DGFT Committee Minutes
RATIFIED Minutes of Meeting No.19/11 held on 10.08.2010 of Norms Committee (NCI) (DES.I Section) The meeting No. 19/11 of the Norms Committee (NCI) for the licensing year 20102011 was under the Chairpersonship of Ms. Shubhra, Jt. Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure VolumeI. The following Members of the Committee were present in the meeting: Sl.No Name of the representatives & their Designation Room No. Telephone No. Deptt. 1. Sh. B. D. Ghosh, Jt. IA 399 23063355 M/o Steel, U.B 2. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A DC(MSME),N.B. 4. Sh. A.K. Mishra, AIA M/o Steel, U.B. 5. Sh. Ktrishan Kumar, Dy. D.G.F.T 302 23061562 Ext. 380 DGFT, UB 6. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B. The committee first considered Minutes of Meeting No. 15/11 dt.13.07.2010 which held on 20.07.2010 for ratification. It was decided to ratify the minutes as placed before it. before it. Thereafter, the Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon are as under: 1
Case No.:24/18/80ALC2/2010
Party Name:VOLTAS LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00277/AM11/ RLA File :03/95/040/00787/AM10/ Lic.No/Date:0310565255 18.03.2010 Defer Date:07.09.2010 Decision : NC noted that the application has been sent to DIPP for examination. The case was deferred for 07.09.2010. 2
Case No.:25/18/80ALC2/2010
Party Name:ATLAS COPCO (INDIA) LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00278/AM11/ RLA File :03/94/040/01007/AM10/ Lic.No/Date:0310568509 07.04.2010 Defer Date:07.09.2010 07.09.2010. 3
Case No.:17/18/80ALC2/2010
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00270/AM11/ RLA File :34/24/040/00010/AM11/ Lic.No/Date:3410026891 26.04.2010 Defer Date:07.09.2010
Decision : The committee noted that the firm’s application was forwarded to DIPP. However, it was decided to send a copy of application to C&PC also for their examination and comments, as the subject pertains to them. The case was deferred for 07.09.2010. 4
Case No.:29/18/80ALC2/2010
Party Name:VIJAY TRANSTECH PVT. LTD. Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00282/AM11/ RLA File :03/95/040/00118/AM11/ Lic.No/Date:0310575321 20.05.2010 Defer Date:07.09.2010 Decision : The committee noted that the case has been sent to DIPP for examination and comments. The case was deferred for 07.09.2010. 5
Case No.:18/18/80ALC2/2010
Party Name:NEWTON ENGINEERING AND CHEMICALS LTD, Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00271/AM11/ RLA File :34/24/040/00034/AM11/ Lic.No/Date:3410027089 28.05.2010 Defer Date:07.09.2010 07.09.2010. 6
Case No.:19/18/80ALC2/2010
Party Name:STARION INDIA P.LTD Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00272/AM11/ RLA File :31/24/040/00028/AM11/ Lic.No/Date:3110043412 31.05.2010 Defer Date:07.09.2010 07.09.2010. 7
Case No.:38/18/80ALC2/2010
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00291/AM11/ RLA File :04/24/040/00018/AM11/ Lic.No/Date:0410114141 31.05.2010 Defer Date:07.09.2010 Decision : On the recommendation of the representative of DHI, it was decided to call for the following information / clarification form the firm: 1. Serial No.5 & 11 of SDL for each export product separately. 2. Quantity of seamless and welded pipes separately both in weight and length for each type of steel i.e. CS, AS and SS. The firm may furnish information so as to reach before 07.09.2010. 8
Case No.:44/18/80ALC2/2010
Party Name:TRANTER INDIA PRIVATE LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00297/AM11/ RLA File :31/24/040/00045/AM11/ Lic.No/Date:3110043547 11.06.2010 Defer Date:07.09.2010 07.09.2010.
9
Case No.:4/13/80ALC2/2010
Party Name:MAGNETI MARELLI UM ELECTRONICS SYSTEMS PVT.LTD., Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00180/AM11/ RLA File :05/24/040/00100/AM11/ Lic.No/Date:0510266016 14.06.2010 Defer Date:07.09.2010 Decision : NC noted that the hard copy of the firm’s application has not been received from the RA. Accordingly, NC decided to remind RA to immediately forward the same for forwarding it further to DIPP for their examination and comments. The case was deferred for 07.09.2010. 10
Case No.:20/18/80ALC2/2010
Party Name:LLOYD ELECTRIC & ENGG. LTD. Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00273/AM11/ RLA File :05/23/040/00056/AM11/ Lic.No/Date:0510266063 15.06.2010 Defer Date:07.09.2010 07.09.2010. 11
Case No.:15/18/80ALC2/2010
Party Name:INDUS PRO AUTO ENGINEERS PVT.LTD. Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00268/AM11/ RLA File :05/23/040/00054/AM11/ Lic.No/Date:0510266316 17.06.2010 Defer Date:07.09.2010 Decision : NC noted that the application has been sent to DIPP for examination. It was decided to forward a copy of application to DHI also for their examination and comments. The case was deferred for 07.09.2010. 12
Case No.:16/18/80ALC2/2010
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00269/AM11/ RLA File :61/24/040/00023/AM11/ Lic.No/Date:6110000459 17.06.2010 Defer Date:07.09.2010 Decision : NC noted that the application has been sent to DHI for examination. It was decided to forward a copy of application to DIPP also for their examination and comments. The case was deferred for 07.09.2010. 13
Case No.:26/18/80ALC2/2010
Party Name:VEE KAY VIKRAM & CO Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00279/AM11/ RLA File :08/24/040/00101/AM10/ Lic.No/Date:0810089805 17.06.2010 Defer Date:07.09.2010 Decision : The committee noted that the application has been sent to C&PC and decided remind them for expediting their comments. The case was deferred for 07.09.2010. 14
Case No.:30/18/80ALC2/2010
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00283/AM11/ RLA File :07/24/040/00080/AM11/ Lic.No/Date:0710072309 17.06.2010 Defer Date:07.09.2010
Decision : NC noted that the application has been sent to DHI for examination. It was decided to forward a copy of application to DIT also for their examination and comments. The case was deferred for 07.09.2010. 15
Case No.:31/18/80ALC2/2010
Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00284/AM11/ RLA File :03/95/040/00211/AM11/ Lic.No/Date:0310579476 18.06.2010 Defer Date:07.09.2010 07.09.2010. 16
Case No.:14/18/80ALC2/2010
Party Name:AUXEIN MEDICAL Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00267/AM11/ RLA File :05/23/040/00062/AM11/ Lic.No/Date:0510266901 24.06.2010 Defer Date:07.09.2010 Decision : The committee noted that the firm’s application forwarded to DHI & DC(MSME). It was decided to forward a copy of the application to DIPP also for examination and comments. The case was deferred for 07.09.2010. 17
Case No.:28/18/80ALC2/2010
Party Name:BECTON DICKINSON INDIA PRIVATE LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Approved HQ File :01/80/050/00281/AM11/ RLA File :05/23/040/00069/AM11/ Lic.No/Date:0510266995 28.06.2010 Decision : It was decided to ratify the norms as recommended in advance authorization No.0510263911 dt.07.05.2010 by NC in its meeting No.14/11 dt.20.07.2010. RA may take necessary action accordingly. 18
Case No.:40/18/80ALC2/2010
Party Name:BOYSEN INDIA LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00293/AM11/ RLA File :05/23/040/00077/AM11/ Lic.No/Date:0510267549 05.07.2010 Defer Date:07.09.2010 Decision : On the recommendation of the representative of DHI, it was decided to call for the following information / clarification form the firm: 1. Sl. No.5, 6 & 11 of SDL export product wise. 2. Export & Import product quantity in number. The case was deferred for 07.09.2010.
Case No.:41/18/80ALC2/2010
Party Name:CLYDE BERGEMANN INDIA PRIVATE LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00294/AM11/ RLA File :05/23/040/00080/AM11/ Lic.No/Date:0510267550 05.07.2010 Defer Date:07.09.2010
19 Decision : On the recommendation of the representative of DC(MSME) vide their UO Note No.30(131)/2010ME dated 05.08.2010, it was decided to call for the following information / clarification form the firm: 1. Drawing Specification, part list of list export product alongwith weight of each export product. 2. Process of Mfg with a process flow chart & stage wise wastage. 3. Mfg operations to be carried out on imported inputs indicating wastage at every stage. 4. Material Balancing & wastage justification. The firm may furnish information so as to reach before 07.09.2010. 20
Case No.:43/18/80ALC2/2010
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00296/AM11/ RLA File :05/23/040/00091/AM11/ Lic.No/Date:0510267552 05.07.2010 Defer Date:07.09.2010 Decision : NC noted that the firm’s application has been sent to DHI for examination and comments. The case was deferred for 07.09.2010. 21
Case No.:42/18/80ALC2/2010
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00295/AM11/ RLA File :05/23/040/00092/AM11/ Lic.No/Date:0510267568 06.07.2010 Defer Date:07.09.2010 Decision : NC noted that the firm’s application has been sent to DHI for examination and comments. The case was deferred for 07.09.2010. 22
Case No.:45/18/80ALC2/2010
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00298/AM11/ RLA File :06/24/040/00018/AM11/ Lic.No/Date:0610018429 07.07.2010 Defer Date:07.09.2010 Decision : The committee noted that the firm’s application has been forwarded to DHI / DC(MSME). However, it was decided to send a copy of application to M/o of Defence also for examination and comments. The case was deferred for 07.09.2010. 23
Case No.:47/18/80ALC2/2010
Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00300/AM11/ RLA File :06/24/040/00017/AM11/ Lic.No/Date:0610018428 07.07.2010 Defer Date:07.09.2010 Decision : The committee noted that the firm’s application has been forwarded to DC(MSME). However, it was decided to send a copy of application to M/o of Defence also for examination and comments. The case was deferred for 07.09.2010. 24
Case No.:39/18/80ALC2/2010
Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00292/AM11/ RLA File :04/24/040/00047/AM11/ Lic.No/Date:0410115365 08.07.2010 Defer Date:07.09.2010
07.09.2010. 25
Case No.:46/18/80ALC2/2010
Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00299/AM11/ RLA File :04/24/040/00044/AM11/ Lic.No/Date:0410115366 08.07.2010 Defer Date:07.09.2010 07.09.2010. 26
Case No.:1/18/80ALC2/2010
Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00254/AM11/ RLA File :05/24/040/00126/AM11/ Lic.No/Date:0510267954 12.07.2010 Defer Date:07.09.2010 Decision : NC noted that the hard copy of the firm’s application has not been received form the RA. Accordingly NC decided to remind RA to immediately forward the same for forwarding it further to DIPP 27
Case No.:2/18/80ALC2/2010
Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00255/AM11/ RLA File :34/24/040/00056/AM11/ Lic.No/Date:3410027487 12.07.2010 Defer Date:07.09.2010 Accordingly NC decided to remind RA to immediately forward the same for forwarding it further to DHI 28
Case No.:3/18/80ALC2/2010
Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00256/AM11/ RLA File :34/24/040/00057/AM11/ Lic.No/Date:3410027488 12.07.2010 Defer Date:07.09.2010 29
Case No.:4/18/80ALC2/2010
Party Name:ABB LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00257/AM11/ RLA File :07/24/040/00127/AM11/ Lic.No/Date:0710072847 12.07.2010 Defer Date:07.09.2010
Case No.:5/18/80ALC2/2010
Party Name:THERMAX LTD., Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred
30 HQ File :01/80/050/00258/AM11/ RLA File :31/24/040/00058/AM11/ Lic.No/Date:3110043947 13.07.2010 Defer Date:07.09.2010 31
Case No.:6/18/80ALC2/2010
Party Name:ASKAR MICRONS PVT. LTD. Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00259/AM11/ RLA File :07/24/040/00105/AM11/ Lic.No/Date:0710072866 13.07.2010 Defer Date:07.09.2010 32
Case No.:7/18/80ALC2/2010
Party Name:MCNALLY BHARAT ENGG. CO. LTD. Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00260/AM11/ RLA File :02/24/040/00057/AM11/ Lic.No/Date:0210144971 13.07.2010 Defer Date:07.09.2010 Decision : NC noted that the firm’s application has been sent to DHI for examination and comments. The case was deferred for 07.09.2010. 33
Case No.:8/18/80ALC2/2010
Party Name:MVS ENGINEERING LTD Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00261/AM11/ RLA File :05/24/040/00138/AM11/ Lic.No/Date:0510268101 13.07.2010 Defer Date:07.09.2010 for their examination and comments. The case was deferred for7.09.2010. 34
Case No.:9/18/80ALC2/2010
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00262/AM11/ RLA File :03/95/040/00155/AM11/ Lic.No/Date:0310583268 13.07.2010 Defer Date:07.09.2010 35
Case No.:10/18/80ALC2/2010
Party Name:MIKROTEK MACHINES LTD., Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00263/AM11/ RLA File :07/24/040/00102/AM11/ Lic.No/Date:0710072868 13.07.2010 Defer Date:07.09.2010
36
Case No.:11/18/80ALC2/2010
Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00264/AM11/ RLA File :61/24/040/00031/AM11/ Lic.No/Date:6110000468 13.07.2010 Defer Date:07.09.2010 37
Case No.:12/18/80ALC2/2010
Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00265/AM11/ RLA File :61/24/040/00032/AM11/ Lic.No/Date:6110000469 13.07.2010 Defer Date:07.09.2010 38
Case No.:52/18/80ALC2/2010
Party Name:TERUMO PENPOL LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00305/AM11/ RLA File :53/24/040/00011/AM11/ Lic.No/Date:5310010998 13.07.2010 Defer Date:07.09.2010 Accordingly NC decided to remind RA to immediately forward the same for forwarding it further to C&PC 39
Case No.:13/18/80ALC2/2010
Party Name:PRECIHOLE MACHINE TOOLS PVT. LTD., Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00266/AM11/ RLA File :03/95/040/00294/AM11/ Lic.No/Date:0310583509 14.07.2010 Defer Date:07.09.2010 Decision :On the recommendation of the representative of DHI, it was decided to call for the following information / clarification form the firm: 1. Sl. No. 11 of SDL The case was deferred for 07.09.2010. 40
Case No.:27/18/80ALC2/2010
Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00280/AM11/ RLA File :04/24/040/00081/AM11/ Lic.No/Date:0410115530 14.07.2010 Defer Date:07.09.2010
41
Case No.:21/18/80ALC2/2010
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00274/AM11/ RLA File :61/24/040/00029/AM11/ Lic.No/Date:6110000472 15.07.2010 Defer Date:07.09.2010 Decision : It was decided to call for legible copies of application from the firm. On receipt one copy is to be sent to DHI for examination and comments. The case was deferred for 07.09.2010. 42
Case No.:22/18/80ALC2/2010
Party Name:SAI DIVYA ENGINEERS Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00275/AM11/ RLA File :09/24/040/00047/AM11/ Lic.No/Date:0910042702 19.07.2010 Defer Date:07.09.2010 and DC(MSME) for their examination and comments. The case was deferred for 07.09.2010. 43
Case No.:23/18/80ALC2/2010
Party Name:MIPALLOY, Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00276/AM11/ RLA File :04/24/040/00089/AM11/ Lic.No/Date:0410115635 19.07.2010 Defer Date:07.09.2010 Decision : The committee noted that the firm’s application forwarded to DHI. It was decided to forward a copy application to DIPP also for examination and comments. The case was deferred for 07.09.2010. 44
Case No.:34/18/80ALC2/2010
Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00287/AM11/ RLA File :03/94/040/00347/AM11/ Lic.No/Date:0310584081 19.07.2010 Defer Date:07.09.2010 Decision : The committee noted that the firm’s application forwarded to DHI and DIT. It was decided to forward a copy of application to DIPP and also remind to DIT for their comments. The case was deferred for 07.09.2010. 45
Case No.:32/18/80ALC2/2010
Party Name:STOCK REDLER INDIA PRIVATE LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00285/AM11/ RLA File :07/24/040/00097/AM11/ Lic.No/Date:0710073084 20.07.2010 Defer Date:07.09.2010 Decision : The committee noted that the firm’s application forwarded to DIPP. It was decided to forward a copy of application to DHI also for examination and comments. The case was deferred for 07.09.2010. 46
Case No.:35/18/80ALC2/2010
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00288/AM11/ RLA File :03/95/040/00252/AM11/ Lic.No/Date:0310584232 20.07.2010 Defer Date:07.09.2010
47
Case No.:53/18/80ALC2/2010
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00306/AM11/ RLA File :09/24/040/00133/AM11/ Lic.No/Date:0910042746 20.07.2010 Defer Date:07.09.2010 48
Case No.:54/18/80ALC2/2010
Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00307/AM11/ RLA File :09/24/040/00138/AM11/ Lic.No/Date:0910042748 20.07.2010 Defer Date:07.09.2010 Accordingly, NC decided to remind RA to immediately forward the same for forwarding it further to DHI 49
Case No.:55/18/80ALC2/2010
Party Name:HTD HEAT TRACE(INDIA)PVT LTD. Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00308/AM11/ RLA File :09/24/040/00130/AM11/ Lic.No/Date:0910042767 20.07.2010 Defer Date:07.09.2010 50
Case No.:33/18/80ALC2/2010
Party Name:LUBI SUBMERSIBLES LTD Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00286/AM11/ RLA File :08/24/040/00084/AM11/ Lic.No/Date:0810090670 21.07.2010 Defer Date:07.09.2010 07.09.2010. 51
Case No.:36/18/80ALC2/2010
Party Name:PERMANENT MAGNETS LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00289/AM11/ RLA File :03/95/040/00274/AM11/ Lic.No/Date:0310584529 22.07.2010 Defer Date:07.09.2010 52
Case No.:37/18/80ALC2/2010
Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00290/AM11/ RLA File :03/95/040/00200/AM11/ Lic.No/Date:0310584600 22.07.2010 Defer Date:07.09.2010
53
Case No.:56/18/80ALC2/2010
Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Approved HQ File :01/80/050/00309/AM11/ RLA File :34/24/040/00093/AM11/ Lic.No/Date:3410027557 22.07.2010 Decision :Hardcopy of the application was not received. However, based on online data. It was decided to ratify the norms under GN4. RA may take action accordingly. 54
Case No.:48/18/80ALC2/2010
Party Name:THERMAX LTD., Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00301/AM11/ RLA File :31/24/040/00061/AM11/ Lic.No/Date:3110044086 23.07.2010 Defer Date:07.09.2010 55
Case No.:49/18/80ALC2/2010
Party Name:DIAMOND METAL SCREENS (P) LTD Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00302/AM11/ RLA File :07/24/040/00131/AM11/ Lic.No/Date:0710073159 26.07.2010 Defer Date:07.09.2010 07.09.2010. 56
Case No.:50/18/80ALC2/2010
Party Name:APEX TEST TECHNOLOGIES, Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00303/AM11/ RLA File :07/24/040/00083/AM11/ Lic.No/Date:0710073162 26.07.2010 Defer Date:07.09.2010 Decision : The committee noted that the firm’s application forwarded to DHI. It was decided to forward a copy application to DIPP also for examination and comments. The case was deferred for 07.09.2010. 57
Case No.:51/18/80ALC2/2010
Party Name:FREUDENBERG FILTRATION TECHNOLOGIES INDIA PVT.LTD. Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00304/AM11/ RLA File :31/24/040/00016/AM11/ Lic.No/Date:3110044106 26.07.2010 Defer Date:07.09.2010 and DC(MSME) for their examination and comments. The case was deferred for 07.09.2010.
58
Case No.:1/19/80ALC2/2010
Party Name:POLY MEDICURE LTD. Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00310/AM11/ RLA File :05/24/040/00154/AM11/ Lic.No/Date:0510269550 03.08.2010 Defer Date:07.09.2010 Accordingly NC decided to remind RA to immediately forward the same for forwarding it further to C&PC 59
Case No.:2/19/80ALC2/2010
Party Name:MICRON INSTRUMENTS PVT LTD Meet No/Date:19/80 ALC2/2010 10.08.2010 Status: Deferred HQ File :01/80/050/00311/AM11/ RLA File :05/24/040/00165/AM11/ Lic.No/Date:0510269599 03.08.2010 Defer Date:07.09.2010
Case No. A/R 78
M/s. Botil Oil Tools India Pvt. LTd., HQ F.No.01/80/50/00918/AM09/DESI Lic. No. & Date Meeting No.19/11 RLA No.05/24/040/00940/AM08 0510217768 dt.12.03.2008 Date: 10.08.2010 Revision of norms The committee noted that for similar case, the firm’s representative(s) have been called for P.H. on 17.08.2010. The committee therefore decided to defer the consideration of the case for 07.09.2010. However, it was decided that RA may be requested to include weight of export and import items in advance authorizations for such product.
Case No. A/R 79
M/s. Botil Oil Tools India Pvt. LTd., HQ F.No.01/80/50/01157/AM09/DESI Lic. No. & Date Meeting No.19/11 RLA No.05/24/040/00435/AM09 0510228787 dt.03.10.2008 Date: 10.08.2010 Revision of norms The committee noted that for similar case, the firm’s representative(s) have been called for P.H. on 17.08.2010. The committee therefore decided to defer the consideration of the case for 07.09.2010. However, it was decided that RA may be requested to include weight of export and import items in advance authorizations for such product.
Case No. A/R 80
M/s. Blue Star Ltd., Mumbai HQ F.No.01/80/50/00553/AM10/DESI Lic. No. & Date Meeting No.19/11 RLA No.03/94/040/00776/AM09 0310544095 dt.05.11.2009 Date: 10.08.2010 Amendment / correction of norms The case was deferred for 07.09.2010 for comments for DIPP.
Case No. A/R 81
M/s. Blue Star Ltd., Mumbai HQ F.No.01/80/50/00781/AM10/DESI Lic. No. & Date Meeting No.19/11 RLA No.03/94/040/00886/AM10 0310559418 dt.10.02.2010 Date: 10.08.2010 Amendment / correction of norms The case was deferred for 07.09.2010 for comments for DIPP.
Case No. A/R 82
M/s. Injectoplast Pvt. Ltd., Kanpur HQ F.No.01/80/50/00266/AM10/DESI Lic. No. & Date Meeting No.19/11 RLA No.06/24/040/00009/AM10 0610015869 dt.10.07.2009 Date: 10.08.2010 Ratification of norms The case was deferred for 07.09.2010 for comments for DHI.
Case No. A/R 83
M/s. IDMC Limited, Vithal Udyognagar HQ F.No.01/80/50/01154/AM09/DESI Lic. No. & Date Meeting No.19/11 RLA No.34/24/040/00073/AM09 3410022464 dt.03.10.2008 Date: 10.08.2010 Ratification of norms
Based on the recommendations of DHI, the Committee decided to ratify the norms as under: 1. Import of three Raw materials to be incorporated as 3067 kg with 3% wastage, as applied by the firm. 2. The description of export product may be amended to “Road Milk Tanke (Elliptical, double compartment) of capacity 9,000 liters weighing 7105 kg each”. RA may take necessary action accordingly.
Case No. A/R 84
M/s. Larson & Toubro LTd., HQ F.No.01/80/50/01664/AM09/DESI Lic. No. & Date Meeting No.19/11 RLA No.03/95/040/00828/AM09 0310501993 dt.09.01.2009 Date: 10.08.2010 Revision of norms The case was deferred for 07.09.2010 for comments of DHI
Case No. A/R 85
M/s. Macmet India Ltd., HQ F.No.01/80/50/00480/AM09/DESI Lic. No. & Date Meeting No.19/11 RLA No.02/24/040/00032/AM09 0210113458 dt.11.06.2008 Date: 10.08.2010 Ratification of norms The case was deferred for 07.09.2010 for comments of DHI.
Case No. A/R 86
M/s. Filter Manufacturing Industries Pvt. LTd., Kolkata HQ F.No.01/80/50/00381/AM09/DESI Lic. No. & Date Meeting No.19/11 RLA No.02/24/040/00054/AM06 0210079402 dt.22.06.2005 Date: 10.08.2010 Ratification of norms It was noted that the representation has been sent to DIPP for examination and the case was deferred for 07.09.2010.
Case No. A/R. 87
M/s. GEA BGR Energy Systems Ltd., Chennai HQ F.No.01/80/50/01801/AM09/DES.I Lic.No. & Date Meeting No.19/11 RA.F.No.04/24/040/00260/AM09 0410102466 dt.19.02.2009 Date: 10.08.2010 Ratification of norms. The committee noted that the firm had been called for P.H. and that the firm has requested for another date for P.H. It was also observed that the firm is in habit of furnishing incomplete information and thus the committee expressed its concern on this issue. After discussion it was decided to call the firm for P.H. on 07.09.2010. The firm’s representative may be asked to come alongwith all deficient information. It was decided that in the P.H. letter, all the deficient information may be mentioned.
Case No. A/R 88
M/s. Botil Oil Tools India Pvt. LTd., HQ F.No.01/80/50/00512/AM10/DESI Lic. No. & Date Meeting No.19/11 RLA No.05/23/040/00093/AM10 0510252255 dt.10.11.2009 Date: 10.08.2010 Revision of norms The committee noted that for similar case, the firm’s representative(s) have been called for P.H. on 17.08.2010. The committee therefore decided to defer the consideration of the case for 07.09.2010. However, it was decided that in the meantime RA may be directed to include weight of export and import items in advance authorizations for such product.
Case No. A/R 89
M/s. Botil Oil Tools India Pvt. LTd., HQ F.No.01/80/50/00648/AM10/DESI Lic. No. & Date Meeting No.19/11 RLA No.05/23/040/00145/AM10 0510255715 dt.06.01.2010 Date: 10.08.2010 Revision of norms The committee noted that for similar case, the firm’s representative(s) have been called for P.H. on 17.08.2010. The committee therefore decided to defer the consideration of the case for 07.09.2010. However, it was decided that in the meantime RA may be directed to include weight of export and import items in advance authorizations for such product.
Case No. A/R 90
M/s. Botil Oil Tools India Pvt. LTd., HQ F.No.01/80/50/00535/AM10/DESI Lic. No. & Date Meeting No.19/11 RLA No.05/23/040/00099/AM10 0510252923 dt.19.11.2009 Date: 10.08.2010 Revision of norms
The committee noted that for similar case, the firm’s representative(s) have been called for P.H. on 17.08.2010. The committee therefore decided to defer the consideration of the case for 07.09.2010. However, it was decided that in the meantime RA may be directed to include weight of export and import items in advance authorizations for such product. S.No.152
Case No. A/R. 116
M/s. GEA BGR Energy Systems Ltd., Chennai HQ F.No.01/80/50/01284/AM09/DES.I Lic.No. & Date Meeting No.19/11 RA.F.No04/24/040/00197/AM09 0410099963 dt.12.11.2008 Date: 10.08.2010 Ratification of norms. The committee noted that the firm had been called for P.H. and that the firm has requested for another date for P.H. It was also observed that the firm is in habit of furnishing incomplete information and thus the committee expressed its concerned on this issue. After discussion it was decided to call the firm for P.H. on 07.09.2010. The firm’s representative may be asked to come alongwith all deficient information. It was decided that in the P.H. letter, all the deficient information may be mentioned. ******