RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE                                                                                                              (DES­II SECTION)   MINUTES OF THE NORMS COMMITTEE­II MEETING NO19/81 SCHEDULED TO BE    HELD ON   02.08.2011 BUT ACTUALLY HELD ON 05.08.2011.  The  Meeting  No.  19/81  of  Norms  Committee­II  was  held  on  05.08.2011  for  the  licensing  year  2011­2012  under  the  Chairmanship  of  Sh. Hardeep  Singh,  Joint  Director  General  of  Foreign  Trade  to  consider  the  following  applications  for  ratification  of  norms  in  respect  of  advance authorisations under Duty Exemption Scheme (Chapter­4) of Foreign Trade Policy 2009­2014. The following members were present in the meeting:­       S.No Name of the representatives &             their Designation   Deptt.   1.            Shri B.D.Ghosh, Addl I.A.                                                              M/o Steel 2.            Shri. S.K.Jain, Sr.D.O.                                                                      DIPP 3.            Shri K.K.Funda, AD                                                                          MSME 4.            Sh Raman Kumar, FTDO                                                                              DGFT   1

Case No.:11/9/81­ALC2/2009

Party Name:PRAKASH STEELAGE LTD. Meet No/Date:19/81­ALC2/2011 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00046/AM10/ RLA File :03/95/040/00846/AM09/ Lic.No/Date:0310520480 20.05.2009 Defer Date:27.09.2011 Decision : The Committee observed that the firm has not appeared in PH , hence decided to give one more opportunity to the firm to explain their case before Committee on 13.09.2011.     The case stands deferred and to be re­listed on 27.09.2011.   2

Case No.:54/27/81­ALC2/2009

Party Name:HINDALCO INDUSTRIES LIMITED 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00236/AM10/ RLA File :34/24/040/00030/AM10/ Lic.No/Date:3410024344 02.06.2009 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MSME. The case stands deferred and to be relisted on 27.09.2011.

3

Case No.:19/39/81­ALC2/2009

Party Name:BIMETAL BEARINGS LIMITED, 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00375/AM10/ RLA File :32/24/040/00017/AM10/ Lic.No/Date:3210040968 03.08.2009 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MSME. The case stands deferred and to be relisted on 27.09.2011.   4

Case No.:16/29/81­ALC2/2009

Party Name:CENTURY METAL RECYCLING PRIVATE LTD.(FORMERLY CENT 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00262/AM10/ RLA File :05/24/040/00223/AM10/ Lic.No/Date:0510250489 08.10.2009 Defer Date:27.09.2011 Decision :NC observed that reply from the firm has been received and being forwarded to MSME. The case stands deferred and to be relisted on 27.09.2011.   5

Case No.:12/31/81­ALC2/2009

Party Name:B.M.P. METALS PVT. LTD. 02.08.2011 Status:Approved HQ File :01/81/050/00278/AM10/ RLA File :05/23/040/00066/AM10/ Lic.No/Date:0510251399 26.10.2009 Defer Date: Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization subject to having necessary clearance from  M/o  Environment  and  Forest  and  Pollu៝�on  Control  Board  and    as  per  written  comments  of  MSME  vide  U.O.  No.  30(77)/2008­ME  dated 14.07.2011 as under:­     Taking clue from existing SION, import of the Lead battery Plates covered by ISRI code word RAILS is recommended with 20% wastage, as applied by the firm . R/A may take suitable consequential action accordingly.   6

Case No.:6/40/81­ALC2/2010

Party Name:RATNESH METAL INDUSTRIES PVT. LTD 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00374/AM11/ RLA File :08/24/040/00256/AM10/ Lic.No/Date:0810085115 21.12.2009 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 27.09.2011.   7

Case No.:2/46/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00447/AM10/ RLA File :09/24/040/00378/AM10/ Lic.No/Date:0910040771 02.02.2010 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.

  8

Case No.:8/40/81­ALC2/2010

Party Name:SUMI MOTHERSON INNOVATIVE ENGINEERING LIMITED 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00376/AM11/ RLA File :05/24/040/00460/AM10/ Lic.No/Date:0510258719 17.02.2010 Defer Date:27.09.2011 Decision : The Committee observed that the application of the firm is not received. Therefore, the Committee decided to send a letter to RA for forwarding the copy of the application of the firm . The case stands deferred and to be relisted on 27.09.2011.   9

Case No.:11/45/81­ALC2/2010

Party Name:DAKI ENGINEERING WORKS, 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00488/AM11/ RLA File :24/24/040/00020/AM10/ Lic.No/Date:2410027741 18.03.2010 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    10

Case No.:29/27/81­ALC2/2010

Party Name:BHARAT UDYOG 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00237/AM11/ RLA File :18/24/040/00001/AM10/ Lic.No/Date:1810002955 30.03.2010 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MSME. The case stands deferred and to be relisted on 27.09.2011.   11

Case No.:11/9/81­ALC2/2010

Party Name:TATA BP SOLAR INDIA LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00044/AM11/ RLA File :07/24/040/00441/AM10/ Lic.No/Date:0710071806 26.05.2010 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MNRE. The case stands deferred and to be relisted on 27.09.2011.   12

Case No.:5/11/81­ALC2/2010

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00050/AM11/ RLA File :35/24/040/00048/AM10/ Lic.No/Date:3510030471 04.06.2010 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MSME. The case stands deferred and to be relisted on 27.09.2011.   13

Case No.:16/11/81­ALC2/2010

Party Name:STERLITE INDUSTRIES (INDIA) LTD. 02.08.2011 Status:Deferred and Re­indexed

HQ File :01/81/050/00061/AM11/ RLA File :35/24/040/00049/AM10/ Lic.No/Date:3510030492 07.06.2010 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MSME. The case stands deferred and to be relisted on 27.09.2011.   14

Case No.:26/25/81­ALC2/2010

Party Name:EVEREADY INDUSTRIES INDIA LTD. 02.08.2011 Status:Approved HQ File :01/81/050/00200/AM11/ RLA File :02/24/040/00053/AM11/ Lic.No/Date:0210144645 08.07.2010 Defer Date: Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP vide U.O. dated 05.08.2011 as under:­ A៻�er taking clue from SIONs C‐1707 & C‐1753, quan៝�៝�es of items of import may be allowed as under: a.       Quan៝�៝�es of import items from Sl.No.1 to 6 may be allowed as applied for i.e. 55896 Kgs., 7776 Kgs., 52680 Kgs., 1440 Kgs., 1560 Kgs., & 144 Kgs respec៝�vely b.      Quan៝�៝�es of import items from Sl. No. 7 to12 may be allowed as applied for i.e 12,000,000 Nos. each on net to net basis. c.       Quan៝�៝�es  of import items from Sl.No. 13 to 15 may be allowed as per Packing Policy. d.      The quan៝�ty of import item at Sl.No. 16 may be allowed as applied for i.e. 648720 meters inclusive of 2% wastage.   15

Case No.:2/27/81­ALC2/2010

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00210/AM11/ RLA File :05/23/040/00059/AM11/ Lic.No/Date:0510267975 12.07.2010 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    16

Case No.:9/25/81­ALC2/2010

Party Name:TTP TECHNOLOGIES PRIVATE LIMITED 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00183/AM11/ RLA File :07/24/040/00121/AM11/ Lic.No/Date:0710072965 15.07.2010 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    17

Case No.:43/40/81­ALC2/2010

Party Name:SALZER ELECTRONICS LTD 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00411/AM11/ RLA File :32/24/040/00020/AM11/ Lic.No/Date:3210044881 22.07.2010 Defer Date:27.09.2011

Decision :NC observed that reply from the firm has been received and sent to DHI for comments. The case stands deferred and to be re­listed on 27.09.2011.   18

Case No.:8/52/81­ALC2/2010

Party Name:DELTON CABLES LTD. 02.08.2011 Status:Approved HQ File :01/81/050/00573/AM11/ RLA File :05/23/040/00173/AM10/ Lic.No/Date:0510268830 22.07.2010 Defer Date: Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP 1.       Words “copper Conductor, PVC Insulated, 225 V” may be suffixed with the descrip៝�ons of export items from Sl. No. 1 to 10. 2.       Words “12 Pair” given in the descrip៝�on of export product at Sl. No.4 may be corrected to “24 Pair”. 3.       Quan៝�ty of import item at Sl.No.1 may be allowed as  128.48 MT inclusive of 1% wastage. 4.       Quan៝�ty of import item at Sl.No.2   may be allowed as 199.87 MT inclusive of 5 % wastage.   19

Case No.:10/27/81­ALC2/2010

Party Name:BHANSALI CABLES & CONDUCTORS (P) LTD., 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00218/AM11/ RLA File :05/23/040/00022/AM11/ Lic.No/Date:0510269614 04.08.2010 Defer Date:27.09.2011 Decision :NC observed that comments from DOT has been received and decided to refer the case again to DOT as the comment received in r/o 5 inputs whereas firm want to import 3 items. The case stands deferred and to be re­listed on 27.09.2011.   20

Case No.:13/27/81­ALC2/2010

Party Name:LEGENDS THE MERCHANT GROUP 02.08.2011 Status:Approved HQ File :01/81/050/00221/AM11/ RLA File :05/23/040/00121/AM11/ Lic.No/Date:0510270636 16.08.2010 Defer Date: Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP 1.       UOM” of export product may be corrected to “Kgs.” 2.       Quan៝�ty of export product may also be specified as “3976 Sq. Mtrs.” in addi៝�on to its weight. 3.       Quan៝�ty of import item may be allowed as 8460 Kgs. inclusive of 44.3 % wastage a៻�er 20 % recovery.   21

Case No.:33/45/81­ALC2/2010

Party Name:TATA BP SOLAR INDIA LTD. 02.08.2011 Status:Deferred and Re­indexed

HQ File :01/81/050/00510/AM11/ RLA File :07/24/040/00181/AM11/ Lic.No/Date:0710073904 30.08.2010 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MNRE. The case stands deferred and to be relisted on 27.09.2011.   22

Case No.:28/40/81­ALC2/2010

Party Name:FLOVEL MECAMIDI ENERGY PRIVATE LIMITED 02.08.2011 Status:Reject HQ File :01/81/050/00396/AM11/ RLA File :05/23/040/00135/AM11/ Lic.No/Date:0510271787 31.08.2010 Defer Date: Decision :NC decided to reject the case as per written comments of DHI vide U.O. No. 3(13)/2011/TSW(B) dated 2.8.11 as under:­ 1.      On examining the application it is observed from the description of export product and imported items that there is no manufacturing activity involved in the proposal. Moreover, quantity of export product has been shown as one number while two number completely built synchronous generator are being imported.     23

Case No.:46/40/81­ALC2/2010

Party Name:GUJARAT VICTORY FORGING PVT.LTD, 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00414/AM11/ RLA File :34/24/040/00150/AM11/ Lic.No/Date:3410028051 22.09.2010 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    24

Case No.:33/27/81­ALC2/2010

Party Name:ADVANCE CABLE TECHNOLOGIES PVT.LTD, 02.08.2011 Status:Approved HQ File :01/81/050/00241/AM11/ RLA File :07/24/040/00218/AM11/ Lic.No/Date:0710074401 23.09.2010 Defer Date: Decision :NC decided to ratify the norms of above AA as per written comments of DIPP in r/o export item No. 1  and as per written comments of DOT Vide I.D. No. 15­01/2011­IP dated 5.7.11 in r/o item No. 2 & 3 of export product as under:­ 1.      Import at item No. 1 is allowed 9813 kg. 2.      Import at item No. 2 is allowed 502.354 kg including 2% wastage. 3.      Import at item No. 3 is allowed 5759 kg. 4.      Import at item No. 4 is allowed 89.097 kg including 2% wastage.   25

Case No.:35/27/81­ALC2/2010

Party Name:UM CABLES LTD., 02.08.2011 Status:Deferred and Re­indexed

HQ File :01/81/050/00243/AM11/ RLA File :03/95/040/00435/AM11/ Lic.No/Date:0310593774 24.09.2010 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MNRE. The case stands deferred and to be relisted on 27.09.2011.   26

Case No.:31/40/81­ALC2/2010

Party Name:ADDI ALLOYS PVT.LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00399/AM11/ RLA File :30/24/040/00031/AM11/ Lic.No/Date:3010069857 30.09.2010 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    27

Case No.:36/40/81­ALC2/2010

Party Name:MINEX METALLURGICAL COMPANY LIMITED 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00404/AM11/ RLA File :03/95/040/00463/AM11/ Lic.No/Date:0310594726 01.10.2010 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MOS. The case stands deferred and to be relisted on 27.09.2011.   28

Case No.:49/40/81­ALC2/2010

Party Name:HINDALCO INDUSTRIES LIMITED 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00417/AM11/ RLA File :34/24/040/00157/AM11/ Lic.No/Date:3410028169 01.10.2010 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    29

Case No.:19/40/81­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00387/AM11/ RLA File :06/24/040/00032/AM11/ Lic.No/Date:0610019278 05.10.2010 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    30

Case No.:29/40/81­ALC2/2010

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00397/AM11/ RLA File :11/24/040/00043/AM11/ Lic.No/Date:1110023344 12.10.2010 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. 

31

Case No.:4/31/81­ALC2/2010

Party Name:CENTURY METAL RECYCLING PRIVATE LTD.(FORMERLY CENT 02.08.2011 Status:Approved HQ File :01/81/050/00310/AM11/ RLA File :05/23/040/00169/AM11/ Lic.No/Date:0510274897 13.10.2010 Defer Date: Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of MSME vide U.O. No. 30(166)/2010­ME dated 26.07.2011 as under:­     Taking clue from   SION C­1627, import item at Sl No. 1 i.e. Zinc Ignot (special high grade 99.9%) is recommended with 2% wastage and  import item at Sl No. 2 i.e. Alumunium scrap (tense) is recommended with 3% wastage.   32

Case No.:8/31/81­ALC2/2010

Party Name:INDIAN TECHNOMAC CO.LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00314/AM11/ RLA File :05/23/040/00197/AM11/ Lic.No/Date:0510275123 18.10.2010 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MOS. The case stands deferred and to be relisted on 27.09.2011.   33

Case No.:9/31/81­ALC2/2010

Party Name:IP SOFTCOM (INDIA) PVT.LTD., 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00315/AM11/ RLA File :04/24/040/00180/AM11/ Lic.No/Date:0410118155 19.10.2010 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at DIT. The case stands deferred and to be relisted on 27.09.2011.   34

Case No.:40/40/81­ALC2/2010

Party Name:BIRLA ERICSSON OPTICAL LTD., 02.08.2011 Status:Approved HQ File :01/81/050/00408/AM11/ RLA File :11/24/040/00048/AM11/ Lic.No/Date:1110023394 21.10.2010 Defer Date: Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DOT vide I.D. No. 15­07/2011­IP dated 01.07.2011 as under:­ S lNo Items % Wastage allowed Quantity 1 Continuous Cast Copper Wire ROD 1% 110412.40 Kg 2 Polythylene 5% 87254.589 Kg 3 Poly  Alumunium  Foil  Coated  with Copolymer 2% 14354.724 Kg

35

Case No.:4/40/81­ALC2/2010

Party Name:INDIAN TECHNOMAC CO.LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00372/AM11/ RLA File :05/23/040/00206/AM11/ Lic.No/Date:0510275960 28.10.2010 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MOS. The case stands deferred and to be relisted on 27.09.2011.   36

Case No.:5/45/81­ALC2/2010

Party Name:ARMOR PLAST LTD., 02.08.2011 Status:Approved HQ File :01/81/050/00482/AM11/ RLA File :07/24/040/00326/AM11/ Lic.No/Date:0710075654 25.11.2010 Defer Date: Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP 1. Word “relevant” may be prefixed with the descrip៝�ons of import items at S.Nos. 1 & 2. 2.  Quan៝�៝�es of import items at S.Nos.  1 & 2 may be allowed as 1.018 Kgs./Kg. content in the export products as claimed by the firm.   37

Case No.:7/45/81­ALC2/2010

Party Name:INDIAN TECHNOMAC CO.LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00484/AM11/ RLA File :05/23/040/00252/AM11/ Lic.No/Date:0510279098 09.12.2010 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MOS. The case stands deferred and to be relisted on 27.09.2011.   38

Case No.:1/39/81­ALC2/2010

Party Name:OIL COUNTRY TUBULAR LIMITED 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00368/AM11/ RLA File :09/24/040/00388/AM11/ Lic.No/Date:0910044671 14.12.2010 Defer Date:27.09.2011 Decision :NC observed that reply of the firm has been received and sent to DHI for comments. The case stands deferred and to be relisted on 27.09.2011.   39

Case No.:2/40/81­ALC2/2010

Party Name:UM CABLES LTD., 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00370/AM11/ RLA File :03/95/040/00690/AM11/ Lic.No/Date:0310606224 14.12.2010 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at DIT. The case stands deferred and to be relisted on 27.09.2011.

40

Case No.:4/45/81­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00481/AM11/ RLA File :03/94/040/00812/AM11/ Lic.No/Date:0310606403 15.12.2010 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    41

Case No.:6/45/81­ALC2/2010

Party Name:WELSPUN CORP LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00483/AM11/ RLA File :34/24/040/00235/AM11/ Lic.No/Date:3410028876 22.12.2010 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MOS. The case stands deferred and to be relisted on 27.09.2011.   42

Case No.:2/46/81­ALC2/2010

Party Name:LEITNER SHRIRAM MANUFACTURING LIMITED, 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00517/AM11/ RLA File :04/24/040/00245/AM11/ Lic.No/Date:0410120023 22.12.2010 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    43

Case No.:13/45/81­ALC2/2010

Party Name:HAMEX FUEL CELL PRIVATE LIMITED 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00490/AM11/ RLA File :31/24/040/00196/AM11/ Lic.No/Date:3110046165 28.12.2010 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    44

Case No.:18/45/81­ALC2/2010

Party Name:TORRENT CABLES LTD. 02.08.2011 Status:Approved HQ File :01/81/050/00495/AM11/ RLA File :08/24/040/00175/AM11/ Lic.No/Date:0810095028 28.12.2010 Defer Date: Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP 1.       Quan៝�ty of import item at Sl.No.1 may be allowed as 5.515 MT inclusive of 1 % wastage. 2.       Quan៝�ty of import item at Sl.No.2 may be allowed as 0.370 MT inclusive of 5 % wastage. 3.       Quan៝�ty of import item at Sl.No.3 may be allowed as 1.153 MT inclusive of 5 % wastage. 4.       Quan៝�ty of import item at Sl.No. 4 may be allowed as 0.145 MT inclusive of 1 % wastage.

5.       Quan៝�ty of import item at S.No.5 may be allowed as 0.189 MT inclusive of   5 % wastage. 6.       Quan៝�ty of import item at S.No.6 may be allowed as 0.017 MT inclusive of   5 % wastage   45

Case No.:30/45/81­ALC2/2010

Party Name:NEXUS ELECTRO STEEL LIMITED, Meet No/Date:19/81­ALC2/2011 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00507/AM11/ RLA File :04/24/040/00253/AM11/ Lic.No/Date:0410120241 29.12.2010 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    46

Case No.:11/52/81­ALC2/2010

Party Name:CHANDAN STEEL LIMITED 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00576/AM11/ RLA File :03/94/040/00883/AM11/ Lic.No/Date:0310611243 17.01.2011 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MOS. The case stands deferred and to be relisted on 27.09.2011.   47

Case No.:11/46/81­ALC2/2010

Party Name:EASTERN COPPER MFG. CO PVT. LTD., 02.08.2011 Status:Approved HQ File :01/81/050/00526/AM11/ RLA File :02/24/040/00086/AM11/ Lic.No/Date:0210153790 19.01.2011 Defer Date: Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP 1.        Quan៝�ty of import item at Sl.No.1 may be allowed as 57528 Kgs. inclusive of 2% wastage a៻�er taking clue from SION C‐1166. 2.       Quan៝�ty of import item at Sl.No.2 may be allowed as 15912 Kgs. inclusive of 2% wastage a៻�er taking clue from SION C‐1189. 3.       Quan៝�ty of import item at Sl.No.3 may be allowed as 13671 Kgs. inclusive of 5% wastage a៻�er taking clue from SION C‐1890. 4.       Quan៝�ty of import item at Sl.No.4 may be allowed as 28560 Kgs. inclusive of 2% wastage a៻�er taking clue from SION C‐1189. 5.    Quan៝�៝�es of import items at Sl.No.5, 6 & 7 may be allowed as 23871 Kgs., 8654 Kgs. & 23909 Kgs. respec៝�vely  inclusive of 6 % wastage   48

Case No.:20/45/81­ALC2/2010

Party Name:ATUL ELECTRO FORMERS LTD 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00497/AM11/ RLA File :31/24/040/00189/AM11/ Lic.No/Date:3110046519 20.01.2011 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. 

49

Case No.:23/45/81­ALC2/2010

Party Name:AGRO DUTCH INDUSTRIES LTD., 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00500/AM11/ RLA File :22/24/040/00086/AM11/ Lic.No/Date:2210010882 21.01.2011 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited despite two reminders hence  decided to send a final reminder to firm  to expedite the reply.  The case stands deferred and to be re­listed on 27.09.2011.   50

Case No.:37/45/81­ALC2/2010

Party Name:SUMI MOTHERSON INNOVATIVE ENGINEERING LIMITED 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00514/AM11/ RLA File :05/24/040/00350/AM11/ Lic.No/Date:0510282431 27.01.2011 Defer Date:27.09.2011 Decision : : NC observed that case is under examina៝�on at C&PC. The case stands deferred and to be relisted on 27.09.2011.   51

Case No.:15/52/81­ALC2/2010

Party Name:SANKALP FORGINGS PVT.LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00580/AM11/ RLA File :31/24/040/00227/AM11/ Lic.No/Date:3110046694 31.01.2011 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    52

Case No.:4/46/81­ALC2/2010

Party Name:RADIANT ­ RSCC SPECIALTY CABLE PRIVATE LIMITED 02.08.2011 Status:Approved HQ File :01/81/050/00519/AM11/ RLA File :09/24/040/00496/AM11/ Lic.No/Date:0910045352 01.02.2011 Defer Date: Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP 1.       Net weight of export product may be specified as 54171 Kgs. 2.       Quan៝�ty of import item at Sl.No.1 may be allowed as  1389000 ៻�. on net to net basis. 3.       Quan៝�ty of import item at Sl.No.2   may be allowed as 44170 Kgs. inclusive of 2 % wastage.   53

Case No.:5/46/81­ALC2/2010

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00520/AM11/ RLA File :05/23/040/00302/AM11/ Lic.No/Date:0510282721 01.02.2011 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.

  54

Case No.:3/47/81­ALC2/2010

Party Name:ALSTOM PROJECTS INDIA LIMITED, 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00529/AM11/ RLA File :03/94/040/00959/AM11/ Lic.No/Date:0310614989 08.02.2011 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    55

Case No.:13/52/81­ALC2/2010

Party Name:LEITNER SHRIRAM MANUFACTURING LIMITED, 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00578/AM11/ RLA File :04/24/040/00305/AM11/ Lic.No/Date:0410121683 17.02.2011 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at DHI. The case stands deferred and to be relisted on 27.09.2011.   56

Case No.:14/52/81­ALC2/2010

Party Name:ANDRITZ HYDRO PRIVATE LIMITED, 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00579/AM11/ RLA File :11/21/040/00129/AM11/ Lic.No/Date:1110024055 18.02.2011 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at DHI. The case stands deferred and to be relisted on 27.09.2011.   57

Case No.:14/50/81­ALC2/2010

Party Name:SWASTIK PIPES LTD 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00560/AM11/ RLA File :05/24/040/00322/AM11/ Lic.No/Date:0510284564 23.02.2011 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    58

Case No.:23/52/81­ALC2/2010

Party Name:VIJAI ELECTRICALS LTD 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00588/AM11/ RLA File :09/24/040/00468/AM11/ Lic.No/Date:0910045872 09.03.2011 Defer Date:27.09.2011 Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.    59

Case No.:1/5/81­ALC2/2011

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 02.08.2011 Status:Deferred and Re­indexed

HQ File :01/81/050/00014/AM12/ RLA File :05/24/040/00008/AM12/ Lic.No/Date:0510288472 21.04.2011 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at DIT. The case stands deferred and to be relisted on 27.09.2011.   60

Case No.:3/5/81­ALC2/2011

Party Name:INDIAN TECHNOMAC CO.LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00016/AM12/ RLA File :05/23/040/00032/AM12/ Lic.No/Date:0510288841 27.04.2011 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at MOS. The case stands deferred and to be relisted on 27.09.2011.   61

Case No.:1/11/81­ALC2/2011

Party Name:A­1 FENCE PRODUCTS CO.PVT.LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00070/AM12/ RLA File :03/94/040/00182/AM12/ Lic.No/Date:0310632798 25.05.2011 Defer Date:27.09.2011 Decision : NC observed that case is under examina៝�on at DIPP. The case stands deferred and to be relisted on 27.09.2011.   62

Case No.:2/11/81­ALC2/2011

Party Name:DELTA POWER SOLUTIONS INDIA PVT.LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00071/AM12/ RLA File :25/24/040/00005/AM12/ Lic.No/Date:2510003250 25.05.2011 Defer Date:27.09.2011 Decision : NC decided to refer the case to DIT for examina៝�on.  The case stands deferred and to be relisted on 27.09.2011.   63

Case No.:3/11/81­ALC2/2011

Party Name:KHOSLA ENGINEERING PVT LTD 02.08.2011 Status:Approved HQ File :01/81/050/00072/AM12/ RLA File :31/83/040/00037/AM12/ Lic.No/Date:3110048377 01.06.2011 Defer Date: Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP Quan៝�ty of import item  may be allowed as 24.48 MT  inclusive of 2 %  wastage   64

Case No.:4/11/81­ALC2/2011

Party Name:ASIATIC ELECTRICAL AND SWITCHGEAR PVT.LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00073/AM12/ RLA File :05/23/040/00064/AM12/ Lic.No/Date:0510292308 01.06.2011 Defer Date:27.09.2011

Decision :NC observed that application has been received and forwarded to DHI for examination. The case stands deferred and to be relisted on 27.09.2011.   65

Case No.:6/11/81­ALC2/2011

Party Name:INDIAN TECHNOMAC CO.LTD. 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00075/AM12/ RLA File :05/23/040/00093/AM12/ Lic.No/Date:0510292675 06.06.2011 Defer Date:27.09.2011 Decision : NC observed that application has been received and forwarded to MOS for examination. The case stands deferred and to be relisted on 27.09.2011.   66

Case No.:7/11/81­ALC2/2011

Party Name:CONSOLIDATED ENGINEERING COMPANY 02.08.2011 Status:Deferred and Re­indexed HQ File :01/81/050/00076/AM12/ RLA File :05/23/040/00088/AM12/ Lic.No/Date:0510292677 07.06.2011 Defer Date:27.09.2011 Decision :NC decided to send a letter to firm to submit   information as per written comments of MSME vide U.O. No. 30(41)2011­ME dated 19.7.2011 (copy enclosed). The case stands deferred and to be relisted on 27.09.2011.     67

Case No.:8/11/81­ALC2/2011

Party Name:SIEPMANNS CARD SYSTEMS PVT.LTD., 02.08.2011 Status:Deferred and Re­indexed   HQ File :01/81/050/00077/AM12/ RLA File :03/95/040/00076/AM12/ Lic.No/Date:0310634855 07.06.2011 Defer Date:27.09.2011   Decision :NC decided to send the application to C&PC for examination. The case stands deferred and to be relisted on 27.09.2011.         PART – AR ­ FRESH   Sl No. 61

CASE NO. AR­ 11

  M/s Siemens Ltd., Mumbai. Meeting No. 19/81 F.No. 01/81/050/252/AM10/DES­II Dated: 02.08.2011  Adv Authorisation No.:­ .0310539877 dated 30.09.2009   RLA F.No­03/95/040/390/AM10

Decision : NC decided to ratify the norms of above AA as per written comments of DHI vide U.O. No. 3(152)/2009/TSW(B)/429 dated 03.08.2011 with following modifications:­ 1.      Net weight per piece of export product is to be indicated as 486 MT along with quan៝�ty in numbers. 2.      Descrip៝�on of import item No. 1 is amended as “CRGO electrical steel sheet” and its quan៝�ty is allowed as 871.33 MT including 6% wastage. 3.      Import item No. 2 is allowed as applied by the firm with ‘nil’ wastage. 4.      Import item No. 3 and 4 is to be deleted as firm has not specified specific items under these items. 5.      Rest of the items are components and may be allowed as applied by the firm on net to net basis.   Sl No. 62

CASE NO. AR­ 12

 M/s Welspun Gujrat Stahl    Rohern  Ltd                               Meeting No. 19/81 F.No. 01/81/162/753/AM11/DES­II   Dated: 02.08.2011  Adv Authorisation No.:­ . 3410022793 dated 26.11.2008   RLA F.No­34/24/039/004/AM09  Decision : The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply.  The case stands deferred and to be re­listed on 13.09.2011. Sl. No.  63

Case No. AR­ 77

 M/S  Dynatch Furnaces (Bombay) Pvt. Ltd.,   Mumbai           Meeting No. 19/81 F.No.01/81/50/0080/AM10/DES­II Dated: 02.08.2011 Advance License No.0310524136  dt.15.06.2009   RLA F.No.03/94/40/0196/AM’10  Decision :NC observed that the case is under examination at DHI. The case stands deferred and to be re­listed on 13.09.2011. PART – C – DEFER Sl. No. 32                                                                                                    

CASE NO.  C­ 10

M/s  T.K.  India  Pvt.  Ltd.,  Chandigarh  received  through DC(NSEZ)  Meeting No. 19/81 F.No.01/81/162/027/AM’11/DES­II

Dated: 02.08.2011     Decision : The Norms Committee decided to ratify the norms in respect of the subject advance authorization, as per written comments of DIPP vide U.O. dated 05.08.2011 as under:­ Based on actual wastage on  the samples submiោ�ed by the EOU , following wastage norms is fixed for the components  of Anesthe៝�c  Equipment:  Export Product   Quan៝�ty Input Quan៝�ty   Components for Anesthe៝�c Equipment namely   1. Shucman Base 1 Kg Stainless  Steel  Rod 28 mm dia. 3.81  Kgs./kg.  content  in the export product 2. GS Base 1 Kg Stainless  Steel  Rod 25.4 mm dia. 4.55  Kgs./kg.  content  in the export product 3. Equip Base 1 Kg Stainless  Steel  Rod 22 mm dia. 2.4 Kgs./kg. content in the export product 4. Standard Base 1 Kg Stainless  Steel  Rod 25.4 mm dia. 1.92  Kgs./kg.  content  in the export product 5. GS II Bandholder 1 Kg Stainless  Steel  Rod 14 mm dia. 2.5 Kgs./kg. content in the export product 6. SS Barrel Dia 28 1 Kg Stainless Steel Pipe 28 mm dia. 1.46  Kgs./kg.  content  in the export product 7. SS Barrel Dia 18 1 Kg Stainless Steel Pipe 18 mm dia. 1.32  Kgs./kg.  content  in the export product 8. SS Barrel Stubby 1 Kg Stainless Steel Pipe 32 mm dia. 1.19  Kgs./kg.  content  in the export product   DC(NSEZ) may take suitable consequential action accordingly. ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