Agenda of the Approval Committee meeting held on 17.04.2025 -AURUM-SEZ
सीÜज़ ͪवशेष आͬथ[क ¢ेğ
SEEPZ SPECIAL ECONOMIC ZONE
अंधेरȣ (पूव[), मुंबई
ANDHERI (EAST), MUMBAI.
काय[सूची के ͧलए AGENDA FOR
मेसस[ ऑरम ǐरयल एèटेट डेवलपस[ ͧलͧमटेड – सेज़, नवी मुंबई के ¢ेğ ͪवशेष आͬथ[क ¢ेğ के ͧलए अनुमोदन सͧमǓत कȧ बैठक। MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE of M/s. AURUM REAL ESTATE DEVELOPERS LIMITED-SEZ at NAVI MUMBAI.
èथल
: सàमेलन क¢, दूसरȣ मंिजल, ͪवकास आयुÈत का काया[लय, सीÜज़-सेज़,
अंधेरȣ (पूव[), मुंबई
VENUE
: Conference Hall, 2nd Floor, The Office of the Development
Commissioner, SEEPZ-SEZ, Andheri (East), Mumbai.
Ǒदनांक
: गुǾवार, 17 अĤैल, 2025
DATE
: Thursday, 17th April, 2025
समय
: पूवा[éन 11:30 बजे
TIME : 11:30 A.M.
गुǾवार, 17 अĤैल, 2025 को ͪवकास आयुÈत, सीÜज़-सेज़ कȧ अÚय¢ता मɅ नवी मुंबई मɅ मेसस[ ऑरम ǐरयल एèटेट डेवलपस[ ͧलͧमटेड - सेज़ के ¢ेğ ͪवशेष ͪवशेष आͬथ[क ¢ेğ के ͧलए अनुमोदन सͧमǓत कȧ बैठक। Meeting of the Approval Committee for Sector Specific Special Economic Zone of M/s. Aurum Real Estate Developers Limited – SEZ at Navi Mumbai under the Chairmanship of Development Commissioner, SEEPZ- SEZ on Thursday, 17th April, 2025.
सूचकांक / INDEX
काय[सूची मद सं. Agenda Item No. ͪवषय Subject काय[सूची मद सं. 01 Agenda Item No. 01 : -
Confirmation of minutes of the meeting held on 24.03.2025. काय[सूची मद सं. 02 Agenda Item No. 02 : - Approval for Change of Name of their company from M/s. Momentum Metropolitan Services Private Limited to M/s Momentum Services Private Limited with Change in Shareholding Pattern and Change in Board of Directors of the company. काय[सूची मद सं. 03 Agenda Item No. 03 : - Monitoring of the performance of M/s. KINAI INFOTECH LLP for the year 2024-25. काय[सूची मद सं. 04 Agenda Item No. 04 : - Approval for Construction of Building IT Tower No. 03/Q3 in the processing area. काय[सूची मद सं. 05 Agenda Item No. 05 : - Request of M/s. Aurum RealEstate Developers Limited (Developer) for approval of procurement of list of material required for Construction of Building IT Tower No. 03/Q3.
िवकास आयु , सी ज़-सेज़ क अयता म िदनांक 24.03.2025 को ितीय तल, सी ज़ सेवा क , सी ज़ सेज़, मुंबई म मेसस ऑरम !रयल ए#टेट डेवलपस 'लिमटेड-सेज़ के े( िवशेष िवशेष आ+थक े( के 'लए आयो-जत अनुमोदन सिम/त क 58व0 बैठक का काय वृ4। Minutes of the 58th Meeting of the Approval Committee for Sector Specific Special Economic Zone of M/s. Aurum Real Estate Developers Limited-SEZ under the Chairmanship of Development Commissioner, SEEPZ-SEZ held on 24.03.2025, at Second Floor, SEEPZ Service Centre, SEEPZ SEZ, Mumbai.
1.
सेज़ का नाम
Name of the SEZ
:
:
मेसस
ऑरम !रयल ए#टेट डेवलपस
'लिमटेड
M/s. Aurum Real Estate Developers Limited
2.
से6टर
Sector
:
:
आईटी/आईटीईएस
IT/ITES
3.
मी7टग नंबर
Meeting No.
:
:
58व0
58th
4.
िदनांक
Date
:
:
24.03.2025
24.03.2025
उप:#थत सद#य/Members Present:
;.
Sr.
No.
सद#य< का नाम
Name of Members
पद का नाम
Designation
संगठन
Organization
1
=ीमती िमतल एस. िहरेमठ
Smt. Mital S. hiremath
संयु िवकास आयु ,
Jt. Development
Commissioner
सी
ज़-सेज़
SEEPZ-SEZ
2
=ी राजेश परदेशी
Shri. Rajesh Pardeshi
संयु आयु आयकर
Joint Commissioner,
Income Tax
आयकर आयु काया
लय, मुंबई के नािमती
Nominee of Commissioner of Income
Tax office, Mumbai
3
=ी िहमांशु धर पांडे
Shri. Himanshu Dhar Pandey
उप िनदेशक डीजीएफटी
Deputy Director DGFT
अ/त!र डीजीएफटी, मुंबई के नािमत
Nominee of the Additional DGFT,
Mumbai
4
=ीमती पूनम दराडे
Smt. Poonam Darade
उCोग उपिनदेशक
Deputy Director of
Industries
डीसी इंड#टEीज, महाराFE सरकार के नािमती
Nominee of DC Industries, Government
of Maharashtra
5
=ीमती मीरा रामकृGण
Smt. Meera Ramkrishan
सहायक आयु , सीमा शुIक /
Asstt. Commissioner of
Customs
सीमा शुIक आयु , जनरल, एयर कागJ, सहार के
नािमती /
Nominee of Commissioner of Customs,
General, Air Cargo, Sahar
6
=ी बालासाहेब बोराडे
Shri Balasaheb Borade
िविनKदF अ/धकारी
Specified Officer
सी
ज़-सेज़
SEEPZ –SEZ
7
=ीमती :#मथा ना:Lबयार
Smt. Smitha Nambiar
िविनKदF अ/धकारी
Specified Officer
ऑरम-सेज़
Aurum –SEZ
=ीमती िM-जट जो, िव.आ.का.स. (Nयू सेज़), =ी
हनीश राठी, एडीसी (Nयू सेज़), =ी जय दीप, एडीसी (Nयू
सेज़), =ी पलाश शंकर, एडीसी (Nयू सेज़) और =ी िववेक
जरवाल, एडीसी (Nयू एसईजेड) बैठक म सहायता और सुचाQ
संचालन के 'लए शािमल हुए।
Smt. Bridget Joe, EA to DC (New SEZ),
Shri. Hanish Rathi, ADC (New SEZ), Shri Jai
Deep, ADC (New SEZ), Shri. Palash Shankar,
ADC (New SEZ) and Shri. Vivek Zarwal, ADC
(New SEZ) also attended for assistance and
smooth functioning of the meeting.
काय
सूची मद संRया 01 : िदनांक 03.03.2025 को
आयो-जत 57व0 बैठक के काय
वृ4 क पुिF।
िदनांक 03.03.2025 को आयो-जत 57व0 बैठक के काय
वृ4
क सव
सLम/त से पुिF क गई।
Agenda Item No. 01: Confirmation of
Minutes
of
the 57th meeting held on
03.03.2025.
The Minutes of the 57th Meeting held on
03.03.2025 were confirmed with consensus.
काय
सूची मद संRया 02 :
िव4 वष
2022-23 से िव4 वष
2023-24 क अव/ध के 'लए
मेसस
िकनाई इNफोटेक एलएलपी के Sदश
न क िनगरानी।
(मूल
एलओए
संRया:-
सी
ज़/Nयूज़ेज़/सन#टEीम-
ठाणे/05/2015-16/946, िदनांक 22.01.2016)
इकाई ारा िव4 वष
2022-23 से िव4 वष
2023-24 के
'लए वाKषक Sदश
न !रपोट
S#तुत क गई। इकाई ने िव4 वष
2022-23 से 2023-24 के दौरान संचयी आधार पर
33.96/- करोड़ Wपये का सकाराXमक एनएफई हा-सल िकया
है।
िनण
य:- िवचार-िवमश
के बाद, सिम/त ने सेज़ िनयम, 2006
के िनयम 54 के अनुसार मेसस
िकनाई इNफोटेक एलएलपी
(ऑरम-सेज़) के Sदश
न को नोट िकया।
सिम/त ने यह भी पाया िक,
1. इकाई ने 2021-22 से 2023-24 क अव/ध के 'लए
एपीआर म कॉलम संRया 4(बी) म गलत आंकड़े दशा
ए ह[।
संदभ
के 'लए अनुल\क-बी (प!रशोधन प() संल\ है।
2. इकाई ने 2021-22 से 2023-24 क अव/ध के 'लए
एपीआर म कॉलम संRया 4(बी) (vi) म गलत आंकड़े दशा
ए
ह[। संदभ
के 'लए अनुल\क-ए (िनया
त और आयात डेटा)
संल\ है।
सिम/त ने इकाई को िनद]श िदया िक, िव4 वष
2021-22 से
2023-24 क अव/ध के 'लए संशो/धत एपीआर S#तुत कर।
Agenda Item No 02 :
Monitoring of the performance of M/s. KINAI
INFOTECH LLP for the period FY 2022-23 to
FY 2023-24.
(Original
LOA
No.:-
SEEPZ/NEWSEZ/SUNSTREAM-THANE/
05/2015-16/946, Dated 22.01.2016)
The Annual Performance Report for the FY
2022-23 to FY 2023-24 was submitted by the
unit. The unit has achieved positive NFE of Rs.
33.96/- Crore on cumulative basis during the
FY 2022-23 to 2023-24.
Decision:- After deliberation, the Committee
noted
the
performance
of M/s.
KINAI
INFOTECH LLP (Aurum-SEZ) in terms of Rule
54 of SEZ Rules, 2006.
Committee also observed that,
1. Unit has wrongly mentioned figures in
Coloumn No.4(B) in the APR for the
period 2021-22 to 2023-24. Annexure-B
(Amortized
sheet)
is
attached
for
reference.
2. Unit has wrongly mentioned figures in
Coloumn No.4(B) (vi) in the APR for the
period 2021-22 to 2023-24. Annexure-A
(Export and Import Data) is attached for
reference.
Committee directed to unit to submit revised
APR for the FY 2021-22 to 2023-24.
काय
सूची मद संRया 03:
िव4 वष
2020-21 से िव4 वष
2023-24 क अव/ध के 'लए
मेसस
थड
वेयर /ड-जटल सKवसेज के Sदश
न क िनगरानी।
(
मूल L O A संRया:
- SEEPZ-SEZ/NEWSEZ/
AURUM-SEZ/TDSL/LCD-1/01/2019-20/04695,
िदनांक 05.03.2020)
इकाई ारा िव4 वष
2020-21 से िव4 वष
2023-24 के
'लए वाKषक Sदश
न !रपोट
S#तुत क गई। इकाई ने िव4 वष
2019-20 से 2023-24 के दौरान संचयी आधार पर
63.73/- करोड़ Wपये का सकाराXमक एनएफई हा-सल िकया
है।
िनण
य:- िवचार-िवमश
के बाद, सिम/त ने सेज़ िनयम, 2006
के िनयम 54 के अनुसार मेसस
थड
वेयर /ड-जटल सKवसेज
(ऑरम-एसईजेड) के Sदश
न को नोट िकया।
सिम/त ने वष
2023-24 क अव/ध के 'लए एपीआर S#तुत
करने म देरी के 'लए कारण बताओ नोिटस जारी करने के 'लए
कार
वाई शुQ करने का भी िनद]श िदया।
Agenda Item No 03 :
Monitoring of the performance of M/s.
Thirdware Digital Services for the period FY
2020-21 to FY 2023-24.
(Original
LOA
No.:-
SEEPZ-
SEZ/NEWSEZ/AURUM-SEZ/TDSL/LCD-
1/01/2019-20/04695, Dated 05.03.2020)
The Annual Performance Report for the FY
2020-21 to FY 2023-24 was submitted by the
unit. The unit has achieved positive NFE of Rs.
63.73/- Crore on cumulative basis during the
FY 2019-20 to 2023-24.
Decision:- After deliberation, the Committee
noted the performance of M/s. Thirdware
Digital Services (Aurum-SEZ) in terms of
Rule 54 of SEZ Rules, 2006.
The Committee also directed to initiate action
for issuance of Show Cause notice for delay in
submission of APR for the period for the year
2023-24.
काय
सूची मद संRया 04:
कंपनी का नाम मेसस
थड
वेयर /ड-जटल सKवसेज 'लिमटेड
(थड
वेयर सॉIयूशन 'लिमटेड का एक Sभाग) से मेसस
टेक
म7हा 'लिमटेड म बदलने के 'लए आवेदन।
Agenda Item No 04 :
Application for change of name of the
Company
from
M/s.
Thirdware
Digital
Services Ltd (A division of Thirdware
Solution Ltd) to M/s. Tech Mahindra Ltd.
(मूल
एलओए
संRया:-
SEEPZ-SEZ/NEWSEZ/
AURUM
SEZ/TDS/LCD-1/01/2019-20/04695
िदनांक 05.03.2020)
(Original
LOA
No.SEEPZ-
SEZ/NEWSEZ/AURUMSEZ/TDS/LCD-
1/01/2019-20/04695 Dated 05.03.2020)
िनण
य:- िवचार-िवमश
के बाद, सिम/त ने िनद]श संRया 109,
िदनांक 18.10.2021 के अनुसार कंपनी का नाम बदलने के
'लए ऑरम-सेज़ म :#थत मेसस
थड
वेयर /ड-जटल सKवसेज
'लिमटेड के S#ताव को मंजूरी दे दी।
Decision:-
After
deliberation,
the
Committee approved
proposal
of M/s.
Thirdware Digital Services Ltd located at
AURUM-SEZ for change of name of the
Company in terms of Instruction No. 109,
dated 18.10.2021.
इसके अलावा, सिम/त ने इकाई को िनद]श संRया 109,
िदनांक 18.10.2021 के अनुसार िनLन'ल'खत सुरा उपाय<
का अनुपालन करने का भी िनद]श िदया।
Further, the Committee also directed the unit to
comply with the following safeguards in terms
of Instruction No. 109, dated 18.10.2021.
1. प!रव_तत इकाई के 'लए अप!रव_तत -जLमेदा!रय<
और दा/यXव< के साथ सेज़ ग/तिव/धय< क िनबा
ध
िनरंतरता।
1. Seamless
continuity
of
the
SEZ
activities
with
unaltered
responsibilities and obligations for the
altered entity.
2. प!रव_तत इकाई और उसके घटक< ारा सुरा मंजूरी
आिद सिहत सभी लागू पा(ता मानदंड< को पूरा
करना।
2. Fulfillment
of
all
eligibility
criteria
applicable, including security clearances
etc, by the altered entity and it’s
constituents.
3. सभी
राज#व/कंपनी
मामले/सेबी
आिद
अ/धिनयम</िनयम< क Sयोaयता और अनुपालन, जो
पूंजीगत लाभ, इ:6वटी प!रवत
न, ह#तांतरण, कर
देयता आिद जैसे मुb< को िविनयिमत करते ह[।
3. Applicability of and compliance with all
Revenue / Company Affairs/SEBI etc,
Acts/Rules which regulate issues like
capital gains, equity change, transfer,
taxability etc.
4. इ:6वटी म प!रवत
न/िवलय, िवभाजन, समामेलन या
#वािमXव म ह#तांतरण आिद से संबं/धत पूण
िव4ीय
िववरण तुरंत सद#य (आईटी एंड आर), सीबीडीटी,
राज#व िवभाग और े(ा/धकार Sा/धकरण को S#तुत
िकया जाएगा।
4. Full financial details relating to change
in
equity/merger,
demerger,
amalgamation or transfer in ownership
etc. shall be furnished immediately to
Member (IT&R), CBDT, Department of
Revenue
and
to
the
jurisdictional authority.
5. मूIयांकन अ/धकारी को इ:6वटी या िवलय,
िवभाजन, एककरण, ह#तांतरण और #वािमXव आिद
के ह#तांतरण से उXपc लाभ/हािन क करदेयता का
आकलन करने का अ/धकार होगा, जैसा भी लागू हो
और आयकर अ/धिनयम, 1961 क Sासंिगक
धाराओं के तहत कटौती के 'लए पा(ता होगी।
5. The Assessing Officer shall have the
right to assess the taxability of the
gain/loss arising out of the transfer of
equity
or
merger
demerger,
amalgamation, transfer and ownerships
etc. as may be applicable and eligibility
for deduction under relevant sections of
the Income Tax Act, 1961.
6. आवेदक को राaय सरकार के Sासंिगक कानून< का
पालन करना होगा, -जसम भूिम के पdे से संबं/धत
कानून भी शािमल ह[।
6. The applicant shall comply with relevant
State Government laws, including those
relating to lease of land, as applicable.
7. आवेदक को सीबीडीटी को इकाई के पैन और
े(ा/धकार िनधा
रण अ/धकारी का िववरण S#तुत
करना होगा।
7. The applicant shall furnish details of
PAN and jurisdictional assessing officer
of the unit to CBDT.
8. आवेदक को सभी अeभलेख< म नये नाम या ऐसी
gयव#था से पहचाना जाएगा।
8. The applicant shall be recognized by the
new name or such arrangement in all
the records.
काय
सूची मद संRया 05:
मेसस
ऑरम !रयल ए#टेट डेवलपस
'लिमटेड (डेवलपर) का
आईटी टॉवर संRया 03/6यू 3 के िनमा
ण के 'लए आवhयक
सामiी क सूची क खरीद के अनुमोदन हेतु अनुरोध।
Agenda Item No 05:
Request
of M/s.
Aurum
RealEstate
Developers Limited (Developer) for approval
of procurement of list of material required for
Construction of Building IT Tower No. 03/Q3.
औपचा!रक अनुमोदन संRया एवं िदनांक- एफ.1/1/2016-
एसईजेड, िदनांक 11.01.2016
Formal Approval No. & Date- F.1/1/2016-SEZ,
Dated 11.01.2016
डेवलपर मेसस
ऑरम !रयल ए#टेट डेवलपस
'लिमटेड ने
चाट
ड
इंजीिनयर मेधा महादेjर (पंजीकरण संRया एएम
143780-4, िदनांक 29.05.2013) ारा िव/धवत Sमाeणत
प( िदनांक 05.06.2024 और 11.03.2025 के मायम से
िबkIडग आईटी टॉवर नंबर 03/6यू3 के िनमा
ण के 'लए
आवhयक सामiी क सूची क खरीद के अनुमोदन के 'लए
अनुरोध िकया है, -जसक राeश 209,67,00,000/- Wपये है।
The
developer M/s.
Aurum
RealEstate
Developers Limited has requested for the
approval of procurement of list of material
required for Construction of Building IT Tower
No. 03/Q3 amounting to Rs. 209,67,00,000/-
vide letters
dated 05.06.2024 & 11.03.2025 duly certified
b y Chartered Engineer Medha Mahadeshwar
(Registration
No.
AM
143780-4,
dtd.
29.05.2013
िविनKदF अ/धकारी, मेसस
ऑरम !रयल ए#टेट डेवलपस
'लिमटेड-सेज़ ने िदनांक 07.11.2024 के प( के मायम से
सXयापन !रपोट
S#तुत क है और कहा है िक,
206,67,00,000/- Wपये क सूची सXयािपत क गई है और
इसे अ/धकृत संचालन के 'लए उपयु पाया गया है।
The
Specified
Officer,
M/s.
Aurum
RealEstate
Developers
Limited-SEZ vide
letter
dated
07.11.2024
has
submitted
verification report and stated that, the list
amounting to Rs. 206,67,00,000/- has been
verified and is found to be fit for Authorized
operations.
िनण
य:- िवचार-िवमश
के बाद सिम/त ने मेसस
ऑरम !रयल
ए#टेट डेवलपस
'लिमटेड (डेवलपर) ारा आईटी टावर
संRया 03/6यू3 के िनमा
ण के 'लए आवhयक सामiी क सूची
क खरीद के अनुमोदन के 'लए 209,67,00,000/- Wपए के
S#ताव को #थिगत कर िदया, 6य<िक आवेदक का S/तिन/ध
उप:#थत नह0 था।
सिम/त ने पाया िक आवेदक ारा दी गई राeश
209,67,00,000/- Wपए, िविनKदF अ/धकारी ारा दी गई
राeश 206,67,00,000/- Wपए से eभc है।
सिम/त ने िविनKदF अ/धकारी, ऑरम-सेज़ को मेसस
ऑरम
!रयल ए#टेट डेवलपस
'लिमटेड के S#ताव को पुनः सXयािपत
करने का िनद]श िदया।
Decision:- After deliberation, the Committee
deferred the proposal of the M/s. Aurum
RealEstate Developers Limited (Developer)
for approval of procurement of list of material
required for Construction of Building IT Tower
No. 03/Q3 amounting to Rs. 209,67,00,000/-
as the representative of the applicant was not
present.
The Committee observed that the figure
provided by the applicant, Rs. 209,67,00,000/-,
is different from the figure given by the
Specified Officer, Rs. 206,67,00,000/-.
The Committee directed to Specified Officer,
Aurum-SEZ to re-verify the proposal of M/s.
Aurum RealEstate Developers Limited.
Also Committe directed developer to present
with
maps
and
approved
layout
the
construction/renewation has been proposed in
coming UAC.
अय को धNयवाद mापन के साथ बैठक समाn हुई।
Meeting concluded with a vote of thanks to the
Chair.
(mानेjर भा. पाटील, आईएएस)
अय-सह-िवकास आयु ,
सी
ज़-सेज़
******************************************
signaturerectangle-1-186
Digitally signed by Dnyaneshwar Bhalchandra
Patil
Date: 2025.04.03 11:28:01 IST
% DSUnknown
q
1 G
1 g
0.1 0 0 0.1 9 0 cm
0 J 0 j 4 M []0 d
1 i
0 g
313 292 m
313 404 325 453 432 529 c
478 561 504 597 504 645 c
504 736 440 760 391 760 c
286 760 271 681 265 626 c
265 625 l
100 625 l
100 828 253 898 381 898 c
451 898 679 878 679 650 c
679 555 628 499 538 435 c
488 399 467 376 467 292 c
313 292 l
h
308 214 170 -164 re
f
0.44 G
1.2 w
1 1 0.4 rg
287 318 m
287 430 299 479 406 555 c
451 587 478 623 478 671 c
478 762 414 786 365 786 c
260 786 245 707 239 652 c
239 651 l
74 651 l
74 854 227 924 355 924 c
425 924 653 904 653 676 c
653 581 602 525 512 461 c
462 425 441 402 441 318 c
287 318 l
h
282 240 170 -164 re
B
Q
Ǒदनांक 24.03.2025 को आयोिजत यूएसी बैठक के ͧलए कȧ गई कार[वाई
Action taken for the UAC Meeting held on 24.03.2025
सेज़ का नाम/
Name of SEZ
इकाई का नाम/
Name of Unit
ͪवषय/
Subject
कȧ गई कार[वाई/
Action Taken
M/s. Aurum
Real Estate
Developers
Limited
M/s. KINAI
INFOTECH LLP
Monitoring
of
the
performance
of
M/s. KINAI INFOTECH LLP for the year
2022-23 to 2023-24.
Letter dated 03.04.2025 has
been issued to unit.
M/s. Thirdware
Digital Services
Monitoring of the performance of M/s.
Thirdware Digital Services for the year
2020-21 to 2023-24.
Show Cause Notice dated
04.04.2025 has been issued to
unit.
M/s. Thirdware
Digital Services
Ltd
Application for change of name of the
Company from M/s. Thirdware Digital
Services Ltd (A division of Thirdware
Solution Ltd) to M/s. Tech Mahindra Ltd.
Letter dated 03.04.2025 has
been issued to unit.
M/s. Aurum
RealEstate
Developers
Limited
(Developer)
Request of M/s. Aurum RealEstate
Developers Limited (Developer) for
approval of procurement of list of
material required for Construction of
Building IT Tower No. 03/Q3.
Letter dated 04.04.2025 has
been issued to unit and
Specified Officer, Aurum-SEZ.
GOVERNMENT OF INDIA,
OFFICE OF THE DEVELOPMENT COMMISSIONER,
SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA,
ANDHERI (EAST), MUMBAI
**************
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
-----------------------
a. Proposal :
Proposal of M/s. Momentum Metropolitan Services Private Limited located at Aurum SEZ for
approval w.r.t. Change of Name of their company, Change in Shareholding Pattern and Change in
Board of Directors of the company.
b. Specific Issue on which decision of AC is required: -
Approval for Change of Name of their company from M/s Momentum Metropolitan Services
Private Limited to M/s Momentum Services Private Limited with Change in Shareholding Pattern
and Change in Board of Directors of the company.
c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :-
Attention is invited to Instruction No. 109 of MOC&I dated 18 th October, 2021
stipulates that - “In supersession of Instruction No. 89 dated 17.05.2018 and Instruction No. 90
dated 03.08.2018 of this Department on the subject cited above and in exercise of provisions of
Section 10(10) of the SEZ Act, 2005, it is hereby conveyed that the guidelines for approval in the
cases of reorganization including change of name, change of shareholding pattern, business
transfer arrangements, court approved mergers and demergers, change of constitution, change of
Directors, etc. of SEZ Developers / Co-developers as well as SEZ Units shall be as follows:
(i)
Reorganization
including
change
of
shareholding
pattern,
business
transfer
arrangements, court approved, mergers and demergers, change of constitution, change of
Directors etc. may be undertaken by the Unit Approval Committee (UAC) concerned subject
to the condition that the Developer / Co-Developer / Unit shall not opt out or exit out of the
SEZ and continues to operate as a going concern. All liabilities of the Developer / Co-
Developer / Unit shall remain unchanged on such reorganization.
d. Other Information: -
1.
LOP No. & Date
SEEPZ/NEWSEEPZ/AURUMSEZ/MMIBTSPL/LCD-1/
03/2019-20/05804 Dated: 30.03.2020. (Original
LOA) as amended.
2.
Item(s) of
manufacture/services
Information
Technology
/
Information
Technology Enabled Services.
3.
Date of commencement of
production
18.06.2020
4.
LOA Valid upto
17.06.2025.
5.
Present location
Unit No. 13, 12th Floor, Building No. 1/Q 1,
Developed by Loma Co-Developers Pvt. Ltd. in
Aurum Platz IT Pvt. Ltd. - SEZ, Plot No. Gen 4/1,
TTC Industrial Area, MIDC, Thane Belapur Road,
Airoli, Navi Mumbai - 400710.
The Unit vide letter dated 17.03.2025 has stated as under –
Reason for Proposed Change in Name :
The Company was incorporated as “MMI Business and Technology Solutions Pvt. Ltd.” on
15.03.2017. The name was subsequently changed from “MMI Business and Technology Solutions
Private Limited” to “Momentum Metropolitan Services Private Limited”, with the Certificate of
Incorporation reflecting change. The name has now been further changed from “Momentum
Metropolitan Services Private Limited” to “Momentum Services Private Limited” to align the
company name with the Momentum Group’s branding.,
The details of Change of name, Shareholding Pattern and Board of Directors of the Company as
under -
A. Change in Name :
From
To
M/s. Momentum Metropolitan Services
Private Limited.
M/s. Momentum Services Private Limited.
B. The details of Change in Shareholding Pattern :
i. Details Pre-Acquisition of Shareholding pattern of the Company :
Sr.
No.
Name of the Shareholders
Shareholding Pattern before transfer of
Shares
No of Shares
Value (Rs)
Percentage
1.
Momentum Metropolitan Strategic
Investments (Pty) Limited.
89,99,999
8,99,99,990
100.00%
2.
Asokan Moonsamy Cunniah Naidu
(As Nominee of Momentum Strategic
Investments (Pty) Limited.
1
10
0.00%
Total
90,00,000
9,00,00,000
100%
ii. Details Post-Acquisition of Shareholding pattern of the Company :
Sr.
No.
Name of the Shareholders
Shareholding Pattern before transfer of
Shares
No of Shares
Value (Rs)
Percentage
1.
Momentum Metropolitan Strategic
Investments (Pty) Limited.
89,99,999
8,99,99,990
100.00%
2.
Mr. Yasir Ahmed (As Nominee of
Momentum Strategic Investments
(Pty) Limited.
1
10
0.00%
Total
90,00,000
9,00,00,000
100%
Sr.
No.
Existing list of Board
of Directors
Appointment
Date
New list of Board
of Directors
Appointment
Date
1.
Asokan Moonsamy
Cunniah Naidu
15.03.2017
Asokan Moonsamy
Cunniah Naidu
15.03.2017
2.
Hermanus Anthon
Swart
20.04.2018
Hermanus Anthon
Swart
20.04.2018
3.
Yasir Ahmed
04.06.2020
Yasir Ahmed
04.06.2020
4.
Richard Llewellyn
Phillips
21.07.2020
Richard Llewellyn
Phillips
21.07.2020
5.
Daniel Nathniel
Kore
28.01.2022
C. The details of Change in Board of Directors :
Documents submitted by Unit :-
1. A copy of Fresh certificate of Incorporation issued by Registrar of Company.
2. Copy altered MOA and AOA.
3. Copy of Special resolution passed for application of Change of name.
4. Form INC-24 and Challan filled with ROC for change of name.
5. List of Directors before and after change.
6. Form MGT-14 for filing of Special Resolution with ROC along with its challan
7. Copy of Resolution passed for appointment of Director.
8. Copy of form DIR-12 for Appointed Director with ROC along with its challan
9. Copy of all Letter of approval
10. CA/CS certified list of Shareholders before and after change of name
11. Form SH-4 for transfer of share
12. Form MGT-6
13. Undertaking in terms of Instruction No. 109
14. PAN Card and GST Certificate of Momentum Services Private Limited
e. Recommendation:
Proposal of M/s. Momentum Metropolitan Services Private Limited located at Aurum- SEZ for
approval w.r.t. Change of Name of their company, Change in Shareholding Pattern and Change in
Board of Directors of the company is submitted before the Approval Committee Meeting in terms of
MoC&I Instruction No. 109 dated 18.10.2021.
*************************************************
GOVERNMENT OF INDIA,
OFFICE OF THE DEVELOPMENT COMMISSIONER,
SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA,
ANDHERI (EAST), MUMBAI
**************
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
-----------------------
a. Proposal :
Monitoring of the performance of M/s. KINAI INFOTECH LLP an IT/ITES unit located at Unit
No. 5, 11th Floor, Building Q1, Aurum Platz IT Pvt. Ltd-SEZ, Plot Gen4-1, MIDC Thane-Belapur Road,
Ghansoli, Navi Mumbai-400710 for 4th year i.e. 2024-25 of 2nd block period (FY 2021-22 to 2024-25).
b. Specific Issue on which decision of AC is required: -
Monitoring of the performance of the unit for 4th year i.e. 2024-25 of 2nd block period (FY 2021-22 to
2024-25), in terms of Rule 54 of SEZ Rules, 2006.
c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :-
As per Rule 54 of SEZ Rules, 2006
“Performance of the Unit shall be monitored by the Approval Committee as per guidelines given in
Annexure appended to these rules”.
d. Other Information: -
i. Approved Projections: (2nd Block Period) (Rs. in Crores)
2021-22
2022-23
2023-24
2024-25
2025-26
Total
FOB Value of
Exports
3.00
4.00
5.00
6.00
7.00
25.00
FE Outgo
0.48
0.72
0.90
1.20
1.25
4.55
NFE
2.52
3.28
4.10
4.80
5.75
20.45
ii. Performance as compared to projections: For FY 2021-22 to 2025-26
(Rs. in Crores)
Year
Export
FE OUTGO
Raw Material
(Goods/Services)
C.G. import/IUT
Other
Outflow
Projected
Actual
Projected
Actual
Projected
Actual
Actual
2021-22
3.00
7.94
N.A.
N.A.
0.05
0.0006
0.86
2022-23
4.00
10.39
0.0005
0.65
2023-24
5.00
19.70
2.78
1.53
2024-25
6.00
20.65
0.00
0.98
Total
18.00
58.68
0.05
2.7811
4.02
iii. Cumulative NFE achieved :
Year
Projected
Cumulative NFE
Cumulative NFE
Achieved
As per APR
(Coloumn 9)
Cumulative NFE as
per Calculation
Cumulative % NFE
as per calculation
2021-22
2.52
6.83
6.83
270.24 %
2022-23
5.80
16.32
16.32
280.86 %
2023-24
9.90
34.21
33.96
343.03 %
2024-25
14.70
53.61
53.07
361.02 %
Year
FOB value
of export
FE Outgo
Calculated
NFE
(As per
Scrutiny)
NFE
(As per
APR)
Cumulative
NFE
(As per APR)
Cumulative
NFE as per
Calculation
1
2
3
(Amortised
Value+Other Outflow)
4
2-3=
5
6
7
As per
APR
FY
2021-22
7.94
0.25+0.86=
1.11
6.83
6.83
6.83
6.83
As per
APR
FY
2022-23
10.39
0.25+0.65=
0.9
9.49
9.49
16.32
16.32
As per
APR
FY
2023-24
19.70
0.53+1.53=
2.06
17.64
17.89
34.21
33.96
As per
APR
FY
2024-25
20.65
0.53+0.98=
1.51
19.14
19.39
53.61
53.07
i. a. FY 2024-25 for 2nd block. (Rs. in Crore)
i. b. NFE for scrutiny period:-(Rs. in Crore)
(iii) Capital Goods Amortized Values table:-
Year
CG Imp. 4B(v) Amortized Value
2016-2017
97.51
9.75
2017-2018
113.00
21.05
2018-2019
7.87
21.84
2019-2020
35.68
25.41
2020-2021
0.00
25.41
2021-2022
0.06
25.41
2022-2023
0.05
25.42
2023-2024
278
53.22
2024-2025
1.59
53.22
Other Information:
LOA No. & Date
SEEPZ/NEWSEZ/SUNSTREAM-THANE/05/2015-16/946,
Dated 22.01.2016
Location of Unit
Unit No.5, 11th Floor, Level 06, Building Q1 developed
by loma Co-Developers 1 Pvt Ltd. in Aurum Platz IT
Pvt. Ltd., IT/ITES SEZ plot No. Gen 4/1, TTC
Industrial Area, MIDC Thane Belapur Road, Ghansoli,
Navi Mumbai 400710
Validity of LOA
31.01.2025
Item(s) of manufacture/ Services
To carry on the business of designing, development,
manufacture,
customization,
implementation,
maintenance, testing and benchmarking of computer
software and solutions, games & applications for in-flight
systems/platforms and others.
Date of commencement of production
04.04.2016
Execution of BLUT
Yes
Validity of Lease Agreement
31.01.2023
The unit vide letter dated 06.01.2021 has submitted
Memorandum
of
Understanding
entered
into
the
Developer for extending the leave & license till
31.03.2026.
Pending CRA Objection, if any
No
Pending Show Cause Notice/ Eviction
Order/Recovery Notice/ Recovery Order
issued, if any
No
Employment for the block period
As per projection
Man: 20
Woman: 06
Total: 26
As on 31.01.2025: (As per Specified Officer reports)
Man: 00
Woman: 00
Total: 00
Area allotted (in sq. ft.)
763 Sq. Ft.
(Area Sq. Ft./No. of Employees)
Area available for each employee per sq.ft. basis (area /
no. of employees)
-
Building
2024-25
0.00
Plant & Machinery
0.00
Investment
till
date (Rs. In Lakhs)
TOTAL
0.00
Quantity and value of goods exported under Rule 34
(unutilized goods)
N.A.
N.A.
Whether all the APRs being considered now has been
filed well within the time limit, or otherwise.
If no, details of the Year along with no of days delayed to
be given.
Yes
(Submitted on 28.02.2025)
The Specified Officer report vide letter dated 02.04.2025 has submitted reported as detailed below:
a. EXPORT:- (Rs. In Crore)
Year/Period
Figures as per
APR
Figures as per
Softex/SB/Customs
Records (INR)
Difference if any
Reason for
Difference /
Remark in INR as
conveyed by the
unit
INR
USD
INR
USD
INR
USD
2024-25
20.65
2.47
21.15
2.55
0.5
0.08
Difference in INR
USD exchange rate
considered by
NSDL. They
considered
exchange rate as
per RBI and same is
furnished in
worksheet uploaded
while filing softex
form online, but the
exchange rate
furnished by them in
softex is not
matching with NSDL
data.
b. Import
i. (Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis: (Rs. In Crore)
Year/
Period
Figures as per
APR
Figures as per
Softex/SB/Customs
Records
Difference if any
Reason for Difference / Remark in
INR as conveyed by the unit
INR
USD
INR
USD
INR
USD
2024-25
00
00
00
00
00
00
00
ii. Raw Material (Rs. in Cr.)
Year/
Period
Figures as per
APR
Figures as per
Softex/SB/Customs
Records
Difference if any
Reason for Difference / Remark in
INR as conveyed by the unit
INR
USD
INR
USD
INR
USD
2024-25
00
00
00
00
00
00
NA
c. DTA SALES
Year/
Period
Figures as per
APR
Figures as per
BOE/Customs Records
Difference if any
Reason for Difference / Remark in
INR as conveyed by the unit
2024-25
0.07
0.07
0.00
NA
d. BLUT
1.
Value of BLUT Executed (Duty foregone) including
for CG/Raw Material/Services)
Value of Additional BLUT executed
-Year
- BLUT amount
F.
No.
SEEPZ/NEWSEZ/
SUNSTREAM-THANE/05/
2015-
16/13585, dated 13.08.2021
Rs. 96 Lakhs
2.
Total Duty Foregone on goods & services procured
Category –wise BLUT value utilized separately for
imported and indigenous goods and services) This
should be based on BLUT worksheet which
provides for estimated value and duty foregone
separately for each category of procurement.
F.Y.
Goods
Services
(Rs. in
Lakhs)
(Imported &
Indigenous)
(Rs. in Lakhs)
2024-25
0.00
1.55
Total
0.00
1.55
3
Has the Unit procured goods and or services
without having sufficient balance in their BLUT?
If Yes,
Month & Year when the BLUT was exhausted
Details of the consignments and Total value of
Goods procured without having suffiecient or nil
balance in BLUT
No
(d)
Employment made as on date
(as on end of block period / year up to which
monitoring is being done) (March 2024)
Gender
As per the
LOA (Form
F1)
As on
31.01.2025
Men
20
0
Women
6
0
Total
26
0
(e)
Details of pending Foreign Remittance beyond
Permissible period, if any
(as on 31 March, 2024)
To cross-check the same and verify whether
necessary permission from AD Bank / RBI has been
obtained.
NIL
(f)
Whether all softex has been filed for the said period. If
no, details thereof.
SO to also check whether unit has obtained Softex
condonation from DC office / RBI and if approved,
whether they have filed such pending Softex.
Yes
(g)
Whether all Softex has been certified, if so till which
month has the same been certified. If not, provide
details of the Softex and reasons for pendency.
Yes, all softex forms are
Certified upto Jan, 2025.
(h)
Whether unit has filed any request for Cancellation of
Softex
No
(i)
Whether
any
Services
provided
in
DTA/SEZ/EOU/STPI etc. against payment in INR in
r/o IT/ITES Unit during the period.
If yes, details thereof (year wise details to be provided)
No
(j)
SO to verify and certify whether the unit has updated
the BLUT ledger Module in SEZ Online.
NA
(k)
Has the unit cleared any Capital Goods procured duty
free in DTA against payment of Duty or otherwise?
Full details to be provided along with value of assets
and duty discharged
No
(l)
Is the unit sharing any of their infrastructures with
other units or are utilizing infrastructure of another unit
in the same or other SEZ.
If so, details thereof, including the details of the unit
with whom the sharing is being made, and the
payment terms
If approval for sharing of common infrastructure has
been obtained from UAC / DC office, the date of UAC /
Approval letter to be indicated
No
(m)
Whether all DSPF for services procured during the
said monitoring period under consideration has been
filed by the unit and whether the same has been
processed for approval by the SO.
Yes
(n)
Whether unit has filed all DTA procurement w.r.t. the
goods procured by them during the monitoring period
for the relevant period.
If no, details thereof
Yes
(o)
Details of the request IDs pending for OOC in respect
of DTA procurement on the date of submission of
monitoring report
Nil
(p)
Has the unit set up any cafeteria / canteen / food court
in unit premises?
If yes, whether permission from UAC / DC office has
been issued, or otherwise office has been issued, or
otherwise
Whether unit has availed any duty free goods /
services for setting up such facility?
If yes, whether unit has discharged such duty / tax
benefit availed? Details to be given including amount
of duty / tax recovered or yet to be recovered
No
(q)
Whether any violation of any of the provisions of law
has been noticed / observed by the Specified Officer
during the period under monitoring
No
Further, Specified Officer stated that, the above figures are based on the details furnished by the
SEZ unit and data available on SEZ Online. These may be records for the purpose of monitoring of
Performance of SEZ unit for the period 01 April 2024 to 31st Jan 2025 of M/s. Kinai Infotech LLP., Aurum-
SEZ, Mumbai.
e. Recommendation:
The proposal of the unit based on the FSR in terms of Rule 54 of SEZ Rules, 2006 is
submitted to the Approval Committee for consideration.
*************************************************
GOVERNMENT OF INDIA,
OFFICE OF THE DEVELOPMENT COMMISSIONER,
SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA,
ANDHERI (EAST), MUMBAI
**************
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
-----------------------
a. Proposal :
Approval for Construction of Building IT Tower No. 03/Q3 in the processing area.
b. Specific Issue on which decision of AC is required: -
M/s. Aurum RealEstate Developers Limited (Developer) has requested to grant permission
for Construction of Building IT Tower No. 03/Q3 in the processing area.
c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :-
Instruction No. 54, dated 15.03.2010 issued by Ministry of Commerce & Industry.
“Construction of all type of buildings in processing area as approved by the Unit Approval
Comiittee.”
d. Other Information: -
M/s. Aurum RealEstate Developers Limited (Developer) vide letter dated 27.03.2025 has
requested to grant permission for Construction of Building IT Tower No. 03/Q3 in the processing
area.
A copy of the letter dated 27.03.2025 has been enclosed.
e. Recommendation:
The request of the Developer for permission for Construction of Building IT Tower No. 03/Q3 in the
processing area is submitted to the Approval Committee for consideration.
*************************************************
GOVERNMENT OF INDIA,
OFFICE OF THE DEVELOPMENT COMMISSIONER,
SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA,
ANDHERI (EAST), MUMBAI
**************
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
-----------------------
a. Proposal :
Request of M/s. Aurum RealEstate Developers Limited (Developer) for approval of procurement
of list of material required for Construction of Building IT Tower No. 03/Q3.
b. Specific Issue on which decision of AC is required: -
Approval of procurement of list of material amounting to Rs. 209,67,00,000/- required for
Construction of Building IT Tower No. 03/Q3.
c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :-
Rule 12(2) of SEZ Rules, 2006 – “The Developer shall make an application, after obtaining approval
for authorized operation under rule 9 to the Development Commissioner along with the list of goods and
services, including machinery, equipments and construction materials required for the authorized
operations, duly certified by Chartered Engineer for approval by the Approval Committee” and also
Instruction No. 50, dated 15.03.2010 issued by MOC&I.
d. Other Information: -
a. Other Information :
1.
Formal Approval No. & Date
F.1/1/2016-SEZ, Dated 11.01.2016
2.
Sector
Development, operation and maintenance of the
sector
specific
Special
Economic
Zone
for
Information
Technology/Information
Technology
Enabled Services (IT/ITES)
3.
SEZ location
Plot No. G-4/1, TTC Industrial Area, MIDC Thane-
Belapur Road, Ghansoli, Navi Mumbai-400 710
4.
Developer’s Proposal
The Developer's vide letters dated 05.06.2024 &
11.03.2025
has
requested
approval
for
procurement of list of material required for
Construction of Building IT Tower No. 03/Q3.
5.
Certified
by
Chartered
Engineer?
The list of goods is certified by the Chartered Engineer
Mr./Mrs. Medha Mahadeshwar (Registration No. AM
143780-4, dtd. 29.05.2013
6.
Verification
report
from
the
Specified Officer.
The Specified Officer vide letter dated 15.04.2025 has
submitted re-verification report i.r.o. list of goods of Rs.
209,67,00,000.00/-
to
be
used
for
Authorized
Operations.
The goods as submitted in the list are required for
construction development and found fit for authorized
operations.
Copies of Developer’s letters dated 05.06.2024 & 11.03.2025 and Specified Officer, Aurum-SEZ letter
dated 15.04.2025 are attached.
b. Observation:
The agenda of M/s. Aurum RealEstate Developers Limited (Developer) for approval of
procurement of list of material required for Construction of Building IT Tower No. 03/Q3 was placed in the
UAC meeting held on 24.03.2025, wherein the Committee deferred the proposal as the representative of the
applicant was not present.
The Committee observed that the figure provided by the applicant, Rs. 209,67,00,000/-, is different from
the figure given by the Specified Officer, Rs. 206,67,00,000/- also committee directed developer to present with
maps and approved layout the construction / renewation has been proposed in coming UAC.
In this connection, the Specified Officer, vide letter dated 15.04.2025, has submitted a re-verification
report in respect of the list of goods valued at Rs. 209,67,00,000/- to be used for Authorized Operations.
e. Recommendation:
The developer’s proposal for the approval of the procurement list of materials required the for
construction of Building IT Tower No. 03/Q3, amounting to Rs. 209,67,00,000.00/- for their Authorized
Operations is scrutinized and placed before Approval Meeting for consideration in terms of Rule 12(2) of
SEZ Rules, 2006 and MOC&I Instruction No. 50, dated 15.03.2010.
*************************************************
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.