IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2009-12-15

DGFT Committee Minutes

Document text

RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   MINUTES OF THE NORMS COMMITTEE­II MEETING NO. 33/10 SCHEDULED TO BE HELD ON 17.11.2009 BUT ACTUALLY HELD ON 15.12.2009. The Meeting No. 33/10 of Norms Committee­II was held on 15.12.2009 for the licensing year 2009­2010 under the Chairmanship of Sh. A. KOMU, Addl. Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorisations under Duty Exemption Scheme (Chapter­4) of Foreign Trade Policy 2004­2009. The following members were present in the meeting:­ S.No Name of the representatives & their Designation   Deptt.   1. 2. 3. 4. 5. 6.   Sh. B.D. Ghosh, Jt. IA Sh. S.K. Jain, D.O. Sh. Gajraj Singh, Sr. D.O. Sh. K.K. Funda, Asst. Dir. Shri Shyam Sunder, Dy. DGFT Sh. A.K. Mishra, Asstt. Director M/o Steel DIPP DHI DC(MSME) DGFT M/o Steel 7.   Shri Narendra Vashista, FTDO DGFT             The Committee took up the individual cases of the agenda of this meeting for discussion and the decision taken in respect of each case is as follows: 1

Case No.:25/33/81­ALC2/2009

Party Name:BLOOMENERGY INDIA PRIVATE LIMITED, Meet No/Date:33/81­ALC2/2009 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00304/AM10/ RLA File :07/24/040/00676/AM09/ Lic.No/Date:0710063959 31.03.2009 Defer Date:05.01.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. Since the representative of DIPP was not present in the meeting, it was decided to defer the case for the next meeting. The case stands deferred and to be relisted on 05.01.2010.

2

Case No.:26/33/81­ALC2/2009

Party Name:MAN INDUSTRIES (INDIA) LTD. 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00305/AM10/ RLA File :03/95/040/01013/AM09/ Lic.No/Date:0310516129 17.04.2009 Defer Date:05.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. Since the representative of DIPP was not present in the meeting, it was decided to defer the case for the next meeting. The case stands deferred and to be relisted on 05.01.2010.   3

Case No.:24/33/81­ALC2/2009

Party Name:FARMOZ ELECTRICALS 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00303/AM10/ RLA File :03/94/040/01089/AM09/ Lic.No/Date:0310516244 20.04.2009 Defer Date:19.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The committee decided to call  for  the  following  information  as  per  DC(MSME)  letter  No.30(59)2008­ME  dated  20.11.2009  and  to  relist  the  case  on 19.01.2010 :­   1. Drawing/Specification and size of product manufactured with Spinnaker Nylon cloth. 2. Process flow chart for the activity. 3. Quantity of imported item mentioned at srl no 2 & 3 indicating qty used as components and numbers to be supplied as spares, separately.   4

Case No.:27/33/81­ALC2/2009

Party Name:A­1 FENCE PRODUCTS CO. 17.11.2009 Status:Approved HQ File :01/81/050/00306/AM10/ RLA File :03/94/040/00188/AM10/ Lic.No/Date:0310523254 09.06.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  33/81  scheduled  to  be  held  on  17.11.2009  but  actually  held  on  15.12.2009.  Based  on  the recommendation of MOS, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorisation as 1.01 kg per kg of export product i.e.198 MT.   R/A may take suitable consequential action accordingly.   5

Case No.:28/33/81­ALC2/2009

Party Name:CIM TOOLS PVT.LTD., 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00307/AM10/ RLA File :07/24/040/00102/AM10/ Lic.No/Date:0710065367 12.06.2009 Defer Date:05.01.2010

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. Since the representative of DIPP was not present in the meeting, it was decided to defer the case for the next meeting. The case stands deferred and to be relisted on 05.01.2010.   6

Case No.:29/33/81­ALC2/2009

Party Name:CIM TOOLS PVT.LTD., 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00308/AM10/ RLA File :07/24/040/00091/AM10/ Lic.No/Date:0710065368 12.06.2009 Defer Date:05.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. Since the representative of DIPP was not present in the meeting, it was decided to defer the case for the next meeting. The case stands deferred and to be relisted on 05.01.2010.   7

Case No.:18/33/81­ALC2/2009

Party Name:RPG CABLES LIMITED, 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00297/AM10/ RLA File :03/95/040/00081/AM10/ Lic.No/Date:0310526436 30.06.2009 Defer Date:05.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009.The Committee observed that DOT has not comments to offer and decided to remind DIPP for comments and relisted on 05.01.2010.     8

Case No.:19/33/81­ALC2/2009

Party Name:RPG CABLES LIMITED, 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00298/AM10/ RLA File :03/95/040/00173/AM10/ Lic.No/Date:0310527454 06.07.2009 Defer Date: 05.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that DOT has not comments to offer and decided to remind DIPP for comments and relisted on 05.01.2010.   9

Case No.:22/33/81­ALC2/2009

Party Name:RPG CABLES LTD. 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00301/AM10/ RLA File :03/95/040/01046/AM09/ Lic.No/Date:0310533237 11.08.2009 Defer Date:05.01.2010

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that DOT has not comments to offer and decided to remind DIPP for comments and relisted on 05.01.2010.   10

Case No.:23/33/81­ALC2/2009

Party Name:RPG CABLES LIMITED, 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00302/AM10/ RLA File :03/95/040/00093/AM10/ Lic.No/Date:0310533660 13.08.2009 Defer Date:05.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that DOT has not comments to offer and decided to remind DIPP for comments and relisted on 05.01.2010.     11

Case No.:7/23/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 17.11.2009 Status: Deffered and Re­indexed HQ File :01/80/050/00329/AM10/ RLA File :05/24/040/00207/AM10/ Lic.No/Date:0510248210 24.08.2009 Defer Date:19.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that Hard copy of the application received from RA and has been referred to DHI for examination and comments. The case stands deferred and to be relisted on 19.01.2010.     12

Case No.:1/20/85­ALC3/2009

Party Name:HPP ENERGY (INDIA) PVT LTD 17.11.2009 Status: Withdrawn HQ File :01/85/050/00108/AM10/ RLA File :05/24/040/00240/AM10/ Lic.No/Date:0510248783 03.09.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. RA has informed that the AA has been issued on repeat basis as per NC decision taken in r/o licence no. 010248783 dated 17.07.2009 in meeting no. 10/81­ALC2/2009  dated 09.06.2009 . Hence decided to withdraw the case on the part of NC.   13

Case No.:20/33/81­ALC2/2009

Party Name:VITECH EQUIPMENTS PVT. LTD. 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00299/AM10/ RLA File :03/95/040/00366/AM10/ Lic.No/Date:0310538430 18.09.2009 Defer Date:19.01.2010

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that the comments from DIPP & MOS are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 19.01.2010.   14

Case No.:21/33/81­ALC2/2009

Party Name:NAVGRAH FASTNERS PVT. LTD. 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00300/AM10/ RLA File :52/24/040/00012/AM10/ Lic.No/Date:5210028344 24.09.2009 Defer Date:19.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that the comments from DIPP & MOS are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 19.01.2010.     15

Case No.:1/33/81­ALC2/2009

Party Name:MET TRADE (INDIA) LTD. 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00280/AM10/ RLA File :05/24/040/00338/AM10/ Lic.No/Date:0510251506 27.10.2009 Defer Date:05.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. Since the representative of DIPP was not present in the meeting, it was decided to defer the case for the next meeting. The case stands deferred and to be relisted on 05.01.2010.   16

Case No.:2/33/81­ALC2/2009

Party Name:ADVANCE CABLE TECHNOLOGIES PVT.LTD, 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00281/AM10/ RLA File :07/24/040/00241/AM10/ Lic.No/Date:0710067840 27.10.2009 Defer Date:05.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that Hard copy of the application is received from RA and has been referred to DIPP & DOT for examination and comments. The case stands deferred and to be relisted on 05.01.2010.   17

Case No.:3/33/81­ALC2/2009

Party Name:COOKSON INDIA PVT. LTD. 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00282/AM10/ RLA File :04/24/040/00153/AM10/ Lic.No/Date:0410109048 03.11.2009 Defer Date:05.01.2010

Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that Hard copy of the application is received from RA and has been referred to DIPP for examination and comments. The case stands deferred and to be relisted on 05.01.2010.         18

Case No.:4/33/81­ALC2/2009

Party Name:DIAMOND ENGINEERING (CHENNAI) PVT LTD 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00283/AM10/ RLA File :04/24/040/00167/AM10/ Lic.No/Date:0410109050 03.11.2009 Defer Date:05.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that Hard copy of the application is received from RA and has been referred to DIPP for examination and comments. The case stands deferred and to be relisted on 05.01.2010.   19

Case No.:5/33/81­ALC2/2009

Party Name:JLC ELECTROMET PVT. LTD., 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00284/AM10/ RLA File :13/24/040/00021/AM10/ Lic.No/Date:1310030398 04.11.2009 Defer Date:05.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that Hard copy of the application is received from RA and has been referred to DIPP for examination and comments. The case stands deferred and to be relisted on 05.01.2010.   20

Case No.:9/33/81­ALC2/2009

Party Name:PRIMEX PLASTICS (P) LTD 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00288/AM10/ RLA File :07/24/040/00276/AM10/ Lic.No/Date:0710068015 04.11.2009 Defer Date:19.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 19.01.2010.     21

Case No.:6/33/81­ALC2/2009

Party Name:POWER GEAR LTD. 17.11.2009 Status: Deffered and Re­indexed

HQ File :01/81/050/00285/AM10/ RLA File :07/24/040/00270/AM10/ Lic.No/Date:0710068044 05.11.2009 Defer Date:19.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee decided that a copy of the application received from RA may be referred to DIPP & DHI for examination and comments. The case stands deferred and to be relisted on 19.01.2010.   22

Case No.:7/33/81­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00286/AM10/ RLA File :03/94/040/00630/AM10/ Lic.No/Date:0310544190 05.11.2009 Defer Date:19.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee decided that a copy of the application received from RA may be referred to DIPP & DHI for examination and comments. The case stands deferred and to be relisted on 19.01.2010.   23

Case No.:10/33/81­ALC2/2009

Party Name:ABB LIMITED 17.11.2009 Status:Approved HQ File :01/81/050/00289/AM10/ RLA File :07/24/040/00296/AM10/ Lic.No/Date:0710068085 06.11.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Norms Committee decided to ratify the norms in respect of the subject Advance Authorisation as per GN 4.    R/A may take suitable consequential action accordingly.     24

Case No.:11/33/81­ALC2/2009

Party Name:PEARL INSULATIONS PVT. LIMITED 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00290/AM10/ RLA File :07/24/040/00268/AM10/ Lic.No/Date:0710068086 06.11.2009 Defer Date:05.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 05.01.2010.

25

Case No.:12/33/81­ALC2/2009

Party Name:PEARL INSULATIONS PVT. LIMITED 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00291/AM10/ RLA File :07/24/040/00282/AM10/ Lic.No/Date:0710068087 06.11.2009 Defer Date:05.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 05.01.2010.   26

Case No.:8/33/81­ALC2/2009

Party Name:HOSLEY INDIA PRIVATE LIMITED Meet No/Date:33/81­ALC2/2009 17.11.2009 Status: Deffered and Re­indexed   HQ File :01/81/050/00287/AM10/ RLA File :05/23/040/00082/AM10/ Lic.No/Date:0510252073 06.11.2009 Defer Date:19.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that  Hard  copy  of  the  application  is  received  from  RA  and  has  been  referred  to   DIPP  and  DC(MSME)  for  examination  and comments. The case stands deferred and to be relisted on 19.01.2010.   27

Case No.:13/33/81­ALC2/2009

Party Name:RAHEE TRACK TECHNOLOGIES PRIVATE LIMITED, 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00292/AM10/ RLA File :02/24/040/00147/AM10/ Lic.No/Date:0210133456 09.11.2009 Defer Date: 19.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that  Hard  copy  of  the  application  is  received  from  RA  and  has  been  referred  to   DIPP  and  DC(MSME)  for  examination  and comments. The case stands deferred and to be relisted on 19.01.2010.   28

Case No.:14/33/81­ALC2/2009

Party Name:MET TRADE (INDIA) LTD. 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00293/AM10/ RLA File :05/24/040/00354/AM10/ Lic.No/Date:0510252096 09.11.2009 Defer Date:05.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that  Hard  copy  of  the  application  is  received  from  RA  and  has  been  referred  to   DIPP  and  DC(MSME)  for  examination  and comments. The case stands deferred and to be relisted on 05.01.2010.

29

Case No.:15/33/81­ALC2/2009

Party Name:MET TRADE (INDIA) LTD. 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00294/AM10/ RLA File :05/24/040/00356/AM10/ Lic.No/Date:0510252098 09.11.2009 Defer Date:05.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that  Hard  copy  of  the  application  is  received  from  RA  and  has  been  referred  to   DIPP  and  DC(MSME)  for  examination  and comments. The case stands deferred and to be relisted on 05.01.2010.     30

Case No.:16/33/81­ALC2/2009

Party Name:LOTUS POWERGEAR P.LTD., 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00295/AM10/ RLA File :07/24/040/00297/AM10/ Lic.No/Date:0710068115 09.11.2009 Defer Date:19.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm.  The case stands deferred and to be relisted on 19.01.2010.   31

Case No.:17/33/81­ALC2/2009

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 17.11.2009 Status: Deffered and Re­indexed HQ File :01/81/050/00296/AM10/ RLA File :05/23/040/00092/AM10/ Lic.No/Date:0510252108 09.11.2009 Defer Date:19.01.2010 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that Hard copy of the application is received from RA and has been referred to DHI & DIPP  for examination and comments. The case stands deferred and to be relisted on 19.01.2010.   PART AR­FRESH  

Case No. AR­45

 M/s Asiatic Electricals & Switchgear Pvt. Ltd.,  New Delhi.   Meeting No.33/81 F.No.01/81/050/00144/AM09/DES­II

Dated 17.11.2009 Advance License No.0510218871 dt.02.04.2008   RLA F.No.05/24/040/048/AM08             Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorisation, as per written comments of DHI  vide their U.O. No. 3(81)/2008/TSW(B)/432 dated 11.11.2009 as below:­            Export product No.2   i)        Weight of export product 7.263 kg. per piece may be incorporated in the licence. ii)       Import of Copper strips @4.242 kg. per piece including 1% wastage may be allowed.             Export ProductNo.7          i)                    Weight of export product 14.4kg.per piece may be incorporated in the licence. ii)                  Word “Alloy” may be added in the description of export product after Aluminium as import of Aluminium alloy is envisaged. iii)                Import of Aluminium alloy ingots @ 8.5 kg. per piece including 5% wastage may be allowed. iv)                Import of brass scrap @ 2.62 kg per piece including 5% may be allowed.                                       R/A may take suitable consequential action accordingly.    

Case No. AR­46

 M/s Maharashtra Seemless Ltd., New Delhi.   Meeting No.33/81 F.No.01/81/050/00701/AM09/DES­II Dated 17.11.2009 Advance License No.0510235197 dt.28.01.2009   RLA F.No.05/24/040/0653/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. Since the representative of DIPP was not present  in  the  meeting,  it  was  decided  to  defer  the  case  for  the  next  meeting.    The  case  stands  deferred  and  to  be  relisted  on 05.01.2010.    

Case No. AR­47

 M/s Associated Cables Pvt. Ltd., Mumbai  Meeting No.33/81 F.No.01/81/050/00604/AM08/DES­II Dated 17.11.2009 Advance License No. 0310441713 dt.03.09.2007   RLA F.No.03/94/040/0522/AM08 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. Since the representative of DIPP was not present  in  the  meeting,  it  was  decided  to  defer  the  case  for  the  next  meeting.    The  case  stands  deferred  and  to  be  relisted  on 05.01.2010.

Case No. AR­48

 M/s Laxmi Electronics Mould & Precision Engineering Ltd., Bangalore  Meeting No.33/81 F.No.01/81/050/00633/AM04/DES­II Dated 17.11.2009 Advance License No. 0710032408 dt.09.09.2004   RLA F.No.07/24/040/05323/AM05 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be relisted on 19.01.2010.  

Case No. AR­49

 M/s Delton Cables Ltd.,     Meeting No.33/81 F.No.01/81/050/00793/AM09/DES­II Dated 17.11.2009 Advance License No.0510206449 dt.18.07.2007   RLA F.No.05/24/040/0306/AM08 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. Since the representative of DIPP was not present  in  the  meeting,  it  was  decided  to  defer  the  case  for  the  next  meeting.  The  case  stands  deferred  and  to  be  relisted  on 05.01.2010.  

Case No. AR­50

 M/s Larsen & Toubro  Ltd., Mumbai  Meeting No.33/81 F.No.01/81/050/00173/AM09/DES­II Dated 17.11.2009 Advance License No. 0310476175 dt.24.06.2008   RLA F.No.03/95/040/0263/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 19.01.2010.         PART C­FRESH  

Case No. C­51

 M/S  Hindustan Zinc Ltd., Noida  through DC(SEZ), Noida Meeting No.33/81 F.No.01/81/162/767/AM09/DES­II Dated 17.11.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that Hard copy of the application is received from RA and has been referred to   Ministry  of  Mines  for  examination  and  comments.  The  case  stands deferred and to be relisted on 19.01.2010.

PART D ­FRESH  

Case No. D ­07

 M/S  Banke Bihari Steels, Mumbai  and M/S Suncity Sheets Pvt. Ltd., Jodhpur through EEPC (India), Kolkata Meeting No.33/81 F.No.01/81/162/451/AM10/DES­II Dated 17.11.2009   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 33/81 scheduled to be held on 17.11.2009 but actually held on 15.12.2009. The Committee observed that Hard copy of the  application  is  received  from  RA  and  has  been  referred  to      Ministry  of  Steel  for  examination  and  comments.  The  case  stands deferred and to be relisted on 19.01.2010.    


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied