MINUTES OF MEETING NO. 22/80 OF NORMS COMMITTEE- I (DES-I SECTION) DATED 28.02.2020

Meeting No. 22/80 of the Norms Committee (NC-I) for the licensing year 2019-2020 held on 28.02.2020 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were present in the meeting: -

==> picture [426 x 235] intentionally omitted <==

----- Start of picture text -----<br> Sl. No. Name of the representatives & their Designation Department<br>1. Shri B. C. Nayak, D. O. DHI<br>2. Shri K.S. Sodhi, Asst. Director MSME<br>3. Shri Sushil Kumar Jangid, Scientist ‘B’ MeitY<br>4. Shri V.C. Agarwal, (Tech-3) Consultant<br>5. Shri S. K. Bhatnagar Consultant<br>In Attendance<br>1. Shri K.V. Tirumala, Deputy DGFT DGFT<br>2. Shri Pranav Upadhyay, Assistant Director ISS DGFT<br>----- End of picture text -----<br>

Note:

  1. In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.

  2. Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less.

  3. All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail address- nc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post.

  4. Minutes of Meeting 20/80 dated 02.01.2020 were circulated on 20.02.2020, to all the members of the Committee and the comments (if any), there upon received, were incorporated in the Minutes and the said minutes were unanimously approved.

1 | P a g e

MEETING NUMBER: 22/80-ALC2/2019 MEETING DATE: 28.02.2020

==> picture [476 x 141] intentionally omitted <==

e Minutes and the said minutes were unanimously approved.

1 | P a g e

MEETING NUMBER: 22/80-ALC2/2019 MEETING DATE: 28.02.2020

==> picture [476 x 141] intentionally omitted <==

----- Start of picture text -----<br> Case No.:78/6/83-ALC1/2015 Party Name: ECOCAT INDIA Meet No/Date:22/80-ALC2/2019 Status:<br>PVT. LTD. 28.02.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510394421 Send to<br>:01/83/050/00408/AM16/ :05/23/040/00078/AM16/ 03.06.2015 Tech 3<br>Decision: The Committee considered the case as per the agenda and noted that the comments for import items at<br>1<br>No. Sl. 1 to 4 was already given by MSME and the case was again referred to MSME on 26.12.2019 for<br>comments on import items at Sl. No. 5 & 6. However, the matter was discussed in the meeting and the Committee<br>decided to refer the case to Consultant (Tech-3) for comments on import items at Sl. No. 5 & 6 as no comments<br>are being furnished by MSME yet.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 119] intentionally omitted <==

port items at Sl. No. 5 & 6 as no comments<br>are being furnished by MSME yet.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:234/15/80-ALC2/2018 Party Name: BHARAT HEAVY Meet No/Date:22/80- Status:<br>ELECTRICALS LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0710108791 Send to<br>2 :01/80/050/00576/AM19/ :07/24/040/00212/AM16/ 24.09.2015 MeitY<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to MeitY for<br>examination & comments as per advice of DHI.<br>Case is deferred.<br>----- End of picture text -----<br>

3

Case No.:16/1/80-ALC2/2019 Party Name: GREATOO Meet No/Date:22/80- Status:
MOLDS INDIA PRIVATE ALC2/2019 Withdrawn
LIMITED 28.02.2020
HQ File<br>:01/80/050/00764/AM19/ RLA File<br>:04/24/040/00205/AM16/ Lic.No/Date:0410161489<br>08.01.2016

Decision: The Committee considered the case as per the agenda and noted that RA, Chennai informed vide email dated 17.02.2020 that the case has been processed and redeemed on 07.05.2019. Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, Chennai.

Case is withdrawn.

==> picture [476 x 153] intentionally omitted <==

7.05.2019. Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, Chennai.

Case is withdrawn.

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/15/80-ALC2/2018 Party Name: AZAD Meet No/Date:22/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0910063260 RA/Firm to<br>:01/80/050/00347/AM19/ :09/24/040/00679/AM16/ 12.02.2016 submit<br>4 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Hyderabad and in this regard a letter was sent to the firm & RA,<br>Hyderabad on 29.07.2019 followed by reminders on 06.11.2019, 26.12.2019 & 03.02.2020. However, no<br>information has been received so far. Therefore, the Committee decided to remind again RA, Hyderabad &<br>the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

2 | P a g e

5

Case No.:390/15/80-ALC2/2018 Party Name: TENOVA INDIA Meet No/Date:22/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00732/AM19/ RLA File<br>:07/24/040/00411/AM16/ Lic.No/Date:0710109544<br>18.03.2016 Send to DHI

-|---|---| ||||PRIVATE LIMITED||ALC2/2019||Deferred| ||||||28.02.2020||| ||HQ File<br>:01/80/050/00732/AM19/||RLA File<br>:07/24/040/00411/AM16/||Lic.No/Date:0710109544<br>18.03.2016||Send to DHI|

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 20.02.2020 for examination of the case. However, the matter was discussed in the meeting and the Committee decided to refer the case to DHI for examination & comments.

Case is deferred.

6

Case No.:25/15/80-ALC2/2018 Party Name: TENOVA INDIA Meet No/Date:22/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00367/AM19/ RLA File<br>:07/24/040/00080/AM17/ Lic.No/Date:0710109946<br>14.06.2016 Send to DHI

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 20.02.2020 for examination of the case. However, the matter was discussed in the meeting and the Committee decided to refer the case to DHI for examination & comments.

Case is deferred.

==> picture [480 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:186/15/80- Party Name: TEMPCO TEMPERATURE Meet No/Date:22/80- Status:<br>ALC2/2018 MEASUREMENT PRIVATE LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File :07/24/040/00157/AM17/ Lic.No/Date:0710110332 Pending<br>:01/80/050/00528/AM19 29.08.2016 with Firm<br>----- End of picture text -----<br>

2019 Deferred<br>28.02.2020<br>HQ File RLA File :07/24/040/00157/AM17/ Lic.No/Date:0710110332 Pending<br>:01/80/050/00528/AM19 29.08.2016 with Firm<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that MeitY has sought following information from the firm vide letter dated 03.01.2020 with subsequent reminder on 13.02.2020:

7

  1. Details of export product i.e. design, drawing, calculations etc.

  2. Quantity of net import items required to manufacture one unit of export product for each export product separately.

  3. Wastage claimed in the manufacturing process.

  4. Justification of wastage.

The Committee decided to wait for the reply/comments.

Case is deferred.

8

Case No.:199/15/80-ALC2/2018 Party Name: TENOVA INDIA Meet No/Date:22/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00541/AM19/ RLA File<br>:07/24/040/00173/AM17/ Lic.No/Date:0710110331<br>29.08.2016 Send to DHI

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 20.02.2020 for examination of the case. However, the matter was discussed in the meeting and the Committee decided to refer the case to DHI for examination & comments.

Case is deferred.

3 | P a g e

==> picture [476 x 268] intentionally omitted <==

cussed in the meeting and the Committee decided to refer the case to DHI for examination & comments.

Case is deferred.

3 | P a g e

==> picture [476 x 268] intentionally omitted <==

----- Start of picture text -----<br> Case No.:404/15/80-ALC2/2018 Party Name: OSWAL PUMPS Meet No/Date:22/80- Status:<br>LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3310030377 Send D/L<br>:01/80/050/00746/AM19/ :33/24/040/00007/AM17/ 03.03.2017<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per written comments of DPIIT vide U. No.: P-47011/16/2020-TSW dated 04.02.2020:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>9 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license, if<br>any, may also be indicated.<br>4.

eight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license, if<br>any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured<br>out of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:94/15/80-ALC2/2018 Party Name: MODEL INFRA Meet No/Date:22/80- Status:<br>CORPORATION PRIVATE ALC2/2019 Deferred<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0710111766 Pending<br>:01/80/050/00436/AM19/ :07/24/040/00085/AM18/ 16.06.2017 with Firm<br>10<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 26.12.2019 followed by a reminder on 26.02.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

by a reminder on 26.02.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:108/15/80-ALC2/2018 Party Name: DEE Meet No/Date:22/80- Status:
DEVELOPMENT ENGINEERS ALC2/2019 Rejected
LTD. 28.02.2020
HQ File<br>:01/80/050/00450/AM19/ RLA File<br>:05/23/040/00116/AM18/ Lic.No/Date:0510403207<br>22.06.2017 Inform RA<br>& Firm

11 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.10.2019 followed by reminders on 22.11.2019 & 16.01.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, New Delhi.

Case is rejected.

4 | P a g e

Case No.:3/18/80-ALC2/2019 Party Name: INTERPUMP Meet No/Date:22/80- Status: HYDRAULICS INDIA PVT. ALC2/2019 Approved LTD. 28.02.2020 HQ File RLA File Lic.No/Date:0410163413 :01/80/050/00248/AM20/ :04/24/040/00094/AM18/ 10.08.2017

: INTERPUMP Meet No/Date:22/80- Status: HYDRAULICS INDIA PVT. ALC2/2019 Approved LTD. 28.02.2020 HQ File RLA File Lic.No/Date:0410163413 :01/80/050/00248/AM20/ :04/24/040/00094/AM18/ 10.08.2017

Case No.:3/18/80-ALC2/2019Party Name: INTERPUMP<br>HYDRAULICS INDIA PVT.<br>LTD.<br>Meet No/Date:22/80-<br>ALC2/2019<br>28.02.2020<br>Status:<br>Approved<br>HQ File<br>:01/80/050/00248/AM20/<br>RLA File<br>:04/24/040/00094/AM18/<br>Lic.No/Date:0410163413<br>10.08.2017 Case No.:3/18/80-ALC2/2019 Case No.:3/18/80-ALC2/2019 Case No.:3/18/80-ALC2/2019 Party Name: INTERPUMP<br>HYDRAULICS INDIA PVT.<br>LTD. Party Name: INTERPUMP<br>HYDRAULICS INDIA PVT.<br>LTD. Party Name: INTERPUMP<br>HYDRAULICS INDIA PVT.<br>LTD. Party Name: INTERPUMP<br>HYDRAULICS INDIA PVT.<br>LTD. Meet No/Date:22/80-<br>ALC2/2019<br>28.02.2020 Meet No/Date:22/80-<br>ALC2/2019<br>28.02.2020 Meet No/Date:22/80-<br>ALC2/2019<br>28.02.2020 Status:<br>Approved
HQ File<br>:01/80/050/00248/AM20/ RLA File<br>:04/24/040/00094/AM18/ Lic.No/Date:0410163413<br>10.08.2017
12 Decision:The Committee considered the case as per agenda and decided toratifythe norm<br>approved forAA No. 0410160379 dated 01.04.2015in M. No.

c.No/Date:0410163413<br>10.08.2017|||| |12|Decision:The Committee considered the case as per agenda and decided toratifythe norm<br>approved forAA No. 0410160379 dated 01.04.2015in M. No. 17/80 dated 20.12.2016 on<br>of representative of MSME as under :|||||||||s onrepeat basisas<br>the recommendation<br>Recommended<br>Norms<br>Import allowed<br>for 29800 kg<br>inclusive of<br>32.5% net<br>wastage<br>Import allowed<br>for 4984 kg<br>inclusive of<br>32% net<br>wastage<br>Import allowed<br>for 6131 kg<br>inclusive of<br>34.3% net<br>wastage|| ||Sl.<br>No.|ITCHS<br>Code|Export Item||Quantity|Sl.<br>No.|ITCHS<br>Code||Import Item|Recommended<br>Norms|| ||1|90328100|Hydraulic<br>Accessories<br>Base Tube Cam<br>HF169 1280 L=<br>1289 C/E= 45<br>(456 Nos.)<br>(Each No. is<br>49.32 kgs.)<br>Length 1289<br>mm Hydraulic<br>Accessories||22489.920<br>Kg|1|73041910||Seamless steel<br>pipes Raw Tube<br>For Base DIA<br>169 x 1289<br>TYPE E355<br>(456 Nos.)<br>(Each 65.36 kgs.<br>) Length 1294<br>mm Seamless<br>steel pipes||| ||2|90328100|Hydraulic<br>Accessories<br>Base Tube Cam<br>HF 169 1360<br>L=1364 C/E=45<br>(72 nos.) each<br>No.

355<br>(456 Nos.)<br>(Each 65.36 kgs.<br>) Length 1294<br>mm Seamless<br>steel pipes||| ||2|90328100|Hydraulic<br>Accessories<br>Base Tube Cam<br>HF 169 1360<br>L=1364 C/E=45<br>(72 nos.) each<br>No. 52.44 kgs.)<br>Length 1364<br>mm Hydraulic<br>Accessories||3775.680<br>Kg|2|73041910||Seamless steel<br>pipes Raw Tube<br>For Base DIA<br>169 x 1364<br>Type E355 (72<br>Nos.) (Each<br>69.23 kgs.)<br>Length 1369mm<br>Seamless Steel<br>Pipes|Import allowed<br>for 4984 kg<br>inclusive of<br>32% net<br>wastage|| ||3|90328100|Hydraulic<br>Accessories<br>Base Tube Cam<br>PF-H169 1680<br>L= 1689 C/E =<br>45(72 nos. each<br>63.4 kgs.)<br>Length 1689<br>mm Hydraulic<br>Accessories||4564.800<br>Kg|3|73041910||Seamless steel<br>pipes RAW<br>TUBE FOR<br>BASE DIA 169<br>x 1689 TYPE<br>E355 (72 Nos.)<br>(Each 85.16<br>kgs.) Length<br>1694 mm<br>Seamless Steel<br>Pipes|Import allowed<br>for 6131 kg<br>inclusive of<br>34.3% net<br>wastage|| ||RA concerned may||take further necessaryaction asper the||||decision of NC.|||||

Decision: The Committee considered the case as per agenda and decided to ratify the norms on repeat basis as approved for AA No. 0410160379 dated 01.04.2015 in M. No. 17/80 dated 20.12.2016 on the recommendation of representative of MSME as under :

5 | P a g e

==> picture [476 x 267] intentionally omitted <==

o. 0410160379 dated 01.04.2015** in M. No. 17/80 dated 20.12.2016 on the recommendation of representative of MSME as under :

5 | P a g e

==> picture [476 x 267] intentionally omitted <==

----- Start of picture text -----<br> Case No.:405/15/80-ALC2/2018 Party Name: OSWAL PUMPS Meet No/Date:22/80- Status:<br>LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3310030410 Send D/L<br>:01/80/050/00747/AM19/ :33/24/040/00007/AM18/ 01.11.2017<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per written comments of DPIIT vide U. No.: P-47011/16/2020-TSWdated 04.02.2020:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>13 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license,<br>if any, may also be indicated.<br>4.

eight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license,<br>if any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured<br>out of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:394/15/80-ALC2/2018 Party Name: TRIVENI HI-TECH Meet No/Date:22/80- Status:<br>PVT. LTD. ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0710113046 Pending<br>:01/80/050/00736/AM19/ :07/24/040/00368/AM18/ 04.04.2018 with MSME<br>14<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>MSME for examination of the case on 11.12.2019 followed by a reminder on 25.02.2020. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:121/15/80-ALC2/2018 Party Name: ZTT INDIA Meet No/Date:22/80- Status:<br>PRIVATE LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0410164238 Pending<br>:01/80/050/00463/AM19/ :04/24/040/00009/AM19/ 23.04.2018 with MeitY<br>15<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>MeitY on 21.01.2020 for examination of the case. However, no comments have been received yet. Therefore,<br>the Committee decided to remind MeitY for expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

6 | P a g e

16

Case No.:122/15/80-ALC2/2018 Party Name: SMC Meet No/Date:22/80- Status:
PNEUMATICS (INDIA) ALC2/2019 Deferred
PRIVATE LIMITED 28.02.2020
HQ File<br>:01/80/050/00464/AM19/ RLA File<br>:05/24/040/00047/AM19/ Lic.No/Date:0510406269<br>27.04.2018 Samples to<br>be sent

Decision: The Committee considered the case as per the agenda and noted that the firm has submitted the requisite information along with samples as asked during personal hearing. Hence, the Committee directed to forward the same to Consultant (Tech-3) for examination of the case.

Case is deferred.

17

e information along with samples as asked during personal hearing. Hence, the Committee directed to forward the same to Consultant (Tech-3) for examination of the case.

Case is deferred.

17

Case No.:11/6/80-ALC2/2019 Party Name: SMC Meet No/Date:22/80- Status:
PNEUMATICS (INDIA) ALC2/2019 Deferred
PRIVATE LIMITED 28.02.2020
HQ File<br>:01/80/050/00082/AM20/ RLA File<br>:05/24/040/00233/AM19/ Lic.No/Date:0510407270<br>23.07.2018 Samples to<br>be sent

Decision: The Committee considered the case as per the agenda and noted that the firm has submitted the requisite information along with samples as asked during personal hearing. Hence, the Committee directed to forward the same to Consultant (Tech-3) for examination of the case.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/12/80-ALC2/2018 Party Name: BIRLA Meet No/Date:22/80- Status:<br>PRECISION TECHNOLOGIES ALC2/2019 Deferred<br>LTD. 28.02.2020<br>HQ File RLA File Lic.No/Date:0310824314 Pending<br>:01/80/050/00276/AM19/ :03/94/040/00599/AM19/ 09.10.2018 with Firm<br>----- End of picture text -----<br>

erred<br>LTD. 28.02.2020<br>HQ File RLA File Lic.No/Date:0310824314 Pending<br>:01/80/050/00276/AM19/ :03/94/040/00599/AM19/ 09.10.2018 with Firm<br>----- End of picture text -----<br>

18 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 14.01.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:4/12/80-ALC2/2018 Party Name: BIRLA Meet No/Date:22/80- Status:
PRECISION TECHNOLOGIES ALC2/2019 Deferred
LTD. 28.02.2020
HQ File<br>:01/80/050/00277/AM19/ RLA File<br>:03/94/040/00600/AM19/ Lic.No/Date:0310824317<br>09.10.2018 Pending<br>with Firm

19 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 14.01.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

7 | P a g e

Case No.: Party Name: BIRLA Meet No/Date:22/80- Status: 5/12/80-ALC2/2018 PRECISION TECHNOLOGIES ALC2/2019 Deferred LTD. 28.02.2020 HQ File RLA File Lic.No/Date:0310824375 Pending :01/80/050/00278/AM19/ :03/94/040/00598/AM19/ 11.10.2018 with Firm

tus: 5/12/80-ALC2/2018** PRECISION TECHNOLOGIES ALC2/2019 Deferred LTD. 28.02.2020 HQ File RLA File Lic.No/Date:0310824375 Pending :01/80/050/00278/AM19/ :03/94/040/00598/AM19/ 11.10.2018 with Firm

20 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 14.01.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:12/12/80-ALC2/2018 Party Name: BIRLA Meet No/Date:22/80- Status: PRECISION TECHNOLOGIES ALC2/2019 Deferred LTD. 28.02.2020 HQ File RLA File Lic.No/Date:0310824374 Pending :01/80/050/00285/AM19/ :03/94/040/00597/AM19/ 11.10.2018 with Firm

21 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 14.01.2020. However, no reply has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the requisite information within 15 days.

Case is deferred.

22

Case No.:22/12/80-ALC2/2018 Party Name: CPS OIL & GAS Meet No/Date:22/80- Status:
EQUIPMENTS PVT. LTD. ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00295/AM19/ RLA File<br>:03/94/040/00630/AM19/ Lic.No/Date:0310824383<br>11.10.2018 Pending<br>with MSME

|EQUIPMENTS PVT. LTD.||ALC2/2019||Deferred| ||||||28.02.2020||| ||HQ File<br>:01/80/050/00295/AM19/||RLA File<br>:03/94/040/00630/AM19/||Lic.No/Date:0310824383<br>11.10.2018||Pending<br>with MSME|

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 18.12.2019 followed by a reminder on 25.02.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/12/80-ALC2/2018 Party Name: JAICO Meet No/Date:22/80- Status:<br>ENTERPRISE LLP ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0310824420 Pending<br>:01/80/050/00274/AM19/ :03/94/040/00612/AM19/ 12.10.2018 with RA<br>23 Decision: The Committee considered the case as per the agenda and the hardcopy of the application has not<br>been received from the firm & RA, Mumbai and in this regard a letter was sent to RA, Mumbai on 05.02.2019<br>followed by reminders on 05.04.2019, 09.05.2019, 07.06.2020, 20.01.2020, 03.02.2020, 20.02.2020. However,<br>no information has been received so far. Hence, the Committee decided to wait for the complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

8 | P a g e

==> picture [476 x 152] intentionally omitted <==

complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

8 | P a g e

==> picture [476 x 152] intentionally omitted <==

----- Start of picture text -----<br> Case No.:23/12/80- Party Name: GENERAL Meet No/Date:22/80- Status:<br>ALC2/2018 INSTRUMENTS CONSORTIUM ALC2/2019 Deferred<br>SOLE PROP. KULKARNI 28.02.2020<br>HQ File RLA File :03/94/040/00640/AM19/ Lic.No/Date:0310824478 Pending with<br>:01/80/050/00296/AM19/ 16.10.2018 RA<br>24 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 09.05.2019 followed by reminders on 24.07.2019, 06.11.2019, 16.01.2020 & 20.02.2020. However,<br>no information has been received so far. Hence, the Committee decided to wait for the complete set of<br>application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:267/15/80- Party Name: LARSEN & TOUBRO Meet No/Date:22/80- Status:<br>ALC2/2018 LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File :03/95/040/00583/AM19/ Lic.No/Date:0310825583 To be send to<br>:01/80/050/00609/AM19/ 11.12.2018 PC-IV<br>----- End of picture text -----<br>

9 Deferred<br>28.02.2020<br>HQ File RLA File :03/95/040/00583/AM19/ Lic.No/Date:0310825583 To be send to<br>:01/80/050/00609/AM19/ 11.12.2018 PC-IV<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted the decision of M. No. 06/80 dated 03.07.2019 wherein it was decided to take up the case for scrutiny under risk management system and hence, 25 RA, Mumbai & the firm were requested to forward complete set of document for examination of the case at the earliest vide letter dated 29.07.2019 followed by reminders on 06.11.2019, 16.01.2020 and 20.02.2020. The Committee also noted that the firm vide email dated 22.01.2020 has informed that they have obtained the AA under Self-ratification (AEO) scheme instead of sending the complete set of application/documents. Therefore, the Committee decided to refer the matter to Policy-IV division asking for guidance as to whether we may stop facility of Self-ratification in such cases.

Case is deferred.

==> picture [476 x 121] intentionally omitted <==

atter to Policy-IV division asking for guidance as to whether we may stop facility of Self-ratification in such cases.

Case is deferred.

==> picture [476 x 121] intentionally omitted <==

----- Start of picture text -----<br> Case No.:276/15/80-ALC2/2018 Party Name: BIRLA Meet No/Date:22/80- Status:<br>FURUKAWA FIBRE OPTICS ALC2/2019 Approved<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0310825749<br>26 :01/80/050/00618/AM19/ :03/94/040/00758/AM19/ 18.12.2018<br>Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per<br>written comments of MeitY vide U. O. No.: 17(33)/2019-IPHW dated 27.02.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:14/6/80-ALC2/2019 Party Name: IND-SPHINX Meet No/Date:22/80- Status:<br>PRECISION LTD ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:2210016034 Pending<br>:01/80/050/00085/AM20/ :22/24/040/00069/AM19/ 18.12.2018 with MSME<br>27<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>MSME on 10.02.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

9 | P a g e

of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

9 | P a g e

Case No.:20/14/80-ALC2/2018 Party Name: ULTRA Meet No/Date:22/80- Status:
ENGINEERS ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00336/AM19/ RLA File<br>:31/83/040/00150/AM19/ Lic.No/Date:3110067260<br>19.12.2018 Pending<br>with Firm

28 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 14.01.2020. However, no reply has been received from the firm. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [476 x 268] intentionally omitted <==

----- Start of picture text -----<br> Case No.:300/15/80-ALC2/2018 Party Name: DILIGENT SCM Meet No/Date:22/80- Status:<br>SOLUTIONS PRIVATE ALC2/2019 Deferred<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0910067093 D/L<br>:01/80/050/00642/AM19/ :09/24/040/00487/AM19/ 18.01.2019<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per advice of the representative of MSME :<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>29 2. Weight of each Export Product.<br>3.

vice of the representative of MSME :<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>29 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be used<br>in the resultant product and sought to be imported/procured from sources other than the license, if any,<br>may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured out<br>of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:313/15/80-ALC2/2018 Party Name: OMEGA ICEHILL Meet No/Date:22/80- Status:<br>PRIVATE LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0510409545 Pending<br>:01/80/050/00655/AM19/ :05/24/040/00627/AM19/ 31.01.2019 with Firm<br>30<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 19.11.2019 followed by a reminder on 24.01.2020.<br>However, no reply has been received yet. Hence, the Committee decided to send Final reminder to the firm for<br>furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

10 | P a g e

==> picture [476 x 193] intentionally omitted <==

for<br>furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

10 | P a g e

==> picture [476 x 193] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/6/80-ALC2/2019 Party Name: BHARAT Meet No/Date:22/80- Status:<br>HEAVY ELECTRICALS ALC2/2019<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:1110028485 Approved<br>:01/80/050/00086/AM20/ :11/24/040/00024/AM19/ 04.02.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms on repeat basis as<br>approved for AA No. 1110027176 dated 17.07.2012 on the recommendation of representative of DHI as under:<br>31<br>ITCHS ITCHS Recommended Norms<br>Export Item Quantity Import Item<br>Code Code<br>RE Joint Flange Import quantity may be<br>50.000<br>84000000 Assembly 72080000 Carbon Steel Plate allowed with 27%<br>Number<br>wastage<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

%<br>Number<br>wastage<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:310/15/80-ALC2/2018 Party Name: TERUMO Meet No/Date:22/80- Status:<br>PENPOL PRIVATE LIMITED ALC2/2019 & 28.02.2020 Deferred<br>HQ File RLA File Lic.No/Date:5310019913 Pending with<br>:01/80/050/00652/AM19/ :53/24/040/00013/AM19/ 05.02.2019 Firm and<br>C&PC<br>32 Decision: The Committee considered the case as per the agenda and noted that no reply has been received yet<br>from the firm against deficiency letter dated 21.08.2019 followed by reminders on 04.11.2019 & 16.01.2020 as<br>raised by Consultant (Tech-1) . The Committee also noted that there are other cases of the same firm wherein<br>comments are awaited from the Department of C & PC . Hence, the Committee decided to wait for the<br>reply/comments.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:324/15/80-ALC2/2018 Party Name: SWASTIK Meet No/Date:22/80- Status:
TUNGSTEN PVT. LTD. ALC2/2019 & 28.02.2020 Deferred
HQ File<br>:01/80/050/00666/AM19/ RLA File<br>:03/95/040/01213/AM19/ Lic.No/Date:0310827084<br>15.02.2019 Pending<br>with Firm

--|---| |||TUNGSTEN PVT. LTD.||ALC2/2019 & 28.02.2020||Deferred| |HQ File<br>:01/80/050/00666/AM19/||RLA File<br>:03/95/040/01213/AM19/||Lic.No/Date:0310827084<br>15.02.2019||Pending<br>with Firm|

33 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.

Case is deferred.

Case No.:6/1/80-ALC2/2019 Party Name: APAR Meet No/Date:22/80- Status:
INDUSTRIES LIMITED ALC2/2019 & 28.02.2020 Deferred
HQ File<br>:01/80/050/00754/AM19/ RLA File<br>:03/94/040/00999/AM19/ Lic.No/Date:0310827307<br>26.02.2019 Pending<br>with Firm

34 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MeitY was sent to the firm on 14.01.2020 followed by a reminder on 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

11 | P a g e

Case No.:8/1/80-ALC2/2019 Party Name: DAGGER Meet No/Date:22/80- Status:
MASTER TOOL INDUSTRIES ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00756/AM19/ RLA File<br>:03/94/040/01048/AM19/ Lic.No/Date:0310827404<br>01.03.2019 Pending<br>with Firm

TOOL INDUSTRIES||ALC2/2019||Deferred| |||LIMITED||28.02.2020||| |HQ File<br>:01/80/050/00756/AM19/||RLA File<br>:03/94/040/01048/AM19/||Lic.No/Date:0310827404<br>01.03.2019||Pending<br>with Firm|

35 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 22.07.2019 followed by reminders with latest on 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:3/2/80-ALC2/2019 Party Name: AUTOCOMP Meet No/Date:22/80- Status:
CORPORATION PANSE ALC2/2019 Deferred
PRIVATE LIMITED 28.02.2020
HQ File<br>:01/80/050/00003/AM20/ RLA File<br>:31/83/040/00298/AM19/ Lic.No/Date:3110067366<br>02.04.2019 Pending<br>with Firm

36 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 14.01.2020. However, no reply has been received from the firm. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [480 x 175] intentionally omitted <==

the firm. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.

Case is deferred.

==> picture [480 x 175] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: STERLITE POWER Meet No/Date:22/80- Status:<br>1/4/80-ALC2/2019 TRANSMISSION LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File :03/95/040/00051/AM20/ Lic.No/Date:0310828571 Pending with<br>:01/80/050/00016/AM20/ 24.04.2019 Firm<br>Decision: The Committee considered the case as per the agenda and noted that MeitY vide letter dated<br>37 20.02.2020 has sought again from the firm to furnish following information as the earlier reply was incomplete:<br>1. The detailed calculation on requirement of raw materials required for manufacturing per unit export<br>product.<br>The Committee decided to wait for the reply/comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 140] intentionally omitted <==

it export<br>product.<br>The Committee decided to wait for the reply/comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/4/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:22/80- Status:<br>PRIVATE LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3110067390 Pending<br>:01/80/050/00017/AM20/ :31/83/040/00009/AM20/ 24.04.2019 with Firm<br>38<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 22.07.2019 followed by reminders with latest on<br>25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s<br>reply.<br>Case is deferred<br>----- End of picture text -----<br>

12 | P a g e

Case No.:3/4/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:22/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00018/AM20/ RLA File<br>:31/83/040/00010/AM20/ Lic.No/Date:3110067391<br>24.04.2019 Pending<br>with Firm

39 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 22.07.2019 followed by reminders with latest on 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

by DPIIT was sent to the firm on 22.07.2019 followed by reminders with latest on 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/4/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:22/80- Status:<br>PRIVATE LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3110067392 Pending<br>:01/80/050/00019/AM20/ :31/83/040/00011/AM20/ 24.04.2019 with Firm<br>----- End of picture text -----<br>

40 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 23.07.2019 followed by reminders with latest on 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

Case No.:5/4/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:22/80- Status:
PVT. LTD. ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00020/AM20/ RLA File<br>:05/24/040/00033/AM20/ Lic.No/Date:0510410376<br>25.04.2019 Pending<br>with Firm

-|---|---| |||PVT. LTD.||ALC2/2019||Deferred| |||||28.02.2020||| |HQ File<br>:01/80/050/00020/AM20/||RLA File<br>:05/24/040/00033/AM20/||Lic.No/Date:0510410376<br>25.04.2019||Pending<br>with Firm|

41 Decision: The Committee considered the case as per the agenda and noted that minutes were erroneously recorded for Meeting 20/80 dated 30.01.2020. The Committee observed that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 26.12.2019 followed by a reminder on 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/4/80-ALC2/2019 Party Name: SHIVALIK Meet No/Date:22/80- Status:<br>BIMETAL CONTROLS LTD ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0510410395 Pending<br>:01/80/050/00022/AM20/ :05/24/040/00016/AM20/ 26.04.2019 with MSME<br>----- End of picture text -----<br>

42 Decision: The Committee considered the case as per the agenda and noted that the copy of application was sent to MSME for examination of the case on 10.06.2019 followed by I.D. reminders on 22.07.2019, 05.11.2019 & 14.01.2020. However, no comments have been received yet. Hence, the Committee decided to remind again MSME for expediting the comments.

Case is deferred.

13 | P a g e

==> picture [476 x 130] intentionally omitted <==

e been received yet. Hence, the Committee decided to remind again MSME for expediting the comments.

Case is deferred.

13 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/4/80-ALC2/2019 Party Name: ERBATECH Meet No/Date:22/80- Status:<br>MACHINERY P LTD ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3210078932 Pending<br>:01/80/050/00024/AM20/ :32/24/040/00004/AM20/ 29.04.2019 with Firm<br>43<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 25.02.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.: Party Name: SRI RAM Meet No/Date:22/80- Status:
13/4/80-ALC2/2019 INDUSTRIES ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00028/AM20/ RLA File<br>:04/24/040/00157/AM19/ Lic.No/Date:0410165532<br>01.05.2019 Pending<br>with Firm

/2019**||INDUSTRIES||ALC2/2019||Deferred| |||||28.02.2020||| |HQ File<br>:01/80/050/00028/AM20/||RLA File<br>:04/24/040/00157/AM19/||Lic.No/Date:0410165532<br>01.05.2019||Pending<br>with Firm|

44 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 04.10.2019 followed by reminders on 19.11.2019 & 16.01.2020. However, no reply has been received yet. Therefore, the Committee decided to remind again the firm for furnishing the requisite information within 15 days, failing which case will be rejected.

Case is deferred

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:14/4/80-ALC2/2019 Party Name: KINECO KAMAN Meet No/Date:22/80- Status:<br>COMPOSITES - INDIA PVT ALC2/2019 Deferred<br>LTD 28.02.2020<br>HQ File RLA File Lic.No/Date:0310828702 Pending<br>:01/80/050/00029/AM20/ :03/94/040/01131/AM19/ 01.05.2019 with Firm<br>45<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 14.01.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/4/80-ALC2/2019 Party Name: CHIRAG UDYOG Meet No/Date:22/80- Status:<br>ALC2/2019 & 28.02.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510410451 Pending<br>:01/80/050/00030/AM20/ :05/23/040/00054/AM20/ 02.05.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and the firm’s representative explained the case<br>46 before Norms Committee during personal hearing. The Committee directed to the representative to furnish<br>following information as per advice of Consultant (Tech-3):<br>1. List of specific export items along with their quantity in numbers with weight.<br>2. Sheet layout of each item.<br>Case is deferred.<br>----- End of picture text -----<br>

14 | P a g e

==> picture [476 x 130] intentionally omitted <==

ty in numbers with weight.<br>2. Sheet layout of each item.<br>Case is deferred.<br>----- End of picture text -----<br>

14 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:16/4/80-ALC2/2019 Party Name: BLISS ANAND Meet No/Date:22/80- Status:<br>PVT. LTD. ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0510410480 Pending<br>:01/80/050/00031/AM20/ :05/23/040/00051/AM20/ 03.05.2019 with Firm<br>47<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 25.02.2020. However, no reply has been received yet.<br>Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 199] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/4/80-ALC2/2019 Party Name: MASU BRAKE Meet No/Date:22/80- Status:<br>PADS PRIVATE LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0510410488 Pending<br>:01/80/050/00036/AM20/ :05/24/040/00057/AM20/ 06.05.2019 with Firm<br>Decision: The Committee considered the case as per agenda and noted that Consultant (Tech 1) has informed<br>that the firm has not provided the specific reply to query at Sl. No. 2 to 5.

ith Firm<br>Decision: The Committee considered the case as per agenda and noted that Consultant (Tech 1) has informed<br>that the firm has not provided the specific reply to query at Sl. No. 2 to 5. Therefore, the Committee decided to<br>48 ask again from the firm to furnish following information:<br>1) Quantity of different input required to manufacture 100kg of formulation pre mix.<br>2) Details of indigenous input with quantity.<br>3) Non volatile matter percentage in import item no. 9<br>4) Details of import item no. 14 with quantity in nos. and kg<br>5) Justifications for 12% wastage in import item no. 1<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/4/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:22/80- Status:<br>PVT. LTD. ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0510410518 Pending<br>:01/80/050/00034/AM20/ :05/24/040/00762/AM19/ 08.05.2019 with Firm<br>49<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by MSME was sent to the firm on 26.12.2019 followed by a reminder on 27.02.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 140] intentionally omitted <==

been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/4/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:22/80- Status:<br>SOLUTIONS PRIVATE ALC2/2019 Deferred<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0910067492 Send D/L<br>:01/80/050/00033/AM20/ :09/24/040/00058/AM20/ 10.05.2019<br>50<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>following information as per advice of the representative of MSME :<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>2. Weight of each Export Product.<br>----- End of picture text -----<br>

15 | P a g e

  1. Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

ted. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

  1. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

Case is deferred.

51

Case No.:28/5/80-ALC2/2019 Party Name: SHIRODKAR Meet No/Date:22/80- Status:
PRECI COMP PRIVATE ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00066/AM20/ RLA File<br>:31/83/040/00028/AM20/ Lic.No/Date:3110067433<br>29.05.2019 Pending<br>with Tech 3

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-3) on 19.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

52

Case No.:29/5/80-ALC2/2019 Party Name: SHIRODKAR Meet No/Date:22/80- Status:
PRECI COMP PRIVATE ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00067/AM20/ RLA File<br>:31/83/040/00027/AM20/ Lic.No/Date:3110067434<br>29.05.2019 Pending<br>with Tech 3

COMP PRIVATE||ALC2/2019||Deferred| ||||LIMITED||28.02.2020||| ||HQ File<br>:01/80/050/00067/AM20/||RLA File<br>:31/83/040/00027/AM20/||Lic.No/Date:3110067434<br>29.05.2019||Pending<br>with Tech 3|

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to Consultant (Tech-3) on 19.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:30/5/80-ALC2/2019 Party Name: TIAGO CHEM Meet No/Date:22/80- Status:<br>ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3410045178 RA/Firm<br>:01/80/050/00068/AM20/ :34/24/040/00075/AM20/ 30.05.2019<br>53<br>Decision: The Committee considered the case as per the agenda and noted that the firm has only sent a copy of<br>AA on 20.02.2020. Therefore, the Committee decided to request again from the firm and RA, Vadodara for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

16 | P a g e

==> picture [476 x 130] intentionally omitted <==

adodara for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

16 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:32/5/80-ALC2/2019 Party Name: FUTURE TECH Meet No/Date:22/80- Status:<br>ENGINEERING PVT. LTD. ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0710115000 Pending with<br>:01/80/050/00070/AM20/ :07/24/040/00050/AM20/ 31.05.2019 RA/Firm<br>54<br>Decision: The Committee considered the case as per the agenda and noted that a letter was sent to RA,<br>Bangalore on 27.02.2020 for submitting the hardcopy of firm’s application. However, no information has been<br>received yet. Hence, the Committee decided to wait for the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

55

Case No.:1/6/80-ALC2/2019 Party Name: SHIVALIK Meet No/Date:22/80- Status:
BIMETAL CONTROLS LTD ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00072/AM20/ RLA File<br>:05/24/040/00129/AM20/ Lic.No/Date:0510410810<br>04.06.2019 Pending with<br>MSME

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 24.12.2019 for examination of the case on 24.12.2019 followed by a reminder on 27.02.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

56

mination of the case on 24.12.2019 followed by a reminder on 27.02.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

56

Case No.: Party Name: LAXMI Meet No/Date:22/80- Status:
2/6/80-ALC2/2019 DENTAL EXPORT PVT. ALC2/2019 Deferred
LTD. 28.02.2020
HQ File<br>:01/80/050/00073/AM20/ RLA File<br>:03/95/040/00207/AM20/ Lic.No/Date:0310829403<br>04.06.2019 Pending with<br>Firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-1) was sent to the firm on 26.12.2019 followed by a reminder on 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:4/6/80-ALC2/2019 Party Name: MAGNA Meet No/Date:22/80- Status:<br>AUTOMOTIVE INDIA ALC2/2019 Deferred<br>PRIVATE LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0410165680 Pending with<br>:01/80/050/00075/AM20/ :04/24/040/00049/AM20/ 06.06.2019 MSME<br>57<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME for examination of the case on 30.07.2019 followed by reminders on 05.11.2019 & 15.01.2020.<br>However, no comments have been received yet.

a and noted that a copy of application was sent to<br>MSME for examination of the case on 30.07.2019 followed by reminders on 05.11.2019 & 15.01.2020.<br>However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for<br>expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

17 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:22/80- Status:<br>LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0310829486 Pending<br>:01/80/050/00077/AM20/ :03/95/040/00221/AM20/ 07.06.2019 with Firm<br>58<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminder on 25.02.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

59

Case No.:7/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:22/80- Status:
LIMITED ALC2/2019 Deferred
22.08.2020
HQ File<br>:01/80/050/00078/AM20/ RLA File<br>:03/95/040/00206/AM20/ Lic.No/Date:0310829488<br>07.06.2019 Pending<br>with Firm

|---|---| ||||LIMITED||ALC2/2019||Deferred| ||||||22.08.2020||| ||HQ File<br>:01/80/050/00078/AM20/||RLA File<br>:03/95/040/00206/AM20/||Lic.No/Date:0310829488<br>07.06.2019||Pending<br>with Firm|

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminder on 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

60

Case No.:10/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:22/80- Status:
LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00081/AM20/ RLA File<br>:03/95/040/00229/AM20/ Lic.No/Date:0310829553<br>11.06.2019 Pending<br>with Firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminder on 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

eminder on 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/6/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:22/80- Status:<br>PVT. LTD ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0510410880 Pending<br>:01/80/050/00083/AM20/ :05/24/040/00144/AM20/ 11.06.2019 with MSME<br>61<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME for examination of the case on 31.07.2019 followed by reminders on 05.11.2019 & 14.01.2020.<br>However, no comments have been received yet. Therefore, the Committee decided to remind again MSME for<br>expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

18 | P a g e

==> picture [476 x 130] intentionally omitted <==

ided to remind again MSME for<br>expediting the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

18 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/6/80-ALC2/2019 Party Name: VEELINE MEDIA Meet No/Date:22/80- Status:<br>LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0210209240 Pending<br>:01/80/050/00084/AM20/ :02/24/040/00038/AM20/ 11.06.2019 with MSME<br>62<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>MSME for examination of the case on 14.08.2019 followed by reminders on 26.12.2019 & 25.02.2020.<br>However, no comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:16/6/80-ALC2/2019 Party Name: TEMA INDIA Meet No/Date:22/80- Status:<br>LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0310829596 Pending<br>:01/80/050/00087/AM20/ :03/95/040/00239/AM20/ 12.06.2019 with Firm<br>63<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminder on 25.02.2020.<br>However, no reply has been received yet.

d noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019 followed by reminder on 25.02.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

64

Case No.:17/6/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:22/80- Status:
AUTOMOTIVES LTD. ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00088/AM20/ RLA File<br>:05/23/040/00062/AM20/ Lic.No/Date:0510410932<br>14.06.2019 Pending<br>with MSME

Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to MSME for examination of the case on 03.12.2019 followed by a reminder on 25.02.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

eminder on 25.02.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/6/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:22/80- Status:<br>AUTOMOTIVES LTD. ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0510410933 Pending<br>:01/80/050/00089/AM20/ :05/23/040/00063/AM20/ 14.06.2019 with MSME<br>65<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>MSME for examination of the case on 03.12.2019 followed by a reminder on 25.02.2020. However, no<br>comments have been received yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

19 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/6/80-ALC2/2019 Party Name: ISGEC HITACHI Meet No/Date:22/80- Status:<br>ZOSEN LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0510410946 Pending<br>:01/80/050/00092/AM20/ :05/23/040/00111/AM20/ 14.06.2019 with Firm<br>66<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019 followed by a reminder on 25.02.2020.<br>However, no reply has been received yet.

noted that a deficiency letter seeking certain<br>information as raised by DPIIT was sent to the firm on 26.12.2019 followed by a reminder on 25.02.2020.<br>However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.<br>Case is deferred.<br>----- End of picture text -----<br>

67

Case No.:1/8/80-ALC2/2019 Party Name: MODEL INFRA Meet No/Date:22/80- Status:
CORPORATION PRIVATE ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00113/AM20/ RLA File<br>:07/24/040/00081/AM20/ Lic.No/Date:0710115134<br>05.07.2019 Pending<br>with MSME

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME for examination of the case on 11.12.2019 followed by a reminder on 25.02.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/8/80-ALC2/2019 Party Name: KABY PRECISION Meet No/Date:22/80- Status:<br>MACHINING PRIVATE ALC2/2019 Approved<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0910067755<br>:01/80/050/00114/AM20/ :09/24/040/00176/AM20/ 05.07.2019<br>----- End of picture text -----<br>

E ALC2/2019 Approved<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0910067755<br>:01/80/050/00114/AM20/ :09/24/040/00176/AM20/ 05.07.2019<br>----- End of picture text -----<br>

68 Decision: The Committee considered the case as per agenda and decided to allow wastage with 7% on repeat basis (of AA 0910067233 dated 01.03.2019) for the quantity of each imported grade of steel (42 CrMoS4QT) having various diameter and length (5.0 – 5.8 Mts) of each item against export of Pivot Pins of relevant grade as per written comments of Consultant (SKB).

RA concerned may take further necessary action as per the decision of NC.

==> picture [476 x 134] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/8/80-ALC2/2019 Party Name: MICRON SPECMA Meet No/Date:22/80- Status:<br>(INDIA) PRIVATE LIMITED ALC2/2019 Withdrawn<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3310030562<br>:01/80/050/00119/AM20/ :33/24/040/00015/AM20/ 08.07.2019<br>69<br>Decision: The Committee considered the case as per agenda and noted that RA, Panipat informed that the<br>above AA has been cancelled on 13.11.2019 due to non-utilization report issued by custom . Therefore, the<br>Committee decided to withdraw the case from the agenda under intimation to RA, Panipat.<br>Case is withdrawn.<br>----- End of picture text -----<br>

20 | P a g e

==> picture [476 x 163] intentionally omitted <==

the case from the agenda under intimation to RA, Panipat.<br>Case is withdrawn.<br>----- End of picture text -----<br>

20 | P a g e

==> picture [476 x 163] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/8/80-ALC2/2019 Party Name: ULTRA Meet No/Date:22/80- Status:<br>ENGINEERS ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3110067470 Pending<br>:01/80/050/00115/AM20/ :31/83/040/00058/AM20/ 10.07.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>70<br>Consultant (Tech-3) on 26.12.2019 for examination of the case. It was also noted that the firm informed vide<br>email dated 30.01.2020 that they are revising drawing & designs of the export products as per customer<br>requirement and requested to hold the fixation of norms for 4 weeks as to prepare revise application for<br>amendment. However, no information has been received yet. Hence, the Committee decided to wait for the<br>requisite information from the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 168] intentionally omitted <==

the Committee decided to wait for the<br>requisite information from the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 168] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/8/80-ALC2/2019 Party Name: VALEO INDIA Meet No/Date:22/80- Status:<br>PRIVATE LIMITED ALC2/2019 Approved<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0410165826<br>:01/80/050/00117/AM20/ :04/24/040/00067/AM20/ 12.07.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>71 written comments of MSME as under:<br>1. Quantity of relevant import item at Sl. No. 1 to 3 may be allowed as per GN-4.<br>2. Quantity of relevant import item at Sl. No. 4 and 5 may be allowed 1.02kg/kg net content of<br>export product.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:6/8/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:22/80- Status:
SOLUTIONS PRIVATE ALC2/2019 Rejected
LIMITED 28.02.2020
HQ File<br>:01/80/050/00118/AM20/ RLA File<br>:09/24/040/00199/AM20/ Lic.No/Date:0910067781<br>12.07.2019

--|---|---|---| |||SOLUTIONS PRIVATE||ALC2/2019||Rejected| |||LIMITED||28.02.2020||| |HQ File<br>:01/80/050/00118/AM20/||RLA File<br>:09/24/040/00199/AM20/||Lic.No/Date:0910067781<br>12.07.2019|||

72 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) was sent to the firm on 04.10.2019 followed by reminders on 19.11.2019 & 16.01.2020. However, no reply has been received yet. Therefore, the Committee decided to reject the case under intimation to RA, Hyderabad .

Case is rejected.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/8/80-ALC2/2019 Party Name: AUTO TECH Meet No/Date:22/80- Status:<br>INDUSTRIES (INDIA) PVT. ALC2/2019 Deferred<br>LTD., 28.02.2020<br>HQ File RLA File Lic.No/Date:0410165827 Pending<br>:01/80/050/00120/AM20/ :04/24/040/00068/AM20/ 15.07.2019 with Firm<br>73<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 14.01.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

21 | P a g e

==> picture [476 x 131] intentionally omitted <==

m for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

21 | P a g e

==> picture [476 x 131] intentionally omitted <==

----- Start of picture text -----<br> Case No.:9/8/80-ALC2/2019 Party Name: ANSTECH Meet No/Date:22/80- Status:<br>ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3410045281 RA/Firm<br>:01/80/050/00121/AM20/ :34/24/040/00127/AM20/ 15.07.2019<br>74<br>Decision: The Committee considered the case as per the agenda and noted that RA, Vadodara has only sent a<br>copy of AA. Therefore, the Committee decided to request again from the firm and RA, Vadodara for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 165] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/8/80-ALC2/2019 Party Name: ULTRA Meet No/Date:22/80- Status:<br>ENGINEERS ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3110067477 Pending<br>:01/80/050/00122/AM20/ :31/83/040/00056/AM20/ 17.07.2019 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>75<br>Consultant (Tech-3) on 26.12.2019 for examination of the case.

9 with Firm<br>Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to<br>75<br>Consultant (Tech-3) on 26.12.2019 for examination of the case. However, it was also noted that the firm<br>informed vide email dated 30.01.2020 that they are revising drawing & designs of the export products as per<br>customer requirement and requested to hold the fixation of norms for 4 weeks as to prepare revise application<br>for amendment. However, no information has been received yet. Hence, the Committee decided to wait for the<br>requisite information from the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:11/8/80-ALC2/2019 Party Name: APAR Meet No/Date:22/80- Status:
INDUSTRIES LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00123/AM20/ RLA File<br>:03/94/040/00303/AM20/ Lic.No/Date:0310830379<br>17.07.2019 Pending<br>with MeitY

76 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MeitY for examination of the case on 26.11.2019 followed by a reminder on 14.01.2020. However, the representative of MeitY requested to send again a copy of application. Hence, the Committee decided to send again a complete set of application to MeitY for examination of the case.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

cation. Hence, the Committee decided to send again a complete set of application to MeitY for examination of the case.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/8/80-ALC2/2019 Party Name: ZOBELE INDIA Meet No/Date:22/80- Status:<br>PRIVATE LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0310830415 RA/Firm<br>:01/80/050/00124/AM20/ :03/95/040/00352/AM20/ 18.07.2019<br>77 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Mumbai and in this regard a letter was sent to the firm & RA,<br>Mumbai on 23.08.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again the firm & RA, Mumbai for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

22 | P a g e

==> picture [476 x 142] intentionally omitted <==

Mumbai for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

22 | P a g e

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/8/80-ALC2/2019 Party Name: HORIZON Meet No/Date:22/80- Status:<br>CHUTES PVT LTD ALC2/2019 & 28.02.2020 Deferred<br>HQ File RLA File Lic.No/Date:3110067480 RA/Firm<br>:01/80/050/00125/AM20/ :31/83/040/00064/AM20/ 18.07.2019<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>78<br>not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on<br>23.08.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has been received so<br>far. Therefore, the Committee decided to remind again the firm & RA, Pune for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/9/80-ALC2/2019 Party Name: DYNA FORCE Meet No/Date:22/80- Status:<br>HYDRAULICS PRIVATE ALC2/2019 Deferred<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:3110067484 RA/Firm<br>:01/80/050/00128/AM20/ :31/83/040/00067/AM20/ 25.07.2019<br>----- End of picture text -----<br>

019 Deferred<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:3110067484 RA/Firm<br>:01/80/050/00128/AM20/ :31/83/040/00067/AM20/ 25.07.2019<br>----- End of picture text -----<br>

79 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from the firm & RA, Pune and in this regard a letter was sent to the firm & RA, Pune on 14.10.2019 followed by reminders on 06.11.2019 & 08.01.2020. However, no information has been received so far. Therefore, the Committee decided to remind again the firm & RA, Pune for submitting the complete set of application.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/10/80-ALC2/2019 Party Name: DOOWON Meet No/Date:22/80- Status:<br>AUTOMOTIVE SYSTEMS ALC2/2019 Deferred<br>INDIA PRIVATE LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0410165942 RA/Firm<br>:01/80/050/00140/AM20/ :04/24/040/00079/AM20/ 07.08.2019<br>80 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Chennai and in this regard a letter was sent to the firm & RA,<br>Chennai on 14.10.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has been<br>received so far.

RA, Chennai and in this regard a letter was sent to the firm & RA,<br>Chennai on 14.10.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has been<br>received so far. Therefore, the Committee decided to remind again the firm & RA, Chennai for submitting the<br>complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/10/80-ALC2/2019 Party Name: JKS Meet No/Date:22/80- Status:<br>ENGINEERING ALC2/2019 & 28.02.2020 Deferred<br>HQ File RLA File Lic.No/Date:3210079060 RA/Firm<br>:01/80/050/00143/AM20/ :32/24/040/00033/AM20/ 08.08.2019<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>81<br>not yet been received from the firm & RA, Coimbatore and in this regard a letter was sent to the firm & RA,<br>Coimbatore on 16.10.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again the firm & RA, Coimbatore for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

23 | P a g e

==> picture [476 x 153] intentionally omitted <==

mbatore for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

23 | P a g e

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:6/10/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:22/80- Status:<br>BLADES INDIA PVT. LTD ALC2/2019<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3410045365 Deferred<br>:01/80/050/00144/AM20/ :34/24/040/00152/AM20/ 09.08.2019<br>82 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from the firm & RA, Vadodara and in this regard a letter was sent to the firm & RA,<br>Vadodara on 11.10.2019 followed by reminders on 06.11.2019 & 16.01.2020. However, no information has<br>been received so far. Therefore, the Committee decided to remind again the firm & RA, Vadodara for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 188] intentionally omitted <==

the firm & RA, Vadodara for<br>submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 188] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/10/80-ALC2/2019 Party Name: MAINI Meet No/Date:22/80- Status:<br>PRECISION PRODUCTS ALC2/2019 Deferred<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0710115278 PH<br>:01/80/050/00145/AM20/ :07/24/040/00106/AM20/ 13.08.2019<br>Decision: The Committee considered the case as per agenda. Consultant (Tech-3) informed that the firm has<br>not provided any specific reply against deficiency letter dated 26.12.2019. Therefore, the Committee decided to<br>83<br>call the firm for personal hearing to explain the case before Norms Committee along with reply of following<br>deficiencies:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.<br>2. To provide clarification for, how the diameter of import item at Sl. No. 3 is 28mm while diameter of export<br>item is shown as 12.80mm.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

tem at Sl. No. 3 is 28mm while diameter of export<br>item is shown as 12.80mm.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 142] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/10/80-ALC2/2019 Party Name: AVLIGHT Meet No/Date:22/80- Status:<br>AUTOMOTIVES PVT. LTD. ALC2/2019 Approved<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0510411553<br>:01/80/050/00149/AM20/ :05/23/040/00164/AM20/ 20.08.2019<br>84<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of MSME as under:<br>1. Quantity of relevant imports may be allowed as per GN-4.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 108] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/10/80-ALC2/2019 Party Name: KINECO KAMAN Meet No/Date:22/80- Status:<br>COMPOSITES - INDIA PVT ALC2/2019 Deferred<br>LTD 28.02.2020<br>HQ File RLA File Lic.No/Date:0310831081 Send D/L<br>85<br>:01/80/050/00150/AM20/ :03/94/040/00329/AM20/ 20.08.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish the<br>following information as per written comments of DPIIT vide U. O. No.: P-47011/193/2019-TSW dated<br>04.02.2020:<br>----- End of picture text -----<br>

24 | P a g e

rm to furnish the<br>following information as per written comments of DPIIT vide U. O. No.: P-47011/193/2019-TSW dated<br>04.02.2020:<br>----- End of picture text -----<br>

24 | P a g e

  1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished.

  2. Assembly drawings/diagrams of the resultant product showing placement and exact use of components in the export product (s).

  3. Bifurcated quantities of components to be accounted for in the resultant product and the requirement of components as spares. Raw Material / Consumables.

  4. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

  5. Basis/Justification for the quantities of import items.

Case is deferred.

==> picture [476 x 119] intentionally omitted <==

ification and supported by documentary evidence/drawings etc.

  1. Basis/Justification for the quantities of import items.

Case is deferred.

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:15/10/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:22/80- Status:<br>BLADES INDIA PVT. LTD ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3410045391 Send to<br>86 :01/80/050/00153/AM20/ :34/24/040/00164/AM20/ 23.08.2019 Tech 1<br>Decision: The Committee considered the case as per the agenda and decided to refer the case to Consultant<br>(Tech-1) for examination & comments.<br>Case is deferred.<br>----- End of picture text -----<br>

87

Case No.:18/10/80-ALC2/2019 Party Name: DECON INDIA Meet No/Date:22/80- Status:
PLASTICS PVT LTD ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00156/AM20/ RLA File<br>:31/83/040/00079/AM20/ Lic.No/Date:3110067515<br>26.08.2019 Pending<br>with Tech 1

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-1) on 24.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

88

nt to Consultant (Tech-1) on 24.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

88

Case No.:19/10/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:22/80- Status:
SOLUTIONS PRIVATE ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00157/AM20/ RLA File<br>:09/24/040/00272/AM20/ Lic.No/Date:0910067939<br>27.08.2019 Pending<br>with Firm

Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by MSME was sent to the firm on 25.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for reply of the firm.

Case is deferred.

25 | P a g e

==> picture [476 x 267] intentionally omitted <==

----- Start of picture text -----<br> Case No.:20/10/80-ALC2/2019 Party Name: OSWAL PUMPS Meet No/Date:22/80- Status:<br>LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3310030578 Send D/L<br>:01/80/050/00158/AM20/ :33/24/040/00017/AM20/ 27.08.2019<br>Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish<br>following information as per written comments of DPIIT vide U. No.: P-47011/16/2020-TSWdated 04.02.2020:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>89 2. Weight of each Export Product.<br>3.

P-47011/16/2020-TSWdated 04.02.2020:<br>1. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>89 2. Weight of each Export Product.<br>3. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>in the export product may be indicated. Net weight along with details of other imported input to be<br>used in the resultant product and sought to be imported/procured from sources other than the license, if<br>any, may also be indicated.<br>4. Starting from the specification of the export product, basic calculation as to how of raw material<br>proposed for import has been arrived at, including the net weight of components to be manufactured<br>out of these imported materials, wastages claimed at each stage of manufacturing with complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

complete<br>justification and supported by documentary evidence/drawings etc.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:21/10/80-ALC2/2019 Party Name: AUTO TECH Meet No/Date:22/80- Status:<br>INDUSTRIES (INDIA) PVT. ALC2/2019 Deferred<br>LTD. 28.02.2020<br>HQ File RLA File Lic.No/Date:0410166015 Pending<br>:01/80/050/00159/AM20/ :04/24/040/00091/AM20/ 28.08.2019 with Firm<br>90<br>Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain<br>information as raised by DHI was sent to the firm on 14.01.2020. However, no reply has been received yet.<br>Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

to remind the firm for furnishing the requisite information within 15 days.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:22/10/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:22/80- Status:<br>ENGINEERING LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0510411660 Pending<br>:01/80/050/00160/AM20/ :05/23/040/00208/AM20/ 28.08.2019 with DHI<br>91<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to DHI<br>on 26.02.2020 for examination of the case. However, no comments have been received yet. Hence, the<br>Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

26 | P a g e

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:36/11/80-ALC2/2004 Party Name: PAHARPUR Meet No/Date:22/80- Status:<br>COOLING TOWERS LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0210209409 RA/Firm<br>:01/80/050/00162/AM20/ :02/24/040/00081/AM20/ 02.09.2019<br>92<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Kolkata & the firm .

0081/AM20/ 02.09.2019<br>92<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Kolkata & the firm . Therefore, the Committee decided to request from RA,<br>Kolkata and the firm to furnish the hard copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:38/11/80-ALC2/2004 Party Name: HANNING Meet No/Date:22/80- Status:<br>MOTORS INDIA P LTD ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date: 3410045416 RA/Firm<br>:01/80/050/00164/AM20/ :34/24/040/00169/AM20/ 04.09.2019<br>93<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Vadodara & the firm . Therefore, the Committee decided to request from RA,<br>Vadodara and the firm to furnish the hard copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 225] intentionally omitted <==

the firm to furnish the hard copy of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 225] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/12/80-ALC2/2019 Party Name: AYYAPPA CNC Meet No/Date:22/80- Status:<br>PVT LTD ALC2/2019 & 28.02.2020 Approved<br>HQ File RLA File Lic.No/Date:0710115448<br>:01/80/050/00173/AM20/ :07/24/040/00135/AM20/ 18.09.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms as per written<br>comments of MSME as under:<br>1. Quantity of relevant import items at Sl. No. 1 may be allowed as 13717.7 Kg inclusive of 590%<br>94 wastage after 15% recovery.<br>2. Quantity of relevant import items at Sl. No. 2 may be allowed as 1370 Kg inclusive of 132% wastage<br>after 15% recovery.<br>3. Quantity of relevant import items at Sl. No. 3 may be allowed as 2657 Kg inclusive of 608% wastage<br>after 15% recovery.<br>4. Quantity of relevant import items at Sl. No. 4 may be allowed as 432 Kg inclusive of 11.2% wastage<br>after 15% recovery.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:2/12/80- Party Name: HEURTEY Meet No/Date:22/80- Status:
ALC2/2019 PETROCHEM INDIA PVT. LTD. ALC2/2019 & 28.02.2020 Deferred
HQ File<br>:01/80/050/00174/AM20/ RLA File :34/24/040/00185/AM20/ Lic.No/Date:3410045459<br>19.09.2019 Pending with<br>DPIIT

19**||PETROCHEM INDIA PVT. LTD.||ALC2/2019 & 28.02.2020||Deferred| |HQ File<br>:01/80/050/00174/AM20/||RLA File :34/24/040/00185/AM20/||Lic.No/Date:3410045459<br>19.09.2019||Pending with<br>DPIIT|

95 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT for examination of the case on 24.02.2020. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

27 | P a g e

==> picture [476 x 290] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/12/80-ALC2/2019 Party Name: FINE PAC Meet No/Date:22/80- Status:<br>STRUCTURES PRIVATE ALC2/2019 Approved<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:3110067537<br>:01/80/050/00175/AM20/ :31/83/040/00088/AM20/ 20.09.2019<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms as per written<br>comments of MSME as under:<br>1. Quantity of relevant import item at Sl. No. 1 may be allowed as 2853 Kg inclusive of 19.5% wastage<br>after 1/3rd recovery.<br>2. Quantity of relevant import item at Sl. No. 2 may be allowed as 5057 Kg inclusive of 18.3% wastage<br>96<br>after 1/3rd recovery.<br>3. Quantity of relevant import item at Sl. No. 3 may be allowed as 448 Kg inclusive of 14.6% wastage<br>after 1/3rd recovery.<br>4. Quantity of relevant import item at Sl. No. 4 may be allowed as 217 Kg inclusive of 9.6% wastage after<br>1/3rd recovery.<br>5. Quantity of relevant import item at Sl. No.

after 1/3rd recovery.<br>4. Quantity of relevant import item at Sl. No. 4 may be allowed as 217 Kg inclusive of 9.6% wastage after<br>1/3rd recovery.<br>5. Quantity of relevant import item at Sl. No. 5 may be allowed as 430 Kg inclusive of 13.6% wastage<br>after 1/3rd recovery.<br>6. Quantity of relevant import items at Sl. No. 6 to 19 may be allowed as per GN-4.<br>7. Quantity of relevant import item at Sl. No. 20 may be allowed at 1% of FOB value.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.: Party Name: FREUDENBERG Meet No/Date:22/80- Status:
4/12/80-ALC2/2019 FILTRATION TECHNOLOGIES ALC2/2019 Deferred
INDIA PVT. LTD. 28.02.2020
HQ File<br>:01/80/050/00176/AM20/ RLA File :31/83/040/00008/AM20/ Lic.No/Date:3110067543<br>24.09.2019 RA/Firm

97

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 176] intentionally omitted <==

. Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 176] intentionally omitted <==

----- Start of picture text -----<br> Case No.:5/12/80-ALC2/2019 Party Name: GODREJ & Meet No/Date:22/80- Status:<br>BOYCE MFG. CO. LTD., ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0310831805 Send D/L<br>:01/80/050/00177/AM20/ :03/94/040/00480/AM20/ 25.09.2019<br>Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the<br>98 following information as per advice of Consultant (Tech-3):<br>1. Detail technical note on manufacturing process including the relevant flow sheet.<br>2. Detail technical drawings with dimension of each export product, Catalogue, if any, may also be<br>furnished.<br>3. Weight of each Export Product.<br>4. Weight of each of the imported and indigenous input, separately for each product, for the purpose of<br>material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input<br>----- End of picture text -----<br>

28 | P a g e

  • in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

ted. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.

  1. Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.

  2. Sheet layout diagram of the material indicating the wastage during blanking.

  3. Use of export product.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.: Party Name: VICTORA AUTO PVT. Meet No/Date:22/80- Status:<br>6/12/80-ALC2/2019 LTD. ALC2/2019 & 28.02.2020 Deferred<br>HQ File RLA File :05/24/040/00338/AM20/ Lic.No/Date:0510411950 RA/Firm<br>:01/80/050/00178/AM20/ 25.09.2019<br>99 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 29.11.2019<br>followed by a reminder on 16.01.2020. However, no information has been received yet. Therefore, the<br>Committee decided to remind again RA, New Delhi & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

gain RA, New Delhi & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/12/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:22/80- Status:<br>PVT. LTD. ALC2/2019 & 28.02.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510411951 RA/Firm<br>:01/80/050/00179/AM20/ :05/24/040/00340/AM20/ 25.09.2019<br>100 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 29.11.2019<br>followed by a reminder on 16.01.2020. However, no information has been received yet. Therefore, the<br>Committee decided to remind again RA, New Delhi & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 154] intentionally omitted <==

gain RA, New Delhi & the firm for submitting the complete set of application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 154] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:22/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0910068046 RA/Firm<br>:01/80/050/00180/AM20/ :09/24/040/00336/AM20/ 27.09.2019<br>101 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 29.11.2019<br>followed by a reminder on 16.01.2020. However, no information has been received yet. Therefore, the<br>Committee decided to remind again RA, Hyderabad & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

29 | P a g e

Case No.:10/12/80-ALC2/2019 Party Name: AUTO TECH Meet No/Date:22/80- Status:
INDUSTRIES INDIA PVT LTD ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00182/AM20/ RLA File<br>:04/24/040/00105/AM20/ Lic.No/Date:0410166124<br>01.10.2019 Pending<br>with Firm

NDUSTRIES INDIA PVT LTD||ALC2/2019||Deferred| |||||28.02.2020||| |HQ File<br>:01/80/050/00182/AM20/||RLA File<br>:04/24/040/00105/AM20/||Lic.No/Date:0410166124<br>01.10.2019||Pending<br>with Firm|

102 Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 14.01.2020. However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the requisite information within 15 days.

Case is deferred.

Case No.:11/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:22/80- Status: ENGINEERING PRIVATE ALC2/2019 Deferred LIMITED 28.02.2020 HQ File RLA File Lic.No/Date:0910068052 RA/Firm :01/80/050/00183/AM20/ :09/24/040/00345/AM20/ 01.10.2019

103 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Hyderabad & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

refore, the Committee decided to remind again RA, Hyderabad & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:12/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:22/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0910068053 RA/Firm<br>:01/80/050/00184/AM20/ :09/24/040/00344/AM20/ 01.10.2019<br>104 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 29.11.2019<br>followed by a reminder on 16.01.2020. However, no information has been received yet. Therefore, the<br>Committee decided to remind again RA, Hyderabad & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

n RA, Hyderabad & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:13/12/80-ALC2/2019 Party Name: AZAD Meet No/Date:22/80- Status:<br>ENGINEERING PRIVATE ALC2/2019 Deferred<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0910068054 RA/Firm<br>:01/80/050/00185/AM20/ :09/24/040/00346/AM20/ 01.10.2019<br>105 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 29.11.2019<br>followed by a reminder on 16.01.2020. However, no information has been received yet. Therefore, the<br>Committee decided to remind again RA, Hyderabad & the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

30 | P a g e

==> picture [476 x 144] intentionally omitted <==

the firm for submitting the complete set of<br>application.<br>Case is deferred.<br>----- End of picture text -----<br>

30 | P a g e

==> picture [476 x 144] intentionally omitted <==

----- Start of picture text -----<br> Case No.:1/14/80-ALC2/2019 Party Name: MITA INDIA Meet No/Date:22/80- Status:<br>PRIVATE LIMITED ALC2/2019 Approved<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0510412156<br>:01/80/050/00197/AM20/ :05/24/040/00388/AM20/ 17.10.2019<br>106<br>Decision: The Committee considered the case as per agenda and decided to ratify the norms as per written<br>comments of MSME as under:<br>1. Quantity of relevant import items may be allowed as per GN-4.<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:2/14/80-ALC2/2019 Party Name: MICRON Meet No/Date:22/80- Status:<br>INSTRUMENTS PVT LTD ALC2/2019 Approved<br>28.02.2020<br>HQ File RLA File Lic.No/Date:0510412157<br>107 :01/80/050/00198/AM20/ :05/24/040/00392/AM20/ 17.10.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of DPIIT vide U. O. No.: P-47011/14/2020-TSW dated 17.02.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

DPIIT vide U. O. No.: P-47011/14/2020-TSW dated 17.02.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

Case No.:3/14/80-ALC2/2019 Party Name: LOTUS Meet No/Date:22/80- Status:
AVIATION TECHNOLOGY ALC2/2019 Deferred
PRIVATE LIMITED 28.02.2020
HQ File<br>:01/80/050/00199/AM20/ RLA File<br>:05/23/040/00283/AM20/ Lic.No/Date:0510412171<br>17.10.2019 RA/Firm

108 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, New Delhi & the firm for submitting the complete set of application.

Case is deferred.

Case No.:4/14/80-ALC2/2019 Party Name: NIDEC INDIA Meet No/Date:22/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00200/AM20/ RLA File<br>:05/24/040/00403/AM20/ Lic.No/Date:0510412197<br>21.10.2019 Send D/L

109 Decision: : The Committee considered the case as per agenda and decided to ask from the firm to furnish following information as per written comments of MSME :

  1. Manufacturing flow chart with step-wise wastage and justification.

Case is deferred.

31 | P a g e

110

the firm to furnish following information as per written comments of MSME :

  1. Manufacturing flow chart with step-wise wastage and justification.

Case is deferred.

31 | P a g e

110

Case No.:5/14/80-ALC2/2019 Party Name: TEGA Meet No/Date:22/80- Status:
INDUSTRIES LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00201/AM20/ RLA File<br>:02/24/040/00100/AM20/ Lic.No/Date:0210209491<br>22.10.2019 Pending<br>with Tech 1

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-1) on 20.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

111

Case No.:6/14/80-ALC2/2019 Party Name: TEGA Meet No/Date:22/80- Status:
INDUSTRIES LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00202/AM20/ RLA File<br>:02/24/040/00107/AM20/ Lic.No/Date:0210209503<br>23.10.2019 Pending with<br>Tech 1

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to Consultant (Tech-1) on 20.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

xamination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

==> picture [476 x 66] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/14/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:22/80- Status:<br>PRIVATE LIMITED ALC2/2019 Deferred<br>28.02.2020<br>HQ File RLA File Lic.No/Date:3110067581 RA/Firm<br>:01/80/050/00203/AM20/ :31/83/040/00096/AM20/ 23.10.2019<br>----- End of picture text -----<br>

112 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 119] intentionally omitted <==

. Therefore, the Committee decided to remind again RA, Pune & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 119] intentionally omitted <==

----- Start of picture text -----<br> Case No.:8/14/80-ALC2/2019 Party Name: HINDUSTAN Meet No/Date:22/80- Status:<br>RUBBER INDUSTRIES ALC2/2019 & 28.02.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510412270 Pending<br>:01/80/050/00204/AM20/ :05/23/040/00294/AM20/ 25.10.2019 with Tech 1<br>113<br>Decision: The Committee considered the case as per the agenda and noted that the firm’s reply was sent to<br>Consultant (Tech-1) on 27.02.2020 for examination of the case. However, no comments have been received<br>yet. Hence, the Committee decided to wait for the comments.<br>Case is deferred.<br>----- End of picture text -----<br>

32 | P a g e

Case No.:9/14/80- Party Name: HITAISHI KK Meet No/Date:22/80- Status:
ALC2/2019 MANUFACTURING COMPANY ALC2/2019 Deferred
PRIVATE LIMITED 28.02.2020
HQ File<br>:01/80/050/00205/AM20/ RLA File :02/24/040/00111/AM20/ Lic.No/Date:0210209515<br>28.10.2019 RA/Firm

*||MANUFACTURING COMPANY||ALC2/2019||Deferred| |||PRIVATE LIMITED||28.02.2020||| |HQ File<br>:01/80/050/00205/AM20/||RLA File :02/24/040/00111/AM20/||Lic.No/Date:0210209515<br>28.10.2019||RA/Firm|

114 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Kolkata & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Kolkata & the firm for submitting the complete set of application.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/14/80-ALC2/2019 Party Name: TENOVA INDIA Meet No/Date:22/80- Status:<br>PRIVATE LIMITED ALC2/2019 & 28.02.2020 Deferred<br>HQ File RLA File Lic.No/Date:0710115616 Send D/L<br>:01/80/050/00206/AM20/ :07/24/040/00154/AM20/ 28.10.2019<br>115 Decision: The Committee considered the case as per the agenda and the representative of DHI informed in<br>meeting that the firm has not given any calculations. Hence, in the absence of the calculations, it is not possible<br>to comments on the merit of the proposal of wastage at 12% wastage. Therefore, the Committee decided to ask<br>the same from the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

116

nts on the merit of the proposal of wastage at 12% wastage. Therefore, the Committee decided to ask<br>the same from the firm.<br>Case is deferred.<br>----- End of picture text -----<br>

116

Case No.:11/14/80-ALC2/2019 Party Name: FERRA Meet No/Date:22/80- Status:
AEROSPACE PRIVATE ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00207/AM20/ RLA File<br>:07/24/040/00164/AM20/ Lic.No/Date:0710115617<br>29.10.2019 Pending<br>with MSME

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to MSME on 17.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Case No.: Party Name: MELSTAR Meet No/Date:22/80- Status:
12/14/80-ALC2/2019 MANUFACTURING SYSTEMS ALC2/2019 Deferred
PRIVATE LIMITED 28.02.2020
HQ File<br>:01/80/050/00208/AM20/ RLA File :07/24/040/00156/AM20/ Lic.No/Date:0710115619<br>29.10.2019 RA/Firm

117

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm and in this regard an email was sent on 29.11.2019 followed by a reminder on 16.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Bangalore & the firm for submitting the complete set of application.

reminder on 16.01.2020. However, no information has been received yet. Therefore, the Committee decided to remind again RA, Bangalore & the firm for submitting the complete set of application.

Case is deferred.

\

33 | P a g e

Case No.:1/16/80-ALC2/2019 Party Name: AYYAPPA CNC Meet No/Date:22/80- Status:
PVT. LTD. ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00211/AM20/ RLA File<br>:07/24/040/00170/AM20/ Lic.No/Date:0710115658<br>08.11.2019 RA/Firm

118 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Bangalore & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 25.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:2/16/80-ALC2/2019 Party Name: STERLITE Meet No/Date:22/80- Status:
POWER TRANSMISSION ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00212/AM20/ RLA File<br>:03/95/040/00761/AM20/ Lic.No/Date:0310832682<br>08.11.2019 RA/Firm

--|---| |||POWER TRANSMISSION||ALC2/2019||Deferred| |||LIMITED||28.02.2020||| |HQ File<br>:01/80/050/00212/AM20/||RLA File<br>:03/95/040/00761/AM20/||Lic.No/Date:0310832682<br>08.11.2019||RA/Firm|

119 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 20.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:3/16/80-ALC2/2019 Party Name: SAMIRI Meet No/Date:22/80- Status:<br>EQUIPMENTS & ENGINEERS ALC2/2019 Deferred<br>PVT.LTD. 28.02.2020<br>HQ File RLA File Lic.No/Date:0310832707 RA/Firm<br>:01/80/050/00213/AM20/ :03/95/040/00758/AM20/ 11.11.2019<br>120<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 01.01.2020<br>followed by a reminder on 26.02.2020. However, no information has been received yet. Hence, the Committee<br>decided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

ation has been received yet. Hence, the Committee<br>decided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:5/16/80-ALC2/2019 Party Name: LM WIND POWER Meet No/Date:22/80- Status:
BLADES INDIA PVT. LTD ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00215/AM20/ RLA File<br>:34/24/040/00242/AM20/ Lic.No/Date:3410045605<br>13.11.2019 RA/Firm

121 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 25.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

34 | P a g e

Case No.:4/16/80-ALC2/2019 Party Name: BLISS ANAND Meet No/Date:22/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00214/AM20/ RLA File<br>:05/23/040/00311/AM20/ Lic.No/Date:0510412485<br>14.11.2019 RA/Firm

|---|---|---|---| |||PRIVATE LIMITED||ALC2/2019||Deferred| |||||28.02.2020||| |HQ File<br>:01/80/050/00214/AM20/||RLA File<br>:05/23/040/00311/AM20/||Lic.No/Date:0510412485<br>14.11.2019||RA/Firm|

122 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 25.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

Case No.:6/16/80-ALC2/2019 Party Name: NUCON Meet No/Date:22/80- Status:
AEROSPACE PVT LTD ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00216/AM20/ RLA File<br>:09/24/040/00409/AM20/ Lic.No/Date:0910068185<br>14.11.2019 RA/Firm

123 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

s been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 140] intentionally omitted <==

----- Start of picture text -----<br> Case No.:7/16/80-ALC2/2019 Party Name: MATRIX Meet No/Date:22/80- Status:<br>CUTTING TOOLS PRIVATE ALC2/2019 Deferred<br>LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0510412508 RA/Firm<br>:01/80/050/00217/AM20/ :05/24/040/00480/AM20/ 15.11.2019<br>124<br>Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020<br>followed by a reminder on 26.02.2020. However, no information has been received yet. Hence, the Committee<br>decided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

Case No.:8/16/80-ALC2/2019 Party Name: DILIGENT SCM Meet No/Date:22/80- Status:
SOLUTIONS PRIVATE ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00218/AM20/ RLA File<br>:09/24/040/00408/AM20/ Lic.No/Date:0910068192<br>18.11.2019 RA/Firm

---|---| |||SOLUTIONS PRIVATE||ALC2/2019||Deferred| |||LIMITED||28.02.2020||| |HQ File<br>:01/80/050/00218/AM20/||RLA File<br>:09/24/040/00408/AM20/||Lic.No/Date:0910068192<br>18.11.2019||RA/Firm|

125 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Hyderabad & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 25.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

35 | P a g e

Case No.:9/16/80-ALC2/2019 Party Name: KUVAWALA Meet No/Date:22/80- Status:
CORE DRILL EQUIPMENT ALC2/2019 Deferred
PVT. LTD. 28.02.2020
HQ File<br>:01/80/050/00219/AM20/ RLA File<br>:03/94/040/00644/AM20/ Lic.No/Date:0310832842<br>18.11.2019 RA/Firm

126 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 26.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

s been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:10/16/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:22/80- Status:<br>PVT. LTD. ALC2/2019 & 28.02.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510412549 RA/Firm<br>:01/80/050/00220/AM20/ :05/24/040/00462/AM20/ 19.11.2019<br>127 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020<br>followed by a reminder on 25.02.2020. However, no information has been received yet. Hence, the Committee<br>decided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

cided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 153] intentionally omitted <==

----- Start of picture text -----<br> Case No.:11/16/80-ALC2/2019 Party Name: GRADUATE Meet No/Date:22/80- Status:<br>AGRO & MECHANICAL ALC2/2019 Deferred<br>ENGINEERS 28.02.2020<br>HQ File RLA File Lic.No/Date:5010002587 RA/Firm<br>:01/80/050/00221/AM20/ :50/24/040/00013/AM20/ 19.11.2019<br>128 Decision: The Committee considered the case as per the agenda and observed that the firm has asked for<br>certain amendments after issuance of Advance Authorization. The Committee wanted to know as to whether<br>the RA has made any amendments in the authorization or not and in this regard an email was sent to RA,<br>Nagpur on 23.01.2020. However, no information has been received yet. Therefore, the Committee decided to<br>remind RA, Nagpur for submitting the requisite information.<br>Case is deferred.<br>----- End of picture text -----<br>

129

Case No.:13/16/80-ALC2/2019 Party Name: OAM SAAI Meet No/Date:22/80- Status:*
INTERNATIONAL INC. ALC2/2019 & 28.02.2020 Deferred
HQ File<br>:01/80/050/00223/AM20/ RLA File<br>:05/24/040/00479/AM20/ Lic.No/Date:0510412570<br>21.11.2019 Pending<br>with DPIIT

---| ||||INTERNATIONAL INC.||ALC2/2019 & 28.02.2020||Deferred| ||HQ File<br>:01/80/050/00223/AM20/||RLA File<br>:05/24/040/00479/AM20/||Lic.No/Date:0510412570<br>21.11.2019||Pending<br>with DPIIT|

Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 19.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

36 | P a g e

Case No.:14/16/80-ALC2/2019 Party Name: MICRON Meet No/Date:22/80- Status:
INSTRUMENTS PVT LTD ALC2/2019 & 28.02.2020 Deferred
HQ File<br>:01/80/050/00224/AM20/ RLA File<br>:05/24/040/00490/AM20/ Lic.No/Date:0510412571<br>21.11.2019 Pending<br>with DPIIT

130 Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DPIIT on 31.12.2019 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DPIIT for expediting the comments.

Case is deferred.

Case No.:15/16/80-ALC2/2019 Party Name: L&T-MHPS Meet No/Date:22/80- Status:
BOILERS PVT LTD ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00225/AM20/ RLA File<br>:03/95/040/00808/AM20/ Lic.No/Date:0310832929<br>21.11.2019 RA/Firm

|---|---|---|---| |||BOILERS PVT LTD||ALC2/2019||Deferred| |||||28.02.2020||| |HQ File<br>:01/80/050/00225/AM20/||RLA File<br>:03/95/040/00808/AM20/||Lic.No/Date:0310832929<br>21.11.2019||RA/Firm|

131 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Mumbai & the firm and in this regard an email was sent on 01.01.2020 followed by a reminder on 20.02.2020. However, no information has been received yet. Hence, the Committee decided to wait for the complete set of application for examination of the case.

Case is deferred.

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:16/16/80-ALC2/2019 Party Name: VALEO INDIA Meet No/Date:22/80- Status:<br>PRIVATE LIMITED ALC2/2019& 28.02.2020 Deferred<br>HQ File RLA File Lic.No/Date:0410166294 RA/Firm<br>:01/80/050/00226/AM20/ :04/24/040/00131/AM20/ 21.11.2019<br>132 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Chennai & the firm and in this regard an email was sent on 01.01.2020<br>followed by a reminder on 20.02.2020. However, no information has been received yet. Hence, the Committee<br>decided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 120] intentionally omitted <==

cided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 120] intentionally omitted <==

----- Start of picture text -----<br> Case No.:17/16/80-ALC2/2019 Party Name: LOTUS Meet No/Date:22/80- Status:<br>AVIATION TECHNOLOGY ALC2/2019 Approved<br>PRIVATE LIMITED 28.02.2020<br>HQ File RLA File Lic.No/Date:0510412636<br>133 :01/80/050/00227/AM20/ :05/23/040/00326/AM20/ 25.11.2019<br>Decision: The Committee considered the case as per the agenda and decided to ratify the ad-hoc norms as per<br>written comments of MeitY vide U. O. No.: 17(1)/2020-IPHW dated 27.02.2020. (Copy enclosed)<br>RA concerned may take further necessary action as per the decision of NC.<br>----- End of picture text -----<br>

37 | P a g e

==> picture [476 x 129] intentionally omitted <==

----- Start of picture text -----<br> Case No.:18/16/80-ALC2/2019 Party Name: VICTORA AUTO Meet No/Date:22/80- Status:<br>PVT. LTD ALC2/2019 & 28.02.2020 Deferred<br>HQ File RLA File Lic.No/Date:0510412651 RA/Firm<br>:01/80/050/00228/AM20/ :05/24/040/00499/AM20/ 26.11.2019<br>134 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020<br>followed by a reminder on 25.02.2020. However, no information has been received yet.

has<br>not yet been received from RA, New Delhi & the firm and in this regard an email was sent on 01.01.2020<br>followed by a reminder on 25.02.2020. However, no information has been received yet. Hence, the Committee<br>decided to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 130] intentionally omitted <==

----- Start of picture text -----<br> Case No.:19/16/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:22/80- Status:<br>PRIVATE LIMITED. ALC2/2019 & 28.02.2020 Deferred<br>HQ File RLA File Lic.No/Date:3110067611 RA/Firm<br>:01/80/050/00229/AM20/ :31/83/040/00115/AM20/ 26.11.2019<br>135 Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has<br>not yet been received from RA, Pune & the firm and in this regard an email was sent on 01.01.2020 followed<br>by a reminder on 26.02.2020. However, no information has been received yet. Hence, the Committee decided<br>to wait for the complete set of application for examination of the case.<br>Case is deferred.<br>----- End of picture text -----<br>

==> picture [476 x 66] intentionally omitted <==

-|---| ||||INSTRUMENTS PVT. LTD.||ALC2/2019 & 28.02.2020||Deferred| ||HQ File<br>:01/80/050/00332/AM20/||RLA File<br>:05/24/040/00712/AM20/||Lic.No/Date:0510413558<br>10.02.2020||Send to<br>DPIIT|

Decision: The Committee considered the case as per the agenda and decided to refer the case to DPIIT for examination & comments.

Case is deferred.

177

Case No.:7/22/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:22/80- Status:
ENGINEERING LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00333/AM20/ RLA File<br>:05/23/040/00429/AM20/ Lic.No/Date:0510413567<br>10.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

48 | P a g e

178

Case No.:8/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:22/80- Status:
MATTHEY INDIA PRIVATE ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00334/AM20/ RLA File<br>:05/23/040/00433/AM20/ Lic.No/Date:0510413568<br>10.02.2020 RA/Firm

| ||||MATTHEY INDIA PRIVATE||ALC2/2019||Deferred| ||||LIMITED||28.02.2020||| ||HQ File<br>:01/80/050/00334/AM20/||RLA File<br>:05/23/040/00433/AM20/||Lic.No/Date:0510413568<br>10.02.2020||RA/Firm|

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

179

Case No.:9/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:22/80- Status:
MATTHEY INDIA PRIVATE ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00335/AM20/ RLA File<br>:05/23/040/00434/AM20/ Lic.No/Date:0510413570<br>10.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

180

Case No.:10/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:22/80- Status:
MATTHEY INDIA PRIVATE ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00336/AM20/ RLA File<br>:05/23/040/00435/AM20/ Lic.No/Date:0510413571<br>10.02.2020 RA/Firm

| ||||MATTHEY INDIA PRIVATE||ALC2/2019||Deferred| ||||LIMITED||28.02.2020||| ||HQ File<br>:01/80/050/00336/AM20/||RLA File<br>:05/23/040/00435/AM20/||Lic.No/Date:0510413571<br>10.02.2020||RA/Firm|

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

181

Case No.:11/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:22/80- Status:
MATTHEY INDIA PRIVATE ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00337/AM20/ RLA File<br>:05/23/040/00436/AM20/ Lic.No/Date:0510413572<br>10.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

49 | P a g e

182

Case No.:12/22/80-ALC2/2019 Party Name: JOHNSON Meet No/Date:22/80- Status:
MATTHEY INDIA PRIVATE ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00338/AM20/ RLA File<br>:05/23/040/00437/AM20/ Lic.No/Date:0510413573<br>10.02.2020 RA/Firm

| ||||MATTHEY INDIA PRIVATE||ALC2/2019||Deferred| ||||LIMITED||28.02.2020||| ||HQ File<br>:01/80/050/00338/AM20/||RLA File<br>:05/23/040/00437/AM20/||Lic.No/Date:0510413573<br>10.02.2020||RA/Firm|

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

183

Case No.:13/22/80-ALC2/2019 Party Name: DEE Meet No/Date:22/80- Status:
DEVELOPMENT ENGINEERS ALC2/2019 Deferred
LIMITED 28.02.2020
HQ File<br>:01/80/050/00339/AM20/ RLA File<br>:05/23/040/00432/AM20/ Lic.No/Date:0510413575<br>10.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

184

Case No.:14/22/80-ALC2/2019 Party Name: ISGEC HEAVY Meet No/Date:22/80- Status:
ENGINEERING LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00340/AM20/ RLA File<br>:05/23/040/00428/AM20/ Lic.No/Date:0510413578<br>11.02.2020 RA/Firm

-|---|---| ||||ENGINEERING LIMITED||ALC2/2019||Deferred| ||||||28.02.2020||| ||HQ File<br>:01/80/050/00340/AM20/||RLA File<br>:05/23/040/00428/AM20/||Lic.No/Date:0510413578<br>11.02.2020||RA/Firm|

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

185

Case No.:15/22/80-ALC2/2019 Party Name: SULZER INDIA Meet No/Date:22/80- Status:
PRIVATE LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00341/AM20/ RLA File<br>:31/83/040/00145/AM20/ Lic.No/Date:3110067680<br>11.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm . Therefore, the Committee decided to request from RA, Pune and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

50 | P a g e

186

Case No.:16/22/80-ALC2/2019 Party Name: MICRON Meet No/Date:22/80- Status:
INSTRUMENTS PVT. LTD. ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00342/AM20/ RLA File<br>:05/24/040/00719/AM20/ Lic.No/Date:0510413598<br>12.02.2020 RA/Firm

---|---| ||||INSTRUMENTS PVT. LTD.||ALC2/2019||Deferred| ||||||28.02.2020||| ||HQ File<br>:01/80/050/00342/AM20/||RLA File<br>:05/24/040/00719/AM20/||Lic.No/Date:0510413598<br>12.02.2020||RA/Firm|

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

187

Case No.:17/22/80-ALC2/2019 Party Name: LM WIND Meet No/Date:22/80- Status:
POWER BLADES INDIA PVT. ALC2/2019 Deferred
LTD 28.02.2020
HQ File<br>:01/80/050/00343/AM20/ RLA File<br>:34/24/040/00355/AM20/ Lic.No/Date:3410045867<br>12.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Vadodara & the firm . Therefore, the Committee decided to request from RA, Vadodara and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

188

Case No.:18/22/80-ALC2/2019 Party Name: SCHOCH REEDS Meet No/Date:22/80- Status:
INDIA PRIVATE LIMITED ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00344/AM20/ RLA File<br>:31/83/040/00152/AM20/ Lic.No/Date:3110067684<br>13.02.2020 RA/Firm

---|---| ||||INDIA PRIVATE LIMITED||ALC2/2019||Deferred| ||||||28.02.2020||| ||HQ File<br>:01/80/050/00344/AM20/||RLA File<br>:31/83/040/00152/AM20/||Lic.No/Date:3110067684<br>13.02.2020||RA/Firm|

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, Pune & the firm . Therefore, the Committee decided to request from RA, Pune and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

189

Case No.:19/22/80-ALC2/2019 Party Name: HFCL LIMITED Meet No/Date:22/80- Status:
ALC2/2019 Deferred
28.02.2020
HQ File<br>:01/80/050/00345/AM20/ RLA File<br>:05/23/040/00443/AM20/ Lic.No/Date:0510413626<br>14.02.2020 RA/Firm

Decision: The Committee considered the case as per the agenda and noted that the hard copy of application has not yet been received from RA, New Delhi & the firm . Therefore, the Committee decided to request from RA, New Delhi and the firm to furnish the hard copy of application for examination of the case.

Case is deferred.

51 | P a g e

Sl. No. 707

Case No. :9/15/80-ALC2/2017<br>Status:
GODREJ & BOYCE MFG. CO. LTD<br>Approved<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020
Lic. No.: 0310815049 Dated 07.08.2017
HQ. No.: 01/80/050/00263/AM18<br>**Subject:**Request for re-fixation of ad-hoc
norms<br>RLA No.: 03/94/040/00379/AM18
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in M. No. 03/80
dated 09.05.2018 on the recommendation ofDPIIT. However, the firm vide letter dated 05.10.2018 requested for
re-fixation of ad-hoc norms.
The Committee reconsidered the case and noted that earlier the case was ratified as per SION C-1647 & GN-4.
The firm had requested for fixation of ad-hoc norms as per Para 4.07 instead of SION C-1647. The Committee
noted that C-1647 would not be applicable and therefore decided torevisethe ad-hoc norms as per written
comments ofDPIITvide U. O. No.: P-47011/268/2018-TSW dated 04.02.2020. (Copy enclosed)
RA concerned maytake further necessaryaction asper the decision of NC.

Sl. No. 708

Sl. No. 708
Case No. :35/20/80-ALC2/2017 Status:
TINITA ENGINEERING PVT. LTD.<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020<br>Lic. No.: 0310818442 Dated 11.01.2018 Deferred
HQ. No.: 01/80/050/00399/AM18<br>**Subject:**Request for fixation of ad-hoc norms Pending
RLA No.: 03/95/040/00851/AM18 with DPIIT
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in M. No. 05/80
dated 06.06.2019 due to non-submission of reply of deficiency letter dated 15.01.2019. However, the firm
furnished the reply vide email dated 25.07.2019 with a request to fix the ad-hoc norms.
The Committee reconsidered the case and noted that the firm’s representation was forwarded toDPIIT
on 10.01.2020 for examination of the case. However, no comments have been received yet. Therefore, the
Committee decided toremind DPIITfor expediting the comments.
Case is deferred.

Sl. No. 709

Case No. :6/13/80-ALC2/2017<br>BOMBARDIER TRANSPORTATION<br>INDIA PRIVATE LTD.<br>Status:<br>Deferred<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020<br>Lic. No.: 3410042477 Date: 30.08.2016
HQ. No.: 01/80/050/00242/AM18<br>**Subject:**Request for re-fixation of ad-hoc<br>Pending
norms<br>with Firm<br>RLA No.: 34/21/040/00306/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in M. No.16/80-
ALC2/2017 dated 14.11.2017as per written comments of DHI I.D No. TSWB 3/80/2017 dated 29.11.2017.
However, the firm has requested for re-fixation of ad-hoc norms.
The Committee reconsidered the case and noted that a deficiency letter seeking justification as raised by
DHIwas tried sending to firm on 21.01.2020 but due to system error could not be delivered. Therefore, the
Committee decided to send the said deficiencies through post to the firm**.**
Case is deferred.

52 | P a g e

Sl. No. 710

Sl. No. 710
Case No. :64/11/80-ALC2/2018 Status:
M. No.: 22/80-ALC2/2019 dated 28.02.2020 IND-SPHINX PRECISION LTD Deferred
Lic. No.: 2210015975 Date: 13.09.2018
HQ. No.: 01/80/050/00255/AM19 **Subject:**Request for re-fixation of ad-hoc PH
RLA No.: 22/24/040/00048/AM19 norms
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting
No.13/80-ALC2/2018 dated 22.01.2019on repeat basis as approved for AA No. 2210015101 dated 10.10.2014 on
the recommendation of the representative of DHI. However, the firm has requested for re-fixation of ad-hoc norms.
The Committee reconsidered the case and decided to call the firm for personal hearing to explain the before
Norms Committee in the forthcoming NC meeting as per advice of representative of the MSME.
Case is deferred.

Sl. No. 711

Sl. No. 711
Case No. :52/25/80-ALC2/2016<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020<br>Lic. No.: 0410162359 Date: 07.10.2016 EXCELLENT HI-CARE PRIVATE<br>LIMITED Status:<br>Deferred
HQ. No.: 01/80/050/00621/AM17 **Subject:**Request for fixation of ad-hoc norms Send to
RLA No.: 04/24/040/00105/AM17 Tech 1
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
14/80-ALC2/2017 dated 10.10.2017 due to non submission of reply ofdeficiency letter as raised by DEIT vide
letter No. 17 (20)/2017-IPHW dated 15.05.2017, 04.07.2017. However, the firm has requested for fixation of ad-
hoc norms.
The Committee reconsidered the case and decided to refer the case to**Consultant (Tech-1)**for
examination as per advice of representative of MeitY.
Case is deferred.

Sl. No. 712

Case No. :16/16/80-ALC2/2016<br>Status:
VEE KAY VIKRAM & CO LLP<br>Approved<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020<br>Lic. No.: 0810136711 Date: 11.12.2015
HQ. No.: 01/80/050/00391/AM17<br>**Subject:**Request for fixation of ad-hoc
norms<br>RLA No.: 08/24/040/00308/AM16
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.<br>17/80-ALC2/2017dated 19.12.2017 on the ground that the unit of measurement ofexport & import items are<br>different i.e. export items are in number and import items are in Kg. However, the firm has requested for fixation of<br>ad-hoc norms.<br> The Committee reconsidered the case and decided to ratify the ad-hoc norms as per written comments of<br>**Consultant (Tech-1)**as under:<br>Sl.<br>No.<br>ITCHS Code<br>Import Item Name.<br>Approved Norms<br>1<br>39095000<br>POLYURETHANE PREPOLYMER<br>As applied for with 2.75% wastage<br>2<br>29053910<br>CURATIVE(ADDITIVE)<br>As applied for with 2.75% wastage<br>Note: Net weight of Polyurethane part in the export should not be less than 14047.80 Kg.<br>RA concerned maytake further necessaryaction asper the decision of NC.

53 | P a g e

Sl. No. 713

Sl. No. 713
Case No. :30/3/80-ALC2/2014 Status:
M/s VIJAY TANKS & VESSELS<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020 Approved
LIMITED<br>Lic. No.: 3410039435 Date: 06.03.2014
HQ. No.: 01/80/050/00041/AM15<br>**Subject:**Request for re-fixation of ad-hoc
norms<br>RLA No.: 34/24/040/00286/AM14
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting
No.21/80-ALC2/2014 dated 06.01.2015as per written comments of DIPP vide Note No. 12/1/2015-TSW/22 dated
06.01.2015 and on firm’s request case was again re-ratified based on written comments of DIPP vide Note No.
12/94/2015-TSW/13 dated 18.08.2015 in Meeting 10/16 dated 17.08.2015. However, the firm has again requested
for reviewing the earlier decisions stating that few of the items have been mistakenly omitted in the revised norms.
The Committee reconsidered the case and decided torevisethe ad-hoc norms as per written comments ofDPIIT
vide U. O. No.: P-47011/285/2019-TSW dated 31.01.2020. (Copy enclosed)
RA concerned maytake further necessaryaction asper the decision of NC.

Sl. No. 714

Sl. No. 714
Case No. :17/19/80-ALC2/2014 Status:
M. No.: 22/80-ALC2/2019 dated 28.02.2020<br>Lic. No.: 2210015101 Date: 10.10.2014 M/s IND-SPHINX PRECISION LTD. Deferred
HQ. No.: 01/80/050/00451/AM15 **Subject:**Request for re-fixation of ad-hoc PH
RLA No.: 22/24/040/00056/AM15 norms
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
22/80-ALC2/2015 dated 02.02.2016as per written comments ofMSMEvide ID Note No. 30 (199)/15-ME dated
30.12.2015.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case
and decided to call the firm forpersonal hearingto explain the before Norms Committee in the forthcoming NC
meeting as per advice of representative of theMSME.
Case is deferred.

Sl. No. 715

Sl. No. 715
Case No. :8/5/80-ALC2/2017 Status:
M. No.: 22/80-ALC2/2019 dated 28.02.2020<br>Lic. No.: 0510402055 Date: 24.03.2017 M/s OAM SAAI INTERNATIONAL INC. Deferred
HQ. No.: 01/80/050/00069/AM18 **Subject:**Request for fixation of ad-hoc norms Pending
RLA No.: 05/24/040/00649/AM17 with MSME
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
17/80-ALC2/2017 dated 19.12.2017on the ground that the export and import item are same.
However, the firm has requested for fixation of ad-hoc norms. The Committee considered the case and
noted that the firm’s representation was referred to MSMEfor examination of the case on 09.10.2019 followed by
an ID reminder on 10.01.2020. However, no comments have been received yet. Therefore, the Committee decided
toremind MSMEfor expediting the comments.
Case is deferred.

54 | P a g e

Sl. No. 716

Sl. No. 716
Case No. :7/2/80-ALC2/2014 Status:
M/s TRANSASIA<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020<br>Lic. No.: 0310771504 Date: 24.02.2014 BIO MEDICALS LTD. Rejected
HQ. No.: 01/80/050/00007/AM15<br>**Subject:**Request for re-fixation of ad-hoc
RLA No.: 03/95/040/00849/AM14 norms
**Decision:**The Committee considered the case as per the agenda noted that the case was approved in Meeting No.
20/80-ALC2/2015dated05.01.2016 as per the written comments of DEIT vide U. O. No.: W-27/17/2014-IPHW
dated 08.12.2015.
However, the firm has requested for fixing the norms for one added item in existing list of import items,
viz.Optiplex 3020 Small From Factor CTOat serial No. 365 quantity as 200. The Committee decided to ask
from the firm to regularize the import of additional inputs.
RA concerned maytake further necessaryaction asper the decision of NC.

Sl. No. 717

Case No. :19/23/80-ALC2/2015<br>Status:
M/s STERLITE TECHNOLOGIES LTD.<br>Deferred<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020<br>Lic. No.: 0310799243 Date: 06.10.2015
HQ. No.: 01/80/050/00432/AM16<br>**Subject:**Request for fixation of ad-hoc norms<br>Pending
with MeitY<br>RLA No.: 03/95/040/00427/AM16
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
15/80-ALC2/2016dated 25.10.2016due to non submission reply of deficiency letter dated 21.06.2016 (raised by
DEIT).
However, the firm has requested for re-fixation of ad-hoc norms. The Committee considered the case
and noted that the firm’s representation was referred toMeitYfor examination of the case on 07.10.2019 followed
by an ID reminder on 20.01.2020. However, the representative of MeitY requested to send again the complete set
of application/representation to MeitY. Hence, the Committee decided to send again a copy of representation to
MeitY.
Case is deferred.

Sl. No. 718

Case No. 56/19/80-ALC2/2017<br>Case No. 18/3/80-ALC2/2018<br>Case No. 50/11/80-ALC2/2018<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020 M/s AUTO COMP INDIA PVT. LTD.
Lic. No. /date: 3110066941 dated 20.12.2017<br>Lic. No. /date: 3110067004 dated 15.03.2018<br>Lic. No. /date: 3110067175 dated 12.09.2018 Status:<br>Deferred
HQ. No. 01/80/050/00337/AM18<br>HQ. No. 01/80/050/00018/AM19<br>HQ. No .01/80/050/00241/AM19 Subject:Request for re-fixation of ad-hoc<br>norms in respect of 3 AA issued toM/s AUTO Pending<br>with DHI
RLA No. 31/83/040/00109/AM18<br>RLA No. 31/83/040/00166/AM18<br>RLA No.31/83/040/00090/AM19 **COMP INDIA PVT. LTD.,**under Para 4.7 of<br>HBP (Vol.-I) – reg.
Decision:
i.)<br>In respect of Lic. No. /date: 3110066941 Date: 20.12.2017
The Committee considered the case as per the agenda and noted that the case was rejected the norms
by NC in its4/80-ALC2/2018 dated 23.05.2018, 3/80-ALC2/2018 dated 09.05.2018 andas import
item description is not clear Advance Authorizations allowed only for specific import item.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case

55 | P a g e

and the firm’s reply was sent to DHI on 19.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

ii.) In respect of Lic. No. /date: 3110067004 dated 15.03.2018

or examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

ii.) In respect of Lic. No. /date: 3110067004 dated 15.03.2018

The Committee considered the case as per agenda and the case was ratified in meeting No. 3/80ALC2/2018 dated 09.05.2018 on the recommendation of technical representatives of DHI, DIPP and MSME.

However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and the firm’s reply was sent to DHI on 19.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

iii.) In respect of Lic. No. /date: 3110067175 dated 12.09.2018

The Committee considered the case as per agenda and the case was ratified in meeting No. 3/80ALC2/2018 dated 09.05.2018 as per the written comments of DHI vide U. No. No. DESI/AIPL/HIC-1-2018-HEI dated 20.12.2018.

However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case and the firm’s reply was sent to DHI on 19.02.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.

Case is deferred.

Sl. No. 719

Sl. No. 719
Case No.13/5/80-ALC2/2017<br>Case No.29/19/80-ALC2/2016<br>Case No.8/14/80-ALC2/2018
M/s SENIOR INDIA PRIVATE LIMITED<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020<br>Adv. Lic. No. 0510402202 dated 12.04.2017<br>Adv. Lic. No. 0510399661 dated 08.09.2016<br>Adv. Lic. No. 0510409022 dated 20.12.2018 Status:<br>Deferred
HQ. No. 01/80/050/00074/AM18<br>HQ. No. 01/80/050/00424/AM17<br>HQ. No. 01/80/050/00324/AM19<br>Subject:Request for re-fixation of ad-hoc<br>norms in respect of 3 AA issued toM/s<br>SENIOR INDIA PRIVATE LIMITED, Pending<br>with DPIIT
under Para 4.7 of HBP (Vol.-I) – reg.<br>RLA No. 05/24/040/00012/AM18<br>RLA No. 05/24/040/00288/AM17<br>RLA No. 05/24/040/00435/AM19
**Decision:**The Committee considered the case as per the agenda noted that the above three cases were approved by
NC<br>in<br>Meeting<br>No.<br>8/80<br>dated<br>18.07.2017,<br>Meeting<br>No. 22/80<br>dated
31.01.2017 and Meeting No. 06/80 dated 03.07.2019 as per the written comments of DIPP letter no. 12/54/2017-
TSW/105 dated 18.7.2017, written comments of DIPP vide UO No. 12/6/2017-TSW/56 dated 31.01.2017 and
written comments of DPIIT vide U.O. No.: P-47011/416/2018-TSW dated 03.07.2019 respectively.
However, the firm has requested for re-viewing of ad-hoc norms. The Committee reconsidered the case
and noted that firm’s reply was sent toDPIITon 30.01.2020.

dated 03.07.2019 respectively.|| |However, the firm has requested for re-viewing of ad-hoc norms. The Committee reconsidered the case|| |and noted that firm’s reply was sent toDPIITon 30.01.2020. However, no comments have been received yet.|| |Therefore, the Committee decided toremind DPIITfor expediting the comments.|| |Case is deferred.||

56 | P a g e

Sl. No. 720

Case No. :12/7/80-ALC2/2016<br>Status:
M/s HONDA TRADING CORPORATION<br>Deferred<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020
INDIA PVT. LTD.<br>Lic. No.: 0510398531 Date: 17.05.2016
HQ. No.: 01/80/050/00233/AM17<br>**Subject:**Request for fixation of ad-hoc norms<br>Pending
with Firm<br>RLA No.: 05/23/040/00053/AM17
**Decision:**The Committee considered the case as per the agenda noted that the case was rejected in Meeting No.
11/80 dated 19.08.2017 due to non submission reply of deficiency letter dated 26.04.2017 (raised byDHI).
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that a deficiency letter seeking certain information as raised by**Consultant (Tech-3)**was sent to the firm on
20.01.2020. However, no reply has been received yet. Therefore, the Committee decided to send final reminder to
the firm for furnishing the requisite information.
Case is deferred.

Sl. No. 721

Case No. :17/31/80-ALC2/2010 Status:
M. No.: 22/80-ALC2/2019 dated 28.02.2020 M/s BHARAT HEAVY Withdrawn
Lic. No.: 0910043002 Date: 06.08.2010 ELECTRICALS LIMITED
HQ. No.: 01/80/050/00495/AM11 **Subject:**Request for fixation of ad-hoc
RLA No.: 09/24/040/00169/AM11 norms
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 40/80 dated 22.03.2011 due to non submission reply of deficiency letter as raised by DHI.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that
the case is already approved in the M. No. 20/80-ALC2/2019 dated 30.01.2020. Therefore, the Committee decided
to withdraw the case form the agenda.
Case is withdrawn.

Sl. No. 722

Case No. :17/33/80-ALC2/2010 Status:
M/s BHARAT HEAVY ELECTRICALS<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020 Withdrawn
LIMITED<br>Lic. No.: 0910043468 dated 09.09.2010
HQ. No.: 01/80/050/00573/AM11<br>**Subject:**Request for fixation of ad-hoc
norms<br>RLA No.: 09/24/040/00223/AM11
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 2/80 dated 19.04.2011 due to non submission reply of deficiency letter as raised by DHI.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
The Committee reconsidered the case and noted that the case is already approved in the M. No. 20/80-ALC2/2019
dated 30.01.2020. Therefore, the Committee decided to withdraw the case form the agenda.
Case is withdrawn.

57 | P a g e

Sl. No. 723

==> picture [476 x 61] intentionally omitted <==

----- Start of picture text -----<br> Case No. : 23/9/80ALC2/2012 Status:<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020 M/s BHARAT HEAVY ELECTRICALS Approved<br>Lic. No.: 0910053032 dated 13.06.2012 LIMITED<br>HQ. No.: 01/80/050/00203/AM13 Subject: Request for re-fixation of ad-hoc<br>RLA No.: 09/24/040/00136/AM13 norms<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that the case was withdrawn from the meeting owing to non receipt of comments from EPCG Division in Meeting No. 23/80 dated 16.02.2016.

However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and observed that it is a case of norms fixation and the comments of EPCG as asked earlier is not required. The RA will check eligibility. The Committee decided to ratify the ad-hoc norms on the recommendation of representative of DHI as under:

  1. Import item at Sl. No. 50 may be deleted as it is a kit.

  2. Quantity of import items at Sl. No. 1, 2, 80 & 96 are forging & may be allowed under GN-4 with nil wastage on weight & number terms.

  3. Quantity of import item at Sl. No. 95 is tube, may be allowed under GN-4 with nil wastage on weight & number terms.

  4. Quantity of all other import items are as per annexure 3 submitted by the firm vide their letter of dated 29.01.2020.

Note: RA may ensure that the firm is eligible to obtain the Authorization as per FTP.

all other import items are as per annexure 3 submitted by the firm vide their letter of dated 29.01.2020.

Note: RA may ensure that the firm is eligible to obtain the Authorization as per FTP.

RA concerned may take further necessary action as per the decision of NC.

Sl. No. 724

Sl. No. 724
Case No. :30/33/80-ALC2/2009 Status:
M/s BHARAT HEAVY ELECTRICALS<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020 Deferred
LIMITED<br>Lic. No.: 0910039076 dated 27.08.2009
HQ. No.: 01/80/050/00496/AM10<br>**Subject:**Request for fixation of ad-hoc Pending
norms<br>RLA No.:09/24/040/00184/AM10 with DHI
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 48/80 dated 02.03.2010 due to non submission reply of the deficiency later as raised by DHI.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that firm’s reply was sent to DHI on 29.01.2020. However, no comments have been received yet. Therefore,
the Committee decided to remind DHI for expediting the comments.
Case is deferred.

Sl. No. 725

Sl. No. 725
Case No.: 1/33/85-ALC3/2008 Status:
M. No.: 22/80-ALC2/2019 dated 28.02.2020<br>Lic. No.: 0710061697 dated 15.12.2008 M/s BOVING FOURESS LIMITED Deferred
HQ. No.: 01/85/050/00218/AM09 **Subject:**Request for fixation of ad-hoc norms Send D/L
RLA No.: 07/24/040/00524/AM09
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 2/80 dated 13.04.2010 due to non submission reply of deficiency letter as raised by DHI.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
decided to send the deficiency letter as raised by DHIto the firmby postas the firm’s correct email id is not
available.
Case is deferred.

58 | P a g e

Sl. No. 726

Case No.2/17/80-ALC2/2017<br>Status:
M/s VEM TECHNOLOGIES PVT. LTD.<br>Deferred<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020<br>Lic. No.: 0910065045 Date: 15.05.2017
HQ. No.: 01/80/050/00281/AM18<br>**Subject:**Request for fixation of ad-hoc norms<br>Pending
with Firm<br>RLA No.: 09/24/040/00055/AM18
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 05/80 dated 06.06.2019 due to non submission reply of deficiency letter dated 14.01.2019as raised byDPIIT.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case
and noted that a deficiency letter seeking certain information as raised by**Consultant (Tech-3)**was sent to the
firm on 20.01.2020. However, no reply has been received yet. Therefore, the Committee decided to send final
reminder to the firm for furnishing the requisite information.
Case is deferred.

Sl. No. 727

==> picture [476 x 63] intentionally omitted <==

----- Start of picture text -----<br> Case No. 47/14/80-ALC2/2014 Status:<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020 M/s ALSTOM TRANSPORT INDIA Deferred<br>Lic. No. /date: 0710105249 dated 20.06.2014 LIMITED<br>HQ. No.: 01/80/050/00368/AM15 Subject: Request for fixation of ad-hoc PH<br>RLA No.: 07/24/040/00092/AM15 norms.<br>----- End of picture text -----<br>

Decision: In continuation to Meeting No. 12/80 dated 09.10.2019, the Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 11/80 dated 01.09.2015 due to non-submission reply of deficiency letter as raised by DHI.

Decision: In continuation to Meeting No. 12/80 dated 09.10.2019, the Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 11/80 dated 01.09.2015 due to non-submission reply of deficiency letter as raised by DHI. Thereafter, the firm represented against the rejection and requested for a review. The case was again considered and deferred in Meeting no. 11/19 dated 06.12.2018 with following decision: “The Committee noted that a personal hearing was already given to the firm on 06.12.2018. In the personal hearing the firm informed the committee that it has taken various AA’s for supply of 33 rail/tramway coaches. Further, firm stated that it _has taken an additional license for supplementary material required for these very 33 rail/tramway coaches.

aken various AA’s for supply of 33 rail/tramway coaches. Further, firm stated that it_ has taken an additional license for supplementary material required for these very 33 rail/tramway coaches. However, it has an additional export obligation of another 33 rail/tramway coaches in this license. The Committee observed that the given submission is not tenable. The committee decided to seek a detailed report from the concerned RA regarding of all such licenses issued to the firm, admissibility and current status.” In response to Norm Committee’s e-mail dated 23.04.2019, Addl. DGFT Bangalore informed that firm has obtained several license, which are pending for the wants of norms and also informed about a letter from ECAII, DGFT, New Delhi seeking information regarding alleged corrupt practices followed by M/s Alstom Transport India. In this matter, the committee noted that the firm had approach the Policy Relaxation Committee (PRC) and the matter was taken up vide Meeting No. 17/AM20 held on 27.08.2019. The PRC noted the submissions by the firm as under: _“They have stated that initially, 7 Advance Authorizations were applied for duty free import of inputs required for the manufacture and supply of 33 Metro Train sets to Chennai Metro Rail Limited being a deemed export project. ATIL sought amendment in all 7 Advance Authorizations to include residual items that were required to manufacture the 33 Train sets but the request was rejected citing technical reasons by RA.

oject. ATIL sought amendment in all 7 Advance Authorizations to include residual items that were required to manufacture the 33 Train sets but the request was rejected citing technical reasons by RA. Thereupon, ATIL was compelled to apply for additional Advance Authorization No.0710105249 dated 20.06.2014 for importing residual inputs that were missed out and not covered under earlier 7 Advance Authorizations. Acquisition of Alstom India limited who was the manufacturer of key sub-assemblies also lead to inclusion of components required for manufacture of sub-assemblies in the captioned Advance Authorization. However, while applying for the said Advance Authorization (8[th] AA), export obligation of 33 Metro Train sets was declared inadvertently, as the system did not allow the applicant to apply for a new license unless the export obligation was declared. In fact, there is no_

59 | P a g e

separate EO under the Advance Authorization No.0710105249 dated 20.06.2014 as all imported inputs were used for manufacture of 33 train sets declared under previous 7 Advance licenses. The Advance Authorization No.0710105249 dated 20.06.2014 under which parts required for manufacture of 33 Metro Trains have been imported has been issued after 22 months from the date of earliest Advance Authorization in the clubbing set. Hence, request is to treat the supplies of 33 Train sets to the Metro Project supplied against Advance Authorizations as one and to discharge the EO. “

The policy relaxation committee vide PRC Meeting No. 17/AM20 dated 27.08.2019 gave the following decision in the matter:

“Decision: The Committee heard the submission made by the firm and discussed the matter at length and decided to relax the conditions as laid down in Para 4.38 (vi), (vii) and (xii) of HBP 2015-20 as amended vide Public Notice No.70/2015-20 dated 30.01.2019 for clubbing of eight Advance Authorizations No.(i)0710090351 dated 21.08.2012, (ii)0710090531 dated 31.08.2012, (iii)0710095554 dated 23.05.2013, (iv)0710096369 dated 02.07.2013, (v)0710096370 dated 02.07.2013, (vi)0710099232 dated 28.10.2013 and (vii)0710101246 dated 10.01.2014 and (viii) 0710105249 dated 20.06.2014. It is subject to verification that amendments request of the firm made in the AAs was rejected by the RA, as claimed by the firm and all inputs imported in the 8 AAs are fully accounted for in the supplies. The other terms and conditions for clubbing shall remain same as per policy/HBP provisions. The firm shall approach RA within 30 days from the date of uploading of the minutes of meeting.”

This Committee observed that the PRC has clubbed all the eight authorizations for imports and export purposes. Export obligation of AA No. 0710105249 dt. 20.06.2014 would remain as it is even after clubbing. Hence, the Committee in its Meeting No. 10/80 dated 11.09.2019, asked the firm to furnish following information:

  1. To provide detailed statement to account for the inputs in the export products against this license.

in its Meeting No. 10/80 dated 11.09.2019, asked the firm to furnish following information:

  1. To provide detailed statement to account for the inputs in the export products against this license.

  2. Relevant technical drawings and wastage details may be provided in relevant formats for examination by the technical authorities for the purpose of fixation of norms.

And also sought clarification from the PRC cell on 05.11.2019 regarding the export obligation of the eighth authorization if it would run concurrently with the export obligation of the first seven authorizations.

PRC in its meeting no. 23/AM20 dt. 03.12.2019, decided as follows:

“The committee reviewed the case and observed that request of the firm and minutes recorded in the earlier PRC decision were very clear. It reiterated that in view of the submission made by the firm, all the above 8 advance authorizations need to be clubbed for imports and exports purposes wherein export obligation of the 8th advance authorization no. 0710105249 dt. 20.06.2014 be treated as NIL as its EO is subsumed in the export obligation of the other 7 advance authorizations taken together. The firm shall approach RA within 30 days from the date of uploading of the minutes of meeting for clubbing.”

The Committee noted in its Meeting No. 18/80 dated 02.01.2020 that the firm’s reply dated 06.11.2019 forwarded to DHI on 02.12.2019 for examination of the case and again it was asked to the firm to furnish following information:

ing No. 18/80 dated 02.01.2020 that the firm’s reply dated 06.11.2019 forwarded to DHI on 02.12.2019 for examination of the case and again it was asked to the firm to furnish following information:

  1. Specific use of items imported under the eighth authorization vis-a-vis those imported under other seven authorizations.

The Committee considered the case and noted that the reply of deficiency letter was sent to DHI on 24.02.2020. The Committee decided to call the firm for personal hearing to explain the case before Norms Committee along with reply of deficiency letter dated 19.02.2020 in the forthcoming NC meeting as per advice of representative of DHI.

Case is deferred.

60 | P a g e

Sl. No. 728

Sl. No. 728
Case No.57/17/80-ALC2/2015
M/s BIRLA FURUKAWA FIBRE<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020 Status:
OPTICS PRIVATE LIMITED<br>Lic. No.: 1710006165 Date: 27.08.2015 Deferred
HQ. No.: 01/80/050/00361/AM16<br>**Subject:**Request for fixation of ad-hoc Pending
norms<br>RLA No.: 17/24/040/00043/AM16 with MeitY
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No. 14/17 dated 11.10.2016 as per comments of DEIT.
However, the firm has requested that typographical error in DEIT comments may be rectified. The
Committee considered the case and noted that the firm’s representation was referred toMeitYfor examination of
the case on 09.10.2019 followed by ID reminders on 02.12.2019 & 21.01.2020. However, no comments have
received yet. Hence, the Committee decided to remind MeitY for expediting the comments.
Case is deferred.

Sl. No. 729

Sl. No. 729
Case No.1/25/80-ALC2/2015
M/s UNITED DRILLING TOOLS LTD<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020 Status:
Lic. No.: 0510397442 Date: 29.01.2016 Deferred
HQ. No.: 01/80/050/00441/AM16/<br>**Subject:**Request for fixation of ad-hoc norms<br>RLA No.: 05/24/040/00493/AM16/ Pending<br>with Firm
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 05/80 dated 07.06.2016 due to non submission reply of deficiency letter dated 29.03.2016 as raised by DHI.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that a deficiency letter seeking certain information as raised by Consultant (Tech-3) on 24.02.2020. However,
no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.

Sl. No. 730

Sl. No. 730
Case No.19/23/80-ALC2/2016
M/s AZAD ENGINEERING PRIVATE<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020 Status:
LIMITED<br>Lic. No.: 0910064137 Date: 14.09.2016 Deferred
HQ. No.: 01/80/050/00522/AM17/<br>**Subject:**Request for fixation of ad-hoc norms<br>RLA No.: 09/24/040/00295/AM17/ Pending<br>with Firm
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in Meeting
No. 02/80-ALC2/2017 dated 25.04.2017 on repeat basis as approved for AA No. 0910064137 dated 14.09.2016 on
the recommendation of the representative of DHI.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case
and noted that a deficiency letter seeking certain information as raised byDHIwas sent to the firm on 20.01.2020.
However, no reply has been received yet. Therefore, the Committee decided to remind the firm for furnishing the
requisite information.
Case is deferred.

61 | P a g e

Sl. No. 731

==> picture [477 x 74] intentionally omitted <==

----- Start of picture text -----<br> Case No. 29/48/80-ALC2/2007<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020 M/s JANDIA ENGINEERING Status:<br>Lic No.: 3210035131 Date: 02.04.2007 PRIVATE LIMITED Withdrawn<br>HQ File No: 01/80/050/00675/AM08/ Subject: Request for fixation of ad-hoc<br>RLA File No: 32/21/040/00328/AM07/ norms<br>Decision: The Committee considered the case as per the agenda and noted the decision of Meeting 10/80-<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted the decision of Meeting 10/80ALC2/2009 dated 09.06.2009: “The Committee noted that RA neither reported the status of the case nor forwarded the four sets of application in response to this office letter and subsequent reminder. Since, the subject authorization is quite old; the Committee presumed that ratification of norms of the subject authorization is not required to RA so that the case may be closed on the part of NC.”

nce, the subject authorization is quite old; the Committee presumed that ratification of norms of the subject authorization is not required to RA so that the case may be closed on the part of NC.”_

ALC2/2009 dated 09.06.2009: “The Committee noted that RA neither reported the status of the case nor forwarded the four sets of application in response to this office letter and subsequent reminder. Since, the subject authorization is quite old; the Committee presumed that ratification of norms of the subject authorization is not required to RA so that the case may be closed on the part of NC.” However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that the query letter as raised in Meeting No. 10/80 dated 11.09.2019 was sent to RA, Coimbatore on 07.10.2019 followed by reminders on 02.12.2019 & 20.01.2020. The Committee also noted that the RA, Coimbatore informed AA was issued on net to net basis so they didn’t forward copy and also informed that the firm didn’t furnish evidence for EO, so a penalty was imposed on the firm RS 8,05,851.65 as the firm did not pay penalty action under RR Act was initiated. Therefore, the Committee decided to withdraw the case form the agenda. Case is withdrawn.

Sl. No. 732

Sl. No. 732
Case No.37/19/80-ALC2/2014
M. No.: 22/80-ALC2/2019 dated 28.02.2020 M/s KAMAR INFRASTRUCTURE PVT Status:
Licence No.: 0310788243 Date: 21.08.2014 LTD. Deferred
HQFile No: 01/80/050/00471/AM15/<br>RLA File No: 03/94/040/00449/AM15/ **Subject:**Request for fixation of ad-hoc norms Pending<br>with Firm
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 06/80 dated 20.06.2017 due to non submission reply of deficiency letter.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 23.12.2019
followed by a reminder on 24.02.2020. However, no reply has been received yet. Hence, the Committee decided to
wait for the firm’s reply.
Case is deferred.

to the firm on 23.12.2019||| |followed by a reminder on 24.02.2020. However, no|reply has been received yet. Hence, the Committee decided to|| |wait for the firm’s reply.||| |Case is deferred.|||

Sl. No. 733
Case No. 3/10/80-ALC2/2017 Status:
M/s HINDUSTAN RUBBER INDUSTRIES<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020 Deferred
Lic. No. 0510402563 Date: 16.05.2017
HQ. No.: 01/80/050/00213/AM18<br>**Subject:**Request for fixation of ad-hoc norms Pending
RLA No.: 05/23/040/00043/AM18 with Firm
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 15/80-ALC2/2018 dated 06.03.2019 due to non submission of reply of deficiency letter dated 08.10.2018.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that the reply of deficiency letter dated 08.10.2018 has not yet been submitted by the firm. It was also noted
that a letter was sent to the firm on 02.11.2019 followed by a reminder on 20.01.2020, asked to submit the reply of
deficiency letter dated 08.10.2018. However, no reply has been received yet. Therefore, the Committee decided to
send final reminderto the firm for furnishing the requisite information.
Case is deferred.

62 | P a g e

Sl. No. 734

==> picture [477 x 61] intentionally omitted <==

----- Start of picture text -----<br> Case No. 8/23/80-ALC2/2015 Status:<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020 M/s HINDUSTAN RUBBER INDUSTRIES Deferred<br>Lic. No. 0510395884 Date: 12.10.2015<br>HQ. No.: 01/80/050/00421/AM16 Subject: Request for fixation of ad-hoc norms Pending<br>RLA No.: 05/23/040/00292/AM16 with Firm<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 06 /80- ALC2/2016dated 21.06.2016 due to non submission of reply of deficiency letter dated 19.04.2016 as raised by DIPP (Chemical) vide ID No.7/77/2016-TSW dated 26.02.2016.

However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that the reply of deficiency letter dated 19.04.2016 has not yet been submitted by the firm. It was also noted that a letter was sent to the firm on 02.11.2019 followed by a reminder on 20.01.2020, asked to submit the reply of deficiency letter dated 19.04.2016. The firm vide email dated 22.02.2020 asked for old deficiency letter. The old deficiency letter was sent to the firm on 24.02.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply .

Case is deferred.

Sl. No. 735

Sl. No. 735
Case No.14/12/80-ALC2/2017 Status:
M. No.: 22/80-ALC2/2019 dated 28.02.2020 M/s GOLD MOHUR PROFILES Deferred
Lic. No. 0510403501 Date: 25.07.2017 LIMITED
HQ. No.: 01/80/050/00228/AM18 **Subject:**Request for fixation of ad-hoc Send to
RLA No.: 05/23/040/00156/AM18 norms DPIIT
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 15/80-ALC2/2018 dated 06.03.2019 due to non submission of reply of deficiency letter dated 12.10.2018 as
raised by DIPP (Chemical).
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
decided to forward the firm’s reply to DPIIT for examination of the case**.**
Case is deferred.

Sl. No. 736

Case No. 1/8/80-ALC2/2018<br>Status:
M/s CORNING TECHNOLOGIES INDIA<br>Deferred<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020
PVT. LTD.<br>Lic. No. 0510406690 Date: 30.05.2018
HQ. No.: 01/80/050/00124/AM19<br>**Subject:**Request for fixation of ad-hoc norms<br>Pending
with MeitY<br>RLA No.: 05/23/040/00089/AM19
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 06/80-ALC2/2019 dated 03.07.2019 due to non submission reply of deficiency letter 11.02.2019 as raised by
MeitY.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that the firm’s representation was referred toMeitYfor examination of the case on 05.11.2019 followed by a
reminder on 20.01.2020. However, no comments have been received yet. Therefore, the Committeedecided to
remind again MeitYfor expediting the comments.
Case is deferred.

63 | P a g e

Sl. No. 737

Sl. No. 737
Case No. 282/15/80-ALC2/2018 Status:
M. No.: 22/80-ALC2/2019 dated 28.02.2020 M/s CORNING TECHNOLOGIES INDIA Deferred
Lic. No 0510409144 Date: 01.01.2019 PVT. LTD.
HQ. No.: 01/80/050/00624/AM19 **Subject:**Request for fixation of ad-hoc norms Pending
RLA No.: 05/23/040/00395/AM19 with MeitY
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 7/80-ALC2/2019 dated 17.07.2019 due to non submission of reply of deficiency letter dated 06.05.2019 as
raised by MeitY.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and noted that
the firm’s representation was referred toMeitYfor examination of the case on 05.11.2019 followed by a reminder
on 20.01.2020. However, no comments have been received yet. Therefore, the Committee decided to remind again
MeitYfor expediting the comments.
Case is deferred.

No. 738

Case No. 13/12/80-ALC2/2018<br>Status:
M/s NIDEC INDIA PRIVATE LIMITED.<br>Deferred<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020
Lic. No. /date 0510408160 Date: 22.10.2018
HQ. No.: 01/80/050/00286/AM19<br>**Subject:**Request for fixation of ad-hoc<br>Pending
norms<br>with Firm<br>RLA No.: 05/24/040/00408/AM19
**Decision:**The Committee considered the case as per the agenda and noted that the case was rejected in Meeting
No. 06/80-ALC2/2019 dated 03.07.2019 due to non submission of reply of deficiency letter as raised by DPIIT.
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that a deficiency letter seeking certain information as raised byDPIITwas sent to the firm on 20.01.2020.
However, no reply has been received yet. Therefore, the Committee decided to send reminder to the firm for
furnishing the requisite information.
Case is deferred.

Sl. No. 739

Sl. No. 739
Case No.19/19/80-ALC2/2016 L & T-MHPS TURBINE GENERATORS Status:
M. No.: 22/80-ALC2/2019 dated 28.02.2020 PRIVATE LIMITED Deferred
Lic. No. 0310807493 Date: 31.08.2016
HQ. No.: 01/80/050/00414/AM17 **Subject:**Request for re-fixation of ad-hoc Pending
RLA No.: 03/95/040/00292/AM17 norms with Firm
**Decision:**The Committee considered the case as per the agenda and noted that the case was approved in M. No.
15/80-ALC2/2018dated 06.03.2019 as per the written comments of DHI vide their U.O. No. 3/96/2016/TSW(B)
dated 24.12.2018
However, the firm has requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that a deficiency letter seeking certain information as raised byDHIwas sent to the firm on 24.02.2020.
However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.

64 | P a g e

Sl. No. 740

==> picture [477 x 61] intentionally omitted <==

----- Start of picture text -----<br> Case No. 33/20/80-ALC2/2017 Status:<br>M. No.: 22/80-ALC2/2019 dated 28.02.2020 AUTOCOMP CORPORATION PANSE Approved<br>Lic. No. 3110066981 Date: 13.02.2018 PRIVATE LIMITED<br>HQ. No.: 01/80/050/00397/AM18 Subject: Request for re-fixation of ad-hoc<br>RLA No.: 31/83/040/00154/AM18 norms<br>----- End of picture text -----<br>

Decision: The Committee considered the case as per the agenda and noted that the case was approved in M. No. 3/80-ALC2/2019 dated 08.05.2019 as per written comments of DHI vide their U. O

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6854 --apply.

Citation copied