DGFT Committee Minutes
RATIFIED Minutes of Meeting No.24/12 scheduled on 07.02.2012 of Norms Committee(NCI) (DES.I Section) The meeting No. 24/12 of the Norms Committee (NCI) for the licensing year 20112012 was held on 07.02.2012 under the Chairmanship of Sh. N.P.S. Monga, Additional Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure VolumeI. The following Members of the Committee were present in the meeting: Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh K. K. Tiwari. I.A. 476 23063321 Extn.3322 DHI, U.B. 2. Sh S.K. Jain, D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (MC) 736A DC(MSME),N.B. 4. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 5. Sh. K.C. Raju, FTDO 404 23061562 Ext.265 DGFT, U.B. I The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon are as under: 1
Case No.:16/2/80ALC2/2011
Party Name:PNEUMAX PNEUMATIC INDIA PVT.LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00937/AM11/ RLA File :07/21/040/00491/AM11/ Lic.No/Date:0710074822 14.10.2010 Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms on Net to Net basis with accountability clause. The RLA may take necessary action accordingly. 2
Case No.:3/33/80ALC2/2010
Party Name:L&T MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00559/AM11/ RLA File :03/95/040/00615/AM11/ Lic.No/Date:0310602242 22.11.2010 Defer Date:20.03.2012 Decision :The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 20.03.2012. 3
Case No.:9/33/80ALC2/2010
Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Rejected HQ File :01/80/050/00565/AM11/ RLA File :07/24/040/00329/AM11/ Lic.No/Date:0710075610 24.11.2010 Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dt.116.12.2011 and subsequent reminder 12.01.2012 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.
4
Case No.:26/38/80ALC2/2010
Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00796/AM11/ RLA File :03/94/040/00885/AM11/ Lic.No/Date:0310609488 05.01.2011 Defer Date:20.03.2012 Decision : The Committee noted that a copy of firm’s additional reply dt.24.01.2012 was forwarded to MCIT for examination and comments. The case is to be relisted on 20.03.2012. 5
Case No.:30/39/80ALC2/2010
Party Name:L&TMHI BOILERS PVT. LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00832/AM11/ RLA File :03/95/040/00765/AM11/ Lic.No/Date:0310609444 05.01.2011 ratify the norms as per SION C1742. 6
Case No.:18/36/80ALC2/2010
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00717/AM11/ RLA File :31/21/040/00312/AM11/ Lic.No/Date:3110046436 14.01.2011 7
Case No.:22/37/80ALC2/2010
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00760/AM11/ RLA File :09/24/040/00477/AM11/ Lic.No/Date:0910045223 25.01.2011 ratify the norms as per SION C1742. 8
Case No.:29/39/80ALC2/2010
Party Name:PNEUMAX PNEUMATIC INDIA PVT.LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00831/AM11/ RLA File :07/21/040/00757/AM11/ Lic.No/Date:0710076903 25.01.2011
Case No.:1/11/85ALC3/2011
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved
9 HQ File :01/85/050/00057/AM12/ RLA File :04/24/040/00296/AM11/ Lic.No/Date:0410121516 10.02.2011 ratify the norms on repeat basis as allowed under advance authorization No.0410124434 dt.27.05.2011. 10
Case No.:10/5/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00046/AM12/ RLA File :09/24/040/00479/AM11/ Lic.No/Date:0910045519 11.02.2011 Defer Date:20.03.2012 Decision :The representative of the DHI informed the Committee that the case is under examination. The 11
Case No.:31/39/80ALC2/2010
Party Name:SAVAS ENGINEERING COMPANY PVT. LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00833/AM11/ RLA File :31/24/040/00249/AM11/ Lic.No/Date:3110046929 15.02.2011 Defer Date:20.03.2012 Decision :The Committee noted that the DO from DDG to concerned RA, Pune has been sent on 14.12.2011 followed by an email dated 12.1.2012. The Committee decided to send a last The Committee noted that the firm did not furnish a reply to this office letter dated 12.12.2011 requesting for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be to RA and close the case in case the application is not received within 15 days. The case is to be relisted on 20.03.2012. 12
Case No.:36/39/80ALC2/2010
Party Name:TRF LIMITED, Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: withdrawn HQ File :01/80/050/00838/AM11/ RLA File :02/24/040/00255/AM10/ Lic.No/Date:0210154977 18.02.2011 Defer Date:20.03.2012 Decision :The Committee noted that RA, Kolkata in their letter dt.20.01.2012 informed that the firm has not utilized the said Advance Authorization and decided to close the case on the part of NC. 13
Case No.:18/5/80ALC2/2011
Party Name:SPRAY ENGINEERING DEVICES LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00054/AM12/ RLA File :22/24/040/00094/AM11/ Lic.No/Date:2210011010 18.02.2011 ratify the norms as per SION C1647.
Case No.:47/39/80ALC2/2010
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred
14 HQ File :01/80/050/00849/AM11/ RLA File :05/23/040/00328/AM11/ Lic.No/Date:0510284479 22.02.2011 Defer Date:20.03.2012 Decision : The representative of the DHI informed that the products in the Advance Authorization are large and wastage is high and proposed for a Team Visit to the factory of the firm to evaluate the wastage. The Committee, therefore, decided to send a team consisting of representatives of DHI, MSME & DDG and submit a report. The case is to be relisted on 20.03.2012. 15
Case No.:48/39/80ALC2/2010
Party Name: BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00850/AM11/ RLA File :05/23/040/00330/AM11/ Lic.No/Date:0510284482 22.02.2011 Defer Date:20.03.2012 Decision : The representative of the DHI informed that the products in the Advance Authorization are large and wastage is high and proposed for a Team Visit to the factory of the firm to evaluate the wastage. The Committee, therefore, decided to send a team consisting of representatives of DHI, MSME & DDG and submit a report. The case is to be relisted on 20.03.2012. 16
Case No.:9/2/80ALC2/2011
Party Name: THERMAX LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00930/AM11/ RLA File :31/24/040/00273/AM11/ Lic.No/Date:3110047467 21.03.2011 ratify the norms as per SION C1742. 17
Case No.:14/2/80ALC2/2011
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00935/AM11/ RLA File :05/23/040/00367/AM11/ Lic.No/Date:0510286717 23.03.2011 Defer Date:20.03.2012 Decision : The representative of the DHI informed that the products in the Advance Authorization are large and wastage is high and proposed for a Team Visit to the factory of the firm to evaluate the wastage. The Committee, therefore, decided to send a team consisting of representatives of DHI, MSME & DDG and submit a report. The case is to be relisted on 20.03.2012. 18
Case No.:6/2/80ALC2/2011
Party Name:METSO POWER INDIA PRIVATE LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00927/AM11/ RLA File :04/24/040/00350/AM11/ Lic.No/Date:0410122852 25.03.2011 Decision: On the recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms as per SION C1742.
Case No.:3/2/80ALC2/2011
Party Name: AYYAPPA CNC PVT.LTD, Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred
19 HQ File :01/80/050/00003/AM12/ RLA File :07/24/040/00547/AM11/ Lic.No/Date:0710078428 29.03.2011 Decision :The Committee deliberated the written comments of DC(MSME) received vide their UO Note No.30(18) 2011ME dated 07.12.2012 and UO Note No.30(18)/2011ME / 30(70)/2011ME dated 24.2.2012 and decided to deliberate the case again. The case is to be relisted on 3.4.2012. 20
Case No.:13/5/80ALC2/2011
Party Name:TDW INDIA LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00049/AM12/ RLA File :34/24/040/00338/AM11/ Lic.No/Date:3410029836 01.04.2011 Defer Date:20.03.2012 Decision :The Committee noted that the firm did not reply to this office letter dated 16.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the requisite information failing which their case will be rejected without any further notice. The case is to be relisted on 20.03.2012. 21
Case No.:18/8/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00166/AM12/ RLA File :61/24/040/00001/AM12/ Lic.No/Date:6110000602 18.04.2011 Defer Date:20.03.2012 Decision :The representative of the DHI informed the Committee that the case is under examination. The 22
Case No.:12/3/80ALC2/2011
Party Name:CHANG YUN INDIA LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00017/AM12/ RLA File :05/23/040/00022/AM12/ Lic.No/Date:0510288459 20.04.2011 Defer Date:20.03.2012 Decision : The Committee noted that the firm’s application has been sent to DHI on 02.09.2011. However, the Committee decided to forward a copy of firm’s application to DC(MSME) for examination and comments, as the case pertains to them. The case is to be relisted on 20.03.2012. 23
Case No.:28/5/80ALC2/2011
Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00064/AM12/ RLA File :05/23/040/00043/AM12/ Lic.No/Date:0510290272 10.05.2011 24
Case No.:1/9/81ALC2/2011
Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/81/050/00051/AM12/ RLA File :05/23/040/00054/AM12/ Lic.No/Date:0510290928 18.05.2011 Defer Date:20.03.2012 Decision : The Committee noted that the firm’s application has been sent to DHI on 20.06.2011. However, the Committee decided to forward a copy of firm’s application to C&PC for examination and comments, as
the case pertains to them. The case is to be relisted on 20.03.2012. 25
Case No.:39/5/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00075/AM12/ RLA File :04/24/040/00040/AM12/ Lic.No/Date:0410124178 19.05.2011 Defer Date:20.03.2012 Decision :The representative of the DHI informed the Committee that the case is under examination. The 26
Case No.:9/11/80ALC2/2011
Party Name:ICEM ENGINEERING COMPANY PRIVATE LIMITED, Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00221/AM12/ RLA File :03/94/040/00270/AM12/ Lic.No/Date:0310638600 24.06.2011 Defer Date:20.03.2012 Decision :The Committee noted that the firm did not reply to this office their letter dated 16.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting requisite information failing which their case will be rejected without any further notice. The case is to be relisted on 20.03.2012. 27
Case No.:14/11/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00226/AM12/ RLA File :09/24/040/00163/AM12/ Lic.No/Date:0910047353 28.06.2011 Decision :The Committee deliberated the written comments of DHI received vide their UO Note No.3(427)/10TSW(B)/64 dated 06.02.2012 and decided to ratify the norms in respect of the subject advance authorization as under: Export Product : 2x660 MW Drive Turbine Import (a) Raw Materials i. As Rounds – 4440 kg. including 30% wastage. ii. Blading Profiles – 330 kg. including 09% wastage. iii. Blading Flates – 3166 kg. including 258% wastage as in AA No.6110000286 dt.06.02.2009. iv. SS Wires – 82 kg. including 02% wastage. v. Titanium Wire – 102 kg. including 02% wastage. (b) Components – to be allowed on net to net basis with accountability clause. 28
Case No.:24/11/80ALC2/2011
Party Name: POLMOR STEEL PVT LTD Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00236/AM12/ RLA File :09/24/040/00140/AM12/ Lic.No/Date:0910047329 28.06.2011 Defer Date:20.03.2012 Decision : The Committee noted that the firm’s application has been sent to DHI on 18.10.2011. However, the committee decided to transfer the case to DC(MSME) and forward a copy of firm’s application to them for examination and comments, as the case pertains to them. The case is to be relisted on 20.03.2012.
29
Case No.:17/8/80ALC2/2011
Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00165/AM12/ RLA File :05/23/040/00127/AM12/ Lic.No/Date:0510295211 30.06.2011 Defer Date:20.03.2012 Decision : The representative of the DHI informed that the products in the Advance Authorization are large and wastage is high and proposed for a Team Visit to the factory of the firm to evaluate the wastage. The Committee, therefore, decided to send a team consisting of representatives of DHI, MSME & DDG and submit a report. The case is to be relisted on 20.03.2012. 30
Case No.:7/11/80ALC2/2011
Party Name:REITZ INDIA LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00219/AM12/ RLA File :09/24/040/00155/AM12/ Lic.No/Date:0910047380 30.06.2011 Defer Date:20.03.2012 Decision : The Committee noted that the firm did not reply to this office letter dated 16.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting requisite information failing which their case will be rejected without any further notice. The case is to be relisted on 20.03.2012. 31
Case No.:25/11/80ALC2/2011
Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00237/AM12/ RLA File :07/24/040/00104/AM12/ Lic.No/Date:0710080361 04.07.2011 Defer Date:20.03.2012 Decision :The Committee noted that the firm has sought time vide their letter dated 16.12.2011 received on 02.02.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting the said information failing which their case will be rejected without any further notice. The case is to be relilsted on 20.03.2012. 32
Case No.:21/11/80ALC2/2011
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00233/AM12/ RLA File :09/24/040/00175/AM12/ Lic.No/Date:0910047647 15.07.2011 Decision :On the recommendation of DHI representative present in the meting, the Committee decided to ratify the norms as under: 1. Item No.16,17,21 & 22 to be allowed (Spares) as per spares policy. 2. Item No. 18, 20, 8, 9, 10, 11 & 12 – (Components) to be allowed under GN4. 3. Import items Sr.No. 1 to 7 & 13 to 15 to be allowed as per SION C1742 33
Case No.:13/11/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00225/AM12/ RLA File :09/24/040/00173/AM12/ Lic.No/Date:0910047823 22.07.2011 Defer Date:20.03.2012
Decision :The representative of the DHI informed the Committee that the case is under examination. The 34
Case No.:12/14/80ALC2/2011
Party Name:AYYAPPA CNC PVT.LTD, Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00266/AM12/ RLA File :07/24/040/00120/AM12/ Lic.No/Date:0710080825 22.07.2011 Decision : The Committee deliberated the written comments of DC(MSME) received vide their UO Note No.30(70) 2011ME dated 08.12.2011 and UO Note No.30(18)/2011ME / 30(70)/2011ME dated 24.2.2012 and decided to deliberate the case again. The case is to be relisted on 3.4.2012. 35
Case No.:7/20/80ALC2/2011
Party Name:DAYCO VIKAS POWER TRANSMISSION PVT. LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00392/AM12/ RLA File :05/23/040/00154/AM12/ Lic.No/Date:0510297629 26.07.2011 Defer Date:20.03.2012 Decision : The Committee deliberated the written comments of DHI received vide UO No. 3(47)/11 TSW(B) dated 11.1.2012 and decided to ratify the norms in respect of the subject authorization under GN4. However, RA to obtain the list of export items from the firm and incorporate in the Authorization. 36
Case No.:29/14/80ALC2/2011
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00283/AM12/ RLA File :07/24/040/00168/AM12/ Lic.No/Date:0710081189 04.08.2011 Decision : On the recommendation of DHI representative present in the meting, the Committee decided to ratify the norms as per SION C1647, as under: 1. Taking Clue from SION C1647, Import Item Nos. 6875 to be allowed within 2% of FOB value. 2. Import Item No. 119 –to be allowed as per packing policy. 3. Balance import items to be allowed on net to net basis with accountability clause. 37
Case No.:2/11/80ALC2/2011
Party Name:KUVAWALA DRILL EQUIP Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00214/AM12/ RLA File :03/94/040/00383/AM12/ Lic.No/Date:0310647125 09.08.2011 Decision : On the recommendation of DHI representative present in the meting, the Committee decided to ratify the norms as applied by the firm with 5% wastage on net content of export product.
Case No.:3/11/80ALC2/2011
Party Name:KUVAWALA DRILL EQUIP Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00215/AM12/ RLA File :03/94/040/00382/AM12/
38 Lic.No/Date:0310647358 09.08.2011 Decision : On the recommendation of DHI representative present in the meting, the Committee decided to ratify the norms as applied by the firm with 5% wastage on net content of export product. 39
Case No.:24/14/80ALC2/2011
Party Name:BOYSEN INDIA LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00278/AM12/ RLA File :05/23/040/00186/AM12/ Lic.No/Date:0510299447 11.08.2011 Decision : On the recommendation of DHI representative present in the meting, the Committee decided to ratify the norms as under: Export Product : To be suffixed with “Bend Pipe” Import Items: To be allowed as applied for with 1.81% wastage on net content of export product. 40
Case No.:31/14/80ALC2/2011
Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00285/AM12/ RLA File :05/24/040/00159/AM12/ Lic.No/Date:0510299729 17.08.2011 Decision : On the recommendation of DHI representative present in the meeting, the committee decided to ratify the norm on Net to Net basis with accountability clause. 41
Case No.:9/14/80ALC2/2011
Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00263/AM12/ RLA File :07/24/040/00192/AM12/ Lic.No/Date:0710081630 22.08.2011 Decision : On the recommendation of DHI representative present in the meting, the Committee decided to ratify the norms as under: 1. Taking clue from SION C1647, Import Item Nos. 89 to 96 to be allowed within 2% of FOB value. 2. All other Import Items to be allowed on net to net with accountability clause. 42
Case No.:39/14/80ALC2/2011
Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00293/AM12/ RLA File :07/24/040/00188/AM12/ Lic.No/Date:0710081631 22.08.2011 Defer Date:20.03.2012 Decision : The Committee noted that a copy of firms reply dt.10.01.2012 has been sent to DC(MSME) on 13.01.2012 for examination and comments and case is under examination with DC(MSME). The case is to be relisted on 20.03.2012.
43
Case No.:8/14/80ALC2/2011
Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00262/AM12/ RLA File :05/24/040/00182/AM12/ Lic.No/Date:0510300205 24.08.2011 Defer Date:20.03.2012 Decision :The Committed noted that the comments called for from the C&PC are yet to be received and decided to remind to C&PC to furnish their comments. The case is to be relisted on 20.03.2012. 44
Case No.:11/14/80ALC2/2011
Party Name:HITTCO TOOLS LTD Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00265/AM12/ RLA File :07/24/040/00203/AM12/ Lic.No/Date:0710081769 25.08.2011 Defer Date:20.03.2012 Decision : On the recommendation of DHI representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 20.03.2012: 1. Information in respect of Sl.No.4,5,& 11 of the Standard Deficiency Format along with representative sample of the product. 45
Case No.:6/14/80ALC2/2011
Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00260/AM12/ RLA File :05/24/040/00177/AM12/ Lic.No/Date:0510300518 26.08.2011 Defer Date:20.03.2012 Decision :The Committee deliberated the written comments of DIPP received vide their UO Note dated 07.02.2012 and decided to ratify the norms in respect of the subject advance authorization as under: 1. Net fabricated weights of 59.80 MT , 66.20 MT, 64.60 MT, 40.42 MT, 113.20 MT & 140 MT may be specified with the quantities of export products from Sl. No. 1 to 6 respectively . 2. Word “Relevant” may be prefixed with the descriptions of import items at Sl. Nos. 1, 2 & 12. 3. Quantity of import item at Sl. No. 1 to be allowed as 188.715 MT inclusive of 3.43 % wastage as claimed by the firm. 4. Quantity of import item at Sl. No. 2 to be allowed as applied for i.e. 64.628 MT inclusive of 3.25 % wastage. 5. Quantity of import item at Sl. No. 3 to be allowed as 20 Nos. on net to net basis. Duty free weight of this item may be allowed as 102.88 MT inclusive of 2 % wastage as applied for. 6. Quantity of import item at Sl. No. 4 to be allowed as 4 Nos. on net to net basis. Duty free weight of this item may be allowed as 21.44 MT inclusive of 1 % wastage as applied for. 7. Quantities of import items at Sl. No. 5 & 6 (Test Plates) to be allowed as applied for i.e. 2.5 MT & 0.75 MT respectively. 8. Quantity of import item at Sl. No.7 to be allowed as 28 Nos. (14.96 MT ) on net to net basis. 9. Quantity of import item at Sl. No.8 to be allowed as 10 Nos. (1.76 MT ) on net to net basis. 10. Quantity of import item at Sl. No.9 to be allowed as 4 Nos. (0.115 MT ) on net to net basis. 11. Import items at Sl. Nos. 10, 11, 13, 14 & 15 to be deleted as requested by the firm. 12. Quantity of import item at Sl. No.12 to be allowed as 0.55 MT ( 1040 Mtrs.) on net to net basis as claimed by the firm. 13. Quantity of import item at Sl. No.16 to be allowed as 4 Nos. (1.212 MT ) on net to net basis. 14. Quantities of import items at Sl. No. 17, 18 & 19 (Welding Consumables) to be allowed as applied for i.e. 13000 Kgs., 13000 Kgs. & 364 Kgs. respectively
46
Case No.:12/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00331/AM12/ RLA File :61/24/040/00030/AM12/ Lic.No/Date:6110000675 29.08.2011 Defer Date:20.03.2012 Decision : DHI representative observed that from the details furnished by the firm, there is no manufacturing activity involved with export product. The Committee, therefore, decided to call the firm to attend Personal Hearing to explain the reasons/justification. The case is to be relisted on 20.03.2012. 47
Case No.:13/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00332/AM12/ RLA File :61/24/040/00031/AM12/ Lic.No/Date:6110000676 29.08.2011 Defer Date:20.03.2012 Decision : DHI representative observed that from the details furnished by the firm, there is no manufacturing activity involved with export product. The Committee, therefore, decided to call the firm to attend Personal Hearing to explain the reasons/justification. The case is to be relisted on 20.03.2012. 48
Case No.:41/14/80ALC2/2011
Party Name:MICRO TECH.CNC PRIVATE LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00295/AM12/ RLA File :07/24/040/00215/AM12/ Lic.No/Date:0710082069 06.09.2011 Defer Date:20.03.2012 Decision :The Committed noted that firm has not replied to email dated 13.01.2012 and decided to send a last reminder requesting them to furnish reply to this office letter dated 25.11.2011 failing which the case will be rejected without any further notice. The case is to be relisted on 20.03.2012. 49
Case No.:14/17/80ALC2/2011
Party Name:STERDILL EQUIPMENTS PVT.LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00333/AM12/ RLA File :03/95/040/00437/AM12/ Lic.No/Date:0310651808 06.09.2011 Decision :The Committee deliberated the written comments of DIPP received vide their UO Note dated 07.02.2012 and decided to ratify the norms in respect of the subject advance authorization as under: 1. Net weight of 18996 Kgs. to be specified with the quantity of export product. 2. Word “Relevant” may be prefixed with the descriptions of import items at Sl. No. 1, 2, 3 & 4 and their quantities to be allowed as 1.05 Kgs./Kg. content in the export products.
Case No.:38/14/80ALC2/2011
Party Name:H.L.EQUIPMENTS Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00292/AM12/ RLA File :52/24/040/00021/AM12/ Lic.No/Date:5210036390 07.09.2011 Decision :The Committee deliberated the written comments of DIPP received vide their UO Note dated 07.02.2012 and decided to ratify the norms in respect of the subject advance authorization as under:
50 1. Net weights of 8280 Kgs. & 900 Kgs. to be specified with quantities of export products at Sl. No. 1 & 2 respectively. 2. Word ‘Relevant” to be prefixed with the description of import item at Sl. No.1 and its quantity to be allowed as 1169 Kgs on net to net basis as claimed by the firm . 3. Quantity of import item at Sl. No. 2 to be allowed as 107 Kgs. on net to net basis as claimed by the firm . 51
Case No.:34/17/80ALC2/2011
Party Name:PRANAV VIKAS (INDIA) LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00353/AM12/ RLA File :05/24/040/00212/AM12/ Lic.No/Date:0510303169 20.09.2011 Decision :The Committee deliberated the written comments of DIPP received vide their UO Note dated 07.02.2012 and decided to ratify the norms in respect of the subject advance authorization to be ratified as under on repeat basis as per Advance Authorization No. 0510288376 dated 20.04.2011 ratified in Norms Committee Meeting dated 10.01.2012: 1. Quantity of import item at Sl. No. 1 to be allowed as applied for i.e. 7200 Nos. on net to net basis with accountability clause. 2. Quantity of import item at Sl. No. 2 to be allowed as 42 Kgs. inclusive of 2 % wastage. 3. Quantities of import items at Sl. No. 3 & 4 to be allowed as 1218 Kgs. & 194.6 Kgs. respectively inclusive of 3 % wastage. 4. Quantities of import items at Sl. No. 5, 6 & 7 to be allowed as 182.8 Kgs., 504 Kgs. & 127.4 Kgs respectively inclusive of 2 % wastage. 5. Quantity of import item at Sl. No. 8 to be allowed as 2400 Nos. on net to net basis. However, duty free weight of this item to be allowed as 184 Kgs. inclusive of 5 % wastage. 6. Total quantities of import items from Sl. No. 9 to 11 put together to be allowed within 2 % of FOB value of exports. 52
Case No.:42/14/80ALC2/2011
Party Name:SPARKLINE EQUIPMENTS PVT.LTD, Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00296/AM12/ RLA File :31/83/040/00126/AM12/ Lic.No/Date:3110050595 26.09.2011 53
Case No.:5/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00324/AM12/ RLA File :04/24/040/00137/AM12/ Lic.No/Date:0410128752 30.09.2011 ratify the norms on repeat basis as per Advance Authorization No. 0410124435 dated 27.05.2011 and 0410124439 dated 27.05.2011 (per unit basis).
54
Case No.:7/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00326/AM12/ RLA File :04/24/040/00171/AM12/ Lic.No/Date:0410128753 30.09.2011 Defer Date:20.03.2012 Decision :The representative of the DHI informed the Committee that the case is under examination. The 55
Case No.:8/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00327/AM12/ RLA File :04/24/040/00116/AM12/ Lic.No/Date:0410128795 30.09.2011 ratify the norms as per SION C1742. 56
Case No.:11/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00330/AM12/ RLA File :04/24/040/00066/AM12/ Lic.No/Date:0410128794 30.09.2011 Defer Date:20.03.2012 Decision : As per written comments of DHI received vide UO No. 3(52)/11TSQW(B)/4 dated 11.1.2012, the Committee decided to ratify the norms of subject Advance Authorization as under: Export Product (EP) The total weight of the EP is 8889 MT and the same to be incorporated in the license. Import: 1. Item No.3(Carbon Steel) The quantity of seamless tube/pipe to be allowed is 1460 MT & as applied for with 2% wastage. “Welded” to be deleted from the description of import item. 2. Item No.2 – (Alloy Steel) The quantity of seamless tube/pipe to be allowed is 1550 MT & welded pipe at 50 MT as applied for with 2% wastage. 3. Item No.3The word “Finished” to be prefixed to the description of import and the same to be incorporated in the license. The quantity of import to be restricted to 1470 MT & the same to be incorporated along with quantity of import in numbers. The item to be allowed under GN4 as applied for. 4. Item no.4 – Welding materialQuantity applied is only 14 MT & the same to be recommend import as applied for. (Welding material weight is normally restricted to 2% of the weight of the steel to be welded). 5. Item No.5 to 12 – These are components & to be allowed under GN4 with accountability clause. 57
Case No.:27/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00346/AM12/ RLA File :05/23/040/00219/AM12/ Lic.No/Date:0510304453 30.09.2011
ratify the norms on repeat basis as per Advance Authorization No. 1110024727 dated 11.05.2011. 58
Case No.:28/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00347/AM12/ RLA File :11/24/040/00026/AM12/ Lic.No/Date:1110025821 30.09.2011 ratify the norms on repeat basis as per Advance Authorization No. 1110024727 dated 11.05.2011. 59
Case No.:30/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00349/AM12/ RLA File :11/24/040/00013/AM12/ Lic.No/Date:1110025819 30.09.2011 Defer Date:20.03.2012 Decision :The representative of the DHI informed the Committee that the case is under examination. The 60
Case No.:31/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00350/AM12/ RLA File :11/24/040/00011/AM12/ Lic.No/Date:1110025820 30.09.2011 ratify the norms on repeat basis as per Advance Authorization No. 1110023992 dated 01.02.2011. 61
Case No.:3/20/80ALC2/2011
Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00388/AM12/ RLA File :05/24/040/00229/AM12/ Lic.No/Date:0510304366 30.09.2011 Defer Date:20.03.2012 Decision :On the recommendation of DIPP representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 20.03.2012: 1. Firm furnish information in respect of Sl.No.6,9,&11 of the Standard Deficiency Format export product wise. 62
Case No.:10/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00329/AM12/ RLA File :04/24/040/00127/AM12/ Lic.No/Date:0410128896 04.10.2011 ratify the norms on repeat basis as per Advance Authorization No. 0410115603 dated 19.07.2010.
63
Case No.:21/20/80ALC2/2011
Party Name:BIRLA FURUKAWA FIBRE OPTICS LIMITED, Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00406/AM12/ RLA File :17/24/040/00057/AM12/ Lic.No/Date:1710004546 04.10.2011 Decision :The Committee deliberated the written comments of Department of Telecommunications received vide their I.D. No.1510/2011IP (Pt.III dated 27.01.2012 and decided to ratify the norms in respect of the subject advance authorization as under: Sl. No. Details of Import item Recommended quantity (including wastage) (Kg.) Wastage allowed 1. PREFORM OF SILICA 5580 2% 2. UV RESIN I 3824 5% 3. UV RESIN II 5346 5% 64
Case No.:6/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00325/AM12/ RLA File :04/24/040/00143/AM12/ Lic.No/Date:0410128933 05.10.2011 Decision : On the recommendation of DHI representative present in the meeting and written comments received vide DHI letter No. 3(45)/2011TSW(B)/84 dated 2.3.2012, the Committee decided to ratify the subject Authorization as follows: Inputs : (Relevant specifications) Sr.No Item Quantity per unit in MT (% wastage) 2 CS Tubes / Pipes 1600 (2%) 3 AS Tubes / Pipes 1500 (2%) 4 SS Tubes / Pipes 14 (2%) 6 Welding Wires / Electrodes 14 Remaining items are finished components and are to be allowed on net to net basis with accountability clause. 65
Case No.:15/17/80ALC2/2011
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00334/AM12/ RLA File :03/95/040/00493/AM12/ Lic.No/Date:0310658143 05.10.2011 Defer Date:20.03.2012
Decision :The Committee noted that the firm has sought time vide their letter dated 13.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting requisite information failing which their case will be rejected without any further notice. The case is to be relisted on 20.03.2012. 66
Case No.:16/17/80ALC2/2011
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00335/AM12/ RLA File :03/95/040/00494/AM12/ Lic.No/Date:0310658156 05.10.2011 Defer Date:20.03.2012 Decision : The Committee noted that the firm has sought time vide their letter dated 13.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting requisite information failing which their case will be rejected without any further notice. The case is to be relisted on 20.03.2012. 67
Case No.:5/20/80ALC2/2011
Party Name:POLY MEDICURE LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00390/AM12/ RLA File :05/24/040/00238/AM12/ Lic.No/Date:0510304858 10.10.2011 Defer Date:20.03.2012 Decision : The Committee noted that the written comments called for from C&PC are yet to be received and decided to remind C&PC expediting their comments. The case is to be relisted on 20.03.2012. 68
Case No.:18/17/80ALC2/2011
Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00337/AM12/ RLA File :03/94/040/00548/AM12/ Lic.No/Date:0310658894 11.10.2011 Decision :The Committee deliberated the written comments of DIPP received vide their UO Note dated 07.02.2012 and decided to ratify the norms in respect of the subject advance authorization as under: 1. Net weights of 18621 Kgs., 19200 Kgs. & 19200 Kgs. to be specified with the quantities of export products at Sl. No.1 , 2 & 3 respectively . 2. Words “ OD: 19.05 MM ” to be suffixed with the description of import item at Sl. No. 1. 3. Quantity of import item at Sl. No.1 to be allowed as 27620 Meters (26610 Kgs.) inclusive of 0.6 % wastage as claimed by the firm. 4. Quantity of import item at Sl. No.2 to be allowed as 12 Nos. (10 Kgs.) on net to net basis. 69
Case No.:1/20/80ALC2/2011
Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00386/AM12/ RLA File :05/24/040/00235/AM12/ Lic.No/Date:0510304889 11.10.2011 Defer Date:20.03.2012 Decision : Representative of DIPP observed that the details of online data and application are at variation. Further, it is observed that the application received from RA is incomplete. Therefore, the Committee decided to request RA/firm to furnish complete set of application along with all requisite enclosures/documents. The case is to be relisted on 20.03.2012.
70
Case No.:29/17/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00348/AM12/ RLA File :05/23/040/00226/AM12/ Lic.No/Date:0510305028 12.10.2011 Defer Date:20.03.2012 Decision : DHI representative observed that from the details furnished by the firm, there is no manufacturing activity involved with export product. The Committee, therefore, decided to call the firm to attend Personal Hearing to explain the reasons/justification. The case is to be relisted on 20.03.2012. 71
Case No.:23/17/80ALC2/2011
Party Name:GAS TECH PROCESS ENGINEERING INDIA PVT. LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00342/AM12/ RLA File :05/23/040/00258/AM12/ Lic.No/Date:0510305104 13.10.2011 Defer Date:20.03.2012 Decision :The Committee noted that the firm did not reply to this office email letter dated 13.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm along with DL dt.13.01.2012 for expediting requisite information failing which their case will be rejected without any further notice. The case is to be relisted on 20.03.2012. 72
Case No.:1/17/80ALC2/2011
Party Name:MAN FORCE TRUCKS PRIVATE LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00320/AM12/ RLA File :31/83/040/00071/AM12/ Lic.No/Date:3110051087 19.10.2011 Defer Date:20.03.2012 Decision :As per DHI UO note dated 07.02.2012, the Committee decided to call for the following information/clarification from the firm and to relist the case on 20.03.2012: 1. Firm to furnish information in respect of Sl.No.4,5, and 11 of the Standard Deficiency Format. 73
Case No.:4/20/80ALC2/2011
Party Name:POLY MEDICURE LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00389/AM12/ RLA File :05/24/040/00242/AM12/ Lic.No/Date:0510305886 19.10.2011 Defer Date:20.03.2012 Decision : The Committee noted that the written comments called for from C&PC are yet to be received and decided to remind C&PC expediting their comments. The case is to be relisted on 20.03.2012. 74
Case No.:6/20/80ALC2/2011
Party Name:POLY MEDICURE LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00391/AM12/ RLA File :05/24/040/00241/AM12/ Lic.No/Date:0510305885 19.10.2011 Defer Date:20.03.2012 Decision : The Committee noted that the written comments called for from C&PC are yet to be received and decided to remind C&PC expediting their comments. The case is to be relisted on 20.03.2012. 75
Case No.:2/17/80ALC2/2011
MFG. CO. LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00321/AM12/ RLA File :03/94/040/00605/AM12/ Lic.No/Date:0310661481 21.10.2011 Defer Date:20.03.2012
Decision : The Committee noted that the firm did not reply to this office email letter dated 13.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm along with DL dt.13.01.2012 for expediting requisite information failing which their case will be rejected without any further notice. The case is to be relisted on 20.03.2012. 76
Case No.:20/20/80ALC2/2011
Party Name:FRICK INDIA LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Rejected HQ File :01/80/050/00405/AM12/ RLA File :05/23/040/00269/AM12/ Lic.No/Date:0510306601 25.10.2011 Decision : The Committee observed that the export and import items are similar and there seems to be no manufacturing activity involved. The Committee, therefore, decided to reject the case. 77
Case No.:35/17/80ALC2/2011
Party Name:COMAU INDIA P.LTD, Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00354/AM12/ RLA File :31/82/040/00186/AM12/ Lic.No/Date:3110051283 02.11.2011 78
Case No.:2/20/80ALC2/2011
Party Name:POLY MEDICURE LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00387/AM12/ RLA File :05/24/040/00244/AM12/ Lic.No/Date:0510307048 02.11.2011 Defer Date:20.03.2012 Decision : The Committee noted that the written comments called for from C&PC are yet to be received and decided to remind C&PC expediting their comments. The case is to be relisted on 20.03.2012. 79
Case No.:17/20/80ALC2/2011
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00402/AM12/ RLA File :03/95/040/00463/AM12/ Lic.No/Date:0310663388 03.11.2011 Defer Date:20.03.2012 Decision :As per DIPP UO note dated 07.02.2012, the Committee decided to call for the following information/clarification from the firm and to relist the case on 20.03.2012: 1. Information in respect of Sl.No.4,5,11 &13 of the Standard Deficiency Format export product wise. 80
Case No.:15/20/80ALC2/2011
MFG. CO. LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00400/AM12/ RLA File :03/94/040/00702/AM12/ Lic.No/Date:0310664727 14.11.2011 Defer Date:20.03.2012 Decision : The Committee noted that the firm did not reply to this office email letter dated 13.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm along with DL dt.13.01.2012 for expediting requisite information failing which their case will be rejected without any further notice. The case is to be relisted on 20.03.2012.
81
Case No.:19/20/80ALC2/2011
Party Name:INJECTOPLAST PVT.LTD Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00404/AM12/ RLA File :06/24/040/00038/AM12/ Lic.No/Date:0610024542 14.11.2011 Decision :The Committee deliberated the written comments of C&PC received vide their OM No.46011/09/2006PCII dated 11.01.2012 and decided to ratify the norms in respect of the subject advance authorization as under: Item to be Exported Quantity Boot (OB) 1 No. Rawmaterial recommended for Import Quantity Thermoplastic Elastomer (TPE) 1.05 kg/ kg content in the export product 82
Case No.:34/20/80ALC2/2011
Party Name:INJECTOPLAST PVT.LTD Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00419/AM12/ RLA File :06/24/040/00040/AM12/ Lic.No/Date:0610024543 14.11.2011 Decision : The Committee deliberated the written comments of C&PC received vide their OM No.46011/09/2006PCII dated 11.01.2012 and decided to ratify the norms in respect of the subject advance authorization as under: Item to be Exported Quantity Boot AC 1700i /Boot GII 500i / Adaptor GII 500i / Adaptor 1 No. Rawmaterial recommended for Import Quantity Thermoplastic Elastomer (TPE) 1.05 kg/ kg content in the export product 83
Case No.:22/20/80ALC2/2011
Party Name:J PAN TUBULAR COMPONENTS PVT.LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00407/AM12/ RLA File :05/23/040/00300/AM12/ Lic.No/Date:0510307950 15.11.2011 Defer Date:20.03.2012 Decision : The Committee noted that the firm did not reply to this office email letter dated 13.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm along with DL dt.13.01.2012 for expediting requisite information failing which their case will be rejected without any further notice. The case is to be relisted on 20.03.2012.
Case No.:29/20/80ALC2/2011
Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00414/AM12/ RLA File :05/23/040/00314/AM12/ Lic.No/Date:0510308164 16.11.2011
84 Decision :The Committee deliberated the written comments of MC&IT received vide their UO Note No. 17(105)/2011IPHW dated 23.01.2012 and decided to ratify the norms as applied by the firm inclusive of 5% wastage. 85
Case No.:33/20/80ALC2/2011
Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00418/AM12/ RLA File :05/23/040/00317/AM12/ Lic.No/Date:0510308167 16.11.2011 86
Case No.:31/20/80ALC2/2011
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00416/AM12/ RLA File :03/95/040/00627/AM12/ Lic.No/Date:0310665598 17.11.2011 Defer Date:20.03.2012 Decision : The Committee noted that the firm did not reply to this office letter dated 13.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting requisite information failing which their case will be rejected without any further notice. The case is to be relisted on 20.03.2012. 87
Case No.:26/20/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00411/AM12/ RLA File :04/24/040/00138/AM12/ Lic.No/Date:0410130571 18.11.2011 Defer Date:20.03.2012 Decision : The Committee noted that the firm did not reply to this office letter dated 13.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm for expediting requisite information failing which their case will be rejected without any further notice. The case is to be relisted on 20.03.2012. 88
Case No.:24/20/80ALC2/2011
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00409/AM12/ RLA File :05/23/040/00309/AM12/ Lic.No/Date:0510308688 21.11.2011 ratify the norms as under: 1. Taking clue from SION at Sl. No. C1647, item No. 1 to be allowed with 5% wastage. 2. All other items to be allowed on Net to Net basis with accountability clause.
Case No.:25/20/80ALC2/2011
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:24/80 ALC2/2011 Status: Deferred
89 07.02.2012 HQ File :01/80/050/00410/AM12/ RLA File :05/23/040/00296/AM12/ Lic.No/Date:0510308687 21.11.2011 Defer Date:20.03.2012 Decision :As per DIPP UO note dated 07.02.2012, the Committee decided to call for the following information/clarification from the firm and to relist the case on 20.03.2012: 1. Firm furnish information in respect of Sl.No.3, 4, 5, 11 & 13 of the Standard Deficiency Format. 2. Quantities of import items at Sl. No. 3, 4 & 5 in Nos. also in addition to their weights. 90
Case No.:23/20/80ALC2/2011
Party Name:KEBURGMANN FLEXIBLES INDIA PVT.LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00408/AM12/ RLA File :04/24/040/00234/AM12/ Lic.No/Date:0410130688 22.11.2011 Defer Date:20.03.2012 Decision :The Committee noted that the firm’s application has been returned by C&PC vide their OM No.46011/05/2006PCII dt.30.01.2012 and decided to forward the application to DIPP/DHI for examination and comments. The case is to be relisted on 20.03.2012. 91
Case No.:27/20/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00412/AM12/ RLA File :04/24/040/00216/AM12/ Lic.No/Date:0410130796 23.11.2011 Decision :The Committee deliberated the written comments of DHI received vide their UO Note No. 3(72)/11TSW(B)/33 dated 13.02.2012 and decided to ratify the norms in respect of the subject advance authorization as under: Export product (EP) The total weight of the EP is 10,262 MT and the same to be incorporated in the License. Import: 1. Item No. 1 – (Carbon Steel) . The quantity of seamless tube/ pipe to be allowed is 1700 MT & welded pipe at 50 MT as applied for with 2% wastage. 2. Item No. 2 (Alloy Steel). The quantity of seamless tube / pipe to be allowed is 1700 MT as applied for with 2% wastage. “Welded” to be deleted from the description of import item. 3. Item No. 3 – (Stainless Steel). The quantity of seamless tube / pipe to be allowed is 100 MT with 2% wastage as applied by the firm. “Welded” to be deleted from the description of import item. 4. Item No. 4 – The word “Finished” to be prefixed to the description of import & the same to be restricted to 335 MT & the same to be incorporated along with quantity of import in numbers. The item to be allowed under GN4 as applied for. 5. Item No. 5 – Welding material – Quantity applied is only 15 MT & the same to be recommended import as applied for. (Welding material weight is normally restricted to 2% of the weight of the steel to be welded). 6. Item No. 6 & 7 – These are components & to be allowed under GN4 with accountability clause.
Case No.:28/20/80ALC2/2011
ELECTRICALS LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00413/AM12/ RLA File :04/24/040/00215/AM12/ Lic.No/Date:0410130775 23.11.2011
92 Decision : On the recommendation of DHI representative present in the meeting and written comments received vide DHI letter No. 3(74)/2011TSW(B)/82 dated 2.3.2012, the Committee decided to ratify the norms of subject Authorization as follows: Inputs : (Relevant specifications) Sr.No Item Quantity per unit in MT (% wastage) 1 CS Tubes / Pipes 350 (2%) 2 AS Tubes / Pipes 340 (2%) 3 SS Tubes / Pipes 20 (2%) 5 Welding Wires / Electrodes 3 Remaining items are components and are to be allowed on net to net basis with accountability clause (Nil wastage). 93
Case No.:8/20/80ALC2/2011
MFG. CO. LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00393/AM12/ RLA File :03/94/040/00768/AM12/ Lic.No/Date:0310668917 05.12.2011 Defer Date:20.03.2012 Decision : The Committee noted that the firm did not reply to this office email letter dated 13.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm alongwith DL dt.13.01.2012 for expediting requisite information failing which their case will be rejected without any further notice. The case is to be relisted on 20.03.2012. 94
Case No.:9/20/80ALC2/2011
Party Name:RADIANT INDUSTRIES Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00394/AM12/ RLA File :31/83/040/00182/AM12/ Lic.No/Date:3110051726 07.12.2011 Defer Date:20.03.2012 Decision :On the recommendation of DHI representative present in the meeting, the Committee decided to call for the following information/clarification from the firm and to relist the case on 20.03.2012: 1. Firm furnish information in respect of Sl.No.4, 5 & 11 of the Standard Deficiency Format. 95
Case No.:10/20/80ALC2/2011
MFG. CO. LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00395/AM12/ RLA File :03/94/040/00763/AM12/ Lic.No/Date:0310668956 07.12.2011 Defer Date:20.03.2012 Decision : The Committee noted that the firm did not reply to this office email letter dated 13.01.2012 for furnishing the information. The Committee, therefore, decided to remind the firm alongwith DL dt.13.01.2012 for expediting requisite information failing which their case will be rejected without any further notice. The case is to be relisted on 20.03.2012.
Case No.:12/20/80ALC2/2011
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved
96 HQ File :01/80/050/00397/AM12/ RLA File :31/82/040/00265/AM12/ Lic.No/Date:3110051774 07.12.2011 97
Case No.:13/20/80ALC2/2011
Party Name:UNI VTL ENGINEERING PVT. LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00398/AM12/ RLA File :03/95/040/00726/AM12/ Lic.No/Date:0310669540 08.12.2011 Defer Date:20.03.2012 Decision : The Committee noted that the firm’s application has been sent to DIPP on 27.12.2011. However, the Committee decided to transfer the case to DC(MSME) and forward a copy of firm’s application to them for examination and comments, as the case pertains to them. The case is to be relisted on 20.03.2012. 98
Case No.:14/20/80ALC2/2011
Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Approved HQ File :01/80/050/00399/AM12/ RLA File :31/82/040/00266/AM12/ Lic.No/Date:3110051789 08.12.2011 99
Case No.:35/20/80ALC2/2011
MFG. CO. LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00420/AM12/ RLA File :03/94/040/00799/AM12/ Lic.No/Date:0310671299 16.12.2011 Defer Date:20.03.2012 Decision :As per DIPP UO note dated 07.02.2012, the Committee decided to call for the following information/clarification from the firm and to relist the case on 20.03.2012: 1. Information in respect of Sl.No.3, 4, 5, 11 & 13 of the Standard Deficiency Format – export product wise. 2. Quantities of import items at Sl. No. 1, 5 & 7 in Nos. also in addition to their weights. 3. Quantity of import item at Sl. No. 2 in meters also in addition to its weight. 100
Case No.:1/24/80ALC2/2011
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00475/AM12/ RLA File :03/95/040/00851/AM12/ Lic.No/Date:0310676898 16.01.2012 Defer Date:20.03.2012 Decision :The Committee noted that the firm’s application has been sent to DIPP on 06.02.2012 for examination and comments. The case is to be relisted on 20.03.2012.
Case No.:2/24/80ALC2/2011
MFG. CO. LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred
101 HQ File :01/80/050/00476/AM12/ RLA File :03/94/040/00885/AM12/ Lic.No/Date:0310677027 17.01.2012 Defer Date:20.03.2012 Decision : The Committee noted that the firm’s application has been sent to DIPP on 06.02.2012 for examination and comments. The case is to be relisted on 20.03.2012. 102
Case No.:3/24/80ALC2/2011
Party Name:GL&V INDIA PRIVATE LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00477/AM12/ RLA File :31/83/040/00209/AM12/ Lic.No/Date:3110052550 20.01.2012 Defer Date:20.03.2012 Decision :The Committee noted that a copy of firms application forward to DC(MSME) for examination. The case is to be relisted on 20.03.2012. 103
Case No.:4/24/80ALC2/2011
Party Name:UTC FIRE & SECURITY INDIA LIMITED Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00478/AM12/ RLA File :03/95/040/00877/AM12/ Lic.No/Date:0310678522 24.01.2012 Defer Date:20.03.3012 Decision : The Committee noted that a copy of firms application forward to DIPP for examination. The case is to be relisted on 20.03.2012. 104
Case No.:5/24/80ALC2/2011
MFG. CO. LTD., Meet No/Date:24/80 ALC2/2011 07.02.2012 Status: Deferred HQ File :01/80/050/00479/AM12/ RLA File :03/94/040/00930/AM12/ Lic.No/Date:0310678658 25.01.2012 Defer Date:20.03.2012 Decision : The Committee decided to remind the RA (with a copy to the firm) to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 20.03.2012. S.No.26
Case No. A 15
M/s. Delphi Automotive Systems Pvt. Ltd., Noida F.No. 01/80/50/ 00495/AM11/DES.I Lic.No. & Date Meeting No.24/12 RA F.No.05/88/040/00721/AM03 0510081234 dt.21.02.2003 Date: 07.02.2012 Ratification of norms The representative of the DHI informed the Committee that the case is under examination. The Committee, therefore, decided to defer the case and to relist the case on 20.03.2012. S.No.585
Case No. A/R
102 M/s. Bharat Heavy Electricals Ltd., Haridwar HQ F.No.01/80/050/01790/AM09/DESI Lic. No. & Date Meeting No.24/12 RLA No.61/24/040/00069/AM09 6110000286 dt.06.02.2009 Date: 07.02.2012 Ratification of Norms The Committee noted the written comments of DHI received vide ID Note No. 3(22)/10TSW(B)/39 dated 24.12.2012 and decided to obtain comments of C&PC on item No.74 – Control Fluid. The firm may also be requested to furnish calculation of requirement of item 74 for flushing to DHI & C&PC. The case may be re listed on 20.03.2012. S.No.586
Case No. A/R
103 M/s. Bharat Heavy Electricals Ltd., Haridwar HQ F.No.01/80/050/00120/AM10/DESI Lic. No. & Date Meeting No.24/12 RLA No.61/24/040/00007/AM10 6110000313 dt.29.05.2009 Date: 07.02.2012 Ratification of Norms On the recommendation of DHI representative, the Committee decided to ratify the norms of the subject Authorization of repeat basis as allowed under Authorization No.6110000286 dated 6.2.2009. S.No.587
Case No. A/R 167
M/s. Bharat Heavy Electricals Ltd., Haridwar F.No. 01/80/50/ 00449/AM10/DES.I Lic.No. & Date Meeting No.24/12 RA F.No.61/24/040/00036/AM10 6110000362 dt.13.10.2009 Date: 07.02.2012 Ratification of norms The Committee noted that the case is under examination of DHI and decided to await their comments. The case may be relisted on 20.03.2012. S.No.588
Case No. A/R 117
M/s. Thermax Ltd., F.No. 01/80/50/01034/AM09/DES.I Lic.No. & Date Meeting No.24/12 RA F.No.31/21/040/00296/AM09 3110035317 dt.09.09.2008 Date: 07.02.2012 Ratification of norms The representative of the DHI informed the Committee that the case is under examination. The Committee, S.No.589
Case No. A/R 173
M/s. Thermax Ltd., F.No. 01/80/50/01550/AM09/DES.I Lic.No. & Date Meeting No.24/12 RA F.No.31/24/040/00296/AM09 3110036393 dt.09.09.2008 Date: 07.02.2012 Ratification of norms The representative of the DHI informed the Committee that the case is under examination. The Committee, S.No.590
Case No. A/R28
M/s. Brakes India Limited, Chennai HQF.No.01/80/050/01124/AM08/DES.I Lic. No. & date Meeting No.24/12 RA.F.No.04/24/040/00263/AM08 0410093871 dt.15.02.2008 Date: 07.02.2012 Revision of norms The representative of the DHI informed the Committee that the case is under examination. The Committee, S.No.591
Case No. A/R37
M/s. Bharat Heavy Electricals Ltd., Haridwar HQF.No.01/80/050/00143/AM11/DES.I Lic. No. & date Meeting No.24/12 RA.F.No.61/24/040/00016/AM11 6110000447 dt.13.05.2010 Date: 07.02.2012 Revision of norms The Committee noted the written comments of DHI received vide ID Note No. 3(22)/10TSW(B)/39 dated 24.12.2012 and decided to obtain comments of C&PC on item No.74 – Control Fluid. The firm may also be requested to furnish calculation of requirement of item 74 for flushing to DHI & C&PC. The case may be re listed on 20.03.2012. S.No.592
Case No. A/R38
M/s. Bharat Heavy Electricals Ltd., Haridwar HQF.No.01/80/050/00184/AM10/DES.I Lic. No. & date Meeting No.24/12 RA.F.No.61/24/040/00012/AM10 6110000320 dt.19.06.2009 Date: 07.02.2012 Revision of norms
On the basis of recommendation of DHI representative present in the meeting, the Committee decided to ratify the norms of the subject Authorization as per comments in Advance Authorization No.6110000472 dated 15.7.2010. S.No.593
Case No. A/R
68 M/s. GEA BGR Energy System India Ltd., Chennai HQF.No.01/80/050/01097/AM08/DES.I Lic. No. & date Meeting No.24/12 RA.F.No.04/24/040/00325/AM08 0410092981 dt.02.01.2008 Date: 07.02.2012 Ratification of norms The representative of the DHI informed the Committee that the case is under examination. The Committee, S.No.594
Case No. A/R
144 M/s. Alstom Projects India Ltd., Vadodara HQF.No.01/80/050/00134/AM11/DES.I Lic. No. & date Meeting No.24/12 RA.F.No.03/94/040/01139/AM10 0310567657 dt.31.03.2010 Date: 07.02.2012 Fixation of Norms The Committee noted that the firm did not furnish any reply with reference to this office letter dated 28.11.2011 and subsequent reminder by email dated 13.01.2012 and decided that to send a last reminder to firm requesting the firm to furnish their reply. S.No.595
Case No. A/R
147 M/s. Bharat Heavy Electricals Ltd., Tiruchirapalli HQF.No.01/80/050/00550/AM11/DES.I Lic. No. & date Meeting No.24/12 RA.F.No.04/24/040/00204/AM11 0410118772 dt.10.11.2010 Date: 07.02.2012 Fixation of Norms The representative of the DHI informed the Committee that the case is under examination. The Committee, S.No.596
Case No. A/R
148 M/s. Bharat Heavy Electricals Ltd., Tiruchirapalli HQF.No.01/80/050/00651/AM11/DES.I Lic. No. & date Meeting No.24/12 RA.F.No.04/24/040/00205/AM11 0410118773 dt.10.11.2010 Date: 07.02.2012 Fixation of Norms The representative of the DHI informed the Committee that the case is under examination. The Committee, S.No.597
Case No. A/R
149 M/s. Bharat Heavy Electricals Ltd., Tiruchirapalli HQF.No.01/80/050/00809/AM11/DES.I Lic. No. & date Meeting No.24/12 RA.F.No.04/24/040/00104/AM11 0410121605 dt.14.02.2011 Date: 07.02.2012 Fixation of Norms The representative of the DHI informed the Committee that the case is under examination. The Committee, S.No.598
Case No. A/R
150 M/s. The Saraswati Industrial Syndicate Ltd., HQF.No.01/80/050/00827/AM06/DES.I Lic. No. & date Meeting No.24/12 RA.F.No.05/24/040/00766/AM06 0510173546 dt.03.01.2006 Date: 07.02.2012 Revision of Norms
The Committee deliberated the written comments of DIPP received vide their UO Note dated 07.02.2012 and decided to ratify the norms in respect of the subject advance authorization as under: Quantities of import items at Sl. No. 4 & 5 to be allowed as under as per GN4 for Engineering products: 1. Quantity of import item at Sl. No. 4 to be allowed as 216 Nos. on net to net basis. In addition, spares to be allowed as per policy for spares. 2. Quantity of import item at Sl. No. 5 to be allowed as 648 Nos. on net to net basis. In addition, spares to be allowed as per policy for spares. S.No.599
Case No. A/R
112 M/s. Bharat Heavy Electricals Ltd., Noida HQF.No.01/80/050/00575/AM10/DES.I Lic. No. & date Meeting No.24/12 RA.F.No.05/23/040/00117/AM10 0510253818 dt.02.12.2009 Date: 07.02.2012 Fixation of Norms Decision : DHI representative observed that from the details furnished by the firm, there is no manufacturing activity involved with export product. The Committee, therefore, decided to call the firm to attend Personal Hearing to explain the reasons/justification. The case is to be relisted on 20.03.2012. S.No.600
Case No. A/R31
M/s. KernLiebers Springs & Stampings Pvt. Ltd., Karnataka HQF.No.01/80/050/01630/AM09/DES.I Lic. No. & date Meeting No.24/12 RA.F.No.07/24/040/00531/AM09 0710062052 dt.26.12.2008 Date: 07.02.2012 Revision of norms DHI representative informed the Committee that revised calculation of recovery based on net weight of export product has been sought by them. The Committee, therefore, decided to await for examination and comments of DHI and to relist the case on 20.03.2012. S.No.601
Case No. A/R
70 M/s. Kern Liebers Springs & Stampings Pvt. Ltd., Tumkur HQF.No.01/80/050/00593/AM09/DES.I Lic. No. & date Meeting No.24/12 RA.F.No.07/24/040/00008/AM09 0710057064 dt.23.04.2008 Date: 07.02.2012 Revision of norms DHI representative informed the Committee that revised calculation of recovery based on net weight of export product has been sought by them. The Committee, therefore, decided to await for examination and comments of DHI and to relist the case on 20.03.2012. S.No.602
Case No. A/R
154 Reference received from Jt.DGFT, CLA, New Delhi of M/s. Gestek Engineering Pvt. Ltd., New Delhi HQF.No.01/80/050/01125/AM07/DES.I Lic. No. & date Meeting No.24/12 RA.F.No.05/24/040/00812/AM07 0510196934 dt.28.12.2006 Date: 07.02.2012 Revision of Norms The Committee noted that CLA, New Delhi has been asked to furnish export documents and decided to send a reminder. The Committee, therefore, decided to defer the case and to relist the case on 20.03.2012. S.No.202
Case No.C35
HQ F.No.01/80/162/1316/AM09/DES.I
M/s. Panch Ratna Fastners (P). Ltd; Meeting No.24/12 Date: 07.02.2012 Alleged swindling of several crores of Govt. revenue –DEPB. The Committee decided to examine this case on file in DESI Section. Sl.No.203
Case No. C 16
M/s. Birla Precision Technologies Ltd., Aurangabad HQ F.No.01/80/162/00608/AM11/ DESI Meeting No.24/12 Fixation of input output norms for the export product “Tool Holder” in respect of 100% EOU Date: 07.02.2012 Based on the advise of the representative of the DHI, the Committee decided to ask the firm to send a technical person to meet and explain the details of the case along with representative sample of the export product. The Sl.No.204
Case No.C01
M/s. Snecma Hal Aerospace Ltd., HQ F.No.01/80/162/00681/AM11/DES.I Meeting No.24/12 Date: 07.02.2012 Fixation of SION for Export Product “(Fluid System) – Air Crafts Part. The Committed that the firm’s reply dated 24.1.2012 has been received and decided to forward to MSME for examination and comments. The Committee, therefore, decided to defer the case and to relist the case on 20.03.2012. Sl.No.205
Case No.C22
M/s. Inoxpa India Pvt. Ltd., Pune HQ F.No.01/80/162/00366 /AM12/DES.I Meeting No.24/12 Date: 07.02.2012 Request for fixation of input output norms in respect of EOUs for the export product “(1) Centrifugal Pumps and Parts thereof (2) Industrial Valves Viz; Butterfly & Ball Valves; (3) Other components required for Food, Dairy, Cosmetic & Pharmaceuticals Industries viz; Tubes Fitings, Flanges, Unions, Joints & bend”. The representative of the DIPP informed the Committee that the case is under examination. The Committee, S.No.206
Case No.C24
M/s. Indo Schottle Auto Parts Pvt. Ltd.,, HQ F.No.01/80/162/00532 /AM12/DES.I Meeting No.24/12 Date: 07.02.2012 Request for fixation of input output norms in respect of 100% EOUs for the export product “Central Housing Cover; Collar Thrust; Coupling Injector Plunger Assembly; Fitting High Pressure Fuel; Guide Pin; Housing Injector Spring; Link Injector Plunger; Plunger Tappet; Sleeve; Spool; Bushing; Oil Seal Plate etc.” Based on the advise of the representative of the DHI, the Committee decided to ask the firm to send a technical person to meet and explain the details of the case along with representative sample of the export product. The
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.