IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2020-09-29

DGFT Committee Minutes

Document text

DIRECTORATE GENERAL OF FOREIGN TRADE

- (DES I SECTION)

MINUTES OF MEETING NO. 06/80 OF THE NORMS COMMITTEE-I DATED 29.09.2020 HELD ON

01.10.2020

Meeting No. 06/80 of the Norms Committee (NC-I) for the licensing year 2020-2021 (originally scheduled for 29.09.2020) held on 01.10.2020 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -

==> picture [464 x 189] intentionally omitted <==

----- Start of picture text -----<br> Sl. No. Name of the representatives & their Designation Department<br>1. Shri Sushil Kumar Jangid, Scientist ‘B’ MeitY<br>2. Shri Shaish Kumar, (Tech-1) Consultant<br>3. Shri V.C. Agarwal, (Tech-3) Consultant<br>4. Shri S. K. Bhatnagar, Consultant<br>In Attendance<br>1. Dr. D. C. Dabhole, Dy. DGFT DGFT<br>2. Shri Pranav Upadhyay, Assistant Director ISS DGFT<br>----- End of picture text -----<br>

Note:

  1. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been

placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.

  1. Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.

  2. All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail addressnc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.

1 | P a g e

MEETING NUMBER: 6/80-ALC2/2020 MEETING DATE: 29.09.2020

Case No.:390/15/80- Party Name: TENOVA INDIA Meet No/Date:6/80-ALC2/2020 Status:
ALC2/2018 PRIVATE LIMITED 29.09.2020 Deferred
HQ File<br>:01/80/050/00732/AM19/ RLA File<br>:07/24/040/00411/AM16/ Lic.No/Date:0710109544<br>18.03.2016 Pending<br>with DHI

1 Decision: The Committee considered the case as per agenda and noted that the firm’s reply was sent to DHI on 11.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to remind DHI for expediting the comments.

Case is deferred.

2

Case No.:395/15/80-ALC2/2018 Party Name: DYNAMATIC Meet No/Date:6/80- Status:
TECHNOLOGIES LIMITED ALC2/2020 & 29.09.2020 Approved
HQ File<br>:01/80/050/00737/AM19/ RLA File<br>:07/24/040/00423/AM16/ Lic.No/Date:0710109626<br>04.04.2016

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of MSME . (Copy enclosed)

RA concerned may take further necessary action as per the decision of NC.

Case No.:25/15/80-ALC2/2018 Party Name: TENOVA INDIA Meet No/Date:6/80- Status:
PRIVATE LIMITED ALC2/2020 & 29.09.2020 Deferred
HQ File<br>:01/80/050/00367/AM19/ RLA File<br>:07/24/040/00080/AM17/ Lic.No/Date:0710109946<br>14.06.2016 Pending<br>with DHI

3 Decision: The Committee considered the case as per agenda and noted that the firm’s reply was sent to DHI on 11.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to remind DHI for expediting the comments.

Case is deferred.

==> picture [476 x 165] intentionally omitted <==

----- Start of picture text -----<br> Case No.:199/15/80-ALC2/2018 Party Name: TENOVA INDIA Meet No/Date:6/80- Status:<br>PRIVATE LIMITED ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0710110331 Pending<br>:01/80/050/00541/AM19/ :07/24/040/00173/AM17/ 29.08.2016 with firm<br>Decision: The Committee considered the case as per the agenda and noted that DHI informed that the firm’s<br>reply is incomplete. Therefore, the Committee decided to ask again from the firm to furnish following<br>4<br>information as per comments of DHI :<br>1. Wastage generated at each stage of manufacture for each raw material separately.<br>2. Calculation sheet for wastage claimed with reference to wastage generated at (1) above.<br>3. Manufacturing flow chart of each export item.<br>Case is deferred.<br>----- End of picture text -----<br>

5

Case No.:404/15/80-ALC2/2018 Party Name: OSWAL PUMPS Meet No/Date:6/80- Status:
LIMITED ALC2/2020 & 29.09.2020 Deferred
HQ File<br>:01/80/050/00746/AM19/ RLA File<br>:33/24/040/00007/AM17/ Lic.No/Date:3310030377<br>03.03.2017 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that DPIIT vide U. O. No. P- 47011/16/2020-TSW dated 28.08.2020 informed that the firm’s reply is incomplete. Therefore, the Committee decided to ask again from the firm to furnish following information as per comments of DPIIT :

2 | P a g e

  1. Quantities of export items in Nos. in addition to their weights.

  2. Weight of each Export Product.

  3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

  4. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

Case is deferred.

==> picture [476 x 229] intentionally omitted <==

----- Start of picture text -----<br> Case No.:94/15/80-ALC2/2018 Party Name: MODEL INFRA Meet No/Date:6/80- Status:<br>CORPORATION PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0710111766 Pending<br>:01/80/050/00436/AM19/ :07/24/040/00085/AM18/ 16.06.2017 with firm<br>Decision: The Committee considered the case as per the agenda and noted that MSME informed vide email<br>dated 30.09.2020 that the firm’s reply is deficient due to following reasons:<br>6 1. As per licence quantity for Sl. No. 3 of import is 109928 Kgs while in the reply it is stated that total<br>import quantity is 69237 Kgs. Additionally, the firm submitted that quantity required per unit of export<br>item is 151 Kgs which corresponds to 458 items (69237/151) for an import of 69237 Kgs while the licence<br>is for an export of 728 shells. Hence, to provide clarification for the same.<br>2. To provide clarification for Sl. No. 4 to 9 of items of import as asked above for Sl. No. 3.<br>Therefore, the Committee decided to ask from the firm to provide clarification for the above mentioned<br>deficiencies as per comments of MSME.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 257] intentionally omitted <==

----- Start of picture text -----<br> Case No.:405/15/80-ALC2/2018 Party Name: OSWAL PUMPS Meet No/Date:6/80- Status:<br>LIMITED ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3310030410 Pending<br>:01/80/050/00747/AM19/ :33/24/040/00007/AM18/ 01.11.2017 with firm<br>Decision: The Committee considered the case as per the agenda and noted that DPIIT vide U. O. No. P-<br>47011/16/2020-TSW dated 28.08.2020 informed that the firm’s reply is incomplete. Therefore, the Committee<br>decided to ask again from the firm to furnish following information as per comments of DPIIT :<br>1. Quantities of export items in Nos. in addition to their weights.<br>2. Weight of each Export Product.<br>7<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured out<br>of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

3 | P a g e

Case No.:15/1/80- Party Name: WONJIN Meet No/Date:6/80- Status: ALC2/2019 AUTOPARTS INDIA PVT LTD ALC2/2020 & 29.09.2020 Approved HQ File RLA File Lic.No/Date:0410163912 :01/80/050/00763/AM19/ :04/24/040/00191/AM18/ 22.01.2018

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:

8

==> picture [446 x 159] intentionally omitted <==

----- Start of picture text -----<br> Sl. ITCHS Export Item Quantit ITCHS Import Item Recommended<br>No Code y Code Norms<br>HTR Pipe-Core Inlet LH<br>(B479) 00253845-01 150000<br>1 87089900<br>(Containing 11550 kgs of Number<br>Import Item) 40847 Kgs with<br>5.17%, 7.30%,<br>HTR Pipe-Core Outlet LH<br>2 87089900 (B479) (Containing 12900 150000 Aluminium Pipe 4.30% & 7.05%<br>kgs of Import Item) Number 76082000 /Tube 17MM wastage for Sl. No.<br>Diameter1mm 1 to 4 of export<br>HTR Pipe Core Inlet RHD<br>90000 Thickness items respectively,<br>3 87089900 (B479) (Containing 7470<br>Number after 1/3 [rd]<br>kgs of Import Item)<br>recover.<br>HTR Pipe Core Outlet<br>90000<br>4 87089900 RHD (B479) (Containing<br>number<br>6615 kgs of Import Item)<br>----- End of picture text -----<br>

Note:

1. Per unit weight of export items at Sl. No. 1 to 4 is 0.077 Kg, 0.086 Kgs, 0.083 Kg & 0.0735 Kg respectively.

2. The firm should import relevant item only.

==> picture [476 x 314] intentionally omitted <==

----- Start of picture text -----<br> Case No.:394/15/80- Party Name: TRIVENI HI- Meet No/Date:6/80- Status:<br>ALC2/2018 TECH PVT. LTD. ALC2/2020 & 29.09.2020 Approved<br>HQ File RLA File Lic.No/Date:0710113046<br>:01/80/050/00736/AM19/ :07/24/040/00368/AM18/ 04.04.2018<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>Sl. ITCHS Export Quantity ITCHS Import Item Recommended<br>No Code Item Code Norms<br>.<br>3985.8Kgs-<br>7005646-1 730 Nos 3.64kg/kg after<br>1. 88033000 - PLATE 1/3 [rd] recovery<br>9 TOP (1095 kgs) ST.ST PLATE 0.7500. PL.316/316L. STAINLESS. HR.ANN. for export item<br>7220909 at Sl. No. 1<br>PICKLE.60.000.240.0000.75"X61"X240"<br>0 2718.75Kgs-<br>(FLAT ROLLED STAINLESS STEEL N.A)<br>7006505-1 725 Nos (6704.55Kgs) 3kg/kg after<br>2. 88033000 BOTTOM - PLATE (906.25 kgs) for export item 1/3 [rd] recovery<br>at Sl. No. 1<br>7005647-1 ST.ST PLATE 0.5000.PL.316/316L. 2.2kg/kg after<br>3. 88033000 - PLATE 1100 Nos 7220909 STAINLESS.HR.ANN.PICKLE.48.000.120.0 1/3 [rd] recovery<br>TOP (1375 kgs) 0 000.5"X48"X120" (FLAT ROLLED for export item<br>STAINLESS STEEL N.A) (3025Kgs) at Sl. No. 2<br>Note:<br>1. Per unit weight for Sl. No. 1 to 3 of export item is 1.5kg, 1.25kg, 1.25kg respectively.<br>2. Relevant Grade and thickness to match in both the import and export items.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

4 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:23/12/80-ALC2/2018 Party Name: GENERAL Meet No/Date:6/80- Status:<br>INSTRUMENTS ALC2/2020 Rejected<br>CONSORTIUM SOLE 29.09.2020<br>PROP.KULKARNI<br>HQ File RLA File Lic.No/Date:0310824478<br>:01/80/050/00296/AM19/ :03/94/040/00640/AM19/ 16.10.2018<br>10<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, a letter was sent to the firm on 16.01.2020 followed by<br>reminders on 20.02.2020, 01.06.2020 & 31.07.2020. However, no information has been received so far.<br>Therefore, the Committee decided to reject the case under intimation to RA, Mumbai .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 248] intentionally omitted <==

----- Start of picture text -----<br> Case No.:20/14/80-ALC2/2018 Party Name: ULTRA Meet No/Date:6/80- Status:<br>ENGINEERS ALC2/2020 Approved<br>29.09.2020<br>HQ File RLA File Lic.No/Date:3110067260<br>:01/80/050/00336/AM19/ :31/83/040/00150/AM19/ 19.12.2018<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DHI as under:<br>ITCHS Quantity ITCHS Import Recommended<br>Export Item<br>11 Code Code Item Norms<br>Parts Of Oil Field Equipment<br>Plate 96 X<br>CRKC, MACHD, PWR END, HT-<br>1850 X Import quantity<br>2000,2009 Part No-101831285 60<br>84139190 72085190 7400 mm may be allowed<br>(Imported weight 863.70 kg & Number<br>S690QL with 139% wastage<br>Domestic Weight 303.37 Total =<br>1167.0760 =70024.2 Kg) (15 Nos)<br>Note: Import quantity is allowed after taking 20% recovery on smaller off cuts in the manufacturing<br>process & 50% on bigger off cuts due to oversize plates.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:300/15/80-ALC2/2018 Party Name: DILIGENT SCM Meet No/Date:6/80- Status:
SOLUTIONS PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00642/AM19/ RLA File<br>:09/24/040/00487/AM19/ Lic.No/Date:0910067093<br>18.01.2019 Pending<br>with Firm

12 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 19.03.2020 followed by reminders on 01.06.2020 & 31.07.2020. However, the firm vide their email dated 30.09.2020 has requested to grant them 30 days time to submit their applications. Therefore, the Committee decided to wait for firm’s reply.

Case is deferred.

==> picture [476 x 95] intentionally omitted <==

----- Start of picture text -----<br> Case No.:310/15/80- Party Name: TERUMO Meet No/Date:6/80- Status: Deferred<br>ALC2/2018 PENPOL PRIVATE LIMITED ALC2/2020<br>29.09.2020<br>13 HQ File RLA File Lic.No/Date:5310019913 Pending with firm/<br>:01/80/050/00652/AM19/ :53/24/040/00013/AM19/ 05.02.2019 Dept. C & PC<br>Decision: The Committee considered the case as per the agenda and noted that letter requesting some<br>information (for similar cases) as suggested by Consultant (Tech 1) was sent to Department of C&PC on<br>----- End of picture text -----<br>

5 | P a g e

12.02.2020 followed by reminders on 18.03.2020, 21.07.2020. A D.O. letter was also sent to the Department of C & PC on 30.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind the Department of C & PC for expediting comments.

Case is deferred.

Case No.:8/1/80-ALC2/2019 Party Name: DAGGER Meet No/Date:6/80- Status:
MASTER TOOL INDUSTRIES ALC2/2020 Rejected
LIMITED 29.09.2020
HQ File<br>:01/80/050/00756/AM19/ RLA File<br>:03/94/040/01048/AM19/ Lic.No/Date:0310827404<br>01.03.2019

14

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 22.07.2019 followed by reminders on 25.02.2020, 03.06.2020 & 03.09.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Mumbai .

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/2/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:6/80- Status:<br>CORPORATION PANSE ALC2/2020 Rejected<br>PRIVATE LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:3110067366<br>:01/80/050/00003/AM20/ :31/83/040/00298/AM19/ 02.04.2019<br>15<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 14.01.2020 followed by reminders on 19.03.2020,<br>03.06.2020 & 03.09.2020. However, no reply has been received yet. Therefore, the Committee decided to reject<br>the case under intimation to RA, Pune .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

16

Case No.:2/4/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:6/80- Status:
PRIVATE LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00017/AM20/ RLA File<br>:31/83/040/00009/AM20/ Lic.No/Date:3110067390<br>24.04.2019 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on updated email address on 28.09.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firms reply.

Case is deferred.

17

Case No.:3/4/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:6/80- Status:
PRIVATE LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00018/AM20/ RLA File<br>:31/83/040/00010/AM20/ Lic.No/Date:3110067391<br>24.04.2019 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on updated email address on 28.09.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firms reply.

Case is deferred.

6 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/4/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:6/80- Status:<br>PRIVATE LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:3110067392 Pending<br>:01/80/050/00019/AM20/ :31/83/040/00011/AM20/ 24.04.2019 with firm<br>18<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on updated email address on 28.09.2020. However, no reply<br>has been received yet. Hence, the Committee decided to wait for the firms reply.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:5/4/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:6/80- Status:
PVT. LTD ALC2/2020 Rejected
29.09.2020
HQ File<br>:01/80/050/00020/AM20/ RLA File<br>:05/24/040/00033/AM20/ Lic.No/Date:0510410376<br>25.04.2019

19 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.12.2019 followed by reminders on 25.02.2020, 03.06.2020 & 03.09.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, New Delhi .

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/4/80-ALC2/2019 Party Name: SHIVALIK Meet No/Date:6/80- Status:<br>BIMETAL CONTROLS LTD ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510410395 Pending<br>:01/80/050/00022/AM20/ :05/24/040/00016/AM20/ 26.04.2019 with firm<br>20<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 31.07.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:9/4/80-ALC2/2019 Party Name: ERBATECH Meet No/Date:6/80- Status:
MACHINERY P LTD ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00024/AM20/ RLA File<br>:32/24/040/00004/AM20/ Lic.No/Date:3210078932<br>29.04.2019 Pending<br>with firm

21 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 03.09.2020. However, the firm via email dated 15.09.2020 requested for extension of time till 30.09.2020 to submit the reply. Therefore, the Committee decided to wait for the reply of the firm.

Case is deferred.

7 | P a g e

Case No.:13/4/80-ALC2/2019 Party Name: SRI RAM Meet No/Date:6/80- Status:
INDUSTRIES ALC2/2020 Rejected
29.09.2020
HQ File<br>:01/80/050/00028/AM20/ RLA File<br>:04/24/040/00157/AM19/ Lic.No/Date:0410165532<br>01.05.2019

22 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.10.2019 followed by reminders on 16.01.2020, 19.03.2020 & 18.08.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Chennai .

==> picture [476 x 199] intentionally omitted <==

----- Start of picture text -----<br> Case No.:14/4/80-ALC2/2019 Party Name: KINECO KAMAN Meet No/Date:6/80- Status:<br>COMPOSITES - INDIA PVT ALC2/2020 Deferred<br>LTD 29.09.2020<br>HQ File RLA File Lic.No/Date:0310828702 Pending<br>:01/80/050/00029/AM20/ :03/94/040/01131/AM19/ 01.05.2019 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DPIIT vide U. O. No.: P-47011/193/2019-TSW dated 31.08.2020 :<br>23<br>1. Basis/justification for the quantities of consumables, as their value is about 40% of FoB value of<br>exports.<br>2. For import items at Sl. No. 1 & 2: Starting from the specification of the export product, basic<br>calculation as to how of raw material proposed for import has been arrived at, including the net weight<br>of components to be manufactured out of these imported materials, wastages claimed at each stage of<br>manufacturing with complete justification and supported by documentary evidence/drawings etc..<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/4/80-ALC2/2019 Party Name: CHIRAG UDYOG Meet No/Date:6/80- Status:<br>ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510410451 Pending<br>:01/80/050/00030/AM20/ :05/23/040/00054/AM20/ 02.05.2019 with firm<br>24<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by Consultant (Tech-3) was sent to the firm on 03.09.2020. However, no reply has been<br>received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite<br>information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:16/4/80-ALC2/2019 Party Name: BLISS ANAND Meet No/Date:6/80- Status:
PVT. LTD. ALC2/2020 Rejected
29.09.2020
HQ File<br>:01/80/050/00031/AM20/ RLA File<br>:05/23/040/00051/AM20/ Lic.No/Date:0510410480<br>03.05.2019

25 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 25.02.2020 followed by reminders on 03.06.2020, 31.07.2020 & 03.09.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, New Delhi .

8 | P a g e

==> picture [476 x 188] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/4/80-ALC2/2019 Party Name: MASU BRAKE Meet No/Date:6/80- Status:<br>PADS PRIVATE LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510410488 Pending<br>:01/80/050/00036/AM20/ :05/24/040/00057/AM20/ 06.05.2019 with firm<br>Decision: The Committee considered the case as per the agenda and Consultant (SKB) informed that the<br>information furnished by the firm regarding the claim of 12% wastage on Black HR steel plate ( 5-6 mm<br>26<br>thick) for manufacturing of Back plate for export of Brake pads. They have shown only 1% wastage of plate<br>during cleaning and shoot blasting. However, how many operations are required and wastage during each<br>operation for making required sizes have not indicated. Therefore, as per comments of Consultant (SKB) , the<br>Committee decided to ask from the firm to furnish the following information :<br>1. To provide proper justification as to how 12% wastage calculated.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/4/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:6/80- Status:<br>PVT. LTD ALC2/2020 Rejected<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510410518<br>:01/80/050/00034/AM20/ :05/24/040/00762/AM19/ 08.05.2019<br>27<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 26.12.2019 followed by reminders on 27.02.2020,<br>03.06.2020 & 03.09.2020. However, no reply has been received yet. Therefore, the Committee decided to reject<br>the case under intimation to RA, New Delhi .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/4/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:6/80- Status:<br>SOLUTIONS PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910067492<br>:01/80/050/00033/AM20/ :09/24/040/00058/AM20/ 10.05.2019<br>28 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 19.03.2020 followed by reminders on 03.06.2020,<br>31.07.2020 & 03.09.2020. However, the firm vide their email dated 30.09.2020 has requested to grant them 30<br>days time to submit their applications. Therefore, the Committee decided to wait for hard copy of application<br>from the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:30/5/80-ALC2/2019 Party Name: TIAGO CHEM Meet No/Date:6/80- Status:
ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00068/AM20/ RLA File<br>:34/24/040/00075/AM20/ Lic.No/Date: 3410045178<br>30.05.2019 Pending<br>with firm

29 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. It was also noted that the earlier emails, regarding submission of copy of application, were sent on outdated email address. Hence, the Committee decided to send the application’s request to the firm by post.

Case is deferred.

9 | P a g e

Case No.:32/5/80-ALC2/2019 Party Name: FUTURE TECH Meet No/Date:6/80- Status:
ENGINEERING PVT.LTD, ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00070/AM20/ RLA File<br>:07/24/040/00050/AM20/ Lic.No/Date:0710115000<br>31.05.2019 Pending<br>with firm

30

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/6/80-ALC2/2019 Party Name: SHIVALIK Meet No/Date:6/80- Status:<br>BIMETAL CONTROLS LTD ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510410810 Pending<br>:01/80/050/00072/AM20/ :05/24/040/00129/AM20/ 04.06.2019 with firm<br>31<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 31.07.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:13/6/80-ALC2/2019 Party Name: VEELINE MEDIA Meet No/Date:6/80- Status:
LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00084/AM20/ RLA File<br>:02/24/040/00038/AM20/ Lic.No/Date:0210209240<br>11.06.2019 Pending<br>with firm

32 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the following information as per written comments of MSME:

  1. To provide net content of the import item in per unit of export product.

Case is deferred.

==> picture [476 x 222] intentionally omitted <==

----- Start of picture text -----<br> Case No.:16/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:6/80- Status:<br>LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0310829596 Pending<br>:01/80/050/00087/AM20/ :03/95/040/00239/AM20/ 12.06.2019 with firm<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>DPIIT for examination of the case on 18.08.2020. However, DPIIT informed that the received reply is for other<br>AA instead of above mentioned AA. Therefore, the Committee decided to ask from the firm to furnish the<br>33 following information as per written comments given by DPIIT vide U. O. No.: P-47011/313/2019-TSW dated<br>25.11.2019:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>2. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>----- End of picture text -----<br>

10 | P a g e

  1. Starting from the specification of export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification & supported by documentary evidence/drawing etc.

  2. Particulars of the licenses obtained in the past and ratified by ALC (with or without modification) for the same export product covered under this application, in view of Public Notice No. 48 dated 14.11.2002.

  3. Quantities of import items at Sl. No. 4 to 8 (Forgings) and 13 in Nos. in addition to their weights.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/6/80-ALC2/2019 Party Name: ISGEC HITACHI Meet No/Date:6/80- Status:<br>ZOSEN LIMITED ALC2/2020 & 29.09.2020 Rejected<br>HQ File RLA File Lic.No/Date:0510410946<br>:01/80/050/00092/AM20/ :05/23/040/00111/AM20/ 14.06.2019<br>34 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminders on 25.02.2020,<br>03.06.2020 & 03.09.2020. However, no reply has been received yet. Therefore, the Committee decided to reject<br>the case under intimation to RA, New Delhi .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/8/80- Party Name: MODEL INFRA Meet No/Date:6/80- Status:<br>ALC2/2019 CORPORATION PVT LTD. ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File :07/24/040/00081/AM20/ Lic.No/Date:0710115134 Pending with<br>:01/80/050/00113/AM20/ 05.07.2019 firm<br>35 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 03.06.2020 followed by a reminder on 31.07.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for<br>furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/8/80-ALC2/2019 Party Name: ANSTECH Meet No/Date:6/80- Status:<br>ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410045281 Pending<br>:01/80/050/00121/AM20/ :34/24/040/00127/AM20/ 15.07.2019 with firm<br>36 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020.<br>However, no information has been received yet. Hence, the Committee decided to wait for the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/8/80-ALC2/2019 Party Name: ZOBELE INDIA Meet No/Date:6/80- Status:<br>PRIVATE LIMITED ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310830415 Pending<br>:01/80/050/00124/AM20/ :03/95/040/00352/AM20/ 18.07.2019 with firm<br>37 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by Consultant (Tech-3) was sent to the firm on 03.09.2020. However, no reply has been<br>received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite<br>information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

11 | P a g e

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/9/80-ALC2/2019 Party Name: DYNA FORCE Meet No/Date:6/80- Status:<br>HYDRAULICS PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:3110067484 Pending<br>:01/80/050/00128/AM20/ :31/83/040/00067/AM20/ 25.07.2019 with firm<br>38<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 03.09.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 234] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/10/80-ALC2/2019 Party Name: DOOWON Meet No/Date:6/80- Status:<br>AUTOMOTIVE SYSTEMS ALC2/2020 Deferred<br>INDIA PRIVATE LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0410165942 Pending<br>:01/80/050/00140/AM20/ :04/24/040/00079/AM20/ 07.08.2019 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (Tech-3):<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>39<br>furnished.<br>2. Assembly drawings/diagrams of the resultant product showing placement and exact use of components<br>in the export product (s).<br>3. Use of export product.<br>4. Processing to be done on imported items particularly at Sl. No. 6 & 12.<br>5. Quantity of imported items at Sl. No. 6 & 12 in numbers.<br>6. Quantity of import items at Sl. No. 6 & 12 do not match with past consumption as per Annexure- 1.<br>7. Copy of Advance Authorization.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 118] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/10/80-ALC2/2019 Party Name: JKS Meet No/Date:6/80- Status:<br>ENGINEERING ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:3210079060<br>40 :01/80/050/00143/AM20/ :32/24/040/00033/AM20/ 08.08.2019<br>Decision: The Committee considered the case as per the agenda and decided to refer the case t o Consultant<br>(Tech-1) for examination & comments as per the advice of MSME .<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:6/10/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:6/80- Status:
BLADES INDIA PVT. LTD ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00144/AM20/ RLA File<br>:34/24/040/00152/AM20/ Lic.No/Date:3410045365<br>09.08.2019 Pending<br>with firm

41 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on updated address on 28.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

12 | P a g e

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/10/80-ALC2/2019 Party Name: MAINI Meet No/Date:6/80- Status:<br>PRECISION PRODUCTS ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0710115278<br>:01/80/050/00145/AM20/ :07/24/040/00106/AM20/ 13.08.2019<br>42<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>Consultant (Tech-3) on 15.08.2020 for examination of the case. However, Consultant (Tech-3) requested to<br>send physical file of the case. Therefore, the Committee decided to send the physical file of the case to<br>Consultant (Tech-3) for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

43

Case No.:4/6/80-ALC2/2020 Party Name: MICRON Meet No/Date:6/80- Status:
INSTRUMENTS PVT LTD ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00585/AM21/ RLA File<br>:05/24/040/00286/AM20/ Lic.No/Date:0510411576<br>20.08.2019 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

Case No.:19/10/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:6/80- Status:
SOLUTIONS PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00157/AM20/ RLA File<br>:09/24/040/00272/AM20/ Lic.No/Date:0910067939<br>27.08.2019 Pending<br>with firm

44 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 25.02.2020 followed by reminders on 01.06.2020 & 31.07.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 222] intentionally omitted <==

----- Start of picture text -----<br> Case No.:20/10/80-ALC2/2019 Party Name: OSWAL PUMPS Meet No/Date:6/80- Status:<br>LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:3310030578<br>:01/80/050/00158/AM20/ :33/24/040/00017/AM20/ 27.08.2019<br>Decision: The Committee considered the case as per the agenda and noted that DPIIT vide U. O. No. P-<br>47011/16/2020-TSW dated 28.08.2020 informed that the firm’s reply is incomplete. Therefore, the Committee<br>decided to ask again from the firm to furnish following information as per comments of DPIIT :<br>45<br>1. Quantities of export items in Nos. in addition to their weights.<br>2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured out<br>----- End of picture text -----<br>

13 | P a g e

of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:36/11/80-ALC2/2004 Party Name: PAHARPUR Meet No/Date:6/80- Status:<br>COOLING TOWERS LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0210209409 Pending<br>:01/80/050/00162/AM20/ :02/24/040/00081/AM20/ 02.09.2019 with firm<br>46<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard a letter was sent to the firm on 29.06.2020 followed by a<br>reminder on 11.08.2020. However, no information has been received so far. Therefore, the Committee decided<br>to remind the firm for submission of complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:38/11/80-ALC2/2004 Party Name: HANNING Meet No/Date:6/80- Status:
MOTORS INDIA P LTD ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00164/AM20/ RLA File<br>:34/24/040/00169/AM20/ Lic.No/Date:3410045416<br>04.09.2019 Pending<br>with firm

47 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard a letter was sent to the firm on 05.06.2020 followed by a reminder on 11.08.2020. However, no information has been received so far. Therefore, the Committee decided to remind the firm for submission of complete set of application for examination of the case.

Case is deferred.

48

Case No.:7/13/85-ALC3/2019 Party Name: AUTOCOMP Meet No/Date:6/80- Status:
CORPORATION PANSE ALC2/2020 Deferred
PRIVATE LIMITED 29.09.2020
HQ File<br>:01/85/050/00082/AM20/ RLA File<br>:31/83/040/00085/AM20/ Lic.No/Date:3110067530<br>11.09.2019

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-3) on 23.09.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to wait for comments.

Case is deferred.

==> picture [476 x 169] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/12/80-ALC2/2019 Party Name: HEURTEY Meet No/Date:6/80- Status:<br>PETROCHEM INDIA PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:3410045459 Pending<br>:01/80/050/00174/AM20/ :34/24/040/00185/AM20/ 19.09.2019 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>49 following information as per comments of DHI:<br>1. To furnish details of actual wastage generated in each operation against each raw material while making<br>the components to verify the wastage claimed.<br>2. To submit technical write-up.<br>Case is deferred.<br>----- End of picture text -----<br>

14 | P a g e

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/12/80- Party Name: FREUDENBERG Meet No/Date:6/80- Status:<br>ALC2/2019 FILTRATION TECHNOLOGIES ALC2/2020 Deferred<br>INDIA PVT. LTD. 29.09.2020<br>HQ File RLA File :31/83/040/00008/AM20/ Lic.No/Date:3110067543 Pending with<br>:01/80/050/00176/AM20/ 24.09.2019 firm<br>50<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020.<br>However, no information has been received yet. Hence, the Committee decided to wait for the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:5/12/80-ALC2/2019 Party Name: GODREJ & Meet No/Date:6/80- Status:
BOYCE MFG. CO. LTD., ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00177/AM20/ RLA File<br>:03/94/040/00480/AM20/ Lic.No/Date:0310831805<br>25.09.2019 Pending<br>with firm

51 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the firm on 03.09.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 268] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/12/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:6/80- Status:<br>PVT. LTD ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510411950 Pending<br>:01/80/050/00178/AM20/ :05/24/040/00338/AM20/ 25.09.2019 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of MSME:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>52 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material proposed<br>for import has been arrived at, including the net weight of components to be manufactured out of these<br>imported materials, wastages claimed at each stage of manufacturing with complete justification and<br>supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

15 | P a g e

==> picture [476 x 268] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/12/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:6/80- Status:<br>PVT. LTD ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510411951 Pending<br>:01/80/050/00179/AM20/ :05/24/040/00340/AM20/ 25.09.2019 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of MSME:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>53 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material proposed<br>for import has been arrived at, including the net weight of components to be manufactured out of these<br>imported materials, wastages claimed at each stage of manufacturing with complete justification and<br>supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

54

Case No.:8/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:6/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00180/AM20/ RLA File<br>:09/24/040/00336/AM20/ Lic.No/Date:0910068046<br>27.09.2019

Decision: The Committee considered the case as per the agenda and noted that DHI has informed the case does not pertain to them since import items will be used in the manufacturing of Air Crafts. Therefore the Committee decided to forward firm’s application to Consultant (SKB).

Case is deferred.

==> picture [476 x 245] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:6/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910068052 Pending<br>:01/80/050/00183/AM20/ :09/24/040/00345/AM20/ 01.10.2019 with firm<br>Decision: The Committee considered the case as per the agenda and noted that DHI informed that the firm did<br>not submit reply point-wise. Therefore, the Committee decided to ask again from the firm to furnish following<br>information point-wise as per comments of DHI :<br>55 1. Specific item of export.<br>2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>4. Calculation of requirement of raw material supported by Dimensional Engineering Drawing with<br>relevant dimensions highlighted. (Export Product wise).<br>Case is deferred.<br>----- End of picture text -----<br>

16 | P a g e

Case No.:12/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:6/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 29.09.2020 HQ File RLA File Lic.No/Date:0910068053 Pending :01/80/050/00184/AM20/ :09/24/040/00344/AM20/ 01.10.2019 with firm

Decision: The Committee considered the case as per the agenda and noted that DHI informed that the firm did not submit reply point-wise. Therefore, the Committee decided to ask again from the firm to furnish following information point-wise as per comments of DHI :

  • 56 1. Specific item of export.

