DGFT Minutes
In force — no superseding record on file.
1 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
DIRECTORATE GENERAL OF FOREIGN TRADE (DES-I SECTION)
MINUTES OF MEETING NO. 08/80 OF THE NORMS COMMITTEE-I DATED 05.11.2020 HELD ON
06.11.2020
Meeting No. 08/80 of the Norms Committee (NC-I) for the licensing year 2020-2021 (originally scheduled for
05.11.2020) held on 06.11.2020 under the Chairmanship of Sh. R.P. Goyal, Additional Director General of
Foreign Trade to consider the applications under Duty Exemption/Remission Schemes (Chapter-4) of the
applicable Foreign Trade Policy and the Handbook of Procedures. The following Members of the Committee were
present in the meeting: -
Sl. No.
Name of the representatives & their Designation
Department
1.
Shri K.S. Sodhi, Asst. Director
MSME
2.
Shri Sushil Kumar Jangid, Scientist ‘B’
MeitY
3.
Shri Shaish Kumar, (Tech-1)
Consultant
4.
Shri V.C. Agarwal, (Tech-3)
Consultant
5.
Shri S. K. Bhatnagar,
Consultant
In Attendance
1.
Dr. D. C. Dabhole, Dy. DGFT
DGFT
2.
Shri PranavUpadhyay, Assistant Director, ISS
DGFT
Note:
- In certain cases the decision of the Norms Committee refers to the Recommendations/ Observations/Deficiencies received from the concerned Technical Authority. Wherever applicable, a scanned copy of such document has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes.
ocument has been placed at the end of the Minutes, in running serial orders. The scanned copies uploaded are to be accepted. The U.O. No./O.M No of the scanned copy is reflected in the minutes. 2. Wherever the Committee has fixed norms, the RAs should allow inputs as per wastage norms approved or as applied whichever is less. 3. All applications/representations/reply to the Deficiency letters etc. may be sent to NC-I at e-mail address- nc1.dgft@nic.in. All firms are also requested to mail/send their present valid email addresses so that correspondences can be made through email/ by Post. 4. Minutes of Meeting 06/80 (originally scheduled for 29.09.2020) held on 01.10.2020 were circulated on 23.10.2020, to all the members of the Committee and the comments (if any), there upon received, were incorporated in the Minutes and therefore the said minutes were uploaded on dgft.gov.in on 03.11.2020. The minutes were unanimously approved.
2 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
MEETING NUMBER: 8/80-ALC2/2020 MEETING DATE: 05.11.2020
1
Case No.:390/15/80-ALC2/2018
Party Name: TENOVA INDIA
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Approved
HQ File :01/80/050/00732/AM19/ RLA File
:07/24/040/00411/AM16/
Lic.No/Date:0710109544
18.03.2016
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments of DHI vide File No.: 12(11)/AANo.0710109544/Tenova/2020-HEI dated 20.10.2020. (Copy enclosed) RA concerned may take further necessary action as per the decision of NC.
2
Case No.:25/15/80-ALC2/2018
Party Name: TENOVA INDIA
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Approved
HQ File
:01/80/050/00367/AM19/
RLA File
:07/24/040/00080/AM17/
Lic.No/Date:0710109946
14.06.2016
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments of DHI vide File No.: 12(12)/AA No.0710109946/Tenova/2020-HEI dated 26.10.2020. (Copy enclosed)
3
Case No.:199/15/80-ALC2/2018 Party Name: TENOVA INDIA
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00541/AM19/
RLA File
:07/24/040/00173/AM17/
Lic.No/Date:0710110331
29.08.2016
Pending
with firm
Decision: The Committee considered the case as per the agenda and noted that a deficiency letter seeking certain
information as raised by DHI was sent to the firm on 23.10.2020. However, no reply has been received yet.
Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
4
Case No.:404/15/80-ALC2/2018 Party Name: OSWAL PUMPS
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00746/AM19/
RLA File
:33/24/040/00007/AM17/
Lic.No/Date:3310030377
03.03.2017
Pending
with firm
information as raised by DPIIT was sent to the firm on 23.10.2020. However, no reply has been received yet.
Case is deferred.
5
Case No.:22/1/80-ALC2/2019
Party Name: KOREA FUEL
TECH INDIA P. LTD.
Meet No/Date:8/80-
ALC2/2020 &05.11.2020
Status:
Deferred
HQ File
:01/80/050/00770/AM19/
RLA File
:04/24/040/00219/AM17/
Lic.No/Date:0410162993
18.04.2017
Pending with
firm
Decision: The Committee considered the case as per the agenda and noted that the copy of application has not
yet been received from the firm. Therefore, the Committee decided to ask from the firm to submit the complete
set of application for examination of the case.
Case is deferred.
3 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
6
Case No.:94/15/80-ALC2/2018 Party Name: MODEL INFRA
CORPORATION PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00436/AM19/
RLA File
:07/24/040/00085/AM18/
Lic.No/Date:0710111766
16.06.2017
Pending
with firm
information as raised by MSME was sent to the firm on 23.10.2020. However, no reply has been received yet.
Case is deferred.
7
Case No.:405/15/80-ALC2/2018 Party Name: OSWAL PUMPS
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00747/AM19/
RLA File
:33/24/040/00007/AM18/
Lic.No/Date:3310030410
01.11.2017
Pending
with firm
information as raised by DPIIT was sent to the firm on 23.10.2020. However, no reply has been received yet.
Case is deferred.
8
Case No.:267/15/80-ALC2/2018 Party Name: LARSEN &
TOUBRO LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00609/AM19/
RLA File
:03/95/040/00583/AM19/
Lic.No/Date:0310825583
11.12.2018
Pending
with firm
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the
following information as per comments of DPIIT vide U. O. No.: P-47011/26/2019-TSW dated 20.10.2020:
- Net weight of indigenous items in the export product.
- Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated. (Information should be export product wise)
- Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc. (Information should be export product wise)
- For net weight of components to be manufactured from import items at Sl. No. 1, 2 & 3, details of components with net weights thereof may be indicated.
mation should be export product wise) 4. For net weight of components to be manufactured from import items at Sl. No. 1, 2 & 3, details of components with net weights thereof may be indicated. 5. Quantities of import item at Sl. No. 4 & 6 to 10 in Nos. also in addition to their weights. 6. Quantities of import item at Sl. No. 5 in meters also in addition to its weight. 7. Detailed calculations for the quantity of import item at Sl. No. 5 supported by length and number of pipes/tubes in the export product.
Case is deferred.
4 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
9
Case No.:300/15/80-
ALC2/2018
Party Name: DILIGENT SCM
SOLUTIONS PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Approved
HQ File
:01/80/050/00642/AM19/
RLA File
:09/24/040/00487/AM19/
Lic.No/Date:0910067093
18.01.2019
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms on repeat basis
as approved for AA No. 0910068346 dated 08.01.2020 in Meeting No. 24/80 dated 25.03.2020 as per comments
of MSME vide email dated 04.11.2020 as under:
Sl.
No.
ITCHS
Code
Export
Item
Quantity
Sl.
No.
ITCHS
Code
Import Item
Recommended
Norms
1
84842000
Horizontal
Joint Seal
50245
Number
1
81059000
Cobalt Alloy
Sheet (Alloy 188)
1.1667Kgs/Kg content
in the export product
2
84842000
Horizontal
Joint Seal
10824
Number
2
81059000
Cobalt Alloy
Sheet (Alloy X)
1.1667Kgs/Kg content
in the export product
3
84842000
Horizontal
Joint Seal
1760
Number
3
75062000
Nickle Alloy
Sheet (L 605)
1.1667Kgs/Kg content
in the export product
Note:
- The firm should import relevant items only.
- The firm would account for the imported inputs in the end product
10
Case No.:310/15/80-
ALC2/2018
Party Name: TERUMO
PENPOL PRIVATE LIMITED
Meet No/Date:8/80-ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00652/AM19/
RLA File
:53/24/040/00013/AM19/
Lic.No/Date:5310019913
05.02.2019
Pending with
Deptt. of C & CP
Decision: The Committee considered the case as per the agenda and noted that letter requesting some
information (for similar cases) as suggested by Consultant (Tech 1) was sent to Department of C&PC on
12.02.2020 followed by reminders on 18.03.2020 & 21.07.2020. Further, it was noted that a D.O. letter was also
sent to the Department of C & PC on 30.07.2020 and the Department of C & PC informed vide email dated
18.10.2020that the matter is under examination. However, no information has been received yet. Therefore, the
Committee decided to remind again the Department of C & PC for expediting comments.
Case is deferred.
11
Case No.:2/4/80-ALC2/2019
Party Name: SULZER INDIA
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00017/AM20/
RLA File
:31/83/040/00009/AM20/
Lic.No/Date:3110067390
24.04.2019
Pending
with firm
information as raised by DPIIT was sent to the firm on updated email address on 28.09.2020. However, no reply
has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the
requisite information within 15 days.
Case is deferred.
5 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
12
Case No.:3/4/80-ALC2/2019
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00018/AM20/
RLA File
:31/83/040/00010/AM20/
Lic.No/Date:3110067391
24.04.2019
Pending
with firm
information as raised by DPIIT was sent to the firm on updated email address on 28.09.2020. However, no reply
has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the
requisite information within 15 days.
Case is deferred.
13
Case No.:4/4/80-ALC2/2019
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00019/AM20/
RLA File
:31/83/040/00011/AM20/
Lic.No/Date:3110067392
24.04.2019
Pending
with firm
information as raised by DPIIT was sent to the firm on updated email address on 28.09.2020. However, no reply
has been received yet. Therefore, the Committee decided to send a reminder to the firm for furnishing the
requisite information within 15 days.
Case is deferred.
14
Case No.:7/4/80-ALC2/2019
Party Name: SHIVALIK
BIMETAL CONTROLS LTD
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Withdrawn
HQ File
:01/80/050/00022/AM20/
RLA File
:05/24/040/00016/AM20/
Lic.No/Date:0510410395
26.04.2019
Decision: The Committee considered the case as per the agenda and noted that the firm informed that the above AA has been surrendered at RA, New Delhi. Therefore, the Committee decided to withdraw the case from the agenda under intimation to RA, New Delhi. (Copy enclosed)
Case is withdrawn.
15
Case No.:9/4/80-ALC2/2019
Party Name: ERBATECH
MACHINERY P LTD
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00024/AM20/
RLA File
:32/24/040/00004/AM20/
Lic.No/Date:3210078932
29.04.2019
Pending
with firm
information as raised by DHI was sent to the firm on 03.09.2020 followed by a reminder on 30.09.2020.
However, no reply has been received yet. Therefore, the Committee decided to send final reminder to the firm
for furnishing the requisite information within 15 days.
Case is deferred.
6 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
16
Case No.:14/4/80-ALC2/2019
Party Name: KINECO KAMAN
COMPOSITES - INDIA PVT
LTD
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00029/AM20/
RLA File
:03/94/040/01131/AM19/
Lic.No/Date:0310828702
01.05.2019
Pending
with firm
Decision: The Committee considered the case as per the agenda and noted that the second deficiency letter
seeking certain information as raised by DPIIT was sent to the firm on 23.10.2020. However, no reply has been
received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
17
Case No.:15/4/80-ALC2/2019
Party Name: CHIRAG UDYOG
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00030/AM20/
RLA File
:05/23/040/00054/AM20/
Lic.No/Date:0510410451
02.05.2019
Pending
with firm
information as raised by Consultant (Tech-3) was sent to the firm on 03.09.2020 followed by a reminder on
23.10.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s
reply.
Case is deferred.
18
Case No.:21/4/80-ALC2/2019
Party Name: MASU BRAKE
PADS PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00036/AM20/
RLA File
:05/24/040/00057/AM20/
Lic.No/Date:0510410488
06.05.2019
Pending
with firm
information as raised by Consultant (SKB) was sent to the firm on 23.10.2020. However, no reply has been
Case is deferred.
19
Case No.:30/5/80-ALC2/2019
Party Name: TIAGO CHEM
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00068/AM20/
RLA File
:34/24/040/00075/AM20/
Lic.No/Date:3410045178
30.05.2019
Pending
with firm
yet been received from the firm. It was also noted that the earlier emails, regarding submission of copy of
application, were sent on outdated email address. Therefore, a letter was sent to the firm by post on 28.10.2020
with a request to send the complete set of application for examination of the case. However, no information has
been received yet. Hence, the Committee decided to wait for the complete set of application.
Case is deferred.
7 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
20
Case No.:32/5/80-ALC2/2019
Party Name: FUTURE TECH
ENGINEERING PVT. LTD.
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00070/AM20/
RLA File
:07/24/040/00050/AM20/
Lic.No/Date:0710115000
31.05.2019
Pending
with firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish
following information as per comments of MSME:
- To submit excel sheet of the calculation.
Case is deferred.
21
Case No.:1/6/80-ALC2/2019
Party Name: SHIVALIK
BIMETAL CONTROLS LTD
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00072/AM20/
RLA File
:05/24/040/00129/AM20/
Lic.No/Date:0510410810
04.06.2019
Pending
with firm
information as raised by MSME was sent to the firm on 31.07.2020 followed by a reminder on 23.10.2020.
However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
22
Case No.:10/6/80-ALC2/2019
Party Name: TEMA INDIA
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Withdrawn
HQ File
:01/80/050/00081/AM20/
RLA File
:03/95/040/00229/AM20/
Lic.No/Date:0310829553
11.06.2019
Decision: The Committee considered the case as per agenda and noted that the case was already approved in Meeting No. 04/80 dated 20.08.2020. Therefore, the Committee decided to withdraw the case from the agenda. Case is withdrawn.
23
Case No.:13/6/80-ALC2/2019
Party Name: VEELINE MEDIA
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00084/AM20/
RLA File
:02/24/040/00038/AM20/
Lic.No/Date:0210209240
11.06.2019
Pending
with firm
Decision: The Committee considered the case as per the agenda and noted that the second deficiency letter
seeking certain information as raised by MSME was sent to the firm on 23.10.2020. However, no reply has been
Case is deferred.
8 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
24
Case No.:16/6/80-
ALC2/2019
Party Name: TEMA INDIA
LIMITED
Meet No/Date:8/80-
ALC2/2020&05.11.2020
Status:
Deferred
HQ File
:01/80/050/00087/AM20/
RLA File
:03/95/040/00239/AM20/
Lic.No/Date:0310829596
12.06.2019
Pending with
firm
Decision: The Committee considered the case as per the agenda and noted that the reply received from the firm
was sent to DPIIT on 18.08.2020 for examination of the case. DPIIT in its comments stated that the firm’s reply
is for different AA and hence, in this regard an email was sent to the firm on 23.10.2020. However, no reply has
been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
25
Case No.:1/8/80-ALC2/2019
Party Name: MODEL INFRA
CORPORATION PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00113/AM20/
RLA File
:07/24/040/00081/AM20/
Lic.No/Date:0710115134
05.07.2019
Pending
with firm
information as raised by MSME was sent to the firm on 03.06.2020 followed by reminders on 31.07.2020 &
23.10.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s
reply.
Case is deferred.
26
Case No.:9/8/80-ALC2/2019
Party Name: ANSTECH
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00121/AM20/
RLA File
:34/24/040/00127/AM20/
Lic.No/Date:3410045281
15.07.2019
Pending
with firm
yet been received from the firm and in this regard, an email was sent on updated email address on 28.09.2020.
However, no information has been received yet. Therefore, the Committee decided to remind the firm for
submitting the complete set of application.
Case is deferred.
27
Case No.:12/8/80-ALC2/2019
Party Name: ZOBELE INDIA
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Approved
HQ File
:01/80/050/00124/AM20/
RLA File
:03/95/040/00352/AM20/
Lic.No/Date:0310830415
18.07.2019
Decision: The Committee considered the case as per agenda and decided to ratify the ad-hoc norms as per written comments of Consultant (Tech-3) considering the firm’s reply dated 24.10.2020as under:
- Quantity of import items (i.e. PP Compound) at Sl. No. 1, 3, 4 & 6 may be allowed on net to net basis.
- Quantity of import item (i.e. Master batch white forPP Compound) at Sl. No. 2 may be allowed on net to net basis.
- Quantity of import item (i.e. Master batch black forPE Compound) at Sl. No. 5 may be allowed on net to net basis
- Quantity of import items at Sl. No. 7 to 15 & 17 to 25 may be allowed as per GN-4.
- Quantity of import item at Sl. No. 16 may be allowed on net to net basis.
9 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
28
Case No.:3/9/80-ALC2/2019
Party Name: DYNA FORCE
HYDRAULICS PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00128/AM20/
RLA File
:31/83/040/00067/AM20/
Lic.No/Date:3110067484
25.07.2019
Pending
with firm
information as raised by MSME was sent to the firm on 03.09.2020 followed by a reminder on 23.10.2020.
Case is deferred.
29
Case No.:2/10/80-ALC2/2019
Party Name: DOOWON
AUTOMOTIVE SYSTEMS
INDIA PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00140/AM20/
RLA File
:04/24/040/00079/AM20/
Lic.No/Date:0410165942
07.08.2019
Pending
with firm
information as raised by Consultant (Tech-3) was sent to the firm on 23.10.2020. However, no reply has been
Case is deferred.
30
Case No.:5/10/80-ALC2/2019
Party Name: JKS
ENGINEERING
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00143/AM20/
RLA File
:32/24/040/00033/AM20/
Lic.No/Date:3210079060
08.08.2019
Pending
with firm
Decision: The Committee considered the case as per the agenda and decided to ask again from the firm to
furnish following information as per comments of Consultant (Tech-1):
- Manufacturing process in detail.
- Net content of import item in export.
- Justification for 52% wastage.
Case is deferred.
31
Case No.:6/10/80-ALC2/2019
Party Name: LM WIND POWER
BLADES INDIA PVT. LTD
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00144/AM20/
RLA File
:34/24/040/00152/AM20/
Lic.No/Date:3410045365
09.08.2019
Pending
with firm
Case is deferred.
10 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
32
Case No.:7/10/80-ALC2/2019 Party Name: MAINI
PRECISION PRODUCTS
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Approved
HQ File
:01/80/050/00145/AM20/
RLA File
:07/24/040/00106/AM20/
Lic.No/Date:0710115278
13.08.2019
written comments of Consultant (Tech-3) considering the firm’s reply dated 14.08.2020as under: Sl. No. ITCHS Code Export Item Quantity Sl. No. ITCHS Code Import Item Recommended Norms 1 87089900 Sleeve AF.0170661.A (Part Of Pump Body Complete -Assembly To P/N TM.0170663.D ) (Weight = 1600 Kg) 100000 Number 1 7222301 9 SS440B Round bar Dia16 SS440B Dia 16 mm 2880 Kgs with 80% wastage 2 87089900 Pump Body FH.0170324.D (Part Of Pump Body Complete - Assembly To P/N TM.0170663.D) (Weight = 59400 Kg) 100000 Number 2 8413919 0 Pump Body Forging SS415M 81675 Kgs with 37.50% wastage 3 87089900 Sleeve Ring Nut DB.0170660.A (Part Of Pump Body Complete - Assembly To P/N TM.0170663.D) (Weight = 2200 Kg) 100000 Number 3 7222201 2 SS630 Round bar Dia 28 SS630 Dia 28mm 4752 Kgs with 116% wastage Note:
- Weight of export product at Sl. No. 1 is 1600Kg and the same may be added in the description of export item.
- Weight of export product at Sl. No. 2 is 59400Kg and the same may be added in the description of export item.
- Weight of export product at Sl. No. 3 is 2200Kg and the same may be added in the description of export item.
- Grade of steel to be imported will be same as used in the export item.
- Outer diameter of export item at Sl. No. 3 will be 27mm.
33
Case No.:4/6/80-ALC2/2020
Party Name: MICRON
INSTRUMENTS PVT LTD
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Approved
HQ File
:01/80/050/00585/AM21/
RLA File
:05/24/040/00286/AM20/
Lic.No/Date:0510411576
20.08.2019
Decision: The Committee considered the case as per agenda and decided to fix the ad-hoc norms as per written comments of DPIIT vide U. O. No.: P-47012/15/2020-TSW dated 03.11.2020. (Copy enclosed)
11 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
34
Case No.:19/10/80-
ALC2/2019
Party Name: DILIGENT SCM
SOLUTIONS PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Approved
HQ File
:01/80/050/00157/AM20/
RLA File
:09/24/040/00272/AM20/
Lic.No/Date:0910067939
27.08.2019
written comments of MSME as under: ITCHS Code Export Item Quantity Sl. No. ITCHS Code Import Item Recommended Norms 84842000 Curved Seal / TP Inner Cloth Seal / TP Outer Cloth Seal [Net content of Cobalt Alloy Sheet(L-605) 1025.280 kgs + Nickle Cobalt Alloy Sheet (x750) 98.568 Kgs +Mesh 30x 250 – Twill Filter Cloth (Haynes 25-L605) 630 Sq Ft)
960 Number 1 8105900 0 Cobalt Alloy Sheet (L-605) 1229 kg inclusive of 19.86% wastage after 1/3rd recovery from scrap 2 7506200 0 Nickle Cobalt Alloy Sheet (X750) 120 kg inclusive of 21.74% wastage after 1/3rd recovery from scrap 3 7314149 0 Mesh 30 x 250 - Twill Filter Cloth (Haynes 25 - L605) 810 Sq. feet inclusive of 28.57% wastage after 1/3rd recovery from scrap Note:
- The firm should import relevant items only.
- The description of export indent should amended as above.
35
Case No.:20/10/80-ALC2/2019 Party Name: OSWAL PUMPS
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00158/AM20/
RLA File
:33/24/040/00017/AM20/
Lic.No/Date:3310030578
27.08.2019
Pending
with firm
Decision: The Committee considered the case as per the agenda and noted that the second deficiency letter
seeking certain information as raised by DPIIT was sent to the firm on 23.10.2020. However, no reply has been
Case is deferred.
36
Case No.:36/11/80-ALC2/2004 Party Name: PAHARPUR
COOLING TOWERS LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00162/AM20/
RLA File
:02/24/040/00081/AM20/
Lic.No/Date:0210209409
02.09.2019
Pending with
DPIIT
Decision: The Committee considered the case as per agenda and noted that a copy of application was sent to
DPIIT on 05.11.2020 for examination of the case. However, no comments have been received yet. Hence, the
Committee decided to wait for the comments.
Case is deferred.
12 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
37
Case No.:38/11/80-ALC2/2004 Party Name: HANNING
MOTORS INDIA P LTD
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Approved
HQ File
:01/80/050/00164/AM20/
RLA File
:34/24/040/00169/AM20/
Lic.No/Date:3410045416
04.09.2019
written comments of MSME as under:
- Quantity of relevant import items at Sl. No. 1 to 13 & 19 to 32 may be allowed as per GN-4.
- Quantity of relevant import items at Sl. No. 18 & 36 may be allowed as 1.01 Kgs/Kg content in the export product.
- Quantity of relevant import items at Sl. No. 14 to 17 & 33 to 35 may be allowed as 1.05 Kgs/Kg content in the export product.
38
Case No.:7/13/85-ALC3/2019
Party Name: AUTOCOMP
CORPORATION PANSE
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/85/050/00082/AM20/
RLA File
:31/83/040/00085/AM20/
Lic.No/Date:3110067530
11.09.2019
Pending
with firm
Decision: The Committee considered the case as per the agenda and decided to ask again from the firm to
furnish following information as per comments of Consultant (Tech-3):
- Weight of each Export Product.
- Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
- Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
- Sheet layout diagram of the material indicating the wastage during blanking.
- Drawings given with application are not correlated to export product.
- Copy of Advance Authorization.
Case is deferred.
39
Case No.:2/12/80-ALC2/2019
Party Name: HEURTEY
PETROCHEM INDIA PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00174/AM20/
RLA File
:34/24/040/00185/AM20/
Lic.No/Date:3410045459
19.09.2019
Decision: The Committee considered the case as per the agenda and noted that email, regarding the following information as per DHI’s comments, was sent to firm on 23.10.2020:
- To furnish details of actual wastage generated in each operation against each raw material while making the components to verify the wastage claimed.
- To submit technical write-up. However, the firm’s reply has not been received yet. Therefore, the Committee decided to wait for the firm’s reply.
13 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
Case is deferred.
40
Case No.:4/12/80-
ALC2/2019
Party Name: FREUDENBERG
FILTRATION TECHNOLOGIES
INDIA PVT.LTD.
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00176/AM20/
RLA File :31/83/040/00008/AM20/
Lic.No/Date:3110067543
24.09.2019
Pending with
firm
Case is deferred.
41
Case No.:5/12/80-ALC2/2019
Party Name: GODREJ &
BOYCE MFG. CO. LTD.
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00177/AM20/
RLA File
:03/94/040/00480/AM20/
Lic.No/Date:0310831805
25.09.2019
Decision: The Committee considered the case as per agenda and decided to forward the firm’s reply to Consultant (SKB) for examination of the case.
Case is deferred.
42
Case No.:6/12/80-ALC2/2019
Party Name: VICTORA AUTO
PVT. LTD
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00178/AM20/
RLA File
:05/24/040/00338/AM20/
Lic.No/Date:0510411950
25.09.2019
Decision: The Committee considered the case as per agenda and decided to forward the firm’s reply to MSME for examination of the case.
Case is deferred.
43
Case No.:7/12/80-ALC2/2019
Party Name: VICTORA AUTO
PVT. LTD
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00179/AM20/
RLA File
:05/24/040/00340/AM20/
Lic.No/Date:0510411951
25.09.2019
Pending
with firm
information as raised by MSME was sent to the firm on 23.10.2020. However, no reply has been received yet.
Case is deferred.
14 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
44
Case No.:8/12/80-ALC2/2019
Party Name: AZAD
ENGINEERING PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00180/AM20/
RLA File
:09/24/040/00336/AM20/
Lic.No/Date:0910068046
27.09.2019
Pending
with firm
Decision: The Committee considered the case as per agenda and decided to ask from the firm to furnish
following information as per comments of Consultant (SKB):
- What is the exact name of the export product?
- Provide complete neat colored drawing of the product with Top, Side and Front view and dimensions thereof.
- What is purpose to bring Stainless Steel Rounds for forging of blanks for finished product? Why not forged SS plate of same the composition for manufacturing of export item, if it is not in round in shape after cutting into required dimensions?
- What is the Rockwell Hardness Number of the final product and forged blank?
- Detail of any heat treatment, if required.
- What is the weight of final export item?
- Why such high percentage wastage is generated for manufacturing of turbine parts? Give complete reasons for such a huge wastage.
- A video film on complete operations (Cutting, forging and machining) for manufacturing of export item. Case is deferred.
45
Case No.:11/12/80-ALC2/2019 Party Name: AZAD
ENGINEERING PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00183/AM20/
RLA File
:09/24/040/00345/AM20/
Lic.No/Date:0910068052
01.10.2019
Pending
with firm
information as raised by Consultant (SKB) was sent to the firm on 23.10.2020. However, no reply has been
Case is deferred.
46
Case No.:12/12/80-ALC2/2019 Party Name: AZAD
ENGINEERING PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00184/AM20/
RLA File
:09/24/040/00344/AM20/
Lic.No/Date:0910068053
01.10.2019
Pending
with firm
information as raised by Consultant (SKB) was sent to the firm on 23.10.2020. However, no reply has been
Case is deferred.
47
Case No.:13/12/80-ALC2/2019 Party Name: AZAD
ENGINEERING PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00185/AM20/
RLA File
:09/24/040/00346/AM20/
Lic.No/Date:0910068054
01.10.2019
Pending
with firm
information as raised by Consultant (SKB) was sent to the firm on 23.10.2020. However, no reply has been
Case is deferred.
15 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
48
Case No.:1/6/80-ALC2/2020
Party Name: JAMES
ROBINSON LABS PVT LTD
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00582/AM21/
RLA File
:09/24/040/00279/AM20/
Lic.No/Date:0910068104
16.10.2019
Pending with
firm
yet been received from the firm and in this regard, a letter was sent on 28.10.2020 by post. However, no
information has been received yet. Hence, the Committee decided to wait for complete set of application for
examination of the case.
Case is deferred.
49
Case No.:3/14/80-
ALC2/2019
Party Name: LOTUS AVIATION
TECHNOLOGY PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020 & 05.11.2020
Status:
Deferred
HQ File
:01/80/050/00199/AM20/
RLA File :05/23/040/00283/AM20/
Lic.No/Date:0510412171
17.10.2019
Decision: The Committee considered the case as per the agenda and noted that in Meeting 06/80 held on 01.10.2020, representative of MeitY raised following deficiencies, i.e. “to provide clarification for, why the description of import & export item is same”, and the same was forwarded to firm on 23.10.2020. The Committee also observed that now MeitY has provided their comments in the matter vide their email dated 15.10.2020, stating that the case be approved on “Net-to-Net basis with Nil wastage”. However, the Committee decided to wait for the firm’s clarification on why the description of Import and Export items are same.
Case is deferred.
50
Case No.:4/14/80-ALC2/2019
Party Name: NIDEC INDIA
PRIVATE LIMITED
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00200/AM20/
RLA File
:05/24/040/00403/AM20/
Lic.No/Date:0510412197
21.10.2019
Pending
with firm
information as raised by MSME was sent to the firm on 23.10.2020. However, no reply has been received yet.
Case is deferred.
51
Case No.:5/14/80-ALC2/2019 Party Name: TEGA
INDUSTRIES LIMITED
Meet No/Date:8/80-
ALC2/2020 & 05.11.2020
Status:
Approved
HQ File
:01/80/050/00201/AM20/
RLA File
:02/24/040/00100/AM20/
Lic.No/Date:0210209491
22.10.2019
Decision: The Committee considered the case as per the agenda and noted that the reply of deficiency letter dated 23.10.2020, as raised by Consultant (SKB),has not yet been received. However, the matter was discussed in the meeting and the Committee decided to ratify the ad-hoc norms on the recommendation of Consultant (Tech-1)&Consultant (SKB) as under:
ITCHS
Code
Export Item
Quantity
Sl.
No.
ITCHS
Code
Import Item
Recommended Norms
84749000
Parts of Mill
Liner for
Grinding Mill
980 MT
1
72254013
Hot Rolled Steel Plate - Hardox
500/ JFE EH 500A -
1.05Kgs/Kg content in
the export product
2
40012200
Natural Rubber
the export product
3
40022000
Synthetic Rubber PBR
the export product
4
28030010
Carbon Black
the export product
Note:
- The firm should import relevant items only.
- The firm should account for the items imported in the resultant product.
16 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
52
Case No.:6/14/80-ALC2/2019 Party Name: TEGA
INDUSTRIES LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Approved
HQ File
:01/80/050/00202/AM20/
RLA File
:02/24/040/00107/AM20/
Lic.No/Date:0210209503
23.10.2019
Decision: The Committee considered the case as per the agenda and noted that the reply of deficiency letter dated 23.10.2020, as raised by Consultant (SKB), has not yet been received. However, the matter was discussed in the meeting and the Committee decided to ratify the ad-hoc norms on the recommendation of Consultant (Tech-1)&Consultant (SKB) as under:
ITCHS
Code
Export Item
Quantity
Sl.
No.
ITCHS
Code
Import Item
Recommended Norms
84749000
Parts of Mill
Liner for
Grinding Mill
980 MT
1
72254013
Hot Rolled Steel Plate - Hardox
500/ JFE EH 500A -
the export product
2
40012200
Natural Rubber
the export product
3
40022000
Synthetic Rubber PBR
the export product
4
28030010
Carbon Black
the export product
Note:
- The firm should import relevant items only.
- The firm should account for the items imported in the resultant product.
53
Case No.:7/14/80-ALC2/2019
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00203/AM20/
RLA File
:31/83/040/00096/AM20/
Lic.No/Date:3110067581
23.10.2019
Pending
with firm
Case is deferred.
54
Case No.:9/14/80-
ALC2/2019
Party Name: HITAISHI KK
MANUFACTURING COMPANY
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Rejected
HQ File
:01/80/050/00205/AM20/
RLA File :02/24/040/00111/AM20/
Lic.No/Date:0210209515
28.10.2019
Decision: The Committee considered the case as per the agenda and noted that as per Policy Circular No. 23/2015-20 dated 15.05.2019, the firm was liable to forward the copy of application along with supporting documents to the concerned NC within two months of making the application. However, the same has not been received despite email dated 20.03.2020 followed by reminders on 15.06.2020, 04.08.2020&23.10.2020. Therefore, the Committee decided to reject the case under intimation to RA, Kolkata.
RA concerned may take suitable consequential action accordingly.
17 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
55
Case No.:10/14/80-ALC2/2019 Party Name: TENOVA INDIA
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00206/AM20/
RLA File
:07/24/040/00154/AM20/
Lic.No/Date:0710115616
28.10.2019
Pending
with DHI
Decision: The Committee considered the case as per agenda and noted that the firm’s reply was sent to DHI on
28.09.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee
decided to remind DHI for expediting the comments.
Case is deferred.
56
Case No.:11/14/80-ALC2/2019 Party Name: FERRA
AEROSPACE PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00207/AM20/
RLA File
:07/24/040/00164/AM20/
Lic.No/Date:0710115617
29.10.2019
Pending
with firm
information as raised by MSME was sent to the firm on updated email address on 28.09.2020 and also by post
on 27.10.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firms
reply.
Case is deferred.
57
Case No.:12/14/80-ALC2/2019 Party Name: MELSTAR
MANUFACTURING SYSTEMS
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00208/AM20/
RLA File
:07/24/040/00156/AM20/
Lic.No/Date:0710115619
29.10.2019
Pending
with firm
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the
following information as per comments of MSME:
- Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished
- Weight of each Export Product.
- Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
- Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
Case is deferred.
18 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
58
Case No.:1/16/80-ALC2/2019 Party Name: AYYAPPA CNC
PVT. LTD.
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status: Approved
HQ File
:01/80/050/00211/AM20/
RLA File
:07/24/040/00170/AM20/
Lic.No/Date:0710115658
08.11.2019
written comments of MSME as under:
ITCHS
Code
Export Item
Quantity
Sl.
No.
ITCHS
Code
Import Item
Recommended Norms
88033000
Aircraft
Components
9132.860
Kgs
1
76061200
Aluminium
Alloy Plate /
Block
52550 Kgs inclusive of 551.68%
wastage after affecting 15%
recovery from scrap
2
81089090
Titanium Alloy
Plate/ Sheet
1245 Kgs inclusive of 132.89%
wastage after affecting 15%
recovery from scrap
3
76061200
Aluminium
Alloy Round Bar
432 Kgs inclusive of 11.21%
wastage after affecting 15%
recovery from scrap
4
76061200
Aluminium
Alloy, Sheet
536 Kgs inclusive of 269% wastage
after affecting 15% recovery from
scrap
Note:
3. The firm should import relevant items only.
2. List of export items is attached at the end of minutes. (Copy enclosed)
59
Case No.:3/16/80-ALC2/2019
Party Name: SAMIRI
EQUIPMENTS & ENGINEERS
PVT. LTD.
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00213/AM20/
RLA File
:03/95/040/00758/AM20/
Lic.No/Date:0310832707
11.11.2019
Pending
with firm
information has been received yet. Hence, the Committee decided to wait for complete set of application for
Case is deferred.
60
Case No.:5/16/80-ALC2/2019
BLADES INDIA PVT. LTD.
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00215/AM20/
RLA File
:34/24/040/00242/AM20/
Lic.No/Date:3410045605
13.11.2019
Pending
with firm
yet been received from the firm and in this regard a letter was sent to the firm on 01.01.2020 followed by
reminders on 26.02.2020, 15.06.2020 & 17.08.2020. The firm vide email dated 16.09.2020 requested for some
more time to submit all the relevant documents. However, no reply has been received yet. Therefore, the
Committee decided to remind again the firm for submitting the complete set of application.
Case is deferred.
19 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
61
Case No.:9/8/80-ALC2/2020
Party Name: INCRYO
SYSTEMS PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00670/AM21/
RLA File
:34/21/040/00346/AM20/
Lic.No/Date:3410045606
13.11.2019
Pending
with firm
Case is deferred.
62
Case No.:4/16/80-ALC2/2019
Party Name: BLISS ANAND
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00214/AM20/
RLA File
:05/23/040/00311/AM20/
Lic.No/Date:0510412485
14.11.2019
Pending
with firm
information as raised by DPIIT was sent to the firm on 23.10.2020. However, no reply has been received yet.
Case is deferred.
63
Case No.:6/16/80-ALC2/2019
Party Name: NUCON
AEROSPACE PVT LTD
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00216/AM20/
RLA File
:09/24/040/00409/AM20/
Lic.No/Date:0910068185
14.11.2019
Pending
with firm
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the
following information as per comments of MSME:
- Detail technical drawings with dimension of each export product, Catalogue, if any, may also be furnished
- Weight of each Export Product.
- Weight of each of the imported and indigenous input, separately for each product, for the purpose of material balancing. Net weight (Gross weight minus wastage) for each imported and indigenous input in the export product may be indicated. Net weight along with details of other imported input to be used in the resultant product and sought to be imported/procured from sources other than the license, if any, may also be indicated.
- Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc. Case is deferred.
64
Case No.:8/16/80-ALC2/2019
Party Name: DILIGENT SCM
SOLUTIONS PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Approved
HQ File
:01/80/050/00218/AM20/
RLA File
:09/24/040/00408/AM20/
Lic.No/Date:0910068192
18.11.2019
written comments of MSME via email dated 06.11.2020. (Copy enclosed)
20 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
65
Case No.:9/16/80-ALC2/2019
Party Name: KUVAWALA
CORE DRILL EQUIPMENT
PVT. LTD.
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00219/AM20/
RLA File
:03/94/040/00644/AM20/
Lic.No/Date:0310832842
18.11.2019
Pending
with firm
information as raised by DHI was sent to the firm on 04.08.2020 followed by a reminder on 23.10.2020.
Case is deferred.
66
Case No.:10/16/80-ALC2/2019 Party Name: VICTORA AUTO
PVT. LTD
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00220/AM20/
RLA File
:05/24/040/00462/AM20/
Lic.No/Date:0510412549
19.11.2019
Pending
with firm
information as raised by MSME was sent to the firm on 23.10.2020. However, no reply has been received yet.
Case is deferred.
67
Case No.:13/16/80-ALC2/2019 Party Name: OAM SAAI
INTERNATIONAL INC.
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00223/AM20/
RLA File
:05/24/040/00479/AM20/
Lic.No/Date:0510412570
21.11.2019
Pending
with firm
information as raised by MSME was sent to the firm on 16.06.2020 followed by reminders on 04.08.2020 &
23.10.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s
reply.
Case is deferred.
68
Case No.:15/16/80-ALC2/2019 Party Name: L&T-MHPS
BOILERS PVT LTD
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00225/AM20/
RLA File
:03/95/040/00808/AM20/
Lic.No/Date:0310832929
21.11.2019
Pending
with firm
information as raised by DHI was sent to the firm on 04.08.2020 followed by a reminder on 23.10.2020.
Case is deferred.
69
Case No.:18/16/80-ALC2/2019 Party Name: VICTORA AUTO
PVT. LTD
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00228/AM20/
RLA File
:05/24/040/00499/AM20/
Lic.No/Date:0510412651
26.11.2019
Pending
with firm
information as raised by MSME was sent to the firm on 23.10.2020. However, no reply has been received yet.
Case is deferred.
21 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
70
Case No.:19/16/80-ALC2/2019 Party Name: SULZER INDIA
PRIVATE LIMITED
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00229/AM20/
RLA File
:31/83/040/00115/AM20/
Lic.No/Date:3110067611
26.11.2019
Pending
with firm
Case is deferred.
71
Case No.:4/18/80-ALC2/2019
Party Name: ZECHA
PRECISION TOOLS LIMITED
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00249/AM20/
RLA File
:03/95/040/00892/AM20/
Lic.No/Date:0310833334
11.12.2019
Pending
with firm
information as raised by MSME was sent to the firm on 03.09.2020 followed by a reminder on 23.10.2020.
Case is deferred.
72
Case No.:8/18/80-ALC2/2019
Party Name: CRYSTAL
INDUSTRIAL SYNDICATE
PVT. LTD.
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Approved
HQ File
:01/80/050/00253/AM20/
RLA File
:03/94/040/00752/AM20/
Lic.No/Date:0310833379
12.12.2019
written comments of DPIIT vide U. O. No. P-47011/135/2020-TSW dated 06.10.2020 as under:
- Quantity of import items at Sl. No. 1 to 8 may be allowed on net to net basis with accountability clause.
- RA concerned may take further necessary action as per the decision of NC.
73
Case No.:9/18/80-ALC2/2019 Party Name: RONCH
POLYMERS PVT. LTD.
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Approved
HQ File
:01/80/050/00254/AM20/
RLA File
:03/95/040/00887/AM20/
Lic.No/Date:0310833381
12.12.2019
written comments of Consultant (Tech-1) as under: ITCHS Code Export Item Quantity Sl. No. ITCHS Code Import Item Recommended Norms 84219900 PureitGer mkill Kit 3000l 360000 Number 1 39011090 Ultra High Molecular Weight Polyethylene GUR 2122 5% wastage allowed with net accounting in export for individual import 2 39011090 Ultra High Molecular Weight Polyethylene GUR 4120/ U050 3 39032000 Styrene Acrylonitrile Polymers
22 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
74
Case No.:10/18/80-ALC2/2019 Party Name: TPI COMPOSITES
INDIA LLP
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00255/AM20/
RLA File
:04/24/040/00138/AM20/
Lic.No/Date:0410166360
13.12.2019
Pending
with firm
information as raised by Consultant (Tech-1) was sent to the firm on 23.10.2020. However, no reply has been
Case is deferred.
75
Case No.:13/18/80-ALC2/2019 Party Name: AZAD
ENGINEERING PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00258/AM20/
RLA File
:09/24/040/00455/AM20/
Lic.No/Date:0910068287
17.12.2019
Pending
with firm
information as raised by DHI was sent to the firm on 23.10.2020. However, no reply has been received yet.
Case is deferred.
76
Case No.:14/18/80-ALC2/2019 Party Name: KELVION INDIA
PVT. LTD.
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00259/AM20/
RLA File
:03/94/040/00474/AM20/
Lic.No/Date:0310833455
17.12.2019
Pending
with firm
information as raised by DPIIT was sent to the firm on 17.08.2020 followed by a reminder on 23.10.2020.
Case is deferred.
77
Case No.:15/18/80-ALC2/2019 Party Name: MASU BRAKE
PADS PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00260/AM20/
RLA File
:05/24/040/00559/AM20/
Lic.No/Date:0510412951
18.12.2019
Pending
with firm
information as raised by Consultant (SKB) was sent to the firm on 29.10.2020. However, no reply has been
Case is deferred.
78
Case No.:16/18/80-ALC2/2019 Party Name: VICTORA AUTO
PVT. LTD
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00261/AM20/
RLA File
:05/24/040/00572/AM20/
Lic.No/Date:0510412958
18.12.2019
Pending
with MSME
MSME on 03.11.2020 for examination of the case. However, no comments have been received yet. Hence, the
Committee decided to wait for the comments.
Case is deferred.
23 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
79
Case No.:17/18/80-ALC2/2019 Party Name: ZECHA
PRECISION TOOLS LIMITED
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00262/AM20/
RLA File
:03/95/040/00919/AM20/
Lic.No/Date:0310833525
18.12.2019
Pending
with firm
information as raised by MSME was sent to the firm on 03.09.2020 followed by a reminder on 23.10.2020.
Case is deferred.
80
Case No.:18/18/80-ALC2/2019 Party Name: L&T- MHPS
TURBINE GENERATORS
PRIVATE LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00263/AM20/
RLA File
:03/95/040/00907/AM20/
Lic.No/Date:0310833550
19.12.2019
Decision: The Committee considered the case as per the agenda and noted that a copy of application was sent to DHI on 02.11.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to wait for comments. Case is deferred.
81
Case No.:19/18/80-ALC2/2019 Party Name: BONATRANS
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00264/AM20/
RLA File
:03/94/040/00773/AM20/
Lic.No/Date:0310833585
20.12.2019
Pending
with firm
information as raised by DHI was sent to the firm on 23.10.2020. However, no reply has been received yet.
Case is deferred.
82
Case No.:1/20/80-ALC2/2019
PRIVATE LIMITED
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00283/AM20/
RLA File
:31/83/040/00132/AM20/
Lic.No/Date:3110067650
07.01.2020
Pending
with firm
Case is deferred.
83
Case No.:2/6/80-ALC2/2020
Party Name: KOREA FUEL
TECH INDIA P. LTD.
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00583/AM21/
RLA File
:04/24/040/00148/AM20/
Lic.No/Date:0410166429
10.01.2020
Pending
with firm
Decision: The Committee considered the case as per the agenda and decided to ask from the firm to furnish the
following information for import item at Sl. No. 27 to 30 as per advice of Consultant (Tech-1):
- To give generic name and its function in moulding process.
24 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
Further, the case was discussed in the meeting and the Committee decided to refer the case to MSME for comments on rest of the import items.
Case is deferred.
84
Case No.:7/20/80-ALC2/2019
Party Name: ARIHANT
INDUSTRIES
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00289/AM20/
RLA File
:33/24/040/00031/AM20/
Lic.No/Date:3310030641
13.01.2020
Pending
with firm
Case is deferred.
85
Case No.:6/20/80-ALC2/2019
Party Name: SULZER PUMPS
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00288/AM20/
RLA File
:03/95/040/01012/AM20/
Lic.No/Date:0310834142
14.01.2020
Pending
with firm
Case is deferred.
86
Case No.:9/20/80-ALC2/2019
Party Name: VEELINE MEDIA
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00291/AM20/
RLA File
:02/24/040/00159/AM20/
Lic.No/Date:0210209681
14.01.2020
Pending
with firm
information as raised by MSME was sent to the firm on 03.09.2020 followed by a reminder on 23.10.2020.
Case is deferred.
87
Case No.:11/20/80-ALC2/2019 Party Name: ANSTECH
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Approved
HQ File
:01/80/050/00293/AM20/
RLA File
:34/24/040/00313/AM20/
Lic.No/Date:3410045793
17.01.2020
written comments of DPIIT vide U. O. No. P-47011/146/2020-TSW dated 21.10.2020 as under:
- Quantity of import items at Sl. No. 1 & 2 may be allowed as per GN-4 i.e. on net to net basis with accountability clause.
25 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
88
Case No.:12/20/80-ALC2/2019 Party Name: MASU BRAKE
PADS PRIVATE LIMITED
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00294/AM20/
RLA File
:05/24/040/00664/AM20/
Lic.No/Date:0510413364
17.01.2020
Pending
with firm
information as raised by Consultant (SKB) was sent to the firm on 23.10.2020. However, no reply has been
Case is deferred.
89
Case No.:16/21/80-
ALC2/2019
Party Name: AZAD ENGINEERING
PRIVATE LIMITED
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00310/AM20/
RLA File :09/24/040/00525/AM20/
Lic.No/Date:0910068424
29.01.2020
Pending with
firm
information as raised by Consultant (SKB) was sent to the firm on 03.09.2020 followed by a reminder on
23.10.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
90
Case No.:1/22/80-
ALC2/2019
Party Name: JOHNSON MATTHEY
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00327/AM20/
RLA File :05/23/040/00426/AM20/
Lic.No/Date:0510413542
10.02.2020
Pending with
Tech-3
Consultant (Tech-3) on 28.10.2020 for examination of the case. However, no comments have been received
yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
91
Case No.:2/22/80-ALC2/2019
Party Name: JOHNSON
MATTHEY INDIA PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00328/AM20/
RLA File
:05/23/040/00427/AM20/
Lic.No/Date:0510413543
10.02.2020
Pending with
Tech-3
Consultant (Tech-3) on 28.10.2020 for examination of the case. However, no comments have been received
Case is deferred.
92
Case No.:7/22/80-ALC2/2019
Party Name: ISGEC HEAVY
ENGINEERING LIMITED
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00333/AM20/
RLA File
:05/23/040/00429/AM20/
Lic.No/Date:0510413567
10.02.2020
Pending
with firm
information as raised by DHI was sent to the firm on 23.10.2020. However, no reply has been received yet.
Case is deferred.
26 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
93
Case No.:8/22/80-
ALC2/2019
Party Name: JOHNSON MATTHEY
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00334/AM20/
RLA File :05/23/040/00433/AM20/
Lic.No/Date:0510413568
10.02.2020
Pending with
Tech-3
Consultant (Tech-3) on 28.10.2020 for examination of the case. However, no comments have been received
Case is deferred.
94
Case No.:9/22/80-
ALC2/2019
Party Name: JOHNSON MATTHEY
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00335/AM20/
RLA File :05/23/040/00434/AM20/
Lic.No/Date:0510413570
10.02.2020
Pending with
Tech-3
Consultant (Tech-3) on 02.11.2020 for examination of the case. However, no comments have been received
Case is deferred.
95
Case No.:10/22/80-
ALC2/2019
Party Name: JOHNSON MATTHEY
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00336/AM20/
RLA File :05/23/040/00435/AM20/
Lic.No/Date:0510413571
10.02.2020
Pending with
Tech-3
Consultant (Tech-3) on 02.11.2020 for examination of the case. However, no comments have been received
Case is deferred.
96
Case No.:11/22/80-
ALC2/2019
Party Name: JOHNSON MATTHEY
Meet No/Date:8/80-
Status:
Deferred
HQ File
:01/80/050/00337/AM20/
RLA File :05/23/040/00436/AM20/
Lic.No/Date:0510413572
10.02.2020
Pending with
Tech-3
Consultant (Tech-3) on 02.11.2020 for examination of the case. However, no comments have been received
Case is deferred.
97
Case No.:12/22/80-ALC2/2019 Party Name: JOHNSON
MATTHEY INDIA PRIVATE
LIMITED
Meet No/Date:8/80-
ALC2/2020
05.11.2020
Status:
Deferred
HQ File
:01/80/050/00338/AM20/
RLA File
:05/23/040/00437/AM20/
Lic.No/Date:0510413573
10.02.2020
Pending
with Tech-3
Consultant (Tech-3) on 02.11.2020 for examination of the case. However, no comments have been received
Case is deferred.
27 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
98
Subject: Request for fixation of ad-hoc
norms.
RLA No.: 07/24/040/00092/AM15 Decision: In continuation to Meeting No. 12/80 dated 09.10.2019, the Committee considered the case as per the agenda and noted that the case was rejected in Meeting No. 11/80 dated 01.09.2015 due to non-submission reply of deficiency letter as raised by DHI.
Thereafter, the firm represented against the rejection and requested for a review. The case was again considered and deferred in Meeting no. 11/19 dated 06.12.2018 with following decision:
“The Committee noted that a personal hearing was already given to the firm on 06.12.2018. In the personal hearing the firm informed the committee that it has taken various AA’s for supply of 33 rail/tramway coaches. Further, firm stated that it has taken an additional license for supplementary material required for these very 33 rail/tramway coaches. However, it has an additional export obligation of another 33 rail/tramway coaches in this license. The Committee observed that the given submission is not tenable. The committee decided to seek a detailed report from the concerned RA regarding of all such licenses issued to the firm, admissibility and current status.”
In response to Norm Committee’s e-mail dated 23.04.2019, Addl. DGFT Bangalore informed that firm
has obtained several license, which are pending for the wants of norms and also informed about a letter from ECA- II, DGFT, New Delhi seeking information regarding alleged corrupt practices followed by M/s Alstom Transport India.
hich are pending for the wants of norms and also informed about a letter from ECA- II, DGFT, New Delhi seeking information regarding alleged corrupt practices followed by M/s Alstom Transport India.
In this matter, the committee noted that the firm had approach the Policy Relaxation Committee (PRC) and the matter was taken up vide Meeting No. 17/AM20 held on 27.08.2019. The PRC noted the submissions by the firm as under:
“They have stated that initially, 7 Advance Authorizations were applied for duty free import of inputs required for the manufacture and supply of 33 Metro Train sets to Chennai Metro Rail Limited being a deemed export project. ATIL sought amendment in all 7 Advance Authorizations to include residual items that were required to manufacture the 33 Train sets but the request was rejected citing technical reasons by RA. Thereupon, ATIL was compelled to apply for additional Advance Authorization No.0710105249 dated 20.06.2014 for importing residual inputs that were missed out and not covered under earlier 7 Advance Authorizations. Acquisition of Alstom India limited who was the manufacturer of key sub-assemblies also lead to inclusion of components required for manufacture of sub-assemblies in the captioned Advance Authorization. However, while applying for the said Advance Authorization (8th AA), export obligation of 33 Metro Train sets was declared inadvertently, as the system did not allow the applicant to apply for a new license unless the export obligation was declared.
ization (8th AA), export obligation of 33 Metro Train sets was declared inadvertently, as the system did not allow the applicant to apply for a new license unless the export obligation was declared. In fact, there is no separate EO under the Advance Authorization No.0710105249 dated 20.06.2014 as all imported inputs were used for manufacture of 33 train sets declared under previous 7 Advance licenses. The Advance Authorization No.0710105249 dated 20.06.2014 under which parts required for manufacture of 33 Metro Trains have been
55 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
imported has been issued after 22 months from the date of earliest Advance Authorization in the clubbing set. Hence, request is to treat the supplies of 33 Train sets to the Metro Project supplied against Advance Authorizations as one and to discharge the EO. “
The policy relaxation committee vide PRC Meeting No.
quest is to treat the supplies of 33 Train sets to the Metro Project supplied against Advance Authorizations as one and to discharge the EO. “
The policy relaxation committee vide PRC Meeting No. 17/AM20 dated 27.08.2019 gave the following decision in the matter:
“Decision: The Committee heard the submission made by the firm and discussed the matter at length and decided to relax the conditions as laid down in Para 4.38 (vi), (vii) and (xii) of HBP 2015-20 as amended vide Public Notice No.70/2015-20 dated 30.01.2019 for clubbing of eight Advance Authorizations No.(i)0710090351 dated 21.08.2012, (ii)0710090531 dated 31.08.2012, (iii)0710095554 dated 23.05.2013, (iv)0710096369 dated 02.07.2013, (v)0710096370 dated 02.07.2013, (vi)0710099232 dated 28.10.2013 and (vii)0710101246 dated 10.01.2014 and (viii) 0710105249 dated 20.06.2014. It is subject to verification that amendments request of the firm made in the AAs was rejected by the RA, as claimed by the firm and all inputs imported in the 8 AAs are fully accounted for in the supplies. The other terms and conditions for clubbing shall remain same as per policy/HBP provisions. The firm shall approach RA within 30 days from the date of uploading of the minutes of meeting.”
This Committee observed that the PRC has clubbed all the eight authorizations for imports and export purposes. Export obligation of AA No. 0710105249 dt. 20.06.2014 would remain as it is even after clubbing. Hence, the Committee in its Meeting No. 10/80 dated 11.09.2019, asked the firm to furnish following information:
of AA No. 0710105249 dt. 20.06.2014 would remain as it is even after clubbing. Hence, the Committee in its Meeting No. 10/80 dated 11.09.2019, asked the firm to furnish following information:
- To provide detailed statement to account for the inputs in the export products against this license.
- Relevant technical drawings and wastage details may be provided in relevant formats for examination by the technical authorities for the purpose of fixation of norms.
And also sought clarification from the PRC cell on 05.11.2019 regarding the export obligation of the eighth authorization if it would run concurrently with the export obligation of the first seven authorizations.
PRC in its meeting no. 23/AM20 dt. 03.12.2019, decided as follows:
“The committee reviewed the case and observed that request of the firm and minutes recorded in the earlier PRC decision were very clear. It reiterated that in view of the submission made by the firm, all the above 8 advance authorizations need to be clubbed for imports and exports purposes wherein export obligation of the 8th advance authorization no. 0710105249 dt. 20.06.2014 be treated as NIL as its EO is subsumed in the export obligation of the other 7 advance authorizations taken together. The firm shall approach RA within 30 days from the date of uploading of the minutes of meeting for clubbing.”
The Committee noted in its Meeting No.
other 7 advance authorizations taken together. The firm shall approach RA within 30 days from the date of uploading of the minutes of meeting for clubbing.”
The Committee noted in its Meeting No. 18/80 dated 02.01.2020 that the firm’s reply dated 06.11.2019 forwarded to DHI on 02.12.2019 for examination of the case and again it was asked to the firm to furnish following information:
- Specific use of items imported under the eighth authorization vis-a-vis those imported under other seven authorizations.
The Committee considered the case and noted that the reply of deficiency letter was sent to DHI on 24.02.2020 and some additional information received from the firm was sent on 19.08.2020. However, no comments have been received yet. Hence, the Committee decided to remind DHI for expediting the case.
Case is deferred.
56 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
Sl. No. 93
Case No. 1/25/80-ALC2/2015
M/s UNITED DRILLING TOOLS LTD
Status: Deferred Lic. No.: 0510397442 Date: 29.01.2016 HQ. No.: 01/80/050/00441/AM16/ Pending with Firm RLA No.: 05/24/040/00493/AM16/ No. 05/80 dated 07.06.2016 due to non submission reply of deficiency letter dated 29.03.2016 as raised by DHI.
Consultant (Tech-3) informed that the firm’s reply dated 29.05.2020 & 06.07.2020 are deficient due to following reasons:
- Process flow chart does not show use of import items at SL. No. 2 & 3.
- Quantity of forging is proposed to be imported in fraction of numbers.
- Weight of export product & import items in annexure A & B are not clear.
- Quantity of export product given in annexure B is not matching with quantity in AA.
Therefore, the Committee decided to ask from the firm to provide clarification on the above mentioned deficiency as per advice of Consultant (Tech-3).
Case is deferred.
Sl. No. 94
Case No. 19/23/80-ALC2/2016
M/s AZAD ENGINEERING PRIVATE LIMITED
Status: Deferred Lic. No.: 0910064137 Date: 14.09.2016 HQ. No.: 01/80/050/00522/AM17/ Pending with DHI RLA No.: 09/24/040/00295/AM17/ Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 02/80-ALC2/2017 dated 25.04.2017 on repeat basis as approved for AA No. 0910064137 dated 14.09.2016 on the recommendation of the representative of DHI.
However, the firm has requested for re-fixation of ad-hoc norms. The Committee reconsidered the case
and noted that the firm’s reply was sent to DHI on 03.11.2020 for examination of the case. However, no comments have been received yet. Hence, the Committee decided to wait for the comments.
Case is deferred.
Sl. No. 95
Case No. 37/19/80-ALC2/2014
M/s KAMAR INFRASTRUCTURE PVT LTD.
Status: Deferred Licence No.: 0310788243 Date: 21.08.2014 HQ File No: 01/80/050/00471/AM15/ Pending with Firm RLA File No: 03/94/040/00449/AM15/ No. 06/80 dated 20.06.2017 due to non submission reply of deficiency letter.
noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 29.10.2020.
Case is deferred.
57 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
Sl. No. 96
Case No. 3/10/80-ALC2/2017
M/s HINDUSTAN RUBBER INDUSTRIES Status: Deferred Lic. No. 0510402563 Date: 16.05.2017 HQ. No.: 01/80/050/00213/AM18 Pending with DPIIT RLA No.: 05/23/040/00043/AM18 No. 15/80-ALC2/2018 dated 06.03.2019 due to non submission of reply of deficiency letter dated 08.10.2018.
noted that the firm’s reply was sent to DPIIT on 21.09.2020 for examination of the case. However, no comments have been received yet. Therefore, the Committee decided to remind DPIIT for expediting the comments.
Case is deferred.
Sl. No. 97
Case No. 8/23/80-ALC2/2015
M/s HINDUSTAN RUBBER INDUSTRIES Status: Deferred Lic. No. 0510395884 Date: 12.10.2015 HQ. No.: 01/80/050/00421/AM16 Pending with Firm RLA No.: 05/23/040/00292/AM16 No. 06/80-ALC2/2016dated 21.06.2016 due to non submission of reply of deficiency letter dated 19.04.2016 as raised by DIPP (Chemical) vide ID No.7/77/2016-TSW dated 26.02.2016.
decided to ask from the firm to furnish the following information as per comments of DPIIT vide U. O. No.: P- 47011/39/2019-TSW dated 12.10.2020:
- To indicate weight of each type of rubber rollers to be exported, giving its composition i.e. net weight of rubber parts, Metal/Aluminium shell, handle etc.
- Complete calculation for requirement of inputs (Both imported and indigenous) indicating wastage claimed for each raw material. In this case, there are two export items as under: i. Rubber rollers for automatic rice mill machinery 10”—8000 Number. ii. Rubber rollers for automatic rice mill machinery 14”—500 Number.
- To provide above details for both the export items.
- To provide relevant drawing of both the export items.
Case is deferred.
Sl. No. 98
Case No. 14/12/80-ALC2/2017
M/s GOLD MOHUR PROFILES LIMITED Status: Deferred Lic. No. 0510403501 Date: 25.07.2017 HQ. No.: 01/80/050/00228/AM18
Subject: Request for fixation of ad-hoc
norms
RLA No.: 05/23/040/00156/AM18 No. 15/80-ALC2/2018 dated 06.03.2019 due to non submission of reply of deficiency letter dated 12.10.2018 as raised by DIPP (Chemical).
noted that a deficiency letter seeking certain information as raised by DPIIT was sent to the firm on 29.10.2020.
Case is deferred.
58 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
Sl. No. 99
Case No. 19/19/80-ALC2/2016
L & T-MHPS TURBINE GENERATORS PRIVATE LIMITED Status: Deferred Lic. No. 0310807493 Date: 31.08.2016 HQ. No.: 01/80/050/00414/AM17 norms Pending with Firm RLA No.: 03/95/040/00292/AM17 Decision: The Committee considered the case as per the agenda and noted that the case was approved in M. No. 15/80-ALC2/2018 dated 06.03.2019 as per the written comments of DHI vide their U.O. No. 3/96/2016/TSW(B) dated 24.12.2018.
However, the firm had requested for fixation of ad-hoc norms. The Committee reconsidered the case and
noted that a deficiency letter seeking certain information as raised by DHI was sent to the firm on 24.02.2020 followed by a reminder on 06.11.2020. However, no reply has been received yet. Hence, the Committee decided to wait for the firm’s reply.
Case is deferred.
Sl. No. 100
Case No. 22/8/80-ALC2/2018
ULTRA ENGINEERS Status: Approved Lic. No. 3110067126 Date: 26.07.2018 HQ. No.: 01/80/050/00145/AM19 norms
RLA No.: 31/83/040/00063/AM19 14/80-ALC2/2018 dated 20.02.2019 on the recommendation of representative of DHI.
However, the firm vide their representation dated 17.06.2019 has submitted their justification for the higher wastage. Firm has also attached Scrap Invoices indicating that the recoverable wastage is only 10% instead of 33% as considered by the Norms Committee. The Committee reconsidered the case and noted the comments of DHI wherein it is stated that the applicant has requested for amendment in quantity for import item at Sl. No. 1 & 3. On the basis of attached scrap invoices. Therefore, the Committee decided to re-fix the ratified ad-hoc norms as per written comments of DHI as under:
- Quantity of import item at Sl. No. 1 (Forging) may be allowed as 1.63Kgs/Kg content in the export product after affecting 13% recovery.
- Quantity of import item at Sl. No. 3 (Aluminum Bronze Tube) may be allowed as 2.90Kgs/Kg content in the export product after affecting 25% recovery. Note: The decision for rest of the import items shall remain unchanged as decided in meeting No. 14/80 dated 20.02.2019.
Sl. No. 101
Case No.: 11/33/80-ALC2/2009
IDMC LIMITED Status: Approved Lic. No. 3410025225 Date: 30.09.2009 HQ. No.: 01/80/050/00477/AM10/ norms
RLA No.: 34/24/040/00104/AM10/
23/11 dated 07.09.2010 (Offline Agenda)as per written comments of DPIIT vide U. No. note dated 07.09.2010.
wherein the description of import items at Sl. No. 2 and Sl. No. 3 were changed with prefix “Steam Condensate
Collection Vessel / Compensator” and “Relevant” respectively.
However, the firm vide letter dated 24.12.2019 had requested to modify the description of import item at Sl. no. 2 & 3 the material were imported as per the applied advance authorization since before the fixation of norms and
59 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
therefore amendment of import item is not possible in the Bill of entry. The Committee reconsidered the case and decided to revise the ad-hoc normsas per written comments of DPIIT vide U. O. No.: P-47011/65/2020-TSW dated 03.11.2020. (Copy enclosed) Note: The decision for rest of the import items shall remain unchanged as decided in meeting No. 23/11 dated 07.09.2010.
Sl. No. 102
Case No.: 67/5/80-ALC2/2018
BHARAT HEAVY ELECTRICALS LIMITED Status: Deferred Lic. No. 0410164150 Date: 02.04.2018 HQ. No.: 01/80/050/00116/AM19/ norms
RLA No.: 04/24/040/00267/AM18/ 3/80-ALC2/2019 dated 08.05.2019 as per written comments of DHI vide email dated 06.05.2019.
However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case and noted that the firm representation was forwarded to DHI for examination of the case on 25.02.2020 followed by a reminder on 29.10.2020.However, DHI again requested to send the complete set of application to examine the case. Therefore, the Committee decided to send the complete set of application to DHI.
Case is deferred.
Sl. No. 103
Case No.: 21/14/80-ALC2/2016
VEE KAY VIKRAM & CO LLP Status: Deferred Lic. No. 0810135377 Date: 27.05.2015 HQ. No.: 01/80/050/00371/AM17/
Subject: Request for fixation of ad-hoc
norms
RLA No.: 08/24/040/00060/AM16/ Decision: The Committee considered the case as per the agenda and noted that the case was rejected in M. No. 26/80-ALC2/2016 dated 28.03.2017 due to non-submission of reply of deficiency letter dated 27.12.2016 as raised by MSME.
The firm vide letter dated 17.09.2019 had requested for fixation of the ad-hoc norms. The Committee reconsidered the case and noted the comments given by MSME. However, the matter was discussed in the meeting and the Committee decided to refer back the comments to MSME for re-examination of the case.
Case is deferred.
Sl. No. 104
Case No.: 79/11/80-ALC2/2018
HONDA TRADING CORPORATION INDIA PVT. LTD. Status: Deferred Lic. No. 0510405508 Date: 02.02.2018 HQ. No.: 01/80/050/00270/AM19 norms
RLA No.: 05/23/040/00418/AM18 13/80 dated 22.01.2019as per written comments of DHI vide U. No. NO. DES-I/HTCI/AUP-I-2018-HEI dated 20.12.2018.
However, the firm had requested for re-viewing the ad-hoc norms. The Committee reconsidered the case and decided to ask from the firm to furnish the following information as per comments of Consultant (Tech-3):
- Specification and catalogue of export product.
60 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
- Starting from the specification of the export product, basic calculation as to how of raw material proposed for import has been arrived at, including the net weight of components to be manufactured out of these imported materials, wastages claimed at each stage of manufacturing with complete justification and supported by documentary evidence/drawings etc.
- Copy of Advance Authorization.
- Copy of export order.
Case is deferred.
Sl. No. 105
Case No.: 34/11/80-ALC2/2018
M/s ULTRA ENGINEERS Status: Withdrawn Lic. No. 3110067168 Date: 06.09.2018 HQ. No.: 01/80/050/00225/AM19/DES-1 norms
RLA No.: 31/83/040/00091/AM19 Decision: The Committee considered the case as per the agenda and noted that the case was already approved in Meeting No. 06/80 dated 29.09.2020. Therefore, the Committee decided to withdraw the case from the agenda.
Case is withdrawn.
Sl. No. 106
Case No.: 325/15/80-ALC2/2018
M/s ULTRA ENGINEERS Status: Withdrawn Lic. No. 3110067318 Date: 18.02.2019 HQ. No.: 01/80/050/00667/AM19/DES-1 norms
RLA No.: 31/83/040/00177/AM19/ Decision: The Committee considered the case as per the agenda and noted that the case was already approved in Meeting No. 06/80 dated 29.09.2020. Therefore, the Committee decided to withdraw the case from the agenda.
Case is withdrawn.
Sl. No. 107
Case No.: 9/14/80-ALC2/2018
M/s TEGA INDUSTRIES LIMITED Status: Deferred Lic. No. 0210208725 Date: 04.10.2018 HQ. No.: 01/80/050/00325/AM19/DES-1 norms
RLA No.: 02/24/040/00099/AM19/ 06/80 dated 03.07.2019 on the recommendation of Consultant (Tech-1).
However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case and noted that reply of deficiency letter dated 23.10.2020 as raised by Consultant (SKB) has not yet been received yet from the firm. However, the matter was discussed in the meeting and the Committee decided to call the firm for personal hearing via video-conferencing in the forthcoming NC meeting.
Case is deferred.
61 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
Sl. No. 108
Case No.: 58/11/80-ALC2/2018
M/s TEGA INDUSTRIES LIMITED Status: Deferred Lic. No 0210208676 Date: 05.09.2018 HQ. No.: 01/80/050/00249/AM19/DES-1 norms Send to SKB RLA No.: 02/24/040/00087/AM19/ 7/80 dated 17.07.2019 as per written comments of DPIIT vide F. No.: 07/178/2018-TS dated 24.06.2019.
However, the firm has requested for re-viewing the ad-hoc norms. The Committee reconsidered the case and noted that reply of deficiency letter dated 23.10.2020 as raised by Consultant (SKB) has not yet been received yet from the firm. However, the matter was discussed in the meeting and the Committee decided to call the firm for personal hearing via video-conferencing in the forthcoming NC meeting.
Case is deferred.
Sl. No. 109
Case No.: 4/8/80-ALC2/2019
M/s THE INDIAN CARD CLOTHING CO LTD Status: Deferred Lic. No 0310830216 Date: 11.07.2019 HQ. No.: 01/80/050/00116/AM20/DES-1 norms
RLA No.: 03/95/040/00302/AM20/ 14/80-ALC2/2019 dated 06.11.2019 as per written comments of Consultant (Tech-3).
However, the firm has requested for re-viewing the ad-hoc norms. The Committee re-considered the case and noted the Consultant (tech 3) comments which states the following:
“Firm has claimed nil wastage on EP 3 & 34 % to 50% on rest of items. Process flow chart given is the same for all EP & products are also similar. In view of this nil wastage was recommended on EP 3 & 2% on rest of items considering the nature of the process.”
As per comments of Consultant (Tech-3), the Committee decide to ask the following from the firm:
- To provide information on stage-wise wastage for each EP (which has been claimed for higher wastage)
Case is deferred.
Sl. No. 110
Case No.: 33/8/80-ALC2/2013
THYSSENKRUPP INDUSTRIES INDIA PVT. LTD. Status: Deferred M. No.: 23/80-ALC2/2019 dated 13.03.2020 Lic. No. /date: 0310733011 Date: 01.05.2013 HQ. No.: 01/80/050/00143/AM14 norms
RLA No.: 03/95/040/00063/AM14 Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 03/80-ALC2/2019 dated08.05.2019 as per written comments of DHI vide F. No.: 3/127/209-TSW(B)/226 dated 11.10.2013.
The firm vide letter dated 31.05.2019 had requested for re-fixation of ad-hoc norms. The Committee
reconsidered the case and noted that a copy of application was sent to DHI on 06.10.2020 for examination & comments. However, DHI again requested to send the complete set of application along with older NC decisions for examining the case. Therefore, the Committee decided to send the requesteddetails to DHI.
Case is deferred.
62 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
Sl. No. 111
Case No.: 74/2/80-ALC2/2016
KOSO INDIA PRIVATE LIMITED Status: Deferred Lic. No : 3110065788 Date: 10.12.2015 HQ. No.: 01/80/050/00077/AM17
Subject: Request for fixation of ad-hoc
norms
RLA No.: 31/83/040/00121/AM16 No. 08/80 dated 19.07.2016 due to non submission of reply of deficiency letter as raised by DIPP.
However, the firm has requested for fixation of the ad-hoc norms. The Committee reconsidered the case and decided to ask from the firm to furnish the following information as per comments of DPIIT vide U. O. No.: P- 47011/331/2019-TSW dated 29.10.2020:
- Recovery from Nickel/Nikel Alloy scrap generated during the manufacturing process with sale price of Nickel/Nikel Alloy scrap supported by documentary evidence like copies of sale invoices.
Case is deferred.
Sl. No. 112
Case No.: 12/16/80-ALC2/2017
LARSEN & TOUBRO LIMITED Status: Deferred Lic. No : 0310815008 dated 03.08.2017 HQ. No.: 01/80/050/00275/AM18/ norms
RLA No.: 03/95/040/00235/AM18 Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 03/80 dated 08.05.2019 on the recommendation of the representative of DHI.
However, the firm vide email dated 14.10.2020 has requested for revision of the ratified ad-hoc norms. The Committee reconsidered the case and decided to forward the firm’s representation to DHI for examination of the case. Case is deferred.
Sl. No. 113
Case No.: 35/3/80-ALC2/2018
SHIV INDUSTRIES Status: Deferred Lic. No : 3010104260 dated 08.03.2018 HQ. No.: 01/80/050/00035/AM19 norms
RLA No.: 30/24/040/00043/AM18/ Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 13/80 dated 22.01.2019 on the recommendation of Consultant (Tech-1).
However, the firm has requested for fixation of the ad-hoc norms. The Committee reconsidered the caseand decided to forward the firm’s representation to Tech-1 for examination of the case. Case is deferred.
63 | P a g e Minutes of NC-I of Meeting No. 08/80 scheduled for 05.11.2020 and held on 06.11.2020
Sl. No. 114
Case No.: 40/3/80-ALC2/2018
SHIV INDUSTRIES Status: Deferred Lic. No : 3010104261 dated 08.03.2018 HQ. No.: 01/80/050/00040/AM19 norms
RLA No.: 30/24/040/00042/AM18 Decision: The Committee considered the case as per the agenda and noted that the case was approved in Meeting No. 13/80 dated 22.01.2019 on the recommendation of Consultant (Tech-1).
However, the firm has requested for fixation of the ad-hoc norms. The Committee reconsidered the caseand decided to forward the firm’s representation to Tech-1 for examination of the case. Case is deferred.
:′3747ノ2020 ^ 目にNo.日にNo.1411ソAANo.0710109544「enovゴ2020‐ H日 =71 8″ γθ Department of Heavy Industry (HE&MT Section) Udyog Bhawan, New Delhi Dated xx.10.2020 OFFICE MEMORNDUM
Subject: Ratification of Norms in respect of the Advance
Authorization of M / s Tenova India Pvt, Ltd. - reg. The undersigned is directed to refer to DGFT OM No. 01/80/050/00732/AML9/DES-7/L72O dated 20.02.2020 in respect of the application of M/s Tenova India Pvt. Ltd dated 28.08.2020 on ratification of wastage norms issued against Advance Authorization No. 0710109544 dated 18/03/2016 in terms of para 4.O7 "Self-declared authorisation where SION does not exist" of Foreign Trade Procedures 2015-2020. 2. M/s Tenova India Pvt. Ltd has imported various steel items for a value of Rs. 117.83 lakhs required for the manufacture and export of the machine namely Thickener used for separating phosphate articles from the incoming slurry. The request for wastages claimed by the applicant against each raw material required for making the finished pafts has been examined and it is noted that the wastage claimed are on higher side with reference to the wastage norms given in the general guidelines for 'Capita! Goods & Machinery not elsewhere specified' under the entry no. C 1647 of SIoN. Accordingly the comments of the Department of Heavy Industry are given in the column (4) of the table as under:- S No. Export Item Steei items/ component required Wastage norm recommended bY DHI 1 (2) (3) (4) 1 l-ank Assembly (1)U Channe s (i)Hot Ro‖ ed Steel Plates (1)20/0 (li)50/0 つ 4 Centre Column (1)Hot Ro‖ ed Steel Plates 50/o
i items/ component required Wastage norm recommended bY DHI 1 (2) (3) (4) 1 l-ank Assembly (1)U Channe s (i)Hot Ro‖ ed Steel Plates (1)20/0 (li)50/0 つ 4 Centre Column (1)Hot Ro‖ ed Steel Plates 50/o
File No.FileNo.l 2(1 1 )/AANo.071 01 09544/Tenoval202O-HEl 72 lノ3747ノ2020 3 一 4 一 5 一 6 7 Torque Cage [i) Tubes and Channels (i)20/0 Discharge Cone Scrapper ()Channels (1)2% Rake Arm Assem bly (1)Tubes (ii)HOt Ro‖ ed Steel Plates (i)20/o (li)5% Feed Well Assem bly (i) Hot Rolled Steel Plates ( ii) Angles and Channels i)5% li)20/O f rive Assembly (1)Hot Ro‖ ed Steel Plates (i)5% (Sanjiv Kumar GuPta) Under Secretary to the Government of India To′ Assistant Director DES-1, DGFT, Udyog Bhawan Dignally S19ned by SAN」lV KUMAR GUPTA DateiF‖ Oc1 23 14136 12 1ST 2020 Reason:Approved
File No F No_12ノ12′AA No 0710709946ノTenovaノ2020‐HEl Department of Heavy lndustry (HE&MT Section) Udyog Bhawan, New Delhi Dated 26.10.2020 OFFICE MEMORNDUM
Subject: Ratification of Norms in respect of the Advance Authori:ation of M/s Tenova
lndia Pvt. [td. * reg. The undersigned is directed to refer to DGFT oM No. o1l80/050/00367/AM 19IDES_ L/L71'8 dated 19.o2.2o2o in respect of the application of M/s Tenova lndia pvt. Ltd dated 28.08.2020 on ratification of wastate norms issued against Advance Authorization No. 0710109946 dared 1'4/06/20L6 in terms of para 4.07 "self-declared authorization where SION does not exist" of Foreign Trade procedures 2Ol5-2O20. 2. M/s Tenova lndia Pvt. Ltd has imported various steel items for a value of Rs. 24.39 lakhs required for the manufacture and export of the machine namely Thickener used for separating phosphate articles from the incoming slurry. The request for wastage claimed by the applicant against each raw material required for making the finished parts has been examined and it is noted that the wastage claimed are on higher side with reference to the wasta8e norms Biven in the general guidelines for ,Capital Goods & Machinery not elsewhere specified' under the entry no. C 1647 of SION. Accordingly the recommendations of the Department of Heavy lndustry which is based on the existing norms are as under:- S.No. Export Item Slecl itcms/componcnt requircd Wastagc norm recommended by DHI (2) (4) 1 l"ced 'l'ank Staircasc M.S. liqual Anglc. Channel and Parallcl Flanged Channel 2o/. 2 Fced 「ank M.S. Ilqual Anglc and Parallel Flangcd Channcl 2% 3 Rakc Arm Assembly M.S Squarc 'l ube 2% 4 Feed Pipe U Channcl 20 71 lノ3748′2020 {o
ual Anglc. Channel and Parallcl Flanged Channel 2o/. 2 Fced 「ank M.S. Ilqual Anglc and Parallel Flangcd Channcl 2% 3 Rakc Arm Assembly M.S Squarc 'l ube 2% 4 Feed Pipe U Channcl 20 71 lノ3748′2020 {o
5 一 6 一 7 Monorail - Thickener Bridge Iie Beam pridge tPE steel beams 2ツ6 ¨ and U Channcl 2% ffiut nngt., UPN Steel Channel, U Channel and U Beam 2ツ6 2ツ6 Feed Tank SuPPort Structure M.S. Equal Anglc, U Channel ano u Beam U Beam 2ツ6 9 一 1 0 Agitator - Superstructure -N"t to N"t buri.. Drive AssemblY ilydraulic Motors :ノ3748′ 2020 File No.F.No.12l12lAA.No.0710709946/Tenova I2o2o-HEl ^ 12 (Saniiv Kumar GuPta) U nder Secretary to the Government of lndia To′ Assistant Director DES-1, DGFT, UdYog Bhawa n Digitally signed bY SANJIV KUMAR GUPTA Date:Mon Oct 26 18:18:22 IST 2020 Reason:APProved
l t4 PagC 1 0rl Govemmenr of India Minisrry ofCommerce and Industry O/o Additional Direcror Ccneral ofForeign Trade Central Liccnsing Area, 'A Wing I.P. Bhavan,l.P. Eslate New Delhi Delhi -110002 SURRENDERED LETTER /4:mVAuK ЫM口■L CONTROLS LTD ‐ SUNEJA CHAMBER 2ND FL00R,H‐ 2,ALAKN ANDA COMMERCIAL COMPLEX NEヽV DELHl,DELHl l10019
SUBJECT:SURRENDERED LETTER in reSpeclofAdvance Au(horisation N0
Place:New Dclhi Date:20122019' 、ヽリ 絆 . 0510410395 DA:ED:26042019 With rcrcrcncc tO yottr lcttcr datcd:26042019,I writc to infonn yOu that● e UNUTlLISED Authorisatlon No:05104103,S D3tcd:260420:9 surendered bv you,has bccn ca1lcc‖ cd as rcqucslt・d by you ノ ン / (Rakesh Kuma. ) Foreign Trade Devclopment Officer ADDITIONAL SHEET ATTACHED TO Authorisation No 0510410395 DATED: 26 04 2019 FORにDEM Pr10N(IssuCd frOm File Number:0524′ 040/000!6/AM201 Datcd 1 10 04 2019) lssucd from File Numbcr 05/2,165′ 0024α AM20/dated 26 04 2019 Copv To: l Commヽ “ oncr customs,(NTKD6)Tughtakabad 1' ″ http:〃19216850241ハonlcpagυЪtmllars′dgnODBCP洒nt asp,id‐2019‐ 12‐2010:59:335&51oNtl n=05加040001116A M20 211 12 2019 ,`
Filc No P‐ 47012′ 15′ 2020‐ TSVV Norms Commiltee may takc a vrew. pCFT(shn Pranav Upaohyay.AD,DESり DP‖TUONO P-47012/15′ 2020-TSい/dated 03 11 2020 亀 協…9″ 311く。●く。い iく 師喘口]て耳輛 輛 RII和 ☆H31k Jいt市詢円R諭 Govor:1口]ent of lndia Ministry●F COnlmerc(〕&industry Department for P4on101iOn()i lndustry&internal Trade (TeChiうiCal Suppon Sect10n) Sublect‐ M/s Micron nstruments P“ ッate L,mned,A A No 0510411576 dated 20 08 2019 Refererlce:‐ DGFT F No :01′ 80′ 050100585/Aヽ読21′ DGFT(DES-1: nlay kindly reler tり tヤ〕or e‐ nla‖ dated 28tい October 2020 fon″arding 'irrrl s appi ca‖ on for fixaton of il()「:llS n resI)ect of the above‐ mentioned A A ln this cOn:lection.the undersigned is directetl to say thatthe instant A A may be ratined as under on repeat basis as pcr firrn's AA No 0510412701 dated 20 11 2019 ratified in NC meeting
ntioned A A ln this cOn:lection.the undersigned is directetl to say thatthe instant A A may be ratined as under on repeat basis as pcr firrn's AA No 0510412701 dated 20 11 2019 ratified in NC meeting No 6780 dated 29 09 2020: l Net welghl of expo「titems ai SI N(,l and 2 may be specified as 158 4 K9s and 40242K9s r(,Spectively 2ヽ´7ords・Dia 138 mm・ may b,sof"xcd with tllc dcscnplon Ofimport lem 3 Quaf、tlty of lml,Ort itenl nlay l,ea‖ o、~ed as 4292 2 Kgs as 12 487 Kgs′ Kg cOntent‖ n export itel,,at sl No l and (ls 5 751 K9slK9 contentin expo「t item at SI No 2 aFtor taking 10%,rtマ)overy f「om trit,s('ral, /多議請 ぃ Development Officer Te1 23063166 E ma‖ IsushkJan@nたぃ ヘ
5rti7 AA No.0710115658 Sl# Part Name Qty Total RM Weight (in Kgs) INPUT (a) Total Part Weight (in Kgs) OUTPUT (b) 1 PACKER 413 5665 1820 2 BRACKE丁 413 16526 1162 3 BRACK巨丁HYD 413 20763 1657 4 BRACKEtt HYD 413 27320 1655 5 BRACKET HYD 298 18305 1113 6 BRACKET HYD 83 5961 422 7 Bracket Brace Bottom 413 225808 18579 8 Bracket Machined 825 28958 2378 9 BRKT MTG Hinge FWD 413 321985 41427 10 CLEA丁 929 47658 7304 CLEAT CLEA丁 CLEA丁 CLEA丁 1053 54019 8279 12 619 33426 5897 13 619 36769 4463 14 413 24532 1 3606 15 CLEA丁 1527 90704 13332 16 CLEA丁 CLEA丁 723 3709o 6630 17 1898 97367 17459 18 CLEA丁 CLttAT CLEAT 495 26730 4195 19 495 38591 4855 20 298 23233 2923 21 CLEA丁 CLttAT 298 23233 2924 22 298 23233 2924 23 CLEA丁 413 23417 3356 24 CLEA丁 CLEA丁 CLEAT 413 22302 3793 25 825 44550 7734 26 413 21187 3440 27 CLEAT 413 22302 3879 28 CLEA丁 825 44550 7748 29 CLttA丁 298 16092 2590 30 CLEA丁 298 16092 2794 31 CLEAT 149 8046 1397
7 3356 24 CLEA丁 CLEA丁 CLEAT 413 22302 3793 25 825 44550 7734 26 413 21187 3440 27 CLEAT 413 22302 3879 28 CLEA丁 825 44550 7748 29 CLttA丁 298 16092 2590 30 CLEA丁 298 16092 2794 31 CLEAT 149 8046 1397
"・CD 32 CLttA丁 149 7644 1378 33 CLttA丁 298 15287 2795 34 CLttAT 298 16092 3204 35 CLttA丁 298 15287 2715 36 CLttA丁 298 15287 2116 37 CLttA丁 298 15287 2234 38 CLttA丁 298 53315 5019 39 CLttAT 298 53315 5019 40 CLEA丁 298 18506 4215 41 CLttAT 298 18506 4215 298 24138 2526 42 CLttA丁 825 66825 6994 43 CLttA丁 232 42528 2737 44 CLEA丁 CLEA丁 CLEA丁 232 131 54 3160 45 149 8851 2173 46 149 8851 1716 47 CLttA丁 CLEA丁 CLEA丁 CLttA丁 1155 174012 20537 48 413 62223 7344 49 1815 264627 22528 50 413 60215 5126 一 b CLttA丁 CLEA丁 CLEAT 232 13781 2252 52 232 19810 1 25笙 53 149 127.23 | 16.22 54 CLttA丁 CLttA丁 CLEAT CLttA丁 CLttAT CLEA丁 CLEA丁 CLEAT CLEA丁 CLEA丁 CLEAT CLEAT CLEAT CLEAT CLEAT CLEA丁 149 12723 1 1606 55 232 49810 1 25m 56 打 12528 1 2447 57 149 1 8046 1376 58 149 1 7644 1467 59 413 1 22302 3466 60 825 1 64319 8838 61 413 1 32199 4424 62 825 61256 8710 63 149 11063 1573 64 149 11063 1568 65 149 11063 1626 66 149 11063 1629 67 825 61256 9020 68 825 46778 8937 69
59 413 1 22302 3466 60 825 1 64319 8838 61 413 1 32199 4424 62 825 61256 8710 63 149 11063 1573 64 149 11063 1568 65 149 11063 1626 66 149 11063 1629 67 825 61256 9020 68 825 46778 8937 69
お・(り 70 CLEA丁 413 21187 3867 71 CLEAT 298 16092 1995 72 CLEA丁 298 15287 2114 73 CLEA丁 165 12251 1712 74 CLttA丁 83 6163 861 75 CLttA丁 83 6723 975 76 CLttA丁 165 13365 1938 77 CLEA丁 83 4258 709 78 CLEA丁 165 8465 1190 79 CLEA丁 42 2381 320 80 CLttA丁 42 2268 420 81 CLEA丁 83 4482 751 82 CLEA丁 83 4482 809 83 CLEA丁 165 7796 1278 84 CLEA丁 165 7796 1278 85 CLttA丁 83 3922 595 86 CLEA丁 650 29177 4263 87 CLttA丁 243 13122 2291 88 CLEA丁 238 12209 2069 89 CLEAT 157 8054 1365 90 CLttA丁 138 20791 1689 91 CLEA丁 2313 348477 28305 92 CLEA丁 238 12852 2428 93 CLEAT 152 9029 1820 94 CLEAT 76 4104 850 95 CLttA丁 598 39961 6685 96 PLAttE KEYHOLE丁3 224 46086 7357 97 PLATE KEYHOLE FWD T4 219 41490 10591 98 PACKttR―FWD 144 11406 2185 99 PACKER―AFT 127 4529 741 100 PACKE丁―INBD AF丁 2128 149386 25991 101 Plate Cover 219 134911 10084 102 CROⅥノN FI可TING STR 16 AFT 一 b 13745 1700 103 CROVVN FITTING STR 17 AFT 5 14157 1700 104 CROIA/N FITTING STR 18 AFT 5 16107 2000 105 CROWN FllTING STR 19 AFT 一 b 16008 2000 106 CROIA/N FITTING STR 20 AFT 5 15712 2000 107 CROWN F1lTING STR 21 AFT 一 b 18919 2400
TR 17 AFT 5 14157 1700 104 CROIA/N FITTING STR 18 AFT 5 16107 2000 105 CROWN FllTING STR 19 AFT 一 b 16008 2000 106 CROIA/N FITTING STR 20 AFT 5 15712 2000 107 CROWN F1lTING STR 21 AFT 一 b 18919 2400
58こう 108 CROWN F1lTING STR 22 AFT 5 17342 2200 109 CROVVN F1lTING STR 23 AFT 5 17787 2300 110 CROVVN FI可TING STR 24 AFT 5 21897 2700 111 CLEAT TOPINBD FSPAR 5 2236 300 112 CLEAT TOP OBD FSPAR 5 2236 300 113 CLEAtt BttM FSPAR 一 b 2236 300 114 CLEAT SttRAP ttOP FSPAR 一 b 6331 650 115 CLEAT STRAP MID FSPAR 一 b 6199 650 116 CLEAtt STRAP BTNtt FSPAR 一 b 6677 700 117 CROWN Fl丁TING SttR 2 FWD 5 6191 900 118 CROWN FI丁TING STR 3 FWD 5 6919 900 119 CROWN Fl丁丁ING SttR 3 AF丁 5 7878 900 120 CROWN FI丁TING SttR 4 FWD 5 6476 700 121 CROWN FITTlNG STR l FWD 一 b 4778 800 122 CROVVN FITTING SttR l AFT 5 6420 800 123 CROWN F1lT!NG STR 2 AFT 一 b 6729 1000 124 CROWN FITTING STR 4 AF丁 5 7453 1000 125 CROWN FITTING SttR 5 FWD 一 b 6962 1000 126 CROVVN FITTING STR 5 AFT 5 7734 1200 127 CROWN F1lTING SttR 6 FWD 5 7637 1000 128 CROWN Fl丁丁ING STR 6 AF丁 5 8778 1100 129 CROWN FI丁丁lNG STR7 FWD 一 b 7318 1000 130 CROWN FITTING STR 7 AFT 一 b 7900 1100 131 CROWN FITTING STR 8 FVVD 5 7401 1100 132 CROVVN FITTING STR 8 AFT 5 7900 1300 133 CROWN FITTING STR 9 FWD 5 8379 1300 134 CROWN Fl丁丁ING SttR 9 AFT 5 10108 1400 135 CROWN FI丁丁lNG SttR 10 FWD 5 8331 1300 136 CROWN FI丁TING SttR 10 AFT 5 9603 1400 137 CROWN Fl丁TING STR ll FWD 一 b 8290 1400 138 CROWN FlTTING STR ll AFT 5 9422 1500 139 CROWN FITTING STR 12 FWD 5 lo0 08 1600 140 CROWN FI丁丁ING STR 12 AFT 一 b 11621 1600
ING SttR 10 AFT 5 9603 1400 137 CROWN Fl丁TING STR ll FWD 一 b 8290 1400 138 CROWN FlTTING STR ll AFT 5 9422 1500 139 CROWN FITTING STR 12 FWD 5 lo0 08 1600 140 CROWN FI丁丁ING STR 12 AFT 一 b 11621 1600
5び(V) 141 CROWN FITTING SttR 13 FWD 5 9259 1500 142 CROWN FITTING SttR 13 AFT 5 9627 1500 143 CROIA/N FITTING SttR 14 FWD 5 12025 1800 144 CROWN FITTING SttR 14 AF丁 5 12149 1800 145 MANIFOLD HYDRA∪LiC ASSY 1500 157080 49500 146 BOX CLEAttj RIB 33 60 3049 480 147 BOX CLEAT,RIB 33 60 3049 540 148 丁∪NNEL CLEA丁,RIB 39 60 10644 1200 149 S丁∪B BRKTLWRl匡X丁 60 5655 600 150 ST∪B BRKttLWR 2 EX丁 60 5655 660 151 S丁∪B BRKttLWR 3巨X丁 60 5655 660 152 S丁∪B BRKttLWR 4 EXT 60 5655 660 153 SttUB BRK丁∪PR l EX丁 60 4807 600 154 S丁∪B BRK丁∪PR 2 EX丁 60 4807 600 155 ST∪B BRK丁∪PR 3 EX丁 60 4807 600 156 S丁∪B BRKtt UPR 4 EX丁 60 4807 600 157 Butt Strap Assembly 60 1201 240 158 Butt Strap Assembly 60 1201 240 159 CHttEKPLA丁巨 50 4563 1072 160 CHEEKPLATE 50 4563 1072 161 CHEttKPLAttE 50 6699 1410 162 CHttEKPLATE 50 6699 1072 163 DEFLECttOR 50 6969 1355 164 DEFLECTOR 50 22261 3232 165 DEFLECttOR,LWR C∪TttER 25 3418 856 166 DttFLECttOR 50 23574 5579 167 BREAKAWAY丁IP 20 8958 1767 168 BREAKAWAY TIP,SHOR丁 50 3982 389 169 DEFLttCTOR 50 7190 1600 170 DEFLECttOR,LOWER C∪丁丁圧R 20 8845 1183 171 BREAKA1/VAY丁IP 15 1120 252 172 SttEP ttXttEN丁10N,WSPS 50 18389 1997 173 Cutter Body, Upper 100 18815 5052 174 Angle, Upper Cutter Assy 100 13061 1728 175 Angle, Upper Cutter Assy 100 13061 1728
171 BREAKA1/VAY丁IP 15 1120 252 172 SttEP ttXttEN丁10N,WSPS 50 18389 1997 173 Cutter Body, Upper 100 18815 5052 174 Angle, Upper Cutter Assy 100 13061 1728 175 Angle, Upper Cutter Assy 100 13061 1728
58.(vi) 176 CU丁丁ER BODY 20 3363 854 177 Deflector, Wiper, WSPS 7 11893 553 178 DenectOr,wiper,VVSPS 7 11893 553 179 CHEttKPLAttE,LOWER RH 50 4890 1296 180 CHEEKPLA丁巨 50 5517 1294 181 L/G」OINtt DttFLECttOR 50 1175 457 182 ANGLE R H 50 3699 724 183 ANGL巨 50 3699 724 184 DEFLECTOR 40 10221 2582 185 C∪丁丁ER BODY,LOWER CU丁丁巨R 20 4425 1415 186 CH巨巨KPLAttE 25 10884 692 187 CHEttKPLAttE 25 10884 692 188 CH巨巨KPLATE, LOWER 40 3912 1075 189 BACKING PLAttE MノC 140 79380 35189 190 DOOR M/C RIB 3 140 463466 46318 191 BRACK巨丁 70 9145 361 192 BRACKE丁 70 9145 406 193 D00R 140 250756 28054 194 BACKING PLAttE 70 1482 701 195 MACHlNttD BRACKE丁 140 26366 4662 196 lNTCOS丁―FAIR ATtt LlR3 220 56192 6182 197 INttERCOSttAL―AFT LIR3 220 424205 32669 1 PLA丁巨―F/S LIR31B AF丁 200 65578 25485 2 PLAttE― FノS LIR3 0B AF丁 200 71539 28004 Strut 250 5500 5000 2 Strut 1000 29000 27000 3 Strut 250 6750 6250 4 Sleeve 750 548 149 5 Spacer 1200 2232 502 1 BRACK巨丁 35 60480 14523
AF丁 200 65578 25485 2 PLAttE― FノS LIR3 0B AF丁 200 71539 28004 Strut 250 5500 5000 2 Strut 1000 29000 27000 3 Strut 250 6750 6250 4 Sleeve 750 548 149 5 Spacer 1200 2232 502 1 BRACK巨丁 35 60480 14523
64 (ι ) AA No 0910068192 dtd 18… 11‐2019 SI No Export ltem Qty UOM lmport ltem lmport allowed (kelsqft) wastage (%) ` CLOTH SEAL ASSY,OUTER(NET CONTENT― Cobait A‖oy_L-605=56 85 kgs,Nickle A‖ oy_ A‖ oy X750=3 71 kgs,Coban A‖ oy_A oy 188=0 13 kgs,Mesh 30☆250 Twin F ter Cloth=7 026Sq ft) Nos Coban AIloソ‐L― 605 72018 2668 N ckle A‖ oy_ A‖ oy x 4349 172287358 Coba‖ A‖oy_ Aloy 188 0163 256538462 Mesh 30・250 Tw‖ F ker CIoth 8896 266097495 2 CLOTH SEAL ASSY.INNER(NET CONTENT― Coba t AIloy_L605=50 87 kgs,Nickle A‖ oy_ Alloy x750=305k9s,Coban A‖ oy_A‖ oy 188=0 14 kgs,Mesh 30・250 Tw‖ IF‖ter Cloth=5 84 sq l) Nos CobaL A‖ oy_L― 605 64443 266826224 N cke A‖ oy_ A‖ oy X750 3864 2668 CobaL AIloy_ A‖oy 188 0173 238214286 Mesh 30'250 Tw‖ F‖ter C oth 7394 266114726 3 CLOTH SEAL,INNER ASSY (NET CONTENT― Cobat A‖ oy_L-605=4291 kgs,Nickle A‖ oy_AIloy X750=2 86 kgs,cobat A loy_A‖ o188=2 97 kgs,Mesh 30'250 Tvv‖ | F‖ter CIoth=6 19 sq ft) Nos CobaL A‖ oy_L_ 605 54356 266737823 Nick e Alloy_ A1loy X750 3627 268199301 CobaL Aloy_ Alloy 1 88 3764 267249158 Mesh 30・250 Tvv‖ IF‖ter C oth 7837 266153473 4 SEAL,CLOTH 6B TPINNER (NET CONTENT― Cobalt A‖ oy_L-605=8933 kgs,Nickle A‖ oy_AIloy X750=5 41kgs, Mesh 30・250 Tw‖ F‖ ter CIoth=20 04 sq ft) 209 Nos CobaL Alloy_L― 605 113162 266785067 N ckle A‖ oy_ A‖ oy X750 6851 266306839 Mesh 30・250 Tw‖ FiRe「C oth 25389 266933134 5 SIDE SEAL ASSY,CLOTH
41kgs, Mesh 30・250 Tw‖ F‖ ter CIoth=20 04 sq ft) 209 Nos CobaL Alloy_L― 605 113162 266785067 N ckle A‖ oy_ A‖ oy X750 6851 266306839 Mesh 30・250 Tw‖ FiRe「C oth 25389 266933134 5 SIDE SEAL ASSY,CLOTH coMBusTloN(NET CONTENT― N cke Aloy_ A‖ oy X750=710,A‖ oy X=7 70 kgs,Mesh 30'250 Tw‖ FiRe「CIoth=14 43sq l) 202 Nos N cke Aloy_ Aloy X 9039 173887766 N cke Aloy_ A‖oy X750 9101 281830986 Mesh 30'250 Tw‖ Fiker CIoth 18279 266707554 6 SEAL ASSEMBLY(NET CONTENT― Coba瞳 AIloy_ L-605=35 97 kgs) Nos Coban Aloy― L― 605 45568 266837086 7 S:DE SEAL ASSY,CLOTH coMBusTloN(NET CONTENT― N cke Aloy_ A loy X750=29 61 kgs,NIckel AIloy_X=2082 kgs Mesh 30'250 Tw‖ | F‖ter Cloth=46 77 sq l) 711 Nos N cke A‖ oy_ AIlov X 34743 173359179 Nick e A‖ oy_ A‖ oy X750 26377 26689611 Mesh 30・250 Tw‖ F‖ ter Cloth 59252 266871306 8 ASSY― PLATE SEALING (NET CONTENT CobaL A‖ ov― L-605=2 04 kqs) Nos Coban AIloy_L― 605 2580 264838235 9 ASSY SIDE CLOTH SEAL (NET CONTENT― Nick e A‖ oy_A‖ oy X750=2 98 Nickel A1loy_AIloy X=2 69 kgs, Mesh 30'250 Tw‖ IF‖ ter Cloth=4 25sq n) Nos N ckle A‖ oy_ A‖oy X 3153 172081041 N ckle A‖ oy_ A‖oy x750 3770 265233221
SEAL (NET CONTENT― Nick e A‖ oy_A‖ oy X750=2 98 Nickel A1loy_AIloy X=2 69 kgs, Mesh 30'250 Tw‖ IF‖ ter Cloth=4 25sq n) Nos N ckle A‖ oy_ A‖oy X 3153 172081041 N ckle A‖ oy_ A‖oy x750 3770 265233221
`十G) Mesh 30・250 Tw‖ F ker Cioth 5384 2668 ASSY SIDE CLOTH SEAL (NET CONTENT― Nick e Alloy― A‖ oy X750=3 23 kgs,Nickel AIloy_A‖ oy X=3 31kgs ,Mesh 30'250 Tw‖ F‖ ter Cloth=5 18 sq ft) Nos N cke A‖oy_ A‖ oy x 3888 174508157 N cke A‖oy_ A‖ oy X750 4093 267213003 Mesh 30・250 Tw‖ F Rer C oth 6561 266542471 11 SEAL,COMB TRNSN PC-lNNER(NET CONTENT Nos CobaはA‖ oy_L_ 605 50382 266833543 SEAL,COMB TRNSN PC‐ INNER(NET CONTENT‐ Nos Coban A‖ oy_L― 605 103018 266816404 SEAL SLOT-OUTER(NET CONTENT‐ N ckel A1loy― A‖ oy x=14 14 kgs) Nos N cke A‖oy_ A‖ ov X 16595 173589816 SEAL SLOT‐ OUTER(NET CONTENT― N ckel A oy_AIoy X=19 56 kgs) Nos N cke Aloy_ A‖ oy X 22950 173297239 SEAL SLOT― INNER(NET CONTENT― Nickel A‖oy ―Aloy x=7 61 kgs) N os Nick e A‖ oy_ Aloy X 8933 173893298 DISCOURAGER SEAL,INNER SHROUD― STG l (NET CONTENT― CobaL A‖ oy A‖oy 488=134 246 Nos Coban A‖ oy_ Alloy 1 88 1700 268791045
ENT― Nickel A‖oy ―Aloy x=7 61 kgs) N os Nick e A‖ oy_ Aloy X 8933 173893298 DISCOURAGER SEAL,INNER SHROUD― STG l (NET CONTENT― CobaL A‖ oy A‖oy 488=134 246 Nos Coban A‖ oy_ Alloy 1 88 1700 268791045
File No P-47011′ 193/2019‐ TSW
t`L
Norms Committee may take a view
Development Oricer
Te1 230631 66
E‐ma li sushlkJan@面ch
DP‖ T U O NO P47011/193/2019‐ TSw dated 12 10 2020
ら‐9°
3Tm oく■lく
競
漱
動
赫
莉
満
薇
鏑繭
c釦Ⅶく,揃
Government of!ndia
Ministry oF Commerce 8 industry
DepartmentrOr PrOm。10n oflndustry&internal Trade
(TeChnical Support Section)
Sublect:― M′ s Kineco Kanl‐dn cOnlpOsnes lnr」
i● Pttvate L nlled.(A A No 0310835424 dated
17032020)
Reference■DGFT F No :01′ 80/050/00374′AM20/
精認ょ鼻椰動地i聯量湖棚鰍絆駅蝋冊靱
ant A A may be ratined as under:
l Quaいtity of import itenns at SI No l t。
3. 6 to 9, 29 32 119 120 and 124 may be
a‖owed hlclusive of 30/。、ャaStage as claimed by the firm
2.Qtlantity Of mportitelns at SI↑ヾo4.5 241o27 33 and 42 maybe a‖ 。wed inclusive OF
lツもwastage as claimed by tl]e flriη
3.Ouantity of impOrt item at SI No 122 inay be a‖
owed inclosive of 2° O wastage as
clainled by the firm
4 0uan‖ ty Df inlpo「tRems at sINo 21 30.31 35 and 86 nlay be allowed without ar,y
wastage as ciaimed by the fri「
l
5 0tJatllty oi col、umables at SI No 10 1o 17 123.125 to 145 and 166 puttogether nlay
be,わwed upt0 2%OFFOB νaれ10
6 t~puantny of iinpOrt ito:1]s at SINo 18to 20 22 23 28 34 to 41,43 to l18 121 and
146to 165 may be a‖ 。vved O l nettO,ielわasis、vにh rnccountability clause
―
―
´
lr_,r_lL,
(S. K. Jain )
%OFFOB νaれ10
6 t~puantny of iinpOrt ito:1]s at SINo 18to 20 22 23 28 34 to 41,43 to l18 121 and
146to 165 may be a‖ 。vved O l nettO,ielわasis、vにh rnccountability clause
―
―
´
lr_,r_lL,
(S. K. Jain )
^ Government of lndia o"r"n,"#ill'9ofl ":,i:ITfl..X:.jit.r,llu,.n"rr,uo" ( r echnical .Support Sectron) Sublecl: - M/s Banoalore Br, 31.07.2020) - otech Labs Prjvate Limited (A.A. No.0710116824 dated Ref: D.G.F.T. F. No. 01/80/050 tOO546tAM21t ,n"**,,?Xtll3ti;lifiXlillly rerer to.their e-mair dated 24rh september 2020 rorwardrno ,h;-#;#;; fi5 ffiJ:U,l#t "J,"1,J0"T'.J, ,,"rxT::ffi;;i*: fffl;T::,frt ji
- ,mport items at St.No.1 to 56, 59, 6.1 to 192, 202 to 223, 23A to 24g. 254 to 273. 216 to 381 may be a owed "1 TLl" net basts *itn ,"""_i"Oifify ctause.
- Quantiry or import irem ar
-st,No.sz, A, ;d: ;;ffi;i.' ,ro ,o 232, zso to 253. 274
and Zl5 may be altowed on net to net uasls as craimi"o by the firm.
Norms Committee may lake a view.
::lυ
:ヽυ r-4′ υ ,1′ ol′
υυ ‐loVV EIr{dFT6R drFrfrqJih trqfq i?iaq r{q}4 x-dfa 3ik:riaR-+ aqrqR Eilra dated 06. i 0.2020 /年 ~ Deve opぶ2お網 :| E‐mtt sush記』 1湯:11 ― `乙'1‐'L"と。 躙粋蹴鵠謡計
may lake a view.
::lυ
:ヽυ r-4′ υ ,1′ ol′
υ υ
‐loVV
EIr{dFT6R
drFrfrqJih trqfq i?iaq
r{q}4 x-dfa 3ik:riaR-+ aqrqR Eilra
dated 06. i 0.2020
/年
~
Deve opぶ2お網
:|
E‐mtt sush記』
1湯:11
―
`乙'1‐'L"と。
躙粋蹴鵠謡計
File No P-47011′ 21′2020‐ TSW DGFT(sll〔J Prattv lJpaせhyay,■LD_D鳴り DP‖TUONO P-47011′21ノ2020‐ TSい′dated 03 11 2020 負″92 ― 31:く。ョて,Tて コ1●魏り3燕勲 lふnd● 碑前蒻輛薇諦3飾剣ЧR節 Government oflndia Ministry of COmnlercc&industry Departrnent fOr PrOmOtion ofllldustry&lnternal Trade (TeChnical Support SectiOn) Subjecr― M/s Tinta EI、9ineer"19P「ivate Limmed.AA No 0310818442 datod ll o1 2018 Reforonce:‐ DGFT F No 01′ 80′050′00399′AM18 DGFT(DES‐ 1):nay k“ 〕dly refer to the r e― ma‖ dated 20th October.2020 fon″ ardin9 therewnh nrm s rel)1ソ fOr nxatiOn Of nornns in rOspoct Oi the above― men‖ oned A A ln this connect10n the ui、(lersigned is directed to say thatthe instant A A may be ratified as under: l Netwe'9ht of eXpo「t itei:,illay t)e speciflod as 3289 Kgs 2 Words‐ 19o5MM ODx124 MM THK(av9)X4877 MM LC・ rrnay be sufflxed with the description of lmporl itcnt. 3. Quantrty ol rmport rlem nray be allowed basis Norms Co[]mrltee may take a view. as 782 Nos.( 3813.8 Mtrs ) on net to nel (SK」alおメ 1'″ L、Lさ Developmenl officer Te1 23063166 Emj「sushkJan@nt h へ
nt. 3. Quantrty ol rmport rlem nray be allowed basis Norms Co[]mrltee may take a view. as 782 Nos.( 3813.8 Mtrs ) on net to nel (SK」alおメ 1'″ L、Lさ Developmenl officer Te1 23063166 Emj「sushkJan@nt h へ
File No P‐ 47011′ 65′2020‐ TSW 幾 slrrd $G5r{ aftEr{r lfir rrfir rrrcrq r<qtJr silta sik rnafi ernqrr flnrrr Governrnent of lndia Ministry of Commerce & Industty Deparlment for Promolion of lndustry & lnternal Trade (Technical Support Section) Sub,ect:- Mis |DMC Lrd. A.A No.3410025225 dated 30.09.2009 Reference:- D.G F T F No. 01/80/050i00477/AM10/DES-1 DGFT(DES' 1 ) nray krnriry refcr to thqr c-mail dar{xi 'r:}th october 2o2o forwarding firm s representalion for anrcndn]erlt of rrornrs in rcspL,ct of the above-mentioned A.A. ln thrs connectro|r. tl)e undersigned is directed to say thal lhe lollowing amendment may be made rn the earlier ralfred rrrrrrns : l. lmport iterrrs at Sl.No.67 to 80 and 'l 14 to 116 strarll be of relevant grade and size as contained/lrtilized rn lttc cxporl ilerDs and quantities of lhese atems may be allowed on net to llcl i.,asrs wtth accouutabrlily clause. 2. As the d(]script()n (]l rmporl items at Sl. No.45 & 46 had nol been specified properly, words 'Sleilm Condensate Collectton Vesselr'Contpensator', were incorporated in the descrrptrorr uf lhese iiems.However, firm has represented lhat aS these items haye already been imported , no amendment is now possible.Keeping above in view, imporl ol items:rl SI .No 45 & 46 rnay be allowed on net to nct basis , subject to verifi(-'alion l)y RA thal thc import itcrns importcd by the tirm at Sl. No.
is now possible.Keeping above in view, imporl ol items:rl SI .No 45 & 46 rnay be allowed on net to nct basis , subject to verifi(-'alion l)y RA thal thc import itcrns importcd by the tirm at Sl. No. 45 & 46 were aclually ullrz{rd rn lhe exporl ilem Norms Corntrilktc rnay lakc a vicw 一 ― (SKj島 'I′ ム。 Deve opment Olficer Te1 23063166 E ma‖ sush‖klan@nt h DCFTtSh“ Prarl●v Upadtlyay.AD,QESiり DPIIT U O NO P 47(〕 11`65′ 2020-TSlrl dated o3 11 2020 ヘ