RATIFIED Minutes of Meeting No.20/12 scheduled on 27.12.2011 of Norms Committee(NCI) (DES.I Section) The meeting No. 20/12 of the Norms Committee (NCI) for the licensing year 20112012 actually held on 03.01.2012 under the Chairmanship of Sh. N.P.S. Monga, Additional Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure VolumeI. The following Members of the Committee were present in the meeting: Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh S.K. Jain, D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A DC(MSME),N.B. 4. Sh. A.K. Mishra, AIA 23063332 M/o Steel, U.B. 5. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 6. Sh. K.C. Raju, FTDO 404 23061562 Ext.265 DGFT, U.B. I The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon are as under: 1
Case No.:27/11/80ALC2/2011
Party Name:A RAYMOND FASTENERS INDIA PRIVATE LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00239/AM12/ RLA File :31/24/040/00108/AM10/ Lic.No/Date:3110040031 23.09.2009 Decision :The Committee deliberated the written comments of C&PC received vide their OM No.46011/83/2011PCIi dated 02.01.2012 and decided to ratify the norms in respect of the subject advance authorization as under: Item to be exported Quantity Automotive Fasteners 1 Kg. Rawmaterial recommended for Import Quantity 1. Polypropylene Granules 2. Polyacetal Granules 1.03 kg/kg content in the export product 1.03 kg/kg content in the export product The RLA may take necessary action accordingly. 2
Case No.:3/37/80ALC2/2009
Party Name:S.M.PULP PACKAGING PVT.LTD Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00562/AM10/ RLA File :05/24/040/00378/AM10/ Lic.No/Date:0510253563 27.11.2009 Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the committee decided to ratify the norms of the said Advance Authorization on net to net basis with accountability clause.
3
Case No.:16/2/80ALC2/2011
Party Name:PNEUMAX PNEUMATIC INDIA PVT.LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00937/AM11/ RLA File :07/21/040/00491/AM11/ Lic.No/Date:0710074822 14.10.2010 Defer Date:07.02.2012 Decision :The Committee noted that DDG informed the firm on phone that the data furnished by them is illegible. The firm promised to give fresh details in a week. The case may be relisted on 07.02.2012. 4
Case No.:20/33/80ALC2/2010
Party Name:BIRLA ERICSSON OPTICAL LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00576/AM11/ RLA File :11/24/040/00051/AM11/ Lic.No/Date:1110023479 02.11.2010 Decision :The Committee deliberated the written comments of DIT received vide their U.O. Note No.17(79)/2010IPHW dated 01.11.2011 and decided to ratify the norms in respect of the subject advance authorization as under: 1. The quantity of optical fibre allowed as 13154.5 kms is based on 5% additional length over the length of the cable. 2. The quantity of Polyethylene import material allowed as 8633.62 kms is inclusive of wastage of 2%. 5
Case No.:3/33/80ALC2/2010
Party Name:L&T MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00559/AM11/ RLA File :03/95/040/00615/AM11/ Lic.No/Date:0310602242 22.11.2010 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s reply dated 22.12.2011 to DHI for examination and comments. The case may be relisted on 07.02.2012. 6
Case No.:9/33/80ALC2/2010
Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00565/AM11/ RLA File :07/24/040/00329/AM11/ Lic.No/Date:0710075610 24.11.2010 Defer Date:07.02.2012 Decision :The Committee observed that the firm has not replied to this office letter dated 09.12.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 07.02.2012. 7
Case No.:28/39/80ALC2/2010
Party Name:MAN FORCE TRUCKS PRIVATE LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Rejected HQ File :01/80/050/00830/AM11/ RLA File :31/24/040/00119/AM11/ Lic.No/Date:3110046183 29.12.2010 Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter and subsequent reminder calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.
8
Case No.:26/38/80ALC2/2010
Party Name:INVENSYS INDIA PVT. LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00796/AM11/ RLA File :03/94/040/00885/AM11/ Lic.No/Date:0310609488 05.01.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm’s reply has been sent to DIT on 28.11.2011 and the case is under examination of DIT. The case may be relisted on 07.02.2012. 9
Case No.:30/39/80ALC2/2010
Party Name:L&TMHI BOILERS PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00832/AM11/ RLA File :03/95/040/00765/AM11/ Lic.No/Date:0310609444 05.01.2011 Defer Date:07.02.2012 Decision: The Committee noted that the firm has sought time vide their letter dated 10.12.2011 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be relisted on 07.02.2012. 10
Case No.:10/36/80ALC2/2010
Party Name:SEC INDUSTRIES PVT.LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00709/AM11/ RLA File :09/24/040/00442/AM11/ Lic.No/Date:0910045076 07.01.2011 Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the committee decided to ratify the norms of the said Advance Authorization on net to net basis with accountability clause. 11
Case No.:3/39/80ALC2/2010
Party Name:L&TMHI BOILERS PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00805/AM11/ RLA File :03/95/040/00774/AM11/ Lic.No/Date:0310610650 12.01.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm’s reply has been sent to DHI on 22.12.2011 and the case is under examination of DHI. The case may be relisted on 07.02.2012. 12
Case No.:13/39/80ALC2/2010
Party Name:L&TMHI BOILERS PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00815/AM11/ RLA File :03/95/040/00824/AM11/ Lic.No/Date:0310610931 13.01.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm has sought time vide their letter dated 10.12.2011 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be relisted on 07.02.2012. 13
Case No.:18/36/80ALC2/2010
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00717/AM11/ RLA File :31/21/040/00312/AM11/
Lic.No/Date:3110046436 14.01.2011 Defer Date:07.02.2012 Decision :The Committee noted that the firm submitted their reply by email dt.03.01.2012 and decided to forward a copy of reply to DHI for examination and comments. The case may be relisted on 07.02.2012. 14
Case No.:22/37/80ALC2/2010
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00760/AM11/ RLA File :09/24/040/00477/AM11/ Lic.No/Date:0910045223 25.01.2011 Defer Date:07.02.2012 Decision :The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 15
Case No.:29/39/80ALC2/2010
Party Name:PNEUMAX PNEUMATIC INDIA PVT.LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00831/AM11/ RLA File :07/21/040/00757/AM11/ Lic.No/Date:0710076903 25.01.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm’s reply has been sent to DHI on 16.12.2011 and the case is 16
Case No.:1/11/85ALC3/2011
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/85/050/00057/AM12/ RLA File :04/24/040/00296/AM11/ Lic.No/Date:0410121516 10.02.2011 Defer Date:07.02.2012 Decision : The representative of the DHI informed the Committee that the case is under examination. The 17
Case No.:10/5/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00046/AM12/ RLA File :09/24/040/00479/AM11/ Lic.No/Date:0910045519 11.02.2011 Defer Date:07.02.2012 Decision :The Committee deliberated the written comments of DIPP for Wet Gas Compressor received vide their U.O. Note dated 27.12.2011 and decided to forward the application to DHI for examination and comments for inputs related to Steam Turbine as it pertains to them. The case is to be relisted on 07.02.2012. 18
Case No.:31/39/80ALC2/2010
Party Name:SAVAS ENGINEERING COMPANY PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00833/AM11/ RLA File :31/24/040/00249/AM11/ Lic.No/Date:3110046929 15.02.2011 Defer Date:07.02.2012 Decision : The Committee noted that a D.O. letter from DDG has been sent to RA, Pune requesting to send a copy of firm’s application but the same is still awaited. To remind RA by email and to relist the case on 07.02.2012. Remind by email.
Case No.:36/39/80ALC2/2010
Party Name:TRF LIMITED, Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00838/AM11/ RLA File :02/24/040/00255/AM10/
19 Lic.No/Date:0210154977 18.02.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm vide letter dated 21.12.2011 informed that they had surrendered the said Advance Authorization. The Committee therefore decided to confirm the status from RA and to relist the case on 07.02.2012. 20
Case No.:41/39/80ALC2/2010
Party Name:SEC INDUSTRIES PVT.LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00843/AM11/ RLA File :09/24/040/00524/AM11/ Lic.No/Date:0910045585 18.02.2011 Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the committee decided to ratify the norms of the said Advance Authorization on net to net basis with accountability clause. 21
Case No.:42/39/80ALC2/2010
Party Name:L&TMHI BOILERS PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00844/AM11/ RLA File :03/95/040/00874/AM11/ Lic.No/Date:0310616717 18.02.2011 Defer Date:07.02.2012 22
Case No.:18/5/80ALC2/2011
Party Name:SPRAY ENGINEERING DEVICES LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00054/AM12/ RLA File :22/24/040/00094/AM11/ Lic.No/Date:2210011010 18.02.2011 Defer Date:07.02.2012 23
Case No.:40/39/80ALC2/2010
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved. HQ File :01/80/050/00842/AM11/ RLA File :04/24/040/00231/AM11/ Lic.No/Date:0410121741 21.02.2011 Decision :The Committee noted that the written comments received from DHI vide their UO No. 3(29)/09 TSW(B)/588 dated 30.09.2011 and decided to ratify the norms as under: Export The description of export may be amended & their weight incorporated as given below: 1. ESP 12 Numbers 2. APH 8 Numbers 3. FAN24 Numbers 4. Dampers & gates Import DHI comments is based on the list of items with detail description incorporated in the licence. 1. Item No.1 Drawing – Deleted. 2. Item No. 2 to 5 – These are components & may be allowed under GN4.
3. Item No. 6 This is spares for item No.2 & may be allowed as per spares policy of item No.2. 4. Item No.7 – This is spares for item No.5 & may be allowed as per spares policy of item No.5. 5. Item No. 8 & 9 this is spares for item No.3 & may be allowed as per spares policy of item No.3. 6. Item No.10 to 34(Except item No. 21 & 33) – These are components & may be allowed under GN$. 7. Item No.21 – Templates – Allowed with accountability clause. 8. Item No. 33 – This is spares for Flue gas Desulpurisation plant & may be allowed as per spares policy for the export product 24
Case No.:47/39/80ALC2/2010
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00849/AM11/ RLA File :05/23/040/00328/AM11/ Lic.No/Date:0510284479 22.02.2011 Defer Date:07.02.2012 25
Case No.:48/39/80ALC2/2010
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00850/AM11/ RLA File :05/23/040/00330/AM11/ Lic.No/Date:0510284482 22.02.2011 Defer Date:07.02.2012 26
Case No.:25/1/81ALC2/2011
Party Name:WEBB INDIA PVT. LTD Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Rejected HQ File :01/81/050/00604/AM11/ RLA File :07/24/040/00485/AM11/ Lic.No/Date:0710077830 04.03.2011 Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 28.09.2011 and subsequent reminder 02.12.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs. 27
Case No.:9/2/80ALC2/2011
Party Name:THERMAX LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00930/AM11/ RLA File :31/24/040/00273/AM11/ Lic.No/Date:3110047467 21.03.2011 Defer Date:07.02.2012 28
Case No.:14/2/80ALC2/2011
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00935/AM11/ RLA File :05/23/040/00367/AM11/ Lic.No/Date:0510286717 23.03.2011 Defer Date:07.02.2012
29
Case No.:6/2/80ALC2/2011
Party Name:METSO POWER INDIA PRIVATE LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00927/AM11/ RLA File :04/24/040/00350/AM11/ Lic.No/Date:0410122852 25.03.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm’s reply has been sent to DHI on 22.12.2011 and the case is 30
Case No.:3/2/80ALC2/2011
Party Name:AYAAPPA CNC PVT.LTD, Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00003/AM12/ RLA File :07/24/040/00547/AM11/ Lic.No/Date:0710078428 29.03.2011 Defer Date:07.02.2012 Decision : The Committee noted the written comments received from MSME and decided to seek details such as quantities, numbers, weight and wastage involved. The case may be relisted on 07.02.2012. 31
Case No.:13/5/80ALC2/2011
Party Name:TDW INDIA LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00049/AM12/ RLA File :34/24/040/00338/AM11/ Lic.No/Date:3410029836 01.04.2011 Defer Date:07.02.2012 Decision : The Committee noted that a DO letter from DDG to RA, Vadodara was sent asking to verify the firm’s existence. Send email reminder. The case may be relisted on 07.02.2012. Send email reminder. 32
Case No.:18/8/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00166/AM12/ RLA File :61/24/040/00001/AM12/ Lic.No/Date:6110000602 18.04.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm’s reply has been sent to DHI on 29.11.2011 and the case is 33
Case No.:12/3/80ALC2/2011
Party Name:CHANG YUN INDIA LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00017/AM12/ RLA File :05/23/040/00022/AM12/ Lic.No/Date:0510288459 20.04.2011 Defer Date:07.02.2012 34
Case No.:19/8/80ALC2/2011
Party Name:AVASARALA TECHNOLOGIES LIMITED, Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Rejected HQ File :01/80/050/00167/AM12/ RLA File :07/21/040/00896/AM11/ Lic.No/Date:0710078776 26.04.2011
Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dt.17.10.2011 and subsequent reminder 25.11.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs. 35
Case No.:23/5/80ALC2/2011
Party Name:L&TMHI BOILERS PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00059/AM12/ RLA File :03/95/040/00090/AM12/ Lic.No/Date:0310630441 10.05.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm’s reply has been sent to DHI on 27.12.2011 and the case is 36
Case No.:28/5/80ALC2/2011
Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00064/AM12/ RLA File :05/23/040/00043/AM12/ Lic.No/Date:0510290272 10.05.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm’s reply has been sent to DHI on 28.11.2011 and the case is 37
Case No.:1/9/81ALC2/2011
Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/81/050/00051/AM12/ RLA File :05/23/040/00054/AM12/ Lic.No/Date:0510290928 18.05.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm’s reply has been sent to DHI on 28.11.2011 and the case is under examination of DHI. The case may be relisted on 07.02.2012. 38
Case No.:39/5/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00075/AM12/ RLA File :04/24/040/00040/AM12/ Lic.No/Date:0410124178 19.05.2011 Defer Date:07.02.2012 Decision :The committee decided to forward a copy of firm’s reply dt.27.12.2011 to DHI for examination and comments. The case may be relisted on 07.02.2012. 39
Case No.:4/8/80ALC2/2011
Party Name:SUPREME INDUSTRIES, Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Rejected HQ File :01/80/050/00152/AM12/ RLA File :32/21/040/00038/AM12/ Lic.No/Date:3210048327 10.06.2011 Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 28.09.2011 and subsequent reminder 02.12.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.
Case No.:22/11/80ALC2/2011
Party Name:TRF LIMITED, Status:
40 Meet No/Date:20/80 ALC2/2011 27.12.2011 Approved HQ File :01/80/050/00234/AM12/ RLA File :02/24/040/00049/AM12/ Lic.No/Date:0210160407 15.06.2011 Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the committee decided to ratify the norms of the said Advance Authorization on net to net basis with accountability clause. 41
Case No.:8/8/80ALC2/2011
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Rejected HQ File :01/80/050/00156/AM12/ RLA File :31/82/040/00053/AM12/ Lic.No/Date:3110048743 21.06.2011 Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 28.09.2011 and subsequent reminder 02.12.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs. 42
Case No.:9/11/80ALC2/2011
Party Name:ICEM ENGINEERING COMPANY PRIVATE LIMITED, Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00221/AM12/ RLA File :03/94/040/00270/AM12/ Lic.No/Date:0310638600 24.06.2011 Defer Date:07.02.2012 Decision :The Committed noted that the reply received from the firm is incomplete. The firm may be requested to furnish specific point wise reply to Sl. No. 3,5, & 11 of SDF – export product wise. The case may be relisted on 07.02.2012. 43
Case No.:14/11/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00226/AM12/ RLA File :09/24/040/00163/AM12/ Lic.No/Date:0910047353 28.06.2011 Defer Date:07.02.2012 Decision : The committee decided to forward a copy of firm’s reply dt.26.12.2011 to DHI for examination and comments. The case may be relisted on 07.02.2012. 44
Case No.:24/11/80ALC2/2011
Party Name:POLMOR STEEL PVT LTD Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00236/AM12/ RLA File :09/24/040/00140/AM12/ Lic.No/Date:0910047329 28.06.2011 Defer Date:07.02.2012 45
Case No.:17/8/80ALC2/2011
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00165/AM12/ RLA File :05/23/040/00127/AM12/
Lic.No/Date:0510295211 30.06.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm’s reply has been sent to DHI on 05.12.2011 and the case is 46
Case No.:7/11/80ALC2/2011
Party Name:REITZ INDIA LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00219/AM12/ RLA File :09/24/040/00155/AM12/ Lic.No/Date:0910047380 30.06.2011 Defer Date:07.02.2012 Decision :The Committee noted that RA confirmed the firm’s change of address and decided to send D/L again to the firm for calling necessary information. The case may be relisted on 07.02.2012. 47
Case No.:25/11/80ALC2/2011
Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00237/AM12/ RLA File :07/24/040/00104/AM12/ Lic.No/Date:0710080361 04.07.2011 Defer Date:07.02.2012 Decision :The Committee observed that the firm has not replied to this office letter dated 02.12.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 07.02.2011. 48
Case No.:21/11/80ALC2/2011
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00233/AM12/ RLA File :09/24/040/00175/AM12/ Lic.No/Date:0910047647 15.07.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s reply received on dt.03.01.2012 to DHI for examination and comments. The case may be relisted on 07.02.2012. 49
Case No.:15/11/80ALC2/2011
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00227/AM12/ RLA File :03/95/040/00283/AM12/ Lic.No/Date:0310643331 20.07.2011 Defer Date:07.02.2012 50
Case No.:12/11/80ALC2/2011
Party Name:HBL POWER SYSTEMS LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00224/AM12/ RLA File :09/24/040/00167/AM12/ Lic.No/Date:0910047808 21.07.2011 Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the committee decided to ratify the norms of the said Advance Authorization on net to net basis with accountability clause.
Case No.:13/11/80ALC2/2011
Status:
51 ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Deferred HQ File :01/80/050/00225/AM12/ RLA File :09/24/040/00173/AM12/ Lic.No/Date:0910047823 22.07.2011 Defer Date:07.02.2012 Decision : The committee decided to forward a copy of firm’s reply dt.26.12.2011 to DHI for examination and comments. The case may be relisted on 07.02.2012. 52
Case No.:12/14/80ALC2/2011
Party Name:AYAAPPA CNC PVT.LTD, Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00266/AM12/ RLA File :07/24/040/00120/AM12/ Lic.No/Date:0710080825 22.07.2011 Defer Date:07.02.2012 Decision : The Committee noted the written comments received from MSME and decided to seek details such as quantities, numbers, weight and wastage involved. The case may be relisted on 07.02.2012. 53
Case No.:16/11/80ALC2/2011
LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00228/AM12/ RLA File :03/95/040/00255/AM12/ Lic.No/Date:0310644231 25.07.2011 Decision :The Committee deliberated the written comments of DIPP received vide their U.O. Note dated 27.12.2011 and decided to ratify the norms in respect of the subject advance authorization as under: 1. Net Fabricated weight of 130 MT may be specified with the quantity of export product. 2. Import items at Sl. Nos. 1 to 3, 5 & 6 shall be of relevant grade and thickness as contained in the export product 3. Import item at Sl. No. 7 shall be of relevant grade and dia. as contained in the export product. 4. Quantities of import items at from Sl. No 1 to 3 & 5 may be allowed as applied for inclusive of a wastage of 3 %. 5. Weights of 3 MT, 0.35 MT, 0.5 MT & 2 MT may be specified with the quantities of import items at Sl. Nos. 4, 13, 14 & 15 respectively and the same may be allowed on net to net basis with accountability clause. 6. Quantity of import item at Sl. No 6 may be allowed as 14620 Kgs. inclusive of a wastage of 12 %. 7. Quantity of import item at Sl. No. 7 may be allowed as 36 Mtrs. (2373 Kgs.) inclusive of a wastage of 2%. 8. Quantities of import items at Sl. Nos. 8, 9, 10, 11 & 12 (welding Consumables) may be allowed as applied for i.e. 1400 Kgs., 1753 Kgs. 800 Kgs., 200 Kgs. & 1753 Kgs. respectively. 9. Import item at Sl. No. 13 to be supplied alongwith export product. 54
Case No.:7/20/80ALC2/2011
Party Name:DAYCO VIKAS POWER TRANSMISSION PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00392/AM12/ RLA File :05/23/040/00154/AM12/ Lic.No/Date:0510297629 26.07.2011 Defer Date:07.02.2012 Decision : The Committee deliberated the details of the case and observed that details of export products to be obtained from CLA. The case may be relisted on 07.02.2012.
55
Case No.:1/11/80ALC2/2011
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00213/AM12/ RLA File :03/94/040/00389/AM12/ Lic.No/Date:0310645892 03.08.2011 Decision :The Committee deliberated the written comments of DIPP received vide their U.O. Note dated 1. Net empty export weight(without internals) of 39402 Kgs. may be specified with the quantity of export product at Sl. No. 1. 2. Net empty export weights of 19137 Kgs., 7931 Kgs., & 5913 Kgs. may be specified with the quantities of export products at Sl. No. 2, 3 & 4 respectively. 3. Quantity of import item at Sl. No. 1 may be allowed as 290.3 Kgs. (3 Nos.) on net to net basis with accountability clause. 4. Quantity of import item at Sl. No. 2 may be allowed as 4 Nos. on net to net basis. However, duty free weight of this item may be allowed as 752 Kg inclusive of 33 % wastage after 20 % recovery. 5. Word “Relevant” may be prefixed with the descriptions of import items at Sl. No. 3 & 4. 6. Quantity of import item at Sl. No. 3 may be allowed as 45631 Kgs. inclusive of 13 % wastage after 1/3rd recovery. 7. Quantity of import item at Sl. No. 4 may be allowed as 191 Kgs. inclusive of 36 % wastage after 1/3rd recovery. 8. Quantity of import item at Sl. No. 5 may be allowed as 10 Kgs. (13 Nos.) on net to net basis with accountability clause. 9. Quantity of import item at Sl. No. 6 may be allowed as 0.77 Kgs. inclusive of 2 % wastage. 10. Quantities of import items at Sl.Nos. 7, 8 & 9 ( Welding Consumables) may be allowed as 852 Kgs. each. 56
Case No.:29/14/80ALC2/2011
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00283/AM12/ RLA File :07/24/040/00168/AM12/ Lic.No/Date:0710081189 04.08.2011 Defer Date:07.02.2012 Decision :The Committee decided to forward a copy of firm’s reply dt.27.12.2011 to DHI for examination and comments. The case may be relisted on 07.02.2012. 57
Case No.:2/11/80ALC2/2011
Party Name:KUVAWALA DRILL EQUIP Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00214/AM12/ RLA File :03/94/040/00383/AM12/ Lic.No/Date:0310647125 09.08.2011 Defer Date:07.02.2012 Decision :The Committee observed that the firm has not replied to this office letter dated 25.11.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 07.02.2012.
Case No.:3/11/80ALC2/2011
Party Name:KUVAWALA DRILL EQUIP Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00215/AM12/ RLA File :03/94/040/00382/AM12/
58 Lic.No/Date:0310647358 09.08.2011 Defer Date:07.02.2012 Decision : The Committee observed that the firm has not replied to this office letter dated 25.11.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 07.02.2012. 59
Case No.:40/14/80ALC2/2011
Party Name:WOLFRA TECH PVT LTD Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00294/AM12/ RLA File :07/24/040/00087/AM12/ Lic.No/Date:0710081399 10.08.2011 Decision :The Committee deliberated the written comments of DHI received vide their U.O. Note dated Quantities of import items at Sl. No. 1 , 2 & 3 may be allowed as applied for i.e. 515 Kgs., 257.5 Kgs. and 20.6 Kgs respectively inclusive of a wastage of 3% after taking 2/3rd recovery 60
Case No.:24/14/80ALC2/2011
Party Name:BOYSEN INDIA LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00278/AM12/ RLA File :05/23/040/00186/AM12/ Lic.No/Date:0510299447 11.08.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm’s reply has been sent to DHI on 28.11.2011 and the case is 61
Case No.:31/14/80ALC2/2011
Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00285/AM12/ RLA File :05/24/040/00159/AM12/ Lic.No/Date:0510299729 17.08.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm’s reply has been sent to DHI on 14.12.2011 and the case is 62
Case No.:25/14/80ALC2/2011
Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00279/AM12/ RLA File :05/23/040/00176/AM12/ Lic.No/Date:0510299788 18.08.2011 Decision : The Committee deliberated the written comments of DC(MSME) received vide their U.O. Note No.30(78)/2011ME dated 07.12.2011 and decided to allow 1.06 kg/kg of Antimony metal in Antimony concentrate in respect of the subject Advance Authorization.
Case No.:27/14/80ALC2/2011
Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00281/AM12/ RLA File :05/23/040/00193/AM12/ Lic.No/Date:0510299789 18.08.2011
63 Decision : The Committee deliberated the written comments of DC(MSME) received vide their U.O. Note No.30(79)/2011ME dated 07.12.2011 and decided to allow 1.06 kg/kg of Antimony metal in Antimony concentrate in respect of the subject Advance Authorization. 64
Case No.:34/14/80ALC2/2011
LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00288/AM12/ RLA File :03/95/040/00346/AM12/ Lic.No/Date:0310649471 19.08.2011 Defer Date:07.02.2012 65
Case No.:9/14/80ALC2/2011
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00263/AM12/ RLA File :07/24/040/00192/AM12/ Lic.No/Date:0710081630 22.08.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s reply dt.27.12.2011 to DHI for examination and comments. The case may be relisted on 07.02.2012. 66
Case No.:39/14/80ALC2/2011
Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00293/AM12/ RLA File :07/24/040/00188/AM12/ Lic.No/Date:0710081631 22.08.2011 Defer Date:07.02.2012 Decision :The Committee observed that the firm has not replied to this office letter dated 23.12.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 07.02.2012. 67
Case No.:8/14/80ALC2/2011
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00262/AM12/ RLA File :05/24/040/00182/AM12/ Lic.No/Date:0510300205 24.08.2011 Defer Date:07.02.2012 Decision : The Committee noted that the DO from DDG has been sent to C&PC on 27.12.2011 and the case is under examination. The case may be relisted on 07.02.2012. 68
Case No.:11/14/80ALC2/2011
Party Name:HITTCO TOOLS LTD Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00265/AM12/ RLA File :07/24/040/00203/AM12/ Lic.No/Date:0710081769 25.08.2011 Defer Date:07.02.2012 Decision :The Committee noted that a note requesting DHI to reexamine the case has been sent. Further, RA, Bangalore vide letter dt.30.11.2011 forwarded a copy of amendment sheet 1 dt.30.11.2011, copy of which may be send to DHI for examination & comments. The case may be relisted on 07.02.2012.
Case No.:6/14/80ALC2/2011
Status:
69 Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Deferred HQ File :01/80/050/00260/AM12/ RLA File :05/24/040/00177/AM12/ Lic.No/Date:0510300518 26.08.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s reply dt.16.12.2011 to DHI for examination and comments. The case may be relisted on 07.02.2012. 70
Case No.:12/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00331/AM12/ RLA File :61/24/040/00030/AM12/ Lic.No/Date:6110000675 29.08.2011 Defer Date:07.02.2012 71
Case No.:13/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00332/AM12/ RLA File :61/24/040/00031/AM12/ Lic.No/Date:6110000676 29.08.2011 Defer Date:07.02.2012 72
Case No.:35/14/80ALC2/2011
LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00289/AM12/ RLA File :03/95/040/00336/AM12/ Lic.No/Date:0310650989 30.08.2011 Decision :The Committee deliberated the written comments of DIPP received vide their U.O. Note dated 1. Net Empty weight of 360 MT may be specified with the quantity of export product. 2. Import items at Sl. Nos. 1 to 3 shall be of relevant grade and thickness as contained in the export product 3. Import item at Sl. No. 7 shall be of relevant grade and dia. as contained in the export product. 4. Quantities of import items at from Sl. No 1 & 3 may be allowed as applied for inclusive of a wastage of 3 %. 5. Quantity of import item at Sl. No 2 may be allowed as 23146 Kgs. inclusive of a wastage of 12 % as claimed by the firm. 6. Quantity of import item at Sl. No. 4 may be allowed as 2 Nos. on net to net basis. However, duty free weight of this item may be allowed as 73.61 MT inclusive of 100 % wastage after 20 % recovery. 7. Weights of 3.5 MT, 1.5 MT & 0.35 MT may be specified with the quantities of import items at Sl. Nos. 5, 6 & 12 respectively and the same may be allowed on net to net basis with accountability clause. 8. Quantity of import item at Sl. No. 7 may be allowed as 66 Mtrs. (15.83 MT ) inclusive of a wastage of 2%. 9. Quantities of import items at Sl. Nos. 8, 9, 10 & 11 (welding Consumables) may be allowed as applied for i.e. 6712 Kgs., 5800 Kgs. 773 Kgs. & 7485 Kgs. respectively. 10. Import item at Sl. No. 12 to be supplied alongwith export product.
73
Case No.:36/14/80ALC2/2011
LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00290/AM12/ RLA File :03/95/040/00418/AM12/ Lic.No/Date:0310650991 30.08.2011 Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the Committee decided to ratify the norms of the said Advance Authorization as per GN4 (Sl. No. 47 to be deleted). 74
Case No.:37/14/80ALC2/2011
LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00291/AM12/ RLA File :03/95/040/00394/AM12/ Lic.No/Date:0310650993 30.08.2011 Defer Date:07.02.2012 Decision :The Committee noted that a copy of firm’s application has been sent to DHI on 30.09.2011 for examination and comments. The case may be relisted on 07.02.2012. 75
Case No.:5/14/80ALC2/2011
Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00259/AM12/ RLA File :05/24/040/00195/AM12/ Lic.No/Date:0510300970 01.09.2011 Decision :The Committee deliberated the written comments of DHI received vide their U.O. Note dated 1. Net empty weight of 38760 Kgs. may be specified with the quantity of export product. 2. Word “Relevant” may be prefixed with the descriptions of import items at S. Nos. 1, 2 & 3. 3. Quantities of import items at Sl. No. 1 & 2 may be allowed as applied for i.e. 2327 Kgs. & 8962 Kgs. respectively inclusive of 4.5 % wastage. 4. Quantity of import item at Sl. No.3 may be allowed as 9332 Kgs.(7180 Mtrs.) inclusive of 2 % wastage. 5. Quantities of import item at Sl. Nos. 4 & 5 may be allowed as applied for on net to net basis with accountability clause. 76
Case No.:41/14/80ALC2/2011
Party Name:MICRO TECH.CNC PRIVATE LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00295/AM12/ RLA File :07/24/040/00215/AM12/ Lic.No/Date:0710082069 06.09.2011 Defer Date:07.02.2012 Decision :The Committee observed that the firm has not replied to this office letter dated 25.11.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 07.02.2012.
Case No.:14/17/80ALC2/2011
Party Name:STERDILL EQUIPMENTS PVT.LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred
77 HQ File :01/80/050/00333/AM12/ RLA File :03/95/040/00437/AM12/ Lic.No/Date:0310651808 06.09.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s reply received through email dt.30.12.2011 to DIPP for examination and comments. The case may be relisted on 07.02.2012. 78
Case No.:38/14/80ALC2/2011
Party Name:H.L.EQUIPMENTS Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00292/AM12/ RLA File :52/24/040/00021/AM12/ Lic.No/Date:5210036390 07.09.2011 Defer Date:07.02.2012 Decision :The Committee observed that the firm has not replied to this office letter dated 25.11.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be re listed on 07.02.2012. 79
Case No.:14/14/80ALC2/2011
Party Name:THERMAX LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00268/AM12/ RLA File :31/83/040/00117/AM12/ Lic.No/Date:3110050321 15.09.2011 Decision : The Committee deliberated the written comments of DHI received vide their U.O. Note No.3(56)/11TSW(B)/7 dated 11.01.2011 and decided to ratify the norms in respect of the subject advance authorization as per SION C1742. 80
Case No.:32/17/80ALC2/2011
Party Name:WOLFRA TECH PVT LTD Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00351/AM12/ RLA File :07/24/040/00184/AM12/ Lic.No/Date:0710082357 15.09.2011 Decision :The Committee deliberated the written comments of DIPP received vide their U.O. Note dated 1. Quantity of import item may be allowed as applied for i.e. 15.45 Kgs inclusive of 3 % wastage after taking clue form SION C227. 81
Case No.:34/17/80ALC2/2011
Party Name:PRANAV VIKAS (INDIA) LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00353/AM12/ RLA File :05/24/040/00212/AM12/ Lic.No/Date:0510303169 20.09.2011 Defer Date:07.02.2012 Decision : The Committee noted that the firm’s reply has been sent to DIPP on 29.12.2011 and the case is under examination at DIPP. The case may be relisted on 07.02.2012.
Case No.:4/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00323/AM12/ RLA File :07/24/040/00106/AM12/
82 Lic.No/Date:0710082716 23.09.2011 Decision : The Committee deliberated the written comments of DIT received vide their U.O. No.17(92)/2011IPHW dated 21.11.2011 and decided to ratify the norms in respect of the subject advance authorization as under: “The items proposed for import are essential to assemble the export product. DIT recommends ratification of norms of advance authorization on net to net basis with accountability clause”. 83
Case No.:42/14/80ALC2/2011
Party Name:SPARKLINE EQUIPMENTS PVT.LTD, Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00296/AM12/ RLA File :31/83/040/00126/AM12/ Lic.No/Date:3110050595 26.09.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 15.11.2011, the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 84
Case No.:17/17/80ALC2/2011
MFG. CO. LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00336/AM12/ RLA File :03/94/040/00343/AM12/ Lic.No/Date:0310656144 26.09.2011 Decision :The Committee deliberated the written comments of DIPP received vide their U.O. Note dated 1. Net export weight of 6850 Kgs. may be specified with the quantity of export product. 2. Word “Relevant” may be prefixed with the descriptions of import items at Sl. No. 1, 3 & 4. 3. Quantity of import item at Sl. No. 1 may be allowed as 50 Kgs. inclusive of 2 % wastage. 4. Quantity of import item at Sl. No. 2 may be allowed as 1 Kgs. (16 Nos.) on net to net basis with accountability clause. 5. Quantity of import item at Sl. No. 3 may be allowed as 1331 Kgs. inclusive of 123 % wastage after 1/3rd recovery. 6. Quantity of import item at Sl. No. 4 may be allowed as 5668 Kgs. ( 4507 Mtrs.) inclusive of 4 % wastage. 7. Quantities of import items at Sl.Nos. 5, 6 & 7 ( Welding Consumables) may be allowed as 47 Kgs. each. 85
Case No.:21/17/80ALC2/2011
Party Name:WAM INDIA PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00340/AM12/ RLA File :03/95/040/00448/AM12/ Lic.No/Date:0310656678 28.09.2011 Decision : The Committee deliberated the details of the case and observed that all the items of import are components. Therefore, the committee decided to ratify the norms of the said Advance Authorization on net to net basis with accountability clause.
86
Case No.:5/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00324/AM12/ RLA File :04/24/040/00137/AM12/ Lic.No/Date:0410128752 30.09.2011 Defer Date:07.02.2012 87
Case No.:7/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00326/AM12/ RLA File :04/24/040/00171/AM12/ Lic.No/Date:0410128753 30.09.2011 Defer Date:07.02.2012 88
Case No.:8/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00327/AM12/ RLA File :04/24/040/00116/AM12/ Lic.No/Date:0410128795 30.09.2011 Defer Date:07.02.2012 89
Case No.:11/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00330/AM12/ RLA File :04/24/040/00066/AM12/ Lic.No/Date:0410128794 30.09.2011 Defer Date:07.02.2012 90
Case No.:27/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00346/AM12/ RLA File :05/23/040/00219/AM12/ Lic.No/Date:0510304453 30.09.2011 Defer Date:07.02.2012 Decision : The Committee noted that the case is to be examined in NCI. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 91
Case No.:28/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00347/AM12/ RLA File :11/24/040/00026/AM12/ Lic.No/Date:1110025821 30.09.2011 Defer Date:07.02.2012
Case No.:30/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 Status: Deferred
92 27.12.2011 HQ File :01/80/050/00349/AM12/ RLA File :11/24/040/00013/AM12/ Lic.No/Date:1110025819 30.09.2011 Defer Date:07.02.2012 93
Case No.:31/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00350/AM12/ RLA File :11/24/040/00011/AM12/ Lic.No/Date:1110025820 30.09.2011 Defer Date:07.02.2012 94
Case No.:3/20/80ALC2/2011
Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00388/AM12/ RLA File :05/24/040/00229/AM12/ Lic.No/Date:0510304366 30.09.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 27.12.2011, the 07.02.2012. 95
Case No.:19/17/80ALC2/2011
LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00338/AM12/ RLA File :03/95/040/00425/AM12/ Lic.No/Date:0310657607 03.10.2011 Defer Date:07.02.2012 96
Case No.:10/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00329/AM12/ RLA File :04/24/040/00127/AM12/ Lic.No/Date:0410128896 04.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 02.11.2011, the 07.02.2012. 97
Case No.:22/17/80ALC2/2011
Party Name:INDSPHINX PRECISION LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00341/AM12/ RLA File :22/24/040/00045/AM12/ Lic.No/Date:2210011985 04.10.2011 Decision :The Committee decided to ratify the norms in respect of the subject advance authorization as per SION C945.
98
Case No.:24/17/80ALC2/2011
Party Name:INJECTOPLAST PVT.LTD Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00343/AM12/ RLA File :06/24/040/00033/AM12/ Lic.No/Date:0610024005 04.10.2011 Decision :The Committee deliberated the written comments of C&PC received vide their OM No.46011/169/2004PCII dated 24.11.2011 and decided to ratify the norms in respect of the subject advance authorization on repeat basis Advance Authorization No.0610016734 dated 30.11.2009, as under: Item to be exported Quantity Insulator Assembly Alternator/rectifier/Seal Assembly / Parts /Components etc. 1 No. Raw – material Recommended for Import Quantity 1. Phenolic Moulding Compound 2. Polyamide66 3. Thermoplastic Elastomer 1.05kg/kg. content in export product 1.05kg/kg. content in export product 1.05kg/kg. content in export product 99
Case No.:21/20/80ALC2/2011
Party Name:BIRLA FURUKAWA FIBRE OPTICS LIMITED, Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00406/AM12/ RLA File :17/24/040/00057/AM12/ Lic.No/Date:1710004546 04.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DIT on 16.12.2011, the 07.02.2012. 100
Case No.:6/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00325/AM12/ RLA File :04/24/040/00143/AM12/ Lic.No/Date:0410128933 05.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 02.11.2011, the 07.02.2012.
Case No.:9/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00328/AM12/ RLA File :04/24/040/00135/AM12/ Lic.No/Date:0410128934 05.10.2011 Decision :The Committee deliberated the written comments of DHI received vide their U.O. Note No.3(44)/11TSW(B)/13 dated 11.01.2011 and decided to ratify the norms in respect of the subject advance authorization as under: Export Product(EP) The Total weight of the EP is 6796 MT and the same may be incorporated in the license.
101 Import 1. Item No. 1 (Carbon Steel) The quantity of seamless tubes/ pipe to be allowed is 1900 MT & as applied for with 2% wastage. “Welded” may be deleted from the description of import item. 2. Item No 2 (Alloy Steel) The quantity of seamless tube / pipe to be allowed is 1260 MT as applied for with 2% wastage. “Welded” may be deleted from the description of import item. 3. Item No 3 (Stainless Steel) The quantity of seamless tube / pipe to be allowed is 8 MT with 2% wastage as applied by the firm. “Welded” may be deleted from the description of import item. 4. Item No. 4 The word “Finished” may be prefixed to the description of import & the same may be incorporated in the lilcense. The quantity of import may be restricted to 300 MT & the same may be incorporated along with quantity of import in numbers. The item may be allowed under GN4 as applied for. 5. Item No.5 Welding material – Quantity applied is only 14 MT & the same may be recommended import as applied for(Welding material weight is normally restricted to 2% of the weight of the steel to be welded). 6. Item No6 to 12 These are components & may be allowed under GN4 with accountability Clause. 102
Case No.:15/17/80ALC2/2011
LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00334/AM12/ RLA File :03/95/040/00493/AM12/ Lic.No/Date:0310658143 05.10.2011 Defer Date:07.02.2012 Decision :As per DIPP U.O. Note dated 27.12.2011, the Committee decided to call for the following information/clarification from the firm and to relist the case on 07.02.2012: 1. Information in respect of Sl. No. 11 of Standard Deficiency Format. 2. For net weight of components to be manufactured out of import items at Sl. No. 1 & 2, name of components with net weights thereof may be indicated. 103
Case No.:16/17/80ALC2/2011
LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00335/AM12/ RLA File :03/95/040/00494/AM12/ Lic.No/Date:0310658156 05.10.2011 Defer Date:07.02.2012 Decision : As per DIPP U.O. Note dated 27.12.2011, the Committee decided to call for the following information/clarification from the firm and to relist the case on 07.02.2012: 1. Information in respect of Sl. No. 11 of Standard Deficiency Format. 2. For net weight of components to be manufactured out of import items at Sl. No. 1 & 2, name of components with net weights thereof may be indicated. 104
Case No.:5/20/80ALC2/2011
Party Name:POLY MEDICURE LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00390/AM12/ RLA File :05/24/040/00238/AM12/ Lic.No/Date:0510304858 10.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to C&PC on 23.12.2011, the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012.
105
Case No.:18/17/80ALC2/2011
MFG. CO. LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00337/AM12/ RLA File :03/94/040/00548/AM12/ Lic.No/Date:0310658894 11.10.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s reply dt.23.12.2011 to DIPP for examination and comments. The case may be relisted on 07.02.2012. 106
Case No.:1/20/80ALC2/2011
Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00386/AM12/ RLA File :05/24/040/00235/AM12/ Lic.No/Date:0510304889 11.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DIPP on 27.12.2011, the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 107
Case No.:29/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00348/AM12/ RLA File :05/23/040/00226/AM12/ Lic.No/Date:0510305028 12.10.2011 Defer Date:07.02.2012 108
Case No.:23/17/80ALC2/2011
Party Name:GAS TECH PROCESS ENGINEERING INDIA PVT. LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00342/AM12/ RLA File :05/23/040/00258/AM12/ Lic.No/Date:0510305104 13.10.2011 Defer Date:07.02.2012 Decision :As per DC(MSME) vide their U.O. Note No. 30(90)/2011ME dated 07.12.2011, the Committee decided to call for the following information/clarification from the firm and to relist the case on 07.02.2012: 1. Weight of the export product. 2. Size/Specifications of all import items including at Srl No.4. 3. Process flow chart indicating process of manufacturing, use of inputs and details whether these are being used as components or being supplied as spares or both. 4. Details of any indigenous items used. 5. Contains of imported inputs separately for each set. 109
Case No.:1/17/80ALC2/2011
Party Name:MAN FORCE TRUCKS PRIVATE LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00320/AM12/ RLA File :31/83/040/00071/AM12/ Lic.No/Date:3110051087 19.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 20.12.2011, the 07.02.2012.
110
Case No.:6/20/80ALC2/2011
Party Name:POLY MEDICURE LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00391/AM12/ RLA File :05/24/040/00241/AM12/ Lic.No/Date:0510305885 19.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to C&PC on 27.12.2011, the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 111
Case No.:4/20/80ALC2/2011
Party Name:POLY MEDICURE LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00389/AM12/ RLA File :05/24/040/00242/AM12/ Lic.No/Date:0510305886 19.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 27.12.2011, the 07.02.2012. 112
Case No.:2/17/80ALC2/2011
MFG. CO. LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00321/AM12/ RLA File :03/94/040/00605/AM12/ Lic.No/Date:0310661481 21.10.2011 Defer Date:07.02.2012 Decision : As per DIPP vide their U.O. Note dated 27.12.2011, the Committee decided to call for the following information/clarification from the firm and to relist the case on 07.02.2012: 1. Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Format. 2. Quantity of import item at Sl. No. 1 in Nos. also in addition to its weight. 113
Case No.:20/20/80ALC2/2011
Party Name:FRICK INDIA LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00405/AM12/ RLA File :05/23/040/00269/AM12/ Lic.No/Date:0510306601 25.10.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent already to DIPP on 16.12.2011 for examination and comments. The Committee, therefore, decided to defer the case and to re list the case on 07.02.2012. 114
Case No.:35/17/80ALC2/2011
Party Name:COMAU INDIA P.LTD, Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00354/AM12/ RLA File :31/82/040/00186/AM12/ Lic.No/Date:3110051283 02.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DIPP on 16.12.2011 and decided to send a copy of firm’s application to DHI for examination and comments as it pertains to them. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 115
Case No.:2/20/80ALC2/2011
Party Name:POLY MEDICURE LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00387/AM12/ RLA File :05/24/040/00244/AM12/ Lic.No/Date:0510307048 02.11.2011 Defer Date:07.02.2012
Decision : The Committee noted that a copy of firm’s application has been sent to C&PC on 27.12.2011 and the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 116
Case No.:17/20/80ALC2/2011
LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00402/AM12/ RLA File :03/95/040/00463/AM12/ Lic.No/Date:0310663388 03.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 16.12.2011 and decided to send a copy of firm’s application to DIPP for examination and comments as it pertains to them. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 117
Case No.:18/20/80ALC2/2011
Party Name:ADLER MEDIEQUIP PRIVATE LIMITED., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00403/AM12/ RLA File :03/94/040/00698/AM12/ Lic.No/Date:0310663899 08.11.2011 Decision :The Committee deliberated the written comments of DIPP received vide their U.O. Note dated 1. Word “relevant” may be prefixed with the description of import items from S.Nos. 1 to 4. 2. The quantity of import item No.1 may be allowed as 453.245 Kgs. inclusive of 368.5 % wastage after taking 20% recovery of scrap. 3. The quantity of import item No.2 may be allowed as 310.88 Kgs. inclusive of 40.5 % wastage after taking 20% recovery of scrap. 4. The quantity of import item No.3 may be allowed as 150.854 Kgs. inclusive of 10 % wastage after taking 20% recovery of scrap. 5. The quantity of import item No.4 may be allowed as 316.27 Kgs. inclusive of 213 % wastage after taking 20% recovery of scrap. 6. Import items from Sl.No. 5 to 8 may be allowed within 2% of FOB Value of Exports 118
Case No.:16/20/80ALC2/2011
LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00401/AM12/ RLA File :03/95/040/00595/AM12/ Lic.No/Date:0310664152 09.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 16.12.2011 for examination and comments. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 119
Case No.:15/20/80ALC2/2011
MFG. CO. LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00400/AM12/ RLA File :03/94/040/00702/AM12/ Lic.No/Date:0310664727 14.11.2011 Defer Date:07.02.2012 Decision :As per DIPP U.O. Note dated 27.12.2011, the Committee decided to call for the following information/clarification from the firm and to relist the case on 07.02.2012: 1. Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Formatexport product wise. 2. Quantity of import item at Sl. No. 2 in Nos. also in addition to its weight.
3. Quantities of import items at Sl. No. 3, 6 & 7 in meters also in addition to their weights. 120
Case No.:19/20/80ALC2/2011
Party Name:INJECTOPLAST PVT.LTD Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00404/AM12/ RLA File :06/24/040/00038/AM12/ Lic.No/Date:0610024542 14.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to C&PC on 16.12.2011 and the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 121
Case No.:34/20/80ALC2/2011
Party Name:INJECTOPLAST PVT.LTD Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00419/AM12/ RLA File :06/24/040/00040/AM12/ Lic.No/Date:0610024543 14.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to C&PC on 16.12.2011 and the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 122
Case No.:22/20/80ALC2/2011
Party Name:J PAN TUBULAR COMPONENTS PVT.LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00407/AM12/ RLA File :05/23/040/00300/AM12/ Lic.No/Date:0510307950 15.11.2011 Defer Date:07.02.2012 Decision :As per DIPP U.O. Note dated 27.12.2011, the Committee decided to call for the following information/clarification from the firm and to relist the case on 07.02.2012: 1. Specific list of export items with their respective quantities. 2. Specific list of import items alongwith their quantities. 3. Basis for the requirement of import items alongwith a tabular statement giving net content of import items in different export products. 123
Case No.:29/20/80ALC2/2011
Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00414/AM12/ RLA File :05/23/040/00314/AM12/ Lic.No/Date:0510308164 16.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DIT on 16.12.2011 and the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 124
Case No.:33/20/80ALC2/2011
Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00418/AM12/ RLA File :05/23/040/00317/AM12/ Lic.No/Date:0510308167 16.11.2011 Defer Date:07.02.2012 Decision :As per DHI U.O. Note No. 3(81)/11TSW(B) dated 02.01.2012, the Committee decided to call for the following information/clarification from the firm and to relist the case on 07.02.2012: 1. Calculation of quantity of import of item No. 8 & 9 (All other items are components).
125
Case No.:30/20/80ALC2/2011
LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Approved HQ File :01/80/050/00415/AM12/ RLA File :03/95/040/00628/AM12/ Lic.No/Date:0310665613 17.11.2011 Decision :The Committee deliberated the written comments of DIPP received vide their U.O. Note dated 1. Net Empty weight of 27.60 MT may be specified with the quantity of export product. 2. Import item at Sl. No. 1 shall be of relevant grade and thickness as contained in the export product 3. Import item at Sl. No. 3 shall be of relevant grade and dia. as contained in the export product. 4. Quantity of import item at from Sl. No. 1 may be allowed as applied for i.e. 12000 Kgs. inclusive of a wastage of 5 %. 5. Weights of 4.76 MT, 2 MT & 0.2 MT may be specified with the quantities of import items at Sl. Nos. 2, 4 & 5 respectively and the same may be allowed on net to net basis with accountability clause. 6. Quantity of import item at Sl. No. 3 may be allowed as 30000 Mtrs. (9.44 MT ) inclusive of a wastage of 2%. 7. Quantity of import item at Sl. No. 6 (welding Electrodes) may be allowed as 234 Kgs. 8. Quantities of import items at Sl. Nos. 7 & 8 (welding Consumables) may be allowed as applied for i.e. 100 Kgs. each. 126
Case No.:31/20/80ALC2/2011
LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00416/AM12/ RLA File :03/95/040/00627/AM12/ Lic.No/Date:0310665598 17.11.2011 Defer Date:07.02.2012 Decision :As per DIPP U.O. Note dated 27.12.2011, the Committee decided to call for the following information/clarification from the firm and to relist the case on 07.02.2012: 1. Information in respect of Sl. No. 11 & 13 of Standard Deficiency Format. 2. Separate weights of Hemispherical Heads and Test Coupons for import item at Sl. No. 5. 127
Case No.:26/20/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00411/AM12/ RLA File :04/24/040/00138/AM12/ Lic.No/Date:0410130571 18.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 10.12.2011 and the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 128
Case No.:32/20/80ALC2/2011
LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00417/AM12/ RLA File :03/95/040/00648/AM12/ Lic.No/Date:0310665958 18.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 16.12.2011 and the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012.
129
Case No.:24/20/80ALC2/2011
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00409/AM12/ RLA File :05/23/040/00309/AM12/ Lic.No/Date:0510308688 21.11.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s application to DHI for examination and comments as it pertains to them. The case may be relisted on 07.02.2012. 130
Case No.:25/20/80ALC2/2011
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00410/AM12/ RLA File :05/23/040/00296/AM12/ Lic.No/Date:0510308687 21.11.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s application to DIPP for examination and comments as it pertains to them. The case may be relisted on 07.02.2012. 131
Case No.:23/20/80ALC2/2011
Party Name:KEBURGMANN FLEXIBLES INDIA PVT.LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00408/AM12/ RLA File :04/24/040/00234/AM12/ Lic.No/Date:0410130688 22.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to C&PC on 16.12.2011, the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. 132
Case No.:27/20/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00412/AM12/ RLA File :04/24/040/00216/AM12/ Lic.No/Date:0410130796 23.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 16.12.2011, the 07.02.2012. 133
Case No.:28/20/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00413/AM12/ RLA File :04/24/040/00215/AM12/ Lic.No/Date:0410130775 23.11.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 16.12.2011, the 07.02.2012. 134
Case No.:8/20/80ALC2/2011
MFG. CO. LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00393/AM12/ RLA File :03/94/040/00768/AM12/ Lic.No/Date:0310668917 05.12.2011 Defer Date:07.02.2012 Decision :As per DIPP U.O. Note dated 27.12.2011, the Committee decided to call for the following information/clarification from the firm and to relist the case on 07.02.1012:
1. Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Formatexport product wise. 2. Quantities of import items at Sl. No. 1, 2 & 3 in Nos. also in addition to their weights. 135
Case No.:9/20/80ALC2/2011
Party Name:RADIANT INDUSTRIES Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00394/AM12/ RLA File :31/83/040/00182/AM12/ Lic.No/Date:3110051726 07.12.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DHI on 27.12.2011, the 07.02.2012. 136
Case No.:10/20/80ALC2/2011
MFG. CO. LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00395/AM12/ RLA File :03/94/040/00763/AM12/ Lic.No/Date:0310668956 07.12.2011 Defer Date:07.02.2012 Decision :As per DIPP U.O. Note dated 27.12.2011, the Committee decided to call for the following information/clarification from the firm and to relist the case on 07.02.2012: 1. Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard Deficiency Formatexport product wise. 2. Quantities of import items at Sl. No. 2 & 3 in Nos. also in addition to their weights. 137
Case No.:11/20/80ALC2/2011
Party Name:ESMECH EQUIPMENT PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Closed HQ File :01/80/050/00396/AM12/ RLA File :03/94/040/00765/AM12/ Lic.No/Date:0310668962 07.12.2011 Decision :The Committee noted that as per RA, Bangalore informed vide their letter dt.07.12.2011, the Advance Authorization has been issued under GN4 and therefore, decided to close the case on the part of NC. 138
Case No.:12/20/80ALC2/2011
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00397/AM12/ RLA File :31/82/040/00265/AM12/ Lic.No/Date:3110051774 07.12.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s application to DHI for examination and comments. The case may be relisted on 07.02.2012. 139
Case No.:13/20/80ALC2/2011
Party Name:UNI VTL ENGINEERING PVT. LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00398/AM12/ RLA File :03/95/040/00726/AM12/ Lic.No/Date:0310669540 08.12.2011 Defer Date:07.02.2012 Decision : The Committee noted that a copy of firm’s application has been sent to DIPP on 27.12.2011. The Committee decided to forward a copy of application to DHI as it pertains to them. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012.
140
Case No.:14/20/80ALC2/2011
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00399/AM12/ RLA File :31/82/040/00266/AM12/ Lic.No/Date:3110051789 08.12.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s application to DHI for examination and comments. The case may be relisted on 07.02.2012. 141
Case No.:35/20/80ALC2/2011
MFG. CO. LTD., Meet No/Date:20/80 ALC2/2011 27.12.2011 Status: Deferred HQ File :01/80/050/00420/AM12/ RLA File :03/94/040/00799/AM12/ Lic.No/Date:0310671299 16.12.2011 Defer Date:07.02.2012 Decision : The Committee decided to forward a copy of firm’s application to DIPP for examination and comments. The case may be relisted on 07.02.2012. S.No.23
Case No. A 15
M/s. Delphi Automotive Systems Pvt. Ltd., Noida F.No. 01/80/50/ 00495/AM11/DES.I Lic.No. & Date Meeting No.20/12 RA F.No.05/88/040/00721/AM03 0510081234 dt.21.02.2003 Date: 27.12.2011 Ratification of norms The Committee noted that the firm’s reply has been sent to DHI on 12.12.2011 and the case is under examination. The case may be relisted on 07.02.2012. S.No.488
Case No. A/R
102 M/s. Bharat Heavy Electricals Ltd., Haridwar HQ F.No.01/80/050/01790/AM09/DESI Lic. No. & Date Meeting No.20/12 RLA No.61/24/040/00069/AM09 6110000286 dt.06.02.2009 Date: 27.12.2011 Ratification of Norms The Committee decided to forward a copy of firm’s reply dt.21.12.2011 to DHI for examination and comments. The case may be relisted on 07.02.2012. S.No.489
Case No. A/R
103 M/s. Bharat Heavy Electricals Ltd., Haridwar HQ F.No.01/80/050/00120/AM10/DESI Lic. No. & Date Meeting No.20/12 RLA No.61/24/040/00007/AM10 6110000313 dt.29.05.2009 Date: 27.12.2011 Ratification of Norms The Committee decided to forward a copy of firm’s reply dt.21.12.2011 to DHI for examination and comments. The case may be relisted on 07.02.2012. S.No.490
Case No. A/R 167
M/s. Bharat Heavy Electricals Ltd., Haridwar F.No. 01/80/50/ 00449/AM10/DES.I Lic.No. & Date Meeting No.20/12 RA F.No.61/24/040/00036/AM10 6110000362 dt.13.10.2009 Date: 27.12.2011 Ratification of norms The Committee observed that the firm has not replied to this office letter dt.calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be relisted on 07.02.2012. S.No.491
Case No. A/R 175
M/s. Precihole Machine Pvt. Ltd., F.No. 01/80/50/ 00942/AM08/DES.I Lic.No. & Date Meeting No.20/12 RA F.No.03/95/040/00586/AM08
0310443655 dt.19.09.2007 Date: 27.12.2011 Ratification of norms The Committee has noted the reply received from the firm vide letter dated 17.12.2011 and wastage details forwarded therein and decided to amend the norms ratified earlier in the NC meeting No.20/11 dated 17.08.2010 (Sl. No. 181) as under: Applied: 1. Item No. 1 – 37 bars wt 1205.87 kg 2. Item No. 2 – 31 bars of st 529.21 kg. Allowed: 1. Item No. 137 bars wt 1108 kg wastage 210% recovery 4%. 2. Item No. 231 bars of wt 496 kg wastage 211% recovery 4%. S.No.492
Case No. A/R 117
M/s. Thermax Ltd., F.No. 01/80/50/01034/AM09/DES.I Lic.No. & Date Meeting No.20/12 RA F.No.31/21/040/00296/AM09 3110035317 dt.09.09.2008 Date: 27.12.2011 Ratification of norms The Committee noted that a copy of firm’s reply has been sent to DHI on 07.12.2011, the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. S.No.493
Case No. A/R 173
M/s. Thermax Ltd., F.No. 01/80/50/01550/AM09/DES.I Lic.No. & Date Meeting No.20/12 RA F.No.31/24/040/00296/AM09 3110036393 dt.09.09.2008 Date: 27.12.2011 Ratification of norms The representative of the DHI informed the Committee that the case is under examination. The S.No.494
Case No. A/R28
M/s. Brakes India Limited, Chennai HQF.No.01/80/050/01124/AM08/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.04/24/040/00263/AM08 0410093871 dt.15.02.2008 Date: 27.12.2011 Revision of norms The Committee noted that a copy of firm’s reply has been sent to DHI on 28.11.2011, the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 07.02.2012. S.No.495
Case No. A/R37
M/s. Bharat Heavy Electricals Ltd., Haridwar HQF.No.01/80/050/00143/AM11/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.61/24/040/00016/AM11 6110000447 dt.13.05.2010 Date: 27.12.2011 Revision of norms S.No.496
Case No. A/R38
M/s. Bharat Heavy Electricals Ltd., Haridwar HQF.No.01/80/050/00184/AM10/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.61/24/040/00012/AM10 6110000320 dt.19.06.2009 Date: 27.12.2011 Revision of norms S.No.497
Case No. A/R
68 M/s. GEA BGR Energy System HQF.No.01/80/050/01097/AM08/DES.I Lic. No. & date
India Ltd., Chennai Meeting No.20/12 RA.F.No.04/24/040/00325/AM08 0410092981 dt.02.01.2008 Date: 27.12.2011 Ratification of norms S.No.498
Case No. A/R
95 M/s. Botil Oil Tools India Pvt. LTd., New Delhi HQF.No.01/80/050/00875/AM09/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.05/24/040/00327/AM09 0510225643 dt.18.08.2008 Date: 27.12.2011 Amendment of norms of norms The Committee noted the communication dated 12.12.2011 received from the firm and decided to allow import item 1 to 4 on net to net basis and delete input no. 5 to 7 as requested by the firm. S.No.499
Case No. A/R
144 M/s. Alstom Projects India Ltd., Vadodara HQF.No.01/80/050/00134/AM11/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.03/94/040/01139/AM10 0310567657 dt.31.03.2010 Date: 27.12.2011 Fixation of Norms The Committee observed that the firm has not replied to this office letter dated 28.11.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be relisted on 07.02.2012. S.No.500
Case No. A/R
147 M/s. Bharat Heavy Electricals Ltd., Tiruchirapalli HQF.No.01/80/050/00550/AM11/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.04/24/040/00204/AM11 0410118772 dt.10.11.2010 Date: 27.12.2011 Fixation of Norms S.No.501
Case No. A/R
148 M/s. Bharat Heavy Electricals Ltd., Tiruchirapalli HQF.No.01/80/050/00651/AM11/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.04/24/040/00205/AM11 0410118773 dt.10.11.2010 Date: 27.12.2011 Fixation of Norms S.No.502
Case No. A/R
149 M/s. Bharat Heavy Electricals Ltd., Tiruchirapalli HQF.No.01/80/050/00809/AM11/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.04/24/040/00104/AM11 0410121605 dt.14.02.2011 Date: 27.12.2011 Fixation of Norms S.No.503
Case No. A/R
150 M/s. The Saraswati HQF.No.01/80/050/00827/AM06/DES.I Lic. No. & date
Industrial Syndicate Ltd., Meeting No.20/12 RA.F.No.05/24/040/00766/AM06 0510173546 dt.03.01.2006 Date: 27.12.2011 Revision of Norms The Committee decided to forward a copy of Advance Authorization to DIPP. S.No.504
Case No. A/R
112 M/s. Bharat Heavy Electricals Ltd., Noida HQF.No.01/80/050/00575/AM10/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.05/23/040/00117/AM10 0510253818 dt.02.12.2009 Date: 27.12.2011 Fixation of Norms S.No.505
Case No. A/R31
M/s. KernLiebers Springs & Stampings Pvt. Ltd., Karnataka HQF.No.01/80/050/01630/AM09/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.07/24/040/00531/AM09 0710062052 dt.26.12.2008 Date: 27.12.2011 Revision of norms The Committee noted that the DHI DL dated 11.11.2011seeking details of volume based calculation from the drawing dimensions is incorrect because they need to revise the recovery based on reply /information already furnished by the firm. The Committee therefore decided to write to DHI to examine the case based on data / information already furnished by the firm & offer comments as revised recovery and to relist the case on 07.02.2012. S.No.506
Case No. A/R
70 M/s. Kern Liebers Springs & Stampings Pvt. LTd., Tumkur HQF.No.01/80/050/00593/AM09/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.07/24/040/00008/AM09 0710057064 dt.23.04.2008 Date: 27.12.2011 Revision of norms The Committee noted that the DHI DL dated 11.11.2011seeking details of volume based calculation from the drawing dimensions is incorrect because they need to revise the recovery based on reply /information already furnished by the firm. The Committee therefore decided to write to DHI to examine the case based on data / information already furnished by the firm & offer comments as revised recovery and to relist the case on 07.02.2012. S.No.507
Case No. A/R
154 M/s. Reference received from Jt.DGFT, CLA, New Delhi of M/s. Gestek Engineering Pvt. LTd., New Delhi HQF.No.01/80/050/01125/AM07/DES.I Lic. No. & date Meeting No.20/12 RA.F.No.05/24/040/00812/AM07 0510196934 dt.28.12.2006 Date: 27.12.2011 Revision of Norms The Committee noted that CLA, New Delhi sought a clarification /advise regarding of Advance Authorization in view of difference in export product shown in the shipping bills and import items shown in the Bill of entry not match as per the ALC decision and therefore decided to obtain export documents from RA & send to DIPP for examination and comments. The case is to be relisted on 07.02.2012. S.No.160
Case No.C35
M/s. Panch Ratna Fastners (P). Ltd; HQ F.No.01/80/162/1316/AM09/DES.I Meeting No.20/12 Date: 27.12.2011 Alleged swindling of several crores of Govt. revenue –DEPB.
The Committee noted that the file is under examination of NCI. The case is to be relisted on 07.02.2012. Sl.No.161
Case No. C 16
M/s. Birla Precision Technologies Ltd., Aurangabad HQ F.No.01/80/162/00608/AM11/ DESI Meeting No.20/12 Fixation of input output norms for the export product “Tool Holder” in respect of 100% EOU Date: 27.12.2011 The Committee noted the DHI comments received vide ID Note dated 16.12.2011 that fixation of norms is not possible due to Large variety of nonstandard components / parts and decided to write a DO to TA, DHI that in 100% EOU cases, the TA needs to examine only the wastage involved. The case is to be relisted on 07.02.2012. Sl.No.162
Case No.C01
M/s. Snecma Hal Aerospace LTd., HQ F.No.01/80/162/00681/AM11/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of SION for Export Product “(Fluid System) – Air Crafts Part. The Committee noted that DL, MSME has been sent to the firm on 23.12.2011 and decided to send a reminder to firm for furnishing of requisite information. The case is to be relisted on 07.02.2012. Sl.No.163
Case No.C12
M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00247/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export . The Committee decided to defer the cases to meeting dated 24.01.2012. Sl.No.164
Case No.C13
M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00246/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export . The Committee decided to defer the cases to meeting dated 24.01.2012. Sl.No.165
Case No.C14
M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00245/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export . The Committee decided to defer the cases to meeting dated 24.01.2012. Sl.No.166
Case No.C15
M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00248/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export . The Committee decided to defer the cases to meeting dated 24.01.2012. Sl.No.167
Case No.C16
M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00243/AM12/DES.I
Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export . The Committee decided to defer the cases to meeting dated 24.01.2012. Sl.No.168
Case No.C17
M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00244/AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export . The Committee decided to defer the cases to meeting dated 24.01.2012. Sl.No.169
Case No.C22
M/s. Inoxpa India Pvt. Ltd., Pune HQ F.No.01/80/162/00366 /AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Request for fixation of input output norms in respect of EOUs for the export product “(1) Centrifugal Pumps and Parts thereof (2) Industrial Valves Viz; Butterfly & Ball Valves; (3) Other components required for Food, Dairy, Cosmetic & Pharmaceuticals Industries viz; Tubes Fitings, Flanges, Unions, Joints & bend”. The Committee observed that the firm has not replied to this office letter dated 25.11.2012 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case may be relisted on 07.02.2012. S.No.170
Case No.C24
M/s. Indo Schottle Auto Parts Pvt. Ltd.,, HQ F.No.01/80/162/00532 /AM12/DES.I Meeting No.20/12 Date: 27.12.2011 Request for fixation of input output norms in respect of 100% EOUs for the export product “Central Housing Cover; Collar Thrust; Coupling Injector Plunger Assembly; Fitting High Pressure Fuel; Guide Pin; Housing Injector Spring; Link Injector Plunger; Plunger Tappet; Sleeve; Spool; Bushing; Oil Seal Plate etc.” The Committee noted that the firm’s reply has been sent to DHI on 28.11.2011 and the case is under examination. The case may be relisted on 07.02.2012.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.