    1. Weight of each Export Product.

    2. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

    3. Calculation of requirement of raw material supported by Dimensional Engineering Drawing with relevant dimensions highlighted. (Export Product wise)

Case is deferred.

==> picture [476 x 245] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:6/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910068054 Pending<br>:01/80/050/00185/AM20/ :09/24/040/00346/AM20/ 01.10.2019 with firm<br>Decision: The Committee considered the case as per the agenda and noted that DHI informed that the firm did<br>not submit reply point-wise. Therefore, the Committee decided to ask again from the firm to furnish following<br>information point-wise as per comments of DHI :<br>57 1. Specific item of export.<br>2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Calculation of requirement of raw material supported by Dimensional Engineering Drawing with relevant<br>dimensions highlighted. (Export Product wise)<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/6/80-ALC2/2020 Party Name: JAMES Meet No/Date:6/80- Status:<br>ROBINSON LABS PVT LTD ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0910068104 Pending<br>:01/80/050/00582/AM21/ :09/24/040/00279/AM20/ 16.10.2019 with firm<br>58<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete<br>set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

17 | P a g e

==> picture [476 x 165] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/14/80-ALC2/2019 Party Name: LOTUS AVIATION Meet No/Date:6/80- Status:<br>TECHNOLOGY PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0510412171 Pending<br>:01/80/050/00199/AM20/ :05/23/040/00283/AM20/ 17.10.2019 with firm<br>Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to<br>59<br>MeitY on 07.09.2020 for examination of the case. However, the representative of MeitY informed that the<br>description of import & export item is same. Therefore, on the advice of representative of MeitY , the Committee<br>decided to ask from the firm to furnish the following information:<br>1. To provide clarification for, why the description of import & export item is same.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/14/80-ALC2/2019 Party Name: NIDEC INDIA Meet No/Date:6/80- Status:<br>PRIVATE LIMITED ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510412197 Pending<br>:01/80/050/00200/AM20/ :05/24/040/00403/AM20/ 21.10.2019 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>60<br>following information as per comments of MSME :<br>2. Manufacturing process performed on import items at Sl. No. 1, 2, 3, 10, 11 & 12 along with step wise<br>wastage and material balancing.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 199] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/14/80-ALC2/2019 Party Name: TEGA Meet No/Date:6/80- Status:<br>INDUSTRIES LIMITED ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0210209491 Pending<br>:01/80/050/00201/AM20/ :02/24/040/00100/AM20/ 22.10.2019 with firm<br>Decision: The Committee considered the case as per the agenda and Consultant (SKB) informed that as per<br>details submitted by the firm, there is no sufficient justification/concrete justification on increase of wastage<br>from 5% to 12%. Therefore, the Committee decided to call the firm for personal hearing via video-<br>61 conferencing along with following information as per comments of Consultant (SKB):<br>1. What do they mean other wastage?<br>2. Sizes of small plates are being cut from the plate size 2020mmx3000mm size plate.<br>3. Number of cuts for small size plate from 2020mmx 3000mm plate.<br>4. When they already discarded the edges in the beginning then why again wastages is required for making<br>small size plates?<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/14/80-ALC2/2019 Party Name: TEGA Meet No/Date:6/80- Status:<br>INDUSTRIES LIMITED ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0210209503 Pending<br>:01/80/050/00202/AM20/ :02/24/040/00107/AM20/ 23.10.2019 with firm<br>Decision: The Committee considered the case as per the agenda and Consultant (SKB) informed that as per<br>62<br>details submitted by the firm, there is no sufficient justification/concrete justification on increase of wastage<br>from 5% to 12%. Therefore, the Committee decided to call the firm for personal hearing via video-<br>conferencing along with following information as per comments of Consultant (SKB):<br>1. What do they mean other wastage?<br>2. Sizes of small plates are being cut from the plate size 2020mmx3000mm size plate.<br>----- End of picture text -----<br>

18 | P a g e

  1. Number of cuts for small size plate from 2020mmx 3000mm plate.

  2. When they already discarded the edges in the beginning then why again wastages is required for making small size plates?

Case is deferred.

Case No.:7/14/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:6/80- Status:
PRIVATE LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00203/AM20/ RLA File<br>:31/83/040/00096/AM20/ Lic.No/Date:3110067581<br>23.10.2019 Pending<br>with firm

63 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/14/80- Party Name: HITAISHI KK Meet No/Date:6/80- Status:<br>ALC2/2019 MANUFACTURING COMPANY ALC2/2020 Deferred<br>PRIVATE LIMITED 29.09.2020<br>HQ File RLA File :02/24/040/00111/AM20/ Lic.No/Date:0210209515<br>:01/80/050/00205/AM20/ 28.10.2019<br>64<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, Kolkata and in this regard a letter was sent to the firm & RA, Kolkata on<br>20.03.2020 followed by reminder on 15.06.2020 , 04.08.2020. However, no information has been received so<br>far. Therefore, the Committee decided to remind firm for submitting the application. .<br>Case is deferred..<br>----- End of picture text -----<br>

65

Case No.:10/14/80-ALC2/2019 Party Name: TENOVA INDIA Meet No/Date:6/80- Status:
PRIVATE LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00206/AM20/ RLA File<br>:07/24/040/00154/AM20/ Lic.No/Date:0710115616<br>28.10.2019 Pending<br>with DHI

Decision: The Committee considered the case as per agenda and noted that the firm’s reply was sent to DHI on 28.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.:11/14/80-ALC2/2019 Party Name: FERRA Meet No/Date:6/80- Status:
AEROSPACE PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00207/AM20/ RLA File<br>:07/24/040/00164/AM20/ Lic.No/Date:0710115617<br>29.10.2019 Pending<br>with firm

66 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent on outdated email address. Further, it was noted that the updated email address of the firm is not available for communication. Therefore, the Committee decided to send the deficiency letter to the firm by post .

Case is deferred.

19 | P a g e

Case No.:12/14/80-ALC2/2019 Party Name: MELSTAR Meet No/Date:6/80- Status:
MANUFACTURING SYSTEMS ALC2/2020 Deferred
PRIVATE LIMITED 29.09.2020
HQ File<br>:01/80/050/00208/AM20/ RLA File<br>:07/24/040/00156/AM20/ Lic.No/Date:0710115619<br>29.10.2019

67 Decision: The Committee considered the case as per the agenda and noted that the earlier minutes were erroneously recorded. The Committee also noted that firm’s application was already sent to MSME on 17.02.2020. However, no comments have been received. Therefore, the Committee decided to remind MSME to expedite the comments.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/16/80-ALC2/2019 Party Name: AYYAPPA CNC Meet No/Date:6/80- Status:<br>PVT.LTD, ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0710115658 Pending<br>:01/80/050/00211/AM20/ :07/24/040/00170/AM20/ 08.11.2019 with firm<br>68<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 03.09.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/16/80-ALC2/2019 Party Name: SAMIRI Meet No/Date:6/80- Status:<br>EQUIPMENTS & ENGINEERS ALC2/2020 Deferred<br>PVT.LTD. 29.09.2020<br>HQ File RLA File Lic.No/Date:0310832707 Pending<br>:01/80/050/00213/AM20/ :03/95/040/00758/AM20/ 11.11.2019 with firm<br>69 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. It was also noted that the earlier emails, regarding submission of copy of<br>application, was sent on outdated email address. Further, it was noted that the updated email address of the firm<br>is not available for communication. Therefore, the Committee decided to send application request to the firm by<br>post .<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/16/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:6/80- Status:<br>BLADES INDIA PVT. LTD ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:3410045605 Pending<br>:01/80/050/00215/AM20/ :34/24/040/00242/AM20/ 13.11.2019 with firm<br>70 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard a letter was sent to the firm on 01.01.2020 followed by<br>reminders on 26.02.2020, 15.06.2020 & 17.08.2020. However, the firm vide email dated 16.09.2020 requested<br>for some more time to submit all the relevant documents. Therefore, the Committee decided to wait for the<br>complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

20 | P a g e

==> picture [476 x 257] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/16/80-ALC2/2019 Party Name: BLISS ANAND Meet No/Date:6/80- Status:<br>PRIVATE LIMITED ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510412485 Pending<br>:01/80/050/00214/AM20/ :05/23/040/00311/AM20/ 14.11.2019 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of DPIIT vide U. O. No.: P-47011/134/2019-TSW dated 08.09.2020 :<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>2. Weight of each Export Product.<br>71<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured out<br>of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 107] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/16/80-ALC2/2019 Party Name: NUCON Meet No/Date:6/80- Status:<br>AEROSPACE PVT LTD ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0910068185<br>:01/80/050/00216/AM20/ :09/24/040/00409/AM20/ 14.11.2019<br>72<br>Decision: The Committee considered the case as per the agenda and decided to refer the case t o MSME for<br>examination & comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/16/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:6/80- Status:<br>SOLUTIONS PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910068192 Pending<br>:01/80/050/00218/AM20/ :09/24/040/00408/AM20/ 18.11.2019 with firm<br>73<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 01.06.2020 followed by a reminder on 31.07.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:9/16/80-ALC2/2019 Party Name: KUVAWALA Meet No/Date:6/80- Status:
CORE DRILL EQUIPMENT ALC2/2020 Deferred
PVT. LTD., 29.09.2020
HQ File<br>:01/80/050/00219/AM20/ RLA File<br>:03/94/040/00644/AM20/ Lic.No/Date:0310832842<br>18.11.2019 Pending<br>with firm

74 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

21 | P a g e

==> picture [476 x 268] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/16/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:6/80- Status:<br>PVT. LTD ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510412549 Pending<br>:01/80/050/00220/AM20/ :05/24/040/00462/AM20/ 19.11.2019 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of MSME:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>75 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material proposed<br>for import has been arrived at, including the net weight of components to be manufactured out of these<br>imported materials, wastages claimed at each stage of manufacturing with complete justification and<br>supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/16/80-ALC2/2019 Party Name: OAM SAAI Meet No/Date:6/80- Status:<br>INTERNATIONAL INC. ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510412570 Pending<br>:01/80/050/00223/AM20/ :05/24/040/00479/AM20/ 21.11.2019 with firm<br>76<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 16.06.2020 followed by a reminder on 04.08.2020.<br>However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:15/16/80-ALC2/2019 Party Name: L&T-MHPS Meet No/Date:6/80- Status:
BOILERS PVT LTD ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00225/AM20/ RLA File<br>:03/95/040/00808/AM20/ Lic.No/Date:0310832929<br>21.11.2019 Pending<br>with firm

77

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

22 | P a g e

Case No.:16/16/80-ALC2/2019 Party Name: VALEO INDIA Meet No/Date:6/80- Status: PRIVATE LIMITED ALC2/2020 Approved 29.09.2020 HQ File RLA File Lic.No/Date:0410166294 :01/80/050/00226/AM20/ :04/24/040/00131/AM20/ 21.11.2019

Case No.:16/16/80-ALC2/2019Party Name: VALEO INDIA<br>PRIVATE LIMITED<br>Meet No/Date:6/80-<br>ALC2/2020<br>29.09.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00226/AM20/<br>RLA File<br>:04/24/040/00131/AM20/<br>Lic.No/Date:0410166294<br>21.11.2019 Case No.:16/16/80-ALC2/2019 <br> Case No.:16/16/80-ALC2/2019 <br> Case No.:16/16/80-ALC2/2019 <br> Party Name: VALEO INDIA<br>PRIVATE LIMITED Party Name: VALEO INDIA<br>PRIVATE LIMITED Party Name: VALEO INDIA<br>PRIVATE LIMITED Meet No/Date:6/80-<br>ALC2/2020<br>29.09.2020 Meet No/Date:6/80-<br>ALC2/2020<br>29.09.2020 Status:<br>Approved
HQ File<br>:01/80/050/00226/AM20/<br> <br> RLA File<br>:04/24/040/00131/AM20/ Lic.No/Date:0410166294<br>21.11.2019
78 Decision:The Committee considered the case as<br>written comments ofMSMEas under:<br>ITCHS<br>Code<br>Export<br>Item<br>Quantity<br>Sl.<br>No.<br>ITCHS<br>Code<br>87089900<br>PSA Air<br>Charge<br>Air<br>Coller<br>(ACAC)<br>50 Max<br>Core<br>Assy<br>188156<br>Number<br>1<br>87089900<br>2<br>87089900<br>3<br>87089900<br>4<br>76071190<br>5<br>76071190<br>RA concerned maytake further necessaryaction as per agenda and decided toratifythe ad-hoc norms as per<br>Import Item<br>Recommended<br>Norms<br>Header Both Side Claded Aluminium<br>Parts for Car Air Charge Air Cooler<br>(ACAC) Part No M155240<br>As per GN4<br>Side Plate Single Side Claded<br>Aluminium Parts for Car AIR Charge Air<br>Cooler (ACAC) Part No M161789<br>As per GN4<br>Electro Welded Tube<br>229 X 50 x 7.7 mm Both Side Claded<br>Aluminium Parts for Car AIR<br>As per GN4<br>Fin Foil 0.067 mm thickness Non Claded<br>Aluminium<br>1.02 Kgs/Kg<br>content in the<br>export product<br>Turbulator Foil 0.1mm Non Claded<br>Aluminium<br>1.02 Kgs/Kg<br>content in the<br>export product<br>per the decision of NC.
Export<br>Item Quantity Sl.<br>No. ITCHS<br>Code Import Item Recommended<br>Norms
PSA Air<br>Charge<br>Air<br>Coller<br>(ACAC)<br>50 Max<br>Core<br>Assy 188156<br>Number 1 87089900 Header Both Side Claded Aluminium<br>Parts for Car Air Charge Air Cooler<br>(ACAC) Part No M155240 As per GN4
2 87089900 Side Plate Single Side Claded<br>Aluminium Parts for Car AIR Charge Air<br>Cooler (ACAC) Part No M161789 As per GN4
3 87089900 Electro Welded Tube<br>229 X 50 x 7.7 mm Both Side Claded<br>Aluminium Parts for Car AIR As per GN4
4 76071190 Fin Foil 0.067 mm thickness Non Claded<br>Aluminium 1.02 Kgs/Kg<br>content in the<br>export product
5 76071190 Turbulator Foil 0.1mm Non Claded<br>Aluminium 1.02 Kgs/Kg<br>content in the<br>export product
per the decision of NC.

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:

==> picture [476 x 268] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/16/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:6/80- Status:<br>PVT. LTD ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510412651 Pending<br>:01/80/050/00228/AM20/ :05/24/040/00499/AM20/ 26.11.2019 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of MSME:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>79 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material proposed<br>for import has been arrived at, including the net weight of components to be manufactured out of these<br>imported materials, wastages claimed at each stage of manufacturing with complete justification and<br>supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 84] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/16/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:6/80- Status:<br>PRIVATE LIMITED ALC2/2020 Deferred<br>29.09.2020<br>80<br>HQ File RLA File Lic.No/Date:3110067611 Pending<br>:01/80/050/00229/AM20/ :31/83/040/00115/AM20/ 26.11.2019 with firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>----- End of picture text -----<br>

23 | P a g e

yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

==> picture [476 x 109] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/18/80-ALC2/2019 Party Name: MICRON Meet No/Date:6/80- Status:<br>INSTRUMENTS PVT LTD ALC2/2020 & 29.09.2020 Approved<br>HQ File RLA File Lic.No/Date:0510412701<br>:01/80/050/00247/AM20/ :05/24/040/00489/AM20/ 29.11.2019<br>81<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/14/2020-TSW dated 24.08.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/18/80-ALC2/2019 Party Name: ZECHA Meet No/Date:6/80- Status:<br>PRECISION TOOLS LIMITED ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310833334 Pending<br>:01/80/050/00249/AM20/ :03/95/040/00892/AM20/ 11.12.2019 with firm<br>82 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 03.09.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 191] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/18/80-ALC2/2019 Party Name: GAUPAD Meet No/Date:6/80- Status:<br>INDUSTRY ALC2/2020 & 29.09.2020 Approved<br>HQ File RLA File Lic.No/Date:0510412855<br>:01/80/050/00252/AM20/ :05/23/040/00329/AM20/ 11.12.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of Consultant (SKB) as under:<br>83<br>ITCHS ITCHS<br>Export Item Quantity Import Item Recommended Norms<br>Code Code<br>Magnesium<br>MG: 99.9% Min. Without<br>Metal 50000 0.75% wastage on net<br>81043010 81041100 Acid Washed. Ingot<br>Turnings Kgs weight of export item<br>Weight of About 7.5Kgs<br>99.9%<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:8/18/80-ALC2/2019 Party Name: CRYSTAL Meet No/Date:6/80- Status:
INDUSTRIAL SYNDICATE ALC2/2020 Deferred
PVT.LTD. 29.09.2020
HQ File<br>:01/80/050/00253/AM20/ RLA File<br>:03/94/040/00752/AM20/ Lic.No/Date:0310833379<br>12.12.2019 Pending<br>with DPIIT

==> picture [475 x 92] intentionally omitted <==

----- Start of picture text -----<br> HQ File RLA File Lic.No/Date:0310833379 Pending<br>:01/80/050/00253/AM20/ :03/94/040/00752/AM20/ 12.12.2019 with DPIIT<br>84<br>Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to<br>DPIIT on 24.09.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

24 | P a g e

==> picture [476 x 188] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/18/80-ALC2/2019 Party Name: RONCH Meet No/Date:6/80- Status:<br>POLYMERS PVT. LTD. ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0310833381 Pending<br>:01/80/050/00254/AM20/ :03/95/040/00887/AM20/ 12.12.2019 with firm<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by Consultant (Tech-1) was sent to the firm on 04.08.2020. However, no reply has been<br>85<br>received yet against the deficiency letter. Therefore, the Committee decided to send final reminder to the firm<br>for furnishing the following information within 15 days:<br>1. Appendix 4E with all technical details indicating percentage wastage applied for.<br>2. Manufacturing process in details with wastage involved at every step.<br>3. Net content of each import item in export.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 234] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/18/80-ALC2/2019 Party Name: TPI COMPOSITES Meet No/Date:6/80- Status:<br>INDIA LLP ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0410166360 Pending<br>:01/80/050/00255/AM20/ :04/24/040/00138/AM20/ 13.12.2019 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask again from the firm to<br>furnish following information as per comments of Consultant (Tech-1) :<br>1. Net weight of export product.<br>86<br>2. Generic name of import items along with its function in manufacturing.<br>3. Percentage wastage involved on net content basis in export for each of raw material and justification for<br>same.<br>4. List of consumables with its value.<br>5. Material balance in weight terms between import and export taking in to consideration indigenous input<br>and wastage involved.<br>6. % solid content for paint and adhesive items in import and indigenous input.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/18/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:6/80- Status:<br>PVT. LTD. ALC2/2020 Rejected<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510412920<br>:01/80/050/00257/AM20/ :05/24/040/00555/AM20/ 16.12.2019<br>87 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm & RA, New Delhi and in this regard a letter was sent to the firm & RA, New<br>Delhi on 17.01.2020 followed by reminders on 20.03.2020, 03.06.2020 & 11.08.2020. However, no information<br>has been received so far. Therefore, the Committee decided to reject the case under intimation to RA, New<br>Delhi.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

25 | P a g e

==> picture [476 x 314] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/18/80-ALC2/2019 Party Name: AZAD Meet No/Date:6/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910068287 Pending<br>:01/80/050/00258/AM20/ :09/24/040/00455/AM20/ 17.12.2019 with firm<br>Decision: The Committee considered the case as per the agenda and noted that DHI informed that the firm did<br>not submit reply point-wise. Therefore, the Committee decided to call the applicant for personal hearing along<br>with following information point-wise as per comments of DHI :<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>2. Weight of each Export Product.<br>88 3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured out<br>of these imported materials, wastages claimed at each stage of manufacturing with complete justification<br>and supported by documentary evidence/drawings etc.<br>5. Manufacturing process of export product giving specific use of import item with justification of quantity<br>of import.<br>6. Write up of import item.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:14/18/80-ALC2/2019 Party Name: KELVION INDIA Meet No/Date:6/80- Status:
PVT LTD ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00259/AM20/ RLA File<br>:03/94/040/00474/AM20/ Lic.No/Date:0310833455<br>17.12.2019 Pending<br>with firm

89 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 17.08.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 187] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/18/80-ALC2/2019 Party Name: MASU BRAKE Meet No/Date:6/80- Status:<br>PADS PRIVATE LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510412951 Pending<br>:01/80/050/00260/AM20/ :05/24/040/00559/AM20/ 18.12.2019 with firm<br>Decision: The Committee considered the case as per the agenda and Consultant (SKB) informed that the<br>information furnished by the firm regarding the claim of 12% wastage on Black HR steel plate ( 5-6 mm<br>90<br>thick) for manufacturing of Back plate for export of Brake pads. They have shown only 1% wastage of plate<br>during cleaning and shoot blasting. However, how many operations are required and wastage during each<br>operation for making required sizes have not indicated. Therefore, as per comments of Consultant (SKB) , the<br>Committee decided to ask from the firm to furnish the following information :<br>1. To provide proper justification as to how 12% wastage calculated.<br>Case is deferred.<br>----- End of picture text -----<br>

26 | P a g e

==> picture [476 x 107] intentionally omitted <==

----- Start of picture text -----<br> Case No.:16/18/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:6/80- Status:<br>PVT. LTD ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510412958<br>:01/80/050/00261/AM20/ :05/24/040/00572/AM20/ 18.12.2019<br>91<br>Decision: The Committee considered the case as per the agenda and decided to refer the case t o MSME for<br>examination & comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:17/18/80-ALC2/2019 Party Name: ZECHA Meet No/Date:6/80- Status:<br>PRECISION TOOLS LIMITED ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310833525 Pending<br>:01/80/050/00262/AM20/ :03/95/040/00919/AM20/ 18.12.2019 with firm<br>92 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 03.09.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within<br>15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/18/80-ALC2/2019 Party Name: L&T- MHPS Meet No/Date:6/80- Status:<br>TURBINE GENERATORS ALC2/2020 Deferred<br>PRIVATE LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0310833550<br>93 :01/80/050/00263/AM20/ :03/95/040/00907/AM20/ 19.12.2019<br>Decision: The Committee considered the case as per the agenda and decided to refer the case t o DHI for<br>examination & comments as per the advice of Consultant (Tech-3).<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/18/80-ALC2/2019 Party Name: BONATRANS Meet No/Date:6/80- Status:<br>INDIA PRIVATE LIMITED ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310833585 Pending<br>:01/80/050/00264/AM20/ :03/94/040/00773/AM20/ 20.12.2019 with firm<br>Decision: The Committee considered the case as per the agenda and noted that DHI informed that the firm’s<br>94 reply dated 30.07.2020 is deficient as the firm has only given statement of wastage. Therefore, the Committee<br>decided to ask again from the firm to furnish following information as per comments of DHI :<br>1. Calculation should be based on the dimensional drawing of import & export item in English language.<br>2. To provide clarification for, why ITCHS Code of import & export is same.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:1/20/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:6/80- Status:
PRIVATE LIMITED ALC2/2020 & 29.09.2020 Deferred
HQ File<br>:01/80/050/00283/AM20/ RLA File<br>:31/83/040/00132/AM20/ Lic.No/Date:3110067650<br>07.01.2020 Pending<br>with firm

95 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application. Case is deferred.

27 | P a g e

==> picture [476 x 120] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/20/80-ALC2/2019 Party Name: HUMANETICS Meet No/Date:6/80- Status:<br>INNOVATIVE SOLUTIONS ALC2/2020 Approved<br>INDIA PRIVATE LIMI 29.09.2020<br>HQ File RLA File Lic.No/Date:0710116010<br>96 :01/80/050/00285/AM20/ :07/24/040/00227/AM20/ 09.01.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/101/2020-TSW dated 10.09.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/6/80-ALC2/2020 Party Name: KOREA FUEL Meet No/Date:6/80- Status:<br>TECH INDIA P. LTD ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0410166429 Pending<br>:01/80/050/00583/AM21/ :04/24/040/00148/AM20/ 10.01.2020 with firm<br>97<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete<br>set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 121] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/20/80-ALC2/2019 Party Name: STEEL STRONG Meet No/Date:6/80- Status:<br>VALVES (I) PVT.LTD. ALC2/2020 Approved<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0310834108<br>98 :01/80/050/00287/AM20/ :03/95/040/01007/AM20/ 13.01.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/75/2020-TSW dated 10.09.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/20/80-ALC2/2019 Party Name: ARIHANT Meet No/Date:6/80- Status:<br>INDUSTRIES, ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:3310030641 Pending<br>:01/80/050/00289/AM20/ :33/24/040/00031/AM20/ 13.01.2020 with firm<br>99<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020.<br>However, no information has been received yet. Hence, the Committee decided to wait for the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

28 | P a g e

Case No.:6/20/80-ALC2/2019 Party Name: SULZER PUMPS Meet No/Date:6/80- Status:
INDIA PRIVATE LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00288/AM20/ RLA File<br>:03/95/040/01012/AM20/ Lic.No/Date:0310834142<br>14.01.2020 Pending<br>with firm

100 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/20/80-ALC2/2019 Party Name: VEELINE MEDIA Meet No/Date:6/80- Status:<br>LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0210209681 Pending<br>:01/80/050/00291/AM20/ :02/24/040/00159/AM20/ 14.01.2020 with firm<br>101<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking<br>certain information as raised by MSME was sent to the firm on 03.09.2020. However, no reply has been<br>received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite<br>information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:11/20/80-ALC2/2019 Party Name: ANSTECH Meet No/Date:6/80- Status:
ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00293/AM20/ RLA File<br>:34/24/040/00313/AM20/ Lic.No/Date:3410045793<br>17.01.2020 Pending<br>with firm

102 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

==> picture [476 x 187] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/20/80-ALC2/2019 Party Name: MASU BRAKE Meet No/Date:6/80- Status:<br>PADS PRIVATE LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510413364 Pending<br>:01/80/050/00294/AM20/ :05/24/040/00664/AM20/ 17.01.2020 with firm<br>Decision: The Committee considered the case as per the agenda and Consultant (SKB) informed that the<br>information furnished by the firm regarding the claim of 12% wastage on Black HR steel plate ( 5-6 mm<br>103<br>thick) for manufacturing of Back plate for export of Brake pads. They have shown only 1% wastage of plate<br>during cleaning and shoot blasting. However, how many operations are required and wastage during each<br>operation for making required sizes have not indicated. Therefore, as per comments of Consultant (SKB) , the<br>Committee decided to ask from the firm to furnish the following information :<br>1. To provide proper justification as to how 12% wastage calculated.<br>Case is deferred.<br>----- End of picture text -----<br>

29 | P a g e

Case No.:16/21/80-ALC2/2019 Party Name: AZAD Meet No/Date:6/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00310/AM20/ RLA File<br>:09/24/040/00525/AM20/ Lic.No/Date:0910068424<br>29.01.2020 Pending<br>with firm

104

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (SKB) was sent to the firm on 03.09.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 118] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:6/80- Status:<br>MATTHEY INDIA PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0510413542<br>105 :01/80/050/00327/AM20/ :05/23/040/00426/AM20/ 10.02.2020<br>Decision: The Committee considered the case as per the agenda and decided to refer the case t o Consultant<br>(Tech-3) for examination & comments as per the advice of Consultant (Tech-1).<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:6/80- Status:<br>MATTHEY INDIA PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0510413543<br>106 :01/80/050/00328/AM20/ :05/23/040/00427/AM20/ 10.02.2020<br>Decision: The Committee considered the case as per the agenda and decided to refer the case t o Consultant<br>(Tech-3) for examination & comments as per the advice of Consultant (Tech-1).<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 256] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/22/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:6/80- Status:<br>ENGINEERING LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510413567 Pending<br>:01/80/050/00333/AM20/ :05/23/040/00429/AM20/ 10.02.2020 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask again from the firm to<br>furnish following information as per comments of DHI :<br>1. Specification of the export product.<br>2. Quality of export product in number.<br>107<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license, if<br>any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured<br>out of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

30 | P a g e

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:6/80- Status:<br>MATTHEY INDIA PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0510413568<br>108 :01/80/050/00334/AM20/ :05/23/040/00433/AM20/ 10.02.2020<br>Decision: The Committee considered the case as per the agenda and decided to refer the case t o Consultant<br>(Tech-3) for examination & comments as per the advice of Consultant (Tech-1).<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 118] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:6/80- Status:<br>MATTHEY INDIA PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0510413570<br>109 :01/80/050/00335/AM20/ :05/23/040/00434/AM20/ 10.02.2020<br>Decision: The Committee considered the case as per the agenda and decided to refer the case t o Consultant<br>(Tech-3) for examination & comments as per the advice of Consultant (Tech-1).<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:6/80- Status:<br>MATTHEY INDIA PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0510413571<br>110 :01/80/050/00336/AM20/ :05/23/040/00435/AM20/ 10.02.2020<br>Decision: The Committee considered the case as per the agenda and decided to refer the case t o Consultant<br>(Tech-3) for examination & comments as per the advice of Consultant (Tech-1).<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 118] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:6/80- Status:<br>MATTHEY INDIA PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0510413572<br>111 :01/80/050/00337/AM20/ :05/23/040/00436/AM20/ 10.02.2020<br>Decision: The Committee considered the case as per the agenda and decided to refer the case t o Consultant<br>(Tech-3) for examination & comments as per the advice of Consultant (Tech-1).<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:12/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:6/80- Status:
MATTHEY INDIA PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00338/AM20/ RLA File<br>:05/23/040/00437/AM20/ Lic.No/Date:0510413573<br>10.02.2020 Pending<br>with firm

112 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 23.06.2020 followed by reminders on 11.08.2020 & 03.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm for submitting the complete set of application.

Case is deferred.

31 | P a g e

==> picture [476 x 280] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/22/80-ALC2/2019 Party Name: DEE Meet No/Date:6/80- Status:<br>DEVELOPMENT ENGINEERS ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0510413575 Pending<br>:01/80/050/00339/AM20/ :05/23/040/00432/AM20/ 10.02.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (Tech-3):<br>1. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in<br>the export product may be indicated. Net weight along with details of other imported input to be used in<br>113<br>the resultant product and sought to be imported/procured from sources other than the license, if any, may<br>also be indicated.<br>2. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured out<br>of these imported materials, wastages claimed at each stage of manufacturing with complete justification<br>and supported by documentary evidence/drawings etc.<br>3. Quantity of import items at Sl. No. 3 to 6 in numbers.<br>4. To provide clarification for why galvanizing is shown as a process but requirement of Zn is not shown.<br>5. Wastage claimed on various inputs.<br>6. Copy of Advance Authorization.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 256] intentionally omitted <==

----- Start of picture text -----<br> Case No.:14/22/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:6/80- Status:<br>ENGINEERING LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510413578 Pending<br>:01/80/050/00340/AM20/ :05/23/040/00428/AM20/ 11.02.2020 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask again from the firm to<br>furnish following information as per comments of DHI :<br>1. Specification of the export product.<br>2. Quality of export product in number.<br>114<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license, if<br>any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured<br>out of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

32 | P a g e

Case No.: Party Name: MICRON Meet No/Date:6/80- Status: 16/22/80-ALC2/2019 INSTRUMENTS PVT. LTD. ALC2/2020 Approved 29.09.2020

HQ File RLA File :05/24/040/00719/AM20/ Lic.No/Date:0510413598 :01/80/050/00342/AM20/ 12.02.2020

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47012/15/2020-TSW dated 25.08.2020 as under:

115

==> picture [446 x 26] intentionally omitted <==

----- Start of picture text -----<br> ITCHS Export Quantity ITCHS Import Item Recommended<br>Code Item Code Norms<br>----- End of picture text -----<br>

Export<br>Item Quantity ITCHS<br>Code Import Item
Collector<br>Baffle.<br>Collector<br>Baffle. Part<br>No.-<br>5507296 566<br>Number 73044900 SMLS SS Hollow Bar.<br>SMLS SS Hollow Bar, Tp304l,<br>Sandvik Sanmac304l, En<br>10216-5-Tc-Tol:Od+2/0% Id<br>0/-2% Length +0.006/0mm

Note:

1. Quantity of export item may be specified as 45.56 Kgs.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:17/22/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:6/80- Status:<br>BLADES INDIA PVT. LTD ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:3410045867 Pending<br>:01/80/050/00343/AM20/ :34/24/040/00355/AM20/ 12.02.2020 with firm<br>116<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020.<br>However, no information has been received yet. Hence, the Committee decided to wait for the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:18/22/80-ALC2/2019 Party Name: SCHOCH REEDS Meet No/Date:6/80- Status:
INDIA PRIVATE LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00344/AM20/ RLA File<br>:31/83/040/00152/AM20/ Lic.No/Date:3110067684<br>13.02.2020 Pending<br>with firm

117

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. It was also noted that the earlier emails, regarding submission of copy of application, were sent on outdated email address. Hence, the Committee decided to send the application’s request to the firm by post.

Case is deferred.

==> picture [476 x 118] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/22/80-ALC2/2019 Party Name: HFCL LIMITED Meet No/Date:6/80- Status:<br>ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510413626 Pending<br>118 :01/80/050/00345/AM20/ :05/23/040/00443/AM20/ 14.02.2020 with MeitY<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to MeitY for<br>examination & comments.<br>Case is deferred.<br>----- End of picture text -----<br>

33 | P a g e

Case No.:5/6/80-ALC2/2020 Party Name: MICRON Meet No/Date:6/80- Status:
INSTRUMENTS PVT LTD ALC2/2020 & 29.09.2020 Deferred
HQ File<br>:01/80/050/00586/AM21/ RLA File<br>:05/24/040/00741/AM20/ Lic.No/Date:0510413765<br>02.03.2020 Pending<br>with firm

119

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/6/80-ALC2/2020 Party Name: VICTORA AUTO Meet No/Date:6/80- Status:<br>PVT. LTD ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510413777 Pending<br>:01/80/050/00587/AM21/ :05/24/040/00744/AM20/ 03.03.2020 with firm<br>120<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the<br>complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/24/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:6/80- Status:<br>PRIVATE LIMITED. ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3110067707 Pending<br>:01/80/050/00360/AM20/ :31/83/040/00160/AM20/ 06.03.2020 with firm<br>121 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020.<br>However, no information has been received yet. Hence, the Committee decided to wait for the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 267] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/24/80-ALC2/2019 Party Name: ULTRA Meet No/Date:6/80- Status:<br>ENGINEERS ALC2/2020 & 29.09.2020 Approved<br>HQ File RLA File Lic.No/Date:3110067709<br>:01/80/050/00362/AM20/ :31/83/040/00162/AM20/ 06.03.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of Consultant (Tech 3) vide email dated 01.10.2020 as under:<br>ITCHS Export Item Quantity ITCHS Import Item Recommended<br>Code (Nos) Code Norms<br>PARTS OF OIL FIELD EQUIPMENT,<br>122 CARR/TUBE, 3.12 ISGS NAL, 4/90, 163.6 MT<br>20KSI, 1 FT MECH<br>84139190 19000 including 9%<br>(Export Product Net weight Total TUBING<br>wastage<br>=7.919000=150100 Kg) Part No- 3.125 OD X 0<br>102014365 .313<br>73043119<br>PARTS OF OIL FIELD EQUIPMENT, WALL,135KSI<br>CARR/TUBE, 3.12 FRACTAL FLEX, YIELD ( Qty<br>340.9 MT<br>6/60, 20KSI, 1 FT 120316.80FT)<br>84139190 39938 including 10%<br>(Export Product Net weight Total 101395796<br>wastage<br>=7.7639938=309918.88Kg) Part No-<br>102698725<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

34 | P a g e

==> picture [476 x 233] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/24/80-ALC2/2019 Party Name: DOOWON Meet No/Date:6/80- Status:<br>AUTOMOTIVE SYSTEMS ALC2/2020 Deferred<br>INDIA PRIVATE LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0410166600 Pending<br>:01/80/050/00363/AM20/ :04/24/040/00195/AM20/ 09.03.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (Tech-3):<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>123<br>furnished.<br>2. Assembly drawings/diagrams of the resultant product showing placement and exact use of<br>components in the export product (s).<br>3. Use of export product.<br>4. Processing to be done on imported items particularly at Sl. No. 6 & 12.<br>5. Quantity of imported items at Sl. No. 6 & 12 in numbers.<br>6. Quantity of import items at Sl. No. 6 & 12 do not match with past consumption as per Annexure- 1.<br>7. Copy of Advance Authorization.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/24/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:6/80- Status:<br>LIMITED ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0310835306 Pending<br>:01/80/050/00364/AM20/ :03/95/040/01160/AM20/ 09.03.2020 with firm<br>124 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 23.06.2020 followed by a reminder on<br>18.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind<br>again the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/24/80-ALC2/2019 Party Name: SHAKTI PUMPS Meet No/Date:6/80- Status:<br>INDIA LIMITED ALC2/2020 & 29.09.2020 Withdrawn<br>HQ File RLA File Lic.No/Date:5610005840<br>:01/80/050/00365/AM20/ :56/24/040/00031/AM20/ 09.03.2020<br>125<br>Decision: The Committee considered the case as per the agenda and noted that the firm vide email dated<br>29.09.2020 informed that the above AA has been surrendered at RA, Indore. Therefore, the Committee<br>decided to withdraw the case from the agenda under intimation to RA, Indore .<br>Case is withdrawn.<br>----- End of picture text -----<br>

Case No.:9/24/80-ALC2/2019 Party Name: SHAKTI PUMPS Meet No/Date:6/80- Status:
INDIA LIMITED ALC2/2020 & 29.09.2020 Withdrawn
HQ File<br>:01/80/050/00366/AM20/ RLA File<br>:56/24/040/00042/AM20/ Lic.No/Date:5610005841<br>09.03.2020

126 Decision: The Committee considered the case as per the agenda and noted that the firm vide email dated 29.09.2020 informed that the above AA has been surrendered at RA, Indore. Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, Indore .

Case is withdrawn.

35 | P a g e

==> picture [476 x 245] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/24/80-ALC2/2019 Party Name: HONDA Meet No/Date:6/80- Status:<br>TRADING CORPORATION ALC2/2020 Deferred<br>INDIA PRIVATE LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0510413853 Pending<br>:01/80/050/00367/AM20/ :05/23/040/00449/AM20/ 12.03.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (Tech-3):<br>1. Copy of Advance Authorization and copy of Export Order.<br>127 2. Model number, technical specification and specific quantity-both in terms of number (if any) and/or<br>weight, of each export product (Appendix-33 of current HBP refers).<br>3. Detail technical note on manufacturing process including the relevant flow sheet.<br>4. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>5. Starting 4from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured<br>out of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/24/80-ALC2/2019 Party Name: HANNING Meet No/Date:6/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410045945 Pending<br>:01/80/050/00368/AM20/ :34/24/040/00382/AM20/ 12.03.2020 with firm<br>128 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 23.06.2020 followed by a reminder on<br>11.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind<br>again the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/24/80-ALC2/2019 Party Name: HANNING Meet No/Date:6/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410045946 Pending<br>:01/80/050/00369/AM20/ :34/24/040/00383/AM20/ 12.03.2020 with firm<br>129 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 23.06.2020 followed by a reminder on<br>11.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind<br>again the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/24/80-ALC2/2019 Party Name: HANNING Meet No/Date:6/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410045947 Pending<br>:01/80/050/00370/AM20/ :34/24/040/00384/AM20/ 12.03.2020 with firm<br>130 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 23.06.2020 followed by a reminder on<br>17.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind<br>again the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

36 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:14/24/80-ALC2/2019 Party Name: S K INDUSTRIES Meet No/Date:6/80- Status:<br>ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410045951 Pending<br>:01/80/050/00371/AM20/ :34/24/040/00387/AM20/ 12.03.2020 with firm<br>131 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. It was also noted that the earlier emails, regarding submission of copy of<br>application, were sent on outdated email address. Hence, the Committee decided to send the application’s<br>request to the firm by post.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:15/24/80-ALC2/2019 Party Name: UNI VTL Meet No/Date:6/80- Status:
PRECISION PVT. LTD. ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00372/AM20/ RLA File<br>:07/24/040/00287/AM20/ Lic.No/Date:0710116245<br>12.03.2020 Pending<br>with firm

132 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 23.06.2020 followed by a reminder on 18.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind again the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:16/24/80-ALC2/2019 Party Name: SHREE LAXMI Meet No/Date:6/80- Status:<br>GLASSTECH ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:1310049548 Pending<br>:01/80/050/00373/AM20/ :13/24/040/00207/AM20/ 13.03.2020 with firm<br>133<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. It was also noted that the earlier emails, regarding submission of copy of<br>application, were sent on outdated email address. Hence, the Committee decided to send the application’s<br>request to the firm by post.<br>Case is deferred.<br>----- End of picture text -----<br>

134

Case No.:17/24/80-ALC2/2019 Party Name: KINECO KAMAN Meet No/Date:6/80- Status: COMPOSITES - INDIA PVT ALC2/2020 Deferred LTD 29.09.2020 HQ File RLA File Lic.No/Date:0310835424 Pending :01/80/050/00374/AM20/ :03/94/040/01027/AM20/ 17.03.2020 with DPIIT

Decision: The Committee considered the case as per agenda and noted that the firm’s reply was sent to DPIIT on 10.08.2020 for examination of the case. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 84] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/24/80-ALC2/2019 Party Name: ANGIPLAST Meet No/Date:6/80- Status:<br>PRIVATE LIMITED ALC2/2020 Deferred<br>29.09.2020<br>135<br>HQ File RLA File Lic.No/Date:0810147487 Pending<br>:01/80/050/00375/AM20/ :08/24/040/00406/AM20/ 17.03.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>----- End of picture text -----<br>

37 | P a g e

following information as per comments of Consultant (Tech-1):

  1. Catalogue and specification of import item k resin.

  2. Any indigenous input used in moulding and extrusion process if so quantity thereof.

  3. Wastage involved in moulding and extrusion process. Since, these two processes involve some wastage.

Case is deferred.

Case No.:19/24/80-ALC2/2019 Party Name: AZAD Meet No/Date:6/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 29.09.2020 HQ File RLA File Lic.No/Date:0910068587 Pending :01/80/050/00376/AM20/ :09/24/040/00624/AM20/ 18.03.2020 with firm

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):

  1. What is the exact name of the export product?

  2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions thereof.

136

  1. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?

  2. What is the Rockwell Hardness Number of the final product and forged blank?

  3. Detail of any heat treatment, if required.

  4. What is the weight of final export item?

  5. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.

  6. A video film on complete operations (Cutting, forging and machining) for manufacturing of export item.

Case is deferred.

Case No.:4/2/80-ALC2/2020 Party Name: MICRON Meet No/Date:6/80- Status: INSTRUMENTS PVT LTD ALC2/2020 & 29.09.2020 Approved HQ File RLA File Lic.No/Date:0510414168 :01/80/050/00434/AM21/ :05/24/040/00045/AM21/ 13.05.2020

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/14/2020-TSW dated 24.08.2020 as under:

137

==> picture [449 x 27] intentionally omitted <==

----- Start of picture text -----<br> ITCHS Export Item Quantity ITCHS Import Item Recommended<br>Code Code Norms<br>----- End of picture text -----<br>

==> picture [449 x 78] intentionally omitted <==

----- Start of picture text -----<br>

|||||
|---|---|---|---|
|2709.16 Kgs as|
|Elctron Collector|2.051 Kgs/Kg|
|OFE-OK Copper Rod.|
|Machining. Elctron|content in the|
|259|Dia 130 mm, Extruded|
|90229040|Collector Machining,|74071090|export product after|
|Number|and Machined, ASTM|
|Drawing No.|taking 50%|
|C10100 AND F68|
|5507294DDW|recovery from the|
|scrap|

----- End of picture text -----<br>

Note: Quantity of export item may be specified as 1320.90 Kgs.

38 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/2/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:6/80- Status:<br>BLADES INDIA PVT. LTD ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410046058 Pending<br>:01/80/050/00435/AM21/ :34/24/040/00031/AM21/ 14.05.2020 with firm<br>138 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020.<br>However, no information has been received yet. Hence, the Committee decided to wait for the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/2/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:6/80- Status:<br>BLADES INDIA PVT. LTD ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410046059 Pending<br>:01/80/050/00436/AM21/ :34/24/040/00032/AM21/ 14.05.2020 with firm<br>139 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020.<br>However, no information has been received yet. Hence, the Committee decided to wait for the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/2/80-ALC2/2020 Party Name: HANNING Meet No/Date:6/80- Status:<br>MOTORS INDIA P LTD ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410046073 Pending<br>:01/80/050/00441/AM21/ :34/24/040/00399/AM20/ 15.05.2020 with firm<br>140 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 17.08.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 257] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/2/80- Party Name: AZAD ENGINEERING Meet No/Date:6/80- Status:<br>ALC2/2020 PRIVATE LIMITED ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File :09/24/040/00087/AM21/ Lic.No/Date:0910068749 Pending with<br>:01/80/050/00443/AM21/ 15.05.2020 firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>141<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>

39 | P a g e

Case No.:14/2/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 29.09.2020 HQ File RLA File Lic.No/Date:0910068750 Pending :01/80/050/00444/AM21/ :09/24/040/00089/AM21/ 15.05.2020 with firm

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):

  1. What is the exact name of the export product?

  2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions thereof.

142

  1. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?

  2. What is the Rockwell Hardness Number of the final product and forged blank?

  3. Detail of any heat treatment, if required.

  4. What is the weight of final export item?

  5. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.

  6. A video film on complete operations (Cutting, forging and machining) for manufacturing of export item.

Case is deferred.

Case No.:15/2/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status: ENGINEERING PRIVATE ALC2/2020 Deferred LIMITED 29.09.2020 HQ File RLA File Lic.No/Date:0910068751 Pending :01/80/050/00445/AM21/ :09/24/040/00086/AM21/ 15.05.2020 with firm

Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per comments of Consultant (SKB):

  1. What is the exact name of the export product?

  2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions thereof.

143

  1. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?

  2. What is the Rockwell Hardness Number of the final product and forged blank?

  3. Detail of any heat treatment, if required.

  4. What is the weight of final export item?

  5. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.

  6. A video film on complete operations (Cutting, forging and machining) for manufacturing of export item.

Case is deferred.

40 | P a g e

==> picture [476 x 280] intentionally omitted <==

----- Start of picture text -----<br> Case No.:16/2/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910068752 Pending<br>:01/80/050/00446/AM21/ :09/24/040/00096/AM21/ 15.05.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>144<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 279] intentionally omitted <==

----- Start of picture text -----<br> Case No.:17/2/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910068753 Pending<br>:01/80/050/00447/AM21/ :09/24/040/00092/AM21/ 15.05.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>145<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>

41 | P a g e

==> picture [476 x 280] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/2/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910068754 Pending<br>:01/80/050/00448/AM21/ :09/24/040/00090/AM21/ 15.05.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat coloured drawing of the product with Top, Side and Front view and<br>dimensions thereof.<br>146<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 279] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/2/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910068755 Pending<br>:01/80/050/00449/AM21/ :09/24/040/00088/AM21/ 15.05.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>147<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>

42 | P a g e

==> picture [476 x 280] intentionally omitted <==

----- Start of picture text -----<br> Case No.:20/2/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910068756 Pending<br>:01/80/050/00450/AM21/ :09/24/040/00085/AM21/ 15.05.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>148<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 279] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/2/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910068757 Pending<br>:01/80/050/00451/AM21/ :09/24/040/00093/AM21/ 15.05.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>149<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>

43 | P a g e

==> picture [476 x 280] intentionally omitted <==

----- Start of picture text -----<br> Case No.:22/2/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910068758 Pending<br>:01/80/050/00452/AM21/ :09/24/040/00094/AM21/ 15.05.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>150<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 279] intentionally omitted <==

----- Start of picture text -----<br> Case No.:23/2/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910068759 Pending<br>:01/80/050/00453/AM21/ :09/24/040/00091/AM21/ 15.05.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of Consultant (SKB):<br>1. What is the exact name of the export product?<br>2. Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions<br>thereof.<br>151<br>3. What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not<br>forged SS plate of same the composition for manufacturing of export item, if it is not in round in<br>shape after cutting into required dimensions?<br>4. What is the Rockwell Hardness Number of the final product and forged blank?<br>5. Detail of any heat treatment, if required.<br>6. What is the weight of final export item?<br>7. Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete<br>reasons for such a huge wastage.<br>8. A video film on complete operations (Cutting, forging and machining) for manufacturing of export<br>item.<br>Case is deferred.<br>----- End of picture text -----<br>

44 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:24/2/80-ALC2/2020 Party Name: DILIGENT SCM Meet No/Date:6/80- Status:<br>SOLUTIONS PR IVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0910068760 Pending<br>:01/80/050/00454/AM21/ :09/24/040/00082/AM21/ 18.05.2020 with firm<br>152 Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per comments of MSME:<br>1. Net content of import in the export item.<br>2. Material balancing & step-wise wastage.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:25/2/80-ALC2/2020 Party Name: DILIGENT SCM Meet No/Date:6/80- Status:
SOLUTIONS PR IVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00455/AM21/ RLA File<br>:09/24/040/00083/AM21/ Lic.No/Date:0910068770<br>18.05.2020 Pending<br>with firm

153 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 31.07.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

154

Case No.:28/2/80-ALC2/2020 Party Name: VENUS SAFETY Meet No/Date:6/80- Status:
& HEALTH PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00458/AM21/ RLA File<br>:03/95/040/00090/AM21/ Lic.No/Date:0310836278<br>20.05.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and there is no e-mail id available for communication. Hence, the Committee decided to send the application’s request to the firm by post.

