IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2011-12-27

DGFT Committee Minutes

Document text

RATIFIED   Minutes of Meeting No.20/12 scheduled on 27.12.2011 of Norms Committee(NC­I) (DES.I Section)   The meeting No. 20/12 of the Norms Committee (NC­I) for the licensing year 2011­2012 actually held on 03.01.2012 under the Chairmanship of Sh. N.P.S. Monga, Additional  Director General of Foreign Trade to consider  the  applications  under  Duty  Exemption  /  Remission  Schemes  (Chapter­4)  of  Foreign  Trade  Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. A.K. Mishra, AIA   23063332 M/o Steel, U.B. 5. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 6. Sh. K.C. Raju, FTDO 404 23061562 Ext.265 DGFT, U.B.   I ­The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon are as under: ­ 1

Case No.:27/11/80­ALC2/2011

Party Name:A RAYMOND FASTENERS INDIA PRIVATE LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00239/AM12/ RLA File :31/24/040/00108/AM10/ Lic.No/Date:3110040031 23.09.2009   Decision  :The  Committee  deliberated  the  written  comments  of  C&PC  received    vide  their  OM No.46011/83/2011­PC­Ii dated 02.01.2012 and decided to ratify the norms in respect of the subject advance authorization  as under:­   Item to be exported Quantity Automotive Fasteners 1 Kg. Raw­material  recommended  for Import Quantity 1.      Polypropylene Granules 2.      Polyacetal Granules 1.03 kg/kg content in the export product 1.03 kg/kg content in the export product   The RLA may take necessary action accordingly.   2

Case No.:3/37/80­ALC2/2009

Party Name:S.M.PULP PACKAGING PVT.LTD Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00562/AM10/ RLA File :05/24/040/00378/AM10/ Lic.No/Date:0510253563 27.11.2009   Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the committee decided to ratify the norms of the said Advance Authorization on net to net basis with accountability clause.  

3

Case No.:16/2/80­ALC2/2011

Party Name:PNEUMAX PNEUMATIC INDIA PVT.LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00937/AM11/ RLA File :07/21/040/00491/AM11/ Lic.No/Date:0710074822 14.10.2010 Defer Date:07.02.2012 Decision :The Committee noted that DDG informed the firm on phone that the data furnished by them is illegible. The firm promised to give fresh details in a week. The case may be re­listed on 07.02.2012.   4

Case No.:20/33/80­ALC2/2010

Party Name:BIRLA ERICSSON OPTICAL LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00576/AM11/ RLA File :11/24/040/00051/AM11/ Lic.No/Date:1110023479 02.11.2010   Decision  :The  Committee  deliberated  the  written  comments  of  DIT  received    vide  their  U.O.  Note No.17(79)/2010­IPHW dated 01.11.2011 and decided to ratify the norms in respect of the subject advance authorization  as under:­ 1. The  quantity of  optical  fibre allowed  as  13154.5  kms  is  based  on  5%  additional  length  over  the length of the cable. 2. The quantity of Polyethylene import material allowed as 8633.62 kms is inclusive of wastage of 2%.     5

Case No.:3/33/80­ALC2/2010

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00559/AM11/ RLA File :03/95/040/00615/AM11/ Lic.No/Date:0310602242 22.11.2010 Defer Date:07.02.2012 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated    22.12.2011  to  DHI  for examination and comments.  The case may be re­listed on 07.02.2012.   6

Case No.:9/33/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00565/AM11/ RLA File :07/24/040/00329/AM11/ Lic.No/Date:0710075610 24.11.2010 Defer Date:07.02.2012 Decision  :The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  dated  09.12.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­ listed on 07.02.2012.   7

Case No.:28/39/80­ALC2/2010

Party Name:MAN FORCE TRUCKS PRIVATE LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Rejected HQ File :01/80/050/00830/AM11/ RLA File :31/24/040/00119/AM11/ Lic.No/Date:3110046183 29.12.2010   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.  

8

Case No.:26/38/80­ALC2/2010

Party Name:INVENSYS INDIA PVT. LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00796/AM11/ RLA File :03/94/040/00885/AM11/ Lic.No/Date:0310609488 05.01.2011 Defer Date:07.02.2012 Decision : The Committee noted  that the firm’s reply has been sent to DIT on 28.11.2011 and the case is under examination of DIT. The case may be re­listed on  07.02.2012.   9

Case No.:30/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00832/AM11/ RLA File :03/95/040/00765/AM11/ Lic.No/Date:0310609444 05.01.2011 Defer Date:07.02.2012 Decision:  The  Committee  noted  that  the  firm  has  sought  time  vide  their  letter  dated  10.12.2011  for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice.  The case may be re­listed on 07.02.2012.   10

Case No.:10/36/80­ALC2/2010

Party Name:SEC INDUSTRIES PVT.LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00709/AM11/ RLA File :09/24/040/00442/AM11/ Lic.No/Date:0910045076 07.01.2011   Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the committee decided to ratify the norms of the said Advance Authorization on net to net basis with accountability clause.     11

Case No.:3/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00805/AM11/ RLA File :03/95/040/00774/AM11/ Lic.No/Date:0310610650 12.01.2011 Defer Date:07.02.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 22.12.2011 and the case is under examination of DHI. The case may be re­listed on  07.02.2012.   12

Case No.:13/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00815/AM11/ RLA File :03/95/040/00824/AM11/ Lic.No/Date:0310610931 13.01.2011 Defer Date:07.02.2012 Decision  :  The  Committee  noted  that  the  firm  has  sought  time  vide  their  letter  dated  10.12.2011  for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 07.02.2012.   13

Case No.:18/36/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00717/AM11/ RLA File :31/21/040/00312/AM11/

Lic.No/Date:3110046436 14.01.2011 Defer Date:07.02.2012 Decision :The Committee noted that the firm submitted their reply by e­mail dt.03.01.2012 and decided to forward a copy of reply to DHI for examination and comments. The case may be re­listed on 07.02.2012.   14

Case No.:22/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00760/AM11/ RLA File :09/24/040/00477/AM11/ Lic.No/Date:0910045223 25.01.2011 Defer Date:07.02.2012 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   15

Case No.:29/39/80­ALC2/2010

Party Name:PNEUMAX PNEUMATIC INDIA PVT.LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00831/AM11/ RLA File :07/21/040/00757/AM11/ Lic.No/Date:0710076903 25.01.2011 Defer Date:07.02.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 16.12.2011 and the case is   16

Case No.:1/11/85­ALC3/2011

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/85/050/00057/AM12/ RLA File :04/24/040/00296/AM11/ Lic.No/Date:0410121516 10.02.2011 Defer Date:07.02.2012 Decision : The representative of the DHI informed the Committee that the case is under  examination. The   17

Case No.:10/5/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00046/AM12/ RLA File :09/24/040/00479/AM11/ Lic.No/Date:0910045519 11.02.2011 Defer Date:07.02.2012 Decision :The Committee deliberated the written comments of DIPP for Wet Gas Compressor received  vide their U.O. Note dated 27.12.2011 and decided to forward the application to DHI for examination and comments  for  inputs  related  to  Steam  Turbine  as  it  pertains  to  them.  The  case  is  to  be  re­listed  on 07.02.2012.   18

Case No.:31/39/80­ALC2/2010

Party Name:SAVAS ENGINEERING COMPANY PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00833/AM11/ RLA File :31/24/040/00249/AM11/ Lic.No/Date:3110046929 15.02.2011 Defer Date:07.02.2012 Decision : The Committee noted that a D.O. letter from DDG has been sent to RA, Pune  requesting to send a copy of firm’s application but the same is still awaited.  To remind RA by email and to re­list the case on 07.02.2012. Remind by email.  

Case No.:36/39/80­ALC2/2010

Party Name:TRF LIMITED, Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00838/AM11/ RLA File :02/24/040/00255/AM10/

19 Lic.No/Date:0210154977 18.02.2011 Defer Date:07.02.2012 Decision  :  The  Committee  noted  that  the  firm  vide  letter  dated  21.12.2011  informed  that  they  had surrendered the said Advance Authorization. The Committee therefore decided to confirm the status from RA and to re­list the case on 07.02.2012.   20

Case No.:41/39/80­ALC2/2010

Party Name:SEC INDUSTRIES PVT.LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00843/AM11/ RLA File :09/24/040/00524/AM11/ Lic.No/Date:0910045585 18.02.2011   Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the committee decided to ratify the norms of the said Advance Authorization on net to net basis with accountability clause.     21

Case No.:42/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00844/AM11/ RLA File :03/95/040/00874/AM11/ Lic.No/Date:0310616717 18.02.2011 Defer Date:07.02.2012   22

Case No.:18/5/80­ALC2/2011

Party Name:SPRAY ENGINEERING DEVICES LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00054/AM12/ RLA File :22/24/040/00094/AM11/ Lic.No/Date:2210011010 18.02.2011 Defer Date:07.02.2012   23

Case No.:40/39/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved. HQ File :01/80/050/00842/AM11/ RLA File :04/24/040/00231/AM11/ Lic.No/Date:0410121741 21.02.2011   Decision :The Committee noted that the written comments received from DHI vide their UO No. 3(29)/09­ TSW(B)/588 dated 30.09.2011 and decided to ratify the norms as under:­ Export The description of export may be amended & their weight incorporated as given below: 1. ESP­ 12 Numbers 2. APH­ 8 Numbers 3. FAN­24 Numbers 4. Dampers & gates   Import DHI comments is based on the list of items with detail description incorporated in the licence. 1. Item No.1­ Drawing – Deleted. 2. Item No. 2 to 5 – These are components & may be allowed under GN­4.

3. Item No. 6­ This is spares for item No.2 & may be allowed as per spares policy of item No.2. 4. Item No.7 – This is spares for item No.5 & may be allowed as per spares policy of item No.5. 5. Item No. 8 & 9­ this is spares for item No.3 & may be allowed as per spares policy of item No.3. 6. Item No.10 to 34(Except item No. 21 & 33) – These are components & may be allowed under GN­$. 7. Item No.21 – Templates – Allowed  with accountability clause. 8.  Item No. 33 – This is spares for Flue gas Desulpurisation plant & may be allowed as             per spares policy for the export product     24

Case No.:47/39/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00849/AM11/ RLA File :05/23/040/00328/AM11/ Lic.No/Date:0510284479 22.02.2011 Defer Date:07.02.2012   25

Case No.:48/39/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00850/AM11/ RLA File :05/23/040/00330/AM11/ Lic.No/Date:0510284482 22.02.2011 Defer Date:07.02.2012   26

Case No.:25/1/81­ALC2/2011

Party Name:WEBB INDIA PVT. LTD Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Rejected HQ File :01/81/050/00604/AM11/ RLA File :07/24/040/00485/AM11/ Lic.No/Date:0710077830 04.03.2011   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 28.09.2011 and subsequent reminder 02.12.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.     27

Case No.:9/2/80­ALC2/2011

Party Name:THERMAX LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00930/AM11/ RLA File :31/24/040/00273/AM11/ Lic.No/Date:3110047467 21.03.2011 Defer Date:07.02.2012   28

Case No.:14/2/80­ALC2/2011

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00935/AM11/ RLA File :05/23/040/00367/AM11/ Lic.No/Date:0510286717 23.03.2011 Defer Date:07.02.2012

  29

Case No.:6/2/80­ALC2/2011

Party Name:METSO POWER INDIA PRIVATE LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00927/AM11/ RLA File :04/24/040/00350/AM11/ Lic.No/Date:0410122852 25.03.2011 Defer Date:07.02.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 22.12.2011 and the case is   30

Case No.:3/2/80­ALC2/2011

Party Name:AYAAPPA CNC PVT.LTD, Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00003/AM12/ RLA File :07/24/040/00547/AM11/ Lic.No/Date:0710078428 29.03.2011 Defer Date:07.02.2012 Decision : The Committee noted the written comments received from MSME and decided to seek details such as quantities, numbers, weight and wastage involved.  The case may be re­listed on  07.02.2012.   31

Case No.:13/5/80­ALC2/2011

Party Name:TDW INDIA LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00049/AM12/ RLA File :34/24/040/00338/AM11/ Lic.No/Date:3410029836 01.04.2011 Defer Date:07.02.2012 Decision : The Committee noted that a DO letter from DDG to RA, Vadodara was sent asking  to verify the firm’s existence. Send e­mail reminder. The case may be re­listed on  07.02.2012. Send email reminder.   32

Case No.:18/8/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00166/AM12/ RLA File :61/24/040/00001/AM12/ Lic.No/Date:6110000602 18.04.2011 Defer Date:07.02.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 29.11.2011 and the case is   33

Case No.:12/3/80­ALC2/2011

Party Name:CHANG YUN INDIA LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00017/AM12/ RLA File :05/23/040/00022/AM12/ Lic.No/Date:0510288459 20.04.2011 Defer Date:07.02.2012   34

Case No.:19/8/80­ALC2/2011

Party Name:AVASARALA TECHNOLOGIES LIMITED, Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Rejected HQ File :01/80/050/00167/AM12/ RLA File :07/21/040/00896/AM11/ Lic.No/Date:0710078776 26.04.2011

Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dt.17.10.2011 and subsequent reminder 25.11.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.     35

Case No.:23/5/80­ALC2/2011

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00059/AM12/ RLA File :03/95/040/00090/AM12/ Lic.No/Date:0310630441 10.05.2011 Defer Date:07.02.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 27.12.2011 and the case is   36

Case No.:28/5/80­ALC2/2011

Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00064/AM12/ RLA File :05/23/040/00043/AM12/ Lic.No/Date:0510290272 10.05.2011 Defer Date:07.02.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 28.11.2011 and the case is   37

Case No.:1/9/81­ALC2/2011

Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/81/050/00051/AM12/ RLA File :05/23/040/00054/AM12/ Lic.No/Date:0510290928 18.05.2011 Defer Date:07.02.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 28.11.2011 and the case is under examination of DHI. The case may be re­listed on 07.02.2012.   38

Case No.:39/5/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00075/AM12/ RLA File :04/24/040/00040/AM12/ Lic.No/Date:0410124178 19.05.2011 Defer Date:07.02.2012 Decision :The committee decided to forward a copy of firm’s reply dt.27.12.2011 to DHI for examination and comments. The case may be re­listed on 07.02.2012.   39

Case No.:4/8/80­ALC2/2011

Party Name:SUPREME INDUSTRIES, Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Rejected HQ File :01/80/050/00152/AM12/ RLA File :32/21/040/00038/AM12/ Lic.No/Date:3210048327 10.06.2011   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 28.09.2011 and subsequent reminder 02.12.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.    

Case No.:22/11/80­ALC2/2011

Party Name:TRF LIMITED, Status:

40 Meet No/Date:20/80­ ALC2/2011 27.12.2011 Approved HQ File :01/80/050/00234/AM12/ RLA File :02/24/040/00049/AM12/ Lic.No/Date:0210160407 15.06.2011   Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the committee decided to ratify the norms of the said Advance Authorization on net to net basis with accountability clause.     41

Case No.:8/8/80­ALC2/2011

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Rejected HQ File :01/80/050/00156/AM12/ RLA File :31/82/040/00053/AM12/ Lic.No/Date:3110048743 21.06.2011   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 28.09.2011 and subsequent reminder 02.12.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.     42

Case No.:9/11/80­ALC2/2011

Party Name:ICEM ENGINEERING COMPANY PRIVATE LIMITED, Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00221/AM12/ RLA File :03/94/040/00270/AM12/ Lic.No/Date:0310638600 24.06.2011 Defer Date:07.02.2012 Decision :The  Committed  noted  that  the  reply  received  from  the  firm  is  incomplete.  The  firm  may  be requested to furnish specific point wise reply to Sl. No. 3,5, & 11 of SDF – export product wise. The case may be re­listed on  07.02.2012.   43

Case No.:14/11/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00226/AM12/ RLA File :09/24/040/00163/AM12/ Lic.No/Date:0910047353 28.06.2011 Defer Date:07.02.2012 Decision : The committee decided to forward a copy of firm’s reply dt.26.12.2011 to DHI for examination and comments. The case may be re­listed on  07.02.2012.   44

Case No.:24/11/80­ALC2/2011

Party Name:POLMOR STEEL PVT LTD Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00236/AM12/ RLA File :09/24/040/00140/AM12/ Lic.No/Date:0910047329 28.06.2011 Defer Date:07.02.2012   45

Case No.:17/8/80­ALC2/2011

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00165/AM12/ RLA File :05/23/040/00127/AM12/

Lic.No/Date:0510295211 30.06.2011 Defer Date:07.02.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 05.12.2011 and the case is   46

Case No.:7/11/80­ALC2/2011

Party Name:REITZ INDIA LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00219/AM12/ RLA File :09/24/040/00155/AM12/ Lic.No/Date:0910047380 30.06.2011 Defer Date:07.02.2012 Decision :The Committee noted  that RA confirmed the firm’s change of address and decided to send D/L again to the firm for calling necessary information. The case may be re­listed on  07.02.2012.   47

Case No.:25/11/80­ALC2/2011

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00237/AM12/ RLA File :07/24/040/00104/AM12/ Lic.No/Date:0710080361 04.07.2011 Defer Date:07.02.2012 Decision  :The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  dated  02.12.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice.  The case may be re­ listed on 07.02.2011.   48

Case No.:21/11/80­ALC2/2011

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00233/AM12/ RLA File :09/24/040/00175/AM12/ Lic.No/Date:0910047647 15.07.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s reply received on dt.03.01.2012  to DHI for examination and comments. The case may be re­listed on  07.02.2012.   49

Case No.:15/11/80­ALC2/2011

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00227/AM12/ RLA File :03/95/040/00283/AM12/ Lic.No/Date:0310643331 20.07.2011 Defer Date:07.02.2012   50

Case No.:12/11/80­ALC2/2011

Party Name:HBL POWER SYSTEMS LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00224/AM12/ RLA File :09/24/040/00167/AM12/ Lic.No/Date:0910047808 21.07.2011   Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the committee decided to ratify the norms of the said Advance Authorization on net to net basis with accountability clause.    

Case No.:13/11/80­ALC2/2011

Status:

51 ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Deferred HQ File :01/80/050/00225/AM12/ RLA File :09/24/040/00173/AM12/ Lic.No/Date:0910047823 22.07.2011 Defer Date:07.02.2012 Decision : The committee decided to forward a copy of firm’s reply dt.26.12.2011 to DHI for examination and comments. The case may be re­listed on  07.02.2012.   52

Case No.:12/14/80­ALC2/2011

Party Name:AYAAPPA CNC PVT.LTD, Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00266/AM12/ RLA File :07/24/040/00120/AM12/ Lic.No/Date:0710080825 22.07.2011 Defer Date:07.02.2012 Decision : The Committee noted the written comments received from MSME and decided to seek details such as quantities, numbers, weight and wastage involved.  The case may be re­listed on  07.02.2012.   53

Case No.:16/11/80­ALC2/2011

LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00228/AM12/ RLA File :03/95/040/00255/AM12/ Lic.No/Date:0310644231 25.07.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their U.O. Note dated 27.12.2011 and decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Net Fabricated weight of 130 MT may be specified with the quantity of export product. 2.       Import items at Sl. Nos. 1 to 3, 5 & 6   shall be of relevant grade and thickness as contained in the export product 3.      Import item at Sl. No. 7  shall be of relevant grade and dia. as contained in the export product. 4.      Quantities of import items at from Sl. No 1 to 3 & 5 may be allowed as applied for inclusive of a wastage of 3 %. 5.      Weights of 3  MT, 0.35 MT, 0.5 MT &  2 MT may be specified with the quantities of import items at Sl.  Nos.  4,  13,  14  &  15    respectively  and  the  same  may  be  allowed  on  net  to  net  basis  with accountability clause. 6.      Quantity of import item at Sl. No 6 may be allowed as 14620 Kgs. inclusive of a wastage of 12 %. 7.      Quantity of import item at Sl. No. 7 may be allowed as 36 Mtrs. (2373 Kgs.)  inclusive of a wastage of 2%. 8.      Quantities of import items at Sl. Nos. 8, 9, 10, 11 &  12 (welding Consumables) may be allowed as applied for i.e. 1400 Kgs., 1753 Kgs. 800 Kgs., 200 Kgs.   & 1753  Kgs. respectively. 9.      Import item at Sl. No. 13 to be supplied alongwith export product.     54

Case No.:7/20/80­ALC2/2011

Party Name:DAYCO VIKAS POWER TRANSMISSION PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00392/AM12/ RLA File :05/23/040/00154/AM12/ Lic.No/Date:0510297629 26.07.2011 Defer Date:07.02.2012 Decision : The Committee deliberated the details of the case and observed that details of export products to be obtained from CLA.   The case may be re­listed on 07.02.2012.

55

Case No.:1/11/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00213/AM12/ RLA File :03/94/040/00389/AM12/ Lic.No/Date:0310645892 03.08.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their U.O. Note dated 1.      Net empty export weight(without internals)  of 39402 Kgs. may be specified with the quantity of export product at  Sl. No. 1. 2.           Net empty export weights of 19137 Kgs., 7931 Kgs., & 5913 Kgs.  may  be  specified  with  the quantities of export products at  Sl. No. 2, 3  & 4  respectively. 3.      Quantity of import item at Sl. No. 1 may be allowed as  290.3 Kgs.   (3 Nos.) on net to net  basis with accountability clause. 4.      Quantity of import item at Sl. No. 2 may be allowed as 4 Nos. on net to net basis. However, duty free weight of this item may be allowed as  752 Kg inclusive of  33 % wastage after 20 % recovery. 5.      Word “Relevant” may be prefixed with the descriptions of import items at Sl. No. 3 & 4. 6.      Quantity of import item at Sl. No. 3  may be allowed as 45631 Kgs. inclusive of 13 % wastage after 1/3rd recovery. 7.      Quantity of import item at Sl. No. 4  may be allowed as 191 Kgs. inclusive of 36 % wastage after 1/3rd recovery. 8.      Quantity of import item at Sl. No. 5 may be allowed as  10 Kgs.    (13 Nos.) on net to net  basis with accountability clause. 9.      Quantity of import item at Sl. No. 6  may be allowed as 0.77 Kgs. inclusive of 2 % wastage. 10.  Quantities of import items at Sl.Nos. 7, 8 & 9 ( Welding Consumables)  may be allowed as 852 Kgs. each.     56

Case No.:29/14/80­ALC2/2011

Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00283/AM12/ RLA File :07/24/040/00168/AM12/ Lic.No/Date:0710081189 04.08.2011 Defer Date:07.02.2012 Decision :The Committee decided to forward a copy of firm’s reply dt.27.12.2011 to DHI for examination and comments.  The case may be re­listed on 07.02.2012.   57

Case No.:2/11/80­ALC2/2011

Party Name:KUVAWALA DRILL­ EQUIP Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00214/AM12/ RLA File :03/94/040/00383/AM12/ Lic.No/Date:0310647125 09.08.2011 Defer Date:07.02.2012 Decision  :The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  dated  25.11.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­ listed on 07.02.2012.  

Case No.:3/11/80­ALC2/2011

Party Name:KUVAWALA DRILL­ EQUIP Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00215/AM12/ RLA File :03/94/040/00382/AM12/

58 Lic.No/Date:0310647358 09.08.2011 Defer Date:07.02.2012 Decision :  The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  dated  25.11.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­ listed on 07.02.2012.   59

Case No.:40/14/80­ALC2/2011

Party Name:WOLFRA­ TECH PVT LTD Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00294/AM12/ RLA File :07/24/040/00087/AM12/ Lic.No/Date:0710081399 10.08.2011   Decision :The Committee deliberated the written comments of DHI received  vide their U.O. Note dated Quantities of import items  at Sl. No. 1 , 2 & 3 may be allowed as applied for i.e. 515 Kgs., 257.5 Kgs. and 20.6 Kgs respectively  inclusive of a wastage of 3% after taking 2/3rd recovery     60

Case No.:24/14/80­ALC2/2011

Party Name:BOYSEN INDIA LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00278/AM12/ RLA File :05/23/040/00186/AM12/ Lic.No/Date:0510299447 11.08.2011 Defer Date:07.02.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 28.11.2011 and the case is   61

Case No.:31/14/80­ALC2/2011

Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00285/AM12/ RLA File :05/24/040/00159/AM12/ Lic.No/Date:0510299729 17.08.2011 Defer Date:07.02.2012 Decision : The Committee noted  that the firm’s reply has been sent to DHI on 14.12.2011 and the case is   62

Case No.:25/14/80­ALC2/2011

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00279/AM12/ RLA File :05/23/040/00176/AM12/ Lic.No/Date:0510299788 18.08.2011   Decision : The Committee deliberated the written comments of DC(MSME) received vide their U.O. Note No.30(78)/2011­ME dated 07.12.2011 and decided to allow 1.06 kg/kg of Antimony metal in Antimony concentrate in respect of the subject Advance Authorization.    

Case No.:27/14/80­ALC2/2011

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00281/AM12/ RLA File :05/23/040/00193/AM12/ Lic.No/Date:0510299789 18.08.2011

63 Decision : The Committee deliberated the written comments of DC(MSME) received vide their U.O. Note No.30(79)/2011­ME dated 07.12.2011 and decided to allow 1.06 kg/kg of Antimony metal in Antimony concentrate in respect of the subject Advance Authorization.     64

Case No.:34/14/80­ALC2/2011

LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00288/AM12/ RLA File :03/95/040/00346/AM12/ Lic.No/Date:0310649471 19.08.2011 Defer Date:07.02.2012   65

Case No.:9/14/80­ALC2/2011

Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00263/AM12/ RLA File :07/24/040/00192/AM12/ Lic.No/Date:0710081630 22.08.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s reply dt.27.12.2011 to DHI for examination and comments.  The case may be re­listed on 07.02.2012.   66

Case No.:39/14/80­ALC2/2011

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00293/AM12/ RLA File :07/24/040/00188/AM12/ Lic.No/Date:0710081631 22.08.2011 Defer Date:07.02.2012 Decision  :The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  dated  23.12.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­ listed on 07.02.2012.   67

Case No.:8/14/80­ALC2/2011

Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00262/AM12/ RLA File :05/24/040/00182/AM12/ Lic.No/Date:0510300205 24.08.2011 Defer Date:07.02.2012 Decision : The Committee noted  that the DO from DDG has been sent to C&PC on 27.12.2011 and the case is under examination. The case may be re­listed on  07.02.2012.   68

Case No.:11/14/80­ALC2/2011

Party Name:HITTCO TOOLS LTD Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00265/AM12/ RLA File :07/24/040/00203/AM12/ Lic.No/Date:0710081769 25.08.2011 Defer Date:07.02.2012 Decision :The Committee noted that a note requesting DHI to re­examine the case has been sent. Further, RA, Bangalore vide letter dt.30.11.2011 forwarded a copy of amendment sheet 1 dt.30.11.2011, copy of which may be send to DHI for examination & comments. The case may be re­listed on  07.02.2012.  

Case No.:6/14/80­ALC2/2011

Status:

69 Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Deferred HQ File :01/80/050/00260/AM12/ RLA File :05/24/040/00177/AM12/ Lic.No/Date:0510300518 26.08.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s reply dt.16.12.2011 to DHI for examination and comments.  The case may be re­listed on 07.02.2012.   70

Case No.:12/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00331/AM12/ RLA File :61/24/040/00030/AM12/ Lic.No/Date:6110000675 29.08.2011 Defer Date:07.02.2012   71

Case No.:13/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00332/AM12/ RLA File :61/24/040/00031/AM12/ Lic.No/Date:6110000676 29.08.2011 Defer Date:07.02.2012   72

Case No.:35/14/80­ALC2/2011

LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00289/AM12/ RLA File :03/95/040/00336/AM12/ Lic.No/Date:0310650989 30.08.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their U.O. Note dated 1.    Net Empty weight of 360 MT may be specified with the quantity of export product. 2.     Import items at Sl. Nos. 1 to 3    shall be of relevant grade and thickness as contained in the export product 3.    Import item at Sl. No. 7  shall be of relevant grade and dia. as contained in the export product. 4.       Quantities of import items at from Sl. No 1 & 3 may be allowed as applied for inclusive  of  a wastage of 3 %. 5.    Quantity of import item at Sl. No 2 may be allowed as 23146 Kgs. inclusive of a wastage of 12 % as claimed by the firm. 6.    Quantity of import item at Sl. No. 4 may be allowed as 2 Nos. on net to net basis. However, duty free weight of this item may be allowed as  73.61 MT inclusive of  100 % wastage after 20 % recovery. 7.    Weights of 3.5 MT, 1.5 MT &  0.35 MT may be specified with the quantities of import items at Sl. Nos. 5, 6 & 12  respectively and the same may be allowed on net to net basis with accountability clause. 8.       Quantity of import item at Sl. No. 7 may be allowed as 66 Mtrs. (15.83 MT )  inclusive of a wastage of 2%. 9.    Quantities of import items at Sl. Nos. 8, 9, 10 &  11  (welding Consumables) may be allowed as applied for i.e. 6712 Kgs., 5800 Kgs. 773 Kgs.   & 7485  Kgs. respectively. 10.  Import item at Sl. No. 12 to be supplied alongwith export product.  

73

Case No.:36/14/80­ALC2/2011

LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00290/AM12/ RLA File :03/95/040/00418/AM12/ Lic.No/Date:0310650991 30.08.2011   Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the Committee decided to ratify the norms of the said Advance Authorization as per GN­4 (Sl. No. 47 to be deleted).     74

Case No.:37/14/80­ALC2/2011

LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00291/AM12/ RLA File :03/95/040/00394/AM12/ Lic.No/Date:0310650993 30.08.2011 Defer Date:07.02.2012 Decision :The Committee noted that a copy of firm’s application has been sent to DHI on 30.09.2011 for examination and comments.  The case may be re­listed on 07.02.2012.   75

Case No.:5/14/80­ALC2/2011

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00259/AM12/ RLA File :05/24/040/00195/AM12/ Lic.No/Date:0510300970 01.09.2011   Decision :The Committee deliberated the written comments of DHI received  vide their U.O. Note dated 1.      Net empty weight of 38760 Kgs. may be specified with the quantity of export product. 2.        Word “Relevant” may be prefixed with the descriptions of import items at S. Nos. 1, 2 & 3. 3.      Quantities  of import items at Sl. No. 1 & 2  may be allowed as applied for i.e. 2327 Kgs. & 8962 Kgs. respectively inclusive of     4.5 % wastage. 4.      Quantity of import item at Sl. No.3  may be allowed as 9332 Kgs.(7180 Mtrs.) inclusive of 2 % wastage. 5.      Quantities  of import item at Sl. Nos. 4 & 5  may be allowed as applied for on net to net basis with accountability clause.     76

Case No.:41/14/80­ALC2/2011

Party Name:MICRO TECH.CNC PRIVATE LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00295/AM12/ RLA File :07/24/040/00215/AM12/ Lic.No/Date:0710082069 06.09.2011 Defer Date:07.02.2012 Decision  :The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  dated  25.11.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice.  The case may be re­ listed on 07.02.2012.  

Case No.:14/17/80­ALC2/2011

Party Name:STERDILL EQUIPMENTS PVT.LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred

77 HQ File :01/80/050/00333/AM12/ RLA File :03/95/040/00437/AM12/ Lic.No/Date:0310651808 06.09.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s reply received through e­mail dt.30.12.2011 to DIPP for examination and comments.  The case may be re­listed on 07.02.2012.   78

Case No.:38/14/80­ALC2/2011

Party Name:H.L.EQUIPMENTS Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00292/AM12/ RLA File :52/24/040/00021/AM12/ Lic.No/Date:5210036390 07.09.2011 Defer Date:07.02.2012 Decision  :The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  dated  25.11.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice.  The case may be re­ listed on 07.02.2012.   79

Case No.:14/14/80­ALC2/2011

Party Name:THERMAX LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00268/AM12/ RLA File :31/83/040/00117/AM12/ Lic.No/Date:3110050321 15.09.2011   Decision  :  The  Committee  deliberated  the  written  comments  of  DHI  received    vide  their  U.O.  Note No.3(56)/11­TSW(B)/7 dated 11.01.2011 and decided to ratify the norms in respect of the subject advance authorization  as per  SION C­1742.     80

Case No.:32/17/80­ALC2/2011

Party Name:WOLFRA­ TECH PVT LTD Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00351/AM12/ RLA File :07/24/040/00184/AM12/ Lic.No/Date:0710082357 15.09.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their U.O. Note dated 1. Quantity of import item  may be allowed as applied for i.e. 15.45 Kgs  inclusive of 3 % wastage after taking clue form SION C­227.     81

Case No.:34/17/80­ALC2/2011

Party Name:PRANAV VIKAS (INDIA) LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00353/AM12/ RLA File :05/24/040/00212/AM12/ Lic.No/Date:0510303169 20.09.2011 Defer Date:07.02.2012 Decision : The Committee noted  that the firm’s reply has been sent to DIPP on 29.12.2011 and the case is under examination at DIPP. The case may be re­listed on  07.02.2012.  

Case No.:4/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00323/AM12/ RLA File :07/24/040/00106/AM12/

82 Lic.No/Date:0710082716 23.09.2011 Decision  :  The  Committee  deliberated  the  written  comments  of  DIT  received    vide  their  U.O. No.17(92)/2011­IPHW dated 21.11.2011 and decided to ratify the norms in respect of the subject advance authorization  as under:­   “The items proposed for import are essential to assemble the export product. DIT recommends ratification of norms of advance authorization on net to net basis with accountability clause”.     83

Case No.:42/14/80­ALC2/2011

Party Name:SPARKLINE EQUIPMENTS PVT.LTD, Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00296/AM12/ RLA File :31/83/040/00126/AM12/ Lic.No/Date:3110050595 26.09.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 15.11.2011, the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   84

Case No.:17/17/80­ALC2/2011

MFG. CO. LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00336/AM12/ RLA File :03/94/040/00343/AM12/ Lic.No/Date:0310656144 26.09.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their U.O. Note dated 1.      Net export weight of 6850 Kgs. may be specified with the quantity of export product. 2.      Word “Relevant” may be prefixed with the descriptions of import items at Sl. No. 1, 3 & 4. 3.      Quantity of import item at Sl. No. 1 may be allowed as  50 Kgs. inclusive of 2 % wastage. 4.      Quantity of import item at Sl. No. 2 may be allowed as  1 Kgs.    (16 Nos.) on net to net  basis with accountability clause. 5.      Quantity of import item at Sl. No. 3  may be allowed as 1331 Kgs. inclusive of 123 % wastage after 1/3rd recovery. 6.      Quantity of import item at Sl. No. 4  may be allowed as 5668 Kgs.    ( 4507 Mtrs.)  inclusive of 4 % wastage. 7.      Quantities of import items at Sl.Nos. 5, 6 & 7 ( Welding Consumables)  may be allowed as 47 Kgs. each.     85

Case No.:21/17/80­ALC2/2011

Party Name:WAM INDIA PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00340/AM12/ RLA File :03/95/040/00448/AM12/ Lic.No/Date:0310656678 28.09.2011   Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the committee decided to ratify the norms of the said Advance Authorization on net to net basis with accountability clause.  

86

Case No.:5/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00324/AM12/ RLA File :04/24/040/00137/AM12/ Lic.No/Date:0410128752 30.09.2011 Defer Date:07.02.2012   87

Case No.:7/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00326/AM12/ RLA File :04/24/040/00171/AM12/ Lic.No/Date:0410128753 30.09.2011 Defer Date:07.02.2012   88

Case No.:8/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00327/AM12/ RLA File :04/24/040/00116/AM12/ Lic.No/Date:0410128795 30.09.2011 Defer Date:07.02.2012   89

Case No.:11/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00330/AM12/ RLA File :04/24/040/00066/AM12/ Lic.No/Date:0410128794 30.09.2011 Defer Date:07.02.2012   90

Case No.:27/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00346/AM12/ RLA File :05/23/040/00219/AM12/ Lic.No/Date:0510304453 30.09.2011 Defer Date:07.02.2012 Decision  :  The  Committee  noted  that  the  case  is  to  be  examined  in  NC­I.  The  Committee,  therefore, decided to defer the case and to re­list the case on 07.02.2012.   91

Case No.:28/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00347/AM12/ RLA File :11/24/040/00026/AM12/ Lic.No/Date:1110025821 30.09.2011 Defer Date:07.02.2012  

Case No.:30/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 Status: Deferred

92 27.12.2011 HQ File :01/80/050/00349/AM12/ RLA File :11/24/040/00013/AM12/ Lic.No/Date:1110025819 30.09.2011 Defer Date:07.02.2012   93

Case No.:31/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00350/AM12/ RLA File :11/24/040/00011/AM12/ Lic.No/Date:1110025820 30.09.2011 Defer Date:07.02.2012   94

Case No.:3/20/80­ALC2/2011

Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00388/AM12/ RLA File :05/24/040/00229/AM12/ Lic.No/Date:0510304366 30.09.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 27.12.2011, the 07.02.2012.   95

Case No.:19/17/80­ALC2/2011

LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00338/AM12/ RLA File :03/95/040/00425/AM12/ Lic.No/Date:0310657607 03.10.2011 Defer Date:07.02.2012   96

Case No.:10/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00329/AM12/ RLA File :04/24/040/00127/AM12/ Lic.No/Date:0410128896 04.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 02.11.2011, the 07.02.2012.   97

Case No.:22/17/80­ALC2/2011

Party Name:IND­SPHINX PRECISION LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00341/AM12/ RLA File :22/24/040/00045/AM12/ Lic.No/Date:2210011985 04.10.2011   Decision :The Committee decided to ratify the norms in respect of the subject advance authorization  as per SION C­945.  

98

Case No.:24/17/80­ALC2/2011

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00343/AM12/ RLA File :06/24/040/00033/AM12/ Lic.No/Date:0610024005 04.10.2011   Decision  :The  Committee  deliberated  the  written  comments  of  C&PC  received    vide  their  OM No.46011/169/2004­PC­II    dated  24.11.2011  and  decided  to  ratify  the  norms  in  respect  of  the  subject advance authorization on repeat basis Advance Authorization No.0610016734 dated 30.11.2009, as under:­   Item to be exported Quantity Insulator  Assembly Alternator/rectifier/Seal  Assembly  / Parts /Components etc. 1 No. Raw  –  material  Recommended  for Import  Quantity 1.      Phenolic Moulding Compound   2.      Polyamide­66   3.      Thermoplastic Elastomer 1.05kg/kg. content in export product 1.05kg/kg. content in export product 1.05kg/kg. content in export product     99

Case No.:21/20/80­ALC2/2011

Party Name:BIRLA FURUKAWA FIBRE OPTICS LIMITED, Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00406/AM12/ RLA File :17/24/040/00057/AM12/ Lic.No/Date:1710004546 04.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DIT on 16.12.2011, the 07.02.2012.   100

Case No.:6/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00325/AM12/ RLA File :04/24/040/00143/AM12/ Lic.No/Date:0410128933 05.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 02.11.2011, the 07.02.2012.  

Case No.:9/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00328/AM12/ RLA File :04/24/040/00135/AM12/ Lic.No/Date:0410128934 05.10.2011   Decision  :The  Committee  deliberated  the  written  comments  of  DHI  received    vide  their  U.O.  Note No.3(44)/11­TSW(B)/13  dated  11.01.2011  and  decided  to  ratify  the  norms  in  respect  of  the  subject advance authorization  as under:­ Export Product(EP) The Total weight of the EP is 6796 MT and the same may be incorporated in the license.

101 Import   1. Item No. 1­ (Carbon Steel) The quantity of seamless tubes/ pipe to be allowed is 1900 MT & as applied for with 2% wastage. “Welded” may be deleted from the description of import item. 2. Item No 2­ (Alloy Steel) The quantity of seamless tube / pipe to be allowed is 1260 MT as applied for with 2% wastage. “Welded” may be deleted from the description of import item. 3. Item No 3­ (Stainless Steel) The quantity of seamless tube / pipe to be allowed is 8 MT with 2% wastage as applied by the firm. “Welded” may be deleted from the description of import item. 4. Item No. 4­ The word “Finished” may be prefixed to the description of import & the same may be incorporated in the lilcense. The quantity of import may be restricted to 300 MT & the same may be incorporated along with quantity of import in numbers. The item may be allowed under GN­4 as applied for. 5. Item No.5­ Welding material – Quantity applied is only 14 MT & the same may be recommended import as applied for(Welding material weight is normally restricted to 2% of the weight of the steel to be welded). 6. Item No­6 to 12­ These are components & may be allowed under GN­4 with accountability Clause.     102

Case No.:15/17/80­ALC2/2011

LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00334/AM12/ RLA File :03/95/040/00493/AM12/ Lic.No/Date:0310658143 05.10.2011 Defer Date:07.02.2012 Decision :As  per  DIPP  U.O.  Note  dated  27.12.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  07.02.2012: ­   1.      Information in respect of Sl. No. 11 of Standard Deficiency Format. 2.      For net weight of components to be manufactured out of import items at Sl.  No. 1 & 2, name of components with net weights thereof may be indicated.   103

Case No.:16/17/80­ALC2/2011

LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00335/AM12/ RLA File :03/95/040/00494/AM12/ Lic.No/Date:0310658156 05.10.2011 Defer Date:07.02.2012 Decision : As per DIPP  U.O. Note dated 27.12.2011, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  07.02.2012: ­   1.      Information in respect of Sl. No. 11 of Standard Deficiency Format. 2.      For net weight of components to be manufactured out of import items at Sl.  No. 1 & 2, name of components with net weights thereof may be indicated.   104

Case No.:5/20/80­ALC2/2011

Party Name:POLY MEDICURE LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00390/AM12/ RLA File :05/24/040/00238/AM12/ Lic.No/Date:0510304858 10.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to C&PC on 23.12.2011, the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.

105

Case No.:18/17/80­ALC2/2011

MFG. CO. LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00337/AM12/ RLA File :03/94/040/00548/AM12/ Lic.No/Date:0310658894 11.10.2011 Defer Date:07.02.2012 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dt.23.12.2011  to  DIPP  for examination and comments.  The case may be re­listed on 07.02.2012.   106

Case No.:1/20/80­ALC2/2011

Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00386/AM12/ RLA File :05/24/040/00235/AM12/ Lic.No/Date:0510304889 11.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DIPP on 27.12.2011, the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   107

Case No.:29/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00348/AM12/ RLA File :05/23/040/00226/AM12/ Lic.No/Date:0510305028 12.10.2011 Defer Date:07.02.2012   108

Case No.:23/17/80­ALC2/2011

Party Name:GAS TECH PROCESS ENGINEERING INDIA PVT. LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00342/AM12/ RLA File :05/23/040/00258/AM12/ Lic.No/Date:0510305104 13.10.2011 Defer Date:07.02.2012 Decision :As per DC(MSME) vide their U.O. Note No. 30(90)/2011­ME dated 07.12.2011, the Committee decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on  07.02.2012: ­ 1. Weight of the export product. 2. Size/Specifications of all import items including at Srl No.4. 3. Process flow chart indicating process of manufacturing, use of inputs and details whether these are being used as components or being supplied as spares or both. 4. Details of any indigenous items used. 5. Contains of imported inputs separately for each set.   109

Case No.:1/17/80­ALC2/2011

Party Name:MAN FORCE TRUCKS PRIVATE LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00320/AM12/ RLA File :31/83/040/00071/AM12/ Lic.No/Date:3110051087 19.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 20.12.2011, the 07.02.2012.

110

Case No.:6/20/80­ALC2/2011

Party Name:POLY MEDICURE LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00391/AM12/ RLA File :05/24/040/00241/AM12/ Lic.No/Date:0510305885 19.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to C&PC on 27.12.2011, the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   111

Case No.:4/20/80­ALC2/2011

Party Name:POLY MEDICURE LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00389/AM12/ RLA File :05/24/040/00242/AM12/ Lic.No/Date:0510305886 19.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 27.12.2011, the 07.02.2012.   112

Case No.:2/17/80­ALC2/2011

MFG. CO. LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00321/AM12/ RLA File :03/94/040/00605/AM12/ Lic.No/Date:0310661481 21.10.2011 Defer Date:07.02.2012 Decision : As per DIPP vide their U.O. Note dated 27.12.2011, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  07.02.2012: ­ 1.      Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Format. 2.      Quantity of import item at Sl. No. 1 in Nos. also in addition to its weight.   113

Case No.:20/20/80­ALC2/2011

Party Name:FRICK INDIA LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00405/AM12/ RLA File :05/23/040/00269/AM12/ Lic.No/Date:0510306601 25.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent already to DIPP on 16.12.2011 for examination and comments. The Committee, therefore, decided to defer the case and to re­ list the case on 07.02.2012.   114

Case No.:35/17/80­ALC2/2011

Party Name:COMAU INDIA P.LTD, Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00354/AM12/ RLA File :31/82/040/00186/AM12/ Lic.No/Date:3110051283 02.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DIPP on 16.12.2011 and decided to send a copy of firm’s application to DHI for examination and comments as it pertains to them. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   115

Case No.:2/20/80­ALC2/2011

Party Name:POLY MEDICURE LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00387/AM12/ RLA File :05/24/040/00244/AM12/ Lic.No/Date:0510307048 02.11.2011 Defer Date:07.02.2012

Decision : The Committee noted that a copy of firm’s application has been sent  to C&PC on 27.12.2011 and the case is under examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   116

Case No.:17/20/80­ALC2/2011

LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00402/AM12/ RLA File :03/95/040/00463/AM12/ Lic.No/Date:0310663388 03.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 16.12.2011 and decided to send a copy of firm’s application to DIPP for examination and comments as it pertains to them. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   117

Case No.:18/20/80­ALC2/2011

Party Name:ADLER MEDIEQUIP PRIVATE LIMITED., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00403/AM12/ RLA File :03/94/040/00698/AM12/ Lic.No/Date:0310663899 08.11.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their U.O. Note dated 1. Word “relevant” may be prefixed with the description of import items from S.Nos. 1 to 4. 2. The quantity of import item No.1 may be allowed as 453.245 Kgs. inclusive of   368.5 % wastage after taking 20% recovery of scrap. 3. The quantity of import item No.2 may be allowed as 310.88 Kgs. inclusive of   40.5 % wastage after taking 20% recovery of scrap. 4. The quantity of import item No.3 may be allowed as 150.854  Kgs. inclusive of    10 % wastage after taking 20% recovery of scrap. 5. The quantity of import item No.4 may be allowed as 316.27 Kgs. inclusive of   213 % wastage after taking 20% recovery of scrap. 6. Import items  from Sl.No. 5 to 8  may be allowed within 2% of FOB Value of Exports     118

Case No.:16/20/80­ALC2/2011

LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00401/AM12/ RLA File :03/95/040/00595/AM12/ Lic.No/Date:0310664152 09.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 16.12.2011 for examination and comments. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   119

Case No.:15/20/80­ALC2/2011

MFG. CO. LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00400/AM12/ RLA File :03/94/040/00702/AM12/ Lic.No/Date:0310664727 14.11.2011 Defer Date:07.02.2012 Decision :As  per  DIPP  U.O.  Note  dated  27.12.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  07.02.2012: ­ 1.      Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Format­export product wise. 2.      Quantity  of import item at Sl. No. 2 in Nos. also in addition to its weight.

3.      Quantities of import items at Sl. No. 3, 6 & 7 in meters also in addition to their weights.   120

Case No.:19/20/80­ALC2/2011

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00404/AM12/ RLA File :06/24/040/00038/AM12/ Lic.No/Date:0610024542 14.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to C&PC on 16.12.2011 and  the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   121

Case No.:34/20/80­ALC2/2011

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00419/AM12/ RLA File :06/24/040/00040/AM12/ Lic.No/Date:0610024543 14.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to C&PC on 16.12.2011 and  the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   122

Case No.:22/20/80­ALC2/2011

Party Name:J PAN TUBULAR COMPONENTS PVT.LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00407/AM12/ RLA File :05/23/040/00300/AM12/ Lic.No/Date:0510307950 15.11.2011 Defer Date:07.02.2012 Decision :As  per  DIPP  U.O.  Note  dated  27.12.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  07.02.2012: ­ 1.      Specific list of  export items  with their respective quantities. 2.      Specific list of import items alongwith  their quantities. 3.      Basis for the requirement of import items alongwith a tabular  statement giving net content of import items in different export products.   123

Case No.:29/20/80­ALC2/2011

Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00414/AM12/ RLA File :05/23/040/00314/AM12/ Lic.No/Date:0510308164 16.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DIT on 16.12.2011 and  the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   124

Case No.:33/20/80­ALC2/2011

Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00418/AM12/ RLA File :05/23/040/00317/AM12/ Lic.No/Date:0510308167 16.11.2011 Defer Date:07.02.2012 Decision :As per DHI U.O. Note No. 3(81)/11­TSW(B) dated 02.01.2012, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  07.02.2012: ­ 1. Calculation of quantity of import of item No. 8 & 9 (All other items are components).

125

Case No.:30/20/80­ALC2/2011

LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00415/AM12/ RLA File :03/95/040/00628/AM12/ Lic.No/Date:0310665613 17.11.2011   Decision :The Committee deliberated the written comments of DIPP received  vide their U.O. Note dated 1.      Net Empty weight of 27.60 MT may be specified with the quantity of export product. 2.       Import item at Sl. No. 1    shall be of relevant grade and thickness as contained in the export product 3.      Import item at Sl. No. 3  shall be of relevant grade and dia. as contained in the export product. 4.      Quantity of import item at from Sl. No. 1  may be allowed as applied for i.e. 12000 Kgs. inclusive of a wastage of 5 %. 5.      Weights of 4.76 MT, 2 MT &  0.2 MT may be specified with the quantities of import items at Sl. Nos. 2, 4 & 5  respectively and the same may be allowed on net to net basis with accountability clause. 6.           Quantity of import item at Sl. No. 3 may be allowed as 30000 Mtrs. (9.44 MT )  inclusive of a wastage of 2%. 7.      Quantity of import item at Sl. No. 6  (welding Electrodes) may be allowed as 234 Kgs. 8.      Quantities of import items at Sl. Nos. 7 &  8  (welding Consumables) may be allowed as applied for i.e. 100 Kgs. each.     126

Case No.:31/20/80­ALC2/2011

LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00416/AM12/ RLA File :03/95/040/00627/AM12/ Lic.No/Date:0310665598 17.11.2011 Defer Date:07.02.2012 Decision :As  per  DIPP  U.O.  Note  dated  27.12.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  07.02.2012: ­ 1.      Information in respect of Sl. No. 11 & 13 of Standard Deficiency Format. 2.      Separate weights of Hemispherical Heads and Test Coupons  for import item at Sl. No. 5.   127

Case No.:26/20/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00411/AM12/ RLA File :04/24/040/00138/AM12/ Lic.No/Date:0410130571 18.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 10.12.2011 and  the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   128

Case No.:32/20/80­ALC2/2011

LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00417/AM12/ RLA File :03/95/040/00648/AM12/ Lic.No/Date:0310665958 18.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 16.12.2011 and  the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.

129

Case No.:24/20/80­ALC2/2011

Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00409/AM12/ RLA File :05/23/040/00309/AM12/ Lic.No/Date:0510308688 21.11.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s application to DHI for examination and comments as it pertains to them.  The case may be re­listed on 07.02.2012.   130

Case No.:25/20/80­ALC2/2011

Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00410/AM12/ RLA File :05/23/040/00296/AM12/ Lic.No/Date:0510308687 21.11.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s application to DIPP for examination and comments as it pertains to them.  The case may be re­listed on 07.02.2012.   131

Case No.:23/20/80­ALC2/2011

Party Name:KE­BURGMANN FLEXIBLES INDIA PVT.LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00408/AM12/ RLA File :04/24/040/00234/AM12/ Lic.No/Date:0410130688 22.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to C&PC on 16.12.2011, the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   132

Case No.:27/20/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00412/AM12/ RLA File :04/24/040/00216/AM12/ Lic.No/Date:0410130796 23.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 16.12.2011, the 07.02.2012.   133

Case No.:28/20/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00413/AM12/ RLA File :04/24/040/00215/AM12/ Lic.No/Date:0410130775 23.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 16.12.2011, the 07.02.2012.   134

Case No.:8/20/80­ALC2/2011

MFG. CO. LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00393/AM12/ RLA File :03/94/040/00768/AM12/ Lic.No/Date:0310668917 05.12.2011 Defer Date:07.02.2012 Decision :As  per  DIPP  U.O.  Note  dated  27.12.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  07.02.1012: ­

1.      Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Format­export product wise. 2.      Quantities of import items at Sl. No. 1, 2 & 3 in Nos. also in addition to their weights.   135

Case No.:9/20/80­ALC2/2011

Party Name:RADIANT INDUSTRIES Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00394/AM12/ RLA File :31/83/040/00182/AM12/ Lic.No/Date:3110051726 07.12.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 27.12.2011, the 07.02.2012.   136

Case No.:10/20/80­ALC2/2011

MFG. CO. LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00395/AM12/ RLA File :03/94/040/00763/AM12/ Lic.No/Date:0310668956 07.12.2011 Defer Date:07.02.2012 Decision :As  per  DIPP  U.O.  Note  dated  27.12.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  07.02.2012: ­ 1.      Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Format­export product wise. 2.      Quantities of import items at Sl. No. 2 & 3 in Nos. also in addition to their weights.   137

Case No.:11/20/80­ALC2/2011

Party Name:ESMECH EQUIPMENT PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Closed HQ File :01/80/050/00396/AM12/ RLA File :03/94/040/00765/AM12/ Lic.No/Date:0310668962 07.12.2011   Decision :The Committee noted that as per RA, Bangalore informed vide their  letter dt.07.12.2011, the Advance Authorization has been issued under GN­4 and therefore,  decided to close the case on the part of NC.     138

Case No.:12/20/80­ALC2/2011

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00397/AM12/ RLA File :31/82/040/00265/AM12/ Lic.No/Date:3110051774 07.12.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s application to DHI for examination and comments.  The case may be re­listed on 07.02.2012.   139

Case No.:13/20/80­ALC2/2011

Party Name:UNI VTL ENGINEERING PVT. LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00398/AM12/ RLA File :03/95/040/00726/AM12/ Lic.No/Date:0310669540 08.12.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DIPP on 27.12.2011. The Committee decided to forward a copy of application to DHI as it pertains to them. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.

140

Case No.:14/20/80­ALC2/2011

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00399/AM12/ RLA File :31/82/040/00266/AM12/ Lic.No/Date:3110051789 08.12.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s application to DHI for examination and comments.  The case may be re­listed on 07.02.2012.   141

Case No.:35/20/80­ALC2/2011

MFG. CO. LTD., Meet No/Date:20/80­ ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00420/AM12/ RLA File :03/94/040/00799/AM12/ Lic.No/Date:0310671299 16.12.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s application to DIPP for examination and comments.  The case may be re­listed on 07.02.2012.   S.No.23

Case No. A ­ 15

M/s.  Delphi Automotive Systems Pvt. Ltd., Noida  F.No. 01/80/50/ 00495/AM11/DES.I Lic.No. & Date Meeting No.20/12 RA F.No.05/88/040/00721/AM03 0510081234 dt.21.02.2003 Date: 27.12.2011 Ratification of norms   The Committee noted  that the firm’s reply has been sent to DHI on 12.12.2011 and the case is under examination. The case may be re­listed on  07.02.2012.   S.No.488

Case  No.  A/R­

102 M/s.  Bharat Heavy Electricals  Ltd., Haridwar HQ F.No.01/80/050/01790/AM09/DES­I Lic. No. & Date Meeting No.20/12 RLA No.61/24/040/00069/AM09 6110000286 dt.06.02.2009 Date: 27.12.2011 Ratification of Norms   The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dt.21.12.2011  to  DHI  for  examination  and comments.  The case may be re­listed on 07.02.2012.   S.No.489

Case  No.  A/R­

103 M/s.  Bharat Heavy Electricals  Ltd., Haridwar HQ F.No.01/80/050/00120/AM10/DES­I Lic. No. & Date Meeting No.20/12 RLA No.61/24/040/00007/AM10 6110000313 dt.29.05.2009 Date: 27.12.2011 Ratification of Norms   The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dt.21.12.2011  to  DHI  for  examination  and comments.  The case may be re­listed on 07.02.2012.   S.No.490

Case No. A/R­ 167

M/s.  Bharat  Heavy Electricals  Ltd., Haridwar  F.No. 01/80/50/ 00449/AM10/DES.I Lic.No. & Date Meeting No.20/12 RA F.No.61/24/040/00036/AM10 6110000362 dt.13.10.2009 Date: 27.12.2011 Ratification of norms   The Committee observed that the firm has not replied to this office letter dt.calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 07.02.2012.   S.No.491

Case No. A/R­ 175

M/s.  Precihole Machine Pvt. Ltd.,  F.No. 01/80/50/ 00942/AM08/DES.I Lic.No. & Date Meeting No.20/12 RA F.No.03/95/040/00586/AM08

0310443655 dt.19.09.2007 Date: 27.12.2011 Ratification of norms   The Committee has noted the reply received from the firm vide letter dated 17.12.2011 and wastage details forwarded therein and decided to amend the norms ratified earlier in the NC meeting No.20/11 dated 17.08.2010 (Sl. No. 181) as under:­   Applied: 1. Item No. 1 – 37 bars wt 1205.87 kg 2. Item No. 2 – 31 bars of st 529.21 kg. Allowed: 1. Item No. 1­37 bars wt 1108 kg wastage 210% recovery 4%. 2. Item No. 2­31 bars of wt 496 kg wastage 211% recovery 4%.   S.No.492

Case No. A/R­ 117

M/s. Thermax Ltd.,  F.No. 01/80/50/01034/AM09/DES.I Lic.No. & Date Meeting No.20/12 RA F.No.31/21/040/00296/AM09 3110035317 dt.09.09.2008 Date: 27.12.2011 Ratification of norms   The Committee noted that a copy of firm’s reply has been sent to DHI on 07.12.2011, the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   S.No.493

Case No. A/R­ 173

M/s. Thermax Ltd.,  F.No. 01/80/50/01550/AM09/DES.I Lic.No. & Date Meeting No.20/12 RA F.No.31/24/040/00296/AM09 3110036393 dt.09.09.2008 Date: 27.12.2011 Ratification of norms The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under    examination.  The   S.No.494

Case No.  A/R­28

M/s.  Brakes  India Limited, Chennai HQF.No.01/80/050/01124/AM08/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.04/24/040/00263/AM08 0410093871 dt.15.02.2008 Date: 27.12.2011 Revision of norms   The Committee noted that a copy of firm’s reply has been sent to DHI on 28.11.2011, the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 07.02.2012.   S.No.495

Case No.  A/R­37

M/s.  Bharat  Heavy Electricals  Ltd., Haridwar HQF.No.01/80/050/00143/AM11/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.61/24/040/00016/AM11 6110000447 dt.13.05.2010 Date: 27.12.2011 Revision of norms     S.No.496

Case No.  A/R­38

M/s.  Bharat  Heavy Electricals  Ltd., Haridwar HQF.No.01/80/050/00184/AM10/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.61/24/040/00012/AM10 6110000320 dt.19.06.2009 Date: 27.12.2011 Revision of norms     S.No.497

Case  No.  A/R­

68 M/s. GEA BGR Energy  System HQF.No.01/80/050/01097/AM08/DES.I Lic. No. & date

India  Ltd., Chennai Meeting No.20/12 RA.F.No.04/24/040/00325/AM08 0410092981 dt.02.01.2008 Date: 27.12.2011 Ratification  of norms     S.No.498

Case  No.  A/R­

95 M/s.  Botil  Oil Tools  India Pvt. LTd., New Delhi HQF.No.01/80/050/00875/AM09/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.05/24/040/00327/AM09 0510225643 dt.18.08.2008 Date: 27.12.2011 Amendment of norms   of norms The Committee noted the communication dated 12.12.2011 received from the firm and decided to allow import item 1 to 4 on net to net basis and delete input no. 5 to 7 as requested by the firm.     S.No.499

Case  No.    A/R­

144 M/s.  Alstom Projects  India Ltd., Vadodara HQF.No.01/80/050/00134/AM11/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.03/94/040/01139/AM10 0310567657 dt.31.03.2010 Date: 27.12.2011 Fixation of Norms   The Committee observed that the firm has not replied to this office letter dated 28.11.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 07.02.2012.   S.No.500

Case  No.    A/R­

147 M/s. Bharat  Heavy Electricals  Ltd., Tiruchirapalli HQF.No.01/80/050/00550/AM11/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.04/24/040/00204/AM11 0410118772 dt.10.11.2010 Date: 27.12.2011 Fixation  of Norms     S.No.501

Case  No.    A/R­

148 M/s. Bharat  Heavy Electricals  Ltd., Tiruchirapalli HQF.No.01/80/050/00651/AM11/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.04/24/040/00205/AM11 0410118773 dt.10.11.2010 Date: 27.12.2011 Fixation  of Norms     S.No.502

Case  No.    A/R­

149 M/s. Bharat  Heavy Electricals  Ltd., Tiruchirapalli HQF.No.01/80/050/00809/AM11/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.04/24/040/00104/AM11 0410121605 dt.14.02.2011 Date: 27.12.2011 Fixation  of Norms     S.No.503

Case  No.    A/R­

150 M/s.  The Saraswati HQF.No.01/80/050/00827/AM06/DES.I Lic. No. & date

Industrial Syndicate Ltd., Meeting No.20/12 RA.F.No.05/24/040/00766/AM06 0510173546 dt.03.01.2006 Date: 27.12.2011 Revision   of Norms   The Committee decided to forward a copy of Advance Authorization to DIPP. S.No.504

Case  No.    A/R­

112 M/s.  Bharat  Heavy Electricals  Ltd., Noida HQF.No.01/80/050/00575/AM10/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.05/23/040/00117/AM10 0510253818 dt.02.12.2009 Date: 27.12.2011 Fixation of Norms     S.No.505

Case No.  A/R­31

M/s.  Kern­Liebers Springs & Stampings Pvt. Ltd., Karnataka HQF.No.01/80/050/01630/AM09/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.07/24/040/00531/AM09 0710062052 dt.26.12.2008 Date: 27.12.2011 Revision of norms   The Committee noted that the DHI DL dated 11.11.2011seeking details of volume based calculation from the drawing dimensions is incorrect because they need to revise the recovery based on reply /information already furnished by the firm. The Committee therefore decided to write to DHI to examine the case based on data / information already furnished by the firm & offer comments as revised recovery and to re­list the case on 07.02.2012.   S.No.506

Case  No.  A/R­

70 M/s.  Kern­ Liebers  Springs &  Stampings Pvt.  LTd., Tumkur HQF.No.01/80/050/00593/AM09/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.07/24/040/00008/AM09 0710057064 dt.23.04.2008 Date: 27.12.2011 Revision  of norms   The Committee noted that the DHI DL dated 11.11.2011seeking details of volume based calculation from the drawing dimensions is incorrect because they need to revise the recovery based on reply /information already furnished by the firm. The Committee therefore decided to write to DHI to examine the case based on data / information already furnished by the firm & offer comments as revised recovery and to re­list the case on 07.02.2012.   S.No.507

Case  No.    A/R­

154 M/s.  Reference received  from Jt.DGFT, CLA, New Delhi  of  M/s. Gestek  Engineering Pvt.  LTd.,  New Delhi HQF.No.01/80/050/01125/AM07/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.05/24/040/00812/AM07 0510196934 dt.28.12.2006 Date: 27.12.2011 Revision of Norms   The Committee noted that CLA, New Delhi sought a clarification /advise regarding of Advance Authorization in view of difference in export product shown in the shipping bills and import items shown in the Bill of entry not match as per the ALC decision and therefore decided to obtain export documents from RA & send to DIPP for examination and comments. The case is to be re­listed on 07.02.2012.   S.No.160

Case No.C­35

 M/s. Panch Ratna Fastners (P). Ltd; HQ F.No.01/80/162/1316/AM09/DES.I Meeting No.20/12 Date: 27.12.2011 Alleged  swindling  of  several  crores  of  Govt. revenue –DEPB.

The Committee noted that the file is under examination  of NC­I. The case is to be re­listed on 07.02.2012.   Sl.No.161

Case No. C ­ 16

M/s.    Birla  Precision Technologies  Ltd., Aurangabad HQ F.No.01/80/162/00608/AM11/ DES­I Meeting No.20/12 Fixation  of  input  output  norms  for  the  export product “Tool Holder” in respect of  100% EOU Date: 27.12.2011   The Committee noted the DHI comments received vide ID Note dated 16.12.2011 that fixation of norms is not possible due to Large variety of non­standard components / parts and decided to write a DO to TA, DHI that in 100% EOU cases, the TA needs to examine only the wastage involved. The case is to be re­listed on 07.02.2012.     Sl.No.162

Case No.C­01

  M/s.  Snecma  Hal Aerospace LTd., HQ F.No.01/80/162/00681/AM11/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation  of  SION  for  Export  Product  “(Fluid System) – Air Crafts Part.   The Committee noted that DL, MSME has been sent to the firm on 23.12.2011 and decided to send a reminder to firm for furnishing of requisite information. The case is to be re­listed on 07.02.2012.   Sl.No.163

Case No.C­12

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00247/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .    The Committee decided to defer the cases to meeting dated 24.01.2012.   Sl.No.164

Case No.C­13

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00246/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   The Committee decided to defer the cases to meeting dated 24.01.2012.   Sl.No.165

Case No.C­14

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00245/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   The Committee decided to defer the cases to meeting dated 24.01.2012.   Sl.No.166

Case No.C­15

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00248/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   The Committee decided to defer the cases to meeting dated 24.01.2012.   Sl.No.167

Case No.C­16

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00243/AM12/DES.I

Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   The Committee decided to defer the cases to meeting dated 24.01.2012.     Sl.No.168

Case No.C­17

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00244/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   The Committee decided to defer the cases to meeting dated 24.01.2012.   Sl.No.169

Case No.C­22

 M/s. Inoxpa India Pvt. Ltd., Pune HQ F.No.01/80/162/00366 /AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Request for fixation of input output norms in respect of EOUs for the export product “(1) Centrifugal Pumps and Parts thereof (2) Industrial Valves Viz; Butterfly & Ball Valves; (3) Other components required for Food, Dairy, Cosmetic & Pharmaceuticals Industries  viz;  Tubes  Fitings,  Flanges, Unions, Joints & bend”.   The Committee observed that the firm has not replied to this office letter dated 25.11.2012 calling for certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information failing  which    their  case  will  be  rejected  without  any  further  notice.    The  case  may  be  re­listed  on 07.02.2012.   S.No.170

Case No.C­24

  M/s.  Indo  Schottle Auto Parts Pvt. Ltd.,, HQ F.No.01/80/162/00532 /AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Request  for  fixation  of  input  output  norms  in respect  of  100%  EOUs  for  the  export  product “Central  Housing  Cover;  Collar  Thrust;  Coupling Injector  Plunger  Assembly;  Fitting  High  Pressure Fuel;  Guide  Pin;  Housing  Injector  Spring;  Link Injector  Plunger;  Plunger  Tappet;  Sleeve;  Spool; Bushing; Oil Seal Plate etc.”   The Committee noted  that the firm’s reply has been sent to DHI on 28.11.2011 and the case is under examination. The case may be re­listed on  07.02.2012.  


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied