DGFT Committee Minutes
RATIFIED Minutes of M.No.39/10 held on 29.12.2009 of Norms Committee (NCI) (DES.I Section) The meeting No. 39/10 of the Norms Committee (NCI) for the licensing year 20092010 was held on 29.12.2009 under the Chairmanship of Shri A. Komu, Addl. Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter4) of Foreign Trade Policy 2004–2009 / Handbook of Procedure VolumeI. The following Members of the Committee were present in the meeting: Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 475 23062635 DHI, U.B. 2. Sh S.K. Jain, D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A DC(MSME),N.B. 4. Sh. A.K. Mishra, AIA M/o Steel, U.B. 5. Sh. Ramavatar Meena, FTDO 404 23061562 Ext.265 DGFT, U.B. The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon were as under: 1
Case No.:6/39/80ALC2/2009
Party Name:DASHMESH JACQUARD AND POWERLOOM Meet No/Date:39/80ALC2/2009 29.12.2009 Status:Case deferred HQ File :01/80/050/00602/AM10/ RLA File :33/24/040/00009/AM10/ Lic.No/Date:3310014265 12.11.2009 Defer Date: 16.02.2010 Decision : The representative of the DHI informed the Committee that they received the firm’s application and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 16.02.2010.
Case No.:20/39/80ALC2/2009
Party Name:TIMKEN INDIA LTD. 29.12.2009 Status:Case approved HQ File :01/80/050/00616/AM10/ RLA File :02/24/040/00159/AM10/ Lic.No/Date:0210133825 16.11.2009
2 Decision : The representative of DIPP present in the meeting informed the Committee that norms of the similar product of the applicant firm in respect of advance authorization No. 0210120599 dated 3.12.2008 has already been ratified by the NC in its meeting No. 08/80 dated 26.05.2009. The Committee, accordingly, decided to ratify the norms in respect of the subject advance authorization on repeat basis as under 1. Total net export weight of 43.344 MT may be added with the quantity of export product. 2. Quantity of import item may be allowed as 3876 Nos. on net to net basis. The duty free weight of import item may be restricted to 44427 Kgs. inclusive of 2.5 % wastage after 20 % recovery. The Regional Authority may take necessary action accordingly. 3
Case No.:25/39/80ALC2/2009
Party Name:LARSEN & TOUBRO LIMITED 29.12.2009 Status:Case approved HQ File :01/80/050/00621/AM10/ RLA File :03/95/040/00529/AM10/ Lic.No/Date:0310548050 27.11.2009 Decision : The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization with following modifications: 1. Net empty export weight of 609 MT may be specified with the quantity of export product. 2. Word “relevant” may be prefixed with the descriptions of import items at S. Nos. 1, 2, 3 & 4. 3. Quantities of import items from Sl.No.1 to 4 may be allowed as 1.03Kgs/Kg content in the export product.. 4. Weights of 17.17 MT, 5 MT, 46.086 MT, 7.7 MT, 1 MT & 4 MT may be specified with the quantities of import items at S.Nos. 5, 6, 9, 15, 16 & 17 respectively and may be allowed on net to net basis. 5. Quantity of import item at S.No. 7 may be allowed as 6 Nos. (173986 Kgs. inclusive of 51 % wastage after 20 % recovery). 6. Quantity of import item at S.No.8 may be allowed as 990 mtrs. (3333 Kgs.) inclusive of 2% wastage. 7. Quantities of import items at S.Nos. 10, 11, 12 & 14 may be allowed as applied for. 8. Quantity of import item at S.No. 13 may be allowed as 8542 Kgs. 9. Import item at S.No. 16 to be supplied alongwith export product. 10. Import of components may be allowed with accountability clause. 4
Case No.:8/39/80ALC2/2009
Party Name:GODREJ & BOYCE MFG. CO. LTD., 29.12.2009 HQ File :01/80/050/00604/AM10/ RLA File :03/94/040/00663/AM10/ Lic.No/Date:0310547941 27.11.2009 Defer Date: 16.02.2010 Decision : On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case on 16.02.2010:
1. Specification of item of export. 2. Complete specification of item of import with out giving equivalent. 3. Input Weight of each flanges/ forging and corresponding finished weight separately. 4. Justification of quantity of import of welding consumables with calculation. 5. Sl no 4,5 and 11 of SDL. 5
Case No.:11/39/80ALC2/2009
Party Name:BHARAT HEAVY ELECTRICALS LIMITED 29.12.2009 HQ File :01/80/050/00607/AM10/ RLA File :04/24/040/00202/AM10/ Lic.No/Date:0410109872 02.12.2009 Defer Date: 16.02.2010 Decision : On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case on 16.02.2010: 1. The firm may be asked to give specific item of export with details of Auxiliaries and corresponding weight separately. 2. Serial no 5 & 11 of SDL for each export product separately. 3. Input Weight of each casting/ forging and corresponding finished weight separately. 4. Quantity of seamless and welded pipes separately both in weight and length for each type of steel i.e. CS, AS and SS. 6
Case No.:7/39/80ALC2/2009
Party Name:BHARAT HEAVY ELECTRICALS LIMITED 29.12.2009 HQ File :01/80/050/00603/AM10/ RLA File :04/24/040/00221/AM10/ Lic.No/Date:0410109974 04.12.2009 Defer Date: 16.02.2010 Decision : On the recommendation of the representative of DHI present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to relist the case on 16.02.2010: 1. The firm may be asked to give specific item of export with details of Auxiliaries and corresponding weight separately. 2. Serial no 5 & 11 of SDL for each export product separately. 3. Input Weight of each casting/ forging and corresponding finished weight separately. 4. Quantity of seamless and welded pipes separately both in weight and length for each type of steel i.e. CS, AS and SS. 5. Break up of Hydraulic shock absorber assembly and snubeer assembly.(Item no 8 of import.
Case No.:1/39/80ALC2/2009
Party Name:PAMGLATT PHARMA TECHNOLOGIES PVT.LTD 29.12.2009 Status:Case reverted back to RA HQ File :01/80/050/00597/AM10/ RLA File :03/95/040/00549/AM10/ Lic.No/Date:0310550186 10.12.2009
7 Decision : The Committee noted that firm’s application has not been received so far. However, according to online data, items of import appear to be covered in GN4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. 8
Case No.:2/39/80ALC2/2009
Party Name:SGL CARBON INDIA PVT.LTD 29.12.2009 HQ File :01/80/050/00598/AM10/ RLA File :31/24/040/00152/AM10/ Lic.No/Date:3110041006 11.12.2009 Defer Date: 16.02.2010 Decision :The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 16.02.2010. 9
Case No.:3/39/80ALC2/2009
Party Name:GEA ECOFLEX INDIA PVT.LTD. 29.12.2009 HQ File :01/80/050/00599/AM10/ RLA File :03/94/040/00769/AM10/ Lic.No/Date:0310550414 11.12.2009 Defer Date: 16.02.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 16.02.2010. 10
Case No.:4/39/80ALC2/2009
Party Name:DELL ORTO INDIA PVT.LTD. 29.12.2009 Status:Case reverted back to RA HQ File :01/80/050/00600/AM10/ RLA File :05/23/040/00102/AM10/ Lic.No/Date:0510254429 11.12.2009 Decision :The Committee noted that firm’s application has not been received so far. However, according to online data, items of import appear to be covered in GN4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.
Case No.:5/39/80ALC2/2009
Party Name:KONE ELEVATOR INDIA PVT LTD 29.12.2009
11 HQ File :01/80/050/00601/AM10/ RLA File :04/24/040/00234/AM10/ Lic.No/Date:0410110142 14.12.2009 Defer Date: 16.02.2010 Decision :The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 16.02.2010. 12
Case No.:9/39/80ALC2/2009
Party Name:ACE MANUFACTURING SYSTEMS LTD., 29.12.2009 Status:Case reverted back to RA HQ File :01/80/050/00605/AM10/ RLA File :07/24/040/00347/AM10/ Lic.No/Date:0710068917 15.12.2009 Decision : The Committee noted that firm’s application has not been received so far. However, according to online data, items of import appear to be covered in GN4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. 13
Case No.:10/39/80ALC2/2009
Party Name:ACE MANUFACTURING SYSTEMS LTD., 29.12.2009 Status:Case reverted back to RA HQ File :01/80/050/00606/AM10/ RLA File :07/24/040/00348/AM10/ Lic.No/Date:0710068918 15.12.2009 Decision : The Committee noted that firm’s application has not been received so far. However, according to online data, items of import appear to be covered in GN4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. 14
Case No.:12/39/80ALC2/2009
Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. 29.12.2009 HQ File :01/80/050/00608/AM10/ RLA File :05/24/040/00403/AM10/ Lic.No/Date:0510254647 16.12.2009 Defer Date: 16.02.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 16.02.2010.
15
Case No.:13/39/80ALC2/2009
Party Name:ECOCAT INDIA PVT.LTD. 29.12.2009 HQ File :01/80/050/00609/AM10/ RLA File :05/23/040/00131/AM10/ Lic.No/Date:0510254668 16.12.2009 Defer Date: 16.02.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 16.02.2010. 16
Case No.:14/39/80ALC2/2009
Party Name:GLOBAL ENGINEERS LTD. 29.12.2009 HQ File :01/80/050/00610/AM10/ RLA File :05/23/040/00121/AM10/ Lic.No/Date:0510254674 16.12.2009 Defer Date: 16.02.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 16.02.2010. 17
Case No.:15/39/80ALC2/2009
Party Name:VOLVO INDIA PVT LIMITED 29.12.2009 Status:Case reverted back to RA HQ File :01/80/050/00611/AM10/ RLA File :07/24/040/00341/AM10/ Lic.No/Date:0710068924 16.12.2009 Decision : The Committee noted that firm’s application has not been received so far. However, according to online data, items of import appear to be covered in GN4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. 18
Case No.:16/39/80ALC2/2009
Party Name:VIDEOCON INDUSTRIES LIMITED 29.12.2009 HQ File :01/80/050/00612/AM10/ RLA File :03/95/040/00586/AM10/ Lic.No/Date:0310551305 17.12.2009 Defer Date: 16.02.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 16.02.2010.
19
Case No.:17/39/80ALC2/2009
Party Name:VIDEOCON INDUSTRIES LIMITED 29.12.2009 HQ File :01/80/050/00613/AM10/ RLA File :03/95/040/00585/AM10/ Lic.No/Date:0310551317 17.12.2009 Defer Date: 16.02.2010 Decision :The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 16.02.2010. 20
Case No.:18/39/80ALC2/2009
Party Name:GODREJ & BOYCE MFG. CO. LTD., 29.12.2009 HQ File :01/80/050/00614/AM10/ RLA File :03/94/040/00786/AM10/ Lic.No/Date:0310551338 17.12.2009 Defer Date: 16.02.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 16.02.2010. 21
Case No.:19/39/80ALC2/2009
Party Name:ACE MANUFACTURING SYSTEMS LTD., 29.12.2009 Status:Case reverted back to RA HQ File :01/80/050/00615/AM10/ RLA File :07/24/040/00346/AM10/ Lic.No/Date:0710068950 17.12.2009 Decision : The Committee noted that firm’s application has not been received so far. However, according to online data, items of import appear to be covered in GN4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. 22
Case No.:21/39/80ALC2/2009
Party Name:VEM TECHNOLOGIES P.LTD., 29.12.2009 HQ File :01/80/050/00617/AM10/ RLA File :09/24/040/00373/AM10/ Lic.No/Date:0910040368 18.12.2009 Defer Date: 16.02.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case. The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. MOD/DIPP for examination and submission of comments. The case may be relisted on 16.02.2010.
23
Case No.:22/39/80ALC2/2009
Party Name:SHOWA INDIA PRIVATE LIMITED 29.12.2009 Status:Case approved HQ File :01/80/050/00618/AM10/ RLA File :05/24/040/00420/AM10/ Lic.No/Date:0510254971 21.12.2009 Decision : The representative of DHI present in the meeting informed the Committee that norms of the similar product of the applicant firm in respect of advance authorization No. 0510247351 dated 07.08.2009 has already been ratified by the NC in its meeting No. 36/10 dated 08.12.2009 vide case No. 10/21/80ALC2/2009. The Committee, accordingly, decided to ratify the norms in respect of the subject advance authorization on repeat basis as under 1. Description of export product may be modified to “Box Assembly Steering gear (Electric Power Steering for Automobiles”. 2. Description of import item No. 23 may be modified to “Electric Motor DC 12V, 1000 + / 300RPM”. 3. All the import items are components and may be allowed under GN4 for the engineering products. 24
Case No.:23/39/80ALC2/2009
Party Name:SARTORIUS STEDIM INDIA PVT. LTD. 29.12.2009 Status:Case approved HQ File :01/80/050/00619/AM10/ RLA File :07/24/040/00359/AM10/ Lic.No/Date:0710069011 21.12.2009 Decision : The Committee noted that firm’s application has not been received so far. The Committee however, after deliberating upon the case decided to ratify the norms of the subject authorization on nettonet basis. 25
Case No.:24/39/80ALC2/2009
Party Name:DICKINSON FOWLER PVT. LTD. 29.12.2009 Status:Case reverted back to RA HQ File :01/80/050/00620/AM10/ RLA File :07/24/040/00362/AM10/ Lic.No/Date:0710069017 21.12.2009 Decision :The Committee noted that firm’s application has not been received so far. However, according to online data, items of import appear to be covered in GN4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.
Case No. A/R125
M/s. Aseem Technologies Pvt. Ltd., F.No. 01/80/50/00428/AM09/DES.I Lic.No. & Date
Indore Meeting No. 39/10 RA F.No.11/24/040/00008/AM09 1110017303 dt.30.05.2008 Date: 29.12.2009 Ratification of norms The representative of the DIPP informed the Committee that they received the firm’s representation and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 16.02.2010.
Case No. A/R126
M/s. Mudhra Fine Blanc Pvt. LTd., F.No. 01/80/50/01125/AM08/DES.I Lic.No. & Date Meeting No. 39/10 RA F.No.04/24/040/00321/AM08 0410093738 dt.11.02.2008 Date: 29.12.2009 Ratification of norms The representative of the DIPP informed the Committee that they received the firm’s representation and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 16.02.2010.
Case No. A/R127
M/s. IDMC Limited, Vithal Udyognagar F.No. 01/80/50/01859/AM09/DES.I Lic.No. & Date Meeting No. 39/10 RA F.No.34/24/040/00214/AM09 3410023783 dt.20.03.2009 Date: 29.12.2009 Ratification of norms The Committee observed that Policy Division has also clarified that SCOMET license is not required for deemed export. Accordingly, Committee decided to ratify the norms in respect of the subject advance authorization as per GN4 for the Engineering Products.
Case No. A/R128
M/s. Bharat Heavy Electricals Ltd., Haridwar F.No. 01/80/50/01319/AM09/DES.I Lic.No. & Date Meeting No. 39/10 RA F.No.61/24/040/00053/AM09 6110000244 dt.19.11.2008 Date: 29.12.2009 Ratification of norms The representative of the DHI informed the Committee that they received the firm’s representation and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 16.02.2010.
Case No. A/R129
M/s. Ultra Engineers, Pune F.No. 01/80/50/01650/AM09/DES.I Lic.No. & Date Meeting No. 39/10 RA F.No.31/24/040/00269/AM09 3110036828 dt.01.01.2009 Date: 29.12.2009 Ratification of norms On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to advise the firm to appear before the NC to explain their case in person along with full facts. The case may be relisted on 16.02.2010. DEFERRED CASES
S.No.207
Case No. A/R
115 M/s. BGR Energy System Ltd., Chennai HQ F.No.01/80/162/01144/AM08/DES.I Lic. No. & date Meeting No. 39/10 RA.F.No.04/24/040/00222/AM08 0410091122 dt.20.09.2007 Date: 29.12.2009 Ratification of norms The representative of DIPP informed the Committee that they have not received representation of the firm. The Committee therefore handed over the case file to the technical authority for examination and submission of comments. The case may be relisted on 16.02.2010. S.No.208
Case No. A/R
124 M/s. Larson & Toubro Ltd., HQ F.No.01/80/162/00442/AM08/DES.I Lic. No. & date Meeting No. 39/10 RA.F.No.04/24/040/00242/AM08 0310442970 dt.13.09.2007 Date: 29.12.2009 Ratification of norms The Committee considered the firm’s request for reduction of export weight with corresponding reduction/deletion of some import items. The representation of DIPP present in the meeting recommended the case. The Committee, accordingly, decided to modify the norms in respect of the subject advance authorization in accordance with DIPP comments as under: 1. Total net empty weight of export product may be modified as 2487 MT. 2. Quantity of import item at S.No. 2 i.e. Clad Plates may be reduced to 165639 Kgs. inclusive of 3% wastage. 3. Quantity of import item at S.No. 3 i.e. Stainless Steel Plates may be reduced to 12000 Kgs. inclusive of 3% wastage. 4. Import item at S.No.8 i.e. Seamless Tubes/Pipes may be deleted. 5. Weight of import item at S.No. 10 i.e. Tubes Sheet Forgings may be reduced to 68700 Kgs. on net to net basis. 6. Weight of import item at S.No. 11 i.e. Forging Flange may be reduced to 148570 Kgs. on net to net basis. 7. Weight of import item at S.No. 12 i.e. Forged Components may be reduced to 29121 Kgs. on net to net basis. 8. Weight of import item at S.No. 14 i.e. Fasterners may be reduced to 1634 Kgs. on net to net basis. 9. Weight of import item at S.No. 15 i.e. Gaskets may be reduced to 118 Kgs. on net to net basis. 10. Import item at S.No.16 i.e Paint may be deleted. 11. Quantity of import item at S.No. 18 i.e. Welding Wires may be reduced to 45064 Kgs. 12. Quantity of import item at S.No. 19 i.e. Welding Strips Stainless Steel may be reduced to 19691 Kgs. 13. Quantity of import item at S.No. 20 i.e. Welding Strips Ni based may be reduced to 10856 Kgs.
Case No. C 26
M/s. Sintech Precision Products Ltd., HQ F.No.01/80/162/00938/AM10/DES.I Lic. No. & date Meeting No. 39/10 Clarification on “Automotive Water Pumps” Enumerated under DEPB Sl.No. 61/439 Date: 29.12.2009 The representative of DHI informed the Committee that they have not received representation of the firm. The Committee therefore handed over the firm’s representation to the technical authority for examination and submission of comments. The case may be relisted on 16.02.2010. (B. C. Nayak D.O., DHI) Member (S.K. Jain, D.O., DIPP) Member (K.K.Funda, Asstt. Dir.,DC(MSME) Member (A.K. Mishra, AIA, MOS) Member (A. Komu) Chairman
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.