Case is deferred.

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:37/2/80-ALC2/2020 Party Name: GODREJ & Meet No/Date:6/80- Status:<br>BOYCE MFG. CO. LTD., ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0310836284 Pending<br>:01/80/050/00467/AM21/ :03/94/040/00083/AM21/ 20.05.2020 with firm<br>155<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking<br>certain information as raised by Consultant (SKB) was sent to the firm on 04.08.2020. However, no reply has<br>been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite<br>information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

45 | P a g e

==> picture [476 x 234] intentionally omitted <==

----- Start of picture text -----<br> Case No.:26/2/80-ALC2/2020 Party Name: TPI COMPOSITES Meet No/Date:6/80- Status:<br>INDIA PRIVATE LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0410166764 Pending<br>:01/80/050/00456/AM21/ :04/24/040/00012/AM21/ 21.05.2020 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask again from the firm to<br>furnish following information as per comments of Consultant (Tech-1) :<br>1. Net weight of export product.<br>156<br>2. Generic name of import items along with its function in manufacturing.<br>3. Percentage wastage involved on net content basis in export for each of raw material and justification<br>for same.<br>4. List of consumables with its value.<br>5. Material balance in weight terms between import and export taking in to consideration indigenous<br>input and wastage involved.<br>6. % solid content for paint and adhesive items in import and indigenous input.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 234] intentionally omitted <==

----- Start of picture text -----<br> Case No.:27/2/80-ALC2/2020 Party Name: TPI COMPOSITES Meet No/Date:6/80- Status:<br>INDIA PRIVATE LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0410166767 Pending<br>:01/80/050/00457/AM21/ :04/24/040/00023/AM21/ 21.05.2020 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask again from the firm to<br>furnish following information as per comments of Consultant (Tech-1) :<br>1. Net weight of export product.<br>157<br>2. Generic name of import items along with its function in manufacturing.<br>3. Percentage wastage involved on net content basis in export for each of raw material and justification for<br>same.<br>4. List of consumables with its value.<br>5. Material balance in weight terms between import and export taking in to consideration indigenous input<br>and wastage involved.<br>6. % solid content for paint and adhesive items in import and indigenous input.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 121] intentionally omitted <==

----- Start of picture text -----<br> Case No.:38/2/80-ALC2/2020 Party Name: STERLITE Meet No/Date:6/80- Status:<br>POWER TRANSMISSION ALC2/2020 Approved<br>LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0310836300<br>158 :01/80/050/00468/AM21/ :03/95/040/01035/AM20/ 21.05.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MeitY vide U. O. No.: W-21/1/2020-IPHW dated 02.09.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

46 | P a g e

==> picture [476 x 211] intentionally omitted <==

----- Start of picture text -----<br> Case No.:29/2/80-ALC2/2020 Party Name: FERRUM Meet No/Date:6/80- Status:<br>EXTREME ENGINEERING ALC2/2020 Deferred<br>PRIVATE LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0510414238 Pending<br>:01/80/050/00459/AM21/ :05/23/040/00029/AM21/ 22.05.2020 with firm<br>Decision: The Committee considered the case as per the agenda and decided to ask again from the firm to<br>furnish following information as per comments of Consultant (SKB) :<br>159<br>1. When the size of plate in export and import is the same, what operations are involved, which can justify<br>65% wastage?<br>2. Is it plate or slab?<br>3. Grade of Steel.<br>4. Complete set of drawing with Top, side and front view.<br>5. Weight of each BBT Crusher frame, which could justify a total weight 8373.33 Kgs of 7 Nos.<br>6. Weight of each segment of BBT crusher frame before welding.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 187] intentionally omitted <==

----- Start of picture text -----<br> Case No.:30/2/80-ALC2/2020 Party Name: HEURTEY Meet No/Date:6/80- Status:<br>PETROCHEM INDIA ALC2/2020 Deferred<br>PRIVATE LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:3410046093 Pending<br>:01/80/050/00460/AM21/ :34/24/040/00042/AM21/ 26.05.2020 with firm<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per comments of DHI:<br>160<br>1. Wastage generated at each stage of manufacture for each raw material separately.<br>2. Calculation sheet for wastage claimed with reference to wastage generated at (1) above.<br>3. Manufacturing flow chart of each export item.<br>4. ITCHS Code indicated for export product i.e. parts of hot oil furnace to be verify as it has been<br>indicated as 8417 whereas it shall be 8419.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:35/2/80-ALC2/2020 Party Name: L&T- MHPS Meet No/Date:6/80- Status:<br>TURBINE GENERATORS ALC2/2020 Deferred<br>PRIVATE LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0310836382<br>161 :01/80/050/00465/AM21/ :03/95/040/00084/AM21/ 26.05.2020<br>Decision: The Committee considered the case as per the agenda and decided to refer the case t o DHI for<br>examination & comments as per the advice of Consultant (Tech-3).<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 118] intentionally omitted <==

----- Start of picture text -----<br> Case No.:36/2/80-ALC2/2020 Party Name: L&T- MHPS Meet No/Date:6/80- Status:<br>TURBINE GENERATORS ALC2/2020 Deferred<br>PRIVATE LIMITED 29.09.2020<br>HQ File RLA File Lic.No/Date:0310836383<br>162 :01/80/050/00466/AM21/ :03/95/040/00085/AM21/ 26.05.2020<br>Decision: The Committee considered the case as per the agenda and decided to refer the case t o DHI for<br>examination & comments as per the advice of Consultant (Tech-3).<br>Case is deferred.<br>----- End of picture text -----<br>

47 | P a g e

Case No.:34/2/80-ALC2/2020 Party Name: DEE Meet No/Date:6/80- Status:
DEVELOPMENT ENGINEERS ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00464/AM21/ RLA File<br>:05/23/040/00034/AM21/ Lic.No/Date:0510414257<br>27.05.2020 Pending<br>with firm

163

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 17.08.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

164

Case No.:39/2/80-ALC2/2020 Party Name: JOHNSON LIFTS Meet No/Date:6/80- Status:
PRIVATE LIMITED ALC2/2020 & 29.09.2020 Deferred
HQ File<br>:01/80/050/00469/AM21/ RLA File<br>:04/24/040/00202/AM20/ Lic.No/Date:0410166788<br>29.05.2020

Decision: The Committee considered the case as per the agenda and decided to refer the case t o DPIIT for examination & comments as per comments of DHI .

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:40/2/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:6/80- Status:<br>BLADES INDIA PVT. LTD ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410046107 Pending<br>:01/80/050/00470/AM21/ :34/24/040/00049/AM21/ 29.05.2020 with firm<br>165 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on updated email address on 29.08.2020 &<br>28.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind the<br>firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 223] intentionally omitted <==

----- Start of picture text -----<br> Case No.:41/2/80-ALC2/2020 Party Name: Meet No/Date:6/80- Status:<br>UNDERCARRIAGE AND ALC2/2020 Approved<br>TRACTOR PARTS PVT.LTD. 29.09.2020<br>HQ File RLA File Lic.No/Date:0310836421<br>:01/80/050/00471/AM21/ :03/95/040/00097/AM21/ 29.05.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>166 1. Quantity of relevant import items at Sl. No. 1 to 8 may be allowed as per GN-4.<br>2. Quantity of relevant import item at Sl. No. 9 may be allowed @ upto 2% of FoB value.<br>3. Quantity of relevant import item at Sl. No. 10 may be allowed as 706443 Kgs inclusive of 37.40%<br>wastage after 1/3 [rd] recovery.<br>4. The export product would contain 513920 kgs of Alloy Steel Bar of the relevant grade.<br>5. The specification/technical characteristics and model of imported parts and that used in the resultant<br>product to conform.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

48 | P a g e

167

Case No.:43/2/80-ALC2/2020 Party Name: NTB Meet No/Date:6/80- Status:
INTERNATIONAL PVT LTD ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00473/AM21/ RLA File<br>:03/95/040/01237/AM20/ Lic.No/Date:0310836497<br>04.06.2020 Pending<br>with DPIIT

Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 29.09.2020 for examination of the case. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

168

Case No.:44/2/80-ALC2/2020 Party Name: GODREJ & Meet No/Date:6/80- Status:
BOYCE MFG. CO. LTD. ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00474/AM21/ RLA File<br>:03/94/040/00124/AM21/ Lic.No/Date:0310836537<br>05.06.2020 Pending<br>with DPIIT

Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 29.09.2020 for examination of the case. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

169

Case No.:3/6/80-ALC2/2020 Party Name: WELLCARE OIL Meet No/Date:6/80- Status:
TOOLS PRIVATE LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00584/AM21/ RLA File<br>:05/24/040/00109/AM21/ Lic.No/Date:0510414463<br>22.06.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

Case No.:1/4/80-ALC2/2020 Party Name: ISGEC HEAVY Meet No/Date:6/80- Status:
ENGINEERING LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00539/AM21/ RLA File<br>:05/23/040/00096/AM21/ Lic.No/Date:0510414734<br>27.07.2020 Pending<br>with firm

170 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 03.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

49 | P a g e

Case No.:2/4/80-ALC2/2020 Party Name: DILIGENT SCM Meet No/Date:6/80- Status: SOLUTIONS PR IVATE ALC2/2020 Approved LIMITED 29.09.2020 HQ File RLA File Lic.No/Date:0910068997 :01/80/050/00540/AM21/ :09/24/040/00229/AM21/ 28.07.2020

Case No.:2/4/80-ALC2/2020<br>Party Name: DILIGENT SCM<br>SOLUTIONS PR IVATE<br>LIMITED<br>Meet No/Date:6/80-<br>ALC2/2020<br>29.09.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00540/AM21/<br>RLA File<br>:09/24/040/00229/AM21/<br>Lic.No/Date:0910068997<br>28.07.2020 Case No.:2/4/80-ALC2/2020 Case No.:2/4/80-ALC2/2020 Case No.:2/4/80-ALC2/2020 Party Name: DILIGENT SCM<br>SOLUTIONS PR IVATE<br>LIMITED Party Name: DILIGENT SCM<br>SOLUTIONS PR IVATE<br>LIMITED Party Name: DILIGENT SCM<br>SOLUTIONS PR IVATE<br>LIMITED Party Name: DILIGENT SCM<br>SOLUTIONS PR IVATE<br>LIMITED Meet No/Date:6/80-<br>ALC2/2020<br>29.09.2020 Meet No/Date:6/80-<br>ALC2/2020<br>29.09.2020 Meet No/Date:6/80-<br>ALC2/2020<br>29.09.2020 Status:<br>Approved
HQ File<br>:01/80/050/00540/AM21/ RLA File<br>:09/24/040/00229/AM21/ Lic.No/Date:0910068997<br>28.07.2020
171 Decision:The Committee considered the c<br>written comments ofMSMEas under:
Sl.<br>No. ITCHS<br>Code Export Item Quantity Sl.<br>No. ITCHS<br>Code Import<br>Item Recommended Norms
1 81059000 Horizontal Joint Seal<br>[Net Content of Cobalt<br>Alloy Sheet (HA 188)<br>in Export Product<br>4,856.87 Kgs] 104900<br>Number 1 81059000 Cobalt<br>Alloy<br>Sheet<br>(HA<br>188) 5396 Kgs inclusive of<br>11.10% wastage after<br>1/3rdrecovery from<br>scrap
2 81059000 Horizontal Joint Seal<br>[Net Content of Nickle<br>Alloy Sheet (Alloy X)<br>in Export Product 1,<br>290.33 Kgs] 53100<br>Number 2 75062000 Nickle<br>Alloy<br>sheet<br>(Alloy<br>X) 1492 Kgs inclusive of<br>15.60% wastage after<br>1/3rdrecovery from<br>scrap
Note: The firm should import relevant items only.<br>RA concerned maytake further necessaryaction asper the decision of NC.

Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of MSME as under:

==> picture [476 x 238] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/4/80-ALC2/2020 Party Name: AVLIGHT Meet No/Date:6/80- Status:<br>AUTOMOTIVES PVT. LTD. ALC2/2020 Approved<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510414753<br>:01/80/050/00541/AM21/ :05/23/040/00068/AM21/ 28.07.2020<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>ITCHS Export Item Quantity ITCHS Import Item Recommended<br>172 Code Code Norms<br>Insert Arm - Frt / E2ul As per GN-4<br>Insert Plating - Frt<br>Moulded Arm Frt Mv 59850<br>87089900 73261910 Sheet Metal Components _<br>Parts _ E2ul Plastic Number<br>E2ul _ S2048720<br>Moulded Components<br>Insert Arm Rr / E2ul As per GN-4<br>Insert Plating - Rr<br>Moulded Arm Rr Mv 59850<br>87089900 73261910 Sheet Metal Components<br>Parts _ E2ul Plastic Number<br>_E2ul _S2048820<br>Moulded Components<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/4/80-ALC2/2020 Party Name: TPI COMPOSITES Meet No/Date:6/80- Status:<br>INDIA PRIVATE LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0410166921 Pending<br>:01/80/050/00542/AM21/ :04/24/040/00057/AM21/ 28.07.2020 with firm<br>173<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 03.09.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

50 | P a g e

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/4/80-ALC2/2020 Party Name: ISGEC HEAVY Meet No/Date:6/80- Status:<br>ENGINEERING LIMITED ALC2/2020 Deferred<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510414771 Pending<br>:01/80/050/00543/AM21/ :05/23/040/00107/AM21/ 30.07.2020 with firm<br>174<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm and in this regard, an email was sent on 03.09.2020. However, no information<br>has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:7/4/80-ALC2/2020 Party Name: MEDIVAC Meet No/Date:6/80- Status:
SURGICAL PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00545/AM21/ RLA File<br>:37/24/040/00002/AM21/ Lic.No/Date:3710002787<br>30.07.2020 Pending<br>with firm

175 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 03.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

176

Case No.:6/4/80-ALC2/2020 Party Name: PERMANENT Meet No/Date:6/80- Status:
MAGNETS LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00544/AM21/ RLA File<br>:03/95/040/00262/AM21/ Lic.No/Date:0310837528<br>31.07.2020 Pending<br>with DPIIT

Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 29.09.2020 for examination of the case. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

177

Case No.:8/4/80-ALC2/2020 Party Name: BANGALORE Meet No/Date:6/80- Status:
BIOTECH LABS PVT LTD., ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00546/AM21/ RLA File<br>:07/24/040/00114/AM21/ Lic.No/Date:0710116824<br>31.07.2020 Pending<br>with DPIIT

Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to DPIIT on 24.09.2020 for examination of the case. However, DPIIT informed that the case is under examination. Hence, the Committee decided to wait for the comments.

Case is deferred.

51 | P a g e

==> picture [476 x 144] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/4/80-ALC2/2020 Party Name: OAM SAAI Meet No/Date:6/80- Status:<br>INTERNATIONAL INC. ALC2/2020 Approved<br>29.09.2020<br>HQ File RLA File Lic.No/Date:0510414806<br>:01/80/050/00547/AM21/ :05/24/040/00211/AM21/ 31.07.2020<br>178<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>1. Quantity of relevant import items may be allowed as per GN-4 .<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:10/4/80-ALC2/2020 Party Name: SULZER PUMPS Meet No/Date:6/80- Status:
INDIA LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00548/AM21/ RLA File<br>:03/95/040/00258/AM21/ Lic.No/Date:0310837571<br>07.08.2020 Pending<br>with firm

179 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

Case No.:11/4/80-ALC2/2020 Party Name: SULZER PUMPS Meet No/Date:6/80- Status:
INDIA LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00549/AM21/ RLA File<br>:03/95/040/00257/AM21/ Lic.No/Date:0310837589<br>10.08.2020 Pending<br>with firm

180 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application.

Case is deferred.

Case No.:12/4/80-ALC2/2020 Party Name: FABTECH Meet No/Date:6/80- Status:
PROJECTS & ENGINEERS ALC2/2020 Deferred
LTD 29.09.2020
HQ File<br>:01/80/050/00550/AM21/ RLA File<br>:31/83/040/00038/AM21/ Lic.No/Date:3110067812<br>11.08.2020 Pending<br>with firm

181 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm and in this regard, an email was sent on 03.09.2020. However, no information has been received yet. Therefore, the Committee decided to remind the firm for submitting the complete set of application.

Case is deferred.

52 | P a g e

182

Case No.:7/6/80-ALC2/2020 Party Name: VEELINE MEDIA Meet No/Date:6/80- Status:
LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00588/AM21/ RLA File<br>:02/24/040/00060/AM21/ Lic.No/Date:0210210061<br>28.08.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

183

Case No.:8/6/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:6/80- Status:
BLADES INDIA PVT. LTD ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00589/AM21/ RLA File<br>:34/24/040/00148/AM21/ Lic.No/Date:3410046343<br>28.08.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/6/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:6/80- Status:<br>BLADES INDIA PVT. LTD ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410046344 Pending<br>:01/80/050/00590/AM21/ :34/24/040/00149/AM21/ 28.08.2020 with firm<br>184<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete<br>set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

185

Case No.:10/6/80-ALC2/2020 Party Name: LM WIND Meet No/Date:6/80- Status:
POWER BLADES INDIA PVT. ALC2/2020 Deferred
LTD 29.09.2020
HQ File<br>:01/80/050/00591/AM21/ RLA File<br>:34/24/040/00150/AM21/ Lic.No/Date:3410046345<br>28.08.2020 Pending with<br>firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

Case No.:11/6/80-ALC2/2020 Party Name: INNOVATIVE Meet No/Date:6/80- Status:
OVERSEAS ALC2/2020 & 29.09.2020 Deferred
HQ File<br>:01/80/050/00592/AM21/ RLA File<br>:05/23/040/00128/AM21/ Lic.No/Date:0510415078<br>01.09.2020 Defer Date:

186 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

53 | P a g e

187

Case No.:12/6/80-ALC2/2020 Party Name: L & T-MHPS Meet No/Date:6/80- Status:
TURBINE GENERATORS ALC2/2020 Deferred
PRIVATE LIMITED 29.09.2020
HQ File<br>:01/80/050/00593/AM21/ RLA File<br>:03/95/040/00295/AM21/ Lic.No/Date:0310838015<br>01.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

Case No.:13/6/80-ALC2/2020 Party Name: VEELINE MEDIA Meet No/Date:6/80- Status:
LIMITED ALC2/2020 & 29.09.2020 Deferred
HQ File<br>:01/80/050/00594/AM21/ RLA File<br>:02/24/040/00069/AM21/ Lic.No/Date:0210210076<br>03.09.2020 Pending<br>with firm

188 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:14/6/80-ALC2/2020 Party Name: VEELINE MEDIA Meet No/Date:6/80- Status:<br>LIMITED ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0210210079 Pending<br>:01/80/050/00595/AM21/ :02/24/040/00070/AM21/ 04.09.2020 with firm<br>189<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete<br>set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:17/6/80- Party Name: AZAD ENGINEERING Meet No/Date:6/80- Status:
ALC2/2020 PRIVATE LIMITED ALC2/2020 & 29.09.2020 Deferred
HQ File<br>:01/80/050/00598/AM21/ RLA File :09/24/040/00307/AM21/ Lic.No/Date:0910069151<br>07.09.2020 Pending with<br>firm

190 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

191

Case No.:18/6/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00599/AM21/ RLA File<br>:09/24/040/00302/AM21/ Lic.No/Date:0910069152<br>07.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

54 | P a g e

192

Case No.:19/6/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00600/AM21/ RLA File<br>:09/24/040/00301/AM21/ Lic.No/Date:0910069153<br>07.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

193

Case No.:20/6/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00601/AM21/ RLA File<br>:09/24/040/00300/AM21/ Lic.No/Date:0910069154<br>07.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

194

Case No.:21/6/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00602/AM21/ RLA File<br>:09/24/040/00293/AM21/ Lic.No/Date:0910069155<br>07.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

195

Case No.:22/6/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00603/AM21/ RLA File<br>:09/24/040/00294/AM21/ Lic.No/Date:0910069156<br>07.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 95] intentionally omitted <==

----- Start of picture text -----<br> Case No.:23/6/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:<br>ENGINEERING PRIVATE ALC2/2020 Deferred<br>LIMITED 29.09.2020<br>196 HQ File RLA File Lic.No/Date:0910069157 Pending<br>:01/80/050/00604/AM21/ :09/24/040/00292/AM21/ 07.09.2020 with firm<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete<br>----- End of picture text -----<br>

55 | P a g e

set of application for examination of the case.

Case is deferred.

197

Case No.:24/6/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00605/AM21/ RLA File<br>:09/24/040/00290/AM21/ Lic.No/Date:0910069158<br>07.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

198

Case No.:25/6/80-ALC2/2020 Party Name: AZAD Meet No/Date:6/80- Status:
ENGINEERING PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00606/AM21/ RLA File<br>:09/24/040/00289/AM21/ Lic.No/Date:0910069159<br>07.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

199

Case No.:15/6/80-ALC2/2020 Party Name: SULZER PUMPS Meet No/Date:6/80- Status:
INDIA LIMITED ALC2/2020 Deferred
29.09.2020
HQ File<br>:01/80/050/00596/AM21/ RLA File<br>:03/95/040/00351/AM21/ Lic.No/Date:0310838115<br>07.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

200

Case No.:16/6/80-ALC2/2020 Party Name: SPECTRA Meet No/Date:6/80- Status:
TECHNOLOGY SOLUTIONS ALC2/2020 Deferred
PVT LTD 29.09.2020
HQ File<br>:01/80/050/00597/AM21/ RLA File<br>:07/24/040/00156/AM21/ Lic.No/Date:0710116977<br>09.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

56 | P a g e

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:26/6/80-ALC2/2020 Party Name: RAY Meet No/Date:6/80- Status:<br>INTERNATIONAL ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:0610039606 Pending<br>:01/80/050/00607/AM21/ :06/24/040/00030/AM21/ 10.09.2020 with firm<br>201<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete<br>set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:29/6/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:6/80- Status:
BLADES INDIA PVT. LTD ALC2/2020 & 29.09.2020 Deferred
HQ File<br>:01/80/050/00610/AM21/ RLA File<br>:34/24/040/00166/AM21/ Lic.No/Date:3410046387<br>10.09.2020 Pending<br>with firm

202 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:30/6/80-ALC2/2020 Party Name: LM WIND POWER Meet No/Date:6/80- Status:<br>BLADES INDIA PVT. LTD ALC2/2020 & 29.09.2020 Deferred<br>HQ File RLA File Lic.No/Date:3410046388 Pending<br>:01/80/050/00611/AM21/ :34/24/040/00167/AM21/ 10.09.2020 with firm<br>203<br>Decision: The Committee considered the case as per the agenda and noted that the copy of application has not<br>yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete<br>set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

204

Case No.:27/6/80-ALC2/2020 Party Name: FREEDOM Meet No/Date:6/80- Status:
OPTHALMIC PRIVATE ALC2/2020 Deferred
LIMITED 29.09.2020
HQ File<br>:01/80/050/00608/AM21/ RLA File<br>:04/24/040/00092/AM21/ Lic.No/Date:0410167059<br>11.09.2020 Pending<br>with firm

Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

Case No.:28/6/80-ALC2/2020 Party Name: VICTORA AUTO Meet No/Date:6/80- Status:
PVT. LTD ALC2/2020 & 29.09.2020 Deferred
HQ File<br>:01/80/050/00609/AM21/ RLA File<br>:05/24/040/00280/AM21/ Lic.No/Date:0510415187<br>11.09.2020 Pending<br>with firm

205 Decision: The Committee considered the case as per the agenda and noted that the copy of application has not yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete set of application for examination of the case.

Case is deferred.

57 | P a g e

Offline Cases

Sl. No. 43

Case No. 13/5/80-ALC2/2017 Case No. 29/19/80-ALC2/2016 Case No. 8/14/80-ALC2/2018 M. No.: 06/80-ALC2/2020 dated 29.09.2020 Status: M/s SENIOR INDIA PRIVATE LIMITED Adv. Lic. No. 0510402202 dated 12.04.2017 Approved Adv. Lic. No. 0510399661 dated 08.09.2016 Adv. Lic. No. 0510409022 dated 20.12.2018 HQ. No. 01/80/050/00074/AM18 Subject: Request for re-fixation of ad-hoc HQ. No. 01/80/050/00424/AM17 norms in respect of 3 AA issued to M/s HQ. No. 01/80/050/00324/AM19 SENIOR INDIA PRIVATE LIMITED, RLA No. 05/24/040/00012/AM18 under Para 4.7 of HBP (Vol.-I) – reg. RLA No. 05/24/040/00288/AM17 RLA No. 05/24/040/00435/AM19

Decision: The Committee considered the case as per the agenda noted that the above three cases were approved by NC in Meeting No. 8/80 dated 18.07.2017, Meeting No. 22/80 dated 31.01.2017 and Meeting No. 06/80 dated 03.07.2019 as per the written comments of DIPP letter no. 12/54/2017-TSW/105 dated 18.7.2017, written comments of DIPP vide UO No. 12/6/2017-TSW/56 dated 31.01.2017 and written comments of DPIIT vide U.O. No.: P-47011/416/2018-TSW dated 03.07.2019 respectively. Norms for consumables were fixed at 0.5% of FOB of the respective export item.

However, the firm has requested for revising the adhoc norms on the basis of actual consumption. The Committee reconsidered the case and noted that DPIIT in its comments vide U. O. No.: P-47011/416/2018-TSW dated 02.09.2020 has given justification for revision of ratified ad-hoc norms. Therefore, the Committee decided to revise the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/416/2018-TSW dated 20.05.2020. (Copy enclosed)

Sl. No. 44

==> picture [476 x 62] intentionally omitted <==

----- Start of picture text -----<br> Case No. : 64/11/80-ALC2/2018 Status:<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020 IND-SPHINX PRECISION LTD Deferred<br>Lic. No.: 2210015975 Date: 13.09.2018<br>HQ. No.: 01/80/050/00255/AM19 Subject: Request for re-fixation of ad-hoc<br>RLA No.: 22/24/040/00048/AM19 norms<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda noted that the case was approved in Meeting No. 13/80-ALC2/2018 dated 22.01.2019 on repeat basis as approved for AA No. 2210015101 dated 10.10.2014 on the recommendation of the representative of DHI. However, the firm has requested for re-fixation of ad-hoc norms.

The Committee reconsidered the case and noted that the comments of MSME vide email dated 30.09.2020 wherein it is observed that the recovery is not considered by MSME while fixing the ad-hoc. However, the matter was discussed in the meeting and the Committee decided to refer back the comments to MSME for re-examination of the case.

Case is deferred.

Sl. No. 45

Case No. :52/25/80-ALC2/2016<br>EXCELLENT HI-CARE PRIVATE<br>LIMITED<br>Status:<br>Deferred<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020<br>Lic. No.: 0410162359 Date: 07.10.2016
HQ. No.: 01/80/050/00621/AM17<br>**Subject:**Request for fixation of ad-hoc norms
RLA No.: 04/24/040/00105/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
14/80-ALC2/2017 dated 10.10.2017 due to non submission of reply ofdeficiency letter as raised by DEIT vide
letter No. 17 (20)/2017-IPHW dated 15.05.2017, 04.07.2017. However, the firm has requested for fixation of ad-

58 | P a g e

hoc norms.

The Committee reconsidered the case and noted that the firm’s representation was forwarded to Consultant (Tech-1) on 19.03.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to remind Consultant (Tech-1) for expediting the comments.

Case is deferred.

Sl. No. 46

Case No. :17/19/80-ALC2/2014<br>Status:
M/s IND-SPHINX PRECISION LTD.<br>Deferred<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020<br>Lic. No.: 2210015101 Date: 10.10.2014
HQ. No.: 01/80/050/00451/AM15<br>**Subject:**Request for re-fixation of ad-hoc
norms<br>RLA No.: 22/24/040/00056/AM15
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
22/80-ALC2/2015 dated 02.02.2016as per written comments ofMSMEvide ID Note No. 30 (199)/15-ME dated
30.12.2015.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case
and noted that the comments ofMSMEvide email dated 30.09.2020 wherein it is observed that the recovery is not
considered byMSMEwhile fixing the ad-hoc. However, the matter was discussed in the meeting and the
Committee decided to refer back the comments toMSMEfor re-examination of the case.
Caseis deferred.

Sl. No. 47

==> picture [476 x 60] intentionally omitted <==

----- Start of picture text -----<br> Case No. : 19/23/80-ALC2/2015 Status:<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020 Approved<br>M/s STERLITE TECHNOLOGIES LTD.<br>Lic. No.: 0310799243 Date: 06.10.2015<br>HQ. No.: 01/80/050/00432/AM16 Subject: Request for fixation of ad-hoc norms<br>RLA No.: 03/95/040/00427/AM16<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda noted that the case was rejected in Meeting No. 15/80-ALC2/2016 dated 25.10.2016 due to non submission reply of deficiency letter dated 21.06.2016 (raised by DEIT).

However, the firm has requested for re-opening the case for fixation of ad-hoc norms. The Committee considered the case and decided to ratify the ad-hoc norms as per written comments of MeitY vide U. O. No.: W- 21/8/2020-IPHW dated 24.09.2020. (Copy enclosed)

SL. No. 48

Case No. :12/7/80-ALC2/2016 Status:
M/s HONDA TRADING CORPORATION<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020 Deferred
INDIA PVT. LTD.<br>Lic. No.: 0510398531 Date: 17.05.2016
HQ. No.: 01/80/050/00233/AM17<br>**Subject:**Request for fixation of ad-hoc norms
RLA No.: 05/23/040/00053/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
11/80 dated 19.08.2017 due to non submission reply of deficiency letter dated 26.04.2017 (raised byDHI).
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that the firm’s reply was sent to**Consultant (Tech-3)**on 28.08.2020 for examination of the case. However,
no comments have been received yet. Therefore, the Committee decided to**remind Consultant (Tech-3)**for
expediting the comments.
Case is deferred.

59 | P a g e

Sl. No. 49

Sl. No. 49
Case No. :30/33/80-ALC2/2009 Status:
M/s BHARAT HEAVY ELECTRICALS<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020 Deferred
LIMITED<br>Lic. No.: 0910039076 dated 27.08.2009
HQ. No.: 01/80/050/00496/AM10<br>**Subject:**Request for fixation of ad-hoc
norms<br>RLA No.:09/24/040/00184/AM10
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 48/80 dated 02.03.2010 due to non submission reply of the deficiency later as raised by DHI.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that firm’s reply was sent toDHIon 29.01.2020 & also additional information received from the firm was
sent on 19.08.2020. However,DHIinformed that the case is under examination. Therefore, the Committee decided
to wait for the comments.
Caseis deferred.

Sl. No. 50

Case No. 1/25/80-ALC2/2015 M. No.: 06/80-ALC2/2020 dated 29.09.2020 M/s UNITED DRILLING TOOLS LTD Status: Lic. No.: 0510397442 Date: 29.01.2016 Deferred HQ. No.: 01/80/050/00441/AM16/ Subject: Request for fixation of ad-hoc norms RLA No.: 05/24/040/00493/AM16/

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 05/80 dated 07.06.2016 due to non submission reply of deficiency letter dated 29.03.2016 as raised by DHI.

However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that the firm’s reply was sent to Consultant (Tech-3) on 10.08.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind Consultant (Tech-3) for expediting the comments.

Case is deferred.

Sl. No. 51

==> picture [477 x 63] intentionally omitted <==

----- Start of picture text -----<br> Case No. 37/19/80-ALC2/2014<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020 M/s KAMAR INFRASTRUCTURE PVT Status:<br>Licence No.: 0310788243 Date: 21.08.2014 LTD. Deferred<br>HQ File No: 01/80/050/00471/AM15/ Pending<br>Subject: Request for fixation of ad-hoc norms<br>RLA File No: 03/94/040/00449/AM15/ with Firm<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 06/80 dated 20.06.2017 due to non submission reply of deficiency letter.

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 06/80 dated 20.06.2017 due to non submission reply of deficiency letter. However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that DHI informed that the firm’s reply is incomplete. Therefore, the Committee decided to ask again from the firm to furnish following information as per comments of DHI : 1. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc. 2. The above deficiency should be submitted along with engineering drawing with relevant dimensional highlighted. Case is deferred.

60 | P a g e

Sl. No. 52

Case No. 3/10/80-ALC2/2017<br>Status:
M/s HINDUSTAN RUBBER INDUSTRIES<br>Deferred<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020
Lic. No. 0510402563 Date: 16.05.2017
HQ. No.: 01/80/050/00213/AM18<br>**Subject:**Request for fixation of ad-hoc norms<br>Pending
with DPIIT<br>RLA No.: 05/23/040/00043/AM18
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 15/80-ALC2/2018 dated 06.03.2019 due to non submission of reply of deficiency letter dated 08.10.2018.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that firm’s reply against deficiency letter dated 08.10.2018 was sent to DPIIT on 29.06.2020 followed by
reminder on 17.09.2020. However, no comments have been received yet. Therefore, the Committee decided to
wait for comments.
Case is deferred.

Sl. No. 53

Sl. No. 53
Case No.8/23/80-ALC2/2015 Status:
M/s HINDUSTAN RUBBER INDUSTRIES<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020 Deferred
Lic. No. 0510395884 Date: 12.10.2015
HQ. No.: 01/80/050/00421/AM16<br>**Subject:**Request for fixation of ad-hoc norms Pending
RLA No.: 05/23/040/00292/AM16 with DPIIT
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 06**/80-**ALC2/2016dated 21.06.2016 due to non submission of reply of deficiency letter dated 19.04.2016 as
raised by DIPP (Chemical) vide ID No.7/77/2016-TSW dated 26.02.2016.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted
that firm’s reply against deficiency letter dated 19.04.2016 was sent toDPIITon 29.06.2020 followed by reminder
on 17.09.2020. However, no comments have been received yet. Therefore, the Committee decided towait for
comments.
Case is deferred.

Sl. No. 54

==> picture [477 x 63] intentionally omitted <==

----- Start of picture text -----<br> Case No. 14/12/80-ALC2/2017 Status:<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020 M/s GOLD MOHUR PROFILES Deferred<br>Lic. No. 0510403501 Date: 25.07.2017 LIMITED<br>HQ. No.: 01/80/050/00228/AM18 Subject: Request for fixation of ad-hoc Pending<br>RLA No.: 05/23/040/00156/AM18 norms with firm<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 15/80-ALC2/2018 dated 06.03.2019 due to non submission of reply of deficiency letter dated 12.10.2018 as raised by DIPP (Chemical).

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 15/80-ALC2/2018 dated 06.03.2019 due to non submission of reply of deficiency letter dated 12.10.2018 as raised by DIPP (Chemical). However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and decided to ask from the firm to furnish the following information as per comments of DPIIT vide U. O. No.: P- 47011/193/2019-TSW dated 31.08.2020 : 1. Manufacturing process of item of export, indicating wastage at each stage of manufacturing. 2. Justification for the high wastage in the manufacturing process of Rice Rollers. 3. Complete calculation for the requirement of raw material and Acronitrile Butadiene Rubber, indicating calculation for computing the wastage incurred in the manufacturing process of all raw used duly certified by a Charted Engineer. 4. Justification for usage of different percentage of raw material for compounding of Rubber in different lengths of Rice Rollers. Case is deferred.

61 | P a g e

Sl. No. 55

==> picture [476 x 109] intentionally omitted <==

----- Start of picture text -----<br> Case No.: 31/13/80-ALC2/2013 Status:<br> 31/4/80-ALC2/2013 Approved<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020 NASH INDUSTRIES (I) PVT LTD<br>Lic. No. /date: 0710095300 Date: 09.05.2013<br> 0710094430 Date: 22.03.2013<br>HQ. No.: 01/80/050/00236/AM14 Subject: Request for re-fixation of ad-hoc<br> 01/80/050/00078/AM14 norms<br>RLA No.: 07/24/040/00032/AM14<br> 07/24/040/00527/AM13<br>----- End of picture text -----<br>

AA No.: 0710095300 dated 09.05.2013: Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 23/80-ALC2/2013 dated 04.02.2014 on the basis of comments of DIPP vide U. O. No. 12/18/2014-TSW/17 dated 04.02.2014. The Committee reconsidered the case and noted the comments of DPIIT wherein it is stated that earlier the import item at Sl. No. 2 was deleted because the firm did not show any use of import item in the export product. Now, the firm has clarified that the import item at Sl. No. 2 namely, wear plate is a component used in the locking system of ATM safes and therefore, norms need to be modified. In view of DPIIT comments, the Committee decided to revise the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/94/2020-TSW dated 08.09.2020 as under: 1. Quantity of import item at Sl. No. 2 may be allowed on net to net basis with accountability clause . Note: The decision for rest of the import item shall remain changed as decided in Meeting No. 23/80ALC2/2013 dated 04.02.2014. AA No.: 0710094430 dated 22.03.2013: Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 20/80-ALC2/2013 dated 24.12.2013 on repeat basis, as per DIPP U. O. No. 12/115/2013-TSW/20 dated 24/12/2013. The Committee reconsidered the case and noted the comments of DPIIT wherein it is stated that earlier the import item at Sl. No. 2 was deleted because the firm did not show any use of import item in the export product. Now, the firm has clarified that the import item at Sl. No. 2 namely, wear plate is a component used in the locking system of ATM safes and therefore, norms need to be modified. In view of DPIIT comments, the Committee decided to revise the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47011/94/2020-TSW dated 08.09.2020 as under: 1. Quantity of import item at Sl. No. 2 may be allowed on net to net basis with accountability clause . Note: The decision for rest of the import item shall remain changed as decided in Meeting No. 20/80ALC2/2013 dated 24.12.2013. RA concerned may take further necessary action as per the decision of NC.

Sl. No. 56

Sl. No. 56
Case No.22/8/80-ALC2/2018 Status:
M. No.: 06/80-ALC2/2020 dated 29.09.2020 ULTRA ENGINEERS Deferred
Lic. No. 3110067126 Date: 26.07.2018
HQ. No.: 01/80/050/00145/AM19 **Subject:**Request for re-fixation of ad-hoc Pending
RLA No.: 31/83/040/00063/AM19 norms with DHI
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in M. No.
14/80-ALC2/2018dated 20.02.2019 on the recommendation of representative of DHI.

62 | P a g e

However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case and noted that the firm’s reply was sent to DHI for examination of the case on 23.01.2020 & on 19.02.2020. Further, it was noted that the physical file of the case along with reply has been also sent to DHI on 27.07.2020 for examination of the case. However, DHI informed that the case is under examination . Therefore, the Committee decided wait for the comments.

Case is deferred.

Sl. No. 57

Case No.: 34/11/80-ALC2/2018 Status: M. No.: 06/80-ALC2/2020 dated 29.09.2020 M/s ULTRA ENGINEERS Approved Lic. No. 3110067168 Date: 06.09.2018 HQ. No.: 01/80/050/00225/AM19/DES-1 Subject: Request for re-fixation of ad-hoc RLA No.: 31/83/040/00091/AM19/ norms

Decision: The Committee considered the case as per the agenda and noted that the case was approved in M. No. 3/80 dt 08.05.19 on the recommendation of technical representatives of DHI.

However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case and decided to ratify the ad-hoc norms as per written comments of DHI as under:

==> picture [462 x 26] intentionally omitted <==

----- Start of picture text -----<br> ITCHS Quantity ITCHS Recommended<br>Export Item Import Item<br>Code Code Norms<br>----- End of picture text -----<br>

84139190 Parts Of Oil Field<br>Equipment - 4.5 " Fluid<br>End Body ,52" Long<br>Aw1978 ( In Nos 6 And<br>In K.G. 9951) 6 Number 72222099 Fluid End<br>Forging 52" LG<br>AW108 (6<br>NOS) 86% wastage allowed<br>after taking 11%<br>recovery from scrap

Sl. No. 58

Case No.: 325/15/80-ALC2/2018 Status: M. No.: 06/80-ALC2/2020 dated 29.09.2020 M/s ULTRA ENGINEERS Approved Lic. No. 3110067318 Date: 18.02.2019 HQ. No.: 01/80/050/00667/AM19/DES-1 Subject: Request for re-fixation of ad-hoc RLA No.: 31/83/040/00177/AM19/ norms

Decision:The Committee considered the case as per the agenda and noted that the case was approved in M. No.<br>3/80 dt 08.05.19 on the recommendation of technical representatives of DHI.<br>However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case<br>and decided toratifythe ad-hoc norms as per written comments ofDHIas under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended<br>Norms<br>84139190<br>Parts Of Oil Field<br>Equipment - 4" Fluid End<br>Body ,52" Long Aw1976 (<br>In Nos 26 And In K.G.<br>45384.56)<br>26<br>Number<br>72222099<br>Fluid End Forging<br>52` LG AW108<br>(26 NOS)<br>77% wastage allowed<br>after taking 11%<br>recovery from scrap<br>RA concerned may take further necessary action as per the decision of NC. Decision:The Committee considered the case as per the agenda and noted that the case was approved in M. No.<br>3/80 dt 08.05.19 on the recommendation of technical representatives of DHI.<br>However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case<br>and decided toratifythe ad-hoc norms as per written comments ofDHIas under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended<br>Norms<br>84139190<br>Parts Of Oil Field<br>Equipment - 4" Fluid End<br>Body ,52" Long Aw1976 (<br>In Nos 26 And In K.G.<br>45384.56)<br>26<br>Number<br>72222099<br>Fluid End Forging<br>52` LG AW108<br>(26 NOS)<br>77% wastage allowed<br>after taking 11%<br>recovery from scrap<br>RA concerned may take further necessary action as per the decision of NC. Decision:The Committee considered the case as per the agenda and noted that the case was approved in M. No.<br>3/80 dt 08.05.19 on the recommendation of technical representatives of DHI.<br>However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case<br>and decided toratifythe ad-hoc norms as per written comments ofDHIas under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended<br>Norms<br>84139190<br>Parts Of Oil Field<br>Equipment - 4" Fluid End<br>Body ,52" Long Aw1976 (<br>In Nos 26 And In K.G.<br>45384.56)<br>26<br>Number<br>72222099<br>Fluid End Forging<br>52` LG AW108<br>(26 NOS)<br>77% wastage allowed<br>after taking 11%<br>recovery from scrap<br>RA concerned may take further necessary action as per the decision of NC. Decision:The Committee considered the case as per the agenda and noted that the case was approved in M. No.<br>3/80 dt 08.05.19 on the recommendation of technical representatives of DHI.<br>However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case<br>and decided toratifythe ad-hoc norms as per written comments ofDHIas under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended<br>Norms<br>84139190<br>Parts Of Oil Field<br>Equipment - 4" Fluid End<br>Body ,52" Long Aw1976 (<br>In Nos 26 And In K.G.<br>45384.56)<br>26<br>Number<br>72222099<br>Fluid End Forging<br>52` LG AW108<br>(26 NOS)<br>77% wastage allowed<br>after taking 11%<br>recovery from scrap<br>RA concerned may take further necessary action as per the decision of NC. Decision:The Committee considered the case as per the agenda and noted that the case was approved in M. No.<br>3/80 dt 08.05.19 on the recommendation of technical representatives of DHI.<br>However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case<br>and decided toratifythe ad-hoc norms as per written comments ofDHIas under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended<br>Norms<br>84139190<br>Parts Of Oil Field<br>Equipment - 4" Fluid End<br>Body ,52" Long Aw1976 (<br>In Nos 26 And In K.G.<br>45384.56)<br>26<br>Number<br>72222099<br>Fluid End Forging<br>52` LG AW108<br>(26 NOS)<br>77% wastage allowed<br>after taking 11%<br>recovery from scrap<br>RA concerned may take further necessary action as per the decision of NC. Decision:The Committee considered the case as per the agenda and noted that the case was approved in M. No.<br>3/80 dt 08.05.19 on the recommendation of technical representatives of DHI.<br>However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case<br>and decided toratifythe ad-hoc norms as per written comments ofDHIas under:<br>ITCHS<br>Code<br>Export Item<br>Quantity<br>ITCHS<br>Code<br>Import Item<br>Recommended<br>Norms<br>84139190<br>Parts Of Oil Field<br>Equipment - 4" Fluid End<br>Body ,52" Long Aw1976 (<br>In Nos 26 And In K.G.<br>45384.56)<br>26<br>Number<br>72222099<br>Fluid End Forging<br>52` LG AW108<br>(26 NOS)<br>77% wastage allowed<br>after taking 11%<br>recovery from scrap<br>RA concerned may take further necessary action as per the decision of NC.
Export Item Quantity ITCHS<br>Code Import Item Recommended<br>Norms
Parts Of Oil Field<br>Equipment - 4" Fluid End<br>Body ,52" Long Aw1976 (<br>In Nos 26 And In K.G.<br>45384.56) 26<br>Number 72222099 Fluid End Forging<br>52` LG AW108<br>(26 NOS) 77% wastage allowed<br>after taking 11%<br>recovery from scrap
NC.

63 | P a g e

Sl. No. 59

Case No.:44/5/80-ALC2/2018<br>Status:
M/s GODREJ & BOYCE MFG. CO.<br>Approved<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020
LTD.,<br>Lic. No 0310820811 dated 07.05.2018
HQ. No.: 01/80/050/00093/AM19/DES-1<br>**Subject:**Request for re-fixation of ad-hoc
norms<br>RLA No.: 03/94/040/00060/AM19/
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in M. No.
13/80 dated 22.01.2019 as per the written comments of DIPP vide their F. No.: 47011/320/2018-TSW dated
31.12.2018.
However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case and noted
the comments ofDPIITwherein it is stated that_the norms have been revised due to change in weights of export_
_items and corresponding changes have been done in the quantities of import items._In view ofDPIITcomments,
the Committee decided tore-fix the ratified ad-hoc normsas per written comments ofDPIITvide U. O. No.: P-
47011/320/2018-TSW dated 29.09.2020. (Copy enclosed)
RA concerned may take further necessary action as per the decision of NC.

Sl. No. 60

==> picture [477 x 61] intentionally omitted <==

----- Start of picture text -----<br> Case No.: 74/2/80-ALC2/2016 Status:<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020 KOSO INDIA PRIVATE LIMITED Deferred<br>Lic. No : 3110065788 Date: 10.12.2015<br>HQ. No.: 01/80/050/00077/AM17 Subject: Request for fixation of ad-hoc<br>RLA No.: 31/83/040/00121/AM16 norms<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 08/80 dated 19.07.2016 due to non submission of reply of deficiency letter as raised by DIPP.

However, the firm has requested for fixation of the ad-hoc norms. The Committee reconsidered the case and decided to forward the firm’s representation to DPIIT for examination & comments.

Case is deferred.

Sl. No. 61

==> picture [477 x 63] intentionally omitted <==

----- Start of picture text -----<br> Case No.: 11/17/80-ALC2/2015 Status:<br>M. No.: 06/80-ALC2/2020 dated 29.09.2020 GLOVIS INDIA (P) LTD Approved<br>Lic. No : 0410161029 Date: 21.09.2015<br>HQ. No.: 01/80/050/00315/AM16 Subject: Request for fixation of ad-hoc<br>RLA No.: 04/24/040/00124/AM16 norms<br>----- End of picture text -----<br>

Decision: The Committee re-considered the case as per the agenda and noted that the case was approved in Meeting No. 11/80 dated 25.09.2019 and deleted import items at serial No. 4, refer to the Sl. 4. Rest of Import items deleted as they are components

Decision: The Committee re-considered the case as per the agenda and noted that the case was approved in Meeting No. 11/80 dated 25.09.2019 and deleted import items at serial No. 4, refer to the Sl. 4. Rest of Import items deleted as they are components However, the firm has requested for re-fixation of the ad-hoc norms. The firm has requested to allowed import item at serial No. 4 Refer to the Sl.No.4 – “ Rest of the Items may be deleted as they are components ”. They have stated that they had applied Components on net to net basis. Without this component, unable to process Export resultant product. The Committee reconsidered the case decided to ratify the ad-hoc norms as per recommendation of Consultant (Tech- 1) as under: 1. All the component as applied by the applicant may be allowed as per GN-4 with accountability clause . Note: The decision for rest of the import items shall remain unchanged as decided in meeting No. 11/80dated25.09.2019. RA concerned may take further necessary action as per the decision of NC.

64 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

65 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

66 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

67 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

68 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

69 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

70 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

71 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

72 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

73 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

74 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

75 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

76 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

77 | P a g e

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 75] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

==> picture [469 x 74] intentionally omitted <==

78 | P a g e

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied