decided to send a letter to firm submit requisite information as required by DIT. The case stands deferred and to be relisted on 14.08.2012. PART – C – DEFERRED Sl No. 29

CASE NO. C­10

M/s. Paramount Cables Meeting No. 07/81 F.No.01/81/162/418/AM12/DES­II      Dated:03.07.2012  Modification of SION C­1392       Decision : NC observed that the case is under examination at DIPP. The case stands deferred and to be relisted on 14.08.2012. Sl No. 30

CASE NO. C­ 22

M/s. Nile  Ltd.   Meeting No. 07/81 F.No.01/81/162/751/AM11/DES­II      Dated:03.07.2012 Modification of SION C­1195 Decision :NC decided to reject the request of firm for modification of SION C­1195 as per written comments of M/o Mines vide O.M. No. 16/4/2012­M­V dated 11.06.2012. S.No. 31

CASE NO. C­ 06

M/s. Can­ Pack India Pvt. Ltd.   Meeting No. 07/81 F.No.01/81/162/181/AM13/DES­II      Dated:03.07.2012  Fixation of new SION for various types  of  aluminium  beverage cans without easy open ends   Decision : NC observed that the case is under examination at DIPP. The case stands deferred and to be relisted on 14.08.2012. Sl No. 32

CASE NO. C­ 07

M/s. Can ­Pack India Pvt. Ltd.   Meeting No. 07/81 F.No.01/81/162/182/AM13/DES­II      Dated:03.07.2012 Fixation  of  new  SION  for  various  types  of  aluminium  beverage cans with  easy open ends Decision : NC observed that the case is under examination at DIPP. The case stands deferred and to be relisted on 14.08.2012.   Supplementary Agenda

CASE NO. C­ 08

 Reference received from Ministry of Steel   Meeting No. 07/81 F.No.01/81/162/246/AM13/DES­II      Dated:03.07.2012 Modification  of  existing  SION  C­469  and  fixation  of  two  new SIONs for Colour Coated Steel Sheets /Strip.

Decision : NC decided to defer the case for study of the comments of M/o Steel by other   members of NC,  other than MOS. The case stands deferred and to be relisted on 14.08.2012.   ­­­­­­­­­­­­­

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.