IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2009-03-24

DGFT Committee Minutes

Document text

RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   Minutes of the Norms Committee­II Meeting No. 51/09 scheduled to be held on 24.03.2009. The Meeting No. 51/09 of Norms Committee­II was held on 24.03.2009 for the licensing year 2008­2009 under the Chairmanship of  Sh.  O.P.  Hisaria,  Joint  Director  General  of  Foreign  Trade  (OPH)  to  consider  the  applications  under  Duty  Exemption  Scheme (Chapter­4) of Foreign Trade Policy 2004­2009. The following members were present in the meeting:­ S.No Name of the representatives & their Designation   Deptt.   1. Shri B.D. Ghosh, AIA M/o Steel   2. 3.   4. Sh. N.L. Goswami, Sr. DO Sh. S.K. Jain, D.O. Shri A. K. Mishra, Asst IA DHI DIPP M/o Steel 5. 6. Shri K.K. Funda, AD Shri Narendra Vashista, FTDO DC(SSI) DGFT               The Committee took up the individual cases of the agenda of this meeting for discussion and the decision taken in respect of each case as follows: 1

Case No.:3/51/81­ALC2/2008

Party Name:AMBICA STEELS LTD. Meet No/Date:51/81­ALC2/2008 24.03.2009 Status:Case Added HQ File :01/81/050/00749/AM09/ RLA File :05/24/040/00711/AM09/ Lic.No/Date:0510236523 16.02.2009 Defer Date: Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The committee observed that the case is under examination of M/o Steel. The case stands deferred and to be re­listed on 12.05.2009.     2

Case No.:1/51/81­ALC2/2008

Party Name:SAI FLIPPED COIL LIMITED 24.03.2009 Status:Case Added HQ File :01/81/050/00747/AM09/ RLA File :08/24/040/00218/AM09/ Lic.No/Date:0810078172 Defer Date:

Q 17.02.2009 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. Based on the recommendations of the representative of DC(SSI)  and DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as applied for inclusive of 3% wastage.     R/A may take suitable consequential action accordingly.   3

Case No.:2/51/81­ALC2/2008

Party Name:IDMC LIMITED 24.03.2009 Status:Case Added HQ File :01/81/050/00748/AM09/ RLA File :34/24/040/00175/AM09/ Lic.No/Date:3410023519 17.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 12.05.2009.   4

Case No.:4/51/81­ALC2/2008

Party Name:TRANS ENGINEERS INDIA PVT.LTD. 24.03.2009 Status:Case Added HQ File :01/81/050/00750/AM09/ RLA File :31/24/040/00186/AM09/ Lic.No/Date:3110037391 18.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 12.05.2009.     5

Case No.:5/51/81­ALC2/2008

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 24.03.2009 Status:Case Added HQ File :01/81/050/00751/AM09/ RLA File :05/24/040/00734/AM09/ Lic.No/Date:0510236836 20.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 12.05.2009: ­   1. 1. Information in respect of S.No. 3, 4, 5, 11 & 13 of Standard Deficiency Letter.

2. Length of Pipes at import item S.No. 1. 3. Total piping length of the export product supported by P&I diagram of the system.     6

Case No.:6/51/81­ALC2/2008

Party Name:WELSPUN GUJARAT STAHL ROHREN LTD. 24.03.2009 Status:Case Added HQ File :01/81/050/00752/AM09/ RLA File :34/24/040/00205/AM09/ Lic.No/Date:3410023556 20.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. Based on the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.            The following may be suffixed with the description of export product:  “size 20˝ OD” x 0.625” (WT) – qty 1000 mtrs., size 20˝ OD” x 0.625” (WT) – qty 10687 mtrs., size 20˝ OD” x 0.438” (WT) – qty 3848 mtrs., size 18­5/8˝ OD” x 0.435” (WT) – qty 17131 mtrs.” Total quantity: 32666 mtrs.   Quantities of import items may be allowed as under:   a)            Word “relevant non alloy” may be prefixed and words “0.435” to 625” mm thk.” may be suffixed with the description of import item at Sl.No. 1  and its quantity may be allowed as 5179.64 MT inclusive of 5% wastage. b)            Quantity of import item at S.No.2 may be allowed on net to net basis with accountability clause. R/A may take suitable consequential action accordingly.   7

Case No.:7/51/81­ALC2/2008

Party Name:POWER GEAR LTD. 24.03.2009 Status:Case Added HQ File :01/81/050/00753/AM09/ RLA File :07/24/040/00613/AM09/ Lic.No/Date:0710063182 20.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 12.05.2009.   8

Case No.:8/51/81­ALC2/2008

Party Name:INDUSTRIAL METAL POWDERS (INDIA) PVT.LTD. 24.03.2009 Status:Case Added HQ File :01/81/050/00754/AM09/ RLA File :31/24/040/00313/AM09/ Lic.No/Date:3110037424 Defer Date:

20.02.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 12.05.2009.   9

Case No.:9/51/81­ALC2/2008

Party Name:AMBICA STEELS LTD. 24.03.2009 Status:Case Added HQ File :01/81/050/00755/AM09/ RLA File :05/24/040/00698/AM09/ Lic.No/Date:0510236972 23.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The committee observed that the case is under examination of M/o Steel. The case stands deferred and to be re­listed on 12.05.2009.   10

Case No.:10/51/81­ALC2/2008

Party Name:SIEMENS LTD 24.03.2009 Status:Case Added HQ File :01/81/050/00756/AM09/ RLA File :03/95/040/00552/AM09/ Lic.No/Date:0310509121 25.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The committee observed that RA has issued the AA on net to net basis  as per GN4. Hence decided to withdraw the case.   11

Case No.:11/51/81­ALC2/2008

Party Name:SIEMENS LTD 24.03.2009 Status:Case Added HQ File :01/81/050/00757/AM09/ RLA File :03/95/040/00551/AM09/ Lic.No/Date:0310509126 25.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The committee observed that RA has issued the AA on net to net basis  as per GN4. Hence decided to withdraw the case.   12

Case No.:12/51/81­ALC2/2008

Party Name:SIEMENS LTD 24.03.2009 Status:Case Added HQ File :01/81/050/00758/AM09/ RLA File :03/95/040/00617/AM09/ Lic.No/Date:0310509130 25.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The committee observed that RA has issued the AA on net to net basis  as per GN4. Hence decided to withdraw the case.

13

Case No.:13/51/81­ALC2/2008

Party Name:VINDHYA TELELINKS LTD., 24.03.2009 Status:Case Added HQ File :01/81/050/00759/AM09/ RLA File :11/24/040/00077/AM09/ Lic.No/Date:1110019730 25.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The committee observed that the case is under examination of DOT. The case stands deferred and to be re­listed on 12.05.2009.   14

Case No.:14/51/81­ALC2/2008

Party Name:SIEMENS LTD 24.03.2009 Status:Case Added HQ File :01/81/050/00760/AM09/ RLA File :03/95/040/00767/AM09/ Lic.No/Date:0310509344 26.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The committee observed that RA has issued the AA on net to net basis  as per GN4. Hence decided to withdraw the case.   15

Case No.:15/51/81­ALC2/2008

Party Name:SIEMENS LTD 24.03.2009 Status:Case Added HQ File :01/81/050/00761/AM09/ RLA File :03/95/040/00751/AM09/ Lic.No/Date:0310509352 26.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The committee observed that RA has issued the AA on net to net basis  as per GN4. Hence decided to withdraw the case.   16

Case No.:16/51/81­ALC2/2008

Party Name:GARGI ENTERPRISES, 24.03.2009 Status:Case Added HQ File :01/81/050/00762/AM09/ RLA File :07/24/040/00638/AM09/ Lic.No/Date:0710063290 26.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 12.05.2009.   17

Case No.:17/51/81­ALC2/2008

Party Name:MOLEX (INDIA) PRIVATE LIMITED, Meet No/Date:51/81­ALC2/2008 24.03.2009 Status:Case Added HQ File :01/81/050/00763/AM09/ RLA File :07/24/040/00618/AM09/ Lic.No/Date:0710063292 Defer Date:

26.02.2009 Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 12.05.2009.     18

Case No.:18/51/81­ALC2/2008

Party Name:PERMASTEELISA (INDIA) PVT. LTD., 24.03.2009 Status:Case Added HQ File :01/81/050/00764/AM09/ RLA File :07/24/040/00614/AM09/ Lic.No/Date:0710063303 26.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 12.05.2009: ­   1. Export product wise information in respect of item at S.No.  3, 4, 5 & 11 of Standard Deficiency Format.     19

Case No.:19/51/81­ALC2/2008

Party Name:APAR INDUSTRIES LIMITED 24.03.2009 Status:Case Added HQ File :01/81/050/00765/AM09/ RLA File :34/24/040/00212/AM09/ Lic.No/Date:3410023607 26.02.2009 Defer Date: Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. Based on the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.      Taking clue form SION C­1394, quantities of import items at S.No. 1, 2 & 3 may be allowed as applied for i.e 4.019 MT, 0.035MT & 0.03 MT respectively inclusive of 2%, 10% and 7.5% wastage respectively.   R/A may take suitable consequential action accordingly.     20

Case No.:20/51/81­ALC2/2008

Party Name:SHAKUN POLYMERS LIMITED, 24.03.2009 Status:Case Added

HQ File :01/81/050/00766/AM09/ RLA File :34/24/040/00218/AM09/ Lic.No/Date:3410023608 26.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 12.05.2009.   21

Case No.:21/51/81­ALC2/2008

Party Name:POSCO­INDIA PUNE PROCESSING CENTER PVT. LTD., 24.03.2009 Status:Case Added HQ File :01/81/050/00767/AM09/ RLA File :31/24/040/00309/AM09/ Lic.No/Date:3110037483 27.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The Committee observed that the application of the firm is not received. Therefore, the Committee decided to remind RA for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 12.05.2009.   22

Case No.:22/51/81­ALC2/2008

Party Name:TATA BP SOLAR INDIA LTD. 24.03.2009 Status:Case Added HQ File :01/81/050/00768/AM09/ RLA File :07/24/040/00636/AM09/ Lic.No/Date:0710063332 27.02.2009 Defer Date: Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The committee observed that the case is under examination of DC(SSI). The case stands deferred and to be re­listed on 12.05.2009.                                                     PART –AR­FRESH   

Case No.AR ­ 43

M/s  Proteck Circuits & Systems Pvt.Ltd. Meeting No.51/81 F.No.01/81/50/152/AM04/DES­II Dated: 24­03­2009 Advance Licence No 0410041552   dt 30­05­2003

RLA F.No.  04/24/040/0029/AM04             Decision  :  The  case  regarding  amendment  of    norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The Norms Committee, after deliberating upon the case, decided to amend the norms in respect of the subject Advance Authorisation as per following modification:­   1.            Quantity of item of import at S.No.1 ­5 and 7­25 may be allowed on net to net basis. 2.            Quantity of item of import at S.No. 6 may be allowed as 1.05kg/kg content in export product..   R/A may take suitable consequential action accordingly.    

Case No.AR ­ 44

M/s  Sirius Engineering Pvt.Ltd. Meeting No.51/81 F.No.01/81/50/769/AM07/DES­II Dated: 24­03­2009 Advance Licence No 3210034560   dt   08­01­2007 Advance Licence No 3210033953   dt   12­10­2006              RLA F.No. 32/24/040/071/AM07 RLA F.No.32/24/040/051/AM07              Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II  in  its  M.N0.  51/81  actually  held  on  24.03.2009.  The  committee  decided  to  refer  the  letter  received  from  the  firm  to  DIPP  for examination and comments. The case stands deferred and to be re­listed on 12.05.2009.  

Case No.A R­ 45

M/s  Stelco Strips Ltd.,Ludhiana Meeting No.51/81 F.No.01/81/162/000 /AM07/DES­II Dated: 24­03­2009 Advance Licence No 3000025   dt   03­11­1997              RLA F.No. Adv­149/ALC­98/LIC/LDH              Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.      The inputs for 49.120 MT of CRCA Skin passed steel sheet/coils exported by the firm may be allowed as per SION C­471. 2.       The inputs for 210.075 MT of CRCA sheet exported by the firm may be allowed as per SION C­470.   R/A may take suitable consequential action accordingly.  

Case No.A R­ 46

M/s  Sietz Technologies India Pvt.Ltd. Meeting No.51/81 F.No.01/81/50/177/AM07/DES­II Dated: 24­03­2009 Advance Licence No 0510183784   dt  31­05­2006               RLA F.No. 05/24/040/180/AM07              Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The Committee observed that the application of the firm available in file is for some

licence. Therefore, the Committee decided to request RA as well as firm for forwarding the copy of the application of the firm. The case stands deferred and to be relisted on 12.05.2009. PART –C­FRESH  

Case No.C­36

M/s  Sahney Commutators Pvt.Ltd.Bangalaore Meeting No.51/81 F.No.01/81/162/968/AM08/DES­II Dated: 24­03­2009               Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 12.05.2009.    

Case No.C­37

M/s  Sahney Commutators Pvt.Ltd.Bangalaore Meeting No.51/81 F.No.01/81/162/967/AM08/DES­II Dated: 24­03­2009               Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.N0. 51/81 actually held on 24.03.2009. The committee observed that the case is under examination of DHI. The case stands deferred and to be re­listed on 12.05.2009.  


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied