IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2011-11-15

DGFT Committee Minutes

Document text

RATIFIED   Minutes of Meeting No.17/12 scheduled on 15.11.2011 of Norms Committee(NC­I) (DES.I Section)   The meeting No. 17/12 of the Norms Committee (NC­I) for the licensing year 2011­2012 was held on 15.11.2011  under  the  Chairmanship  of  Sh.  N.P.S.  Monga,  Additional    Director  General  of  Foreign  Trade  to consider  the  applications  under  Duty  Exemption  /  Remission  Schemes  (Chapter­4)  of  Foreign  Trade  Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 5. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.   I ­The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon are as under: ­ 1

Case No.:27/11/80­ALC2/2011

Party Name:A RAYMOND FASTENERS INDIA PRIVATE LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00239/AM12/ RLA File :31/24/040/00108/AM10/ Lic.No/Date:3110040031 23.09.2009 Defer Date:27.12.2011 Decision : The Committee observed that the firm’s has not replied to the C&PC’s deficiency letter dated 04.10.2011.   The  Committee,  therefore,  decided  to  issue  a reminder  to  the  firm  for  expediting  the  said information to C&PC and this office failing which  their case will be rejected without any further notice.   The case may be re­listed on 27.12.2011.   2

Case No.:3/37/80­ALC2/2009

Party Name:S.M.PULP PACKAGING PVT.LTD Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00562/AM10/ RLA File :05/24/040/00378/AM10/ Lic.No/Date:0510253563 27.11.2009 Defer Date:27.12.2011 Decision : The Committee noted vide O.M. No.803/2009­D(EPC) dated 09.11.2011 from the Ministry of Defence  on  09.11.2011  informed  that  the  case  is  under  their  consideration.    The  Committee  therefore, decided to send a D.O. from DDG to Min. of Defence enclosing a list of all pending cases and request for expediting their comments.  The case may be re­listed on 27.12.2011.     3

Case No.:16/2/80­ALC2/2011

Party Name:PNEUMAX PNEUMATIC INDIA PVT.LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00937/AM11/ RLA File :07/21/040/00491/AM11/ Lic.No/Date:0710074822 14.10.2010 Defer Date:27.12.2011 Decision : The Committee noted that the firm has not enclosed requisite documents and the data furnished along with their reply dated 19.09.2011 is not legible. The Committee, therefore, decided  to again ask to send the enclosures and legible data.  The case may be re­listed on 27.12.2011.

4

Case No.:20/33/80­ALC2/2010

Party Name:BIRLA ERICSSON OPTICAL LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00576/AM11/ RLA File :11/24/040/00051/AM11/ Lic.No/Date:1110023479 02.11.2010 Defer Date:27.12.2011 Decision :  The  Committee  noted  that  DIT    has  reminded  the  firm  on17.10.2011  to  furnish  reply.    The Committee, therefore,  decided to await the firm’s reply/comments and to re­list the case on 27.12.2011.   5

Case No.:3/33/80­ALC2/2010

Party Name:L&T – MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00559/AM11/ RLA File :03/95/040/00615/AM11/ Lic.No/Date:0310602242 22.11.2010 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 28.10.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­ listed on 27.12.2011.   6

Case No.:8/33/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00564/AM11/ RLA File :07/24/040/00328/AM11/ Lic.No/Date:0710075606 24.11.2010

Decision : The Committee deliberated the written comments of  DC(MSME)  received  vide their U.O. Note No.30(173)2010­ME dated  18.10.2011.   2. Members of the Committee observed that wastage of the aircraft products has been considered by DC(MSME) after 10% recovery.  However, it was observed that a Technical Committee had earlier recommended  15%  recovery  for  aircraft­components  manufactured  from  Aluminium  and  5% recovery  from  Stainless  steel.    Therefore,    the  Committee  decided  to  ratify  the  norms  after condsidering15%  recovery  on  Aluminium  and  5%  on  Stainless  steel  instead  of  10%  recovery recommended by DC(MSME).   3. The amended norms ratified by the Committee in respect of the subject advance authorization are as under:­   Sl. No. Name of Product Weight  of each  Export Product Weight  of RM Wastage %  after 15%/5% recovery Permissible Imported  Raw  material’s  Wt (After  15%/5% recovery) 01 Base  Short  Base  assy­ Right­831 Nos. 0.196 Kg 0.869 Kg 292% 638  Kg  (import  item at no 2) 02 Base  Short  Base  assy­ Left­831 Nos. 0.196 Kg 0.869 Kg 292% 638  Kg  (import  item at no 2) 03 Inner Pawl­71 Nos. 0.134 Kg 0.774 Kg 406% 48 Kg (import item at no 1) 04 Link Toggle­121 Nos. 0.01 Kg 0.041 Kg 295% 4.77  Kg  (import  item at no 3) 05 Crank  Assy  Idlear­261 Nos. 0.552 Kg 4.548 Kg 688% 1135 Kg (import item at no 4) 06 Blade­370 Nos. 0.334 Kg 1.684 Kg 384% 398  Kg  (import  item at no 5)   The RLA may take necessary action accordingly.   7

Case No.:9/33/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00565/AM11/ RLA File :07/24/040/00329/AM11/ Lic.No/Date:0710075610 24.11.2010 Defer Date:27.12.2011 Decision  :  The  Committee  noted  the  firm’s  reply  has  been  sent  to  DC(MSME)  on  19.10.2011  for examination and comments.  The Committee decided to defer the case and to re­listed on 27.12.2011.   8

Case No.:28/39/80­ALC2/2010

Party Name:MAN FORCE TRUCKS PRIVATE LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00830/AM11/ RLA File :31/24/040/00119/AM11/ Lic.No/Date:3110046183 29.12.2010 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 18.10.2011

9

Case No.:26/38/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00796/AM11/ RLA File :03/94/040/00885/AM11/ Lic.No/Date:0310609488 05.01.2011 Defer Date:27.12.2011 Decision : The Committee decided to send the DL of DIT dated 11.11.2011 to the firm  for furnishing requisite information .  The case may be re­listed  on 27.12.2011.   10

Case No.:30/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00832/AM11/ RLA File :03/95/040/00765/AM11/ Lic.No/Date:0310609444 05.01.2011 Defer Date:27.12.2011 Decision :As per DHI U.O. Note No. 3(64)/10­TSW(B) dated 09.11.2011, the Committee decided to call for the following information/clarification from the firm and to re­list the case on 27.12.2011: ­   1. Representative  calculation  of  requirement  of  Alloy  Steel  tubes  for  852.4  MT  required  in  the manufacture of super heater coils & tubes. 2. Calculation of requirement of Low  Alloy Steel plates for 205.9 MT required in the manufacture of Furnace panel with attachments. 3. Calculation of requirement of SS plates for 455 MT required in the manufacture of  Economiser coils & tubes.. 4. All the above calculations should be supported by drawing & dimensions highlighted.   11

Case No.:10/36/80­ALC2/2010

Party Name:SEC INDUSTRIES PVT.LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00709/AM11/ RLA File :09/24/040/00442/AM11/ Lic.No/Date:0910045076 07.01.2011 Defer Date:27.12.2011 Decision : The Committee noted vide O.M. No.803/2009­D(EPC) dated 09.11.2011 from the Ministry of Defence  on  09.11.2011  informed  that  the  case  is  under  their  consideration.    The  Committee  therefore, decided to send a D.O. from DDG to Min. of Defence enclosing a list of all pending cases and request for expediting their comments.  The case may be re­listed on 27.12.2011.     12

Case No.:3/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00805/AM11/ RLA File :03/95/040/00774/AM11/ Lic.No/Date:0310610650 12.01.2011 Defer Date:27.12.2011 Decision :As per DHI U.O. Note No. 3(64)/10­TSW(B) dated 09.11.2011, the Committee decided to call for the following information/clarification from the firm and to re­list the case on 27.12.2011: ­   1. Representative calculation of requirement of Alloy Steel tubes for 2514 MT, Low Alloy Steel plates for 580 MT & SS plates for 807 MT required in the manufacture of Export product. 2. All the above calculations should be supported by drawing & dimensions highlighted.  

Case No.:13/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00815/AM11/ RLA File :03/95/040/00824/AM11/ Lic.No/Date:0310610931 13.01.2011 Defer Date:27.12.2011

13 Decision :As per DHI U.O. Note No. 3(64)/10­TSW(B) dated 09.11.2011, the Committee decided to call for the following information/clarification from the firm and to re­list the case on 27.12.2011: ­   1. Representative  calculation  of  requirement  of  Alloy  Steel  tubes  for  1704.9  MT  required  in  the manufacture of super heater coils & tubes. 2. Calculation of requirement of Low  Alloy Steel plates for 411.9 MT required in the manufacture of Furnace panel with attachments. 3. Calculation of requirement of SS plates for 910 MT required in the manufacture of Economiser coils & tubes.. 4. All the above calculations should be supported by drawing & dimensions highlighted. 5. It  is  observed  that  the  above  license  &  license  0310609444  dt  05­01­11  are  issued  for  the  same project of 3X660 MW Koradi Expansion project. The firm may clarify the difference between two projects.   14

Case No.:18/36/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00717/AM11/ RLA File :31/21/040/00312/AM11/ Lic.No/Date:3110046436 14.01.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 28.09.2011   15

Case No.:22/37/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00760/AM11/ RLA File :09/24/040/00477/AM11/ Lic.No/Date:0910045223 25.01.2011 Defer Date:27.12.2011 Decision :The Committee noted a copy of firm’s reply has been sent to DHI on 01.11.2011 for examination and comments.  The case may be re­listed on 27.12.2011.   16

Case No.:17/39/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00819/AM11/ RLA File :61/24/040/00074/AM11/ Lic.No/Date:6110000553 25.01.2011 Defer Date:13.12.2011 Decision : The Committee already noted the recommendation of DHI  for ratification of norms on repeat basis as per AA No.6110000544 dated 04.01.11 which is yet to be ratified.  The Committee, therefore, decided to defer and  to re­list  the case on 24.01.2012.   17

Case No.:29/39/80­ALC2/2010

Party Name:PNEUMAX PNEUMATIC INDIA PVT.LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00831/AM11/ RLA File :07/21/040/00757/AM11/ Lic.No/Date:0710076903 25.01.2011 Defer Date:27.12.2011 Decision : The Committee noted that as per DHI U.O. Note No. 3(29)/11­TSW(B)620 dated 13.10.2011 a deficiency letter has been issued to the firm on 15.11.2011calling for certain information.  The Committee, therefore, decided to await the firm’s reply and to re­list the case on 27.12.2011.

18

Case No.:23/39/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00825/AM11/ RLA File :61/24/040/00078/AM11/ Lic.No/Date:6110000557 03.02.2011 Defer Date:13.12.2011 Decision : The Committee already noted the recommendation of DHI  for ratification of norms on repeat basis as per AA No.6110000544 dated 04.01.11 which is yet to be ratified.  The Committee, therefore, decided to defer and to re­list  the case on 24.01.2012.   19

Case No.:1/11/85­ALC3/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/85/050/00057/AM12/ RLA File :04/24/040/00296/AM11/ Lic.No/Date:0410121516 10.02.2011 Defer Date:27.12.2011 Decision  :  The  Committee  noted  a  copy  of  firm’s  reply  has  been  sent  to  DHI  on  11.11.2011  for examination and comments.  The case may be re­listed on 27.12.2011.   20

Case No.:2/39/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00804/AM11/ RLA File :04/24/040/00257/AM11/ Lic.No/Date:0410121550 11.02.2011 Defer Date:10.01.2012 Decision :  The Committee noted the written comments of DHI received vide U.O. Note No. 3(40)/10­ TSW(B) /639 dated 24.10.2011 and decided to advise the firm to appear in  PH before the NC to explain their case  regarding  Item  No.  14  (Furnace  maintenance  platform)  which  appear  as    not  part  of  export product and Item No. 24 & 25  (A1 Sheet & Grill) for which calculation has not been given.  The case may be re­listed on 10.01.2012.   21

Case No.:10/5/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00046/AM12/ RLA File :09/24/040/00479/AM11/ Lic.No/Date:0910045519 11.02.2011 Defer Date:27.12.2011 Decision : The Committee again decided to forward a copy of firm’s reply dated 27.09.2011 to DIPP for examination and comments.  The case may be re­listed on 27.12.2011.   22

Case No.:31/39/80­ALC2/2010

Party Name:SAVAS ENGINEERING COMPANY PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00833/AM11/ RLA File :31/24/040/00249/AM11/ Lic.No/Date:3110046929 15.02.2011 Defer Date:27.12.2011 Decision  :The  Committee  noted  that    R.A.  neither  reported  status  of  the  case  nor  forwarded  the  firm application  despite  3  reminders.    Further,  letters  sent  to  the  firm  were  received  undelivered.    The Committee, therefore, decided  to send a D.O. reminder from DDG seeking clarification from R.A. failing which it will be presumed that ratification of norms is not required and the case will be closed on the part of  NC­I. The case may be re­listed on 27.12.2011.  

Case No.:36/39/80­ALC2/2010

Party Name:TRF LIMITED, Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred

23 HQ File :01/80/050/00838/AM11/ RLA File :02/24/040/00255/AM10/ Lic.No/Date:0210154977 18.02.2011 Defer Date:27.12.2011 Decision :As per DHI U.O. Note No. 3(05)/10­TSW(B) dated 14.11.2011, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  27.12.2011: ­   (i)                 The export item as per Advance Authorization is Coal Handling Plant for which it proposes to import coal sampling plant.  Then there is some amendment.  The above information is not matching with the list given in the application. (ii)               The firm to give the specific list of export items with quantity and corresponding import items along with catalogue to examine their request.   24

Case No.:41/39/80­ALC2/2010

Party Name:SEC INDUSTRIES PVT.LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00843/AM11/ RLA File :09/24/040/00524/AM11/ Lic.No/Date:0910045585 18.02.2011 Defer Date:27.12.2011 Decision : The Committee noted vide O.M. No.803/2009­D(EPC) dated 09.11.2011 from the Ministry of Defence  on  09.11.2011  informed  that  the  case  is  under  their  consideration.    The  Committee  therefore, decided to send a D.O. from DDG to Min. of Defence enclosing a list of all pending cases and request for expediting their comments.  The case may be re­listed on 27.12.2011.   25

Case No.:42/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00844/AM11/ RLA File :03/95/040/00874/AM11/ Lic.No/Date:0310616717 18.02.2011 Defer Date:27.12.2011 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 27.12.2011.   26

Case No.:18/5/80­ALC2/2011

Party Name:SPRAY ENGINEERING DEVICES LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00054/AM12/ RLA File :22/24/040/00094/AM11/ Lic.No/Date:2210011010 18.02.2011 Defer Date:27.12.2011 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 27.12.2011.   27

Case No.:40/39/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00842/AM11/ RLA File :04/24/040/00231/AM11/ Lic.No/Date:0410121741 21.02.2011 Defer Date:27.12.2011 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  09.11.2011  to  DHI  for examination and comments.  The case may be re­listed on 27.12.2011.   28

Case No.:47/39/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00849/AM11/ RLA File :05/23/040/00328/AM11/ Lic.No/Date:0510284479 22.02.2011 Defer Date:27.12.2011

Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 27.12.2011.   29

Case No.:48/39/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00850/AM11/ RLA File :05/23/040/00330/AM11/ Lic.No/Date:0510284482 22.02.2011 Defer Date:27.12.2011 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 27.12.2011.   30

Case No.:25/1/81­ALC2/2011

Party Name:WEBB INDIA PVT. LTD Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/81/050/00604/AM11/ RLA File :07/24/040/00485/AM11/ Lic.No/Date:0710077830 04.03.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 26.09.2011   31

Case No.:9/2/80­ALC2/2011

Party Name:THERMAX LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00930/AM11/ RLA File :31/24/040/00273/AM11/ Lic.No/Date:3110047467 21.03.2011 Defer Date:27.12.2011 Decision :The Committee noted  that the firm’s reply has been sent to DHI on 04.11.2011.  The Committee, therefore, decided to defer the case and to re­list the case on 27.12.2011.   32

Case No.:14/2/80­ALC2/2011

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00935/AM11/ RLA File :05/23/040/00367/AM11/ Lic.No/Date:0510286717 23.03.2011 Defer Date:27.12.2011 Decision :The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 27.12.2011.   33

Case No.:6/2/80­ALC2/2011

Party Name:METSO POWER INDIA PRIVATE LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00927/AM11/ RLA File :04/24/040/00350/AM11/ Lic.No/Date:0410122852 25.03.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 28.10.2011  

Case No.:3/2/80­ALC2/2011

Party Name:AYAAPPA CNC PVT.LTD, Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred

34 HQ File :01/80/050/00003/AM12/ RLA File :07/24/040/00547/AM11/ Lic.No/Date:0710078428 29.03.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 21.10.2011   35

Case No.:19/2/80­ALC2/2011

Party Name:STARION INDIA P.LTD Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Rejected HQ File :01/80/050/00940/AM11/ RLA File :31/24/040/00278/AM11/ Lic.No/Date:3110047653 31.03.2011   Decision :The Committee decided to reject the case on the ground that the firm did not furnish any reply to DL raised by DIT on 30.06.2011,  their reminder dated 13.09.2011 and also this office final reminder sent to the firm on 18.10.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.     36

Case No.:13/5/80­ALC2/2011

Party Name:TDW INDIA LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00049/AM12/ RLA File :34/24/040/00338/AM11/ Lic.No/Date:3410029836 01.04.2011 Defer Date:27.12.2011 Decision :  The Committee noted that a deficiency letter to the firm has been received undelivered from the post office.  The Committee, therefore, decided to ask R.A.  to confirm the existence of the firm and send a report in this regard.  The Case may be re­listed on 27.12.2011.   37

Case No.:18/8/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00166/AM12/ RLA File :61/24/040/00001/AM12/ Lic.No/Date:6110000602 18.04.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 24.10.2011   38

Case No.:12/3/80­ALC2/2011

Party Name:CHANG YUN INDIA LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00017/AM12/ RLA File :05/23/040/00022/AM12/ Lic.No/Date:0510288459 20.04.2011 Defer Date:27.12.2011 Decision :The Committee noted  that the firm’s reply has been sent to DHI on 18.10.2011.  The Committee, therefore, decided to defer the case and to re­list the case on  27.12.2011.  

Case No.:19/8/80­ALC2/2011

Party Name:AVASARALA TECHNOLOGIES LIMITED, Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred

39 HQ File :01/80/050/00167/AM12/ RLA File :07/21/040/00896/AM11/ Lic.No/Date:0710078776 26.04.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 17.10.2011   40

Case No.:23/5/80­ALC2/2011

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00059/AM12/ RLA File :03/95/040/00090/AM12/ Lic.No/Date:0310630441 10.05.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 29.09.2011   41

Case No.:28/5/80­ALC2/2011

Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00064/AM12/ RLA File :05/23/040/00043/AM12/ Lic.No/Date:0510290272 10.05.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm sought time vide their letter dated 05.11.2011 and has not replied to this office letter  dated 29.09.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 27.12.2011.   42

Case No.:37/5/80­ALC2/2011

Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00073/AM12/ RLA File :05/24/040/00049/AM12/ Lic.No/Date:0510290853 16.05.2011   Decision : As per the written comments of  DIPP  received  vide their U.O. Note dated 15.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1.      Quantities of import items from Sl. No 1 to 18 & 23 to 66 to be allowed on net to net basis with accountability clause. 2.      Quantity of import item  at import items Sl. No. 19 to be allowed as 15032377 gms inclusive of 85 % wastage after 50 % recovery. 3.      Quantity of import item  at import items Sl. No. 20  to be allowed as 564925 gms inclusive of 87 % wastage after 50 % recovery. 4.      Quantity of import item  at import items Sl. No. 21 to be allowed as 6938037 gms inclusive of 70.5 % wastage after 50 % recovery. 5.      Quantity of import item  at import items Sl. No. 22 to be allowed as 3905213 gms inclusive of 94 % wastage after 50 % recovery.  

43

Case No.:1/9/81­ALC2/2011

Party Name:DELPHI AUTOMOTIVE SYSTEMS PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/81/050/00051/AM12/ RLA File :05/23/040/00054/AM12/ Lic.No/Date:0510290928 18.05.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm has sought time vide their letter dated 05.11.2011 and  has not replied to this office letter  dated 28.10.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 27.12.2011.   44

Case No.:39/5/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00075/AM12/ RLA File :04/24/040/00040/AM12/ Lic.No/Date:0410124178 19.05.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 20.10.2011   45

Case No.:23/11/80­ALC2/2011

Party Name:TIL LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00235/AM12/ RLA File :02/24/040/00045/AM12/ Lic.No/Date:0210160081 08.06.2011   Decision : The Committee decided to ratify the norms in respect of all items except import item No. 13 as per GN­4 and Import Item S.No.13 (Rectangular Hollow Tue of Cross Section ­350MMX 150 MM X 12.5 MM) on net to net basis with accountability clause under the subject advance authorization.     46

Case No.:4/8/80­ALC2/2011

Party Name:SUPREME INDUSTRIES, Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00152/AM12/ RLA File :32/21/040/00038/AM12/ Lic.No/Date:3210048327 10.06.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 28.09.2011   47

Case No.:22/11/80­ALC2/2011

Party Name:TRF LIMITED, Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00234/AM12/ RLA File :02/24/040/00049/AM12/ Lic.No/Date:0210160407 15.06.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 18.10.2011

48

Case No.:8/8/80­ALC2/2011

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00156/AM12/ RLA File :31/82/040/00053/AM12/ Lic.No/Date:3110048743 21.06.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 28.09.2011   49

Case No.:9/11/80­ALC2/2011

Party Name:ICEM ENGINEERING COMPANY PRIVATE LIMITED, Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00221/AM12/ RLA File :03/94/040/00270/AM12/ Lic.No/Date:0310638600 24.06.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 17.10.2011   50

Case No.:14/11/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00226/AM12/ RLA File :09/24/040/00163/AM12/ Lic.No/Date:0910047353 28.06.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 18.10.2011   51

Case No.:24/11/80­ALC2/2011

Party Name:POLMOR STEEL PVT LTD Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00236/AM12/ RLA File :09/24/040/00140/AM12/ Lic.No/Date:0910047329 28.06.2011 Defer Date:27.12.2011 Decision  :The  Committee  noted  that  the  firm  application  has  been  sent  to  DHI  on18.10.2011  for examination and comments. The committee decided to defer the case and to re­list the case on 27.12.2011.   52

Case No.:17/8/80­ALC2/2011

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00165/AM12/ RLA File :05/23/040/00127/AM12/ Lic.No/Date:0510295211 30.06.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm has sought time vide their letter dated 01.11.2011 and has not replied to this office letter  dated 17.10.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 27.12.2011.

53

Case No.:7/11/80­ALC2/2011

Party Name:REITZ INDIA LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00219/AM12/ RLA File :09/24/040/00155/AM12/ Lic.No/Date:0910047380 30.06.2011 Defer Date:27.12.2011 Decision : The Committee noted that a deficiency letter issued to the firm has been received undelivered from  the  post  office  and  R.A.  has  been  asked  to  confirm  the  existence  of  the  firm.    The  Committee, therefore, decided to send a D.O. reminder from DDG. The case may be re­listed on 27.12.2011.   54

Case No.:25/11/80­ALC2/2011

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00237/AM12/ RLA File :07/24/040/00104/AM12/ Lic.No/Date:0710080361 04.07.2011 Defer Date:27.12.2011 Decision  :As  per  DIPP  U.O.  Note  dated  15.11.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on 27.12.2011: ­   1. Information in respect of Item at Sl. No. 5 of Standard Deficiency Format, export product wise. 2. Information in respect of Item at Sl. No. 11 of Standard Deficiency Format in respect of import items at Sl. Nos. 50 to 57, 78, 79 & 88. 3. For net weight of components to be manufactured from import item at Sl. No. 50 to 57, 78 ,79 & 88, details of components with net weights thereof may be indicated   55

Case No.:10/11/80­ALC2/2011

Party Name:APEX TEST TECHNOLOGIES, Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00222/AM12/ RLA File :07/24/040/00096/AM12/ Lic.No/Date:0710080635 14.07.2011   Decision :The representative of the firm Sh. D. Rohidas Jannu, Director has appeared for personal hearing and explained the details of requirement /products etc.  The Committee deliberated the details and decided to allow 5% wastage on raw material and other components on net to net basis. Accordingly norms ratified by the Committee in respect of the subject advance authorization are as under:­   (i)                 Import item No. 1, 2 & 3 – To be allowed at 1.05 kg/kg content in the export product.     56

Case No.:21/11/80­ALC2/2011

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00233/AM12/ RLA File :09/24/040/00175/AM12/ Lic.No/Date:0910047647 15.07.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 28.09.2011  

Case No.:8/11/80­ALC2/2011

Party Name:SUR HENNIG PVT. LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved

57 HQ File :01/80/050/00220/AM12/ RLA File :07/24/040/00123/AM12/ Lic.No/Date:0710080787 20.07.2011   Decision :As per the written comments of  DHI  received  vide their U.O. Note No.3(49)/08­TSW(B)/645 dated  27.10.2011,  the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization  as under:­   (i)                 Import item No. 2, 6, 7 & 8 – To be allowed inclusive wastage of 1%. (ii)               Import item No. 3,5,9,13,17,19 &24 to be allowed inclusive wastage of 2%. (iii)             Rest of the import items which are components allowed net to net basis under GN­4.     58

Case No.:15/11/80­ALC2/2011

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00227/AM12/ RLA File :03/95/040/00283/AM12/ Lic.No/Date:0310643331 20.07.2011 Defer Date:27.12.2011 Decision : The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 27.12.2011.   59

Case No.:12/11/80­ALC2/2011

Party Name:HBL POWER SYSTEMS LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00224/AM12/ RLA File :09/24/040/00167/AM12/ Lic.No/Date:0910047808 21.07.2011 Defer Date:27.12.2011 Decision : The Committee noted vide O.M. No.803/2009­D(EPC) dated 09.11.2011 from the Ministry of Defence  on  09.11.2011  informed  that  the  case  is  under  their  consideration.    The  Committee  therefore, decided to send a D.O. from DDG to Min. of Defence enclosing a list of all pending cases and request for expediting their comments.  The case may be re­listed on 27.12.2011.   60

Case No.:13/11/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00225/AM12/ RLA File :09/24/040/00173/AM12/ Lic.No/Date:0910047823 22.07.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 22.09.2011   61

Case No.:12/14/80­ALC2/2011

Party Name:AYAAPPA CNC PVT.LTD, Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00266/AM12/ RLA File :07/24/040/00120/AM12/ Lic.No/Date:0710080825 22.07.2011 Defer Date:27.12.2011 Decision  :The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  02.11.2011  received  on 14.11.2011 to DC(MSME) for examination and comments.  The case may be re­listed on 27.12.2011.

62

Case No.:16/11/80­ALC2/2011

LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00228/AM12/ RLA File :03/95/040/00255/AM12/ Lic.No/Date:0310644231 25.07.2011 Defer Date:27.12.2011 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  09.11.2011to  DIPP  for examination and comments.  The case may be re­listed 27.12.2011.   63

Case No.:20/11/80­ALC2/2011

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00232/AM12/ RLA File :04/24/040/00110/AM12/ Lic.No/Date:0410126694 02.08.2011   Decision :The Committee noted the written comments of DC(MSME) received vide their U.O. note dated 30(60)/2011­ME  dated  12.10.2011  and    decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization as unde:­   (i)                 Import Item “ Inserts” to be allowed upto 0.75% of FOB value. (ii)               All other components to be allowed on net to net basis with accountability clause.     64

Case No.:1/11/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00213/AM12/ RLA File :03/94/040/00389/AM12/ Lic.No/Date:0310645892 03.08.2011 Defer Date:27.12.2011 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  14.11.2011  to  DIPP  for examination and comments.  The case may be re­listed on  27.12.2011.   65

Case No.:29/14/80­ALC2/2011

Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00283/AM12/ RLA File :07/24/040/00168/AM12/ Lic.No/Date:0710081189 04.08.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 19.10.2011   66

Case No.:2/11/80­ALC2/2011

Party Name:KUVAWALA DRILL­ EQUIP Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00214/AM12/ RLA File :03/94/040/00383/AM12/ Lic.No/Date:0310647125 09.08.2011 Defer Date:27.12.2011

Decision :As per DHI U.O. Note No. 3(62)/09­TSW(B) dated 11.11.2011, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  27.12.2011: ­   1. Specific quantity of each export product. 2. Information in respect of Sl.No.3, 4 & 11 of the Standard Deficiency Format. 3. Volume based wastage calculation from drawing Dimensions.     67

Case No.:3/11/80­ALC2/2011

Party Name:KUVAWALA DRILL­ EQUIP Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00215/AM12/ RLA File :03/94/040/00382/AM12/ Lic.No/Date:0310647358 09.08.2011 Defer Date:27.12.2011 Decision : As per DHI U.O. Note No. 3(62)/09­TSW(B) dated 11.11.2011, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  27.12.2011: ­   1. Specific quantity of each export product. 2. Information in respect of Sl.No.3, 4 & 11 of the Standard Deficiency Format. 3. Volume based wastage calculation from drawing Dimensions.   68

Case No.:40/14/80­ALC2/2011

Party Name:WOLFRA­ TECH PVT LTD Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00294/AM12/ RLA File :07/24/040/00087/AM12/ Lic.No/Date:0710081399 10.08.2011 Defer Date:27.12.2011 Decision :The Committee noted that the firm’s application has been sent to Min. of Shipping on 19.11.2011 for examination and comments. The Committee decided to send a copy application to DIPP and to re­list the case on 27.12.2011.   69

Case No.:24/14/80­ALC2/2011

Party Name:BOYSEN INDIA LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00278/AM12/ RLA File :05/23/040/00186/AM12/ Lic.No/Date:0510299447 11.08.2011 Defer Date:27.12.2011 Decision  :  The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  11.11.2011  to  DHI  for examination and comments.  The case may be re­listed on 27.12.2011.   70

Case No.:26/14/80­ALC2/2011

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00280/AM12/ RLA File :05/23/040/00175/AM12/ Lic.No/Date:0510299443 11.08.2011   Decision : The representative of DC(MSME) observed that the subject Advance Authorization is similar to Advance Authorization No.  0510261727 dt.05.04.2010. The Committee, therefore, decided to ratify the norms in respect of  the subject advance authorization on repeat basis as per firm Advance Authorization No.  0510261727 dt.05.04.2010 ratified in Norms Committee Meeting No.04/12 held on 17.05.2011.   The Regional Authority may take necessary action accordingly.

71

Case No.:3/14/80­ALC2/2011

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00257/AM12/ RLA File :03/95/040/00373/AM12/ Lic.No/Date:0310648593 16.08.2011     1.      Quantity of import items at S.No. 1, 2 & 3  to be allowed on net to net basis with accountability clause. 2.      Quantity of each import item at S.No. 4 to be allowed upto 0.5 % of FOB value of exports. 3.      Quantity of import item at S.No. 5 to be allowed on net to net basis as claimed by the firm. 4.      Quantity of import item at S.No. 6  to be allowed as per packing policy.     72

Case No.:16/14/80­ALC2/2011

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00270/AM12/ RLA File :03/95/040/00377/AM12/ Lic.No/Date:0310648590 16.08.2011     1.      Quantity of import items at S.No. 1, 2 & 3  to be allowed on net to net basis with accountability clause. 2.      Quantity of each import item at S.No. 4 to be allowed upto 0.5 % of FOB value of exports. 3.      Quantity of import item at S.No. 5 to be allowed on net to net basis as claimed by the firm. 4.      Quantity of import item at S.No. 6  to be allowed as per packing policy.     73

Case No.:22/14/80­ALC2/2011

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00276/AM12/ RLA File :03/95/040/00378/AM12/ Lic.No/Date:0310648595 16.08.2011     1.      Quantity of import items at S.No. 1, 2 & 3 to be allowed on net to net basis with accountability clause. 2.      Quantity of each import item at S.No. 4 to be allowed upto 0.5 % of FOB value of exports. 3.      Quantity of import item at S.No. 5 to be allowed on net to net basis as claimed by the firm. 4.      Quantity of import item at S.No. 6  to be allowed as per packing policy.    

Case No.:23/14/80­ALC2/2011

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved

74 HQ File :01/80/050/00277/AM12/ RLA File :03/95/040/00374/AM12/ Lic.No/Date:0310648597 16.08.2011     1.      Quantity of import items at S.No. 1, 2 & 3  to be allowed on net to net basis with accountability clause. 2.      Quantity of each import item at S.No. 4 to be allowed upto 0.5 % of FOB value of exports. 3.      Quantity of import item at S.No. 5 to be allowed on net to net basis as claimed by the firm. 4. Quantity of import item at S.No. 6  to be allowed as per packing policy.     75

Case No.:31/14/80­ALC2/2011

Party Name:METSO PAPER INDIA PVT.LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00285/AM12/ RLA File :05/24/040/00159/AM12/ Lic.No/Date:0510299729 17.08.2011 Defer Date:27.12.2011 Decision  :The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  dated  19.10.2011 said information failing which  their case will be rejected without any further notice. The case may be re­   76

Case No.:25/14/80­ALC2/2011

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00279/AM12/ RLA File :05/23/040/00176/AM12/ Lic.No/Date:0510299788 18.08.2011 Defer Date:27.12.2011 Decision :The Committee decided to forward a copy of firm’s reply dated 01.11.2011 to DC(MSME) for examination and comments.  The case may be re­listed on 27.12.2011.   77

Case No.:27/14/80­ALC2/2011

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00281/AM12/ RLA File :05/23/040/00193/AM12/ Lic.No/Date:0510299789 18.08.2011 Defer Date:27.12.2011 Decision : The Committee decided to forward a copy of firm’s reply dated 01.11.2011 to DC(MSME) for examination and comments.  The case may be re­listed on 27.12.2011.   78

Case No.:28/14/80­ALC2/2011

Party Name:CAMFIL FARR AIR FILTRATION INDIA PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00282/AM12/ RLA File :05/23/040/00194/AM12/ Lic.No/Date:0510299787 18.08.2011

Decision : As per the written comments of  DC(MSME)  received  vide their U.O. Note  No. 30(74)/2011­ ME  dated  14.11.2011,  the  Committee  decided  to  ratify  the  norms    in  respect  of  the  subject  advance authorization as under:­   1.      After taking clue from C­1799, import inputs i.e. relevant filter papers to be allowed at 1.02 Kg./Kg content in export product.     79

Case No.:30/14/80­ALC2/2011

Party Name:INGERSOLL­RAND (INDIA) LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00284/AM12/ RLA File :03/94/040/00453/AM12/ Lic.No/Date:0310649559 19.08.2011     1.      Description, quantity and net weight of export products to be specified as under:      Sl. No. Description Quantity ( in Nos.) Net  export weight (MT) 1 Air Compressors Model: 15T2 75 17.1 Model: 15T 110 26.4 Model:  231 35 1.855 Model: 2340 1000 49 Model: 2475 2800 182 Model: 2545 350 35 Model: 2545cr 350 35.35 Model: 7100 200 35 Model: 3000 40 10.24 Model: 7T2 20 3.44 Model: SS3 2800 64.4 Model: SS5 1500 66 Model: SS10 50 3.25 Model: TS5 1000 45 Total 10330 574.035 2 Vacuum Pumps Model: V255 20 1.66 Model: V244 25 2.375 Total: 45 4.035   2.      Quantities of import items from Sl. No 1 to 21, 23 to 42, 45 to 54 & 56 to 61 to be allowed on net to net basis with accountability clause. 3.      Quantities of Gasket material/ sheet at Sl. No. 22, 43 & 44 of the list of import items to be allowed as 1.65 sq. mtrs/ sq mtrs content in the Export product. 4.      Quantity of Aluminium Alloy Ingot at import items Sl. No. 55 to be allowed as 1.06 Kgs./ Kg. content in the export product  

80

Case No.:34/14/80­ALC2/2011

LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00288/AM12/ RLA File :03/95/040/00346/AM12/ Lic.No/Date:0310649471 19.08.2011 Defer Date:27.12.2011 Decision : The Committee noted and checked that the firm’s application has been forwarded to DHI on 30.09.2011 and decided  to defer the case and to re­list on 27.12.2011.   81

Case No.:9/14/80­ALC2/2011

Party Name:DICKINSON FOWLER PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00263/AM12/ RLA File :07/24/040/00192/AM12/ Lic.No/Date:0710081630 22.08.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 17.10.2011   82

Case No.:39/14/80­ALC2/2011

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00293/AM12/ RLA File :07/24/040/00188/AM12/ Lic.No/Date:0710081631 22.08.2011 Defer Date:27.12.2011 Decision :The Committee noted that the firm’s application has been forwarded to DIPP on 09.11.2011 and decided  to forward a copy of firm’s application to DC(MSME) as the case does not pertain to them.  The case may be re­listed on 27.12.2011.   83

Case No.:8/14/80­ALC2/2011

Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00262/AM12/ RLA File :05/24/040/00182/AM12/ Lic.No/Date:0510300205 24.08.2011 Defer Date:27.12.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  The Committee, therefore, decided to send  D.O. reminder from DDG them for expediting their comments. The case may be re­listed on 27.12.2011.   84

Case No.:17/14/80­ALC2/2011

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00271/AM12/ RLA File :03/95/040/00401/AM12/ Lic.No/Date:0310650145 24.08.2011     1.      Quantity of import items at S.No. 1, 2 & 3 to be allowed on net to net basis with accountability clause. 2.      Quantity of each import item at S.No. 4 to be allowed upto 0.5 % of FOB value of exports. 3.      Quantity of import item at S.No. 5 to be allowed on net to net basis as claimed by the firm. 4.      Quantity of import item at S.No. 6 to be allowed as per packing policy.  

85

Case No.:18/14/80­ALC2/2011

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00272/AM12/ RLA File :03/95/040/00408/AM12/ Lic.No/Date:0310650137 24.08.2011     1.      Quantity of import items at S.No. 1, 2 & 3 to allowed on net to net basis with accountability clause. 2.      Quantity of each import item at S.No. 4 to allowed upto 0.5 % of FOB value of exports. 3.      Quantity of import item at S.No. 5 to allowed on net to net basis as claimed by the firm. 4.      Quantity of import item at S.No. 6  to be allowed as per packing policy.     86

Case No.:19/14/80­ALC2/2011

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00273/AM12/ RLA File :03/95/040/00400/AM12/ Lic.No/Date:0310650142 24.08.2011     1.      Quantity of import items at S.No. 1, 2 & 3  to be allowed on net to net basis with accountability clause. 2.      Quantity of each import item at S.No. 4 to be allowed upto 0.5 % of FOB value of exports. 3.      Quantity of import item at S.No. 5 to be allowed on net to net basis as claimed by the firm. 4.      Quantity of import item at S.No. 6 to be allowed as per packing policy.     87

Case No.:11/14/80­ALC2/2011

Party Name:HITTCO TOOLS LTD Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00265/AM12/ RLA File :07/24/040/00203/AM12/ Lic.No/Date:0710081769 25.08.2011 Defer Date:27.12.2011 Decision :The Committee deliberated the written comments of  DHI  received  vide their U.O. Note No. 3(35)/11­TSW(B)/622 dated 17.10.2011 recommending that the firm may avail SION C­945 for ratification the norms in respect of the subject advance authorization. However, it was observed that the relevant item is not covered under the said SION.  Therefore,  the Committee decided to inform the same to DHI and request them to re­examine their comments.  The case may be re­listed on 27.12.2011.   88

Case No.:6/14/80­ALC2/2011

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00260/AM12/ RLA File :05/24/040/00177/AM12/ Lic.No/Date:0510300518 26.08.2011 Defer Date:27.12.2011

Decision :The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter    dated  18.10.2011   89

Case No.:20/14/80­ALC2/2011

Party Name:PLAST TECH ENGINEERING Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00274/AM12/ RLA File :04/24/040/00156/AM12/ Lic.No/Date:0410127497 26.08.2011   Decision : As per the written comments of  DC(MSME)  received  vide their U.O. Note  No. 30(74)/2011­ ME  dated  11.10.2011,  the  Committee  decided  to  ratify  the  norms    in  respect  of  the  subject  advance authorization as under:­             After taking clue from H­27, export product Article  made of Nylon Resin­to be allowed of 68400 kg. Import item Relevant Nylon Resin to be allowed of 71,820 kg with 5% wastage.         90

Case No.:33/14/80­ALC2/2011

Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00287/AM12/ RLA File :31/83/040/00106/AM12/ Lic.No/Date:3110049997 26.08.2011     1.            Total weight of import item to be allowed as 292.4 Kgs. inclusive of wastage of 24.4 % after taking 1/3rd recovery.     91

Case No.:12/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00331/AM12/ RLA File :61/24/040/00030/AM12/ Lic.No/Date:6110000675 29.08.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 01.11.2011 and decided  to defer the case and to re­list on 27.12.2011.   92

Case No.:13/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00332/AM12/ RLA File :61/24/040/00031/AM12/ Lic.No/Date:6110000676 29.08.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 01.11.2011 and

93

Case No.:35/14/80­ALC2/2011

LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00289/AM12/ RLA File :03/95/040/00336/AM12/ Lic.No/Date:0310650989 30.08.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 30.09.2011  and decided  to send a copy of firm’s application to DIPP as the case pertain to them.  The case may be re­listed on  27.12.2011.   94

Case No.:36/14/80­ALC2/2011

LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00290/AM12/ RLA File :03/95/040/00418/AM12/ Lic.No/Date:0310650991 30.08.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DIPP on 30.09.2011  and decided  to send a copy of firm’s application to DHI as the case  pertains to them.  The case may be re­ listed on  27.12.2011.   95

Case No.:37/14/80­ALC2/2011

LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00291/AM12/ RLA File :03/95/040/00394/AM12/ Lic.No/Date:0310650993 30.08.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DIPP on 30.09.2011  and decided  to send a copy of firm’s application to DHI as the case pertains to them.  The case may be re­listed on  27.12.2011.   96

Case No.:3/17/80­ALC2/2011

Party Name:G.R.ENGINEERING PRIVATE LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00322/AM12/ RLA File :03/94/040/00477/AM12/ Lic.No/Date:0310650924 30.08.2011     1. Net Empty Export weights of 160 MT, 240 MT, 56 MT, 151 MT, 4 MT, 26 MT, 51 MT, 56 MT & 1.5 MT to be specified with the quantities of each export product from S.No.1 to 9 respectively.   2. Word “Relevant” to be prefixed with the description of import item at Sl. No. 1 and its quantity may be allowed as 1.05 Kg/ Kg. content in the export products.   3. Weight of “68.019 MT ” to be added with the quantity of import item at Sl.No.2 and quantity of this item may be allowed on net to net basis.    

Case No.:5/14/80­ALC2/2011

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred

97 HQ File :01/80/050/00259/AM12/ RLA File :05/24/040/00195/AM12/ Lic.No/Date:0510300970 01.09.2011 Defer Date:27.12.2011 Decision : The Committee observed that the firm has not replied to this office letter  dated 18.10.2011   98

Case No.:32/14/80­ALC2/2011

Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00286/AM12/ RLA File :05/24/040/00191/AM12/ Lic.No/Date:0510300935 01.09.2011     1.            Net weight of export product  to be specified as 410.4 Kgs. 2.            Quantity of import item to be allowed as 1797.6 Kgs. inclusive of 338% wastage after taking 6% recovery from scrap.     99

Case No.:41/14/80­ALC2/2011

Party Name:MICRO TECH.CNC PRIVATE LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00295/AM12/ RLA File :07/24/040/00215/AM12/ Lic.No/Date:0710082069 06.09.2011 Defer Date:27.12.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, the Committee decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 27.12.2011: ­   1.      Information in respect of Sl.No.4, 5 & 11 of the Standard Deficiency Format export product wise.   100

Case No.:14/17/80­ALC2/2011

Party Name:STERDILL EQUIPMENTS PVT.LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00333/AM12/ RLA File :03/95/040/00437/AM12/ Lic.No/Date:0310651808 06.09.2011 Defer Date:27.12.2011 Decision :On the recommendation of the representative of DIPP present in the meeting, the Committee decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 27.12.2011: ­   1.      Information in respect of Sl.No.4, 5, & 11 of the Standard Deficiency Format.    

Case No.:38/14/80­ALC2/2011

Party Name:H.L.EQUIPMENTS Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00292/AM12/ RLA File :52/24/040/00021/AM12/ Lic.No/Date:5210036390 07.09.2011 Defer Date:27.12.2011

101 Decision :On the recommendation of the representative of DIPP present in the meeting, the Committee decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on 27.12.2011: ­   1.      Information in respect of Sl.No.4, 5, 11 & 13 of the Standard Deficiency Format export product wise.   102

Case No.:13/14/80­ALC2/2011

Party Name:GEA ECOFLEX INDIA PVT.LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Revert back HQ File :01/80/050/00267/AM12/ RLA File :31/83/040/00039/AM12/ Lic.No/Date:3110050308 14.09.2011   Decision : The Committee noted that firm’s application has not been received so far.  However, according to  online  data,  items  of  import  appear  to  be  covered  in  GN­4  for  the  Engineering  Products.  The Committee  therefore  presumed  the  subject  Authorization  may  have  been  issued  under  GN­4.  The Committee accordingly decided to revert back the case to the concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dated 05.12.2007. The Regional Authority may take necessary action accordingly.   103

Case No.:14/14/80­ALC2/2011

Party Name:THERMAX LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00268/AM12/ RLA File :31/83/040/00117/AM12/ Lic.No/Date:3110050321 15.09.2011 Defer Date:27.12.2011 Decision: The Committee noted that the firm application has been received on 14.11.2011 and decided to forward a copy of firm’s application to DHI for examination and comments.  The case may be re­listed on 27.12.2011.   104

Case No.:32/17/80­ALC2/2011

Party Name:WOLFRA­ TECH PVT LTD Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00351/AM12/ RLA File :07/24/040/00184/AM12/ Lic.No/Date:0710082357 15.09.2011 Defer Date:27.12.2011 Decision :The Committee noted that the firm’s application has been forwarded to Min. of Shipping on 09.11.2011  and decided  to forward a copy of firm’s application to DIPP as the case pertains to them.  The case may be re­listed on 27.12.2011.   105

Case No.:34/17/80­ALC2/2011

Party Name:PRANAV VIKAS (INDIA) LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00353/AM12/ RLA File :05/24/040/00212/AM12/ Lic.No/Date:0510303169 20.09.2011 Defer Date:27.12.2011 Decision :As  per  DIPP  U.O.  Note  dated  15.11.2011,  the  Committee  decided  to  call for the following   1.      Information in respect of S.No. 3, 4, 5 &  11 of Standard Deficiency Format. 2.      Detailed justification for claiming wastage of 20 % on all the import items from Sl. No 2 to 11.

106

Case No.:4/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00323/AM12/ RLA File :07/24/040/00106/AM12/ Lic.No/Date:0710082716 23.09.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 01.11.2011  and decided  to send a copy of firm’s application to DIT as the case  pertains to them.  The case may be re­ listed on  27.12.2011.   107

Case No.:20/17/80­ALC2/2011

Party Name:INGERSOLL­RAND (INDIA) LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00339/AM12/ RLA File :03/94/040/00537/AM12/ Lic.No/Date:0310655633 23.09.2011     1.      Description, quantity and net weight of export products may be specified as under:        Sl. No. Description Quantity ( in Nos.) Net  export weight (MT)   1. Air Compressors Model: 15T2 50 11.4   Model: 15T 110 26.4   Model:  231 35 1.855   Model: 2340 1000 49   Model: 2475 2800 182   Model: 2545 300 30   Model: 2545cr 300 30.3   Model: 7100 200 35   Model: 3000 40 10.24   Model: 7T2 20 3.44   Model: SS3 2800 64.4   Model: SS5 1500 66   Model: SS10 50 3.25   Model: TS5 1000 45   Total 10205 558.285   2 Vacuum Pumps Model: V255 25 2.075   Model: V244 20 1.9   Total: 45 3.975     2.      Quantities of import items from Sl. No 1 to 21, 23 to 42, 45 to 54 & 56 to 61 to be allowed on net to net basis with accountability clause. 3.           Quantities of Gasket material/ sheet at Sl. No. 22, 43 & 44 of the list of import items to be allowed as 1.65 sq. mtrs/ sq mtrs content in the Export product. 4.      Quantity of Aluminium Alloy Ingot at import items Sl. No. 55 to be allowed as 1.06 Kgs./ Kg. content in the export product  

108

Case No.:42/14/80­ALC2/2011

Party Name:SPARKLINE EQUIPMENTS PVT.LTD, Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00296/AM12/ RLA File :31/83/040/00126/AM12/ Lic.No/Date:3110050595 26.09.2011 Defer Date:27.12.2011 Decision : The Committee noted that the application has been received from R.A. and decided  to send a copy  of  firm’s  application  to  DHI  for  examination  and  comments.    The  case  may  be  re­listed  on  27.12.2011.   109

Case No.:17/17/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00336/AM12/ RLA File :03/94/040/00343/AM12/ Lic.No/Date:0310656144 26.09.2011 Defer Date:27.12.2011 Decision :As  per  DIPP  U.O.  Note  dated  15.11.2011,  the  Committee  decided  to  call for the following   1.           Information in respect of Sl. No. 3, 4, 5, 11 & 13 of Standard  Deficiency Format­export product wise. 2.      Quantity of import item at Sl. No. 2 in Nos. also in addition to its weight. 3.      Quantity of import item at Sl. No. 4 in meters also in addition to its weight 4.      Detailed calculations for the  quantity of import item at Sl. No. 4 supported by length and number of tubes in the export product   110

Case No.:21/17/80­ALC2/2011

Party Name:WAM INDIA PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00340/AM12/ RLA File :03/95/040/00448/AM12/ Lic.No/Date:0310656678 28.09.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 09.11.2011 and   111

Case No.:5/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00324/AM12/ RLA File :04/24/040/00137/AM12/ Lic.No/Date:0410128752 30.09.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 02.11.2011 and   112

Case No.:7/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00326/AM12/ RLA File :04/24/040/00171/AM12/ Lic.No/Date:0410128753 30.09.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 01.11.2011 and

113

Case No.:8/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00327/AM12/ RLA File :04/24/040/00116/AM12/ Lic.No/Date:0410128795 30.09.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 02.11.2011 and   114

Case No.:11/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00330/AM12/ RLA File :04/24/040/00066/AM12/ Lic.No/Date:0410128794 30.09.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 01.11.2011 and   115

Case No.:27/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00346/AM12/ RLA File :05/23/040/00219/AM12/ Lic.No/Date:0510304453 30.09.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 04.11.2011 and   116

Case No.:28/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00347/AM12/ RLA File :11/24/040/00026/AM12/ Lic.No/Date:1110025821 30.09.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 04.11.2011 and     117

Case No.:30/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00349/AM12/ RLA File :11/24/040/00013/AM12/ Lic.No/Date:1110025819 30.09.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 04.11.2011 and   118

Case No.:31/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00350/AM12/ RLA File :11/24/040/00011/AM12/ Lic.No/Date:1110025820 30.09.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 04.11.2011 and

119

Case No.:19/17/80­ALC2/2011

LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00338/AM12/ RLA File :03/95/040/00425/AM12/ Lic.No/Date:0310657607 03.10.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 04.11.2011 and   120

Case No.:10/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00329/AM12/ RLA File :04/24/040/00127/AM12/ Lic.No/Date:0410128896 04.10.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 02.11.2011 and   121

Case No.:22/17/80­ALC2/2011

Party Name:IND­SPHINX PRECISION LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00341/AM12/ RLA File :22/24/040/00045/AM12/ Lic.No/Date:2210011985 04.10.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 04.11.2011 and   122

Case No.:24/17/80­ALC2/2011

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00343/AM12/ RLA File :06/24/040/00033/AM12/ Lic.No/Date:0610024005 04.10.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to C&PC on 04.11.2011 and decided  to defer the case and to re­list on 27.12.2011.   123

Case No.:6/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00325/AM12/ RLA File :04/24/040/00143/AM12/ Lic.No/Date:0410128933 05.10.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 02.11.2011 and   124

Case No.:9/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00328/AM12/ RLA File :04/24/040/00135/AM12/ Lic.No/Date:0410128934 05.10.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 02.11.2011 and

125

Case No.:15/17/80­ALC2/2011

LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00334/AM12/ RLA File :03/95/040/00493/AM12/ Lic.No/Date:0310658143 05.10.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 04.11.2011  and decided  to forward a copy of firm’s application to DIPP as the case  pertains to them.  The case may be re­listed on 27.12.2011.   126

Case No.:16/17/80­ALC2/2011

LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00335/AM12/ RLA File :03/95/040/00494/AM12/ Lic.No/Date:0310658156 05.10.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 04.11.2011  and decided  to forward a copy of firm’s application to DIPP as the case  pertains to them.  The case may be re­listed on 27.12.2011.   127

Case No.:18/17/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00337/AM12/ RLA File :03/94/040/00548/AM12/ Lic.No/Date:0310658894 11.10.2011 Defer Date:27.12.2011 Decision :As  per  DIPP  U.O.  Note  dated  15.11.2011,  the  Committee  decided  to  call for the following   1.      Information in respect of Sl. No. 3, 4, 5 & 11 of Standard Deficiency Format­export product wise. 2.      Detailed calculations for the  quantity of import item at Sl. No. 1 supported by length and number of tubes in the export products. 3.      Quantity of import item at Sl. No. 2 in Nos. also in addition to its weight.   128

Case No.:25/17/80­ALC2/2011

Party Name:DAYCO VIKAS POWER TRANSMISSION PVT. LTD. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Revert back HQ File :01/80/050/00344/AM12/ RLA File :05/23/040/00253/AM12/ Lic.No/Date:0510305049 12.10.2011   Decision : The Committee noted that firm’s application has not been received so far.  However, according to  online  data,  items  of  import  appear  to  be  covered  in  GN­4  for  the  Engineering  Products.  The Committee  therefore  presumed  the  subject  Authorization  may  have  been  issued  under  GN­4.  The Committee accordingly decided to revert back the case to the concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dated 05.12.2007. The Regional Authority may take necessary action accordingly.  

Case No.:26/17/80­ALC2/2011

Party Name:GLOBE HI­FABS Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved

129 HQ File :01/80/050/00345/AM12/ RLA File :05/23/040/00255/AM12/ Lic.No/Date:0510305047 12.10.2011   Decision : The Committee decided to ratify the norms in respect of  the subject advance authorization  as per GN­4 on net to net basis with accountability clause.     130

Case No.:29/17/80­ALC2/2011

ELECTRICALS LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00348/AM12/ RLA File :05/23/040/00226/AM12/ Lic.No/Date:0510305028 12.10.2011 Defer Date:27.12.2011 Decision : The Committee noted that the firm’s application has been forwarded to DHI on 04.11.2011 and   131

Case No.:23/17/80­ALC2/2011

Party Name:GAS TECH PROCESS ENGINEERING INDIA PVT. LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00342/AM12/ RLA File :05/23/040/00258/AM12/ Lic.No/Date:0510305104 13.10.2011 Defer Date:27.12.2011 Decision  :  The  Committee  noted  that  the  firm’s  application  has  been  forwarded  to  DC(MSME)  on 04.11.2011 and decided  to defer the case and to re­list on 27.12.2011.   132

Case No.:33/17/80­ALC2/2011

Party Name:SHREE GAYATRI HEALDS MFG. CO. Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Approved HQ File :01/80/050/00352/AM12/ RLA File :52/24/040/00029/AM12/ Lic.No/Date:5210036722 14.10.2011   Decision : The Committee decided to ratify the norms in respect of  the subject advance authorization  as per GN­4 on net to net basis with accountability clause.     133

Case No.:1/17/80­ALC2/2011

Party Name:MAN FORCE TRUCKS PRIVATE LIMITED Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00320/AM12/ RLA File :31/83/040/00071/AM12/ Lic.No/Date:3110051087 19.10.2011 Defer Date:27.12.2011 Decision : The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application at the earliest and on receipt forward the same to DHI  for examination and submission of comments. The case may be re­listed on 27.12.2011.   134

Case No.:2/17/80­ALC2/2011

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00321/AM12/ RLA File :03/94/040/00605/AM12/ Lic.No/Date:0310661481 21.10.2011 Defer Date:27.12.2011 Decision : The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application at the earliest and on receipt forward the same to DIPP  for examination and submission of comments. The case may be re­listed on 27.12.2011.

135

Case No.:35/17/80­ALC2/2011

Party Name:COMAU INDIA P.LTD, Meet No/Date:17/80­ ALC2/2011 15.11.2011 Status: Deferred HQ File :01/80/050/00354/AM12/ RLA File :31/82/040/00186/AM12/ Lic.No/Date:3110051283 02.11.2011 Defer Date:27.12.2011 Decision : The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application at the earliest and on receipt forward the same to DHI  for examination and submission of comments. The case may be re­listed on 27.12.2011. S.No.20

Case No. A ­ 15

M/s.  Delphi Automotive Systems Pvt. Ltd., Noida  F.No. 01/80/162/00495/AM11/DES.I Lic.No. & Date Meeting No.17/12 RA F.No.05/88/040/00721/AM03 0510081234 dt.21.02.2003 Date: 15.11.2011 Ratification of norms   The Committee observed that the firm has sought time vide their letter dated 20.09.2011 and 04.11.2011 and has not  replied  to  this  office  letter    dated  21.09.2011  calling  for  certain  information.  The  Committee,  therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 27.12.2011.   S.No.424

Case  No.  A/R­

102 M/s.  Bharat Heavy Electricals  Ltd., Haridwar HQ F.No.01/80/050/01790/AM09/DES­I Lic. No. & Date Meeting No.17/12 RLA No.61/24/040/00069/AM09 6110000286 dt.06.02.2009 Date: 15.11.2011 Ratification of Norms   As per DHI U.O. Note No. 3(69)/10­TSW(B) dated 20.10.2011, the Committee decided to call for the following   1. Calculation  data  given  in  third  column  of  table  for  blades(AS  flats)  &  subsequent  volume  based calculation. 2. Diagram/phato of weld overlay. 3. Calculation/drawing/usage of baffle ring.   S.No.425

Case  No.  A/R­

103 M/s.  Bharat Heavy Electricals  Ltd., Haridwar HQ F.No.01/80/050/00120/AM10/DES­I Lic. No. & Date Meeting No.17/12 RLA No.61/24/040/00007/AM10 6110000313 dt.29.05.2009 Date: 15.11.2011 Ratification of Norms   As per DHI U.O. Note No. 3(69)/10­TSW(B) dated 20.10.2011, the Committee decided to call for the following   1. Calculation  data  given  in  third  column  of  table  for  blades(AS  flats)  &  subsequent  volume  based calculation. 2. Diagram/phato of weld overlay. 3. Calculation/drawing/usage of baffle ring.   S.No.426

Case No. A/R­ 167

M/s.  Bharat  Heavy Electricals  Ltd., Haridwar  F.No. 01/80/50/ 00449/AM10/DES.I Lic.No. & Date Meeting No.17/12 RA F.No.61/24/040/00036/AM10 6110000362 dt.13.10.2009 Date: 15.11.2011

As per DHI U.O. Note No. 3(69)/10­TSW(B) dated 20.10.2011, the Committee decided to call for the following   1. Calculation  data  given  in  third  column  of  table  for  blades(AS  flats)  &  subsequent  volume  based calculation. 2. Diagram/phato of weld overlay. 3. Calculation/drawing/usage of baffle ring.   S.No.427

Case No. A/R­ 168

M/s.  Godrej  & Boyce  Mfg.  Co. LTd., Mumbai  F.No. 01/80/50/ 01741/AM09/DES.I Lic.No. & Date Meeting No.17/12 RA F.No.03/94/040/00798/AM09 0310497146 dt.10.12.2008 Date: 15.11.2011   The Committee noted that the firm has requested for postponement of personal hearing vide their letter dated 03.11.2011  and  e­mail  date  17.11.2011  for  one  month/January,  2012.  The  Committee,  therefore,  decided  to advise the firm again to appear before NC on 10.01.2012 to explain their case in person along with information sought from them and  facts of the case failing which their case will be rejected.  The case may be re­listed on 10.01.2012.   S.No.428

Case No. A/R­ 175

M/s.  Precihole Machine Pvt. Ltd.,  F.No. 01/80/50/ 00942/AM08/DES.I Lic.No. & Date Meeting No.17/12 RA F.No.03/95/040/00586/AM08 0310443655 dt.19.09.2010 Date: 15.11.2011   The Committee observed that the firm has not replied to this office letter dated 18.10.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 27.12.2011.   S.No.429

Case No. A/R­ 117

M/s. Thermax Ltd.,  F.No. 01/80/50/01034/AM09/DES.I Lic.No. & Date Meeting No.17/12 RA F.No.31/21/040/00296/AM09 3110035317 dt.09.09.2008 Date: 15.11.2011   The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  01.11.2011  to  DHI  for  examination  and comments.  The case may be re­listed on 27.12.2011.   S.No.430

Case No. A/R­ 173

M/s. Thermax Ltd.,  F.No. 01/80/50/01550/AM09/DES.I Lic.No. & Date Meeting No.17/12 RA F.No.31/24/040/00296/AM09 3110036393 dt.09.09.2008 Date: 15.11.2011   The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  11.11.2011  to  DHI  for  examination  and comments.  The case may be re­listed on 27.12.2011.   S.No.431

Case No.  A/R­27

M/s.  The  Saraswati Industrial  Syndicate Ltd., HQF.No.01/80/050/01187/AM08/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.05/24/040/00760/AM08 0510214345 dt.03.01.2008 Date: 15.11.2011   As per the written comments of  DIPP  received  vide their U.O. Note dated 15.11.2011, the Committee decided to modify the norms in respect of the subject advance authorization  as under:­   1.      Quantity of import item at Sl. No 5 may be allowed as 66584 Mtrs. (459.699 MT) inclusive of 4 % wastage.

2.      Quantity of import item at Sl. No 6 may be allowed as 172841.6 Mtrs. (223.5 MT) inclusive of 4 % wastage. 3.      Quantity of import item at Sl. No 7 may be allowed as 40465 Mtrs. (49.101 MT) inclusive of 4 % wastage. 4.      Quantity of import item at  Sl.No.8  may be allowed as 113 Nos. on net to net basis. The weight of this item may be allowed as applied for i.e. 69.911 MT. 5.      Quantity of import item at  Sl.No.9  may be allowed as 50 Nos. on net to net basis. The weight of this item may be allowed as applied for i.e. 25.198 MT.  6.      Quantity of import item at  Sl.No.10  may be allowed as 140 Nos. on net to net basis.  The weight of this item may be allowed as applied for i.e. 249.704 MT      S.No.432

Case No.  A/R­28

M/s.  Brakes  India Limited, Chennai HQF.No.01/80/050/01124/AM08/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.04/24/040/00263/AM08 0410093871 dt.15.02.2008 Date: 15.11.2011 Revision of norms   The Committee decided to forward a copy of firm’s reply dated 14.11.2011 to DHI for examination and comments.  The case may be re­listed on 27.12.2011.   S.No.433

Case No.  A/R­29

M/s.  The  Saraswati Industrial  Syndicate Ltd., HQF.No.01/80/050/00006/AM11/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.05/24/040/00532/AM10 0510261713 dt.05.04.2010 Date: 15.11.2011 Revision of norms   As per the written comments of  DIPP  received  vide their U.O. Note dated 15.11.2011, the Committee decided to modify the norms in respect of the subject advance authorization  as under:­   1.      Net empty weights of 298.3 MT, 298.3 MT, 78.93 MT, 78.93 MT, &   219.63 MT  to be specified with the quantities of export products from  Sl. No. 1 to 5 respectively. 2.      Quantities of import items at Sl. No 2 &  13 to be allowed as 267366 Kgs. each. 3.      Total weight of import items at Sl. No.10, 21, 35, 50 & 64 put together  to be allowed as 98351 Kgs. 4.      Quantities of import items from Sl .Nos. 6 to 9, 17 to 20, 28 to 34, 43 to 49 and 57 to 63   which are welding consumables for overlay to be allowed as applied for.     S.No.434

Case No.  A/R­31

M/s.  Kern­Liebers Springs & Stampings Pvt. Ltd., Karnataka HQF.No.01/80/050/01630/AM09/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.07/24/040/00531/AM09 0710062052 dt.26.12.2008 Date: 15.11.2011 Revision of norms   The  Committee  noted  the  deficiency  raised  by  DHI  vide  their  U.O.  Note  No.  3(46)/08­TSW(B)/665  dated 11.11.2011 and decided to seek the clarification/details from the firm.  The case may be re­listed on 27.12.2011. S.No.435

Case No.  A/R­35

M/s. Motherson Sumi Systems  Ltd.,  New Delhi HQF.No.01/80/050/00319/AM09/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.05/24/040/00821/AM08 0510215301 dt.22.01.2008 Date: 15.11.2011   As  per  the  written  comments  of    DHI    received    vide  their  U.O.  Note    No.  3(61)/10­TSW(B)/511  dated  14.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Export item 5­ Panel ASM­L/PLR UPR TR 2. Export item no 6A­ PANEL ASM L/PLR TR

3.      Export item no 6B­ PANEL ASM L/PLR TR 4.      Export item no 7­ Cover W/S O/S MSTRE SEN ­ weight 48 grams.     S.No.436

Case No.  A/R­37

M/s.  Bharat  Heavy Electricals  Ltd., Haridwar HQF.No.01/80/050/00143/AM11/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.61/24/040/00016/AM11 6110000447 dt.13.05.2010 Date: 15.11.2011 Revision of norms   The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 27.12.2011.   S.No.437

Case No.  A/R­38

M/s.  Bharat  Heavy Electricals  Ltd., Haridwar HQF.No.01/80/050/00184/AM10/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.61/24/040/00012/AM10 6110000320 dt.19.06.2009 Date: 15.11.2011 Revision of norms   The representative of the DHI informed the Committee that the case is under  examination. The Committee, therefore, decided to defer the case and to re­list the case on 27.12.2011.   S.No.438

Case No.  A/R­39

M/s.  The  Saraswati Industrial  Syndicate Ltd., New Delhi HQF.No.01/80/050/00828/AM10/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.05/24/040/00517/AM10 0510260519 dt.15.03.2010 Date: 15.11.2011 Revision of norms   As per the written comments of  DIPP  received  vide their U.O. Note dated 15.11.2011, the Committee decided to modify the norms in respect of the subject advance authorization  as under:­   1.      Net empty weight of export product at Sl. No. 2 to be modified as 139.092 MT. 2.       As welding consumables at Sl. No. 11, 12, 13 & 14  are required for export product at Sl. No. 1, no change to be made in the quantities of these import items. 3.      Quantity of import item at Sl. No. 21 to be allowed as 10 Nos. ( 1922 Kgs. inclusive of 2 % wastage). 4.      Quantity of import item at Sl. No. 23 to be allowed as 1 No.  ( 4450 Kgs. inclusive of 2 % wastage). 5.      Quantity of import item at Sl. No. 25 to be allowed as 2 Nos.  ( 170 Kgs. inclusive of 2 % wastage). 6.      Quantity of import item at Sl. No. 26 to be allowed as 4 Nos.  ( 1100 Kgs. inclusive of 2 % wastage).     S.No.439

Case No.  A/R­41

M/s. Motherson Sumi Systems  Ltd.,  New Delhi HQF.No.01/80/050/00850/AM10/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.05/24/040/00535/AM10 0510261287 dt.26.03.2010 Date: 15.11.2011 Ratification  of norms   As  per  the  written  comments  of    DHI    received    vide  their  U.O.  Note    No.  3(61)/10­TSW(B)/510dated  14.09.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   1. Export item 5­ Panel ASM­L/PLR UPR TR 2. Export item no 6­ PANEL ASM L/PLR TR 3.      Export item no 7­ Cover W/S O/S MSTRE SEN ­ weight 48 grams.     S.No.440

Case  No.  A/R­

67 M/s.  Metso Power India Pvt. Ltd.,Chennai HQF.No.01/80/050/00508/AM11/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.04/24/040/00195/AM11 0410118269 dt.25.10.2010 Date: 15.11.2011 Ratification  of norms   As per the written comments of  DHI  received  vide their U.O. Note No. 3(22)/10­TSW(B) dated 05.07.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­   Export product  (EP)  ­    The  description  to  be  amended  to  “RECOX  Boiler”  of  capacity  2400Tds/Day  ­  one Number. The total weight  953.19 MT to be incorporated in the license. Import   To allow  2% wastage on Utilized quantity for the following import items:­   LIC. S.No DESCRIPTION SPECIFICATION LIC QTY UOM UTILIZED QTY 1 Steel  Tubes/Pipes  OD 42.40mm x WT 4.00 mm ASME SA­210 Gr A­1 479547.45 kgs 426620.40 2 Steel  Tubes/Pipes  OD 63.50mm x WT 5.60 mm ASME SA­210 Gr A­1 225188.57 Kgs 197349.60 3 Steel  Tubes/Pipes  OD 76.10mm x WT 11.00 mm ASME SA­106 Gr B 10412.40 Kgs 8883.50 4 Steel  Tubes/Pipes  OD 101.60mm x WT 12.50 mm ASME SA­106 Gr B 19094.88 Kgs 13864.80 5 Steel  Tubes/Pipes  OD 101.60mm x WT 30.00 mm ASME SA­106 Gr B 2330.81 Kgs 523.20 6 Steel  Tubes/Pipes  OD 114.30mm x WT 9.53mm ASME SA­106 Gr B 2437.72 Kgs 1317.00 7 Steel  Tubes/Pipes  OD 139.70mm x WT 30.00mm ASME SA­106 Gr B 267.83 Kgs 161.00 8 Steel  Tubes/Pipes  OD 219.10mm x WT 36.00mm ASME SA­106 Gr C 21457.76 Kgs 20930.20 9 Steel  Tubes/Pipes  OD 323.90mm x WT 30.00mm ASME SA­106 Gr C 26023.27 Kgs 21418.00 10 Steel  Tubes/Pipes  OD 63.50mm x WT 6.30mm ASME SA­210 Gr A­1 45233.48 Kgs 42840.00     S.No.441

Case  No.  A/R­

68 M/s. GEA BGR Energy  System India  Ltd., Chennai HQF.No.01/80/050/01097/AM08/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.04/24/040/00325/AM08 0410092981 dt.02.01.2008 Date: 15.11.2011 Ratification  of norms   The Committee noted  that the firm’s reply has been sent to DHI on 04.11.2011.  The Committee, therefore, decided to defer the case and to re­list the case on 27.12.2011.   S.No.442

Case  No.  A/R­

70 M/s.  Kern­ Liebers  Springs &  Stampings Pvt.  LTd., Tumkur HQF.No.01/80/050/00593/AM09/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.07/24/040/00008/AM09 0710057064 dt.23.04.2008 Date: 15.11.2011 Revision  of norms

The representative of the DHI informed the Committee that the earlier Committee had approved 15% wastage in similar cases and the same may be granted in  respect of the subject advance authorization.  However, DES­I could not find such precedent cases nor DHI provided the same.  Therefore, it has been decided to defer the case and to re­list the case on 27.12.2011.    S.No.443

Case  No.  A/R­

73 M/s.  Zenith Precision  Pvt. LTd., Bangalore HQF.No.01/80/050/00376/AM11/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.07/24/040/00206/AM11 0710073875 dt.27.08.2010 Date: 15.11.2011 Revision   of norms   The  Committee  deliberated  the  written  comments  of    DC(MSME)    received    vide  their  U.O.  Note  No. No.30(142)2010­ME dated  01.11.2011,   2.            Members  of  the  Committee  observed  that  wastage  of  the  aircraft  products  has  been considered by DC(MSME) after 10% recovery.  However, it was observed that a Technical Committee had earlier recommended 15% recovery for aircraft components manufactured from Aluminium and 5% recovery from Stainless steel.  Therefore,  the Committee decided to ratify the norms after considering15% recovery on Aluminium and 5% on Stainless steel instead of 10% recommended by DC(MSME).   3.            The  amended  norms  ratified  by  the  Committee  in  respect  of  the  subject  advance authorization are  as under:­   Sl. No. Name of Product Weight  of Export Product Permissible wastage  after 15%/5% recovery Srl  no  of imported input Permissible Imported  Raw material’s Wt 01 Base  Short  Base  Assy­ Right 352.21 Kg 292% 01 1381 Kg 02 Base  Short  Base  Assy­ Left 352.21 Kg 292% 01 1381 Kg 03 Outer Pawl 15.02 Kg 353% 02 69 Kg 04 Inner Pawl. 18.80 Kg 476% 03 109 Kg 05 Lock Head 11.68 Kg 332% 04 51 Kg 06 Inner Pawl. 41.95 Kg 406% 05 212 Kg 07 Inner Pawl. 105.03 Kg 344% 06 467 Kg 08 Shackle 39.55 Kg 569% 07 265 Kg 09 Link Fork End. 16.32 Kg 633% 08 47.67Kg 10 Inner Pawl 41.52 Kg 344% 06 184 Kg     S.No.444

Case  No.  A/R­

94 M/s. GEA BGR Energy  System India  Ltd., Chennai HQF.No.01/80/050/01098/AM08/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.04/24/040/00324/AM08 0410092979 dt.02.01.2008 Date: 15.11.2011 Revision   of norms   As per written comments of DHI received vide their U.O. note No. 3(74)/10­TSW(B)/668 dated 11.11.2011, the Committee decided to reject the case on the ground that the export weight of 32.9 MT was incorporated in license as per firm’s letter dated 07.11.2009  and the firm has not given any justification for change in export product weight.  

S.No.445

Case  No.  A/R­

95 M/s.  Botil  Oil Tools  India Pvt. LTd., New Delhi HQF.No.01/80/050/00875/AM09/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.05/24/040/00327/AM09 0510225643 dt.18.08.2008 Date: 15.11.2011 Amendment of norms   of norms   As  per  DHI  U.O.  Note  No.  3(08)/11­TSW(B)  dated  14.11.2011,  the  Committee  decided  to  the  firm  may  be asked to furnish the catalogue of the export product highlighting the inputs as the difference is not clear and to re­list the case on  27.12.2011.   S.No.446

Case  No.  A/R­

97 M/s.  Brakes India  Ltd., Chennai HQF.No.01/80/050/01072/AM04/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.04/24/040/00203/AM04 0410050733 dt.18.12.2003 Date: 15.11.2011 Amendment of norms   of norms   The Committee noted the written comments of DHI received  vide their U.O. Note No.3(58)/08­TSW(B) dated 14.11.2011 not agreeing to amend of the export product weight. After due deliberations, the Committee decided to  revise  the  weight  of  export  product  from  300MT    to  297.867  MT  in  respect  of  the  subject  advance authorization.     S.No.447

Case  No.    A/R­

133 M/s.  Kone Elevator India Pvt. LTd., Chennai HQF.No.01/80/050/00725/AM11/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.04/24/040/00227/AM11 0410119695 dt.13.12.2010 Date: 15.11.2011 Amendment of Norms   As per the written comments of  DIPP  received  vide their U.O. Note dated 15.11.2011, the Committee decided to modify the norms in respect of the subject advance authorization  as under:­   1.  “UOM” of import items at Sl. No. 4 & 5 to be modified to “sets”     S.No.448

Case No.  A/R­59

M/s.  Apex  Test Technologies, Bangalore HQF.No.01/80/050/0000831/AM10/DES.I Lic. No. & date Meeting No. 17/12 RA.F.No.07/21/040/00797/AM10 0710069015 dt.21.12.2009 Date: 15.11.2011   The representative of the firm Sh. D. Rohidas Jannu, Director has appeared for personal hearing and explained the  details  of  requirement  /products  etc.    The  Committee  deliberated  the  details  and  decided  to  allow  5% wastage on raw material and components items  on net to net basis.  The norms ratified by the Committee are as under:­   (i)                 Import item No. 7,8 & 9 – To be allowed at 1.05 kg/kg content in the export product. (ii)               Import item No.1­6 – To be allowed on net to net basis with accountability clause.         S.No.449

Case  No.    A/R­

143 M/s.  Fedders LLOYD Corporation  Ltd., New Delhi HQF.No.01/80/050/00953/AM09/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.05/24/040/00517/AM08 0510210266 dt.09.10.2007 Date: 15.11.2011 Modification of export product   As per the written comments of  DIPP  received  vide their U.O. Note dated 15.11.2011, the Committee decided to modiby the norms in respect of the subject advance authorization  as under:­   Description of export products and their quantities of export to be corrected as under:   Equipments for Scaffoldings containing 190.47 MT of Mild Steel ERW Pipes namely a. Kwikstage Standard­ 5 MT b. Kwikstage Ledger­ 5 MT. c. Quick Lock Vertical­ 115 MT d. Quick Lock Ledger­ 115 MT     S.No.450

Case  No.    A/R­

144 M/s.  Alstom Projects  India Ltd., Vadodara HQF.No.01/80/050/00134/AM11/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.03/94/040/01139/AM10 0310567657 dt.31.03.2010 Date: 15.11.2011 Fixation of Norms   As per DHI U.O. Note No. 3(31)/10­TSW(B) dated 09.08.2010, the Committee decided to call for the following   (i)                             It is informed by the firm that they had submitted two applications for manufacture and export of 4 numbers of Turbine shaft forgings of weight 270.8 MT for which it proposes to import 4 numbers of proof machined Turbine shaft forgings of weight 301.028 MT in the first license. But in the 2nd license, the firm proposes to import 12 numbers of shaft forgings of weight 301.028 MT. The export value of both the licenses is same. Therefore, the firm may clarify the above.   (ii)                           The firm  may also give the manufacturing process of the item and also be asked to inform how the three shafts in case of 2nd application are coupled. S.No.451

Case  No.    A/R­

145 M/s.  Paharpur Cooling  Towers Ltd., Kolkata HQF.No.01/80/050/01312/AM09/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.02/24/040/00110/AM08 0210119996 dt.20.11.2008 Date: 15.11.2011 Fixation of Norms   The Committee decided to send the file to DIPP for examination and comments.  The case may be re­listed on 27.12.2011.     S.No.452

Case  No.    A/R­

146 M/s. Timken  India Ltd., Kolkata HQF.No.01/80/050/00726/AM11/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.02/24/040/00150/AM11 0210150897 dt.23.10.2010 Date: 15.11.2011 Revision  of Norms   As per the written comments of  DIPP  received  vide their U.O. Note dated 15.11.2011, the Committee decided to ratify the norms in respect of the subject advance authorization  as under:­

1. Total net export weight of  53498  Kgs to be specified with the quantity of export product. 2. Quantity of import item to be allowed as  98127  Kgs. inclusive of 83.4 % wastage after 20 % recovery.     S.No.453

Case  No.    A/R­

147 M/s. Bharat  Heavy Electricals  Ltd., Tiruchirapalli HQF.No.01/80/050/00550/AM11/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.04/24/040/00204/AM11 0410118772 dt.10.11.2010 Date: 15.11.2011 Fixation  of Norms   The  Committee  noted  that  the  firm’s  representation  has  been  sent  to  DHI  on  04.11.2011.    The  Committee therefore, decided to defer the case and to re­list the case on 27.12.2011.   S.No.454

Case  No.    A/R­

148 M/s. Bharat  Heavy Electricals  Ltd., Tiruchirapalli HQF.No.01/80/050/00651/AM11/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.04/24/040/00205/AM11 0410118773 dt.10.11.2010 Date: 15.11.2011 Fixation  of Norms   The Committee noted that the firm’s representation has been sent to DHI 04.11.2011.  The Committee therefore, decided to defer the case and to re­list the case on 27.12.2011.   S.No.455

Case  No.    A/R­

149 M/s. Bharat  Heavy Electricals  Ltd., Tiruchirapalli HQF.No.01/80/050/00809/AM11/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.04/24/040/00104/AM11 0410121605 dt.14.02.2011 Date: 15.11.2011 Fixation  of Norms   The Committee noted that the firm’s representation has been sent to DHI 04.11.2011.  The Committee therefore, decided to defer the case and to re­list the case on 27.12.2011.   S.No.456

Case  No.    A/R­

150 M/s.  The Saraswati Industrial Syndicate Ltd., HQF.No.01/80/050/00827/AM06/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.05/24/040/00766/AM06 0510173546 dt.03.01.2006 Date: 15.11.2011 Revision   of Norms   The Committee decided to send a copy of Advance Authorization to DIPP for examination and to re­list the case on 27.12.2011.     S.No.457

Case No.  A/R­112

M/s.  Bharat  Heavy Electricals Ltd., Noida HQF.No.01/80/050/00575/AM10/DES.I Lic. No. & date Meeting No.17/12 RA.F.No.05/23/040/00117/AM10 0510253818 dt.02.12.2009 Date: 15.11.2011 Fixation of Norms   The Committee noted the written comments of  DHI received vide U.O. Note No. 3(151/09­TSW(B)/631 dated 24.10.2011 and decided to examine the case on file.  The case may be re­listed on 27.12.2011.   S.No.123

Case No.C­35

 M/s. Panch Ratna Fastners (P). Ltd; HQ F.No.01/80/162/1316/AM09/DES.I Meeting No.17/12 Date: 15.11.2011 Alleged  swindling  of  several  crores  of  Govt. revenue –DEPB.

The Committee decided to examine the case on file and to re­list the case on 27.12.2011.   Sl.No.124

Case No. C ­ 16

M/s.    Birla  Precision Technologies  Ltd., Aurangabad HQ F.No.01/80/162/00608/AM11/ DES­I Meeting No.17/12 Fixation  of  input  output  norms  for  the  export product “Tool Holder” in respect of  100% EOU Date: 15.11.2011   The Committee noted  that the firm’s reply has been sent to DHI on  17.10.2011.  The Committee, therefore, decided to defer the case and to re­list the case on 27.12.2011.   Sl.No.125

Case No.C­01

  M/s.  Snecma  Hal Aerospace LTd., HQ F.No.01/80/162/00681/AM11/DES.I Meeting No.17/12 Date: 15.11.2011 Fixation  of  SION  for  Export  Product  “(Fluid System) – Air Crafts Part.   The Committee decided to send application to DC(MSME) again and to re­list the case on 27.12.2011.   Sl.No.126

Case No.C­11

  M/s.  Tata  Autocomp Systems Ltd., Pune HQ F.No.01/80/162/00348/AM12/DES.I Meeting No.17/12 Date: 15.11.2011 Clarification  sought  as  to  whether  various Engineering    Products  covered  under  the various DEPB entries – reg.   The Committee decided to reject the case on the ground that the firm did not furnish any reply with reference to this office letter dated 08.08.2011 and subsequent reminder dated 18.10.2011calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.         Sl.No.127

Case No.C­12

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00247/AM12/DES.I Meeting No.17/12 Date: 15.11.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   The Committee decided to ask the firm to forward  a copy complete firm’s application to DIPP for examination and comments.  The case may be re­listed on 27.12.2011.   Sl.No.128

Case No.C­13

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00246/AM12/DES.I Meeting No.17/12 Date: 15.11.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   The  Committee  decided  to  ask  the  firm  to  forward    a  copy  firm’s  application  to  DIPP  for  examination  and comments.  The case may be re­listed on 27.12.2011.   Sl.No.129

Case No.C­14

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00245/AM12/DES.I Meeting No.17/12 Date: 15.11.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .

The Committee decided to ask the firm to forward  a copy complete firm’s application to DIPP for examination and comments.  The case may be re­listed on 27.12.2011.   Sl.No.130

Case No.C­15

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00248/AM12/DES.I Meeting No.17/12 Date: 15.11.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   The Committee decided to ask the firm to forward  a copy complete firm’s application to DIPP for examination and comments.  The case may be re­listed on 27.12.2011.   Sl.No.131

Case No.C­16

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00243/AM12/DES.I Meeting No.17/12 Date: 15.11.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   The Committee decided to ask the firm to forward  a copy complete firm’s application to DIPP for examination and comments.  The case may be re­listed on 27.12.2011.   Sl.No.132

Case No.C­17

 M/s. Ultra Engineers, Pune HQ F.No.01/80/162/00244/AM12/DES.I Meeting No.17/12 Date: 15.11.2011 Fixation of wastage norms for “Special Brand Rate Duty Draw Back” against deemed export .   The Committee decided to ask the firm to forward  a copy complete firm’s application to DIPP for examination and comments.  The case may be re­listed on 27.12.2011.   Sl.No.133

Case No.C­22

 M/s. Inoxpa India Pvt. Ltd., Pune HQ F.No.01/80/162/00366 /AM12/DES.I Meeting No.17/12 Date: 15.11.2011 Request for fixation of input output norms in respect of EOUs for the export product “(1) Centrifugal Pumps and Parts thereof (2) Industrial Valves Viz; Butterfly & Ball Valves; (3) Other components required for Food, Dairy, Cosmetic & Pharmaceuticals Industries  viz;  Tubes  Fitings,  Flanges, Unions, Joints & bend”.   As  per  DIPP  U.O.  Note  dated  15.11.2011,  the  Committee  decided  to  call  for  the  following information/clarification from the firm and to re­list the case on  27.12.2011:­   1.      Specific item of manufacture and their inputs for which wastage norms are required to be fixed. 2.      Information in respect of Sl. No. 3, 4, 5 & 11 of Standard Deficiency Format­export product wise.   S.No.134

Case No.C­23

  M/s.  Shakti Pumps  (India) Ltd., HQ F.No.01/80/162/00372 /AM12/DES.I Meeting No.17/12

Date: 15.11.2011 Clarification sought as to whether DEPB benefits is  available  on  export  product  “Submersible Motors”.   The Committee noted that DEPB scheme is over on 30.09.2011.  The Committee, therefore, decided to close the case on the part of NC.   The Regional Authority may take necessary action accordingly.     S.No.135

Case No.C­24

  M/s.  Indo  Schottle Auto Parts Pvt. Ltd.,, HQ F.No.01/80/162/00532 /AM12/DES.I Meeting No.17/12 Date: 15.11.2011 Request  for  fixation  of  input  output  norms  in respect  of  100%  EOUs  for  the  export  product “Central  Housing  Cover;  Collar  Thrust;  Coupling Injector  Plunger  Assembly;  Fitting  High  Pressure Fuel;  Guide  Pin;  Housing  Injector  Spring;  Link Injector  Plunger;  Plunger  Tappet;  Sleeve;  Spool; Bushing; Oil Seal Plate etc.”   The  Committee  decided  to  forward  a  copy  of  firm’s  reply  dated  10.11.2011  to  DHI  for  examination  and comments.  The case may be re­listed on 27.12.2011.   S.No.136

Case No.C­31

  M/s.  Paharpur Cooling  Towers Ltd., Kolkata HQ F.No.01/80/162/00958/AM09/DES.I Meeting No.17/12 Date: 15.11.2011 Relaxation  of  Policy  or  importability  of  items under  SION  C­1708  in  respect  of  Advance Authorization NO.0210119229 dated 04.11.2008.   The  Committee  deliberated  the  details  of  the  case.    The  Committee  noted  that  Advance  Authorization  No. 0210119229 dated 04.11.2008 was obtained on 4.11.2008 for import item ‘Pine/Fir Lumber’ under SION C­ 1708. The Committee noted that ‘Fir Lumber’ is an essential item of input for the manufacture of the export product ‘Process & Acid Plant Cooling Towers’. Due to the  non ­ availability of Pine Lumber in international market on competitive terms, the firm manufactured the export product by using FIR LUMBER only and it was so declared at the time of export in the shipping bills. Subsequently, based on the request of the Company,  SION C­1708 were modified for inclusion of ‘Fir Lumber’ as an import item as per recommendations of the Norms Committee in its meeting dated 13.10.2009 and Public Notice No.19 dated  23.11.2009. Further, had the firm applied for the said Advance Authorization under ‘ad­hoc’ norms category, the import item ‘Fir Lumber’ would have been allowed for import.  In view of this, the Committee decided to permit import of ‘Fir Lumber’ under Advance Authorization No. 0210119229 dated 04.11.2008. The Regional Authority may take necessary action accordingly.                                                        


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied