DGFT Committee Minutes
Ra쬅fied Minutes of Meeting No.26/14 scheduled on 18.03.2014 of Norms Committee(NCI) (DES.I Section) The mee쬅ng No. 26/14 of the Norms Commi蠅ee (NC‐I) for the licensing year 2012‐2013 was held on18.03.2014 under the Chairmanship of Dr. L.B. Singhal, Addi쬅onal Director General of Foreign Trade to consider the applica쬅ons under Duty Exemp쬅on / Remission Schemes (Chapter‐4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume‐I. The following Members of the Commi蠅ee were present in the mee쬅ng: ‐ Sl.No Name of the representa쬅ves & their Designa쬅on Room No. Telephone No. Dep蠅. 1. Sh K.K. Tiwari I.A 476 23063321 DHI, U.B. 2. Sh S.K. Jain, D.O. 428A 23063321 Extn.3318 23063166 DIPP, U.B. 3. Sh. Kanwalinder Singh Sodhi, Ass蠅. Dir. (Mech) 736A 23063802 Extn.2459 DC(MSME),N.B. 4. Sh. Parveen Sharma, Dy.DGFT 302 23061562 Extn.146 DGFT, U.B. 5. Sh. Priya Ranjan, FTDO 404 23061562 Ext.265 DGFT, U.B. I ‐The Commi蠅ee considered the individual cases of the agenda of this mee쬅ng generated through the online system of NIC. The decisions taken thereon are as under: 1
Case No.:16/25/80ALC2/2011
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00495/AM12/ RLA File :34/24/040/00186/AM12/ Lic.No/Date:3410032547 14.12.2011 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s applica쬅on has been forwarded to C&PC on 05.02.2012 and a쌀er that several reminders have been sent to C&PC. The Commi蠅ee further noted that the last/seventh reminder have sent to C&PC on 13.03.2014 and decided to remind them again. Case is deferred to 29.04.2014. 2
Case No.:38/23/80ALC2/2013
Party Name:NETAFIM IRRIGATION INDIA PVT.LTD., Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00464/AM14/ RLA File :34/24/040/00021/AM13/ Lic.No/Date:3410034147 17.05.2012 Decision : The Commi蠅ee decided to ra쬅fy norms on the basis of C&PC le蠅er No. 46011/55/2010‐PC‐II dated 10.03.2014 (Copy is to be forwarded to RA and firm). RLA may take necessary ac쬅on accordingly. 3
Case No.:4/10/81ALC2/2012
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/81/050/00199/AM13/ RLA File :05/23/040/00134/AM13/ Lic.No/Date:0510329855 17.07.2012 Decision : The Commi蠅ee decided to ra쬅fy norms on the basis wri蠅en comments of DHI dated 18.03.2014 which are as under: Item No 1,2 – 1.02 Kg/kg content. Item 3,4 ‐ Net to net with accountability.
4
Case No.:29/25/80ALC2/2012
Party Name:BRAKES INDIA LIMITED, Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00561/AM13/ RLA File :04/24/040/00205/AM13/ Lic.No/Date:0410143034 31.01.2013 Decision : The Commi蠅ee decided to ra쬅fy norms on the basis of DHI U.O. No. 3(67)/11‐TSW(B) dated 06.03.2014 (Copy is to be forwarded to RA and firm). 5
Case No.:16/2/80ALC2/2013
Party Name:CICB CHEMICON PRIVATE LIMITED, Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00016/AM14/ RLA File :07/24/040/00452/AM13/ Lic.No/Date:0710093506 01.02.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 09.12.2013 followed by reminder dated 16.01.2014, final reminder dated 27.02.2014 and decided to await 15 days more to receive reply from the firm failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. 6
Case No.:20/4/80ALC2/2013
Party Name:UNDERCARRIAGE AND TRACTOR PARTS PVT.LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00067/AM14/ RLA File :03/95/040/01027/AM13/ Lic.No/Date:0310728824 20.03.2013 Decision : The Commi蠅ee noted that the norms of subject AA have been ra쬅fied in the mee쬅ng No. 24/14 dated 18.02.2014 on the basis of MSME U.O. note No. 30(28)2013‐ME dated 05.2.2014. The Commi蠅ee further noted that Technical Authority, MSME has observed that some calcula쬅on error occurred in their aforesaid communica쬅on which has been no쬅ced by him and rec쬅fied vide their subsequent UO note No. 30(28)2013 –ME dated 26.02.2013 and decided to accept the amendment proposed by MSME vide their aforesaid recent communica쬅on (Copy of said U.O. Notes may be forwarded to firm and RA) 7
Case No.:40/2/80ALC2/2013
Party Name:TERUMO PENPOL LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00040/AM14/ RLA File :53/24/040/00015/AM13/ Lic.No/Date:5310016509 27.03.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s applica쬅on has been forwarded to C&PC for examina쬅on/comments which is under their examina쬅on. The Commi蠅ee further noted that C&PC has been reminded for expedi쬅ng their comments vide le蠅er dated 13.03.2014 and decided to remind them again. Case is deferred to 29.04.2014.
Case No.:42/23/80ALC2/2013
Party Name:HTD HEAT TRACE(INDIA)PVT LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00468/AM14/ RLA File :09/24/040/00314/AM13/ Lic.No/Date:0910055714 12.04.2013
8 Decision : The Commi蠅ee decided to ra쬅fy norms on the basis of DIPP U.O. Note No. 12/40/2014‐TSW/8 dated 18.03.2014 which are as under: 1. Words “1 set comprising of 24 Hea쬅ng modules ” may be suffixed with the descrip쬅on of export product. 2. Net Weight of export products may be specified as 19428.4 Kgs. 3. Quan쬅쬅es of import items from Sl. Nos. 1 to 24 may be allowed on net to net basis as claimed by the firm. 9
Case No.:2/26/80ALC2/2013
Party Name:BANCO PRODUCTS (INDIA) LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00568/AM14/ RLA File :34/24/040/00271/AM13/ Lic.No/Date:3410036702 26.04.2013 Decision : The Commi蠅ee decided to ra쬅fy norms as per SION: C‐1891, on the basis of DHI wri蠅en Communica쬅on dated 18.03.2014 . 10
Case No.:17/8/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00127/AM14/ RLA File :04/24/040/00253/AM13/ Lic.No/Date:0410145648 30.04.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 20.01.2014 followed by reminder dated 28.02.2014 and decided to send final reminder to firm failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. 11
Case No.:10/8/80ALC2/2013
Party Name:BANCO PRODUCTS (INDIA) LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00120/AM14/ RLA File :34/24/040/00030/AM14/ Lic.No/Date:3410036871 14.05.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s reply dated 13.02.2014 has been sent to DHI on 20.02.2014 for their examina쬅on & comments which is under their examina쬅on and decided to await comments of DHI. Case is deferred to 29.04.2014. 12
Case No.:4/8/80ALC2/2013
Party Name:IN TRANS ENGINEERING LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00114/AM14/ RLA File :02/24/040/00012/AM14/ Lic.No/Date:0210189641 15.05.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 20.02.2014 and decided to send reminder. Case is deferred to 29.04.2014.
Case No.:8/20/80ALC2/2013
Party Name:GANDIKOTA THERMO CONTROLS PVT LTD Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00396/AM14/ RLA File :09/24/040/00079/AM14/
13 Lic.No/Date:0910056155 28.05.2013 Decision : The Commi蠅ee decided to ra쬅fy norms on the basis of DIPP U.O. Note No. 12/40/2014‐TSW/13 dated 18.03.2014 which are as under: 1. Import items at Sl. No 1 & 2 may be allowed as per packing policy for export product at Sl. No. 1. 2. Quan쬅쬅es of import items from Sl. No. 3 to 36 may be allowed on net to net basis for export product at Sl. No. 1. 3. Import items at Sl. No 37 & 38 may be allowed as per packing policy for export product at Sl. No. 2. 4. Quan쬅쬅es of import items from Sl. No. 39 to 59 may be allowed on net to net basis for export product at Sl. No. 2. 5. Import of components may be allowed with accountability clause 14
Case No.:14/8/80ALC2/2013
Party Name:SPIROTECH HEAT EXCHANGERS PVT. LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00124/AM14/ RLA File :05/24/040/00491/AM13/ Lic.No/Date:0510355533 29.05.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the reply received from the firm is incomplete and decided to ask the firm to furnish the following informa쬅on according to DIPP ID Note No. 12/40/2014‐TSW/14 dated 18.03.2014: Basis for the quan쬅쬅es of import items supported by quan쬅쬅es of each export product namely, BSH Evap. 7.00mm, BSH Cond. 7.00mm, IR ES‐300 & IR ES‐500. Case is deferred to 29.04.2014. 15
Case No.:6/13/80ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00211/AM14/ RLA File :05/23/040/00072/AM14/ Lic.No/Date:0510356381 06.06.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 09.01.2014 followed by reminder dated 27.02.2014 and decided to send final reminder to firm failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. 16
Case No.:11/8/80ALC2/2013
Party Name:METSO MINERALS (INDIA) PVT.LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00121/AM14/ RLA File :05/24/040/00074/AM14/ Lic.No/Date:0510357008 13.06.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s reply has been sent to DHI on 19.12.2013 for their examina쬅on & comments which is under their examina쬅on and decided to await comments of DHI. Case is deferred to 29.04.2014. 17
Case No.:2/11/80ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00203/AM14/ RLA File :05/23/040/00094/AM14/ Lic.No/Date:0510357230 17.06.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the informa쬅on furnished by the firm vide their reply dated 03.02.2014 is not in accordance with the submissions made by their representa쬅ve during ‘PH’ held on 24.12.2013, on the basis of the comments offered by Technical Authority, DHI present in the mee쬅ng. The Commi蠅ee decided to apprise firm
about the aforesaid and ask the firm to furnish the appropriate reply according to deficiency le蠅er sent to them. 18
Case No.:37/13/80ALC2/2013
Party Name:PRIJAI HEAT EXCHANGERS PVT. LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00242/AM14/ RLA File :03/95/040/00236/AM14/ Lic.No/Date:0310741064 10.07.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 29.10.2013 followed by reminder dated 09.12.2013, final reminder dated 20.01.2014 and granted 15 days 쬅me to the firm for furnishing their reply but the firm’s reply has not been received 쬅ll date. The Commi蠅ee decided to give one last opportunity to the firm by reminding them through e‐mail again failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. 19
Case No.:11/13/80ALC2/2013
Party Name:LARSEN& TOUBRO LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00216/AM14/ RLA File :03/95/040/00289/AM14/ Lic.No/Date:0310741482 15.07.2013 Decision : The Commi蠅ee decided to ra쬅fy norms on the basis of DIPP U.O. Note No. 12/40/2014‐TSW/19 dated 18.03.2014 which are as under: 1. Net empty weight of 330 MT may be specified with the quan쬅ty of export product. 2. Import items at Sl. No. 1 & 2 shall be of relevant grade and thickness as contained in the export product 3. Quan쬅쬅es of import items at from Sl. No. 1 & 2 may be allowed as applied for i.e. 40000 Kgs. & 16000 Kgs. respec쬅vely as 1.05 Kgs./Kg. content in the export products. 4. Quan쬅ty of import item at Sl. No. 3 may be allowed as under on net to net basis: Hemispherical Heads: 4 Nos. (27112 Kgs.) Test Coupons: 12 Nos. (2388 Kgs.) 5. Total quan쬅ty of import item at Sl. No. 4 may be allowed as 110 Nos. (157 MT) on net to net basis. 6. Weight of “Test Coupons” in import item at Sl. No. 4 may be restricted to 2388 Kgs. 7. Import items at Sl. No. 5 & 6 shall be of relevant grade and dia. as contained in the export product. 8. Quan쬅ty of import item at Sl. No. 5 may be allowed as 60500 Mtrs. (87470 Kgs.) inclusive of a wastage of 2%. 9. Quan쬅ty of import item at Sl. No. 6 may be allowed as 649 Kgs. as 1.02 Kgs./Kg. content in the export products. 10. Quan쬅ty of import item at Sl. No. 7 may be allowed as 90 Nos. (800 Kgs.) on net to net basis. 11. Total quan쬅ty of import item at Sl. No. 8 may be allowed as 2900 Nos. (248 Kgs.) on net to net basis. 12. Quan쬅쬅es of import items at Sl. No. 9, 10, 11 & 12 (welding Consumables) may be allowed as 1550 Kgs., 500 Kgs., 1810 Kgs. & 3360 Kgs. respec쬅vely. 20
Case No.:47/13/80ALC2/2013
Party Name:THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT. LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00252/AM14/ RLA File :31/82/040/00079/AM14/ Lic.No/Date:3110059367 15.07.2013 Defer Date:29.04.2014
Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 28.02.2014 and decided to send reminder. Case is deferred to 29.04.2014. 21
Case No.:36/13/80ALC2/2013
Party Name:PRIJAI HEAT EXCHANGERS PVT. LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00241/AM14/ RLA File :03/95/040/00282/AM14/ Lic.No/Date:0310741722 16.07.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 29.10.2013 followed by reminder dated 09.12.2013, final reminder dated 20.01.2014 and granted 15 days 쬅me to the firm for furnishing their reply but the firm’s reply has not been received 쬅ll date. The Commi蠅ee decided to give one last opportunity to the firm by reminding them through e‐mail again failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. 22
Case No.:10/13/80ALC2/2013
Party Name:LARSEN&TOUBRO LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00215/AM14/ RLA File :03/95/040/00278/AM14/ Lic.No/Date:0310742010 18.07.2013 Decision : The Commi蠅ee decided to ra쬅fy norms on the basis of DHI U.O. No. 3(61)/13‐TSW(B)/47 dated 11.02.2014 (Copy is to be forwarded to RA and firm). 23
Case No.:15/13/80ALC2/2013
Party Name:ANUPAMMHI INDUSTRIES LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00220/AM14/ RLA File :34/24/040/00080/AM14/ Lic.No/Date:3410037482 25.07.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 09.02.2014 followed by reminder dated 27.02.2014 and decided to send final reminder to firm failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. 24
Case No.:13/13/80ALC2/2013
Party Name:MOTHERSON SUMI SYSTEMS LTD., Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00218/AM14/ RLA File :05/24/040/00152/AM14/ Lic.No/Date:0510360927 26.07.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s reply has been forwarded to C&PC on 20.2.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind C&PC for expedi쬅ng their comments. Case is deferred to 29.04.2014. 25
Case No.:12/13/80ALC2/2013
Party Name:MOTHERSON SUMI SYSTEMS LTD., Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00217/AM14/ RLA File :05/24/040/00157/AM14/ Lic.No/Date:0510361154 29.07.2013 Defer Date:29.04.2014
Decision : The Commi蠅ee noted that the firm’s applica쬅on has been sent to C&PC on 12.9.2013 and firm’s another le蠅er dated 01.01.2014 has also been sent to JS(C&PC). The Commi蠅ee further noted that C&PC has been reminded for expedi쬅ng their comments on 27.2.2014 and decided to await their comments. Case is deferred to 29.04.2014. 26
Case No.:45/13/80ALC2/2013
Party Name:NEO WHEELS LTD (FRMLY KNOWN AS VERSATILE H.C.& ENG Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00250/AM14/ RLA File :03/95/040/00325/AM14/ Lic.No/Date:0310743194 29.07.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 29.11.2013 followed by reminder dated 17.01.2014, final reminder dated 28.02.2014 and decided to await 15 days more to receive reply from the firm failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. 27
Case No.:25/13/80ALC2/2013
Party Name:YTEC INDIA PVT. LTD., Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00230/AM14/ RLA File :05/24/040/00146/AM14/ Lic.No/Date:0510361186 30.07.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to le蠅er dated 13.09.2013 sent to them for apprising Commi蠅ee about the type of the export (Physical Export or Deemed Export), deficiency le蠅er dated 29.10.2013 followed by reminder dated 09.12.2013, final reminder dated 16.01.2014, further communica쬅on dated 17.01.2014 and granted 15 days 쬅me to the firm for furnishing their reply but the firm’s reply has not been received 쬅ll date. The Commi蠅ee decided to give one last opportunity to the firm by reminding them through e‐mail again failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. 28
Case No.:26/13/80ALC2/2013
Party Name:YTEC INDIA PVT. LTD., Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00231/AM14/ RLA File :05/24/040/00145/AM14/ Lic.No/Date:0510361184 30.07.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to le蠅er dated 09.10.2013 sent to them for apprising Commi蠅ee about the type of the export (Physical Export or Deemed Export) followed by reminder dated 14.10.2014, deficiency le蠅er dated 29.10.2013 followed by its reminder dated 09.12.2013, final reminder dated 16.01.2014, further communica쬅on dated 17.01.2014 and granted 15 days 쬅me to the firm for furnishing their reply but the firm’s reply has not been received 쬅ll date. The Commi蠅ee decided to give one last opportunity to the firm by reminding them through e‐mail again failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. 29
Case No.:32/13/80ALC2/2013
Party Name:SPIROTECH HEAT EXCHANGERS PVT. LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00237/AM14/ RLA File :05/24/040/00147/AM14/ Lic.No/Date:0510361267 30.07.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm has sent the reply dated 03.02.2014 to Technical Authori쬅es, DIPP directly which has not been received by him and decided to forward the copy of firm’s reply to DIPP for their examina쬅on and comments. Case is deferred to 29.04.2014.
30
Case No.:27/13/80ALC2/2013
Party Name:VEESONS ENERGY SYSTEMS PRIVATE LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00232/AM14/ RLA File :04/24/040/00082/AM14/ Lic.No/Date:0410148394 31.07.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 25.10.2013 followed by reminder dated 09.12.2013, final reminder dated 08.02.2014 and decided to await 15 days more to receive reply from the firm failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. 31
Case No.:8/13/80ALC2/2013
Party Name:BORG WARNER EMISSIONS SYSTEMS INDIA PVT. LTD Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00213/AM14/ RLA File :05/23/040/00160/AM14/ Lic.No/Date:0510361728 02.08.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that deficiency le蠅er (D/L) dated 29.11.2013 has been again send to the firm as per their request made through e‐mail message dated 06.2.2014 but the firm has not replied to the aforesaid D/L and decided to send reminder to the firm. Case is deferred to 29.04.2014. 32
Case No.:14/13/80ALC2/2013
Party Name:MOTHERSON SUMI SYSTEMS LTD., Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00219/AM14/ RLA File :05/24/040/00165/AM14/ Lic.No/Date:0510361578 02.08.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s reply has been forwarded to C&PC on 20.2.2014 for examina쬅on/comments which is under their examina쬅on and decided to remind C&PC for expedi쬅ng their comments. Case is deferred to 29.04.2014. 33
Case No.:24/13/80ALC2/2013
Party Name:BRAKES INDIA LIMITED, Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00229/AM14/ RLA File :04/24/040/00084/AM14/ Lic.No/Date:0410148445 02.08.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s reply has been forwarded to DHI on 27.1.2014 for examina쬅on/comments which is under their examina쬅on and decided to remind DHI for expedi쬅ng their comments. 34
Case No.:8/23/80ALC2/2013
Party Name:TATA HITACHI CONSTRUCTION MACHINERY CO. LTD, Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00434/AM14/ RLA File :02/24/040/00069/AM14/ Lic.No/Date:0210193631 30.08.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 28.2.2014 and decided to send reminder to the firm. Case is deferred to 29.04.2014. 35
Case No.:13/23/80ALC2/2013
Party Name:TATA HITACHI CONSTRUCTION MACHINERY CO. LTD, Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00439/AM14/ RLA File :02/24/040/00086/AM14/ Lic.No/Date:0210194377 17.09.2013 Defer Date:29.04.2014
Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 28.2.2014 and decided to 36
Case No.:15/23/80ALC2/2013
Party Name:TATA HITACHI CONSTRUCTION MACHINERY CO. LTD, Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00441/AM14/ RLA File :02/24/040/00092/AM14/ Lic.No/Date:0210194727 25.09.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 28.2.2014 and decided to 37
Case No.:16/23/80ALC2/2013
Party Name:TIL LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00442/AM14/ RLA File :02/24/040/00094/AM14/ Lic.No/Date:0210194860 27.09.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s applica쬅on has been forwarded to DHI on 30.1.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind DHI for expedi쬅ng their 38
Case No.:41/23/80ALC2/2013
Party Name:PUTZMEISTER CONCRETE MACHINES PRIVATE LIMITED, Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00467/AM14/ RLA File :17/24/040/00069/AM14/ Lic.No/Date:1710005527 01.10.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 28.2.2014 and decided to 39
Case No.:48/23/80ALC2/2013
Party Name:RUD INDIA CHAIN PVT. LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00474/AM14/ RLA File :03/95/040/00485/AM14/ Lic.No/Date:0310751919 01.10.2013 Decision : The Commi蠅ee decided to ra쬅fy norms on GN‐4 basis according to DHI U.O. No. 3(54)/13‐TSW(B)/45 dated 11.02.2014 (Copy is to be forwarded to RA and firm). 40
Case No.:2/20/80ALC2/2013
Party Name:L&T MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00390/AM14/ RLA File :03/95/040/00511/AM14/ Lic.No/Date:0310753783 15.10.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s reply has been forwarded to DHI on 13.3.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind DHI for expedi쬅ng their comments. Case is deferred to 29.04.2014.
Case No.:3/20/80ALC2/2013
Party Name:L&T MHI TURBINE GENERATORS PVT.LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00391/AM14/ RLA File :03/95/040/00510/AM14/
41 Lic.No/Date:0310753791 15.10.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s reply has been forwarded to DHI on 14.3.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind DHI for expedi쬅ng their comments. Case is deferred to 29.04.2014. 42
Case No.:49/23/80ALC2/2013
Party Name:SHAKTI PUMPS (INDIA) LTD., Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00475/AM14/ RLA File :56/24/040/00021/AM14/ Lic.No/Date:5610003030 17.10.2013 Decision : The Commi蠅ee decided to ra쬅fy norms on repeat basis according to DIPP U.O. Note No. 12/40/2014‐ TSW/42 dated 18.03.2014 which are as under: 1. Net weights of 78 MT, 88.5 MT & 102 MT may be specified with the quan쬅쬅es of export products at Sl. No. 1, 2 & 3 respec쬅vely. 2. Word “Relevant” may be prefixed with the descrip쬅ons of import items at Sl. No. 1 to 5. 3. Quan쬅ty of import item at Sl. No. 1 may be allowed as 12970 Kgs. inclusive of 5 % wastage. 4. Quan쬅ty of import item at Sl. No. 2 may be allowed as 1062 Kgs. inclusive of 18 % wastage a쌀er 1/3rd recovery from scrap. 5. Quan쬅쬅es of import item at Sl. No. 3 & 4 may be allowed as 176850 Kgs. & 32060 Kgs. respec쬅vely as per SION C‐1519. 6. Quan쬅ty of import item at Sl. No. 5 may be allowed as 33235 Kgs. inclusive of 20 % wastage a쌀er 20 % recovery from scrap. 7. Words “4Cx2.5 Sq.mm” may be suffixed with the descrip쬅on of import item at Sl. No. 6 and its quan쬅ty may be allowed as applied for i.e.18450 Meters on net to net basis. 8. Import items at Sl. Nos. 7 to 12 , 14 & 15 may be allowed as applied for i.e. 4500 Nos. each on net to net basis with accountability clause. 9. Quan쬅ty of import item at Sl. No. 13 may be allowed on net to net basis as claimed by the firm. 43
Case No.:6/20/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00394/AM14/ RLA File :61/24/040/00045/AM14/ Lic.No/Date:6110001074 22.10.2013 Decision : The Commi蠅ee decided to ra쬅fy norms on the basis of DHI U.O. No. 3(15)/13‐TSW(B) dated 06.03.2014 (Copy is to be forwarded to RA and firm). 44
Case No.:5/20/80ALC2/2013
Party Name:LARSEN& TOUBRO LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00393/AM14/ RLA File :03/95/040/00540/AM14/ Lic.No/Date:0310755439 25.10.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 16.01.2014 followed by reminder dated 27.02.2014 and decided to send final reminder to firm failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014.
45
Case No.:6/23/80ALC2/2013
Party Name:TEXMACO RAIL & ENGINEERING LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00432/AM14/ RLA File :02/24/040/00022/AM14/ Lic.No/Date:0210195978 04.11.2013 Decision : The Commi蠅ee decided to ra쬅fy norms on GN‐4 basis according to DHI wri蠅en comments dated 18.3.2014. 46
Case No.:26/23/80ALC2/2013
Party Name:TATA HITACHI CONSTRUCTION MACHINERY CO. LTD, Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00452/AM14/ RLA File :02/24/040/00114/AM14/ Lic.No/Date:0210195980 04.11.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 28.2.2014 and decided to 47
Case No.:5/23/80ALC2/2013
Party Name:IN TRANS ENGINEERING LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00431/AM14/ RLA File :02/24/040/00117/AM14/ Lic.No/Date:0210196536 19.11.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s reply has been forwarded to DIPP (Shri Nand Lal, Sr. D.O.) on 27.2.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind DIPP for expedi쬅ng their comments. Case is deferred to 29.04.2014. 48
Case No.:2/23/80ALC2/2013
Party Name:BANCO PRODUCTS (INDIA) LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00428/AM14/ RLA File :34/24/040/00162/AM14/ Lic.No/Date:3410038487 20.11.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that DHI has advised to send the firm’s request regarding ra쬅fica쬅on of norms of subject AA to C&PC for their comments vide their U.O. No. 3(02)/14‐TSW(B)/43 dated 10.02.2014 (Copy is to be forwarded to C&PC). Case is deferred to 29.04.2014. 49
Case No.:4/23/80ALC2/2013
Party Name:GRAND PRIX ENGINEERING PVT.LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00430/AM14/ RLA File :05/23/040/00319/AM14/ Lic.No/Date:0510371308 20.11.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 28.2.2014 and decided to
Case No.:50/23/80ALC2/2013
Party Name:SHAKTI PUMPS (INDIA) LTD., Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00476/AM14/ RLA File :56/24/040/00026/AM14/ Lic.No/Date:5610003237 21.11.2013 Defer Date:29.04.2014
50 Decision : The Commi蠅ee decided to ask the firm to furnish the following informa쬅on according to DIPP ID Note No. 12/40/2014‐TSW/50 dated 18.03.2014: 1. Informa쬅on in respect of Sl. No. 4 & 5 of Standard Deficiency Format, export product wise. 2. Informa쬅on in respect of Sl. No. 11 of Standard Deficiency Format for import items at Sl. No.1, 2 , 5 & 13 export product wise. 3. Size/Specs. of import item at Sl. No. 6 and jus쬅fica쬅on/basis for quan쬅ty of this item. Net length of rubber cable in each export product may also be indicated. 51
Case No.:36/23/80ALC2/2013
Party Name:POLY MEDICURE LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00462/AM14/ RLA File :05/24/040/00301/AM14/ Lic.No/Date:0510371932 26.11.2013 Decision : The Commi蠅ee decided to ra쬅fy norms on the basis of C&PC le蠅er No. 46011/106/2009‐PC‐II dated 13.03.2014 (Copy is to be forwarded to RA and firm). 52
Case No.:39/23/80ALC2/2013
Party Name:SATTVA ETECH INDIA PRIVATE LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00465/AM14/ RLA File :07/24/040/00276/AM14/ Lic.No/Date:0710100031 27.11.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s applica쬅on has been forwarded to DIT on 29.1.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind DIT for expedi쬅ng their 53
Case No.:1/20/80ALC2/2013
Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00389/AM14/ RLA File :61/24/040/00058/AM14/ Lic.No/Date:6110001106 03.12.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the hard copy of the firm’s applica쬅on has not been forwarded by RA, Dehradun and decided to remind them for forwarding the same. Case is deferred to 29.04.2014. 54
Case No.:23/23/80ALC2/2013
Party Name:HELVOET RUBBER AND PLASTIC TECHNOLOGIES INDIA P.L. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00449/AM14/ RLA File :31/83/040/00105/AM14/ Lic.No/Date:3110061381 05.12.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s applica쬅on has been forwarded to C&PC on 21.1.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind C&PC for expedi쬅ng their 55
Case No.:46/23/80ALC2/2013
Party Name:MARINE FRONTIERS PVT. LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00472/AM14/ RLA File :03/95/040/00699/AM14/ Lic.No/Date:0310760784 05.12.2013 Defer Date:29.04.2014
Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 07.2.2014 and decided to 56
Case No.:24/23/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00450/AM14/ RLA File :04/24/040/00181/AM14/ Lic.No/Date:0410152825 11.12.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 20.2.2014 and decided to 57
Case No.:3/23/80ALC2/2013
Party Name:DEE DEVELOPMENT ENGINEERS LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00429/AM14/ RLA File :05/23/040/00372/AM14/ Lic.No/Date:0510373563 16.12.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s applica쬅on has been forwarded to DHI on 21.1.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind DHI for expedi쬅ng their 58
Case No.:37/23/80ALC2/2013
Party Name:SPIROTECH HEAT EXCHANGERS PVT. LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00463/AM14/ RLA File :05/24/040/00298/AM14/ Lic.No/Date:0510373587 16.12.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee decided to ask the firm to furnish the following informa쬅on according to DIPP ID Note No. 12/40/2014‐TSW/58 dated 18.03.2014: 1. Informa쬅on in respect of Sl. No. 3, 4 5 & 11 of Standard Deficiency Format‐export product wise. 2. Basis for the quan쬅쬅es of import items supported by quan쬅ty of each export product. 59
Case No.:25/23/80ALC2/2013
Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00451/AM14/ RLA File :04/24/040/00199/AM14/ Lic.No/Date:0410153118 17.12.2013 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that firm has not replied to the le蠅er dated 27.01.2014 sent to the them for clarifying the type of export (Physical Export/Deemed Export), deficiency le蠅er dated 20.02.2014 followed by reminder dated 28.02.2014 and decided to send final reminder to firm failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. 60
Case No.:22/23/80ALC2/2013
Party Name:TERUMO PENPOL LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00448/AM14/ RLA File :53/24/040/00007/AM14/ Lic.No/Date:5310017874 31.12.2013 Decision : The Commi蠅ee decided to ra쬅fy norms on the basis of C&PC le蠅er No. 46011/21/2009‐PC‐II dated 13.03.2014 (Copy is to be forwarded to RA and firm).
61
Case No.:9/26/80ALC2/2013
Party Name:MOTHERSON SUMI SYSTEMS LTD., Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00575/AM14/ RLA File :05/24/040/00381/AM14/ Lic.No/Date:0510376193 15.01.2014 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s applica쬅on has been sent to C&PC on 07.03.2014 for examina쬅on and comments. The Commi蠅ee further noted that firm’s clarifica쬅on on type of export (whether physical export or deemed export against invalida쬅on le蠅er to EPCG license) as asked vide DES‐I le蠅er dated 07.03.2014 has not been received and decided the following: (i) to await comments of C&PC; (ii) to send reminder to the firm. Case is deferred to 29.04.2014 62
Case No.:1/23/80ALC2/2013
Party Name:APEX TEST TECHNOLOGIES, Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00427/AM14/ RLA File :07/24/040/00310/AM14/ Lic.No/Date:0710101331 17.01.2014 Defer Date:29.04.2014 Decision : The Commi蠅ee decided to ask the firm to furnish the following informa쬅on according to DIPP ID Note No. 12/40/2014‐TSW/62 dated 18.03.2014: 1. Quan쬅ty of export products in Nos. also in addi쬅on to their weight. 2. Informa쬅on in respect of Sl. No. 3, 5 & 11 of Standard Deficiency Format, export product wise. 3. Detailed calcula쬅ons/basis for the quan쬅쬅es of import items 63
Case No.:51/23/80ALC2/2013
Party Name:GL&V INDIA PRIVATE LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Approved HQ File :01/80/050/00477/AM14/ RLA File :31/83/040/00204/AM14/ Lic.No/Date:3110062278 23.01.2014 Decision : The Commi蠅ee decided to ra쬅fy norms on the basis of MSME UO Note No. 30(134)/13‐ME dated 24.02.2014 (Copy is to be forwarded to RA and firm). 64
Case No.:3/26/80ALC2/2013
Party Name:ALPINE COILS LLP Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00569/AM14/ RLA File :04/24/040/00254/AM14/ Lic.No/Date:0410155295 17.02.2014 Defer Date:29.04.2014 Decision : The Commi蠅ee decided to ask the firm to furnish the following informa쬅on according to DIPP ID Note No. 12/40/2014‐TSW/64 dated 18.03.2014: 1. Material of construc쬅on of import items at Sl. No. 1 to 4 (LWC) and 5 to 12 (ACR Pipe) 2. Informa쬅on in respect of Sl. No. 3, 4 & 5 of Standard Deficiency Format, export product wise. 3. Informa쬅on in respect of Sl. No. 11 of Standard Deficiency Format for import items at Sl. No. 1 to 12, export product wise. 4. Informa쬅on in respect of Sl. No. 6, 8 & 9 of Standard Deficiency Format for import items at Sl. No. 13 to 25, export product wise.
65
Case No.:10/26/80ALC2/2013
Party Name:ISGEC HEAVY ENGINEERING LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00576/AM14/ RLA File :05/23/040/00476/AM14/ Lic.No/Date:0510379678 18.02.2014 Defer Date:29.04.2014 Decision : The Commi蠅ee decided to ask the firm to furnish the following informa쬅on according to DIPP ID Note No. 12/40/2014‐TSW/65 dated 18.03.2014: 1. Informa쬅on in respect of Sl. No. 3, 4, 5, 11 & 14 of Standard Deficiency Format, export product wise. 2. Quan쬅ty of import item at Sl. No. 1 in meters also in addi쬅on to its weight. 3. Quan쬅쬅es of import items at Sl. No. 2 to 6 & 10 to 12 in Nos. also in addi쬅on to their weights. 66
Case No.:4/26/80ALC2/2013
Party Name:JOHNSONMATTHEY INDIA PVT. LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00570/AM14/ RLA File :05/23/040/00483/AM14/ Lic.No/Date:0510380001 21.02.2014 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s applica쬅on has been forwarded to MSME on 12.3.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind MSME for expedi쬅ng their 67
Case No.:5/26/80ALC2/2013
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00571/AM14/ RLA File :05/23/040/00485/AM14/ Lic.No/Date:0510380003 21.02.2014 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s applica쬅on has been forwarded to MSME on 12.3.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind MSME for expedi쬅ng their 68
Case No.:6/26/80ALC2/2013
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00572/AM14/ RLA File :05/23/040/00482/AM14/ Lic.No/Date:0510380000 21.02.2014 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s applica쬅on has been forwarded to MSME on 12.3.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind MSME for expedi쬅ng their 69
Case No.:7/26/80ALC2/2013
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00573/AM14/ RLA File :05/23/040/00484/AM14/ Lic.No/Date:0510380002 21.02.2014 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s applica쬅on has been forwarded to MSME on 12.3.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind MSME for expedi쬅ng their
70
Case No.:8/26/80ALC2/2013
Party Name:JOHNSON MATTHEY INDIA PVT. LTD. Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00574/AM14/ RLA File :05/23/040/00486/AM14/ Lic.No/Date:0510380004 21.02.2014 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s applica쬅on has been forwarded to MSME on 12.3.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind MSME for expedi쬅ng their 71
Case No.:1/26/80ALC2/2013
Party Name:TOSHIBA JSW POWER SYSTEM PRIVATE LIMITED Meet No/Date:26/80 ALC2/2013 18.03.2014 Status: Deferred HQ File :01/80/050/00567/AM14/ RLA File :04/24/040/00213/AM14/ Lic.No/Date:0410155774 03.03.2014 Defer Date:29.04.2014 Decision : The Commi蠅ee noted that the firm’s applica쬅on has been forwarded to DHI on 14.3.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind DHI for expedi쬅ng their S.No.607
Case No. A/R111
M/s. Poly Medicure Ltd., New Delhi HQF.No.01/80/050/00390/AM12/DES.I Lic. No. & date Meeting No.26/14 RA.F.No.05/24/040/00238/AM12 0510304858 dt.10.10.2011 Date: 18.03.2014 Revision of norms Decision : The Commi蠅ee decided to modify norms on the basis of C&PC le蠅er No. 46011/106/2009‐PC‐II dated 13.02.2014 (Copy is to be forwarded to RA and firm). S.No.608
Case No. A/R10
M/s. Minda Sai Ltd., Mumbai HQF.No.01/80/050/00903/AM08/DES.I Lic. No. & date Meeting No.26/14 RA.F.No.03/95/040/00474/AM08 0310440650 dt.23.08.2007 Date: 18.03.2014 Amendment / revision of norms Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 09.01.2014 followed by reminder dated 27.02.2014 and decided to send final reminder to firm failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. S.No.609
Case No. A/R48
M/s. Gas Tech Engineering India Pvt. Ltd., Faridabad HQF.No.01/80/050/00575/AM13/DES.I Lic. No. & date Meeting No.26/14 RLA, No.05/23/040/00447/AM13 0510345184 dt.07.02.2013 Date: 18.03.2014 Request for addition of import items in subject authorization Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 16.01.2014 followed by reminder dated 28.02.2014 and decided to send final reminder to firm failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. S.No.610
Case No. A/R67
M/s. BIOTech Vision Care Pvt. Ltd., Ahmedabad HQF.No.01/80/050/00559/AM13/DES.I Lic. No. & date Meeting No.26/14 RLA, No.08/24/040/00065/AM13 0810112711 dt.18.06.2012 Date: 18.03.2014 Request for revision of norms Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er(D/L) dated 23.12.2013 sent by C&PC directly followed by DGFT reminder dated 27.02.2014 sent alongwith the copy of D/L given by C&PC and decided to send final reminder to firm failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014.
S.No.611
Case No. A/R70
M/s. Gastek Engineering (P) Ltd., New Delhi HQF.No.01/80/050/00509/AM07/DES.I Lic. No. & date Meeting No.26/14 RLA, No.05/24/040/00346/AM07 0510188500 dt.08.08.2006 Date: 18.03.2014 Request for revision of norms Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 28.02.2014 and decided to send reminder to firm. Case is deferred to 29.04.2014. S.No.612
Case No. A/R71
M/s. Daewon India Autoparts Pvt. Ltd., Thiruvallur(TN) HQF.No.01/80/050/00374/AM13/DES.I Lic. No. & date Meeting No.26/14 RLA, No.04/24/040/00142/AM13 0410140372 dt.11.10.2012 Date: 18.03.2014 Request for fixation of norms Decision : The Commi蠅ee noted that the firm’s reply has been forwarded to DHI on 12.3.2014 for examina쬅on and comments which is under their examina쬅on and decided to remind DHI for expedi쬅ng their comments. Case is deferred to 29.04.2014. S.No.613
Case No. A/R72
M/s. AccuFix Precision Tools Pvt. Ltd., Baroda HQF.No.01/80/050/00505/AM13/DES.I Lic. No. & date Meeting No.26/14 RLA, No.34/24/040/00220/AM13 3410035737 dt.26.12.2012 Date: 18.03.2014 Request for fixation of norms Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 09.12.2013 followed by reminder dated 16.01.2014, final reminder dated 27.02.2014 and decided to await 15 days more to receive reply from the firm failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. S.No.614
Case No. A/R81
M/s. Hari Machines Ltd., Sundergarh, Orissa HQF.No.01/80/050/00233/AM13/DES.I Lic. No. & date Meeting No.26/14 RLA, No.23/24/040/00001/AM13 2310003202 dt.10.07.2012 Date: 18.03.2014 Request for fixation of norms Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 05.02.2014 and decided to send reminder to firm. Case is deferred to 29.04.2014. S.No.615
Case No. A/R
104 M/s. SMC Pneumatics (India) Pvt. Ltd., GautamBudh Nagar HQF.No.01/80/171/00210/AM14/DES.I Lic. No. & date Meeting No.26/14 RLA, No.05/24/040/00394/AM12 0510316837 dt.17.02.2012 Date: 18.03.2014 Request for fixation of norms Decision : The Commi蠅ee noted that firm has not replied to deficiency le蠅er dated 06.01.2014 followed by reminder dated 28.02.2014 and decided to send final reminder to firm failing which the Commi蠅ee would be constrained to reject their case with direc쬅on to pay the Custom Duty and applicable interest for regulariza쬅on of the license. Case is deferred to 29.04.2014. S.No.616
Case No. A/R
129 M/s. IFB Industries Limited, Kolkata HQF.No.01/80/162/00047/AM14/DES.I Lic. No. & date
Meeting No.26/14 RLA, No.02/73/040/00818/AM92 RLA, No.02/73/040/00026/AM93 RLA, No.02/73/040/00881/AM92 RLA, No.02/73/040/01020/AM90 RLA, No.02/73/040/00203/AM93 RLA, No.02/73/040/00075/AM93 RLA, No.02/73/040/03976/AM90 RLA, No.02/73/040/01827/AM90 RLA, No.02/73/040/00227/AM91 RLA, No.02/73/040/00014/AM91 RLA, No.02/73/040/00750/AM92 (i) 3321963 dt.30.04.1992 (ii) 3327432 dt.29.09.1992 (iii) 3321987 dt.19.05.1992 (iv) 3204053 dt.21.07.1989 (v) 3388496 dt.30.03.1993 (vi) 3227504 dt.04.12.1992 (vii) 3206667 dt.01.11.1989 (viii) 3204858 dt.09.08.1989 (ix) 3262973 dt.05.02.1991 (x) 3259424 dt.28.02.1992 (xi) 3325249 dt.30.06.1992 Date: 18.03.2014 Request for amendment / revision of norms Decision : The Commi蠅ee noted that the firm’s replies dated 04.03.2014 & 12.03.2014 have been forwarded to DHI on 12.3.2014 & 14.03.2014 respec쬅vely for examina쬅on and comments which is under their examina쬅on and decided to await their comments. Case is deferred to 29.04.2014. S.No.617
Case No. A/R
145 M/s. Berco Undercarriages (India) Pvt. Ltd., Hyderabad HQF.No.01/80/050/00131/AM14/DES.I Lic. No. & date Meeting No.26/14 RLA, No.09/24/040/00625/AM13 0910055625 dt.28.03.2013 Date: 18.03.2014 Request for revision of norms Decision : The Commi蠅ee decided to modify norms on the basis of MSME UO Note No. 30(71)/13‐ME dated 27.02.2014 (Copy is to be forwarded to RA and firm). S.No.618
Case No. A/R
146 M/s. Birla Furukawa Fibre Optics Ltd., Salcette, Goa HQF.No.01/80/050/00113/AM14/DES.I Lic. No. & date Meeting No.26/14 RLA, No.17/24/040/00042/AM14 1710005395 dt.28.03.2013 Date: 18.03.2014 Request for revision of norms Decision : The Commi蠅ee noted that the firm’s request dated 28.01.2014 have been forwarded to D/o Telecommunica쬅on on 07.3.2014 for examina쬅on and comments which is under their examina쬅on and decided to await their comments. Case is deferred to 29.04.2014. S.No.619
Case No. A/R
147 M/s. Fenix Process Technologies Pvt. Ltd., Pune HQF.No.01/80/050/00135/AM14/DES.I Lic. No. & date Meeting No.26/14 RLA, No.31/83/040/00013/AM14 3110058143 dt.30.04.2013 Date: 18.03.2014 Request for revision of norms Decision : The Commi蠅ee decided to ask the firm to furnish informa쬅on in respect of Sl. No. 5 of SDL as per the comments of DIPP representa쬅ve present in the mee쬅ng . Case is deferred to 29.04.2014. S.No.620
Case No. A/R
148 Reference received from Addl. DGFT, Mumbai of M/s. Alstom India Ltd., Mumbai HQF.No.01/80/050/00399/AM14/DES.I Lic. No. & date Meeting No.26/14 RLA, No.03/94/040/00696/AM14 0310756972 dt.06.11.2013 Date: 18.03.2014 Amendment in the description of import item No.1,2,5&6.
Decision : The Commi蠅ee noted that the RA, Mumbai’s le蠅er dated 07.02.2014 have been forwarded to DHI on 07.3.2014 and the case is under examina쬅on DHI. The Commi蠅ee decided to await DHI comments. Case is deferred to 29.04.2014. Sl.No.621
Case No. C – 09
M/s. MTAR Technologies Pvt. Ltd., Hyderabad HQ F.No.01/80/162/00462/AM13/DESI Meeting No.26/14 Fixation of input output wastage Adhoc Norms for the export product “Oil & Gas Exploration components, Catalina Hot Box & Aero Space Parts” in respect of 100% EOU –reg. Date: 18.03.2014 Decision : The Commi蠅ee noted the DHI representa쬅ve sugges쬅on to decided the case as per Sub‐Commi蠅ee report . The Commi蠅ee also noted that comments of DIPP and MSME are also required for ra쬅fica쬅on of norms of AA in respect of some import items and decided to send the same to DIPP and MSME for examina쬅on and comments. Case is deferred to 29.04.2014. Sl.No.622
Case No. C – 12
M/s. Tyco Electronics Corporation India Pvt. Ltd., Bangalore HQ F.No.01/80/162/00361/AM14/DESI Meeting No.26/14 Fixation of Scrap/Wastage norms 0f 100% EOU for the export product “Connectors, Parts of Connectors, Terminals & Contacts for Wires & Cables etc.” –reg. Date: 18.03.2014 Decision : The Commi蠅ee noted that the firm has been asked to furnish recommenda쬅on of MSME, Chennai in respect of modifica쬅on of subject AA which has not been received and decided to send reminder to the firm . Case is deferred to 29.04.2014. S.No.623
Case No. A/R
149 M/s. Pranita Engineering Solutions Pvt. Ltd., HQF.No.01/80/050/00083/AM14/DES.I Lic. No. & date Meeting No.26/14 RLA, No.07/24/040/00503/AM13 0710094700 dt.08.04.2013 Date: 18.03.2014 Ratifications of norms Decision : The Commi蠅ee noted that the firm has been asked to furnish informa쬅on as per deficiency le蠅er dated 27.05.2013 sent to them earlier, vide le蠅er dated 11.3.2014 and further communica쬅on has also been sent on 13.03.2014 to the firm and decided to await reply of the firm. Case is deferred to 29.04.2014. S.No.624
Case No. A/R
150 M/s. Pranita Engineering Solutions Pvt. Ltd., HQF.No.01/80/050/00312/AM13/DES.I Lic. No. & date Meeting No.26/14 RLA, No.07/24/040/00043/AM13 0710088185 dt.14.05.2012 Date: 18.03.2014 Ratifications of norms Decision : The Commi蠅ee noted that the firm has been asked to furnish informa쬅on as per deficiency le蠅ers dated 05.10.2012, 20.11.2012 & 11.4.2013 sent to them earlier, vide le蠅er dated 11.3.2014 and further communica쬅on has also been sent on 13.03.2014 to the firm and decided to await reply of the firm. Case is deferred to 29.04.2014. S.No.625
Case No. A/R
151 M/s. Pranita Engineering Solutions Pvt. Ltd., HQF.No.01/80/050/00313/AM13/DES.I Lic. No. & date Meeting No.26/14 RLA, No.07/24/040/00180/AM13 0710090071 dt.03.08.2012 Date: 18.03.2014 Ratifications of norms Decision : The Commi蠅ee noted that the firm has been asked to furnish informa쬅on as per deficiency le蠅ers dated 05.10.2012, 20.11.2012 & 11.4.2013 sent to them earlier, vide le蠅er dated 11.3.2014 and further communica쬅on has also been sent on 13.03.2014 to the firm and decided to await reply of the firm. Case is deferred to 29.04.2014. S.No.626
Case No. A/R
152 M/s. Pranita Engineering Solutions Pvt. Ltd., HQF.No.01/80/050/00765/AM10/DES.I Lic. No. & date Meeting No.26/14 RLA, No.07/24/040/00393/AM10 0710070031 dt.15.02.2010 Date: 18.03.2014 Ratifications of norms Decision : The Commi蠅ee noted that firm has requested to reconsider their reply dated 21.9.2010 vide their le蠅er dated 08.02.2014 which has been forwarded to DIPP 11.3.2014. It was observed that the case was given to DIPP because
it pertains to commodi쬅es under purview of DIPP. Case is deferred to 29.04.2014. S.No.627
Case No. A/R
153 M/s. PSK Engineering Pvt. Ltd., HQF.No.01/80/050/00584/AM13/DES.I Lic. No. & date Meeting No.26/14 RLA, No.07/24/040/00420/AM13 0710092968 dt.08.01.2013 Date: 18.03.2014 Ratifications of norms Decision : The Commi蠅ee noted that the firm’s representa쬅on has been forwarded to DIPP on 11.3.2014 for examina쬅on and comments which is under their examina쬅on and decided to await DIPP comments. Case is deferred to 29.04.2014. S.No.628
Case No. A/R
154 M/s. Plast Tech Engineering HQF.No.01/80/050/00367/AM13/DES.I Lic. No. & date Meeting No.26/14 RLA, No.04/24/040/00136/AM13 0410140373 dt.11.10.2012 Date: 18.03.2014 Ratifications of norms Decision : The Commi蠅ee decided to ra쬅fy norms on the basis of C&PC le蠅er No. 46011/22/2013 dated 05.03.2014 (Copy is to be forwarded to RA and firm). S.No.629
Case No. A/R
155 M/s. Plast Tech Engineering HQF.No.01/80/050/00122/AM14/DES.I Lic. No. & date Meeting No.26/14 RLA, No.04/24/040/00030/AM14 0410146308 dt.17.05.2013 Date: 18.03.2014 Ratifications of norms Decision : The Commi蠅ee noted that the firm’s representa쬅on has been forwarded to C&PC on 11.3.2014 for examina쬅on and comments which is under their examina쬅on and decided to await C&PC comments. Case is deferred to 29.04.2014.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.