IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2011-04-19

DGFT Committee Minutes

Document text

RATIFIED   Minutes of Meeting No.02/12 scheduled on 19.04.2011 of Norms Committee(NC­I) (DES.I Section)   The meeting No. 02/12 of the Norms Committee (NC­I) for the licensing year 2011­2012 was held on 19.04.2011  under  the  Chairmanship  of  Sh.  N.P.S.  Monga,  Additional    Director  General  of  Foreign  Trade  to consider  the  applications  under  Duty  Exemption  /  Remission  Schemes  (Chapter­4)  of  Foreign  Trade  Policy 2009–2014 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 ALC, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. A.K. Mishra, AIA   23063332 M/o Steel, U.B. 5. Sh. G. Parthasarthi, Dy.DGFT 312 23061563 Extn.301 DGFT, U.B. 6. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.   I –The ALC considered the individual cases of the agenda of this meeting generated through the online system of NIC. The decisions taken thereon were as under: ­ 1

Case No.:36/42/80­ALC2/2008

Party Name:THERMAX LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/01660/AM09/ RLA File :31/24/040/00274/AM09/ Lic.No/Date:3110036910 06.01.2009   Decision : As per written comments of DHI received vide their U.O. Note No.3(14)/10­TSW(B)/158  dated 01/06.04.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export Total export weight is 950.7 MT to be incorporated in the license. Import The firm has requested for deletion of import item no 9,12,13,16,17 & 24 to 26 & 28. The same may be agreed. The firm has indicated “nil” wastage at Appendix 11A of the application. Hence this Office has not considered any wastage on raw material. 1.        Item no 1­ Allowed import of 16.47 MT of length 2636 meters without wastage. The tube OD is 50.8 mm & 5 mm thick to be incorporated in the license. 2.      Item no 2­ Allowed import of 7332 kg of length 311.6 meters without wastage. 3.        Item no 3­ Allowed import of 271.453 MT of length 76896 meters without wastage. The tube OD is 38.1 mm & 4 mm thick to be incorporated in the license.

4.        Item no 4­ Allowed import of 167.374 kg of length 1720.2 meters without wastage. 5.        Item no 5 – These are components. Allowed under GN­4. However the import weight is 89.97 MT to be incorporated in the license along with quantity in number. 6.        Item no 6 – These are components. Allowed under GN­4. However the import weight is 19.965 MT may be incorporated in the license along with quantity in number. 7.        Item no 7 – These are components. Allowed under GN­4. However the import weight is 4380 kg to be incorporated in the license along with quantity in number. 8.        Item no 8 – These are components. Allowed under GN­4. However the import weight is 16.96 MT to be incorporated in the license along with quantity in number. 9.        Item no 10 – These are components. Allowed under GN­4. However the import weight is 8.5 MT to be incorporated in the license along with quantity in number. 10.    Item no 11, 15,18 to 21,27, 29 to 31­ This is a component & to be allowed under GN­4. 11.    Item no 22,23 & 30 are in sets ­The items are deleted because quantity is unspecified and it does not have appropriate units. 12.     Item no 14­ This is a welding consumables. The firm has applied for 500 kg.  May be allowed as applied for.   The Regional Authority may take necessary action accordingly   2

Case No.:3/37/80­ALC2/2009

Party Name:S.M.PULP PACKAGING PVT.LTD Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00562/AM10/ RLA File :05/24/040/00378/AM10/ Lic.No/Date:0510253563 27.11.2009 Defer Date: 31.05.2011 Decision : The Committee noted that reminder has been sent to the Ministry of Defence and decided  to await the firm’s reply. The case may be re­listed on 31.05.2011.   3

Case No.:26/39/80­ALC2/2010

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00828/AM11/ RLA File :07/24/040/00483/AM10/ Lic.No/Date:0710070683 26.03.2010   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  19.04.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.            Quantities of import items at S.No.1 to 20 to be allowed as 52.35 Kgs., 33.874 Kgs., 6.681 Kgs., 29.189 Kgs., 30.16 Kgs., 416.66 Kgs., 1.11 Kgs,   1.11 Kgs,  25.76 Kgs,  84.683 Kgs,  84.683 Kgs,   133.09 Kgs,   11.232 Kgs,   3.038 Kgs,   0.326 Kgs,   22.691 Kgs,   22.691 Kgs,   4.334 Kgs,  16.01 Kgs,   & 39.01 Kgs. respectively  inclusive  of 240 % wastage after taking 20 %  recovery.   The Regional Authority may take necessary action accordingly.   4

Case No.:3/11/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00149/AM11/ RLA File :04/24/040/00012/AM11/ Lic.No/Date:0410113741 12.05.2010 Defer Date: 31.05.2011 Decision : The Committee noted that D.L. for  import item No. 3 & 4 were sought in view of  written comments of DHI received vide U.O. note No. 3(74)/10­TSW(B)/62 dated 18.01.2011.  Now the reply of the firm has been received. The Committee, therefore, decided to forward a copy of  firm’s reply dated 08.04.2011 to DHI for examination &  comments.  The case may be re­listed on 31.05.2011.

5

Case No.:4/11/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00150/AM11/ RLA File :04/24/040/00011/AM11/ Lic.No/Date:0410113742 12.05.2010 Defer Date: 31.05.2011 Decision : The Committee noted that D.L. for  import item No. 15 & 17 were sought in view of  written comments of DHI received vide U.O. note No. 3(74)/10­TSW(B)/62 dated 18.01.2011.  Now the reply of the firm has been received. The Committee, therefore, decided to forward a copy of firm’s reply dated 08.04.2011 to DHI for examination & comments.  The case may be re­listed on 31.05.2011.   6

Case No.:12/15/80­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Rejected HQ File :01/80/050/00219/AM11/ RLA File :03/94/040/00167/AM11/ Lic.No/Date:0310574388 14.05.2010   Decision : The Committee decided to reject the case on the ground that the firm did not furnish any reply with  reference  to  this  office  letter  dated  09.09.2010  and  subsequent  reminder  dated  12.10.10  and 22.03.2011  calling  for  certain  information,  in  the  absence  of  which,  it  was  not  possible  to  decide  the requirement of inputs.      7

Case No.:41/18/80­ALC2/2010

Party Name:CLYDE BERGEMANN INDIA PRIVATE LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00294/AM11/ RLA File :05/23/040/00080/AM11/ Lic.No/Date:0510267550 05.07.2010 Defer Date: 31.05.2011 Decision  :  The  Committee  noted    the  written  comments  of    DHI  received  vide  their  U.O.  Note  No. 3(30)/08­TSW(B)/155 dated 11.03.2011 wherein it was observed that firm claimed 25% to 40% wastage on  8  raw  materials  but  failed  to  justify  the  wastage  involved  in  the  processing  of  raw  materials.  The Committee deliberated the details of the case and decided to advise the firm to appear before the NC in person along with  technical expert to explain their case with full facts of the case. The case may be relisted on  31.05.2011.  

Case No.:5/18/80­ALC2/2010

Party Name:THERMAX LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00258/AM11/ RLA File :31/24/040/00058/AM11/ Lic.No/Date:3110043947 13.07.2010

8 Decision : As per written comments of DHI received vide their U.O. Note No.3(14)/10­TSW(B)/207  dated 01/06.04.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Export The Total export weight is 356.18 MT to be incorporated in the license.   Import 1.       Item no 2 to 8­ The firm has amended the requirement of some of the items as per the calculation given. Allowed 2% wastage on the net quantity given by the firm at annexure 1 of their reply of dated 12­11­10. & the same to be incorporated in the license along with quantity in meters already in the license. 2.             Item no 1­ Deleted the item as the firm has not given calculation for the same (Item no 8 of calculation of reply). 3.       Item no 9 to 17­ These are components & may be allowed under GN­4. 4.       Item no 18 to 20­ These are welding material. The quantity applied is reasonable.  Allowed as applied for.     9

Case No.:24/22/80­ALC2/2010

Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00335/AM11/ RLA File :05/23/040/00106/AM11/ Lic.No/Date:0510268585 21.07.2010 Defer Date: 31.05.2011 Decision : The Committee noted the written comments of DHI received  vide U.O. Note No. 3(123)/10­ TSW(B)187 dated 29/30/03/2011that the firm has replied vide their letter dated 25.11.10  & 03.01.2011 which is incomplete.  The firm has applied for export of 51 ton with import of 6.5 ton. Export weight was subsequently  amended  to  19  Mt  with  import  3  MT  without  changing  import  list.    The  Committee, therefore, decided to ask  the firm to furnish the following information/clarification:­   1. Copy of purchase order. 2. Break up of indigenous item with value.(Value Addition is very low) 3. Sl no 11 of SDL .    The case may be relisted on 31.05.3011.  

Case No.:48/18/80­ALC2/2010

Party Name:THERMAX LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00301/AM11/ RLA File :31/24/040/00061/AM11/ Lic.No/Date:3110044086 23.07.2010

10 Decision : As per written comments of DHI received vide their U.O. Note No.3(14)/10­TSW(B)/208  dated 01/06.04.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­ Export Total export weight is 578.66 MT may be incorporated in the license.   Import 1.       Item no 1 to 5­ These are different types of pipes. The firm has amended the quantity of import drastically.  Allowed 2% wastage on the net quantity given by the firm at annexure 1 of their reply of  dated  12­11­10  &  the  same  to  be  incorporated  in  the  license  along  with  quantity  in  meters already in the license. 2.       Item no 6, 8 & 9­ This is a component &  allowed under GN­4. 3.       Item no 7­ The firm has amended requirement to 56991 kg with 2% wastage. We may agree to firm’s request.     11

Case No.:43/31/80­ALC2/2010

Party Name:KINETIC ENGINEERING LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00521/AM11/ RLA File :31/24/040/00090/AM11/ Lic.No/Date:3110044615 06.09.2010   Decision : The Committee deliberated & noted  the written comments of DHI received vide their U.O. Note No.3(93)/09­TSW(B)/180  dated  23.03.2011 that the firm has sought wastage 5% in Appendix ­11A of application, the actual imports are the multiples of the export item.   The Committee, therefore, decided to  ratify  the  norms  of  import  in  respect  of  the  subject  advance  authorization  under  GN­4  without  any wastage.     12

Case No.:4/25/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00394/AM11/ RLA File :53/24/040/00015/AM11/ Lic.No/Date:5310011323 08.09.2010 Defer Date: 31.05.2011 Decision  :  The  Committee  noted  that  C&PC  has  been  reminded  on  24.03.2011  for  comments.  The  Committee, therefore, decided to await the comments of C&PC.  The case may be relisted on 31.05.2011.   13

Case No.:18/29/80­ALC2/2010

Party Name:DENSO HARYANA PVT. LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00453/AM11/ RLA File :05/23/040/00131/AM11/ Lic.No/Date:0510272444 09.09.2010 Defer Date: 31.05.2011 Decision  :  The  Committee  observed  that  the  firm  has  not  replied  to  this  office  letter  (D.L.)  dated 22.03.2011  calling  for  certain  information.  The  Committee,  therefore,  decided  to  remind  the  firm  for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 31.05.2011.  

Case No.:17/33/80­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Rejected

14 HQ File :01/80/050/00573/AM11/ RLA File :09/24/040/00223/AM11/ Lic.No/Date:0910043468 09.09.2010   with  reference  to  this  office  letter  dated  24.12.2010  and  subsequent  reminder  dated  10.02.11  and 22.03.2011  calling  for  certain  information,  in  the  absence  of  which,  it  was  not  possible  to  decide  the requirement of inputs.      15

Case No.:6/25/80­ALC2/2010

Party Name:KERN­LIEBERS SPRINGS & STAMPINGS PVT.LTD, Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Rejected HQ File :01/80/050/00396/AM11/ RLA File :07/24/040/00188/AM11/ Lic.No/Date:0710074164 14.09.2010   with reference to this office letter dated 24.12.2010 and giving sufficient time given after their letter dated 27.01.2011. In the absence of which, it was not possible to decide the requirement of inputs.      16

Case No.:5/29/80­ALC2/2010

Party Name:PRABHA EXPORTS(P) LTD Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Closed HQ File :01/80/050/00440/AM11/ RLA File :03/95/040/00425/AM11/ Lic.No/Date:0310594357 29.09.2010   Decision :  The Committee noted that the firm has surrendered the license to R.A., Mumbai vide their letter dated 31.03.2011.  The Committee, therefore, decided to close the case on the part of NC.   The Regional Authority may take note of the NC decision for information.   17

Case No.:28/33/80­ALC2/2010

Party Name:WUERTH ELEKTRONIK INDIA PRIVATE LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00584/AM11/ RLA File :07/24/040/00233/AM11/ Lic.No/Date:0710074556 01.10.2010   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  19.04.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.      Quantities of import items from  Sl. No. 1 to 10, 16 & 17 to be allowed on net to net basis. Accordingly, quantities of import items at Sl. Nos. 3, 4, 8, 9, 10 & 16 may be reduced as 78676 Nos., 423640  Nos., 43076 Nos., 3560 Nos., 3560 Nos. & 712  Nos. respectively. 2.      Quantity of import item at Sl. No. 12 to be reduced as 356 Nos. 3.           Quantities of import items from  Sl. No. 11 to 15 to be allowed as applied for as 1.05 Sqmtrs./Sq.mtrs. content in the export product. 4.      Import items at Sl. Nos. 18 & 19 put together to be allowed within  2 % of FOB value of exports.  

18

Case No.:16/33/80­ALC2/2010

Party Name:C K INDUSTRIES Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00572/AM11/ RLA File :34/24/040/00163/AM11/ Lic.No/Date:3410028224 07.10.2010 Defer Date: 31.05.2011 Decision  :  The  Committee  noted  that  the  reply  submitted  by  the  firm  is  not  complete.  On  the recommendation of the representative of DIPP present in the meeting, the Committee decided to call for the following information/clarification from the firm and to re­list the case on  31.05.2011: ­           1. Separate quantities of each of the four precision turned parts namely PD 1337, PD 2123, PD 1843 & PD 2386 in Nos.   19

Case No.:41/29/80­ALC2/2010

Party Name:SHREE GAYATRI HEALDS MFG. CO. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00476/AM11/ RLA File :52/24/040/00018/AM11/ Lic.No/Date:5210032162 08.10.2010 Defer Date: 31.05.2011 Decision  :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  DIPP/DC(MSME)  for  examination  and submission of comments. The case may be re­listed on 31.03.2011   20

Case No.:27/33/80­ALC2/2010

Party Name:TEMA INDIA LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Rejected HQ File :01/80/050/00583/AM11/ RLA File :03/95/040/00543/AM11/ Lic.No/Date:0310596007 08.10.2010   with  reference  to  this  office  letter  dated  23.12.2010  and  subsequent  reminders  dated  10.02.11  and 23.03.2011  calling  for  certain  information,  in  the  absence  of  which,  it  was  not  possible  to  decide  the requirement of inputs.      21

Case No.:25/33/80­ALC2/2010

Party Name:R.D.ENGINEERS (INDIA) PVT.LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00581/AM11/ RLA File :03/95/040/00557/AM11/ Lic.No/Date:0310596998 14.10.2010   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  19.04.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.   Total net empty weight of export products may be specified as  243.203 MT. 2.   Word “Relevant” may be prefixed with the description of import item and its quantity may be allowed as  107.487 MT on net to net basis as claimed by the firm.  

22

Case No.:16/2/80­ALC2/2011

Party Name:PNEUMAX PNEUMATIC INDIA PVT.LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00937/AM11/ RLA File :07/21/040/00491/AM11/ Lic.No/Date:0710074822 14.10.2010 Defer Date: 31.05.2011 Decision  :The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  DHI  for  examination  and  submission  of comments. The case may be re­listed on 31.03.2011.     23

Case No.:18/33/80­ALC2/2010

Party Name:HIND HIGH VACUUM COMPANY PVT LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00574/AM11/ RLA File :07/24/040/00285/AM11/ Lic.No/Date:0710074989 22.10.2010 Defer Date: 31.05.2011 Decision : The representative of the DIPP informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 31.05.2011.   24

Case No.:24/33/80­ALC2/2010

Party Name:TEMA INDIA LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Rejected HQ File :01/80/050/00580/AM11/ RLA File :03/95/040/00582/AM11/ Lic.No/Date:0310598467 25.10.2010   with  reference  to  this  office  letter  dated  23.12.2010  and  subsequent  reminder  dated  10.02.11  and 24.03.2011  calling  for  certain  information,  in  the  absence  of  which,  it  was  not  possible  to  decide  the requirement of inputs.      25

Case No.:8/41/81­ALC2/2010

Party Name:AUTO COMP INDIA PVT. LTD Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/81/050/00427/AM11/ RLA File :31/24/040/00130/AM11/ Lic.No/Date:3110045269 28.10.2010   Decision :  As  per  written  comments  of  DHI  received  vide  their  U.O.  Note  No.3(77)/10­TSW(B)/574  dated    02.12.2010,    the  Committee  decided  to  ratify  the  norms  of  import  item  on  repeat  basis  as  per Advance Authorization License No. 3110043464 dated 02.06.2010 in Meeting No. 1/12 dated 05.04.2011 in respect of the subject advance authorization as under:­   “Import of f 100 MT as applied for with 42% wastage in  respect to out put.  However, the description of import may be amended to “Carbon Steed seamless Tubes”.     26

Case No.:21/33/80­ALC2/2010

Party Name:VOLVO BUSES INDIA PVT.LTD, Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00577/AM11/ RLA File :07/24/040/00296/AM11/ Lic.No/Date:0710075184 01.11.2010 Defer Date: 31.05.2011

Decision  :  The  Committee  noted  that  some  information  has  been  sought  for  DHI  from  the  firm  on 22.03.3011.  The  Committee,  therefore,  decided  to  await  the  firm’s  reply  and  to  re­list  the  case  on 31.05.2011.   27

Case No.:10/33/80­ALC2/2010

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00566/AM11/ RLA File :05/23/040/00161/AM11/ Lic.No/Date:0510276220 02.11.2010 Defer Date: 31.05.2011 Decision : The representative of the DC(MSME) informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 31.05.2011.   28

Case No.:20/33/80­ALC2/2010

Party Name:BIRLA ERICSSON OPTICAL LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00576/AM11/ RLA File :11/24/040/00051/AM11/ Lic.No/Date:1110023479 02.11.2010 Defer Date: 31.05.2011 Decision  :  The  Committee  noted  that  some  information  has  been  sought  by  DIT  from  the  firm  on 22.03.3011.  The  Committee,  therefore,  decided  to  await  the  firm’s  reply  and  to  re­list  the  case  on 31.05.2011.   29

Case No.:38/36/80­ALC2/2010

Party Name:RUBAMIN LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00737/AM11/ RLA File :34/24/040/00195/AM11/ Lic.No/Date:3410028521 04.11.2010   Decision : The Committee deliberated the written comments of DC(MSME) received vide their U.O. Note No.30(191)/2010­ME dated 19.04.2011 and noted that wastage claimed by the firm is below the wastage recommended in earlier cases by the sub­Committee in case of M/s Nicomet Industries Ltd., Mumbai.  The Committee also observed that earlier few authorizations were ratified by the Norms Committee based upon the sub­Committee report, wherein the imported input which were Cobalt Concentrate, was allowed with 9.06% wastage i.e. @ 1.0963 Kg./Kg content of cobalt in cobalt concentrate. Whereas in its application, the firm  has  applied  for  intermediate  products  of  cobalt  metallurgy  with  7.5%.wastage.  The  Committee, therefore, decided to ratify the norms in respect of the subject advance authorization allow import items  with 7.5% wastage.     30  

Case No.:39/36/80­ALC2/2010

Party Name:SHARP TANKS AND STRUCTURALS PVT.LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00738/AM11/ RLA File :03/95/040/00637/AM11/ Lic.No/Date:0310600483 08.11.2010 Defer Date: 31.05.2011 Decision  :  The  Committee  noted  that  some  information  has  been  sought  for  DIPP  from  the  firm  on 22.03.3011.    The  Committee,  therefore,  decided  to  await  the  firm’s  reply  and  to  re­list  the  case  on 31.05.2011.  

Case No.:2/33/80­ALC2/2010

Party Name:LIEBHERR MACHINE TOOLS (I) PVT LTD Meet No/Date:2/80­ ALC2/2011 1069.04.2011 Status: Closed

31 HQ File :01/80/050/00558/AM11/ RLA File :07/24/040/00301/AM11/ Lic.No/Date:0710075512 19.11.2010   Decision : The Committee noted that RA vide their letter dated 01.03.2011 has issued subject authorization for import of components on net­to­net basis with accountability  as per GN­4.  The Committee therefore decided to treat  the case as closed on the part of NC.   The Regional Authority may take note of the NC decision for information.   32

Case No.:3/33/80­ALC2/2010

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00559/AM11/ RLA File :03/95/040/00615/AM11/ Lic.No/Date:0310602242 22.11.2010 Defer Date: 31.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and 31.05.2011.   33

Case No.:27/36/80­ALC2/2010

Party Name:TIMKEN INDIA LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Rejected HQ File :01/80/050/00726/AM11/ RLA File :02/24/040/00150/AM11/ Lic.No/Date:0210150897 23.11.2010   with reference to this office letter dated 10..02.2011 and subsequent reminder dated 23.03.11 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.      34

Case No.:8/33/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00564/AM11/ RLA File :07/24/040/00328/AM11/ Lic.No/Date:0710075606 24.11.2010 Defer Date: 31.05.2011 Decision :  The Committee noted that based on D.L. from DC(MSME), some information has been sought from the firm vide this office letter dated 15.03.2011.  The Committee therefore decided to await the firm’s reply and to re­list the case on 31.05.2011.   35

Case No.:9/33/80­ALC2/2010

Party Name:ZENITH PRECISION PVT LTD ., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00565/AM11/ RLA File :07/24/040/00329/AM11/ Lic.No/Date:0710075610 24.11.2010 Defer Date: 31.05.2011 Decision : The Committee noted that based on D.L. from DC(MSME), some information has been sought from the firm vide this office letter dated 05.04.2011.  The Committee therefore decided to await the firm’s reply and to re­list the case on 31.05.2011.  

Case No.:11/33/80­ALC2/2010

Party Name:SCHOTT KAISHA PRIVATE LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved

36 HQ File :01/80/050/00567/AM11/ RLA File :03/95/040/00680/AM11/ Lic.No/Date:0310602719 24.11.2010   Decision : As per written comments of  DC(MSME) vide their U.O. Note No. 25(1)/S.E.O.N/Ka.Mr. dated 15.02.2010 the Committee decided to ratify the norms in respect of the subject advance authorization on repeat  basis  as  per  firm’s  Advance  Authorization  No.0310384276  dated  13.06.2006  ratified  in  Norms Committee Meeting No. 16/82 dated 19.07.2006 & Advance Authorization No. 0310606206 dated 14.12.2010  Meeting No. 38/11 dated 22.02.2011 as under:­        The I/O norms for the export product Glass Cartridges for use in Dental/Pen    injectors/Auto injectors in various Capacities Sterile or Non Sterile is fixed  as per norms for the SION at S.No. A­1034 for the purpose of para 4.7 of H.B.P. only.     37

Case No.:12/33/80­ALC2/2010

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00568/AM11/ RLA File :05/23/040/00236/AM11/ Lic.No/Date:0510277816 24.11.2010 Defer Date: 31.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and 31.05.2011   38

Case No.:13/33/80­ALC2/2010

Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00569/AM11/ RLA File :05/23/040/00237/AM11/ Lic.No/Date:0510277817 24.11.2010 Defer Date: 31.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and 31.05.2011   39

Case No.:29/33/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Rejected HQ File :01/80/050/00585/AM11/ RLA File :04/24/040/00214/AM11/ Lic.No/Date:0410119184 25.11.2010   with reference to this office letter dated 10.02.2011 and subsequent reminder dated 22.03.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.      40

Case No.:30/36/80­ALC2/2010

Party Name:TEMA INDIA LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Rejected HQ File :01/80/050/00729/AM11/ RLA File :03/95/040/00704/AM11/ Lic.No/Date:0310603295 26.11.2010

with reference to this office letter dated 10.02.2011 and subsequent reminder dated  24.03.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.      41    

Case No.:35/36/80­ALC2/2010

Party Name:ANAND EXPORTS Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00734/AM11/ RLA File :06/24/040/00042/AM11/ Lic.No/Date:0610019975 06.12.2010 Defer Date: 31.05.2011 Decision : The Committee decided to call for the following information as on written comments of DHI’s  letter dated 13.12.2011 from the firm and to re­list the case on  31.05.2011:­   1.   Manufacturing process of the export product.       2      .Roughness of import vis­a­vis export   42

Case No.:62/35/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00689/AM11/ RLA File :03/94/040/00823/AM11/ Lic.No/Date:0310605374 09.12.2010 Defer Date: 31.05.2011 Decision : The Committee noted that the firm’s has been reminded on 25.03.2011 to furnish their reply to DIT.  The Committee, therefore, decided to await their reply and to relist the case on 31.05,2011.   43

Case No.:22/36/80­ALC2/2010

Party Name:BIO ­ TECH VISION CARE PVT.LTD Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00721/AM11/ RLA File :08/24/040/00264/AM11/ Lic.No/Date:0810094482 09.12.2010 Defer Date: 31.05.2011 Decision  :    The  Committee  noted  that  the  C&PC  have  been  reminded  on  23.03.2011  to  furnish  their comments.  The Committee therefore, decided to await their comment and to relist the case on 31.03.2011.   44

Case No.:28/36/80­ALC2/2010

Party Name:RUBAMIN LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00727/AM11/ RLA File :34/24/040/00221/AM11/ Lic.No/Date:3410028777 10.12.2010   Decision : The Committee deliberated the written comments of DC(MSME) received vide their U.O. Note No.30(191)/2010­ME dated 19.04.2011 and noted that wastage claimed by the firm is below the wastage recommended in earlier cases by the sub­Committee in case of M/s Nicomet Industries Ltd., Mumbai.  The Committee also observed that earlier few authorizations were ratified by the Norms Committee based upon the sub­Committee report, wherein the imported input which were Cobalt Concentrate, was allowed with 9.06% wastage i.e. @ 1.0963 Kg./Kg content of cobalt in cobalt concentrate. Whereas in its application, the firm  has  applied  for  intermediate  products  of  cobalt  metallurgy  with  7.5%.wastage.  The  Committee, therefore, decided to ratify the norms in respect of the subject advance authorization allow import items  with 7.5% wastage.  

45

Case No.:21/36/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00720/AM11/ RLA File :04/24/040/00233/AM11/ Lic.No/Date:0410119698 13.12.2010 Defer Date: 31.05.2011 Decision :The representative of the DHI informed the Committee that they received the firm’s reply and 31.05.2011.   46

Case No.:26/36/80­ALC2/2010

Party Name:KONE ELEVATOR INDIA PVT LTD Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00725/AM11/ RLA File :04/24/040/00227/AM11/ Lic.No/Date:0410119695 13.12.2010   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  19.04.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.      Description of Export product to be modified as  “ Elevator/Lift              Model No. B­MONO­GREEN PW15/10­19 –Quantity 5 Nos.” 2.      “UOM” of import items at Sl. No. 4 & 5 to be modified to “Number” 3.      Word “relevant” to be prefixed with the description of import items at Sl. Nos. 22 & 23. 4.      Import items from S.No.1 to 23 to be allowed on net to net basis with accountability clause     47

Case No.:31/36/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00730/AM11/ RLA File :04/24/040/00237/AM11/ Lic.No/Date:0410119699 13.12.2010 Defer Date: 31.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and 31.05.2011.   48

Case No.:15/39/80­ALC2/2010

Party Name:KONECRANES INDIA  PRIVATE LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00817/AM11/ RLA File :31/21/040/00243/AM11/ Lic.No/Date:3110045890 13.12.2010 Defer Date: 31.05.2011 Decision : The Committee deliberated  the written comments of DIPP received vide their U.O. Note No.  dated  19.04.2011 and decided to seek a clarification from the firm regarding  Import of “Documents”  at  S.No.7, 14, 21, 28, 35, 42, 49, 56, 63, 67, 72,77, 82, 87, 92, 97, 102, 107, 113, 118, 123, 128, 133, 138, 143, 148 & 153 of the Advance Authorization.  The case may be re­listed on 31.05.2011.   49

Case No.:32/36/80­ALC2/2010

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00731/AM11/ RLA File :04/24/040/00240/AM11/ Lic.No/Date:0410120014 21.12.2010 Defer Date: 31.05.2011

Decision : The Committee noted that based on D.L. from DC(MSME) some information has been sought  from the firm vide this office letter dated 29.03.2011.  The Committee therefore decided to await the firm’s reply and to re­list the case on 31.03.2011.   50

Case No.:33/36/80­ALC2/2010

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00732/AM11/ RLA File :04/24/040/00239/AM11/ Lic.No/Date:0410120009 21.12.2010 Defer Date: 31.05.2011 Decision : The Committee noted that based on D.L. from DC(MSME) some information has been sought from the firm vide this office letter dated 29.03.2011.  The Committee therefore decided to await the firm’s reply and to re­list the case on 31.03.2011.   51

Case No.:19/36/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00718/AM11/ RLA File :07/24/040/00380/AM11/ Lic.No/Date:0710076235 23.12.2010   Decision : As per written comments of DIT received vide their U.O. Note No.17(29)/2011­IPHW  dated  14.03.2011,  the Committee decided to ratify the norms for import on net­to­net basis with accountability clause in respect of the subject advance authorization.     52

Case No.:25/36/80­ALC2/2010

Party Name:EASTERN EQUIPMENT AND ENGINEERS PRIVATE LIMITED. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00724/AM11/ RLA File :02/24/040/00168/AM11/ Lic.No/Date:0210152463 23.12.2010 Defer Date: 31.05.2011 Decision : The Committee handed over the firm’s reply to DIPP for examination and comments.  The Case may be re­listed on 31.05.2011.   53

Case No.:16/39/80­ALC2/2010

Party Name:LINCOLN HELIOS ( I ) LTD Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00818/AM11/ RLA File :07/24/040/00396/AM11/ Lic.No/Date:0710076349 29.12.2010 Defer Date: 31.05.2011 Decision : On the recommendation of the representative of DHI present in the meeting, the Committee decided  to  call  for  the  following  information/clarification  from  the  firm  and  to  re­list  the  case  on  31.5.2011:­   1.      Information in respect of Sl.No.5 & 11 of the Standard Deficiency Format. 2.      Use of the export products with their catalogue.  

Case No.:28/39/80­ALC2/2010

Party Name:MAN FORCE TRUCKS PRIVATE LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00830/AM11/ RLA File :31/24/040/00119/AM11/ Lic.No/Date:3110046183 29.12.2010 Defer Date: 31.05.2011

54 Decision :On  the  recommendation  of  the  representative  of  DHI  present  in  the  meeting,  the  Committee 31.05.2011:­   1.      Information in respect of Sl.No.11 of the Standard Deficiency Format for item No. 232,255,258. 2.      Net weight & gross weight of “Crank Case casting”. The firm may also give the process of manufacture of the component out of the above raw material.   55

Case No.:11/39/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00813/AM11/ RLA File :03/95/040/00733/AM11/ Lic.No/Date:0310608646 30.12.2010 Defer Date: 31.05.2011 Decision :On the recommendation of the representative of DIPP present in the meeting, the Committee 31.05.2011:­   1. Information in respect of Sl.No.4,5, 11 & 13 of the Standard Deficiency Format export product wise.   56

Case No.:2/36/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00701/AM11/ RLA File :09/24/040/00450/AM11/ Lic.No/Date:0910045023 03.01.2011 Defer Date: 31.05.2011 Decision : On the recommendation of the representative of DHI present in the meeting, the Committee 31.05.2011:­   1.        Weight of each export product separately (LP Heaters, HP Heaters etc separately) 2.        Net weight & gross weight of different casting & forgings. 3.        Serial no 4,5,9 & 11 of SDL export product wise.( LP Heaters, HP Heaters etc separately) 4.        Use of each component proposed for import in the manufacture of export product. 5.        Length & weight of different tubes proposed for import.  

Case No.:4/36/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00703/AM11/ RLA File :53/24/040/00025/AM11/ Lic.No/Date:5310011980 04.01.2011

57 Decision :  The  Committee  deliberated    that  the  written  comments  of  C&PC  received  vide  their  O.M. No.46011/21/2009­PC­II  dated 02.12.2010 and 22.03.2011.  The Committee decided to ratify the norms in respect of the subject advance authorization as per written comments of C&PC on repeat basis as per firm Advance Authorization No.5310011884 dated 13.12.2011 ratified in Norms Committee Meeting No. 38/11 held on dated 22.02.2011 with an amendment that the calculation of export item would be based on number and weight specified as under:­   Item to be exported Quantity Blood Bags 1 No. Relevant ­material Recommended for Import Quantity 1. PVC Compound (Medical Grade)   2. Relevant Evident Paper­Plastic (Self Adhesive) 3. Relevant Stainless Steel Capillary (Needle Holder Assembly) 4.  Relevant Stamping Foil Tape 5.  Relevant Thermal Transfer Ribbon 6.  Relevant Oxygen Absorber 7. Relevant Break Off Value Assembly 8. Relevant Aluminium Foil Cover 9. Relevant Y­Conductor 10. Relevant Luer Adapter 11.Relevant Plasma Cap (Rubber Cap) 12.Relevant Soft Shell Filter (CRC Filter) 1.05 kg/kg content in the export product Net +5% wastage Net to Net   Net­to­net Net­to­net Net­to­net Net­to­net Net­to­net Net­to­net Net­to­net Net­to­net Net to Net     58

Case No.:5/36/80­ALC2/2010

Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00704/AM11/ RLA File :05/23/040/00280/AM11/ Lic.No/Date:0510280956 04.01.2011 Defer Date: 31.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and 31.05.2011.   59

Case No.:6/36/80­ALC2/2010

Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00705/AM11/ RLA File :05/23/040/00281/AM11/ Lic.No/Date:0510280957 04.01.2011 Defer Date: 31.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s reply and 31.05.2011.   60

Case No.:7/36/80­ALC2/2010

Party Name:DRIPLEX WATER ENGINEERING LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00706/AM11/ RLA File :05/23/040/00282/AM11/ Lic.No/Date:0510280959 04.01.2011 Defer Date: 31.05.2011

Decision : The representative of the DHI informed the Committee that they received the firm’s reply and 31.05.2011.   61

Case No.:23/36/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Rejected HQ File :01/80/050/00722/AM11/ RLA File :61/24/040/00072/AM11/ Lic.No/Date:6110000544 04.01.2011   Decision : The Committee decided to reject the case on the ground that the firm did not furnished any reply  with  reference  to  this  office  letter  dated    10.02.2011  and  subsequent  reminder  dated  22.03.2011 calling for certain information, in the absence of which, it was not possible to decide the requirement of inputs.      62

Case No.:24/36/80­ALC2/2010

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00723/AM11/ RLA File :06/24/040/00049/AM11/ Lic.No/Date:0610020433 05.01.2011 Defer Date: 31.05.2011 Decision : The Committee observed that the comments called for from C&PC are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 31.05.2011.   63

Case No.:30/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00832/AM11/ RLA File :03/95/040/00765/AM11/ Lic.No/Date:0310609444 05.01.2011 Defer Date: 31.05.2011 Decision : On the recommendation of the representative of DHI present in the meeting, the Committee 31.05.2011: ­   1. Specific  item  of  export  with  details  of  Auxiliaries  &  quantity  of  export  in  number  and  weight separately. 2. Net weight & gross weight of castings &forgings proposed for import 3. Sl no 3(Legible Drawing), 4 5 & 11 of SDL export product wise.     64

Case No.:10/36/80­ALC2/2010

Party Name:SEC INDUSTRIES PVT.LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00709/AM11/ RLA File :09/24/040/00442/AM11/ Lic.No/Date:0910045076 07.01.2011 Defer Date: 31.05.2011 Decision  :    The  Committee  noted  that  the  firm  application  has  been  sent  to  Ministry  of  Defence  on 24.03.2011 and decided to await the comments of Ministry  of  Defence.    The  case  may  be  re­listed  on 31.05.2011.

65

Case No.:11/36/80­ALC2/2010

Party Name:KIRLOSKAR CHILLERS PRIVATE LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00710/AM11/ RLA File :31/21/040/00276/AM11/ Lic.No/Date:3110046340 07.01.2011 Defer Date: 31.05.2011 Decision :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments. The case may be re­listed on 31.05.2011.   66

Case No.:12/36/80­ALC2/2010

Party Name:LION HOLDINGS PVT. LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00711/AM11/ RLA File :05/23/040/00264/AM11/ Lic.No/Date:0510281397 12.01.2011 Defer Date: 31.05.2011 Decision : The representative of the DC(MSME) informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 31.05.2011   67

Case No.:13/36/80­ALC2/2010

Party Name:DONG WOO SURFACE TECH (INDIA) PVT. LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00712/AM11/ RLA File :04/24/040/00277/AM11/ Lic.No/Date:0410120619 12.01.2011 Defer Date: 31.05.2011 Decision : The Committee noted that based on D.L. from DC(MSME) some information has been sought vide this office letter dated 22.03.2011.  The Committee therefore decided to await the firm’s reply and to re­list the case on 31.05.2011.   68

Case No.:3/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00805/AM11/ RLA File :03/95/040/00774/AM11/ Lic.No/Date:0310610650 12.01.2011 Defer Date: 31.05.2011 Decision : On the recommendation of the representative of DHI present in the meeting, the Committee 31.05.2011: ­   1. Specific  item  of  export  with  details  of  Auxiliaries  &  quantity  of  export  in  number  and  weight separately. 2. Net weight & gross weight of castings &forgings proposed for import 3. Sl no 4 5 & 11 of SDL export product wise.   69

Case No.:22/39/80­ALC2/2010

Party Name:CARTOON SANITATION PVT. LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00824/AM11/ RLA File :06/24/040/00056/AM11/ Lic.No/Date:0610020559 12.01.2011 Defer Date: 31.05.2011 Decision : The representative of the DIPP informed the Committee that they received the firm’s reply and 31.05.2011.

70

Case No.:15/36/80­ALC2/2010

Party Name:ASACO PVT LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Withdrawn HQ File :01/80/050/00714/AM11/ RLA File :09/70/040/00175/AM11/ Lic.No/Date:0910045124 13.01.2011   Decision :  The  Committee  noted  that  the  case  has  already  been  approved  in  Meeting  No.  39/11  dated 08.03.2011.  Accordingly case has been withdrawn.   71

Case No.:18/36/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00717/AM11/ RLA File :31/21/040/00312/AM11/ Lic.No/Date:3110046436 14.01.2011 Defer Date: 31.05.2011 Decision : The Committee decided to forward the firm’s application again to DHI for examination and comments and to re­list the case on 31.05.2011.   72

Case No.:19/39/80­ALC2/2010

Party Name:BIRLA FURUKAWA FIBRE OPTICS LIMITED, Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00821/AM11/ RLA File :17/24/040/00036/AM11/ Lic.No/Date:1710003714 19.01.2011 Defer Date: 31.05.2011 Decision : The Committee decided to await the comments of DIT and to re­list the case on 31.05.2011.   73

Case No.:20/39/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00822/AM11/ RLA File :03/94/040/00941/AM11/ Lic.No/Date:0310611795 19.01.2011 Defer Date: 31.05.2011 Decision : The Committee observed that no reply of the firm had been received by this office in response to DIT letter dt.16.03.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information to DIT within a period of 15 days from the date of issue of communication failing which their case will be rejected without further notice.   The case may be re­listed on 31.05.2011.   74

Case No.:21/39/80­ALC2/2010

Party Name:INVENSYS INDIA PVT., LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00823/AM11/ RLA File :03/94/040/00942/AM11/ Lic.No/Date:0310611805 19.01.2011 Defer Date: 31.05.2011 Decision : The Committee observed that no reply of the firm had been received by this office in response to DIT letter dt.16.03.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information to DIT within a period of 15 days from the date of issue of communication failing which their case will be rejected without further notice.   The case may be re­listed on 31.05.2011.   75

Case No.:17/39/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00819/AM11/ RLA File :61/24/040/00074/AM11/ Lic.No/Date:6110000553 25.01.2011 Defer Date: 31.05.2011

Decision : The Committee observed that the firm has not replied to this office letter calling for certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information failing which  their case will be rejected without any further notice and to re­list the case on 31.05.2011.   76

Case No.:29/39/80­ALC2/2010

Party Name:PNEUMAX PNEUMATIC INDIA PVT.LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00831/AM11/ RLA File :07/21/040/00757/AM11/ Lic.No/Date:0710076903 25.01.2011 Defer Date: 31.05.2011 Decision : The Committee handed over the firm’s application to DHI in the meeting for examination and comments.  The case may be re­listed on 31.05.2011.   77

Case No.:25/39/80­ALC2/2010

Party Name:PLAST TECH ENGINEERING Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00827/AM11/ RLA File :04/24/040/00284/AM11/ Lic.No/Date:0410121063 28.01.2011   Decision : As per written comments of DC(MSME) of vide their U.O. Note No.3139/2010­ME  dated 24.09.2010,  the committee decided after taking clue from H­27 norms for the export product “Articles made  of  Nylon  Resin  ­  “Articles  made  of  Nylon  Resin­Quantity  –  76000Kg.  in  respect  of  the  subject advance authorization on repeat basis as per Advance Authorization No. 0410114950  dated  25.06.2010 ratified in Meeting No. 26/11 dated 28.9.2010 may be ratified as under:­               Item of import i.e. Relevant Nylon may be recommended with 5%       wastage and accordingly the quantity of import item may be recommend as 79,800 Kg.     78

Case No.:7/2/80­ALC2/2011

Party Name:MAN FORCE TRUCKS PRIVATE LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00928/AM11/ RLA File :31/24/040/00170/AM10/ Lic.No/Date:3110046726 01.02.2011 Defer Date: Decision : On the recommendation of the representative of DHI present in the meeting, the Committee 31.05.2011 ­   1.      Net weight & gross weight of “crank Case casting”. The firm may also give the process of manufacture of the component out of the above raw material. 2.      Sl no 11 of SDL for item no 232, 255, 258.   79

Case No.:23/39/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00825/AM11/ RLA File :61/24/040/00078/AM11/ Lic.No/Date:6110000557 03.02.2011 Defer Date: 31.05.2011 Decision : The Committee observed that the firm has not replied to this office letter calling for certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information failing which  their case will be rejected without any further notice and to re­list the case on 31.05.2011.

80

Case No.:1/39/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00803/AM11/ RLA File :31/21/040/00353/AM11/ Lic.No/Date:3110046848 10.02.2011 Defer Date: 31.05.2011 Decision  :The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The Committee, therefore, decided to defer the consideration and to relist the case on 31.05.2011.   81

Case No.:2/39/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00804/AM11/ RLA File :04/24/040/00257/AM11/ Lic.No/Date:0410121550 11.02.2011 Defer Date: 31.05.2011 Decision : The Committee observed that the firm has not replied to this office letter calling for certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information failing which  their case will be rejected without any further notice and to re­list the case on 31.05.2011.   82

Case No.:5/39/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status Deferred HQ File :01/80/050/00807/AM11/ RLA File :31/21/040/00364/AM11/ Lic.No/Date:3110046899 11.02.2011 Defer Date: 31.05.2011 application  at  the  earliest  and  on  receipt  forward  the  same  to  DIT  for  examination  and  submission  of comments. The case may be re­listed on 31.05.2011.   83

Case No.:7/39/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00809/AM11/ RLA File :04/24/040/00104/AM11/ Lic.No/Date:0410121605 14.02.2011 Defer Date: 31.05.2011 Decision : The Committee observed that the firm has not replied to this office letter calling for certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information failing which  their case will be rejected without any further notice and to re­list the case on 31.05.2011.   84

Case No.:9/39/80­ALC2/2010

Party Name:IDMC LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Closed HQ File :01/80/050/00811/AM11/ RLA File :34/24/040/00245/AM11/ Lic.No/Date:3410029337 14.02.2011   Decision :  The Committee noted that R.A., Vadodara has informed vide their letter dated 29.03.2011 that Advance Authorization  was issued under GN­4 with accountability clause for engineering products as the items allowed for import were components. The Committee therefore decided to treat the case as closed on the part of NC.   The Regional Authority may take note of the NC decision for information.  

Case No.:10/39/80­ALC2/2010

Party Name:SCHOTT KAISHA PRIVATE LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred

85 HQ File :01/80/050/00812/AM11/ RLA File :03/95/040/00915/AM11/ Lic.No/Date:0310616011 15.02.2011 Defer Date: 31.05.2011 application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments. The case may be re­listed on 31.05.2011.   86

Case No.:14/39/80­ALC2/2010

Party Name:SPRAY ENGINEERING DEVICES LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00816/AM11/ RLA File :22/24/040/00091/AM11/ Lic.No/Date:2210010996 15.02.2011 Defer Date: 31.05.2011 application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments. The case may be re­listed on 31.05.2011.   87

Case No.:31/39/80­ALC2/2010

Party Name:SAVAS ENGINEERING COMPANY PVT. LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00833/AM11/ RLA File :31/24/040/00249/AM11/ Lic.No/Date:3110046929 15.02.2011 Defer Date: 31.05.2011 application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments. The case may be re­listed on 31.05.2011.   88

Case No.:32/39/80­ALC2/2010

Party Name:MOTHERSON SUMI SYSTEMS LTD Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00834/AM11/ RLA File :05/24/040/00381/AM11/ Lic.No/Date:0510284047 15.02.2011 Defer Date: 31.05.2011 Decision  :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The Committee, therefore, decided to defer the consideration and to relist the case on 31.05.2011.   89

Case No.:33/39/80­ALC2/2010

Party Name:NOV SARA INDIA PRIVATE LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00835/AM11/ RLA File :61/24/040/00080/AM11/ Lic.No/Date:6110000561 15.02.2011 Defer Date: 31.05.2011 application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments. The case may be re­listed on 31.05.2011.   90

Case No.:34/39/80­ALC2/2010

Party Name:PREMIER INDUSTRIAL CORPORATION LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00836/AM11/ RLA File :03/95/040/00799/AM11/ Lic.No/Date:0310616498 17.02.2011 Defer Date: 31.05.2011 Decision : The Committee noted that the firm’s application has been forwarded to  Ministry of Mines on 16.03.2011 for examination and comments.  The Committee decided to await the comments of Ministry of Mines. The case may be re­listed on 31.05.2011.

91

Case No.:38/39/80­ALC2/2010

Party Name:MUBEA AUTOMOTIVE INDIA PRIVATE LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00840/AM11/ RLA File :31/24/040/00233/AM11/ Lic.No/Date:3110046959 17.02.2011 Defer Date: 31.05.2011 Decision : The representative of the DHI informed the Committee that they received the firm’s application and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 31.05.2011.   92

Case No.:36/39/80­ALC2/2010

Party Name:TRF LIMITED, Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00838/AM11/ RLA File :02/24/040/00255/AM10/ Lic.No/Date:0210154977 18.02.2011 Defer Date: 31.05.2011 Decision  :  The  Committee  decided  to  forward  the  firm’s  application  to  DHI  for  examination  and comments.  The case may be re­listed on 31.05.2011.   93

Case No.:41/39/80­ALC2/2010

Party Name:SEC INDUSTRIES PVT.LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00843/AM11/ RLA File :09/24/040/00524/AM11/ Lic.No/Date:0910045585 18.02.2011 Defer Date: 31.05.2011 Decision : The Committee decided to forward the firm’s application to Ministry of  Defence on 13.04.2011 for examination and comments. The Committee decided to await the comments of Ministry of Defence only as the subject matter pertains to them.   The case may be re­listed on 31.05.2011.   94

Case No.:42/39/80­ALC2/2010

Party Name:L&T­MHI BOILERS PVT. LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00844/AM11/ RLA File :03/95/040/00874/AM11/ Lic.No/Date:0310616717 18.02.2011 Defer Date: 31.05.2011 Decision:    The  Committee  noted  that  the  firm  application  has  been  sent  to  DHI    on  24.03.2011  for examination  and  comments.      The  Committee  decided  to  defer  the  case  and  to  re­list  the  case  on 31.05.2011.   95

Case No.:37/39/80­ALC2/2010

Party Name:DAEWON INDIA AUTOPARTS PVT LTD Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00839/AM11/ RLA File :04/24/040/00307/AM11/ Lic.No/Date:0410121739 21.02.2011 Defer Date: 31.05.2011 Decision : The Committee observed that the firm has not replied to this office letter calling for certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information failing which  their case will be rejected without any further notice and to re­list the case on 31.05.2011.   96

Case No.:40/39/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00842/AM11/ RLA File :04/24/040/00231/AM11/ Lic.No/Date:0410121741 21.02.2011 Defer Date: 31.05.2011

Decision : The Committee decided to forward a copy of firm’s application to DHI and the case may be relisted on 31.05.2011.   97

Case No.:44/39/80­ALC2/2010

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00846/AM11/ RLA File :03/95/040/00930/AM11/ Lic.No/Date:0310616990 21.02.2011   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  19.04.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.       Total net of export products to be specified as 213.6 MT. 2.      Weights of 50 MT, 70 MT & 80 MT to be specified with the quantities of import items at Sl. No 1, 2 & 3 respectively. 3.      Quantities of import items at S.No. 1, 2 & 3 to be allowed on net to net basis with accountability clause. 4.      Quantity of import item at S.No. 4 to be allowed upto 0.5 % of FOB value of exports 5.      Quantity of import item at S.No. 5  to be allowed on net to net basis as claimed by the firm. 6.      Quantity of import item at S.No. 6  to  be allowed as per packing policy.     98

Case No.:45/39/80­ALC2/2010

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00847/AM11/ RLA File :03/95/040/00931/AM11/ Lic.No/Date:0310616992 21.02.2011   Decision : As per written comments of DIPP received vide their U.O. Note No.  dated  19.04.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1.      Total net of export products to be specified as 576.2 MT. 2.      Weights of 140 MT, 213 MT & 200 MT to be specified with the quantities of import items at Sl. No 1, 2 & 3 respectively. 3.      Quantities of import items at S.No. 1, 2 & 3 to be allowed on net to net basis with accountability clause. 4.      Quantity of import item at S.No. 4 to be allowed upto 0.5 % of FOB value of exports 5.      Quantity of import item at S.No. 5  to be allowed on net to net basis as claimed by the firm. 6.      Quantity of import item at S.No. 6  to be allowed as per packing policy.    

Case No.:46/39/80­ALC2/2010

Party Name:BOSCH LIMITED, Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00848/AM11/ RLA File :07/24/040/00415/AM11/ Lic.No/Date:0710077490 22.02.2011

99 Decision : The Committee noted the written comments of DHI received vide their U.O. Note No.3(04)/11­ TSW(B)/209 dated 04/06.04.2011 observing that the firm proposes to import unfinished armature plate of weight 4.2885 gm and the weight of finished product is 3.5855 gm resulting in wastage 19.6%.  The value addition is 100%. The Committee deliberated the comments of DHI and decided to ratify the norms in respect of the subject advance authorization as under:­   1.       The export weight is 3.5855 gm each to be incorporated in the license. 2.        The firm may be allowed duty free import of 21,24,000 numbers of unfinished armature plate of weight 8805 kg with net wastage of 15.6 % with 20% recovery & the balance quantity to be imported by paying duty. 3.       Consumables to be allowed at 3% of FOB value of export as applied for.     100

Case No.:47/39/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00849/AM11/ RLA File :05/23/040/00328/AM11/ Lic.No/Date:0510284479 22.02.2011 Defer Date: 31.05.2011 Decision :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The Committee, therefore, decided to defer the consideration and to relist the case on 31.05.2011.   101

Case No.:48/39/80­ALC2/2010

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00850/AM11/ RLA File :05/23/040/00330/AM11/ Lic.No/Date:0510284482 22.02.2011 Defer Date: 31.05.2011 Decision :  The  representative  of  the  DHI  informed  the  Committee  that  the  case  is  under  study.    The Committee, therefore, decided to defer the consideration and to relist the case on 31.05.2011.   102

Case No.:9/2/80­ALC2/2011

Party Name:THERMAX LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00930/AM11/ RLA File :31/24/040/00273/AM11/ Lic.No/Date:3110047467 21.03.2011 Defer Date:31.05.2011 application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments. The case may be re­listed on 31.05.2011.   103

Case No.:12/2/80­ALC2/2011

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00933/AM11/ RLA File :05/24/040/00427/AM11/ Lic.No/Date:0510286528 21.03.2011 Defer Date: 31.05.2011 Decision : On the recommendation of the representative of DIPP present in the meeting, the Committee 31.05.2011   1. Information in respect of Sl.No.3,4,5 11 & 13 of the Standard Deficiency Format.

104

Case No.:10/2/80­ALC2/2011

Party Name:BROSE INDIA AUTOMOTIVE SYSTEMS PVT LTD Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00931/AM11/ RLA File :31/24/040/00280/AM11/ Lic.No/Date:3110047494 22.03.2011 Defer Date: 31.05.2011 Decision : The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to forward the firm’s application at the earliest and on receipt forward the same to DHI for examination and submission of   105

Case No.:13/2/80­ALC2/2011

Party Name:POLY MEDICURE LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00934/AM11/ RLA File :05/24/040/00428/AM11/ Lic.No/Date:0510286557 22.03.2011 Defer Date: Decision : The Committee noted that the firm application has been sent to C&PC on 13.04.2011.  The Committee decided to await the comments of C&PC and to re­list the case on 31.05.2011.   106

Case No.:11/2/80­ALC2/2011

Party Name:GL&V INDIA PRIVATE LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00932/AM11/ RLA File :31/24/040/00283/AM11/ Lic.No/Date:3110047508 23.03.2011 Defer Date: 31.05.2011 Decision : The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to forward the firm’s application at the earliest and on receipt forward the same to DHI for examination and submission of   107

Case No.:14/2/80­ALC2/2011

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00935/AM11/ RLA File :05/23/040/00367/AM11/ Lic.No/Date:0510286717 23.03.2011 Defer Date: 31.05.2011 Decision :  The  Committee  noted  that  the  firm’s  application  has    been  sent  to  DHI  on  04.04.2011  for examination and comments. The case may be re­listed on 31.05.2011   108

Case No.:8/2/80­ALC2/2011

Party Name:MICROFINISH VALVES PRIVATE LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00929/AM11/ RLA File :07/24/040/00489/AM11/ Lic.No/Date:0710078298 24.03.2011 Defer Date: 31.05.2011 application at the earliest and on receipt forward the same to DIPP for examination and submission of   109

Case No.:15/2/80­ALC2/2011

Party Name:MVS ENGINEERING LTD Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00936/AM11/ RLA File :05/24/040/00412/AM11/ Lic.No/Date:0510286765 24.03.2011 Defer Date: 31.05.2011

Decision :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to forward the firm’s application at the earliest and on receipt forward the same to DIPP for examination and submission of   110

Case No.:6/2/80­ALC2/2011

Party Name:METSO POWER INDIA PRIVATE LIMITED Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00927/AM11/ RLA File :04/24/040/00350/AM11/ Lic.No/Date:0410122852 25.03.2011 Defer Date: 31.05.2011 Decision :The representative of the DHI informed the Committee that they received the firm’s application on 13.4.2011 and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 31.05.2011.   111

Case No.:18/2/80­ALC2/2011

Party Name:HTD HEAT TRACE(INDIA)PVT LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00939/AM11/ RLA File :09/24/040/00550/AM11/ Lic.No/Date:0910046072 25.03.2011 Defer Date: 31.05.2011 Decision :The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to  forward  the  firm’s application at the earliest and on receipt forward the same to DIPP for examination and submission of comments. The case may be re­listed on 31.05.2011..   112

Case No.:17/2/80­ALC2/2011

Party Name:AUTOMAT IRRIGATION PVT. LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00938/AM11/ RLA File :05/23/040/00363/AM11/ Lic.No/Date:0510286865 28.03.2011 Defer Date: 31.05.2011 Decision :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to forward the firm’s application at the earliest and on receipt forward the same to DIPP/DHI for examination and submission of comments. The case may be re­listed on 31.05.2011.   113

Case No.:20/2/80­ALC2/2011

Party Name:HEXAGON METROLOGY INDIA PVT. LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00941/AM11/ RLA File :05/23/040/00266/AM11/ Lic.No/Date:0510287163 29.03.2011 Defer Date: 31.05.2011 Decision :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to forward the firm’s application at the earliest and on receipt forward the same to DHI for examination and submission of   114

Case No.:3/2/80­ALC2/2011

Party Name:AYAAPPA CNC PVT.LTD, Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00003/AM12/ RLA File :07/24/040/00547/AM11/ Lic.No/Date:0710078428 29.03.2011 Defer Date: application  at  the  earliest  and  on  receipt  forward  the  same  to  DIPP/DC(MSME)  for  examination  and submission of comments. The case may be re­listed on 31.05.2011.

115

Case No.:4/2/80­ALC2/2011

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00004/AM12/ RLA File :07/24/040/00540/AM11/ Lic.No/Date:0710078432 29.03.2011 Defer Date: 31.05.2011 Decision :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to forward the firm’s application at the earliest and on receipt forward the same to DIPP for examination and submission of   116

Case No.:2/2/80­ALC2/2011

Party Name:ACE MANUFACTURING SYSTEMS LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00002/AM12/ RLA File :07/24/040/00541/AM11/ Lic.No/Date:0710078477 30.03.2011   Decision : The Committee noted that firm’s application has not been received so far.  However, according to  online  data,  items  of  import  appear  to  be  covered  in  GN­4  for  the  Engineering  Products.  The Committee  therefore  presumed  the  subject  Authorisation  may  have  been  issued  under  GN­4.  The Committee accordingly decided to revert back the case to the concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dated 05.12.2007.     117

Case No.:5/2/80­ALC2/2011

Party Name:ACE MANUFACTURING SYSTEMS LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Approved HQ File :01/80/050/00005/AM12/ RLA File :07/24/040/00532/AM11/ Lic.No/Date:0710078476 30.03.2011   Decision : The Committee noted that firm’s application has not been received so far.  However, according to  online  data,  items  of  import  appear  to  be  covered  in  GN­4  for  the  Engineering  Products.  The Committee  therefore  presumed  the  subject  Authorisation  may  have  been  issued  under  GN­4.  The Committee accordingly decided to revert back the case to the concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dated 05.12.2007.     118

Case No.:19/2/80­ALC2/2011

Party Name:STARION INDIA P.LTD Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00940/AM11/ RLA File :31/24/040/00278/AM11/ Lic.No/Date:3110047653 31.03.2011 Defer Date: 31.05.2011 Decision :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to forward the firm’s application at the earliest and on receipt forward the same  to  DIT  for  examination  and  submission  of   119

Case No.:1/2/80­ALC2/2011

Party Name:BANDO (INDIA) PVT. LTD., Meet No/Date:2/80­ ALC2/2011 19.04.2011 Status: Deferred HQ File :01/80/050/00001/AM12/ RLA File :05/23/040/00001/AM12/ Lic.No/Date:0510287392 04.04.2011 Defer Date: 31.05.2011

Decision :  The  Committee  decided  to  remind  the  RA  (with  a  copy  to  the  firm)  to forward the firm’s application at the earliest and on receipt forward the same to DHI for examination and submission of       S.No.03

Case No. A ­ 15

M/s.  Delphi Automotive Systems Pvt. Ltd., Noida  F.No. 01/80/50/ 00495/AM11/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.05/88/040/00721/AM03 0510081234 dt.21.02.2003 Date: 19.04.2011 Ratification of norms   The  Committee  decided  to  remind  R.A.  to  send  complete  application  of  the  firm  and  to  re­list  the  case  on 31.05.2011.   S.No.30 Case No A/R – 152 M/s. Thermax LTd.,   HQ F.No.01/81/50/00240/AM08/DES.I Lic.No. & Date Meeting No.02/12  RA.F.No.31/24/040/00153/AM08 3110030218 dt.08.08.2007 Date: 19.04.2011 Ratification of  norms.   The  representative  of  the  firm  Shri  Jacob  George,  Deputy  General  Manager  Commercial  (Internal Business);  B.M.  Dhumal,  Manager  (Imports)  &  others;    appeared  before  the  Committee  for  personal hearing. They explained the case to the Committee.  The Committee decided to ratify the  deliberated written comments of DHI received vide their U.O. Note No.3(14)/10­TSW(B)/57  dated  13/18.01.2011 and decided to ratify the norms in respect of the subject advance authorization as under:­ Export Export weight 1879.8 MT may be incorporated in the license.   Import The firm has not indicated any wastage in Appendix 11A of application.  So wastage is not allowed on the same.   1. Item No 1 – Allowed import of 3220 kg. of length 618 meters without any wastage. 2. Item No.2 – Allowed import of 1300 kg of length 74.5 meter meters without any wastage. 3. Item No. 3 – Allowed  import of 32700 kg of length 41547 meters with out any wastage. 4. Item No. 4 & 5 – These are components & to be allowed under GN­4.     S.No.31

Case No. A/R­63

M/s.  Godrej  & Boyce  Mfg.  Co. Ltd., Mumbai  F.No. 01/80/162/ 00961/AM08/DES.ILic.No. & Date Meeting No.02/12 RA F.No.03/94/040/00587/AM08 0310442080 dt.06.09.2007 Date: 19.04.2011   The Committee observed that the firm has not replied to this office letter dated 01.4.2011 calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 31.05.2011.   S.No.32    

Case  No.  A/R­

102 M/s.  Bharat Heavy Electricals  Ltd., Haridwar HQ F.No.01/80/050/01790/AM09/DES­I Lic. No. & Date Meeting No.02/12 RLA No.61/24/040/00069/AM09 6110000286 dt.06.02.2009 Date: 19.04.2011 Ratification of Norms

The representative of the DHI informed the Committee that the case is under study.  The Committee, therefore, decided to defer the consideration and to relist the case on 31.05.2011.   S.No.33

Case  No.  A/R­

103 M/s.  Bharat Heavy Electricals  Ltd., Haridwar HQ F.No.01/80/050/00120/AM10/DES­I Lic. No. & Date Meeting No.02/12 RLA No.61/24/040/00007/AM10 6110000313 dt.29.05.2009 Date: 19.04.2011 Ratification of Norms   The representative of the DHI informed the Committee that the case is under study.  The Committee, therefore,   S.No.34

Case No. A/R­ 141

M/s.  Mahati Electrics, Pune  F.No. 01/85/50/ 00005/AM09/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.31/24/040/00308/AM08 3110032430 dt.23.01.2008 Date: 19.04.2011   The Committee noted written comments of DHI received vide their U.O. Note No.3(26)/09­TSW(B)/211  dated 20.01.2011  &  06/08.04.2011  the  Committee  decided  to  ratify  the  norms  in  respect  of  the  subject  advance authorization as under:­   (i)  The description of item no 41 may be amended to “Governor Sub Assy” & quantity of import as one number & that of item no 42 may be amended to “Exciter for Generator” & quantity of import as one number and import may be allowed under GN­4.   (ii) Allowing import of item No. 45 under GN­4.     S.No.35

Case No. A/R­ 99

M/s.    United  Drilling Tools Pvt. LTd., Delhi HQ F.No.01/80/50/00815/AM09/DES­I Lic. No. & Date Meeting No.02/12 RLA No.05/24/040/00305/AM09 0510225008 dt.05.08.2008 Date: 19.04.2011 Revision of norms   The Committee noted the written comments of DHI received vide their U.O. Note No. 3(86)/09­TSW(B)/193 dated 01.04.2011 and observed that the firm has represented against reduction of quantity of import item No1­ As per information submitted and calculation, the recovery can be taken 11%.  The entitlement comes to 39 (Net wastage of 32%)  & import item 3 firm entitlement comes to 47.03 numbers after considering recovery of 16% with wastage of 27%.. The Committee, therefore, decided  to advise the firm to appear before the NC in person along with and technical expert to explain their case with full facts of the case. The case may be relisted on 31.05.2011.   S.No.36

Case No. A/R­110

  M/s.  Godrej  & Boyce  MFG.  Co. Ltd., Mumbai F.No. 01/80/50/ 00522/AM10/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.03/94/040/00528/AM10 0310539241 dt.24.09.2009 Date: 19.04.2011   The Committee noted that firm has informed vide their letter dated 29.03.2011 that their export order has been cancelled and they have not imported under this license.  They are also surrendering the license to Jt. D.G.F.T., Mumbai and  requested to withdraw their case.  The Committee, therefore, decided to close the case on the par of NC.  

S.No.37

Case No. A/R­ 167

M/s.  Bharat  Heavy Electricals  Ltd., Haridwar  F.No. 01/80/50/ 00449/AM10/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.61/24/040/00036/AM10 6110000362 dt.13.10.2009 Date: 19.04.2011   The representative of the DHI informed the Committee that the case is under study.  The Committee, therefore,   S.No.38

Case No. A/R­ 168

M/s.  Godrej  & Boyce  Mfg.  Co. LTd., Mumbai  F.No. 01/80/50/ 01741/AM09/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.03/94/040/00798/AM09 0310497146 dt.10.12.2008 Date: 19.04.2011   The representative of the DHI informed the Committee that the case is under study.  The Committee, therefore,   S.No.39

Case No. A/R­ 173

M/s. Thermax Ltd.,  F.No. 01/80/50/ 01550/AM09/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.31/21/040/00296/AM09 3110036393 dt.11.12.2008 Date: 19.04.2011   The  representative  of  the  firm  Shri  Jacob  George,  Deputy  General  Manager  Commercial  (Internal Business);  B.M.  Dhumal,  Manager  (Imports)  &  others;    appeared  before  the  Committee  for  personal hearing.  They  explained  the  case  to  the  Committee.  The    firm’s  representatives  were  asked  to  furnish details of actual export product and specific import  against it and justify the quantity of import through calculation/documentary evidence supported by drawing.  For items manufactured by the firm, shipping bill are required to be produced. The firm’s representative promised to furnish the complete reply  as per advice. The case may be re­listed on 31.05.2011.   S.No.40

Case No. A/R­ 174

M/s.  Boving Fouress Pvt. Ltd.,  F.No. 01/80/50/ 00218/AM09/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.07/24/040/00524/AM09 0710061697 dt.15.12.2008 Date: 19.04.2011   The representative of the DHI informed the Committee that they received the firm’s reply and case is under study. The Committee, therefore, decided to defer the consideration and to relist the case on 31.05.2011.       S.No.41

Case No. A/R­ 175

M/s.  Precihole Machine Pvt. Ltd.,  F.No. 01/80/50/ 00942/AM08/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.03/95/040/00586/AM08 0310443655 dt.19.09.2010 Date: 19.04.2011   The Committee observed that the firm has not replied to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 31.05.2011.   S.No.42

Case No. A/R­ 190

M/s. Blue Star Ltd., Mumbai  F.No. 01/80/50/01756/AM09/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.03/94/040/00766/AM09 0310494391 dt.17.11.2008 Date: 19.04.2011 Amendment /correction of norms   The Committee observed that the firm has not replied to this office letter calling for certain information. The Committee, therefore, decided to remind the firm for expediting the said information failing which  their case will be rejected without any further notice.  The case may be re­listed on 31.05.2011.

S.No.43

Case No. A/R­ 192

M/s. Andritz Hydro Pvt. Ltd.,  F.No. 01/80/50/01612/AM09/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.05/24/040/00631/AM09 0510233247 dt.23.12.2008 Date: 19.04.2011   The  Committee  deliberated  the  written  comments  of  DHI  received  vide  their  U.O.  Note  No.  3(83)/09­ TSW(B)/191 dated 31.03.2011,  which observed as follows:­   (i)                 No new information with reference to  item No. 1 to 4 given by the firm; (ii)               Import of  dome may not be required as it is testing facility; (iii)             Flow measurement for export not furnished with specific item and quantity; (iv)             Documentary proof import of item No. 86 that it is software & not a tool; (v)               No new information regarding main inlet valve.    The Committee, therefore, decided to advise the firm to advise the firm to appear before the NC in person along technical expert with full facts of the case. The case may be relisted on 31.05.2011.   S.No.44

Case No. A/R­ 193

M/s.  Air  Liquid Engineering  India Pvt. Ltd., Hyderabad  F.No. 01/80/50/00024/AM10/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.09/70/040/00167/AM09 0910036290 dt.12.12.2008 Date: 19.04.2011   As per written comments of DIPP received vide their U.O. Note No. dated 19.04.2011,  the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   1. Description, quantity and net weight  of export product  to be modified as under:   Description Quantity Net Export Weight Air  Separation  Unit consisting of Valve Skid 1No. 41 MT   2. Import items from Sl. No. 1 to 6, 8, 10 & 12 to 20 to be deleted as the same are not required in the manufacture of revised export product. 3. Quantities of import items at Sl. No. 7 & 9 to be allowed as 13 Nos. & 6 Nos. respectively on net to net basis with accountability clause. 4. Description  of  import  item  at  Sl.  No.  11  to  be  modified  as  “Relevant  Carbon  Steel Plates/Channel/Angles/Flats/Rods” and its quantity to be allowed as 29 MT on net to net basis. 5. Import item at Sl. No 21 to be allowed on net to net basis. 6. Quantity of import item at Sl. No. 22  to be allowed as 5 Nos. on net to net basis with accountability clause.     S.No.45

Case No. A/R­ 195

M/s.  Bharat  Heavy Electricals  Ltd., Ranipet  F.No. 01/80/50/00758/AM10/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.04/24/040/00249/AM10 0410110777 dt.12.01.2010 Date: 19.04.2011   The  Committee  noted  that  reply  submitted  by  the  firm  is  insufficient.  On  the  recommendation  of  the representative of DIPP present in the meeting, the Committee decided to call for the following details from the firm and to re­list the case on  31.05.2011: ­ 1.           Separate quantity of pipes (in mtrs.) and fittings (in Numbers) for import item at S.No. 6 and basis thereof.

2.      Quantities of testing chemicals at Sl. No. 7 & 8 and basis/justification for their quantities.   S.No.46

Case No. A/R­ 196

M/s.  Bharat  Heavy Electricals  Ltd., Ranipet  F.No. 01/80/50/00819/AM10/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.04/24/040/00290/AM10 0410112044 dt.02.03.2010 Date: 19.04.2011   The  Committee  noted  that  reply  submitted  by  the  firm  is  insufficient.  On  the  recommendation  of  the representative of DIPP present in the meeting, the Committee decided to call for the following details from the firm and to re­list the case on  31.05.2011: ­ 1.      Total  weight of export product has now been indicated as 610 MT as against 905 MT in the original application and the same may be clarified. 2.      Quantity of import item at Sl. No. 9 and basis/justification thereof. 3.      Specific item of import at Sl. No. 12 & 13 and basis/justification for their quantities. 4.      Specific description of import items of import items at Sl. Nos. 15, 16 & 17. 5.      Separate quantity of pipes (in mtrs.) and fittings (in Numbers) for import items at Sl. Nos. 19, 20 & 22 and basis thereof. 6.      Constituents of “Sets” for all the import items.   S.No.47

Case No. A/R­ 189

M/s.  Nicomet Industries Ltd.,  F.No. 01/80/50/01590/AM06/DES.I Lic.No. & Date Meeting No.02/12 RA F.No.03/95/040/01527/AM06 0310372647 dt.22.03.2006 Date: 19.04.2011   The  representative  of  the  firm  Shri  Vipul  Porwal,  Chief  Executive  Officer  and  Sh.  Ashok  Mehtra;  appeared  before  the  Committee  for  personal  hearing.  They  explained  the  case  to  the  Committee.  The representative of  DC(MSME) present in the meeting suggested to ratify the norms of the export item “Cobalt Metal’ based on earlier decision in the similar cases taken as per sub­Committee report in respect of M/s Nicomet Industries Ltd. and comments on M/s Rubamin Ltd case. The Committee decided to ratify the  norms  in  respect  of  the  subject  advance  authorization  subject  to  furnishing  of  Comments  of DC(MSME).  DC(MSME) furnished the written comments  vide their U.O. note No. 30(3)/2011­ME dated 21.04.2011. The norms in respect of the subject advance authorization are ratified as under:­   Export Products Cobalt Metal   ­­­­­­ 1 Kg.   S.No. Import  Item Quantity allowed per 1 kgs of Cobalt Metal 1. Intermediate  product  of  Cobalt metallurgy 1.075  Kg  including  7.5  % wastage  2. Caustic Soda flaks 4.34  kg./kg  cobalt  of  metal  as per  sub  Committee recommendations 3. EXXSOL  D80/SUPERIOR KERSOENE  OIL/  SAFRASOL D80/SHELLSOL 2046 d80/shell 0.143  LITER/KG  OF  COBALT METAL  as  per  sub  Committee recommendations 4. SOLVENT    (LIX664M/IONQUES 801/VERSATIC 10) 0.086  KG/KG  OF  COBALT METAL  as  per  sub  Committee recommendations       S.No.48

Case No. A/R­ 117

M/s. Thermax Ltd.,  F.No. 01/80/50/01034/AM09/DES.I Lic.No. & Date

Meeting No.02/12 RA F.No.31/24/040/00143/AM09 3110035317 dt.09.09.2008 Date: 19.04.2011   The  representative  of  the  firm  Shri  Jacob  George,  Deputy  General  Manager  Commercial  (Internal Business);  B.M.  Dhumal,  Manager  (Imports)  &  others;    appeared  before  the  Committee  for  personal hearing.  They  explained  the  case  to  the  Committee.  The    firm’s  representatives  were  asked  to  furnish details of actual export product and specific import  against it and justify the quantity of import through calculation/documentary evidence supported by drawing.  For items manufactured by the firm, shipping bill are required to be produced. The firm’s representative promised to furnish the complete reply  as per advice. The case may be re­listed on 31.05.2011.    

Case  No.    A/R­

03 M/s.  GEA  BGR Energy  System India  LTd., Chennai HQF.No.01/80/050/01101/AM08/DES.I Lic. No. & date Meeting  No. 02/12 RA.F.No.04/24/040/00349/AM08 0410093469 dt.25.01.2008 Date: 19.04.2011   The Committee noted that the firm has requested vide their letter dated 12.04.2011 to postpone the personal hearing to 03.05.2011.  The Committee decided to postpone the personal hearing on 31.05.2011 and to re­list the case on 31.05.2011.  

Case  No.    A/R­

04 M/s.  GEA  BGR Energy  System India  LTd., Chennai HQF.No.01/80/050/01098/AM08/DES.I Lic. No. & date Meeting  No. 02/12 RA.F.No.04/24/040/00324/AM08 0410092979 dt.02.01.2008 Date: 19.04.2011   The Committee noted that the firm has requested vide their letter dated 12.04.2011 to postpone the personal hearing to 03.05.2011.  The Committee decided to postpone the personal hearing on  31.05.2011 and to re­list the case on 31.05.2011. DHI’s written comments dated 09.03.2011 has been received.      

Case  No.    A/R­

05 M/s.  Bharat Heavy Electricals  LTd., Ranipet HQF.No.01/80/050/00253/AM10/DES.I Lic. No. & date Meeting  No. 02/12 RA.F.No.04/24/040/00034/AM10 0410106305 dt.21.07.2009 Date: 19.04.2011   The representative of the DHI informed the Committee that the case is under study.  The Committee, therefore,  

Case  No.    A/R­

06 M/s.  Bharat Heavy Electricals  LTd., Ranipet HQF.No.01/80/050/00333/AM09/DES.I Lic. No. & date Meeting  No. 02/12 RA.F.No.04/24/040/00383/AM08 0410094754 dt.25.03.2008 Date: 19.04.2011   The representative of the DHI informed the Committee that the case is under study.  The Committee, therefore,  

Case  No.    A/R­

07 M/s.  Kamal Rubber  Plast HQF.No.01/80/050/00496/AM10/DES.I Lic. No. & date

Industries  P. LTd., Meeting  No. 02/12 RA.F.No.05/23/040/00063/AM10 0510251132 dt.20.10.2009 Date: 19.04.2011   The representative of the DIPP informed the Committee that the case is under study.  The Committee, therefore,  

Case  No.    A/R­

08 M/s.  Johnson Matthey  India Pvt.  LTd., Gurgaon HQF.No.01/80/050/00501/AM10/DES.I Lic. No. & date Meeting  No. 02/12 RA.F.No.05/24/039/00001/AM10 0510240582 dt.29.04.2009 Date: 19.04.2011   The representative of the DHI informed the Committee that the case is under study.  The Committee, therefore,  

Case  No.    A/R­

09 M/s.  Cantronics Office Equipments  Pvt. LTd., Thane HQF.No.01/80/050/00399/AM11/DES.I Lic. No. & date Meeting  No. 02/12 RA.F.No.03/94/040/00342/AM11 0310585473 dt.29.07.2010 Date: 19.04.2011   The Committee was apprised that the firm was also given personal hearing by the Chairman and the request was examined  on  file.    In  view  of  the  fact  that  in  similar  cases  earlier,  the  norms  were  ratified  by  the  Norms Committee,  the Committee decided to ratify the norms in this case on repeat basis i.e. similar to norms ratify in Advance Authorization No. A.0310532496 dated 05.08.2009 in Meeting No. 38/10  held on 05.08.2009, as under:­   1. Quantity of Empty Cartridges  may be allowed on net­to­net basis. 2. Quantity of Toner may be allowed as Net + 5% wastage.      

Case  No.    A/R­

10 M/s.  Cantronics Office Equipments  Pvt. LTd., Thane HQF.No.01/80/050/00398/AM11/DES.I Lic. No. & date Meeting  No. 02/12 RA.F.No.03/94/040/00341/AM11 0310585472 dt.29.07.2010 Date: 19.04.2011   The Committee was apprised that the firm was also given personal hearing by the Chairman and the request was examined  on  file.    In  view  of  the  fact  that  in  similar  cases  earlier,  the  norms  were  ratified  by  the  Norms Committee,  the Committee decided to ratify the norms in this case on repeat basis i.e. similar to norms ratify in Advance Authorization No. A.0310532496 dated 05.08.2009 in Meeting No. 38/10  held on 05.08.2009, as under:­   1. Quantity of Empty Cartridges  may be allowed on net­to­net basis. 2. Quantity of Toner may be allowed as Net + 5% wastage.       S.No.06

Case No.C­35

 M/s. Panch Ratna Fastners (P). Ltd; HQ F.No.01/80/162/1316/AM09/DES.I Meeting No.02/12

Date: 19.04.2011 Alleged  swindling  of  several  crores  of  Govt. revenue –DEPB.   The Committee decided to examine the case on file and to re­list the case on 31.05.2011.   Sl.No.07

Case No. C ­ 16

M/s.    Birla  Precision Technologies  Ltd., Aurangabad HQ F.No.01/80/162/00608/AM11/ DES­I Meeting No.02/12 Fixation of input output norms for the export product  “Tool  Holder”  in  respect  of    100% EOU Date: 19.04.2011   The Committee noted the written comments of  the representative DHI received vide U.O. Note No. 01/08/10­ TSW(B) dated 19.04.2011that the firm has submitted information along with samples vide their letter of dated 24­01­11  &  2­2­11.    It  is  observed  that  the  firm  has  taken  over  size  raw  material.  For  example  for  part  no 4009944 ( Item no 12), the dia of final product is 12.7 mm & length is 97.46 mm against which the firm has taken bar of dia 16 mm & length 103 mm. Similarly for item no 13 the dia of final product is 21.2 mm against which the firm has taken bar of dia 25 mm. The Committee, therefore, decided to ask the firm to give calculation of raw material taking in to account the actual size of bar required & not over size bars.  The case may be re­ listed on 31.05.2011.    

Case No.C­01

  M/s.  Snecma  Hal Aerospace LTd., HQ F.No.01/80/162/00681/AM11/DES.I Meeting No.02/12 Date: 19.04.2011 Fixation  of  SION  for  Export  Product  “(Fluid System) – Air Crafts Part.   The Committee to await the comments from DGCA and to relist the case on 31.05.2011.  

Case No.C­02

  M/s.  Kumar  Exports, Ludhiana HQ F.No.01/80/162/00057/AM12/DES.I Meeting No.02/12 Date: 19.04.2011 Denial of DEPB benefits by the ICD Ludhiana Customs  against  the  export  product  under  Sl. No.51/426 of DEPB rate Schedule.   The Committee decided to call the following information from the firm:­   (i)                 Quantity of import/material used; (ii)               Duty applicable under SION 531; 446 & 426 (iii)             Details of  the product; Drawing; flow chart and photographs of the  product.   The case may be re­listed on 31.05.2011  