IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2009-07-28

DGFT Committee Minutes

Document text

RATIFIED   Minutes of M.No.17/10 held on 28.07.2009 of Norms Committee (NC­I) (DES.I Section)   The meeting No. 17/10 of the Norms Committee (NC­I) for the licensing year 2009­2010 held on 28.07.2009 under the Chairmanship of Shri A. Komu, Joint Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2004–2009 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 475 23062635 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. B.D. Ghosh. Jt. IA 399 23063355 M/o Steel, U.B. 4. Sh. A.K. Mishra, AIA     M/o Steel, U.B. 5. Sh. K.K. Funda, Asstt. Director 736A   DC(MSME) N.B. 6. Sh. Krishan Kumar, DDG & Convener NC­I 302 23061562 Ext.380 DGFT, U.B. 7. Sh. Ramavatar Meena, FTDO 404 23061562 Ext.265 DGFT, U.B.   The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon were as under: ­    1

Case No.:22/30/80­ALC2/2007

Party Name:BHARAT HEAVY ELECTRICALS LIMITED Meet No/Date:17/80­ALC2/2009 28.07.2009 Status:Case deferred HQ File :01/80/050/00494/AM08/ RLA File :04/24/040/00201/AM08/ Lic.No/Date:0410091443 09.10.2007 Defer Date: 15.09.2009 Decision :The Committee noted that minutes recorded for the case in the meeting held on 14.10.2008 were incorrect.  Accordingly, Committee has reviewed its earlier decision taken in its M.No.29/09 dt.14.10.08 and handed over the case file to the representative of DHI with the advice to forward their comments if they have already finalized and see for further examination if comments have not been prepared. The case may be relisted on 15.09.2009.     2

Case No.:29/17/80­ALC2/2009

Party Name:SUR HENNING PVT. LTD., 28.07.2009 HQ File :01/80/050/00256/AM10/ RLA File :07/24/040/00645/AM08/ Lic.No/Date:0710054948 12.12.2007 Defer Date: 15.09.2009 Decision : The Committee noted that the case was not listed by the NIC earlier due to technical reasons and the hardcopy of firm’s application also not received from RA. The Committee, therefore, decided to call for the copy of application from RA and firm and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments.  In the letter to RA and firm, they are also to be requested to confirm whether the norms in the case have been ratified earlier and if yes, they may forward a copy of relevant NC’s decision and need not forward copy of application.  The case may be relisted on 15.09.2009.  

Case No.:25/17/80­ALC2/2009

Party Name:HIND HIGH VACUUM COMPANY PVT LTD. 28.07.2009 HQ Fil 01/80/050/00252/AM10/ RLA Fil 07/24/040/00611/AM08/ Li N /D 0710055125 D f D

3 HQ File :01/80/050/00252/AM10/ RLA File :07/24/040/00611/AM08/ Lic.No/Date:0710055125 28.12.2007 Defer Date: 15.09.2009 Decision : The Committee noted that the case was not listed by the NC earlier due to technical reasons. However, the hardcopy of firm’s application has been received from RA. Accordingly, the firm’s application has already been forwarded to DHI for examination and submission of comments. A letter may also be writer to RA and firm requesting them to confirm whether the norms in the case have been ratified earlier and if yes, they me forward a copy of relevant NC’s decision. The case may be relisted on 15.09.2009.   4

Case No.:20/38/80­ALC2/2008

Party Name:DENSO HARYANA PVT. LTD., 28.07.2009 Status:Case approved HQ File :01/80/050/01519/AM09/ RLA File :05/24/040/00532/AM09/ Lic.No/Date:0510231959 02.12.2008   Decision : The Committee noted that there is a mistake in the Online data. Therefore, the DHI has recommended norms in the subject authorization vide their U.O.No. 3(11)/08­TSW(B)/80 dt. 12.02.2009 based on the hardcopy of firm’s application.   The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization in accordance  with  DHI  comments  referred  to  above.  The  Committee  also  decided  to forward a copy of firm’s application to RA for verification as NC is recommending the norms based on the data given in the hardcopy of the application.   A copy of DHI letter referred to above may also be forwarded to RA. The Regional Authority may take necessary action accordingly.   5

Case No.:4/17/80­ALC2/2009

Party Name:CANTRONICS OFFICE EQUIPMENTS PVT.LTD., 28.07.2009 HQ File :01/80/050/00227/AM10/ RLA File :03/94/040/00050/AM10/ Lic.No/Date:0310517619 28.04.2009 Defer Date: 15.09.2009 Decision : The Committee decided to call for the following information/clarification from the firm and to re­list the case on 15.09.2009:­   1.      Clarify the make of toner cartridge to be refilled. 2.      Whether they are having agreement with the original tenor cartridge manufacturer for re­manufacture of such cartridge. 3.      Forward a copy of Export Order.   6

Case No.:5/17/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED 28.07.2009 HQ File :01/80/050/00228/AM10/ RLA File :03/95/040/00067/AM10/ Lic.No/Date:0310520406 19.05.2009 Defer Date: 15.09.2009 Decision : The representative of the DIPP informed the Committee that they received the firm’s application and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 15.09.2009.   7

Case No.:6/17/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED 28.07.2009 HQ File :01/80/050/00229/AM10/ RLA File :03/95/040/00085/AM10/ Lic.No/Date:0310520430 20.05.2009 Defer Date: 15.09.2009 Decision  :  On  the  recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the  following information/clarification from the firm and to re­list the case on 15.09.2009:­

1.      Information in respect of Sl.No.4,5,11, & 13 of the Standard Deficiency Format.   8

Case No.:18/17/80­ALC2/2009

Party Name:PAM­GLATT PHARMA TECHNOLOGIES PVT.LTD 28.07.2009 Status:Case closed HQ File :01/80/050/00241/AM10/ RLA File :03/95/040/00137/AM10/ Lic.No/Date:0310522886 05.06.2009   Decision : The Committee noted that RA vide their letter No. 03/95/040/00137/AM10  dt.5.6.09  informed the subject advance authorization has been issued as per GN – 4 for the engineering products hence hard copy of the firm’s application not forwarded to NC. The Committee accordingly decided to close the case on the part of NC without any examination.   9

Case No.:8/17/80­ALC2/2009

Party Name:TRF LIMITED, 28.07.2009 HQ File :01/80/050/00231/AM10/ RLA File :02/24/040/00039/AM10/ Lic.No/Date:0210127502 10.06.2009 Defer Date: 15.09.2009 Decision : The representative of DHI present in the meeting informed that he has received incomplete application. The Committee therefore handed over the case file to the technical authority for examination and submission of comments. The case may be relisted on 15.09.2009.      10

Case No.:10/17/80­ALC2/2009

Party Name:OMNI LENS PVT. LTD. 28.07.2009 HQ File :01/80/050/00233/AM10/ RLA File :08/24/040/00059/AM10/ Lic.No/Date:0810080896 22.06.2009 Defer Date: 15.09.2009 Decision : The Committee noted that firm’s application has already been forwarded to DC(MSME) for their comments and the case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 15.09.2009.   11

Case No.:17/17/80­ALC2/2009

Party Name:RATHI TRANSPOWER PVT.LTD. 28.07.2009 HQ File :01/80/050/00240/AM10/ RLA File :31/21/040/00078/AM10/ Lic.No/Date:3110038963 23.06.2009 Defer Date: 15.09.2009 Decision  :  On  the  recommendation  of  the  representative  of  DHI  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the  following information/clarification from the firm and to re­list the case on 15.09.2009:­   1.      Information in respect of Sl.No.4, 5 & 11 of the Standard Deficiency Format export product wise.   12

Case No.:22/17/80­ALC2/2009

Party Name:GEA ECOFLEX INDIA PVT.LTD. 28.07.2009 HQ File :01/80/050/00245/AM10/ RLA File :03/94/040/00253/AM10/ Lic.No/Date:0310525579 24.06.2009 Defer Date: 15.09.2009 Decision  :  On  the  recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the  following information/clarification from the firm and to re­list the case on 15.09.2009:­   1.      Information in respect of Sl.No.4,5,11 & 11a of the Standard Deficiency Format.

13

Case No.:12/17/80­ALC2/2009

Party Name:L&T ­ MHI TURBINE GENERATORS PVT.LTD. 28.07.2009 Status:Case closed HQ File :01/80/050/00235/AM10/ RLA File :03/95/040/00127/AM10/ Lic.No/Date:0310526014 26.06.2009   Decision : The Committee noted that RA vide their letter No. 03/95/040/00127/AM10 dt. 26.6.09 informed the subject advance authorization has been issued as per GN – 4 for the engineering products hence hard copy of the firm’s application not forwarded to NC. The Committee accordingly decided to close the case on the part of NC without any examination.   14

Case No.:9/17/80­ALC2/2009

Party Name:VIJAY FIRE VEHICLES AND PUMPS LTD. 28.07.2009 Status:Case closed HQ File :01/80/050/00232/AM10/ RLA File :03/95/040/00188/AM10/ Lic.No/Date:0310526731 01.07.2009   Decision : The Committee noted that RA vide their letter No. 03/95/040/00188/AM10/  dt. 1.7.09 informed the subject advance authorization has been issued as per GN – 4 for the engineering products hence hard copy of the firm’s application not forwarded to NC. The Committee accordingly decided to close the case on the part of NC without any examination.   15

Case No.:7/17/80­ALC2/2009

Party Name:AQUASUB ENGINEERING 28.07.2009 HQ File :01/80/050/00230/AM10/ RLA File :32/24/040/00013/AM10/ Lic.No/Date:3210040747 03.07.2009 Defer Date: 15.09.2009 Decision  :  On  the  recommendation  of  the  representative  of  DIPP   present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the  following information/clarification from the firm and to re­list the case on 15.09.2009:­   1. Information in respect of Sl.No.3,4,5,11 & 11a of the Standard Deficiency Format.   16

Case No.:1/16/80­ALC2/2009

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 28.07.2009 HQ File :01/80/050/00212/AM10/ RLA File :05/24/040/00205/AM10/ Lic.No/Date:0510245460 09.07.2009 Defer Date: 15.09.2009 Decision  :  On  the  recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the  following information/clarification from the firm and to re­list the case on 15.09.2009:­   1. Information in respect of S.No. 3, 4, 5, 11 & 13 of Standard Deficiency Letter – export product­wise. 2. Length of Pipes/Tubes at import item S.Nos. 1, 3, 7 & 9. 3. Quantity of pipe fittings at import item at S.No. 2, 4, 8 & 10 in Nos. 4. Total piping length of each export product supported by P&I diagram of the system.   17

Case No.:11/17/80­ALC2/2009

Party Name:SEJASMI INDUSTRIES (INDIA) PVT. LTD. 28.07.2009 Status:Case approved HQ File :01/80/050/00234/AM10/ RLA File :08/24/040/00076/AM10/ Lic.No/Date:0810081365 09.07.2009   Decision : The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization with following modifications:­

the norms in respect of the subject advance authorization with following modifications:   1.      Quantity of import item at Sl. No. 1 may be allowed as applied for i.e. 52500 Kgs inclusive of a wastage of 5 %. 2.      Quantity of import item at Sl. No. 2 may be allowed as 500000 Nos (25000 Kgs) on net to net basis.   18

Case No.:13/17/80­ALC2/2009

Party Name:RATNAMANI METALS & TUBES LIMITED 28.07.2009 HQ File :01/80/050/00236/AM10/ RLA File :08/24/040/00086/AM10/ Lic.No/Date:0810081362 09.07.2009 Defer Date: 15.09.2009 Decision  :  On  the  recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the  following information/clarification from the firm and to re­list the case on 15.09.2009:­   1. Information in respect of Sl.No.5 & 11 of the Standard Deficiency Format.   19

Case No.:2/16/80­ALC2/2009

Party Name:PAHARPUR COOLING TOWERS LIMITED, 28.07.2009 HQ File :01/80/050/00213/AM10/ RLA File :02/24/040/00058/AM10/ Lic.No/Date:0210128862 09.07.2009 Defer Date: 15.09.2009 Decision : The representative of DIPP informed the Committee that they have not received firm’s application. The Committee therefore handed over the firm’s application to the technical authority for examination and submission of comments. The case may be relisted on 15.09.2009.     20

Case No.:3/16/80­ALC2/2009

Party Name:MOTHERSON SUMI SYSTEMS LTD 28.07.2009 HQ File :01/80/050/00214/AM10/ RLA File :05/24/040/00220/AM10/ Lic.No/Date:0510245518 10.07.2009 Defer Date: 15.09.2009 Decision : The representative of the DHI informed the Committee that they received the firm’s application and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 15.09.2009.   21

Case No.:4/16/80­ALC2/2009

Party Name:MOTHERSON SUMI SYSTEMS LTD 28.07.2009 HQ File :01/80/050/00215/AM10/ RLA File :05/24/040/00221/AM10/ Lic.No/Date:0510245519 10.07.2009 Defer Date: 15.09.2009 Decision : The representative of the DHI informed the Committee that they received the firm’s application and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 15.09.2009.   22

Case No.:5/16/80­ALC2/2009

Party Name:KENT INTROL PRIVATE LIMITED 28.07.2009 Status:Case reverted back to RA HQ File :01/80/050/00216/AM10/ RLA File :31/24/040/00064/AM10/ Lic.No/Date:3110039178 10.07.2009

22 Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.   23

Case No.:6/16/80­ALC2/2009

Party Name:SAHAJANAND MEDICAL TECHNOLOGIES PVT LTD, 28.07.2009 HQ File :01/80/050/00217/AM10/ RLA File :52/24/040/00007/AM10/ Lic.No/Date:5210027361 10.07.2009 Defer Date: 15.09.2009 Decision : The representative of DIPP informed the Committee that they have not received firm’s application. The Committee therefore handed over the firm’s application to the technical authority for examination and submission of comments. The case may be relisted on 15.09.2009.     24

Case No.:7/16/80­ALC2/2009

Party Name:ITS INDIA PVT. LTD. 28.07.2009 HQ File :01/80/050/00218/AM10/ RLA File :03/94/040/00262/AM10/ Lic.No/Date:0310528364 10.07.2009 Defer Date: 15.09.2009 Decision  :The  Committee  observed  that  agenda  was  attached  by  the  NIC  without  receipt  of  hardcopy  of  firm’s  application  from  concerned  Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 15.09.2009.   25

Case No.:8/16/80­ALC2/2009

Party Name:SHOWA INDIA PRIVATE LIMITED 28.07.2009 HQ File :01/80/050/00219/AM10/ RLA File :05/24/040/00224/AM10/ Lic.No/Date:0510245619 10.07.2009 Defer Date: 15.09.2009 Decision  :  The  Committee  observed  that  agenda  was  attached  by  the  NIC  without  receipt  of  hardcopy  of  firm’s  application  from  concerned  Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 15.09.2009.   26

Case No.:10/16/80­ALC2/2009

Party Name:PAM­GLATT PHARMA TECHNOLOGIES PVT.LTD 28.07.2009 Status:Case reverted back to RA HQ File :01/80/050/00221/AM10/ RLA File :03/95/040/00237/AM10/ Lic.No/Date:0310528571 13.07.2009   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.

27

Case No.:9/16/80­ALC2/2009

Party Name:VIGEL MANUFACTURING TECHNOLOGIES PVT.LTD. 28.07.2009 Status:Case reverted back to RA HQ File :01/80/050/00220/AM10/ RLA File :03/95/040/00187/AM10/ Lic.No/Date:0310528542 13.07.2009   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.   28

Case No.:1/17/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED 28.07.2009 HQ File :01/80/050/00224/AM10/ RLA File :04/24/040/00079/AM10/ Lic.No/Date:0410106106 14.07.2009 Defer Date: 15.09.2009 Decision : The representative of the DHI informed the Committee that they received the firm’s application and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 15.09.2009.   29

Case No.:11/16/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED 28.07.2009 HQ File :01/80/050/00222/AM10/ RLA File :03/95/040/00200/AM10/ Lic.No/Date:0310528720 14.07.2009 Defer Date: 15.09.2009 Decision  :  The  Committee  observed  that  agenda  was  attached  by  the  NIC  without  receipt  of  hardcopy  of  firm’s  application  from  concerned  Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 15.09.2009.   30

Case No.:12/16/80­ALC2/2009

Party Name:BLUE STAR LTD. 28.07.2009 HQ File :01/80/050/00223/AM10/ RLA File :03/94/040/01112/AM09/ Lic.No/Date:0310528757 14.07.2009 Defer Date: 15.09.2009 Decision  :  The  Committee  observed  that  agenda  was  attached  by  the  NIC  without  receipt  of  hardcopy  of  firm’s  application  from  concerned  Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 15.09.2009.     31

Case No.:2/17/80­ALC2/2009

Party Name:ULTRAMATIX COMPUTER SUPPORT SYSTEMS PVT.LTD. 28.07.2009 HQ File :01/80/050/00225/AM10/ RLA File :31/21/040/00107/AM10/ Lic.No/Date:3110039239 14.07.2009 Defer Date: 15.09.2009 Decision  :  The  Committee  observed  that  agenda  was  attached  by  the  NIC  without  receipt  of  hardcopy  of  firm’s  application  from  concerned  Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 15.09.2009.  

Case No.:23/17/80­ALC2/2009

Party Name:TERUMO PENPOL LIMITED 28.07.2009

32 HQ File :01/80/050/00250/AM10/ RLA File :53/24/040/00004/AM10/ Lic.No/Date:5310008755 14.07.2009 Defer Date: 15.09.2009 Decision  :  The  Committee  observed  that  agenda  was  attached  by  the  NIC  without  receipt  of  hardcopy  of  firm’s  application  from  concerned  Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. C&PC and DC(MSME) for examination and submission of comments. The case may be relisted on 15.09.2009.   33

Case No.:14/17/80­ALC2/2009

Party Name:ACE MANUFACTURING SYSTEMS LTD., 28.07.2009 Status:Case reverted back to RA HQ File :01/80/050/00237/AM10/ RLA File :07/24/040/00694/AM09/ Lic.No/Date:0710065962 16.07.2009   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.     34

Case No.:15/17/80­ALC2/2009

Party Name:ACE MANUFACTURING SYSTEMS LTD., 28.07.2009 Status:Case reverted back to RA HQ File :01/80/050/00238/AM10/ RLA File :07/24/040/00690/AM09/ Lic.No/Date:0710065963 16.07.2009   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.   35

Case No.:16/17/80­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 28.07.2009 HQ File :01/80/050/00239/AM10/ RLA File :03/94/040/00300/AM10/ Lic.No/Date:0310529264 16.07.2009 Defer Date: 15.09.2009 Decision  :  The  Committee  observed  that  agenda  was  attached  by  the  NIC  without  receipt  of  hardcopy  of  firm’s  application  from  concerned  Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 15.09.2009.   36

Case No.:3/17/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED 28.07.2009 HQ File :01/80/050/00226/AM10/ RLA File :03/95/040/00226/AM10/ Lic.No/Date:0310529040 16.07.2009 Defer Date: 15.09.2009 Decision :  The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIPP for examination and submission of comments. The case may be relisted on 15.09.2009.

37

Case No.:19/17/80­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 28.07.2009 Status:Case approved HQ File :01/80/050/00242/AM10/ RLA File :03/95/040/00246/AM10/ Lic.No/Date:0310529294 17.07.2009   Decision : The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization as per SION C­1829 of the Engineering Product.     38

Case No.:20/17/80­ALC2/2009

Party Name:OGNIBENE INDIA PRIVATE LIMITED 28.07.2009 HQ File :01/80/050/00243/AM10/ RLA File :31/21/040/00095/AM10/ Lic.No/Date:3110039293 17.07.2009 Defer Date: 15.09.2009 Decision : The Committee observed that agenda was attached by the NIC without receipt of hardcopy of firm’s application from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 15.09.2009.   39

Case No.:21/17/80­ALC2/2009

Party Name:CRAFTSMAN AUTOMATION PVT. LTD., 28.07.2009 HQ File :01/80/050/00244/AM10/ RLA File :32/21/040/00063/AM10/ Lic.No/Date:3210040862 17.07.2009 Defer Date: 15.09.2009 Decision  :  The  Committee  observed  that  agenda  was  attached  by  the  NIC  without  receipt  of  hardcopy  of  firm’s  application  from  concerned  Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 15.09.2009.     40

Case No.:24/17/80­ALC2/2009

Party Name:PAHARPUR COOLING TOWERS LIMITED, 28.07.2009 HQ File :01/80/050/00251/AM10/ RLA File :02/24/040/00063/AM10/ Lic.No/Date:0210129313 21.07.2009 Defer Date: 15.09.2009 Decision  :  The  Committee  observed  that  agenda  was  attached  by  the  NIC  without  receipt  of  hardcopy  of  firm’s  application  from  concerned  Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 15.09.2009.   41

Case No.:26/17/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 28.07.2009 HQ File :01/80/050/00253/AM10/ RLA File :04/24/040/00034/AM10/ Lic.No/Date:0410106305 21.07.2009 Defer Date: 15.09.2009 Decision  :  The  Committee  observed  that  agenda  was  attached  by  the  NIC  without  receipt  of  hardcopy  of  firm’s  application  from  concerned  Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 15.09.2009.

42

Case No.:27/17/80­ALC2/2009

Party Name:PAM­GLATT PHARMA TECHNOLOGIES PVT.LTD 28.07.2009 Status:Case reverted back to RA HQ File :01/80/050/00254/AM10/ RLA File :03/95/040/00252/AM10/ Lic.No/Date:0310529933 21.07.2009   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.     43

Case No.:28/17/80­ALC2/2009

Party Name:MONGA STRAYFIELD PVT. LTD. 28.07.2009 Status:Case reverted back to RA HQ File :01/80/050/00255/AM10/ RLA File :31/21/040/00100/AM10/ Lic.No/Date:3110039328 21.07.2009   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to be covered in GN­4 for the Engineering Products. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.  

Case No.A/R­26

M/s.    Kineco  Pvt. Ltd., HQ F.No.01/80/50/1229/AM06/DES–I Lic. No. & Date Meeting No. 17/10 RLA No.17/24/040/00041/AM06   1710001187 dt.20.12.2005 Date: 28.7.2009 Ratification of norms The Committee considered the firm’s representation for correction in the unit of measurement of import item no. 11 recorded in the minutes of NC meeting No. 13/08 held on 26.06.2007.  The representative of the DIPP present in the meeting recommended the correction. The Committee, after deliberating upon the case, decided to correct the unite of measurement (UOM) of import item at S.No.11 from “Kgs.” to “Square Meters” and quantity of this item may accordingly be allowed as 7900 sq.mtrs.      

Case No.A/R­27

M/s.    Larsen  & Toubro Ltd., HQ F.No.01/80/50/00627/AM07/DES–I Lic. No. & Date Meeting No. 17/10 RLA No.03/95/040/00632/AM07   0310399061 dt.12.09.2006 Date: 28.7.2009 Ratification of norms The Committee considered the firm’s representation for minor amendment in the description of import item and quantity of import item No. 2 allowed by the NC in the minutes of NC meeting No. 50/07 held on 20.03.2007.  The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to modify the description and quantity of import item at S.No. 2 as under:   “Relevant Alloy Steel Plates Spec SA 387 – Quantity 72315 Kgs.”  

Case No.A/R­28

M/s.    Larsen  & Toubro Ltd., HQ F.No.01/80/50/00894/AM06/DES–I Lic. No. & Date Meeting No. 17/10 RLA No.03/95/040/00807/AM06 0310351285 dt.11.10.2005 Date: 28.7.2009 Ratification of norms The  Committee  considered  the  firm’s  representation  for  reduction  of  export  weight  workout  by  the  NC  in  meeting  No.  37/06  held  on  20.12.2005.    The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to modify the norms upto following extent:­   1.      Net empty weight of export product may be modified as 1010.25 MT. 2.      Total quantity of import item at S.No. 1 may be reduced to 802683 Kgs. 3.      Quantity of import item at S.No. 9 may be reduced to 10496 Kgs.    

Case No.A/R­29

M/s.    Larsen  & Toubro Ltd., HQ F.No.01/80/50/00935/AM06/DES–I Lic. No. & Date Meeting No. 17/10 RLA No.03/95/040/00839/AM06 0310352553 dt.19.10.2005 Date: 28.7.2009 Ratification of norms The  Committee  considered  the  firm’s  representation  for  reduction  of  export  weight  workout  by  the  NC  in  meeting  No.  39/07  held  on  03.01.2006.    The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to modify the  norms upto following extent:­   Total  weight of export product may be revised as under:   Net export weight of equipment:       2149.576  MT Weight of Saddles/Support System:    275.643  MT             Total export weight:                            2425.219 MT           

Case No.A/R­30

M/s.  Delkor  Technik India Pvt. LTd., HQ F.No.01/80/50/00945/AM08/DES–I Lic. No. & Date Meeting No. 17/10 RLA No.07/24/040/00457/AM08 0710053565 dt.27.09.2007 Date: 28.7.2009 Ratification of norms The representative of the DIPP informed the Committee that they received the firm’s representation and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 15.09.2009.     

Case No.A/R­31

M/s.    Jord  Engineers (I) Ltd., HQ F.No.01/80/50/01132/AM03/DES–I Lic. No. & Date Meeting No. 17/10 RLA No.34/80/040/00336/AM03 3410005671 dt.25.10.2002 Date: 28.7.2009 Ratification of norms The Committee considered the firm’s representation for consideration of norms of the subject advance authorization as per agenda.  The Committee noted that the case was rejected by the NC in its meeting no. 03/04 held on 29.04.2003 due to non submission of required information by the firm.  The Committee decided to call for the comments of RA on the firm’s request before taking any decision to review the case.   The case may be relisted on 15.09.2009.     

Case No. C­10

M/s.  Hindalco  Industries Ltd., Gujarat  HQ F.No.01/80/162/00385/AM10/DES­I   Meeting No. 17/10 Clarification of the norms   Date: 28.7.2009 The Committee observed that the comments called for from M/o Mines and DC(MSME) are yet to be received.  The Committee, therefore, decided to remind them f di i h i h b li d

for expediting their comments. The case may be re­listed on 15.09.2009.     

Case No. C­11

M/s. Nakshatra Enterprises Pvt. Ltd.,  HQ F.No.01/80/162/00088/AM09/DES­I   Meeting No. 17/10 Fixation of SION   Date: 28.7.2009 The Committee considered the firm’s application for fixation of wastage norms of the product for the applicant firm which is a 100% EOU.  The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to fix the wastage norms for the applicant firm after taking clue from SION C­385 as under:­   Export Product   Quantity  Input Quantity Stainless Steel/Alloy Steel  Flanges & Fittings 1 MT Stainless Steel/Alloy Steel Bars & Billets 1.65 MT/MT content in the export product The DC, KSEZ may take necessary action accordingly.       (B. C. Nayak D.O., DHI)  Member      (S.K. Jain, D.O., DIPP)      Member             (B. D. Ghosh, Jt. IA, MOS) Member        (K.K. Funda, Asstt. Director)       Member             (A.K. Mishra, AIA, MOS) Member       (Krishan Kumar, Dy. DGFT)      Convener           (A. Komu) Chairman

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied