IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2013-04-30

DGFT Committee Minutes

Document text

RATIFIED Minutes of Mee៝�ng No.03/14 scheduled on 30.04.2013 of Norms Commiោ�ee(NC‐I) (DES.I Sec៝�on) The mee៝�ng No. 03/14 of the Norms Commiោ�ee (NC‐I) for the licensing year 2012‐2013 actually was held on 30.04.2013 under the Chairmanship of Sh. L.B. Singhal, Addi៝�onal  Director General of Foreign Trade to consider the applica៝�ons under Duty Exemp៝�on Schemes (Chapter‐4) of Foreign Trade Policy 2009–2014 / Handbook of Procedure Volume‐I.  The following Members of the Commiោ�ee were present in the mee៝�ng: ‐ Sl.No Name  of  the  representa៝�ves  &  their Designa៝�on Room No. Telephone No. Depោ�. 1. Sh K.K. Tiwari I.A 476 23063321 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 428A 23063166 DIPP, U.B. 3. Sh. K.K. Funda, Assោ�. Dir. (Mech) 736A 23063802 Extn.2459 DC(MSME),N.B. 4. Sh. Parveen Sharma, Dy.DGFT 312 23061562 Extn.146 DGFT, U.B. 5. Sh. K.C. Raju, FTDO 404 23061562 Ext.265 DGFT, U.B. The Commiោ�ee first considered the minutes of the Norms Commiោ�ee Mee៝�ng No.02/14 dated 16.4.2013 for confirma៝�on and confirmed and adopted the same without any change. 1

Case No.:27/1/80‐ALC2/2011

Party Name:SHRI LAKSHMI DEFENCE SOLUTIONS LTD. Meet No/Date:3/80‐ALC2/2013 30.04.2013 Status: Deferred HQ File :01/80/050/00910/AM11/ RLA File :06/24/040/00051/AM11/ Lic.No/Date:0610020480 07.01.2011 Defer Date:11.06.2013 Decision : The reply submiោ�ed by the firm a៻�er aោ�ending the personal hearing in the NC, has been examined by the administra៝�ve ministry and they found that though firm has submiោ�ed their reply, they have s៝�ll not provided the complete informa៝�on desired in the personal hearing. The Commiោ�ee, therefore, decided to advise the firm to provide the sheet cu៶�ng diagram with dimensions and the volume and weight calcula៝�ons immediately.   2

Case No.:14/38/80‐ALC2/2010

Party Name:VASUNDRA MANUFACTURING SYSTEMS PVT.LTD, 30.04.2013 Status: Deferred HQ File :01/80/050/00784/AM11/ RLA File :07/21/040/00786/AM11/ Lic.No/Date:0710077109 03.02.2011 Decision : The Commiោ�ee noted that the case is under examina៝�on of DIT and decided to await comments.   3

Case No.:36/7/80‐ALC2/2011

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00142/AM12/ RLA File :04/24/040/00051/AM12/ Lic.No/Date:0410124216 20.05.2011 Decision : The Commiោ�ee noted that the case is under examina៝�on of DHI and decided to await comments.   4

Case No.:29/2/80‐ALC2/2012

Party Name:OMEGA ICEHILL PRIVATE LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00618/AM12/ RLA File :05/24/040/00384/AM12/ Lic.No/Date:0510316908 08.02.2012 Decision : The Commiោ�ee noted that the firm has s៝�ll not provided the desired informa៝�on and hence decided to advise firm to provide informa៝�on as per Sr.No. 4,5, & 11of Standard Deficiency Format for EP No.4.   5

Case No.:26/14/80‐ALC2/2012

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 30.04.2013 Status: Deferred HQ File :01/80/050/00312/AM13/ RLA File :07/24/040/00043/AM13/ Lic.No/Date:0710088185 14.05.2012 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 12.4.2013 and decided to remind them for expedi៝�ng their reply.   6

Case No.:15/11/80‐ALC2/2012

Party Name:YOKOGAWA INDIA LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00229/AM13/ RLA File :07/21/040/00120/AM13/ Lic.No/Date:0710088440 24.05.2012 Decision : The Commiោ�ee noted that the case is under examina៝�on of DIT and decided to await comments.   7

Case No.:2/8/80‐ALC2/2012

Party Name:SULZER INDIA LTD 30.04.2013 Status: Deferred HQ File :01/80/050/00148/AM13/ RLA File :31/83/040/00036/AM13/ Lic.No/Date:3110054707 18.06.2012 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 4.1.2013 followed by reminder dated 28.2.2013 and final reminder dated 9.4.2013 and decided to await 15 days more to receive firm’s reply.   8

Case No.:24/14/80‐ALC2/2012

Party Name:TEXMACO RAIL & ENGINEERING LIMITED 30.04.2013 Approved HQ File :01/80/050/00310/AM13/ RLA File :02/24/040/00036/AM13/ Lic.No/Date:0210178842 22.06.2012 Decision : Based on DHI wriោ�en comments dated 30.4.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: i)                     Components – GN4 Net to Net basis with accountability clause. ii)                   Spares – As per policy.

iii)                  Item 3 and 4 in EP are imported and supplied as such and hence to be deleted.   RLA may take necessary ac៝�on accordingly.   9

Case No.:44/14/80‐ALC2/2012

Party Name:SATTVA ETECH INDIA PRIVATE LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00330/AM13/ RLA File :07/24/040/00149/AM13/ Lic.No/Date:0710089403 02.07.2012 Decision : The Commiោ�ee noted that the case is under examina៝�on of DIT and decided to await comments.   10

Case No.:17/11/80‐ALC2/2012

Party Name:MOTHERSON SUMI SYSTEMS LTD 30.04.2013 Status: Deferred HQ File :01/80/050/00231/AM13/ RLA File :05/24/040/00129/AM13/ Lic.No/Date:0510329275 10.07.2012 Decision : The Commiោ�ee noted that the case is under examina៝�on of C&PC and decided to await comments.   11

Case No.:19/11/80‐ALC2/2012

Party Name:HARI MACHINES LTD 30.04.2013 Status: Deferred HQ File :01/80/050/00233/AM13/ RLA File :23/24/040/00001/AM13/ Lic.No/Date:2310003202 10.07.2012 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 18.3.2013 followed by reminder dated 9.4.2013 and decided to send a final reminder reques៝�ng them to expedite their reply within 15 days, failing which the Commiោ�ee shall be constrained to reject their case with direc៝�on to pay the Customs duty and applicable interest for regulariza៝�on of the licence.   12

Case No.:9/11/80‐ALC2/2012

Party Name:BENGAL INDUSTRIES PVT. LTD. 30.04.2013 Status: Deferred HQ File :01/80/050/00223/AM13/ RLA File :05/23/040/00131/AM13/ Lic.No/Date:0510329934 17.07.2012 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er and decided to remind them for expedi៝�ng their reply immediately.   13

Case No.:2/11/80‐ALC2/2012

Party Name:ABB LIMITED 30.04.2013 Closed HQ File :01/80/050/00216/AM13/ RLA File :07/24/040/00202/AM13/ Lic.No/Date:0710090030 02.08.2012 Decision : The Commiោ�ee considered the case and observed that RA vide leោ�er No. 07/24/00202/AM13 dated 28.12.2012 informed that this authoriza៝�on has been issued on net to net basis with accountability clause and hence decided to close the case. RLA may take necessary ac៝�on accordingly.   14

Case No.:27/14/80‐ALC2/2012

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 30.04.2013 Status: Deferred HQ File :01/80/050/00313/AM13/ RLA File :07/24/040/00180/AM13/ Lic.No/Date:07100                                        03.08.2012 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 12.4.2013 and decided to remind them for expedi៝�ng their reply.   15

Case No.:8/14/80‐ALC2/2012

Party Name:BOYSEN INDIA LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00294/AM13/ RLA File :05/23/040/00149/AM13/ Lic.No/Date:0510331556 08.08.2012 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 16.4.2013 and decided to remind them for expedi៝�ng their reply.   16

Case No.:1/17/80‐ALC2/2012

Party Name:TEMA INDIA LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00366/AM13/ RLA File :03/95/040/00333/AM13/ Lic.No/Date:0310704473 08.08.2012 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 9.4.2013 and decided to remind them for expedi៝�ng their reply.   17

Case No.:19/14/80‐ALC2/2012

Party Name:DEE DEVELOPMENT ENGINEERS LTD. 30.04.2013 Status: Deferred HQ File :01/80/050/00305/AM13/ RLA File :05/23/040/00166/AM13/ Lic.No/Date:0510331795 09.08.2012 Decision : The Commiោ�ee observed that a number of cases of the firm are pending before the NC for want of clarifica៝�ons from firm as to whether their exports are Physical exports or Deemed exports and also in some of the cases the supplies are to be made against Invalida៝�on Leោ�er of EPCG licences. The Commiោ�ee, therefore, decided to request the firm to aោ�end for personal hearing before the Commiោ�ee at 2.30 p.m. on 11.6.2013 to clarify the status of these cases.   18

Case No.:21/14/80‐ALC2/2012

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00307/AM13/ RLA File :07/24/040/00188/AM13/ Lic.No/Date:0710090187 10.08.2012 Decision : The Commiោ�ee noted that DIT has issued a deficiency leោ�er to firm on 10.10.2013 and reminder from NC on 9.4.2013 and decided send a final reminder for providing informa៝�on reques៝�ng them to expedite their reply within 15 days, failing which the Commiោ�ee shall be constrained to reject their case with direc៝�on to pay the Customs duty and applicable interest for regulariza៝�on of the licence.

19

Case No.:5/13/80‐ALC2/2012

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00260/AM13/ RLA File :05/24/040/00199/AM13/ Lic.No/Date:0510333158 30.08.2012 Decision : The Commiោ�ee noted that the case is under examina៝�on of DIT and decided to await comments.   20

Case No.:6/14/80‐ALC2/2012

Party Name:GRAZIANO TRASMISSIONI INDIA PVT LTD 30.04.2013 Approved HQ File :01/80/050/00292/AM13/ RLA File :05/23/040/00200/AM13/ Lic.No/Date:0510333669 05.09.2012 Decision : The Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per MSME UO No. 30(222)/11/‐ME dated 1.4.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly.   21

Case No.:39/14/80‐ALC2/2012

Party Name:DOOSAN CHENNAI WORKS PRIVATE LIMITED Meet No/Date:3/80‐ALC2/2013 30.04.2013 Status: Deferred HQ File :01/80/050/00325/AM13/ RLA File :04/24/040/00102/AM13/ Lic.No/Date:0410139508 05.09.2012 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 26.2.2013 followed by reminder dated 9.4.2013 and decided to send a final reminder reques៝�ng them to expedite their reply within 15 days, failing which the Commiោ�ee shall be constrained to reject their case with direc៝�on to pay the Customs duty and applicable interest for regulariza៝�on of the licence.   22

Case No.:24/20/80‐ALC2/2012

Party Name:KILBURN ENGINEERING LTD 30.04.2013 Status: Deferred HQ File :01/80/050/00440/AM13/ RLA File :03/94/040/00515/AM13/ Lic.No/Date:0310710999 28.09.2012 Decision : The Commiោ�ee noted that the case is under examina៝�on of DIPP and decided to await comments.   23

Case No.:4/20/80‐ALC2/2012

Party Name:DIA ALUMINIUM INDIA PRIVATE LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00420/AM13/ RLA File :31/83/040/00065/AM13/ Lic.No/Date:3110055921 01.10.2012 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 18.1.2013 followed by reminder dated 1.3.2013 and final reminder dated 9.4.2013 and decided to await 15 days more to receive reply from firm.   24

Case No.:23/20/80‐ALC2/2012

Party Name:ICEM ENGINEERING COMPANY PRIVATE LIMITED, 30.04.2013 Status: Deferred HQ File :01/80/050/00439/AM13/ RLA File :03/94/040/00546/AM13/ Lic.No/Date:0310711364 03.10.2012 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 21.1.2013 followed by reminder dated 20.2.2013 and final reminder dated 9.4.2013 and decided to await 15 days more to receive reply from firm.   25

Case No.:15/20/80‐ALC2/2012

Party Name:ROTHE ERDE INDIA PRIVATE LIMITED 30.04.2013 Approved HQ File :01/80/050/00431/AM13/ RLA File :31/83/040/00110/AM13/ Lic.No/Date:3110056019 09.10.2012 Decision : Based on DIPP wriោ�en comments dated 30.4.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1.       Net empty export weights of 2366 Kgs., 2960 Kgs., 6084 Kgs. & 6052 Kgs. to be specified with the quan៝�៝�es of export products at  Sl. No. 1, 2, 3 & 4  respec៝�vely. 2.       Quan៝�ty of import item at Sl.No.1 to be allowed as 2 Nos. on net to net basis. However, duty free weight of this item to be allowed as  2584 Kg inclusive of  66 % wastage a៻�er taking 20 % recovery. 3.       Quan៝�ty of import item at Sl.No.2 to be allowed as 2 Nos. on net to net basis. However, duty free weight of this item to be allowed as  3022 Kg inclusive of  69.6 % wastage a៻�er taking 20 % recovery. 4.       Quan៝�ty of import item at Sl.No.3 to be allowed as 2 Nos. on net to net basis. However, duty free weight of this item to be allowed as  1684 Kg inclusive of  68 % wastage a៻�er taking 20 % recovery. 5.       Quan៝�ty of import item at Sl.No.4 to be allowed as 2 Nos. on net to net basis. However, duty free weight of this item to be allowed as  2596 Kg inclusive of  64 % wastage a៻�er taking 20 % recovery. 6.       Quan៝�ty of import item at Sl.No.5 to be allowed as 8 Nos. on net to net basis. However, duty free weight of this item to be allowed as  10380 Kg inclusive of  65 % wastage a៻�er taking 20 % recovery. 7.       Quan៝�ty of import item at Sl.No.6 to be allowed as 8 Nos. on net to net basis. However, duty free weight of this item to be allowed as  7432 Kg inclusive of  50 % wastage a៻�er taking 20 % recovery.   26

Case No.:2/17/80‐ALC2/2012

Party Name:PLAST TECH ENGINEERING 30.04.2013 Status: Deferred HQ File :01/80/050/00367/AM13/ RLA File :04/24/040/00136/AM13/ Lic.No/Date:0410140373 11.10.2012 Decision : The Commiោ�ee noted that C&PC has issued a deficiency leោ�er to the firm directly and firm’s reply is awaited.  

Case No.:26/20/80‐ALC2/2012

Party Name:GODREJ & BOYCE MFG. CO. LTD., 30.04.2013 Approved HQ File :01/80/050/00442/AM13/ RLA File :03/94/040/00442/AM13/ Lic.No/Date:0310712579 12.10.2012 Decision : Based on DIPP wriោ�en comments dated 30.4.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1.       Net empty fabricated weight of 36560 Kgs.  to be specified with the quan៝�៝�es each  of export product at Sl. No. 1 & 2. 2.       Net empty fabricated weight of 67200 Kgs.  to be specified with the quan៝�៝�es each  of export product at Sl. No. 3 & 4.

27 3.       Net empty fabricated weight of 32500 Kgs.  to be specified with the quan៝�៝�es each  of export product at Sl. No. 5 & 6. 4.       Word “Relevant” to be prefixed with the descrip៝�ons of import items at Sl. No. 2, 3  & 4. 5.       Import item at Sl. No. 1 to be deleted. 6.       Quan៝�ty of import item at Sl. No. 2 to be allowed as 4186 Kgs. inclusive of 60 % wastage a៻�er 1/3rd recovery. 7.       Quan៝�ty of import item at Sl. No. 3 to be allowed as 31066  Kgs. inclusive of 81 % wastage a៻�er 1/3rd recovery. 8.       Quan៝�ty of import item at Sl. No. 4 to be allowed as 109816 Kgs.             ( 139098  Mtrs.) inclusive of 2% wastage. 9.       Quan៝�៝�es of import items at Sl. Nos. 5, 6 & 7 ( Welding Consumables)  to be allowed as 1770  Kgs. each.   28

Case No.:5/20/80‐ALC2/2012

Party Name:FENIX PROCESS TECHNOLOGIES PVT.LTD. 30.04.2013 Status: Deferred HQ File :01/80/050/00421/AM13/ RLA File :31/83/040/00127/AM13/ Lic.No/Date:3110056062 15.10.2012 Decision : The Commiោ�ee noted that the case is under examina៝�on of DIPP and decided to await comments.   29

Case No.:3/20/80‐ALC2/2012

Party Name:METSO PAPER INDIA PVT.LTD. 30.04.2013 Approved HQ File :01/80/050/00419/AM13/ RLA File :05/24/040/00264/AM13/ Lic.No/Date:0510337411 18.10.2012 Decision : Based on DIPP wriោ�en comments dated 30.4.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: Components – Net to Net with descrip៝�on as per enclosure to uo dated 18.2.2013. RLA may take necessary ac៝�on accordingly.   30

Case No.:21/20/80‐ALC2/2012

Party Name:GEI INDUSTRIAL SYSTEMS LTD., 30.04.2013 Status: Deferred HQ File :01/80/050/00437/AM13/ RLA File :11/24/040/00024/AM12/ Lic.No/Date:1110027289 19.10.2012 Decision : The Commiោ�ee noted that a reply was received from firm but firm has s៝�ll not provided point wise reply. The Commiោ�ee decided to ask firm to provide point wise reply to deficiency leោ�er.   31

Case No.:6/20/80‐ALC2/2012

Party Name:ISGEC HEAVY ENGINEERING LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00422/AM13/ RLA File :05/23/040/00276/AM13/ Lic.No/Date:0510337677 26.10.2012 Decision : The Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as per DIPP wriោ�en comments dated 19.3.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly.   32

Case No.:30/20/80‐ALC2/2012

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 30.04.2013 Closed HQ File :01/80/050/00446/AM13/ RLA File :61/24/040/00034/AM13/ Lic.No/Date:6110000889 07.11.2012 Decision : The Commiោ�ee noted that firm vide their leោ�er No. MM/IMP/VINDHYACHL/2013 dated 23.3.2013 informed RA that VinDHyachal 1x500 MW is not covered under Policy Circular No.14 dated 4.2.2013 for Deemed Export benefit and hence surrendered the original licence to RA, Dehradun for cancella៝�on. The Commiោ�ee decided to close the case and advise RA to cancel the licence immediately if the same has not been u៝�lized by the firm. RLA may take necessary ac៝�on accordingly.   33

Case No.:19/20/80‐ALC2/2012

Party Name:SMC PNEUMATICS (INDIA) PRIVATE LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00435/AM13/ RLA File :05/24/040/00298/AM13/ Lic.No/Date:0510338939 12.11.2012 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 21.1.2013 followed by reminder dated 28.2.2013 and final reminder dated 9.4.2013 and decided to await 15 days more to receive firm’s reply.   34

Case No.:10/26/80‐ALC2/2012

Party Name:HTD HEAT TRACE(INDIA)PVT LTD. 30.04.2013 Status: Deferred HQ File :01/80/050/00571/AM13/ RLA File :09/24/040/00407/AM13/ Lic.No/Date:0910054497 12.12.2012 Decision : The Commiោ�ee noted that copy of firm’s reply dated 22.4.2013 is to be forwarded to DIPP for examina៝�on and comments.   35

Case No.:29/26/80‐ALC2/2012

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00590/AM13/ RLA File :09/24/040/00435/AM13/ Lic.No/Date:0910054516 14.12.2012 Decision : The Commiោ�ee noted that the case is under examina៝�on of DHI and decided to await comments.   36

Case No.:37/26/80‐ALC2/2012

Party Name:PAM‐GLATT PHARMA TECHNOLOGIES PVT.LTD Meet No/Date:3/80‐ALC2/2013 30.04.2013 Status: Deferred HQ File :01/80/050/00598/AM13/ RLA File :03/95/040/00700/AM13/ Lic.No/Date:0310717702 19.12.2012 Decision : The Commiោ�ee noted that copy of applica៝�on has not been received from RA. The Commiោ�ee decided to remind RA to forward copy of applica៝�on and in case the authoriza៝�on was issued under GN4, RA may please specify the same.  

Case No.:13/26/80‐ALC2/2012

Party Name:HINDUSTAN AERONAUTICS LTD, Status:

37 30.04.2013 Deferred HQ File :01/80/050/00574/AM13/ RLA File :07/24/040/00366/AM13/ Lic.No/Date:0710092780 31.12.2012 Decision : The Commiោ�ee decided to forward copy of applica៝�on to DIPP for examina៝�on and comments.   38

Case No.:23/26/80‐ALC2/2012

Party Name:PSK ENGINEERING PVT LTD 30.04.2013 Status: Deferred HQ File :01/80/050/00584/AM13/ RLA File :07/24/040/00420/AM13/ Lic.No/Date:0710092968 08.01.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 9.4.2013 and decided to remind them for expedi៝�ng their reply.   39

Case No.:8/26/80‐ALC2/2012

Party Name:JINDAL RAIL INFRASTRUCTURE LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00569/AM13/ RLA File :05/23/040/00400/AM13/ Lic.No/Date:0510342981 10.01.2013 Decision : The Commiោ�ee noted that firm was asked to provide informa៝�on as per DHI UO NO. 3(31)/13‐TSW(B)/63 dated 3.4.2013 and decided to remind them for expedi៝�ng their reply.   40

Case No.:26/26/80‐ALC2/2012

Party Name:SOGEFI MNR FILTRATION INDIA PVT LTD, 30.04.2013 Status: Deferred HQ File :01/80/050/00587/AM13/ RLA File :07/24/040/00424/AM13/ Lic.No/Date:                                                                                                                               10.01.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated as per MSME UO No. 30(8)/13‐ME dated 15.4.2013 and decided to await comments.   41

Case No.:32/26/80‐ALC2/2012

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL 30.04.2013 Rejected HQ File :01/80/050/00593/AM13/ RLA File :05/23/040/00412/AM13/ Lic.No/Date:0510342940 10.01.2013 Decision : The Commiោ�ee considered the reply received from firm vide leោ�er dated 24.4.2013. The Norms Commiោ�ee earlier considered firm’s other similar cases in consulta៝�on with Policy Sec៝�on‐VI about firm’s eligibility for Advance Authoriza៝�on for supply of goods to petroleum explora៝�on fields as per provision of para 8.2(f) and 8.4.4(iii) of FTP. The Policy Sec៝�on‐VI has informed that in this case, the supplier is neither main contractor nor a sub‐contractor, and cer៝�fica៝�on from the Directorate General of Hydro Carbon in the Ministry of Petroleum has not been obtained,  they are not eligible for deemed export benefit. Accordingly, the Commiោ�ee decided to advise RA to immediately re‐examine the issuance of all Advance Authoriza៝�ons to the firm including past cases and take further necessary ac៝�on immediately. RA may take necessary ac៝�on accordingly.   42

Case No.:27/26/80‐ALC2/2012

Party Name:SGL CARBON INDIA PVT.LTD 30.04.2013 Status: Deferred HQ File :01/80/050/00588/AM13/ RLA File :31/83/040/00164/AM13/ Lic.No/Date:3110056801 11.01.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 9.2.2013 and decided to remind them for expedi៝�ng their reply.   43

Case No.:31/26/80‐ALC2/2012

Party Name:ROBONIK ( INDIA ) PVT. LTD. 30.04.2013 Status: Deferred HQ File :01/80/050/00592/AM13/ RLA File :03/95/040/00550/AM13/ Lic.No/Date:0310720573 14.01.2013 Decision : The Commiោ�ee noted that a reply received from firm and decided to forward copy of reply to concerned technical authority for examina៝�on and comments.   44

Case No.:17/26/80‐ALC2/2012

Party Name:BLUE STAR LTD. 30.04.2013 Status: Deferred HQ File :01/80/050/00578/AM13/ RLA File :03/94/040/00825/AM13/ Lic.No/Date:0310720787 15.01.2013 Decision : The Commiោ�ee noted that a reply received from firm and decided to forward copy of reply to concerned technical authority for examina៝�on and comments   45

Case No.:19/26/80‐ALC2/2012

Party Name:HUF INDIA PVT LTD 30.04.2013 Status: Deferred HQ File :01/80/050/00580/AM13/ RLA File :31/83/040/00174/AM13/ Lic.No/Date:3110056821 15.01.2013 Decision : The Commiោ�ee noted that firm has not replied to MSME deficiency sent to them vide MSME UO No. 30(10)/13‐ME dated 15.4.2013  and decided to remind them for expedi៝�ng their reply.   46

Case No.:7/26/80‐ALC2/2012

Party Name:GRAND PRIX ENGINEERING PVT.LTD. 30.04.2013 Status: Deferred HQ File :01/80/050/00568/AM13/ RLA File :05/23/040/00420/AM13/ Lic.No/Date:0510343805 21.01.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 9.2..2013 and decided to remind them for expedi៝�ng their reply.   47

Case No.:34/26/80‐ALC2/2012

Party Name:LION HOLDINGS PRIVATE LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00595/AM13/ RLA File :05/23/040/00423/AM13/ Lic.No/Date:0510343833 21.01.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 9.2..2013 and decided to remind them for expedi៝�ng their reply.

48

Case No.:28/26/80‐ALC2/2012

Party Name:SINTERCOM INDIA PVT LTD 30.04.2013 Status: Deferred HQ File :01/80/050/00589/AM13/ RLA File :31/83/040/00182/AM13/ Lic.No/Date:3110056897 22.01.2013 Decision : The Commiោ�ee decided to forward copy of applica៝�on to DIPP for examina៝�on and comments.   49

Case No.:11/26/80‐ALC2/2012

Party Name:ALSTOM TRANSPORT INDIA LIMITED 30.04.2013 Closed HQ File :01/80/050/00572/AM13/ RLA File :07/21/040/00439/AM13/ Lic.No/Date:0710093277 23.01.2013 Decision : The Commiោ�ee noted that firm vide leោ�er No. ALSTOM/DGFT NORMS Commiោ�ee dated 17.4.2013 informed that they are in the process of surrendering the authoriza៝�on and has requested  not  to  process  this  authoriza៝�on  for  fixa៝�on  of  norms  and treat  the  same  as  cancelled.  The  Commiោ�ee  decided  to  close  the  case  and advise  RA  to  cancel  the  authoriza៝�on immediately if the firm has not u៝�lized the same and inform the Commiោ�ee of the ac៝�on taken.   50

Case No.:12/26/80‐ALC2/2012

Party Name:ALSTOM TRANSPORT INDIA LIMITED 30.04.2013 Closed HQ File :01/80/050/00573/AM13/ RLA File :07/21/040/00413/AM13/ Lic.No/Date:0710093279 23.01.2013 Decision : The Commiោ�ee noted that firm vide leោ�er No. ALSTOM/DGFT NORMS Commiោ�ee dated 17.4.2013 informed that they are in the process of surrendering the authoriza៝�on and has requested  not  to  process  this  authoriza៝�on  for  fixa៝�on  of  norms  and treat  the  same  as  cancelled.  The  Commiោ�ee  decided  to  close  the  case  and advise  RA  to  cancel  the  authoriza៝�on immediately if the firm has not u៝�lized the same and inform the Commiោ�ee of the ac៝�on taken.   51

Case No.:15/26/80‐ALC2/2012

Party Name:LARSEN & TOUBRO LIMITED 30.04.2013 Status: Deferred HQ File :01/80/050/00576/AM13/ RLA File :03/95/040/00791/AM13/ Lic.No/Date:0310722249 29.01.2013 Decision : The Commiោ�ee considered the reply received from firm vide leោ�er No. LIC:LUT:1017:TM dated 6.4.2013 informing that this is a case of Deemed Exports and supplies are meant for M/s. ONGC.  The Commiោ�ee decided to ask the firm to provide a copy of PAC and also to produce a cer៝�ficate from the Directorate General of Hydro Carbon in the Ministry of Petroleum & Natural Gas sta៝�ng that goods being supplied are required for petroleum gases, in terms of condi៝�on No.41, Sr.No.356 of Custom No៝�fica៝�on No.12 dated 17.3.2012.    52

Case No.:20/26/80‐ALC2/2012

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD. 30.04.2013 Status: Deferred HQ File :01/80/050/00581/AM13/ RLA File :34/24/040/00237/AM13/ Lic.No/Date:3410035974 30.01.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on of C&PC and decided to await comments.   53

Case No.:25/26/80‐ALC2/2012

Party Name:SARTORIUS STEDIM INDIA PVT. LTD. 30.04.2013 Approved HQ File :01/80/050/00586/AM13/ RLA File :07/24/040/00367/AM13/ Lic.No/Date:0710093431 30.01.2013 Decision : Based on DIPP wriោ�en comments dated 30.4.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1. Import items from Sl. No. 1 to 49 & 51 to 56  to be allowed on net to net basis with accountability clause. 2. Import item at Sl. No. 50  to be allowed on net to net basis as claimed by the firm.                                                                                                         The Commiោ�ee also noted that the firm is making supplies to SEZ units. In case supply is made to SEZ units, then supplies have to be effected against Bill of Exports as per Rule 30 of SEZ Rules.   54

Case No.:38/26/80‐ALC2/2012

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 30.04.2013 Approved HQ File :01/80/050/00599/AM13/ RLA File :04/24/040/00216/AM13/ Lic.No/Date:0410142973 30.01.2013 Decision : Based on DHI wriោ�en comments dated 30.4.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: EP weight 1672 MT per Steam generator to be included. Item 1 with 3% and item 2 with 2% wastage respec៝�vely. Quan៝�ty as applied for. Remaining items on net to net basis, as per their leោ�er dated 20.3.2013 (copy enclosed).   55

Case No.:6/26/80‐ALC2/2012

Party Name:BIO ‐ TECH VISION CARE PVT.LTD 30.04.2013 Status: Deferred HQ File :01/80/050/00567/AM13/ RLA File :08/24/040/00375/AM13/ Lic.No/Date:0810118061 04.02.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on of C&PC and decided to await comments.   56

Case No.:33/26/80‐ALC2/2012

Party Name:BOTIL OIL TOOLS INDIA PVT LTD(FORMERLY BAKER OIL 30.04.2013 Rejected HQ File :01/80/050/00594/AM13/ RLA File :05/23/040/00428/AM13/ Lic.No/Date:0510345058 06.02.2013 Decision : The Commiោ�ee considered the reply received from firm vide leោ�er dated 24.4.2013. The Norms Commiោ�ee earlier considered firm’s other similar cases in consulta៝�on with Policy Sec៝�on‐VI about firm’s eligibility for Advance Authoriza៝�on for supply of goods to petroleum explora៝�on fields as per provision of para 8.2(f) and 8.4.4(iii) of FTP. The Policy Sec៝�on‐VI has informed that in this case, the supplier is neither main contractor nor a sub‐contractor, and cer៝�fica៝�on from the Directorate General of Hydro Carbon in the Ministry of Petroleum has not been obtained,  they are not eligible for deemed export benefit. Accordingly, the Commiោ�ee decided to advise RA to immediately re‐examine the issuance of all Advance Authoriza៝�ons to the firm including past cases and take further necessary ac៝�on immediately. RA may take necessary ac៝�on accordingly.  

Case No.:5/26/80‐ALC2/2012

Party Name:DEE DEVELOPMENT ENGINEERS LTD. Status:

57 30.04.2013 Deferred HQ File :01/80/050/00566/AM13/ RLA File :05/23/040/00453/AM13/ Lic.No/Date:0510345480 11.02.2013 Decision : The Commiោ�ee observed that a number of cases of the firm are pending before the NC for want of clarifica៝�ons from firm as to whether their exports are Physical exports or Deemed exports and also in some of the cases the supplies are to be made against Invalida៝�on Leោ�er of EPCG licences. The Commiោ�ee, therefore, decided to request the firm to aោ�end for personal hearing before the Commiោ�ee at 2.30 p.m. on 11.6.2013 to clarify the status of these cases.   58

Case No.:21/26/80‐ALC2/2012

Party Name:TEXMACO UGL RAIL PRIVATE LIMITED. 30.04.2013 Status: Deferred HQ File :01/80/050/00582/AM13/ RLA File :02/24/040/00174/AM13/ Lic.No/Date:0210186293 11.02.2013 Decision :  Based on DHI recommenda៝�on, the Commiោ�ee decided to seek informa៝�on as per sr. No. 4,5, 11 of Standard Deficiency Format.   59

Case No.:9/26/80‐ALC2/2012

Party Name:KAMAL RUBPLAST INDUSTRIES (P) LTD. 30.04.2013 Status: Deferred HQ File :01/80/050/00570/AM13/ RLA File :05/23/040/00460/AM13/ Lic.No/Date:0510345892 13.02.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on of DIPP and decided to await comments.   60

Case No.:1/26/80‐ALC2/2012

Party Name:NETAFIM IRRIGATION INDIA PVT.LTD. 30.04.2013 Status: Deferred HQ File :01/80/050/00562/AM13/ RLA File :34/24/040/00249/AM13/ Lic.No/Date:3410036266 26.02.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on of C&PC and decided to await comments.   61

Case No.:2/26/80‐ALC2/2012

Party Name:POLY MEDICURE LTD. 30.04.2013 Status: Deferred HQ File :01/80/050/00563/AM13/ RLA File :05/24/040/00442/AM13/ Lic.No/Date:0510347757 28.02.2013 Decision : The Commiោ�ee noted that the case is under examina៝�on of C&PC and decided to await comments.   62

Case No.:3/26/80‐ALC2/2012

Party Name:M M AQUA TECHNOLOGIES LTD. 30.04.2013 Status: Deferred HQ File :01/80/050/00564/AM13/ RLA File :05/24/040/00290/AM12/ Lic.No/Date:0510347794 28.02.2013 Decision : The Commiោ�ee noted that firm has not replied to deficiency leោ�er and decided to remind them for expedi៝�ng their reply.   S.No.52

Case No.  A/R‐57

M/s.  ISGEC  Heavy Engineering  Ltd., Yamunanagar HQF.No.01/80/050/00410/AM12/DES.I Lic. No. & date Mee៝�ng  No. 03/14 RA.F.No.05/23/040/00296/AM12 0510308687 dt.21.11.2011 Date: 30.04.2013 Revision  of norms The Commiោ�ee noted that the case is under examina៝�on of DIPP and decided to await comments. Case deferred to 11.06.2013.   S.No.53

Case No.  A/R‐70

M/s.  Zenith Precision  Pvt. Ltd., Bangalore HQF.No.01/80/050/00375/AM11/DES.I Lic. No. & date Mee៝�ng  No. 03/14 RA.F.No.07/24/040/00207/AM11 (i)              0710073874 dt.27.08.2010 (ii)          0710072313 dt.07.06.2010 (iii)        0710070294 dt.17.03.2010 (iv)        0710075610 dt.24.11.2010 Date: 30.04.2013 Ra៝�fica៝�on of norms The Commiោ�ee noted that firm has not replied to deficiency leោ�er and decided to remind them for expedi៝�ng their reply. Case deferred to 11.06.2013.   Sl.No.54

Case No.  A/R‐73

M/s.  CIM  Tools Pvt.  Ltd., Bangalore HQF.No.01/80/050/01808/AM09/DES.I Mee៝�ng No. 03/14 RA.F.No.07/24/040/00601/AM09 Date: 30.04.2013 Fixa៝�on  of  norms  in  respect  of  Advance  Authoriza៝�ons  No.(1) 0710045512  dt.16.06.2006  (2)    0710048538  dt.21.11.2006  (3) 0710049073  dt.20.12.2006  (4)  0710056594  dt.26.03.2008  (5) 0710057420  dt.14.05.2008  (6)    0710057706  dt.  04.06.2008  (7) 0710058177  dt.27.06.2008  (8)  0710061857  dt.22.12.2008  (9) 0710062744  dt.04.02.2009  (10)  0710063214  dt.24.02.2009  (11) 0710063217  dt.24.02.2009  (12)  0710063398  dt.03.03.2009  (13) 0710064050  dt.06.04.2009  (14)  0710064254  dt.20.04.2009  (15) 0710065367 dt.12.06.2009 and (16) 0710065368 dt.12.06.2009 ‐ reg. Firm’s representa៝�ve, Sh  Srikanth G.S., Director  appeared for the Personal Hearing. He informed that they  are manufacturing  components for Aircra៻� Structure for Boeing and Airbus. He also informed that as per requirement, they are required to source the raw materials from approved vendors only from  abroad as there are no approved vender in India and the cost of raw materials is very high. Moreover, from safety point of view, all the components are required to be made from solid piece as no forgings/cas៝�ngs or welds are permiោ�ed resul៝�ng in very high wastages. He also showed  samples of  a few components manufactured by them. Sh  Srikanth  also    stated  that  a  Sub‐Commiោ�ee  of  Norms  Commiោ�ee    had  physically  visited  their    plant  in  Bangalore  in  December,  2008  and  recommended    wastages  for  different  components manufactured by them  a៻�er taking 15 % recovery from Aluminum scrap and 5 % recovery from Ferrous scrap. According to Sh. Srikanth, recovery of 15 % taken on Aluminum scarp is very high as they are selling  aluminum scrap at about Rs 45/ per Kgs. which is about   1 % of  cif value on  average basis. He further  men៝�oned that  Norms Commiោ�ee is not considering the non‐recoverable part of wastage during the manufacturing opera៝�ons as  a lot of material is lost during machining  due to burning and flushing along with coolants. He, therefore, requested that recovery scrap may be reduced. Applicant said that  he is ready to submit documentary evidence cer៝�fied by their  excise authori៝�es in support of their claim of recovery of  1 % for scrap.��

Firm was advised to submit basis of the consump៝�on norms, separately for each advance Authorisa៝�on supported by the details/size/weight of the components and raw material blank size/weight for the same, recoverable and non‐recoverable scrap etc. Applicant agreed to submit the same in two week ៝�me. A៻�er the hearing, Commiោ�ee deliberated the issue and decided to maintain the recovery of 15 % from Aluminium scrap as recommended by the Sub‐commiោ�ee. However, it was decided that norms may be fixed a៻�er taking recovery only from the recoverable part of scrap and not on non‐recoverable wastage. Commiោ�ee, advised the representa៝�ve to work out the norms accordingly on receipt of informa៝�on from the applicant. Case deferred to 11.06.2013.   Sl.No.55

Case No.  A/R‐80

M/s.  Boysen  India Limited Noida HQF.No.01/80/050/00533/AM11/DES.I Lic. No. & date Mee៝�ng  No. 03/14 RA.F.No.05/23/040/00204/AM12 0510275831 dt.27.10.2010 Date: 30.04.2013 Revision of norms The Commiោ�ee noted that the case is under examina៝�on of MSME and decided to await comments. Case deferred to 11.06.2013.   Sl.No.56 Case  No.  A/R‐81 M/s. Boysen India Limited Noida HQF.No.01/80/050/00278/AM12/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.05/23/040/00186/AM12 0510299447                                                                                                                                                                                                                                                                                                                                                                                                       dt.11.08.2011 Date: 30.04.2013 Revision of norms The Commiោ�ee decided to revise norms of subject authoriza៝�on as per MSME UO note No. 30(247)/11‐ME dated 4.4.2013 (copy to be forwarded to firm and RA). RLA may take necessary ac៝�on accordingly.   Sl.No.57

Case No.  A/R‐82

M/s.  Boysen  India Limited Noida HQF.No.01/80/050/00035/AM12/DES.I Lic. No. & date Mee៝�ng  No. 03/14 RA.F.No.05/23/040/00037/AM12 0510288928 dt.27.04.2011 Date: 30.04.2013 Revision of norms The Commiោ�ee noted that a reply against deficiency leោ�er is awaited from firm and decided to remind them for expedi៝�ng their reply. Case deferred to 11.06.2013.     Sl.No.58

Case No.  A/R‐117

M/s.  Motherson Sumi  Systems Ltd., New Delhi HQF.No.01/80/050/00171/AM11/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.05/24/040/00072/AM11 0510265356 dt.02.06.2010 Date: 30.04.2013 Request for revision of norms The Commiោ�ee noted that the case is under examina៝�on of C&PC and decided to await comments. Case deferred to 11.06.2013.   Sl.No.59

Case No.  A/R‐122

M/s.  ISGEC  Heavy Engineering  Ltd., Noida HQF.No.01/80/050/00551/AM12/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.05/23/040/00426/AM12 0510316755 dt.07.02.2012 Date: 30.04.2013 Revision of import item No.4 & %   of norms Based on DHI wriោ�en comments dated 30.4.2013, the Commiោ�ee decided to revise norms of subject authoriza៝�on as under: Item No.4 & 5 – 6 MT each (Total quan៝�ty).   Sl.No.60

Case No.  A/R‐123

M/s.  Thermax Ltd., HQF.No.01/81/050/01034/AM09/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.31/24/040/00296/AM09 3110035317 dt.09.09.2008 Date: 30.04.2013 Revision of norms The Commiោ�ee decided to revise norms of subject authoriza៝�on as per DHI UO No.3(14)/10‐TSW(B) dated 15.2.2013 (copy to be forwarded to firm and RA). The wastage norms are for regulariza៝�on purpose only. In case of expired licence, no fresh import to be permiោ�ed. RLA may take necessary ac៝�on accordingly.   Sl.No.61

Case No.  A/R‐124

M/s.  R.D. Engineers (India) Pvt. Ltd., HQF.No.01/80/050/00057/AM12/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.03/95/040/00004/AM12 1.              0310584240 dt.20.07.2010 2.              0310596998 dt.14.10.2011 3.              0310634076 dt.01.06.2011 4.              0310592767 dt.16.09.2010 5.              0310625116 dt.05.04.2011 Date: 30.04.2013 Revision of norms The Commiោ�ee noted that the case is under examina៝�on of DIPP and decided to await comments. Case deferred to 11.06.2013.   S.No.62

Case No.  A/R‐150

M/s.  Automat Irriga៝�on  Pvt.  Ltd., Delhi HQF.No.01/80/050/00137/AM13/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.05/23/040/00014/AM13 0510322527 dt.19.04.2012 Date: 30.04.2013 Fixa៝�on  of norms Based on DIPP wriោ�en comments dated 16.4.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1.  Net weights of 18300 Kgs., 24480 Kgs., 0.23 Kgs., 0.85 Kgs., 1.85 Kgs., 3.65 Kgs., 3.75  Kgs., 4.3 Kgs. & 0.49 Kgs. may be specified with the quan៝�៝�es of  export products from Sl. No 1 to 9 respec៝�vely. 2.  Quan៝�ty of import item at Sl. No. 1 may be allowed as  applied for i.e. 23631 Kgs. inclusive of     2 % wastage. 3.  Quan៝�ty of import item at Sl. No. 2 may be allowed as 2056000 Nos. on net to net basis with accountability clause. 4.  Quan៝�៝�es of import item at Sl. No. 3 & 4  may be allowed as applied for i.e. 0.58 Sq. Mtrs. & 0.6 Sq. Mtrs. respec៝�vely  inclusive of   2 % wastage. 5.  Quan៝�ty of import item at Sl. No. 5 may be allowed as applied for i.e. 507.56 Kgs. inclusive of   2 % wastage.   S.No.63

Case No.  A/R‐151

M/s.  Automat Irriga៝�on  Pvt.  Ltd., Delhi HQF.No.01/80/050/00095/AM13/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.05/23/040/00021/AM13 0510323233 dt.26.04.2012 Date: 30.04.2013 Fixa៝�on  of norms Based on DIPP wriោ�en comments dated 16.4.2013, the Commiោ�ee decided to ra៝�fy norms of subject authoriza៝�on as under: 1.  Net weights of 5280 Kgs., 6280 Kgs., 1540 Kgs., 12200 Kgs., 30600 Kgs., 6700 Kgs., 8270  Kgs. & 9430 Kgs. may be specified with the quan៝�៝�es of  export products from Sl. No 1 to 8 respec៝�vely. 2.  Quan៝�ty of import item at Sl. No. 1 may be allowed as  applied for i.e. 37686.45 Kgs. inclusive of     2 % wastage. 3. Quan៝�ty of import item at Sl. No. 2 may be allowed as applied for i.e. 11291.4 Kgs. inclusive of   2 % wastage 4.  Quan៝�ty of import item at Sl. No. 3 may be allowed on net to net basis with accountability clause.

5.  Word “Relevant” may be prefixed with the descrip៝�on of import item at Sl. No. 4 and its quan៝�ty may be allowed as applied for i.e. 8780.16 Kgs.  inclusive of   2 % wastage.   S.No.64

Case No.  A/R‐13

M/s. Boysen  India Ltd.,  Greater Noida HQF.No.01/80/050/00782/AM11/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.05/23/040/00316/AM11 0510282994 dt.03.02.2011 Date: 30.04.2013 Request for amendment  of norms Shri Suresh Bhagat, CFO & Company Secretary of the firm aោ�ended personal hearing. He explained that the license was obtained in for quan៝�៝�es in Kgs but norms were ra៝�fied for the quan៝�ty in number and weight. Since the export have already completed, it is not possible now to incorporate quan៝�៝�es by numbers in license as per ra៝�fied norms. The Commiោ�ee discussed this maោ�er and representa៝�ve of administra៝�ve ministry pointed out that weight of the export product has been calculated based on the number of items to be exported and for the purpose of arriving of wastage, weight to weight correla៝�on is to be indicated in the import and export item. The Commiោ�ee decided to delete the numbers from the export product. However, the Commiោ�ee advised the firm that in all their future authoriza៝�ons, they must indicate the quan៝�ty in numbers as well as in weight. RLA may take necessary ac៝�on accordingly.   S.No.65

Case No.  A/R‐14

M/s. Boysen  India Ltd.,  Greater Noida HQF.No.01/80/050/00129/AM11/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.05/23/040/00023/AM11 0510263144 dt.27.04.2010 Date: 30.04.2013 Request for amendment  of norms   Shri Suresh Bhagat, CFO & Company Secretary of the firm aោ�ended personal hearing. He explained that the license was obtained in for quan៝�៝�es in Kgs but norms were ra៝�fied for the quan៝�ty in number and weight. Since the export have already completed, it is not possible now to incorporate quan៝�៝�es by numbers in license as per ra៝�fied norms. The Commiោ�ee discussed this maោ�er and representa៝�ve of administra៝�ve ministry pointed out that weight of the export product has been calculated based on the number of items to be exported and for the purpose of arriving of wastage, weight to weight correla៝�on is to be indicated in the import and export item. The Commiោ�ee decided to delete the numbers from the export product. However, the Commiោ�ee advised the firm that in all their future authoriza៝�ons, they must indicate the quan៝�ty in numbers as well as in weight. RLA may take necessary ac៝�on accordingly.   S.No.66

Case No.  A/R‐15

M/s.  MMP Filtra៝�on  Pvt.  Ltd., Kolkata HQF.No.01/80/050/00896/AM09/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.02/24/040/00310/AM08 0210111016 dt.02.04.2008 Date: 30.04.2013 Request for revision  of norms The  Commiោ�ee  considered  firm’s  representa៝�on  dated  27.12.2012  and  decided  to  delete  the  word  “Made  of  Polypropelene”  a៻�er  the  name  of  export  product.   The wastage norms are for regulariza៝�on purpose only. In case of expired licence, no fresh import to be permiោ�ed. RLA may take necessary ac៝�on accordingly.   S.No.67

Case No.  A/R‐16

M/s.  Clyde Bergemann  India Pvt. Ltd., Noida HQF.No.01/80/050/00295/AM13/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.05/23/040/00184/AM13 0510332726 dt.28.08.2012 Date: 30.04.2013 Request for revision  of norms Based on DHI wriោ�en comments dated 30.4.2013, the Commiោ�ee decided to revise norms of subject authoriza៝�on as under: Item 9 – 1.02 kg/kg content with accountability clause.   S.No.68

Case No.  A/R‐17

M/s.  IDMC Limited,  Udyog Nagar HQF.No.01/80/050/00723/AM06/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.34/24/040/00124/AM06 3410014306 dt.07.09.2005 Date: 30.04.2013 Request for amendment / revision  of norms The Commiោ�ee noted that the case is under examina៝�on of DIPP and decided to await comments. Case deferred to 11.06.2013.   S.No.69

Case No.  A/R‐18

M/s.  IDMC Limited,  Udyog Nagar HQF.No.01/80/050/00477/AM10/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.34/24/040/00104/AM10 3410025225 dt.30.09.2009 Date: 30.04.2013 Fixa៝�on  of norms The Commiោ�ee decided to forward copy of applica៝�on to DIPP for examina៝�on and comments. Case deferred to 11.06.2013.   S.No.70

Case No.  A/R‐19

M/s.  J  Pan  Tubular Components  Pvt. Ltd., New Delhi HQF.No.01/80/050/00407/AM12/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.05/23/040/00300/AM12 0510307950 dt.15.11.2011 Date: 30.04.2013 Fixa៝�on  of norms The Commiោ�ee decided to forward copy of applica៝�on to DIPP for examina៝�on and comments. Case deferred to 11.06.2013.   S.No.71

Case No.  A/R‐20

M/s.  J  Pan  Tubular Components  Pvt. Ltd., New Delhi HQF.No.01/80/050/00248/AM12/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.05/23/040/00167/AM12 0510298976 dt.08.08.2011 Date: 30.04.2013 Fixa៝�on  of norms The Commiោ�ee noted that the case is under examina៝�on of DIPP and decided to await comments. Case deferred to 11.06.2013.   S.No.72

Case No.  A/R‐21

M/s.  Atlas  Copco (India) Ltd., Pune HQF.No.01/80/050/00690/AM11/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.03/94/040/01231/AM06 0310375369 dt.10.04.2006 Date: 30.04.2013 Fixa៝�on  of norms The Commiោ�ee noted that the case is under examina៝�on of DIPP and decided to await comments. Case deferred to 11.06.2013.   S.No.73

Case No.  A/R‐22

M/s.  Toshiba  JSW Turbine  & Generator  Pvt. Ltd., Chennai HQF.No.01/80/050/00027/AM12/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.04/24/040/00299/AM11 0410122107 dt.01.03.2011 Date: 30.04.2013 Fixa៝�on  of norms The Commiោ�ee noted that the case is under examina៝�on of DHI and decided to await comments. Case deferred to 11.06.2013.   S.No.74

Case No.  A/R‐23

M/s.  ISGEC  Heavy Engineering  Ltd., Noida HQF.No.01/80/050/00544/AM12/DES.I Lic. No. & date Mee៝�ng No. 03/14 RA.F.No.05/23/040/00407/AM12 0510315464 dt.24.01.2012 Date: 30.04.2013 Revision  of norms Based on DIPP wriោ�en comments dated 16.4.2013, the Commiោ�ee decided to revise norms of subject authoriza៝�on as under: 1.       Words “size 19.05 MM OD x2.22 mm Thk” may be prefixed with the descrip៝�on of import item at Sl. No. 1. 2.       Quan៝�ty of import item at Sl. No. 1 may be allowed as 60280 Kgs on net to net basis.   Sl.No.75

Case No.  C – 35

M/s.  Poly  Medicure  Ltd., Haryana HQ F.No.01/80/162/00947/AM12/DES‐I Mee៝�ng No. 03/14 Fixa៝�on of wastage norms in respect of 100% EOU. Date: 30.04.2013 The Commiោ�ee noted that firm has not replied to deficiency leោ�er dated 27.8.2012 followed by reminder dated 18.1.2013 and final reminder dated 9.4.2013 and decided to await 15 days more to receive firm’s reply. Case deferred to 11.06.2013.

Sl.No.76 Case No.  C –03 M/s.  Eppinger Tooling  Asia  Pvt. Ltd., Coimbatore HQ F.No.01/92/180/Norms/AM12/PC‐VI/DES‐I Mee៝�ng No. 03/14 Fixa៝�on of input output norms for the export product “Precision Components Accessories  &  Equipments,  Turret  Head,    Revolving Tool Holders and VDI Tool Holders” in respect of 100% EOU – reg. Date: 30.04.2013 The Commiោ�ee noted that copy of applica៝�on along with firm’s reply has been forwarded to MSME for examina៝�on and comments. Case deferred to 11.06.2013.   Sl.No.77 Mee៝�ng No. 03/14 M/s.  Alpha Technologies  Pvt.  Ltd., Bangalore HQ F.No.01/80/162/00016/AM13/DES‐I Date: 30.04.2013 Fixa៝�on of input output norms for the export product “Row & Heat Exchanger and Des Kit, Pre‐processor PCB Assembly, Main  Processor  PCB  Assembly,  Power  Supply  Unit  PCB Assembly etc.” in respect of 100% EOU – reg. Mee៝�ng No. 03/14 The Commiោ�ee noted that the case is under examina៝�on of MSME and decided to await comments. Case deferred to 11.06.2013.   Sl.No.78

Case No.  C – 08

M/s.  Gilbarco  Veeder  – Root  India  Pvt.  Ltd., Coimbatore HQ F.No.01/80/162/00284/AM13/DES‐I Mee៝�ng No. 03/14 Fixa៝�on of  input  output  norms  for  the  export  product “Meters  and  Pumping  Units(GPUs)” in  respect  of  100% EOU – reg. Date: 30.04.2013 The Commiោ�ee noted that the case is under examina៝�on of MSME and decided to await comments. Case deferred to 11.06.2013.   Sl.No.79 Case  No.  C – 10 M/s.  Lucas                                                                                            TVS Ltd., Chennai HQ F.No.01/80/162/00379/AM10/DES‐I Mee៝�ng No. 03/14 Fixa៝�on of input output wastage norms for  the  export  product  “Starters, Alterator,  Wiper  Motor  and Compressor”” in respect of 100% EOU – reg. Date: 30.04.2013 The  Commiោ�ee  decided  to  fix  input  output  wastage  norms  as  per  MSME  UO  note  No.  30(271)/12‐ME  dated  15.4.2013  (copy  to  be  forwarded  to  firm  and  RA).  RLA  may  take  necessary  ac៝�on accordingly.   Sl.No.80

Case No.  C –20

M/s. Getrag  Hi‐Tech  Gears Pvt. Ltd., Bhiwani HQ F.No.01/92/180/Norms/AM12/DES‐I Mee៝�ng No. 03/14 Fixa៝�on of input output wastage ad‐hoc norms for the export product “Timing Gears” in respect of LOP NO.03‐ 129/99‐100% EOU – reg. Date: 30.04.2013 Shri Swapan Banerjee, Dyp. GM‐Engg & Dev of the firm aោ�ended personal hearing and explained the manufacturing processes involved in their export product. The representa៝�ve of MSME has desired that the firm may make a wriោ�en submission giving individual product details, calcula៝�on giving size and specifica៝�on of each gear along with relevant drawings. The firm has agreed to submit these details within 15 days. Case deferred to 11.06.2013.   REPRESENTATION  CASES FOR REVISON / AMENDMENTS OF NORMS RECEIVED  BEYOND 4 MONTHS   S.No.81

Case No.  A/R‐41

M/s.  GEA  BGR Energy System India Ltd., Chennai HQF.No.01/80/050/00438/AM10/DES.I Lic. No. & date Mee៝�ng  No. 03/14 RA.F.No.04/24/040/00158/AM10 0410108279 dt.08.10.2009 Date: 30.04.2013 Amendment  of norms The Commiោ�ee noted that norms in this case has already been fixed. Your representa៝�on for revision of norms  has been examined by the administra៝�ve department (DHI) who have indicated that wastage norms given earlier were appropriate and do not require any further revision. Accordingly, the Commiោ�ee decided that it is not possible to consider your request for revision of norms and the norms given earlier are reaffirmed. RLA may take necessary ac៝�on accordingly.   S.No.82

Case No.  A/R‐43

M/s.  GEA  BGR Energy System India Ltd., Chennai HQF.No.01/80/050/01095/AM08/DES.I Lic. No. & date Mee៝�ng  No. 03/14 RA.F.No.04/24/040/00364/AM08 0410093855 dt.13.02.2008 Date: 30.04.2013 Ra៝�fica៝�on  of norms The Commiោ�ee noted that norms in this case has already been fixed. Your representa៝�on for revision of norms  has been examined by the administra៝�ve department (DHI) who have indicated that wastage norms given earlier were appropriate and do not require any further revision. Accordingly, the Commiោ�ee decided that it is not possible to consider your request for revision of norms and the norms given earlier are reaffirmed. RLA may take necessary ac៝�on accordingly.   S.No.83

Case No.  A/R‐45

M/s.  GEA  BGR Energy System India Ltd., Chennai HQF.No.01/80/050/00439/AM10/DES.I Lic. No. & date Mee៝�ng  No. 03/14 RA.F.No.04/24/040/00159/AM10 0410108280 dt.08.10.2009 Date: 30.04.2013 Amendment  of norms The Commiោ�ee noted that norms in this case has already been fixed. Your representa៝�on for revision of norms  has been examined by the administra៝�ve department (DHI) who have indicated that wastage norms given earlier were appropriate and do not require any further revision. Accordingly, the Commiោ�ee decided that it is not possible to consider your request for revision of norms and the norms given earlier are reaffirmed. RLA may take necessary ac៝�on accordingly.   S.No.84

Case No.  A/R‐49

M/s.  Larsen  & Toubro  Ltd., Mumbai  HQF.No.01/80/050/00245/AM11/DES.I Lic. No. & date Mee៝�ng  No. 03/14 RA.F.No.03/95/040/00712/AM10 0310557677 dt.29.01.2010 Date: 30.04.2013 Amendment  in  quan៝�៝�es  /  addi៝�on  of addi៝�onal import items The Commiោ�ee noted that wriោ�en comments has been received from DIPP. While considering the case, the Commiោ�ee observed that this is a case of Deemed Exports and firm is making supplies to M/s. ONGC.  Therefore, the Commiោ�ee decided to ask the firm to provide a copy of PAC and also to produce a cer៝�ficate from the Directorate General of Hydro Carbon in the Ministry of Petroleum & Natural Gas sta៝�ng that goods being supplied are required for petroleum gases, in terms of condi៝�on No.41, Sr.No.356 of Custom No៝�fica៝�on No.12 dated 17.3.2012.   Case deferred to 11.06.2013.   S.No.85

Case No.  A/R‐61

M/s. United  Drilling Tools Ltd., Delhi HQF.No.01/80/050/00397/AM10/DES.I Lic. No. & date Mee៝�ng  No. 03/14 RA.F.No.05/24/040/00318/AM10 0510249707 dt.22.09.2009 Date: 30.04.2013 Revision of norms The Commiោ�ee noted that the case is under examina៝�on of DHI. However, the Commiោ�ee observed that this is a case of Deemed Exports and supplies are meant for M/s. ONGC.  The Commiោ�ee decided to ask the firm to provide a copy of PAC and also to produce a cer៝�ficate from the Directorate General of Hydro Carbon in the Ministry of Petroleum & Natural Gas sta៝�ng that goods being supplied are required for petroleum gases, in terms of condi៝�on No.41, Sr.No.356 of Custom No៝�fica៝�on No.12 dated 17.3.2012.   Case deferred to 11.06.2013.   S.No.86

Case No.  A/R‐24

M/s.  ISGEC  Heavy Engineering  Ltd., HQF.No.01/80/050/00016/AM12/DES.I Lic. No. & date

Noida Mee៝�ng  No. 03/14 RA.F.No.05/23/040/00456/AM12 0510318045 dt.16.02.2012 Date: 30.04.2013 Revision of Norms     The Commiោ�ee noted that the case is under examina៝�on of DIPP and decided to await comments. Case deferred to 11.06.2013.  


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied