IN FORCE Norms Committee — Engineering (Gr A / NC-II) Advance Authorisation 2009-12-22

DGFT Committee Minutes

Document text

RATIFIED MINUTES DIRECTORATE GENERAL OF FOREIGN TRADE (DES­II SECTION)   MINUTES OF THE NORMS COMMITTEE­II MEETING NO. 36/10 SCHEDULED TO BE HELD ON 08.12.2009 BUT ACTUALLY HELD ON 22.12.2009. The Meeting No. 36/10 of Norms Committee­II was held on 22.12.2009 for the licensing year 2009­2010 under the Chairmanship of Sh. A. KOMU, Addl. Director General of Foreign Trade to consider the following applications for ratification of norms in respect of advance authorisations under Duty Exemption Scheme (Chapter­4) of Foreign Trade Policy 2004­2009. The following members were present in the meeting:­ S.No Name of the representatives & their Designation   Deptt.   1. 2. 3. 4. 5. 6.   Sh. B.D. Ghosh, Jt. IA Sh. S.K. Jain, D.O. Sh. K.K. Funda, Asst. Dir. Shri Shyam Sunder, Dy. DGFT Sh. A.K. Mishra, Asstt. Director Shri Narendra Vashista, FTDO M/o Steel DIPP DC(MSME) DGFT M/o Steel DGFT                   The Committee took up the individual cases of the agenda of this meeting for discussion and the decision taken in respect of each case is as follows:     1

Case No.:31/27/81­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, Meet No/Date:36/81­ALC2/2009 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00213/AM10/ RLA File :03/94/040/01278/AM08/ Lic.No/Date:0310464531 11.03.2008 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.   C N 69/15/81 ALC2/2008 P N NOKIA SIEMENS NETWORKS M N /D 36/81 ALC2/2009 St t D ff d d

2

Case No.:69/15/81­ALC2/2008

Party Name:NOKIA SIEMENS NETWORKS INDIA PVT. LTD., 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00237/AM09/ RLA File :02/24/040/00004/AM09/ Lic.No/Date:0210113297 04.06.2008 Defer Date: 02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. NC observed that there are still discrepancies in the comments received from DOT and decided to direct FTDO/NC­II to contact the concerned Asst. Director and discuss the issue and sort out the matter. The case stands deferred and to be relisted on 02.02.2010.   3

Case No.:14/21/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00325/AM09/ RLA File :03/95/040/00422/AM09/ Lic.No/Date:0310481936 08.08.2008 Defer Date: 02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 02.02.2010.   4

Case No.:15/21/81­ALC2/2008

Party Name:VIDEOCON INDUSTRIES LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00326/AM09/ RLA File :03/95/040/00406/AM09/ Lic.No/Date:0310481947 08.08.2008 Defer Date: 02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and     5

Case No.:8/27/81­ALC2/2008

Party Name:VIJAI ELECTRICALS LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00390/AM09/ RLA File :09/24/040/00238/AM09/ Lic.No/Date:0910035321 18.09.2008 Defer Date: 02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.  

Case No.:5/29/81­ALC2/2008

Party Name:BHUSHAN STEEL LIMITED Meet No/Date:36/81­ALC2/2009 Status:

6

Case No.:5/29/81 ALC2/2008

Party Name:BHUSHAN STEEL LIMITED Meet No/Date:36/81 ALC2/2009 08.12.2009 Status: Approved HQ File :01/81/050/00422/AM09/ RLA File :05/24/040/00350/AM09/ Lic.No/Date:0510228478 29.09.2008   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorisation, as per written comments of M/o Steel  vide U.O. No. 2(11)/2008­TW (Vol.I) dated 21.12.2009 as below:­   Requirements of substrate and paints was worked out by providing reasonable wastages and taking clue from SION C­2034. For arriving at the requirements of S.No. 1, clue has been taken from SION C­2034. For arriving at the requirement of consumables at S.Nos. 4 to 8, clue has been taken from SION C­2034 and Engineering Table­1.   Export Item: Item Thickness Quantity Cold Rolled, Zinc (43.50%) & Aluminium­Silicon (56.50%) alloy  coated,  Colour  Coated,  Non  Alloy  steel  Sheets (plain/  corrugated)  /Strips/  Wide  Coils  having  paint coating  of  primer  9  to  10  micron;  back  coat  7  to  20 micron;  and top coat 20 micron. Coating weight of Zinc­ Aluminium­Silicon Alloy will be 120 gms per sq.metre. a) 0.30 mm   b) 0.32 mm   c) 0.34 mm a) 6500 MT   b) 5500 MT   c) 4000 MT   TOTAL 16000 MT   Import Items:   Sl. No. Item Quantity 1. Hot Rolled Non Alloy Steel Wide Coils of relevant grade 16064.60 MT 2. Zinc Slab/Ingots     450 MT 3. Aluminium­Silicon alloy slab/ingots     584 MT 4. Rolling Mill Rolls       20 MT 5. Rolling Oil         5.6 MT 6. Pickling Oil         7.2 MT 7. Steel Strappings       32 MT 8. Guard Film (to be allowed if export product is covered with guard film)     255.04 MT 9. Primer (Volume Solid 30+2%; Weight Solid 43.51+ 2%)  159040 litre   10. Top Coat (Volume Solid 36+2%; Weight Solid 57.66+ 2%))  318064 litre 11. Back Coat (Volume Solid 32+2%; Weight Solid 52+ 2%))  167239 litre     R/A may take suitable consequential action accordingly.

7

Case No.:41/29/81­ALC2/2008

Party Name:JSW STEEL LIMITED 08.12.2009 Status:Approved HQ File :01/81/050/00458/AM09/ RLA File :03/94/040/00476/AM09/ Lic.No/Date:0310490039 13.10.2008   Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M No 36/81 scheduled to be held on 08 12 2009 but actually held on 22 12 2009 The Norms Committee after deliberating upon the case decided

M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorisation, as per written comments of M/o Steel  vide U.O. No. 2(11)/2008­TW (Vol.I) dated 21.12.2009 as below:­   Export Item: Item Thickness (mm) Quantity (MT) Coating  Weight (gms/m2) of Zinc ­­ Aluminium­­Silicon alloy  in  the substrate Cold  Rolled  Zinc (43.50%)  & Aluminium­  Silicon (56.50%)  alloy coated,  Colour Coated  Non  Alloy steel  Sheets /Strips/  Wide  Coils  having  paint coating  of  primer 20  micron;  back coat  10  micron;  and  top  coat  5  to 10 micron.     a) 0.25 to 0.29   b) 0.30 to 0.34   c) 0.35 to 0.39   d) 0.40 to 0.44   e) 0.45 to 0.49   f) 0.50 to 0.54   g) 0.60 to 0.64 a) 494   b) 4945   c)  5506   d) 2383   e) 184   f)  231   g)  257 a) 70   b)  70 to 150   c)  65 to 100   d) 70 to 150   e) 150   f) 70 to 165   g) 150 to 165   TOTAL 14000         Import Item:

Sl. No. Item Quantity 1. Hot Rolled Non Alloy Steel Wide Coils 14710.31 MT 2. Zinc Slab/Ingots     285.2 MT 3. Aluminium­Silicon alloy slab/ingots     370.4 MT 4. Resin       NIL 5. Rolling Mill Rolls       17.50 MT 6. Rolling Mill Oil         4.90 MT 7. Steel Strapping for packing       28 MT 8. Galvanized Plain Sheets for packing     As per packing policy 9. VCI Rusto Paper 70000 sq. metre 10. Primer (Volume Solid 32+2%; Dry density 1.267 +  0.02)    99570 liters 11. Top Coat (Volume Solid 41+2%; Dry density 1.46 +  0.02)    85944 liters 12. Backer (Volume Solid 38+2%; Dry density 1.318 +  0.02)  154549 liters 13. Guard Film (to be allowed if export product is covered with guard film)    160.78 MT   8

Case No.:17/34/81­ALC2/2008

Party Name:L M GLASFIBER (INDIA) PVT LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00514/AM09/ RLA File :07/24/040/00437/AM09/ Lic.No/Date:0710060971 07.11.2008 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 02.02.2010.     9

Case No.:20/27/81­ALC2/2009

Party Name:ABB LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00202/AM10/ RLA File :07/21/040/00757/AM09/ Lic.No/Date:0710061858 22.12.2008 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of DHI was not present in the meeting NC decided to defer the case The case stands deferred and to be relisted on 02 02 2010

DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.   10

Case No.:5/42/81­ALC2/2008

Party Name:TECHNO TRACK ENGINEERS(PROP. ASHOK R. SONAWANE) 08.12.2009 Status: Approved HQ File :01/81/050/00639/AM09/ RLA File :31/24/040/00235/AM09/ Lic.No/Date:3110036602 23.12.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  36/81  scheduled  to  be  held  on  08.12.2009  but  actually  held  on  22.12.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.      Quantity of export product at S.No.1 may be specified as 3152 nos. (622.047 Mtrs.) 2.      Quantity of export product at S.No.2 may be specified as 960 nos. (256.51 Mtrs.) 3.      Net weight of export products at S.No.1 & 2 may be specified as 54908 Kgs. & 23702 Kgs. respectively. 4.           Quantity of import item may be allowed as 938.1 Mtrs. ( 110.8 MT after taking 20% recovery from scrap) inclusive of 6.8% wastage.       11

Case No.:34/27/81­ALC2/2009

Party Name:HIGH ENERGY BATTERIES ( INDIA ) LIMITED, 08.12.2009 Status: approved HQ File :01/81/050/00216/AM10/ RLA File :04/24/040/00231/AM09/ Lic.No/Date:0410101299 30.12.2008   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  36/81  scheduled  to  be  held  on  08.12.2009  but  actually  held  on  22.12.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.      Words “No. of Cells 1050” may be suffixed with the description of export product. 2.      Word “relevant” may be prefixed with the description of import item at S.No.1 and its quantity may be allowed as 672 sq.mtrs. inclusive of wastage of 2%. 3.      Quantity of import item at S.No.2 may be allowed as 2100 Nos. on net to net basis with accountability clause.    

Case No.:24/42/81­ALC2/2008

Party Name:VICTORY TRANSFORMERS & SWITCHGEARS LTD. 08.12.2009 Status: Reject

12 HQ File :01/81/050/00658/AM09/ RLA File :09/24/040/00252/AM09/ Lic.No/Date:0910036578 05.01.2009   Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that the firm has failed to furnish the required details and therefore, decided to reject the request of the firm.       13

Case No.:25/42/81­ALC2/2008

Party Name:VICTORY TRANSFORMERS & SWITCHGEARS LTD. 08.12.2009 Status: Reject HQ File :01/81/050/00659/AM09/ RLA File :09/24/040/00253/AM09/ Lic.No/Date:0910036579 05.01.2009   Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that the firm has failed to furnish the required details and therefore, decided to reject the request of the firm.     14

Case No.:4/48/81­ALC2/2008

Party Name:L M GLASFIBER (INDIA) PVT LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00709/AM09/ RLA File :07/24/040/00594/AM09/ Lic.No/Date:0710062693 03.02.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 02.02.2010.     15

Case No.:19/48/81­ALC2/2008

Party Name:DELTON CABLES LTD. 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00724/AM09/ RLA File :05/24/040/00664/AM09/ Lic.No/Date:0510235840 05.02.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re list the case on 02 02 2010:

from the firm and to re­list the case on 02.02.2010: ­   1. Detailed calculations for the requirement of each  raw material, export product wise supported by the Cross sectional diagram of the cable/Buyers data sheet 2. Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product. 3. Total requirement of each raw material, export product wise, in a tabular form.         16

Case No.:7/27/81­ALC2/2009

Party Name:RPG CABLES LIMITED, 08.12.2009 Status: approved HQ File :01/81/050/00189/AM10/ RLA File :03/95/040/00512/AM09/ Lic.No/Date:0310505799 05.02.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  36/81  scheduled  to  be  held  on  08.12.2009  but  actually  held  on  22.12.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.           Quantity of import item at Sl.No.1 i.e. Continuous Cast Copper Rod may be allowed as applied for i.e. 2.438 MT inclusive of 1% wastage. 2.      Quantity of import item at Sl.No.2 i.e. XLPE Semiconducting Compound may be allowed as applied for i.e. 0.125 MT inclusive of 4 % wastage. 3.           Quantity of import  item  at  Sl.No.3  ie.  XLPE  Insulation  Compound  may  be  allowed  as  applied  for  i..e.  0.295  MT inclusive of 4 % wastage. 4.      Quantity of import item at Sl.No.4 i.e. Copper Foil(Tape)  may be allowed as 0.054  MT inclusive of 0.5% wastage as applied for.     17

Case No.:34/48/81­ALC2/2008

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 08.12.2009 Status:Rejected HQ File :01/81/050/00739/AM09/ RLA File :11/21/040/00128/AM09/ Lic.No/Date:1110019619 11.02.2009   Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M No 36/81 scheduled to be held on 08 12 2009 but actually held on 22 12 2009 Based on RA’s reference and

Committee   II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Based on RAs reference and DHI letter, NC decided that ratification is not   required.       18

Case No.:41/48/81­ALC2/2008

Party Name:ALSTOM PROJECTS INDIA LIMITED, 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00746/AM09/ RLA File :03/94/040/01011/AM09/ Lic.No/Date:0310507423 16.02.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.   19

Case No.:7/51/81­ALC2/2008

Party Name:POWER GEAR LTD. 08.12.2009 Status: approved HQ File :01/81/050/00753/AM09/ RLA File :07/24/040/00613/AM09/ Lic.No/Date:0710063182 20.02.2009   Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorisation, as per written comments of DHI  vide their U.O. No. 3(78)/2009/TSW(B)/416 dated 29.10.2009 as below:­   i)                    Total net weight of export product may be indicated as 45,640 Kg. in addition to quantity in numbers. ii)                  Import item No.1 to 10 & 13 may be allowed as per condition of GN­4. iii)                Import item No.11 to 12 may be allowed as applied by the firm as value of these items is within 0.5% of FOB value. iv)                Import item No.14 may be allowed as applied by the firm.       20

Case No.:32/27/81­ALC2/2009

Party Name:HEDISA INDIA DIAMOND TOOLS PVT LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00214/AM10/ RLA File :04/24/040/00256/AM09/ Lic.No/Date:0410102503 25.02.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of

DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.   21

Case No.:27/27/81­ALC2/2009

Party Name:L M GLASFIBER (INDIA) PVT LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00209/AM10/ RLA File :07/24/040/00641/AM09/ Lic.No/Date:0710063326 27.02.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 02.02.2010.   22

Case No.:9/5/81­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00017/AM10/ RLA File :05/24/040/00525/AM09/ Lic.No/Date:0510237295 27.02.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 29.01.2010. The case stands deferred and to be relisted on 02.02.2010.     23

Case No.:26/27/81­ALC2/2009

Party Name:ASEEM TECHNOLOGIES (P) LTD., 08.12.2009 Status:approved HQ File :01/81/050/00208/AM10/ RLA File :11/24/040/00078/AM09/ Lic.No/Date:1110019769 04.03.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  36/81  scheduled  to  be  held  on  08.12.2009  but  actually  held  on  22.12.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,

1.  Words  “  Model  Nos.  6441.055500,  8130.202500,  6441.054901,  6441.025004,  6441.202300,  6441.202400,  6441.049000, 6441.027001,  6441.054601,  6441.054700,  6441.024100,  6441.055200,  8130.203200,  6441.055000,  6441.055100, 6441.055300,  6441.001800,  6441.043100,  6441.045100,  8131.100800,  6441.045000,  6441.048300,  8130.203700, 6441.010301,  6441.022400,  6441.025102,  6441.055001,  8130.202600,  8130.202700,  3665.0200,  3665.8300,  3656.2700, 3656.4900, 4015.2400, 4016.1400”  may be suffixed with the description of export product.   2. Quantity of import item may be allowed as 45.44 MT inclusive of 10% wastage after taking 50% recovery.     24

Case No.:48/27/81­ALC2/2009

Party Name:ASTRA LIGHTING LTD., 08.12.2009 Status: approved HQ File :01/81/050/00230/AM10/ RLA File :22/24/040/00074/AM09/ Lic.No/Date:2210008739 17.03.2009   Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. NC debated the case and decided  to  ratify  on  repeat  basis  as  per  decision  in  meeting  No.  20/81  dated  18.08.2009  in  licence  no.  2210008650  dated 13.02.2009.         25

Case No.:49/27/81­ALC2/2009

Party Name:ASTRA LIGHTING LTD., 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00231/AM10/ RLA File :22/24/040/00075/AM09/ Lic.No/Date:2210008740 17.03.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the case is under examination of DIPP. The case stands deferred and to be relisted on 02.02.2010.     26

Case No.:37/27/81­ALC2/2009

Party Name:RAAJRATNA METAL INDUSTRIES LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00219/AM10/ RLA File :08/24/040/00254/AM09/ Lic.No/Date:0810079181 03.04.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms

g g p y Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 29.01.2010. The case stands deferred and to be relisted on 02.02.2010.   27

Case No.:1/5/81­ALC2/2009

Party Name:AMARTARA PVT. LTD. 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00009/AM10/ RLA File :03/94/040/00016/AM10/ Lic.No/Date:0310515819 16.04.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 02.02.2010.     28

Case No.:9/27/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00191/AM10/ RLA File :03/95/040/00009/AM10/ Lic.No/Date:0310515887 16.04.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and   29

Case No.:33/27/81­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00215/AM10/ RLA File :03/95/040/00944/AM09/ Lic.No/Date:0310516404 21.04.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1 Information in respect of S No 5 11 & 11A of Standard Deficiency Format export product­wise

1.      Information in respect of S.No. 5, 11 & 11A of Standard Deficiency Format, export product­wise. 2.      Quantity of materials required for Welder and procedure qualifications with basis / justification thereof.     30

Case No.:7/5/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00015/AM10/ RLA File :09/24/040/00479/AM09/ Lic.No/Date:0910037711 22.04.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.   31

Case No.:52/27/81­ALC2/2009

Party Name:MACCAFERRI ENVIRONMENTAL SOLUTIONS PVT. LTD. 08.12.2009 Status: approved HQ File :01/81/050/00234/AM10/ RLA File :31/24/040/00012/AM10/ Lic.No/Date:3110038202 24.04.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  36/81  scheduled  to  be  held  on  08.12.2009  but  actually  held  on  22.12.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1. Words “made of Galvanized MS Wire” may be suffixed with the description of export product. 2. Words “of relevant diameter” may be suffixed with the description of import item and quantity of this item may be allowed as 90780 Kgs. inclusive of 2% wastage.     32

Case No.:35/27/81­ALC2/2009

Party Name:HIGH ENERGY BATTERIES ( INDIA ) LIMITED, 08.12.2009 Status: approved HQ File :01/81/050/00217/AM10/ RLA File :04/24/040/00018/AM10/ Lic.No/Date:0410104343 30.04.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  36/81  scheduled  to  be  held  on  08.12.2009  but  actually  held  on  22.12.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.      Words “No. of Cells 1050” may be suffixed with the description of export product.

2.      Word “relevant” may be prefixed with the description of import item at S.No.1 and its quantity may be allowed as 336 sq.mtrs. inclusive of wastage of 2%. 3.      Quantity of import item at S.No.2 may be allowed as 1050 Nos. on net to net basis with accountability clause.       33

Case No.:21/27/81­ALC2/2009

Party Name:BIRLA ERICSSON OPTICAL LTD., 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00203/AM10/ RLA File :11/24/040/00002/AM10/ Lic.No/Date:1110020144 01.05.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. NC observed that there are still discrepancies in the comments received from DOT and decided to direct FTDO/NC­II to contact the concerned Asst. Director and discuss the issue and sort out the matter. The case stands deferred and to be relisted on 02.02.2010.   34

Case No.:8/27/81­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00190/AM10/ RLA File :03/95/040/00004/AM10/ Lic.No/Date:0310518039 01.05.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Copy of application of the firm was handed over to the representative of DIPP for examination and comments. The case stands deferred and to be relisted on 02.02.2010.   35

Case No.:38/27/81­ALC2/2009

Party Name:TATA BP SOLAR INDIA LTD. 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00220/AM10/ RLA File :07/24/040/00025/AM10/ Lic.No/Date:0710064531 05.05.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from DC(MSME) and MNRES are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 02.02.2010.

36

Case No.:56/27/81­ALC2/2009

Party Name:SUZLON ENERGY LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00238/AM10/ RLA File :31/24/040/00021/AM10/ Lic.No/Date:3110038406 13.05.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 02.02.2010.   37

Case No.:29/27/81­ALC2/2009

Party Name:HIGH ENERGY BATTERIES ( INDIA ) LIMITED, 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00211/AM10/ RLA File :04/24/040/00026/AM10/ Lic.No/Date:0410104670 18.05.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1.      Information in respect of S.No. 3, 4, 5 & 11 of Standard Deficiency Format, export product­wise.     38

Case No.:47/27/81­ALC2/2009

Party Name:REINDEER SYSTEMS PVT LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00229/AM10/ RLA File :04/24/040/00028/AM10/ Lic.No/Date:0410104664 18.05.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and    

Case No.:23/27/81­ALC2/2009

Party Name:EUROBOND INDUSTRIES PVT. LTD. Meet No/Date:36/81­ALC2/2009 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00205/AM10/ RLA File :03/94/040/00164/AM10/ Lic.No/Date:0310522291 02.06.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M No 36/81 scheduled to be held on 08 12 2009 but actually held on 22 12 2009 On the recommendation of

39 Committee   II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1.      Total thickness of Aluminium Composite Panel and thickness of PE core and Aluminium  sheet in the Composite Panel. 2.      Thickness of Aluminium Coil/sheet i.e. import item at Sl. No.1 alongwith its quantity in Sq. meters. 3        Information in respect of items at Sl.Nos. 4,5 & 11 of SDF for each type of Composite Panel.     40

Case No.:28/27/81­ALC2/2009

Party Name:CIM TOOLS PVT.LTD., 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00210/AM10/ RLA File :07/24/040/00084/AM10/ Lic.No/Date:0710065141 02.06.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1. Information in respect of S.No. 3 & 11 of Standard Deficiency format, export product­wise. 2. Input raw material blanks size without cutting allowance – export product wise. 3. Input raw material blanks weight without cutting allowance – export product wise.        4. Cutting allowance and any other allowance / wastage export product wise.       41

Case No.:54/27/81­ALC2/2009

Party Name:HINDALCO INDUSTRIES LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00236/AM10/ RLA File :34/24/040/00030/AM10/ Lic.No/Date:3410024344 02.06.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the  comments  from  M/o  Mines  are  still  awaited  and  therefore  decided  to  remind  them  to  expedite  the  same.  The  case  stands deferred and to be relisted on 02.02.2010.  

Case No.:36/27/81­ALC2/2009

Party Name:SHIV OM BRASS INDUSTRIES 08.12.2009 Status:Deffered and Re­indexed

42 HQ File :01/81/050/00218/AM10/ RLA File :24/24/040/00004/AM10/ Lic.No/Date:2410024949 03.06.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 29.01.2010. The case stands deferred and to be relisted on 02.02.2010.   43

Case No.:6/13/81­ALC2/2009

Party Name:UTV SOFTWARE COMMUNICATIONS LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00074/AM10/ RLA File :05/24/040/00004/AM10/ Lic.No/Date:0510243219 08.06.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and     44

Case No.:22/27/81­ALC2/2009

Party Name:HALLMARK STEEL PVT. LTD. 08.12.2009 Status: approved HQ File :01/81/050/00204/AM10/ RLA File :03/94/040/00201/AM10/ Lic.No/Date:0310523401 10.06.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  36/81  scheduled  to  be  held  on  08.12.2009  but  actually  held  on  22.12.2009.  Based  on  the recommendations of the representative of M/o Steel present in the meeting, the Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject Advance Authorisation as per following modification:­   1.      The description of export product may be amended as Valve Steel bars from 4.5 mm to 30 mm. 2.      Quantity of import item may be allowed as 1.05 kg/kg content in the export product.

  45

Case No.:4/13/81­ALC2/2009

Party Name:CLESTRA MODULAR SYSTEMS PVT.LTD 08.12.2009 Status: Rejected HQ File :01/81/050/00072/AM10/ RLA File :31/24/040/00037/AM10/ Lic.No/Date:3110038755 10.06.2009   Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that the firm has failed to furnish the  reply despite repeated reminders. Therefore, decided to reject the request of the firm.       46

Case No.:8/13/81­ALC2/2009

Party Name:NIRLEP APPLIANCES LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00076/AM10/ RLA File :03/95/040/00152/AM10/ Lic.No/Date:0310523710 11.06.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. NC directed that RA may be asked to forward complete set of application since the enclosures are not forwarded. The case stands deferred and to be relisted on 02.02.2010.   47

Case No.:10/13/81­ALC2/2009

Party Name:DEE DEVELOPMENT ENGINEERS PVT. LTD. 08.12.2009 Status: approved HQ File :01/81/050/00078/AM10/ RLA File :05/24/040/00099/AM10/ Lic.No/Date:0510243650 12.06.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  36/81  scheduled  to  be  held  on  08.12.2009  but  actually  held  on  22.12.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.            Export item at S.No.1 may be deleted as same is not being exported. 2.            Import item at S.No.1 may be deleted which was required for manufacture of export product at S.No.1. 3.            Net weight of export product at S.No.2 may be modified as 333 MT. 4 Word “relevant” may be prefixed with the description of import items at S No 2 & 3

4.            Word  relevant  may be prefixed with the description of import items at S.No.2 & 3. 5.            Quantity of import item at S.No. 2 may be allowed as 1041 mtrs.(251.94 MT) inclusive of 2% wastage. 6.             Quantity of import item at S.No. 3 may be allowed as 634 mtrs.(65.9  MT) inclusive of 2% wastage. 7.            Quantity of import item at S.No.4 may be allowed as 3.18 MT. 8.            Quantity of import item at S.No.5 may be allowed equal to quantity of Welding Wire at S.No. 4 of import item. 9.            Firm has also requested for amendment of FOB value of exports and CIF value of items of import which may be looked into by RA/DGFT.       48

Case No.:18/27/81­ALC2/2009

Party Name:CIM TOOLS PVT.LTD., 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00200/AM10/ RLA File :07/24/040/00099/AM10/ Lic.No/Date:0710065366 12.06.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1. Information in respect of S.No. 3 & 11 of Standard Deficiency format, export product­wise. 2. Input raw material blanks size without cutting allowance – export product wise. 3. Input raw material blanks weight without cutting allowance – export product wise. 4. Cutting allowance and any other allowance / wastage export product wise.     49

Case No.:19/27/81­ALC2/2009

Party Name:CIM TOOLS PVT.LTD., 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00201/AM10/ RLA File :07/24/040/00100/AM10/ Lic.No/Date:0710065365 12.06.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1. Information in respect of S.No. 3 & 11 of Standard Deficiency format, export product­wise. 2. Input raw material blanks size without cutting allowance – export product wise. 3. Input raw material blanks weight without cutting allowance – export product wise. 4 Cutting allowance and any other allowance / wastage export product wise

4. Cutting allowance and any other allowance / wastage export product wise.     50

Case No.:9/13/81­ALC2/2009

Party Name:ALCAN COMPOSITES INDIA PVT. LTD. 08.12.2009 Status: Rejected HQ File :01/81/050/00077/AM10/ RLA File :03/94/040/00110/AM10/ Lic.No/Date:0310523944 12.06.2009   Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that the firm has failed to furnish the  reply despite repeated reminders. Therefore, decided to reject the request of the firm.     51

Case No.:11/13/81­ALC2/2009

Party Name:JUPITER INTERNATIONAL LTD., 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00079/AM10/ RLA File :02/24/040/00046/AM10/ Lic.No/Date:0210127724 15.06.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and   52

Case No.:12/13/81­ALC2/2009

Party Name:DYNATECH FURNACES (BOMBAY) PVT.LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00080/AM10/ RLA File :03/94/040/00196/AM10/ Lic.No/Date:0310524136 15.06.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.     53

Case No.:11/27/81­ALC2/2009

Party Name:DYNATECH FURNACES (BOMBAY) PVT.LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00193/AM10/ RLA File :03/94/040/00172/AM10/ Lic.No/Date:0310524162 15.06.2009 Defer Date:19.01.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that Hard copy of the application is received from RA and to be referred to  DHI for examination and comments. The case stands

py pp deferred and to be relisted on  02.02.2010.   54

Case No.:13/13/81­ALC2/2009

Party Name:VIJAI ELECTRICALS LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00081/AM10/ RLA File :09/24/040/00073/AM10/ Lic.No/Date:0910038235 16.06.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 29.01.2010. The case stands deferred and to be relisted on 02.02.2010.   55

Case No.:14/13/81­ALC2/2009

Party Name:ADITYA VIDYUT APPLIANCES LTD., 08.12.2009 Status:Rejected HQ File :01/81/050/00082/AM10/ RLA File :03/94/040/00204/AM10/ Lic.No/Date:0310524339 16.06.2009   Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that the firm has failed to furnish the  reply despite repeated reminders. Therefore, decided to reject the request of the firm.       56

Case No.:17/13/81­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED 08.12.2009 Status:Rejected HQ File :01/81/050/00085/AM10/ RLA File :31/24/040/00040/AM10/ Lic.No/Date:3110038911 18.06.2009   Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that the firm has failed to furnish the  reply despite repeated reminders. Therefore, decided to reject the request of the firm.    

Case No.:16/27/81­ALC2/2009

Party Name:CIM TOOLS PVT.LTD., 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00198/AM10/ RLA File :07/24/040/00108/AM10/ Lic.No/Date:0710065479 Defer

57 19.06.2009 Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1.      Information in respect of S.No. 3 & 11 of Standard Deficiency format, export product­wise. 2.      Input raw material blanks size without cutting allowance – export product wise. 3.      Input raw material blanks weight without cutting allowance – export product wise. 4.      Cutting allowance and any other allowance / wastage export product wise.       58

Case No.:17/27/81­ALC2/2009

Party Name:CIM TOOLS PVT.LTD., 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00199/AM10/ RLA File :07/24/040/00114/AM10/ Lic.No/Date:0710065505 22.06.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1.      Information in respect of S.No. 3 & 11 of Standard Deficiency format, export product­wise. 2.      Input raw material blanks size without cutting allowance – export product wise. 3.      Input raw material blanks weight without cutting allowance – export product wise. 4.      Cutting allowance and any other allowance / wastage export product wise.     59

Case No.:10/27/81­ALC2/2009

Party Name:DYNATECH FURNACES (BOMBAY) PVT.LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00192/AM10/ RLA File :03/94/040/00171/AM10/ Lic.No/Date:0310526069 26.06.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.

60

Case No.:43/27/81­ALC2/2009

Party Name:ANCHOR ELECTRICALS PVT.LTD. 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00225/AM10/ RLA File :03/94/040/00239/AM10/ Lic.No/Date:0310528341 10.07.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. NC observed that there are still discrepancies in the comments received from DOT and decided to direct FTDO/NC­II to contact the concerned Asst. Director and discuss the issue and sort out the matter. The case stands deferred and to be relisted on 02.02.2010.   61

Case No.:44/27/81­ALC2/2009

Party Name:BOSCH LIMITED, 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00226/AM10/ RLA File :07/24/040/00159/AM10/ Lic.No/Date:0710065933 14.07.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.   62

Case No.:45/27/81­ALC2/2009

Party Name:INJECTOPLAST PVT.LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00227/AM10/ RLA File :06/24/040/00010/AM10/ Lic.No/Date:0610015897 14.07.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the case is under examination of DC(MSME). The case stands deferred and to be relisted on 02.02.2010.       63

Case No.:46/27/81­ALC2/2009

Party Name:RPG CABLES LTD. 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00228/AM10/ RLA File :03/95/040/00416/AM09/ Lic.No/Date:0310529890 21.07.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1.      Information in respect of Sl. No. 12 of standard Deficiency Format 2 M t i l b l i i t t t f h i t d d i di i t t d t i KM f

2.           Material balancing viz. net content of each imported and indigenous input, export product wise, per KM of export product.                                  3. Total requirement of each raw material, export product      wise, in a tabular form     64

Case No.:59/27/81­ALC2/2009

Party Name:HI ­ MAK PROCESS CONTROLS 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00241/AM10/ RLA File :34/21/040/00164/AM10/ Lic.No/Date:3410024802 31.07.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from DHI and MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 02.02.2010.     65

Case No.:2/21/81­ALC2/2009

Party Name:HI­TECH ELASTOMERS LTD, 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00142/AM10/ RLA File :08/24/040/00285/AM08/ Lic.No/Date:0810082016 04.08.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1.                  Information in respect of S.No. 4, 5 & 11 of Standard Deficiency Format, export product wise. 2.                  Specifications / size of import items from S.Nos. 1 to 4.     66

Case No.:42/27/81­ALC2/2009

Party Name:BHASTRIK MECHANICAL LABS PRIVATE LIMITED, 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00224/AM10/ RLA File :04/24/040/00093/AM10/ Lic.No/Date:0410106791 07.08.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification   1 Information in respect of S No 3 4 5 & 11 of Standard Deficiency Format export product­wise

1.      Information in respect of S.No. 3, 4, 5 & 11 of Standard Deficiency Format, export product wise.       67

Case No.:5/21/81­ALC2/2009

Party Name:MANAKSIA LTD.( FORMERLY HINDUSTHAN SEALS LTD.) 08.12.2009 Status: approved HQ File :01/81/050/00145/AM10/ RLA File :02/24/040/00090/AM10/ Lic.No/Date:0210130103 07.08.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  36/81  scheduled  to  be  held  on  08.12.2009  but  actually  held  on  22.12.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1.                  Quantities of import items at S.No. 1 & 2  may be allowed as 128.775 MT & 103.929 MT respectively inclusive of 1% wastage. 2.                   Quantity of import item at S.No. 2 may be allowed within 2% of FOB value of exports     68

Case No.:10/21/81­ALC2/2009

Party Name:ITP INFOTECH PRIVATE LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00150/AM10/ RLA File :05/23/040/00006/AM10/ Lic.No/Date:0510247502 11.08.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and   69

Case No.:41/27/81­ALC2/2009

Party Name:CONTROL AUTOMATION PROJECTS PVT LTD, 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00223/AM10/ RLA File :03/94/040/00415/AM10/ Lic.No/Date:0310533468 12.08.2009 Defer Date:02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from DHI and MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 02.02.2010.  

Case No :12/21/81­ALC2/2009

Party Name:INSTA EXHIBITIONS PVT LTD Meet No/Date:36/81­ALC2/2009 Status:Deffered and

70

Case No.:12/21/81­ALC2/2009

Party Name:INSTA EXHIBITIONS PVT LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00152/AM10/ RLA File :03/94/040/00412/AM10/ Lic.No/Date:0310533747 13.08.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. This reminder may be treated as final and the case will be rejected if reply is not received before the 29.01.2010. The case stands deferred and to be relisted on 02.02.2010.   71

Case No.:60/27/81­ALC2/2009

Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 08.12.2009 Status: approved HQ File :01/81/050/00242/AM10/ RLA File :31/24/040/00082/AM10/ Lic.No/Date:3110039573 17.08.2009   Decision :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee  ­  II  in  its  M.No.  36/81  scheduled  to  be  held  on  08.12.2009  but  actually  held  on  22.12.2009.  Based  on  the recommendations of the representative of DIPP present in the meeting, the Norms Committee, after deliberating upon the case,   1. Word “relevant” may be prefixed with the descriptions of import items from S.Nos. 1 to 7. 2. Quantities of import items from S.Nos.1 to 7 may be allowed as 11133 Kgs., 20432 Kgs.,  5696 Kgs.,  9386  Kgs.,  9547  Kgs.,   55670 Kgs. &  75937 Kgs.      respectively inclusive of 6% wastage. 3. Quantities of import items at S.No. 8 & 9  put together  may be allowed within 2 %   of FOB value of exports       72

Case No.:1/23/81­ALC2/2009

Party Name:INDUSTRIAL METAL POWDERS (INDIA) PVT.LTD. 08.12.2009 Status: approved HQ File :01/81/050/00154/AM10/ RLA File :31/24/040/00065/AM10/ Lic.No/Date:3110039597 19.08.2009   Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. NC debated the case and decided  to  ratify  on  repeat  basis  as  per  decision  in  meeting  No.  26/81  dated  29.09.2009  in  licence  no.  31110037694  dated 16.03.2009.  

73

Case No.:1/27/81­ALC2/2009

Party Name:UM CABLES LTD., 08.12.2009 Status: approved HQ File :01/81/050/00183/AM10/ RLA File :03/95/040/00371/AM10/ Lic.No/Date:0310538432 18.09.2009   Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorisation, as per written comments of DOT  vide their I.D. No. 15­46/2009­IP dated 19.11.2009 as follows:­   1. The quantity of item of import No.1 may be reduced to 6962.69 Kms   inclusive of 1% wastage. 2. The quantity of item of import No.2 may be reduced to 14761.32 Kg   inclusive of 2% wastage. 3. The quantity of item of import No.3 may be reduced to 9201.61 Kg   inclusive of 1.5% wastage.       74

Case No.:4/27/81­ALC2/2009

Party Name:IMAGE LABELS PVT.LTD., 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00186/AM10/ RLA File :07/24/040/00228/AM10/ Lic.No/Date:0710067108 18.09.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from C&PC are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 02.02.2010.   75

Case No.:12/27/81­ALC2/2009

Party Name:EXIDE INDUSTRIES LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00194/AM10/ RLA File :02/24/040/00111/AM10/ Lic.No/Date:0210131885 23.09.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee decided that a copy of the reply received from the firm may be handed over to DIPP for examination and comments. The case stands deferred and to be relisted on 02.02.2010.   76

Case No.:13/27/81­ALC2/2009

Party Name:EXIDE INDUSTRIES LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00195/AM10/ RLA File :02/24/040/00112/AM10/ Lic.No/Date:0210131899 23.09.2009 Defer Date:02.02.2010

76 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee decided that a copy of the reply received from the firm may be handed over to DIPP for examination and comments. The case stands deferred and to be relisted on 02.02.2010.     77

Case No.:14/27/81­ALC2/2009

Party Name:TRANSLLOY INDIA PVT. LTD., 08.12.2009 Status:Deffered and Re­ indexed HQ File :01/81/050/00196/AM10/ RLA File :03/95/040/00318/AM10/ Lic.No/Date:0310538895 23.09.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from DC(MSME) and M/o Mines are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 02.02.2010.   78

Case No.:5/27/81­ALC2/2009

Party Name:GAMESA WIND TURBINES P.LTD 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00187/AM10/ RLA File :04/24/040/00136/AM10/ Lic.No/Date:0410107978 23.09.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.   79

Case No.:6/27/81­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00188/AM10/ RLA File :03/94/040/00525/AM10/ Lic.No/Date:0310539041 23.09.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.     80

Case No.:50/27/81­ALC2/2009

Party Name:WELSPUN GUJARAT STAHL ROHREN LTD. 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00232/AM10/ RLA File :34/24/040/00092/AM10/ Lic.No/Date:3410025173 24.09.2009 Defer Date:02.02.2010

80 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that  the  application  of  the  firm  is  not  received.  Therefore,  the  Committee  decided  to  remind  RA  for  forwarding  the  copy  of  the application of the firm. The case stands deferred and to be relisted on 02.02.2010.   81

Case No.:61/27/81­ALC2/2009

Party Name:ALCOMEX SPRINGS PRIVATE LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00243/AM10/ RLA File :31/24/040/00112/AM10/ Lic.No/Date:3110040060 24.09.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Committee observed that  the  application  of  the  firm  is  not  received.  Therefore,  the  Committee  decided  to  remind  RA  for  forwarding  the  copy  of  the application of the firm. The case stands deferred and to be relisted on 02.02.2010.   82

Case No.:62/27/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00244/AM10/ RLA File :03/95/040/00343/AM10/ Lic.No/Date:0310539390 25.09.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and     83

Case No.:63/27/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 08.12.2009 Status:Deffered and Re­indexed HQ File :01/81/050/00245/AM10/ RLA File :03/95/040/00342/AM10/ Lic.No/Date:0310539395 25.09.2009 Defer Date:02.02.2010 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and  

Case No.:64/27/81­ALC2/2009

Party Name:VIDEOCON INDUSTRIES LIMITED 08.12.2009 Status: approved HQ File :01/81/050/00246/AM10/ RLA File :03/95/040/00341/AM10/ Lic.No/Date:0310539548 25 09 2009

84 25.09.2009 Decision  :  The  case  regarding  ratification  of  norms  in  respect  of  above  advance  authorization  was  considered  by  the  Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The Norms Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorisation, as per written comments of MIT  vide their U.O. No. 17(38)/2009­IPHW dated 27.11.2009 as below:­   1.      Import item No. 1 to 4 may be allowed on net to net basis with accountability clause.  2.      Import item No. 5 may be allowed as applied for with accountability clause.  3.      Import item No. 6 may be allowed as per packing policy.                    PART –A ­DEFFER S.No.14

Case No.AR ­7

M/s  Crompton Greaves Ltd.Mumbai           Meeting No. 36/81 Pt.F.No.01/80/162 /1101/AM08/DES­I/DES­II Dated: 08­12­2009 Advance Licence No 0310444382  dt. 26­09­2007          RLA F.No. 03/94/040/634/AM08       Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the reply from the firm  is  still  awaited  and  therefore  decided  to  remind  the  firm  to  expedite  the  reply.  The  case  stands  deferred  and  to  be  relisted  on 02.02.2010.                                                   PART –AR ­DEFFER   S.No.72

Case No AR 46

M/S Goodstar power components Pvt Ltd

Case No. AR­46

 M/S  Goodstar power components Pvt. Ltd.            Meeting No.36/81 F.No.01/81/50/233/AM09/DES­II Dated 08­12­2009 Advance License No.  0710058253 dt. 01.07.2008   RLA F.No. 07/24/40/148/AM09 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. The committee observed that the comments from MIT are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 02.02.2010.   S.No.73

Case No. AR­ 49

 M/S  Laxmi Electronics Moulds & Precision Engineering Pvt. Ltd. Bangalore            Meeting No.36/81 F.No.01/81/50/ 841/AM06/DES­I/DES­II Dated  08­12­2009 Advance License No.  0710033649 dt. 21.10.2004   RLA F.No. 07/24/40/443/AM05 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.   S.No.74

Case No. AR­ 50

 M/S  Laxmi Electronics Moulds & Precision Engineering Pvt. Ltd. Bangalore            Meeting No.36/81 F.No.01/81/162/ 770/AM06/DES­I/DES­II Dated 08­12­2009 Advance License No.  0710041856 dt. 07.12.2005   RLA F.No. 07/24/40/703/AM06 Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.   S.No.75

Case No.AR ­7

M/s  Penwalt Ltd.Mumbai           Meeting No. 36/81 Pt.F.No.01/81/162 /432/AM07/DES­II Dated: 08­12­2009 Advance Licence No 0310389620 dt. 14­07­2006          RLA F.No. 03/95/040/220/AM07       Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. NC decided that case may be re­submitted before NC alongwith the original file, copy of original licence and application. The case stands deferred and to be relisted on 02.02.2010.

PART­C­DEFFER S.N0.52

Case No.C ­1

M/s  Salzer Electronics,Coimbatore through EEPC,Kolkata            Meeting No. 36/81 F.No.01/81/162 /0034/AM10/DES­II Dated: 08­12­2009  .         Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the representative of DHI was not present in the meeting, NC decided to defer the case. The case stands deferred and to be relisted on 02.02.2010.     S.NO.53

Case No.C ­2

M/s  Jindal Aluminium through EEPC,Bangalore          Meeting No. 36/81 F.No.01/81/162 /0766/AM09/DES­II Dated: 08­12­2009  .         Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Based on the comments of M/o Mines, NC decided to turn down the request of the firm.     S.NO.54

Case No.C ­3

M/s  Bhukhanvala Tools Pvt.Ltd.Navsari M/s Kalpataru Power Transmission Ltd.Gandhinagar M/s B.C.Instruments,Udyog Nagar through O/O The D.C(KFTZ),Gandhidham­Kutch          Meeting No. 36/81 F.No.01/81/162 /0033/AM10/DES­II Dated: 08­12­2009  .         Decision : The case regarding ratification of norms in respect of above advance authorization was considered by the Norms Committee ­ II in its M.No. 36/81 scheduled to be held on 08.12.2009 but actually held on 22.12.2009. Since the request is for fixation of norms for different products by different firm, separate agenda may be prepared for future. TA is also different in each case. Individual details are as under:­   1. M/s  Bhukhanvala Tools Pvt.Ltd.Navsari   The committee observed that the reply from the firm is still awaited and therefore decided to remind the firm to expedite the reply. The case stands deferred and to be relisted on 02.02.2010.

2. M/s Kalpataru Power Transmission Ltd. Gandhinagar   The committee observed that the item is already covered under SION S. No. C­220. DC(SEZ) may be informed accordingly.   3. M/s B.C. Instruments, Udyog Nagar   The Committee observed that the comments from DC(MSME) are still awaited and therefore decided to remind them to expedite the same. The case stands deferred and to be relisted on 02.02.2010.    


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied