IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2010-07-20

DGFT Committee Minutes

Document text

RATIFIED   Minutes of Meeting .No.15/11due for 13.7.2010 was actually  held on 20.07.2010   Norms Committee (NC­I) (DES.I Section)   The  meeting  No.  15/11  of  the  Norms  Committee  (NC­I)  for  the  licensing  year  2010­2011  due  for 13.07.2010 was actually held on 20.07.2010 under the Chairmanship of Shri V.K. Srivastava, Addl. Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of  Foreign  Trade  Policy  2009–2014  /  Handbook  of  Procedure  Volume­I.    The  following  Members  of  the Committee were present in the meeting: ­     Sl.No Name of the representatives &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429 A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. A.K. Aggarwal,     Deptt.  of  C&CP, Shastri Bhavan 5. Sh. A.K. Mishra, AIA     M/o Steel, U.B. 6. Sh. B.D. Ghosh, Jt.IA 399 23063355 M/o Steel, U.B. 7. Sh. Rajinder Pal Singh  Dy.DGFT, 486 23061562 Extn.345 DGFT, U.B. 8. Sh. B.K. Sachdeva, FTDO 404 23061562 Ext.265 DGFT, U.B.   The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon were as under: ­ 1

Case No.:21/39/80­ALC2/2008

Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/01574/AM09/ RLA File :31/24/040/00230/AM09/ Lic.No/Date:3110036420 15.12.2008 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.    The  representative  of    the  DHI informed the Committee that they have not received the firm’s reply.  The Committee, therefore directed to forward a copy of the firm’s reply to DHI. The case will be re­listed on 17.08.2010.            

Case No.:1/44/80­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/01661/AM09/ RLA File :09/24/040/00377/AM09/ Lic.No/Date:0910036659 09.01.2009 Defer Date:17.08.2010

2 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.    The  representative  of  DHI informed the Committee that they have not replied to the query raised by their Office vide their letter dated 03.03.2009  and  therefore    reply  is  incomplete.  The  Committee  decided  to  remind  the  firm  to  send  the complete  reply  for  certain  information  of  DHI’s.otherwise  their  case  will  be  rejected    and  no  further  representation will be entertained.   The case may be re­listed on 17.08.2010.   3

Case No.:12/14/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00182/AM10/ RLA File :09/24/040/00048/AM10/ Lic.No/Date:0910038038 28.05.2009 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The Committee observed that no eply of the firm had been received by this office.  The Committee, therefore, decided to allow to amend the advance authorization with the condit Director of the firm along with U.O. Note dated 28.5.10 to furnish the complete information otherwise the case will be rejected without any further opportunity and no further representation will be entertained.  The case stands deferred for relisting on 17.08.2010.   4

Case No.:12/15/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00196/AM10/ RLA File :04/24/040/00067/AM10/ Lic.No/Date:0410105868 03.07.2009 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.  The  representative  of  the  DHI informed the Committee that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   5

Case No.:3/23/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00325/AM10/ RLA File :04/24/040/00292/AM09/ Lic.No/Date:0410107117 21.08.2009 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information despite reminder. The Committee, therefore, decided to write to Executive Director with a copy to Chief Managing Director of the firm for expediting the said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010   6

Case No.:31/23/80­ALC2/2009

Party Name:HINDUSTAN AERONAUTICS LTD, Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00353/AM10/ RLA File :07/24/040/00651/AM09/ Lic.No/Date:0710066776 02.09.2009 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The Committee observed that the comments called for from DGCA are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 17.08.2010.

7

Case No.:21/47/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00740/AM10/ RLA File :09/24/040/00215/AM10/ Lic.No/Date:0910039330 22.09.2009 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information despite reminder. The Committee, therefore, decided to write to Executive Director with a copy to Chief Managing Director of the firm for final reminder for expediting the said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.   8

Case No.:10/28/80­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00428/AM10/ RLA File :31/24/040/00121/AM10/ Lic.No/Date:3110040185 07.10.2009 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.  The  representative of the DIPP informed the Committee that they have not received the firm’s reply. The Committee, therefore, directed to forward a copy of firm’s reply to DIPP and to relist the case for 17.08.2010.   9

Case No.:3/31/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00451/AM10/ RLA File :04/24/040/00161/AM10/ Lic.No/Date:0410108588 15.10.2009 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information despite reminder. The Committee, therefore, decided to write to Executive Director with a copy to Chief Managing Director of  the firm for final reminder for expediting the said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.   10

Case No.:11/31/80­ALC2/2009

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00459/AM10/ RLA File :05/24/040/00341/AM10/ Lic.No/Date:0510251004 15.10.2009 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010. The  representative  of    the  DHI informed the Committee that they have not received the firm’s reply.  The Committee, therefore directed to forward a copy of the firm’s reply to DHI. and to relist the case on 17.08.2010.  

Case No.:20/47/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00739/AM10/ RLA File :09/24/040/00267/AM10/ Lic.No/Date:0910039619 15.10.2009 Defer Date:17.08.2010

11 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The Committee observed that no reply of the firm had been received by this office in response to this office letter calling for certain information despite reminder. The Committee, therefore, decided to  write  to  Executive  Director  with  a copy  to  Chief  Managing  Director  of    the  firm  for  final  reminder  for  expediting  the  said  information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­ listed on 17.08.2010.   12

Case No.:4/31/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00452/AM10/ RLA File :04/24/040/00168/AM10/ Lic.No/Date:0410108614 16.10.2009 Defer Date:17.08.2010 defer the consideration and to relist the case on 17.08.2010 .   13

Case No.:8/31/80­ALC2/2009

Party Name:KAMAL RUBPLAST INDUSTRIES (P) LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00456/AM10/ RLA File :05/23/040/00063/AM10/ Lic.No/Date:0510251132 20.10.2009 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The Committee decided  to forward a copy of firm’s application along with reply received to Sh. Shaish Kumar (DIPP)  for examination and  comments.  The case may be relisted on 17.8.2010.   14

Case No.:16/31/80­ALC2/2009

Party Name: SUTURES INDIA PRIVATE LIMITED, Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00464/AM10/ RLA File :07/24/040/00263/AM10/ Lic.No/Date:0710067849 28.10.2009 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The Committee observed that the comments called for from C&PC are yet to be received. The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 17.08.2010.   15

Case No.:18/31/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00466/AM10/ RLA File :04/24/040/00156/AM10/ Lic.No/Date:0410108868 28.10.2009 Defer Date:17.08.2010  

Case No.:6/39/80­ALC2/2009

Party Name:DASHMESH JACQUARD AND POWERLOOM Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred

16 HQ File :01/80/050/00602/AM10/ RLA File :33/24/040/00009/AM10/ Lic.No/Date:3310014265 12.11.2009 Defer Date:17.08.2010   17

Case No.:5/41/80­ALC2/2009

Party Name:RANE (MADRAS) LIMITED, Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00626/AM10/ RLA File :04/24/040/00206/AM10/ Lic.No/Date:0410109740 26.11.2009 Defer Date:17.08.2010   18

Case No.:8/39/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00604/AM10/ RLA File :03/94/040/00663/AM10/ Lic.No/Date:0310547941 27.11.2009 Defer Date:17.08.2010   19

Case No.:33/47/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00752/AM10/ RLA File :09/24/040/00356/AM10/ Lic.No/Date:0910040183 07.12.2009 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information despite reminder. The Committee, therefore, decided to write to Executive Director with a copy to Chief Managing Director of the firm for final reminder expediting the said information otherwise their case  will  be  rejected  and  no  further  representation  will  be  entertained.      The  case  may  be  re­listed  on 17.08.2010.   20

Case No.:2/39/80­ALC2/2009

Party Name:SGL CARBON INDIA PVT.LTD Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00598/AM10/ RLA File :31/24/040/00152/AM10/ Lic.No/Date:3110041006 11.12.2009 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The Committee directed the Firm’s reply to be forwarded to DIPP and to relist the case for 17.08.2010.

21

Case No.:18/3/80­ALC2/2010

Party Name:THERMAX LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00018/AM11/ RLA File :31/24/040/00172/AM10/ Lic.No/Date:3110041009 11.12.2009 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The Committee directed the Firm’s reply to be forwarded to DIPP and to relist the case for 17.08.2010.   22

Case No.:16/39/80­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00612/AM10/ RLA File :03/95/040/00586/AM10/ Lic.No/Date:0310551305 17.12.2009 Defer Date:17.08.2010 informed the Committee that they have not received reply of the firm.  The Committee therefore decided to forward the firm’s reply to technical authority for examination & submission of comments.   The case may be re­listed on 17.08.2010.   23

Case No.:17/39/80­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00613/AM10/ RLA File :03/95/040/00585/AM10/ Lic.No/Date:0310551317 17.12.2009 Defer Date:17.08.2010 informed the Committee that they have not received reply of the firm.  The Committee therefore decided to forward the firm’s reply to technical authority for examination & submission of comments.   The case may be re­listed on 17.08.2010.   24

Case No.:18/39/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00614/AM10/ RLA File :03/94/040/00786/AM10/ Lic.No/Date:0310551338 17.12.2009 Defer Date:17.08.2010 defer the consideration and to relist the case on 17.08.2010   25

Case No.:17/3/80­ALC2/2010

Party Name:THERMAX LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00017/AM11/ RLA File :31/24/040/00160/AM10/ Lic.No/Date:3110041115 17.12.2009 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010. The  representative  of    the  DHI informed the Committee that they have not received the firm’s reply.  The Committee, therefore directed to forward a copy of the firm’s reply to DHI. and to relist the case on 17.08.2010.

26

Case No.:21/39/80­ALC2/2009

Party Name:VEM TECHNOLOGIES P.LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00617/AM10/ RLA File :09/24/040/00373/AM10/ Lic.No/Date:0910040368 18.12.2009 Defer Date:17.08.2010   27

Case No.:1/47/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00720/AM10/ RLA File :03/94/040/00761/AM10/ Lic.No/Date:0310551799 21.12.2009 Defer Date:17.08.2010 informed the Committee that they have not received reply of the firm.  The Committee therefore decided to handover the firm’s reply to technical authority for examination & submission of comments.   The case may be re­listed on 17.08.2010.   28

Case No.:38/47/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00757/AM10/ RLA File :04/24/040/00246/AM10/ Lic.No/Date:0410110530 04.01.2010 Defer Date:17.08.2010   29

Case No.:12/47/80­ALC2/2009

Party Name:RAINA ENGINEERS Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00731/AM10/ RLA File :03/95/040/00641/AM10/ Lic.No/Date:0310553727 05.01.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information  despite  reminder.  The  Committee,  therefore,  decided  to  issue  reminder  to  the  firm  for expediting the said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010   30

Case No.:13/47/80­ALC2/2009

Party Name:ATLAS COPCO (INDIA) LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00732/AM10/ RLA File :03/94/040/00759/AM10/ Lic.No/Date:0310554872 12.01.2010 Defer Date:17.08.2010

informed the Committee that they have not received the firm’s reply. The Committee, therefore, directed to forward a copy of firm’s reply to DIPP and to relist the case for 17.08.2010.   31

Case No.:16/47/80­ALC2/2009

Party Name:ATLAS COPCO (INDIA) LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00735/AM10/ RLA File :03/94/040/00729/AM10/ Lic.No/Date:0310554882 12.01.2010 Defer Date:17.08.2010 informed the Committee that they have not received the firm’s reply. The Committee, therefore, directed to forward a copy of firm’s reply to DIPP and to relist the case for 17.08.2010.   32

Case No.:39/47/80­ALC2/2009

ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00758/AM10/ RLA File :04/24/040/00249/AM10/ Lic.No/Date:0410110777 12.01.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its  Meeting  No.15/11  held  on  20.07.2010.  The  Committee  observed  that  no  reply  of  the  firm had been received by this office in response to this office letter calling for certain information despite reminder. The Committee, therefore, decided to write to Executive Director with a copy to Chief Managing Director of the firm for final reminder for expediting the said information otherwise their case will be rejected and no further representation will be entertained.   The case may be re­listed on 17.08.2010.   33

Case No.:20/3/80­ALC2/2010

Party Name:MAN FORCE TRUCKS PRIVATE LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00020/AM11/ RLA File :31/24/040/00163/AM10/ Lic.No/Date:3110041577 19.01.2010 Defer Date:17.08.2010   34

Case No.:28/47/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00747/AM10/ RLA File :04/24/040/00275/AM10/ Lic.No/Date:0410110976 21.01.2010 Defer Date:17.08.2010  

Case No.:29/47/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred

35 HQ File :01/80/050/00748/AM10/ RLA File :04/24/040/00273/AM10/ Lic.No/Date:0410110970 21.01.2010 Defer Date:17.08.2010   36

Case No.:30/47/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00749/AM10/ RLA File :04/24/040/00272/AM10/ Lic.No/Date:0410110978 21.01.2010 Defer Date:17.08.2010   37

Case No.:31/47/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00750/AM10/ RLA File :04/24/040/00274/AM10/ Lic.No/Date:0410110973 21.01.2010 Defer Date:17.08.2010   38

Case No.:32/47/80­ALC2/2009

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00751/AM10/ RLA File :04/24/040/00259/AM10/ Lic.No/Date:0410111039 25.01.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.  The  representative  of  the DC(MSME) informed the Committee that the case was under their examination. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   39

Case No.:9/47/80­ALC2/2009

Party Name:VISHAY TRANSDUCERS INDIA LTD Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00728/AM10/ RLA File :04/24/040/00195/AM10/ Lic.No/Date:0410111262 03.02.2010 Defer Date:17.08.2010  

Case No.:27/47/80­ALC2/2009

Party Name:PIONEER FRICTION LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred

40 HQ File :01/80/050/00746/AM10/ RLA File :02/24/040/00220/AM10/ Lic.No/Date:0210137588 08.02.2010 Defer Date:17.08.2010   41

Case No.:40/47/80­ALC2/2009

Party Name:MINDA SILCA ENGINEERING LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00759/AM10/ RLA File :05/24/040/00462/AM10/ Lic.No/Date:0510258405 12.02.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010. The  representative  of    the  DHI informed the Committee that they have not received the firm’s reply.  The Committee, therefore directed to forward a copy of the firm’s reply to DHI.and to relist the case on 17.08.2010.   42

Case No.:42/47/80­ALC2/2009

Party Name:M M AQUA TECHNOLOGIES LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved HQ File :01/80/050/00761/AM10/ RLA File :05/24/040/00396/AM10/ Lic.No/Date:0510258494 15.02.2010   Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. As per written comments of C&PC communicated vide OM No.46011/253/2004­PC­II  dated 05.01.2009, the Committee  decided to ratify the norms in respect of the subject advance authorization as under:­   Item to be exported Quantity PVC Fill Media / Drift Eliminator 1 MT   Raw­material  Recommended  for import Quantity PVC  Sheet  (Thickness  0.175  mm  to 0.80 mm) 1.15 MT     The Regional Authority may take necessary action accordingly.   

Case No.:43/47/80­ALC2/2009

Party Name:TERUMO PENPOL LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved HQ File :01/80/050/00762/AM10/ RLA File :53/24/040/00014/AM10/ Lic.No/Date:5310010148 15.02.2010

43 Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. As per the written comments of C&PC communicated vide their O.M. No. 46011/21/2009­PC.II  dated 07.07.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Item to be Exported Quantity Blood Bags 1 No. Raw­material Recommended for Import Quantity 1.      PVC compound (Medical Grade)   2.            Relevant  Stainless  Steel  Needle Assembly 3.      Evident Paper – Plastic (Self Adhesive) 4.      Aluminium Foil Cover 5.      Relevant Plasma Cap (Rubber Cap) 6.      Relevant Luer Adapter 7.      Relevant Oxygen Absorber 8.      Stamping Foil Tape 9.      Thermal Transfer Ribbon 10.  Relevant Big Beak off Valve Assembly 11.  Y­ Connector 1.10 kg/kg content in export product Net + 3% wastage   Net + 5% wastage   Net + 1% wastage Net + 1% wastage Net + 1% wastage Net + 1% wastage Net + 1% wastage Net + 1% wastage Net + 1% wastage   Net + 1% wastage   The Regional Authority may take necessary action accordingly    44

Case No.:44/47/80­ALC2/2009

Party Name:TERUMO PENPOL LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved HQ File :01/80/050/00763/AM10/ RLA File :53/24/040/00015/AM10/ Lic.No/Date:5310010149 15.02.2010

Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. As per the written comments of C&PC communicated vide their O.M. No. 46011/21/2009­PC.II  dated 07.07.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under:­   Item to be Exported Quantity Blood Bags 1 No. Raw­material Recommended for Import Quantity 12.  PVC compound (Medical Grade)   13.    Relevant  Stainless  Steel  Needle Assembly 14.  Evident Paper – Plastic (Self Adhesive) 15.  Aluminium Foil Cover 16.  Relevant Plasma Cap (Rubber Cap) 17.  Relevant Luer Adapter 18.  Relevant Oxygen Absorber 19.  Stamping Foil Tape 20.  Thermal Transfer Ribbon 21.  Relevant Big Beak off Valve Assembly 22.  Y­ Connector 1.10 kg/kg content in export product Net + 3% wastage   Net + 5% wastage   Net + 1% wastage Net + 1% wastage Net + 1% wastage Net + 1% wastage Net + 1% wastage Net + 1% wastage Net + 1% wastage   Net + 1% wastage   The Regional Authority may take necessary action accordingly    45

Case No.:46/47/80­ALC2/2009

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00765/AM10/ RLA File :07/24/040/00393/AM10/ Lic.No/Date:0710070031 15.02.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.  On  the  recommendation  of  the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on  17.08.2010:­  1,   Sl. No.3,4 & 11 of Standard Deficiency Format.   2. Input raw material blank size and weight without cutting allowance – export    product wise.   3.  Cutting allowance and any other allowance/wastage export product wise.  

Case No.:22/3/80­ALC2/2010

Party Name:THYSSENKRUPP INDUSTRIES INDIA PVT.LTD Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00022/AM11/ RLA File :31/24/040/00198/AM10/ Lic.No/Date:3110041936 15.02.2010 Defer Date:17.08.2010

46 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.  On  the  recommendation  of  the representative of DHI present in the meeting vide their UO No.3(127)/09/TSW(B)/346 dated 15.07.2010, it was decided by the committee called for the following information / clarification from the firm:­   1. The firm may be submit Sl. No. 3,4, 5 & 11 for each of 21 export product; 2. The drawing of  Sl. No. 3 of SDL; 3. Sl.No.11 of SDL. 4. It is observed that the fob value of export is Rs1,43,00,000/ against the cif value of import of Rs 1,07,44,574/ resulting in value addition of 33%. The difference of value of export & import is only Rs 36 lakhs. But the firm is proposing to use indigenous items of weight 1625 MT which implies that the value of indigenous material is maximum Rs 2 per kg which is not possible. The firm also need to give clarification for the same. The caase may be relisted on 17.08.2010   47

Case No.:47/47/80­ALC2/2009

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00766/AM10/ RLA File :06/24/040/00046/AM10/ Lic.No/Date:0610017254 16.02.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010. The  representative  of    the  DHI informed  the  Committee  that  they  have  not  received  the  firm’s  application    The  Committee,  therefore directed to forward a copy of the firm’s application to DHI.and to relist the case on 17.08.2010.   48

Case No.:38/5/80­ALC2/2010

Party Name:RUBAMIN LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved HQ File :01/80/050/00071/AM11/ RLA File :34/24/040/00194/AM10/ Lic.No/Date:3410026435 19.02.2010   Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. As per the written comments of DC(MSME) communicated vide their UO Note No.30(109)/2010­ME dated 02.07.2010, the Committee decided to ratify the norms in respect of the subject advance authorization as under by allowing import of cobalt concentrate to the extent of 1.0963 kg/kg content in the export product.    

Case No.:26/3/80­ALC2/2010

Party Name:DESMON CONTINENTAL FRIGO PVT. LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved HQ File :01/80/050/00026/AM11/ RLA File :05/23/040/00196/AM10/ Lic.No/Date:0510259268 23.02.2010

49 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. As per the written comments of DIPP  communicated  vide  their  note    dated  20.07.2010,  the  Committee  decided  to  ratify  the  norms  in respect of the subject advance authorization with following modifications:­   1. Quantity of export product at Sl. No. 2 may be corrected to 103 Nos. 2. UOM  of  import  items  at  Sl.  Nos.  15,  25  to  32,  55,  57  and  58  may  be  corrected  as  “Mtrs.”  and quantities of these items may be allowed on net to net basis. 3. Remaining import items at S.No.1 to 14, 16 to 24, 33 to 54 and 56 are components and   may be allowed on net to net basis with accountability clause.       50

Case No.:16/49/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deffered   HQ File :01/80/050/00785/AM10/ RLA File :03/94/040/00986/AM10/ Lic.No/Date:0310561988 25.02.2010   Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.  On  the  recommendation  of  the representative of the DHI present in the meeting. It was decided by the committee to call for the following information / clarification from the firm:­   1. Sl no 3, 4, 5 & 11 of SDL for export product 3. 2. Sl no 9 for export product 1 & 2.   The case may be relisted on 17.08.2010.     51

Case No.:24/3/80­ALC2/2010

Party Name:INTERNATIONAL COIL LIMITED, Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved HQ File :01/80/050/00024/AM11/ RLA File :05/23/040/00187/AM10/ Lic.No/Date:0510259534 25.02.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.  As  per  discussion  and  in consultation with the representative of DC (MSME) present in the meeting, the Committee decided to ratify the  norms  in  respect  of  the  subject  advance  authorization  with  import  of  item  on  net­to­net  basis  with accountability clause.     52

Case No.:27/3/80­ALC2/2010

Party Name:BOYSEN INDIA LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00027/AM11/ RLA File :05/23/040/00182/AM10/ Lic.No/Date:0510259655 02.03.2010 Defer Date:17.08.2010

  53

Case No.:22/49/80­ALC2/2009

Party Name:ULTRA ENGINEERS Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00791/AM10/ RLA File :31/24/040/00234/AM10/ Lic.No/Date:3110042181 03.03.2010 Defer Date:17.08.2010   54

Case No.:14/3/80­ALC2/2010

Party Name:LARSEN & TOUBRO LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00014/AM11/ RLA File :03/95/040/00813/AM10/ Lic.No/Date:0310564429 12.03.2010 Defer Date:17.08.2010   55

Case No.:25/3/80­ALC2/2010

Party Name:INTERNATIONAL COIL LIMITED, Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved   HQ File :01/80/050/00025/AM11/ RLA File :05/23/040/00192/AM10/ Lic.No/Date:0510260354 12.03.2010   Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. As per the written comments of DC(MSME) communicated vide their U.O. Note No. 30(102)2010­ME dated 01.7.2010, the Committee decided  to  ratify  the  norms  in  respect  of  the  subject  advance  authorization  on  net­to­net  basis  with accountability clause.     56

Case No.:29/3/80­ALC2/2010

Party Name:AQUASUB ENGINEEING Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00029/AM11/ RLA File :32/24/040/00057/AM10/ Lic.No/Date:3210043302 17.03.2010 Defer Date:17.08.2010

57

Case No.:3/3/80­ALC2/2010

Party Name:MONGA STRAYFIELD PVT. LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00003/AM11/ RLA File :31/21/040/00158/AM10/ Lic.No/Date:3110042710 31.03.2010 Defer Date:17.08.2010   58

Case No.:4/3/80­ALC2/2010

Party Name:MONGA STRAYFIELD PVT. LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00004/AM11/ RLA File :31/21/040/00400/AM10/ Lic.No/Date:3110042722 31.03.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010. The  representative  of    the  DHI informed  the  Committee  that  they  have  not  received  the  firm’s  application.    The  Committee,  therefore directed to forward a copy of the firm’s application to DHI. and to relist the case on 17.08.2010.   59

Case No.:16/3/80­ALC2/2010

Party Name:G.B. ENGINEERING ENTERPRISES PVT. LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00016/AM11/ RLA File :04/24/040/00332/AM10/ Lic.No/Date:0410112797 31.03.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010.   The representative of the DIPP informed the Committee that the case was under study.  The Committee, therefore, decided to defer the consideration and to relist the case for 17.08.2010.   60

Case No.:5/3/80­ALC2/2010

Party Name:METSO POWER INDIA PRIVATE LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00005/AM11/ RLA File :04/24/040/00338/AM10/ Lic.No/Date:0410112870 05.04.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information.  The  Committee,  therefore,  decided  to  remind  finally  to  the  firm  for  expediting  the  said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed 17.08.2010.     61

Case No.:6/3/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00006/AM11/ RLA File :05/24/040/00532/AM10/ Lic.No/Date:0510261713 05.04.2010 Defer Date:17.08.2010

reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information otherwise  their  case  will  be  rejected  without  any  further  chance  and  no  further  representation  will  be entertained.   The case may be re­listed on 17.08.2010.   62

Case No.:7/3/80­ALC2/2010

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved HQ File :01/80/050/00007/AM11/ RLA File :05/24/040/00541/AM10/ Lic.No/Date:0510261873 06.04.2010   Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. As per the written comments of DIT communicated vide their U.O. No.  17(32)/2010­IPHW  dated 06.07.2010, the Committee decided to ratify the norms of subject Advance Authorization on net­to­net basis with accountability clause.     63

Case No.:8/3/80­ALC2/2010

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved HQ File :01/80/050/00008/AM11/ RLA File :05/24/040/00544/AM10/ Lic.No/Date:0510261874 06.04.2010   Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010.  As per the written comments of DIT communicated vide their U.O. No.  17(33)/2010­IPHW  dated 06.07.2010, the Committee decided to ratify the norms of subject Advance Authorization on net­to­net basis with accountability clause.     64

Case No.:10/3/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00010/AM11/ RLA File :05/24/040/00548/AM10/ Lic.No/Date:0510262026 07.04.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information entertained.   The case may be re­listed on 17.08.2010   65

Case No.:11/3/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00011/AM11/ RLA File :05/24/040/00545/AM10/ Lic.No/Date:0510262027 07.04.2010 Defer Date:17.08.2010

reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information entertained.   The case may be re­listed on 17.08.2010.   66

Case No.:15/3/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00015/AM11/ RLA File :04/24/040/00317/AM10/ Lic.No/Date:0410113082 12.04.2010 Defer Date:17.08.2010 informed the Committee that they received the firm’s reply and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   67

Case No.:32/3/80­ALC2/2010

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00033/AM11/ RLA File :05/24/040/00550/AM10/ Lic.No/Date:0510262337 13.04.2010 Defer Date:17.08.2010 informed the Committee that they have not received the firm’s reply. The Committee, therefore, directed to forward a copy of firm’s reply to DIPP and to relist the case for 17.08.2010..   68

Case No.:12/5/80­ALC2/2010

Party Name:INJECTOPLAST PVT.LTD Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved HQ File :01/80/050/00045/AM11/ RLA File :06/24/040/00005/AM11/ Lic.No/Date:0610017742 20.04.2010

Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.    .  As  per  written  comments  of Deptt.  of  C  &  P  communicated  vide  O.M.  No.46011/169/2009­PC.II  dated  16th  April,  2010,  the Committee, decided to ratify the norms in respect of  the  subject advance authorization as under:­   Item to be Exported Quantity Handle ASM­R/RL RR Asst 1 No. Raw­material sought to be Imported Quantity 1.  For 1 kg weight of parts/component of Polyamide 66 Resin          i) Polyamide 66 Resin         ii) Master Batch Colour Concentrate 2.  For  1  kg  weight  of  parts/component  of Polypropylene Impact Copolymer          i) Polypropylene Impact Copolymer         ii) Master Batch Colour Concentrate   3. Relevant Springs 4. Relevant Bolts 5. Relevant Damper     1.03 kg. 0.02 kg.     1.03 kg. 0.02 kg.   Net + 2% wastage Net + 2% wastage Net + 2% wastage   The Regional Authority may take necessary action accordingly   69

Case No.:20/15/80­ALC2/2010

Party Name:HAWA VALVES (INDIA) PVT. LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved HQ File :01/80/050/00227/AM11/ RLA File :03/94/040/00105/AM11/ Lic.No/Date:0310572849 05.05.2010   Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. As per written comments of DIPP communicated vide note dated  20.07.2010, the Committee, decided to ratify the norms in respect of the subject advance authorization as per GN­4.     70

Case No.:9/15/80­ALC2/2010

Party Name:ZINSER TEXTILE SYSTEMS PVT. LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00216/AM11/ RLA File :03/95/040/00099/AM11/ Lic.No/Date:0310573877 12.05.2010 Defer Date:17.08.2010 informed  the  Committee  that  they  have  received  the  firm’s  reply  and  case  was  under  their  study.  The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   71

Case No.:15/15/80­ALC2/2010

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00222/AM11/ RLA File :03/94/040/00102/AM11/ Lic.No/Date:0310574212 13.05.2010 Defer Date:17.08.2010

informed  the  Committee  that  they  have  received  the  firm’s  reply  and  case  was  under  their  study.  The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   72

Case No.:12/15/80­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00219/AM11/ RLA File :03/94/040/00167/AM11/ Lic.No/Date:0310574388 14.05.2010 Defer Date:17.08.2010 informed the Committee that they have not received the firm’s reply. The Committee, therefore, directed to forward a copy of firm’s reply to DHI and to relist the case on 17.08.2010.   73

Case No.:23/15/80­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00230/AM11/ RLA File :05/23/040/00040/AM11/ Lic.No/Date:0510264485 18.05.2010 Defer Date:17.08.2010 informed the Committee that they have not received the firm’s reply. The Committee, therefore, directed to forward a copy of firm’s reply to DHI and to relist the case on 17.08.2010.   74

Case No.:13/15/80­ALC2/2010

Party Name:GEI INDUSTRIAL SYSTEMS LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00220/AM11/ RLA File :11/24/040/00001/AM11/ Lic.No/Date:1110022429 19.05.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.  On  the  recommendation  of  the representative of the DIPP vide their U.o. note dated 20.7.2010, present in the meeting, it was decided by the Committee to ask the following details information  from the firm:­ 1.      Sl. No. 4,5 & 11 of Standard Deficiency Format; 2.      Size/specifications of items of  import.   75

Case No.:11/15/80­ALC2/2010

Party Name:HAWA VALVES (INDIA) PVT. LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved HQ File :01/80/050/00218/AM11/ RLA File :03/94/040/00150/AM11/ Lic.No/Date:0310575743 24.05.2010   Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. As per written comments of DIPP communicated vide note dated  20.07.2010, the Committee, decided to ratify the norms in respect of the subject advance authorization as per GN­4.  

76

Case No.:14/15/80­ALC2/2010

Party Name:HAWA VALVES (INDIA) PVT. LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved HQ File :01/80/050/00221/AM11/ RLA File :03/94/040/00170/AM11/ Lic.No/Date:0310575746 24.05.2010   Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. As per written comments of DIPP communicated vide note dated  20.07.2010, the Committee, decided to ratify the norms in respect of the subject advance authorization as per GN­4.     77

Case No.:10/15/80­ALC2/2010

Party Name:GODREJ & BOYCE MFG. CO. LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00217/AM11/ RLA File :03/94/040/00114/AM11/ Lic.No/Date:0310575827 25.05.2010 Defer Date:17.08.2010 informed  the  Committee  that  they  have  received  the  firm’s  reply  and  case  was  under  their  study.  The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   78

Case No.:21/15/80­ALC2/2010

Party Name:VOLKSWAGEN INDIA PRIVATE LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00228/AM11/ RLA File :31/24/040/00033/AM11/ Lic.No/Date:3110043395 26.05.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The representative of the DHI/DIPP informed  the  Committee  that  they  have  received  the  firm’s  reply  and  case  was  under  their  study.  The Committee, therefore, decided to defer the consideration and to relist the case on  17.08.2010.   79

Case No.:26/15/80­ALC2/2010

Party Name:LION HOLDINGS PVT. LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00233/AM11/ RLA File :05/23/040/00042/AM11/ Lic.No/Date:0510264999 31.05.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.  The  Committee  noted  that  the Regional Authority has neither forwarded the hard copy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind the RA with a copy to the firm to forward the firm’s application  at  the  earliest  and  on  receipt  forward  the  same  to  technical  authority  for  examination  and submission of comments.  The case may be relisted on 17.08.2010.   80

Case No.:13/11/80­ALC2/2010

Party Name:PRECISION AUTOMATION AND ROBOTICS INDIA LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00159/AM11/ RLA File :31/21/040/00074/AM11/ Lic.No/Date:3110043449 01.06.2010 Defer Date:17.08.2010

Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.    The  representative  of  the  DHI informed  the  Committee  that  they  received  the  firm’s  application  and  case  was  under  their  study.  The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   81

Case No.:16/15/80­ALC2/2010

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00223/AM11/ RLA File :04/24/040/00052/AM11/ Lic.No/Date:0410114304 07.06.2010 Defer Date:17.08.2010 informed  the  Committee  that  they  have  received  the  firm’s  reply  and  case  was  under  their  study.  The Committee, therefore, decided to defer the consideration and to relist the case on  17.08.2010.   82

Case No.:24/15/80­ALC2/2010

Party Name:CHEMICO SYNTHETICS LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00231/AM11/ RLA File :05/23/040/00058/AM11/ Lic.No/Date:0510265601 07.06.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The Committee observed that the comments called for from Technical Authorities i.e. Ministry of Mines are yet to be received.  The Committee, therefore, decided to remind them for expediting their comments. The case may be re­listed on 17.08.2010.   83

Case No.:22/15/80­ALC2/2010

Party Name:CANALAIR AIR SOLUTIONS PRIVATE LIMITED, Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00229/AM11/ RLA File :32/24/040/00012/AM11/ Lic.No/Date:3210044286 09.06.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010. The  representative  of  the  DIIP informed the Committee that the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   84

Case No.:27/15/80­ALC2/2010

Party Name:ITS CORPORATION Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00234/AM11/ RLA File :22/21/040/00014/AM11/ Lic.No/Date:2210010058 11.06.2010 Defer Date:17.08.2010 Norms  Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010. The  representative  of  the  DIPP informed  the  Committee  that  they  have  received  the  firm’s  reply  and  case  was  under  their  study.  The Committee, therefore, decided to defer the consideration and to relist the case on  17.08.2010.  

Case No.:17/15/80­ALC2/2010

Party Name:AUTO TECH INDUSTRIES (INDIA) PVT. LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred

85 HQ File :01/80/050/00224/AM11/ RLA File :04/24/040/00053/AM11/ Lic.No/Date:0410114549 14.06.2010 Defer Date:17.08.2010 informed the Committee that they received the firm’s reply and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 17.08.2010.   86

Case No.:18/15/80­ALC2/2010

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00225/AM11/ RLA File :04/24/040/00061/AM11/ Lic.No/Date:0410114584 15.06.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010.   The Committee observed that no reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information. The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information entertained.   The case may be re­listed on 17.08.2010.   87

Case No.:25/15/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00232/AM11/ RLA File :61/24/040/00024/AM11/ Lic.No/Date:6110000457 17.06.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information entertained.   The case may be re­listed on 17.08.2010.   88

Case No.:19/15/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00226/AM11/ RLA File :11/24/040/00011/AM11/ Lic.No/Date:1110022638 18.06.2010 Defer Date:17.08.2010 Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010.  The Committee observed that no reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information entertained.   The case may be re­listed on 17.08.2010.   89

Case No.:4/15/80­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00211/AM11/ RLA File :03/94/040/00261/AM11/ Lic.No/Date:0310580285 23.06.2010 Defer Date:17.08.2010

application  at  the  earliest  and  on  receipt  forward  the  same  to  DHI  for  examination  and  submission  of comments.  The case may be relisted on 17.08.2010.   90

Case No.:1/15/80­ALC2/2010

Party Name:ARMOR PLAST LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00208/AM11/ RLA File :07/24/040/00092/AM11/ Lic.No/Date:0710072431 24.06.2010 Defer Date:17.08.2010 application  at  the  earliest  and  on  receipt  forward  the  same  to  DIPP  for  examination and submission of comments.  The case may be relisted on 17.08.2010.   91

Case No.:2/15/80­ALC2/2010

Party Name:MECHSOL TECHNOLOGIES PVT.LTD, Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00209/AM11/ RLA File :07/21/040/00118/AM11/ Lic.No/Date:0710072435 24.06.2010 Defer Date:17.08.2010 application  at  the  earliest  and  on  receipt  forward  the  same  to  DHI  for  examination  and  submission  of comments.  The case may be relisted on 17.08.2010.   92

Case No.:3/15/80­ALC2/2010

Party Name:PLAST TECH ENGINEERING Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00210/AM11/ RLA File :04/24/040/00070/AM11/ Lic.No/Date:0410114950 25.06.2010 Defer Date:17.08.2010 application at the earliest and on receipt forward the same to DC(MSME) for examination and submission of comments.  The case may be relisted on 17.08.2010.   93

Case No.:5/15/80­ALC2/2010

Party Name:TERUMO PENPOL LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00212/AM11/ RLA File :53/24/040/00010/AM11/ Lic.No/Date:5310010688 25.06.2010 Defer Date:17.08.2010

application at the earliest and on receipt forward the same to C&PC for examination and submission of comments.  The case may be relisted on 17.08.2010.   94

Case No.:6/15/80­ALC2/2010

ELECTRICALS LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00213/AM11/ RLA File :04/24/040/00068/AM11/ Lic.No/Date:0410115017 28.06.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information entertained.   The case may be re­listed on 17.08.2010.   95

Case No.:7/15/80­ALC2/2010

Party Name:MVS ENGINEERING LTD Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Approved HQ File :01/80/050/00214/AM11/ RLA File :05/24/040/00110/AM11/ Lic.No/Date:0510267074 28.06.2010   Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010.  As per written comments of DIPP communicated vide note dated  20.07.2010, the Committee, decided to ratify the norms in respect of the subject advance authorization as under:­     1.  Words “ Containing 2500 Kgs. of Carbon Molecular Sieve” may be suffixed with         a description of export product.    2. Quantity of import item may be allowed as applied for i.e. 2500 Kgs. on net to net basis     96

Case No.:8/15/80­ALC2/2010

Party Name:ZINSER TEXTILE SYSTEMS PVT. LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00215/AM11/ RLA File :03/95/040/00230/AM11/ Lic.No/Date:0310581105 29.06.2010 Defer Date:17.08.2010 application  at  the  earliest  and  on  receipt  forward  the  same  to  Technical  Authority  for  examination  and  

Case No.:28/15/80­ALC2/2010

Party Name:SHRIRAM PISTONS & RINGS LTD Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred

97 HQ File :01/80/050/00235/AM11/ RLA File :05/24/040/00067/AM11/ Lic.No/Date:0510267170 30.06.2010 Defer Date:17.08.2010 reply  of  the  firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain information.  The  Committee,  therefore,  decided  to  remind  the  firm  for  expediting  the  said  information entertained.   The case may be re­listed on 17.08.2010.   98

Case No.:29/15/80­ALC2/2010

Party Name:ADLER MEDIEQUIP PRIVATE LIMITED., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00236/AM11/ RLA File :03/94/040/00294/AM11/ Lic.No/Date:0310581349 30.06.2010 Defer Date:17.08.2010 application  at  the  earliest  and  on  receipt  forward  the  same  to  Technical  Authority  for  examination  and   99

Case No.:30/15/80­ALC2/2010

Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00237/AM11/ RLA File :61/24/040/00026/AM11/ Lic.No/Date:6110000464 01.07.2010 Defer Date:17.08.2010 application  at  the  earliest  and  on  receipt  forward  the  same  to  Technical  Authority  for  examination  and   100

Case No.:31/15/80­ALC2/2010

Party Name:UEM INDIA LTD. Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00238/AM11/ RLA File :05/24/040/00113/AM11/ Lic.No/Date:0510267553 05.07.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The Committee noted that the application at the earliest and on receipt forward the same to Technical Authority for examination and  

Case No.:32/15/80­ALC2/2010

Party Name:MAG ENGINEERING PVT LTD Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00239/AM11/ RLA File :07/21/040/00243/AM11/ Lic.No/Date:0710072585 06.07.2010 Defer Date:17.08.2010

101 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The Committee noted that the application at the earliest and on receipt forward the same to Technical Authority for examination and   102

Case No.:33/15/80­ALC2/2010

Party Name:WUERTH ELEKTRONIK INDIA PRIVATE LIMITED Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00240/AM11/ RLA File :07/24/040/00096/AM11/ Lic.No/Date:0710072614 06.07.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The Committee noted that the application at the earliest and on receipt forward the same to Technical Authority for examination and   103

Case No.:34/15/80­ALC2/2010

Party Name:NOV SARA INDIA PVT. LTD., Meet No/Date:15/80­ ALC2/2010 13.07.2010 Status: Deferred HQ File :01/80/050/00241/AM11/ RLA File :61/24/040/00028/AM11/ Lic.No/Date:6110000465 06.07.2010 Defer Date:17.08.2010 Decision : The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The Committee noted that the application at the earliest and on receipt forward the same to Technical Authority for examination and   S.No.11

Case No. A ­ 10

M/s.  CPS  Color India  Pvt.  Ltd., Mumbai F.No.01/80/50/01279/AM06/DES.I Lic.No. & Date Meeting No. 15/11 RA F.No.03/94/040/01080/AM06 0310361349 dt.29.12.2009 Date: 13.07.2010 Ratification of norms The  case  regarding  ratification  of  norms  in  respect  of  above  authorization  was  considered  by  the  Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The Committee observed that no reply of the firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain  information.  The Committee, therefore, decided to remind the firm for expediting the said information otherwise their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 17.08.2010   S.No.12

Case No. A – 01

M/s.  Larson  & Toubro Ltd., F.No.01/80/50/01184/AM10/DES.I Lic.No. & Date Meeting No. 15/11 RA F.No.03/95/039/00001/AM09 0310475712 dt.20.06.2008 Date: 13.07.2010   Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010.  The Committee observed that no reply of the firm  had  been  received  by  this  office  in  response  to  this  office  letter  calling  for  certain  information.  The Committee, therefore, decided to send a final reminder to the firm for expediting the said information otherwise

their case will be rejected without any further chance and no further representation will be entertained.   The case may be re­listed on 17.8.2010   S.No.120

Case No. A/R­57

M/s.  Bharat  Heavy Electricals  Ltd., Tiruchiraalli  F.No. 01/80/50/ 00285/AM09/DES.I Lic.No. & Date Meeting No. 15/11 RA F.No.04/24/040/00228/AM08 0410092521 dt.07.12.2007 Date: 13.07.2010 Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The representative of the DHI informed the Committee that they have received the firm’s reply and case was under their study. The Committee, therefore,   S.No.121

Case No. A/R­63

M/s.  Godrej  & Boyce  Mfg.  Co. Ltd., Mumbai  F.No. 01/80/162/ 00961/AM08/DES.I Lic.No. & Date Meeting No. 15/11 RA F.No.03/94/040/00587/AM08 0310442080 dt.06.09.2007 Date: 13.07.2010   The case regarding ratification of norms in respect of above authorization was considered by the Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The representative of the DIPP informed the decided to defer the consideration and to relist the case on 17,08.2010.   S.No.122

Case No.  A/R­78

M/s.  GEA  BGR Energy  System India  Ltd., Chennai HQ F.No.01/80/50/01099/AM08/DES.I Lic. No. & date Meeting No. 15/11 RA.F.No.04/24/040/00323/Am08 0410092975 dt.02.01.2008 Date: 13.07.2010   Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The representative of the DHI informed the decided to defer the consideration and to relist the case on 17.08.2010   S.No.123

Case No. A/R­159

M/s.  Precihole Machine Pvt. Ltd.,  F.No.01/80/50/00942/AM08/DES.I Lic.No. & Date Meeting No. 15/11 RA F.No.03/95/040/00586/AM08 0310443655 dt.19.09.2007 Date: 13.07.2010   Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The representative of the DHI informed the decided to defer the consideration and to relist the case on 17.08.2010   S.No.124

Case No. A/R­163

M/s.  CIM  Tools Pvt. Ltd., Bangalore F.No.01/80/50/01747/AM09/DES.I Lic.No. & Date Meeting No. 15/11 RA F.No.07/24/040/00599/AM09 0710062744 dt.04.02.2009 Date: 13.07.2010   Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The representative of the DIPP informed the   S.No.125

Case No. A/R­165

M/s.  Kevin Enterprises Ltd., F.No.01/80/50/00884/AM08/DES.I Lic.No. & Date

Meeting No. 15/11 RA F.No.03/94/040/00398/AM08 0310436880 dt.19.07.2007 Date: 13.07.2010   Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The representative of the DIPP informed the     S.No.126

Case No. A/R­167

M/s.  The  Saraswati Industrial Syndicate Ltd., F.No.01/80/50/01626/AM09/DES.I Lic.No. & Date Meeting No. 15/11 RA F.No.05/24/040/00630/Am09 0510233406 dt.29.12.2008 Date: 13.07.2010 Revision of norms   Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The representative of the DIPP informed the   S.No.127

Case No. A/R­07

M/s.  Kirloskar Penumatic Co, Ltd.,  F.No. 01/80/50/ 01780/AM09/DES.I Lic.No. & Date Meeting No. 15/11 RA F.No.31/24/040/00303/AM09 3110037315 dt.10.02.2009 Date: 13.07.2010 Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The representative of the DIPP informed the Committee that they have not received the firm’s reply.  The Committee, therefore, decided to send the firm’s reply to DIPP and to relist the case on 17.08.2010.   S.No.128

Case No. A/R­08

M/s.  Sur  Hening Pvt. Ltd., F.No. 01/80/50/ 00975/AM09/DES.I Lic.No. & Date Meeting No. 15/11 RA F.No.07/24/040/00061/AM09 0710057712 dt.04.06.2008 Date: 13.07.2010   Committee  (NC­I)  in  its  Meeting  No.15/11  held  on  20.07.2010.  As  per  the  written  comments  of  DHI communicated vide their U.O. Note No. No 3(49)/08­TSW(B) dated 24.5.2010 and stated that Imports proposed for import are mainly components,  the Committee decided to ratify the norms in respect of the subject advance authorization with wastage of 1% on brass raw materials, 2% on steel & rubber raw materials & components on net to net basis.     S.No.129

Case No. A/R­16

M/s.  Saint­Gobain Seva  Engineering India Ltd., F.No. 01/80/50/ 00743/AM08/DES.I Lic.No. & Date Meeting No. 15/11 RA F.No.07/24/040/00724/AM08 0710055706 dt.06.02.2008 Date: 13.07.2010   Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The representative of the DHI informed the     S.No.130

Case No. A/R­17

M/s. The Ratnamani Metals  &  Tubes  P. Ltd.,  F.No. 01/80/50/ 00236/AM10/DES.I Lic.No. & Date Meeting No. 15/11 RA F.No.08/24/040/00086/AM10 0810081362 dt.09.07.2009 Date: 13.07.2010   Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The representative of the DIPP informed the      

Case No. A/R­74

M/s.  GEA  BGR Energy  Systems India  LTd., CHennai  F.No. 01/80/50/ 01799/AM09/DES.I Lic.No. & Date Meeting No. 15/11 RA F.No.04/24/040/00263/AM09 0410192464 dt.19.02.2009 Date: 13.07.2010   Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The representative of the DHI informed the decided to defer the consideration and to relist the case on 17.08.2010      

Case No. A/R­75

M/s.  Bharat  Heavy Electricals  Ltd., Hyderabad  F.No. 01/80/50/ 00496/AM10/DES.I Lic.No. & Date Meeting No. 15/11 RA F.No.09/24/040/00184/AM10 0910039076 dt.27.08.2009 Date: 13.07.2010   Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. The representative of the DHI informed the   S.No.24

Case No. C­02

M/s. Gardex, Jalandhar F.No. 01/80/162/01289/AM10/DES.I Meeting No. 15/11 Addition  of  inputs item against SION Sl. No. C­ 390,    for  the  export  product  “Powarh/  Hoe/Pick Axe/ Kudali /Pick Mattock/Cutter Mattock / Trowel /  Transplantor/  Fork/  Cultivator/  Weeder/  Bulb Planter/  Ombination  Tool  made  of  non  alloy  steel/ alloy  steel  (including  stainless  steel)  without  or without  or  with  handle  made  of  wood  or  Fibre Glass” Date: 13.07.2010   The case regarding addition of  inputs to the existing norms in respect of above firm was considered by the Norms Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010. As per the written comments of DC (MSME) communicated vide their U.O. Note No. No 20(G)/2010­ME dated 13.7.2010, the Committee decided to includes  following modification/addition/more input items in SION C­390 for handle:­   S. No. Item of export/SION Qty.   Addition to SION Qty. recommended 01 Powrah/Hole/Pick Axe/Kudali/Pick Mattock/Cutter Mattock /Towel /Transplantor/Fork/Cultivator /weeder/Bulb 1Kg 1. Roving 400 tex glass       1.02Kg/Kg Content in export Product   1.02Kg/Kg Content in export

Planter/Combination tools made of non alloy steel/alloy steel (including stainless steel) with handle made PP and FRP or wood 2. Resin GP/Isothermic       3. Polypropelene       4. Relevant Wood Blank   Product   1.02Kg/Kg Content in export Product   1Kg/Kg Content in export Product   NOTE: Item at sl. No. 1,2, and 3 above are applicable increase of export with Fibre glass handle covered with Polypropylene and srl no 4, incase of wooden handle.    

Case No. C­ 09

M/s.  Addison  &  Co.  Ltd., Chennai F.No. 01/81/80/162/00372/AM10/DES.I Meeting No. 15/11 Modification    of  SION  for  the  export  product “Cutting  Tools­Multiple  Point  of  High  Speed Steel(Cobalt Grade)/Tool Steel” Date: 13.07.2010   Committee (NC­I) in its Meeting No.15/11 held on 20.07.2010 and it was decided to defer the same for re­ listing on 17.08.2010 for want of  comments of  DHI.                                                               ******

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied