IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2010-08-10

DGFT Committee Minutes

Document text

RATIFIED   Minutes of Meeting No.19/11 held on 10.08.2010 of Norms Committee (NC­I) (DES.I Section)     The meeting No. 19/11 of the Norms Committee (NC­I) for the licensing year 2010­2011 was under the Chairpersonship of Ms. Shubhra, Jt. Director General of Foreign Trade to consider the applications under Duty Exemption  /  Remission  Schemes  (Chapter­4)  of  Foreign  Trade  Policy  2009–2014  /  Handbook  of  Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt.   1. Sh. B. D. Ghosh, Jt. IA 399 23063355 M/o Steel, U.B 2. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. A.K. Mishra, AIA     M/o Steel, U.B. 5.      Sh. Ktrishan Kumar, Dy. D.G.F.T 302 23061562  Ext. 380 DGFT, UB 6. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.   The  committee  first  considered  Minutes  of  Meeting  No.  15/11  dt.13.07.2010  which  held  on  20.07.2010  for ratification.  It was  decided to ratify the minutes as placed before it. before it.   Thereafter, the Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon are as under: ­   1

Case No.:24/18/80­ALC2/2010

Party Name:VOLTAS LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00277/AM11/ RLA File :03/95/040/00787/AM10/ Lic.No/Date:0310565255 18.03.2010 Defer Date:07.09.2010 Decision : NC noted that the application has been sent to DIPP for examination. The case was deferred for 07.09.2010.   2

Case No.:25/18/80­ALC2/2010

Party Name:ATLAS COPCO (INDIA) LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00278/AM11/ RLA File :03/94/040/01007/AM10/ Lic.No/Date:0310568509 07.04.2010 Defer Date:07.09.2010 07.09.2010.   3

Case No.:17/18/80­ALC2/2010

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00270/AM11/ RLA File :34/24/040/00010/AM11/ Lic.No/Date:3410026891 26.04.2010 Defer Date:07.09.2010

Decision :  The  committee  noted  that  the  firm’s  application  was  forwarded    to  DIPP.  However,  it  was decided to send a copy of application to  C&PC also for their examination and comments, as the subject pertains to them. The case was deferred for 07.09.2010.   4

Case No.:29/18/80­ALC2/2010

Party Name:VIJAY TRANSTECH PVT. LTD. Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00282/AM11/ RLA File :03/95/040/00118/AM11/ Lic.No/Date:0310575321 20.05.2010 Defer Date:07.09.2010 Decision : The committee noted that the case has been sent to DIPP for examination and comments. The case was deferred for 07.09.2010.   5

Case No.:18/18/80­ALC2/2010

Party Name:NEWTON ENGINEERING AND CHEMICALS LTD, Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00271/AM11/ RLA File :34/24/040/00034/AM11/ Lic.No/Date:3410027089 28.05.2010 Defer Date:07.09.2010 07.09.2010.   6

Case No.:19/18/80­ALC2/2010

Party Name:STARION INDIA P.LTD Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00272/AM11/ RLA File :31/24/040/00028/AM11/ Lic.No/Date:3110043412 31.05.2010 Defer Date:07.09.2010 07.09.2010.   7

Case No.:38/18/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00291/AM11/ RLA File :04/24/040/00018/AM11/ Lic.No/Date:0410114141 31.05.2010 Defer Date:07.09.2010 Decision : On the recommendation of the representative of DHI, it was decided to call for the following information / clarification form the firm:­   1. Serial No.5 & 11 of SDL for each export product separately. 2. Quantity of seamless and welded pipes separately both in weight and length for each type of steel i.e. CS, AS and SS.         The firm may furnish information so as to reach before 07.09.2010.   8

Case No.:44/18/80­ALC2/2010

Party Name:TRANTER INDIA PRIVATE LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00297/AM11/ RLA File :31/24/040/00045/AM11/ Lic.No/Date:3110043547 11.06.2010 Defer Date:07.09.2010 07.09.2010.

9

Case No.:4/13/80­ALC2/2010

Party Name:MAGNETI MARELLI UM ELECTRONICS SYSTEMS PVT.LTD., Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00180/AM11/ RLA File :05/24/040/00100/AM11/ Lic.No/Date:0510266016 14.06.2010 Defer Date:07.09.2010 Decision : NC noted that the hard copy of the firm’s application    has  not  been  received  from  the  RA. Accordingly, NC decided to remind RA to immediately forward the same for forwarding it further to DIPP for their examination and comments. The case was deferred for 07.09.2010.   10

Case No.:20/18/80­ALC2/2010

Party Name:LLOYD ELECTRIC & ENGG. LTD. Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00273/AM11/ RLA File :05/23/040/00056/AM11/ Lic.No/Date:0510266063 15.06.2010 Defer Date:07.09.2010 07.09.2010.   11

Case No.:15/18/80­ALC2/2010

Party Name:INDUS PRO AUTO ENGINEERS PVT.LTD. Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00268/AM11/ RLA File :05/23/040/00054/AM11/ Lic.No/Date:0510266316 17.06.2010 Defer Date:07.09.2010 Decision : NC noted that the application has been sent to DIPP for examination. It was decided to forward a  copy  of  application  to  DHI  also  for  their  examination  and  comments.  The  case  was  deferred  for 07.09.2010.   12

Case No.:16/18/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00269/AM11/ RLA File :61/24/040/00023/AM11/ Lic.No/Date:6110000459 17.06.2010 Defer Date:07.09.2010 Decision : NC noted that the application has been sent to DHI for examination. It was decided to forward a copy  of  application  to  DIPP  also  for  their  examination  and  comments.  The  case  was  deferred  for 07.09.2010.   13

Case No.:26/18/80­ALC2/2010

Party Name:VEE KAY VIKRAM & CO Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00279/AM11/ RLA File :08/24/040/00101/AM10/ Lic.No/Date:0810089805 17.06.2010 Defer Date:07.09.2010 Decision : The committee noted that the application has been sent to C&PC and decided remind them for expediting their comments. The case was deferred for 07.09.2010.   14

Case No.:30/18/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00283/AM11/ RLA File :07/24/040/00080/AM11/ Lic.No/Date:0710072309 17.06.2010 Defer Date:07.09.2010

Decision : NC noted that the application has been sent to DHI for examination. It was decided to forward a copy of application to DIT also for their examination and comments. The case was deferred for 07.09.2010.   15

Case No.:31/18/80­ALC2/2010

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00284/AM11/ RLA File :03/95/040/00211/AM11/ Lic.No/Date:0310579476 18.06.2010 Defer Date:07.09.2010 07.09.2010.   16

Case No.:14/18/80­ALC2/2010

Party Name:AUXEIN MEDICAL Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00267/AM11/ RLA File :05/23/040/00062/AM11/ Lic.No/Date:0510266901 24.06.2010 Defer Date:07.09.2010 Decision :  The  committee  noted  that  the  firm’s  application  forwarded    to  DHI  &  DC(MSME).  It  was decided to forward a copy of the application to DIPP also for examination and comments.  The case was deferred for 07.09.2010.   17

Case No.:28/18/80­ALC2/2010

Party Name:BECTON DICKINSON INDIA PRIVATE LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Approved HQ File :01/80/050/00281/AM11/ RLA File :05/23/040/00069/AM11/ Lic.No/Date:0510266995 28.06.2010   Decision : It was decided to ratify the norms as recommended in advance authorization No.0510263911 dt.07.05.2010 by NC in its meeting No.14/11 dt.20.07.2010.   RA may take necessary action accordingly.   18

Case No.:40/18/80­ALC2/2010

Party Name:BOYSEN INDIA LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00293/AM11/ RLA File :05/23/040/00077/AM11/ Lic.No/Date:0510267549 05.07.2010 Defer Date:07.09.2010 Decision : On the recommendation of the representative of DHI, it was decided to call for the following information / clarification form the firm:­   1. Sl. No.5, 6 & 11 of SDL export product wise. 2. Export & Import product quantity in number.      The case was deferred for 07.09.2010.  

Case No.:41/18/80­ALC2/2010

Party Name:CLYDE BERGEMANN INDIA PRIVATE LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00294/AM11/ RLA File :05/23/040/00080/AM11/ Lic.No/Date:0510267550 05.07.2010 Defer Date:07.09.2010

19 Decision : On the recommendation of the representative of DC(MSME) vide their UO Note No.30(131)/2010­ME dated 05.08.2010, it was decided to call for the following information / clarification form the firm:­   1. Drawing Specification, part list of list export product alongwith weight of each export product. 2. Process of Mfg with a process flow chart & stage wise wastage. 3. Mfg operations to be carried out on imported inputs indicating wastage at every stage. 4. Material Balancing & wastage justification.        The firm may furnish information so as to reach before 07.09.2010.   20

Case No.:43/18/80­ALC2/2010

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00296/AM11/ RLA File :05/23/040/00091/AM11/ Lic.No/Date:0510267552 05.07.2010 Defer Date:07.09.2010 Decision : NC noted that the firm’s application has been sent to DHI for examination and comments. The case was deferred for 07.09.2010.   21

Case No.:42/18/80­ALC2/2010

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00295/AM11/ RLA File :05/23/040/00092/AM11/ Lic.No/Date:0510267568 06.07.2010 Defer Date:07.09.2010 Decision : NC noted that the firm’s application has been sent  to DHI for examination and comments. The case was deferred for 07.09.2010.   22

Case No.:45/18/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00298/AM11/ RLA File :06/24/040/00018/AM11/ Lic.No/Date:0610018429 07.07.2010 Defer Date:07.09.2010 Decision : The committee noted that the firm’s application has been forwarded    to DHI / DC(MSME). However,  it  was  decided  to  send  a  copy  of  application  to    M/o  of  Defence  also  for  examination  and comments. The case was deferred for 07.09.2010.   23

Case No.:47/18/80­ALC2/2010

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00300/AM11/ RLA File :06/24/040/00017/AM11/ Lic.No/Date:0610018428 07.07.2010 Defer Date:07.09.2010 Decision : The committee noted that the firm’s application has been forwarded  to DC(MSME). However, it was decided to send a copy of application to  M/o of Defence also for examination and comments. The case was deferred for 07.09.2010.   24

Case No.:39/18/80­ALC2/2010

Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00292/AM11/ RLA File :04/24/040/00047/AM11/ Lic.No/Date:0410115365 08.07.2010 Defer Date:07.09.2010

07.09.2010.   25

Case No.:46/18/80­ALC2/2010

Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00299/AM11/ RLA File :04/24/040/00044/AM11/ Lic.No/Date:0410115366 08.07.2010 Defer Date:07.09.2010 07.09.2010.   26

Case No.:1/18/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00254/AM11/ RLA File :05/24/040/00126/AM11/ Lic.No/Date:0510267954 12.07.2010 Defer Date:07.09.2010 Decision : NC noted that the hard copy of the firm’s application    has  not  been  received  form  the  RA. Accordingly NC decided to remind RA to immediately forward the same for forwarding it further to DIPP   27

Case No.:2/18/80­ALC2/2010

Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00255/AM11/ RLA File :34/24/040/00056/AM11/ Lic.No/Date:3410027487 12.07.2010 Defer Date:07.09.2010 Accordingly NC decided to remind RA to immediately forward the same for forwarding it further to DHI   28

Case No.:3/18/80­ALC2/2010

Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00256/AM11/ RLA File :34/24/040/00057/AM11/ Lic.No/Date:3410027488 12.07.2010 Defer Date:07.09.2010   29

Case No.:4/18/80­ALC2/2010

Party Name:ABB LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00257/AM11/ RLA File :07/24/040/00127/AM11/ Lic.No/Date:0710072847 12.07.2010 Defer Date:07.09.2010  

Case No.:5/18/80­ALC2/2010

Party Name:THERMAX LTD., Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred

30 HQ File :01/80/050/00258/AM11/ RLA File :31/24/040/00058/AM11/ Lic.No/Date:3110043947 13.07.2010 Defer Date:07.09.2010   31

Case No.:6/18/80­ALC2/2010

Party Name:ASKAR MICRONS PVT. LTD. Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00259/AM11/ RLA File :07/24/040/00105/AM11/ Lic.No/Date:0710072866 13.07.2010 Defer Date:07.09.2010   32

Case No.:7/18/80­ALC2/2010

Party Name:MCNALLY BHARAT ENGG. CO. LTD. Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00260/AM11/ RLA File :02/24/040/00057/AM11/ Lic.No/Date:0210144971 13.07.2010 Defer Date:07.09.2010 Decision : NC noted that the firm’s application has been sent  to DHI for examination and comments. The case was deferred for 07.09.2010.   33

Case No.:8/18/80­ALC2/2010

Party Name:MVS ENGINEERING LTD Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00261/AM11/ RLA File :05/24/040/00138/AM11/ Lic.No/Date:0510268101 13.07.2010 Defer Date:07.09.2010 for their examination and comments. The case was deferred for7.09.2010.   34

Case No.:9/18/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00262/AM11/ RLA File :03/95/040/00155/AM11/ Lic.No/Date:0310583268 13.07.2010 Defer Date:07.09.2010   35

Case No.:10/18/80­ALC2/2010

Party Name:MIKROTEK MACHINES LTD., Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00263/AM11/ RLA File :07/24/040/00102/AM11/ Lic.No/Date:0710072868 13.07.2010 Defer Date:07.09.2010

36

Case No.:11/18/80­ALC2/2010

Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00264/AM11/ RLA File :61/24/040/00031/AM11/ Lic.No/Date:6110000468 13.07.2010 Defer Date:07.09.2010   37

Case No.:12/18/80­ALC2/2010

Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00265/AM11/ RLA File :61/24/040/00032/AM11/ Lic.No/Date:6110000469 13.07.2010 Defer Date:07.09.2010   38

Case No.:52/18/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00305/AM11/ RLA File :53/24/040/00011/AM11/ Lic.No/Date:5310010998 13.07.2010 Defer Date:07.09.2010 Accordingly NC decided to remind RA to immediately forward the same for forwarding it further to C&PC   39

Case No.:13/18/80­ALC2/2010

Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00266/AM11/ RLA File :03/95/040/00294/AM11/ Lic.No/Date:0310583509 14.07.2010 Defer Date:07.09.2010 Decision :On the recommendation of  the representative of DHI, it was decided to call for the following information / clarification form the firm:­   1. Sl. No. 11 of SDL The case was deferred for 07.09.2010.   40

Case No.:27/18/80­ALC2/2010

Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00280/AM11/ RLA File :04/24/040/00081/AM11/ Lic.No/Date:0410115530 14.07.2010 Defer Date:07.09.2010

41

Case No.:21/18/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00274/AM11/ RLA File :61/24/040/00029/AM11/ Lic.No/Date:6110000472 15.07.2010 Defer Date:07.09.2010 Decision : It was decided to call for legible copies of application from the firm. On receipt one copy is to be sent to DHI for examination and comments. The case was deferred for 07.09.2010.   42

Case No.:22/18/80­ALC2/2010

Party Name:SAI DIVYA ENGINEERS Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00275/AM11/ RLA File :09/24/040/00047/AM11/ Lic.No/Date:0910042702 19.07.2010 Defer Date:07.09.2010 and DC(MSME) for their examination and comments. The case was deferred for 07.09.2010.   43

Case No.:23/18/80­ALC2/2010

Party Name:MIPALLOY, Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00276/AM11/ RLA File :04/24/040/00089/AM11/ Lic.No/Date:0410115635 19.07.2010 Defer Date:07.09.2010 Decision : The committee noted that the firm’s application forwarded  to DHI. It was decided to forward a copy application to DIPP also for examination and comments.  The case was deferred for 07.09.2010.   44

Case No.:34/18/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00287/AM11/ RLA File :03/94/040/00347/AM11/ Lic.No/Date:0310584081 19.07.2010 Defer Date:07.09.2010 Decision : The committee noted that the firm’s application forwarded  to DHI and DIT. It was decided to forward a copy of application to DIPP and also remind to DIT for their comments.  The case was deferred for 07.09.2010.   45

Case No.:32/18/80­ALC2/2010

Party Name:STOCK REDLER INDIA PRIVATE LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00285/AM11/ RLA File :07/24/040/00097/AM11/ Lic.No/Date:0710073084 20.07.2010 Defer Date:07.09.2010 Decision : The committee noted that the firm’s application forwarded  to DIPP. It was decided to forward a copy of application to DHI also for examination and comments.  The case was deferred for 07.09.2010.   46

Case No.:35/18/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00288/AM11/ RLA File :03/95/040/00252/AM11/ Lic.No/Date:0310584232 20.07.2010 Defer Date:07.09.2010

47

Case No.:53/18/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00306/AM11/ RLA File :09/24/040/00133/AM11/ Lic.No/Date:0910042746 20.07.2010 Defer Date:07.09.2010   48

Case No.:54/18/80­ALC2/2010

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00307/AM11/ RLA File :09/24/040/00138/AM11/ Lic.No/Date:0910042748 20.07.2010 Defer Date:07.09.2010 Accordingly, NC decided to remind RA to immediately forward the same for forwarding it further to DHI   49

Case No.:55/18/80­ALC2/2010

Party Name:HTD HEAT TRACE(INDIA)PVT LTD. Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00308/AM11/ RLA File :09/24/040/00130/AM11/ Lic.No/Date:0910042767 20.07.2010 Defer Date:07.09.2010   50

Case No.:33/18/80­ALC2/2010

Party Name:LUBI SUBMERSIBLES LTD Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00286/AM11/ RLA File :08/24/040/00084/AM11/ Lic.No/Date:0810090670 21.07.2010 Defer Date:07.09.2010 07.09.2010.   51

Case No.:36/18/80­ALC2/2010

Party Name:PERMANENT MAGNETS LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00289/AM11/ RLA File :03/95/040/00274/AM11/ Lic.No/Date:0310584529 22.07.2010 Defer Date:07.09.2010   52

Case No.:37/18/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00290/AM11/ RLA File :03/95/040/00200/AM11/ Lic.No/Date:0310584600 22.07.2010 Defer Date:07.09.2010

  53

Case No.:56/18/80­ALC2/2010

Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Approved HQ File :01/80/050/00309/AM11/ RLA File :34/24/040/00093/AM11/ Lic.No/Date:3410027557 22.07.2010   Decision :Hardcopy of the application was not received. However, based on on­line data. It was decided to ratify the norms under GN­4.   RA may take action accordingly.   54

Case No.:48/18/80­ALC2/2010

Party Name:THERMAX LTD., Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00301/AM11/ RLA File :31/24/040/00061/AM11/ Lic.No/Date:3110044086 23.07.2010 Defer Date:07.09.2010   55

Case No.:49/18/80­ALC2/2010

Party Name:DIAMOND METAL SCREENS (P) LTD Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00302/AM11/ RLA File :07/24/040/00131/AM11/ Lic.No/Date:0710073159 26.07.2010 Defer Date:07.09.2010 07.09.2010.   56

Case No.:50/18/80­ALC2/2010

Party Name:APEX TEST TECHNOLOGIES, Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00303/AM11/ RLA File :07/24/040/00083/AM11/ Lic.No/Date:0710073162 26.07.2010 Defer Date:07.09.2010 Decision : The committee noted that the firm’s application forwarded  to DHI. It was decided to forward a copy application to DIPP also for examination and comments.  The case was deferred for 07.09.2010.   57

Case No.:51/18/80­ALC2/2010

Party Name:FREUDENBERG FILTRATION TECHNOLOGIES INDIA PVT.LTD. Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00304/AM11/ RLA File :31/24/040/00016/AM11/ Lic.No/Date:3110044106 26.07.2010 Defer Date:07.09.2010 and DC(MSME) for their examination and comments. The case was deferred for 07.09.2010.

58

Case No.:1/19/80­ALC2/2010

Party Name:POLY MEDICURE LTD. Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00310/AM11/ RLA File :05/24/040/00154/AM11/ Lic.No/Date:0510269550 03.08.2010 Defer Date:07.09.2010 Accordingly NC decided to remind RA to immediately forward the same for forwarding it further to C&PC   59

Case No.:2/19/80­ALC2/2010

Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:19/80­ ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00311/AM11/ RLA File :05/24/040/00165/AM11/ Lic.No/Date:0510269599 03.08.2010 Defer Date:07.09.2010    

Case No. A/R­ 78

M/s.  Botil Oil Tools India Pvt. LTd., HQ F.No.01/80/50/00918/AM09/DES­I Lic. No. & Date Meeting No.19/11 RLA No.05/24/040/00940/AM08 0510217768 dt.12.03.2008 Date: 10.08.2010 Revision of norms The committee noted that for similar case, the firm’s representative(s) have been called for P.H. on 17.08.2010. The committee therefore decided to defer the consideration of the case for 07.09.2010. However, it was decided that RA may be requested to include weight of export and import items in advance  authorizations  for such product.  

Case No. A/R­ 79

M/s.  Botil Oil Tools India Pvt. LTd., HQ F.No.01/80/50/01157/AM09/DES­I Lic. No. & Date Meeting No.19/11 RLA No.05/24/040/00435/AM09 0510228787 dt.03.10.2008 Date: 10.08.2010 Revision of norms The committee noted that for similar case, the firm’s representative(s) have been called for P.H. on 17.08.2010. The committee therefore decided to defer the consideration of the case for 07.09.2010. However, it was decided that RA may be requested to include weight of export and import items in advance  authorizations  for such product.  

Case No. A/R­ 80

M/s.    Blue  Star  Ltd., Mumbai  HQ F.No.01/80/50/00553/AM10/DES­I Lic. No. & Date Meeting No.19/11 RLA No.03/94/040/00776/AM09 0310544095 dt.05.11.2009 Date: 10.08.2010 Amendment / correction of norms  The case was deferred for 07.09.2010 for comments for DIPP.

Case No. A/R­ 81

M/s.    Blue  Star  Ltd., Mumbai  HQ F.No.01/80/50/00781/AM10/DES­I Lic. No. & Date Meeting No.19/11 RLA No.03/94/040/00886/AM10 0310559418 dt.10.02.2010 Date: 10.08.2010 Amendment / correction of norms  The case was deferred for 07.09.2010 for comments for DIPP.

Case No. A/R­ 82

M/s.  Injectoplast   Pvt. Ltd., Kanpur HQ F.No.01/80/50/00266/AM10/DES­I Lic. No. & Date Meeting No.19/11 RLA No.06/24/040/00009/AM10 0610015869 dt.10.07.2009 Date: 10.08.2010 Ratification of norms   The case was deferred for 07.09.2010 for comments for DHI.

Case No. A/R­ 83

M/s.    IDMC  Limited, Vithal Udyognagar HQ F.No.01/80/50/01154/AM09/DES­I Lic. No. & Date Meeting No.19/11 RLA No.34/24/040/00073/AM09 3410022464 dt.03.10.2008 Date: 10.08.2010 Ratification of norms

Based on the recommendations of DHI, the Committee decided to ratify the norms as under:­ 1. Import of three Raw materials to be incorporated as 3067 kg with 3% wastage, as applied by the firm. 2. The description of export product may be amended to “Road Milk Tanke (Elliptical, double compartment) of capacity 9,000 liters weighing 7105 kg each”. RA may take necessary action accordingly.

Case No. A/R­ 84

M/s.    Larson  & Toubro LTd., HQ F.No.01/80/50/01664/AM09/DES­I Lic. No. & Date Meeting No.19/11 RLA No.03/95/040/00828/AM09 0310501993 dt.09.01.2009 Date: 10.08.2010 Revision  of norms The case was deferred for 07.09.2010 for comments of DHI

Case No. A/R­ 85

M/s.    Macmet  India Ltd., HQ F.No.01/80/50/00480/AM09/DES­I Lic. No. & Date Meeting No.19/11 RLA No.02/24/040/00032/AM09 0210113458 dt.11.06.2008 Date: 10.08.2010 Ratification  of norms The case was deferred for 07.09.2010 for comments of DHI.

Case No. A/R­ 86

M/s.    Filter Manufacturing  Industries  Pvt.  LTd., Kolkata HQ F.No.01/80/50/00381/AM09/DES­I Lic. No. & Date Meeting No.19/11 RLA No.02/24/040/00054/AM06 0210079402 dt.22.06.2005 Date: 10.08.2010 Ratification  of norms It was noted that the representation has been sent to DIPP for examination and the case was deferred for 07.09.2010.    

Case No.  A/R. ­ 87

M/s. GEA BGR Energy Systems Ltd., Chennai   HQ F.No.01/80/50/01801/AM09/DES.I Lic.No. & Date Meeting No.19/11  RA.F.No.04/24/040/00260/AM09 0410102466 dt.19.02.2009 Date: 10.08.2010 Ratification of  norms. The committee noted that the firm had been called for P.H. and that the firm has requested for another date for P.H. It was also observed that the firm is in habit of furnishing incomplete information and thus the committee expressed its concern on this issue. After discussion it was decided to call the firm for P.H. on 07.09.2010.  The firm’s representative may be asked to come alongwith all deficient information. It was  decided that in the P.H. letter, all the deficient information may be mentioned.

Case No. A/R­ 88

M/s.  Botil Oil Tools India Pvt. LTd., HQ F.No.01/80/50/00512/AM10/DES­I Lic. No. & Date Meeting No.19/11 RLA No.05/23/040/00093/AM10 0510252255 dt.10.11.2009 Date: 10.08.2010 Revision of norms The committee noted that for similar case, the firm’s representative(s) have been called for P.H. on 17.08.2010. The committee therefore decided to defer the consideration of the case for 07.09.2010. However, it was decided that  in  the  meantime  RA  may  be  directed  to  include  weight  of  export  and  import  items  in  advance  authorizations  for such product.  

Case No. A/R­ 89

M/s.  Botil Oil Tools India Pvt. LTd., HQ F.No.01/80/50/00648/AM10/DES­I Lic. No. & Date Meeting No.19/11 RLA No.05/23/040/00145/AM10 0510255715 dt.06.01.2010 Date: 10.08.2010 Revision of norms The committee noted that for similar case, the firm’s representative(s) have been called for P.H. on 17.08.2010. The committee therefore decided to defer the consideration of the case for 07.09.2010. However, it was decided that  in  the  meantime  RA  may  be  directed  to  include  weight  of  export  and  import  items  in  advance  authorizations  for such product.  

Case No. A/R­ 90

M/s.  Botil Oil Tools India Pvt. LTd., HQ F.No.01/80/50/00535/AM10/DES­I Lic. No. & Date Meeting No.19/11 RLA No.05/23/040/00099/AM10 0510252923 dt.19.11.2009 Date: 10.08.2010 Revision of norms

The committee noted that for similar case, the firm’s representative(s) have been called for P.H. on 17.08.2010. The committee therefore decided to defer the consideration of the case for 07.09.2010. However, it was decided that  in  the  meantime  RA  may  be  directed  to  include  weight  of  export  and  import  items  in  advance  authorizations  for such product.   S.No.152

Case No.  A/R. ­ 116

M/s. GEA BGR Energy Systems Ltd., Chennai   HQ F.No.01/80/50/01284/AM09/DES.I Lic.No. & Date Meeting No.19/11  RA.F.No04/24/040/00197/AM09 0410099963 dt.12.11.2008 Date: 10.08.2010 Ratification of  norms. The committee noted that the firm had been called for P.H. and that the firm has requested for another date for P.H. It was also observed that the firm is in habit of furnishing incomplete information and thus the committee expressed its concerned on this issue. After discussion it was decided to call the firm for P.H. on 07.09.2010.  The firm’s representative may be asked to come alongwith all deficient information. It was  decided that in the P.H. letter, all the deficient information may be mentioned.                                                          ******

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied